Loading...
HomeMy WebLinkAboutPreliminary (Binder Notes) Capital Improvements Program FY07-08Texas Star Renovation Kitchen at Grille Needs Fryers 4 compartment gas with builtin filtration system Frymaster 60lbs. w/filter #300-069 1 $91500.00 $9,500,00 - - $9,500,00 2 compartment gas with builtin filtration system Frymaster 60 lbs. #MJ45EBLC-SD 2 $4,100,00 $8,200,00 - - . $8,200.00 Steamer 6 shelf, 2 door steamer w/base Vulcan #C24GA6 2 $9,979000 $19,958.001 - - $19,958.00 Stove/Range/Cooktops/Ovens 6 burner gas stove top with built in oven Vlucan 36" #VULK-2500 1 $1,545,00 $1,545,00 - - $1,545,00 4 burner gas stove top with built in oven Vulcan 36" #VULK-1500 1 $1,510000 $1,510,00 - - $1,510.00 36" flat top griddle Star Ultra Max w/Thermostat & safety pilot #STAC-5636 1 $1,725,00 $1,725,00 - - $1,725000 48" flat top griddle Star Ultra Max w/Thermostat & safety pilot #STAC-5648 1 $2,175,00 $2,175000 - - $2,175000 36" charbroiler Star HD Radient Gas #STAC-8136 1 $3,220.00 $3,220,00 - - $31220.00 4 shelf gas convection oven Duke gas #DUKK-2000 3 $21818.00 $8,454000 - - $89454000 Refrigerated Equipment Double door tall refrigeration unit True 72cuft. Bottom Compressor #TRER-1149 1 $2,370.00 $2,370.00 - - $2,370.00 Single door tall refrigeration unit True 23 cuft. Bottom Compressor #TRERA 123 1 $1,785.00 $1,785,00 - - $1,785000 2 drawer, 1 door pizza/salad prep station True 67" #TRER-6702 1 $3,805,00 $3,805.00 - - $31805.00 4 drawer pizza/salad prep station True 67" #TRER-6704 1 $4,070,00 $4,070,00 - - $4,070.00 84" 4 drawer chefs base True 82 3/8" #TRER-0086 1 $31940900 $3,940,00 - - $3,940,00 900# ice machine Manitowoc 1060 lbs. #MANIA090 1 $31415.00 $31415000 - - $31415.00 215# under counter ice machine Manitowoc 280 lbs. #MANI-0295 1 $2,005,00 $2,005.00 - - $2,005,00 Custom Fabricated Equipment Custom fabricated dish table for space around dish washing area 1 $2,800,00 $2,800000 - - $2,800000 Custom fabricated vent a hood system 1 $5,800,00 $5,800.00 - - $5,800.00 Custom fabricated refrigerated/steam table/prep area 2 $4,800000 $9,600,00 - - $9,600,00 Misc. Equipment multi purpose carts 4 $120000 $480,00 - - $480,00 mobile ppan racks 2 $320.00 $640,00 - - $640,00 metro selving 74"x48"x24" Nexel #SRVL-5160 4 $250,00 $1,000.00 - - $1,000000 glass racks 8 $40,00 $320,00 - - $320000 dish racks 8 $28,00 $224,00 - - $224,00 rack dollies 2 $115,00 $230,00 - - $230000 ice caddy 1 $560,00 $560,00 - - $560000 door style dish machines 2 $%500.00 $19,000,00 - - $19,000000 booster heaters for dish machines 2 $3,200,00 $6,400,00 - - $67400,00 mobile proofing/holding cabinets 2 $1,960000 $3,920,00 - - $3,920600 mobile ingredient bins 4 $190,00 $760,00 - - $760,00 new table bases 25 $35,00 $875000 - - $875,00 New tabletops various sizes 25 $155,00 $3,875000 - - $3,875000 New dining room chairs 100 $95,00 $9,500,00 - - $9,500,00 New dining room barstools 6 $95.00 $570,00 - - $570,00 300 new set silverware $5,700,00 $5,700,00 0 $0.00 $0,00 5 dozen set of new plates/dishes $2,000,00 $2,000000 - - $600000 3 portable dish caddies 3 $470000 $1,410,00 - - $1,410.00 Assorted steamtable pans $500,00 $500,00 - - $500,00 Assorted food storage containers $500,00 $500,00 - - $500,00 Assorted pots and pans $2,000.00 $2,000000 - - $2,000,00 Conference Centre Renovation Audio to accommodate the area PA System with miss, and floor ports 1 $1,100000 $1,100,001 - - $1,100000 Flat screen TV for two breakout rooms and treaty room 48" 2 $1,700,00 $3,400,00 - - $3,400,00 60" 1 $2,800,00 $21800.00 - - $2,800.00 Three drop screens for projection Included in bid Projectors for three areas 3 $3,800,00 $11,400,001 - - $11,400,00 Chairs Upholstered lite tables, green tops 72" rounds 25 $175.00 $4,375,00 - - $4,375.00 Upholstered seats, armless, stackable 100 $90,00 $9,000,00 - - $92000,00 Chair dollies 5 $350,00 $17750.00 - - $1,750,00 Tables Aluminum lite tables, green tops 72" rounds 25 $175,00 $49375,00 25 $479,00 $11,975.00 Aluminum lite tables, green tops 6" rectangular 45 $225,00 $10,125,00 45 $255.00 $11,475,00 Aluminum lite tables, green tops 60" rounds 16 $225.00 $3,600000 16 $339.00 $5,424.00 Serpentine tables 3sections Cocktail tables 24" rounds, 42" high Catering Supplies