FISCAL YEAR 2014-2015
LINDA MARTIN, MAYOR
Tim Stinneford, Council Member Place One
Jeremy Tompkins, Council Member Place Two
Eddie Price, Council Member Place Three
Linda Eilenfeldt, Council Member Place Four, Mayor Pro Tem
Glenn Porterfield, Council Member Place Five
Perry Bynum, Council Member Place Six
Gary McKamie, City Manager
Loretta Getchell, Deputy City Manager
Chris Barker, Assistant City Manager
TABLE OF CONTENTS
PRELIMINARY CAPITAL IMPROVEMENTS PROGRAM
City Officials
Tableof Contents................................................................................................................
i-iv
Letter................................................................................................................................
v-vi
FUNDED PROJECTS
Summaryof Funded Projects..............................................................................................
01-02
FY14Amendments..............................................................................................................
03
Drainage Projects
Summary of Funded Drainage Projects...........................................................................
05
DR9903 Miscellaneous Drainage Improvements....................................................
06-07
DR1101 Flooding Mitigation....................................................................................
08-09
DR1201 Miscellaneous Creek Maintenance...........................................................
10-11
DR0000 Boyd Branch Improvements......................................................................
12-13
Street Projects
Summary of Funded Street Projects................................................................................
15
PSI 102 Glade Parks Improvements.......................................................................
16-17
PSI 202 ADA/TAS Infrastructure Improvements.....................................................
18-19
PS1203 Miscellaneous Street Repairs....................................................................
20-21
PS1303 Cullum Drive Improvements......................................................................
22-23
PS1401 FY2014 39th CDBG-ADA/TAS Infrastructure Improvements .....................
24-25
Wastewater Proiects
'�..- Summary of Funded Wastewater Projects.......................................................................
27
WW0002 Miscellaneous Wastewater Rehabilitation ...............................................
28-29
WW0605 TRA Wastewater Payments — Impact ......................................................
30-31
WW1203 SH183 Phase I Wastewater Relocation ...................................................
32-33
WWI 401 Line Replacement — Denton Drive...........................................................
34-35
Water Projects
Summary of Funded Water Projects................................................................................
37
WT0001 Miscellaneous Water Rehabilitation..........................................................
38-39
WT0101 Water Tank Debt Payment —Impact ........................................................
40-41
WT0104Well Repairs..............................................................................................
42-43
WT0803 Meters and Transponders.........................................................................
44-45
WT0901 TRA Water Payments — Impact................................................................
46-47
WTI 201 Reclaimed Water Line Extension..............................................................
48-49
WT1401 Line Replacement — El Camino Real ........................................................
50-51
WT1402 Fixed Base Meter Reading and Water Meter Changeout .........................
52-53
WT1403 Reclaimed Water Line Extension Debt Payment — Impact ......................
54-55
Other Projects
Summary of Funded Other Projects.................................................................................
57
AC1201 Texas Star Sports Complex Phase IV .......................................................
58-59
CM0304 Entry Monument Sign Program.................................................................
60-61
CM0804Redevelopment.........................................................................................
62-63
DV9901 EDC Incentive Funds................................................................................
64-65
ED0101 Planning Consultants................................................................................
66-67
ED1002EDC Contingency......................................................................................
68-69
FM1201 ADA/TAS Facility Improvements...............................................................
70-71
GC1201 TSGC Miscellaneous Improvements.........................................................
72-73
i
GC1401 Golf Course Upgrades.............................................................................. 74-75
PD9901 Police & Courts Facility.............................................................................. 76-77
PR0720 Miscellaneous Park Improvements............................................................ 78-79
PR0804Park Irrigation............................................................................................ 80-81
PR1201 Euless Family Life Center Aquatics........................................................... 82-83
PR1401 Glade Parks Trail Connection Design ....................................................... 84-85
PROPOSED & UNFUNDED PROJECTS
Summary of FYI Proposed & Unfunded Projects — Sorted by Type ................................. 87-90
Drainaae Proiects
Summary of FYI Proposed & Unfunded Drainage Projects ..........................................
91
BellHi Addition........................................................................................................
92-93
Blessing Branch — Main Street to SH360................................................................
94-95
Hollow Oak Channel Erosion...................................................................................
96-97
Kynette Drive Culvert Modifications.........................................................................
98-99
Little Bear Creek Drainage Improvements..............................................................
100-101
Marlene Drive Culvert Replacement........................................................................
102-103
Simmons Drive Culvert Improvements....................................................................
104-105
Street Proiects
Summary of FYI Proposed & Unfunded Street Projects ...............................................
107
FY2015 40th CDBG — ADA/TAS Infrastructure Improvements ................................
108-109
FY2015 Street Overlay...........................................................................................
110-111
FY2016 41 st CDGB — ADA/TAS Infrastructure Improvements ................................
112-113
FY2016 Street Overlay............................................................................................
114-115
East Harwood Road Extension................................................................................
116-117
State Highway 183 East Improvements..................................................................
118-119
FY2017 42"d CDBG — ADA/TAS Infrastructure Improvements ................................
120-121
FY2017Street Overlay............................................................................................
122-123
FY2018 43rd CDGB — ADA/TAS Infrastructure Improvements ...............................
124-125
FY2018 Street Overlay............................................................................................
126-127
Traffic Signal — Harwood Road at Bear Creek Parkway ..........................................
128-129
FY2019 44th CDGB — ADA/TAS Infrastructure Improvements ...............................
130-131
FY2019 Street Overlay............................................................................................
132-133
E Alexander Lane Reconstruction...........................................................................
134-135
Bear Creek Parkway Reconstruction.......................................................................
136-137
Cresthaven Drive Reconstruction............................................................................
138-139
Fuller -Wiser Road Reconstruction — Harwood Road to Mid Cities Boulevard.........
140-141
Fuller -Wiser Road Reconstruction — SH183 to Harwood Road ...............................
142-143
Highland Drive Reconstruction................................................................................
144-145
RossAvenue Extension..........................................................................................
146-147
South Pipeline Road Reconstruction.......................................................................
148-149
Vine Street Reconstruction — SH183 to SH10.........................................................
150-151
Wastewater Proiects
Summary of FYI Proposed & Unfunded Wastewater Projects ...................................... 153
Line Replacement — Crane Drive............................................................................ 154-155
Line Replacement — Town Creek Drive................................................................... 156-157
Line Replacement — Cedar Hills Estates/Hollywood Boulevard .............................. 158-159
Line Replacement — Milam Drive............................................................................. 160-161
Line Replacement — Oakwood Terrace Addition Phase I ........................................ 162-163
SH183 Phase II Wastewater Relocation................................................................ 164-165
Line Replacement — Ector Drive/Fayette Drive ....................................................... 166-167
Line Replacement — Oakwood Terrace Addition Phase 11....................................... 168-169
ii
Line Replacement — Kynette Drive/Wilshire Drive ...................................................
170-171
Line Replacement — Huntington/Koen/Atkerson/E Huitt/Slaughter/Martin ..............
172-173
Line Replacement — NW Midway/Rusk/Parker/Rockwall........................................
174-175
Line Replacement — Collin Drive/Harris Drive/Trion Drive ........................................
176-177
Line Replacement — Donley Drive/Shelmar Drive ...................................................
178-179
Line Replacement — Eastcliff Drive/Windlea Drive/Signet Drive ..............................
180-181
Line Replacement — Ector Drive/Donley Drive/Crane Drive ....................................
182-183
Line Replacement — Evans Drive/Canyon Ridge Drive/N Kynette Drive .................
184-185
Line Replacement — Glenn Drive.............................................................................
186-187
Line Replacement — Janann Street/Brownstone Drive/Shelmar Drive ....................
188-189
Line Replacement — Lakewood Boulevard/Dogwood Circle/Bocowood Circle........
190-191
Line Replacement — Live Oak Drive/Silver Creek Drive/Marlene Drive ...................
192-193
Line Replacement — Mary/Marlene/Commerce/Wilshire/Green briar .......................
194-195
Line Replacement — N Midway Park.......................................................................
196-197
Line Replacement — Northcliff/Toplea/Windlea/Signet/Kynette/Westcliff.................
198-199
Line Replacement — S Main Street..........................................................................
200-201
Line Replacement — Sagebrush/Toplea/WilshireNorkshire/Tyler ...........................
202-203
Line Replacement — Sierra Drive.............................................................................
204-205
Line Replacement — W Don ley/Private/M imosa/Mag nolia/Red bud .........................
206-207
Line Replacement — W MidwayNictoria/Delta/Lamar/Rockwall ..............................
208-209
Water Projects
Summary of FY15 Proposed & Unfunded Water Projects ...............................................
211
24-Inch Valve Replacement — Cinnamon Ln, Anice Ln, Fuller -Wiser Rd ...............
212-213
Line Replacement — S Pipeline Road West.............................................................
214-215
SH183 Phase II Water Relocation...........................................................................
216-217
Water System Security Camera Installation............................................................
218-219
Line Replacement — Ector Drive, Trojan Trail to Midway Drive ...............................
220-221
Line Replacement — Blessing Creek/Stony Creek/Rock Creek ...............................
222-223
Line Replacement — Kynette Drive, Cyclone Creek to Wilshire Drive .....................
224-225
Line Replacement — Collin Drive, Dallas Drive to Harwood Road ...........................
226-227
Line Replacement — Collin Drive, Denton Drive to Dallas Drive ..............................
228-229
Line Replacement — Denton Drive, Tarrant Drive to Harwood Road .......................
230-231
Line Replacement — Dickey Drive North, SH10 to E Huitt Lane ..............................
232-233
Line Replacement — Dickey Drive South, E Huitt Lane to Hilton Drive ....................
234-235
Line Replacement — Dunaway Drive, E Alexander Lane to E Ascot Drive ..............
236-237
Line Replacement — E Huitt Lane, S Main Street to Dunaway Drive .......................
238-239
Line Replacement — Eastcliff Drive, Toplea Drive to Del Prado Apts ......................
240-241
Line Replacement — Fuller Drive, Salem Drive to Carter Drive ...............................
242-243
Line Replacement — Hollow Oak Drive....................................................................
244-245
Line Replacement — Live Oak Court/Live Oak Drive ...............................................
246-247
Line Replacement — Midcreek Drive/Rock Creek Drive/Stony Creek Drive ............
248-249
Line Replacement — Midway Drive East, N Main Street to Freestone Drive ...........
250-251
Line Replacement — Midway Drive West, Freestone Drive to Ector Drive ..............
252-253
Line Replacement — Needles Street, Paula Lane to Raider Drive ...........................
254-255
Line Replacement — Paula Lane, Needles Street to S Pipeline Road .....................
256-257
Line Replacement — S Main Street (North), E Huitt Lane to SH10..........................
258-259
Line Replacement — S Main Street (South), Landover Drive to E Huitt Lane..........
260-261
Line Replacement — S Pipeline Road East, Vine Street to S Main Street ..............
262-263
SH360Water Crossing............................................................................................
264-265
Line Replacement — Shady Creek Drive/Cliffwood Road ........................................
266-267
Line Replacement — Springwood Court ...................................................................
268-269
Line Replacement — Sunset Drive, S Pipeline Road to S Main Street ....................
270-271
Line Replacement — Westwood Drive, Fuller Drive to Carter Drive .........................
272-273
Line Replacement — Wildwood Street.....................................................................
274-275
Line Replacement — Woodvine Drive (East), Cliffwood Road to El Camino Real ...
276-277
iii
Line Replacement — Woodvine Drive (West), Pebble Creek Drive to Cliffwood Rd 278-279
Other Proiects
Summary of FY15 Proposed & Unfunded Other Projects ................................................
CarRental Contingency..........................................................................................
Development/Engineering Building Design.............................................................
Glade Parks Trail Connection Construction............................................................
Municipal Plaza Improvements Phase I..................................................................
Blessing Branch Park Improvements......................................................................
Development/Engineering Building Construction....................................................
Municipal Plaza Improvements Phase II.................................................................
Texas Star Sports Complex Phase V Design..........................................................
Trail Enhancements Phase I...................................................................................
Texas Star Sports Complex Phase V Construction .................................................
Trail Connection South Euless................................................................................
Trailwood Park Improvements.................................................................................
LibraryRemodel Design..........................................................................................
Library Remodel Construction.................................................................................
Animal Shelter Expansion/Renovation....................................................................
FireStation #2 Remodel..........................................................................................
Kiddie Carr Park Improvements.............................................................................
South Euless Park Upgrades..................................................................................
Trail Enhancements Phase II..................................................................................
Trail Enhancements Villages of Bear Creek............................................................
WilshirePark Upgrades...........................................................................................
COMPLETED PROJECTS
Drainage Projects
Summary of Completed Drainage Projects ..................................................
Street Proiects
281
282-283
284-285
286-287
288-289
290-291
292-293
294-295
296-297
298-299
300-301
302-303
304-305
306-307
308-309
310-311
312-313
314-315
316-317
318-319
320-321
322-323
............ 325
Summary of Completed Street Projects........................................................................... 327
PS1301 FY2013 38th CDBG — ADA/TAS Infrastructure Improvements ................... 328-329
PS1302 FY2013 County Overlay — Trailwood/Summit Ridge/Westpark/Baze........ 330-331
PS1402 FY2014 County Overlay — Ector Dr/Midway Dr/Trojan Trail ...................... 332-333
Wastewater Projects
Summary of Completed Wastewater Projects............................................................
WW1301 Line Replacement — Ross Ave/Slaughter Ln/East and West Huitt Ln
Water Projects
Summary of Completed Water Projects ...........
Other Projects
Summary of Completed Other Projects ..............................
335
336-337
.. 339
341
--1
''1
iv
T H E C I T Y O F
EULESS
July 25, 2014
Honorable Mayor Linda Martin
Honorable City Councilmembers:
Tim Stinneford, Place One
Jeremy Tompkins, Place Two
Eddie Price, Place Three
Linda Eilenfeldt, Place Four, Mayor Pro Tem
Glenn Porterfield, Place Five
Perry Bynum, Place Six
INTRODUCTION
The City of Euless' Capital Improvements Program is a comprehensive document
detailing all projects that have been identified to date. Emphasis has been placed on
organizing this data in a manner that will facilitate decision -making processes, assist in
long-range planning, and provide the citizens of Euless with information regarding
'�.. planned projects. This document meets the requirements of the City Charter. Article
VII, Section 2 (5) requires, "A statement proposing any capital expenditures deemed
necessary for undertaking during the next budget year and recommended provisions for
financing." Section 2 (6) further requires, "A list of capital projects which should be
undertaken within the five (5) next succeeding years."
M
We extend special appreciation to the directors and the finance staff for their outstanding
performance in creating this document_
UNDERSTANDING THIS BOOK
Although this book contains a large volume of information, the summaries should make it
easy to understand at a glance. The book is divided into three sections: Funded
Projects, FY2015 Proposed and Unfunded Projects, and Completed Projects. Each
section begins with a summary and is followed by detailed data for those wishing to
research individual projects.
The detail provided includes the project's relationship to City master plans, the project
description and justification, the effect on future maintenance and operating costs, and
the estimated total cost. Within each section, you will find the detailed descriptions
sorted by type. There are five basic project types: Drainage, Streets, Wastewater,
Water, and Other.
201 N. Eetor Drive, Euless, Texas 76039-3595
817/685-1400 • Metro 817/267-4403 9 Fax 817/685-1416
www.eulesstx.gov
V
The Funded Projects section includes all projects that the City Council has previously
authorized. Many of these projects are on -going and require additional funding from
time to time. For each project, a detailed description has been provided that includes
any City Council authorization, the current status of the project, and a financial summary
detailing funding sources and total project budget. Any amendments or additional
appropriations requested are also identified.
Any project that has been authorized by the City Council that is not fully funded will
include a clear explanation as to how the remainder of the project is expected to be
funded.
The FY2015 Proposed and Unfunded Projects section has been classified into three
categories of priority. Priority A indicates the item is recommended and funding has
been identified in the proposed FY2015 budget. Staff recommends City Council
authorization for these projects. Priority B projects should be presented to Council
within two to five years for consideration. Projects that will not begin for at least five
years have been assigned a Priority C. This system has been used to allow the Council
to evaluate and shift priorities, when necessary, and to provide a means of budgeting
capital projects for at least five years. Recommended funding sources have been
indicated if known.
The Completed Projects section provides a summary for each project type indicating
total project budget, actual expenditure, and variance. Funds remaining have been
returned to the appropriate fund balance account for re -appropriation. Details of projects
closed during the prior year have also been included.
FY2015 PROJECTS:
Funding has been identified for all proposed FY2015 projects which are reflected on the
FY2015 Proposed and Unfunded Projects Summary as Priority A. These include:
• 401h Year CDBG - ADA/TAS Infrastructure Improvements
• FY2015 Street Overlay
• Crane Drive Wastewater Line Replacement
• Town Creek Wastewater Line Replacement
• 24-Inch Valve Replacement — Cinnamon, Anice, Fuller -Wiser
• Car Rental Contingency
• Development/Engineering Building Design
• Glade Parks Trail Connection Construction
• Municipal Plaza Improvements Phase I
CLOSING COMMENTS
This document is prepared as a comprehensive summary of capital needs that have
been identified throughout the City of Euless. This document will be updated annually to
aid the City Coun'q in allocating resources and determining priorities.
Sincerel
J
Gary McKamie
City Manager
vi
CAPITAL IMPROVEMENTS PROGRAM
FUNDED PROJECTS SUMMARY
Project
Number
Project Description
Budget as of
5131/13
Appropriation/
Amendment
Budget as of
5/31/14
Expended as
of 5131114
Remaining
Funds
Revised
Project Cost
Estimates
Unfunded/
(Excess
Funding)
DRAINAGE
PROJECTS
DR9903
Imisc. Drainage Improvements
$
812,833
$
25,000
$
837,833
$
143,783
$
694,050
$ 932,833
$ 95,000
DR1101
Flooding Mitigation
$
500,000
$
$
500,000
$
18,334
$
481,666
$ 500,000
$
DR1201
Misc. Creek Maintenance min bal $100,000
$
105,000
$
$
106,000
$
34,534
$
70,466
$ 135,000
$ 30,000
DR0000
Boyd Branch Improvements
$ 10,000 000
$
$
10,000 000
$
-
$
10,000,000
$ 10 000.000
$
FB9902
Fund Balance - Drainage CIP
$
-
$
$
$
-
$
-
$ -
$ 6,823
Sub -Total Drainage Projects
$ 11,417,833
$
25,000
$
11,442,833
$
196,651
$
11,246,182
$ 11,567,833
$ 118,177
STREET PROJECTS
PS1102
Glade Parks Improvements
$ 12,100,604
$
$ 12,100,604
$
2,625,092
$
9,475,512
$ 12,100,604
$
PS1202
ADA/TAS Infrastructure Improvements
$
413,800
$
$
413,800
$
366,927
$
46,873
$ 463,800
$ 50,000
PS1203
Misc. Street Repairs min bal $150 000
$
300,000
$
30,000
$
330,000
$
170,649
$
159,351
$ 405.000
$ 75,000
PS1303
Cullum Drive Improvements
$
200,000
$
1,095,738
$
1,295,738
$
516,265
$
779,473
$ 1,295,736
$
PS1401
FY2014 39" CDBG-ADA/TAS Infrastructure Improvements
$
-
$
300,000
$
300,000
$
-
$
300,000
$ 300,000
$
FB9907
Fund Balance - Street CIP
$
-
$
-
$
-
$
-
$
-
$ -
$ 7,456
Sub -Total Street Projects
$ 13,014,404
$
1,425,738
$
14,440,142
$
3,678,933
$
10,761,209
$ 14,565,142
$ 117,544
WASTEWATER PROJECTS
WW0002
IMisc. Wastewater Rehab min bal $100 000
$
341,086
$
75,000
$
416,086
$
375,547
$
40,539
$ 506,086
$ 90,000
WW0605
TRA Wastewater Payments - Impact
$
480,000
$
100,000
$
580,000
$
480,000
$
100,000
$ 680,000
$ 100,000
WW1203
SH183 Phase I Wastewater Relocation
$
454,000
$
$
454,000
$
-
$
454,000
$ 454,000
$
WW1401
Line Re - Denton Drive
$
$
629,000
$
629,000
$
25,067
$
603,933
$ 629,000
$
F89911
FB - Wastewater Impact Restricted
$
-
$
$
$
-
$
-
$
$ 549,027
Sub -Total Wastewater Projects
$
1,275,086
$
804,000 1
$
2,079,085
$
880,614
$
1,198,472 1
$ 2,269,086 1
$ (359,027)
ueut not yet issues.
2 Portion of debt not yet issued.
ha
CAPITAL IMPROVEMENTS PROGRAM
FUNDED PROJECTS SUMMARY
Project
Number
Project Description
Budget as of
5/31/13
Appropriation/
Amendment
Budget as of
5/31/14
Expended as
of 5/31/14
Remaining
Funds
Revised
Project Cost
Estimates
Unfunded/
(Excess
Funding)
WATER PROJECTS
WT0001
Misc. Water Rehab min bal $150,000
$
418,511
$
25,000
$
443,511
$
442,952
$
559
$ 593,511
$ 150,000
WT0101
Water Tank Debt Payment -Impact
$
3,480,048
$
250,232
$
3,730,280
$
3,647,064
$
83,216
$ 3,978,420
$ 248,140
WT0104
Well Repairs min bal $200,000
$
1,113,992
$
200,000
$
1,313,992
$
1,156,935
$
157,057
$ 1,613,992
$ 300,000
WT0803
Meters/Trans onders annual transfer$158,000
$
1,295,750
$
158,000
$
1,453,750
$
994,134
$
459,616
$ 1.611,750
$ 158,000
WT0901
TRA Water Payments -Impact
$
700,000
$
50,000
$
750,000
$
700,000
$
50,000
$ 750,000
$
WT1201
Reclaimed Water Line Extension
$
6,500,000
$
150,000
$
6,650,000
$
3.035,320
$
3,614,680
$ 6,650,000
$
WT1401
Line Rep: El Camino Real
$
-
$
515,000
$
515,000
$
58,757
$
456,243
$ 515,000
$
WT1402
Fixed Base Meter Reading and Water Meter Chan eout
$
$
5,500,000
$
5,500,000
$
$
5,500,000
$ 5,500,000
$
WT1403
Reclaimed Water Line Extension Debt Payment -impact
$
$
120,369
$
120,369
$
80,248
$
40,121
$ 241,263
$ 120,894
FB9910
FB- Water Impact Restricted
$
$
-
$
$
$
$
$ 1,192,157
FB9901
FB - Water & Wastewater CIP
$
$
-
$
-
$
-
$
-
$ -
$ 208,121
Sub -Total Water Projects
$ 13,508,301
$
6.9683,601$
$ 20,476,902
$
10,115,410
$
10,361,492
$ 21,453.936
$ (423,244
OTHER
AC1201
ITexas Star Sports Complex Phase IV
$
840,687
$
-
$
840,687
$
556,196
$
284,491
$ 840,687
$
CM0304
Entry Monument Sign Program
$
115,782
$
-
$
115,782
$
93,027
$
22,755
$ 135,782
$ 20,000
CM0804
Redevelopment
$
974,022
$
278
$
974,300
$
907,847
$
66,453
$ 1,374,300
$ 400,000
DV9901
EDC Incentive Funds
$
475,854
$
25,000
$
500,854
$
450,853
$
50,001
$ 625,854
$ 25,000
ED0101
Planning Consultants
$
204,869
$
-
$
204,869
$
104,869
$
100,000
$ 204,869
$ -
ED1002
EDC Contingency
$
250,000
$
-
$
250,000
$
-
$
250,000
$ 250,000
$
FM1201
ADA/TAS Facility Improvements min bal $75 000
$
50,000
$
50,000
$
100,000
$
26,586
$
73,414
$ 100,000
$ -
GC1201
TSGC Misc. Improvements min bal $150,000
$
250,000
$
-
$
250,000
$
145,247
$
104,753
$ 315,000
$ 65,000
GC1401
Golf Course Upgrades
$
$
587,000
$
587,000
$
6,221
$
581,779
$ 587,000
$
PD9901
Police and Courts Facility
$ 11,718,184
$
109
$
11,718,293
$
11,640,751
$
77,542
$ 11,718,293
$
PR0720
Misc. Park Improvements min bal $100,000
$
575,000
$
-
$
575,000
$
457,469
$
117,531
$ 575,000
$ -
PR0804
Park Irrigation
$
150,000
$
25,000
$
175,000
$
83,761
$
91,239
$ 200,000
$ 25,000
PR1201
Euless Family Life Center Aquatics
$
7,504,972
$
-
$
7,504,972
$
7,305,539
$
199,433
$ 7,504,972
$
PR1401
Glade Parks Trail Connection Design
$
$
117,000
$
117,000
$
28,104
$
88,896
$ 117,000
$
FB9906
FB-EDC CIP
$
$
$
-
$
-
$
-
$ -
$ 417,694
FB9908
FB-Texas Star Sports Complex CIP
$
$
$
$
$
$
$ 753,029
FB9909
FB-General CIP
$
$
$
$
$
$
$ 189,246
FB9913
FB-Car Rental CIP
$
$
$
$
$
$
$ 37,660
Sub -Total Other Projects
$ 23.109,370
$
804,387
$ 23,913,757
$ 21,805,470
$
2,108,287
$ 24,448,757
$ (862,629)
TOTAL FUNDED PROJECTS
$ 62,324,994
$
10,027,726
$ 72,352,720
$ 36,677,078
$ 35,675,642
$ 74.304,754
$ (1,409,179)
Portion of rrcht not yet issued.
" Debt not )ed.
errs or NUL=6
CAPITAL VAPROVXMXXT PROGRAM
AMMOMMU - YVINIVED PRDJWM
PROJECT#
PROJECT DEscREPTIOx
DATE
AxcNDmzNTs ♦$ AcTioxs
CM0804
Redevelopment
05/31/2014
Increase funding for additional earned interest of $278.
DR9903
Miscellaneous Drainage Improvements
10/O1/2013
To provide additional funding per FY2014 Approved CIP Plan - $25,000
from Drainage Operating Fund.
OV9901
EDC Incentive Funds
10/O1/2013
To provide additional funding per FY2014 Approved CIP Plan - $25,000
from EDC Operating Fund.
FM1201
ADA/TAS Facility Improvements
10/O1/2013
To provide additional funding per FY2014 Approved CIP Plan - $50,000
from General Fund.
GC1401
Golf Course Upgrades
10/O1/2013
To provide funding per FY2014 Approved CIP Plan - $512,000 from TSGC
Reserve Fund and $75,000 from Car Rental Fund.
PD9901
Police and Courts Facility
05/31/2014
Increase funding for additional earned interest of $109.
PR0804
Park Irrigation
10/O1/2013
To provide additional funding per FY2014 Approved CIP Plan - $25,000
from EDC Operating Fund.
PR1401
Glade Parks Trail Connection Design
10/01/2013
To provide funding per FY2014 Approved CIP Plan - $117,000 from Car
Rental Fund.
PS1203
Miscellaneous Street Repairs
10/01/2013
To provide additional funding per FY2014 Approved CIP Plan - $30,000
from Street CIP Fund Balance.
PS1301
FY2013 38th CDBG-ADA/TAS infrastructure
05/31/2014
To close project. Any unused funds will be allocated to future CDBG
Improvements
projects.
PS1302
FY2013 County Overlay-Trailwood/Summit
05/31/2014
To close project and transfer excess funding of $6,005 to Street CIP Fund
Ridge/Westpark/gaze
Balance.
PS1303
Cullum Drive Design
10/01/2013
To transfer excess design funding per PY2014 Approved CIP Plan - $43,000
to Street CIP Fund Balance.
PS1303
Cullum Drive Construction
10/O1/2013
To provide funding per FY2014 Approved CIP Plan - $643,000 from Street
CIP Fund Balance, $67,214 from Escrow Funds and $189,786 from Car
Rental Fund.
PS1303
Cullum Drive Construction
11/12/2013
To provide additional funding of $192,610 from Street CIP Fund Balance
and $46,128 from Car Rental CIP Fund Balance.
PS1401
FY2014 39th CDBG-ADA Infrastructure
10/01/2013
To provide funding per FY2014 Approved CIP Plan - $300,000 from
Improvements
lCommunity Development Block Grant.
PS1402
FY2014 County Overlay-Ector Drive/Midway
10/O1/2013
To provide funding per FY2014 Approved CIP Plan - $300,000 from Car
Drive/Trojan Trail
Rental Fund.
PS1402
FY2014 County Overlay-Ector Drive/Midway
05/31/2014
To close project.
Drive/Trojan Trail
WT0001
Miscellaneous Water Rehabilitation
10/O1/2013
To provide additional funding per FY2014 Approved CIP Plan - $25,000
from W/WW CIP Fund Balance.
WTO101
Water Tank Debt Payment -Impact
10/O1/2013
To provide additional funding per FY2014 Approved CIP Plan - $250,232
from Water Impact Fee Fund Balance.
WT0104
Well Repairs
10/O1/2013
To provide additional funding per FY2014 Approved CIP Plan - $200,000
from W/WW CIP Fund Balance.
WT0803
Meters/Transponders
10/01/2013
To provide additional funding per FY2014 Approved CIP Plan - $158,000
from W/WW Operating Fund.
WT0901
TRA Water Payments -Impact
10/O1/2013
To provide additional funding per FY2014 Approved CIP Plan - $50,000
from Water Impact Fee Fund Balance.
WT1201
Reclaimed Water Line Extension
10/O1/2013
To provide additional funding of $150,000 from W/WW CIP Fund Balance.
WT1401
Line Rep - El Camino Real
10/O1/2013
To provide funding per FY2014 Approved CIP Plan - $515,000 from
W/WW Operating Fund.
WT1402
Fixed Base Meter Reading and Water Meter
10/01/2013
To establish budget per FY2014 Approved CIP Plan - $4,500,000 (Future
Changeout
Bond Issue).
WT1402
Fixed Base Meter Reading and Water Meter
05/31/2014
To increase budget by $1,000,000 (Future Bond Issue).
Changeout
WT1403
Reclaimed Water Line Extension Debt Payment-
10/01/2013
To provide funding per FY2014 Approved CIP Plan - $120,369 from Water
Impact
Impact Fee Fund Balance.
WW0002
Miscellaneous Water Rehabilitation
10/O1/2013
To provide additional funding per FY2014 Approved CIP Plan - $75,000
from W/WW CIP Fund Balance.
WW0605
TRA Wastewater Payments -Impact
10/01/2013
To provide additional funding per FY2014 Approved CIP Plan - $100,000
from WW Impact Fee Fund Balance.
W W1301
Line Rep - Ross/Slaughter/East and West Huitt
10/O1/2013
To transfer excess funding of $200,000 to W/WW CIP Fund Balance.
WW1301
Line Rep - Ross/Slaughter/East and West Huitt
05/31/2014
To close project and transfer excess funding of $103,360 to W/WW CIP
Fund Balance.
WW1401
Line Rep - Denton Drive
10/O1/2013
To provide funding per FY2014 Approved CIP Plan - $539,000 from
W/WW Operating Fund.
WW1401
Line Rep - Denton Drive
05/31/2014
To provide additional funding of $90,000 from W/WW CIP Fund Balance.
.-IN
CAPITAL IMPROVEMENTS PROGRAM
FUNDED PROJECTS SUMMARY
Project
Number
Project Description
Budget as of
5131/13
Appropriation)
Amendment
Budget as of
5/31/14
Expended as
of 5/31/14
Remaining
Funds
Revised
Project Cost
Estimates
Unfunded/
(Excess
Funding)
DRAINAGE PROJECTS
DR9903
Misc. Drainage Improvements
$ 812,833
$ 25,000
$ 837,833
$ 143,783
$ 694,050
$ 932,833
$ 95,000
DR1101
Flooding Mitigation
$ 500,000
$ -
$ 500,000
$ 18,334
$ 481,666
$ 500,000
$
DR1201
Misc. Creek Maintenance min bal $100 000
$ 105,000
$
$ 105,000
$ 34,534
$ 70,466
$ 135,000
$ 30,000
DR0000
Boyd Branch Improvements
$ 10,000,000
$
$ 10,000 000
$ -
$ 10,000,000
$ 10 000,000
$
F69902
Fund Balance - Drainage CIP
$ -
$
$ -
$ -
$
$
$ 6,823
Sub -Total Drainage Projects
$ 11,417,833
$ 25,000
$ 11,442,833
$ 196,651
$ 11,246,182
$ 11,567,833
$ 118,177
Uebt not yet Issued.
Cn
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: July 23,1999
Submitted By: RON YOUNG Date Completed:
Project Title: MISCELLANEOUS DRAINAGE IMPROVEMENTS
Project Type: DRAINAGE Sub -Type: IMPROVEMENTS
Project Code: DR9903 Priority: A
COUNCIL AUTHORIZATION:
May 27, 2014: Awarded Bid No. 007-14 for a construction contract to Knight Erosion Control, Inc. for Drainage
Channel Improvements along Hurricane Creek and authorized the City Manager to enter into a contract with
Knight Erosion Control, Inc. The estimated expenditure is $135,487.82.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project provides funding for various drainage projects or emergency repairs identified throughout the year.
Often correction of these problems requires design services and other improvements such as bank stabilization.
As major projects are identified, they will be tracked separately and assigned a different project number.
PROJECT SCHEDULE:
JUSTIFICATION:
Failure to correct these problems often causes damage to existing infrastructure.
