HomeMy WebLinkAboutPreliminary (Binder Notes) Capital Improvements Program FY11-12City of Euless Estimate
Conflicts: 360, 361, 362, 363
Eligibility Ratio: 81.06%
Total Construction Costs 1 $2,150,651.25
Bluebonnet Contractor's Indirect Costs 1 $148,401.54
City of Euless' Indirect Costs 1 $102,826.05
Total Cost for Relocations 1 $2,401,878.84
Estimate Share for BBC 1 $2,148,181.19
Estimated Share for City of Euless (Including easement reimbursement) 1 $253,697.65
Eligibility Ratio
Total Footage for Relocation 7696
Total Footage in ROW 2915
Total Footage in Easement 4781
100% * (4322 / 7696) = 62.12%
50% * (3374 / 7696) = 18.94%
81.06%
Indirect Costs for Bluebonnet Contractors, LLC
Description I Quantity I Unit I Unit Price I Total
Design Fees
1
LS
$59,882.00
$59,882.00
Plan Review
100
HRS
$80.00
$8,000.00
Inspection of Work
120
HRS
$100.00
$12,000.00
Assembly Preparation
40
HRS
$100.00
$4,000.00
BBC Overhead
1
LS
$64,519.54
$64,519.54
Total 1 $148,401.54
Property Reimbursement to the City of Euless
(Easement Reimbursement 1 335301 SF 1 $6.001 $201,180.001
$201,180.00
Indirect Costs for the City of Euless
Description Quantity Unit Unit Price Total
Plan Review
60
HRS
80
$4,800.00
Inspection of Work
120
HRS
100
$12,000.00
City of Euless Overhead
1
LS
$86,026.05
$86,026.05
Total 1 $102,826.05
Ron Young
From: Ron Young
Sent: Monday, August 01, 2011 10:33 AM
To: Gary McKamie
Subject: RE: Rio Grande Blvd
The project start date was February 10, 2011, with a contract length of 150 days.
The original completion date was July 9, 2011.
After construction began, it was discovered that the original water main installation by the Rubloff contractor was not as
shown on the construction plans. Two locations required water line lowering and an 8" water line needed to be
extended and an 8" x 8" tapping sleeve and valve added. This added 20 days to the time.
Correction of a low point in the existing Heritage paving required installation of an inlet and pipe. We had McMahon
perform this work and it added 10 days to the time.
Off site street light relocations (remove existing bases, install new bases, boring and new conduit) and requested hydra
storz installation account for 4 additional days to the time.
The additional time pushes the completion date to August 12, 2011, however, McMahon projects a substantial
completion of their pay items on August 5, 2011. In regard to this, it should be noted that Oncor or Oncor's contractor is
pulling the electric lines through the conduit installed by McMahon. Oncor will not remove the existing wood poles
along the frontage road until the new electric line is energized. McMahon has some small amount of paving to complete
at two of the pole locations.
The liquidated damages on this project are $500 per day.
From: Gary McKamie
Sent: Wednesday, July 27, 2011 1:07 PM
To: Ron Young
Subject: Rio Grande Blvd
Ron:
Please provide a detailed update on the status of this project. What was the original contractual completion date? What
is the current contractual completion date, including rain days? What is the actual projected completion date? What is
the delay? There does not appear to be any utility work occurring. What is the daily LID and when do they commence?
