HomeMy WebLinkAboutPreliminary Capital Improvements Program FY12-13CITY OF E L7LESS
PRELIMINARY CAPITAL
IMPROVEMENTS PROGRAM
FISCAL YEAR 2012- 2013
201 X Ector Drive
Euless, TX 76039
www.elilesstx.gov
June 24, 2008
Perry Bynum, Linda Martin Leb'n Mayor Mary Lib Salehjim Stinneford Donna Mickan, Glenn Porterfield
MARY LIB SALEH, MAYOR
Tim Stinneford, Council Member — Place One
Leon Hogg, Council Member — Place Two
Linda Martin, Council Member — Place Three
Donna Mickan, Council Member — Place Four
Glenn Porterfield, Council Member — Place Five
Bynum, Council Member — Place Sig, Mayor Pro Tem
M
July 27, 2012
Honorable Mayor Mary Lib Saleh
Honorable City Councilmembers:
Tim Stinneford, Place One
Leon Hogg, Place Two
Linda Martin, Place Three
Donna Mickan, Place Four
Glenn Porterfield, Place Five
Perry Bynum, Place Six, Mayor Pro Tern
INTRODUCTION
The City of Euless Capital Improvements Program is a comprehensive document
detailing all projects that have been identified to date. Emphasis has been placed on
organizing this data in a manner that will facilitate decision -making processes, assist in
long-range planning, and provide the citizens of Euless with information regarding
planned projects. This document meets the requirements of the City Charter. Article
VII, Section 2 (5) requires, "A statement proposing any capital expenditures deemed
necessary for undertaking during the next budget year and recommended provisions for
financing." Section 2 (6) further requires, "A list of capital projects which should be
undertaken within the five (5) next succeeding years."
We extend special appreciation to the directors and the finance staff for their outstanding
performance in creating this document.
UNDERSTANDING THIS BOOK
Although this book contains a large volume of information, the summaries should make it
easy to understand at a glance. The book is divided into three sections: Funded
Projects, FY2013 Proposed and Unfunded Projects, and Completed Projects. Each
section begins with a summary and is followed by detailed data for those wishing to
research individual projects.
The detail provided includes the project's relationship to City master plans, the project
description and justification, the effect on future maintenance and operating costs, and
the estimated total cost. Within each section, you will find the detailed descriptions
sorted by type. There are five basic project types: Drainage, Streets, Wastewater,
Water, and Other.
201 N. Ector Drive, Euless, Texas 76039-3595
817/685-1400 • Metro 817/267-4403 9 Fax 817/685-1416
www.ci.euless.tx.us
V
The Funded Projects section includes all projects that the City Council has previously
authorized. Many of these projects are on -going and require additional funding from
time to time. For each project, a detailed description has been provided that includes
any City Council authorization, the current status of the project, and a financial summary
detailing funding sources and total project budget. Any amendments or additional
appropriations requested are also identified.
Any project that has been authorized by the City Council that is not fully funded will
include a clear explanation as to how the remainder of the project is expected to be
funded.
The FY2013 Proposed and Unfunded Projects section has been classified into three
categories of priority. Priority A indicates the item is recommended and funding has
been identified in the proposed FY2013 budget. Staff recommends City Council
authorization for these projects. Priority 8 projects should be presented to Council
within two to five years for consideration. Projects that will not begin for at least five
years have been assigned a Priority C. This system has been used to allow the Council
to evaluate and shift priorities, when necessary, and to provide a means of budgeting
capital projects for at least five years. Recommended funding sources have been
indicated if known.
The Completed Projects section provides a summary for each project type indicating
total project budget, actual expenditure, and variance. Funds remaining have been
returned to the appropriate fund balance account for re -appropriation. Details of projects
closed during the prior year have also been included.
FY2013 PROJECTS:
Funding has been identified for all proposed FY2013 projects which are reflected on the
FY2013 Proposed and Unfunded Projects Summary as Priority A. These include:
• 38th Year CDBG — ADA Infrastructure Improvements
• FY2013 County Overlay (Trailwood/Summit Ridge/Westpark)
• Cullum Drive Design and Right -of -Way
• Ross Avenue Wastewater Line Replacement
• Slaughter Lane/E Huitt Lane Wastewater Line Replacement
• W Huitt Wastewater Line Replacement
• Euless Family Life Center Aquatics Construction
CLOSING COMMENTS
This document
been identify/
aid the CiMl
Gary'McKamie
City Manager
is prepared as a comprehensive summary of capital needs that have
hroughout the City of Euless. This document will be updated annually to
ncil in allocating resources and determining priorities.
__N
'1
vi
TABLE OF CONTENTS
PRELIMINARY CAPITAL IMPROVEMENTS PROGRAM
City Officials
Tableof Contents.............................................................................................................. i-iv
Letter................................................................................................................... v-vi
FUNDED PROJECTS
Summaryof Funded Projects............................................................................................ 01-02
FYIAmendments........................................................................................................... 03-04
Drainaqe Proiects
Summary of Funded Drainage Projects.......................................................................... 05
DR9903 Miscellaneous Drainage Improvements................................................... 06-07
DR1101 Flooding Mitigation................................................................................... 08-09
DR1201 Miscellaneous Creek Maintenance.......................................................... 10-11
DR0000 Boyd Branch Improvements..................................................................... 12-13
Street Proiects
Summary of Funded Street Projects............................................................................... 15
PS0605 South Pipeline Road Bridge Replacement ............................................... 16-17
PS1003 Ash Lane -Aransas Drive to N Main Street ................................................ 18-19
PSI 102 Glade Parks Improvements...................................................................... 20-21
PS1201 FY2012 County Overlay -Aransas Drive/Slaughter Lane ........................... 22-23
PS1202 ADA/TAS Infrastructure Improvements.................................................... 24-25
PS1203 Miscellaneous Street Repairs................................................................... 26-27
Wastewater Projects
Summary of Funded Wastewater Projects..................................................................... 29
WW0002 Miscellaneous Wastewater Rehabilitation .............................................. 30-31
WW0605 TRA Wastewater Payments — Impact ..................................................... 32-33
WWI 102 Line Replacement — E Huitt Lane/Ascot Drive/Dunaway Drive ............... 34-35
WW1201 Line Replacement — Blanco Drive/Aransas Drive/Crane Drive ............... 36-37
WW1203 NTE (SH183) Phase I Wastewater Relocation ....................................... 38-39
Water Proiects
Summary of Funded Water Projects...............................................................................
41
WT0001 Miscellaneous Water Rehabilitation.........................................................
42-43
WT0101 Water Tank Debt Payment — Impact .......................................................
44-45
WT0104Well Repairs............................................................................................
46-47
WT0202 Reclaimed Water Main...........................................................................
48-49
WT0803 Meters and Transponders.......................................................................
50-51
WT0901 TRA Water Payments — Impact...............................................................
52-53
WTI 201 Reclaimed Water Line Extension.............................................................
54-55
WT1202 Standpipe Storage Tank & Building Demolition .......................................
56-57
WT1203 Water and Wastewater Impact Fee Update .............................................
58-59
Other Projects
Summary of Other Funded Projects...............................................................................
61
AC1201 Texas Star Sports Complex Phase IV ......................................................
62-63
CM0304 Entry Monument Sign Program...............................................................
64-65
CM0804Redevelopment.......................................................................................
66-67
DV9901 EDC Incentive Funds..............................................................................
68-69
ED0101 Planning Consultants..............................................................................
70-71
i
ED1002EDC Contingency.................................................................................... 72-73
FM1201 ADA/TAS Facility Improvements.............................................................. 74-75
GC1201 TSGC Miscellaneous Improvements........................................................ 76-77
PD9901 Police & Courts Facility............................................................................ 78-79
PR0720 Miscellaneous Park Improvements.......................................................... 80-81
PRO804Park Irrigation.......................................................................................... 82-83
PR1201 Euless FLC Aquatics Design.................................................................... 84-85
PROPOSED & UNFUNDED PROJECTS
Summary of FY13 Proposed & Unfunded Projects — Sorted by Type ................................ 87-90
Drainaae Proiects
Summary of FY13 Proposed & Unfunded Drainage Projects .......................................... 91
BellHi Addition...................................................................................................... 92-93
Blessing Branch — Main Street to SH360............................................................... 94-95
Hollow Oak Channel Erosion................................................................................. 96-97
Kynette Drive Culvert Modifications....................................................................... 98-99
Little Bear Creek Drainage Improvements............................................................. 100-101
Marlene Drive Culvert Replacement...................................................................... 102-103
Simmons Drive Culvert Improvements................................................................... 104-105
Street Proiects
Summary of FY13 Proposed & Unfunded Street Projects ..............................................
107
FY2013 38th CDBG-ADA/TAS Infrastructure Improvements ..................................
108-109
FY2013 County Overlay — Trailwood Drive/Summit Ridge Drive/Westpark Way....
110-111
Cullum Drive Design and Right-of-Way..................................................................
112-113
FY2014 391h CDBG-ADA/TAS Infrastructure Improvements ..................................
114-115
FY2014 County Overlay — Monterrey/Sotogrande/EI Camino Real .......................
116-117
Cullum Drive Construction....................................................................................
118-119
FY2015 40th CDGB-ADA/TAS Infrastructure Improvements ..................................
120-121
FY2015 County Overlay — Baze Road/Kynette Drive/Signet Drive ........................
122-123
FY2016 41st CDGB-ADA/TAS Infrastructure Improvements ...................................
124-125
FY2016 County Overlay — Ector Drive/Raider Drive/Texas Star Parkway ..............
126-127
Traffic Signal — Harwood Road at Bear Creek Parkway .........................................
128-129
FY2017 42nd CDBG-ADA/TAS Infrastructure Improvements ..................................
130-131
FY2017 County Overlay — Aransas Drive/Ector Drive ............................................
132-133
BearCreek Parkway..............................................................................................
134-135
Cresthaven Drive Reconstruction..........................................................................
136-137
E Alexander Lane Reconstruction..........................................................................
138-139
Fuller -Wiser Road — Harwood Road to Mid Cities Boulevard .................................
140-141
Fuller -Wiser Road — SH183 to Harwood Road .......................................................
142-143
Highland Drive Reconstruction..............................................................................
144-145
Ross Avenue Extension.........................................................................................
146-147
SPipeline Road.....................................................................................................
148-149
Vine Street — SH183 to SH10................................................................................
150-151
Wastewater Proiects
Summary of FY13 Proposed & Unfunded Wastewater Projects ..................................... 153
Line Replacement — Ross Avenue........................................................................ 154-155
Line Replacement — Slaughter Lane/E Huitt Lane ................................................. 156-157
Line Replacement — W Huitt.................................................................................. 158-159
Line Replacement — Denton Drive......................................................................... 160-161
Line Replacement — Milam Drive........................................................................... 162-163
NTE (SH183) Phase II Wastewater Relocation..................................................... 164-165
ii
Line Replacement — Oakwood Terrace Addition Phase I .......................................
166-167
Line Replacement — Oakwood Terrace Addition Phase II ......................................
168-169
Line Replacement — Kynette Drive/Wilshire Drive ..................................................
170-171
Line Replacement — Cedar Hills Estates/Hollywood Boulevard ..............................
172-173
Line Replacement — Collin Drive/Harris Drive/Trion Drive .......................................
174-175
Line Replacement — Crane Drive...........................................................................
176-177
Line Replacement — Donley Drive/Shelmar Drive ..................................................
178-179
Line Replacement — Eastcliff Drive/Windlea Drive/Signet Drive .............................
180-181
Line Replacement — Ector Drive/Donley Drive/Crane Drive ...................................
182-183
Line Replacement — Ector Drive/Fayette Drive ......................................................
184-185
Line Replacement — Evans Drive/Canyon Ridge Drive/N Kynette Drive .................
186-187
Line Replacement — Glenn Drive...........................................................................
188-189
Line Replacement — Huntington/Koen/Atkerson/E Huitt/Slaughter/Martin ..............
190-191
Line Replacement — Janann Street/Brownstone Drive/Shelmar Drive ....................
192-193
Line Replacement — Lakewood Boulevard/Dogwood Circle/Bocowood Circle .......
194-195
Line Replacement — Live Oak Drive/Silver Creek Drive/Marlene Drive ..................
196-197
Line Replacement — Mary/Marlene/Commerce/Wilshire/Greenbriar .......................
198-199
Line Replacement — N Midway Park......................................................................
200-201
Line Replacement — Northcliff/Toplea/Windlea/Signet/Kynette/Westcliff................
202-203
Line Replacement — NW Midway/Rusk/Parker/Rockwall.......................................
204-205
Line Replacement — S Main Street........................................................................
206-207
Line Replacement — Sagebrush/Toplea/Wilshire/Yorkshire/Tyler ...........................
208-209
Line Replacement — Sierra Drive...........................................................................
210-211
Line Replacement — Town Creek Drive..................................................................
212-213
Line Replacement — W Donley/Private/Mimosa/Magnolia/Red bud .........................
214-215
Line Replacement — W MidwayNictoria/Delta/Lamar/Rockwall .............................
216-217
Water Projects
Summary of FY13 Proposed & Unfunded Water Projects ..............................................
219
Line Replacement — El Camino Real.....................................................................
220-221
Water System Security Camera Installation...........................................................
222-223
Line Replacement — S Pipeline Road West...........................................................
224-225
NTE (SH183) Phase II Water Relocation...............................................................
226-227
Residential Meter Replacement Program..............................................................
228-229
Line Replacement — Blessing Creek/Stony Creek/Rock Creek ..............................
230-231
SH360Water Crossing..........................................................................................
232-233
Line Replacement — Collin Drive, Dallas Drive to Harwood Road ..........................
234-235
Line Replacement — Collin Drive, Denton Drive to Dallas Drive .............................
236-237
Line Replacement — Denton Drive, Tarrant Drive to Harwood Road ......................
238-239
Line Replacement — Dickey Drive North, SH10 to E Huitt Lane .............................
240-241
Line Replacement — Dickey Drive South, E Huitt Lane to Hilton Drive ...................
242-243
Line Replacement — Dunaway Drive, E Alexander Lane to E Ascot Drive ..............
244-245
Line Replacement — E Huitt Lane, S Main Street to Dunaway Drive ......................
246-247
Line Replacement — Eastcliff Drive, Toplea Drive to Del Prado Apts......................
248-249
Line Replacement — Ector Drive, Trojan Trail to Midway Drive ..............................
250-251
Line Replacement — Fuller Drive, Salem Drive to Carter Drive ...............................
252-253
Line Replacement — Hollow Oak Drive..................................................................
254-255
Line Replacement — Kynette Drive, Cyclone Creek to Wilshire Drive .....................
256-257
Line Replacement — Live Oak Court/Live Oak Drive ..............................................
258-259
Line Replacement — Midcreek Drive/Rock Creek Drive/Stony Creek Drive ............
260-261
Line Replacement — Midway Drive East, N Main Street to Freestone Drive ...........
262-263
Line Replacement — Midway Drive West, Freestone Drive to Ector Drive ..............
264-265
Line Replacement — Needles Street, Paula Lane to Raider Drive ..........................
266-267
Line Replacement — Paula Lane, Needles Street to S Pipeline Road ....................
268-269
Line Replacement — S Main Street (North), E Huitt Lane to SH10 .........................
270-271
iii
Line Replacement — S Main Street (South), Landover Drive to E Huitt Lane..........
272-273
Line Replacement — S Pipeline Road East, Vine Street to S Main Street ..............
274-275
Line Replacement — Shady Creek Drive/Cliffwood Road .......................................
276-277
Line Replacement - Springwood Court.................................................................
278-279 1-04N
Line Replacement — Sunset Drive, S Pipeline Road to S Main Street ....................
280-281
Line Replacement — Westwood Drive, Fuller Drive to Carter Drive ........................
282-283
Line Replacement — Wildwood Street....................................................................
284-285
Line Replacement — Woodvine Drive (East), Cliffwood Road to El Camino Real ...
286-287
Line Replacement — Woodvine Drive (West), Pebble Creek Drive to Ciffwood Rd.
288-289
Water System Security Land Acquisition...............................................................
290-291
Other Projects
Summary of Other FY13 Proposed & Unfunded Projects ...............................................
293
Euless FLC Aquatics Construction.........................................................................
294-295
Glade Parks Trail Connection................................................................................
296-297
Texas Star Golf Course Bunker Replacement.......................................................
298-299
Blessing Branch Park Improvements.....................................................................
300-301
Texas Star Sports Complex Phase V.....................................................................
302-303
Development/Engineering Building........................................................................
304-305
TSGCGreens Replacement..................................................................................
306-307
Animal Shelter Expansion/Renovation...................................................................
308-309
Kiddie Carr Park Improvements............................................................................
310-311
South Euless Water Feature..................................................................................
312-313
Trail Connection South Euless...............................................................................
314-315
Trail Enhancements Phase I..................................................................................
316-317
Trail Enhancements Phase II.................................................................................
318-319
Trail Enhancements Villages of Bear Creek...........................................................
320-321
Trailwood Park Improvements...............................................................................
322-323
Wilshire Park Water Feature..................................................................................
324-325
COMPLETED PROJECTS
Drainage Projects
Summary of Completed Drainage Projects...................................................................... 327
Street Proiects
Summary of Completed Street Projects.......................................................................... 329
PS9901 North Main Street..................................................................................... 330-331
PS9904 Harwood Road, N Main Street to SH360.................................................. 332-333
PS1001Baze Road............................................................................................... 334-335
PS1101 County Overlay — Bear Creek Drive/Lakewood Blvd/Ash Lane ................ 336-337
Wastewater Proiects
Summary of Completed Wastewater Projects................................................................ 339
WW1001 Line Replacement — W Alexander/Norman/Franklin ............................... 340-341
WW1 101 Line Replacement — Bayless/Pauline/Jones (CDBG) ............................. 342-343
WW1103 Line Replacement — Bayless/Pauline/Jones Outfall................................ 344-345
WW1202 Line Replacement — Collin Drive (CDBG)............................................... 346-347
Water Proiects
Summary of Completed Water Projects.......................................................................... 349
Other Proiects
Summary of Completed Other Projects.......................................................................... 351
AC1001 TSSC Lighting Improvements.................................................................. 352-353
iv
rA
CAPITAL IMPROVEMENTS PROGRAM
FUNDED PROJECTS SUMMARY
Project
Number
Project Description
Budget as of
5/31111
Appropriation/
Amendment
Budget as of
5131112
Expended as
of 5131112
Remaining
Funds
Revised
Project Cost
Estimates
Unfunded/
(Excess
Funding)
DRAINAGE PROJECTS
DR9903
Misc. Drainage Improvements
$
362,833
$
$ 362,833
$
121,175
$
241,658
$ 812,833
$ 450,000
DR1101
Flooding Mitigation
$
500,000
$
$ 500,000
$
17,748
$
482,252
$ 500,000
$
DR1201
Misc Creek Maintenance min bal $100,000
$
-
$
50,000
$ 50,000
$
4,200
$
45,800
$ 105,000
$ 55,000
DR0000
Boyd Branch Improvements")
$
$
10,000,000
$ 10,000,000
$
-
$
10,000.000
$ 10,000,000
$
FB9902
Fund Balance - Drainage CIP
$
$
-
$
$
-
$
$
$ 227,262
Sub -Total Drainage Projects
$
862,833
$
10,050,000
$ 10,912,833
$
143,123
$ 10,769,710
$ 11,417,833
$ 277,738
STREET PROJECTS
PS0605
ISouth Pipeline Road Bridge Replacement
$
157,000
$
-
$ 157,000
$
$
157,000
$ 157,000
$ -
PS1003
JAsh Lane
$
2,170,000
$
$ 2,170,000
$
810,931
$
1,359,069
$ 2,170,000
$
PS1102
1 Glade Parks Improvements 2
$
7,300,000
$
4,800,604
$ 12,100,604
$
2,416,043
$
9,684,561
$ 12,100,604
$
PS1201
FY2012 County Overlay -Aransas Drive/Slaughter Lane
$
$
300,000
$ 300,000
$
90,015
$
209,985
$ 300.000
$
PS1202
ADA Infrastructure Improvements
$
$
413,800
$ 413,800
$
45,079
$
368,721
$ 413,800
$
PS1203
Misc. Street Repairs min bal $150,000
$
$
150,000
$ 150,000
$
6,564
$
143,436
$ 300,000
$ 150,000
FB9907
Fund Balance - Street CIP
$
$
-
$
$
$
$ -
$ 480,070
Sub -Total Street Projects
$
9,627,000
$
5,664,404
$ 15,291,404
$
3,368,632
$ 11,922,772
$ 15,441,404
$ (330,070)
WASTEWATER PROJECTS
WW0002
Misc. Wastewater Rehab min bal $100,000
$
316,086
$
25,000
$ 341,086
$
239,798
$
101,288
$ 341,086
$
WW0605
TRA Wastewater Payments - Impact
$
360,000
$
60,000
$ 420,000
$
360,000
$
60,000
$ 480,000
$ 60,000
WW1102
Line Re - E Huitt/Ascot/Dunaway
$
510,000
$
50,000
$ 560,000
$
274,329
$
285,671
$ 560.000
$
WW1201
Line Rep - Blanco/Aransas/Crane
$
-
$
327,000
$ 327,000
$
14,134
$
312,866
$ 327,000
$
WW1203
NTE SH183 Phase I Wastewater Relocation
$
$
454,000
$ 454,000
$
$
454,000
$ 454,000
$
FB9911
FB - Wastewater Impact Restricted
$
$
$
$
-
$
$
$ 512,599
Sub -Total Wastewater Projects
$
1,186,086
$
916,000
$ 2,102,086
$
888,261
$
1,213,825
$ 2,162,086
$ (452,599)
1 Debt not yet issued.
2 Remaining debt not yet issued.
CAPITAL IMPROVEMENTS PROGRAM
FUNDED PROJECTS SUMMARY
Project
Number
Project Description
Budget as of
5131111
Appropriation/
Amendment
Budget as of
6131112
Expended as
of 6131/12
Remaining
Funds
Revised
Project Cost
Estimates
Unfunded/
(Excess
Funding)
WATER PROJECTS
Wr0001
Misc. Water Rehab (min bal $150,000)
$
218,511
$
100,000
$
318.511
$
220,056
$
98,455
$
418,511
$ 100,000
WT0101
Water Tank Debt Payment -Impact
$
2,957,502
$
262,212
$
3,219,714
$
3,132,310
$
87,404
$
3,479,748
$ 260,034
WT0104
Well Repairs min bal $200,000
$
813,594
$
95,000
$
908,594
$
847,135
$
61,459
$
1,108,594
$ 200,000
WT0202
Reclaimed Water Main
$
1.750,000
$
-
$
1,750,000
$
1,497,663
$
252,337
$
1,750,000
$ -
WT0803
Meters/Transponders annual transfer $158,000
$
979,750
$
158,000
$
1,137,750
$
775,032
$
362,718
$
1,295,750
$ 158,000
WT0901
1TRA Water Payments -Impact
$
400,000
$
150,000
$
550,000
$
400,000
$
150,000
$
700,000
$ 150,000
Wr1201
Reclaimed Water Line Extension j3
$
$
4,607,000
$
4,607,000
$
-
$
4,607,000
$
6,500,000
$ 1,893,000
WT1202
Standpipe Storage Tank & Bldg Demolition
$
$
84,640
$
84,640
$
1,600
$
83,040
$
84,640
$ -
WT 1203
Water & Wastewater Impact Fee Update
$
$
30,000
$
30,000
$
-
$
30,000
$
30,000
$
FB9910
FB- Water Impact Restricted
$
$
-
$
$
$
$
$ 1,696,497
F69901
FB - Water & Wastewater CIP
$
$
$
$
$
$
$ 855,776
Sub -Total Water Projects
$
7,119,357
$
5,486,852
$ 12,606,209
$
6,873,796
$
5,732,413
$
15,367,243
$ 208,761
OTHER
AC1201
ITexas Star sports Complex Phase IV
$
-
$
794,470
$
794,470
$
-
$
794,470
$
840,687
$ 46,217
CM0304
Entry Monument Sign Program
$
115.782
$
-
$
115,782
$
93,027
$
22,755
$
115,782
$
CM0804
Redevelopment
$
973,326
$
377
$
973,703
$
694,749
$
278,954
$
1,323,703
$ 350,000
DV9901
EDC Incentive Funds
$
400,854
$
50,000
$
450,854
$
300.854
$
150,000
$
475,854
$ 25,000
ED0101
Planning Consultants
$
204,869
$
$
204,869
$
104,869
$
100,000
$
204,869
$
ED1002
EDC Contingency
$
250,000
$
-
$
250,000
$
$
250,000
$
250,000
FM1201
ADA Facility Improvements min bal $50,000
$
-
$
50,000
$
50,000
$
3,642
$
46,358
$
50,000
$
GC1201
TSGC Misc Improvements min bal $150,000
$
-
$
150,000
$
150,000
$
62,323
$
87,677
$
250,000
$ 100,000
PD9901
Police and Courts Facility
$ 11,718,034
$
32
$ 11,718,066
$ 11,609,560
$
108,506
$
11,718,066
$
PR0720
Misc. Park Improvements min bal $100,000
$
225,000
$
75,000
$
300,000
$
241.128
$
58,872
$
575,000
$ 275,000
PR0804
Park Irrigation
$
100,000
$
25,000
$
125,000
$
47,787
$
77,213
$
150,000
$ 25,000
PR1201
Euless FLC Aquatics Design
$
-
$
786,500
$
786,500
$
9,465
$
777,035
$
550,000
$ 236,500
FB9906
FB-EDC CIP
$
$
-
$
$
$
$
$ 482,302
FB9908
FB-Texas Star Sports Complex CIP
$
$
$
$
$
$
$ 751,828
FB9909
FB-General CIP
$
$
$
$
$
$
$ (1,600,577)
FB9913
FB-Car Rental CIP
$
$
$
$
$
$
$ 73,146
Sub -Total Other Projects
$ 13,987,865
$
1,931,379
$ 15,919,244
$ 13,167,404
$
2,751,840
$
16,503,961
$ (2,323.136)
TOTAL FUNDED PROJECTS
$ 32,783,141
$
24,048,635
$ 56,831.776
$ 24,441,216
$ 32,390,560
$
60,892,527
$ (2,619,305)
Debt not yet issued.
" To be reallocated to Euless FLC Aquatics Construction project.
J ) )
09
N..
ft. P
-P
PRojEcT#
PROJECT DzscRipnoN
DATE
AmzxDmmffs ACTIONS
AC1001
TSSC Lighting Improvements
05/31/2012
Close project and transfer excess funding of $28,954 to TSSC CIP Fund
Balance.
AC1201
TSSC Phase IV
10101/2011
To provide project funding per FY2012 Approved CIP Plan - $794,470.
CM0804
Redevelopment
05/31/2012
Increase funding for additional earned interest of $377.
DR1201
Miscellaneous Creek Maintenance
10/01/2011
To provide project funding per FY2012 Approved CIP Plan - $50,000 from
Drainage CIP Fund Balance.
DV9901
EDC Incentive Funds
10/01/2011
To provide additional funding per FY2012 Approved CIP Plan - $25,000
transfer from EDC Operating Fund.
DV9901
EDC Incentive Funds
05/31/2012
To provide additional project funding of $25,000 from EDC CIP Fund
Balance.
FM1201
ADA Facility Improvements
10/01/2011
To provide project funding per FY2012 Approved CIP Plan - $50,000 from
Car Rental.
GC1201
TSGC Miscellaneous Improvements
10/01/2011
To provide project funding per FY2012 Approved CIP Plan - $150,000
from TSGC Reserve Fund.
PD9901
Police and Courts Facility
05/31/2012
Increase funding for additional earned interest of $32.
PR0720
Miscellaneous Park Improvements
10/01/2011
To provide additional funding per FY2012 Approved CIP Plan - $75,000
from EDC Operating Fund.
PR0804
Park Irrigation
10/01/2011
To provide additional funding per FY2012 Approved CIP Plan - $25,000
from EDC Operating Fund.
PR1201
Euless FLC Aquatics Design
10/01/2011
To provide project funding per FY2012 Approved CIP Plan - $786,500
from Car Rental.
PR1201
Euless FLC Aquatics Design
05/31/2012
Reduce project funding per revised estimate and transfer $236,500 to
Car Rental CIP Fund Balance.
PS9901
North Main Street
05/31/2012
Close project and transfer excess funding of $46,898 to Street CIP Fund
Balance.
PS9904
Harwood Road, North Main Street to SH360
05/31/2012
Close project and transfer excess funding of $83,655 to ADA
Infrastructure improvements PS1202.
PS1001
Baze Road
OS/31/2012
Close project and transfer excess funding of $271,599 to Street CIP Fund
Balance.
PS1101
FY2011 County Overlay
05/31/2012
Close project and transfer excess funding of $34,113 to Street CIP Fund
Balance.
PS1102
Glade Parks Improvements
10/01/2011
To authorize additional funding per FY2012 Approved CIP Plan (Future
Bond Issue).
PS1201
FY2012 County Overlay
10/01/2011
To provide project funding per FY2012 Approved CIP Plan - $300,000
from Street CIP Fund Balance.
PS1202
ADA infrastructure Improvements
10/01/2011
To provide project funding per FY2012 Approved CIP Plan - $250,D00
from Car Rental,
PS1202
ADA infrastructure Improvements
OS/31/2012
To provide additional funding of $80,145 from Escrow Funds and
1
$83,655 from Harwood Road P59904.
PS1203
Miscellaneous Street Repair
10/01/2011
To provide project funding per FY2012 Approved CIP Plan - $150,000
1
from Street CIP Fund Balance.
WT0001
Miscellaneous Water Rehab
10/01/2011
To provide additional funding per FY2012 Approved CIP Plan - $100,000
from W/WW CIP Fund Balance.
WT0101
Water Tank Debt Payment
1010112011
To provide additional funding per FY2012 Approved CIP Plan - $262,212
from Water impact Fund Balance.
WT0104
Well Repairs
1010112011
To provide additional funding per FY2012 Approved CIP Plan - $75,000
from W/WW CIP Fund Balance.
WT0104
Well Repairs
10/01/2011
To provide additional funding of $20,000 for FY2012 emergency well
repairs from W/WW CIP Fund Balance.
VVT0803
Transponders/Meters
10/01/2011
To provide additional funding per FY2012 Approved CIP Plan - $158,000
from W/WW Operating Fund.
V11T0901
TRA Water Payments -Impact
10/01/2011
To provide additional funding per FY2012 Approved CIP Plan - $150,000
from Water Impact Fund Balance.
VI/T1201
Reclaimed Water Line Extension
10/01/2011
To authorize project funding per FY2012 Approved CIP Plan (Future Bond
i
issue).
VVT1202
Storage Tank and Building Demolition
1010112011
To provide project funding per FY2012 Approved CIP Plan - $84,640 from
IStandpipe
I
IW/WW Operating Fund.
PROJECT#
PROJECT DESCRIPTION
DATE
AMENDMENTS 8i ACTIONS
WT1203
W/WW Impact Fee Update
10/01/2011
To provide project funding per FY2012 Approved CIP Plan - $30,000 from
Impact Fee.
WW0002
Miscellaneous Wastewater Rehab
10/01/2011
To provide additional funding per FY2012 Approved CIP Plan - $25,000
from W/WW CIP Fund Balance.
WW0605
TRA Wastewater Payments
10/01/2011
To provide additional funding per FY2012 Approved CIP Plan - $60,000
from WW Impact Fee Fund Balance.
WW1001
Line Rep - W Alexander/Norman/Franklin
10/01/2011
Reduce project funding per approved FY2012 CIP Plan and transfer
$150,000 to W/WW CIP Fund Balance.
WW1001
Line Rep - W Alexander/Norman/Franklin
05/31/2012
Close project and transfer excess funding of $88,386 to W/WW CIP Fund
Balance.
WW1101
Line Rep - Bayless/Pauline/Jones (CDBG)
05/31/2012
Close project and transfer excess funding of $50,000 to W/WW CIP Fund
Balance.
WW1102
Line Rep - E Huitt/Ascot/Dunaway
10/01/2011
To provide additional funding per FY2012 Approved CIP Plan - $50,000
from W/WW CIP Fund Balance.
WW1103
Line Rep - Bayless/Pauline/Jones Outfall
05/31/2012
Close project and transfer excess funding of $19,456 to W/WW CIP Fund
Balance.
WW1201
Line Rep - Blanco/Aransas/Crane
10/01/2011
To provide project funding per FY2012 Approved CIP Plan - $327,000
from W/WW Operating Fund.
WW1202
Line Rep - Collin Drive (CDBG)
10/01/2011
To provide project funding per FY2012 Approved CIP Plan - $405,000.
WW1202
Line Rep - Collin Drive (CDBG)
05/31/2012
To transfer excess funding of $105,000 to W/WW CIP Fund Balance.
WW1202
Line Rep - Collin Drive (CDBG)
05/31/2012
Close project and release excess CDBG funding for future project.
WW1203
NTE (SH183) Phase I Wastewater Relocation
10/01/2011
To provide project funding per FY2012 Approved CIP Plan - $454,000.
W
CAPITAL IMPROVEMENTS PROGRAM
FUNDED PROJECTS SUMMARY
Project
Number
Project Description
Budget as of
5131/11
Appropriation/
Amendment
Budget as of
5131112
Expended as
of 5/31/12
Remaining
Funds
Revised
Project Cost
Estimates
Unfunded/
(Excess
Funding)
DRAINAGE PROJECTS
Misc. Drainage improvements
$ 362,833
$
$ 362,833
$ 121,175
$ 241,658
$ 812,833
$ 450,000
Flooding Mitigation
$ 500,000
$
$ 500,000
$ 17,748
$ 482,252
$ 500,000
$Misc.
L
Creek Maintenance (min bal $100,000)
$ -
$ 50,000
$ 50,000
$ 4,200
$ 45,800
$ 105,000
$ 55,000
Boyd Branch Improvements (1)
$
$ 10,000,000
$ 10,000,000
$ -
$ 10,000,000
$ 10,000,000
$
FB9902
Fund Balance- Drainage CIP
$
$ -
$ -
$ -
$ -
is -
$ 227,262
Total Drainage Projects
$862,833
$10,050,000
$10,912,833
$143,123
$10,769,710
J $11,417,833
$277,738
Debt not yet issued.
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: July 23,1999
Submitted By: RON YOUNG Date Completed:
Project Title: MISCELLANEOUS DRAINAGE IMPROVEMENTS
Project Type: DRAINAGE Sub -Type: IMPROVEMENTS
Project Code: DR9903 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project provides funding for various drainage projects or emergency repairs identified throughout the year.
Often correction of these problems requires design services and other improvements such as bank stabilization.
As major projects are identified, they will be tracked separately and assigned a different project number.
PROJECT SCHEDULE:
JUSTIFICATION:
Failure to correct these problems often causes damage to existing infrastructure.
W
PROJECT TITLE: MISCELLANEOUS DRAINAGE IMPROVEMENTS PROJECT CODE: DR9903
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Improvements
Personnel: Full Time
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
$812,
Subtotal:
$0
Total Estimated Capital Cost
$812,833
Maintenance Costs
Funding Source:
Transfer from:
Drainage Operating Fund
$351,609
Drainage CIP Fund Balance
$11,224
$0
Additional Funding Needed:
Subtotal:
$0
Transfer from:
Drainage Operating Fund
$278,000
Drainage CIP Fund Balance
$172,000
Total Estimated Annual Cost
$0
Total Funding
$812,833
CURRENT STATUS
OVERIUNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED BUDGET (- +)
% EXPENDED
Fence
$559 $559 0
100%
Storm Drain
$812,079 $120,421 691,658
15%
Meters & Setting
$195 $195 0
100%
JTAL PROJECT
$812,833 $121,175 $691,658
15%
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: June 30,2010
Submitted By: RON YOUNG Date Completed:
Project Title: FLOODING MITIGATION
Project Type: DRAINAGE Sub -Type: IMPROVEMENTS
Project Code: DR1101 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project consists of identifying chronic flooding locations within the City of Euless and determining the
cost/benefit of property acquisition and protection compared to extensive drainage relief projects. Property
acquisition will be recommended after consideration of flooding history, appraisals, and feasible alternative
drainage solutions have been evaluated. It is recommended that this be established as an ongoing project.
PROJECT SCHEDULE:
JUSTIFICATION:
Properties throughout the City of Euless situated adjacent to creeks have experienced drainage problems for
several years. The cost for implementing drainage improvement projects to mitigate flooding at isolated locations
may be much greater than the cost of property acquisition. Chronic flooding lowers the property values and this
program will offer a means of relief for affected property owners.