0M
PROJECT TITLE: MISCELLANEOUS DRAINAGE IMPROVEMENTS PROJECT CODE: DR9903
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
TOTAL ESTIMATED CAPITAL COST:
Improvements $932,833
Subtotal:
$0
Total Estimated Capital Cost
$932,833
Maintenance Costs
Funding Source:
Transfer from:
Drainage Operating Fund
$654,609
Drainage CIP Fund Balance
$183,224
$0
Subtotal:
$0
Additional Funding Needed:
Transfer from:
Drainage Operating Fund
$95,000
Total Estimated Annual Cost
$0
Total Funding
$932,833
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED BUDGET (-+)
% EXPENDED
Fence
$559 $559 0
100%
Storm Drain
$932,079 $143,029 789,050
15%
Meters & Setting
$195 $195 0
100%
$932,833 $143,783 $789,050 15%
/1
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: June 30,2010
Submitted By: RON YOUNG Date Completed:
Project Title: FLOODING MITIGATION
Project Type: DRAINAGE Sub -Type: IMPROVEMENTS
Project Code: DR1101 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project consists of identifying chronic flooding locations within the City of Euless and determining the
cost/benefit of property acquisition and protection compared to extensive drainage relief projects. Property
acquisition will be recommended after consideration of flooding history, appraisals, and feasible alternative
drainage solutions have been evaluated. It is recommended that this be established as an ongoing project.
PROJECT SCHEDULE:
JUSTIFICATION:
Properties throughout the City of Euless situated adjacent to creeks have experienced drainage problems for
several years. The cost for implementing drainage improvement projects to mitigate flooding at isolated locations
may be much greater than the cost of property acquisition. Chronic flooding lowers the property values and this
program will offer a means of relief for affected property owners.
L
PROJECT TITLE: FLOODING MITIGATION
PROJECT CODE: DR110
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Flooding Mitigation $500,000
Personnel: Full Time
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
Subtotal: $0 Total Estimated Capital Cost $500,000
Maintenance Costs Funding Source:
Transfer from:
Drainage Operating Fund $150,000
Drainage CIP Fund Balance $350,000
$0
Subtotal: $0
Total Estimated Annual Cost $01 Total Funding $500,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) %, EXPENDED
Storm Sewer $500,000 $18,334 $481,666 4%
AL PROJECT $500,000 $18,334 $481,666 4% I
C
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 22,2011
Submitted By: RON YOUNG Date Completed:
Project Title: MISCELLANEOUS CREEK MAINTENANCE
Project Type: DRAINAGE Sub -Type: CREEK MAINTENANCE
Project Code: DR1201 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The City of Euless completed drainage master plan studies for the major creeks that traverse the City. They
include Little Bear Creek, Hurricane Creek, Boyd Branch and Blessing Branch.
PROJECT DESCRIPTION:
The project provides for maintenance in the creeks described above including removal of fallen trees that impede
the flow of creek water in the natural creek channels, clearing brush and debris at major bridge crossings, and
preventative maintenance. This project does not address items that are deemed cosmetic enhancements.
PROJECT SCHEDULE:
Creek maintenance will occur between mid October and mid March.
JUSTIFICATION:
Natural creek erosion undermines the root systems of trees adjacent to creek banks which results in trees falling
into or across creek channels. These fallen trees together with accumulated brush and debris can impede the
flow of storm water in the natural creek channels resulting in a rise in the normal water surface elevation. Fallen
trees that are conveyed down stream in the natural creek channels may cause damage to the substructure of
bridges spanning the creek channels.
'.1
k
bo
10
PROJECT TITLE: MISCELLANEOUS CREEK MAINTENANCE PROJECT CODE: DR1201
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct ODeratina Cost Improvements
Personnel: Full Time (Minimum balance $100,000)
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal: $0 Total Estimated Capital Cost
Maintenance Costs Funding Source:
Transfer from:
Drainage CIP Fund Balance $105,000
Subtotal: $0 Additional Funding Needed:
Transfer from:
Drainage Operating Fund $30,000
Total Estimated Annual Cost $0 Total Funding $135,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Storm Sewers $135,000 $34,534 $100,466 26%
(TOTAL PROJECT $135,000 $34,534 $100,466 26%
11
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: July 17,2009
Submitted By: RON YOUNG Date Completed:
Project Title: BOYD BRANCH IMPROVEMENTS
Project Type: DRAINAGE Sub -Type: IMPROVEMENTS
Project Code: DR0000 Priority: A
COUNCIL AUTHORIZATION:
Authorized in the FY2011 Capital Improvement Plan.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Drainage improvements are included in the Boyd Branch Watershed Study.
PROJECT DESCRIPTION:
This project includes the portion of Boyd Branch from S Pipeline Road to SH183 and may include structural and
non-structural activities to reduce or minimize the effects of large stormwater events. A large portion of this
project occurs on a section of Boyd Branch that lies in a platted private drainage easement which also shows the
maintenance responsibility to rest on the property owner(s). Since the City of Euless has no easement rights
along these sections of Boyd Branch, the City is of the opinion that improving the capacity of Boyd Branch to
handle large stormwater events is the responsibility of the property owner(s). The City of Euless may have some
expenses related to improvements made to Boyd Branch.
PROJECT SCHEDULE:
JUSTIFICATION:
Large stormwater events result in runoff exceeding the capacity of Boyd Branch. This project is intended to
reduce or minimize property losses associated with stormwater runoff exceeding the capacity of Boyd Branch.
12
PROJECT TITLE: BOYD BRANCH IMPROVEMENTS
PROJECT CODE: DR0000
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct ODerating Cost Construction $10,000
Personnel: Full Time
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0 Total Estimated Capital Cost $10,000,000
Maintenance Costs Funding Source:
$0
Subtotal: $0 Additional Funding Needed:
Developer Contribution $6,000,000
Future Revenue Bond Issue $4,000,000
Total Estimated Annual Cost $0 Total Funding $10,000,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Construction $10,000,000 $0 $10,000,000 0%
AL PROJECT $10,000,000 $0 $10,000,000 0% I
13
I
C I T Y O F
wo
14
CAPITAL IMPROVEMENTS PROGRAM
FUNDED PROJECTS SUMMARY
Project
Number
Project Description
Budget as of
6/31/13
Appropriation/
Amendment
Budget as of
5/31114
Expended as
of 5/31/14
Remaining
Funds
Revised
Project Cost
Estimates
Unfunded/
(Excess
Funding)
STREET PROJECTS
PS1102
JGIade Parks Improvements
$ 12,100,604
$
$ 12,100,604
$ 2,625,092
$ 9,475,512
$ 12,100,604
$
PS1202
ADA/TAS Infrastructure Improvements
$ 413,800
$
$ 413,800
$ 366,927
$ 46,873
$ 463,800
$ 50,000
PS1203
Misc. Street Repairs (min bal $160,000)
$ 300,000
$ 30,000
$ 330,000
$ 170,649
$ 159,351
$ 405,000
$ 75,000
PS1303
Cullum Drive Improvements
$ 200,000
$ 1,095,738
$ 1,295,738
$ 516,265
$ 779,473
$ 1,295,738
$ -
PS1401
FY2014 39t6 CDBG-ADA/TAS Infrastructure Improvements
$ -
$ 300,000
$ 300,000
$ -
$ 300,000
$ 300,000
$
FB9907
Fund Balance - Street CIP
$ -
$ -
$ -
$ -
$ -
$ -
$ 7,456
Total Street Projects
$ 13,014,404
$ 1,425,738
$ 14,440,142
$ 3,678,933
$ 10,761,209
$ 14,565,142
$ 117,544
Portion of debt not yet issued.
Ch
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 27,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: GLADE PARKS IMPROVEMENTS
Project Type: STREET Sub -Type: CONSTRUCTION
Pro'ect Code: PS1102 Priority: A
COUNCIL AUTHORIZATION:
December 14, 2010: Approval of Resolution #10-1352 authorizing the publication of intention to issue COs.
January 25, 2011: Consider all matters incident and related to the issuance of and sale of up to $3.1 M in COs.
January 25, 2011: Consider acceptance of ROW and easements necessary for public improvements.
January 25, 2011: Awarded Bid #001-11 for a construction contract to McMahon Contracting LP in the amount of
$1,973,615.95 for the construction of Rio Grande Boulevard, Heritage Avenue, and widening of the SH121
service road.
February 24, 2011: Issued COs for funding of first segment of public improvements at Glade Parks.
February 14, 2012: Authorized the City Manager to enter into a contract with Jackson Construction, LTD in the
amount of $1,696,277.25 for the construction of Glade Parks Phase II streets (Brazos Drive, Red River Drive, and
Heritage Avenue).
October 23, 2012: Authorized the City Manager to enter into a contract with All Around Lawn Care, Inc. in the
amount of $213,925.65 for the construction of the Glade Parks Phase II Streetscape project.
August 13, 2013: Authorized the City Manager to execute an Engineering Design Contract with Mycoskie,
McInnis & Associates for the design of portions of the Glade Parks Infrastructure. The estimated expenditure is
$114,800, plus reimbursable expenses and additional services.
March 25, 2014: Authorized the City Manager to execute an Engineering Design Contract with Mycoskie McInnis
Associates, Inc. for the design of the Glade Parks Trail Connection Project with an estimated expenditure of
$119,000. A portion of this amount is authorized for project PR1401-Glade Parks Trail Connection.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The infrastructure located in the Glade Parks development is included in the City's Master Thoroughfare Plan.
PROJECT DESCRIPTION:
The project represents the initial funding required for the infrastructure improvements at the Glade Parks
Development as approved in the Project and Financing Plan. The project scope includes the construction of Rio
Grande Boulevard, portions of Heritage Avenue, the Little Bear Creek bridge, SH121 improvements,
landscaping, wetland mitigation, Brazos Boulevard and remaining streets, main entrance and medians,
underground drainage, and associated utility installations, as well as administrative and financing costs.
PROJECT SCHEDULE:
Design: Winter 2010 Phase I Complete: FY2012
ROW: Winter 2010 Phase II Complete: August 2012
Construction: Spring 2011 Phase II Streetscapes Complete: April 2013
JUSTIFICATION:
The construction of public infrastructure at Glade Parks will spur economic development in the area and complete
an access route to existing Euless businesses.
16
1-11
IN-1
PROJECT TITLE: GLADE PARKS IMPROVEMENTS
PROJECT CODE: PS110
INET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
uireci v eraun cost uesign $297,000
Personnel: Full Time Construction $11,785,604
Part Time $0 Miscellaneous $15,000
Total Salary $0 Other Professional Services $3,000
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0 Total Estimated Capital Cost $12,100,604
Maintenance Costs Funding Source:
2011 COs $2,854,870
Street CIP Fund Balance $180,130
Subtotal:
$0
Additional Funding Needed. -
Future Bond Issue
$9,065,604
Total Estimated Annual Cost
$0
Total Funding
$12,100,604
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED BUDGET (- +)
% EXPENDED
Design
$297,000 $192,826 $104,174
65%
Construction
$11,785,604 $2,416,166 $9,369,438
21%
Transfer to Debt Service
$15,000 $15,000 $0
100%
Other Professional Services
$3,000 $1,100 $1,900
37%
$12,100,604 $2,625,092 $9,475,512 22% I
17
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 27,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: ADA/TAS INFRASTRUCTURE IMPROVEMENTS
Project Type: STREETS Sub -Type: SIDEWALKS
Pro'ect Code: PS1202 Priority: A
COUNCIL AUTHORIZATION:
October 23, 2012: Authorized the City Manager to enter into a contract with Estrada Concrete, LLC in the
amount of $111,026 for the construction of ADA ramp improvements.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The Master Thoroughfare Plan includes and addresses sidewalks, crosswalks, and curb ramps for City streets.
PROJECT DESCRIPTION:
This project provides for the continued improvements to City infrastructure as required by Federal and State
mandated Americans with Disabilities Act/Texas Accessibility Standards ("ADA/TAS"). City sidewalks,
crosswalks, curb ramps, and other areas covered under both ADA and TAS requirements will be part of these
improvements.
PROJECT SCHEDULE:
JUSTIFICATION:
Many sidewalks, curb ramps, and other similar items are outdated and do not meet current ADA/TAS standards.
Updating accessibility on a continuing basis will help keep the City in compliance with government standards and
will address the growing needs of citizens with accessibility issues.
W
InO
18
PROJECT TITLE: ADA/TAS INFRASTRUCTURE IMPROVEMENTS PROJECT CODE: PS1202
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Ooeratina Cost Improvements $463,800
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
$0
Total Estimated Capital Cost
$463,800
Maintenance Costs
Funding Source:
Transfer from:
Car Rental
$250,000
Harwood Road - PS9904
$83,655
$0
Escrow Funds
$80,145
Subtotal:
$0
Additional Funding Needed:
Transfer from:
Car Rental Fund
$50,000
Total Estimated Annual Cost
$0
Total Funding
$463,800
CURRENT STATUS
OVERIUNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED BUDGET (-+)
% EXPENDED
Sidewalks/Curbs
$380,145 $300,339 $79,806
79%
Utility Relocation
$83,655 $66,588 $17,067
80%
$463,800 $366,927 $96,873 79%
19
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 27,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: MISCELLANEOUS STREET REPAIRS
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: PS1203 Priority: A
COUNCIL AUTHORIZATION:
April 24, 2012: Authorized the City Manager to enter into a contract with Estrada Concrete Co. LLC for concrete
road repairs at various locations on North Main Street, Fuller -Wiser Road and Bear Creek Parkway in the amount
of $93,390.
March 11, 2014: Authorized the City Manager to negotiate and execute a contract for a citywide pavement
management analysis and asset management inventory with Infrastructure Management Services (IMS), 1820
West Drake Drive, Tempe, Arizona. The estimated expenditure is $82,155.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The Master Thoroughfare Plan identifies the various street types within the City of Euless. These street types
include residential streets through regional arterial streets.
PROJECT DESCRIPTION:
This project includes the removal and replacement of deteriorated sections of pavement along identified
roadways.
PROJECT SCHEDULE:
JUSTIFICATION:
Continuing repair of the existing street pavement will maintain safe driving conditions and will extend the overall
life of the City streets.
b
20
11.1
PROJECT TITLE: MISCELLANEOUS STREET REPAIRS
INET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal:
PROJECT CODE: PS120
TOTAL ESTIMATED CAPITAL COST:
Construction
(Minimum balance $150,000)
Total Estimated Capital
Funding Source:
Transfer from:
Street CIP Fund Balance
$330,
Subtotal: $0 Additional Funding Needed:
Transfer from:
Car Rental Fund $75,000
Total Estimated Annual Cost $0 Total Funding $405,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Construction $405,000 $170,649 $234,351 42%
TOTAL
$405,000 $170,649 $234,351
21
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 27,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: CULLUM DRIVE IMPROVEMENTS-SH10 TO HUITT LANE
Project Type: STREET Sub -Type: CONSTRUCTION
Proiect Code: PS1303 Priority: A
COUNCIL AUTHORIZATION:
January 22, 2013: Authorized the City Manager to execute an engineering design contract with Neel -Schaffer,
Inc. consulting engineers with an amount not to exceed $137,000 for the design of Cullum Drive from SH10 to
East Huitt Lane.
November 12, 2013: Authorized the City Manager to enter into a construction contract with McClendon
Construction in the amount of $1,138,738, which includes a $50,000 contingency, for the construction of street
improvements to Cullum Drive from SH10 to East Huitt Lane.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Cullum Drive is a roadway that connects an arterial thoroughfare (SH10) and a residential collector thoroughfare
(Huitt Lane) both of which are identified in the City's Master Thoroughfare Plan.
PROJECT DESCRIPTION:
The project consists of the engineering, required right-of-way acquisition and construction for a 31' wide concrete
roadway to replace an existing deteriorating asphalt roadway from SH10 to Huitt Lane. The project scope
includes underground storm drainage, sidewalks and wastewater main replacement.
PROJECT SCHEDULE:
Design Complete: September 2013
Construction Began: January 2014
Anticipate Construction Complete: September 2014
JUSTIFICATION:
Reconstruction of this street will decrease the annual maintenance and provide compliance with current City
standards.
_1 �
22
PROJECT TITLE: CULLUM DRIVE IMPROVEMENTS-SH10 TO HUITT LANE PROJECT CODE: PS1303
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
TOTAL ESTIMATED CAPITAL COST:
Engineering
Right -of -Way
$0 Construction
$0
Total Estimated Caaital Cost
Funding Source:
Transfer from:
Street CIP Fund Balance
-ar Rental Fund
-ar Rental CIP Fund Balance
=scrow Funds
$137,000
$20,000
$1,138,738
$1,295,7381
$992,610
$189,786
$46,128
$67,214
Total Estimated Annual Cost
$01
Total Funding
$1,295,738
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED
BUDGET (- +)
% EXPENDED
Engineering
$137,000 $141,133
($4,133)
103%
Right -of -Way
$20,000 $0
$20,000
0%
Construction
$1,138,738 $375,132
$763,606
33%
TOTAL
$1,295,738 $516,265 $779,473
40%
23
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 17,2011
Submitted By: CHRIS BARKER Date Completed:
Project Title: 39TH CDBG-ADA/TAS INFRASTRUCTURE IMPROVEMENTS
Project Type: STREET Sub -Type: CDBG
Project Code: PS1401 Priority: A
COUNCIL AUTHORIZATION:
February 12, 2013: Conduct a Public Hearing for the proposed 39th Year CDBG project, for the installation of
sidewalk accessibility ramps located along North Main Street, Midway Drive, and within several neighborhoods
and motion to approve a recommendation regarding the selected CDBG project.
May 13, 2014: Approved Resolution No. 14-1433, recommending award of a construction contract for the 39th
Year Community Development Block Grant (CDBG) Project (No. B13-UC-48-0001-22-30) to Reliable Paving,
Inc., 1903 Peyco Drive N., Arlington, Texas, for the replacement of sidewalk accessibility ramps. The estimated
expenditure is $265,598.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project provides for continued improvements to accessibility ramps by removing architectural barriers to
accessibility as required by Federal and State mandated Americans with Disabilities Act/Texas Accessibility
Standards ("ADA/TAS"). The project scope includes identification of architectural barriers to accessibility that
meet CDBG eligibility guidelines and the subsequent replacement thereof.
(39th year CDBG project)
PROJECT SCHEDULE:
Begin Construction: July 2014
Anticipate Construction Complete: November 2014
JUSTIFICATION:
Removing architectural barriers to accessibility is an eligible CDBG activity and will assist in the City's efforts to
maintain compliance with applicable Federal and State ADA/TAS codes.
'1
24
PROJECT TITLE: 39TH CDBG-ADA/TAS INFRASTRUCTURE IMPROVEMENTS PROJECT CODE: PS140
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
I Subtotal:
Subtotal:
TOTAL ESTIMATED CAPITAL COST:
Engineering $45,
Construction $255,
Total Estimated Capital Cost $300,
Funding Source:
CDBG Award $300,
i otai tstimatea Annual cost
-'
Total Funding
$300,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED
BUDGET (- +)
% EXPENDED
Engineering
$45,000 $0
$45,000
0%
Construction
$255,000 $0
$255,000
0%
$300,000 $0 $300,000 0% I
25
T H E.Q; _rC I T Y O F
ss
No
26
CAPITAL IMPROVEMENTS PROGRAM
FUNDED PROJECTS SUMMARY
Project
Number
Project Description
Budget as of
5131/13
Appropriation/
Amendment
Budget as of
5/31114
Expended as
of 5131/14
Remaining
Funds
Revised
Project Cost
Estimates
Unfunded/
(Excess
Funding)
WASTEWATER PROJECTS
WW0002
Misc. Wastewater Rehab(min bal $100,000)
$ 341,086
$ 75,000
$ 416,086
$ 375,547
$ 40,539
$ 506,086
$ 90,000
WW0605
TRA Wastewater Payments - Impact
$ 480,000
$ 100,000
$ 580,000
$ 480,000
$ 100,000
$ 680,000
$ 100,000
WW1203
SH183 Phase I Wastewater Relocation
$ 454,000
$ -
$ 454,000
$ -
$ 454,000
$ 454,000
$ -
WW1401
Line Re - Denton Drive
$ -
$ 629,000
$ 629,000
$ 25,067
$ 603,933
$ 629,000
$
FB9911
I FB - Wastewater Impact (Restricted)
$ -
$ -
$ -
$ -
$ -
$ -
$ 549,027)
Total Wastewater Projects
$ 1,275,086
$ 804,000
$ 2,079,086
$ 880,614
$ 1,198,472
$ 2,269,086
N
V
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: July 26,1999
Submitted By: RON YOUNG Date Completed:
Project Title: MISCELLANEOUS WASTEWATER REHABILITATION
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: WW0002 Priority: A
COUNCIL AUTHORIZATION:
March 8, 2005: Awarded contract to Hall -Albert Construction Company for the replacement of various
wastewater lines in the amount of $977,857.50. (This award was only partially for the WW0002 project.)
March 28, 2006: Authorized the city manager to proceed with emergency repair by GRA-TEX Utilities to the
aerial wastewater main crossing Hurricane Creek at a cost of $55,000.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project is for funding of small wastewater main projects identified throughout the fiscal year. Larger projects
will be determined on an "as needed" basis and presented for funding under a new project number.
PROJECT SCHEDULE:
JUSTIFICATION:
Most of these lines are clay tile and are seriously deteriorated.
28
PROJECT TITLE: MISCELLANEOUS WASTEWATER REHABILITATION PROJECT CODE: WW0002
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Wastewater Mains
Personnel: Full Time (Minimum balance $100,000)
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
$0
Total Estimated Capital Cost
Maintenance Costs
Funding Source:
Transfer from:
W/WW Operating Fund
$165,000
WW9903
$37,013
$0
W/WW CIP Fund Balance
$214,073
Subtotal:
$0
Additional Funding Needed:
Transfer from:
W/WW CIP Fund Balance
$90,000
Total Estimated Annual Cost
$01
Total Funding
$506,086
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED BUDGET (- +)
% EXPENDED
Wastewater Mains
$473,567 $343,028 130,539
72%
Engineering
$1,939 $1,939 0
100%
Contingency
$30,580 $30,580 0
100%
$506,086 $375,547 $130,539 74% I
29
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 03,2006
Submitted By: RON YOUNG Date Completed:
Project Title: TRINITY RIVER AUTHORITY WASTEWATER PAYMENT
Project Type: WASTEWATER Sub -Type: IMPACT FEE
Project Code: WW0605 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Based on a review by Birkhoff, Hendricks, and Conway of the water and wastewater impact fees, it was
determined that a substantial portion of the wastewater impact fee is attributed to Trinity River Authority ("TRA")
capital projects. Therefore, these fees should be used to pay a portion of the annual TRA expense, as these
funds are directly attributed to the expansion of TRA. Based on the available fund balance, a systematic
drawdown over a ten year period has been developed.
PROJECT SCHEDULE:
JUSTIFICATION:
The expansion at TRA provides additional capacity and it was determined through the wastewater impact fee
study that these funds could be used to pay a portion of TRA wastewater payments. It was determined a ten
year drawdown would approximate the Capital Improvement Plan Review time frame, as well as provide for a
systematic drawdown that would not impact the annual budget.
No
30
PROJECT TITLE: TRINITY RIVER AUTHORITY WASTEWATER PAYMENT PROJECT CODE: WW0605
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
$0
($100,000)
TOTAL ESTIMATED CAPITAL COST:
TRA Wastewater Payments $680,000
Subtotal: ($100,000) Total Estimated Capital Cost
Maintenance Costs Funding Source:
Transfer from:
WW Impact Fee Fund Balance
$680, 0001
$580,0001
Subtotal: $0 Additional Funding Needed:
Transfer from:
WW Impact Fee Fund Balance $100,000
Total Estimated Annual Cost ($100,000)l Total Funding $680,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Wastewater - TRA Service $680,000 $480,000 $200,000 71 %
PROJECT
$680,000 $480,000 $200,000
31
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 10, 2010
Submitted By: RON YOUNG Date Completed:
Project Title: SH183 PHASE I WASTEWATER RELOCATION
Project Type: WASTEWATER Sub -Type: LINE RELOCATION
Proiect Code: WW1203 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The Texas Department of Transportation ("TxDoT') has entered into a developer agreement with North Tarrant
Express Mobility Partners ("NTEMP") for the expansion of SH183. A portion of the Phase I construction will affect
the City of Euless utilities along SH183 between Westpark Way and FM157.
PROJECT DESCRIPTION:
The City of Euless has approximately 2,400 linear feet of wastewater mains and several manholes located within
the SH183 right-of-way. These facilities must be relocated to accommodate the SH183 expansion. It is
anticipated that the City will enter into a relocation agreement with NTEMP to authorize them to design and
relocate the wastewater lines. The City will be responsible for 50% of the cost of the line relocation.
PROJECT SCHEDULE:
Anticipate Construction Complete: June 2014
JUSTIFICATION:
City of Euless wastewater facilities are located within TxDoT right-of-way. As such, the City must provide for
utility relocation to accommodate the roadway expansion.
W
bw
32
PROJECT TITLE: SH183 PHASE I WASTEWATER RELOCATION
PROJECT CODE: WW1203
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering $68,000
Personnel: Full Time Construction $386,000
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal: $0 Total Estimated Capital Cost $454,000
Maintenance Costs Funding Source:
Transfer from:
W/WW Operating Fund ��/, ��° $151,000
R-O-W Proceeds 07— $201,000
$0 Plan Review/Inspection Fees $102,000
Subtotal: $0
?L
Total Estimated Annual Cost $0 Total Funding s %� � '1 $454,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED
BUDGET (- +)
% EXPENDED
Engineering
$68,000 $0
$68,000
0%
Construction
$386,000 $0
$386,000
0%
TOTAL PROJECT
$454,000 $0
$454,000
0%
33
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 05,2007
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEMENT-DENTON DRIVE
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: WW1401 Priority: A
COUNCIL AUTHORIZATION:
December 10, 2013: Authorized the City Manager to execute an engineering design contract with Elliott and
Hughes, Inc. for the design of Fiscal Year 2014 Sanitary Sewer Rehabilitation Project. The estimated expenditure
is $60,000.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project
is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
This project consists of the replacement of the following wastewater mains:
1. Denton Drive between Collin Drive and Harwood Drive to include a portion of Bell Drive,
2. Dallas Drive between Denton Drive and Irion Drive, and
3. Irion Drive between Dallas Drive and Harwood Drive.
PROJECT SCHEDULE:
Begin Construction: September 2014
Anticipate Construction Complete: December 2014
JUSTIFICATION:
Many wastewater mains throughout the city are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
34
'ROJECT TITLE: LINE REPLACEMENT-DENTON DRIVE
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct ODeratinci Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
I Subtotal:
I Subtotal:
PROJECT CODE: WW1401
TOTAL ESTIMATED CAPITAL COST:
$OI$0 Total Estimated Capital Cost
Funding Source:
Transfer from:
W/WW Operating Fund
W/WW CIP Fund Balance
$62,000�
$567,000
$629, 0001
$539, 000
$90,000
Total Estimated Annual Cost
$()I
Total Funding
$629,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED
BUDGET (- +)
% EXPENDED
Engineering
$62,000 $25,067
$36,933
40%
Construction
$567,000 $0
$567,000
0%
PROJECT
$629,000 $25,067 $603,933
4%
35
T H E C I T Y O F
SS
',*N
.-*N
36
CAPITAL IMPROVEMENTS PROGRAM
FUNDED PROJECTS SUMMARY
Project
Number
Project Description
Budget as of
5/31/13
Appropriation/
Amendment
Budget as of
5131114
Expended as
of 5131114
Remaining
Funds
Revised
Project Cost
Estimates
Unfunded/
(Excess
Funding)
WATER PROJECTS
WT0001
Imisc. Water Rehab min bal $160 000
$
418,511
$
25,000
$
443,511
$
442,952
$
559
$ 593,511
$ 150,000
WT0101
lWater Tank Debt Payment -Impact
$
3,480,048
$
250,232
$
3,730,280
$
3,647,064
$
83,216
$ 3,978 420
$ 248,140
WT0104
JWell Repairs min bal $200000
$
1,113,992
$
200,000
$
1,313,992
$
1,156,935
$
157,057
$ 1,613,992
$ 300,000
WT0803
Meters/Trans onders annual transfer $158 000
$
1,295,750
$
158,000
$
1,453,750
$
994,134
$
459,616
$ 11,611,750
$ 158,000
WT0901
TRA Water Payments -impact
$
700,000
$
50,000
$
750,000
$
700,000
$
50,000
$ 750,000
$ -
WT1201
Reclaimed Water Line Extension
$
6,500,000
$
150,000
$
6,650,000
$
3,035,320
$
3,614.680
$ 6,650,000
$
WT1401
Line Re - El Camino Real
$
$
515,000
$
515,000
$
58,757
$
456,243
$ 515,000
$
WT1402
Fixed Base Meter Reading and Water Meter Chan eout
$
$
5,500,000
$
5,500 000
$
$
5,500,000
$ 5,500,000
$ -
WT1403
Reclaimed Water Line Extension Debt Payment -impact
$
$
120,369
$
120,369
$
80,248
$
40,121
$ 241,263
$ 120,894
FB9910
FB- Water Impact Restricted
$
$
$
-
$
$
-
$ -
$ 1,192,157
F69901
FB -Water &Wastewater CIP
$
$
$
$
$
$
$ (208,121)
Total Water Projects
$13,506,301
$6,968,601
$20,476,902
1
$10,115,410
$10,361,492
$21,453,936
$423,244
Portion of debt not yet issued.
to 2 Debt not yet issued.
V
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 10,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: MISCELLANEOUS WATER REHABILITATION
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Proiect Code: WT0001 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project provides funding for small water main projects identified throughout the fiscal year. Large projects
that are identified will be presented for funding under a new project number.
PROJECT SCHEDULE:
JUSTIFICATION:
Some of the City's older water mains have deteriorated and need replacement or repair.
W
38
PROJECT TITLE: MISCELLANEOUS WATER REHABILITATION
INET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
PROJECT CODE: WT0001
TOTAL ESTIMATED CAPITAL COST:
Water Mains
(Minimum balance $150,000)
$0
$0
Subtotal:
$0
Total Estimated Capital Cost
Maintenance Costs
Funding Source:
Transfers from:
W/WW CIP Fund Balance
$390,000
W/WW Operating Fund
$200,000
$0
Project Transfers
($146,489)
Subtotal:
$0
Additional Funding Needed:
Transfer from:
W/WW Operating Fund
$150,000
Total Estimated Annual Cost
$0
Total Funding$593,511
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED BUDGET (- +)
% EXPENDED
Contingency
$49,231 $24,852 $24,379
50%
Water Mains
$544,280 $418,100 $126,180
77%
$593,511 $442,952 $150,559 75% I
39
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 01,2001
Submitted By: RON YOUNG Date Completed:
Project Title: WATER TANK DEBT PAYMENT - IMPACT
Project Type: WATER Sub -Type: IMPACT FEE
Project Code: WT0101 Priority: A
COUNCIL AUTHORIZATION:
Approved in the annual budget.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water tower was included in the water impact fee study.
PROJECT DESCRIPTION:
This project includes the transfer of funds from the water impact fee to pay debt service (WIS System Revenue
Refunding Bonds, Series 2012) related to the construction of the new water tower (Heritage Park).
PROJECT SCHEDULE:
Last debt payment for the water tower is scheduled for July 15, 2020.
JUSTIFICATION:
The water tower provides additional capacity and was included in the water impact fee study.
40
1-11
PROJECT TITLE: WATER TANK DEBT PAYMENT - IMPACT
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Annual debt payment - water impact fee
Subtotal:
PROJECT CODE: WT0101
TOTAL ESTIMATED CAPITAL COST:
Debt Service - FY2001-FY2014 $3,730,280
Debt Service - FY2015 $248,140
$250,000
$0
$250,000 Total Estimated Capital Cost
Funding Source:
WT Impact Fee Fund Balance
$3,978
$3,730
Subtotal: $0 Additional Funding Needed:
Transfer from:
WT Impact Fee Fund Balance $248,140
Total Estimated Annual Cost $250,0001 Total Funding $3,978,420
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Transfer to Debt Service $3,978,420 $3,647,064 331,356 92%
'AL
$3,978,420 $3,647,064 $331,356
92%
41
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 27,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: WELL REPAIRS
Project Type: WATER Sub -Type: WELL REPAIR
Project Code: WT0104 Priority: A
COUNCIL AUTHORIZATION:
April 22, 2003: Awarded bid 018-03 for Far North Well pump repair to Layne -Texas for $32,790.
February 14, 2006: Awarded bid 011-06 to Millican Well Service, LLC for rehabilitation and installation of the new
Centrilift submersible motor and pump for the Far North Well in the amount of $250,035.
January 25, 2011: Authorized Millican Well Service, LLC to repair Fuller Well in an amount not to exceed
$117,000, budget increase and additional funding of $117,000 required.
July 20, 2011: Transferred $95,000 from FB9901 to WT0104 for emergency well repairs.
August 9, 2011: Ratified City Manager action to proceed with emergency repairs to the Far North Well site, by
Millican Well Service, LLC in an amount not to exceed $95,000.
June 26, 2012: Ratified City Manager action to proceed with emergency repairs to the well located at 1400 North
Main Street, by Millican Well Service, LLC for an estimated amount of $64,950.
May 14, 2013: Authorized well repairs to the well located at 118 W. Fuller Drive (Fuller Well Site) by Millican Well
Service, LLC for an estimated amount of $120,000.
August 13, 2013: Ratified the City Manager action to proceed with emergency repairs to the city owned and
operated water well located at 1400 North Main Street, by Millican Well Service, LLC. The estimated expenditure
is $75,178.02.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The funding is being utilized to repair well pumps and for other unexpected well repairs.
PROJECT SCHEDULE:
JUSTIFICATION:
Maintaining the City's wells results in the ability to produce water at a substantial reduction in cost.