Flatware setting Serving Chafers Place settings 300 Above Glassware Goblets Flutes Assorted Barware Hood and vent system in catering kitchen portable indoor bars ice caddy glass racks plate dolly shelving Lobby Furniture Sofa Chairs Coffee Table Lamps, etc/ estimated Office Furniture executive office set mid management set secretary set misc. chairs & files Patio Furniture misc, estimated Software caterease room reservation included in bid $5000 eating. $5800 room included 18 $325.00 $5,850.00I - - $5,850.00 16 $425,00 $6,800,00 16 $100.00 $1,600.00 200 $31733.00 $37733,00 - - $3,733.00 18 $4,900.00 $4,900.00 - - $4,900.00 500 $1,483.75 $1,483.75 - - $11483.75 250 $287,84 $287,84 - - $287,84 400 $1,100,00 $1,100,00 - - $1,100,00 2 $27000.00 $41000.00 1 $21000.00 $21000.00 2 $560.00 $1,120,00 - - $1,1MOO 16 $40.00 $640,00 - - $640,00 2 $470,00 $940,00 - - $940,00 $1,500.00 $11500.00 - - $1,500,00 2 $2,200.00 $4,400.00 1 $2,200.00 $2,200.00 4 $900000 $3,600,00 4 $700.00 $21800.00 2 $850.00 $1,700,00 2 $650.00 $11300.00 $2,500.00 $2,500.00 - $1,500,00 $1,500,00 1 $5,800.00 $5,800.00 - - $5,800.00 3 $31000.00 $97000,00 2 $3,000,00 $6,000,00 2 $2,400,00 $4,800,00 1 $21400.00 $2,400,00 $4,000,00 $4,000,00 - $31000.00 $3,000,00 $4,500.00 800.00 $4,500.00 $9,800.00 $290,720.59 Difference: - $3,100.00 $3,100.00 $9,800.00 $2743994.59 $15,726.00 Loretta Getchell - Byron - Library Estimates Page 1 From: Kyle McAdams To: Getchell, Loretta; McKamie, Gary Date: 12/20/2007 11:35:15 AM Subject: Byron - Library Estimates I talked to Byron at length this morning about his construction estimate. He stated that the plans as he was instructed were for a very simple layout. Bare minimums in the office and build out areas. Minimal electrical and no data & telephone in any areas except for the small office expansions. We have obviously more added into our plans. I was not involved in the master plan discussions so I can not confirm his designs. Per our discussion this is what we have concluded: 1. The expansion in his estimate is @ 2044 sq ft. - The amount I have in my plans is @ 3900 +/-. 2. He has no dollars figured in for HVAC expansion. He has based his figures on trunking off the existing system. - I have this quoted by Siemens at @ $32k. We will need additional air handlers, VAV boxes, ducting, and water piping with overflows. 3. They show @ $14,308.00 for sprinklers and simple electrical. - I have electrical outlets for computers tied into our UPS backup system, data & telephone runs, which he does not have figured in. Plus an individual server room with dedicated circuits. This is not figured into his plans. He has based his estimate on @ $7.04 per square foot. I show @ $32,000000 4. Byron shows no millwork - I have cabinets, study carols, and work counters in my plans and quotes. I will inquire this afternoon, based on my plans were we should be on estimated construction costs. I will update as soon as I have this information. Loretta Getchell - Library- FYI Page 1 ` From: Kyle McAdams To: Getchell, Loretta Date. 12/20/2007 9:38:03 AM Subject: Library - FYI I have a meeting set with two HUB electrical vendors next Thursday. HVAC contractors have not responded. Chilled water system contractors are not as prevalent as regular HVAC companies. I have inter office copies of Ed's contract/quote with Hurst, we are on a joint purchase agreement with them, and Siemens for your information. I have also asked TJ and Mike to include copies of the original quote request returned by the vendors to be attached to all future Blanket PO renewal requests. This should help in answering your questions on pricing and how we arrived at approving the vendor. We have always included this in the original PO request but have not on the renewals. Loretta Getchell - Re: Library - Carpet Page 1 From: Kyle McAdams To: Loretta Getchell Date: 12/19/2007 4:23:13 PM Subject: Re: Library - Carpet As per your request I'll work on this ASAP. The only issue we might have is with the HVAC. We have Siemens under contract for a comprehensive maintenance program. This contract covers all items that go out including compressors at their expense. So, if another company comes in and makes additions to the