CAPITAL IMPROVEMENTS PROGRAM
FUNDED PROJECTS SUMMARY
Project
Number
Project Description
Budget as of
5/31/11
Appropriation/
Amendment
Budget as of
2/29/12
Expended as
of 2/29112
Remaining
Funds
Revised
Project Cost
Estimates
Unfunded/
(Excess
Funding)
DRAINAGE PROJECTS
DR9903
Misc Drainage Improvements min bal $150,000
$
362,833
$
$
362,833
$
121,175
$
241,658
$ 362,833
$
DR1101
Flooding Mitigation
$
500,000
$
$
500,000
$
23,381
$
476,619
$ 500,000
$
DR1201
Miscellaneous Creek Maintenance
$
-
$
50,000
$
50,000
$
1,928
$
48,072
$ 50,000
FB9902
Fund Balance - Drainage CIP
$
-
$
-
$
-
$
-
$
-
$ -
$ 226,964
Sub -Total Drainage Projects
$
862,833
$
50,000
$
912,833
$
146,484
$
766,349
$ 912,833
$ (226,964)
STREET PROJECTS
PS9901
North Main Street
$
6,745,047
$
-
$
6,745,047
$
6,698,149
$
46,898
$ 6,745,047
$
PS9904
Harwood Road
$
5,770,211
$
$
5,770,211
$
5,686,178
$
84,033
$ 5,770,211
$
PS0605
South Pipeline Road Bride Replacement
$
157,000
$
$
157,000
$
-
$
157,000
$ 157,000
$
PS1001
Baze Road
$
1,830,000
$
$
1,830,000
$
1,239,177
$
590,823
$ 1,830,000
$
PS1003
Ash Lane
$
2,170,000
$
$
2,170,000
$
491,129
$
1,678,871
$ 2,170,000
$
PS1101
FY2011 County Overlay -Bear Creek Drive/Lakewood
Blvd/Ash Lane
$
300,000
$
$
300,000
$
265,887
$
34,113
$ 300,000
$
PS1102 r'r
Glade Parks Improvements
$
7,300,000
$
4,802,401
$
12,102,401
$
2,409,770
$
9,692;fi31
$ 12,102,401
$
PS1201
FY2012 County Overlay-Aransas/Trojan/Slaughter
$
-
$
300,000
$
300,000
$
30,606
$
269,394
$ 300,000
$
PS1202
ADA Infrastructure Improvements
$
$
250,000
$
250,000
$
26,966
$
223,034
$ 250,000
$
PS1203
Miscellaneous Street Repair min bal $150,000
$
$
150,000
$
150,000
$
6,564
$
143,436
$ 150,000
$
$
$
$
$
$
$
$
FB9907
Fund Balance - Street CIP
$
$
$
$
$
$
$ 210,016
Sub -Total Street Projects
$ 24,272,258
$
5,502,401
$ 29,774,659
$
16,854,425
$
12,920,234
$ 29,774,659
$ 210,016
I' .tlusrafJected?
Rubloff Escrow actives `ShdWW'f6P7rl1ormat nat-purposes-
ed?
WASTEWATER PROJECTS
WW0002
Misc Wastewater Rehab min bal $100,000
$
316,086
$
25,000
$
341,086
$
236,665
$
104,421
$ 341,086
$
WW0605
TRA Wastewater Payments - Impact
$
360,000
$
60,000
$
420,000
$
360,000
$
60,000
$ 480,000
$ 60,000
WWI 001
Line Re - W Alexander Ln/Norman Dr/Franklin Dr-'
$
570,000
$
150,000
$
420,000
$
331,614
$
88,386
$ 420,000
$ -
WW1 101
Line Re - Bayless/Pauline/Jones CDBG
$
350,000
$
-
$
350,000
$
208,903
$
141,097
$ 350,000
$
WW1102
Line Re - E Huitt/Ascot/Dunawa - ra <
$
510,000
$
50,000
$
560,000
$
63,709
$
496,291
$ 560,000
$
WW1103
1 Line Re - Bayless/Pauline/Jones Outfall
$
57,000
$
-
$
57,000
$
37,544
$
19,456
$ 57,000
$
WW1201
Line Re - Blanco/Aransas/Crane
$
-
$
327,000
$
327,000
$
-
$
327,000
$ 327,000
$
WW1202
Line Re - Collin Drive 37th CDBG . Alm, virk
$
$
405,000
$
405,000
$
3,133
$
401,867
$ 405,000
$
WW1203
Line Relocation, N Tarrant Express Phase I
$
$
454,000
$
454,000
$
-
$
454,000
$ 454,000
$
FB9911
FB - Wastewater Impact Restricted
$
$
-
$.