L
42
11.1
04-11M
M
PROJECT TITLE: WELL REPAIRS
PROJECT CODE: WT0104
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Well Rehabilitation
Personnel: Full Time (Minimum balance $200,000)
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: I Total Estimated Capital
Maintenance Costs
Funding Source:
Transfer from:
WT0001 - Misc Water Rehab
$145,720
W/WW CIP Fund Balance
$793,272
W/WW Operating Fund
$375,000
Subtotal:
Additional Funding Needed:
W/WW Operating Fund
$200,000
W/WW CIP Fund Balance
$100,000
Total Estimated Annual Cost
ITotal Fundina
$1,613,992
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED BUDGET (-+)
% EXPENDED
Well Rehabilitation
$1,613,992 $1,156,935 $457,057
72%
ECT $1,613,992 $1,156,935 $457,057 72%
43
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 10,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: METERS AND TRANSPONDERS
Project Type: WATER Sub -Type: METERS/TRANSPONDERS
Proiect Code: WT0803 Priority: A
COUNCIL AUTHORIZATION:
November 13, 2007: Awarded the annual contract for the purchase of water meters and transponders, and
authorized the City Manager to enter into an agreement with Atlas Utility Supply Company in the amount of
$383,875. Amount for project not to exceed $331,875.
November 11, 2008: Awarded the annual contract for the purchase of water meters and transponders, and
authorized the City Manager to enter into an agreement with Atlas Utility Supply Company in the amount of
$356,875. Amount for project not to exceed $331,875.
February 14, 2012: Awarded the annual contract for the purchase of water meters and transponders, and
authorized the City Manager to enter into an agreement with Atlas Utility Company in the amount of $200,000.
January 14, 2014: Authorized the City Manager to execute an Engineering Services Contract with Alan Plummer
and Associates, Inc. for services in assisting the City with the Texas Water Development Board State Revolving
Fund loan applications and the United States Bureau of Reclamation WaterSMART grant application. The
estimated amount is $78,000 and a portion of this amount is also authorized for project WTI 201-Reclaimed
Water Line Extension.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Partial replacement of transponders occurred in FY2006 and FY2007. This project proposes to replace the
balance of the old transponders. The systematic replacement of meters and transponders at or near end of life is
included in the Water System Master Plan.
PROJECT DESCRIPTION:
Purchase and installation of electronic transponders affixed to water meters allowing for electronic or remote
reading of customer water consumption. These water meters (transponders) are read with an electronic device
located inside a vehicle which is driven along a predefined route. System -wide replacement of older meters
beginning with the larger meters first is also included in the scope of the project. Scope also includes engineering
services for WTI 402 and debt issuance costs.
PROJECT SCHEDULE:
Ongoing
JUSTIFICATION:
This project provides funding for the systematic replacement of meters and transponders on a regular schedule at
or near end of asset life.
ow
'_"N
44
�11
PROJECT TITLE: METERS AND TRANSPONDERS
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
PROJECT CODE: WT0803
TOTAL ESTIMATED CAPITAL COST:
(Annual Funding $158,000)
Transponders/Meters
$0 FY2008 through FY2014 $1,453,750
$0 Transponders/Meters FY2015 $158,000
Subtotal:
$0
Total Estimated Capital Cost
$1,611,750
Maintenance Costs
Funding Source:
Transfer from:
W/WW CIP Fund Balance
$347,750
W/WW Operating Fund
$1,106,000
$0
Subtotal:
$0
Additional Funding Needed:
Transfer from:
W/WW Operating Fund
$158,000
Total Estimated Annual Cost
$0
Total Funding
$1,611,750
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED BUDGET (-+)
% EXPENDED
Meters/Transponders
$1,449,593 $994,134 $455,459
69%
Debt Service
$162,157 $0 $162,157
0%
AL PROJECT
$1611750 $994,134 $617,616 62%
45
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 31,2008
Submitted By: RON YOUNG Date Completed:
Project Title: TRINITY RIVER AUTHORITY WATER PAYMENT -IMPACT
Project Type: WATER Sub -Type: IMPACT FEE
Proiect Code: WT0901 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Based on a review by Birkhoff, Hendricks, and Conway of the water and wastewater impact fees, it was
determined that a substantial portion of the water impact fee is attributed to Trinity River Authority ("TRA") capital
projects. Therefore, these fees should be used to pay a portion of the annual TRA expense, as these funds are
directly attributed to the expansion of TRA. Based on the available fund balance, a systematic drawdown over a
ten year period has been developed.
PROJECT SCHEDULE:
Annual payment FY2009: $100,000
Annual payments FY2010-2013: $150,000
Annual payment FY2014: $50,000
JUSTIFICATION:
The expansion at TRA provides additional capacity and it was determined through the water impact fee study that
these funds could be used to pay a portion of TRA water payments. It was determined a ten year drawdown
would approximate the Capital Improvement Plan Review time frame, as well as provide for a systematic
drawdown that would not impact the annual budget.
1'1
46
PROJECT TITLE: TRINITY RIVER AUTHORITY WATER PAYMENT -IMPACT PROJECT CODE: WTO901
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct ODerating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
$0
($50,000)
TOTAL ESTIMATED CAPITAL COST:
TRA Water Pmts FY2009-2013 $700,000
TRA Water Payments FY2014 $50,000
Subtotal: ($50,000) Total Estimated Capital Cost
Maintenance Costs Funding Source:
Transfer from:
WT Impact Fee Fund Balance
Subtotal:
$0
$0
$750
$750, 0001
Total Estimated Annual Cost ($50,000)1 Total Funding $750,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Water - TRA Service $750,000 $700,000 $50,000 93%
TOTAL
1000 $700,000 $50,000
47
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 17, 2011
Submitted By: CHRIS BARKER Date Completed:
Project Title: RECLAIMED WATER LINE EXTENSION
Project Type: WATER Sub -Type: RECLAIMED WATER SYSTEM
Project CODE: WT1201 Priority: A
COUNCIL AUTHORIZATION:
January 22, 2013: Authorized the City Manager to execute an engineering design contract with Alan Plummer and
Associates, Inc. (APAI) with an amount not to exceed $294,678 for the design of a reclaimed water system line
extension project.
May 14, 2013: Authorized the City Manager to seek bids for Phase I of the extended reclaimed water distribution system.
June 25, 2013: Authorized the City Manager to execute a construction contract to Crescent Constructors, Inc. for the
Reclaimed Water Delivery System Extension, Phase I. The estimated expenditure is $3,110,758 which includes a
contingency of $150,000.
January 14, 2014: Authorized the City Manager to execute an Engineering Services Contract with Alan Plummer and
Associates, Inc. for services in assisting the City with the Texas Water Development Board State Revolving Fund loan
applications.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The reclaimed water line extension is a continuation of the City's Reclaimed Water Utility System. The feasibility study
completed in FY2012 recommends breaking the project into six phases with the first phase beginning in FY2013.
PROJECT DESCRIPTION:
The project will extend the City's Reclaimed Water Utility System from a point near the northeast corner of Bear Creek
Parkway and Midway Drive, northward to a point near Mid Cities Boulevard. Extension of this system will ultimately provide
reclaimed water service to several multi -family properties from Harwood Road to Mid Cities Boulevard as well as the City's
Bear Creek Park. Additional system expansion would be possible in the future.
PROJECT SCHEDULE:
Feasibility Study Complete: July 2012
Phase I Construction Began: July 2013
Anticipate Phase I Construction Complete: July 2014
JUSTIFICATION:
Construction of the project will provide a non -potable water source for irrigation which will offset future potable water
purchases by the City and will serve to responsibly conserve potable water resources for the City and the region.
10�*N
48
I'KUJLU I I I I Lt: KLULAIMLu VVA I LK LINE EA I EN61UN PROJECT CODE: WT1201
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Preliminary Design/Feasibility $100,000
Personnel: Full Time Engineering $400,000
Part Time Construction $6,050,000
Total Salary $0 Multi -Family Connections & $100,000
Purchase of Services Customer Education
Materials & Supplies
Utilities
Estimated avg. annual debt service $275,000
$275,000
Total Estimated Capital Cost $6,650,000
FUNDING SOURCE:
Transfer from:
W/WW CIP Fund Balance $750,000
W/WW Operating Fund $1,000,000
Revenue Bond Issue $1,500,000
Reclaimed Water - WT0202 $143,663
Subtotal: $0 Additional Funding Needed:
Future Revenue Bond issue $3,256,337
Total Estimated Annual Cost $275,000 Total Funding $6,650,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET
EXPENDED
BUDGET (- +)
% EXPENDED
Engineering
$500,000
$329,945
$170,055
66%
Construction
$6,050,000
$2,705,375
$3,344,625
45%
Utility Relocation
$100,000
$0
$100,000
0%
(I) Revised cost estimates for Phase II -VI, which will be constructed over a number of years, have increased
significantly due to scope of service expansion and construction cost increases. Current funding authorized
will likely cover Phase II and portions of Phase III. Additional funding will likely be necessary to complete
future phases.
PROJECT
$6,650,000 $3,035,320 $3,61
46%
49
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 27,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEMENT -EL CAMINO REAL
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: WT1401 Priority: A
COUNCIL AUTHORIZATION:
January 28, 2014: Authorized the City Manager to execute an Engineering Design Contract to Wier and
Associates, Inc. for the design of El Camino Real waterline. The estimated expenditure is $63,595.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of an existing 8" AC water main with a 10" PVC water main on El Camino
Real from W Pipeline Road to the south City limits. The project scope includes approximately 3200 linear feet of
10" PVC, 20 valves, and 8 fire hydrants. New water service connections to the apartments and townhomes will
also be included in the project.
PROJECT SCHEDULE:
Begin Construction: August 2014
Anticipate Construction Complete: December 2014
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic replacement of old deteriorated or substandard size water mains will
reduce maintenance costs. The water main on El Camino Real has experienced several breaks within the last
two years.
'-N,
50
2ROJECT TITLE: LINE REPLACEMENT -EL CAMINO REAL PROJECT CODE: WT1401
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering $65,000
Personnel: Full Time Construction $450,000
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal: $0 Total Estimated Capital Cost $515,000
Maintenance Costs Funding Source:
Transfer from:
W/WW Operating Fund $515,000,
$0
I Subtotal:
Total Estimated Annual Cost
$01
Total Funding
$515,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED
BUDGET (- +)
% EXPENDED
Engineering
$65,000 $58,757
$6,243
90%
Construction
$450,000 $0
$450,000
0%
AL PROJECT $515,000 $58,757 $456,243 11% I
51
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 25, 2013
Submitted By: RON YOUNG Date Completed:
Project Title: FIXED BASE METER READING & WATER METER CHANGEOUT
Project Type: WATER Sub -Type: METER
Project CODE: WT1402 Priority: A
COUNCIL AUTHORIZATION:
January 14, 2014: Alan Plummer and Associates, Inc. (APAI) will assist the City through the preparation of information
forms, application forms and follow-up administration of loan(s) for Texas Water Development Board (TWDB) funding and
with the preparation of a U.S. Bureau of Reclamation (USBR) WaterSMART grant application. The Engineering
Services Contract to APAI is authorized for project WT0803-Meters and Transponders and WTI 201-Reclaimed Water Line
Extension. The funding requested from TWDB and USBR is for project WT1402.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Replacement of existing meter reading capital project of 1992.
PROJECT DESCRIPTION:
Replace existing drive by meter reading system to a fixed base reading system. Currently, City water meters are divided into
one of four reading cycles with each cycle being read on a monthly basis. The reading occurs as a City vehicle traverses
each street within the cycle that is being read for that week. By implementing a fixed base system, all City water meters can
be read at the same time with the readings transmitted to the Utility Billing Office utilizing current City infrastructure.
PROJECT SCHEDULE:
FY2014/FY2015
JUSTIFICATION:
Implementing the new system will:
1. allow real time reading of approximately 15,000 meters,
2. allow for more timely billing to coincide with billings from TRA,
3. provide the ability to track water efficiency (billed vs produced and purchased) with greater accuracy,
4. replace the high percentage of meters nearing the point at which there is a loss of accuracy due to age and volume,
5. store consumption history allowing for pinpointing of consumption patterns for suspected leak resolution,
6. facilitate enforcement of time of day irrigation violations during times of drought and watering restrictions,
7. depending upon manufacturer chosen, offer system wide leak monitoring/detection as an option,
8. allow customer to access to water use patterns, and
9. replace meters with low/no lead brass meters to meet EPA requirements.
,-IN
1
.11�
52
00a
'ROJECT TITLE: FIXED BASE METER READING & WATER METER CHANGEOUT PROJECT CODE: WT140;
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
I Subtotal:
Subtotal:
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Fixed Base Equipment
Meter Installation
Contingency
TOTAL PROJECT
AL ESTIMATED CAPITAL COST:
Fixed Base Equipment
Meter Installation
Contingency
$0
Total Estimated Capital Cost
$0
FUNDING SOURCE:
Funding Needed:
Future Bond Issue
$0
$0 Total Funding
CURRENT STATUS
$4,750,000
$450,000
$300,000
$5,500,000 1
$5,500,000 1
$5,500,000 1
OVER/UNDER
BUDGET
EXPENDED
BUDGET (-+)
% EXPENDED
$4,750,000
$0
$4,750,000
0%
$450,000
$0
$450,000
0%
$300,000
$0
$300,000
0%
000 $0 $5,500,000 0%I
53
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 31,2013
Submitted By: CHRIS BARKER Date Completed:
Project Title: RECLAIMED WATER LINE EXTENSION DEBT PAYMENT
Project Type: WATER Sub -Type: IMPACT FEE
Project Code: WT1403 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The reclaimed water system extension was included in the impact fee study.
PROJECT DESCRIPTION:
This project includes the transfer of funds from the water impact fee to pay debt service (W(S System Revenue
Bonds, 2013) related to the extension of the reclaimed water system.
PROJECT SCHEDULE:
Last debt payment is scheduled for July 15, 2033.
JUSTIFICATION:
The project provides a non -potable water source for irrigation which will offset future potable water purchases by
the City and will serve to responsibly conserve potable water resources for the City and the region.
54
PROJECT TITLE: RECLAIMED WATER LINE EXTENSION DEBT PAYMENT PROJECT CODE: WT1403
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Ooeratina Cost Debt Service FY2014 $120,369
Personnel: Full Time Debt Service FY2015 $120,894
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
Subtotal: $0 Total Estimated Capital Cost $241,263
Maintenance Costs Funding Source:
Annual debt payment - water impact fee $120,000 Transfer from:
WT Impact Fee Fund Balance $120,369
Gf
Subtotal: $120,000 Additional Funding Needed:
Transfer from:
WT Impact Fee Fund Balance $120,894
Total Estimated Annual Cost $120,0001 Total Funding $241,263
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Transfer to Debt Service $241,263 $80,248 $161,015 33%
$241,263 $80,248 $161,015 33% I
55
.-*N
T H E C I T Y O F
I-N,
56
N
V
� ( i
CAPITAL IMPROVEMENTS PROGRAM
FUNDED PROJECTS SUMMARY
Project
Number
Project Description
Budget as of
5/31113
Appropriation/
Amendment
Budget as of
5/31/14
Expended as
of 5/31/14
Remaining
Funds
Revised
Project Cost
Estimates
Unfunded/
(Excess
Funding)
OTHER
AC1201 ITexas
Star Sports Complex Phase IV
$
840,687
$
$
840,687
$
556,196
$
284,491
$
840,687
$
CM0304
I Entry Monument Sign Program
$
115,782
$
$
115,782
$
93.027
$
22,755
$
135,782
$ 20,000
CM0804
lRedevelopment
$
974,022
$ 278
$
974,300
$
907,847
$
66,453
$
1,374,300
$ 400,000
DV9901
EDC Incentive Funds
$
475,854
$ 25,000
$
500,854
$
450,853
$
50,001
$
525,854
$ 25,000
ED0101
Planning Consultants
$
204,869
$ -
$
204,869
$
104,869
$
100,000
$
204,869
$ -
ED1002
EDC Contingency
$
250,000
$ -
$
250,000
$
-
$
250,000
$
250,000
$
FM1201
ADAITAS Facility Improvements (min bal $75,000)
$
50,000
$ 50,000
$
100,000
$
26,586
$
73,414
$
100,000
$ -
GC1201
TSGC Misc. Improvements (min bal $150,000)
$
250,000
$ -
$
250,000
$
145,247
$
104,753
$
315,000
$ 65,000
GC1401
Golf Course Upgrades
$
-
$ 587,000
$
587,000
$
5,221
$
581,779
$
587,000
$ -
PD9901
Police and Courts Facility
$
11,718,184
$ 109
$
11,718,293
$ 11,640,751
$
77,542
$
11,718,293
$
PR0720
Misc. Park Improvements (min bal $100,000)
$
575,000
$ -
$
575,000
$
457,469
$
117,531
$
575,000
$
PR0804
Park Irrigation
$
150,000
$ 25,000
$
175,000
$
83,761
$
91,239
$
200,000
$ 25,000
PR1201
Euless Family Life Center Aquatics
$
7,504,972
$ -
$
7,504,972
$
7,305,539
$
199,433
$
7,504,972
$ -
PR1401
Glade Parks Trail Connection Design
$
-
$ 117.000
$
117,000
$
28,104
$
88,896
$
117,000
$
FB9906
FB-EDC CIP
$
$ -
$
-
$
-
$
-
$
-
$
FB-Texas Star Sports Com lex CIP
$
$
$
$
$
$
$
FB9909
FB-General CIP
$
$
$
$
$
$
J(417,694)FB9908
$
FB9 113
FB-Car Rental CIP
$
$
$
$
$
$
$
Total Other Pro ects
$23,109,370
$804,387
$23,913,757
$21,805,470
$2,108,287
$24,448,757
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: May 01,2010
Submitted By: RAY MCDONALD Date Completed:
Project Title: TEXAS STAR SPORTS COMPLEX PHASE IV
Project Type: PARK/RECREATION Sub -Type: TSSC IMPROVEMENTS
Project Code: AC1201 Priority: A
COUNCIL AUTHORIZATION:
January 24, 2012: Authorized the City Manager to negotiate and execute a Field Use and Lease Agreement with
Sting Soccer Group, LP and Texas Titans FC, LLC, (collectively "Sting") for the use of a portion of the property
located at 1501 South Pipeline Road Euless, Texas 76040 (The Parks at Texas Star Sports Complex) as a
practice and training facility for youth soccer. In consideration of its use of the property, Sting will construct
certain facility improvements on the property.
August 28, 2012: Ratified the Euless Development Corporation action taken on August 28, 2012, approving Bid
No. 015-12, to award a contract to Reliable Paving, Inc. in the amount of $494,823 for parking improvements at
the Parks at Texas Star.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Texas Star Sports Complex Phase IV incorporates the addition of a concession and rest room facility and parking
for 200 vehicles. This addition will ensure that the Texas Star Sports Complex is positioned as a premier facility
that serves the athletic and recreational programming needs of the City.
PROJECT DESCRIPTION:
The project scope includes the design and construction of a parking lot and a concession/rest room facility at the
Texas Star Sports Complex. Related support facilities such as electrical service, lighting, fencing, etc. are also
included in the scope of the project.
PROJECT SCHEDULE:
Began Construction: September 2012
Construction Complete: December 2013
Anticipate Concession Complete: December 2014
JUSTIFICATION:
Since the completion of Phase III at the Texas Star Sports Complex, the facility has been severely under served
in parking, rest room facilities, and concessions. With the completion of Phase IV, the Texas Star Sports
Complex will be positioned to serve the ever-increasing athletic needs of the community and spur economic
opportunities for the City.
58
J
PROJECT TITLE: TEXAS STAR SPORTS COMPLEX PHASE IV PROJECT CODE: AC120,
NET EFFECTS ON OPERATING AND
TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Parking Lot
$412,000
Personnel: Full Time
$0
Concessions & Rest Room
$195,000
Part Time
$0
Lights/Electrical
$90,000
Total Salary
$0
Material storage bin
$15,600
Purchase of Services
$0
Entry walk
$35,000
Materials & Supplies
$7,500
Fencing
$18,000
Utilities
$3,500
Concession equipment
$16,000
Retaining Wall
$18,000
5% Contingency
$41,087
Subtotal: $11,000 Total Estimated Capital Cost $840,687
Maintenance Costs Funding Source:
$0 Transfer from:
EDC CIP Fund Balance $645,687
Contributed Capital (Sting) $195,000
Subtotal:
Total Estimated Annual Cost
$11,0001
Total Funding
$840,687
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED
BUDGET (-+)
% EXPENDED
Parking Improvements
$489,561 $489,561
$0
100%
Lighting
$33,000 $33,000
$0
100%
Remodel / Improvements
$8,030 $8,030
$0
100%
Land Betterments
$45,000 $7,260
$37,740
16%
Construction
$1,585 $1,584
$1
100%
Buildings
$195,000 $0
$195,000
0%
Contingencies
$12,111 $0
$12,111
0%
Special Services
$56,400 $16,760
$39,640
30%
TOTAL PROJECT $840,687 $556,196 $284,491 66%
59
City of Euless
Capital Project Request
Department: CITY MANAGER Date Prepared: July 11,2006
Submitted By: JOE HENNIG Date Completed:
Project Title: ENTRY MONUMENT SIGN PROGRAM
Project Type: MISCELLANEOUS Sub -Type: IMPROVEMENTS
Project Code: CM0304 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Continuation of the original City of Euless Entry Monument Sign Program.
PROJECT DESCRIPTION:
Continued construction of City of Euless entry monument signs at key high visibility points throughout the City
extending Euless beautification and branding efforts.
PROJECT SCHEDULE:
JUSTIFICATION:
To enable continuous efforts to identify, beautify, and brand the City of Euless.
w
w
60
Ow
PROJECT TITLE: ENTRY MONUMENT SIGN PROGRAM
PROJECT CODE: CM0304
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Land Betterments $135,782
Personnel: Full Time
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal: $0 Total Estimated Capital Cost $135,782
Maintenance Costs Funding Source:
Transfer from:
Car Rental Fund $115,782
$0
Subtotal: $0 Additional Funding Needed:
Transfer from:
Car Rental Fund $20,000
Total Estimated Annual Cost $01 Total Funding $135,782
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED
Land Betterments $135,782 $93,027 42,755 69%
AL PROJECT $135,782 $93,027 $42,755 69% I
61
City of Euless
Capital Project Request
Department: CITY MANAGER Date Prepared: July 11,2006
Submitted By: GARY MCKAMIE Date Completed:
Project Title: REDEVELOPMENT
Project Type: MISCELLANEOUS Sub -Type: DEVELOPMENT
Project Code: CM0804 Priority: A
COUNCIL AUTHORIZATION:
Oct 23, 2007: Authorized the purchase of property on Lot 27, Block 2, Cresthaven Addn, 1010 Highland Dr
Nov 27, 2007: Authorized the purchase of property on Lot 24, Block 1, Cresthaven Addn, 1010 Cresthaven Dr
Dec 11, 2007: Authorized the purchase of property on Lots 17&18, Block 8, Cedar Hill Estates Addn, 710 S Main
Oct 28, 2008: Authorized the purchase of property on Lot 3, Block 2, Cresthaven Addn, 1007 Cresthaven Dr
Jan 13, 2009: Authorized the purchase of property on Lot 18, Block 1, Cresthaven Addn, 912 Cresthaven Dr; Lot
4, Block 2, Cresthaven Addn, 1005 Cresthaven Dr; and Lot 23, Block 2, Cresthaven Addn, 1002 Highland Dr
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project provides funding to allow the City to participate in redevelopment projects and other community
improvements or make acquisitions of property that will be of economic benefit to the City of Euless.
PROJECT DESCRIPTION:
Project includes City participation in community redevelopment projects and property acquisitions that will be of
economic benefit to the City.
PROJECT SCHEDULE:
Long-term on -going project for continuous improvement of the community.
JUSTIFICATION:
As the City ages, it is imperative that the economic vitality of the City remain strong. Reinvestment into the
community will protect property values from deterioration and keep commercial properties occupied and
vibrant.
'1
,-'IN
62
Om
L
PROJECT TITLE: REDEVELOPMENT
PROJECT CODE: CM0804
INET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Land Acquisition
$875,880
Personnel: Full Time
Demolition
$87,823
Part Time
$0
Minor Apparatus
$597
Total Salary
$0
Incentives
$10,000
Purchase of Services
Redevelopment
$400,000
Materials & Supplies
Utilities
Subtotal:
$0
Total Estimated Capital Cost
$1,374,300
Maintenance Costs
Funding Source:
Transfer from:
General Fund
$930,000
Interest Earnings
$34,300
$0
Drill Site Surface Damage
$10,000
Subtotal:
$0
Additional Funding Needed:
Transfer from:
Car Rental Fund
$400,000
Total Estimated Annual Cost
$01
Total Funding
$1,374,300
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED BUDGET (- +)
% EXPENDED
Land Acquisition
$875,880 $810,465 65,415
93%
Demolition
$87,823 $87,215 608
99%
Minor Apparatus
$597 $167 430
28%
Incentives
$10,000 $10,000 0
100%
Redevelopment
$400,000 $0 400,000
0%
TOTAL PROJECT $1,374,300 $907,847 $466,453 66% I
63
City of Euless
Capital Project Request
Department: ECONOMIC DEVELOPMENT Date Prepared: July 26,1999
Submitted By: BILL RIDGWAY Date Completed:
Project Title: EULESS DEVELOPMENT CORPORATION INCENTIVE
Project Type: EDC Sub -Type: DEVELOPMENT
Project Code: DV9901 Priority: A
COUNCIL AUTHORIZATION:
March 27, 2001: Approved transfer of $325,000 to North Main Street for right-of-way to free up funds for a sign
program.
May 30, 2006: Approved payment to Professional Turf Products, Inc. in the amount of $300,000 per agreement.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Euless Development Corporation funds that have been set aside to aid the City of Euless in attracting
development opportunities.
PROJECT SCHEDULE:
JUSTIFICATION:
This would enable the City to act quickly on development opportunities that may arise throughout the year.
64
PROJECT TITLE: EULESS DEVELOPMENT CORPORATION INCENTIVE PROJECT CODE: DV9901
INET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
I Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
TOTAL ESTIMATED CAPITAL COST:
Will be based on the merits of
each opportunity.
$0
$0
$0
Subtotal:
$0
Total Estimated Capital Cost
Maintenance Costs
Funding Source:
Transfers from:
EDC CIP Fund Balance
$913,454
EDC Operating Fund
$375,000
$0
Transfer to FS#2 SS0010
($432,600)
Subtotal:
$0
Transfer to N Main PS9901
($355,000)
Additional Funding Needed:
EDC Operating Fund
$25,000
Total Estimated Annual Cost
$01
Total Funding
$525,854
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED BUDGET (- +)
% EXPENDED
Economic Development Incentives
$525,000 $450,000 $75,000
86%
Irrigation Supplies
$854 $853 $1
100%
TOTAL PROJECT
$525,854 $450,853 $75,001 86%
65
City of Euless
Capital Project Request
Department: ECONOMIC DEVELOPMENT Date Prepared: July 07,2000
Submitted By: BILL RIDGWAY Date Completed:
Project Title: PLANNING CONSULTANTS
Project Type: MISCELLANEOUS Sub -Type: DEVELOPMENT
Pro'ect Code: ED0101 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project provides funding for evaluating various development opportunities.
PROJECT DESCRIPTION:
Commission a study to determine the highest and best use of valuable undeveloped commercial land.
PROJECT SCHEDULE:
JUSTIFICATION:
Poor planning can result in lower than desired tax revenue, hodge podge development activity, and less than
optimal development quality. The City needs to be proactive to guide the development of these vital tracts.
W
W
'1
66
PROJECT TITLE: PLANNING CONSULTANTS
INET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
PROJECT CODE: ED0101
TOTAL ESTIMATED CAPITAL COST:
Planning Study $204,869
$0
$0
$0
$0 Total Estimated Capital Cost $204,869
Funding Source:
Transfer from:
Car Rental Fund $200,000
Car Rental CIP Fund Balance $4,869
$0
$0
Total Estimated Annual Cost $01 Total Funding $204,869
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Planning Study $204,869 $104,869 100,000 51%
$204,869 $104,869 $100,000 51% I
67
City of Euless
Capital Project Request
Department: ECONOMIC DEVELOPMENT Date Prepared: Sept 30,2010
Submitted By: GARY MCKAMIE Date Completed:
Project Title: EDC CONTINGENCY
Project Type: EDC Sub -Type: MISCELLANEOUS
Project Code: ED1002 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
To provide funding for emergencies or unforeseen projects that arise throughout the year.
PROJECT SCHEDULE:
JUSTIFICATION:
This would enable the City to act quickly on emergency or unforeseen projects. Without funding, these types of
projects would have to wait until the next budget cycle which could increase costs or impede economic
development opportunities.
W
68
11.1
PROJECT TITLE: EDC CONTINGENCY
PROJECT CODE: ED1002
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Contingency $250,000
Personnel: Full Time
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
Subtotal: $0 Total Estimated Capital Cost $250,000
Maintenance Costs Funding Source:
Transfer from:
EDC CIP Fund Balance $250,000
I Subtotal:
Total Estimated Annual Cost $01 Total Funding $250,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Contingency $250,000 $0 $250,000 0%
TOTAL PROJECT $250,000 $0 $250,000 0%
69
City of Euless
Capital Project Request
Department: FACILITIES Date Prepared: April 11,2011
Submitted By: KYLE MCADAMS Date Completed:
Project Title: ADA/TAS FACILITY IMPROVEMENTS
Project Type: FACILITIES Sub -Type: IMPROVEMENTS
Project Code: FM1201 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project provides for the continued improvements to various City facilities as required by Federal and State
mandated Americans with Disabilities Act/Texas Accessibility Standards ("ADA/TAS"). City facilities, entrances,
lifts, signage, speech and hearing aided devices, and other areas covered under both ADA and TAS
requirements will be part of these improvements. Project funds will be managed by the City Manager's Office and
will be allocated as identified projects are brought forth and approved.
PROJECT SCHEDULE:
JUSTIFICATION:
Some City facilities do not meet current ADA/TAS standards. Updating accessibility on a continuing basis will
help keep the City in compliance with government standards and will address the growing needs of citizens with
accessibility issues.
1-1111
70
CM
PROJECT TITLE: ADA/TAS FACILITY IMPROVEMENTS
PROJECT CODE: FM1201
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Improvements
Personnel: Full Time (Minimum balance $50,000)
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal: $0 Total Estimated Capital Cost
Maintenance Costs Funding Source:
Transfer from:
Car Rental Fund $50,000
General Fund $50,000
I Subtotal:
Total Estimated Annual Cost
$01
Total Funding
$100,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED
BUDGET (-+)
% EXPENDED
Structural Maintenance
$97,000 $24,228
$72,772
25%
Training
$3,000 $2,359
$641
79%
TOTAL PROJECT $100,000 $26,586 $73,414 27% I
71
City of Euless
Capital Project Request
Department: TEXAS STAR GOLF COURSE Date Prepared: May 17,2011
Submitted By: GLENDA HARTSELL Date Completed:
Project Title: TSGC MISCELLANEOUS IMPROVEMENTS
Project Type: PARKIRECREATION Sub -Type: TSGC IMPROVEMENTS
Project Code: GC1201 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
To provide funding to address small capital projects that arise throughout the year at Texas Star Golf Course.
PROJECT SCHEDULE:
JUSTIFICATION:
Without funding for this project, the smaller items identified throughout the year could not be addressed in a
timely manner and would have to be postponed until the next budget cycle for funding consideration. Timely
response preserves the City's investment in a high -profile asset and maintains the quality service levels expected
from patrons.
72
PROJECT TITLE: TSGC MISCELLANEOUS IMPROVEMENTS
INET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
I Subtotal:
Subtotal:
Total Estimated Annual
PHASE/FUNDING SOURCE
Repair & Maintenance
Land Acquisition
Land Betterments
Improvements
Equipment
PROJECT CODE: GC1201
TOTAL ESTIMATED CAPITAL COST:
Improvements
(Minimum balance $150,000)
$0
$0 Total Estimated Capital Cost
Funding Source:
Transfer from:
TSGC Reserve Fund $250,000
$0
$01
Additional Funding Needed:
Transfer from:
TSGC Reserve Fund
Total Funding
$65,000
$315,000
CURRENT STATUS
OVER/UNDER
BUDGET EXPENDED
BUDGET(-+)
% EXPENDED
$38,076 $38,076
$0
100%
$2,000 $2,000
$0
100%
$40,105 $30,697
$9,408
77%
$162,611 $2,267
$160,344
1%
$72,208 $72,207
$1
100%
$315,000 $145,247 $169,753 46%
73
City of Euless
Capital Project Request
Department: TEXAS STAR GOLF COURSE Date Prepared: March 18, 2013
Submitted By: GLENDA HARTSELL Date Completed:
Project Title: GOLF COURSE UPGRADES
Project Type: PARK/RECREATION Sub -Type: TSGC IMPROVEMENTS
Project CODE: GC1401 Priority: A
COUNCIL AUTHORIZATION:
December 10, 2013: Awarded Bid No. 005-14 for the fumigation of putting greens at Texas Star Golf Course to Francis
and Francis, Highland Village, Texas. The estimated expenditure is $68,850.
March 25, 2014: Authorized the purchase of bunker sand with Turf Materials, Inc., P.O. Box 2213, Rockwall, Texas, for
Texas Star Golf Course bunker renovation. The estimated expenditure is $72,150.
March 25, 2014: Authorized the City Manager to execute a contract with King Ranch Turfgrass, LP, 106 North Dennis
Street, Wharton, Texas, for the purchase of MiniVerde Ultra -Dwarf Bermuda grass sprigs on 19 greens and certified
Tifway 419 Bermuda grass on collars around the greens. The estimated expenditure is $64,028.
April 22, 2014: Awarded Bid No. 006-14 for a construction contract to Fleetwood Services, LLC, 4558 Steeple Chase
Lane, Rockwall, Texas, for miscellaneous golf course improvements to Texas Star Golf Course. The estimated
expenditure is $235,788.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Resurface the 18 Bentgrass greens on the course and the green nursery. Strip and prepare putting surface and collars for
new turf, fumigate greens and collars to kill all plants, weed seeds, diseases, nematodes, and insects present in the soil. Sprig
putting surface with Mini Verde Ultra Dwarf Bermuda and re -sod collars with 419 Bermuda. Reconstruct all sand bunkers to
consistent standards and specifications including the removal of existing sand material and drainage, reshape the bunkers as
needed, install new drainage and bunker liner material, and refill with premier crushed quartz bunker sand material to a
uniform depth. The existing sand will be used for agronomic practices around the course and practice areas. Tee leveling,
cart path improvements, expansion of the tee boxes and various miscellaneous improvements are included in the project
scope.