PROJECT TITLE: FLOODING MITIGATION PROJECT CODE: DR1101
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Flooding Mitigation
$500,000
Personnel: Full Time
Part Time
$0
Total Salary
$0
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal:
$0
Total Estimated Capital Cost
$500,000
Maintenance Costs
Funding Source:
Transfers from:
Operating Fund (FY2011)
$150,000
Drainage CIP Fund Balance
$350,000
$0
Subtotal:
$0
Total Estimated Annual Cost $01 Total Funding $500,00(
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED
Storm Sewer $500,000 $17,748 $482,252 4%
TAL PROJECT $500,000 $17,748 $482,252 4%
9
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 22,2011
Submitted By: RON YOUNG Date Completed:
Project Title: MISCELLANEOUS CREEK MAINTENANCE
Project Type: DRAINAGE Sub -Type: CREEK MAINTENANCE
Project Code: DR1201 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The City of Euless completed drainage master plan studies for the major creeks that traverse the City. They
include Little Bear Creek, Hurricane Creek, Boyd Branch and Blessing Branch.
PROJECT DESCRIPTION:
The project provides for maintenance in the creeks described above including removal of fallen trees that impede
the flow of creek water in the natural creek channels, clearing brush and debris at major bridge crossings, and
preventative maintenance. This project does not address items that are deemed cosmetic enhancements.
PROJECT SCHEDULE:
Creek maintenance will occur between mid October and mid March.
JUSTIFICATION:
Natural creek erosion undermines the root systems of trees adjacent to creek banks which results in trees falling
into or across creek channels. These fallen trees together with accumulated brush and debris can impede the
flow of storm water in the natural creek channels resulting in a rise in the normal water surface elevation. Fallen
trees that are conveyed down stream in the natural creek channels may cause damage to the substructure of
bridges spanning the creek channels.
'1
'-'IN
10
PROJECT TITLE: MISCELLANEOUS CREEK MAINTENANCE PROJECT CODE: DR1201
�. NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Improvements
Personnel: Full Time (Minimum balance $100,000)
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal: $0 Total Estimated Capital Cost
Maintenance Costs Funding Source:
Transfer from:
Drainage CIP Fund Balance $50,
$0 Additional Funding Needed:
Subtotal: $0 Transfer from:
Drainage CIP Fund Balance $55,000
Total Estimated Annual Cost $01Total Funding $105,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Storm Sewers $105,000 $4,200 $100,800 4%
L PROJECT
$105,000 $4,200 $100,800
4%
m
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: July 17,2009
Submitted By: RON YOUNG Date Completed:
Project Title: BOYD BRANCH IMPROVEMENTS
Project Type: DRAINAGE Sub -Type: IMPROVEMENTS
Pro'ect Code: DR0000 Priority: A
COUNCIL AUTHORIZATION:
Authorized in the FY2011 Capital Improvement Plan.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Drainage improvements are included in the Boyd Branch Watershed Study.
PROJECT DESCRIPTION:
This project includes the portion of Boyd Branch from S Pipeline Road to SH183 and may include structural and
non-structural activities to reduce or minimize the effects of large stormwater events. A large portion of this
project occurs on a section of Boyd Branch that lies in a platted private drainage easement which also shows the
maintenance responsibility to rest on the property owner(s). Since the City of Euless has no easement rights
along these sections of Boyd Branch, the City is of the opinion that improving the capacity of Boyd Branch to
handle large stormwater events is the responsibility of the property owner(s). The City of Euless may have some
utility relocation expenses related to any improvements made to Boyd Branch.
PROJECT SCHEDULE:
JUSTIFICATION:
Large stormwater events result in runoff exceeding the capacity of Boyd Branch. This project is intended to
reduce or minimize property losses associated with stormwater runoff exceeding the capacity of Boyd Branch.
W
12
PROJECT TITLE: BOYD BRANCH IMPROVEMENTS PROJECT CODE: DR0000
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Construction $10,000,000
Personnel: Full Time $0
Part Time $0
Total Salary $0
Purchase of Services $0
Materials & Supplies $0
Utilities $0
Subtotal: $0 Total Estimated Capital Cost $10,000,000
Maintenance Costs Funding Source:
$0
Subtotal: $0 Additional Funding Needed:
Developer Contribution $6,000,000
Future Revenue Bond Issue $4,000,000
Total Estimated Annual Cost $0 Total Funding $10,000,000
CURRENT STATUS
OVERIUNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED
Construction $10,000,000 $0 $10,000,000 0%
CT $10,000,000 $0 $10,000,000 0%
13
110
r H E17 C t r v a F
'"IN
14
CAPITAL IMPROVEMENTS PROGRAM
FUNDED PROJECTS SUMMARY
Project
Number
Project Description
Budget as of
5131/11
Appropriation/
Amendment
Budget as of
5131/12
Expended as
of 5/31/12
Remaining
Funds
Revised
Project Cost
Estimates
Unfunded/
(Excess
Funding)
STREET PROJECTS
PS0605
South Pipeline Road Bridge Replacement
$ 157,000
$
$ 157,000
$ -
$ 157,000
$ 157,000
$
PS1003
Ash Lane — i r
$ 2,170,000
$
$ 2,170,000
$ 810,931
$ 1,359,069
$ 2,170,000
$
PS1102
Glade Parks Improvements�'i I
$ 7,300,000
$ 4,800,604
$ 12,100,604
$ 2,416,043
$ 9,684,561
$ 12,100,604
$
PS1201
FY2012 County Overlay -Aransas Drive/Slaughter Lane—!
$ -
$ 300,000
$ 300,000
$ 90,015
$ 209,985
$ 300,000
$
PS1202
ADA Infrastructure Improvements — J
$
$ 413,800
$ 413,800
$ 45,079
$ 368,721
$ 413,800
$
PS1203
Misc. Street Repairs (min bal $150,000)
$
$ 150,000
$ 150,000
$ 6,564
$ 143,436
1 $ 300,000
1 $ 150.000
FB9907
Fund Balance - Street CIP
$
$ -
$ -
$ -
$ -
$ -
$ (480,070
Total Street Projects
$ 9,627,000
$ 5,664,404
$ 15,291,404
$ 3,368,632
$ 11,922,772
$ 15,441,404
$ (330,070)
Remaining debt not yet issued.
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 15,2005
Submitted By: RON YOUNG Date Completed:
Project Title: SOUTH PIPELINE ROAD BRIDGE REPLACEMENT
Project Type: STREET Sub -Type: BRIDGE
Project Code: PS0605 Priority: A
COUNCIL AUTHORIZATION:
June 26, 2007: Approved an inter -local agreement between the City of Euless and the City of Fort Worth. The
City of Euless' estimated cost is $157,000.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project is related to the proposed asphalt overlay of South Pipeline Road to be performed by Tarrant County
and jointly funded by the City of Euless and the City of Fort Worth.
PROJECT DESCRIPTION:
Bridge and related channel improvements are planned at South Pipeline Road over Post Oak Channel. The
existing structure is to be replaced because of structural and geometric deficiencies as well as load restrictions.
The City of Fort Worth will manage the project and the City of Euless will contribute 25% of the construction costs
which represents the portion of the project that falls within the city limits of Euless.
PROJECT SCHEDULE:
July 2012
JUSTIFICATION:
South Pipeline Road is an important east -west thoroughfare providing access to the southeast portion of the City
of Euless. This project will correct structural and geometric deficiencies as well as alleviate load restrictions.
16
PROJECT TITLE: SOUTH PIPELINE ROAD BRIDGE REPLACEMENT PROJECT CODE: PS0605
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Bridge Construction
Personnel: Full Time
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
$0
$157,000
Subtotal: $0 Total Estimated Capital Cost $157,000
Maintenance Costs Funding Source:
Transfer from:
Street CIP Fund Balance $157,000
$0
Subtotal: $0
Total Estimated Annual Cost $01Total Funding $157,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED
Bridge Construction $157,000 $0 157,000 0%
AL
$157,000
$0 $157,000
0%
17
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 01,2002
Submitted By: RON YOUNG Date Completed:
Project Title: ASH LANE-ARANSAS DRIVE TO N MAIN STREET
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: PS1003 Priority: A
COUNCIL AUTHORIZATION:
November 10, 2009: Authorize the City Manager to execute an engineering design contract for Ash Lane with
Freese and Nichols, Inc. in an amount not to exceed $132,200.
September 14, 2010: Approve Resolution #10-1346 declaring a public necessity for the acquisition of real estate.
August 9, 2011: Award construction contract to Stabile & Winn, Inc. in the amount of $991,292.90.
May 8, 2012: Authorize the replacement of water and wastewater utilities associated with Ash Lane
reconstruction.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Ash Lane is identified in the Master Thoroughfare Plan as a four -lane minor arterial roadway from Industrial
Boulevard to Fuller -Wiser Road.
PROJECT DESCRIPTION:
This project consists of the design, right-of-way acquisition, and construction costs necessary to facilitate removal
of the existing two lanes of asphalt pavement on Ash Lane from Aransas Drive to N. Main Street which is to be
replaced by a four lane concrete roadway. The associated sidewalks, storm drainage, and water and wastewater
utility replacements are included in the project scope.
PROJECT SCHEDULE:
Award Design: November 2009
Plans Complete: March 2011
Right -of -Way Complete: January 2011
Begin Construction: August 2011
Anticipate Construction Complete: November 2012
JUSTIFICATION:
The portion of Ash Lane from Aransas Drive to N. Main Street is the only portion that is not constructed to the
Master Thoroughfare Plan standards. Completion of this section of Ash Lane will provide an orderly flow of traffic
from Industrial Boulevard to Fuller -Wiser Road.
18
PROJECT TITLE: ASH LANE-ARANSAS DRIVE TO N MAIN STREET PROJECT CODE: PS1003
�..� NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering $150,000
Personnel: Full Time Right -of -Way $100,000
Part Time $0 Construction $1,920,000
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
Subtotal: $01Total Estimated Capital Cost $2,170,000
Maintenance Costs
Funding Source:
Transfer from:
Street CIP Fund Bal (2010) $330,000
Street CIP Fund Bal (2011) $126,870
Car Rental (2011) $648,000
Subtotal:
Grant Funding $885,000
2011 COs $180,130
Total Estimated Annual Cost
$01Total
Funding
$2,170,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED
BUDGET (-+)
% EXPENDED
Engineering
$150,000 $122,215
27,785
81%
Right -of -Way
$100,000 $46,565
53,435
47%
Construction
$1,920,000 $642,151
1,277,849
33%
'AL PROJECT $2,170,000 $810,931 $1,359,069 37%
19
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: June 08,2010
Submitted By: RON YOUNG Date Completed:
Project Title: GLADE PARKS IMPROVEMENTS
Project Type: STREET Sub -Type: CONSTRUCTION
Pro'ect Code: PS1102 Priority: A
COUNCIL AUTHORIZATION:
December 14, 2010: Approval of Resolution #10-1352 authorizing the publication of intention to issue COs.
January 25, 2011: Consider all matters incident and related to the issuance of and sale of up to $3.1 M in COs.
January 25, 2011: Consider acceptance of ROW and easements necessary for public improvements.
January 25, 2011: Award of Bid #001-11 for a construction contract to McMahon Contracting LP in the amount of
$1,973,615.95 for the construction of Rio Grande Boulevard, Heritage Avenue, and widening of the SH121
service road.
February 24, 2011: Issued COs for funding of first segment of public improvements at Glade Parks.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The infrastructure located in the Glade Parks development is included in the City's Master Thoroughfare Plan.
PROJECT DESCRIPTION:
The project represents the initial funding required for the infrastructure improvements at the Glade Parks
Development as approved in the Project and Financing Plan. The project scope includes the construction of Rio
Grande Boulevard, portions of Heritage Avenue, the Little Bear Creek bridge, SH121 improvements,
landscaping, wetland mitigation, Brazos Boulevard and remaining streets, main entrance and medians,
underground drainage, and associated utility installations, as well as administrative and financing costs.
PROJECT SCHEDULE:
Design: Winter 2010
ROW: Winter 2010
Construction: Spring 2011
Phase I Complete: FY2012
Phase II Estimated Completion: August 2012
JUSTIFICATION:
The construction of public infrastructure at Glade Parks will spur economic development in the area and complete
an access route to existing Euless businesses.
20
PROJECT TITLE: GLADE PARKS IMPROVEMENTS PROJECT CODE: PSI 102
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Design
$300,000
Personnel: Full Time
Construction
$11,785,604
Part Time
$0
Miscellaneous
$15,000
Total Salary
$0
Purchase of Services
Materials & Supplies
Utilities
Avg annual debt service
$640,000
(fiscal years 2012 through 2031)
Subtotal:
$640,000
Total Estimated Capital Cost
$12,100,604
Maintenance Costs
Funding Source:
2011 COs
$2,854,870
Street CIP Fund Balance
$180,130
$0
Subtotal: $0 Additional Funding Needed:
Future Bond Issue $9,065,604
Total Estimated Annual Cost $640,000 Total Funding $12,100,604
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED
Design $300,000 $0 $300,000 0%
Construction $11,785,604 $2,401,043 $9,384,561 20%
Transfer to Debt Service $15,000 $15,000 $0 100%
)TAL PROJECT $12,100,604 $2,416,043 $9,684,561 20%
21
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 20,2010
Submitted By: RON YOUNG Date Completed:
Project Title: FY2012 COUNTY OVERLAY - ARANSAS DRIVE/SLAUGHTER LANE
Project Type: STREET Sub -Type: OVERLAY
Project Code: PS1201 Priority: A
COUNCIL AUTHORIZATION:
October 11, 2011: Authorize the City Manager to execute an Interlocal Agreement with Tarrant County for
roadway reconstruction and asphalt overlay improvements to Slaughter Lane and Aransas Drive and tree/brush
trimming along South Pipeline Road.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Aransas Drive is a collector street in the City of Euless Master Thoroughfare Plan.
PROJECT DESCRIPTION:
The project consists of edge milling, asphalt overlay, and restriping on:
1. Aransas Drive from Midway Drive to Harwood Road, and
2. Slaughter Lane from Dunaway Drive to Dickey Drive.
PROJECT SCHEDULE:
Begin Construction: May 2012
Anticipated Completion: July 2012
JUSTIFICATION:
The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, will
extend the life of the roadway, and will enhance the appearance of the streets.
22
PROJECT TITLE: FY2012 COUNTY OVERLAY - ARANSAS DRIVE/SLAUGHTER LPROJECT CODE: PS1201
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
$300,000
Subtotal: $0 Total Estimated Capital Cost $300,000
Maintenance Costs Funding Source:
Transfer from. -
Street CIP Fund Balance $300,000
$0
Subtotal: $0
Total Estimated Annual Cost $()I Total Funding $300,00(
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED
Construction $300,000 $90,015 $209,985 30%
$300,000 $90,015 $209,985 30%
23
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 11,2011
Submitted By: RON YOUNG Date Completed:
Project Title: ADA/TAS INFRASTRUCTURE IMPROVEMENTS
Project Type: STREETS Sub -Type: SIDEWALKS
Proiect Code: PS1202 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The Master Thoroughfare Plan includes and addresses sidewalks, crosswalks, and curb ramps for City streets.
PROJECT DESCRIPTION:
This project provides for the continued improvements to City infrastructure as required by Federal and State
mandated Americans with Disabilities Act/Texas Accessibility Standards ("ADA/TAS"). City sidewalks,
crosswalks, curb ramps, and other areas covered under both ADA and TAS requirements will be part of these
improvements.
PROJECT SCHEDULE:
JUSTIFICATION:
Many sidewalks, curb ramps, and other similar items are outdated and do not meet current ADA/TAS standards.
Updating accessibility on a continuing basis will help keep the City in compliance with government standards and
will address the growing needs of citizens with accessibility issues.
Oki
t
24
PROJECT TITLE: ADA/TAS INFRASTRUCTURE IMPROVEMENTS PROJECT CODE: PS1202
INET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
$0
TOTAL ESTIMATED CAPITAL COST:
Improvements $413
Subtotal: $0 Total Estimated Capital Cost $413,800
Maintenance Costs Funding Source:
Transfer from:
Car Rental $250,000
Harwood Road - PS9904 $83,655
$0 Escrow Funds $80,145
Subtotal: $0
Total Estimated Annual Cost $0 Total Funding $413,800
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Sidewalks/Curbs $330,145 $45,079 $285,066 14%
Utility Relocation $83,655 $0 $83,655 0%
PROJECT
13,800 $45,079 $368,721
25
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 17,2011
Submitted By: RON YOUNG Date Completed:
Project Title: MISCELLANEOUS STREET REPAIRS
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: PS1203 Priority: A
COUNCIL AUTHORIZATION:
April 24, 2012: Authorize the City Manager to enter into a contract with Estrada Concrete Co. LLC for concrete
road repairs at various locations on North Main Street, Fuller -Wiser Road and Bear Creek Parkway in the amount
of $93,390.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The Master Thoroughfare Plan identifies the various street types within the City of Euless. These street types
include residential streets through regional arterial streets.
PROJECT DESCRIPTION:
This project includes the removal and replacement of deteriorated sections of pavement along identified
roadways.
PROJECT SCHEDULE:
JUSTIFICATION:
Continuing repair of the existing street pavements will maintain safe driving conditions and will extend the overall
life of the City streets.
W
26
PROJECT TITLE: MISCELLANEOUS STREET REPAIRS PROJECT CODE: PS1203
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
construction
(Minimum balance $150,000)
$0
$0 Total Estimated Capital Cost
Funding Source:
Transfer from:
Street CIP Fund Balance $150,
RE11
Subtotal: $0 Additional Funding Needed:
Transfer from:
Street CIP Fund Balance $150,000
Total Estimated Annual Cost $0 Total Funding $300,000
CURRENT STATUS
OVERIUNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Construction $300,000 $6,564 $293,436 2%
AL
$300,000 $6,564 $293,436 2%
27
1—�
28
roo
I
CAPITAL IMPROVEMENTS PROGRAM
FUNDED PROJECTS SUMMARY
Project
Number
Project Description
Budget as of
5/31111
Appropriation/
Amendment
Budget as of
5/31/12
Expended as
of 5131/12
Remaining
Funds
Revised
Project Cost
Estimates
Unfunded/
(Excess
Funding)
WASTEWATER PROJECTS
WW0002
IMisc. Wastewater Rehab (min bal $100,000)
$ 316,086
$ 25,000
$ 341,086
$ 239,798
$ 101,288
$ 341,086
$
WW0605
ITRA Wastewater Payments - Impact
$ 360,000
$ 60,000
$ 420,000
$ 360,000
$ 60,000
$ 480,000
$ 60,000
WWI 102
1 Line Re - E Huitt/Ascot/Dunawa —C",rt. p
$ 510,000
$ 50,000
$ 560,000
$ 274,329
$ 285,671
$ 560,000
$ -
WW1201
Line Rep - Blanco/Aransas/Crane
$ -
$ 327,000
$ 327,000
$ 14,134
$ 312,866
$ 327,000
$
WW1203
NTE (SH183) Phase I Wastewater Relocation
$
$ 454,000
$ 454,000
$ -
$ 454,000
$ 454,000
$
FB9911
FB - Wastewater Impact (Restricted)
$
$ -
$ -
$ -
$ -
$ -
$ 512,599)
Total Wastewater Projects
$ 1,186,086
$ 916,600
$ 2,102,086
$ 888,261
$ 1,213.825
$ 2,162,086
$ (452,599)
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: July 26,1999
Submitted By: RON YOUNG Date Completed:
Project Title: MISCELLANEOUS WASTEWATER REHABILITATION
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Pro'ect Code: WW0002 Priority: A
COUNCIL AUTHORIZATION:
March 8, 2005: Award contract to Hall -Albert Construction Company for the replacement of various wastewater
lines in the amount of $977,857.50.
March 28, 2006: Authorized the city manager to proceed with emergency repair by GRA-TEX Utilities to the
aerial wastewater main crossing Hurricane Creek at a cost of $55,000.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project is for funding of small wastewater main projects identified throughout the fiscal year. Larger projects
will be determined on an "as needed" basis and presented for funding under a new project number.
PROJECT SCHEDULE:
JUSTIFICATION:
Most of these lines are clay tile and are seriously deteriorated.
W
''1
30
PROJECT TITLE: MISCELLANEOUS WASTEWATER REHABILITATION PROJECT CODE: WW0002
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Wastewater Mains
Personnel: Full Time (Minimum balance $100,000)
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
Subtotal: $01 Total Estimated Capital Cost
Maintenance Costs Funding Source:
Transfers from:
W/WW Operating Fund $165,000
WW9903 $37,013
$0 WA/VW CIP Fund Balance $139,073
Subtotal: $0
Total Estimated Annual Cost $01 Total Funding $341,086
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED
Wastewater Mains $308,567 $207,279 101,288 67%
Engineering $1,939 $1,939 0 100%
Contingency $30,580 $30,580 0 100%
AL PROJECT
$341,086 $239,798
$101,288
70%
KE
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 03,2006
Submitted By: RON YOUNG Date Completed:
Project Title: TRINITY RIVER AUTHORITY WASTEWATER PAYMENT
Project Type: WASTEWATER Sub -Type: IMPACT FEE
Proiect Code: WW0605 Priori A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Based on a review by Birkhoff, Hendricks, and Conway of the water and wastewater impact fees, it was
determined that a substantial portion of the wastewater impact fee is attributed to Trinity River Authority ('TRA")
capital projects. Therefore, these fees should be used to pay a portion of the annual TRA expense, as these
funds are directly attributed to the expansion of TRA. Based on the available fund balance, a systematic
drawdown over a ten year period has been developed.
PROJECT SCHEDULE:
Annual Payment $60,000: FY2006-FY2015
JUSTIFICATION:
The expansion at TRA provides additional capacity and it was determined through the wastewater impact fee
study that these funds could be used to pay a portion of TRA wastewater payments. It was determined a ten
year drawdown would approximate the Capital Improvement Plan Review time frame, as well as provide for a
systematic drawdown that would not impact the annual budget.
W
32
PROJECT TITLE: TRINITY RIVER AUTHORITY WASTEWATER PAYMENT PROJECT CODE: WW0605
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Wastewater Payments
Personnel: Full Time
Part Time $0
Total Salary $0
Purchase of Services ($60,000)
Materials & Supplies
Utilities
$480,
Subtotal:
($60,000)
Total Estimated Capital Cost
$480,OOC
Maintenance Costs
Funding Source:
Transfer from:
WW Impact Fee Fund Balance
$420,000
$0
Subtotal:
$0
Additional Funding Needed:
Transfer from:
WW Impact Fee Fund Balance
$60,000
Total Estimated Annual Cost
($60,000)
Total Funding
$480,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED BUDGET (- +)
% EXPENDED
Wastewater - TRA Service
$480,000 $360,000 $120,000
75%
AL PROJECT $480,000 $360,000 $120,000 75%
33
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 30, 2003
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REP- E HUITT LANE/ASCOT DRIVE/DUNAWAY DRIVE
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: WW1102 Priority: A
COUNCIL AUTHORIZATION:
February 22, 2011: Authorize the City Manager to execute an engineering design contract with Elliot and
Hughes, Inc. in an amount not to exceed $73,314.
November 8, 2011: Award construction contract to Ark Contracting Services in the amount of $421,286.75.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan.
The project is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Ascot Drive to E Huitt Lane along Fuller Branch, and
2. Ascot Drive, Dunaway Court, and Dunaway Drive between Dunaway Court and Ascot Drive.
PROJECT SCHEDULE:
Award Design: February 2011
Anticipate Plans Complete: August 2011
Anticipate Begin Construction: November 2011
Anticipate Construction Complete: 2nd Quarter 2012
JUSTIFICATION:
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
34
PROJECT TITLE: LINE REP- E HUITT LANE/ASCOT DRIVE/DUNAWAY DRIVE PROJECT CODE: WW1102
�.. NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Uirect Operating Cost Engineering $73,314
Personnel: Full Time Construction $486,686
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal: $0 Total Estimated Capital Cost $560,000
Maintenance Costs Funding Source:
Transfer from:
W/WW Operating Fund $510,000
W/WW CIP Fund Balance $50,000
$0
Subtotal: $0
Total Estimated Annual Cost
$01Total
Funding
$560,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED
BUDGET (-+)
% EXPENDED
Engineering
$73,314 $63,573
$9,741
87%
Construction
$486,686 $210,756
$275,930
43%
ALP
$560,000 $274,329 $285,671
49%
35
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 12,2011
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-BLANCO DR/ARANSAS DR/CRANE DR
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: WW1201 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan.
The project is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
This project consists of the replacement of the following wastewater mains:
1. Between Blanco Drive and Aransas Drive from south of Harwood Road and
2. Between Blanco Drive and Crane Drive from Harwood Road to Aransas Drive.
PROJECT SCHEDULE:
Award Design Contract: January 2012
Design Complete: July 2012
Award Construction Contract: October 2012
Anticipate Construction Complete: January 2013
JUSTIFICATION:
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
-.1
'-*N
-'-*N
36
PROJECT TITLE: LINE REPLACEMENT-BLANCO DR/ARANSAS DR/CRANE DR PROJECT CODE: WW1201
INET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering $35,000
Personnel: Full Time Construction $292,000
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal: $0 Total Estimated Capital Cost $327,000
Maintenance Costs Funding Source:
Transfer from:
W/WW Operating Fund $327,000
$0
Subtotal: $0
Total Estimated Annual Cost
$01Total
Funding
$327,00,
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED
BUDGET (- +)
% EXPENDED
Engineering
$35,000 $14,134
$20,866
40%
Construction
$292,000 $0
$292,000
0%
'AL PROJECT
$327,000 $14,134 $312,866
4%
37
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 10, 2010
Submitted By: RON YOUNG Date Completed:
Project Title: NTE (SH183) PHASE I WASTEWATER RELOCATION
Project Type: WASTEWATER Sub -Type: LINE RELOCATION
Project Code: WW1203 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The Texas Department of Transportation ("TxDoT") has entered into a developer agreement with North Tarrant
Express Mobility Partners ("NTEMP") for the expansion of SH183. A portion of the Phase I construction will affect
the City of Euless utilities along SH183 between Westpark Way and FM157.
PROJECT DESCRIPTION:
The City of Euless has approximately 2,400 linear feet of wastewater mains and several manholes located within
the SH183 right-of-way. These facilities must be relocated to accommodate the SH183 expansion. It is
anticipated that the City will enter into a relocation agreement with NTEMP to authorize them to design and
relocate the wastewater lines. The City will be responsible for 50% of the cost of the line relocation.
PROJECT SCHEDULE:
Anticipate Construction Complete: FY2013
JUSTIFICATION:
City of Euless wastewater facilities are located within TxDoT right-of-way. As such, the City must provide for
utility relocation to accommodate the roadway expansion.
W
'-,*N
38
PROJECT TITLE: NTE (SH183) PHASE I WASTEWATER RELOCATION PROJECT CODE: WWI 203
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering $68,
Personnel: Full Time Construction $386,
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
Subtotal: $01Total Estimated Capital Cost $454,000
Maintenance Costs Funding Source:
Transfer from:
W/WW Operating Fund $151,000
R-O-W Proceeds $201,000
$0 Plan Review/Inspection Fees $102,000
Subtotal: $0
Total Estimated Annual Cost
$01
Total Funding
$454,00
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED
BUDGET (-+)
% EXPENDED
Engineering
$68,000 $0
$68,000
0%
Construction
$386,000 $0
$386,000
0%
CT
$454,000
$0 $454,000
0%
39
T H E C I T Y O F
sa, a
bo
40
CAPITAL IMPROVEMENTS PROGRAM
FUNDED PROJECTS SUMMARY
Project
Number
Project Description
Budget as of
5/31/11
Appropriation/
Amendment
Budget as of
5131112
Expended as
of 6131112
Remaining
Funds
Revised
Project Cost
Estimates
Unfunded/
(Excess
Funding)
WATER PROJECTS
WT0001
Misc. Water Rehab (min bal $160,000)
$
218,511
$
100,000
$
318,611
$
220,056
$
98,455
$ 418,611
$ 100,000
WT0101
Water Tank Debt Payment -impact
$
2,957,502
$
262,212
$
3,219,714
$
3,132,310
$
87,404
$ 3,479,748
$ 260,034
WT0104
Well Repairs (min bal $200,000)
$
813,594
$
95,000
$
908,594
$
847,135
$
61,459
$ 1,108,594
$ 200,000
WT0202
Reclaimed Water Main
$
1,750,000
$
-
$
1,750,000
$
1,497,663
$
252,337
$ 1,750,000
$
WT0803
Meters/Transponders (annual transfer $158,000)
$
979,750
$
158,000
$
1,137,750
$
775,032
$
362,718
$ 1,295,750
$ 158,000
WT0901
TRA Water Payments -impact
$
400,000
$
150,000
$
550,000
$
400,000
$
150,000
$ 700,000
$ 150,000
WT1201
Reclaimed Water Line Extension c3)
$
-
$
4,607,000
$
4,607,000
$
-
$
4,607,000
$ 6,500,000
$ 1,893,000
WT1202
Standpipe Storage Tank & Bldg Demolition 'C-
$
$
84,640
$
84,640
$
1,600
$
83,040
$ 84,640
$
WT1203
Water & Wastewater Im pact Fee U pdate
$
$
30,000
$
30,000
$
-
$
30,000
$ 30,000
$
FB9910
FB- Water Impact (Restricted)
$
$
-
$
-
$
$
-
$ -
$ 1,696,497
FB9901
FB - Water & Wastewater CIP
$
$
$
$
$
$
$ 855,776
Total Water Projects
$7,119,357
$5,486,852
$12,606,209
$6,873,796
$5,732,413
$15,367,243
$208,761
Debt not yet issued.
C. P K-0
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: July 26,2009
Submitted By: RON YOUNG Date Completed:
Project Title: MISCELLANEOUS WATER REHABILITATION
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Pro'ect Code: WT0001 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project provides funding for small water main projects identified throughout the fiscal year. Large projects
that are identified will be presented for funding under a new project number.
PROJECT SCHEDULE:
JUSTIFICATION:
Some of the City's older water mains have deteriorated and need replacement or repair.
42
PROJECT TITLE: MISCELLANEOUS WATER REHABILITATION PROJECT CODE: WT0001
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Water Mains
Personnel: Full Time (Minimum balance $150,000)
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
Subtotal: $01 Total Estimated Capital Cost
Maintenance Costs Funding Source:
Transfers from:
W/WW CIP Fund Balance $365,000
W/WW Operating Fund $100,000
$0 Project Transfers ($1,46,489)
Subtotal: $0 Additional Funding:
Transfer from:
W/WW Operating Fund $100,000
Total Estimated Annual Cost $0 Total Funding $418,511
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET I-+) % EXPENDED
Contingency $49,231 $24,852 $24,379 50%
Water Mains $369,280 $195,204 $174,076 53%
TAL PROJECT $418,511 $220,056 $198,455 53%
43
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 01,2001
Submitted By: RON YOUNG Date Completed:
Project Title: WATER TANK DEBT PAYMENT - IMPACT
Project Type: WATER Sub -Type: IMPACT FEE
Project Code: WT0101 Priority: A
COUNCIL AUTHORIZATION:
Approved in the annual budget.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water tower was included in the water impact fee study.
PROJECT DESCRIPTION:
This project includes the transfer of funds from the water impact fee to pay debt service (W/S System Revenue
Refunding Bonds, Series 2006) related to the construction of the new water tower (Heritage Park).
PROJECT SCHEDULE:
Last debt payment is scheduled for July 15, 2020.
JUSTIFICATION:
The water tower provides additional capacity and was included in the water impact fee study.
bo
44
i
PROJECT TITLE: WATER TANK DEBT PAYMENT - IMPACT PROJECT CODE: WT0101
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct OperatingQperating Cost Debt Service - FY2001-FY2012 $3,219,714
Personnel Full Time
Part Time $0 Debt Service - FY2013 $260,034
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal: $0 Total Estimated Capital Cost $3,479,748
Maintenance Costs Funding Source:
WT Impact Fee Fund Balance $3,219,714
$0 Additional Funding Needed:
Subtotal: $0 Transfer from:
WT Impact Fee Fund Balance $260,034
Total Estimated Annual Cost $0 Total Funding $3,479,748
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET I-+) % EXPENDED
17ansfer to Debt Service $3,479,748 $3,132,310 347,438 90%
AL PROJECT $3,479,748 $3,132,310 $347,438 90%
45
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: June 01,2001
Submitted By: RON YOUNG Date Completed:
Project Title: WELL REPAIRS
Project Type: WATER Sub -Type: WELL REPAIR
Project Code: WT0104 Priority: A
COUNCIL AUTHORIZATION:
April 22, 2003: Awarded bid 018-03 for Far North Well pump repair to Layne -Texas for $32,790.
February 14, 2006: Awarded bid 011-06 to Millican Well Service, LLC for rehabilitation and installation of the new
Centrilift submersible motor and pump for the Far North Well in the amount of $250,035.
January 25, 2011: Authorize Millican Well Service, LLC to repair Fuller Well in an amount not to exceed
$117,000, budget increase and additional funding of $117,000 required.
July 20, 2011: Transferred $95,000 from FB9901 to WT0104 for emergency well repairs.
August 9, 2011: Ratify City Manager action to proceed with emergency repairs to the Far North Well site, by
Millican Well Service, LLC in an amount not to exceed $95,000.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The funding is being utilized to repair well pumps and for other unexpected well repairs.
PROJECT SCHEDULE:
JUSTIFICATION:
Maintaining the City's wells results in the ability to produce water at a substantial reduction in cost.
r
1_1%N
46
PROJECT TITLE: WELL REPAIRS PROJECT CODE: WT0104
's, INET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Well Rehabilitation
Personnel: Full Time (Minimum balance $200,000)
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: I Total
Maintenance Costs
Funding Source:
Transfer from:
WT0001 - Misc Water Rehab
$145,720
WA/VW CIP Fund Balance
$387,874
W/WW Operating Fund
$375,000
Subtotal:
Additional Funding Needed. -
Transfer from:
W/WW CIP Fund Balance
$200,000
Total Estimated Annual Cost
Total Funding
$1,108,594
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED BUDGET (- +)
% EXPENDED
Well Rehabilitation
$1,108,594 $847,135 $261,459
76%
AL PROJECT $1,108,594 $847,135 $261,459 76%
47
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: June 29, 2000
Submitted By: RON YOUNG Date Completed:
Project Title: RECLAIMED WATER MAIN
Project Type: WATER Sub -Type: RECLAIMED WATER SYSTEM
Project Code: WT0202 Priority: A
COUNCIL AUTHORIZATION:
March 11, 2008: Approved resolution 08-1272 to enter into negotiations with the City of Fort Worth (""FW`
May 26, 2009: Authorized the City Manager to negotiate and execute an agreement with FW for the purchase of
reclaimed water, including the related Memorandum of Understanding (with 20-year term).
October 13, 2009: Authorized the City Manager to execute an engineering design contract with Alan Plummer
Associates Inc. in an amount not to exceed $127,600 for the design of a reclaimed water main.
May 25, 2010: Award bid #007-10 for construction contract in the amount of $1,157,625 including alternate to
William J. Schultz, Inc. dba Circle C Construction for the reclaimed water main adjacent to TSGC.
April 12, 2011: Authorize the City Manager to negotiate and execute an agreement with the City of Fort Worth for
the extension of the reclaimed water service.
May 24, 2011: Ratify negotiated change order to contract with Circle C to extend reclaimed water line for a cost of
$278,425.
May 24, 2011: Authorize the City Manager to negotiate and execute a professional services contract with Alan
Plummer and Associates for the reclaimed water line extension.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of the construction of a reclaimed water main from the City of Fort Worth Village Creek
Wastewater Treatment Facility to the Texas Star property. Project scope includes the extension of the water
main to other areas of the City that would benefit from the availability of reclaimed water.
PROJECT SCHEDULE:
Award Design Contract: October 2009
Award Construction Contract: May 2010
Anticipate Construction Completed: September 2012
JUSTIFICATION:
Utilization of this source of water would ensure the City could continue irrigation in the event of drought and/or
activation of mandatory water restrictions. Continued irrigation is required for the protection of the City's capital
investment in the Texas Star Golf Course and the Texas Star Sports Complex.