-
$
-
$
-
$ -
$ 511,199
Sub -Total Wastewater Pro
$
2,163,086
$
1,171,000
$
3,334,086
$
1,241,569
$
2,092,517
$ 3,394,086
$ (451,199)
CAPITAL IMPROVEMENTS PROGRAM
FUNDED PROJECTS SUMMARY
Project
Number
Project Description
Budget as of
5/31/11
Appropriation/
Amendment
Budget as of
2/29/12
Expended as
of 2129112
Remaining
Funds
Revised
Project Cost
Estimates
Unfunded/
(Excess
Funding)
WATER PROJECTS
WT0001
Misc Water Rehab min bal $150,000
$
218,511
$
100,000
$
318,511
$
205,831
$
112,680
$ 358,511
$ 40,000
WT0101
Water Tank Debt Payment -impact
$
2,957,502
$
262,212
$
3,219,714
$
3,066,757
$
152,957
$ 3,479,748
$ 260,034
WT0104
Well Repairs min bal $75,000 rr/.r d c4v
$
813,594
$
95,000
$
908,594
$
834,573
$
74,021
$ 908,594
$ -
WT0202
Reclaimed Water Main
$
1,750,000
$
-
$
1,750,000
$
1,292,395
$
457,605
$ 1,750,000
$
WT0803
Transponders/Meters annual transfer$158,000
$
979,750
$
158,000
$
1,137,750
$
746,938
$
390,812
$ 1,295,750
$ 158,000
WT0901
TRA Water Payments -Impact
$
400,000
$
150,000
$
550,000
$
400,000
$
150,000
$ 550,000
$
WT1201
Reclaimed Water Line Extension
$
-
$
4,607,000
$
4,607,000
$
-
$
4,607,000
$ 4,607,000
$
WT1202
Standpipe Storage Tank & Bldg Demolition
$
$
84,640
$
84,640
$
$
84,640
$ 84,640
$
WT1203
Water & Wastewater Impact Fee Update
$
$
30,000
$
30,000
$
$
30,000
$ 30,000
$
FB9910
FB- Water Impact Restricted
$
$
-
$
$
$
-
$ -
$ 1,669,801
FB9901
FB - Water & Wastewater CIP
$
$
-
$
-
$
$
-
$ -
$ 590,704
Sub -Total Water Projects
$
7,119,357
$
5,486,852
$
12,606,209
$
6,546,495
$
6,059,714
$ 13,064,243
$ (1,802,471)
OTHER
AC1001
ITexas Star Sports Complex Lighting Improvements
$
504,200
$
-
$
504,200
$
475,246
$
28,954
$ 504,200
$
AC1201
Texas Star Sports Com lex Phase IV
$
-
$
599,470
$
599,470
$
-
$
599,470
$ 599,470
$
CM0304
Entry Monument Sin Program
$
115,782
$
-
$
115,782
$
93,027
$
22,755
$ 115,782
$
CM0804
Redevelopment
$
973,326
$
377
$
973,703
$
694,749
$
278,954
$ 973,703
$
DV9901
EDC Incentive Funds
$
400,854
$
25,000
$
425,854
$
300,853
$
125,001
$ 425,854
$
ED0101
Planning Consultants
$
204,869
$
-
$
204,869
$
104,869
$
100,000
$ 204,869
$
ED1002
EDC Contingency
$
250,000
$
-
$
250,000
$
-
$
250,000
$ 250,000
FM1201
ADA Facility Improvements
$
-
$
50,000
$
50,000
$
3,536
$
46,464
$ 50,000
$
C1201
TSGC Misc Improvements min bal $150,000?