PROJECT SCHEDULE:
Begin Construction: June 2014
Anticipate Construction Complete: September 2014
JUSTIFICATION:
Texas Star is a championship daily fee golf facility known for its high level of service and excellent course conditions. At this
point in the life of the greens, it has become increasing more difficult to maintain the Bentgrass greens in an acceptable
condition during the summer months. This is due in large part to a reduction in drainage capabilities of the greens
themselves, weed and surrounding turf encroachment, the utilization of fans for air circulation, and the use of reclaimed water
containing higher salt levels. The proposed Ultra Dwarf Bermuda greens are much better suited to withstand the heat of North
Texas summers and are much more forgiving of drainage issues, poor air circulation, and the use of reclaimed water.
Additionally, the sand bunkers have been a consistent area of concern which staff has addressed on a limited number of
bunkers each year by repair or replacement of both the bunker sand and underlying drainage. Simultaneous reconstruction of
all sand bunkers to consistent standards and specifications would result in not only an aesthetically pleasing look, but optimal
Flaying conditions as well.
74
ROJECT TITLE: GOLF COURSE UPGRADES
PROJECT COnF- rclanl
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL;
Direct Operating Cost Greens Replacement $270,000
Personnel: Full Time Bunker Replacement $242,000
Part Time Contingency $75,000
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
Total Estimated Capital Cost $587,000
Subtotal: $0
FUNDING SOURCE:
Maintenance Costs Transfer from:
Golf Course Reserves $512,000
Car Rental Fund $75,000
Subtotal: $0
Total Estimated Annual Cost $0 Total Funding $587,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET
EXPENDED
BUDGET (- +) % EXPENDED
Golf Course Greens Improvement
$270,000
$5,221
$264,779 2%
Golf Course Bunker Improvement
$242,000
$0
$242,000 0%
Contingencies
$75,000
$0
$75,000 0%
AL PROJECT $587,000 $5,221 $581,779 1%I
75
City of Euless
Capital Project Request
Department: POLICE DEPARTMENT Date Prepared: July 15, 1999
Submitted By: GARY MCKAMIE Date Completed:
Project Title: POLICE & COURTS FACILITY
Project Type: BUILDINGS/FACILITIES Sub -Type: CONSTRUCTION
Project No.: PD9901 Priority: A
COUNCIL AUTHORIZATION:
January 13, 1998 - Authorized contract with Phillips Swager for architectural services.
April 14, 1998 - Authorized the acquisition of the Western Hills Inn and Western Hills Annex.
June 9, 1998 - Awarded Bid No. 98-13 for demolition services.
October 9, 1998 - Awarded change order to West Excavation for abatement of asbestos.
February 23, 1999 - Authorized additional funds for demolition.
June 22, 1999 - Declared expectation to reimburse expenditures with proceeds of future debt.
June 22, 1999 - Authorized City Manager to request qualifications for construction management service.
February 22, 2000 - Public Hearing and approval of Special Use Permit.
February 22, 2000 - Approval of request for site plan.
May 9, 2000 - Approval of Ordinance No. 1426 authorizing sale of Cert. Of Obligation Series 2000A.
May 9, 2000 - Awarded bid for construction to Ratcliff Construction.
November 14, 2000 - Authorized execution of contract for Project Management Services
January 9, 2001 - Granted City Manager approval to authorize change orders not to exceed $25,000.
January 23, 2001 - Ratified contract for inspection services to increase limit to $65,000
January 23, 2001 - Approved Change Order #1 to credit contract $152,391.
January 23, 2001 - Approved Change Order #3 for payment of $48,372.79 on new piers & removal.
March 27, 2001 - Approved Change Order #4 to credit contract $42,871.41.
May 22, 2001 - Awarded bid #044-01 for furniture in the amount of $332,400.70.
June 12, 2001 - Authorized City Manager to execute contract with DataTex not to exceed $74,257.86.
August 28, 2001 - Awarded contract to DFW Communication in the amount of $33,009 for relocating and
installing police and public works radio system.
April 22, 2014: Authorized the purchase of a security control system to upgrade and replace various existing
system components from ISI Security/MCS, 12903 Delivery Drive, San Antonio, Texas, at the Euless Police,
Jail, and Municipal Court Facility. The estimated expenditure is $149,480 and a portion of this amount is
authorized for project PD1 401 -SecuritySystem Upgrade.
PROJECT DESCRIPTION AND RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This 53,000 square foot facility will accommodate police, jail and courts.
PROJECT SCHEDULE:
JUSTIFICATION:
Current facility space is grossly inadequate for these areas.
76
011IR
PROJECT TITLE: POLICE & COURTS FACILITY
PRA_IPrTtt- Dnooni
NET EFFECTS ON OPERATING AND
TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Bond Issuance Cost
$76,000
Direct Operating Cost
Construction
$9,071,257
Personnel: Full Time
$128,000
Contingency
$128,302
Part Time
Demolition
$606,709
Architectural/ Surveying/ Geotech
$826,439
Other Professional Services
$36,310
Utilities
$106,000
Equipment
$67,912
Furnishings
$350,000
Land Purchase
$43,592
Planning Services
$70,428
Subtotal:
$234,000
Owner Equipment
$441,344
Total Estimated Capital Cost
$11,718,293
Maintenance Costs
HVAC Maintenance
$18,084
FUNDING SOURCE:
Maintenance
$24,850
Transfers from:
Janitorial Services & Supplies
$37,500
General Fund
$394,890
Elect. Supplies
$8,000
W/S Operating Fund
$175,000
Pest Control
$1,500
CCPD Operating Fund
$2,160,000
Subtotal:
$89,934
DEA Funds
$450,000
Bond Proceeds
$8,600,000
Other
Interest Income
$577,206
Average Annual Debt Service
$750,815
Less Inter -project Transfer to:
Building D FM0101
($638,803)
Total Estimated Annual Cost
$1,074,749
Total Funding
$11,718,293
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET
EXPENDED
BUDGET (-+)
% EXPENDED
Bond Issuance Cost
$76,000
$76,000
$0
100%
Construction
$9,071,257
$9,071,257
$0
100%
Contingency plus interest earnings
$169,998
$92,455
$77,543
54%
Demolition
$606,709
$606,709
$0
100%
Architectural Services
$745,369
$745,369
$0
100%
Surveying Services
$6,070
$6,071
($1)
100%
Geo-Technical Services
$72,511
$72,511
$0
100%
Other Professional Services
$36,310
$36,310
$0
100%
Equipment
$67,912
$67,912
$0
100%
Furnishings
$348,347
$348,347
$0
100%
Land Purchase
$43,592
$43,591
$1
100%
Off -Site Utilities
$0
$0
$0
0%
Owner Equipment
$403,790
$403,791
($1)
100%
Planning Services
$70,428
$70,428
$0
100%
- This project transferred $638,803 to FM0101.
TOTAL PROJECT $11,718,293 $11,640,751 $77
99%
77
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: March 23,2004
Submitted By: RAY MCDONALD Date Completed:
Project Title: MISCELLANEOUS PARK IMPROVEMENTS
Project Type: EDC Sub -Type: PARKS
Proiect Code: PR0720 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The adopted Parks Master Plan recommends funding for system -wide park facilities and amenities upgrades.
PROJECT DESCRIPTION:
The project provides funding for the upgrade and modernization of City parks to include replacement of aged
structures such as pavilions, picnic tables, gazebos, signs, safety components, and other park amenities
including the addition of a gazebo on Main Street. Park infrastructure and structure painting are included in the
scope of the project. Additionally, the project encompasses the installation of trail lighting along the Trails of
Euless similar to the lighting installed along the trail through Midway Park. Trailwood Park, Bob Eden Trail, The
Preserve at McCormick Park, The Villages of Bear Creek Park and Heritage Park would also benefit from trail
lighting.
PROJECT SCHEDULE:
JUSTIFICATION:
Pursuant to the recommendations in the Parks Master Plan, park accessibility should be in compliance with the
Americans with Disabilities Act. The existing equipment in many park areas is becoming aged and will require
refurbishment or replacement in the near term. Additionally, park infrastructure should be maintained at a level
that meets citizen expectations. The popularity of the trails have necessitated the installation of lighting to extend
the hours of usage and to provide increased visibility in remote areas of the trail system.
W
78
a
PROJECT TITLE: MISCELLANEOUS PARK IMPROVEMENTS
PROJECT CODE: PR072
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Fixtures, landscaping, lighting,
Personnel: Full Time & other park and infrastructure
Part Time $0 improvements
Total Salary $0
Purchase of Services (Minimum balance $100,000)
Materials & Supplies
Utilities
$0
Subtotal: $0 Total Estimated Capital Cost
Maintenance Costs Funding Source:
Transfer from:
EDC Operating Fund $575,
$0
Subtotal: $0
Total Estimated Annual Cost
$01
Total Funding
$575,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED
BUDGET (-+)
% EXPENDED
Park Furnishings
$394,848 $356,430
38,418
90%
Landscaping
$45,442 $40,167
5,275
88%
Contingency
$81,540 $57,702
23,838
71%
Park Lighting
$50,000 $0
50,000
0%
Equipment
$3,170 $3,170
0
100%
TOTAL PROJECT $575,000 $457,469 $117,531 80% I
79
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: October 01,2007
Submitted By: RAY MCDONALD Date Completed:
Project Title: PARK IRRIGATION
Project Type: EDC Sub -Type: PARKS
Proiect Code: PR0804 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project provides annual funding to continue efforts to meet irrigation needs throughout the City's park
system.
PROJECT SCHEDULE:
Projects will be identified and completed on an as needed basis.
JUSTIFICATION:
This project allows for maintenance and expansion of the irrigation systems throughout the parks system to
enhance the overall condition of the landscape and green space.
80
\1
PROJECT TITLE: PARK IRRIGATION
PROJECT CODE: PR0804
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost (Annual Transfer $25,000)
Personnel: Full Time Irrigation $200,000
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
Subtotal: $0 Total Estimated Capital Cost $200
Maintenance Costs Funding Source:
Transfer from:
EDC Operating Fund $175
Subtotal: $0 Additional Funding Needed:
Transfer from:
EDC Operating Fund $25,000
Total Estimated Annual Cost $0 Total Funding $200,000
CURRENT STATUS
OVERIUNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Irrigation $200,000 $83,761 116,239 42%
'AL PROJECT $200,000 $83,761 $116,239 42%
81
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: February 11, 2009
Submitted By: RAY MCDONALD Date Completed:
Project Title: EULESS FAMILY LIFE CENTER AQUATICS
Project Type: PARK/RECREATION Sub -Type: AQUATICS
Project CODE: PR1201 Priority: A
COUNCIL AUTHORIZATION:
April 10, 2012: Authorized the City Manager to negotiate and execute an architectural contract for certain components of the
Euless Family Life Center ("FLC") aquatics facilities to John Kirksey Associates, Architects, Inc. d/b/a Kirksey, Houston, TX.
Fee is anticipated at 8% of construction costs of the buildings.
April 10, 2012: Authorized the City Manager to solicit statements of qualifications for Design/Build Services related to the
Euless FLC Indoor and Outdoor Aquatics Facilities.
August 14, 2012: Authorized the City Manager to negotiate and execute a Design/Build contract with Progressive
Commercial Aquatics in the approximate amount of $3,200,000, which includes construction administration and general
contracting services for certain components of the Euless Family Life Aquatics Center.
January 8, 2013: Authorized the City Manager to negotiate and execute a contract with Modern Contractors in the amount
of $3,658,000 for the construction of an Indoor Pool Structure and Outdoor Building Features. Authorized a contingency in
the amount of $150,000.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The City of Euless has for many years recognized the importance of planning for parks, recreation, and open space based on
the needs as expressed by the citizens. For the update to the Parks Master Plan and as part of the City's five year master
plan, a survey of park, recreation, and open space needs was conducted from a sample of randomly selected citizens in
Euless. The survey identified a new aquatic center as a top priority of the citizens. Project approval requires revision of the
master planning of Midway Park as the aquatics center eliminates the current ball fields and requires the relocation of the
existing tennis courts in order to provide support facilities and amenities for the FLC.
PROJECT DESCRIPTION:
The project consists of the design of indoor and outdoor family aquatic facilities. The indoor facility includes a lap/leisure pool,
current channel, slide, and therapy pool. This multi -purpose facility will be attached to the senior center and will offer aquatic
programs for the senior population and the general public. The outdoor aquatics center will include various play components
such as a leisure pool, slides, aqua play features, shade structures, a bath house, and all the necessary filtration systems. The
project scope also includes redevelopment and improvement of the entire site such as relocating the tennis courts and the
construction of various trails, a group pavilion, an amphitheater, multi -use sport courts, additional picnic stations with grills, a
nature area, a botanical garden, and public art display(s).
PROJECT SCHEDULE:
Outdoor Complete: May 2013
Indoor Complete: December 2013
JUSTIFICATION:
The City's population is sufficient to support a family aquatic center. The City's existing aquatic facilities have aged and
maintaining the pools and support facilities has been an ongoing issue and concern. The operating expenses continue to
increase, far exceeding the revenue generated by the pools. Continuing in repair mode is no longer possible at the Wilshire
and South Euless Pools and a long-term plan is necessary. Given the fact that two of the neighborhood pools are over thirty
years old and the cost to renovate, repair, or replace them is estimated at over one million dollars each, it is recommended that
the City concentrate efforts and resources toward the family aquatic facility to serve the citizens of Euless.
W
82
PROJECT TITLE: EULESS FAMILY LIFE CENTER AQUATICS PROJECT CODE: PR1201
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL
Direct Operating Cost
(Personnel: Full Time
Part Time
(Total Salary
Purchase of Services
Materials & Supplies
Utilities
I Subtotal:
I Subtotal:
(Total Estimated Annual Cos,
PHASE/FUNDING SOURCE
Surveying -
Architectural Services
Engineering
Contingencies
Construction
Owner Equipment
AL PROJECT
TOTAL ESTIMATED CAPITAL COST
Architectural - Design
Architectural - Reimbursables
$198,903 Architectural - Consulting
$198,903 Surveying
Engineering Services
Contingencies
Construction - Aquatic Element
Construction - Buildings
Owner Equipment
Total Estimated Capital Cost
$198,903
FUNDING SOURCE:
Transfer from:
Car Rental Fund
Car Rental CIP Fund Balance
General CIP Fund Balance
$0
$198,903ITotal Funding
RRENT STATUS
$292,640
$21,000
$72,832
$13,500
$30,000
$147,630
$3,239,370
$3,658,000
$30,000
$7,504,972 1
$1,763,500
$4,236,500
$1,504,972
$7,504,972 1
OVER/UNDER
BUDGET
EXPENDED
BUDGET (- +)
% EXPENDED
$14,000
$13,973
$28
100%
$386,472
$343,385
$43,087
89%
$55,000
$54,999
$1
100%
$114,130
$0
$114,130
0%
$6,897,370
$6,855,743
$41,627
99%
$38,000
$37,439
$561
99%
$7,504,972 $7
$1
97%
83
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: May 05,2008
Submitted By: RAY MCDONALD Date Completed:
Project Title: GLADE PARKS TRAIL CONNECTION DESIGN
Project Type: PARK/RECREATION Sub -Type: TRAIL SYSTEM
Proiect Code: PR1401 Priority: A
COUNCIL AUTHORIZATION:
March 25, 2014: Authorized the City Manager to execute an Engineering Design Contract with Mycoskie McInnis
Associates, Inc. for the design of the Glade Parks Trail Connection Project with an estimated expenditure of
$119,000. A portion of this amount is authorized for project PS1102-Glade Parks Improvements.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
As identified in the Glade Parks development, this project proposes to connect the existing Trails of Euless to the
City of Colleyville trails through the Glade Parks Development.
PROJECT DESCRIPTION:
This phase of the project consists of the design, engineering, surveying and geotech for a trail that will connect to
the existing trail at Creekwood Estates, run underneath the northbound service road, SH121, and the southbound
service road to the southeast corner of the Glade Parks Development. Future connectivity through Glade Parks
is planned within the overall development of that site.
PROJECT SCHEDULE:
Anticipate Design Complete: September 2014
JUSTIFICATION:
The City of Euless has experienced significant progress in the last few years in the area of trail development with
an extensive network of paved and unpaved trails. The trails system is a valuable asset to the community as it
assists not only in providing a safe means for non -vehicular travel, but also in providing an opportunity for a
variety of unstructured, low -impact recreational pursuits. The development and maintenance of the trails system
continued to receive significant support from the citizens as indicated in the responses to the needs assessment
survey conducted as a part of the Parks Master Plan update.
'1
W
84
PROJECT TITLE: GLADE PARKS TRAIL CONNECTION DESIGN
PROJECT CODE: PR140'
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Design $45
Personnel: Full Time Engineering, Surveying and
Part Time $0 Geotech $72
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
Me
Subtotal: $0 Total Estimated Capital Cost $117,000
Maintenance Costs Funding Source:
Transfer from. -
Car Rental Fund $117,000
Subtotal:
Total Estimated Annual Cost
$()I
Total Funding
$117,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED
BUDGET (- +)
% EXPENDED
Design
$45,000 $28,104
$16,896
62%
Engineering, Surveying and Geotech
$72,000 $0
$72,000
0%
PROJECT $117,000 $28,104 $88,896 24%
85
I
C
Y
A
FMO
86
00
V
� � C
CAPITAL IMPROVEMENT PROGRAMS
FY16 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE
PROPOSED METHOD OF FINANCING
Project Description
Priority
Estimated Cost
Operating
Fund
CIP Fund
Balance
Bond Sale
Grants/
Contributions
Impact
Fees
Escrow
Funds
Car Rental Tax
Other
EDC
To Be
Determined
DRAINAGE PROJECTS
None Currently
A
$
Sub -Total Drainage Priority A -Proposed FY15
$
None Currently B
$
Sub -Total Drainage Priority B-Unfunded
$
Bell Hi Addition
C
TBD
XX
Blessing Branch -Main Street to SH 360
C
TBD
XX
Hollow Oak Channel Erosion
C
TBD
XX
K nette Drive Culvert Modifications
C
TBD
XX
Little Bear Creek Drainage Improvements
C
TBD
XX
Marlene Drive Culvert Replacement
C
TBD
XX
Simmons Drive Culvert Improvements
C
TBD
XX
Sub -Total Drainage Priority C-Unfunded
$
DRAINAGE PROJECTS - TOTAL
STREET PROJECTS
FY2015 40" CDBG-ADA/TAS Infrastructure Improvements
A
$ 495,600
$ 385,028
1 $ 110,572
FY2015 Street Overlay
A
$ 300,000
XX
Sub -Total Street Priority A -Proposed FY15
$ 795,600
FY2016 41 " CDBG-ADA/TAS Infrastructure Improvements 1'6)
B
$ 300,000
XX
FY2016 Street Overlay (16)
B
$ 300,000
XX
East Harwood Road Extension (16)
B
$ 100,000
XX
State Highway 183 East Improvements It61
B
$ 250,000
XX
FY2017 42nd CDBG-ADA/TAS Infrastructure Improvements (17)
B
$ 300,000
XX
FY2017 Street Overlay (17)
B
$ 300,000
XX
FY2018 43rd CDBG-ADA/TAS Infrastructure Improvements ('6)
B
$ 300,000
XX
FY2018 Street Overlay (16)
B
$ 300,000
XX
Traffic Signal -Harwood Road at Bear Creek Parkway (18)
B
$ 180,000
XX
FY2019 44" CDBG-ADA/TAS Infrastructure Improvements (79)
B
$ 300,000
XX
FY2019 Street Overlay (19)
B
$ 300,000
XX
E Alexander Lane Reconstruction (19)
B
$ 504.000
XX
Sub -Total Street Priority B-Unfunded
$ 3,434,000
Bear Creek Parkway Reconstruction
C
TBD
XX
Cresthaven Drive Reconstruction
C
TBD
XX
Fuller -Wiser Road Reconstruction -Harwood Road to Mid Cities
Boulevard
C
TBD
XX
Fuller -Wiser Road Reconstruction-SH183 to Harwood Road
C
TBD
XX
Highland Drive Reconstruction
C
TBD
XX
Ross Avenue Extension
C
TBD
XX
South Pipeline Road Reconstruction
C
TBD
XX
Vine Street Reconstruction-SH183 to SH10
C
TBD
XX
Sub -Total Street Priority C-Unfunded
$
STREET PROJECTS -TOTAL4,221,600
OD
00
CAPITAL IMPROVEMENT PROGRAMS
FY16 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE
PROPOSED METHOD OF FINANCING
Project Description
Priority
Estimated Cost
Operating
Fund
CIP Fund
Balance
Bond Sale
Grants/
Contributions
Impact
Fees
Escrow
Funds
Car Rental Tax
Other
EDC
To Be
Determined
WASTEWATER PROJECTS
LR: Crane Drive
A
$ 185,000
XX
LR: Town Creek Drive
A
$ 437,000
XX
Sub -Total Wastewater Priority A -Proposed FY15
$ 622,000
LR: Cedar Hill Estates/Hollywood Boulevard
B
$ 121,000
XX
LR: Milam Drive (")
B
$ 280,000
XX
LR: Oakwood Terrace Phase I I1eI
B
$ 248,000
XX
SH183 Phase II Wastewater Relocation(16)
B
$ 600,000
XX
LR: Ector Drive/Fayette Drive
B
$ 300,000
XX
LR. Oakwood Terrace Phase II (")
B
$ 437,000
XX
LR: Kynette Drive/Wilshire Drive
B
$ 380,000
XX
LR: Huntington/Koen/Atkerson/E Huitt/Slaughter/Martin
B
$ 494,000
XX
LR. NW Midway Drive/Rusk Drive/Parker Drive/Rockwall Drive
B
$ 529,000
XX
Sub -Total Wastewater Priority B-Unfunded
$ 3,389,000
LR: Collin Drive/Harris Drive/Irion Drive
C
TBD
XX
LR: Donley Drive/Shelmar Drive
C
TBD
XX
LR Eastcliff Drive/Windlea Drive/Signet Drive
C
TBD
XX
LR: Ector Drive/Donley Drive/Crane Drive
C
TBD
LR Evans Drive/Canyon Ridge Drive/N Kynette Drive
C
TBD
LR. Glenn Drive
C
TBD
P
LR: Janann Street/Brown stone/Shelm ar Drive
C
TBD
LR. Lakewood Boulevard/Dogwood Circle/Bocowood Circle
C
TBD
LR Live Oak Drive/Silver Creek Drive/Marlene Drive
C
TBD
LR. Mary/Marlene/Commerce/ Wilshire/Greenbriar
C
TBD
XX
LR: N MidwayPark
C
TBD
XX
LR: Northcliff/Toplea/Windlea/Signet/ Kynette/Westcliff
C
TBD
XX
LR: S Main Street
C
TBD
XX
LR. Sagebrush/Toplea/WilshireNorkshire/Tyler
C
TBD
XX
LR. Sierra Drive
C
TBD
XX
LR: W Donley/Private Drive/Mimosa/Magnolia/Redbud
C
TBD
XX
LR W Midway/Victoria/Delta/ Lamar/Rockwall
C
TBD
XX
Sub -Total Wastewater Priority C-Unfunded
$
WASTEWATER PROJECTS - TOTAL
4,U11,UUU
LR = Line Replacement
J
co
tp
CAPITAL IMPROVEMENT PROGRAMS
FY16 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE
PROPOSED METHOD OF FINANCING
Project Description
Priority
Estimated Cost
Operating
Fund
CIP Fund
Balance
Bond Sale
Grants/
Contributions
Impact
Fees
Escrow
Funds
Car Rental Tax
Other
EDC
To Be
Determined
WATER PROJECTS
24-Inch Valve Replacement Cinnamon, Anice, Fuller -Wiser
A
$ 220,000
XX
Sub -Total Water Priority A -Proposed FY15
$ 220,000
LR: S Pipeline Road West""
8
$ 307,000
XX
SH183 Phase II Water Relocation 1i61
B
$ 1,200,000
XX
Water System Security Camera Installation (ie)
B
$ 75,000
XX
LR: Ector Drive (17)
B
$ 291,000
XX
LR: Blessing Creek/Stony Creek/Rock Creek
B
$ 365,000
XX
LR: K netle Drive "'I
B
$ 289.000
XX
Sub -Total Water Priority B-Unfunded
$ 2,527,000
LR Collin Drive -Dallas Drive to Harwood Road
C
TBD
XX
LR: Collin Drive -Denton Drive to Dallas Drive
C
TBD
XX
LR: Denton Drive
C
TBD
XX
LRDickey Drive North
C
TBD
XX
LR: Dickey Drive South
C
TBD
XX
LR: Dunaway Drive
C
TBD
XX
LR: E Huitt Lane
C
TBD
XX
LR: Easlcliff Drive
C
TBD
XX
LR: Fuller Drive
C
TBD
XX
LR: Hollow Oak Drive
C
TBD
XX
LR Live Oak Court/Live Oak Drive
C
TBD
XX
LR: Midcreek/Rock Creek/Stony Creek
C
TBD
XX
LR: Midway Drive East
C
TBD
XX
LR Midway Drive West
C
TBD
XX
LR: Needles Street
C
TBD
XX
LR. Paula Lane
C
TBD
XX
LR: S Main Street (North)
C
TBD
XX
LR: S Main Street (South)
C
TBD
XX
LR: S Pipeline Road East
C
TBD
XX
SH360 Water Crossing
C
TBD
XX
LR: Shady Creek Drive/Cliffwood Road
C
TBD
XX
LR: S rin wood Court
C
TBD
XX
LR: Sunset Drive
C
TBD
XX
LR. Westwood Drive
C
TBD
XX
LR: Wildwood Street
C
TBD
XX
LR' Woodvine (East)
C
TBD
XX
LR: Woodvine (West)
C
TBD
XX
Sub -Total Water Priority C-Unfunded
$
WATER PROJECTS -TOTAL
LR = Line Replacement
�O
O
CAPITAL IMPROVEMENT PROGRAMS
FY16 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE
PROPOSED METHOD OF FINANCING
Project Description
P
Priori! y
Estimated Cos!
Operating
Fund
CIP Fund
Balance
Bond Sale
Grants/
Contributions
Impact
Fees
Escrow
Funds
Car Rental Tax
Other
EDC
To Be
Determined
OTHER PROJECTS
Car Rental Contingency
A
$ 700,000
XX
Development/Engineering Building Design
A
$ 94,350
XX
Glade Parks Trail Connection Construction
A
$ 357,545
XX
XX
XX
Municipal Plaza Improvements Phase I
A
$ 100.000
XX
Sub -Total Other Priority A -Proposed FY15
$ 1,251,895
Blessing Branch Park Improvements
B
$ 267,120
XX
Development/Engineering Building Construction (16)
B
$ 1,464,300
XX
Municipal Plaza Improvements Phase II (16)
B
$ 150,000
XX
Texas Star Sports Com lex Phase V Design I'BI
B
$ 688.000
XX
XX
Trail Enhancements Phase 11181
B
$ 182,756
XX
Texas Star Sports Complex Phase V Construction (17)
B
$ 8,462,164
XX
XX
XX
Trail Connection South Euless (17)
B
$ 51,240
XX
Trailwood Park Improvements (17)
B
$ 220,500
XX
Library Remodel Design (18)
B
$ 147,630
1
1
XX
Library Remodel Construction (19)
B
$ 1,596.000
1 XX
Sub -Total Other Priority B-Unfunded
$ 13,229,710
Animal Shelter Expansion/Renovation
C
TBD
XX
Fire Station #2 Remodel
C
TBD
XX
Kiddie Carr Park Improvements
C
TBD
XX
South Euless Park Upgrades
C
TBD
XX
Trail Enhancements Phase II
C
TBD
XX
Trail Enhancements Villages of Bear Creek
C
TBD
XX
Wilshire Park Upgrades
C
TBD
XX
Sub -Total Other Priority C-Unfunded
is
OTHER PROJECTS - TOTAL
CAPITAL IMPROVEMENT PROGRAMS
FYI PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE
PROPOSED METHOD OF FINANCING
Project Description
Priority
Estimated Cost
Operating
Fund
CIP Fund
Balance
Bond Sale
Grants/
Contrib
Impact
Fees
Escrow
Funds
Car Rental
Tax
Other
EDC
To Be
Determined
DRAINAGE PROJECTS
None Currently
A
$ -
Sub -Total Drainage Priority A -Proposed FYI
$
None Currently B
$ -
Sub -Total Drainage Priority B-Unfunded
$
Bell Hi Addition
C
TBD
XX
Blessing Branch -Main Street to SH 360
C
TBD
XX
Hollow Oak Channel Erosion
C
TBD
XX
K nette Drive Culvert Modifications
C
TBD
XX
Little Bear Creek Drainage Improvements
C
TBD
XX
Marlene Drive Culvert Replacement
C
TBD
XX
Simmons Drive Culvert Improvements
C
TBD
XX
Sub -Total Drainage Priority C-Unfunded
$
DRAINAGE PROJECTS -TOTAL
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: July 26,1999
Submitted By: RON YOUNG Date Completed:
Project Title: BELL HI ADDITION
Project Type: DRAINAGE Sub -Type: IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
In 2005, the City commissioned and received a drainage plan from Freese and Nichols, Inc. In this plan, the
Bell Hi Addition was identified as an area in need of flood relief.
PROJECT DESCRIPTION:
The proposed project ties into an existing storm drainage system on Needles Street. A substantial portion of the
cost of this project is related to street repair which would indicate the need to combine this project with a street
reconstruction project.
PROJECT SCHEDULE:
JUSTIFICATION:
The construction of this project will prevent the flooding of Paula Lane, David Drive, and Needles Street during
the most intense rainfall events. The terrain in this location is very flat, which causes the streets to have a very
low capacity to remove storm water.
.-"*N
92
PROJECT TITLE: BELL HI ADDITION
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
93
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: July 26,1999
Submitted By: RON YOUNG Date Completed:
Project Title: BLESSING BRANCH -MAIN STREET TO SH360
Project Type: DRAINAGE Sub -Type: IMPROVEMENTS
Project Code: Priori : C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The Blessing Branch Drainage Master Plan included a conceptual plan to convey storm water through the creek
more efficiently.
PROJECT DESCRIPTION:
This project involves the channeling and lining of Blessing Branch in accordance with the Blessing Branch
Master Plan.
PROJECT SCHEDULE:
JUSTIFICATION:
The City expects to receive significant developer contributions toward this project. However, the City may be
required to fund a portion of this project.
11111110
'_*N
94
PROJECT TITLE: BLESSING BRANCH -MAIN STREET TO SH360
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
95
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 03,2008
Submitted By: RON YOUNG Date Completed:
Project Title: HOLLOW OAK CHANNEL EROSION
Project Type: DRAINAGE Sub -Type: IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
In May 2008, the City authorized a drainage study for the creek area that runs at the rear of the lots fronting on
Hollow Oak Drive and Linkwood Drive. The completed drainage study was received in July 2008.
PROJECT DESCRIPTION:
The creek area along the rear of the lots on Hollow Oak Drive and Linkwood Drive exists in a natural state. The
creek bank along the south has experienced some slope failure. The drainage study recommends installation of
"bag wall" slope protection.
PROJECT SCHEDULE:
JUSTIFICATION:
The City has received complaints that fences and other improvements on private property will be threatened if
additional slope failures take place. Currently no residences are threatened.
11111110
96
Li
PROJECT TITLE: HOLLOW OAK CHANNEL EROSION
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Operating Fund Conceptual Design % 0%
Fund Balance Preliminary Design % 0%
Special Project Fund Final Plans % 0%
Certificate of Obligation Specifications % 0%
County, State, Federal Funding Construction % 0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined XX
ADDITIONAL COMMENTS:
Due to the expected impact to the native conditions, this project would require broad support from all impacted
neighbors. Alternatives, such as possible assistance with removal or relocation of improvements on affected
properties, should also be considered.
97
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: July 21,1999
Submitted By: RON YOUNG Date Completed:
Project Title: KYNETTE DRIVE CULVERT MODIFICATIONS
Project Type: DRAINAGE Sub -Type: IMPROVEMENTS
Project Code: Priori : C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Wilshire Village Addition was constructed prior to the adoption of the City's Uniform Development Code ("UDC").
The requirements prior to the UDC were lower than what the City now requires. The current construction
configuration of Wilshire Village causes more water to remain above ground than is acceptable under current
standards. The drainage system in the Wilshire Village Addition needs to be upgraded to meet the current
requirements.
PROJECT DESCRIPTION:
The project involves the installation of a small drainage system on Kynette Drive up to Sierra Drive. It is Project
No. 16 in the 1990 Knowlton, English, Flowers Drainage Utility System Study of Selected Improvement Projects.
PROJECT SCHEDULE:
JUSTIFICATION:
Surface water flow within Kynette Drive exceeds the City's current development standards. A large amount of
storm water drains to an existing culvert on Kynette Drive between Eastcliff and Westcliff Drives. The existing
drainage facilities collecting this storm water are inadequate according to current standards.
1'-
.-IN
'-IN
98
PROJECT TITLE: KYNETTE DRIVE CULVERT MODIFICATIONS
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
99
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: July 21,1999
Submitted By: RON YOUNG Date Completed:
Project Title: LITTLE BEAR CREEK DRAINAGE IMPROVEMENTS
Project Type: DRAINAGE Sub -Type: IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The improvements proposed for Bob Eden Park are identified in the Little Bear Creek Watershed Master Plan.
The Little Bear Creek Park portion of this project was identified in the 1990 Knowlton, English and Flowers
Drainage Utility System Study of Selected Improvement Projects.