''1
48
PROJECT TITLE: RECLAIMED WATER MAIN
�— NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
PROJECT CODE: WT0202
TOTAL ESTIMATED CAPITAL COST:
Direct O er ting Cost
Engineering
$240,OOC
Personnel: Full Time
Construction
$1,510,OOC
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Total Estimated Capital Cost
$1,750,000
Maintenance Costs
Funding Source:
Transfers from:
W/WW Operating Fund
$970,000
City of Fort Worth
$130,000
W/WW CIP Fund Balance
$400,000
Subtotal:
Developer Contribution
$250,000
Total Estimated Annual Cost
Total Funding
$1,750,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED BUDGET (- +)
% EXPENDED
Engineering
$240,000 $204,289 $35,711
85%
Water Mains
$1,510,000 $1,293,374 $216,626
86%
AL PROJECT $1,750,000 $1,497,663 $252,337 86%
49
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 31,2007
Submitted By: RON YOUNG Date Completed:
Project Title: METERS AND TRANSPONDERS
Project Type: WATER Sub -Type: METERS/TRANSPONDERS
Proiect Code: WT0803 Priority: A
COUNCIL AUTHORIZATION:
November 13, 2007: Awarded the annual contract for the purchase of water meters and transponders, and
authorized the City Manager to enter into an agreement with Atlas Utility Supply Company in the amount of
$383,875. Amount for project not to exceed $331,875.
November 11, 2008: Awarded the annual contract for the purchase of water meters and transponders, and
authorized the City Manager to enter into an agreement with Atlas Utility Supply Company in the amount of
$356,875. Amount for project not to exceed $331,875.
February 14, 2012: Awarded the annual contract for the purchase of water meters and transponders, and
authorized the City Manager to enter into an agreement with Atlas Utility Company in the amount of $200,000.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Partial replacement of transponders occurred in FY2006 and FY2007. This project proposes to replace the
balance of the old transponders. The systematic replacement of meters and transponders at or near end of life is
included in the Water System Master Plan.
PROJECT DESCRIPTION:
Purchase and installation of electronic transponders affixed to water meters allowing for electronic or remote
reading of customer water consumption. These water meters (transponders) are read with an electronic device
located inside a vehicle which is driven along a predefined route. System -wide replacement of older meters
beginning with the larger meters first is also included in the scope of the project.
PROJECT SCHEDULE:
Ongoing
JUSTIFICATION:
This project provides funding for the systematic replacement of meters and transponders on a regular schedule at
or near end of asset life.
ba
50
City of Euless
Capital Project Request
Department: ECONOMIC DEVELOPMENT Date Prepared: July 26,1999
Submitted By: BILL RIDGWAY Date Completed:
Project Title: EULESS DEVELOPMENT CORPORATION INCENTIVE
Project Type: EDC Sub -Type: DEVELOPMENT
Project Code: DV9901 Priority: A
COUNCIL AUTHORIZATION:
March 27, 2001: Approved transfer of $325,000 to North Main Street for right-of-way to free up funds for a sign
program.
May 30, 2006: Approved payment to Professional Turf Products, Inc. in the amount of $300,000 per agreement.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Euless Development Corporation funds that have been set aside to aid the City of Euless in attracting
development opportunities.
PROJECT SCHEDULE:
JUSTIFICATION:
11�
68
PROJECT TITLE: REDEVELOPMENT PROJECT CODE: CM0804
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Land Acquisition $902,910
Personnel: Full Time Demolition $60,696
Part Time $0 Minor Apparatus $97
Total Salary $0 Incentives $360,000
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal:
$0
Total Estimated Capital Cost
$1,323,703
Maintenance Costs
Funding Source:
Transfer from:
General Fund
$930,000
Interest Earnings
$33,703
$0
Drill Site Surface Damage
$10,000
Subtotal:
$0
Additional Funding Needed:
Transfer from GCIP Fund Bal
$350,000
Total Estimated Annual Cost
$0
Total Fundinq
$1,323,703
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED BUDGET (- +)
% EXPENDED
Land Acquisition
$902,910 $626,335 276,575
69%
Demolition
$60,696 $58,317 2,379
96%
Minor Apparatus
$97 $97 0
100%
Incentives
$360,000 $10,000 350,000
3%
PROJECT $1,323,703 $694 749 $628 954 52%
67
City of Euless
Capital Project Request
Department: CITY MANAGER Date Prepared: July 11,2006
Submitted By: GARY MCKAMIE Date Completed:
Project Title: REDEVELOPMENT
Project Type: MISCELLANEOUS Sub -Type: DEVELOPMENT
Project Code: CM0804 Priority: A
COUNCIL AUTHORIZATION:
Oct 23, 2007: Authorized the purchase of property on Lot 27, Block 2, Cresthaven Addn, 1010 Highland Dr
Nov 27, 2007: Authorized the purchase of property on Lot 24, Block 1, Cresthaven Addn, 1010 Cresthaven Dr
Dec 11, 2007: Authorized the purchase of property on Lots 17&18, Block 8, Cedar Hill Estates Addn, 710 S Main
Oct 28, 2008: Authorized the purchase of property on Lot 3, Block 2, Cresthaven Addn, 1007 Cresthaven Dr
Jan 13, 2009: Authorized the purchase of property on Lot 18, Block 1, Cresthaven Addn, 912 Cresthaven Dr; Lot
4, Block 2, Cresthaven Addn, 1005 Cresthaven Dr; and Lot 23, Block 2, Cresthaven Addn, 1002 Highland Dr
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project provides funding to allow the City to participate in redevelopment projects and other community
improvements or make acquisitions of property that will be of economic benefit to the City of Euless.
PROJECT DESCRIPTION:
Project includes City participation in community redevelopment projects and property acquisitions that will be of
economic benefit to the City.
PROJECT SCHEDULE:
Long-term on -going project for continuous improvement of the community.
JUSTIFICATION:
As the City ages, it is imperative that the economic vitality of the City remain strong. Reinvestment into the
community will protect property values from deterioration and keep commercial properties occupied and
vibrant.
111%�
66
PROJECT TITLE: ENTRY MONUMENT SIGN PROGRAM PROJECT CODE: CM0304
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Land Betterments $115,78:
Personnel: Full Time
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal: $0 Total Estimated Capital Cost $115,782
Maintenance Costs Funding Source:
Transfer from. -
Car Rental $115,782
$0
Subtotal: $0
Total Estimated Annual Cost $01 Total Funding $115,782
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED
Land Betterments $115,782 $93,027 22,755 80%
AL PROJECT $115,782 $93,027 $22,755 80%
65
City of Euless
Capital Project Request
Department: CITY MANAGER Date Prepared: July 11,2006
Submitted By: JOE HENNIG Date Completed:
Project Title: ENTRY MONUMENT SIGN PROGRAM
Project Type: MISCELLANEOUS Sub -Type: IMPROVEMENTS
Pro'ect Code: CM0304 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Continuation of the original City of Euless Entry Monument Sign Program.
PROJECT DESCRIPTION:
Continued construction of City of Euless entry monument signs at key high visibility points throughout the City
extending Euless beautification and branding efforts.
PROJECT SCHEDULE:
JUSTIFICATION:
To enable continuous efforts to identify, beautify, and brand the City of Euless.
1111i
64
10*N PROJECT TITLE: TEXAS STAR SPORTS COMPLEX PHASE IV PROJECT CODE: AC1201
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Parking Lot
$0 Concessions & Rest Room
$0 Lights/Electrical
$0 Material storage bin
$0 Entry walk
$7,500 Fencing
$3,500 Concession equipment
Retaining Wall
5% Contingency
Subtotal: $11,000 Total Estimated Capital Cost
Maintenance Costs Funding Source:
$0 Transfer from:
EDC CIP Fund Balance
Contributed Capital (Sting)
$412, 000'I
$195,000
$90,000
$15,600
$35,000
$18,000
$16, 000
$18, 000
$41,087
$840,687
$599,470
$195,000
Subtotal:
$0
Additional Funding Needed:
Transfer from:
EDC CIP Fund Balance
$46,217
Total Estimated Annual Cost
$11,000
Total Funding
$840,687
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED BUDGET (- +)
% EXPENDED
Parking Improvements
$412,000 $0 $412,000
0%
Lighting
$90,000 $0 $90,000
0%
Equipment
$31,600 $0 $31,600
0%
Land Betterments
$71,000 $0 $71,000
0%
Contingency
$41,087 $0 $41,087
0%
Buildings
$195,000 $0 $195,000
0%
$840,687 $0 $840,687
0%
63
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: May 01,2010
Submitted By: RAY MCDONALD Date Completed:
Project Title: TEXAS STAR SPORTS COMPLEX PHASE IV
Project Type: PARK/RECREATION Sub -Type: TSSC IMPROVEMENTS
Project Code: AC1201 Priority: A
COUNCIL AUTHORIZATION:
January 24, 2012: Authorize the City Manager to negotiate and execute a Field Use and Lease Agreement with
Sting Soccer Group, LP and Texas Titans FC, LLC, (collectively "Sting") for the use of a portion of the property
located at 1501 South Pipeline Road Euless, Texas 76040 (The Parks at Texas Star Sports Complex) as a
practice and training facility for youth soccer. In consideration of its use of the property, Sting will construct
certain facility improvements on the property.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Texas Star Sports Complex Phase IV incorporates the addition of a concession and rest room facility and parking
for 200 vehicles. This addition will ensure that the Texas Star Sports Complex is positioned as a premier facility
that serves the athletic and recreational programming needs of the City.
PROJECT DESCRIPTION:
The project scope includes the design and construction of a parking lot and a concession/rest room facility at the
Texas Star Sports Complex. Related support facilities such as electrical service, lighting, fencing, etc. are also
included in the scope of the project.
PROJECT SCHEDULE:
Concession Complete: Per contract with Sting, must be complete by October 16, 2013.
JUSTIFICATION:
Since the completion of Phase III at the Texas Star Sports Complex, the facility has been severely under served
in parking, rest room facilities, and concessions. With the completion of Phase IV, the Texas Star Sports
Complex will be positioned to serve the ever-increasing athletic needs of the community and spur economic
opportunities for the City.
62
CAPITAL IMPROVEMENTS PROGRAM
FUNDED PROJECTS SUMMARY
Project
Number
Project Description
Budget as of
6/31/11
Appropriation/
Amendment
Budget as of
6131/12
Expended as
of 5/31/12
Remaining
Funds
Revised
Project Cost
Estimates
Unfunded/
(Excess
Funding)
OTHER
AC1201
iTexas Star Sports Complex Phase IV
$
-
$
794,470
$
794,470
$
-
$
794,470
$
840,687
$ 46.217
CM0304
Entry Monument Sin Program
$
115,782
$
-
$
115,782
$
93,027
$
22,755
$
115,782
$
CM0804
Redevelopment
$
973,326
$
377
$
973,703
$
694,749
$
278,954
$
1,323,703
$ 350,000
DV9901
EDC Incentive Funds
$
400,854
$
50,000
$
450,854
$
300,854
$
150,000
$
475,854
$ 25,000
ED0101
Planning Consultants
$
204,869
$
-
$
204,869
$
104,869
$
100,000
$
204,869
$
ED1002
EDC Contingency
$
250,000
$
-
$
250,000
$
-
$
250,000
$
250,000
FM1201
ADA Facility Improvements (min bal $50,000)
$
-
$
50,000
$
50,000
$
3,642
$
46,358
$
50,000
$
GC1201
TSGC Misc. Improvements (min bal $150,000)
$
-
$
150,000
$
150,000
$
62,323
$
87,677
$
250,000
$ 100,000
PD9901
Police and Courts Facility
$ 11,718,034
$
32
$
11,718,066
$ 11,609,560
$
108,506
$
11,718,066
$
PR0720
Misc. Park Improvements (min bal $100,000)
$
225,000
$
75,000
$
300,000
$
241,128
$
58,872
$
575,000
$ 275,000
PRO804
Park Irrigation
$
100,000
$
25,000
$
125,000
$
47,787
$
77,213
$
150,000
$ 25,000
PR1201
I Euless FLC Aquatics Design
$
-
$
786,500
$
786,500
$
9,465
$
777,035
$
550,000
$ 236,500
FB9906
FB-EDC CIP
$
$
-
$
-
$
-
$
-
$
-
$ 482,302
FB9908
FB-Texas Star Sports Complex CIP
$
$
$
$
$
$
$ 751,828
FB9909
FB-General CIP
$
$
$
$
$
$
$ 1,600,577
FB9913
FB-Car Rental CIP
$
$
$
$
$
$
$ 73,146
Total Other Projects
$13,987,865
$1,931,379
$15,919,244
$13,167,404
$2,751,840
$16,503,961
($2,323,136)
('� To be reallocated to Euless FLC Aquatics Construction project.
L
60
PROJECT TITLE: WATER AND WASTEWATER IMPACT FEE UPDATE PROJECT CODE: WT1203
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
ineering
Personnel: Full Time
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
$0
$30,
Subtotal: $0 Total Estimated Capital Cost $30,000
Maintenance Costs Funding Source:
Transfer from:
WT Impact Fee Fund Balance $30,000
Subtotal:
Total Estimated Annual Cost $01Total Funding $30,00,
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Engineering $30,000 $0 $30,000 0%
TAL
$30,000
$0 $30,000
0%
59
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 31,2009
Submitted By: RON YOUNG Date Completed:
Project Title: WATER AND WASTEWATER IMPACT FEE UPDATE
Project Type: WATER Sub -Type: IMPACT FEE
Pro'ect Code: WT1203 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Water and wastewater impact fee charges were instituted by the City of Euless in 1990 in accordance with
applicable state law to generate revenue for funding of capital improvements attributable to new development.
Impact fees are related to the items identified by the Capital Improvements Plan and the Water and Wastewater
System Master Plan.
PROJECT DESCRIPTION:
This project will consist of reviewing the City's Land Use Assumptions, the costs of future infrastructure needs,
system capacity available for future growth, the cost of Trinity River Authority service, and the cost of updating the
Capital Improvements Plan. Calculations based on state dictated requirements will be made to determine the
maximum allowable impact fees. The city council will determine what percentage of the maximum allowable fee
to impose.
PROJECT SCHEDULE:
FY2012
JUSTIFICATION:
Legislation passed in 2001 provided an automatic five year extension to the 2002 update. The impact fees were
updated in 2007 as required. The next impact fee update will be in 2012 barring any new legislative action.
M
58
^, PROJECT TITLE: STANDPIPE STORAGE TANK & BUILDING DEMOLITION PROJECT CODE: WT1202
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Standpipe Demolition
$30,000
Personnel: Full Time
Building Demolition Services
$35,000
Part Time
$0
Asbestos Remediation
$3,000
Total Salary
$0
Remediation Monitoring Svcs
$2,000
Purchase of Services
Oncor Electrical Svc Removal
$11,300
Materials & Supplies
Contingency
$3,000
Utilities
TDLR Filing Fees
$340
Subtotal: $0 Total Estimated Capital Cost $84,640
Maintenance Costs Funding Source:
Transfer from:
W/WW Operating Fund $84,640
$0
Subtotal: $0
Total Estimated Annual Cost
$01Total
Funding
$84,640
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED
BUDGET (- +)
% EXPENDED
Engineering
$2,340 $0
$2,340
0%
Standpipe Demolition
$30,000 $0
$30,000
0%
Contingency
$3,000 $1,600
$1,400
53%
Building Demolition
$35,000 $0
$35,000
0%
Utility Relocation
$11,300 $0
$11,300
0%
Asbestos Remediation
$3,000 $0
$3,000
0%
$84,640 $1,600 $83,040 2%
57
City of Euless
Capital Project Request
Department: PUBLIC WORKS/FACILITIES Date Prepared: March 08, 2010
Submitted By: RON YOUNG Date Completed:
Project Title: STANDPIPE STORAGE TANK & BUILDING DEMOLITION
Project Type: FACILITIES Sub -Type: DEMOLITION
Project Code: WT1202 Priority: A
COUNCIL AUTHORIZATION:
May 22, 2012: Authorize the Mayor to negotiate and execute conveyance documents for the sale of
approximately 2.624 acres of city owned property situated in the James M. Matson Survey, Abstract No. 1080,
Tract 6A, Tarrant County, Texas, located at 1000 Central Drive, Bedford, Texas. Pending sale is for property "AS
IS."
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The project does not affect the City's master plan nor is it dependent on other projects.
PROJECT DESCRIPTION:
The project scope includes the demolition of five (5) structures and standpipe located at 1100 Central Drive,
Bedford, Texas. This location was once the site of the City's public works facility which relocated to 1517
Westpark Way, Euless. The buildings are a public nuisance and removal is recommended. An asbestos survey
has been conducted and a minimal amount of non -friable asbestos material was discovered. This will be
remediated as part of the demolition process. Removal of the electric service that supplied power to the well
pumps is included in the project scope.
PROJECT SCHEDULE:
Upon completion of sale, receipt of proceeds, and conveyance of property "AS IS," this project will be closed and
allocated funding will be returned to W/WW CIP Fund Balance.
JUSTIFICATION:
Removal of the two million gallon standpipe and site buildings will improve the appearance of the property and
enhance the market value of the land.
56
PROJECT TITLE: RECLAIMED WATER LINE EXTENSION PROJECT CODE: WT1201
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Preliminary Design/Feasibility $100,000
Personnel: Full Time Engineering $400,000
Part Time $0 Construction $5,900,000
Total Salary $0 Multi -Family Connections &
Purchase of Services Customer Education $100,000
Materials & Supplies
Utilities
Estimated avg. annual debt service $275,000
Subtotal: $275,000
Total Estimated Capital Cost $6,5,00,000
Maintenance Costs
Funding Source:
Transfer from:
W/WW CIP Fund Balance
Additional Funding Needed:
Subtotal:
Transfer from W/WW Op Fund $1,000,000
2013 Revenue Bond Issue $1,590,000
Future Revenue Bond Issue _ a 988;@6Q
Total Estimated Annual Cost $275,000
Total Funding $6,500,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED
Engineering $500,000 $0 $500,000 0%
Construction $5,900,000 $0 $5,900,000 0%
Utility Relocation $100,000 $0 $100,000 0%
JTAL PROJECT $6,500,000 $0 $6,500,000 0%
55
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 17,2011
Submitted By: CHRIS BARKER Date Completed:
Project Title: RECLAIMED WATER LINE EXTENSION
Project Type: WATER Sub -Type: RECLAIMED WATER SYSTEM
Project Code: WT1201 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The reclaimed water line extension is a continuation of the City's Reclaimed Water Utility System. The feasibility
study completed in FY2012 recommends breaking the project into six phases with the first phase beginning in
FY2013.
PROJECT DESCRIPTION:
The project will extend the City's Reclaimed Water Utility System from a point near the northeast corner of Bear
Creek Parkway and Midway Drive, northward to a point near Mid Cities Boulevard. Extension of this system will
ultimately provide reclaimed water service to several multi -family properties from Harwood Road to Mid Cities
Boulevard as well as the City's Bear Creek Park. Additional system expansion would be possible in the future.
PROJECT SCHEDULE:
Feasibility Study Complete: July 2012
Begin Phase I: FY2013
JUSTIFICATION:
Construction of the project will provide a non -potable water source for irrigation which will offset future potable
water purchases by the City and will serve to responsibly conserve potable water resources for the City and the
region.
L/
54
PROJECT TITLE: TRINITY RIVER AUTHORITY WATER PAYMENT -IMPACT PROJECT CODE: WT0901
INET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
($150,000)
Water Pmts FY2009-2012 $550,
Water Payments FY2013 $150,
Subtotal: ($150,000) Total Estimated Capital Cost $700,000
Maintenance Costs Funding Source:
Transfer from:
WT Impact Fee Fund Balance $550,000
$0
Subtotal: $0 Additional Funding Needed:
Transfer from:
WT Impact Fee Fund Balance $150,000
Total Estimated Annual Cost ($150,000)1 Total Funding $700,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET I- +) % EXPENDED
Water - TRA Service $700,000 $400,000 $300,000 57%
PROJECT $700,000 $400,000 $300,000 57%
53
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 31,2008
Submitted By: RON YOUNG Date Completed:
Project Title: TRINITY RIVER AUTHORITY WATER PAYMENT -IMPACT
Project Type: WATER Sub -Type: IMPACT FEE
Proiect Code: WT0901 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Based on a review by Birkhoff, Hendricks, and Conway of the water and wastewater impact fees, it was
determined that a substantial portion of the water impact fee is attributed to Trinity River Authority ("TRA") capital
projects. Therefore, these fees should be used to pay a portion of the annual TRA expense, as these funds are
directly attributed to the expansion of TRA. Based on the available fund balance, a systematic drawdown over a
ten year period has been developed.
PROJECT SCHEDULE:
Annual payment FY2009: $100,000
Annual payments FY2010-2018: $150,000
JUSTIFICATION:
The expansion at TRA provides additional capacity and it was determined through the water impact fee study that
these funds could be used to pay a portion of TRA water payments. It was determined a ten year drawdown
would approximate the Capital Improvement Plan Review time frame, as well as provide for a systematic
drawdown that would not impact the annual budget.
111i
11i
52
PROJECT TITLE: METERS AND TRANSPONDERS PROJECT CODE: WT0803
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
(Annual Funding $158,000)
FY2008 through FY2012 $1,137,750
insponders/Meters FY2013 $158,000
Subtotal:
$0
Total Estimated Capital Cost
$1,295,750
Maintenance Costs
Funding Source:
Transfers from:
W/WW CIP Fund Balance
$347,750
WA/VW Operating Fund
$790,000
$0
Subtotal:
$0
Additional Funding Needed:
Transfer from:
WNM Operating Fund
$158,000
Total Estimated Annual Cost
$01
Total Funding
$1,295,750
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED BUDGET (-+)
% EXPENDED
Meters/Transponders
$1,295,750 $775,032 520,718
60%
$1,295,750 $775,032 $520,718 60%
51
PROJECT TITLE: EULESS DEVELOPMENT CORPORATION INCENTIVE PROJECT CODE: DV9901
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Will be based on the merits of
Personnel: Full Time each opportunity.
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
Subtotal: $01 Total Estimated Caoital
maintenance costs
Funding Source:
Transfers from:
EDC CIP Fund Balance
$913,454
EDC Operating Fund
$325,000
r
$0
Transfer to FS#2 SS0010
($432,600)
Subtotal:
$0
Transfer to N Main PS9901
($355,000)
Additional Funding Needed:
EDC Operating Fund
$25,000
Total Estimated Annual Cost
$0
Total Funding
$475,854
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED BUDGET (-+)
% EXPENDED
Economic Development Incentives
$475,000 $300,000 $175,000
63%
Irrigation Supplies
$854 $854 $0
100%
L PROJECT $475,854 $300,854 $175,000 63%
69
City of Euless
Capital Project Request
Department: ECONOMIC DEVELOPMENT Date Prepared: July 07,2000
Submitted By: BILL RIDGWAY Date Completed:
Project Title: PLANNING CONSULTANTS
Project Type: MISCELLANEOUS Sub -Type: DEVELOPMENT
Project Code: ED0101_ Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project provides funding for evaluating various development opportunities.
IPROJECT DESCRIPTION:
Commission a study to determine the highest and best use of valuable undeveloped commercial land.
I PROJECT SCHEDULE:
JUSTIFICATION:
Poor planning can result in lower than desired tax revenue, hodge podge development activity, and less than
optimal development quality. The City needs to be proactive to guide the development of these vital tracts.
No
70
PROJECT TITLE: PLANNING CONSULTANTS
�.- NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
$0
$0
$0
$0
PROJECT CODE: ED0101
TOTAL ESTIMATED CAPITAL COST:
Planning Study $204,8E
Total Estimated Capital Cost
Funding Source:
Transfer from:
Car Rental
Car Rental CIP Fund Balance
$204,
$200,000
$4, 869
Total Estimated Annual Cost $01 Total Funding $204,869
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Planning Study $204,869 $104,869 100,000 51%
$204,869 $104,869 $100,000
51%
71
City of Euless
Capital Project Request
Department: ECONOMIC DEVELOPMENT Date Prepared: Sept 30,2010
Submitted By: GARY MCKAMIE Date Completed:
Project Title: EDC CONTINGENCY
Project Type: EDC Sub -Type: MISCELLANEOUS
Project Code: ED1002 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
To provide funding for emergencies or unforeseen projects that arise throughout the year.
PROJECT SCHEDULE:
JUSTIFICATION:
This would enable the City to act quickly on emergency or unforeseen projects. Without funding, these types of
projects would have to wait until the next budget cycle which could increase costs or impede economic
development opportunities.
t
ram,
PROJECT TITLE: EDC CONTINGENCY
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
PROJECT CODE: ED1002
TOTAL ESTIMATED CAPITAL COST:
$250,
$0
$0
$0 Total Estimated Capital Cost $250,000
Funding Source:
Transfer from:
EDC CIP Fund Balance $250,000
$0
$0
Total Estimated Annual Cost $01 Total Funding $250,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Contingency $250,000 $0 $250,000 0%
$250,000 $0 $250,000 0%
73
City of Euless
Capital Project Request
Department: FACILITIES Date Prepared: April 11,2011
Submitted By: KYLE MCADAMS Date Completed:
Project Title: ADA/TAS FACILITY IMPROVEMENTS
Project Type: FACILITIES Sub -Type: IMPROVEMENTS
Project Code: FM1201 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project provides for the continued improvements to various City facilities as required by Federal and State
mandated Americans with Disabilities Act/Texas Accessibility Standards ("ADA/TAS"). City facilities, entrances,
lifts, signage, speech and hearing aided devices, and other areas covered under both ADA and TAS
requirements will be part of these improvements. Project funds will be managed by the City Manager's Office and
will be allocated as identified projects are brought forth and approved.
PROJECT SCHEDULE:
JUSTIFICATION:
Some City facilities do not meet current ADA/TAS standards. Updating accessibility on a continuing basis will
help keep the City in compliance with government standards and will address the growing needs of citizens with
accessibility issues.
'-,*N
74
PROJECT TITLE: ADA/TAS FACILITY IMPROVEMENTS PROJECT CODE: FM1201
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
uirect uperating cost Improvements
Personnel: Full Time (Minimum balance $50,000)
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal: $0 Total Estimated Capital Cost
Maintenance Costs Funding Source:
Transfer from:
Car Rental $50,000
$0
Subtotal: $0
Total Estimated Annual Cost $01Total Funding $50,00
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED
Structural Maintenance $50,000 $3,642 $46,358 7%
$50,000 $3,642 $46,358 7%
75
City of Euless
Capital Project Request
Department: TEXAS STAR GOLF COURSE Date Prepared: May 17,2011
Submitted By: GLENDA HARTSELL Date Completed:
Project Title: TSGC MISCELLANEOUS IMPROVEMENTS
Project Type: PARK/RECREATION Sub -Type: TSGC IMPROVEMENTS
Project Code: GC1201 Priority: A
COUNCIL AUTHORIZATION:
I RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
To provide funding to address small capital projects that arise throughout the year at Texas Star Golf Course.
PROJECT SCHEDULE:
JUSTIFICATION:
Without funding for this project, the smaller items identified throughout the year could not be addressed in a
timely manner and would have to be postponed until the next budget cycle for funding consideration. Timely
response preserves the City's investment in a high -profile asset and maintains the quality service levels expected
from patrons.
76
PROJECT TITLE: TSGC MISCELLANEOUS IMPROVEMENTS PROJECT CODE: GC1201
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Improvements
(Minimum balance $150,000)
Total Estimated Cad
Funding Source:
Transfer from:
TSGC Reserve Fund
Cost
$150,
Subtotal:
Total Estimated Annual Cost
$0
$0
Additional Funding Needed. -
Transfer from:
TSGC Reserve Fund
Total Funding
$100,000
$250,000
CURRENT STATUS
OVEWUNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED BUDGET (- +)
% EXPENDED
Land Betterments
$113,000 $24,628 $88,372
22%
Land Acquisition
$2,000 $2,000 $0
100%
Equipment
$50,000 $14,380 $35,620
29%
Improvements
$35,000 $0 $35,000
0%
Repair & Maintenance
$50,000 $21,315 $28,685
43%
'AL PROJECT $250,000 $62,323 $187,677 25%
77
City of Euless
Capital Project Request
Department: POLICE DEPARTMENT Date Prepared: July 15, 1999
Submitted By: GARY MCKAMIE Date Completed:
Project Title: POLICE & COURTS FACILITY
Project Type: BUILDINGS/FACILITIES Sub -Type: CONSTRUCTION
Project No.: PD9901 Priority: A
COUNCIL AUTHORIZATION:
January 13, 1998 - Authorized contract with Phillips Swager for architectural services.
April 14, 1998 - Authorized the acquisition of the Western Hills Inn and Western Hills Annex.
June 9, 1998 - Awarded Bid No. 98-13 for demolition services.
October 9, 1998 - Awarded change order to West Excavation for abatement of asbestos.
February 23, 1999 - Authorized additional funds for demolition.
June 22, 1999 - Declared expectation to reimburse expenditures with proceeds of future debt.
June 22, 1999 - Authorized City Manager to request qualifications for construction management service.
February 22, 2000 - Public Hearing and approval of Special Use Permit.
February 22, 2000 - Approval of request for site plan.
May 9, 2000 - Approval of Ordinance No. 1426 authorizing sale of Cert. Of Obligation Series 2000A.
May 9, 2000 - Awarded bid for construction to Ratcliff Construction.
November 14, 2000 - Authorized execution of contract for Project Management Services
January'9, 2001 - Granted City Manager approval to authorize change orders not to exceed $25,000.
January 23, 2001 - Ratified contract for inspection services to increase limit to $65,000
January 23, 2001 - Approved Change Order #1 to credit contract $152,391.
January 23, 2001 - Approved Change Order #3 for payment of $48,372.79 on new piers & removal.
March 27, 2001 - Approved Change Order #4 to credit contract $42,871.41.
May 22, 2001 - Awarded bid #044-01 for furniture in the amount of $332,400.70.
June 12, 2001 - Authorize City Manager to execute contract with DataTex not to exceed $74,257.86.
August 28, 2001 - Awarded contract to DFW Communication in the amount of $33,009 for relocating and
installing police and public works radio system.
PROJECT DESCRIPTION AND RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This 53,000 square foot facility will accommodate police, jail and courts.
PROJECT SCHEDULE:
JUSTIFICATION:
Current facility space is grossly inadequate for these areas.
W
78
PROJECT TITLE: POLICE & COURTS FACILITY
PRn-1F:r_T It- Pn000l
NET EFFECTS ON OPERATING AND
TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Bond Issuance Cost
$ 76,000
Direct Operating Cost
Construction
9,071,257
Personnel: Full Time
128,000
Contingency
128,075
Part Time
Demolition
606,709
Architectural/ Surveying/ Geotech
826,439
Other Professional Services
36,310
Utilities
106,000
Equipment
67,912
Furnishings
350,000
Land Purchase
43,592
Planning Services
70,428
Subtotal:
$234,000
Owner Equipment
441,344
Total Estimated Capital Cost
$11,718,066
Maintenance Costs
HVAC Maintenance
18,084
FUNDING SOURCE:
Maintenance
24,850
Transfers from:
Janitorial Services & Supplies
37,500
General Fund
$394,890
Elect. Supplies
8,000
W/S Operating Fund
$175,000
Pest Control
1,500
CCPD Operating Fund
2,160,000
Subtotal:
$89,934
DEA Funds
450,000
Bond Proceeds
8,600,000
Other
Interest Income
576,979
Average Annual Debt Service
$750,815
Less Inter -project Transfer to:
Building D FMO101
(638,803)
Total Estimated Annual Cost'
$1,074,749
Total Funding
$11,718,066
CURRENT STATUS
OVERIUNDER
PHASE/FUNDING SOURCE
BUDGET
EXPENDED
BUDGET (- +)
% EXPENDED
Bond Issuance Cost
76,000
76,000
0
100%
Construction
9,071,257
9,071,257
0
100%
Contingency plus interest earnings
128,075
61,264
66,811
48%
Demolition
606,709
606,709
0
100%
Architectural Services
745,369
745,369
0
100%
Surveying Services
6,070
6,071
(1)
100%
Geo-Technical Services
75,000
72,511
2,489
97%
Other Professional Services
36,310
36,310
0
100%
Equipment
67,912
67,912
0
100%
Furnishings
350,000
348,347
1,653
100%
Land Purchase
43,592
43,591
1
100%
Off -Site Utilities
0
0
0
0%
Owner Equipment
441,344
403,791
37,553
91 %
Planning Services
70,428
70,428
0
100%
* - This project transferred $638,803 to FM0101.
DOTAL PROJECT $11,718,066 $11,609,560 $108,506 99%
79
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: March 23,2004
Submitted By: RAY MCDONALD Date Completed:
Project Title: MISCELLANEOUS PARK IMPROVEMENTS
Project Type: EDC Sub -Type: PARKS
Prollect Code: PR0720 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The adopted Parks Master Plan recommends funding for system -wide park facilities and amenities upgrades.
PROJECT DESCRIPTION:
The project provides funding for the upgrade and modernization of City parks to include replacement of aged
structures such as pavilions, picnic tables, gazebos, signs, safety components, and other park amenities
including the addition of a gazebo on Main Street. Park infrastructure and structure painting are included in the
scope of the project. Additionally, the project encompasses the installation of trail lighting along the Trails of
Euless similar to the lighting installed along the trail through Midway Park. Trailwood Park, Bob Eden Trail, The
Preserve at McCormick Park, The Villages of Bear Creek Park and Heritage Park would also benefit from trail
lighting.
PROJECT SCHEDULE:
JUSTIFICATION:
Pursuant to the recommendations in the Parks Master Plan, park accessibility should be in compliance with the
Americans with Disabilities Act. The existing equipment in many park areas is becoming aged and will require
refurbishment or replacement in the near term. Additionally, park infrastructure should be maintained at a level
that meets citizen expectations. The popularity of the trails have necessitated the installation of lighting to extend
the hours of usage and to provide increased visibility in remote areas of the trail system.
10,
80
PROJECT TITLE: MISCELLANEOUS PARK IMPROVEMENTS PROJECT CODE: PR0720
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Fixtures, landscaping, lighting,
Personnel: Full Time & other park and infrastructure
Part Time $0 improvements
Total Salary $0
Purchase of Services (Minimum balance $100,000)
Materials & Supplies
Utilities
$0
Subtotal:
$0
Total Estimated Capital Cost
Maintenance Costs
Funding Source:
Transfer from:
EDC Operating Fund
$300,000
$0
Additional Funding Needed:
Subtotal:
$0
Transfer from:
EDC Operating Fund
$275,000
Total Estimated Annual Cost
$0
Total Funding
$575,000
CURRENT STATUS
OVERIUNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED BUDGET (- +)
% EXPENDED
Park Furnishings
$169,848 $169,848 0
100%
Landscaping
$24,870 $24,870 0
100%
Contingency
$127,112 $43,240 83,872
34%
Park Lighting
$50,000 $0 50,000
0%
Equipment
$3,170 $3,170 0
100%
Other
$200,000 $0 200,000
0%
TAL PROJECT $575,000 $241,128 $333,872 42%
81
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: October 01,2007
Submitted By: RAY MCDONALD Date Completed:
Project Title: PARK IRRIGATION
Project Type: EDC Sub -Type: PARKS
Proiect Code: PR0804 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project provides annual funding to continue efforts to meet irrigation needs throughout the City's park
system.
PROJECT SCHEDULE:
Projects will be identified and completed on an as needed basis.
JUSTIFICATION:
This project allows for maintenance and expansion of the irrigation systems throughout the parks system to
enhance the overall condition of the landscape and green space.
82
PROJECT TITLE: PARK IRRIGATION PROJECT CODE: PR0804
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
uirect uperatmg Cost (Annual Transfer $25,000)
Personnel: Full Time Irrigation $150,
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
Subtotal: $0 Total Estimated Capital Cost $150,
Maintenance Costs Funding Source:
Transfer from:
EDC Operating Fund $125,
$0 Additional Funding Needed:
Subtotal: $0 Transfer from:
EDC Operating Fund $25,
Total Estimated Annual Cost $01Total Funding $150 00
CURRENT STATUS
OVERIUNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Irrigation $150,000 $47,787 102,213 32%
$150,000 $47,787 $102,213 32%
83
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: February 11, 2009
Submitted By: RAY MCDONALD Date Completed:
Project Title: EULESS FLC AQUATICS DESIGN
Project Type: PARK/RECREATION Sub -Type: AQUATICS
Project Code: PR1201 Priority: A
COUNCIL AUTHORIZATION:
April 10, 2012: Authorize the City Manager to negotiate and execute an architectural contract for certain
components of the Euless Family Life Center ("FLC") aquatics facilities to John Kirksey Associates, Architects,
Inc. d/b/a Kirksey, Houston, Texas. Fee is anticipated at 8% of construction costs of the buildings.