$
-
$
150,000
$
150,000
$
26,941
$
123,059
$ 150,000
$
PD9901
Police and Courts Facility
$ 11,718,034
$
32
$
11,718,066
$
11,609,560
$
108,506
$ 11,718,066
$ -
PR0720
Misc.. Park Improvements min bal $100,000
$
225,000
$
75,000
$
300,000
$
223,884
$
76,116
$ 325,000
$ 25,000
PRO804
Park Irrigation
$
100,000
$
25,000
$
125,000
$
44,880
$
80,120
$ 125,000
$ -
PR1201
Euless FLC Indoor Aquatics Design
$
-
$
317,500
$
317,500
$
-
$
317,500
$ 317,500
$
PR1202
Euless FLC Outdoor Aquatics Design
$
$
469,000
$
469,000
$
$
469,000
$ 469,000
$
FB9906
FB-EDC CIP
$
$
-
$
-
$
$
-
$ -
$ 481,731
FB9908
FB-Texas Star Sports Complex CIP
$
$
$
$
$
$
$ 722,643
FB9909
FB-General CIP
$
$
$
$
$
$
$ 1,345,205
FB9913
FB-Car Rental CIP
$
$
$
$
$
$
$ 72,812
Sub -Total Other Projects
$ 14,492,065
$
1,711,379
$
16,203,444
$
13,577,544
$
2,625,900
$ 16,228,444
$ (2,597,391)
TOTAL FUNDED PROJECTS
$ 48,909,599
$
13,921,632
$ 62,831,231
$ 38,366,517
$ 24,464,714
$ 63,374,265
$ (5,288,041)
CAPITAL IMPROVEMENT PROGRAMS
FY13 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE
PROPOSED METHOD OF FINANCING
Project Description
Priority
Estimated Cost
Operating
Fund
CIP Fund
Balance
Bond Sale
Grants/
Contrib
Impact
Fees
Escrow
Funds
Car Rental
Tax
Other
EDC
To Be
Determined
DRAINAGE PROJECTS
Boyd Branch Improvements
—
$ 10,000,000
$4,000,000
$6,000,000
Sub -Total Drainage Priority A -Proposed FY13
$ 10,000,000
None Currently
$ -
Sub -Total Drainage Priority El -Unfunded
$
Bell Hi Addition
C
TBD
XX
Blessing Branch -Main Street to SH 360
C
TBD
XX
Hollow Oak Channel Erosion
C
TBD
XX
Kynette Drive Culvert Modifications
C
TBD
XX
Little Bear Creek -Drainage Improvements
C
TBD
XX
Little Bear Creek -Land Acquisition
C
TBD
XX
Marlene Drive Culvert Replacement
C
TBD
XX
Simmons Culvert Improvements
C
TBD
XX
Sub -Total Drainage Priority C-Unfunded
$
DRAINAGE PROJECTS - TOTAL—$--Tq,-000,000
STREET PROJECTS
A
$
XX
FY2013 381h CDBG-ADA Infrastructure Improvements
A
$ aiiow
XX
dge/WeMpark — yr
A
$ 300,000
XX
Sub -Total Street Priorit -Proposed FY13
$ 805,060
4
XX
FY2014 39" CDBG-ADA Infrastructure Improvementsrl4r
B
$ 26G,,W
XX
FY2014 County Overlay-Raider/Monterrey/Sotogrande/ El
Camino Real 1141
B
$ 300,000
XX
15is
XX
FY2015 40"' CDBG-ADA Infrastructure Improvements (15)
B
$ 255;900
Soo
XX
FY2015 County Overlay-Baze Road/Kynette Drive/ Signet
Drive (15)
B
$ 300,000
XX
XX
FY2016 41e1 CDBG-ADA Infrastructure Improvements(16)
B
$ 255 0a0
Sao ,t,
XX
FY2016 County Overay-Ector Drive/Raider Drive/Texas
Star Pkwy (16)
B
$ 300,000
XX
Traffic Signal -Harwood Rd at Bear Creek Pkwy (16)
B
$ 180,000
XX
1715
1
XX
FY2017 42nd CDBG-ADA Infrastructure Improvements(")
B
$ 25a99E)500<
I