PROJECT DESCRIPTION:
Both parts of this drainage project involve erosion control and channelization improvements to Little Bear Creek.
The Bear Creek Park part is a portion of Project No. 11 in the above -referenced study. This project will be re-
evaluated to determine if the scope and proposed improvements should be modified. This part of the project will
be redefined and re -estimated.
PROJECT SCHEDULE:
JUSTIFICATION:
Continued erosion will eventually undermine the creek in both parks and cause damage to existing City facilities.
W
'-1
100
ON
PROJECT TITLE: LITTLE BEAR CREEK DRAINAGE IMPROVEMENTS
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
101
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 10,2008
Submitted By: RON YOUNG Date Completed:
Project Title: MARLENE DRIVE CULVERT REPLACEMENT
Project Type: DRAINAGE Sub -Type: IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Marlene Drive is noted as a collector street on the City's Master Thoroughfare Plan.
PROJECT DESCRIPTION:
The scope of the project includes construction of a new culvert at Cyclone Branch to meet current load and
drainage capacity standards. A portion of the concrete channel will also need to be reconstructed both
upstream and downstream to ensure a smooth transition.
PROJECT SCHEDULE:
JUSTIFICATION:
The existing culvert is load limited. The new culvert will be designed to convey sufficient drainage to comply
with current standards.
WE 0
102
PROJECT TITLE: MARLENE DRIVE CULVERT REPLACEMENT
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
103
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 15,2005
Submitted By: RON YOUNG Date Completed:
Project Title: SIMMONS DRIVE CULVERT IMPROVEMENTS
Project Type: DRAINAGE Sub -Type: IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
In 2005, the City commissioned and received a drainage plan from Freese and Nichols, Inc.
PROJECT DESCRIPTION:
An additional culvert will extend from the apartment complex on the east side of Simmons Drive and will outfall
into the creek area on the north side of Carr Park.
PROJECT SCHEDULE:
JUSTIFICATION:
In intense storms, the capacity of the existing culvert is exceeded. Additional culverts will be required to convey
the storm flows. The construction of this project will enable the safe use of Simmons Drive in intense storm
events.
,- N
104
PROJECT TITLE: SIMMONS DRIVE CULVERT IMPROVEMENTS
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
105
,.-"N
T H E C I T Y O F
_-,ss
wo
106
O
V
CAPITAL IMPROVEMENT PROGRAMS
FY15 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE
PROPOSED METHOD OF FINANCING
Project Description
/ P
Priority
y
Estimated Cost
Operating
Fund
CIP Fund
Balance
Bond Sale
Grants/
Contrib
Impact
Fees
Escrow
Funds
Car Rental
Tax
Other
EDC
To Be
Determined
STREET PROJECTS
FY2015 40" CDBG-ADA/TAS Infrastructure Improvements
A
$ 495,600
$ 385,028
$ 110,572
FY2015 Street Overlay
A
$ 300,000
XX
Sub -Total Street Priority A -Proposed FY15
$ 795,600
FY2016 415' CDBG-ADA/TAS Infrastructure Improvements (16)
B
$ 300,000
XX
FY2016 Street Overlay (16)
B
$ 300,000
XX
East Harwood Road Extension (16)
B
$ 100,000
XX
State Highway 183 East Improvements (16)
B
$ 250,000
XX
FY2017 42ntl CDBG-ADA/TAS Infrastructure Improvements (17)
B
$ 300,000
XX
FY2017 Street Overlay (17)
B
$ 300,000
XX
FY2018 43r° CDBG-ADA/TAS Infrastructure Improvements (18)
B
$ 300,000
XX
FY2018 Street Overlay (18)
B
$ 300,000
XX
Traffic Signal -Harwood Road at Bear Creek Parkway i181
B
$ 180,000
XX
FY2019 44" CDBG-ADA/TAS Infrastructure Improvements (19)
B
$ 300,000
XX
FY2019 Street Overlay (19)
B
$ 300,000
XX
E Alexander Lane Reconstruction (19)
B
$ 504,000
XX
Sub -Total Street Priority 8-Unfunded
$ 3,434,000
Bear Creek Parkway Reconstruction
C
TBD
XX
Cresthaven Drive Reconstruction
C
TBD
XX
Fuller -Wiser Road Reconstruction -Harwood Road to Mid
Cities Boulevard
C
TBD
XX
Fuller -Wiser Road Reconstruction-SH183 to Harwood Road
C
TBD
XX
Highland Drive Reconstruction
C
TBD
XX
Ross Avenue Extension
C
TBD
XX
South Pipeline Road Reconstruction
C
TBD
XX
Vine Street Reconstruction-SH183 to SH10
C
TBD
XX
Sub -Total Street Priority C-Unfunded
$
STREET PROJECTS - TOTAL
$ 4,229,600
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: June 03,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: FY2015 40TH CDBG-ADA/TAS INFRASTRUCTURE IMPROVEMENTS
Project Type: STREET/FACILITIES Sub -Type: CDBG
Project Code: Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project provides for continued improvements to accessibility by removing architectural barriers to
accessibility as required by the Federal and State mandated Americans with Disabilities Act/Texas Accessibility
Standards (ADA/TAS). This project includes identification of architectural barriers to accessibility that meet
CDBG eligibility guidelines and the subsequent replacement thereof.
PROJECT DESCRIPTION:
The 40th Year CDBG project consists of two separate scopes of work. The first is the replacement of fifty (50)
sidewalk ramp locations identified by the Engineering Department. These areas are primarily located along W.
Pipeline Road, Kynette Drive, and Signet Drive. Sidewalk accessibility ramp installations are eligible for CDBG
funding regardless of their location within the community. Secondly, staff has also identified an accessibility
project which affects citizen access to municipal buildings within the City Municipal Complex. This portion of the
project also focuses on the reconstruction of pathways for ADA compliance.
PROJECT SCHEDULE:
FY2015
JUSTIFICATION:
Removing architectural barriers to accessibility is an eligible CDBG activity and will assist in the City's efforts to
maintain compliance with applicable Federal and State ADA/TAS requirements.
a
108
PROJECT TITLE: FY2015 40TH CDBG-ADA/TAS INFRASTRUCTURE IMPROVEMENTS
NET EFFECTS ON OPERATING AND
TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Engineering $67,876
Personnel: Full Time $0
Construction $427,724
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
Maintenance Costs
$0
Subtotal: $0
Total Estimated Annual Cost $0
Total Estimated Capital Cost $495,600
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
Fund Balance
Preliminary Design %
Special Project Fund
Final Plans %
Certificate of Obligation
Specifications %
County, State, Federal Funding $ 386,028
Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund $110,572
To Be Determined
ADDITIONAL COMMENTS:
Project funding is subject to actual CDBG funding availability.
Council Action:
February 25, 2014: Conducted a Public Hearing for the proposed 40th Year CDBG projects and approved the
recommendation regarding the selected CDBG projects.
109
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 31,2014
Submitted By: HAL CRANOR Date Completed:
Project Title. FY2015 STREET OVERLAY
Project Type: STREET Sub -Type: OVERLAY
Project Code: Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by their
pavement condition index.
PROJECT SCHEDULE:
Anticipate Construction Beginning: May 2015
Anticipate Construction Complete: July 2015
JUSTIFICATION:
The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, will
extend the life of the roadways, and will enhance the appearance of the streets.
.-1*N
110
PROJECT TITLE: FY2015 STREET OVERLAY
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
I Subtotal:
I Subtotal:
$0
$0
$0
$0
$0
$0
TOTAL ESTIMATED CAPITAL COST:
Construction $300,000
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$300,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
00 0
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0
°
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
XX
To Be Determined
ADDITIONAL COMMENTS:
'*1.1
ill
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 17,2011
Submitted By: CHRIS BARKER Date Completed:
Project Title: FY2016 41 ST CDBG-ADA/TAS INFRASTRUCTURE IMPROVEMENTS
Project Type: STREET Sub -Type: CDBG
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project provides for continued improvements to accessibility ramps by removing architectural barriers to
accessibility as required by Federal and State mandated Americans with Disabilities Act/Texas Accessibility
Standards ("ADA/TAS"). The project scope includes identification of architectural barriers to accessibility that
meet CDBG eligibility guidelines and the subsequent replacement thereof.
(41st year CDBG project)
PROJECT SCHEDULE:
FY2016
JUSTIFICATION:
Removing architectural barriers to accessibility is an eligible CDBG activity and will assist in the City's efforts to
maintain compliance with applicable Federal and State ADA/TAS codes.
112
M
PROJECT TITLE: FY2016 41 ST CDBG-ADA/TAS INFRASTRUCTURE IMPROVEMENTS
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering $45,000
Personnel: Full Time Construction $255,000
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$300,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
XX
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Project funding is subject to actual CDBG funding availability
113
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 31,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: FY2016 STREET OVERLAY
Project Type: STREET Sub -Type: OVERLAY
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by their
pavement condition index.
PROJECT SCHEDULE:
Anticipate Construction Beginning: May 2016
Anticipate Construction Complete: July 2016
JUSTIFICATION:
The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, will
extend the life of the roadways, and will enhance the appearance of the streets.
ba
114
PROJECT TITLE: FY2016 STREET OVERLAY
NET EFFECTS ON OPERATING AND
TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Construction
$300,000
Personnel: Full Time
Part Time
$0
Total Salary
$0
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal:
$0
Maintenance Costs
$0
Subtotal:
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$300,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
00 0
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
XX
To Be Determined
ADDITIONAL COMMENTS:
115
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: June 20,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: EAST HARWOOD ROAD EXTENSION
Project Type: STREETS Sub -Type: CONSTRUCTION
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The Texas Department of Transportation and DFW Airport are combining efforts to extend East Harwood Road
through the airport to Walnut Hill Lane to provide additional access to airport properties. Euless has committed to
share in the cost of the extension in an amount not to exceed $100,000.
PROJECT SCHEDULE:
FY2016
JUSTIFICATION:
Participation in the project will provide Euless residents with an additional route to and through the airport properties.
.-*N
116
PROJECT TITLE: EAST HARWOOD ROAD EXTENSION
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
I Subtotal:
TOTAL ESTIMATED CAPITAL COST:
Construction $100,000
$0
$0
$0
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$100,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
XX
Other -plan review/inspection fees
ADDITIONAL COMMENTS:
117
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: June 03,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: STATE HIGHWAY 183 EAST IMPROVEMENTS
Project Type: STREETS Sub -Type: IMPROVEMENTS
Project Code: Priori B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Various street improvements and realignments necessitated by the SH183 East expansion project.
PROJECT SCHEDULE:
FY2016
JUSTIFICATION:
The expansion of 183 eastward may necessitate street improvements and the realignment of various City
streets. These improvements will help facilitate efficient traffic flow and property redevelopment.
.1
118
PROJECT TITLE: STATE HIGHWAY 183 EAST IMPROVEMENTS
NET
EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
I Subtotal:
Subtotal:
$0
$0
$0
$0
$0
$0
TOTAL ESTIMATED CAPITAL COST:
Improvements
$250,000'
Total Estimated Annual Cost
$0
Total Estimated Capital Cost $250,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
Fund Balance
Preliminary Design %
Special Project Fund
Final Plans %
Certificate of Obligation
Specifications %
County, State, Federal Funding
Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
XX
To Be Determined
ADDITIONAL COMMENTS:
119
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 16,2012
Submitted By: CHRIS BARKER Date Completed:
Project Title: FY2017 42ND CDBG-ADA/TAS INFRASTRUCTURE IMPROVEMENTS
Project Type: STREET Sub -Type: CDBG
Project Code: Priori : B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project provides for continued improvements to accessibility ramps by removing architectural barriers to
accessibility as required by Federal and State mandated Americans with Disabilities Act/Texas Accessibility
Standards ("ADA/TAS"). The project scope includes identification of architectural barriers to accessibility that
meet CDBG eligibility guidelines and the subsequent replacement thereof.
(42nd year CDBG project)
PROJECT SCHEDULE:
FY2017
JUSTIFICATION:
Removing architectural barriers to accessibility is an eligible CDBG activity and will assist in the City's efforts to
maintain compliance with applicable Federal and State ADA/TAS codes.
.,
120
PROJECT TITLE: FY2017 42ND CDBG-ADA/TAS INFRASTRUCTURE IMPROVEMENTS
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering $45,000
Personnel: Full Time Construction $255,000
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
I Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$300,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
XX
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Project funding is subject to actual CDBG funding availability
121
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 31,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: FY2017 STREET OVERLAY
Project Type: STREET Sub -Type: OVERLAY
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by their
pavement condition index.
PROJECT SCHEDULE:
Anticipate Construction Beginning: May 2017
Anticipate Construction Complete: July 2017
JUSTIFICATION:
The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, will
extend the life of the roadways, and will enhance the appearance of the streets.
122
PROJECT TITLE: FY2017 STREET OVERLAY
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
I Subtotal:
I Subtotal:
$0
$0
$0
$0
$0
$0
TOTAL ESTIMATED CAPITAL COST:
Construction $300,000 1
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$300,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
00 0
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
00 0
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
XX
To Be Determined
ADDITIONAL COMMENTS:
OR
123
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 15,2013
Submitted By: CHRIS BARKER Date Completed:
Project Title: FY2018 43RD CDBG-ADA/TAS INFRASTRUCTURE IMPROVEMENTS
Project Type: STREET Sub -Type: CDBG
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project provides for continued improvements to accessibility ramps by removing architectural barriers to
accessibility as required by Federal and State mandated Americans with Disabilities Act/Texas Accessibility
Standards ("ADA/TAS"). The project scope includes identification of architectural barriers to accessibility that
meet CDBG eligibility guidelines and the subsequent replacement thereof.
(43rd year CDBG project)
PROJECT SCHEDULE:
FY2018
JUSTIFICATION:
Removing architectural barriers to accessibility is an eligible CDBG activity and will assist in the City's efforts to
maintain compliance with applicable Federal and State ADA/TAS codes.
-IN
124
1-11
PROJECT TITLE: FY2018 43RD CDBG-ADA/TAS INFRASTRUCTURE IMPROVEMENTS
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering $45,000
Personnel: Full Time Construction $255,000
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$300,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
00 0
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
00 0
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
XX
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Project funding is subject to actual CDBG funding availability
125
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 31,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: FY2018 STREET OVERLAY
Project Type: STREET Sub -Type: OVERLAY
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by their
pavement condition index.
PROJECT SCHEDULE:
Anticipate Construction Beginning: May 2018
Anticipate Construction Complete: July 2018
JUSTIFICATION:
The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, will
extend the life of the roadway, and will enhance the appearance of the streets.
,-,*N
126
PROJECT TITLE: FY2018 STREET OVERLAY
NET
EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
I Subtotal:
Subtotal:
$0
$0
$0
$0
$0
$0
TOTAL ESTIMATED CAPITAL COST:
Construction $300,000
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$300,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
00 0
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
XX
To Be Determined
ADDITIONAL COMMENTS:
127
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 12,2004
Submitted By: RON YOUNG Date Completed:
Project Title: TRAFFIC SIGNAL-HARWOOD ROAD @ BEAR CREEK PARKWAY
Project Type: STREET Sub -Type: SIGNALIZATION
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Traffic signals are located at the intersections of arterial and collector thoroughfares identified in the City's
Master Thoroughfare Plan adopted in 1999.
PROJECT DESCRIPTION:
The project consists of the installation of traffic signal poles, mast arms, signal heads, pedestrian indicators,
underground conduit, vehicle detection, and signal controller for the intersection of Harwood Road and Bear
Creek Parkway.
PROJECT SCHEDULE:
FY2018
JUSTIFICATION:
Traffic volumes at this intersection will be monitored and signal warrant studies will be performed to justify signal
installation. This intersection will ultimately require a traffic signal.
128
PROJECT TITLE: TRAFFIC SIGNAL-HARWOOD ROAD @ BEAR CREEK PARKWAY
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
TOTAL ESTIMATED CAPITAL COST:
Engineering $30,000
Traffic Signals $150,000
$0
$0
$0
$0
$0
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$180,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
XX
To Be Determined
ADDITIONAL COMMENTS:
129
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 31,2014
Submitted By: CHRIS BARKER Date Completed:
Project Title: FY2019 44TH CDBG-ADA/TAS INFRASTRUCTURE IMPROVEMENTS
Project Type: STREET Sub -Type: CDBG
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project provides for continued improvements to accessibility ramps by removing architectural barriers to
accessibility as required by Federal and State mandated Americans with Disabilities Act/Texas Accessibility
Standards ("ADA/TAS"). The project scope includes identification of architectural barriers to accessibility that
meet CDBG eligibility guidelines and the subsequent replacement thereof.
(44th year CDBG project)
PROJECT SCHEDULE:
FY2019
JUSTIFICATION:
Removing architectural barriers to accessibility is an eligible CDBG activity and will assist in the City's efforts to
maintain compliance with applicable Federal and State ADA/TAS codes.
,-N
130
1-11
Li
PROJECT TITLE: FY2019 44TH CDBG-ADA/TAS INFRASTRUCTURE IMPROVEMENTS
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering $45,000
Personnel: Full Time Construction $255,000
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$300,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
XX
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Project funding is subject to actual CDBG funding
availability.
131
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 31,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: FY2019 STREET OVERLAY
Project Type: STREET Sub -Type: OVERLAY
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by their
pavement condition index.
PROJECT SCHEDULE:
Anticipate Construction Beginning: May 2019
Anticipate Construction Complete: July 2019
JUSTIFICATION:
The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, will
extend the life of the roadway, and will enhance the appearance of the streets.
W
132
ON
M
PROJECT TITLE: FY2019 STREET OVERLAY
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
$0
$0
$0
$0
$0
$0
TOTAL ESTIMATED CAPITAL COST:
Construction $300,000 1
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$300,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
XX
To Be Determined
ADDITIONAL COMMENTS:
133
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: July 23,1999
Submitted By: RON YOUNG Date Completed:
Project Title: E ALEXANDER LANE RECONSTRUCTION
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This minor street serves as a collector type street by conveying traffic to major roadways.
PROJECT DESCRIPTION:
E Alexander Lane will be reconstructed from Main Street to Cullum Drive. It will be reconstructed from a two-
lane county type road to a standard 31' wide residential street with underground drainage and sidewalks.
PROJECT SCHEDULE:
FY2019
JUSTIFICATION:
Reconstruction of this street will decrease the annual maintenance and provide compliance with current City
standards.
134
7
PROJECT TITLE: E ALEXANDER LANE RECONSTRUCTION
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
TOTAL ESTIMATED CAPITAL COST:
Engineering $54,000
Construction $450,000
$0
$0
$0
$0
$0
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$504,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
00 0
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Other
Supplemental Sales Tax
Car Rental Tax Fund
XX
To Be Determined
ADDITIONAL COMMENTS:
135
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 03,2008
Submitted By: RON YOUNG Date Completed:
Project Title: BEAR CREEK PARKWAY RECONSTRUCTION
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Bear Creek Parkway is identified as a local collector thoroughfare in the City's Master Thoroughfare Plan.
PROJECT DESCRIPTION:
This project consists of the complete reconstruction of Bear Creek Parkway from Harwood Road to Ash Lane to
meet current City standards.
PROJECT SCHEDULE:
JUSTIFICATION:
Bear Creek Parkway is an aging roadway nearing the end of its service life. Portions of the roadway are
beginning to deteriorate and require additional maintenance. As the pavement deteriorates and fails,
maintenance costs increase.
.1�
136
LOW
PROJECT TITLE: BEAR CREEK PARKWAY RECONSTRUCTION
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost
Engineering - To Be Determined
Personnel: Full Time
Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
137
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 13,2007
Submitted By: RON YOUNG Date Completed:
Project Title: CRESTHAVEN DRIVE RECONSTRUCTION
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Cresthaven Drive is not identified in the City's Master Thoroughfare Plan.
PROJECT DESCRIPTION:
This project includes the reconstruction of Cresthaven Drive from a two-lane asphalt roadway to a 31' wide curb
and gutter concrete street from SH10 to S Pipeline Road.
PROJECT SCHEDULE:
JUSTIFICATION:
To upgrade Cresthaven Drive to a standard City concrete curb and gutter street.
'1
138
PROJECT TITLE: CRESTHAVEN DRIVE RECONSTRUCTION
NET
EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
00 0
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
q
139
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: February 16,2009
Submitted By: ROBERT BARKER Date Completed:
Project Title: FULLER -WISER ROAD RECONSTRUCTION-HARWOOD ROAD TO MID CITIES BLVD
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Fuller -Wiser Road is identified as a minor arterial in the City's Master Thoroughfare Plan.
PROJECT DESCRIPTION:
This project consists of the complete reconstruction of Fuller -Wiser Road to current City standards from
Harwood Road to Mid Cities Boulevard.
PROJECT SCHEDULE:
JUSTIFICATION:
Fuller -Wiser Road is an aging roadway nearing the end of its service life. Portions of the roadway are beginning
to deteriorate and require additional maintenance. As the pavement deteriorates and fails, maintenance costs
increase.
'"\
140
0111111
PROJECT TITLE: FULLER -WISER ROAD RECONSTRUCTION-HARWOOD ROAD TO MID CITIES BLVD
NET
EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Ooerating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal:
Total Estimated Annual Cost
$0
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
00 0
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
141
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: February 16,2009
Submitted By: ROBERT BARKER Date Completed:
Project Title: FULLER -WISER ROAD RECONSTRUCTION-SH183 TO HARWOOD ROAD
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Fuller -Wiser Road is identified as a minor arterial in the City's Master Thoroughfare Plan.
PROJECT DESCRIPTION:
The project consists of the complete reconstruction of Fuller -Wiser Road to current standards from SH183 to
Harwood Road.
PROJECT SCHEDULE:
JUSTIFICATION:
Fuller4fter Road is an aging roadway nearing the end of its service life. Portions of the roadway are beginning
to deteriorate and require additional maintenance. As the pavement deteriorates and fails, maintenance costs
increase.
142
PROJECT TITLE: FULLER -WISER ROAD RECONSTRUCTION-SH183 TO HARWOOD ROAD
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct OlDerating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
143
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 13,2007
Submitted By: RON YOUNG Date Completed:
Project Title: HIGHLAND DRIVE RECONSTRUCTION
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Highland Drive is not identified in the City's Master Thoroughfare Plan.
PROJECT DESCRIPTION:
The project includes the reconstruction of Highland Drive from SH10 to S Pipeline Road from a two-lane asphalt
roadway to a 31' wide curb and gutter concrete street.
PROJECT SCHEDULE:
JUSTIFICATION:
To upgrade Highland Drive to a standard City concrete curb and gutter street.
144
PROJECT TITLE: HIGHLAND DRIVE RECONSTRUCTION
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
145
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 31,2005
Submitted By: RON YOUNG Date Completed:
Project Title: ROSS AVENUE EXTENSION
Project Type: STREET Sub -Type: CONSTRUCTION
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This extension of Ross Avenue from the recently completed section adjacent to the fire station will complete the
upgrading of this street.
PROJECT DESCRIPTION:
The construction of the remainder of Ross Avenue from the fire station to the west limit will be in accordance
with City standards which includes concrete pavement.
PROJECT SCHEDULE:
JUSTIFICATION:
This construction, in accordance with City standards, will allow the road a long service life and lower the annual
maintenance costs.
146
PROJECT TITLE: ROSS AVENUE EXTENSION
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost
Engineering - To Be Determined
Personnel: Full Time
Right -of -Way - To Be Determined
Part Time $0
Construction - To Be Determined
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
147
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 13,2007
Submitted By: RON YOUNG Date Completed:
Project Title: SOUTH PIPELINE ROAD RECONSTRUCTION
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
South Pipeline Road is not identified in the City's Master Thoroughfare Plan.
PROJECT DESCRIPTION:
The project consists of reconstruction of South Pipeline Road from a two-lane asphalt roadway to a 31' wide
curb and gutter concrete street from east of Royal Parkway to east of Highland Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
To upgrade South Pipeline Road to a standard City concrete curb and gutter street.
148
M
PROJECT TITLE: SOUTH PIPELINE ROAD RECONSTRUCTION
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
149
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: July 23,1999
Submitted By: RON YOUNG Date Completed:
Project Title: VINE STREET RECONSTRUCTION-SH183 TO SH10
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Vine Street is not identified in the City's Master Thoroughfare Plan.
PROJECT DESCRIPTION:
The project consists of the reconstruction of Vine Street from SH183 to SH10.
PROJECT SCHEDULE:
JUSTIFICATION:
The City has received street escrow funds from several developments along Vine Street. When development is
complete, it would be appropriate for the City to reconstruct the existing roadway.
,-*N
W
150
PROJECT TITLE: VINE STREET RECONSTRUCTION-SH183 TO SH10
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost Engineering - To be Determined
Personnel: Full Time Construction - To be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
$0 Total Estimated Capital Cost
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Other XX
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined XX
ADDITIONAL COMMENTS:
Escrow Funds will be used to finance a portion of this project.
151
'1
T H E C I T Y O F
Eu
ss
'1
152
C ( C
CAPITAL IMPROVEMENT PROGRAMS
FY16 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE
PROPOSED METHOD OF FINANCING
Project Description
Priority
Estimated Cost
Operating
Fund
CIP Fund
Balance
Bond Sale
Grants/
Contrib
Impact
Fees
Escrow
Funds
Car Rental
Tax
Other
EDC
To Be
Determined
WASTEWATER PROJECTS
LR: Crane Drive
A
$ 185,000
XX
LR: Town Creek Drive
A
$ 437,000
XX
Sub -Total Wastewater Priority A -Proposed FY15
$ 622,000
LR: Cedar Hill Estates/Hollywood Boulevard7M7
B
$ 121,000
XX
LR: Milam Drive I181
B
$ 280,000
XX
LR: Oakwood Terrace Phase I I781
B
$ 248,000
XX
SH183 Phase II Wastewater Relocation (16)
B
$ 600,000
XX
LR: Ector Drive/Fayette Drive
B
$ 300,000
XX
LR: Oakwood Terrace Phase II I"I
B
$ 437,000
XX
LR: Kynette Drive/Wilshire Drive
B
$ 380,000
XX
LR: Huntington/Koen/Atkerson/E Huitt/Slaughter/Martin
B
$ 494,000
XX
LR: NW Midway Drive/Rusk Drive/Parker Drive/Rockwall Drive
B
$ 529,000
XX
Sub. Total Wastewater Priority B-Unfunded
$ 3,389,000
LR: Collin Drive/Harris Drive/Irion Drive
C
TBD
XX
LR: Donley Drive/Shelmar Drive
C
TBD
XX
LR: Eastcliff DriveNVindlea Drive/Signet Drive
C
TBD
XX
LR: Ector Drive/Donley Drive/Crane Drive
C
TBD
XX
LR: Evans Drive/Canyon Ridge Drive/N Kynette Drive
C
TBD
XX
LR: Glenn Drive
C
TBD
XX
LR: Janann Street/Brownstone/Shelmar Drive
C
TBD
XX
LR: Lakewood Boulevard/Dogwood Circle/Bocowood Circle
C
TBD
XX
LR: Live Oak Drive/Silver Creek Drive/Marlene Drive
C
TBD
XX
LR: Mary/Marlene/Commerce/ Wilshire/Greenbrier
C
TBD
XX
LR: N Midway Park
C
TBD
XX
LR: Northcliff/Toplea/Windlea/Signet/ Kynette/Westcliff
C
TBD
XX
LR: S Main Street
C
TBD
XX
LR: Sagebrush/Toplea/Wilshire/Yorkshirerryler
C
TBD
XX
LR: Sierra Drive
C
TBD
XX
LR: W Donley/Private Drive/Minn osa/Magnolia/Redbud
C
TBD
XX
LR: W MidwayNictoria/Delta/ Lamar/Rockwall
C
TBD
XX
Sub -Total Wastewater Priority C-Unfunded
$
WASTEWATER PROJECTS - TOTAL
$ 4,011,000
LK = Line Kepiacement
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 26,2014
Submitted By: HAL CRANOR Date Completed:
Project Title. LINE REPLACEMENT -CRANE DRIVE
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priori : A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of wastewater mains between Crane Drive and Donley Drive north of
Harwood Road to the upper end of the main north of Glenn Drive.
PROJECT SCHEDULE:
FY2015
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
--IN
--IN
154
`1.1.�
PROJECT TITLE: LINE REPLACEMENT -CRANE DRIVE
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
I Subtotal:
TOTAL ESTIMATED CAPITAL COST:
Engineering $20,000
Construction $165,000
$0
$0
$0
$0
$0
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$185,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
XX
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
155
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 26,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEMENT -TOWN CREEK DRIVE
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Town Creek Drive from Salem Drive to Carter Drive,
2. Carter Drive south of Town Creek Drive,
3. Westport Circle,
4. Newport Circle,
5. Asbury Circle, and
5. the outfall between Westport Circle and Newport Circle.
PROJECT SCHEDULE:
FY2015
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
No
156
M
PROJECT TITLE: LINE REPLACEMENT -TOWN CREEK DRIVE
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
I Subtotal:
TOTAL ESTIMATED CAPITAL COST:
Engineering
Construction
$0
$0
$0
$0
$0
$0
$57,000
$380, 000
Total Estimated Annual Cost
$0
Total Estimated Capital Cost $437,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
XX
Conceptual Design %
Fund Balance
Preliminary Design %
Special Project Fund
Final Plans %
Certificate of Obligation
Specifications %
County, State, Federal Funding
Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
157
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 26,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEMENT -CEDAR HILL ESTATES/HOLLYWOOD BOULEVARD
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of wastewater mains in the Cedar Hill Addition along Hollywood
Boulevard from Vine Street to east of Cannon Drive.
PROJECT SCHEDULE:
FY2016
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
158
M
PROJECT TITLE: LINE REPLACEMENT -CEDAR HILL ESTATES/HOLLYWOOD BOULEVARD
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
I Subtotal:
TOTAL ESTIMATED CAPITAL COST:
Engineering $16,000
Construction $105,000
$0
$0
$0
$0
$0
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$121,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
XX
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
159
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 26,2014
Submitted By: HAL CRANOR Date Completed:
Project Title. LINE REPLACEMENT-MILAM DRIVE
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the wastewater mains located along Milam Drive from Blanco Drive to
south of Bell Drive.
PROJECT SCHEDULE:
FY2016
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
W
-IN
160
PROJECT TITLE: LINE REPLACEMENT-MILAM DRIVE
NET
EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
TOTAL ESTIMATED CAPITAL COST:
Construction $245,000
Engineering $35,000
$0
$0
$0
$0
$0
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$280,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
XX
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
00 0
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
��
161
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 26,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEMENT-OAKWOOD TERRACE ADDITION PHASE I
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
This project consists of the replacement of the following wastewater mains..
1. Between Hollywood Boulevard and Reaves Court from Vine Street to the end of Reaves Court and
2. From Hollywood Boulevard to Reaves Court along 306 Hollywood Boulevard.
PROJECT SCHEDULE:
FY2016
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
162
PROJECT TITLE: LINE REPLACEMENT-OAKWOOD TERRACE ADDITION PHASE I
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
I Subtotal:
I Subtotal:
TOTAL ESTIMATED CAPITAL COST:
Engineering $33,000
Construction $215,000
$0
$0
$0
$0
$0
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$248,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
XX
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
163
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 10, 2010
Submitted By: RON YOUNG Date Completed:
Project Title: SH183 PHASE II WASTEWATER RELOCATION
Project Type: WASTEWATER Sub -Type: LINE RELOCATION
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The Texas Department of Transportation ("TxDoT") has planned for the expansion of SH183. The Phase II
construction will affect the City of Euless' utilities along and crossing SH183 between FM157 and the east city
limits.
PROJECT DESCRIPTION:
The City of Euless has wastewater mains and associated items located within the SH183 right-of-way. These
facilities must be relocated to accommodate the SH183 expansion. It is anticipated that the City of Euless will
enter into a relocation agreement with the contractor selected by TxDoT to authorize them to design and
relocate wastewater lines. The City will be responsible for the cost of the relocation of the utilities.
PROJECT SCHEDULE:
Est. FY2016
JUSTIFICATION:
City of Euless wastewater facilities are located within TxDoT right-of-way. As such, the City must provide for
utility relocation to accommodate the roadway expansion.
164
PROJECT TITLE: SH183 PHASE II WASTEWATER RELOCATION
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
I Subtotal:
$0
$0
$0
$0
$0
TOTAL ESTIMATED CAPITAL COST:
WW Line Relocation Reimbursement $600,000 1
Subtotal:
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$600,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0
°
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
XX
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
165
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 26,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEMENT-ECTOR DRIVE/FAYETTE DRIVE
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the wastewater mains between Fayette Drive and Ector Drive from
Harwood Road to the end of the line.
PROJECT SCHEDULE:
FY2017
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
'tee
166
L
PROJECT TITLE: LINE REPLACEMENT-ECTOR DRIVE/FAYETTE DRIVE
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
I Subtotal:
Subtotal:
TOTAL ESTIMATED CAPITAL COST:
Engineering $40,000
Construction $260,000
$0
$0
$0
$0
$0
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$300,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
XX
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
167
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 26,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEMENT-OAKWOOD TERRACE ADDITION PHASE 11
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Along 608 and 610 Martha Street,
2. Between Martha Street and Cannon Drive from Reaves Court to W Huitt Lane,
3. Between Jefflyn Court and W Huitt Lane from Martha Street to S Main Street, and
4. Between Henslee Drive and Cannon Drive from Reaves Court to Jefflyn Court.
PROJECT SCHEDULE:
FY2017
JUSTIFICATION:
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
,-*N
,- 1
168
PROJECT TITLE: LINE REPLACEMENT-OAKWOOD TERRACE ADDITION PHASE II
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
I Subtotal:
I Subtotal:
TOTAL ESTIMATED CAPITAL COST:
Engineering $57,000
Construction $380,000
$0
$0
$0
$0
$0
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$437,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
XX
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0
°
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
169
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 26,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEMENT-KYNETTE DRIVE/WILSHIRE DRIVE
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Kynette Drive from Eastcliff Drive to Wilshire Drive and
2. Wilshire Drive from Kynette Drive extending 1000' north.
PROJECT SCHEDULE:
FY2018
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
W
'—**N
170
PROJECT TITLE: LINE REPLACEMENT-KYNETTE DRIVE/WILSHIRE DRIVE
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
I Subtotal:
I Subtotal:
TOTAL ESTIMATED CAPITAL COST:
Engineering $50,000
Construction $330,000
$0
$0
$0
$0
$0
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$380,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
XX
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
171
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 26,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REP-HUNTINGTON/KOEN/ATKERSON/E HUITT/SLAUGHTER/MARTIN
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains.