April 10, 2012: Authorize the City Manager to solicit statements of qualifications for Design Build Services related
to the Euless FLC Indoor and Outdoor Aquatics Facilities.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The City of Euless has for many years recognized the importance of planning for parks, recreation, and open
space based on the needs as expressed by the citizens. For the update to the Parks Master Plan and as part of
the City's five year master plan, a survey of park, recreation, and open space needs was conducted from a
sample of randomly selected citizens in Euless. The survey identified a new aquatic center as a top priority of the
citizens. Project approval requires revision of the master planning of Midway Park as the aquatics center
eliminates the current ball fields and requires the relocation of the existing tennis courts in order to provide
support facilities and amenities for the FLC.
PROJECT DESCRIPTION:
The project consists of the design of indoor and outdoor family aquatic facilities. The indoor facility includes a
lap/leisure pool, current channel, slide, and therapy pool. This multi -purpose facility will be attached to the senior
center and will offer aquatic programs for the senior population and the general public. The outdoor aquatics
center will include various play components such as a leisure pool, slides, aqua play features, shade structures, a
bath house, and all the necessary filtration systems. The project scope also includes redevelopment and
improvement of the entire site such as relocating the tennis courts and the construction of various trails, a group
pavilion, an amphitheater, multi -use sport courts, additional picnic stations with grills, a nature area, a botanical
garden, and public art display(s).
PROJECT SCHEDULE:
JUSTIFICATION:
The City's population is sufficient to support a family aquatic center. The City's existing aquatic facilities have
aged and maintaining the pools and support facilities has been an ongoing issue and concern. The operating
expenses continue to increase, far exceeding the revenue generated by the pools. Continuing in repair mode is
no longer possible at the Wilshire and South Euless Pools and a long-term plan is necessary. Given the fact that
two of the neighborhood pools are over thirty years old and the cost to renovate, repair, or replace them is
estimated at over one million dollars each, it is recommended that the City concentrate efforts and resources
toward the family aquatic facility to serve the citizens of Euless.
84
PROJECT TITLE: EULESS FLC AQUATICS DESIGN PROJECT CODE: PR1201
�.. INET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering $550,OOC
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost $550,000
Maintenance Costs Funding Source:
Transfer from:
Car Rental $786,500
Subtotal
Transfer to:
Car Rental CIP Fund Balance ($236,500)
Total Estimated Annual Cost Total Funding $550,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED
Engineering $550,000 $9,465 $540,535 2%
PROJECT $550,000 $9,465 $540,535 2%
85
NO
86
CAPITAL IMPROVLMENT PROGRAMS
FY13 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE
PROPOSED METHOD OF FINANCING
Project Description
Priority
Estimated Cost
Operating
Fund
CIP Fund
Balance
Bond Sale
Grants/
Contrib
Impact
Fees
Escrow
Funds
Car Rental
Tax
Other
EDC
To Be
Determined
DRAINAGE PROJECTS
None Currently
A
$
L.
Sub -Total Drainage Priority A -Proposed FY13
$
None Currently B
$
Sub -Total Drainage Priority B-Unfunded
$
Bell Hi Addition
C
TBD
XX
Blessing Branch -Main Street to SH 360
C
TBD
XX
Hollow Oak Channel Erosion
C
TBD
XX
Kynette Drive Culvert Modifications
C
TBD
XX
Little Bear Creek Drainage Improvements
C
TBD
XX
Marlene Drive Culvert Replacement
C
TBD
XX
Simmons Drive Culvert Improvements
C
TBD
XX
Sub -Total Drainage Priority C-Unfunded
$
DRAINAGE PROJECTS - TOTAL
STREET PROJECTS
FY2013 38`h CDBG-ADA Infrastructure Improvements
A
$ 450,000
XX
FY2013 County Overlay-Trailwood/Summit Ridge/
West ark
A
$ 300.000
XX
Cullum Drive Design and ROW
A
$ 200.000
XX
Sub -Total Street Priority A -Proposed FY13
$ 950,000
FY2014 39' CDBG-ADA Infrastructure Improvements(")
B
$ 300,000
XX
FY2014 County Overlay-Monterrey/Sotogrande/EI Camino
Real h4i
6
$ 300,000
XX
Cullum Drive Construction (14)
B
$ 565,000
$100,786
$ 67,214
$397,000
FY2015 40t° CDBG-ADA Infrastructure Improvements("'
B
$ 300,000
Xx
FY2015 County Overlay-Baze Road/Kynette Drive/Signet
Drive (15)
B
$ 300,000
XX
FY2016 41" CDBG-ADA Infrastructure Improvements (16)
B
$ 300,000
XX
FY2016 County Overlay-Ector Drive/Raider Drive/Texas
Star Pk 1)
B
$ 300,000
XX
Traffic Signal -Harwood Rd at Bear Creek Pkwy6j
B
$ 180,000
XX
FY2017 42" CDBG-ADA Infrastructure Improvements I'
B
$ 300,000
XX
FY2017 County Overlay -Aransas Drive/Ector Drive i" i
B
$ 300,000
XX
Sub -Total Street Priority B-Unfunded
$ 3,145,000
Bear Creek Parkway
C
TBD
XX
Cresthaven Drive
C
TBD
XX
E Alexander Lane
C
TBD
XX
Fuller -Wiser Road -Harwood Road to Mid Cities Blvd
C
TBD
XX
Fuller -Wiser Road-SH183 to Harwood Road
C
TBD
XX
Highland Drive
C
TBD
XX
Ross Avenue
C
TBD
XX
South Pipeline Road
C
TBD
XX
Vine Street-SH183 to SH10
C
TBD
XX
Sub -Total Street Priority C-Unfunded
$
CAPITAL IMPROVEMENT PROGRAMS
FY13 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE
PROPOSED METHOD OF FINANCING
Project Description
Priority
Estimated Cost
Operating
Fund
CIP Fund
Balance
Bond Sale
Grants/
Contrib
Impact
Fees
Escrow
Funds
Car Rental
Tax
Other
EDC
To Be
Determined
STREET PROJECTS - TOTAL
4,096,000
WASTEWATER PROJECTS
LR: Ross Avenue
A
$ 215,000
XX
LR: Slaughter Lane/E Huitt Lane
A
$ 475,000
XX
LR: W Huitt
A
$ 180,000
XX
Sub -Total Wastewater Priority A -Proposed FY13
$ 870,000
LR: Denton Drive
B
$ 539,000
XX
LR: Milam Drive (14)
B
$ 253,000
XX
NTE (SH183) Phase II Wastewater Relocation(15)
B
$ 600,000
XX
LR: Oakwood Terrace Phase 11'S)
B
$ 345,000
XX
LR: Oakwood Terrace Phase II t15j
B
$ 635,000
XX
LR: Kynette Drive/Wilshire Drive
B
$ 663,000
XX
LR: Cedar Hills Estates/Hollywood Blvd.
B
$ 112,000
XX
Sub -Total Wastewater Priority 8-Unfunded
$ 3,147,000
LR: Collin Drive/Harris Drive/Trion Drive
C
TBD
XX
LR: Crane Drive
C
TBD
XX
LR: Donley Drive/Shelmar Drive
C
TBD
XX
LR: Eastcliff/Wmdlea/Signet
C
TBD
XX
LR: Ector Dr/Donley Dr/Crane Dr
C
TBD
XX
LR: Ector Drive/Fayette Drive
C
TBD
I XX
LR: Evans/Canyon Ridge/N Kynette
C
TBD
XX
LR: Glenn Drive
C
TBD
XX
LR: Huntington/Koen/Atkerson/E Huitt/Slaughter/Martin
C
TBD
XX
LR: Janann/Brownstone/Shelmar Drive
C
TBD
XX
LR: Lakewood/Dogwood/Bocowood
C
TBD
XX
LR. Live Oak Drive/Silver Creek Drive/Marlene Drive
C
TBD
XX
LR. Mary/Marlene/Commerce/ Wilshire/Greenbriar
C
TBD
XX
LR: N Midway Park
C
TBD
XX
LR: Northcliff/Toplea/Windlea/Signet/ Kynette/Westcliff
C
TBD
XX
LR: NW Midway/Rusk/Parker/Rockwall
C
TBD
XX
LR: S Main Street
C
TBD
XX
LR: Sagebrush/Toplea/Wilshire/Yorkshire/Tyler
C
TBD
XX
LR: Sierra Drive
C
TBD
XX
LR: Town Creek Drive
C
TBD
XX
LR: W Donley/Private Drive/Mimosa/Magolia/Redbud
C
TBD
XX
LR: W Midway/Victoria/Delta/ Lamar/Rockwall
C
TBD
XX
Sub -Total Wastewater Priority C-Unfunded
$
WASTEWATER PROJECTS -TOTAL
4,017,000
LR = Line Replacement
I
CAPITAL IMPROVEMENT PROGRAMS
FY13 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE
PROPOSED METHOD OF FINANCING
Project Description
Priority
Estimated Cost
Operating
Fund
CIP Fund
Balance
Bond Sale
Grants/
Contrib
Impact
Fees
Escrow
Funds
Car Rental
Tax
Other
EDC
To Be
Determined
WATER PROJECTS
None Current/
$
Sub -Total Water Priority A -Proposed FY13
$
LR: El Camino Real(14)
B
$ 410,000
XX
Water System Security Camera Installation
B
$ 75,000
XX
LR: S Pipeline Road West I"6
B
$ 300,000
XX
NTE (SH183) Phase II Water Relocation it61
B
$ 1,200,000
XX
Residential Meter Replacement Program
B
$ 3,690,350
XX
LR: Blessing Creek/Stony Creek/Rock Creek (16)
B
$ 315,000
XX
SH360 Water Crossing (17)
B
$ 735,500
XX
Sub -Total Water Priority 8-Unfunded
$ 6,725,850
LR: Collin Drive -Dallas Dr to Harwood Rd
C
TBD
XX
LR: Collin Drive -Denton Dr to Dallas Dr
C
TBD
XX
LR: Denton Drive
C
TBD
XX
LR: Dickey Drive North
C
TBD
XX
LR: Dickey Drive South
C
TBD
XX
LR: Dunaway Drive
C
TBD
XX
LR: E Huitt Lane
C
TBD
XX
LR: Eastcliff Drive
C
TBD
XX
LR: Ector Drive
C
TBD
XX
LR: Fuller Drive
C
TBD
XX
LR: Hollow Oak Drive
C
TBD
XX
LR: Kynette Drive
C
TBD
XX
LR: Live Oak Court/Live Oak Drive
C
TBD
XX
LR: Midcreek/Rock Creek/Stony Creek
C
TBD
XX
LR: Midway Drive East
C
TBD
XX
LR: Midway Drive West
C
TBD
XX
LR: Needles Street
C
TBD
XX
LR: Paula Lane
C
TBD
XX
LR: S Main Street North
C
TBD
XX
LR: S Main Street South
C
TBD
XX
LR: S Pipeline Road East
C
TBD
XX
LR'i Shady Creek Drive/Cliffwood Drive
C
TBD
XX
LR: S rin wood Court
C
TBD
XX
LR: Sunset Drive
C
TBD
XX
LR: Westwood Drive
C
TBD
XX
LR: Wildwood Street
C
TBD
XX
LR: Woodvine East
C
TBD
XX
LR: Woodvine (West)
C
TBD
XX
Water System Security Land Acquisition
C
TBD
XX
Sub -Total Water Priority C-Unfunded
$
WATER PROJECTS - TOTAL
6,725,856
LR = Line Replacement
CAPITAL IMPROVEMENT PROGRAMS
FY13 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE
PROPOSED METHOD OF FINANCING
Project Description
Priority
Estimated Cost
Operating
Fund
CIP Fund
Balance
Bond Sale
Grants/
Contrib
Impact
Fees
Escrow
Funds
Car Rental
Tax
Other
EDC
To Be
Determined
OTHER PROJECTS
Euless FLC Aquatics Construction
A
$ 6,450,000
$5,236,500`
$ 1,213,500
Sub -Total Other Priority A -Proposed FY13
$ 6,450,000
Glade Parks Trail Connection (14)
B
$ 359,625
XX
Texas Star Golf Course Bunker Re lacement (14)
B
$ 195,000
XX
Blessing Branch Park Improvements
B
$ 225,120
XX
Texas Star Sports Complex Phase V (15)
B
$ 4,152,000
XX
-Development/Engineering Building (16)
B
$ 1,579,800
XX
TSGC Greens Replacement(")
B
$ 800,000
XX
Sub -Total Other Priority El -Unfunded
$ 7,311,545
Animal Shelter Expansion/Renovation
C
TBD
XX
Kiddie Carr Park Improvements
C
TBD
XX
South Euless Water Feature
C
TBD
XX
Trail Connection South Euless
C
TBD
XX
Trail Enhancements Phase I
C
TBD
XX
Trail Enhancements Phase II
C
TBD
XX
Trail Enhancements Villages Bear Creek
C
TBD
XX
Trailwood Park Improvements
C
TBD
XX
Wilshire Park Water Feature
C
TBD
XX
Sub -Total Other Priority C-Unfunded
$
OTHER PROJECTS - TOTAL
5 13,761,545
Car Rental CIP - $4,236,500 including reallocation from Euless FLC Aquatics Design project.
General CIP - $1,000,000
CAPITAL IMPROVEMENT PROGRAMS
FY13 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE
PROPOSED METHOD OF FINANCING
Project Description
Priority
Estimated Cost
Operating
Fund
CIP Fund
Balance
Bond Sale
Grants/
Contrib
Impact
Fees
Escrow
Funds
Car Rental
Tax
Other
EDC
To Be
Determined
DRAINAGE PROJECTS
None Currentl
A
$
Sub -Total Drainage Priority A -Proposed FY13
$
None Currently B
$
Sub -Total Drainage Priority B-Unfunded
$
Bell Hi Addition
C
TBD
XX
Blessing Branch -Main Street to SH 360
C
TBD
XX
Hollow Oak Channel Erosion
C
TBD
XX
Kynette Drive Culvert Modifications
C
TBD
XX
Little Bear Creek Drainage Improvements
C
TBD
XX
Marlene Drive Culvert Replacement
C
TBD
XX
Simmons Drive Culvert Improvements
C
TBD
XX
Sub -Total Drainage Priority C-Unfunded
$ -
DRAINAGE PROJECTS - TOTAL
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: July 26,1999
Submitted By: RON YOUNG Date Completed:
Project Title: BELL HI ADDITION
Project Type: DRAINAGE Sub -Type: IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
In 2005, the City commissioned and received a drainage plan from Freese and Nichols, Inc. In this plan, the
Bell Hi Addition was identified as an area in need of flood relief.
PROJECT DESCRIPTION:
The proposed project ties into an existing storm drainage system on Needles Street. A substantial portion of the
cost of this project is related to street repair which would indicate the need to combine this project with a street
reconstruction project.
PROJECT SCHEDULE:
JUSTIFICATION:
The construction of this project will prevent the flooding of Paula Lane, David Drive, and Needles Street during
the most intense rainfall events. The terrain in this location is very flat, which causes the streets to have a very
low capacity to remove storm water.
W
92
PROJECT TITLE: BELL HI ADDITION
;NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 I Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
93
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: July 26,1999
Submitted By: RON YOUNG Date Completed:
Project Title: BLESSING BRANCH -MAIN STREET TO SH360
Project Type: DRAINAGE Sub -Type: IMPROVEMENTS
Project Code: Priori : C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The Blessing Branch Drainage Master Plan included a conceptual plan to convey storm water through the creek
more efficiently.
PROJECT DESCRIPTION:
This project involves the channeling and lining of Blessing Branch in accordance with the Blessing Branch
Master Plan.
PROJECT SCHEDULE:
JUSTIFICATION:
The City expects to receive significant developer contributions toward this project. However, the City may be
required to fund a portion of this project.
W
94
M
OR
PROJECT TITLE: BLESSING BRANCH -MAIN STREET TO SH360
NET EFFECTS ON OPERATING AND
TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Engineering - To Be Determined
Personnel: Full Time
Construction - To Be Determined
Part Time
$0
Total Salary
$0
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal:
$0
Maintenance Costs
$0
Subtotal:
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
00 0
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
95
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 03,2008
Submitted By: RON YOUNG Date Completed:
Project Title: HOLLOW OAK CHANNEL EROSION
Project Type: DRAINAGE Sub -Type: IMPROVEMENTS
Project Code: Priori : C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
In May 2008, the City authorized a drainage study for the creek area that runs at the rear of the lots fronting on
Hollow Oak Drive and Linkwood Drive. The completed drainage study was received in July 2008.
PROJECT DESCRIPTION:
The creek area along the rear of the lots on Hollow Oak Drive and Linkwood Drive exists in a natural state. The
creek bank along the south has experienced some slope failure. The drainage study recommends installation of
"bag wall" slope protection.
PROJECT SCHEDULE:
JUSTIFICATION:
The City has received complaints that fences and other improvements on private property will be threatened if
additional slope failures take place. Currently no residences are threatened.
No
96
PROJECT TITLE: HOLLOW OAK CHANNEL EROSION
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Operating Fund
Conceptual Design %
00
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
Due to the expected impact to the native conditions, this project would require broad support from all impacted
neighbors. Alternatives, such as possible assistance with removal or relocation of improvements on affected
properties, should also be considered.
97
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: July 21,1999
Submitted By: RON YOUNG Date Completed:
Project Title: KYNETTE DRIVE CULVERT MODIFICATIONS
Project Type: DRAINAGE Sub -Type: IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Wilshire Village Addition was constructed prior to the adoption of the City's Uniform Development Code ("UDC").
The requirements prior to the UDC were lower than what the City now requires. The current construction
configuration of Wilshire Village causes more water to remain above ground than is acceptable under current
standards. The drainage system in the Wilshire Village Addition needs to be upgraded to meet the current
requirements.
PROJECT DESCRIPTION:
The project involves the installation of a small drainage system on Kynette Drive up to Sierra Drive. It is Project
No. 16 in the 1990 Knowlton, English, Flowers Drainage Utility System Study of Selected Improvement Projects.
PROJECT SCHEDULE:
JUSTIFICATION:
Surface water flow within Kynette Drive exceeds the City's current development standards. A large amount of
storm water drains to an existing culvert on Kynette Drive between East Cliff and West Cliff Drives. The existing
drainage facilities collecting this storm water are inadequate according to current standards.
.-"N
98
PROJECT TITLE: KYNETTE DRIVE CULVERT MODIFICATIONS
`•► NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
99
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: July 21,1999
Submitted By: RON YOUNG Date Completed:
Project Title: LITTLE BEAR CREEK DRAINAGE IMPROVEMENTS
Project Type: DRAINAGE Sub -Type: IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The improvements proposed for Bob Eden Park are identified in the Little Bear Creek Watershed Master Plan.
The Little Bear Creek Park portion of this project was identified in the 1990 Knowlton, English and Flowers
Drainage Utility System Study of Selected Improvement Projects.
PROJECT DESCRIPTION:
Both parts of this drainage project involve erosion control and channelization improvements to Little Bear Creek.
The Bear Creek Park part is a portion of Project No. 11 in the above -referenced study. This project will be re-
evaluated to determine if the scope and proposed improvements should be modified. This part of the project will
be redefined and re -estimated.
PROJECT SCHEDULE:
JUSTIFICATION:
Continued erosion will eventually undermine the creek in both parks and cause damage to existing City facilities.
100
PROJECT TITLE: LITTLE BEAR CREEK DRAINAGE IMPROVEMENTS
NET
EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
AINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
00
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
101
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 10,2008
Submitted By: RON YOUNG Date Completed:
Project Title: MARLENE DRIVE CULVERT REPLACEMENT
Project Type: DRAINAGE Sub -Type: IMPROVEMENTS
Project Code: Priori : C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Marlene Drive is noted as a collector street on the City's Master Thoroughfare Plan.
PROJECT DESCRIPTION:
The scope of the project includes construction of a new culvert at Cyclone Branch to meet current load and
drainage capacity standards. A portion of the concrete channel will also need to be reconstructed both
upstream and downstream to ensure a smooth transition.
PROJECT SCHEDULE:
JUSTIFICATION:
The existing culvert is load limited. The new culvert will be designed to convey sufficient drainage to comply
with current standards.
102
PROJECT TITLE: MARLENE DRIVE CULVERT REPLACEMENT
NET EFFECTS ON OPERATING AND
TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Engineering - To Be Determined
Personnel: Full Time
Construction - To Be Determined
Part Time
$0
Total Salary
$0
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal:
$0
Maintenance Costs
$0
Subtotal:
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
103
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 15,2005
Submitted By: RON YOUNG Date Completed:
Project Title: SIMMONS DRIVE CULVERT IMPROVEMENTS
Project Type: DRAINAGE Sub -Type: IMPROVEMENTS
Project Code: Priori : C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
In 2005, the City commissioned and received a drainage plan from Freese and Nichols, Inc.
PROJECT DESCRIPTION:
An additional culvert will extend from the apartment complex on the east side of Simmons Drive and will outfall
into the creek area on the north side of Carr Park.
PROJECT SCHEDULE:
JUSTIFICATION:
In intense storms, the capacity of the existing culvert is exceeded. Additional culverts will be required to convey
the storm flows. The construction of this project will enable the safe use of Simmons Drive in intense storm
events.
No
104
PROJECT TITLE: SIMMONS DRIVE CULVERT IMPROVEMENTS
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST(+OR-)ANNUAL:
Direct Operating Cost Engineering-To Be Determined
Personnel: Full Time Construction-To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials&Supplies
Utilities $0
Subtotal: $0
Maintenance Costs
$0
Subtotal: $0
Total Estimated Annual Cost • $0 Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design % 0%
Fund Balance Preliminary Design% 0%
Special Project Fund Final Plans% 0%
Certificate of Obligation Specifications% 0%
County, State, Federal Funding Construction % 0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined XX
ADDITIONAL COMMENTS:
105
THEFCITY OF
106
1
0
U
0
W
m
U
3 O
X x O x x x X
Z• z F X X X X X X
() ai 4)
Z U i
Z cr
LL
0 :o.
0 O
O W
O r9
I
I-
III u
5 ,., m
O a Q)
W E a-
(s)
0
lll 0-
a O �
> X X X X X
} to o
0
W L I
m F- ar
Ncn
0 . c
ac> m I
Z
w
O c m
wC4 g2 x r
2 a LL m X o
W 0 a R , 0 ,
re Z i .
a , rn
2 Z c
I 08 a LL
Er. 0 0
¢ w
() U) y) O 0 0 0 O 0 0 O 00 00 0 0 0 ' 0
O O O O O 0 0 O O O O O 00 O O 0 0
a 0 0 o 0 0 0 00 0 00 00 0 0 0 0
O .D o 0 0 0 0 0 cc o 0 0 0 0 0 0)n 0 0 0 0 0 0 0 0 0 v)
re :: L0 0 0 u) 0 0 Efl 0 0 0 o 0, o O v rn
a 16 V M N 01 M co �[) M M co co co M N) H (0 (0 (0 CO I- (0 (0 CO Ov
E"/ E
LL W EA E9 V! 41 4) 69 69 49 49 E9 E9 63 49 49 49 4/ 46
L.,-
o Q a s co an m m m co CO CO m m 0 0 0 0 0 0 0 0 0 C}
.,_.-
CV.
o
N V� of rn vim, x n 2 lw
E rn U 5 -6 EF aci"m L
c ��
E E a a m ai= n 45 a s °,.• ? °?
v E 0 E CD E E o �c E w z g J
o m a) o , a <c O 0 o a) a 22 Y d w 2 .- ? 0 0 C)
0 i> uu 0, ? En P. > . m g ,
a X Q 2 2 2 m 2 m 6 co J
N ° N'� O
• l0 t,'' rn O O f7^:
O E N O O . CO v f0 .e V co E N a O , 0 a 0 1 o-
U < Fr c 2 o c m c W ct a , . g ao � y � t
o co 5 - .,'t'm y 0 m U 0 a < 9 o O 9 w , 2 1 ° o - U)
F- m Q 2 ? Q - • h cn I- s
W m O" N 0 m 0 c m 0 . 0 m 0.,„ > c o o w W o. �'.
7 V �` 0 w U c U c U c = U .~ a 0` J lY W > c 1 12 0 ram. `..
re a0 O > h 6) 0 > o O :- 70" C <V 70 7 N a) -0 VOi y 0 C N N ? _V3 ` )
d co U ` 0 a co U � v U v U 0 v U y d > c 5 5 -o > a u) . G
I- c9 M ca v v Q In Lc) Eo CO x u) Cj ca X c Q a F-
W o o E 0 o o'" E o 0 0 0 0 a ' o oII O w
F u_ u. U u_ u_ ct U u_ u_ 0 u_ u. 0 1- u_ u. m c.) w u_ u_ _ CC CO > 1-
CON
107
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 17,2011
Submitted By: CHRIS BARKER Date Completed:
Project Title: FY2013 38TH CDBG-ADA/TAS INFRASTRUCTURE IMPROVEMENTS
Project Type: STREET Sub-Type: CDBG
Project Code: Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project provides for continued improvements to accessibility ramps by removing architectural barriers to
accessibility as required by Federal and State mandated Americans with Disabilities Act/Texas Accessibility
Standards ("ADA/TAS"). The project scope includes identification of architectural barriers to accessibility that
meet CDBG eligibility guidelines and the subsequent replacement thereof.
(38th year CDBG project)
PROJECT SCHEDULE:
FY2013
JUSTIFICATION:
Removing architectural barriers to accessibility is an eligible CDBG activity and will assist in the City's efforts to
maintain compliance with applicable Federal and State ADA/TAS codes.
108
PROJECT TITLE: FY2013 38TH CDBG-ADA/TAS INFRASTRUCTURE IMPROVEMENTS
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST(+OR-)ANNUAL:
Direct Operating Cost Engineering $67,500
Personnel: Full Time Construction $382,500
Part Time $0
Total Salary $0
Purchase of Services
Materials&Supplies
Utilities $0
Subtotal: $0
Maintenance Costs
$0
Subtotal: $0
Total Estimated Annual Cost $0 Total Estimated Capital Cost $450,000
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design % 0 o
Fund Balance Preliminary Design % 0%
Special Project Fund Final Plans% 0%
Certificate of Obligation Specifications% 0%
County, State, Federal Funding XX Construction % 0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Council Action:
February 28, 2012: Conduct a Public Hearing regarding the proposed 38th year CDBG project, including the
installation of sidewalk accessibility ramps located along South Main Street, Fair Oaks Boulevard, Limestone
Drive, Himes Drive, Collin Drive, Sixpence Lane and Newport Way and motion to approve a recommendation
regarding the selected CDBG project.
109
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 20, 2010
Submitted By: RON YOUNG Date Completed:
Project Title: FY2013 COUNTY OVERLAY-TRAILWOOD DR/SUMMIT RIDGE DR/WESTPARK WAY
Project Type: STREET Sub-Type: OVERLAY
Project Code: Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Trailwood Drive and Summit Ridge Drive are collector streets in the City's Master Thoroughfare Plan. Westpark
Way is an undivided arterial street in the City's Master Thoroughfare Plan.
PROJECT DESCRIPTION:
The project consists of edge milling, asphalt overlay, and restriping on:
1. Trailwood Drive from N Main Street to Summit Ridge Drive (west end),
2. Summit Ridge Drive from Lakewood Boulevard to Trailwood Drive, and
3. Westpark Way from S Pipeline to SH10.
PROJECT SCHEDULE:
Anticipate Construction Beginning: May 2013
Anticipate Construction Complete: July 2013
JUSTIFICATION:
The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, will
extend the life of the roadway, and will enhance the appearance of the streets.
110
PROJECT TITLE: FY2013 COUNTY OVERLAY-TRAILWOOD DR/SUMMIT RIDGE DRIWESTPARK WAY
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST(+OR-)ANNUAL:
Direct Operating Cost Construction $300,000
Personnel: Full Time
Part Time $0
Total Salary $0
Purchase of Services
Materials&Supplies
Utilities $0
Subtotal: $0
Maintenance Costs
$0
Subtotal: $0
Total Estimated Annual Cost $0 Total Estimated Capital Cost $300,000
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design % 00 0
Fund Balance Preliminary Design% 0%
0
Special Project Fund Final Plans% 0%
Certificate of Obligation Specifications% 0%
County, State, Federal Funding Construction % 0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund XX
To Be Determined
ADDITIONAL COMMENTS:
111
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: June 28,2012
Submitted By: RON YOUNG Date Completed:
Project Title: CULLUM DRIVE DESIGN AND ROW-SH10 TO HUITT LANE
Project Type: STREET Sub -Type: CONSTRUCTION
Project Code: Priori : A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Cullum Drive is a roadway that connects an arterial thoroughfare (SH10) and a residential collector thoroughfare
(Huitt Lane) both of which are identified in the City's Master Thoroughfare Plan.
PROJECT DESCRIPTION:
The project consists of the engineering and required right-of-way acquisition for a 31' wide concrete roadway to
replace an existing deteriorating asphalt roadway from SH10 to Huitt Lane. The project scope includes
underground storm drainage, sidewalks and wastewater main replacement.
PROJECT SCHEDULE:
FY2013
JUSTIFICATION:
Reconstruction of this street will decrease the annual maintenance and provide a residential street in
compliance with current City standards.
'**N
.-N
112
PROJECT TITLE: CULLUM DRIVE DESIGN AND ROW-SH10 TO HUITT LANE
�... NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
AINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering $180,000
Personnel: Full Time Right -of -Way $20,000
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal:
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Escrow Funds
Other
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Street CIP Fund Balance
$0
$0
$0
$0 Total Estimated Capital Cost $2Q0,000
CURRENT STATUS:
Conceptual Design % 0%
$200,000 Preliminary Design % 0%
Final Plans % 0%
Specifications % 00
Construction % 0%
113
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 17,2011
Submitted By: CHRIS BARKER Date Completed:
Project Title: FY2014 39TH CDBG-ADA/TAS INFRASTRUCTURE IMPROVEMENTS
Project Type: STREET Sub -Type: CDBG
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project provides for continued improvements to accessibility ramps by removing architectural barriers to
accessibility as required by Federal and State mandated Americans with Disabilities Act/Texas Accessibility
Standards ("ADA/TAS"). The project scope includes identification of architectural barriers to accessibility that
meet CDBG eligibility guidelines and the subsequent replacement thereof.
(39th year CDBG project)
PROJECT SCHEDULE:
FY2014
JUSTIFICATION:
Removing architectural barriers to accessibility is an eligible CDBG activity and will assist in the City's efforts to
maintain compliance with applicable Federal and State ADA/TAS codes.
114
PROJECT TITLE: FY2014 39TH CDBG-ADA/TAS INFRASTRUCTURE IMPROVEMENTS
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost Engineering $45,000
Personnel: Full Time Construction $255,000
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
L
Total Estimated Annual Cost $0
Total Estimated Capital Cost $300,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design % 00
Fund Balance
Preliminary Design % 0%
Special Project Fund
Final Plans % 00 °
Certificate of Obligation
Specifications % 0%
County State Federal Funding XX
Construction % 0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Project funding is subject to actual CDBG funding availability
115
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 20, 2010
Submitted By: RON YOUNG Date Completed:
Project Title: FY2014 COUNTY OVERLAY-MONTERREY/SOTOGRANDE/EL CAMINO REAL
Project Type: STREET Sub -Type: OVERLAY
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Monterrey Boulevard, Sotogrande Boulevard, and El Camino Real are collector streets in the City's Master
Thoroughfare Plan.
PROJECT DESCRIPTION:
The project consists of edge milling, asphalt overlay, and restriping on:
1. Monterrey Boulevard from Sotogrande Boulevard to W Pipeline Road,
2. Sotogrande Boulevard from El Camino Real to Monterrey Boulevard, and
3. El Camino Real from W Pipeline Road to south city limits.
PROJECT SCHEDULE:
Anticipate Construction Beginning: May 2014
Anticipate Construction Complete: July 2014
JUSTIFICATION:
The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, will
extend the life of the roadway, and will enhance the appearance of the streets.
'-N
rIN
IMP
PROJECT TITLE: FY2014 COUNTY OVE RLAY-MONTERREY/SOTOG RAN DE/E L CAMINO REAL
�. NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Construction $300,000
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost $300,000
CURRENT STATUS:
Conceptual Design % 0%
Preliminary Design % 0%
Final Plans % 0%
Specifications % 0%
Construction % 0%
117
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: June 28,2012
Submitted By: RON YOUNG Date Completed:
Project Title: CULLUM DRIVE CONSTRUCTION-SH10 TO HUITT LANE
Project Type: STREET Sub -Type: CONSTRUCTION
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Cullum Drive is a roadway that connects an arterial thoroughfare (SH10) and a residential collector thoroughfare
(Huitt Lane) both of which are identified in the City's Master Thoroughfare Plan.
PROJECT DESCRIPTION:
The project consists of the construction of a 31' wide concrete roadway to replace an existing deteriorating
asphalt roadway from SH10 to Huitt Lane. The project scope includes underground storm drainage, sidewalks
and wastewater main replacement.
PROJECT SCHEDULE:
FY2014
JUSTIFICATION:
Reconstruction of this street will decrease the annual maintenance and provide a residential street in
compliance with current City standards.
118
PROJECT TITLE: CULLUM DRIVE CONSTRUCTION-SH10 TO HUITT LANE
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
AINTENANCE COST (+ OR -) ANNUAL:
ni 'PCt OnizrAtinn (n-,t Construction $565,000
Personnel: Full Time
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost $0 Total Estimated Capital Cost $565,000
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund
Conceptual Design %
00 0
Fund Balance
$100,786
Preliminary Design %
0%
Special Project Fund
Final Plans %
00
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Escrow Funds
$67,214
Other
Car Rental Tax Fund
$397,000
To Be Determined
ADDITIONAL COMMENTS:
Street CIP Fund Balance
Escrow accounts:
ES0284 $61,370
ES0297 $ 5,844
119
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 17,2011
Submitted By: CHRIS BARKER Date Completed:
Project Title: FY2015 40TH CDBG-ADA/TAS INFRASTRUCTURE IMPROVEMENTS
Project Type: STREET Sub -Type: CDBG
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project provides for continued improvements to accessibility ramps by removing architectural barriers to
accessibility as required by Federal and State mandated Americans with Disabilities Act/Texas Accessibility
Standards ("ADA/TAS"). The project scope includes identification of architectural barriers to accessibility that
meet CDBG eligibility guidelines and the subsequent replacement thereof.
(40th year CDBG project)
PROJECT SCHEDULE:
FY2015
JUSTIFICATION:
Removing architectural barriers to accessibility is an eligible CDBG activity and will assist in the City's efforts to
maintain compliance with applicable Federal and State ADA/TAS codes.
111
.-�N
120
PROJECT TITLE: FY2015 40TH CDBG-ADA/TAS INFRASTRUCTURE IMPROVEMENTS
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering $45,000
Personnel: Full Time Construction $255,000
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost $0
Total Estimated Capital Cost $300,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design % 0
Fund Balance
Preliminary Design % 0%
Special Project Fund
Final Plans % 0%
Certificate of Obligation
Specifications % 0%
County, State, Federal Funding XX
Construction % 0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Project funding is subject to actual CDBG funding availability
121
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 20, 2010
Submitted By: RON YOUNG Date Completed:
Project Title: FY2015 COUNTY OVERLAY-BAZE ROAD/KYNETTE DRIVE/SIGNET DRIVE
Project Type: STREET Sub -Type: OVERLAY
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Baze Road, Kynette Drive, and Signet Drive are collector streets in the City's Master Thoroughfare Plan.
PROJECT DESCRIPTION:
The project consists of edge milling, asphalt overlay, and restriping on:
1. Baze Road from Mid Cities Boulevard to Priest Lane,
2. Kynette Drive from Evans Drive to Wilshire Drive, and
3. Signet Drive from Eastcliff Drive to Yorkshire Drive.
PROJECT SCHEDULE:
Anticipate Construction Beginning: May 2015
Anticipate Construction Complete: July 2015
JUSTIFICATION:
The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, will
extend the life of the roadways, and will enhance the appearance of the streets.