XX
Sub -Total Street Priority 8-Unfunded
$ 3,100,000
Bear Creek Parkway
C
TBD
XX
Cresthaven Drive
C
TBD
XX
Cullum Drive/Alexander Lane
TBD
XX
Fuller -Wiser Road -Harwood Road to Mid Cities Blvd
C
TBD
XX
Fuller -Wiser Road-SH183 to Harwood Road
C
TBD
XX
Highland Drive
C
TBD
XX
Ross Avenue
C
TBD
XX
South Pipeline Road
C
TBD
XX
Vine Street-SH183 to SH10
C
TBD
XX
Sub -Total Street Priority C-Unfunded
$
STREET PROJECTS - TOTAL
I s 3, 5,0
J
CAPITAL IMPROVEMENT PROGRAMS
FYI PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE
PROPOSED METHOD OF FINANCING
Project Description
Priority
Estimated Cost
Operating
Fund
CIP Fund
Balance
Bond Sale
Grants/
Contrib
Impact
Fees
Escrow
Funds
Car Rental
Tax
Other
EDC
To Be
Determined
WASTEWATER PROJECTS
LR: Ross Avenue
A
$ 215,000
XX
LR: Slaughter Lane/E Huitt Lane
A
$ 475,000
XX
LR: W Huitt
A
$ 180,000
XX
Sub -Total Wastewater Priority A -Proposed FY13
$ 870,000
LR: Oakwood Terrace Phase 1 (14)
B
$ 345,000
XX
LR: Oakwood Terrace Phase II (14)
B
$ 635,000
XX
LR: Denton Drive
B
$ 539,000
XX
LR: Milam Drivel
B
$ 253,000
XX
Line Relocation, N TarraPLExpross Phase II (15)
B
$ 600,000
XX
LR: Aransas Drive 1-1
B
$ 352,000
XX
LR: Kynette Drive/Wilshire Drive
B
$ 663,000
XX
Sub -Total Wastewater Priority B-Unfunded
$ 3,387,000
LR: Boyd Branch
C
TBD
XX
LR: Cedar Hills Estates/Hollywood Blvd.
C
TBD
XX
LR: Cedar Hills Estates/Sunset Drive
C
TBD
XX
LR: Collin Drive/Harris Drive/Trion Drive
C
TBD
XX
LR: Crane Drive
C
TBD
XX
LR: Donley/Shelmar Drive
C
TBD
XX
LR: Eastcliff/Windlea/Signet
C
TBD
XX
LR: Ector Dr/Donley Dr/Crane Dr
C
TBD
XX
LR: Ector Drive/Fayette Drive
C
TBD
XX
LR: Evans/Canyon Ridge/N Kynette
C
TBD
XX
LR: Glenn Drive
C
TBD
XX
LR: Huntington/Koen/Atkerson
C
TBD
XX
LR: Janann/Brownstone/Shelmar Drive
C
TBD
XX
LR: Lakewood/Dogwood/Bocowood
C
TBD
XX
LR: Mary/Mariene/Commerce/ Wilshire/Greenbriar
C
TBD
XX
LR: N Midway Park
C
TBD
XX
LR: Northcliff/TopleaANindlea/Signet/ Kynette/Westcliff
C
TBD
XX
LR: NW Midway/Rusk/Parker/Rockwall
C
TBD
XX
LR: S Main Street
C
TBD
XX
LR: Sagebrush-Toplea/Wilshire
C
TBD
XX
LR: Sierra Drive
C
TBD
XX
LR: W Donley/Private Drive/Mimosa
C
TBD
XX
LR: W Midway/Victoria/Delta/ LamadRockwall
C
TBD
XX
Sub -Total Wastewater Priority C-Unfunded
$
WASTEWATER PROJECTS - TOTAL
4,257,00
LR = Line Replacement
CAPITAL IMPROVEMENT PROGRAMS
FY13 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE
PROPOSED METHOD OF FINANCING
Project Description
Priority
Estimated Cost
Operating
Fund
CIP Fund
Balance
Bond Sale
Grants/
Contrib
Impact
Fees
Escrow
Funds
Car Rental
Tax
Other
EDC
To Be
Determined
WATER PROJECTS
Water System Security Camera Installation
$ 75,000
XX
Sub -Total Water Priority A -Proposed FY13