PROJECT DESCRIPTION:
This project consists of the replacement of the following wastewater mains:
1. East of Huntington Drive from S Atkerson Lane to E Alexander Lane,
2. Between Koen Lane and S Atkerson Lane from Huntington Drive to FAA Road,
3. Between S Atkerson Lane and N Atkerson Lane from Huntington Drive to FAA Road,
4. Between N Atkerson Lane and E Huitt Lane from Huntington Drive to FAA Road,
5. Between E Huitt Lane and Slaughter Lane from Huntington Drive to FAA Road,
6. Between Slaughter Lane and Martin Lane from Huntington to FAA Road, and
7. Between Martin Lane and E Alexander Lane from Huntington Drive to FAA Road.
PROJECT SCHEDULE:
FY2019
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
172
PROJECT TITLE: LINE REP-HUNTINGTON/KOEN/ATKERSON/E HUITT/SLAUGHTER/MARTIN
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
I Subtotal:
TOTAL ESTIMATED CAPITAL COST:
Engineering $64,000
Construction $430,000
$0
$0
$0
$0
$0
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$494,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
XX
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
`S�
173
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 26,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEMENT -NW MIDWAY/RUSK/PARKER/ROCKWALL
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. North of West Midway Drive from FM157 to Parker Drive,
2. West Midway Drive from Parker Drive to Rusk Drive,
3. Rusk Drive from West Midway Drive to Parker Drive,
4. Parker Drive from West Midway Drive to Rockwall Drive, and
5. Rockwall Drive from west of Parker Drive to 400' west of Lamar Drive.
PROJECT SCHEDULE:
FY2019
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
wo
174
ROW
M
PROJECT TITLE: LINE REPLACEMENT -NW MIDWAY/RUSK/PARKER/ROCKWALL
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
II Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
I Subtotal:
I Subtotal:
TOTAL ESTIMATED CAPITAL COST:
Engineering $69,000
Construction $460,000
$0
$0
$0
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$529,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
XX
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
175
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 05,2007
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-COLLIN DRIVE/HARRIS DRIVE/IRION DRIVE
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priori : C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the following wastewater main replacements:
1. West of Collin Drive between Denton Drive and Harwood Road,
2. West of Harris Drive from Dallas Drive to Harwood Road,
3. Dallas Drive from west of Collin Drive to west of Harris Drive,
4. South of Dallas Drive from west of Collin Drive to Dallas Drive, and
5. West of Irion Drive from Dallas Drive to Harwood Road.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
I
a
176
PROJECT TITLE: LINE REPLACEMENT-COLLIN DRIVE/HARRIS DRIVE/IRION DRIVE
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
177
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: February 16,2009
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-DONLEY DRIVE/SHELMAR DRIVE
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains.
PROJECT DESCRIPTION:
This project consists of the replacement of the following wastewater lines:
1. Donley Drive from Shelmar Drive to W Ash Lane,
2. Donley Drive from Harwood Road to Shelmar Drive, and
3. Shelmar Drive from Green Hill Street to the end of Shelmar Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
.-,
178
PROJECT TITLE: LINE REPLACEMENT-DONLEY DRIVE/SHELMAR DRIVE
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
179
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: February 16,2009
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-EASTCLIFF DRIVE/WINDLEA DRIVE/SIGNET DRIVE
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains.
PROJECT DESCRIPTION:
This project includes the replacement of the following wastewater mains:
1. Eastcliff Drive from Tyler Avenue to Signet Drive,
2. Windlea Drive from Eastcliff Drive to Wilshire Drive, and
3. Between Windlea Drive and Signet Drive from Eastcliff Drive to Wilshire Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
180
PROJECT TITLE: LINE REPLACEMENT-EASTCLIFF DRIVEM/INDLEA DRIVE/SIGNET DRIVE
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
181
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: February 16,2009
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-ECTOR DRIVE/DONLEY DRIVE/CRANE DRIVE
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Between Ector Drive and Donley Drive from Aransas Drive to Harwood Road and
2. Between Donley Drive and Crane Drive from Aransas Drive to Harwood Road.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
..�
182
M
PROJECT TITLE: LINE REPLACEMENT-ECTOR DRIVE/DONLEY DRIVE/CRANE DRIVE
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Ooeratinq Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
00 0
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
183
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: February 16,2009
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-EVANS DRIVE/CANYON RIDGE DRIVE/N KYNETTE DRIVE
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Between Evans Drive and Canyon Ridge Drive from Cyclone Branch to north of Kynette Drive and
2. North of Kynette Drive from Canyon Ridge Drive to Cyclone Branch.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
—'s"
184
M
PROJECT TITLE: LINE RE PLACEM ENT- EVANS DRIVE/CANYON RIDGE DRIVE/N KYNETTE DRIVE
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal:
Total Estimated Annual Cost
$0
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
00 0
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
185
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 26,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEMENT-GLENN DRIVE
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priori : C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the wastewater mains located west of Glenn Drive from Aransas
Drive to Glenn Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
'1
186
PROJECT TITLE: LINE REPLACEMENT-GLENN DRIVE
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
187
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: February 16,2009
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-JANANN STREET/BROWNSTONE DRIVE/SHELMAR DRIVE
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Janann Street from Aransas Drive to Donley Drive,
2. Brownstone Drive from Aransas Drive to Donley Drive,
3. Shelmar Drive from Greenhill Street to Aransas Drive, and
4. Aransas Drive from 500' south of Shelmar Drive to Janann Street.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
.�
t
188
PROJECT TITLE: LINE REPLACEMENT-JANANN STREET/BROWNSTONE DRIVE/SHELMAR DRIVE
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost
Engineering - To Be Determined
Personnel: Full Time
Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal:
Total Estimated Annual Cost
$0
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
189
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: February 16,2009
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-LAKEWOOD BLVD/DOGWOOD CIRCLE/BOCOWOOD CIRCLE
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Lakewood Boulevard from Dogwood Circle north to Private Drive and
2. Dogwood Circle, Cypress Circle, Bocowood Circle, and Aspenway Circle.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
190
PROJECT TITLE: LINE REPLACEMENT-LAKEWOOD BLVD/DOGWOOD CIRCLE/BOCOWOOD CIRCLE
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal:
Total Estimated Annual Cost
$0
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
191
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 16,2012
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REP -LIVE OAK DRIVE/SILVER CREEK DRIVE/MARLENE DRIVE
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Live Oak Drive from Silver Creek Drive south to Hurricane Creek,
2. Mains in the cul-de-sacs on the east side of Live Oak Drive,
3. Silver Creek Drive between Westpark Way and Evans Drive, and
4. Marlene Drive between Live Oak and Marlene Court.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
L
192
PROJECT TITLE: LINE REP -LIVE OAK DRIVE/SILVER CREEK DRIVE/MARLENE DRIVE
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
I Subtotal:
I Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
193
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: February 16,2009
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-MARY/MARLENE/COMMERCE/WILSHIRE/GREENBRIAR
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Between Mary Drive and Marlene Drive from Cyclone Branch to Marlene Drive,
2. Between Commerce Street and Wilshire Drive from Marlene Drive to Sagebrush Trail,
3. South of Greenbriar Drive from Cyclone Branch to Debra Drive,
4. Between Greenbriar Drive and Mary Street from Eastcliff Drive to Debra Drive, and
5. East of Debra Drive and south of Mary Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
194
11.1
PROJECT TITLE: LINE REPLACEMENT-MARY/MARLENE/COMMERCE/WILSHIRE/GREEN BRIAR
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0
°
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0
°
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0
°
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
195
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 13,2006
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-N MIDWAY PARK
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. East of Denton Drive between Bell Drive and Dallas Drive,
2. Between Denton Drive and Irion Drive from Dallas Drive to Harwood Road,
3. Along Denton Drive from Harwood Road to Collin Drive, and
4. Along Milam Drive from Blanco Drive to Midway Park Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay the and are
susceptible to ground movement, open joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
_1 �
No
196
OR
PROJECT TITLE: LINE REPLACEMENT-N MIDWAY PARK
NEINT EFFECTS ON OPERATING AND
MATENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental TaxFund
To Be Determined
XX
ADDITIONAL COMMENTS:
197
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: February 16,2009
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REP-NORTHCLIFF/TOPLEA/WINDLEA/SIGNET/KYNETTEM/ESTCLIFF
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Between Northcliff Drive and Toplea Drive from Canyon Ridge to Cyclone Branch,
2. Between Toplea Drive and Windlea Drive from Canyon Ridge to Cyclone Branch,
3. Between Windlea Drive and Signet Drive from Canyon Ridge to Cyclone Branch,
4. Between Signet Drive and Kynette Drive from the church to Cyclone Branch, and
5. Westcliff Drive from Toplea Drive to north of Windlea Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
.-,
198
PROJECT TITLE: LINE REP-NORTHCLIFF/TOPLEA/WINDLEA/SIGNET/KYNETTEMESTCLIFF
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
199
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 13,2006
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-S MAIN STREET
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the wastewater main along S Main Street from Jean Lane to W
Alexander Lane.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
'1
'1
200
PROJECT TITLE: LINE REPLACEMENT-S MAIN STREET
NET
EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
201
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: February 16,2009
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-SAGEBRUSH/TOPLEA/WILSHIRE/YORKSHIRE/TYLER
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains..
1. Between Sagebrush Trail and Toplea Drive from Cyclone Branch to east of Wilshire Drive,
2. Between Wilshire Drive and Yorkshire Drive from Signet Drive to south of Toplea Drive,
3. Between Sagebrush Trail and Tyler Avenue from Cyclone Branch to Commerce Street,
4. Eastcliff Drive from Tyler Avenue to the apartments, and
5. Between Marlene Drive and Tyler Avenue from Eastcliff Drive to Commerce Street.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
W
'1
202
1-11
PROJECT TITLE: LINE REP LACEMENT-SAGEBRUSH/TOPLEA/WILSHIRENORKSHIRE/TYLER
NET
EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Or)erating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
203
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 01,2011
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT -SIERRA DRIVE
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
This project consists of replacement of the following wastewater mains:
1. Between Sierra Drive and Eastcliff Drive from Kynette Drive to Signet Drive and
2. East of Sierra Drive from Wilshire Park to Signet Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
t
.- N
204
ON
PROJECT TITLE: LINE REPLACEMENT -SIERRA DRIVE
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct ODerating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal:
Total Estimated Annual Cost
$0
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
00 0
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
00 0
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
205
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: February 16,2009
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-W DONLEY/PRIVATE DRIVE/MIMOSA/MAGNOLIA/REDBUD
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. West of Donley Drive from West Ash Lane to Private Drive,
2. Private Drive from west of Redbud Drive to Lakewood Boulevard,
3. Mimosa Lane from Bocowood Drive to Private Drive,
4. Magnolia Lane from Bocowood Drive to Private Drive, and
5. Redbud Drive from Bocowood Drive to Private Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
1' �
W
206
PROJECT TITLE: LINE REPLACEMENT-W DONLEY/PRIVATE DRIVE/MIMOSA/MAGNOLIA/REDBUD
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal:
Total Estimated Annual Cost
$0
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
00 0
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
207
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: February 16,2009
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REP-W MIDWAY/VICTORIA/DELTA/LAMAR/ROCKWALL
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains..
1. West Midway Drive from FM157 to Victoria Drive,
2. Victoria Drive from West Midway Drive north 700',
3. Delta Drive from West Midway Drive north 1000',
4. Lamar Drive from West Midway Drive north to Fayette Drive, and
5. Rockwall Drive from Lamar Drive west and north 800'.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
wo
.-,�N
208
ON
PROJECT TITLE: LINE REP-W MIDWAY/VICTORIA/DELTA/LAMAR/ROCKWALL
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
AINTENANCE COST (+ OR -) ANNUAL:
Direct Or)erating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0
°
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
209
.1
T H E C I T Y O F
"1
210
CAPITAL IMPROVEMENT PROGRAMS
FY16 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE
PROPOSED METHOD OF FINANCING
Project Description
Priority
Estimated Cost
Operating
Fund
CIP Fund
Balance
Bond Sale
Grants/
Contrib
Impact
Fees
Escrow
Funds
Car Rental
Tax
Other
EDC
To Be
Determined
WATER PROJECTS
24-Inch Valve Replacement Cinnamon, Anice, Fuller -Wiser
A
$ 220,000
XX
Sub -Total Water Priority A -Proposed FY15
$ 220,000
LR: S Pipeline Road West (18)
B
$ 307,000
XX
SH183 Phase II Water Relocation (16)
B
$ 1,200,000
XX
Water System Security Camera Installation t'Bl
B
$ 75,000
XX
LR: Ector Drive (17)
B
$ 291,000
XX
LR: Blessing Creek/Stony Creek/Rock Creek I181
B
$ 365,000
XX
LR: K nette Drive (18)
B
$ 289,000
XX
Sub -Total Water Priority S-Unfunded
$ 2,627,000
LR: Collin Drive -Dallas Drive to Harwood Road
C
TBD
XX
LR: Collin Drive -Denton Drive to Dallas Drive
C
TBD
XX
LR: Denton Drive
C
TBD
XX
LR: Dickey Drive North
C
TBD
XX
LR: Dickey Drive South
C
TBD
XX
LR: Dunaway Drive
C
TBD
XX
LR: E Huitt Lane
C
TBD
XX
LR: Eastcldf Drive
C
TBD
XX
LR: Fuller Drive
C
TBD
XX
LR: Hollow Oak Drive
C
TBD
XX
LR: Live Oak Court/Live Oak Drive
C
TBD
XX
LR: Midcreek/Rock Creek/Stony Creek
C
TBD
XX
LR: Midway Drive East
C
TBD
XX
LR: Midway Drive West
C
TBD
XX
LR: Needles Street
C
TBD
XX
LR: Paula Lane
C
TBD
XX
LR: S Main Street (North)
C
TBD
XX
LR: S Main Street (South)
C
TBD
XX
LR: S Pipeline Road East
C
TBD
XX
SH360 Water Crossing
C
TBD
XX
LR: Shady Creek Drive/Cliffwood Road
C
TBD
XX
LR: Springwood Court
C
TBD
XX
LR: Sunset Drive
C
TBD
XX
LR: Westwood Drive
C
TBD
XX
LR: Wildwood Street
C
TBD
XX
LR: Woodvine (East)
C
TBD
XX
LR: Woodvine (West)
C
TBD
XX
Sub -Total Water Priority C-Unfunded
$
WATER PROJECTS - TOTAL
$ 2,747,000
LK = Line Replacement
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 08,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: 24-INCH VALVE REPLACEMENT- CINNAMON LN, ANICE LN, FULLER -WISER RD
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Pro'ect Code: Priori A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are part of the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project will replace three 24-inch gate valves on the 24-inch main line running between North Main Street
and Fuller -Wiser Road.
PROJECT SCHEDULE:
FY2015
JUSTIFICATION:
Old and deteriorated water valves prevent water lines from being isolated in the event of a line break. Not being
able to isolate as small a segment as possible during a line break increases the labor required to isolate the line,
as well as the number of residents and fire hydrants that would be affected by a line break. Systematic annual
replacement of old deteriorated water valves will increase efficiency, reduce maintenance costs, and ensure
maximum fire protection and water service availability.
--N
woo
212
OR
PROJECT TITLE: 24-INCH VALVE REPLACEMENT- CINNAMON LN, ANICE LN, FULLER -WISER RD
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
AINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering
Personnel: Full Time Construction
Part Time $0 10% Contingency
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
$20,000
$180,000'
$20, 000
Subtotal:
Total Estimated Annual Cost
$0
$0
Total Estimated Capital Cost
$220,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
XX
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
213
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 26,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEMENT-S PIPELINE ROAD WEST
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of 1,625 feet of existing 6" cast iron water main with an 8" PVC water
main along S Pipeline Road west from Simmons Drive to Vine Street.
PROJECT SCHEDULE:
FY2016
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
W
214
5,
PROJECT TITLE: LINE REPLACEMENT-S PIPELINE ROAD WEST
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering
Personnel: Full Time Construction
Part Time $0 10% Contingency
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
$37,000
$246, 000
$24, 000
Subtotal:
Total Estimated Annual Cost
$0
$0
Total Estimated Capital Cost
$307,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
XX
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
215
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 10, 2010
Submitted By: RON YOUNG Date Completed:
Project Title: SH183 PHASE II WATER RELOCATION
Project Type: WATER Sub -Type: LINE RELOCATION
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The Texas Department of Transportation ("TxDoT") has planned for the expansion of SH183. The Phase II
construction will affect the City of Euless' utilities along and crossing SH183 between FM157 and the east city
limits.
PROJECT DESCRIPTION:
The City of Euless has water mains and associated items located within the SH183 right-of-way. These facilities
must be relocated to accommodate Phase II the SH183 expansion. It is anticipated that the City of Euless will
enter into a relocation agreement with the contractor selected by TxDoT to authorize them to design and
relocate water lines and associated infrastructure. The City will be responsible for the cost of relocating the
utilities.
PROJECT SCHEDULE:
Est. FY2016
JUSTIFICATION:
City of Euless water facilities are located within TxDoT right-of-way. As such, the City must provide for utility
relocation to accommodate the roadway expansion.
216
PROJECT TITLE: SH183 PHASE II WATER RELOCATION
NET EFFECTS ON OPERATING AND
TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Water Relocation Reimbursement
$1,200,000
Personnel: Full Time
Part Time
$0
Total Salary
$0
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal:
$0
Maintenance Costs
$0
Subtotal:
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$1,200,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
$1,200,000
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
217
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 12,2004
Submitted By: RON YOUNG Date Completed:
Project Title: WATER SYSTEM SECURITY CAMERA INSTALLATION
Project Type: WATER Sub -Type: SYSTEM SECURITY
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project is a result of the findings included in the 2004 Water System Vulnerability Assessment of the City's
Water System Master Plan.
PROJECT DESCRIPTION:
The project provides for the installation of security cameras at the water production and storage sites (ground
storage tanks and towers) located at West Fuller Drive, Heritage Park, 1400 N Main Street, 2591 N Main Street,
and 2700 N Main Street.
PROJECT SCHEDULE:
FY2016
JUSTIFICATION:
Increase water system security by addressing vital elements as recommended in the 2004 Water System
Vulnerability Assessment as identified by Lockwood, Andrews, and Newman, Inc. and submitted to the
Environmental Protection Agency (EPA).
INQ
W
218
M
PROJECT TITLE: WATER SYSTEM SECURITY CAMERA INSTALLATION
NET EFFECTS ON OPERATING AND
TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct ODerating Cost
Equipment Installation
$75,000
Personnel: Full Time
Part Time
$0
Total Salary
$0
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal:
$0
Maintenance Costs
$0
Subtotal:
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$75,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
XX
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0
°
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
219
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 26,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEMENT-ECTOR DRIVE, TROJAN TRAIL TO MIDWAY DRIVE
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of 1,840 feet of 6" cast iron water main with an 8" PVC main on Ector
Drive from Trojan Trail to Midway Drive.
PROJECT SCHEDULE:
FY2017
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
220
PROJECT TITLE: LINE REPLACEMENT-ECTOR DRIVE, TROJAN TRAIL TO MIDWAY DRIVE
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
AINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering
Personnel: Full Time Construction
Part Time $0 10% Contingency
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
$35,000
$233,000
$23,000
Subtotal:
Total Estimated Annual Cost
$0
$0
Total Estimated Capital Cost
$291,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
XX
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
221
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 26,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEMENT -BLESSING CREEK/STONY CREEK/ROCK CREEK
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains are included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
This project will replace the 6" AC main with an 8" PVC main for Blessing Creek, Stony Creek, and Rock Creek.
PROJECT SCHEDULE:
FY2018
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
..1
'1
222
PROJECT TITLE: LINE REPLACEMENT -BLESSING CREEK/STONY CREEK/ROCK CREEK
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
AINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering/Surveying
Personnel: Full Time Construction
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
$45, 000
$320,000
Subtotal:
Total Estimated Annual Cost
$0
$0
Total Estimated Capital Cost
$365,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
XX
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
223
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 26,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEMENT-KYNETTE DRIVE, CYCLONE CREEK TO WILSHIRE DRIVE
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priori : B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of 1,500 feet of 6" cast iron water main with an 8" PVC main along
Kynette Drive from Cyclone Creek to Wilshire Drive.
PROJECT SCHEDULE:
FY2018
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
-- N
224
am -
PROJECT TITLE: LINE REPLACEMENT-KYNETTE DRIVE, CYCLONE CREEK TO WILSHIRE DRIVE
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Engineering
Personnel: Full Time
Construction
Part Time $0
10% Contingency
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
$32, 000
$236,000
$21,000
Subtotal:
Total Estimated Annual Cost
$0
$0
Total Estimated Capital Cost
$289,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
XX
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
225
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 28,2003
Submitted By: RON YOUNG Date Completed:
Project Title. LINE REPLACEMENT-COLLIN DRIVE, DALLAS DRIVE TO HARWOOD ROAD
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project will replace a 6" cast iron main with an 8" PVC main along Collin Drive from Dallas Drive to Harwood
Road.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
226
L
M
OR
PROJECT TITLE: LINE REPLACEMENT-COLLIN DRIVE, DALLAS DRIVE TO HARWOOD ROAD
NET
EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
AINTENANCE COST (+ OR -) ANNUAL:
Direct ODerating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
00 0
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
00 0
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
227
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 28,2003
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-COLLIN DRIVE, DENTON DRIVE TO DALLAS DRIVE
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project will replace a 6" cast iron main to an 8" PVC main along Collin Drive from Denton Drive to Dallas
Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
No
228
PROJECT TITLE: LINE REPLACEMENT-COLLIN DRIVE, DENTON DRIVE TO DALLAS DRIVE
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
I Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
n %
Conceptual Design
P g
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
S P
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
229
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 28,2003
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-DENTON DRIVE, TARRANT DRIVE TO HARWOOD ROAD
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of the 6" cast iron water main with an 8" PVC main along Denton Drive
from Tarrant Drive to Harwood Road.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
230
M
L.
PROJECT TITLE: LINE REPLACEMENT-DENTON DRIVE, TARRANT DRIVE TO HARWOOD ROAD
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
1 Subtotal: $0
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
w
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
231
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 28,2003
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT -DICKEY DRIVE NORTH, SH10 TO E HUITT LANE
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
This project consists of replacing the 6" cast iron water main with an 8" PVC main along Dickey Drive north from
SH10 to E Huitt Lane.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
232
PROJECT TITLE: LINE REPLACEMENT -DICKEY DRIVE NORTH, SH10 TO E HUITT LANE
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
00 0
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
233
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 28,2003
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT -DICKEY DRIVE SOUTH, E HUITT LANE TO HILTON DRIVE
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
This project consists of the replacement of a 6" cast iron water main with an 8" PVC main along Dickey Drive
south from E Huitt Lane to Hilton Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
'"1
234
MR
PROJECT TITLE: LINE REPLACEMENT -DICKEY DRIVE SOUTH, E HUITT LANE TO HILTON DRIVE
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
235
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 15,2005
Submitted By: RON YOUNG Date Completed:
Project Title. LINE REPLACEMENT-DUNAWAY DRIVE, E ALEXANDER LANE TO E ASCOT DRIVE
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of the existing 6" AC water main with an 8" PVC water main on
Dunaway Drive from E Alexander Lane to E Ascot Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
'—"*N
,- 1
236
L
`+1
PROJECT TITLE: LINE REPLACEMENT-DUNAWAY DRIVE, E ALEXANDER LANE TO E ASCOT DRIVE
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal:
Total Estimated Annual Cost
$0
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
237
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 15,2005
Submitted By: RON YOUNG Date Completed:
Project Title. LINE REPLACEMENT-E HUITT LANE, S MAIN STREET TO DUNAWAY DRIVE
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of the existing 6" PVC water main with an 8" PVC water main along
E Huitt Lane from S Main Street to Dunaway Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
238
RM
PROJECT TITLE: LINE REPLACEMENT-E HUITT LANE, S MAIN STREET TO DUNAWAY DRIVE
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
239
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 15,2005
Submitted By: RON YOUNG Date Completed:
Project Title. LINE REPLACEMENT-EASTCLIFF DRIVE, TOPLEA DRIVE TO DEL PRADO APTS.
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of the 6" AC main to an 8" PVC main along Eastcliff Drive from Toplea
Drive to Del Prado Apartments.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
roo
240
11-11
M
PROJECT TITLE: LINE REPLACEMENT-EASTCLIFF DRIVE, TOPLEA DRIVE TO DEL PRADO APTS.
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
AINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
I Subtotal: $0
$0
Subtotal:
Total Estimated Annual Cost
$0
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
241
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 28,2003
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT -FULLER DRIVE, SALEM DRIVE TO CARTER DRIVE
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of replacing a 6" cast iron water main with an 8" PVC water main along Fuller Drive from
Salem Drive to Carter Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
242
7
PROJECT TITLE: LINE REPLACEMENT -FULLER DRIVE, SALEM DRIVE TO CARTER DRIVE
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
243
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 26,2014
Submitted By: HAL CRANOR Date Completed:
Project Title. LINE REPLACEMENT -HOLLOW OAK DRIVE
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of 1,270 feet of 6" cast iron main with an 8" PVC main along Hollow
Oak Drive from Woodridge Circle to Pebble Creek Drive and Woodridge Circle south of Hollow Oak Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
,-N
244
OR
PROJECT TITLE: LINE REPLACEMENT -HOLLOW OAK DRIVE
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
AINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
245
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 28,2003
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT -LIVE OAK CT/LIVE OAK DRIVE
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of the existing 4" cast iron water main with an 8" PVC main along Live
Oak Drive from Cedar Court to the south end of Live Oak Court. Additionally, the replacement of the existing 8"
cast iron water main with an 8" PVC water main from Canyon Ridge to West Cliff Drive is also included in the
scope of the project.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
.,*N
-IN
246
001
M
PROJECT TITLE: LINE REPLACEMENT -LIVE OAK CT/LIVE OAK DRIVE
NEINT EFFECTS ON OPERATING AND
MATENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
00 0
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
247
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 05,2007
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REP-MIDCREEK DRIVE/ROCK CREEK DRIVE/STONY CREEK DRIVE
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
This project consists of the replacement of a 6" AC main with an 8" PVC main on Midcreek Drive, Rock Creek
Drive, and Stony Creek Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
io
'1
248
PROJECT TITLE: LINE REP-MIDCREEK DRIVE/ROCK CREEK DRIVE/STONY CREEK DRIVE
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
AINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
249
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 28,2003
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT -MIDWAY DRIVE EAST, N MAIN ST TO FREESTONE DR
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priori C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
This project replaces the 6" cast iron water main with an 8" PVC main on Midway Drive east from N Main Street
to Freestone Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
.-,
250
M
am
PROJECT TITLE: LINE REPLACEMENT -MIDWAY DRIVE EAST, N MAIN ST TO FREESTONE DR
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
00 0
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
251
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 28,2003
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT -MIDWAY DRIVE WEST, FREESTONE DRIVE TO ECTOR DRIVE
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
This project replaces the 6" cast iron water main with an 8" PVC main along Midway Drive west from Freestone
Drive to Ector Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
.-IN
252
�1_--
11.1
PROJECT TITLE: LINE REPLACEMENT -MIDWAY DRIVE WEST, FREESTONE DRIVE TO ECTOR DRIVE
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design % 0%
Preliminary Design % 0%
Final Plans % 0%
Specifications % 0%
Construction % 0%
253
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 15,2005
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT -NEEDLES STREET, PAULA LANE TO RAIDER DRIVE
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of the existing 6" cast iron water main with an 8" PVC water main along
Needles Street from Paula Lane to Raider Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
11-N
,-IN
254
L
PROJECT TITLE: LINE REPLACEMENT -NEEDLES STREET, PAULA LANE TO RAIDER DRIVE
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
255
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 28,2003
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-PAULA LANE, NEEDLES STREET TO S PIPELINE ROAD
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of the 6" cast iron water main with an 8" PVC main along Paula Lane
from Needles Street to S Pipeline Road.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
.1%,
256
PROJECT TITLE: LINE REPLACEMENT-PAULA LANE, NEEDLES STREET TO S PIPELINE ROAD
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
257
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 12,2004
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-S MAIN STREET (NORTH), E HUITT LANE TO SH10
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are part of the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project will replace and upgrade the water main along S Main Street from E Huitt Lane to SH10 from a 6"
cast iron main to an 8" PVC main.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
.-,
258
PROJECT TITLE: LINE REPLACEMENT-S MAIN STREET (NORTH), E HUITT LANE TO SH10
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
259
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 12,2004
Submitted By: RON YOUNG Date Completed:
Project Title. LINE REPLACEMENT-S MAIN STREET (SOUTH), LANDOVER DR TO E HUITT LN
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are part of the City's Water System Master Plan.
PROJECT DESCRIPTION:
This project will replace and upgrade the water main along S Main Street from Landover Drive to E Huitt Lane
from a 6" cast iron main to an 8" PVC.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
W
260
M
PROJECT TITLE: LINE REPLACEMENT-S MAIN STREET (SOUTH), LANDOVER DR TO E HUITT LN
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
AINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal:
Total Estimated Annual Cost
$0
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
261
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 28,2003
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-S PIPELINE ROAD EAST, VINE STREET TO S MAIN STREET
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project will replace the existing 6" cast iron water main with an 8" PVC water main along S Pipeline Road
east from Vine Street to S Main Street.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
.-�N
262
q
PROJECT TITLE: LINE REPLACEMENT-S PIPELINE ROAD EAST, VINE STREET TO S MAIN STREET
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal:
Total Estimated Annual Cost
$0
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
00 0
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
263
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: July 21,2000
Submitted By: RON YOUNG Date Completed:
Project Title: SH360 WATER CROSSING
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project is related to the DFW International Airport Master Plan for property in Euless.
PROJECT DESCRIPTION:
The project scope includes the extension of two (2) 12" diameter water mains through the SH360 right-of-way to
provide service to the southwest portion of the DFW Airport property. The water mains will be bored under
SH360 at the Midway Drive intersection and between Harwood Road and Ash Lane. The mains will be located
within the Texas Department of Transportation right-of-way. The mains will be plugged at the east right-of-way
of SH360 in anticipation of the likely extension into DFW Airport property to serve future development.
PROJECT SCHEDULE:
JUSTIFICATION:
Development on the airport property could potentially increase the City's tax revenues. Future development is
dependent upon the availability of water service to this area.
ow
'-N,
264
PROJECT TITLE: SH360 WATER CROSSING
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
AINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
265
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 12,2004
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT -SHADY CREEK DRIVE/CLIFFWOOD ROAD
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are part of the City's Water System Master Plan.
PROJECT DESCRIPTION:
This project will replace and upgrade the water mains along Shady Creek Drive and Cliffwood Road from the
existing 6" cast iron mains to 8" PVC.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
266
PROJECT TITLE: LINE REPLACEMENT -SHADY CREEK DRIVE/CLIFFWOOD ROAD
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
267
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 12,2004
Submitted By: RON YOUNG Date Completed:
Project Title. LINE REPLACEMENT-SPRINGWOOD COURT
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are part of the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of 4" water main with an 8" main on Springwood Court.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance cost. Substandard size water mains provide
a reduced flow of water. Systematic annual replacement of deteriorated and substandard size water mains will
reduce maintenance costs.
101111100
268
PROJECT TITLE: LINE REPLACEMENT-SPRINGWOOD COURT
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
I Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
n %
Conceptual Design
P 9
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
269
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 26,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEMENT -SUNSET DRIVE, S PIPELINE ROAD TO S MAIN STREET
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are part of the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project will replace and upgrade 2,230 feet of water main along Sunset Drive from S Pipeline Road to S
Main Street from a 6" cast iron main to an 8" PVC main.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
270
PROJECT TITLE: LINE REPLACEMENT -SUNSET DRIVE, S PIPELINE ROAD TO S MAIN STREET
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
AINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0
°
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
271
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 28,2003
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-WESTWOOD DRIVE, FULLER DRIVE TO CARTER DRIVE
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priori C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This water main is included in the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project will replace a 6" cast iron main with an 8" PVC main along Westwood Drive from Fuller Drive to
Carter Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
272
PROJECT TITLE: LINE REPLACEMENT-WESTWOOD DRIVE, FULLER DRIVE TO CARTER DRIVE
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
I Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
273
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 12,2004
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REPLACEMENT-WILDWOOD STREET
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are part of the City's Water System Master Plan.
PROJECT DESCRIPTION:
This project will replace and upgrade the water main along Wildwood Street from a 6" cast iron main to an 8"
PVC main.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
274
LIM
PROJECT TITLE: LINE REPLACEMENT-WILDWOOD STREET
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
AINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
275
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 12,2004
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REP-WOODVINE DRIVE (EAST), CLIFFWOOD ROAD TO EL CAMINO REAL
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are part of the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project will replace and upgrade the water main along Woodvine Drive from Cliffwood Road to El Camino
Real from a 6" cast iron main to an 8" PVC main.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
276
M
1
PROJECT TITLE: LINE REP-WOODVINE DRIVE (EAST), CLIFFWOOD ROAD TO EL CAMINO REAL
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal:
Total Estimated Annual Cost
$0
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
277
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 12,2004
Submitted By: RON YOUNG Date Completed:
Project Title: LINE REP-WOODVINE DRIVE (WEST), PEBBLE CREEK DR TO CLIFFWOOD RD
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are part of the City's Water System Master Plan.