10"N
.-ON
122
PROJECT TITLE: FY2015 COUNTY OVERLAY-BAZE ROAD/KYNETTE DRIVE/SIGNET DRIVE
`-' NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Construction $300,000
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost $300,000
CURRENT STATUS:
Conceptual Design % 0%
Preliminary Design % 0%
Final Plans % 0%
Specifications % 0%
Construction % 0%
123
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 17,2011
Submitted By: CHRIS BARKER Date Completed:
Project Title: FY2016 41 ST CDBG-ADA/TAS INFRASTRUCTURE IMPROVEMENTS
Project Type: STREET Sub -Type: CDBG
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project provides for continued improvements to accessibility ramps by removing architectural barriers to
accessibility as required by Federal and State mandated Americans with Disabilities Act/Texas Accessibility
Standards ("ADA/TAS"). The project scope includes identification of architectural barriers to accessibility that
meet CDBG eligibility guidelines and the subsequent replacement thereof.
(41 st year CDBG project)
PROJECT SCHEDULE:
FY2016
JUSTIFICATION:
Removing architectural barriers to accessibility is an eligible CDBG activity and will assist in the City's efforts to
maintain compliance with applicable Federal and State ADA/TAS codes.
124
PROJECT TITLE: FY2016 41 ST CDBG-ADA/TAS INFRASTRUCTURE IMPROVEMENTS
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering $45,000
Personnel: Full Time Construction $255,000
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost $0
Total Estimated Capital Cost $300,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design % 0%
Fund Balance
Preliminary Design % 0%
Special Project Fund
Final Plans % 0%
Certificate of Obligation
Specifications % 0%
County, State, Federal Funding XX
Construction % 0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Project funding is subject to actual CDBG funding availability
125
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 20, 2010
Submitted By: RON YOUNG Date Completed:
Project Title: FY2016 COUNTY OVERLAY-ECTOR DR/RAIDER DR/TEXAS STAR PKWY
Project Type: STREET Sub -Type: OVERLAY
Pro Code: Priority:
B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Ector Drive, Raider Drive and Texas Star Parkway are collector streets in the City's Master Thoroughfare Plan.
PROJECT DESCRIPTION:
The project consists of edge milling, asphalt overlay, and restriping on:
1. Ector Drive from SH10 to SH183,
2. Raider Drive from SH10 to W Pipeline, and
3. Texas Star Parkway from SH10 to S Pipeline.
PROJECT SCHEDULE:
Anticipate Construction Beginning: May 2016
Anticipate Construction Complete: July 2016
JUSTIFICATION:
The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, will
extend the life of the roadways, and will enhance the appearance of the streets.
126
PROJECT TITLE: FY2016 COUNTY OVERLAY-ECTOR DR/RAIDER DR/TEXAS STAR PKWY
�-- NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Construction $300,000
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost $300,000
CURRENT STATUS:
Conceptual Design % 0%
Preliminary Design % 0%
Final Plans % 0%
Specifications % 0%
Construction % 0%
127
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 12,2004
Submitted By: RON YOUNG Date Completed:
Project Title: TRAFFIC SIGNAL-HARWOOD ROAD @ BEAR CREEK PARKWAY
Project Type: STREET Sub -Type: SIGNALIZATION
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Traffic signals are located at the intersections of arterial and collector thoroughfares identified in the City's
Master Thoroughfare Plan adopted in 1999.
PROJECT DESCRIPTION:
The project consists of the installation of traffic signal poles, mast arms, signal heads, pedestrian indicators,
underground conduit, vehicle detection, and signal controller for the intersection of Harwood Road and Bear
Creek Parkway.
PROJECT SCHEDULE:
FY2016
JUSTIFICATION:
Traffic volumes at this intersection will be monitored and signal warrant studies will be performed to justify signal
installation. This intersection will ultimately require a traffic signal.
11"N
128
PROJECT TITLE: TRAFFIC SIGNAL-HARWOOD ROAD @ BEAR CREEK PARKWAY
`-' NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
'%� I Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
Engineering $30,000
Traffic Signals $150,000
$0
$0
$0
$0
$0
$0
$0
Total Estimated Capital Cost $180,000
CURRENT STATUS:
0
Conceptual Design % °
Preliminary Design % 0%
Final Plans % 00 °
0
Specifications % 0 0
0
Construction % °
129
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 16,2012
Submitted By: CHRIS BARKER Date Completed:
Project Title: FY2017 42ND CDBG-ADA/TAS INFRASTRUCTURE IMPROVEMENTS
Project Type: STREET Sub -Type: CDBG
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project provides for continued improvements to accessibility ramps by removing architectural barriers to
accessibility as required by Federal and State mandated Americans with Disabilities Act/Texas Accessibility
Standards ("ADA/TAS"). The project scope includes identification of architectural barriers to accessibility that
meet CDBG eligibility guidelines and the subsequent replacement thereof.
(42nd year CDBG project)
PROJECT SCHEDULE:
FY2017
JUSTIFICATION:
Removing architectural barriers to accessibility is an eligible CDBG activity and will assist in the City's efforts to
maintain compliance with applicable Federal and State ADA/TAS codes.
"'1
a
130
PROJECT TITLE: FY2017 42ND CDBG-ADA/TAS INFRASTRUCTURE IMPROVEMENTS
L-' NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
Total, Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
TOTAL ESTIMATED CAPITAL COST:
Engineering
Construction
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding XX
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Project funding is subject to actual CDBG funding availability.
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
$45,000
$255, 000
$300,000
0%
0%
0%
0%
0%
131
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 14, 2012
Submitted By: RON YOUNG Date Completed:
Project Title: FY2017 COUNTY OVERLAY-ARANSAS DRIVE/ECTOR DRIVE
Project Type: STREET Sub -Type: OVERLAY
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Aransas Drive and Ector Drive are collector streets in the City's Master Thoroughfare Plan.
PROJECT DESCRIPTION:
The project consists of edge milling, asphalt overlay, and restriping on:
1. Aransas Drive from Harwood Road to W Ash Lane, and
2. Ector Drive from SH183 to Midway Drive.
PROJECT SCHEDULE:
Anticipate Construction Beginning: May 2017
Anticipate Construction Complete: July 2017
JUSTIFICATION:
The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, will
extend the life of the roadways, and will enhance the appearance of the streets.
."*N
.-N,
132
PROJECT TITLE: FY2017 COUNTY OVERLAY-ARANSAS DRIVE/ECTOR DRIVE
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
`,, Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
TOTAL ESTIMATED CAPITAL COST:
Construction $300,000
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost $300,000
CURRENT STATUS:
Conceptual Design % 0
Preliminary Design % 0%
Final Plans % 0%
Specifications % 0%
Construction % 0%
133
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 03,2008
Submitted By: RON YOUNG Date Completed:
Project Title: BEAR CREEK PARKWAY
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Bear Creek Parkway is identified as a local collector thoroughfare in the City's Master Thoroughfare Plan.
PROJECT DESCRIPTION:
This project consists of the complete reconstruction of Bear Creek Parkway from Harwood Road to Ash Lane to
meet current City standards.
PROJECT SCHEDULE:
JUSTIFICATION:
Bear Creek Parkway is an aging roadway nearing the end of its service life. Portions of the roadway are
beginning to deteriorate and require additional maintenance. As the pavement deteriorates and fails,
maintenance costs increase.
134
PROJECT TITLE: BEAR CREEK PARKWAY
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
'N� I Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LAN
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 1 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
135
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 13,2007
Submitted By: RON YOUNG Date Completed:
Project Title: CRESTHAVEN DRIVE RECONSTRUCTION
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Cresthaven Drive is not identified in the City's Master Thoroughfare Plan.
PROJECT DESCRIPTION:
This project includes the reconstruction of Cresthaven Drive from a two-lane asphalt roadway to a 31' wide curb
and gutter concrete street from SH10 to S Pipeline Road.
PROJECT SCHEDULE:
JUSTIFICATION:
To upgrade Cresthaven Drive to a standard City concrete curb and gutter street.
..,
.-,
136
PROJECT TITLE: CRESTHAVEN DRIVE RECONSTRUCTION
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
AINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
137
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: July 23,1999
Submitted By: RON YOUNG Date Completed:
Project Title: E ALEXANDER LANE RECONSTRUCTION
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This minor street serves as a collector type street by conveying traffic to major roadways.
PROJECT DESCRIPTION:
E Alexander Lane will be reconstructed from Main Street to Cullum Drive. It will be reconstructed from a two-
lane county type road to a standard 31' wide residential street with underground drainage and sidewalks.
PROJECT SCHEDULE:
JUSTIFICATION:
Reconstruction of this street will decrease the annual maintenance and provide a standard residential street in
compliance with current City standards.
'-IN,
138
PROJECT TITLE: E ALEXANDER LANE RECONSTRUCTION
�-- I NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
�, I Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0I•Total Estimated Capital Cost
CURRENT STATUS:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Other XX
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined XX
ADDITIONAL COMMENTS:
Escrow Funds will be used to finance a portion of this project.
Conceptual Design % 0%
Preliminary Design % 0
Final Plans % 0%
Specifications % 0%
Construction % 0%
139
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: February 16,2009
Submitted By: ROBERT BARKER Date Completed:
Project Title: FULLER -WISER ROAD-HARWOOD ROAD TO MID CITIES BLVD
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Fuller -Wiser Road is identified as a minor arterial in the City's Master Thoroughfare Plan.
PROJECT DESCRIPTION:
This project consists of the complete reconstruction of Fuller -Wiser Road to current City standards from
Harwood Road to Mid Cities Boulevard.
PROJECT SCHEDULE:
JUSTIFICATION:
Fuller -Wiser Road is an aging roadway nearing the end of its service life. Portions of the roadway are beginning
to deteriorate and require additional maintenance. As the pavement deteriorates and fails, maintenance costs
increase.
140
ON
9M
PROJECT TITLE: FULLER -WISER ROAD-HARWOOD ROAD TO MID CITIES BLVD
NET EFFECTS ON OPERATING AND
TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Engineering - To Be Determined
Personnel: Full Time
Construction - To Be Determined
Part Time
$0
Total Salary
$0
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal:
$0
Maintenance Costs
$0
Subtotal:
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
141
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: February 16,2009
Submitted By: ROBERT BARKER Date Completed:
Project Title: FULLER -WISER ROAD-SH183 TO HARWOOD ROAD
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Fuller -Wiser Road is identified as a minor arterial in the City's Master Thoroughfare Plan.
PROJECT DESCRIPTION:
The project consists of the complete reconstruction of Fuller -Wiser Road to current standards from SH183 to
Harwood Road.
PROJECT SCHEDULE:
JUSTIFICATION:
Fuller -Wiser Road is an aging roadway nearing the end of its service life. Portions of the roadway are beginning
to deteriorate and require additional maintenance. As the pavement deteriorates and fails, maintenance costs
increase.
.-,
142
PROJECT TITLE: FULLER -WISER ROAD-SH183 TO HARWOOD ROAD
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
� I Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 1 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
143
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 13,2007
Submitted By: RON YOUNG Date Completed:
Project Title: HIGHLAND DRIVE RECONSTRUCTION
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Highland Drive is not identified in the City's Master Thoroughfare Plan.
PROJECT DESCRIPTION:
The project includes the reconstruction of Highland Drive from SH10 to S Pipeline Road from a two-lane asphalt
roadway to a 31' wide curb and gutter concrete street.
PROJECT SCHEDULE:
JUSTIFICATION:
To upgrade Highland Drive to a standard City concrete curb and gutter street.
,-IN
144
PROJECT TITLE: HIGHLAND DRIVE RECONSTRUCTION
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
's,� I Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
145
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 31,2005
Submitted By: RON YOUNG Date Completed:
Project Title: ROSS AVENUE EXTENSION
Project Type: STREET Sub -Type: CONSTRUCTION
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This extension of Ross Avenue from the recently completed section adjacent to the fire station will complete the
upgrading of this street.
PROJECT DESCRIPTION:
The construction of the remainder of Ross Avenue from the fire station to the west limit will be in accordance
with City standards which includes concrete pavement.
PROJECT SCHEDULE:
JUSTIFICATION:
This construction, in accordance with City standards, will allow the road a long service life and lower the annual
maintenance costs.
.�
'' N
146
PROJECT TITLE: ROSS AVENUE EXTENSION
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Engineering - To Be Determined
Personnel: Full Time
Right -of -Way - To Be Determined
Part Time $0
Construction - To Be Determined
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
M4
$0 I Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
147
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 13,2007
Submitted By: RON YOUNG Date Completed:
Project Title: SOUTH PIPELINE ROAD
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
South Pipeline Road is not identified in the City's Master Thoroughfare Plan.
PROJECT DESCRIPTION:
The project consists of reconstruction of South Pipeline Road from a two-lane asphalt roadway to a 31' wide
curb and gutter concrete street from east of Royal Parkway to east of Highland Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
To upgrade South Pipeline Road to a standard City concrete curb and gutter street.
148
PROJECT TITLE: SOUTH PIPELINE ROAD
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
149
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: July 23,1999
Submitted By: RON YOUNG Date Completed:
Project Title: VINE STREET-SH183 TO SH10
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: Priori : C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Vine Street is not identified in the City's Master Thoroughfare Plan.
PROJECT DESCRIPTION:
The project consists of the reconstruction of Vine Street from SH183 to SH10.
PROJECT SCHEDULE:
JUSTIFICATION:
The City has received street escrow funds from several developments along Vine Street. When development is
complete, it would be appropriate for the City to reconstruct the existing roadway.
150
PROJECT TITLE: VINE STREET-SH183 TO SH10
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
TOTAL ESTIMATED CAPITAL COST:
Engineering - To be Determined
Construction - To be Determined
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Other XX
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Escrow Funds will be used to finance a portion of this project.
Conceptual Design % 0%
Preliminary Design % 0%
Final Plans % 0%
Specifications % 0%
Construction % 0%
151
i H E C 1 T Y o f
ss
q k
152
9
m
mE XXXXXXX XXXXXX XXX XXXXXX
F 2.
m
0
0
W
`m
t
O
:
m x
• re H z
z `N
U U
z
z
LL O
O y 3
O W w
0
=
H ..
11.1 2 U m
a m
a E LL
W —
H
0
a
O aC9
II E E.
W o_ E o
J
I
m
U '
K
H
U
-, g c
H
W Ce LL @
m y a'm
W0 (7m
O 0
a
2 u- O)
J p
U to -
O 0
0. O 0 0 0 0 0 0 0 0 0 0 0 0
O m 0 0 0 0 0 0 0 0 0 0 0 0 N v
K 0 000. 00 00000 0 0
0, 0 i O O of co-co N i 0 ui ui n r
n v
Yli Y N V "m ooti M (NV O M M o .- ` ❑ ❑ ❑ O ❑ ❑ O m❑ ❑ ❑ ❑ ❑ m❑❑ ❑ ❑ ❑ ❑ ❑ mO ❑
T.;
m M H H H H H H F H H H H F H HH H H F H HH H a
.y
W N v) 69 w 69 69 69 69 69 69 » W w w
A
5 < < ' co m m m m m co U U U U U U U 0 0 0 0 0 0 00 U U U U U U U
0
a
c
> -0E m a d
e o .� m c
v
N• " . r m a N 2_ - w
g c m _ C
' 3 N m t O Y V t
f0 .t m @ @ U` G N co Uoi
c A.
o Q > > > d ia A Y 2 f • Q
a « mp � m 3 U. HN - H
V. ` m o . w � oN E � �
p � a ❑ m $ a
O• (p d N % ❑ >' m N ❑ a, m > Z w L o 03 U 0• Y a, �° @ F
o U CD 5 o. m .c L ,- = d o `m o, 0 ❑ W Y y ' `m E c a@ 0 _❑ 0 W ;
a -Wi r d _ m U) 0 mm. H e E 0 ' '° Q c 0 — E �° m : .° m ') 7
w _ = ` ro 5 3 L , m c p 3 o @ w a, ' @ 0 3 O c 0
O y h' m `m @ y m c o c rn m 0 °� 0 0 > p m �1,.,
am m 3 m e m ;, d m w @, = y c ti 0 Y 3 per° c @ o i " m Y .c `°' d aE '._1
M ( J a_@. ' • to H H N p > > ' 0 > m .> o ° -0 0 = - @ `� N > ami -. , ti ce m Sd
1-- Q ID t = Ip- ❑ co 0 0 _ •c ❑ ❑ t 0 0 -- ❑ 2 m 3 0 2 3, :° c 9 U c a H 0
o> > o f 3 3 `o ' c N a, Y c c. • vt @ m c 0 a , J
3 uNi S c @ 2 Y Y c vCr) = m c u, $ ° @ m c m �, N m
p @ ] m • N @ @ T m O O @ U U > O @ @ > @ O @ O W C
W r 5• 0 ❑ O O Y U U U ❑ W W W W C7 S J _1 �L ZZZ (n U) N H - F
W
ID
3 J J J J J Z J J J J J J J J J J J J J J J J J J J J J J J J J J W W .
/ ;!
�� 153
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 30,2003
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-ROSS AVENUE
Project Type: WASTEWATER Sub-Type: MAIN REPLACEMENT
Project Code: Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the wastewater mains located on Ross Avenue and outfall to West
Alexander Lane.
PROJECT SCHEDULE:
FY2013
JUSTIFICATION:
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce
maintenance costs and customer problems.
154
PROJECT TITLE: LINE REPLACEMENT-ROSS AVENUE
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST(+OR-)ANNUAL:
Direct Operating Cost Engineering $25,000
Personnel: Full Time Construction $190,000
Part Time $0
Total Salary $0
Purchase of Services
Materials&Supplies
Utilities $0
Subtotal: $0
Maintenance Costs
$0
Subtotal: $0
Total Estimated Annual Cost $0 Total Estimated Capital Cost $215,000
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund XX Conceptual Design % 0%
Fund Balance Preliminary Design% 0%
Special Project Fund Final Plans % °
0
Certificate of Obligation Specifications% 0%
County, State, Federal Funding Construction % 0°
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
155
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 12,2004
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-SLAUGHTER LANE/E HUITT LANE
Project Type: WASTEWATER Sub-Type: MAIN REPLACEMENT
Project Code: Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Between John Vernon Lane and Slaughter Lane east of Dunaway Drive,
2. East of Dunaway Drive from Slaughter Lane to E Huitt Lane, and
3. Along E Huitt Lane from S Main Street to Dunaway Drive.
PROJECT SCHEDULE:
FY2013
JUSTIFICATION:
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
156
PROJECT TITLE: LINE REPLACEMENT-SLAUGHTER LANE/E HUITT LANE
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST(+OR-)ANNUAL:
Direct Operating Cost Engineering $55,000
Personnel: Full Time Construction $420,000
Part Time $0
Total Salary $0
Purchase of Services
Materials&Supplies
Utilities $0
Subtotal: $0
Maintenance Costs
$0
Subtotal: $0
Total Estimated Annual Cost $0 Total Estimated Capital Cost $475,000
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund XX Conceptual Design % 0%
Fund Balance Preliminary Design % 0%
Special Project Fund Final Plans% 0%
Certificate of Obligation Specifications% 0%
County, State, Federal Funding Construction % 0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
157
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 13,2010
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-W HUITT
Project Type: WASTEWATER Sub-Type: MAIN REPLACEMENT
Project Code: Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the wastewater mains between Linda Lane and W Huitt Lane.
PROJECT SCHEDULE:
FY2013
JUSTIFICATION:
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
158
PROJECT TITLE: LINE REPLACEMENT-W HUITT
�. NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST(+OR-)ANNUAL:
Direct Operating Cost Engineering $20,000
Personnel: Full Time Construction $160,000
Part Time $0
Total Salary $0
Purchase of Services
Materials&Supplies
Utilities $0
Subtotal: $0
Maintenance Costs
$0
Subtotal: $0
Total Estimated Annual Cost $0 Total Estimated Capital Cost $180,000
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund XX Conceptual Design % 0%
Fund Balance Preliminary Design% 0%
Special Project Fund Final Plans% 0%
Certificate of Obligation Specifications% 0%
County, State, Federal Funding Construction % 0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
159
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 05,2007
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-DENTON DRIVE
Project Type: WASTEWATER Sub-Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
This project consists of the replacement of wastewater mains located on Denton Drive between Collin Drive and
Harwood Road to include Bell Drive.
PROJECT SCHEDULE:
FY2014
JUSTIFICATION:
Many wastewater mains throughout the city are 40+years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
160
PROJECT TITLE: LINE REPLACEMENT-DENTON DRIVE
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST(+OR-)ANNUAL:
Direct Operating Cost Construction $477,000
Personnel: Full Time Engineering $62,000
Part Time $0
Total Salary $0
Purchase of Services
Materials &Supplies
Utilities $0
Subtotal: $0
Maintenance Costs
$0
Subtotal: $0
Total Estimated Annual Cost • $0 Total Estimated Capital Cost $539,000
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund XX Conceptual Design % 0%
Fund Balance Preliminary Design% 0%
Special Project Fund Final Plans% 0%
Certificate of Obligation Specifications% 0%
County, State, Federal Funding Construction % 0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
161
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 05,2007
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-MILAM DRIVE
Project Type: WASTEWATER Sub-Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the wastewater mains located along Milam Drive from Blanco Drive to
south of Bell Drive.
PROJECT SCHEDULE:
FY2014
JUSTIFICATION:
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
162
PROJECT TITLE: LINE REPLACEMENT-MILAM DRIVE
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST(+OR-)ANNUAL:
Direct Operating Cost Construction $224,000
Personnel: Full Time Engineering $29,000
Part Time $0
Total Salary $0
Purchase of Services
Materials& Supplies
Utilities $0
Subtotal: $0
Maintenance Costs
$0
Subtotal: $0
Total Estimated Annual Cost - $0 Total Estimated Capital Cost $253,000
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund XX Conceptual Design % 0%
Fund Balance Preliminary Design% 0%
Special Project Fund Final Plans% 00 0
Certificate of Obligation Specifications% 0%
County, State, Federal Funding Construction % 0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
114.7
163
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 10, 2010
Submitted By: RON YOUNG Date Completed:
Project Title: NTE(SH 183) PHASE II WASTEWATER RELOCATION
Project Type: WASTEWATER Sub-Type: LINE RELOCATION
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The Texas Department of Transportation ("TxDoT") has entered into a developer agreement with North Tarrant
Express Mobility Partners("NTEMP")for the expansion of SH183. The Phase II construction will affect the City
of Euless'utilities along and crossing SH183 between FM157 and the east city limits.
PROJECT DESCRIPTION:
The City of Euless has wastewater mains and associated items located within the SH183 right-of-way. These
facilities must be relocated to accommodate the SH183 expansion. It is anticipated that the City of Euless will
enter into a relocation agreement with NTEMP to authorize them to design and relocate wastewater lines. The '1
City will be responsible for the cost of the relocation of the utilities.
PROJECT SCHEDULE:
Est. FY2015
JUSTIFICATION:
City of Euless wastewater facilities are located within TxDoT right-of-way. As such, the City must provide for
utility relocation to accommodate the roadway expansion.
164
PROJECT TITLE: NTE(SH 183) PHASE II WASTEWATER RELOCATION
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST(+OR-)ANNUAL:
Direct Operating Cost City Funding $600,000
Personnel: Full Time
Part Time $0
Total Salary $0
Purchase of Services
Materials&Supplies
Utilities $0
Subtotal: $0
Maintenance Costs
$0
Subtotal: $0
Total Estimated Annual Cost $0 Total Estimated Capital Cost $600,000
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design % 0%
Fund Balance Preliminary Design% 0%
Special Project Fund Final Plans% 0%
Certificate of Obligation Specifications% 0%
County, State, Federal Funding XX Construction % 0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
This project may qualify for a State Infrastructure Bank("SIB") loan. Staff is currently researching requirements
and repayment terms of SIB loans. SIB loans allow borrowers to access capital funds at or lower-than-market
interest rates. If the SIB loan option is not feasible, a bond sale will be considered as an alternate source of
funding.
165
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 13,2006
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-OAKWOOD TERRACE ADDITION PHASE I
Project Type: WASTEWATER Sub-Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
This project consists of the replacement of the following wastewater mains:
1. Between Hollywood Boulevard and Reaves Court from Vine Street to the end of Reaves Court and
2. From Hollywood Boulevard to Reaves Court along 306 Hollywood Boulevard.
PROJECT SCHEDULE:
FY2015
JUSTIFICATION:
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
166
PROJECT TITLE: LINE REPLACEMENT-OAKWOOD TERRACE ADDITION PHASE I
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST(+OR-)ANNUAL:
Direct Operating Cost Engineering $40,000
Personnel: Full Time Cosntruction $305,000
Part Time $0
Total Salary $0
Purchase of Services
Materials&Supplies
Utilities $0
Subtotal: $0
Maintenance Costs
$0
Subtotal: $0
Total Estimated Annual Cost $0 Total Estimated Capital Cost $345,000
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund XX Conceptual Design % 0%
Fund Balance Preliminary Design% 0%
Special Project Fund Final Plans % 0%
°
Certificate of Obligation Specifications% 0%
County, State, Federal Funding Construction % 0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
\PIT
167
City of Euless '1
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 13,2006
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-OAKWOOD TERRACE ADDITION PHASE II
Project Type: WASTEWATER Sub-Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Along 608 and 610 Martha Street,
2. Between Martha Street and Cannon Drive from Reaves Court to W Huitt Lane,
3. Between Jefflyn Court and W Huitt Lane from Martha Street to S Main Street, and
4. Between Henslee Drive and Cannon Drive from Reaves Court to Jefflyn Court.
PROJECT SCHEDULE:
FY2015
JUSTIFICATION:
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
168
PROJECT TITLE: LINE REPLACEMENT-OAKWOOD TERRACE ADDITION PHASE II
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST(+OR-)ANNUAL:
Direct Operating Cost Engineering $75,000
Personnel: Full Time Construction $560,000
Part Time $0
Total Salary $0
Purchase of Services
Materials &Supplies
Utilities $0
Subtotal: $0
Maintenance Costs
$0
Subtotal: $0
Total Estimated Annual Cost $0 Total Estimated Capital Cost $635,000
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
0
Operating Fund Conceptual Design % 0%
Fund Balance Preliminary Design% 0%
Special Project Fund Final Plans% 0%
0
Certificate of Obligation Specifications% 0%
County, State, Federal Funding Construction % 0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
169
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: February 16,2009
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-KYNETTE DRIVE/WILSHIRE DRIVE
Project Type: WASTEWATER Sub-Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Kynette Drive from Eastcliff Drive to Wilshire Drive and
2. Wilshire Drive from Kynette Drive extending 1000' north. '1
PROJECT SCHEDULE:
FY2016
JUSTIFICATION:
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
170
PROJECT TITLE: LINE REPLACEMENT-KYNETTE DRIVE/WILSHIRE DRIVE
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST(+OR-)ANNUAL:
Direct Operating Cost Engineering $64,000
Personnel: Full Time Construction $599,000
Part Time $0
Total Salary $0
Purchase of Services
Materials&Supplies
Utilities $0
Subtotal: $0
Maintenance Costs
$0
Subtotal: $0
Total Estimated Annual Cost $0 Total Estimated Capital Cost $663,000
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund XX Conceptual Design % 0%
Fund Balance Preliminary Design% 0%
Special Project Fund Final Plans% 0%
Certificate of Obligation Specifications% 0%
County, State, Federal Funding Construction % 0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
171
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 15,2005
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-CEDAR HILLS ESTATES/HOLLYWOOD BOULEVARD
Project Type: WASTEWATER Sub-Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of wastewater mains in the Cedar Hill Addition along Hollywood
Boulevard from Vine Street to east of Cannon Drive.
PROJECT SCHEDULE:
FY2017
JUSTIFICATION:
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
172
PROJECT TITLE: LINE REPLACEMENT-CEDAR HILLS ESTATES/HOLLYWOOD BOULEVARD
'`"••' NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST(+OR-)ANNUAL:
Direct Operating Cost Engineering $12,000
Personnel: Full Time Construction $100,000
Part Time $0
Total Salary $0
Purchase of Services
Materials &Supplies
Utilities $0
Subtotal: $0
Maintenance Costs
$0
Subtotal: $0
`., Total Estimated Annual Cost $0 Total Estimated Capital Cost $112,000
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund XX Conceptual Design % 0%
Fund Balance Preliminary Design% 0%
Special Project Fund Final Plans% 0%
Certificate of Obligation Specifications% 0%
County, State, Federal Funding Construction % 0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
173
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 05,2007
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-COLLIN DRIVE/HARRIS DRIVE/IRION DRIVE
Project Type: WASTEWATER Sub-Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the following wastewater main replacements:
1. West of Collin Drive between Denton Drive and Harwood Road,
2. West of Harris Drive from Dallas Drive to Harwood Road,
3. Dallas Drive from west of Collin Drive to west of Harris Drive,
4. South of Dallas Drive from'west of Collin Drive to Dallas Drive, and
5. West of Irion Drive from Dallas Drive to Harwood Road
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
174
PROJECT TITLE: LINE REPLACEMENT-COLLIN DRIVE/HARRIS DRIVE/IRION DRIVE
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST(+OR-)ANNUAL:
Direct Operating Cost Engineering-To Be Determined
Personnel: Full Time Construction-To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials&Supplies
Utilities $0
Subtotal: $0
Maintenance Costs
$0
Subtotal: $0
Total Estimated Annual Cost • $0 Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design% 0°
Fund Balance Preliminary Design% 0%
Special Project Fund Final Plans% 0%
°
Certificate of Obligation Specifications% 0%
County, State, Federal Funding Construction % 0%
°
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined XX
ADDITIONAL COMMENTS:
175
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 01,2011
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-CRANE DRIVE
Project Type: WASTEWATER Sub-Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of wastewater mains between Crane Drive and Donley Drive north of
Harwood Road to the upper end of the main north of Glenn Drive.
•
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
176
PROJECT TITLE: LINE REPLACEMENT-CRANE DRIVE
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST(+OR-)ANNUAL:
Direct Operating Cost Engineering-To Be Determined
Personnel: Full Time Construction-To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials&Supplies
Utilities $0
Subtotal: $0
Maintenance Costs
$0
Subtotal: $0
Total Estimated Annual Cost • $0 Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design % 0%
Fund Balance Preliminary Design% 0%
Special Project Fund Final Plans% 0%
Certificate of Obligation Specifications% 0%
County, State, Federal Funding Construction % 0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined XX
ADDITIONAL COMMENTS:
177
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: February 16,2009
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-DONLEY DRIVE/SHELMAR DRIVE
Project Type: WASTEWATER Sub-Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains.
PROJECT DESCRIPTION:
This project consists of the replacement of the following wastewater lines:
1. Donley Drive from Shelmar Drive to W Ash Lane,
2. Donley Drive from Harwood Road to Shelmar Drive, and '1 3. Shelmar Drive from Green Hill Street to the end of Shelmar Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
178
PROJECT TITLE: LINE REPLACEMENT-DONLEY DRIVE/SHELMAR DRIVE
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST(+OR-)ANNUAL:
Direct Operating Cost Engineering-To Be Determined
Personnel: Full Time Construction-To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials &Supplies
Utilities $0
Subtotal: $0
Maintenance Costs
$0
Subtotal: $0
Total Estimated Annual Cost $0 Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design % 0%
°
Fund Balance Preliminary Design% 0%
Special Project Fund Final Plans% 0%
Certificate of Obligation Specifications% 0%
County, State, Federal Funding Construction % 0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined XX
ADDITIONAL COMMENTS:
179
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: February 16,2009
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-EASTCLIFF DRIVE/WINDLEA DRIVE/SIGNET DRIVE
Project Type: WASTEWATER Sub-Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains.
PROJECT DESCRIPTION:
This project includes the replacement of the following wastewater mains:
1. Eastcliff Drive from Tyler Avenue to Signet Drive,
2. Windlea Drive from Eastcliff Drive to Wilshire Drive, and
3. Between Windlea Drive and Signet Drive from Eastcliff Drive to Wilshire Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
180
PROJECT TITLE: LINE REPLACEMENT-EASTCLIFF DRIVE/WINDLEA DRIVE/SIGNET DRIVE
`-- NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST(+OR-)ANNUAL:
Direct Operating Cost Engineering-To Be Determined
Personnel: Full Time Construction-To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials&Supplies
Utilities $0
Subtotal: $0
Maintenance Costs
$0
Subtotal: $0
Total Estimated Annual Cost $0 Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design % °
0
Fund Balance Preliminary Design % 0%
0
Special Project Fund Final Plans% 0 °
Certificate of Obligation Specifications% 0%
County, State, Federal Funding Construction % 0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined XX
ADDITIONAL COMMENTS:
181
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: February 16,2009
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-ECTOR DRIVE/DONLEY DRIVE/CRANE DRIVE
Project Type: WASTEWATER Sub-Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Between Ector Drive and Donley Drive from Aransas Drive to Harwood Road and
2. Between Donley Drive and Crane Drive from Aransas Drive to Harwood Road.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
182
PROJECT TITLE: LINE REPLACEMENT-ECTOR DRIVE/DONLEY DRIVE/CRANE DRIVE
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST(+OR-)ANNUAL:
Direct Operating Cost Engineering-To Be Determined
Personnel: Full Time Construction-To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials& Supplies
Utilities $0
Subtotal: $0
Maintenance Costs
$0
Subtotal: $0
Total Estimated Annual Cost $0 Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
0
Operating Fund Conceptual Design % °
Fund Balance Preliminary Design% 0%
Special Project Fund Final Plans% °
0
Certificate of Obligation Specifications% 0%
County, State, Federal Funding Construction % 0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined XX
ADDITIONAL COMMENTS:
183
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 15,2005
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-ECTOR DRIVE/FAYETTE DRIVE
Project Type: WASTEWATER Sub-Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the wastewater mains between Fayette Drive and Ector Drive from
Harwood Road to the end of the line.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
184
PROJECT TITLE: LINE REPLACEMENT-ECTOR DRIVE/FAYETTE DRIVE
�-' NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST(+OR-)ANNUAL:
Direct Operating Cost Engineering-To Be Determined
Personnel: Full Time Construction-To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials &Supplies
Utilities $0
Subtotal: $0
Maintenance Costs
$0
Subtotal: $0
Total Estimated Annual Cost $0 Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design % 0%
0
Fund Balance Preliminary Design % 0%
Special Project Fund Final Plans% 0%
Certificate of Obligation Specifications% 0%
County, State, Federal Funding Construction % 0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined XX
ADDITIONAL COMMENTS:
185
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: February 16,2009
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-EVANS DRIVE/CANYON RIDGE DRIVE/N KYNETTE DRIVE
Project Type: WASTEWATER Sub-Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Between Evans Drive and Canyon Ridge Drive from Cyclone Branch to north of Kynette Drive and
2. North of Kynette Drive from Canyon Ridge Drive to Cyclone Branch.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
186
PROJECT TITLE: LINE REPLACEMENT-EVANS DRIVE/CANYON RIDGE DRIVE/N KYNETTE DRIVE
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST(+OR-)ANNUAL:
Direct Operating Cost Engineering-To Be Determined
Personnel: Full Time Construction-To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials& Supplies
Utilities $0
Subtotal: $0
Maintenance Costs
$0
Subtotal: $0
Total Estimated Annual Cost $0 Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design % 00
Fund Balance Preliminary Design % 0%
Special Project Fund Final Plans% 00/o
Certificate of Obligation Specifications% 0%
County, State, Federal Funding Construction % 0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined XX
ADDITIONAL COMMENTS:
' 4117
187
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 05,2007
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-GLENN DRIVE
Project Type: WASTEWATER Sub-Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the wastewater mains located west of Glenn Drive from Aransas
Drive to Glenn Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
188
PROJECT TITLE: LINE REPLACEMENT-GLENN DRIVE
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST(+OR-)ANNUAL:
Direct Operating Cost Engineering-To Be Determined
Personnel: Full Time Construction-To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials&Supplies
Utilities $0
Subtotal: $0
Maintenance Costs
$0
Subtotal: $0
Total Estimated Annual Cost • $0 Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
0
Operating Fund Conceptual Design % °
Fund Balance Preliminary Design% 0%
Special Project Fund Final Plans% °
0
Certificate of Obligation Specifications% 0%
County, State, Federal Funding Construction % 0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined XX
ADDITIONAL COMMENTS:
189
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: February 16,2009
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REP-HUNTINGTON/KOEN/ATKERSON/E HUITT/SLAUGHTER/MARTIN
Project Type: WASTEWATER Sub-Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan.The
project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains.