system that Siemens does not approve of or causes parts of the system to fail. Then we would have to foot the bill in addition to our maintenance contract with them. Just to make you aware. I have asked TJ and Pat to set up additional vendor contacts for this week. »> Loretta Getchell 12/19/2007 4:13 PM »> Don't think we can do anything until we know what we are doing with the rest of the project. I am looking over the quotes now. I think we really should have approached other vendors for the HVAC and the electrical. Seems like their bids were kinda thrown together. I might suggest that before we go to bid the entire job that you explore more quotes from the various trades just to see where that leads us. Loretta Getchell - Library - Carpet I I I I I I I I I I 1 66 6 1 1 Page 1 From: Kyle McAdams To: Getchell, Loretta; Kate Lyon Date: 12/19/2007 4:09:05 PM Subject: Library - Carpet We'll I do have some good news this week, and trust me I needed it! The quote on the carpet came in at $92K + some change. This includes all of the main Library area, staff office, and the new additions. I budgeted $98k so we are within our figures. The carpet is on TXMAS pricing. If you approve, this can go to council at the first meeting in January. CC: Donoghue III, TJ Loretta Getchell - Library Page 1 From: Kyle McAdams To: Getchell, Loretta Date: 12/19/2007 8:48:32 AM Subject: Library I will bring you copies today. I have meetings with vendors to go over solutions for the sliding doors at the Library from 9:15 till 11 am. I have had one contractor, Avondale Const pull his bid. He was too busy this time of year. The carpet; The vendor has told us it is a 4-6 week lead time for manufacturing and delivery. The supplier/mill is on TXMAS pricing, we believe. TJ is verifying this. So we can save time utilizing this. If not then we can bid in the first half of January, open late in the month, and go to council the first part of February. We would be looking at a March/April install time. The kitchen appliance; We are in the process of getting our pricing/quotes. Most of these will be local and in stock. Conference room wallpaper; Quotes are in the works. Same type, fabric backed, similar pattern. Facility staff have the back shelled area cleaned and all items either moved or stored. TARRANT COUNTY COMMISSIONERS COURT G. K. MAENIUS COUNTY ADMINISTRATOR July 9, 2007 City of Euless Mr. Joe Hennig, City Manager 201 N. Ector Dr. Euless, Texas 76039 On May 29, 2007, the Tarrant County Commissioners Court agreed to accept additional projects in the County's Transportation Bond Program. Through the efforts of staff, funding has been identified within the program that will allow for the inclusion of these additional projects. However, given the financial constraints of funding both transportation and facilities projects, along with the Court's desire to not raise the property ta�X to pay for program implementation, funding for these projects will be disbursed at a time deemed feasible by the County. The following City of Euless project has been selected for inclusion in the program: Ash Lane —Aransas to Main —widen arterial from 2 to 4 lanes In order to ensure that our records are accurate, please provide our Transportation Services Department with an updated project schedule, including start and end dates for the design, right-of-way acquisition, utility adjustment and construction phases. As this project nears implementation, County staff will forward an Interlocal Agreement for your signature. We are pleased that additional projects can be advanced through this program. If you have any questions, please contact Randy Skinner, Program Manager, at 817-884-1653 or by email at rvskinner@tarrantcounty.com. incerely, 6M G.K. Maenius Cc: Tarrant County Commissioners Court Mayor Mary Lib Saleh, City of Euless TARRANT COUNTY ADMINISTRATION BUILDING 100 E. WEATHERFORD, FORT WORTH, TEXAS 817/884.1733 FAX 817/884-1702 - h Q- O— _ O O 10 • ' I IL I �1\ ImmowI W&L --PEBK-----r---- QLAM y - IApD WALL 000liq To i 1 ( j, I I I I I' I I ! I c i 6ED HI6tOJ4YA1�y4 o� roclerlrui (I. HH i r4 ` GENEALOGY n' 1p ti'{, i�' O'I•ol-6D2 DALE, 1°lv®®R PLAN PU�LIG 1�I�RAR�' I KrCnln NEW 1 REMODELED 6PACE