PROJECT DESCRIPTION:
This project will replace and upgrade the water main along Woodvine Drive from Pebble Creek to Cliffwood
Road from a 6" cast iron main to an 8" PVC main.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
._,N
278
PROJECT TITLE: LINE REP-WOODVINE DRIVE (WEST), PEBBLE CREEK DR TO CLIFFWOOD RD
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
AINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering - To Be Determined
Personnel: Full Time Construction - To Be Determined
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
00 0
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0
°
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
XX
ADDITIONAL COMMENTS:
279
T H E C I T Y O F
EULESS
'--N
280
CAPITAL IMPROVEMENT PROGRAMS
FY15 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE
PROPOSED METHOD OF FINANCING
Project Description
Priority
Estimated Cost
Operating
Fund
CIP Fund
Balance
Bond Sala
Grants/
Contrib
Impact
Fees
Escrow
Funds
Car Rental
Tax
Other
EDC
To Be
Determined
OTHER PROJECTS
Car Rental Contingency
A
$ 700,000
XX
Development/Engineering Building Design
A
$ 94,350
XX
Glade Parks Trail Connection Construction
A
$ 357,545
XX
XX
XX
Municipal Plaza Improvements Phase I
A
$ 100,000
XX
Sub -Total Other Priority A -Proposed FY15
$ 1,251,895
Blessing Branch Park Improvements
B
$ 267,120
XX
Development/Engineering Building Construction (16)
B
$ 1,464,300
XX
Municipal Plaza Improvements Phase II (16)
B
$ 150,000
XX
Texas Star Sports Complex Phase V Design (16)
B
$ 688,000
XX
XX
Trail Enhancements Phase I ("I
B
$ 182,756
XX
Texas Star Sports Complex Phase V Construction (17)
B
$ 8,462,164
XX
XX
XX
Trail Connection South Euless (17)
B
$ 51,240
XX
Trailwood Park Improvements (17)
B
$ 220,500
XX
Library Remodel Design (18)
B
$ 147,630
XX
Library Remodel Construction(t9)
B
$ 1,596,000
XX
Sub -Total Other Priority B-Unfunded
$ 13,229,710
Animal Shelter Expansion/Renovation
C
TBD
XX
Fire Station #2 Remodel
C
TBD
XX
Kiddie Carr Park Improvements
C
TBD
XX
South Euless Park Upgrades
C
TBD
XX
Trail Enhancements Phase II
C
TBD
XX
Trail Enhancements Villages of Bear Creek
C
TBD
XX
Wilshire Park U rades
C
TBD
XX
ub-Total Other Priority C-Unfunded
OTHER PROJECTS - TOTAL
14,481,605
City of Euless
Capital Project Request
Department: CITY MANAGER Date Prepared: July 22,2014
Submitted By: GARY MCKAMIE Date Completed:
Project Title: CAR RENTAL CONTINGENCY
Project Type: MISCELLANEOUS Sub -Type: DEVELOPMENT
Project Code: Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
To provide funding for development opportunities that arise throughout the year.
PROJECT SCHEDULE:
FY2015
JUSTIFICATION:
Funding this project provides flexibility and enables the City to act quickly on development opportunities.
'-'IN
'IN
282
PROJECT TITLE: CAR RENTAL CONTINGENCY
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
$0
$0
$0
$0
$0
$0
TOTAL ESTIMATED CAPITAL COST:
Contingency
$700,000 1
Total Estimated Annual Cost
$0
Total Estimated Capital Cost $700,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
Fund Balance
Preliminary Design %
Special Project Fund
Final Plans %
Certificate of Obligation
Specifications %
County, State, Federal Funding
Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
XX
To Be Determined
ADDITIONAL COMMENTS:
283
City of Euless
Capital Project Request
Department: FLEET & FACILITY OPERATIONS Date Prepared: April 0112013
Submitted By: KYLE MCADAMS Date Completed:
Project Title: DEVELOPMENT/ENGINEERING BUILDING DESIGN
Project Type: FACILITIES Sub -Type: REMODEL
Project Code: Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The Development and Engineering Building is the final project planned as part of the City's 1999 Master
Construction plan.
PROJECT DESCRIPTION:
Planning and design phase for renovation of the Development and Engineering Building scheduled for FY2016.
Selected firm will conduct staff interviews, identify potential utilization of available space, complete design
process, create budget projections, and prepare plans and specifications for bid documents.
PROJECT SCHEDULE:
FY2015
JUSTIFICATION:
The Development and Engineering Building received a major remodel in 1996 with renovation of the building's
interior. Due to limited funding at that time, certain elements could not be justified as part of the remodel.
.-1
5110
,-1
284
PROJECT TITLE: DEVELOPMENT/ENGINEERING BUILDING DESIGN
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
$0
$0
$0
$0
$0
TOTAL ESTIMATED CAPITAL COST:
Planning/Bid Specifications $94,3501
Subtotal:
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$94,350
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
00 0
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
XX
To Be Determined
ADDITIONAL COMMENTS:
285
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: May 05,2008
Submitted By: RAY MCDONALD Date Completed:
Project Title: GLADE PARKS TRAIL CONNECTION CONSTRUCTION
Project Type: PARK/RECREATION Sub -Type: TRAIL SYSTEM
Project Code: Priori : A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
As identified in the Glade Parks development, this project proposes to connect the existing Trails of Euless to
the City of Colleyville trails through the Glade Parks Development.
PROJECT DESCRIPTION:
The project consists of the construction of a trail that will connect to the existing trail at Creekwood Estates, run
underneath the northbound service road, SH121, and the southbound service road to the southeast corner of
the Glade Parks Development. Future connectivity through Glade Parks is planned within the overall
development of that site.
PROJECT SCHEDULE:
FY2015
JUSTIFICATION:
Very high interest in trails and trail connectivity were identified in the scientific survey conducted for the adopted
Parks Master Plan. 88% of those who participated in the survey singled out trail connections between existing
and future park developments as the number one priority. Additionally, 76% identified the need for trail
connectivity to other cities as a top priority.
The City of Euless has experienced significant progress in the last few years in the area of trail development
with an extensive network of paved and unpaved trails. The trails system is a valuable asset to the community
as it assists not only in providing a safe means for non -vehicular travel, but also in providing an opportunity for a
variety of unstructured, low -impact recreational pursuits. The development and maintenance of the trails system
continued to receive significant support from the citizens as indicated in the responses to the needs assessment
survey conducted as a part of the Parks Master Plan update.
286
PROJECT TITLE: GLADE PARKS TRAIL CONNECTION CONSTRUCTION
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
I Subtotal:
Subtotal. -
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
TOTAL ESTIMATED CAPITAL COST:
Construction
Contingencies 10%
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
$325, 045
$32,500
$357,545 1
Operating Fund
Conceptual Design %
0%
Fund Balance
XX
Preliminary Design %
0%
Special Project Fund
Final Plans %
00 0
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
XX
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
XX
To Be Determined
ADDITIONAL COMMENTS:
Project has been submitted to TXDOT for potential grant funding; estimated grant award is 80% of construction
costs. All other costs are the responsibility of the City.
287
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: June 03,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: MUNICIPAL PLAZA IMPROVEMENTS PHASE I
Project Type: FACILITIES Sub -Type: IMPROVEMENTS
Project Code: Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project is the landscaping and irrigation related to the 40th CDBG ADA accessibility and infrastructure
improvements.
PROJECT DESCRIPTION:
Landscaping and irrigation improvements to the Municipal Plaza following the 40th CDBG ADA accessibility and
infrastructure improvements.
PROJECT SCHEDULE:
FY2015
JUSTIFICATION:
Beautification of the municipal plaza following the hardscape improvements.
1_1
''IN
288
�r
PROJECT TITLE: MUNICIPAL PLAZA IMPROVEMENTS PHASE I
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
$0
$0
$0
$0
$0
$0
TOTAL ESTIMATED CAPITAL COST:
Landscaping
$100,000 1
Total Estimated Annual Cost
$0
Total Estimated Capital Cost $100,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
Fund Balance
Preliminary Design %
Special Project Fund
Final Plans %
Certificate of Obligation
Specifications %
County, State, Federal Funding
Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
XX
To Be Determined
ADDITIONAL COMMENTS:
289
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: April 30,2008
Submitted By: RAY MCDONALD Date Completed:
Project Title: BLESSING BRANCH PARK IMPROVEMENTS
Project Type: PARK/RECREATION Sub -Type: PARK IMPROVEMENTS
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project is a continuation of the overall trail system expansion and general park improvements as identified
in the Parks Master Plan.
PROJECT DESCRIPTION:
Blessing Branch Park is a 7.3 acre linear park located on the east side of Main Street across from Midway Park.
Currently, the park has only one swing set. This project includes construction of a trail connection from Main
Street to the west and Fuller -Wiser to the east. Additionally, the project includes a new playground, picnic
pads with grills, and some type of shade shelter/pavilion/gazebo. This area currently gets a high volume of foot
traffic. Constructing a trail in this linear greenbelt would not only provide a safe paved access for the residents
east of Main Street to Midway Park, Midway Park Elementary, and to Trinity High School, but also help create a
renewed sense of quality of life for the residents in that area by enhancing the recreational amenities available.
PROJECT SCHEDULE:
FY2016
JUSTIFICATION:
The number one request from Euless citizens as it relates to trails, based on the responses to the needs
assessment survey as identified in the Parks Master Plan, was to construct trail connections between existing
and/or future park developments. This project not only satisfies that request, but also provides trail connections
to neighborhoods, schools, between major thoroughfares, and potentially to future commercial developments to
the southeast.
'_" N
290
\11
PROJECT TITLE: BLESSING BRANCH PARK IMPROVEMENTS
NET EFFECTS ON OPERATING AND
TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct O eratin Cost
Approximately 28,000 square feet of
Personnel: Full Time
4"x8' concrete trail @ $4.25 square foot
$119,000
Part Time
$0
Playground/Border
$60,000
Total Salary
$0
Picnic pads w/grills
$20,000
Purchase of Services
Shade shelter/pavilion/gazebo
$30,000
Materials & Supplies
Trail Lighting
$20,000
Utilities
$0
Playground chips
$5,400
Contingency 5%
$12,720
Subtotal: $0
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
$0
$0lTotal Estimated Capital Cost $267,120I
CURRENT STATUS:
Operating Fund
XX
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
The proposed method of finance is EDC Operating Fund
291
City of Euless
Capital Project Request
Department: FLEET & FACILITY OPERATIONS Date Prepared: May 07,2007
Submitted By: KYLE MCADAMS Date Completed:
Project Title: DEVELOPMENT/ENGINEERING BUILDING CONSTRUCTION
Project Type: FACILITIES Sub -Type: REMODEL
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The Development and Engineering Building is the final project planned as part of the City's 1999 Master
Construction plan.
PROJECT DESCRIPTION:
The project includes the construction of a new entrance facade to match the other campus structures. Security
issues pertaining to controlled access will be addressed as well as renovation of the Fuller Room into a
functional conference area. Public rest room facilities will be relocated to meet American with Disabilities Act/
Texas Accessibility Standards, the interior will be upgraded, and new carpet will be installed throughout the
facility.
PROJECT SCHEDULE:
FY2016
JUSTIFICATION:
The Development and Engineering Building received a major remodel in 1996 with renovation of the building's
interior. Due to limited funding at that time, certain elements could not be justified as part of the remodel.
292
PROJECT TITLE: DEVELOPMENT/ENGINEERING BUILDING CONSTRUCTION
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost
Construction
Personnel: Full Time
Architect Construction Services
Part Time $0
Survey & Testing Fees
Total Salary $0
Contingency (20%)
Purchase of Services
Furniture
Materials & Supplies
Instruments & Apparatus
Utilities $0
Data & Telephone
Alarm & Security Services
Subtotal: $0
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
$1, 020, 000
$35,000
$8,000
$204,000
$175,000
$6, 000
$10, 500
$5,800
$1,464,300 1
25%
0%
0%
0%
0%
293
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: June 03,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: MUNICIPAL PLAZA IMPROVEMENTS PHASE II
Project Type: FACILITIES Sub -Type: IMPROVEMENTS
Pro'ect Code: Priori B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project is the landscaping and irrigation related to the 40th CDBG ADA accessibility and infrastructure
improvements.
PROJECT DESCRIPTION:
Landscaping and irrigation improvements to the Municipal Plaza following the 40th CDBG ADA accessibility and
infrastructure improvements.
PROJECT SCHEDULE:
FY2016
JUSTIFICATION:
Beautification of the municipal plaza following the hardscape improvements.
,-*IN
.-,*N
294
L
PROJECT TITLE: MUNICIPAL PLAZA IMPROVEMENTS PHASE II
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
$0
$0
$0
$0
$0
$0
TOTAL ESTIMATED CAPITAL COST:
Landscaping
$150,000 1
Total Estimated Annual Cost
$0
Total Estimated Capital Cost $150,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
Fund Balance
Preliminary Design %
Special Project Fund
Final Plans %
Certificate of Obligation
Specifications %
County, State, Federal Funding
Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
XX
To Be Determined
ADDITIONAL COMMENTS:
295
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: March 27,2014
Submitted By: RAY MCDONALD Date Completed:
Project Title: TEXAS STAR SPORTS COMPLEX PHASE V DESIGN
Project Type: PARK/RECREATION Sub -Type: TSSC IMPROVEMENTS
Project Code: Priori : B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The Texas Star Sports Complex Phase V includes additional multi -use fields to accommodate both softball and
baseball. Also included in the project is additional parking and a concession building to support the new phase
and the number of participants the activities hosted by the new phase will generate. With the growing number of
participants in youth baseball and adult softball, the new multi -use fields will allow our staff the opportunity to
expand our programming in both sports as well as creating new opportunities for future programs including girl's
fast pitch. The addition of this phase will ensure that the Texas Star Sports Complex remains the premier sports
facility for amateur athletics for many years to come.
PROJECT DESCRIPTION:
The project includes the design of four (4) multi -use playing fields that would accommodate adult slow pitch and
girl's fast pitch softball, as well as youth baseball. In addition, the design would also include an additional 60/90
or high school aged field as the need for another field this size continues to grow. Phase V will also feature
synthetic sports turf in all the infields, a concession and restroom building, a pavilion, playground and sufficient
parking to accommodate the additional patrons.
PROJECT SCHEDULE:
FY2016
JUSTIFICATION:
Softball World is an aging facility with many necessary upgrades looming in the short-term which would require
a significant capital investment. This phase would eliminate the upgrades with consolidation and movement of
this operation to the Parks at Texas Star, collectively known as the Texas Star Sports Complex. With the
completion of Phase V, the new multi -use facility will serve the athletic needs of the community and spur
economic opportunities for the City.
--4N
'-*N
296
PROJECT TITLE: TEXAS STAR SPORTS COMPLEX PHASE V DESIGN
NET EFFECTS ON OPERATING AND
TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Design Development (30%)
$222,000
Personnel: Full Time
Construction Documents (45%)
$330,000
Part Time
$0
Bidding (5%)
$36,000
Total Salary
$0
Boundary Survey / Replat
$40,000
Purchase of Services
Topographic Surveying
$30,000
Materials & Supplies
Geotechnical
$15,000
Utilities
$0
Reimbursable Expenses
$15,000
Subtotal: $0
$0
Subtotal:
$0
Total Estimated Annual Cost $0 Total Estimated Capital Cost $688,000
PROPOSED METHOD OF FINANCE: I CURRENT STATUS:
Operating Fund XX
Conceptual Design % 0%
Fund Balance XX
Preliminary Design % 0%
Special Project Fund
Final Plans % 0%
Certificate of Obligation
Specifications % 0%
County, State, Federal Funding
Construction % 0%
General Obligation Bonds
Revenue Bonds
Escrow Funds
Other
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Note: Operating currently under the TSSC umbrella,
Softball World's proposed relocation to Parks At Texas
Star, under this phase, will cover all operating costs of the new operations. Accordingly, no additional baseline
expenses are anticipated.
297
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: May 12,2008
Submitted By: RAY MCDONALD Date Completed:
Project Title: TRAIL ENHANCEMENTS PHASE I
Project Type: PARK/RECREATION Sub -Type: TRAIL SYSTEM
Project Code: Priori B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Identified in the Needs Assessment and Identification section of the adopted Parks Master Plan are a number of
trail related improvements.
PROJECT DESCRIPTION:
This project consists of the first phase of implementation of park improvements identified in the adopted Parks
Master Plan which includes additional water fountains, additional benches, construction of shaded seating areas
along the trail, addition and/or installation of new exercise equipment along the trails, picnic stations, and
construction of additional pedestrian bridges in high water areas. Also identified, is the need to address various
areas in our trails system that might need to be converted from unpaved to paved trails.
PROJECT SCHEDULE:
FY2016
JUSTIFICATION:
The City of Euless has experienced significant progress in the last few years in the area of trail development
with an extensive network of paved and unpaved trails. The trails system is a valuable asset to the community
as it assists not only in providing a safe means for non -vehicular travel, but also in providing an opportunity for a
variety of unstructured, low -impact recreational pursuits. The development and maintenance of the trails system
continued to receive significant support from the citizens as indicated in the responses to the needs assessment
survey conducted as a part of the Parks Master Plan update.
W
'-IN
298
PROJECT TITLE: TRAIL ENHANCEMENTS PHASE I
NET EFFECTS ON OPERATING AND
TOTAL ESTIMATED CAPITAL COST:
AINTENANCE COST (+ OR -) ANNUAL:
Direct O eratin Cost
Stopping Stations:
Personnel: Full Time
8'x8' w/bench (2) Bob Eden
Part Time $0
Health Trail:
Total Salary $0
Fitness Course - Bob Eden
Purchase of Services
Freight for fitness equipment
Materials & Supplies
Installation of fitness equipment
Utilities $0
32' Gazebo shade shelter
Freight for gazebo
Installation of gazebo
New fitness trail surface
Subtotal: $0
(4527 sq. ft @ $4.25 sq. ft)
Maintenance Costs
Gazebo slab (805 sq. ft @ $4.25 sq.ft)
$0
Safety surface for fitness stations
Contingency (10%)
Other (5%)
Subtotal: $0
Total Estimated Annual Cost $0 Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: I CURRENT STATUS:
Operating Fund
Fund Balance XX
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
ADDITIONAL COMMENTS:
The proposed method of finance is EDC CIP Fund Balance
$8,200 1
$9,678
$1,249
$2,709
$44, 552
$2,050
$17,820
$19,240
$3,421
$50,000
$15, 892
$7, 945
$182,756 1
0%
0%
0%
0%
0%
299
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: May 01,2010
Submitted By: RAY MCDONALD Date Completed:
Project Title: TEXAS STAR SPORTS COMPLEX PHASE V CONSTRUCTION
Project Type: PARK/RECREATION Sub -Type: TSSC IMPROVEMENTS
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The Texas Star Sports Complex Phase V includes additional multi -use fields to accommodate both softball and
baseball. Also included in the project is additional parking and a concession building to support the new phase
and the number of participants the activities hosted by the new phase will generate. With the growing number of
participants in youth baseball and adult softball, the new multi -use fields will allow our staff the opportunity to
expand our programming in both sports as well as creating new opportunities for future programs including girl's
fast pitch. The addition of this phase will ensure that the Texas Star Sports Complex remains the premier sports
facility for amateur athletics for many years to come.
PROJECT DESCRIPTION:
The project includes the construction of four (4) multi -use playing fields that would accommodate adult slow
pitch and girl's fast pitch softball, as well as youth baseball. In addition, the construction would also include an
additional 60/90 or high school aged field as the need for another field this size continues to grow. Phase V will
also feature synthetic sports turf in all the infields, a concession and restroom building, a pavilion, playground
and sufficient parking to accommodate the additional patrons.
PROJECT SCHEDULE:
FY2017
JUSTIFICATION:
Softball World is an aging facility with many necessary upgrades looming in the short-term which would require
a significant capital investment. This phase would eliminate the upgrades with consolidation and movement of
this operation to the Parks at Texas Star, collectively known as the Texas Star Sports Complex. With the
completion of Phase V, the new multi -use facility will serve the athletic needs of the community and spur
economic opportunities for the City.
,--IN
300
PROJECT TITLE: TEXAS STAR SPORTS COMPLEX PHASE V CONSTRUCTION
NET EFFECTS ON OPERATING AND
AAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Personnel: Full Time
General Items
$115,000
Part Time
$0
Earth Work
$167,000
Total Salary
$0
Site Paving
$1,370,100
Purchase of Services
Softball Fields (four- plex)
$1,821,920
Materials & Supplies
Baseball Field
$799,812
Utilities
$0
General Site Amenities
$139,180
Playground
$200,000
Concession/Restroom Bldg
$450,000
Irrigation/Landscaping
$320,000
Subtotal:
$0
Water
$132,600
Maintenance Costs
Sanitary Sewer
$46,600
$0
Storm Drain
$389,460
Electrical
$817,900
10% Contingency
$677,037
Survey,Geotech, Etc 15%
$1,015,555
Subtotal:
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$8,462,164
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
XX
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
XX
Escrow Funds
Other
XX
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Note: Operating currently under the TSSC umbrella, Softball World's proposed relocation to Parks At Texas
Star, under this phase, will cover all operating costs of the new operations. Accordingly, no additional baseline
expenses are anticipated.
301
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: May 12,2008
Submitted By: RAY MCDONALD Date Completed:
Project Title. TRAIL CONNECTION SOUTH EULESS
Project Type: PARK/RECREATION Sub -Type: TRAIL SYSTEM
Project Code: Priori : B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Identified in the adopted Parks Master Plan is the need for additional trail connections from neighborhoods to
parks.
PROJECT DESCRIPTION:
There is very high interest in trails and trail connectivity as identified in the scientific survey in the adopted Parks
Master Plan. 88% of those participating in the survey identified the need for trail connections between
neighborhoods and parks. Additionally, 68% percent identified the need for trail connectivity to schools as a top
priority. This project would allow for safe access to South Euless Park from adjacent neighborhoods as well as
South Euless Elementary from the adjacent neighborhood to the south.
PROJECT SCHEDULE:
FY2017
JUSTIFICATION:
The City of Euless has experienced significant progress in the last few years in the area of trail development
with an extensive network of paved and unpaved trails. The trails system is a valuable asset to the community
as it assists not only in providing a safe means for non -vehicular travel, but also in providing an opportunity for a
variety of unstructured, low -impact recreational pursuits. The development and maintenance of the trails system
continued to receive significant support from the citizens as indicated in the responses to the needs assessment
survey conducted as a part of the Parks Master Plan update.
.""N
302
"I -,
OR
PROJECT TITLE: TRAIL CONNECTION SOUTH EULESS
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Approximately 5,600 Square Feet
Personnel: Full Time of 4'x8'x4" Concrete Trail @ $4.25 sq.ft
Part Time $0 Handrails, Concrete Footer, Retaining
Total Salary $0 Wall
Purchase of Services Contingencies 5%
Materials & Supplies
Utilities $0
Subtotal: $0
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Operating Fund
Fund Balance XX
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
The proposed method of finance is EDC CIP Fund Balance.
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
$23,800 1
$25,000
$2,440
$51,240 1
0%
0%
0%
0%
0%
303
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: May 13,2008
Submitted By: RAY MCDONALD Date Completed:
Project Title: TRAILWOOD PARK IMPROVEMENTS
Project Type: PARK/RECREATION Sub -Type: PARK IMPROVEMENTS
Project Code: Priori : B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project is a continuation of the overall park improvement plan as identified in the Parks Master Plan.
PROJECT DESCRIPTION:
Trailwood Park is an eleven acre site that currently has a playground and a half -mile hike/bike trail. This project
includes the installation of a new pavilion, a parking lot, upgraded playground to meet American with Disabilities
Act standards, park lighting, new park signs, benches along the trail, and trail lighting.
PROJECT SCHEDULE:
FY2017
JUSTIFICATION:
As identified in the adopted Parks Master Plan, the municipal park is the foundation of any solid parks and
recreation system. The City of Euless parks and recreation system provides the residents and visitors with
significant personal, social, environmental and economic benefits. The revitalization efforts that the Euless City
Council has focused on over the years has increased the sense of community pride. This proposed project will
continue those efforts by creating an area that will serve both the passive and active leisure needs of the
residents in the vicinity.
304
PROJECT TITLE: TRAILWOOD PARK IMPROVEMENTS
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Park amenities (playground, signs, etc) $100,000
Personnel: Full Time Parking (30 spaces) $75,000
Part Time $0 Parking lot lighting $15,000
Total Salary $0 2- Illini picnic shelters (12'x12') $20,000
Purchase of Services Contingencies 5% $10,500
Materials & Supplies
Utilities $0
Subtotal: $0
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
$0
$0
$0 Total Estimated Capital Cost $220,500
CURRENT STATUS:
Conceptual Design %
0%
Preliminary Design %
0%
Final Plans ova
0%
Specifications %
0%
Construction %
0%
305
City of Euless
Capital Project Request
Department: FLEET & FACILITY OPERATIONS Date Prepared: April 01,2013
Submitted By: KYLE MCADAMS Date Completed:
Project Title: LIBRARY REMODEL DESIGN
Project Type: FACILITIES Sub -Type: REMODEL
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This remodel planning is submitted as a new project and is not related to the City's Master Plan.
PROJECT DESCRIPTION:
Planning and design phase for remodel of the Library scheduled for FY2019.
PROJECT SCHEDULE:
FY2018
JUSTIFICATION:
The Library was constructed in 1996 and interior furnishings and design layout are in need of updating.
'_-N
306
M,
PROJECT TITLE: LIBRARY REMODEL DESIGN
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Insurance
Subtotal:
$0
$0
$0
$0
$0
TOTAL ESTIMATED CAPITAL COST:
Planning/Bid Specifications $147,6301
Subtotal:
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$147,630
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
S P
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
XX
To Be Determined
ADDITIONAL COMMENTS:
307
City of Euless
Capital Project Request
Department: FLEET & FACILITY OPERATIONS Date Prepared: April 01,2013
Submitted By: KYLE MCADAMS Date Completed:
Project Title: LIBRARY REMODEL CONSTRUCTION
Project Type: FACILITIES Sub -Type: REMODEL
Project Code: Priori : B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This remodel is submitted as a new project and is not related to the City Master Plan.
PROJECT DESCRIPTION:
The library facility remodel project scope includes reconfiguration of the general interior layout, HVAC upgrade,
replacement of furnishings, updating overall facility decor, lighting upgrades, and electrical work.
PROJECT SCHEDULE:
FY2019
JUSTIFICATION:
The Library was constructed in 1996, pre-internet and pre -digital age. Electrical plugs and data ports are
currently in limited areas but are needed throughout the building to provide increased access to computers and
technology. Patrons are requesting more space for quiet study, group study, and collaboration. The Young
Adult/Teen collection is one of the highest circulation and this group needs a space in the Library.
`1
308
PROJECT TITLE: LIBRARY REMODEL CONSTRUCTION
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
I Subtotal:
$0
$0
$0
$0
$0
TOTAL ESTIMATED CAPITAL COST:
Construction $1,596,000
Subtotal:
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$1,596,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
XX
To Be Determined
ADDITIONAL COMMENTS:
309
City of Euless
Capital Project Request
Department: FLEET & FACILITY OPERATIONS Date Prepared: May 07,2007
Submitted By: KYLE MCADAMS Date Completed:
Project Title: ANIMAL SHELTER-EXPANSION/RENOVATION
Project Type: FACILITIES Sub -Type: REMODEL
Project Code: Priori : C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project is part of the City's five year master plan.
PROJECT DESCRIPTION:
The project consists of the expansion of the current animal shelter facility to better accommodate visitors,
adoptions, and animal services. The project scope includes the addition of ten (10) enclosed dog runs, six (6)
quarantine runs, an adoption room, additional room for cat containment, and an area for animal washing. Office
space expansion will be included in the renovation as well as updates to the public/employee rest rooms.
PROJECT SCHEDULE:
JUSTIFICATION:
The current animal control facility has insufficient space to meet current and future demands.
,-IN
310
PROJECT TITLE: ANIMAL SHELTER-EXPANSION/RENOVATION
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
Total Estimated Annual Cost
I PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0 1 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
25%
Preliminary Design %
0%
Final Plans %
0%
Specifications %
0%
Construction %
0%
311
City of Euless
Capital Project Request
Department: FLEET & FACILITY OPERATIONS Date Prepared: March 13,2013
Submitted By: KYLE MCADAMS Date Completed:
Project Title. FIRE STATION #2 REMODEL
Project Type: CONSTRUCTION Sub -Type: REMODEL
Project Code. Priori C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This structure was the former vehicle service center and was reconstructed for the relocation of Fire Station #2
from 1100 Westpark Way. The building is in need of Americans with Disabilities Act enhancements,
reconfiguration of the bathrooms and shower facilities, kitchen, and general remodel of interior structures.
PROJECT SCHEDULE:
JUSTIFICATION:
W
No
312
L.1
PROJECT TITLE: FIRE STATION #2 REMODEL
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
I Subtotal:
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
1'_
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
313
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: May 13,2008
Submitted By: RAY MCDONALD Date Completed:
Project Title: KIDDIE CARR PARK IMPROVEMENTS
Project Type: PARK/RECREATION Sub -Type: PARK IMPROVEMENTS
Project Code: Priori : C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The adopted Parks Master Plan recommends funding for system -wide park facilities and amenities upgrades.
PROJECT DESCRIPTION:
This project includes the construction or installation of a pavilion, a concrete trail connection to Carr Park, bank
stabilization along Boyd Branch Creek which runs through the park, a playground, park lighting, picnic stations,
an irrigation system, new perimeter fencing, a drinking fountain, benches, and a dedicated parking lot at Kiddie
Carr Park.
PROJECT SCHEDULE:
JUSTIFICATION:
As identified in the adopted Parks Master Plan, the municipal park is the foundation of any solid parks and
recreation system. The City of Euless parks and recreation system provides residents and visitors with
significant personal, social, environmental, and economic benefits. The revitalization efforts that the Euless City
Council has focused on over the years has increased the sense of community pride. Kiddie Carr Park is a four
acre park located adjacent to Carr Park off Pauline. The current amenities at this park include the Parks
Department's in -ground tree farm, a greenhouse, and an outdoor basketball court. The park is located in a
section of town that needs something to stimulate community pride. The proposed project will continue the City
Council's revitalization efforts by creating an area that will serve both the passive and active leisure needs of the
residents in this area.
--1
.-,
314
L
PROJECT TITLE: KIDDIE CARR PARK IMPROVEMENTS
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
I Subtotal:
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
315
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: April 02,2013
Submitted By: RAY MCDONALD Date Completed:
Project Title: SOUTH EULESS PARK UPGRADES
Project Type: PARK/RECREATION Sub -Type: PARK IMPROVEMENTS
Project Code: Priori : C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The adopted Parks Master Plan calls for general upgrades and improvements in the overall quality of parks in
the city and to develop a high quality parks system that provides for all age and interest groups and enhances
the adjoining neighborhoods.
PROJECT DESCRIPTION:
Overall park enhancements and improvements that might include amenities such as new playground equipment,
park redevelopment, improved lighting, water features, upgrades to existing splashpad, expansion of existing
splashpad, and additional landscaping.
PROJECT SCHEDULE:
JUSTIFICATION:
This has been documented in the adopted Parks Master Plan.
—l"
316
PROJECT TITLE: SOUTH EULESS PARK UPGRADES
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
317
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: May 13,2008
Submitted By: RAY MCDONALD Date Completed:
Project Title: TRAIL ENHANCEMENTS PHASE II
Project Type: PARK/RECREATION Sub -Type: TRAIL SYSTEM
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This enhancement was identified in the Needs Assessment and Identification section of the adopted Parks
Master Plan.
PROJECT DESCRIPTION:
This project is Phase II of the trail enhancements that continues implementation of park improvements identified
in the adopted Parks Master Plan which includes additional water fountains, additional benches, construction of
shaded seating areas along the trail, addition and/or installation of new exercise equipment along the trails,
picnic stations, and construction of additional pedestrian bridges in high water areas. Also identified, is the need
to address various areas along the trail that need to be converted from unpaved to paved trails.
PROJECT SCHEDULE:
JUSTIFICATION:
The City of Euless has experienced significant progress in the last few years in the area of trail development
with an extensive network of paved and unpaved trails. The trails system is a valuable asset to the community
as it assists not only in providing a safe means for non -vehicular travel, but also in providing an opportunity for a
variety of unstructured, low -impact recreational pursuits. The development and maintenance of the trails system
continued to receive significant support from the citizens as indicated in the responses to the needs assessment
survey conducted as a part of the Parks Master Plan update.
,-1
318
PROJECT TITLE: TRAIL ENHANCEMENTS PHASE 11
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
Total Estimated Annual Cost
r
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
/Xl
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
319
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: March 23,2004
Submitted By: RAY MCDONALD Date Completed:
Project Title. TRAIL ENHANCEMENTS VILLAGES OF BEAR CREEK
Project Type: PARK/RECREATION Sub -Type: TRAIL SYSTEM
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project includes infrastructure improvements which were identified as a high priority in the adopted Parks
Master Plan.
PROJECT DESCRIPTION:
This project includes the redevelopment/redesign and improvement of the trail at the Villages of Bear Creek
Park to offer multiple uses for the citizens of Euless.
PROJECT SCHEDULE:
JUSTIFICATION:
Trail development and enhancement opportunities will be consistent with available land, funding and time
variables. This Master Plan recommendation will be part of a city-wide comprehensive trail enhancement
project. Due to the continual erosion of the existing trail, a redevelopment/redesign of the trail system at Villages
of Bear Creek will be a high priority.