PROJECT DESCRIPTION:
This project consists of the replacement of the following wastewater mains:
1. East of Huntington Drive from S Atkerson Lane to E Alexander Lane,
2. Between Koen Lane and S Atkerson Lane from Huntington Drive to FAA Road,
3. Between S Atkerson Lane and N Atkerson Lane from Huntington Drive to FAA Road,
4. Betweeri N Atkerson Lane and E Huitt Lane from Huntington Drive to FAA Road,
5. Between E Huitt Lane and Slaughter Lane from Huntington Drive to FAA Road,
6. Between Slaughter Lane and Martin Lane from Huntington to FAA Road, and
7. Between Martin Lane and E Alexander Lane from Huntington Drive to FAA Road.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
190
PROJECT TITLE: LINE REP-HUNTINGTON/KOEN/ATKERSON/E HUITT/SLAUGHTER/MARTIN
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST(+OR-)ANNUAL:
Direct Operating Cost Engineering-To Be Determined
Personnel: Full Time Construction-To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials& Supplies
Utilities $0
Subtotal: $0
Maintenance Costs
$0
Subtotal: $0
Total Estimated Annual Cost $0 Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
0
Operating Fund Conceptual Design % 0%
Fund Balance Preliminary Design% 0%
Special Project Fund Final Plans% 0%
Certificate of Obligation Specifications% 0%
County, State, Federal Funding Construction % 0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined XX
ADDITIONAL COMMENTS:
191
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: February 16,2009
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-JANANN STREET/BROWNSTONE DRIVE/SHELMAR DRIVE
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Janann Street from Aransas Drive to Donley Drive,
2. Brownstone Drive from Aransas Drive to Donley Drive,
3. Shelmar Drive from Greenhill Street to Aransas Drive, and
4. Aransas Drive from 500' south of Shelmar Drive to Janann Street.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
''1
I-N,
192
PROJECT TITLE: LINE REPLACEMENT-JANANN STREET/BROWNSTONE DRIVE/SHELMAR DRIVE
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
U*
$0 Total Estimated Capital Cost
CURRENT STATUS:
0
Conceptual Design % 0 0
Preliminary Design % 0%
Final Plans % 00 0
Specifications % 00
Construction % 0
193
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: February 16,2009
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-LAKEWOOD BLVD/DOGWOOD CIRCLE/BOCOWOOD CIRCLE
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Lakewood Boulevard from Dogwood Circle north to Private Drive and
2. Dogwood Circle, Cypress Circle, Bocowood Circle, and Aspenway Circle.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
194
PROJECT TITLE: LINE REPLACEMENT-LAKEWOOD BLVD/DOGWOOD CIRCLE/BOCOWOOD CIRCLE
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
�.. Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
0%
Preliminary Design %
0%
Final Plans %
0%
Specifications %
00 °
Construction %
0%
195
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 16,2012
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REP -LIVE OAK DRIVE/SILVER CREEK DRIVE/MARLENE DRIVE
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Live Oak Drive from Silver Creek Drive south to Hurricane Creek,
2. Mains in the cul-de-sacs on the east side of Live Oak Drive,
3. Silver Creek Drive between Westpark Way and Evans Drive, and
4. Marlene Drive between Live Oak and Marlene Court.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
196
PROJECT TITLE: LINE REP -LIVE OAK DRIVE/SILVER CREEK DRIVE/MARLENE DRIVE
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
�.. I Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 I Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
197
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: February 16,2009
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-MARY/MARLENE/COMMERCEMI LSHIRE/GREEN BRIAR
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Between Mary Drive and Marlene Drive from Cyclone Branch to Marlene Drive,
2. Between Commerce Street and Wilshire Drive from Marlene Drive to Sagebrush Trail,
3. South of Greenbriar Drive from Cyclone Branch to Debra Drive,
4. 'Between Greenbriar Drive and Mary Street from Eastcliff Drive to Debra Drive, and
5. East of Debra Drive and south of Mary Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
,•-*N
_1\
198
PROJECT TITLE: LINE REPLACEMENT-MARY/MARLENE/COMMERCEMILSHIRE/GREENBRIAR
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
"'*� I Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 ( Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
199
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 13,2006
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-N MIDWAY PARK
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. East of Denton Drive between Bell Drive and Dallas Drive,
2. Between Denton Drive and Irion Drive from Dallas Drive to Harwood Road,
3. Along Denton Drive from Harwood Road to Collin Drive, and
4. Along Milam Drive from Blanco Drive to Midway Park Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, open joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
WhO
._*N
200
PROJECT TITLE: LINE REPLACEMENT-N MIDWAY PARK
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
AINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
201
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: February 16,2009
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REP-NORTHCLIFF/TOPLEA/WINDLEA/SIGNET/KYNETTEANESTCLIFF
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains..
1. Between Northcliff Drive and Toplea Drive from Canyon Ridge to Cyclone Branch,
2. Between Toplea Drive and Windlea Drive from Canyon Ridge to Cyclone Branch,
3. Between Windlea Drive and Signet Drive from Canyon Ridge to Cyclone Branch,
4. Between Signet Drive and Kynette Drive from the church to Cyclone Branch, and
5. Westcliff Drive from Toplea Drive to north of Windlea Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
W
.**N
202
PROJECT TITLE: LINE REP-NORTHCLIFF/TOPLEA/WINDLEA/SIGNET/KYNETTE/WESTCLIFF
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
AINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
203
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: February 16,2009
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT -NW MIDWAY/RUSK/PARKER/ROCKWALL
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. North of West Midway Drive from FM157 to Parker Drive,
2. West Midway Drive from Parker Drive to Rusk Drive,
3. Rusk Drive from West Midway Drive to Parker Drive,
4. Parker Drive from West Midway Drive to Rockwall Drive, and
5. Rockwall Drive from west of Parker Drive to 400' west of Lamar Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
204
PROJECT TITLE: LINE REPLACEMENT -NW MIDWAY/RUSK/PARKER/ROCKWALL
`-' NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
`S,� I Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0 1 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
205
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 13,2006
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-S MAIN STREET
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the wastewater main along S Main Street from Jean Lane to W
Alexander Lane.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
e_
206
PROJECT TITLE: LINE REPLACEMENT-S MAIN STREET
�-NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
Total Estimated•Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
W
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
207
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: February 16,2009
Submitted By: RON YOUNG Date Com leted:
Project Title: LINE REP-SAGEBRUSH/TOPLEA/WILSHIRE/YORKSHIRE/TYLER
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of deteriorating vitrified clay the wastewater mains.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Between Sagebrush Trail and Toplea Drive from Cyclone Branch to east of Wilshire Drive,
2. Between Wilshire Drive and Yorkshire Drive from Signet Drive to south of Toplea Drive,
3. Between Sagebrush Trail and Tyler Avenue from Cyclone Branch to Commerce Street,
4. Eastcliff Drive from Tyler Avenue to the apartments, and
5. Between Marlene Drive and Tyler Avenue from Eastcliff Drive to Commerce Street.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
10�
208
PROJECT TITLE: LINE REP-SAGEBRUSH/TOPLEA/WILSHIRE/YORKSHIRE/TYLER
�-' NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
�• Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
ffil
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
209
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 01,2011
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT -SIERRA DRIVE
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
This project consists of replacement of the following wastewater mains:
1. Between Sierra Drive and Eastcliff Drive from Kynette Drive to Signet Drive and
2. East of Sierra Drive from Wilshire Park to Signet Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
.,
.-*N
210
PROJECT TITLE: LINE REPLACEMENT -SIERRA DRIVE
`-' NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
`.,- I Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 1 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
211
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 16,2012
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT -TOWN CREEK DRIVE
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Town Creek Drive from Salem Drive to Carter Drive,
2. Carter Drive south of Town Creek Drive,
3. Westport Court,
4. Newport Court,
5. Asbury Court, and
5. the outfall between Westport Court and Newport Court.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
'O 1
W
212
PROJECT TITLE: LINE REPLACEMENT -TOWN CREEK DRIVE
`► NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
'% , I Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
w
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 I Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
213
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: February 16,2009
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-W DONLEY/PRIVATE DRIVE/MIMOSA/MAGNOLIA/REDBUD
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priori : C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. West of Donley Drive from West Ash Lane to Private Drive,
2. Private Drive from west of Redbud Drive to Lakewood Boulevard,
3. Mimosa Lane from Bocowood Drive to Private Drive,
4. Magnolia Lane from Bocowood Drive to Private Drive, and
5. Redbud Drive from Bocowood Drive to Private Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
L
214
PROJECT TITLE: LINE REPLACEMENT-W DONLEY/PRIVATE DRIVE/MIMOSA/MAGNOLIA/REDBUD
�... NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
0%
Preliminary Design %
0%
Final Plans %
0%
Specifications %
0%
Construction %
0%
215
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: February 16,2009
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REP-W MIDWAY/VICTORIA/DELTA/LAMAR/ROCKWALL
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. West Midway Drive from FM157 to Victoria Drive,
2. Victoria Drive from West Midway Drive north 700',
3. Delta Drive from West Midway Drive north 1000',
4. Lamar Drive from West Midway Drive north to Fayette Drive, and
5. Rockwall Drive from Lamar Drive west and north 800'.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
.*Is
1_\
216
PROJECT TITLE: LINE REP-W MIDWAYVICTORIA/DELTA/LAMAR/ROCKWALL
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal. -
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
IQV
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
217
khO
T H EF'C I T Y O F
lffim-,-§J ss
,
218
I
CAPITAL IMPROVEMENT PROGRAMS
FY13 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE
PROPOSED METHOD OF FINANCING
Project Description
Priority
Estimated Cost
Operating
Fund
CIP Fund
Balance
Bond Sale
Grants/
Contrib
Impact
Fees
Escrow
Funds
Car Rental
Tax
Other
EDC
To Be
Determined
WATER PROJECTS
None Currently$
Sub -Total Water Priority A -Proposed FY13
$
LR. El Camino Real (14)
B
$ 410,000
XX
Water System Security Camera Installation (14)
B
$ 75,000
XX
LR: S Pipeline Road West "Si
B
$ 300,000
XX
NTE (SH183) Phase II Water Relocation i151
B
$ 1,200,000
XX
Residential Meter Replacement Program j15
B
$ 3,690,350
XX
LR: Blessing Creek/Stony Creek/Rock Creek Il
B
$ 315,000
XX
SH360 Water Crossing I17I
B
$ 735,500
XX
Sub -Total Water Priority 8-Unfunded
$ 6,726,860
LR: Collin Drive -Dallas Dr to Harwood Rd
C
TBD
XX
LR: Collin Drive -Denton Dr to Dallas Dr
C
TBD
XX
LR: Denton Drive
C
TBD
XX
LR Dickey Drive North
C
TBD
XX
LR: Dickey Drive South
C
TBD
XX
LR. Dunaway Drive
C
TBD
Xx
LR: E Huitt Lane
C
TBD
XX
LR: Eastcliff Drive
C
TBD
XX
LR: Ector Drive
C
TBD
XX
LR: Fuller Drive
C
TBD
XX
LR. Hollow Oak Drive
C
TBD
XX
LR: Kynette Drive
C
TBD
XX
LR: Live Oak Court/Live Oak Drive
C
TBD
XX
LR: Midcreek/Rock Creek/Stony Creek
C
TBD
XX
LR: Midway Drive East
C
TBD
XX
LR: Midway Drive West
C
TBD
XX
LR: Needles Street
C
TBD
XX
LR. Paula Lane
C
TBD
XX
LR: S Main Street (North)
C
TBD
XX
LR: S Main Street (South)
C
TBD
XX
LR: S Pipeline Road East
C
TBD
XX
LR: Shady Creek Drive/Cliffwood Drive
C
TBD
XX
LR: Springwood Court
C
TBD
XX
LR: Sunset Drive
C
TBD
XX
LR. Westwood Drive
C
TBD
XX
LR. Wildwood Street
C
TBD
XX
LR Woodvine (East)
C
TBD
XX
LR. Woodvine (West)
C
TBD
XX
Water System Security Land Acquisition
C
TBD
XX
Sub -Total Water Priority C-Unfunded
$
WATER PROJECTS -TOTAL
$ 6,726,850
L, - LAIC mGyl .CIllC I11
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 16,2012
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT -EL CAMINO REAL
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan. El Camino Real is the FY2014 County
Overlay project.
PROJECT DESCRIPTION:
The project consists of the replacement of an existing 8" AC water main with a 10" PVC water main on El
Camino Real from W Pipeline Road to the south city limits. The project scope includes approximately 3200
linear feet of 10" PVC, 800 linear feet of 8" PVC, 20 valves, and 8 fire hydrants. New water service connections
to the apartments and townhomes will also be included in the project.
PROJECT SCHEDULE:
FY2014 to coincide with the anticipated County overlay on El Camino Real.
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic replacement of old deteriorated or substandard size water mains will
reduce maintenance costs. The water main on El Camino Real has experienced several breaks within the last
two years.
_0�
220
PROJECT TITLE: LINE REPLACEMENT -EL CAMINO REAL
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Engineering
Construction
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
XX Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
$45, 000
$365,000
$410,000
221
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 12,2004
Submitted By: RON YOUNG Date Completed:
Project Title: WATER SYSTEM SECURITY CAMERA INSTALLATION
Project Type: WATER Sub -Type: SYSTEM SECURITY
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project is a result of the findings included in the 2004 Water System Vulnerability Assessment of the City's
Water System Master Plan.
PROJECT DESCRIPTION:
The project provides for the installation of security cameras at the water production and storage sites (ground
storage tanks and towers) located at West Fuller Drive, Heritage Park, 1400 N Main Street, 2591 N Main Street,
and 2700 N Main Street.
PROJECT SCHEDULE:
FY2014
JUSTIFICATION:
Increase water system security by addressing vital elements as recommended in the 2004 Water System
Vulnerability Assessment as identified by Lockwood, Andrews, and Newman, Inc. and submitted to the
Environmental Protection Agency (EPA).
.-IN
'IN
222
PROJECT TITLE: WATER SYSTEM SECURITY CAMERA INSTALLATION
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
TOTAL ESTIMATED CAPITAL COST:
Equipment Installation $75,000
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost $75,000
CURRENT STATUS:
Conceptual Design % 00 °
Preliminary Design % 0%
0
Final Plans % °
0
Specifications % °
Construction % 00 °
XX
223
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 28,2003
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-S PIPELINE ROAD WEST
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of the existing 6" cast iron water main with an 8" PVC water main along
S Pipeline Road west from Simmons Drive to Vine Street.
PROJECT SCHEDULE:
FY2015
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
'�
224
PROJECT TITLE: LINE REPLACEMENT-S PIPELINE ROAD WEST
ET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
,s I Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
TOTAL ESTIMATED CAPITAL COST:
Engineering $30,000
Construction $270,000
$0
$0
$0
$0
$0
$0
$0
Total Estimated Capital Cost $300,000
XX
CURRENT STATUS:
Conceptual Design % 0%
Preliminary Design % 0%
Final Plans % 0%
Specifications % 0%
Construction % 0%
225
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 10, 2010
Submitted By: RON YOUNG Date Completed:
Project Title: NTE (SH183) PHASE II WATER RELOCATION
Project Type: WATER Sub -Type: LINE RELOCATION
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The Texas Department of Transportation ("TxDoT") has entered into a developer agreement with North Tarrant
Express Mobility Partners ("NTEMP") for the expansion of SH183. The Phase II construction will affect the City
of Euless' utilities along and crossing SH183 between FM157 and the east city limits.
PROJECT DESCRIPTION:
The City of Euless has water mains and associated items located within the SH183 right-of-way. These facilities
must be relocated to accommodate Phase II the SH183 expansion. It is anticipated that the City of Euless will
enter into a relocation agreement with NTEMP to authorize them to design and relocate water lines and
associated infrastructure. The City will be responsible for the cost of relocating the utilities.
PROJECT SCHEDULE:
Est. FY2015
JUSTIFICATION:
City of Euless water facilities are located within TxDoT right-of-way. As such, the City must provide for utility
relocation to accommodate the roadway expansion.
'1
226
PROJECT TITLE: NTE (SH183) PHASE II WATER RELOCATION
NET EFFECTS ON OPERATING AND
AAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
TOTAL ESTIMATED CAPITAL COST:
City Funding $1,200,000
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost, $1,200,000
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
00 0
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
$1,200,000
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
This project may qualify for a State Infrastructure Bank ("SIB") loan. Staff is currently researching requirements
and repayment terms of SIB loans. SIB loans allow borrowers to access capital funds at or lower -than -market
interest rates. If the SIB loan option is not feasible, a bond sale will be considered as an alternate source of
funding.
227
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: June 07,2012
Submitted By: RON YOUNG Date Completed:
Project Title: RESIDENTIAL METER REPLACEMENT PROGRAM
Project Type: WATER Sub -Type: METERS/TRANSPONDERS
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The systematic replacement of meters and transponders at or near end of life is included in the Water System Master
Plan.
PROJECT DESCRIPTION:
The project includes the system -wide replacement of residential water meters one inch and less in size. The reading
equipment and associated software are included in the scope of the project as well.
PROJECT SCHEDULE:
FY2015
JUSTIFICATION:
The project will upgrade the current residential meters and transponders to the latest in auto -read technology and
provide funding for the reading equipment and software necessary for the system upgrade.
228
PROJECT TITLE: RESIDENTIAL METER REPLACEMENT PROGRAM
�NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
IAAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Meters $3,690,350
Personnel: Full Time $0
Part Time
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
Subtotal:
,.'otal Estimated Annual Cost $0 Total Estimated Capital Cost $3,690,350
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund
Conceptual Design %
0
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
00
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
XX
Donations
Supplemental Sales Tax
Car Rental Tax Fund
Other -plan review/inspection fees
ADDITIONAL COMMENTS:
229
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 05,2007
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT -BLESSING CREEK/STONY CREEK/ROCK CREEK
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains are included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
This project will replace the 6" AC main with an 8" PVC main for Blessing Creek, Stony Creek, and Rock Creek.
PROJECT SCHEDULE:
FY2016
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
230
PROJECT TITLE: LINE REPLACEMENT -BLESSING CREEK/STONY CREEK/ROCK CREEK
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
AINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering/Surveying
Personnel: Full Time Construction
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
$0 Total Estimated Capital Cost
CURRENT STATUS:
XX Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
$45,000
$270,000
$315,000
0%
0%
0%
0%
0%
231
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: July 21,2000
Submitted By: RON YOUNG Date Completed:
Project Title: SH360 WATER CROSSING
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project is related to the DFW International Airport Master Plan for property in Euless.
PROJECT DESCRIPTION:
The project scope includes the extension of two (2) 12" diameter water mains through the SH360 right-of-way to
provide service to the southwest portion of the DFW Airport property. The water mains will be bored under
SH360 at the Midway Drive intersection and between Harwood Road and Ash Lane. The mains will be located
within the Texas Department of Transportation right-of-way. The mains will be plugged at the east right-of-way
of SH360 in anticipation of the likely extension into DFW Airport property to serve future development.
PROJECT SCHEDULE:
FY2017
JUSTIFICATION:
Development on the airport property could potentially increase the City's tax revenues. Future development is
dependent upon the availability of water service to this area.
''\
'1
232
PROJECT TITLE: SH360 WATER CROSSING
`-- NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering/Surveying $90,000
Construction $645,500
$0
$0
$0
$0
$0
$0
$0
Total Estimated Capital Cost $735,500
CURRENT STATUS:
Conceptual Design % 0%
Preliminary Design % 0%
Final Plans % 0%
Specifications % 0%
Construction % 0%
233
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 28,2003
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-COLLIN DRIVE, DALLAS DRIVE TO HARWOOD ROAD
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project will replace a 6" cast iron main with an 8" PVC main along Collin Drive from Dallas Drive to Harwood
Road.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
' N
234
PROJECT TITLE: LINE REPLACEMENT-COLLIN DRIVE, DALLAS DRIVE TO HARWOOD ROAD
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
1%, 1 Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
235
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 28,2003
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-COLLIN DRIVE, DENTON DRIVE TO DALLAS DRIVE
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priorit : C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project will replace a 6" cast iron main to an 8" PVC main along Collin Drive from Denton Drive to Dallas
Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
k
W
IWI
236
PROJECT TITLE: LINE REPLACEMENT-COLLIN DRIVE, DENTON DRIVE TO DALLAS DRIVE
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
�N. Jotal Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
237
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 28,2003
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-DENTON DRIVE, TARRANT DRIVE TO HARWOOD ROAD
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of the 6" cast iron water main with an 8" PVC main along Denton Drive
from Tarrant Drive to Harwood Road.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
No
238
9M
PROJECT TITLE: LINE REPLACEMENT-DENTON DRIVE, TARRANT DRIVE TO HARWOOD ROAD
NET EFFECTS ON OPERATING AND
TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Engineering - To Be Determined
Personnel: Full Time
Construction - To Be Determined
Part Time
$0
Total Salary
$0
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal:
$0
Maintenance Costs
$0
Subtotal:
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
00
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
polo
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
239
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 28,2003
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT -DICKEY DRIVE NORTH, SH10 TO E HUITT LANE
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
This project consists of replacing the 6" cast iron water main with an 8" PVC main along Dickey Drive north from
SH10 to E Huitt Lane.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
'�
240
PROJECT TITLE: LINE REPLACEMENT -DICKEY DRIVE NORTH, SH10 TO E HUITT LANE
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost
Engineering - To Be Determined
Personnel: Full Time
Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
QQ
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design % 0%
Preliminary Design % 0%
Final Plans % 0%
Specifications % 0%
Construction % 0%
241
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 28,2003
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT -DICKEY DRIVE SOUTH, E HUITT LANE TO HILTON DRIVE
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
This project consists of the replacement of a 6" cast iron water main with an 8" PVC main along Dickey Drive
south from E Huitt Lane to Hilton Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
bo
.-IN
242
PROJECT TITLE: LINE REPLACEMENT -DICKEY DRIVE SOUTH, E HUITT LANE TO HILTON DRIVE
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
AINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
243
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 15,2005
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-DUNAWAY DRIVE, E ALEXANDER LANE TO E ASCOT DRIVE
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of the existing 6" AC water main with an 8" PVC water main on
Dunaway Drive from E Alexander Lane to E Ascot Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
._"N
244
PROJECT TITLE: LINE REPLACEMENT-DUNAWAY DRIVE, E ALEXANDER LANE TO E ASCOT DRIVE
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
QQ
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 1 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design % 0%
Preliminary Design % 0%
Final Plans % 0%
Specifications % 0%
Construction % 0%
245
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 15,2005
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-E HUITT LANE, S MAIN STREET TO DUNAWAY DRIVE
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of the existing 6" PVC water main with an 8" PVC water main along
E Huitt Lane from S Main Street to Dunaway Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
246
PROJECT TITLE: LINE REPLACEMENT-E HUITT LANE, S MAIN STREET TO DUNAWAY DRIVE
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
247
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 15,2005
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-EASTCLIFF DRIVE, TOPLEA DRIVE TO DEL PRADO APTS.
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of the 6" AC main to an 8" PVC main along Eastcliff Drive from Toplea
Drive to Del Prado Apartments.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
248
PROJECT TITLE: LINE REPLACEMENT-EASTCLIFF DRIVE, TOPLEA DRIVE TO DEL PRADO APTS.
�- NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
0%
Preliminary Design %
0%
Final Plans %
0 °
Specifications %
0%
Construction %
0 °
249
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 28,2003
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-ECTOR DRIVE, TROJAN TRAIL TO MIDWAY DRIVE
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of the 6" cast iron water main with an 8" PVC main on Ector Drive from
Trojan Trail to Midway Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
.-IN
-N
250
PROJECT TITLE: LINE REPLACEMENT-ECTOR DRIVE, TROJAN TRAIL TO MIDWAY DRIVE
`-- NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
251
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 28,2003
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT -FULLER DRIVE, SALEM DRIVE TO CARTER DRIVE
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of replacing a 6" cast iron water main with an 8" PVC water main along Fuller Drive from
Salem Drive to Carter Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
252
PROJECT TITLE: LINE REPLACEMENT -FULLER DRIVE, SALEM DRIVE TO CARTER DRIVE
NET EFFECTS ON OPERATING AND
TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Engineering - To Be Determined
Personnel: Full Time
Construction - To Be Determined
Part Time
$0
Total Salary
$0
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal:
$0
Maintenance Costs
$0
Subtotal:
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
i
Operating Fund
Conceptual Design %
o
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
253
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 28,2003
Submitted B RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT -HOLLOW OAK DRIVE
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of the 6" cast iron main with an 8" PVC main along Hollow Oak Drive
from Woodridge Circle to Pebble Creek Drive and Woodridge Circle south of Hollow Oak Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
..1
001
254
PROJECT TITLE: LINE REPLACEMENT -HOLLOW OAK DRIVE
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
'`. Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
MW
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
255
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 15,2005
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-KYNETTE DRIVE, CYCLONE CREEK TO WILSHIRE DRIVE
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of a 6" cast iron water main with an 8" PVC main along Kynette Drive
from Cyclone Creek to Wilshire Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
256
PROJECT TITLE: LINE REPLACEMENT-KYNETTE DRIVE, CYCLONE CREEK TO WILSHIRE DRIVE
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
AINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal:
Total Estimated Annual Cost
$0
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
L
257
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 28,2003
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT -LIVE OAK CT/LIVE OAK DRIVE
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of the existing 4" cast iron water main with an 8" PVC main along Live
Oak Drive from Cedar Court to the south end of Live Oak Drive. Additionally, the replacement of the existing 8"
cast iron water main with an 8" PVC water main from Canyon Ridge to West Cliff Drive is also included in the
scope of the project.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
,-*N
258
PROJECT TITLE: LINE REPLACEMENT -LIVE OAK CT/LIVE OAK DRIVE
�-= NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
'*-*� I Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 1 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
259
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 05,2007
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REP-MIDCREEK DRIVE/ROCK CREEK DRIVE/STONY CREEK DRIVE
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
This project consists of the replacement of a 6" AC main with an 8" PVC main on Midcreek Drive, Rock Creek
Drive, and Stony Creek Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
W
260
PROJECT TITLE: LINE REP-MIDCREEK DRIVE/ROCK CREEK DRIVE/STONY CREEK DRIVE
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
M
Ei3
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
0%
Preliminary Design %
0%
Final Plans %
0%
Specifications %
0%
Construction %
0%
261
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 28,2003
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT -MIDWAY DRIVE EAST, N MAIN ST TO FREESTONE DR
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
This project replaces the 6" cast iron water main with an 8" PVC main on Midway Drive east from N Main Street
to Freestone Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
262
PROJECT TITLE: LINE REPLACEMENT -MIDWAY DRIVE EAST, N MAIN ST TO FREESTONE DR
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
AINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
I Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
263
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 28,2003
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT -MIDWAY DRIVE WEST, FREESTONE DRIVE TO ECTOR DRIVE
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
This project replaces the 6" cast iron water main with an 8" PVC main along Midway Drive west from Freestone
Drive to Ector Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
4.
.-,
264
PROJECT TITLE: LINE REPLACEMENT -MIDWAY DRIVE WEST, FREESTONE DRIVE TO ECTOR DRIVE
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
265
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 15,2005
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT -NEEDLES STREET, PAULA LANE TO RAIDER DRIVE
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priori : C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of the existing 6" cast iron water main with an 8" PVC water main along
Needles Street from Paula Lane to Raider Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
W
266
PROJECT TITLE: LINE REPLACEMENT -NEEDLES STREET, PAULA LANE TO RAIDER DRIVE
�-- NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal.-
``,, I Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 1 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
267
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 28,2003
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-PAULA LANE, NEEDLES STREET TO S PIPELINE ROAD
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of the 6" cast iron water main with an 8" PVC main along Paula Lane
from Needles Street to S Pipeline Road.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
"\
1_"N
268
PROJECT TITLE: LINE REPLACEMENT-PAULA LANE, NEEDLES STREET TO S PIPELINE ROAD
`-- NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
M4
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
269
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 12,2004
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-S MAIN STREET (NORTH), E HUITT LANE TO SH10
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are part of the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project will replace and upgrade the water main along S Main Street from E Huitt Lane to SH10 from a 6"
cast iron main to an 8" PVC main.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
'-IN
'_N
270
PROJECT TITLE: LINE REPLACEMENT-S MAIN STREET (NORTH), E HUITT LANE TO SH10
NET EFFECTS ON OPERATING AND
AINTENANCE COST(
OST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 1 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
271
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 12,2004
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-S MAIN STREET (SOUTH), LANDOVER DR TO E HUITT LN
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are part of the City's Water System Master Plan.
PROJECT DESCRIPTION:
This project will replace and upgrade the water main along S Main Street from Landover Drive to E Huitt Lane
from a 6" cast iron main to an 8" PVC.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
wo
272
PROJECT TITLE: LINE REPLACEMENT-S MAIN STREET (SOUTH), LANDOVER DR TO E HUITT LN
`-- NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
'S'-� I Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 I Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
0%
Preliminary Design %
0%
Final Plans %
0%
Specifications %
0%
Construction %
0%
273
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 28,2003
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-S PIPELINE ROAD EAST, VINE STREET TO S MAIN STREET
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project will replace the existing 6" cast iron water main with an 8" PVC water main along S Pipeline Road
east from Vine Street to S Main Street.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
'",
274
PROJECT TITLE: LINE REPLACEMENT-S PIPELINE ROAD EAST, VINE STREET TO S MAIN STREET
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
� I Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
0%
Preliminary Design %
0%
Final Plans %
0%
Specifications %
0%
Construction %
0%
275
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 12,2004
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT -SHADY CREEK DRIVE/CLIFFWOOD ROAD
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are part of the City's Water System Master Plan.
PROJECT DESCRIPTION:
This project will replace and upgrade the water mains along Shady Creek Drive and Cliffwood Road from the
existing 6" cast iron mains to 8" PVC.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
''N
276
PROJECT TITLE: LINE REPLACEMENT -SHADY CREEK DRIVE/CLIFFWOOD ROAD
`-- NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
� I Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 1 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
277
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 12,2004
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-SPRINGWOOD COURT
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are part of the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of 4" water main with an 8" main on Springwood Court.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance cost. Substandard size water mains provide
a reduced flow of water. Systematic annual replacement of deteriorated and substandard size water mains will
reduce maintenance costs.
W
.—*N
278
PROJECT TITLE: LINE REPLACEMENT-SPRINGWOOD COURT
�- I NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
279
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 12,2004
Submitted B RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT -SUNSET DRIVE, S PIPELINE ROAD TO S MAIN STREET
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are part of the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project will replace and upgrade the water main along Sunset Drive from S Pipeline Road to S Main Street
from a 6" cast iron main to an 8" PVC main.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
''1
11
280
l
PROJECT TITLE: LINE REPLACEMENT -SUNSET DRIVE, S PIPELINE ROAD TO S MAIN STREET
NET EFFECTS ON OPERATING AND
TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Engineering - To Be Determined
Personnel: Full Time
Construction - To Be Determined
Part Time
$0
Total Salary
$0
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal:
$0
Maintenance Costs
$0
Subtotal:
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
00
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
281
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 28,2003
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-WESTWOOD DRIVE, FULLER DRIVE TO CARTER DRIVE
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project will replace a 6" cast iron main with an 8" PVC main along Westwood Drive from Fuller Drive to
Carter Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
282
M
M
PROJECT TITLE: LINE REPLACEMENT-WESTWOOD DRIVE, FULLER DRIVE TO CARTER DRIVE
NET EFFECTS ON OPERATING AND
TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Engineering - To Be Determined
Personnel: Full Time
Construction - To Be Determined
Part Time
$0
Total Salary
$0
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal:
$0
Maintenance Costs
$0
Subtotal:
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
00 0
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
283
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 12,2004
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-WILDWOOD STREET
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priorit : C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are part of the City's Water System Master Plan.
PROJECT DESCRIPTION:
This project will replace and upgrade the water main along Wildwood Street from a 6" cast iron main to an 8"
PVC main.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
284
PROJECT TITLE: LINE REPLACEMENT-WILDWOOD STREET
ET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal. -
Subtotal:
ITotal Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 1 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
285
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 12,2004
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REP-WOODVINE DRIVE (EAST), CLIFFWOOD ROAD TO EL CAMINO REAL
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are part of the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project will replace and upgrade the water main along Woodvine Drive from Cliffwood Road to El Camino
Real from a 6" cast iron main to an 8" PVC main.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
0- N
L
286
PROJECT TITLE: LINE REP-WOODVINE DRIVE (EAST), CLIFFWOOD ROAD TO EL CAMINO REAL
�..- NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 1 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
287
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 12,2004
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REP-WOODVINE DRIVE (WEST), PEBBLE CREEK DR TO CLIFFWOOD RD
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priori : C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are part of the City's Water System Master Plan.
PROJECT DESCRIPTION:
This project will replace and upgrade the water main along Woodvine Drive from Pebble Creek to Cliffwood
Road from a 6" cast iron main to an 8" PVC main.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
288
PROJECT TITLE: LINE REP-WOODVINE DRIVE (WEST), PEBBLE CREEK DR TO CLIFFWOOD RD
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 I Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
289
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 12,2004
Submitted By: RON YOUNG Date Completed:
Project Title: WATER SYSTEM SECURITY LAND ACQUISITION
Project Type: WATER Sub -Type: SYSTEM SECURITY
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project is a result of the findings of the 2004 Water System Vulnerability Assessment of the City's Water
System Master Plan.
PROJECT DESCRIPTION:
The project consists of the acquisition of a small residential property which shields the Fuller ground storage
tank from public view. Removal of the residence in order to provide greater security, access, and visibility is
also included in the scope of the project.
PROJECT SCHEDULE:
JUSTIFICATION:
Increase water system security by addressing vital elements as recommended in the 2004 Water System
Vulnerability Assessment as identified by Lockwood, Andrews and Newman, Inc. and submitted to the
Environmental Protection Agency (EPA).
W
W
290
PROJECT TITLE: WATER SYSTEM SECURITY LAND ACQUISITION
�. NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Land Acquisition - To Be Determined
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
291
i"\
V2
CAPITAL IMPROVEMENT PROGRAMS
FY13 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE
PROPOSED METHOD OF FINANCING
Project Descri tion
I P
Priori
Estimated Cost
Operating
Fund
CIP Fund
Balance
Bond Sale
Grants/
Contrib
Impact
Fees
Escrow
Funds
Car Rental
Tax
Other
EDC
To Be
Determined
OTHER PROJECTS
Euless FLC Aquatics Construction
A
$ 6,450,000
$5,236,500-1
1 $ 1,213.500
Sub -Total Other Priority A -Proposed FY13
$ 6,450,000
Glade Parks Trail Connection 114)
B
$ 359,625
XX
Texas Star Golf Course Bunker Re lacement (14)
B
$ 195,000
XX
Blessing Branch Park Improvements
B
$ 225,120
XX
Texas Star Sports Complex Phase V i'5i
B
$ 4,152,000
XX
Development/Engineering Building c16I
B
$ 1,579,800
XX
TSGC Greens Replacement i16I
B
$ 800,000
XX
Sub -Total Other Priority 8-Unfunded
$ 7,311,545
Animal Shelter Expansion/Renovation
C
TBD
XX
Kiddie Carr Park Improvements
C
TBD
XX
South Euless Water Feature
C
TBD
XX
Trail Connection South Euless
C
TBD
XX
Trail Enhancements Phase I
C
TBD
XX
Trail Enhancements Phase II
C
TBD
XX
Trail Enhancements Villages Bear Creek
C
TBD
XX
Trailwood Park Improvements
C
TBD
XX
Wilshire Park Water Feature
C
TBD
XX
Sub -Total Other Priority C-Unfunded
$
OTHER PROJECTS - TOTAL
1 ,76 ,545
General CIP - $1,000,000
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: February 11, 2009
Submitted By: RAY MCDONALD Date Completed:
Project Title: EULESS FLC AQUATICS CONSTRUCTION
Project Type: PARK/RECREATION Sub -Type: AQUATICS
Project Code: PR1201 Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The City of Euless has for many years recognized the importance of planning for parks, recreation, and open space
based on the needs as expressed by the citizens. For the update to the Parks Master Plan and as part of the City's
five year master plan, a survey of park, recreation, and open space needs was conducted from a sample of randomly
selected citizens in Euless. The survey identified a new aquatic center as a top priority of the citizens. Project
approval requires revision of the master planning of Midway Park as the aquatics center eliminates the current ball
fields and requires the relocation of the existing tennis courts in order to provide support facilities and amenities for the
FLC.