$ 75,000
LR: S Pipeline Road West(")
B
$ 300,000
XX
Line Relocation, N Tarrant Express Phase II r15
B
$ 1,200,000
XX
LR: Blessing Creek/Stony Creek/Rock Creek (17)
B
$ 315,000
XX
SH360 Water Crossing (17)
B
$ 735,500
XX
Sub -Total Water Priority B-Unfunded
$ 2,550,600
LR: Collin -Dallas Dr to Harwood Rd
C
TBD
XX
LR: Collin -Denton Dr to Dallas Dr
C
TBD
XX
LR: Denton Drive
C
TBD
XX
LR: Dickey Drive North
C
TBD
XX
LR: Dickey Drive South
C
TBD
XX
LR: Dunaway Drive
C
TBD
XX
LR: E Huitt Lane
C
TBD
XX
LR: Eastcliff Drive
C
TBD
XX
LR: Ector Drive
C
TBD
XX
LR: Fuller Drive
C
TBD
XX
LR: Hollow Oak Drive
C
TBD
XX
LR: Kynette Drive
C
TBD
XX
LR: Live Oak Court/Live Oak Drive/Marlene Drive
C
TBD
XX
LR: Midcreek/Rock Creek/Stony Creek
C
TBD
XX
LR: Midway Drive East
C
TBD
XX
LR: Midway Drive West
C
TBD
XX
LR: Needles Street
C
TBD
XX
LR: Paula Lane
C
TBD
XX
LR: S Main Street (North)
C
TBD
XX
LR: S Main Street (South)
C
TBD
XX
LR: S Pipeline Road East
C
TBD
XX
LR: Shady Creek Drive/Cliffwood Drive
C
TBD
XX
LR: Springwood Court
C
TBD
XX
LR: Sunset Drive
C
TBD
XX
LR: Westwood Drive
C
TBD
XX
LR: Wildwood Street
C
TBD
XX
LR: Woodvine (East)
C
TBD
XX
LR: Woodvine (West)
C
TBD
XX
Water System Security Land Acquisition
C
TBD
XX
Sub -Total Water Priority C-Unfunded
$
WATER PROJECTS - TOTAL
s 2,625,500
LR = Line Replacement
CAPITAL IMPROVEMENT PROGRAMS
FY13 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE
PROPOSED METHOD OF FINANCING
Project Description
Priority
Estimated Cost
Operating
Fund
CIP Fund
Balance
Bond Sale
Grants/
Contrib
Impact
Fees
Escrow
Funds
Car Rental
Tax
Other
EDC
To Be
Determined
OTHER PROJECTS
Euless FLC Indoor Aquatics Construction
A
$ 4,362,600
XX
ents
XX
Glade Parks Trail Connection
$ 359,625
XX
Sub -Total Other Priority -Proposed.FY13
$ 4,772,225
Blessing Branch Park Improvement
B
$ �7.b;040
U
XX
Euless FLC Outdoor Aquatics Construction (14)
B
$ 5,200,000
XX
$ 500,000
000
XX
Development/Engineering Building (") 22co, :��
B
$ 1,822,500
XX
B .
$-----60,000
XX
Texas Star Sports Complex Phase V (15)
B
$ 4,152,000
XX
FY2016-ADA-Facfflylfn- rovements -
B
$ - 50ii00
XX
TSGC Greens Replacement I16I
B
$ 800,000
XX
F aVements - w
_
XX
Sub -Total Other Priority B-Unfunded
$~� 12,449,540
Animal Shelter
C
TBD
XX
Kiddie Carr Park Improvements
C
TBD
XX
South Euless Water Feature
C
TBD
XX
Trail Connection - S Euless
C
TBD
XX
Trail Enhancements -Phase I
C
TBD
XX
Trail Enhancements -Phase 11
C
TBD
XX
Trail Enhancements -Villages Bear Creek
C
TBD
XX
Trailwood Park Improvements
C
TBD
XX
Wilshire Park Water Feature
C
TBD
XX
Sub -Total Other Priority C-Unfunded
$
OTHER PROJECTS - TOTAL
7,2 ,7 5
609
7�✓rrl
o66� ,e,__'