''1
320
PROJECT TITLE: TRAIL ENHANCEMENTS VILLAGES OF BEAR CREEK
NET EFFECTS ON OPERATING AND
AAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
I Subtotal:
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0 I Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
321
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: April 03,2013
Submitted By: RAY MCDONALD Date Completed:
Project Title: WILSHIRE PARK UPGRADES
Project Type: PARK/RECREATION Sub -Type: PARK IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The adopted Parks Master Plan calls for general upgrades and improvements in the overall quality of parks in
the city and to develop a high quality parks system that provides for all age and interest groups and enhances
the adjoining neighborhoods.
PROJECT DESCRIPTION:
Overall park enhancements and improvements that might include amenities such as new playground equipment,
park/trail lighting, pavilion, additional water features, parking improvements, additional landscaping and shade
structures for existing picnic pads.
PROJECT SCHEDULE:
JUSTIFICATION:
Documented in the adopted Parks Master Plan.
'-N,
322
PROJECT TITLE: WILSHIRE PARK UPGRADES
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
I Subtotal:
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
L04
TOTAL ESTIMATED CAPITAL COST:
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
323
T H E C I T Y O F
EU.LESS
324
CAPITAL IMPROVEMENTS PROGRAM
COMPLETED PROJECTS SUMMARY
Project
Number
Project Description
Total Project (Over) Under
Date Completed Total Budget Costs Budget
DRAINAGE PROJECTS
DR9901
ISulphurpranch Phase II
08/01/99
$ 123,404
$ 120,128
$ 3,276
DR9902
JWindlea & WestCliff
08/01/99
$ 4,396
$ 1,159
$ 3,237
DR9904
Hurricane Creek
04130/02
$ 257,500
$ 69,906
$ 187,594
DR0302
Flooding Mitigation
Cancelled
$ 250,000
$ -
$ 250,000
DR0303
Aransas A Glenn
12/31/04
$ 250,000
$ 250,000
$ -
DR0304
Live Oak Drainage
04/15/05
$ 218,000
$ 175,958
$ 42,042
DR0305
Sierra Drive Drainage
04/15/05
$ 40,738
$ 40,738
$ 0
DR0306
Flood Mitigation Plan FEMA
04/15/05
$ 32,000
$ 7,750
$ 24,250
DR0307
Simmons Drainage
04/15/05
$ 22,995
$ 22,995
$
DR0301
Fuller Branch Channel Stabilization
05/31107
$ 279,136
$ 232,176
$ 46,960
DR0401
Channel Stabilization Tribute WFA
05/31/07
$ 437,462
$ 438,070
$ 608
DR0402
Drainage Project Stud
05/31/07
$ 60,000
$ 51.000
$ 9,000
DR0601
Little Bear Creek Study Update
04/25/08
$ 50.000
$ 49,000
$ 1,000
DR0602
McCormick Park
04/25/08
$ 250,000
$ 247,925
$ 2,075
DR0701
Eastcliff Drive/Greenbriar Drive Drainage Imp.
04/17/10
$ 340,000
$ 246,584
$ 93,416
DR0801
Rockwall Drive/Lamar Drive Drainage Imp.
04/17/10
$ 430,000
$ 272,554
$ 157,446
DR0901
Bear Creek Parkway Erosion Repair
02/17/11
$ 530,000
$ 464,465
$ 65,535
DR0802
Hurricane Creek R Bridge at Marlene
Improvements
04/14/11
1 $ 378,500
$ 344,574
$ 33,926
Drainage Projects - Prior Years
Is 3 954,131
$ 3,034 962
$ 919,149
Draina a Projects - Current Year
$ -
$ -
$
Total Drainage Projects
$ 3,954,131
$ 3,034,982
$ 919,149
325
W
T H E C I T Y O F
ss..w
wo
326
CAPITAL IMPROVEMENTS PROGRAM
COMPLETED PROJECTS SUMMARY
Project
Number
Project Description
Total Project (Over) Under
Date Completed Total Budget Costs Budget
STREET PROJECTS
PS9911
Overlay Projects
03/30/00
$ 294,687
$ 294,687
$
PS9912
Harwood -Main Intersection
04/30/00
$ 1,126,935
$ 1,077 303
$ 49,632
PS9907
WestPark Way -SH10 to SH183
09/30/00
$ 605,542
$ 479,915
$ 125,627
PS9902
Mid Cities Blvd.
05/02/02
$ 1,075,074
$ 963,635
$ 111,439
PS9910
Sidewalks
06/30/03
$ 200,000
$ 200,000
$
PS0001
FM 157 S Pipeline to SH10(Utility Relocation
04/30/04
$ 378,207
$ 371,318
$ 6,889
PS0003
Glade from Heritage to SH121
04/30/04
$ 1,866,612
$ 1,866,612
$
PS0004
Glade Rd East-SH121toChampagne
04/30/04
$ 1,210014
$ 1,162009
$ 48,005
PS0201
Gateway Blvd - Southern Portion
04/30/04
$ 510,000
$ 473,817
$ 36,183
PS0301
Mid Cities Roadway Illumination
04/15105
$ 160,000
$ 148,115
$ 11,885
PS0302
Driftwood Pipeline Traffic Signal
04/15/05
$ 100,000
$ 68,665
$ 31,335
PS0303
Aransas/Harwood Traffic Signal
04/15/05
$ 120,000
$ 89,118
$ 30,882
PSO402
South Pipeline Road Bride
04/30/05
$ 28,208
$ 28.208
$
PS9908
Si nalization
05/31/06
$ 168,055
$ 168,055
$
PSO401
West Pipeline - Raider to City Limits
05/31/06
$ 223,000
$ 104,859
$ 118,141
PSO403
Raider Dr - SH10 to South Pipeline
05/31/06
$ 330,000
$ 293,435
$ 36,565
PS0501
Ross Avenue/S.Main 300' W
05/31/06
$ 95,688
$ 95,638
$ 50
PS0502
Industrial Signal Timing
05/31/06
$ 50,000
$ 50,000
$
3
Overly -Harwood 157/Main
05/31/06
$ 137,000
$ 119816
$ 17,184
4
Overly S Main, SH10/S Pi aline
05/31/06
$ 137,000
$ 140,211
$ (3,211)
1
Oveda -East Midwa
05/31/07
$ 83,000
$ 73,550
$ 9,450
2
Overly -Midwa , N Main /FM157
05/31/07
$ 105000
$ 67,632
$ 37368
3
Ovena -Fuller Wiser Mrdwa Manxood
05/31/07
$ 40000
$ 28,695
$ 11305
6
Traffic Safe /Si nalization
05/31/08
$ 128,027
$ 127939
$ 88
4
I
South Pipeline Road Overlay
05/31/08
$ 114,750
$ 85,062
$ 29,688
1
Oveda -Dicke Drive
05/31/08
$ 122,200
$ 48.435
$ 73,765
Oveda-EastHuitt
05/31/08
$ 89,000
$ 64,895
$ 24105
Overly-Huntin ton Drive
05/31/08
$ 69500
$ 42884
$ 26,616
Gatewa Blvd Screenin Wall
05/31/08
$ 135800
$ 138,862
$ 3062
Si nal Gatewav Blvd ftGlade
10/28/08
$ 98,000
$ 98,000
$
PS0002
West Pipeline Road-Raider/H 10
12/01/08
$ 6,082,621
$ 6,081,392
$ 1,229
PS0801
Overlay -North Mair/Cullum Drive
12/31/08
$ 290,000
$ 211,130
$ 78,870
PS9905
Traffic Studies
05/30/09
$ 27,286
$ 27,197
$ 89
PS0704
DisabilityAccess Stu
05/31/09
$ 30,000
$ 13,950
$ 16,050
PS0901
Ash/Denton/Fair Oaks Overta
09/30/09
$ 320,000
$ 231,9134
$ 88,016
PS0902
Vine Street Design
Cancelled
$ 100,000
$ -
$ 100,000
PS9903
HWY 183 Service Road
Cancelled
$ -
$ -
$
PS0304
Glade Road
04/16/10
$ 3,077 977
$ 2,905,205
$ 172.772
PS9909
FM157 North -SH183toSH121
04/16/10
$ 267519
$ 129215
$ 138,304
PS0903
Mid Cities a Gateway & Baze Traffic Signals
04/16/10
$ 320,000
$ 250,702
$ 69,298
PS0802
Fuller -Wiser Connector
02/17/11
$ 495,000
$ 441,491
$ 53,509
PS1002
FY10 County Overlay - Wishire/Madene
05/17/11
$ 288,000
$ 200,890
$ 87,110
PS9901
North Main Street
05/31/12
$ 6,745,047
$ 6,698,149
$ 46,898
PS9904
Harwood Road
05/31/12
$ 57.$770211
5,686,556
$ 83,655
PS1001
Baze Road
05/31/12
$
$ 1558,401
$ 271,599
PS1101
FY2011 County Oveday-Bear Creek
Drive/Lakewcod Blvd/Ash Lane
05/31/12
$
$ 265,887
$ 34,113
PS0605
South Pi line Road Brid a Re lacement
05/31/13
$
$ 157,000
$
PS1003
Ash Lane -Aransas Drive to N. Main Street
05/31/13
$ 1,959,230
$ 1,597,2
$ 361,960
PS1201
FY2012 County Overlay -Aransas Drive/Slaughter
Lane
05/31/13
$ 300 000
$ 228,7
$ 71,241
Street Projects -Prior Years
$ 38161190
$ 35,656,547
$ 2,504,643
PS1301 Improvements
FY2013 38th CDBG-ADA/TAS Infrastructure
05/31/14
$ 450,000
$ 284,581
$ 165,419
PS1302
FY2013 County Overlay-Trailwood/Summit
Rid e/Wes ark/Baze
05/31/14
$ 280,000
$ 273,995
$ 6,005
PS1402
FY2014 County Overay-Ector Drive/Midway
Drive/TroanTrail
05/31/14
$ 300000
$ 300,000
$
Street Projects - Current Year
$ 1,030,000
$ 858,576
$ 171,424
Total S6eetProjects $ 39,191,190 1 $ 36,515,123 $ 2,676,067
327
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 17,2011
Submitted By: CHRIS BARKER Date Completed: Jan 31, 2014
Project Title: 38TH CDBG-ADA/TAS INFRASTRUCTURE IMPROVEMENTS
Project Type: STREET Sub -Type: CDBG
Pro'ect Code: PS1301 Priority: A
COUNCIL AUTHORIZATION:
February 28, 2012: Conduct a Public Hearing regarding the proposed 38th year CDBG project, including the
installation of sidewalk accessibility ramps located along South Main Street, Fair Oaks Boulevard, Limestone
Drive, Himes Drive, Collin Drive, Sixpence Lane and Newport Way and motion to approve a recommendation
regarding the selected CDBG project.
March 26, 2013: Awarded construction contract to Estrada Concrete Company, LLC in the amount of
$306,492.50 for the replacement of sidewalk accessibility ramps.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project provides for continued improvements to accessibility ramps by removing architectural barriers to
accessibility as required by Federal and State mandated Americans with Disabilities Act/Texas Accessibility
Standards ("ADA/TAS"). The project scope includes identification of architectural barriers to accessibility that
meet CDBG eligibility guidelines and the subsequent replacement thereof.
(38th year CDBG project)
PROJECT SCHEDULE:
Began Construction: May 2013
Construction Complete: January 2014
JUSTIFICATION:
Removing architectural barriers to accessibility is an eligible CDBG activity and will assist in the City's efforts to
maintain compliance with applicable Federal and State ADA/TAS codes.
328
PROJECT TITLE: 38TH CDBG-ADA/TAS INFRASTRUCTURE IMPROVEMENTS PROJECT CODE: PSI 301
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
TOTAL ESTIMATED CAPITAL COST:
Engineering $67,500
Construction $382, 500
$0
Subtotal: $0 Total Estimated Capital Cost $450,000
Maintenance Costs Funding Source:
CDBG Award $450,000
Subtotal: $
Total Estimated Annual Cost
$0
Unused 38th CDBG Funding
Total Fundin-q
($165,419)
$284,581
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED
BUDGET (- +)
% EXPENDED
Engineering
$67,500 $0
$67,500
0%
Construction
$382,500 $284,581
$97,919
74%
PROJECT $450,000 $284,581 $165,419 63%
329
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 20, 2010
Submitted By: RON YOUNG Date Completed: Aug 31, 2013
Project Title: FY2013 COUNTY OVERLAY - TRAILWOOD/SUMMIT RIDGE/WESTPARK/BAZE
Project Type: STREET Sub -Type: OVERLAY
Proiect Code: PS1302 Priority: A
COUNCIL AUTHORIZATION:
January 22, 2013: Authorized the City Manager to execute an interlocal agreement with Tarrant County for
asphalt overlay improvements to Summit Ridge Drive, Westpark Way, Trailwood Drive and Baze Road.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Trailwood Drive, Summit Ridge Drive and Baze Road are collector streets in the City's Master Thoroughfare Plan.
Westpark Way is an undivided arterial street in the City's Master Thoroughfare Plan.
PROJECT DESCRIPTION:
The project consists of edge milling, asphalt overlay, and restriping on:
1. Trailwood Drive from N Main Street to Summit Ridge Drive (west end),
2. Summit Ridge Drive from Lakewood Boulevard to Trailwood Drive,
3. Westpark Way from S Pipeline to SH10, and
4. Baze Road from Mid Cities Boulevard to Priest Lane.
PROJECT SCHEDULE:
Began Construction: January 2013
Construction Complete: August 2013
JUSTIFICATION:
The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, will
extend the life of the roadway, and will enhance the appearance of the streets.
, -,*N
.-1*11
330
L
PROJECT TITLE: FY2013 COUNTY OVERLAY - TRAILWOOD/SUMMIT RIDGE/WEPROJECT CODE: PSI 30,
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Construction $280,000
Personnel: Full Time
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal: $0 Total Estimated Capital Cost $280,000
Maintenance Costs Funding Source:
Transfer from:
Car Rental $300,000
Subtotal: $0 Transfer to:
Street CIP Fund Balance FY13 ($20,000)
Street CIP Fund Balance FY14 ($6,005)
Total Estimated Annual Cost $01 Total Funding $273,995
CURRENT STATUS
OVERIUNDER
PHASEIFUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Construction $280,000 $273,995 $6,005 98%
AL PROJECT $280,000 $273,995 $6,005 98%
331
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 01,2014
Submitted By: HAL CRANOR Date Completed: May 31, 2014
Project Title: FY2014 COUNTY OVERLAY-ECTOR DR/MIDWAY DR/TROJAN TR
Project Type: STREET Sub -Type: OVERLAY
Pro'ect Code: PS1402 Priority: A
COUNCIL AUTHORIZATION:
September 24, 2013: Authorized the City Manager to execute an Interlocal Agreement with Tarrant County for
asphalt overlay improvements to South Ector Drive, North Ector Drive, Trojan Trail, and Midway Drive. The
estimated expenditure is $300,000.
February 25, 2014: Renewed Bid No. 007-12 for an annual contract for the purchase of Type-B and Type-D Hot
Mix Asphalt to Reynolds Asphalt and Construction Co. Euless, TX 76039, as the primary supplier and to JLB
Contracting, LLC as secondary supplier.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Ector Drive, Midway Drive and Trojan Trail are collector streets in the City's Master Thoroughfare Plan.
PROJECT DESCRIPTION:
The project consists of edge milling, asphalt overlay, and restriping on:
1. Ector Drive from SH10 to SH183 and from SH183 to Midway Drive,
2. Midway Drive from Ector Drive to North Main Street, and
3. Trojan Trail from FM157 to Ector Drive.
PROJECT SCHEDULE:
Began Construction: March 2014
Construction Complete: March 2014
JUSTIFICATION:
The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, will
extend the life of the roadways, and will enhance the appearance of the streets.
Eno
332
PROJECT TITLE: FY2014 COUNTY OVERLAY-ECTOR DR/MIDWAY DR/TROJAN PROJECT CODE: PSI 40',
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
I Subtotal:
TOTAL ESTIMATED CAPITAL COST:
$0
$0
$0
$0 Total Estimated
Funding Source:
Transfer from:
Car Rental
Cost
$300,0001
$300,0001
$300,0001
Total Estimated Annual Cost $01 Total Funding $300,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED
Construction $300,000 $300,000 $0 100%
ECT
$300,000 $300,000 $0 100%
333
roo
T H E C I T Y O F
E� U- �ESS
334
ON
CAPITAL IMPROVEMENTS PROGRAM
COMPLETED PROJECTS SUMMARY
Project
Number
Project Description
Total Project (Over) Under
Date Completed Total Budget Costs Budget
WASTEWATER PROJECTS
WW9902
Impact Fee Stud
09/30/99
$ 13,000
$ 12,238
$ 762
WW9903
Misc Sewer Rehab FY99
09130/99
$ 50,000
$ 12,987
$ 37,013
WW9904
Hydraulic Anasis
06/30/00
$ 27,000
$ 27,000
$
WW9901
CDBGB/98-UC-48-0001/B95-22-50
08/19/00
$ 150,000
$ 72,927
$ 77073
WW0003
TRA Debt Payment
05/31/01
$ 822,037
$ 822,037
$ -
VWV0001
CDBG B/99-UC-48-0001
09/30/01
$ 150,000
$ 121,682
$ 28,318
WW0101
CDBGB00-UC480001-2250
02/20/02
$ 251,485
$ 247,790
$ 3695
WW0102
Manhole Rehab. Pro ram
03/31/03
$ 250,000
$ 184,520
$ 65,480
VWV0201
CDBG - B01-UC-48-0001-22-50
03/31/03
$ 237,086
$ 172,948
$ 64,138
WW0202
Line Replacement -Dunaway
02/28/05
$ 140,000
$ 139,955
$ 45
W W0203
Line Replacement - E. Alexander
02/28/05
$ 20,000
$ 20.000
$ -
WW0204
Line Replacement - Paula Lane
02/28/05
$ 79,000
$ 79,000
$ -
WW0103
Line replacement-S. Pi eline,Heather-Vine
04/15105
$ 489,759
$ 464,504
$ 25,255
VWV0205
Line Replacement - Midway Park
04/30/05
$ 366,000
$ 318,149
$ 47,851
WW0401
CDBG B03-UC-48-0001-22-50
04/30/05
$ 217,000
$ 161,170
$ 55,830
VVW0301
CDBG B02-UC-48-0001-22-50
07/26/05
$ 271,455
$ 271,454
$ 1
VWV0302
Inflow & Infiltration
Cancelled
$ 200,000
$ -
$ 200,000
WW0303
Line Replacement, Canyon Ride
08/31/06
$ 196,200
$ 173,516
$ 22,684
WW0304
Line Replacement, Sagebrush
08/31/06
$ 160,900
$ 136,470
$ 24430
WWO305
Line Replacement, Short
08/31/06
$ 251,400
$ 219,932
$ 31,468
WW0306
Line Replacement, E. Fuller
08/31/06
$ 231,372
$ 180,089
$ 51,283
WW0501
Line Replacement, Pebble Creek
08/31/06
$ 172,600
$ 145,655
$ 26,945
WW0604
Line Replacement, CDBG-Oakwood Terrace
05/31/07
$ 293,723
$ 232,274
$ 61,449
WWO402
Line Replacement, Carr Park/SH10
05/31/08
$ 588,000
$ 528,302
$ 59,698
WW0403
Line Replacement, Ector Drive
05/31/08
$ 373,000
$ 328,309
$ 44,691
VWV0601
Line Replacement, Cedar Hills Estate
05/31/08
$ 319,000
$ 200,201
$ 118,799
WWO602
Line Replacement, Ector Drive
05/31/08
$ 425,000
$ 285,758
$ 139,242
WW0603
Little Bear Creek Collection Line
05/31/08
$ 575,000
$ 464,293
$ 110,707
WW0701
Line Replacement, McCormick & Co her
02/05/09
$ 243,000
$ 194.254
$ 48,746
WW0702
Line Replacement, Arnett Addition
02/05/09
$ 313,322
$ 229,006
$ 84,316
VWV0703
Line Replacement, Jean Lane
02/05/09
$ 111,000
$ 70,603
$ 40,397
WW0704
Line Replacement, W. Fuller
02/05/09
$ 132,000
$ 82,708
$ 49,292
WW0902
Line Replacement, West Mills Drive-34th CDBG
04/16/10
$ 46,855
$ 46,855
$ -
VJW0802
Line Replacement South Mills Drive CDBG-R
11/01/10
$ 253,710
$ 165,867
$ 87,843
WW0901
Line Replacement Woodridge Circle/Koen Lane
11/01/10
$ 407,000
$ 309,410
$ 97,590
WWO801
Line Replacement Fayette Drive
04/14/11
$ 357,000
$ 325,676
$ 31,324
WW1001
Line Re - W Alexander Ln/Norman Dr/Franklin Dr
05/31/12
$ 420,000
$ 331,614
$ 88,386
WW1101
Line Re - Ba less/Pauline/Jones CDBG
05/31/12
$ 350,000
$ 208,903
$ 141,097
WWI 103
Line Re - Ba less/Pauline/Jones Outtall
05131/12
$ 57,000
$ 37,544
$ 19,456
VVW1202
Line Re - Collin Drive 37th CDBG
05/31/12
$ 300,000
$ 231,173
$ 68,827
WWI 102
Line Re - E Huit Lane/Ascot Drive/Dunaway Drive
05/31/13
$ 560,000
$ 468,932
$ 91,068
WW1201
Line Re - Blanco/Aransas/Crane
05/31/13
$ 327,000
$ 284,321
$ 42,679
WastewaterPro'ects - Prior Years
$ 11,197,904
$ 9,010,076
$ 2.167.878
WW1301 I Line Re - Ross/Slaughter/East & West Huitt 05/31/14
$ 670,000
$ 566,640
$ 103,360
Wastewater Projects-CurrentYear
$ 670,000
$ 566,640
$ 103,360
Total Wastewater Projects $ 11,867,904 $ 9,576,666 $ 2,291,238
335
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 27,2014
Submitted By: HAL CRANOR Date Completed: May 31, 2014
Project Title: LINE REP-ROSS AVE/SLAUGHTER LN/EAST&WEST HUITT LN
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Proiect Code: WW1301 Priority: A
COUNCIL AUTHORIZATION:
January 8, 2013: Authorized the City Manager to execute an engineering design contract with Elliot and Hughes,
Inc. with an amount not to exceed $71,500 for the design of replacement sanitary sewer mains.
October 8, 2013: Awarded Bid No. 008-13 for a construction contract to William J. Schultz Inc. dba Circle C
Construction, Fort Worth, Texas, for the replacement of sanitary sewer mains in portions of the Oak Crest
Estates, Alexander Cullum, Oakwood Terrace East, and Ross Additions and authorized the City Manager to enter
into a contract with William J. Schultz Inc. dba Circle C Construction. The estimated expenditure is $509,590.50.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project
is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Ross Avenue and the outfall to West Alexander Lane,
2. Between John Vernon Lane and Slaughter Lane east of Dunaway Drive,
3. East of Dunaway Drive from Slaughter Lane to E Huitt Lane,
4. Along E Huitt Lane from S Main Street to Dunaway Drive, and
5. Between Linda Lane and W Huitt Lane.
PROJECT SCHEDULE:
Award Design: January 2013
Plans Complete: July 2013
Award Construction: October 2013
Construction Began: November 2013
Construction Compete: April 2014
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce
maintenance costs and customer problems.
--IN
'"\
336
Om
\I -
PROJECT TITLE: LINE REP-ROSS AVE/SLAUGHTER LN/EAST&WEST HUITT LNPROJECT CODE: WW1301
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering $100,
Personnel: Full Time Construction $570,
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
Subtotal: $0 Total Estimated Capital Cost $670,000
Maintenance Costs Funding Source:
Transfer from/to:
W/WW Operating Fund $870,000
W/WW CIP Fund Balance ($200,000)
$0
Subtotal:
$0
Transfer to:
W/WW CIP Fund Bal FY14
($103,360)
Total Estimated Annual Cost
$01
Total Fundina
$566,640
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED
BUDGET (- +)
% EXPENDED
Engineering
$100,000 $66,555
$33,445
67%
Construction
$570,000 $500,085
$69,915
88%
ECT $670 000 $566,640 $103,360 85%
337
H E C I T Y O
J _
wo
..IN
338
OWN
CAPITAL IMPROVEMENTS PROGRAM
COMPLETED PROJECTS SUMMARY
Project
Number
Project Description
Total Project (Over) Under
Date Completed Total Budget Costs Budget
WATER PROJECTS
WT9903
Master Plan
08/30/99
$ 42,000
$ 5,445
$ 36,555
WT9904
Well Repairs
09/30/99
$ 66,921
$ 66,921
$ -
WT9907
Impact Fee Stud
09/30/99
$ 13,000
$ 12,238
$ 762
WT9911
Water Distribution - Master Plan
09/30/99
$ 25,600
$ 24,000
$ 1,600
WT9901
Meter Change Out Program
10/30/99
$ 101,917
$ 98,365
$ 3,552
WT0002
Emergency Repair - H10
11/30/99
$ 15450
$ 14,214
$ 1236
WT9906
Hwy 10 Water Line
01/30/00
$ 150,000
$ 138,883
$ 11 117
WT0006
Central Drive Water Mains
03/31/00
$ 92,814
$ 90,742
$ 2,072
WT9905
Misc Water Rehab
06/30/00
$ 50,000
$ 43,749
$ 6,251
WT0004
Water Line Milam - Ector/Midwa
06/30/00
$ 18,248
$ 13,743
$ 4,505
W170102
SCADA Upgrade
04/09/01
$ 93,400
$ 93,400
$ -
WT0003
Waterline Re lacement - Aransas
06/30/01
$ 12,057
$ 7,089
$ 4,968
WT0005
Waterline Replacement - Milam- Denton/Mid
04/30/02
$ 26,988
$ 26,988
$ -
WT9910
Water Line for Elevated Tank
05/31/02
$ 1,608,386
$ 1,201,698
$ 406,688
WT9909
2MGWater Tank
03/31/03
$ 2,430,881
$ 2,289,571
$ 141,310
WT0103
Fire Hydrant Replacement Program
03/31/03
$ 50,000
$ 49,626
$ 374
WT9908
Mid Cities Blvd. 12" Line
04/30/04
$ 342,080
$ 313,354
$ 28,726
WT0401
Line Replacement, West Pipeline Main
05/31/06
$ 1,215,663
$ 1,215,663
$ -
WT0403
Waterline Replacement - Fairlawn Court
Cancelled
$ 35,000
$ -
$ 35,000
WT0404
Waterline Replacement - Atkerson Lane
Cancelled
$ 104,000
$ -
$ 104,000
WT0405
Line Replacement, West Ash Lane
08/31/06
$ 30,000
$ 11,626
$ 18,374
W1-0406
Line Replacement, Westport/Newport/Asbury
08/31/06
$ 67,000
$ 9,866
$ 57,134
WT0502
FY'2005 CDBG
08/31/06
$ 69.300
$ 29,549
$ 39,751
WT0503
Line Replace ent, S. Atkerson Lane
08/31/06
$ 79,000
$ 51,294
$ 27,706
WT0504
Line Replacement, Blanco Drive
08131106
$ 112,620
$ 112,620
$ -
WT0505
Line Replacement, Henslee
08/31/06
$ 183000
$ 123,859
$ 59,141
WT0506
Line Replacement, Vernon/Slaughter
08/31/06
$ 161,000
$ 113,052
$ 47,948
WT9902
Tank Painting
05/31/07
$ 1,317,763
$ 957,542
$ 360,221
WT0501
S stem Security Upgrade
05/31/08
$ 40,000
$ 28,319
$ 11,681
W10601
Wtr Sys Se rity Perimeter Fence Upgrade
05/31/08
$ 75,000
$ 49,567
$ 25,433
WT0602
Line Replacement, Cannon Drive
05/31/08
$ 250,000
$ 223,055
$ 26,945
WT0701
Line Replacement, Canyon Ride
05/31/08
$ 116,000
$ 78,136
$ 37,864
WT0702
CDBG FY07 - 32nd Oakwood Terrace
05/31/08
$ 334,481
$ 296,223
$ 38,258
W1-0802
CDBG-33rd Oakwood Terrace -Simmons
12/31/08
$ 451,639
$ 384,173
$ 67,466
WT0402
Water & Wastewater Impact Fee Update
05131/09
$ 30,000
$ 17,729
$ 12,271
WT0801
Line Replacement, Signet/Mesa
05/31/09
$ 255,000
$ 218,663
$ 36,337
WT0201
Well Rehabilitation/Disinfection
04/17/10
$ 600,000
$ 522,308
$ 77,692
WT0202
Reclaimed Water Main
05/31/13
$ 1,750,000
$ 1,606,337
$ 143,663
WT1202
Standpipe Storage Tank & Building Demolition
05131113
$ 134,640
$ 70,089
$ 64,551
WT1203
Water & Wastewater impact Fee Update
05/31/13
$ 34,575
$ 34,575
$
WaterPro"ects- PriorYears
$ 12,585,423
$ 10,644,271
$ 1,941,152
Water Prgects- Current Year
is
$
$
Total Water Projects
$ 12,585,423
$ 10,644,2 1
=$ 1,941,152
339
T H E C I T Y O F
ss
ENO
340
M
CAPITAL IMPROVEMENTS PROGRAM
COMPLETED PROJECTS SUMMARY
Project
Number
Project Description
Total Project (Over) Under
Date Completed Total Budget Costs Budget
OTHER PROJECTS
AC9901
Athletic Complex Phase II
06/30/02
$ 123,654
$ 75,047
$ 48,607
ACO202
Athletic Complex Phase 111
05/31/06
$ 1,252,221
$ 1,251,915
$ 306
AC1001
Texas Star Sports Complex Lighting Improvements
05/31/12
$ 504,200
$ 475,246
$ 28,954
ED0102
Bell Ranch Terrace
Cancelled
$ 200,000
$ -
$ 200,000
FM0209
Midway Recreation Upgrade
06/30/02
$ 557,125
$ 557,125
$ -
FM0101
Buildin D
09/30/02
$ 930,610
$ 930,608
$ 2
FM0308
Building A Remodel
05/31/07
$ 1,663,238
$ 1,651,325
$ 11,913
FM0309
Fire Station #3
05/31/07
$ 2,286,798
$ 2,286,229
$ 569
FM0601
Public Works Facility
05/31/08
$ 2,210,956
$ 2,213,507
$ 2,551
FM0802
Senior Citizen Center Design
cancelled
$ 250,000
$ -
$ 250,000
FMO804
Library -Shell Expansion
12/31/08
$ 307,034
$ 305,664
$ 1,370
FMO803
Midway Recreation Improvements
03/31/09
$ 293,500
$ 75,976
$ 217,524
FM0504
Building "B" Remodel
05/31/09
$ 1,322,490
$ 1,315,697
$ 6,793
FM0801
TX Star Golf Course & Conference Ctr Expand
05/31/09
$ 3,630,079
$ 3,630,079
$ -
PR0015
Purchase of Dallas Stars Center
05/31/00
$ 10,327,978
$ 10,327,978
$ -
PR0016
Wilshire Park Improvements
06/30/02
$ 150,000
$ 149,926
$ 74
PRO110
Sloe Protection/Screening Wall
03/31/03
$ 1,275,203
$ 1,273,923
$ 1,280
PR0409
Parking Improvements, Simmons
07/29/04
$ 6,960
$ 6,960
$ -
PR0410
Parking Improvements, Villages Bear Creek
07/29/04
$ 33,666
$ 33,666
$ -
PR0302
Bob Eden Parkin
04/30/05
$ 75,000
$ 74,854
$ 146
PR0303
Youth Ballpark
04/30/05
$ 600,000
$ 600,000
$
PR9901
Hike/Bike Trail
04/30/05
$ 237,714
$ 237,714
$
PR9902
Senior Citizen Remodel
04/30/05
$ 16,130
$ 16,130
$
PR0407
Parking Improvements, Midway
Cancelled
$ 11,000
$ -
$ 11,000
PR0408
Parkincl improvements, S. Euless Park
05/31106
$ 55,000
$ 20,991
$ 34,009
PR0411
Preserve at McCormick Park
05/31/06
$ 1,168,427
$ 1,168,427
$
PR0412
ISplash Pool
05/31/06
$ 125,000
$ 124,477
$ 523
PR9903-
PR9918
Various EDC Park Projects
09/30/06
$ 259,566
$ 248.891
$ 10,675
PR0602
Mid Cities Landsca in
05/31/09
$ 40,000
$ 33,199
$ 6,801
PR0719
Midway Park Trail
05/31/09
$ 210,000
$ 190,473
$ 19,527
PR0601
Park Amenities Upgrade
04/17/10
$ 150,000
$ 145,316
$ 4,684
PRO901
Trail Enhancements - Bob Eden Park
04/17/10
$ 135,000
$ 101,673
$ 33,327
PRO902
Senior Citizen Center at Midway Park
05/31/11
$ 4,763,661
$ 3,888,892
$ 874,769
PRO907
Euless Family Life Center Phase I
05/31/11
$ 2,105 000
$ 2,099,281
$ 5,719
PR9922
Teas Remodel
11/30/01
$ 430,000
$ 455,885
$ 25,885
PR9927
Park Improvements - Texas Star
09/30/01
$ 1.036 500
$ 1 025 298
$ 11,202
SS9901
Fire Station II
03/30/00
$ 49,688
$ 49,688
$ -
SS9919
Fire Station #3 - Structural Re airs
03/30/00
$ 30,000
$ 17,344
$ 12,656
SS9902
Library Books
08/15/00
$ 3,302
$ 3,302
$ -
SS0010
Former Fire Station #2
06/30/02
$ 599,600
$ 595.257
$ 4,343
SS0113
Park Building
06/30102
$ 1,492,400
$ 1,492,100
$ 300
OtherPro"ects- PriorYears
$ 40.918,700
$ 39,150063
1 $ 1,768,637
Other Projects- Current Year
Is
$
$
Total Other Projects
1 $ 40,918,700
1 $ 39,150, 663
$ 1,768,637
341