PROJECT DESCRIPTION:
The project consists of the construction of indoor and outdoor family aquatic facilities. The indoor facility includes a
lap/leisure pool, current channel, slide, and therapy pool. This multi -purpose facility will be attached to the senior
center and will offer aquatic programs for the senior population and the general public. The outdoor aquatics center
will include various play components such as a leisure pool, slides, aqua play features, shade structures, a bath
house, and all the necessary filtration systems. The project scope also includes redevelopment and improvement of
the entire site such as relocating the tennis courts and the construction of various trails, a group pavilion, an
amphitheater, multi -use sport courts, additional picnic stations with grills, a nature area, a botanical garden, and public
art display(s).
PROJECT SCHEDULE:
FY2013
JUSTIFICATION:
The City's population is sufficient to support a family aquatic center. The City's existing aquatic facilities have aged
and maintaining the pools and support facilities has been an ongoing issue and concern. The operating expenses
continue to increase, far exceeding the revenue generated by the pools. Continuing in repair mode is no longer
possible at the Wilshire and South Euless Pools and a long-term plan is necessary. Given the fact that two of the
neighborhood pools are over thirty years old and the cost to renovate, repair, or replace them is estimated at over one
million dollars each, it is recommended that the City concentrate efforts and resources toward the family aquatic
facility to serve the citizens of Euless.
'-N.
294
PROJECT TITLE: EULESS FLC AQUATICS CONSTRUCTION
�NET EFFECTS ON OPERATING AND
VIAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
,'otal Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
Other
ADDITIONAL COMMENTS:
Proposed fund balance allocation is as follows:
TOTAL ESTIMATED CAPITAL COST:
Construction
$0
$114,000
$114,000
$114,000 Total Estimated Capital Cost
CURRENT STATUS:
$5,236,500 1
$1,213,500 1
Car Rental CIP - $4,236,500 ($236,500 excess design funding)
General CIP - $1,000,000
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
$6,450, 000
$6,4501, 000
0%
0%
0%
0%
0%
295
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: May 05,2008
Submitted By: RAY MCDONALD Date Completed:
Project Title: GLADE PARKS TRAIL CONNECTION
Project Type: PARK/RECREATION Sub -Type: TRAIL SYSTEM
Pro'ect Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
As identified in the Glade Parks development, this project proposes to connect the existing Trails of Euless to
the City of Colleyville trails through the Glade Park Development.
PROJECT DESCRIPTION:
Construction of this trail will connect to the existing trail at Creekwood Estates, run underneath the northbound
service road, SH121, and the southbound service road to the southeast corner of the Glade Parks Development.
Future connectivity through Glade Parks is planned within the overall development of that site.
PROJECT SCHEDULE:
FY2014
JUSTIFICATION:
Very high interest in trails and trail connectivity were identified in the scientific survey conducted for the adopted
Parks Master Plan. 88% of those who participated in the survey singled out trail connections between existing
and future park developments as the number one priority. Additionally, 76% identified the need for trail
connectivity to other cities as a top priority.
The City of Euless has experienced significant progress in the last few years in the area of trail development
with an extensive network of paved and unpaved trails. The trails system is a valuable asset to the community
as it assists not only in providing a safe means for non -vehicular travel, but also in providing an opportunity for a
variety of unstructured, low -impact recreational pursuits. The development and maintenance of the trails system
continued to receive significant support from the citizens as indicated in the responses to the needs assessment
survey conducted as a part of the Parks Master Plan update.
.-N
.-'N
296
PROJECT TITLE: GLADE PARKS TRAIL CONNECTION
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time Engineering, surveying, geotech, etc. $72,000
Part Time $0 Construction $270,500
Total Salary $0 Contingency 5% $17,125
Purchase of Services
Materials & Supplies .
Utilities $0
Subtotal: $0
Subtotal:
Total Estimated Annual Cast
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
$0
$0
$0 Total Estimated Capital Cost $359,625
CURRENT STATUS:
Conceptual Design % 0%
Preliminary Design % 0%
Final Plans % 00
Specifications % 0%
Construction % 0%
297
City of Euless
Capital Project Request
Department: TEXAS STAR GOLF COURSE Date Prepared: June 19,2012
Submitted By: GLENDA HARTSELL Date Completed:
Project Title: TSGC BUNKER REPLACEMENT
Project Type: PARK/RECREATION Sub -Type: TSGC IMPROVEMENTS
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project would include the simultaneous reconstruction of all sand bunkers to consistent standards and
specifications including the removal of existing sand material and drainage, reshaping the sand bunker as
needed, installation of new drainage and bunker liner material, and refilling with USGA specification bunker sand
material to a uniform depth. Golf course maintenance staff would use the existing bunker sand for agronomic
practices around the course and practice areas.
PROJECT SCHEDULE:
Weather permitting, reconstruction of the sand bunkers should take approximately sixty days. Staff
recommends that the process be completed during a time that traditionally exhibits slow play, specifically
January -February or July -August. Reconstruction would occur on two to three holes simultaneously in order to
minimize disruption to play. At no time will it be necessary for the golf course to close due to the project.
JUSTIFICATION:
Texas Star is a championship daily fee golf facility known for its high level of service and excellent course
conditions. Due to the nature of their initial construction, the sand bunkers have been a consistent area of
concern despite continual efforts to maintain and improve their playability. Over the life of the course, staff has
repaired and replaced both the bunker sand as well as the underlying drainage in an effort to improve
conditions. Specifically, over the past few years, staff has experimented with a variety of different methods and
products designed to improve draining, prevent contamination from underlying silt and gravel and enhance the
performance of each bunker. Due to the number of bunkers on the course, coupled with the necessary labor
needed, staff has only been able to complete a limited number of sand bunker renovations each year. As a
result, Texas Star suffers from inconsistent playing conditions and aesthetics. Simultaneous reconstruction of
all sand bunkers to the consistent standards and specifications would result in not only an aesthetically pleasing
look, but optimal playing conditions as well.
1111111-0
298
PROJECT TITLE: TSGC BUNKER REPLACEMENT
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund _
Fund Balance _
Special Project Fund _
Certificate of Obligation _
County, State, Federal Funding _
General Obligation Bonds _
Revenue Bonds _
Donations
Supplemental Sales Tax _
Car Rental Tax Fund _
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding source is TSGC reserves.
TOTAL ESTIMATED CAPITAL COST:
Construction
Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
XX Preliminary Design %
Final Plans %
Specifications %
Construction %
$195,000
$195,000
299
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: April 30,2008
Submitted By: RAY MCDONALD Date Completed:
Project Title: BLESSING BRANCH PARK IMPROVEMENTS
Project Type: PARK/RECREATION Sub -Type: PARK IMPROVEMENTS
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project is a continuation of the overall trail system expansion and general park improvements as identified
in the Parks Master Plan.
PROJECT DESCRIPTION:
Blessing Branch Park is a 7.3 acre linear park located on the east side of Main Street across from Midway Park.
Currently, the park has only one swing set. This project includes construction of a trail connection from Main
Street to the west and Fuller -Wiser to the east. Additionally, the project includes a new playground, picnic
pads with grills, and some type of shade shelter/pavilion/gazebo. This area currently gets a high volume of foot
traffic. Constructing a trail in this "linear greenbelt would not only provide a safe paved access for the residents
east of Main Street to Midway Park, Midway Park Elementary, and to Trinity High School, but also help create a
renewed sense of quality of life for the residents in that area by enhancing the recreational amenities available.
PROJECT SCHEDULE:
FY2015
JUSTIFICATION:
The number one request from Euless citizens as it relates to trails, based on the responses to the needs
assessment survey as identified in the Parks Master Plan, was to construct trail connections between existing
and/or future park developments. This project not only satisfies that request, but also provides trail connections
to neighborhoods, schools, between major thoroughfares, and potentially to future commercial developments to
the southeast.
'11\
300
M
PROJECT TITLE: BLESSING BRANCH PARK IMPROVEMENTS
NET EFFECTS ON OPERATING AND
TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Approximately 28,000 square feet of
Personnel: Full Time
4"x8' concrete trail @ $4.25 square foot
$119,000
Part Time
$0
Playground/Border
$30,000
Total Salary
$0
Picnic pads w/grills
$10,000
Purchase of Services
Shade shelter/pavilion/gazebo
$30,000
Materials & Supplies
Trail Lighting
$20,000
Utilities
$0
Playground chips
$5,400
Contingency 5%
$10,720
Subtotal: $0
$0
Subtotal:
Total Estimated Annual Cost
$0
$0
Total Estimated Capital Cost
$225,120
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
�
Preliminary Design %
9
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
The proposed method of finance is EDC CIP Fund Balance
301
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: May 01,2010
Submitted By: RAY MCDONALD Date Completed:
Project Title: TEXAS STAR SPORTS COMPLEX PHASE V
Project Type: PARK/RECREATION Sub -Type: TSSC IMPROVEMENTS
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Texas Star Sports Complex Phase V incorporates the addition of four (4) additional multi -use playing fields
(four-plex). This addition could also incorporate a multi -use all -season playing surface that will allow for
additional recreational sports programming, baseball league and tournament play, and softball (adult and girls
fast -pitch). With the closure of athletic fields at Midway Park, and the proposed relocation of Softball World, the
addition of this complex will ensure that the Texas Star Sports Complex is positioned as a premier facility that
serves the athletic and recreational programming needs of the City.
PROJECT DESCRIPTION:
The project includes the design and construction of four (4) multi -use playing fields (four-plex). The four-plex will
feature bleacher/terraced sitting similar to that of the existing structures at the facility, as well as a location for
softball (adult and girl's fast pitch), youth baseball (recreational and select), and other recreational sports.
PROJECT SCHEDULE:
FY2015
JUSTIFICATION:
The aging facility of Softball World would require a significant capital investment; this investment would not be
required with the consolidation and movement of this operation to the Parks At Texas Star, collectively known as
Texas Star Sports Complex. With the completion of Phase V, the new multi -use Texas Star Sports Complex will
serve the athletic needs of the community and spur economic opportunities for the City.
''\
._N
302
PROJECT TITLE: TEXAS STAR SPORTS COMPLEX PHASE V
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Grounds/Utilities
$290,000
Personnel: Full Time
Fencing (Est)
$125,000
Part Time
$0
Turf/Irrigation
$360,000
Total Salary
$0
Terrace Seating/Bleacher/Dug Outs
$2,162,000
Purchase of Services
Lighting (Piers / Relocation / Concrete)
$250,000
Materials & Supplies
Alt 1 (All Season Play Surface)
$425,000
Utilities
5% Contingency
$180,000
10% Indirect Cost
$360,000
Subtotal:
Subtotal:
Total Estimated Annual Cost
$0
$0
$0 Total Estimated Capital Cost $4,152,000
PROPOSED METHOD OF FINANCE: I CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
XX
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Note: Operating currently under the TSSC umbrella, Softball World's proposed relocation to Parks At Texas
Star, under this phase, will cover all operating costs of the new operations. Accordingly, no additional baseline
expenses are anticipated.
303
City of Euless
Capital Project Request
Department: FLEET & FACILITY OPERATIONS Date Prepared: May 07,2007
Submitted By: KYLE MCADAMS Date Completed:
Project Title: DEVELOPMENT/ENGINEERING BUILDING
Project Type: FACILITIES Sub -Type: REMODEL
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project is part of the City's five year master plan.
PROJECT DESCRIPTION:
The development and engineering building received a major remodel in 1996 with renovation of the building's
interior. Due to limited funding at that time, certain elements could not be justified as part of the remodel. This
upgrade will allow for construction of a new entrance facade to match the other campus structures. Security
issues pertaining to controlled access will be addressed as well as renovation of the Fuller Room into a
functional conference area. Public rest room facilities will be relocated to meet American with Disabilities Act/
Texas Accessibility Standards, the interior will be upgraded, and new carpet will be installed throughout the
facility.
PROJECT SCHEDULE:
Bid Specifications: August 1, 2015
Bid Project: December 1, 2015
Receive Bids: January 1, 2016
Council Approval: February 1, 2016
Start Construction: February 1, 2016
JUSTIFICATION:
304
PROJECT TITLE: DEVELOPMENT/ENGINEERING BUILDING
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Construction
Personnel: Full Time $0
Architect (10%)
Part Time $0
Survey & Testing Fees
Total Salary $0
Contingency (20%)
Purchase of Services $2,000
Furniture
Materials & Supplies $3,500
Fixtures
Utilities
Instruments & Apparatus
Insurance $750
Data & Telephone
Alarm & Security Services
Interior & Exterior Signage
Subtotal: $6,250
Janitorial Service/Pest Control
PM & Minor Repairs
Unscheduled Maintenance
Renewal & Replacement
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
$2,230
$10,100
$11,250
$25,000
$48,580
$54,830 I Total Estimated Capital Cost
XX
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
$1,020,000
$102,000
$8,000
$204, 000
$175,000
$40,000
$6,000
$10,500
$5,800
$8,500
$1,579,800
25%
0%
0%
0%
0%
305
City of Euless
Capital Project Request
Department: GOLF COURSE Date Prepared: April 12,2011
Submitted By: GLENDA HARTSELL Date Completed:
Project Title: GOLF COURSE GREENS REPLACEMENT
Project Type: PARK/RECREATION Sub -Type: TSGC IMPROVEMENTS
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Replace and rebuild the 20 Bentgrass greens on the course. Kill and fumigate all 20 greens, remove drainage
and soil. Replace drainage, replace and contour soil to the original design of each green. Seed the greens and
wait for grow in of Bentgrass over a three-month period.
(Bermuda greens would require less construction and have a shorter down time.)
PROJECT SCHEDULE:
2016 or when needed. The ideal schedule for the replacement and reconstruction would be August through
October during the optimum growing period.
JUSTIFICATION:
With continued play on the course after 15-20 years, the sand based greens will start to deteriorate. As they
decline, it will become more difficult to maintain the health of the greens during the growing season and through
the heavy play time on the course. The result will be reduced play and declining revenues, as well as increased
maintenance cost. The end result will be the deterioration of the quality of playing surface and experience
provided to customers.
Wo
306
PROJECT TITLE: GOLF COURSE GREENS REPLACEMENT
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Landscaping Architect & Maintenance $800,000
$0
$0
$0
(Bermuda $250,000-$300,000)
$0
$0
$0
$0
Total Estimated Capital Cost $800,000
CURRENT STATUS:
Conceptual Design % 00
Preliminary Design % 0%
Final Plans % 0%
Specifications % 00
Construction % 0
If the greens could be replaced with Bermuda grass, this process would not require as much rebuilding and the
greens would be sprigged as opposed to seeding of Bentgrass, this process would cost $250,000 to $300,000.
307
City of Euless
Capital Project Request
Department: FLEET & FACILITY OPERATIONS Date Prepared: May 07,2007
Submitted By: KYLE MCADAMS Date Completed:
Project Title: ANIMAL SHELTER-EXPANSION/RENOVATION
Project Type: FACILITIES Sub -Type: REMODEL
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project is part of the City's five year master plan.
PROJECT DESCRIPTION:
The project consists of the expansion of the current animal shelter facility to better accommodate visitors,
adoptions, and animal services. The project scope includes the addition of ten (10) enclosed dog runs, six (6)
quarantine runs, an adoption room, additional room for cat containment, and an area for animal washing . Office
space expansion will be included in the renovation as well as updates to the public/employee rest rooms.
PROJECT SCHEDULE:
JUSTIFICATION:
The current animal control facility has insufficient space to meet current and future demands.
FMO
308
PROJECT TITLE: ANIMAL SHELTER-EXPANSION/RENOVATION
P ET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Insurance
Subtotal:
PM & Minor Repairs
Unscheduled Maintenance
Renewal & Replacement
Pest Control
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Q2
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
250 0
Preliminary Design %
0%
Final Plans %
00
Specifications %
00
Construction %
0
309
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: May 13,2008
Submitted By: RAY MCDONALD Date Completed:
Project Title: KIDDIE CARR PARK IMPROVEMENTS
Project Type: PARK/RECREATION Sub -Type: PARK IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The adopted Parks Master Plan recommends funding for system -wide park facilities and amenities upgrades.
PROJECT DESCRIPTION:
This project includes the construction or installation of a pavilion, a concrete trail connection to Carr Park, bank
stabilization along Boyd Branch Creek which runs through the park, a playground, park lighting, picnic stations,
an irrigation system, new perimeter fencing, a drinking fountain, benches, and a dedicated parking lot at Kiddie
Carr Park.
PROJECT SCHEDULE:
JUSTIFICATION:
As identified in the adopted Parks Master Plan, the municipal park is the foundation of any solid parks and
recreation system. The City of Euless parks and recreation system provides residents and visitors with
significant personal, social, environmental, and economic benefits. The revitalization efforts that the Euless City
Council has focused on over the years has increased the sense of community pride. Kiddie Carr Park is a four
acre park located adjacent to Carr Park off Pauline. The current amenities at this park include the Parks
Department's in -ground tree farm, a greenhouse, and an outdoor basketball court. The park is located in a
section of town that needs something to stimulate community pride. The proposed project will continue the City
Council's revitalization efforts by creating an area that will serve both the passive and active leisure needs of the
residents in this area.
.-IN
310
PROJECT TITLE: KIDDIE CARR PARK IMPROVEMENTS
�. NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
FM
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
311
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: May 05,2008
Submitted By: RAY MCDONALD Date Completed:
Project Title: SOUTH EULESS WATER FEATURE
Project Type: PARK/RECREATION Sub -Type: AQUATICS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The adopted Parks Master Plan calls for the renovation of the South Euless Pool. This aquatic facility has not
received any major renovations since it opened in 1972. This request will probably be revised and/or withdrawn
upon completion of the aquatic portion of the Euless Family Life Center.
PROJECT DESCRIPTION:
Recommendations made in both the adopted Parks Master Plan and the Swimming Pool Audit addressed major
renovations that were needed at South Euless Pool. The estimated cost for these renovations was
approximately $1.3 million. Because of limited space as well as parking, this project will need to be carefully
thought through and a decision will need to be made to either spend the money to renovate this existing facility
or use the funds toward the construction of a family aquatic facility.
PROJECT SCHEDULE:
JUSTIFICATION:
This has been documented in both the Swimming Pool Audit and the adopted Parks Master Plan.
'1
.--IN
312
PROJECT TITLE: SOUTH EULESS WATER FEATURE
NET EFFECTS ON OPERATING AND
TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Engineering - To Be Determined
Personnel: Full Time
Construction - To Be Determined
Part Time
$0
Total Salary
$0
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal:
$0
Maintenance Costs
$0
Subtotal:
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
313
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: May 12,2008
Submitted By: RAY MCDONALD Date Completed:
Project Title: TRAIL CONNECTION SOUTH EULESS
Project Type: PARK/RECREATION Sub -Type: TRAIL SYSTEM
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Identified in the adopted Parks Master Plan is the need for additional trail connections from neighborhoods to
parks.
PROJECT DESCRIPTION:
There is as very high interest in trails and trail connectivity as identified in the scientific survey in the adopted
Parks Master Plan. 88% of those participating in the survey identified the need for trail connections between
neighborhoods and parks. Additionally, 68% percent identified the need for trail connectivity to schools as a top
priority. This project would allow for safe access to South Euless Park from adjacent neighborhoods as well as
South Euless Elementary from the adjacent neighborhood to the south.
PROJECT SCHEDULE:
JUSTIFICATION:
The City of Euless has experienced significant progress in the last few years in the area of trail development
with an extensive network of paved and unpaved trails. The trails system is a valuable asset to the community
as it assists not only in providing a safe means for non -vehicular travel, but also in providing an opportunity for a
variety of unstructured, low -impact recreational pursuits. The development and maintenance of the trails system
continued to receive significant support from the citizens as indicated in the responses to the needs assessment
survey conducted as a part of the Parks Master Plan update.
.-**N
'__N
314
PROJECT TITLE: TRAIL CONNECTION SOUTH EULESS
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
M4
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
315
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: May 12,2008
Submitted By: RAY MCDONALD Date Completed:
Project Title: TRAIL ENHANCEMENTS PHASE I
Project Type: PARK/RECREATION Sub -Type: TRAIL SYSTEM
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Identified in the Needs Assessment and Identification section of the adopted Parks Master Plan are a number of
trail related improvements.
PROJECT DESCRIPTION:
This project consists of the first phase of implementation of park improvements identified in the adopted Parks
Master Plan which includes additional water fountains, additional benches, construction of shaded seating areas
along the trail, addition and/or installation of new exercise equipment along the trails, picnic stations, and
construction of additional pedestrian bridges in high water areas. Also identified, is the need to address various
areas along the trail that need to be converted from unpaved to paved trails.
PROJECT SCHEDULE:
JUSTIFICATION:
The City of Euless has experienced significant progress in the last few years in the area of trail development
with an extensive network of paved and unpaved trails. The trails system is a valuable asset to the community
as it assists not only in providing a safe means for non -vehicular travel, but also in providing an opportunity for a
variety of unstructured, low -impact recreational pursuits. The development and maintenance of the trails system
continued to receive significant support from the citizens as indicated in the responses to the needs assessment
survey conducted as a part of the Parks Master Plan update.
''1
'1
316
PROJECT TITLE: TRAIL ENHANCEMENTS PHASE I
�-- I NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
317
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: May 13,2008
Submitted By: RAY MCDONALD Date Completed:
Project Title: TRAIL ENHANCEMENTS PHASE II
Project Type: PARK/RECREATION Sub -Type: TRAIL SYSTEM
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This enhancement was identified in the Needs Assessment and Identification section of the adopted Parks
Master Plan.
PROJECT DESCRIPTION:
This project is Phase II of the trail enhancements that continues implementation of park improvements identified
in the adopted Parks Master Plan which includes additional water fountains, additional benches, construction of
shaded seating areas along the trail, addition and/or installation of new exercise equipment along the trails,
picnic stations, and construction of additional pedestrian bridges in high water areas. Also identified, is the need
to address various areas along the trail that need to be converted from unpaved to paved trails.
PROJECT SCHEDULE:
JUSTIFICATION:
The City of Euless has experienced significant progress in the last few years in the area of trail development
with an extensive network of paved and unpaved trails. The trails system is a valuable asset to the community
as it assists not only in providing a safe means for non -vehicular travel, but also in providing an opportunity for a
variety of unstructured, low -impact recreational pursuits. The development and maintenance of the trails system
continued to receive significant support from the citizens as indicated in the responses to the needs assessment
survey conducted as a part of the Parks Master Plan update.
.-**N
318
PROJECT TITLE: TRAIL ENHANCEMENTS PHASE II
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
L� Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
319
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: March 23,2004
Submitted By: RAY MCDONALD Date Completed:
Project Title: TRAIL ENHANCEMENTS VILLAGES OF BEAR CREEK
Project Type: PARK/RECREATION Sub -Type: TRAIL SYSTEM
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project includes infrastructure improvements which were identified as a high priority in the adopted Parks
Master Plan.
PROJECT DESCRIPTION:
This project includes the redevelopment/redesign and improvement of the trail at the Villages of Bear Creek
Park to offer multiple uses for the citizens of Euless.
PROJECT SCHEDULE:
JUSTIFICATION:
Trail development and enhancement opportunities will be consistent with available land, funding and time
variables. This Master Plan recommendation will be part of a city-wide comprehensive trail enhancement
project. Due to the continual erosion of the existing trail, a redevelopment/redesign of the trail system at Villages
of Bear Creek will be a high priority.
W
320
PROJECT TITLE: TRAIL ENHANCEMENTS VILLAGES OF BEAR CREEK
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
W
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0 1 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
321
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: May 13,2008
Submitted By: RAY MCDONALD Date Completed:
Project Title: TRAILWOOD PARK IMPROVEMENTS
Project Type: PARK/RECREATION Sub -Type: PARK IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project is a continuation of the overall park improvement plan as identified in the Parks Master Plan.
PROJECT DESCRIPTION:
Trailwood Park is an eleven acre site that currently has a playground and a half -mile hike/bike trail. This project
includes the installation of a new pavilion, a parking lot, a non -paved nature trail on the east end of the park,
upgraded playground to meet American with Disabilities Act standards, park lighting, new park signs, benches
along the trail, and trail lighting.
PROJECT SCHEDULE:
JUSTIFICATION:
As identified in the adopted Parks Master Plan, the municipal park is the foundation of any solid parks and
recreation system. The City of Euless parks and recreation system provides the residents and visitors with
significant personal, social, environmental and economic benefits. The revitalization efforts that the Euless City
Council has focused on over the years has increased the sense of community pride. This proposed project will
continue those efforts by creating an area that will serve both the passive and active leisure needs of the
residents in the vicinity.
ho
322
PROJECT TITLE: TRAILWOOD PARK IMPROVEMENTS
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
ff
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
323
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: May 05,2008
Submitted By: RAY MCDONALD Date Completed:
Project Title: WILSHIRE PARK WATER FEATURE
Project Type: PARK/RECREATION Sub -Type: AQUATICS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The adopted Parks Master Plan calls for the renovation of Wilshire Pool. This aquatic facility has not received
any major renovations since it opened in 1972. This request will most likely be revised or withdrawn upon
completion of the aquatic portion of the Euless Family Life Center.
PROJECT DESCRIPTION:
Recommendations made in both the adopted Parks Master Plan and the Swimming Pool Audit addressed major
renovations that were needed at Wilshire Pool. The estimated cost for these renovations was approximately
$1.3 million. Because of limited space as well as parking, this project will need to be carefully thought through
and a decision will need to be made to either spend the money to renovate this existing facility or use the funds
toward the construction of a family aquatic facility.
PROJECT SCHEDULE:
JUSTIFICATION:
Documented in both the Swimming Pool Audit and the adopted Parks Master Plan.
324
PROJECT TITLE: WILSHIRE PARK WATER FEATURE
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0� $0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
325
T H E Q 'C I T Y 0 F
ss
- - - - - - .......
-�
326
q
CAPITAL IMPROVEMENTS PROGRAM
COMPLETED PROJECTS SUMMARY
Project
Number
Project Description
Total Project (Over) Under
Date Completed Total Budget Costs Budget
DRAINAGE PROJECTS
DR9901
Sulphur Branch Phase II
08/01/99
$ 123,404
$ 120,128
$ 3,276
DR9902
Windlea & WestCliff
08/01/99
$ 4,396
$ 1,159
$ 3,237
DR9904
Hurricane Creek
04/30/02
$ 257,500
$ 69,906
$ 187.594
DR0302
Flooding Mitigation
Cancelled
$ 250,000
$ -
$ 250,000
DR0303
Aransas Q Glenn
12/31/04
$ 250,000
$ 250,000
$
DR0304
Live Oak Drainage
04/15/05
$ 218,000
$ 175,958
$ 42.042
DR0305
Sierra Drive Drainage
04/15/05
$ 40,738
$ 40,738
$ 0
DR0306
Flood Miti ation Plan FEMA
04/15/05
$ 32,000
$ 7,750
$ 24,250
DR0307
Simmons Drainage
04/15/05
$ 22,995
$ 22,995
$
DR0301
Fuller Branch Channel Stabilization
05/31/07
$ 279,136
$ 232,176
$ 46,960
DR0401
Channel Stabilization Tributary WFA
05/31/07
$ 437,462
$ 438,070
$ 608
DR0402
Drainage Project Study
05/31/07
$ 60,000
$ 51,000
$ 9,000
DR0601
Little Bear Creek Study Update
04/25/08
$ 50,000
$ 49,000
$ 1,000
DR0602
McCormick Park
04/25/08
$ 250,000
$ 247,925
$ 2,075
DR0701
Eastcliff Drive/Greenbriar Drive Drainage imp.
04/17/10
$ 340,000
$ 246,584
$ 93,416
DR0801
Rockwall Drive/Lamar Drive Drainage Imp.
04/17/10
$ 430,000
$ 272,554
$ 157,446
DR0901
Bear Creek Parkway Erosion Repair
02/17/11
$ 530,000
$ 464,465
$ 65,535
DR0802
Hurricane Creek & Bridge at Marlene Improvements
04/14/11
$ 378,500
$ 344,574
$ 33,926
Drainage Projects - Prior Years
$ 3,954,131
$ 3,034982
$ 919,149
Draina a Projects - Current Year
$ _
$ -
$
Sub -Total Drainage Projects
$ 3,954,131
$ 3,034,982
$ 919,149
327
�
I H Ei )C , f Y o f
11"N
328
CAPITAL IMPROVEMENTS PROGRAM
COMPLETED PROJECTS SUMMARY
Project
Number
Project Description
Total Project (Over) Under
Date Completed Total Budget Costs Budget
STREET PROJECTS
PS9911
Overlay Projects
03/30/00
$ 294,687
$ 294,687
$
PS9912
Harwood -Main Intersection
04/30/00
$ 1,126,935
$ 1,077,303
$ 49,632
PS9907
West ark Way -SH10 to SH183
09/30/00
$ 605,542
$ 479,915
$ 125,627
PS9902
Mid Cities Blvd.
05/02/02
$ 1,075,074
$ 963,635
$ 111,439
PS9910
Sidewalks
06/30/03
$ 200,000
$ 200,000
$
PS0001
FM 157 S Pipeline to SH10(Utility Relocation
04/30/04
$ 378,207
$ 371,318
$ 6,889
PS0003
Glade from Heritage to SH121
04/30/04
$ 1,866,612
$ 1,866,612
$
PS0004
Glade Rd East - SH121 to Champagne
04/30/04
$ 1,210,014
$ 1,162,009
$ 48,005
PS0201
Gateway Blvd - Southern Portion
04/30/04
$ 510,000
$ 473,817
$ 36,183
PS0301
Mid Cities Roadway Illumination
04/15/05
$ 160,000
$ 148,115
$ 11,885
PS0302
Driftwood Pipeline Traffic Signal
04/15/05
$ 100,000
$ 68,665
$ 31,335
PS0303
Aransas/Harwood Traffic Signal
04/15/05
$ 120,000
$ 89,118
$ 30,882
PSO402
South Pipeline Road Bride
04/30/05
$ 28,208
$ 28,208
$
PS9908
Si nalization
05/31/06
$ 168,055
$ 168,055
$
PSO401
West Pipeline - Raider to City Limits
05/31/06
$ 223,000
$ 104,859
$ 118,141
PSO403
Raider Dr -SH10 to South Pipeline
05/31/06
$ 330,000
$ 293,435
$ 36,565
PS0501
Ross Avenue/S.Main 300' W
05/31/06
$ 95,688
$ 95,638
$ 50
PS0502
Industrial Signal Timing
05/31/06
$ 50,000
$ 50,000
$
PS0503
Overlay -Harwood 157/Main
05/31/06
$ 137,000
$ 119,816
$ 17,184
PS0604
Overlay-S.Main, SH10/S.Pi eline
05/31/06
$ 137,000
$ 140,211
$ 3,211)
PS0601
Overlay -East Midway
05/31/07
$ 83,000
$ 73,550
$ 91450
PS0602
Overlay -Midway, N Main,/FM157
05/31/07
$ 105,000
$ 67,632
$ 37,368
PS0603
Overla -Fuller Wiser, Midway/Harwood
05/31/07
$ 40,000
$ 28,695
$ 11,305
PS9906
Traffic Safet /Si nalization
05/31/08
$ 128,027
$ 127,939
$ 88
PSO404
South Pipeline Road Overlay
05/31/08
$ 114,750
$ 85,062
$ 29,688
PS0701
Overlay -Dickey Drive
05131/08
$ 122,200
$ 48,435
$ 73,765
PS0702
Overlay -East Huitt
05/31/08
$ 89,000
$ 64,895
$ 24,105
PS0703
Overlay -Huntington Drive
05/31/08
$ 69,500
$ 42,884
$ 26,616
PS0706
Gateway Blvd Screening Wall
05/31/08
$ 135,800
$ 138,862
$ 3,062
PS0705
Signal Gateway Blvd @ Glade
10/28/08
$ 98,000
$ 98,000
$
PS0002
West Pipeline Road-Raider/H 10
12/01/08
$ 6,082,621
$ 6,081,392
$ 1,229
PS0801
Overlay -North Main/Cullum Drive
12/31/08
$ 290,000
$ 211,130
$ 78,870
PS9905 ITraffic
Studies
05/30/09
$ 27,286
$ 27,197
$ 89
PS0704 I
Disability Access Stud
05/31/09
$ 30,000
$ 13,950
$ 16,050
PS0901
Ash/Denton/Fair Oaks Overlay
09/30/09
$ 320,000
$ 231,984
$ 88,016
PS0902
Vine Street Design
Cancelled
$ 100,000
$ -
$ 100,000
PS9903
HWY 183 Service Road
Cancelled
$ -
$
$
PS0304
Glade Road
04/16/10
$ 3,077,977
$ 2,905,205
$ 172,772
PS9909
FM157 North - SH183 to SH121
04/16/10
$ 267,519
$ 129,215
$ 138,304
PS0903
Mid Cities @ Gateway & Baze Traffic Signals
04/16/10
$ 320,000
$ 250,702
$ 69,298
PS0802
Fuller -Wiser Connector
02/17/11
$ 495,000
$ 441,491
$ 53,509
PS1002 IFY10
County Overlay - Wilshire/Marlene
05/17/11
$ 288,000
$ 200,890
$ 87,110
StreetProjects- PriorYears
$ 21,099,702
$ 19,464,525 1
$ 1,635,177
PS9901
North Main Street
05/31/12
$ 6,745,047
$ 6,698,149
$ 46,898
PS9904
Harwood Road
05/31/12
$ 5,770,211
$ 5,686,556
$ 83,655
PS1001
Baze Road
05/31/12
$ 1,830,000
$ 1,558,401
$ 271,599
PS1101
FY2011 County Overlay -Bear Creek Drive/Lakewood
Blvd/Ash Lane
05/31/12
$ 300,000
$ 265,887
$ 34,113
Street Projects - Current Year
$ 300,000
$ 265,887
$ 34,113
Sub -Total Street Projects $ 21,399,702 $ 19,730,412 1 $ 1,669,290
329
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 24, 1999
Submitted By: RON YOUNG Date Completed: May 31, 2012
Project Title: NORTH MAIN STREET
Project Type: STREET Sub -Type: CONSTRUCTION
Project Code: PS9901 Priority: A
COUNCIL AUTHORIZATION:
April 14, 1998: Authorized bond election for the purpose of funding construction.
November 24, 1998: Approved contract with Cummings & Prewitt, Inc. for paving and drainage design.
February 8, 2000: Authorized the acquisition of ROW to allow for widening and paving improvements.
August 22, 2000: Ratified the expenditure of $30,000 of EDC funds for ROW acquisition along Main Street.
August 22, 2000: Ratified EDC Resolution 11-00 authorizing a project involving facility improvements along
North Main Street.
November 14, 2000: Authorized Resolution #00-1083 declaring public necessity for acquisition of ROW.
February 27, 2001: Authorized publication of notice of intent to issue certificates of obligation.
April 9, 2001: Approved Ord. 1468 authorizing issuance of General Obligation Bonds, Series 2001 in the
amount of $6,000,000.
September 11, 2001: Authorized city manager to negotiate and execute a contract with TXU Electric for
the relocation of utilities along North Main Street at an estimated cost of $550,000.
December 11, " 2001: Awarded Bid #004-02 to Southlake Construction for the demolition and removal of
single-family houses along North Main Street.
March 11, 2003: Authorized City Manager to seek competitive bids for paving & drainage construction.
April 8, 2003: Awarded contract to McClendon Construction Co. for construction of street, utility, and
drainage for North Main Street for $3,370,035.15, provided for a $180,000 contingency.
September 28, 2004: Award bid contract to Whitmore and Sons for landscaping/irrigation for $83,275.
April 26, 2005: Award bid to Durable Specialties, Inc., for traffic signalization in the amount of $68,780.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project is a part of the $13.5 million bond package approved by the voters in October 1998.
PROJECT DESCRIPTION:
The project consists of reconstruction and widening of North Main Street from SH10 to Harwood Road. It
also consists of relocating overhead utilities, the addition of a subsurface drainage system, and the
addition of street lights and landscaping improvements.
PROJECT SCHEDULE:
Construction complete: October 2005
Landscaping and compliance of Americans with Disabilities Act for sidewalks: FY 2010
JUSTIFICATION:
1. Improvement of traffic flow and traffic safety.
2. Improve aesthetics with relocation of overhead utilities and addition of landscaping.
3. Subsurface drainage system needed.
4. Reduction of maintenance requirements.
330
PROJECT TITLE: NORTH MAIN STREET PROJECT CODE: PS9901
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST(+OR-)ANNUAL:
*Engineering $698,156
Direct Operating Cost Right-of-Way $1,447,814
Personnel: Full Time Utility Relocation (City) $290,878
Part Time Appraisal Services $114,673
Total Salary $0 Street Lights $27,443
Purchase of Services Landscaping $115,808
Materials & Supplies Construction $3,386,609
Utilities Signs&Markings $497,419
Contingency $824
Issuance Cost $62,261
Subtotal: $0 Contract Labor $103,162
*Added$70,000 for work related to medians.
Total Estimated Capital Cost $6,745,047
Maintenance Costs FUNDING SOURCE:
Transfer from:
Street CIP Fund Balance FY99 $1,416,185
Developer's Escrow $17,276
Subtotal: $0 EDC Operating Fund $430,000
W/S Operating Fund $5,053
C.O. Bond Proceeds FY01 $1,012,961
G.O. Bond Proceeds FY01 $4,820,919
Other Interest Income $163,667
Average Annual Debt Service $412,567 Miscellaneous $450
Less Transfer To:
Street CIP Fund Balance ($1,046,464)
Harwood Road PS9904 ($75,000)
Street CIP Fund Balance ($46,898)
Total Estimated Annual Cost $412,567 Total Funding $6,698,149
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET(-+) % EXPENDED
Engineering $698,156 $698,156 $0 100%
Right-of-Way $1,017,814 $1,017,814 $0 100%
Utility Relocation (City) $290,878 $290,878 $0 100%
Appraisal Services $101,495 $101,495 $0 100%
Surveying Services $5,170 $5,170 $0 100%
Other Professional Services $2,955 $2,955 $0 100%
Special Services $5,053 $5,053 $0 100%
Landscaping $115,808 $115,808 $0 100%
Signs&Markings $497,419 $467,340 $30,079 94%
Construction $3,386,609 $3,386,609 $0 100%
Lighting $27,443 $10,624 $16,819 39%
Contingency $824 $824 $0 0%
Issuance Cost $62,261 $62,261 $0 100%
Contract Labor $103,162 $103,162 $0 100%
Other Expenditures $430,000 $430,000 $0 100%
"ITOTAL PROJECT $6,745,047 $6,698,149 $46,898 99%
331
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: July 29, 1999
Submitted By: RON YOUNG Date Completed: May 31, 2012
Project Title: HARWOOD ROAD, N. MAIN STREET TO SH360
Project Type: STREET Sub-Type: CONSTRUCTION
Project CODE: PS9904 Priority: A
COUNCIL AUTHORIZATION:
April 14, 1998: Authorized bond election for the purpose of funding construction.
November 24, 1998: Authorized contract for appraisal services for parcels necessary to project.
May 24, 1999: Approved resolution determining the necessity for and ordering the improvement.
May 24, 1999: Authorized the acquisition of the necessary right-of-way.
June 22, 1999: Approved right of way acquisition.
December 14, 1999: Authorized City Manager to negotiate for and acquire additional rights-of-way.
February 8,2000: Awarded construction contract to Larry H. Jackson Construction.
March 28, 2000: Authorized issuance of G.O. bonds for Harwood, Main, and West Pipeline.
April 8, 2003: Awarded contract to J&J Sprinkler&Landscaping for median pavers for$151,836.30.
February 10, 2004: Approved bid 009-04 to Whitmore and Sons, Inc. for median irrigation and landscaping
in the amount of$74,627.
' RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project is part of the $13.5 million bond program approved by the voters in October 1998. Project is
identified in the 1999 Master Thoroughfare Plan.
PROJECT DESCRIPTION:
Reconstruction of Harwood Road from a point approximately 350 feet west of North Main Street to SH360.
New roadway will be a six lane boulevard with sidewalks, landscaping, and lighting. Signals will be
added at Fuller-Wiser Road and Bear Creek Parkway.
PROJECT SCHEDULE:
Construction complete: June 2002
Landscaping Improvements: FY2010
JUSTIFICATION:
The existing two lane roadway does not meet current and future needs.
332
PROJECT TITLE: HARWOOD ROAD, N. MAIN STREET TO SH360 PROJECT CODE: PS9904
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR-)ANNUAL:
Direct Operating Cost Appraisal Services $53,750
Personnel: Full Time Professional Services-Soil Test $52,123
Part Time Acquisition $800,637
Total Salary $0 Engineering $415,597
Purchase of Services Construction $4,004,091
Materials &Supplies Contingency $78,150
Utilities Landscaping $295,863
Issuance Cost $70,000
Total Estimated Capital Cost $5,770,211
Subtotal: $0
FUNDING SOURCE:
Maintenance Costs
Transfer from:
Developer's Escrow $301,677
Other Street CIP Fund Balance $283,634
Average Annual Debt Service $465,722 W/S Operating Fund $16,919
G.O. Bond Proceeds $5,392,302
Transfer from N Main PS9901 $75,000
Subtotal: $465,722 Less Inter-Project Transfer to:
Pipeline Road- PS0002 ($299,321)
ADA Infrastructure- PS1202 ($83,655)
\--- Total Estimated Annual Cost $465,722 Total Funding $5,686,556
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) %EXPENDED
Engineering $415,597 $415,597 $0 100%
Construction $4,021,668 $4,036,882 ($15,214) 100%
Right-of-Way $800,637 $800,637 $0 100%
Appraisal Services $54,036 $53,750 $286 99%
Issuance Cost $70,000 $70,000 $0 100%
Contingencies $78,150 $3,092 $75,058 4%
Other Professional Services $52,123 $52,123 $0 100%
Landscaping $278,000 $254,475 $23,525 92%
TOTAL PROJECT $5,770,211 $5,686,556 $83,655 99%
333
City of Euless
Capital Project Request '1
Department: PUBLIC WORKS Date Prepared: July 22,1999
Submitted By: RON YOUNG Date Completed: May 31, 2012
Project Title: BAZE ROAD
Project Type: STREET Sub-Type: CONSTRUCTION
Project Code: PS1001 Priority: A
COUNCIL AUTHORIZATION:
November 10, 2009: Authorize the City Manager to execute an engineering design contract with Neel-Schaffer,
Inc. in an amount not to exceed$128,600.
September 14, 2010: Approve Resolution#10-1348 declaring a public necessity for the acquisition of real estate.
May 10, 2011: Award construction contract to McClendon Construction in the amount of$1,269,134.50.
June 14, 2011: Authorize the Mayor to execute an Interlocal Agreement between Grapevine-Colleyville ISD and
the City of Euless for school bus service in the amount of$5,464.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The reconstruction and expansion of Baze Road was identified in the 1999 Master Thoroughfare Plan.
PROJECT DESCRIPTION:
This project consists of the detailed engineering design, right-of-way acquisition, and construction of a 31'back-
to-back concrete roadway to replace an existing deteriorating two-lane asphalt roadway. The project includes
underground drainage, sidewalks, and street lighting.
PROJECT SCHEDULE:
Award Design: December 2009
Plans Complete: February 2011
Right-of-Way Complete: October 2010
Begin Construction: June 2011
Construction Complete: May 2012
JUSTIFICATION:
Baze Road is an important north-south residential collector that is planned to connect Glade Road and Mid Cities
Boulevard. This roadway exists as a four-lane divided roadway north of Glade Road in Grapevine. In Euless, it
is constructed partially as a 40 foot undivided roadway and as a 36 foot(two-lane) undivided roadway from Mid
Cities Boulevard to Priest Lane. The portion of Baze Road from Priest Lane to Glade Road is the only portion
that is not constructed to City standards.
334
PROJECT TITLE:BAZE ROAD PROJECT CODE: PS1001
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST(+OR-)ANNUAL:
Direct O•eratin• Cost Engineering $150,000
Personnel: Full Time Right-of-Way $90,000
Part Time Construction $1,590,000
Total Salary
Purchase of Services
Materials& Supplies
Utilities
Subtotal: Total Estimated Capital Cost $1,830,000
Maintenance Costs Funding Source:
Transfer from Car Rental $164,938
Transfer from Escrow Funds $125,062
Transfer from Car Rental $1,540,000
Subtotal:
Transfer to:
Street CIP Fund Balance ($271,599)
Total Estimated Annual Cost Total Funding $1,558,401
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET(-+) % EXPENDED
Engineering $150,000 $144,103 $5,897 96%
Right-of-Way $90,000 $4,249 $85,751 5%
Construction $1,590,000 $1,410,049 $179,951 89%
\,..,eOTAL PROJECT $1,830,000 $1,558,401 $271,599 85%
335
City of Euless
Capital Project Request '1
Department: PUBLIC WORKS Date Prepared: March 10,2010
Submitted By: RON YOUNG Date Completed: May 31, 2012
Project Title: FY2011 COUNTY OVERLAY-BEAR CREEK DR/LAKEWOOD BLVD/ASH LANE
Project Type: STREET Sub-Type: OVERLAY
Project Code: PS1101 Priority: A
COUNCIL AUTHORIZATION:
February 8, 2011: Authorize the City Manager to execute an Interlocal Agreement with Tarrant County for
asphalt overlay improvements to Lakewood Boulevard, Bear Creek Drive, and Ash Lane.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Bear Creek Drive, Lakewood Boulevard, and Ash Lane are collector streets in the City of Euless Master
Thoroughfare Plan.
PROJECT DESCRIPTION:
The project consists of edge milling, asphalt overlay, and restriping on:
1. Bear Creek Drive from Mid Cities Boulevard to N. Main Street,
2. Lakewood Boulevard from Ash Lane to Bent Tree Drive, and
3. Ash Lane from N. Main Street to Fuller-Wiser Road.
PROJECT SCHEDULE:
Begin Construction: May 2011
Construction Complete: July 2011
JUSTIFICATION:
The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, will
extend the life of the roadways, and will enhance the appearance of the streets.
336
PROJECT TITLE:FY2011 COUNTY OVERLAY-BEAR CREEK DR/LAKEWOOD BPROJECT CODE: PS1101
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST(+OR-)ANNUAL:
Direct Operating Cost Construction $300,000
Personnel: Full Time
Part Time $0
Total Salary $0
Purchase of Services
Materials& Supplies
Utilities
$0
Subtotal: $0 Total Estimated Capital Cost $300,000
Maintenance Costs Funding Source:
Transfer from:
Car Rental $300,000
$0
Subtotal: $0 Transfer to:
Street CIP Fund Balance ($34,113)
Total Estimated Annual Cost $0 Total Funding $265,887
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET(-+) % EXPENDED
Construction $300,000 $265,887 $34,113 89%
_,.OTAL PROJECT $300,000 $265,887 $34,113 89%
337
THETHEia C I T Y OF
, ,,, ',, ,
S S
338
CAPITAL IMPROVEMENTS PROGRAM
COMPLETED PROJECTS SUMMARY
Project Total Project (Over)Under
Number Project Description Date Completed Total Budget Costs Budget
WASTEWATER PROJECTS
WW9902 Impact Fee Study 09/30/99 $ 13,000 $ 12,238 $ 762
VWV9903 Misc Sewer Rehab FY99 09/30/99 $ 50,000 $ 12,987 $ 37,013
WW9904 Hydraulic Analysis 06/30/00 $ 27,000 $ 27,000 $ -
WW9901 CDBG B/98-UC-48-0001/B95-22-50 08/19/00 $ 150,000 $ 72,927 $ 77,073
WVV0003 TRA Debt Payment 05/31/01 $ 822,037 $ 822,037 $ -
WVV0001 CDBG B/99-UC-48-0001 09/30/01 $ 150,000 $ 121,682 $ 28,318
WW0101 CDBG BOO-UC480001-2250 02/20/02 $ 251,485 $ 247,790 $ 3,695
VWV0102 Manhole Rehab.Program 03/31/03 $ 250,000 $ 184,520 $ 65,480
VVVV0201 CDBG-B01-UC-48-0001-22-50 03/31/03 $ 237,086 $ 172,948 $ 64,138
WVV0202 Line Replacement-Dunaway 02/28/05 $ 140,000 $ 139,955 $ 45
WVV0203 Line Replacement-E.Alexander 02/28/05 $ 20,000 $ 20,000 $ -
WW0204 Line Replacement-Paula Lane 02/28/05 $ 79,000 $ 79,000 $ -
VVVV0103 Line replacement-S.Pipeline,Heather-Vine 04/15/05 $ 489,759 $ 464,504 $ 25,255
VVW0205 Line Replacement-Midway Park 04/30/05 $ 366,000 $ 318,149 $ 47,851
VVW0401 CDBG B03-UC-48-0001-22-50 04/30/05 $ 217,000 $ 161,170 $ 55,830
WW0301 CDBG 802-UC-48-0001-22-50 07/26/05 $ 271,455 $ 271,454 $ 1
WW0302 Inflow&Infiltration Cancelled $ 200,000 $ - $ 200,000
WW0303 Line Replacement,Canyon Ridge 08/31/06 $ 196,200 $ 173,516 $ 22,684
WW0304 Line Replacement,Sagebrush 08/31/06 $ 160,900 $ 136,470 $ 24,430
VVVV0305 Line Replacement,Short 08/31/06 $ 251,400 $ 219,932 $ 31,468
WW0306 Line Replacement,E.Fuller 08/31/06 $ 231,372 $ 180,089 $ 51,283
VWN0501 Line Replacement,Pebble Creek 08/31/06 $ 172,600 $ 145,655 $ 26,945
WW0604 Line Replacement,CDBG-Oakwood Terrace 05/31/07 $ 293,723 $ 232,274 $ 61,449
VVVV0402 Line Replacement,Carr Park/SH10 05/31/08 $ 588,000 $ 528,302 $ 59,698
WVV0403 Line Replacement,Ector Drive 05/31/08 $ 373,000 $ 328,309 $ 44,691
WW0601 Line Replacement,Cedar Hills Estate 05/31/08 $ 319,000 $ 200,201 $ 118,799
WW0602 Line Replacement,Ector Drive 05/31/08 $ 425,000 $ 285,758 $ 139,242
''''',....i WW0603 Little Bear Creek Collection Line 05/31/08 $ 575,000 $ 464,293 $ ' 110,707
VVVV0701 Line Replacement,McCormick&Copher 02/05/09 $ 243,000 $ 194,254 $ 48,746
VWV0702 Line Replacement,Arnett Addition 02/05/09 $ 313,322 $ 229,006 $ 84,316
WW0703 Line Replacement,Jean Lane 02/05/09 $ 111,000 $ 70,603 $ 40,397
WW0704 Line Replacement,W.Fuller 02/05/09 $ 132,000 $ 82,708 $ 49,292
WW0902 Line Replacement,West Mills Drive-34th CDBG 04/16/10 $ 46,855 $ 46,855 $ -
VWV0802 Line Replacement South Mills Drive CDBG-R 11/01/10 $ 253,710 $ 165,867 $ 87,843
WW0901 Line Replacement Woodridge Circle/Koen Lane 11/01/10 $ 407,000 $ 309,410 $ 97,590
WW0801 Line Replacement Fayette Drive 04/14/11 $ 357,000 $ 325,676 $ 31,324
Wastewater Projects-Prior Years $ 9,183,904 $ 7,447,539 $ 1,736,365
VWV1001 Line Rep-W Alexander Ln/Norman Dr/Franklin Dr 05/31/12 $ 420,000 $ 331,614 $ 88,386
WW1101 Line Rep-Bayless/Pauline/Jones(CDBG) 05/31/12 $ 350,000 $ 208,903 $ 141,097
WVV1103 - Line Rep-Bayless/Pauline/Jones Outrall 05/31/12 $ 57,000 $ 37,544 $ 19,456
WW1202 Line Rep-Collin Drive(37th CDBG) 05/31/12 $ 300,000 $ 231,173 $ 68,827
Wastewater Projects-Current Year $ 1,127,000 $ 809,234 $ 317,766
Sub-Total Wastewater Projects I$ 10,310,904 I$ 8,256,773 $ 2,054,131
339
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 30,2003
Submitted By: RON YOUNG Date Completed: May 31, 2012
Project Title: LINE REPLACEMENT-W ALEXANDER/NORMAN/FRANKLIN
Project Type: WASTEWATER Sub-Type: MAIN REPLACEMENT
Project Code: WW1001 Priority: A
COUNCIL AUTHORIZATION:
November 24, 2009: Authorized the City Manager to execute an engineering design contract with Elliott and
Hughes, Inc. in an amount not to exceed $66,300.
August 17, 2010: Authorized the City Manager to execute a contract in the amount of$268,354 with William J.
Schultz, Inc. dba Circle C Construction to rehabilitate the W Alexander/Norman/Franklin sanitary sewer lines.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan and are
included in the plan for the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Between Ross Avenue and West Alexander Lane,
2. Between Norman Drive and Franklin Drive, and
3. Between Franklin Drive and Simmons Drive, North of Bayless Drive.
PROJECT SCHEDULE:
Design Award: November 2009
Construction Award: September 2010
Begin Construction: September 2010
Construction Complete: April 2011
JUSTIFICATION:
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce
maintenance costs and customer problems.
340
PROJECT TITLE:LINE REPLACEMENT-W ALEXANDER/NORMAN/FRANKLIN PROJECT CODE:WW1001
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST(+OR-)ANNUAL:
Direct Operating Cost Engineering $70,000
Personnel: Full Time Construction $350,000
Part Time $0
Total Salary $0
Purchase of Services
Materials& Supplies
Utilities
$0
Subtotal: $0 Total Estimated Capital Cost $420,000
Maintenance Costs Funding Source:
Transfer from:
W/WW Operations $570,000
$0 Transfer to:
Subtotal: $0 W/WW CIP Fund Balance ($150,000)
W/WW CIP Fund Balance ($88,386)
Total Estimated Annual Cost $0 Total Funding $331,614
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET(-+) % EXPENDED
Wastewater Mains $350,000 $267,611 $82,389 76%
Engineering $70,000 $64,003 $5,997 91%
�,..fJTAL PROJECT $420,000 $331,614 $88,386 79%
341
City of Euless
Capital Project Request '1
Department: PUBLIC WORKS Date Prepared: April 15,2005
Submitted By: RON YOUNG Date Completed: May 31, 2012
Project Title: LINE REPLACEMENT-BAYLESS/PAULINE/JONES (CDBG)
Project Type: WASTEWATER Sub-Type: CDBG
Project Code: WW1101 Priority: A
COUNCIL AUTHORIZATION:
June 15, 2010: Tarrant County awarded the engineering contract to Elliott& Hughes in the amount of$38,293.
January 11, 2011: Recommend Tarrant County award construction contract to Hall Albert Construction Company
of Benbrook, Texas in the amount of$187,978.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project
is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains along:
1. Bayless Drive,
2. Pauline Street,
3. Jones Street, and
4. East of S Mills to the outfall.
(36th year CDBG project)
PROJECT SCHEDULE:
Award Design: June 2010 (Tarrant County)
Plans Complete: September 2010
Begin Construction: February 2011
Construction Complete: June 2011
JUSTIFICATION:
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce
maintenance costs and customer problems.
342
PROJECT TITLE:LINE REPLACEMENT-BAYLESS/PAULINE/JONES (CDBG) PROJECT CODE:WW1101
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST(+OR-)ANNUAL:
Direct Operating Cost Engineering $50,000
Personnel: Full Time Construction $300,000
Part Time $0
Total Salary $0
Purchase of Services
Materials&Supplies
Utilities
$0
Subtotal: $0 Total Estimated Capital Cost $350,000
Maintenance Costs Funding Source:
Transfer from Operations $50,000
CDBG Award $300,000
$0
Subtotal: $0 Transfer to:
W/WW CIP Fund Balance ($50,000)
Unused 36th CDBG Funding ($91,097)
Total Estimated Annual Cost $0 Total Funding $208,903
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET(-+) % EXPENDED
Engineering $50,000 $38,293 $11,707 77%
Construction $300,000 $170,610 $129,390 57%
_ OTAL PROJECT $350,000 $208,903 $141,097 60%
343
City of Euless
Capital Project Request '1
Department: PUBLIC WORKS Date Prepared: April 01,2011
Submitted By: RON YOUNG Date Completed: May 31, 2012
Project Title: LINE REPLACEMENT-BAYLESS/PAULINE/JONES OUTFALL
Project Type: WASTEWATER Sub-Type: MAIN REPLACEMENT
Project Code: WW1103 Priority: A
COUNCIL AUTHORIZATION:
February 2010: City Manager executed a construction contract in the amount of$42,822 to Texas ReExcavation
for the construction of Bayless/Pauline/Jones Outfall sanitary sewer project.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project
is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains along:
1. Bayless Drive,
2. Pauline Street,
3. Jones Street, and
4. East of S Mills to the outfall.
The City of Euless project is replacing the sanitary sewer lines located within the 100-year floodplain. These lines
are not included in the CDBG project.
PROJECT SCHEDULE:
Begin Construction: March 2011
Construction Complete: June 2011
JUSTIFICATION:
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce
maintenance costs and customer problems.
344
PROJECT TITLE:LINE REPLACEMENT-BAYLESS/PAULINE/JONES OUTFALL PROJECT CODE:WW1103
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST(+OR-)ANNUAL:
Direct O•eratin• Cost Engineering $7,000
Personnel: Full Time Construction $50,000
Part Time $0
Total Salary $0
Purchase of Services
Materials& Supplies
Utilities
$0
Subtotal: $0 Total Estimated Capital Cost $57,000
Maintenance Costs Funding Source:
Transfer from:
W/WW CIP Fund Balance $57,000
$0
Subtotal: $0 Transfer to:
W/WW CIP Fund Balance ($19,456)
Total Estimated Annual Cost $0 Total Funding $37,544
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET(-+) % EXPENDED
Engineering $7,000 $5,749 $1,251 82%
Construction $50,000 $31,795 $18,205 64%
,.JAL PROJECT $57,000 $37,544 $19,456 66%
345
City of Euless
Capital Project Request '1
Department: PUBLIC WORKS Date Prepared: April 12,2011
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-COLLIN DRIVE(CDBG)
Project Type: WASTEWATER Sub-Type: CDBG
Project Code: WW1202 Priority: A
COUNCIL AUTHORIZATION:
December 13, 2011: Recommend Tarrant County award construction contract to Horseshoe Construction, Inc. in
the amount of$216,671.50.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan.
The project is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
This project consists of the replacement of the following wastewater mains:
1. Along Collin Drive from Falls Drive to Travis Drive,
2. Between Falls Drive and Fannin Drive east of Collin Drive,
3. Between Fannin Drive and Travis Drive east of Collin Drive,
4. Between Travis Drive and Dallas Drive east of Collin Drive, and
5. Between Dallas Drive and Tarrant Drive east of.Collin Drive.
(37th year CDBG project)
PROJECT SCHEDULE:
Award Design Contract: June 2011
Design Complete: October 2011
Award Construction Contract: January 2012
Anticipate Construction Complete: June 2012
JUSTIFICATION:
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. The project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
346
PROJECT TITLE:LINE REPLACEMENT-COLLIN DRIVE(CDBG) PROJECT CODE:WW1202
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST(+OR-)ANNUAL:
Direct O•eratin• Cost Engineering $45,000
Personnel: Full Time Construction $255,000
Part Time $0
Total Salary $0
Purchase of Services
Materials& Supplies
Utilities
$0
Subtotal: $0 Total Estimated Capital Cost $300,000
Maintenance Costs Funding Source:
Transfer from:
W/WW Operating Fund $105,000
CDBG Award $300,000
$0
Subtotal: $0 Transfer to:
W/WW CIP Fund Balance ($105,000)
Unused 37th CDBG Funding ($68,827)
Total Estimated Annual Cost $0 Total Funding $231,173
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET(-+) % EXPENDED
Engineering $45,000 $42,544 $2,456 95%
Construction $255,000 $188,629 $66,371 74%
�.it)TAL PROJECT $300,000 $231,173 $68,827 77%
347
T H E ; C I T Y OF
ti SS
348
CAPITAL IMPROVEMENTS PROGRAM
COMPLETED PROJECTS SUMMARY
Project Total Project (Over)Under
Number Project Description Date Completed Total Budget Costs Budget
WATER PROJECTS
WT9903 Master Plan 08/30/99 $ 42,000 $ 5,445 $ 36,555
WT9904 Well Repairs 09/30/99 $ 66,921 $ 66,921 $ -
WT9907 Impact Fee Study 09/30/99 $ 13,000 $ 12,238 $ 762
WT9911 Water Distribution-Master Plan 09/30/99 $ 25,600 $ 24,000 $ 1,600
WT9901 Meter Change Out Program 10/30/99 $ 101,917 $ 98,365 $ 3,552
WT0002 Emergency Repair-Hwy 10 11/30/99 $ 15,450 $ 14,214 $ 1,236
WT9906 Hwy 10 Water Line 01/30/00 $ 150,000 $ 138,883 $ 11,117
WT0006 Central Drive Water Mains 03/31/00 $ 92,814 $ 90,742 $ 2,072
WT9905 Misc Water Rehab 06/30/00 $ 50,000 $ 43,749 $ 6,251
WT0004 Water Line Milam-Ector/Midway 06/30/00 $ 18,248 $ 13,743 $ 4,505
WT0102 SCADA Upgrade 04/09/01 $ 93,400 $ 93,400 $ -
WT0003 Waterline Replacement-Aransas 06/30/01 $ 12,057 $ 7,089 $ 4,968
WT0005 Waterline Replacement-Milam-Denton/Mid 04/30/02 $ 26,988 $ 26,988 $ -
WT9910 Water Line for Elevated Tank 05/31/02 $ 1,608,386 $ 1,201,698 $ 406,688
WT9909 2MG Water Tank 03/31/03 $ 2,430,881 $ 2,289,571 $ 141,310
WT0103 Fire Hydrant Replacement Program 03/31/03 $ 50,000 $ 49,626 $ 374
WT9908 Mid Cities Blvd.12"Line 04/30/04 $ 342,080 $ 313,354 $ 28,726
WT0401 Line Replacement,West Pipeline Main 05/31/06 $ 1,215,663 $ 1,215,663 $ -
WT0403 Waterline Replacement-Fairlawn Court Cancelled $ 35,000 $ - $ 35,000
WT0404 Waterline Replacement-Atkerson Lane Cancelled $ 104,000 $ - $ 104,000
WT0405 Line Replacement,West Ash Lane 08/31/06 $ 30,000 $ 11,626 $ 18,374
WT0406 Line Replacement,Westport/NewporUAsbury 08/31/06 $ 67,000 $ 9,866 $ 57,134
WT0502 FY'2005 CDBG 08/31/06 $ 69,300 $ 29,549 $ 39,751
WT0503 Line Replacement,S.Atkerson Lane 08/31/06 $ 79,000 $ 51,294 $ 27,706
WT0504 Line Replacement,Blanco Drive 08/31/06 $ 112,620 $ 112,620 $ -
WT0505 Line Replacement,Henslee 08/31/06 $ 183,000 $ 123,859 $ 59,141
WT0506 Line Replacement,Vernon/Slaughter 08/31/06 $ 161,000 $ 113,052 $ 47,948
' WT9902 Tank Painting 05/31/07 $ 1,317,763 $ 957,542 $ 360,221
WT0501 System Security Upgrade 05/31/08 $ 40,000 $ 28,319 $ 11,681
WT0601 Wtr Sys Security Perimeter Fence Upgrade 05/31/08 $ 75,000 $ 49,567 $ 25,433
WT0602 Line Replacement,Cannon Drive 05/31/08 $ 250,000 $ 223,055 $ 26,945
WT0701 Line Replacement,Canyon Ridge 05/31/08 $ 116,000 $ 78,136 $ 37,864
WT0702 CDBG FY07-32nd Oakwood Terrace 05/31/08 $ 334,481 $ 296,223 $ 38,258
WT0802 CDBG-33rd Oakwood Terrace-Simmons 12/31/08 $ 451,639 $ 384,173 $ 67,466
WT0402 Water&Wastewater Impact Fee Update 05/31/09 $ 30,000 $ 17,729 $ 12,271
WT0801 Line Replacement,Signet/Mesa 05/31/09 $ 255,000 $ 218,663 $ 36,337
WT0201 Well Rehabilitation/Disinfection 04/17/10 $ 600,000 $ 522,308 $ 77,692
Water Projects-Prior Years $ 10,666,208 $ 8,933,270 $ 1,732,938
Water Projects-Current Year $ - $ - $ -
Sub-Total Water Projects $ 10,666,208 $ 8,933,270 $ 1,732,938
349
.amik
I H E \C I I Y OF
� a .
\ 1
j
ate, \
�, \ƒ \
« :
:
350
CAPITAL IMPROVEMENTS PROGRAM
COMPLETED PROJECTS SUMMARY
Project Total Project (Over)Under
Number Project Description Date Completed Total Budget Costs Budget
OTHER PROJECTS
AC9901 Athletic Complex Phase II 06/30/02 $ 123,654 $ 75,047 $ 48,607
ACO202 Athletic Complex Phase III 05/31/06 $ 1,252,221 $ 1,251,915 $ 306
ED0102 Bell Ranch Terrace Cancelled $ 200,000 $ - $ 200,000
FM0209 Midway Recreation Upgrade 06/30/02 $ 557,125 $ 557,125 $ -
FM0101 Building D 09/30/02 $ 930,610 $ 930,608 $ 2
FM0308 Building A Remodel 05/31/07 $ 1,663,238 $ 1,651,325 $ 11,913
FM0309 Fire Station#3 05/31/07 $ 2,286,798 $ 2,286,229 $ 569
FM0601 Public Works Fadlity 05/31/08 $ 2,210,956 $ 2,213,507 $ (2,551)
FM0802 Senior Citizen Center Design cancelled $ 250,000 $ - $ 250,000
FM0804 Library-Shell Expansion 12/31/08 $ 307,034 $ 305,664 $ 1,370
FM0803 Midway Recreation Improvements 03/31/09 $ 293,500 $ 75,976 $ 217,524
FM0504 Building B"Remodel 05/31/09 $ 1,322,490 $ 1,315,697 $ 6,793
FM0801 TX Star Golf Course&Conference Ctr Expand 05/31/09 $ 3,630,079 $ 3,630,079 $ -
PR0015 Purchase of Dallas Stars Center 05/31/00 $ 10,327,978 $ 10,327,978 $ -
PR0016 Wilshire Park Improvements 06/30/02 $ 150,000 $ 149,926 $ 74
PRO110 Slope Protection/Screening Wall 03/31/03 $ 1,275,203 $ 1,273,923 $ 1,280
PR0409 Parking Improvements,Simmons 07/29/04 $ 6,960 $ 6,960 $ -
PRO410 Parking Improvements,Villages Bear Creek 07/29/04 $ 33,666 $ 33,666 $ -
PR0302 Bob Eden Parking 04/30/05 $ 75,000 $ 74,854 $ 146
PR0303 Youth Ballpark 04/30/05 $ 600,000 $ 600,000 $ -
PR9901 Hike/Bike Trail 04/30/05 $ 237,714 $ 237,714 $ -
PR9902 Senior Citizen Remodel 04/30/05 $ 16,130 $ 16,130 $ -
PR0407 Parking Improvements,Midway Cancelled $ 11,000 $ - $ 11,000
PR0408 Parking Improvements,S.Euless Park 05/31/06 $ 55,000 $ 20,991 $ 34,009
PRO411 Preserve at McCormick Park 05/31/06 $ 1,168,427 $ 1,168,427 $ -
PR0412 Splash Pool 05/31/06 $ 125,000 $ 124,477 $ 523
PR9903- Various EDC Park Projects
PR9918 09/30/06 $ 259,566 $ 248,891 $ 10,675
PR0602 Mid Cities Landscaping 05/31/09 $ 40,000 $ 33,199 $ 6,801
PR0719 Midway Park Trail 05/31/09 $ 210,000 $ 190,473 $ 19,527
PR0601 Park Amenities Upgrade 04/17/10 $ 150,000 $ 145,316 $ 4,684
PR0901 Trail Enhancements-Bob Eden Park 04/17/10 $ 135,000 $ 101,673 $ 33,327
PR0902 Senior Citizen Center at Midway Park 05/31/11 $ 4,763,661 $ 3,888,892 $ 874,769
PR0907 Euless Family Life Center Phase I 05/31/11 $ 2,105,000 $ 2,099,281 $ 5,719
PR9922 Tejas Remodel 11/30/01 $ 430,000 $ 455,885 $ (25,885)
PR9927 Park Improvements-Texas Star 09/30/01 $ 1,036,500 $ 1,025,298 $ 11,202
SS9901 Fire Station II 03/30/00 $ 49,688 $ 49,688 $ -
SS9919 Fire Station#3-Structural Repairs 03/30/00 $ 30,000 $ 17,344 $ 12,656
SS9902 Library Books 08/15/00 $ 3,302 $ 3,302 $ -
SS0010 Former Fire Station#2 06/30/02 $ 599,600 $ 595,257 $ 4,343
SS0113 Park Building 06/30/02 $ 1,492,400 $ 1,492,100 $ 300
Other Projects-Prior Years $ 40,414,500 $ 38,674,817 $ 1,739,683
AC1001 Texas Star Sports Complex Lighting Improvements 05/31/12 $ 504,200 $ 475,246 $ 28,954
Other Projects-Current Year $ 504,200 $ 475,246 $ 28,954
Sub-Total Other Projects $ 40,918,700 $ 39,150,063_$ 1,768,637
TOTAL COMPLETED PROJECTS $ 86,949,645 $ 78,874,327 $ 8,075,318
'No`/
351
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: April 29,2008
Submitted By: RAY MCDONALD Date Completed: May 31, 2012
Project Title: TEXAS STAR SPORTS COMPLEX LIGHTING IMPROVEMENTS
Project Type: PARK/RECREATION Sub-Type: TSSC IMPROVEMENTS
Project Code: AC1001 Priority: A
COUNCIL AUTHORIZATION:
November 9,2010: Award of Bid#018-10 for a construction contract to Falkenberg Construction Company, Inc.
in the amount of$469,027.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Identified in the feasibility study was the recommendation to remove the existing light fixtures, poles, and
foundations, and the replacement with new Sports lighting poles and fixtures.
PROJECT DESCRIPTION:
The project replaces the existing field lighting fixtures, poles, and foundations with Musco"Light Structure Green"
or"LSG" lighting which is the best product on the market for spill/glare control and maintaining constant light
levels. The system includes a remote ballast for easy maintenance, constant illumination levels, pre-wired and
pre-aimed fixtures from the factory, and a 25-year maintenance free warranty. The"LSG" is considerably more
efficient than the existing sport lighting fixtures installed, requires approximately 30%fewer fixtures than the
existing system to achieve 50/30 foot-candle levels, and reduces utility costs.
PROJECT SCHEDULE:
Grant Award: November 2009
Award Contract: November 2010 (Grant Deadline 18 months)
Project Completion: June 2011 (Grant Deadline 36 months)
JUSTIFICATION:
The existing poles, which were originally installed in 1982, are integral ballasted 1500 watt metal halide sports
lighting fixtures that require maintenance approximately two times per year to replace fixtures, lenses and bulbs.
There are numerous cracks and erosion points in the light pole foundations and existing poles do not meet
current wind load requirements.
352
PROJECT TITLE:TEXAS STAR SPORTS COMPLEX LIGHTING IMPROVEMENTSPROJECT CODE:AC1001
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST(+OR-)ANNUAL:
Direct Operating Cost Lighting $398,000
Personnel: Full Time Concrete Piers/Bolts $71,000
Part Time $0 Design/Engineering $10,000
Total Salary $0 Contingency $25,200
Purchase of Services ($25,000)
Materials&Supplies
Utilities
Subtotal: ($25,000) Total Estimated Capital Cost $504,200
Maintenance Costs Funding Source:
Dept of Energy ARRA Grant $454,200
TSSC CIP Fund Balance $50,000
(Gas Royalties)
$0
Subtotal: $0 Transfer to:
TSSC CIP Fund Balance ($28,954)
Total Estimated Annual Cost ($25,000) Total Funding $475,246
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET(-+) % EXPENDED
Equipment- Lighting System $469,000 $470,446 ($1,446) 100%
Design/Engineering $10,000 $4,800 $5,200 48%
Contingency $25,200 $0 $25,200 0%
-�.vOTAL PROJECT $504,200 $475,246 $28,954 94%
353
THEVCITY OF
. �.
s s
354