HomeMy WebLinkAboutPreliminary (Binder Notes) Capital Improvements Program FY17-18 FY2O18 Funding Sources
Funded
Project# Project Name Amount Needed Source
DR9903 Misc.Drainage Improvements 100,000 Drainage Operating Fund
PS1203 Misc.Street Repairs(min bal$150,000) 150,000 General Fund
WW0002 Misc.Wastewater Rehab(min bal$100,000) 50,000 W/WW Operating Fund(One-time)
WW0605 TRA Wastewater Payments-Impact 100,000 WW Impact Fees-FB9911
WT0001 Misc.Water Rehab(min bal$150,000) 100,000 W/WW Operating Fund(One-time)
WT0101 Water Tank Debt Payment-Impact 252,188 WT Impact Fees-FB9910
WT0104 Well Repairs(min bal$150,000) 75,000 W/WW Operating Fund(One-time)
WT0803 Meters/Transponders/Leak Detection(annual transfer$158,000) 158,000 W/WW Operating Fund(Baseline)
WT1212 Reclaimed Water Line Extension Phase II (723,023) Transfer to Reclaimed Phase III Construction
WT1403 Reclaimed Water Line Extension Debt Payment-Impact 121,694 WT Impact Fees-FB9910
WT1603 Misc.Valve Replacement(min bal$150,000) 105,000 W/WW CIP Fund Balance-FB9901
CM084 Redevelopment 2,000,000 Car Rental CIP Restricted Fund Balance-FB9918
DV9901 EDC Incentive Funds 25,000 EDC Operating Fund(Baseline)
FM1708 Library Design 127,370 EDC Operating Fund(One-time)
GC1201 TSGC Misc.Improvements(min bal$150,000) 100,000 TSGC Reserves
GC1201 TSGC Misc.Improvements(min bal$150,000) 120,000 Hotel/Motel Fund
PR0720 Misc.Park Improvements(min bal$100,000) 50,000 EDC Operating Fund(One-time)
PR0804 Park Irrigation 25,000 EDC Operating Fund(Baseline)
2,936,229
Totals for Funding Sources
2,000,000 Car Rental CIP Restricted Fund Balance-FB9918
Car Rental Fund
CDBG
100,000 Drainage Operating Fund
EDC Operating Fund
50,000 EDC Operating Fund(Baseline)
177,370 EDC Operating Fund(One-time)
150,000 General Fund
120,000 Hotel/Motel Fund
Street CIP Fund Balance-FB9907
(723,023) Transfer to Reclaimed Phase III Construction
100,000 TSGC Reserves
TSSC CIP Fund Balance-FB9908
TSSC Reserves
105,000 W/WW CIP Fund Balance-FB9901
158,000 W/WW Operating Fund(Baseline)
225,000 W/WW Operating Fund(One-time)
373,882 WT Impact Fees-FB9910
100,000 WW Impact Fees-FB9911
2,936,229
FY2O18 Funding Sources
Unfunded
Project Project Name Amount Needed Source
Street"A" FY2018 Street Improvements $425,000 General Fund
Street"A" FY2018 Street Reconstruction $6,030,620 CO Bond Sale
$6,455,620
Wastewater"A" FY2018 43rd CDBG LR: Oakwood Terrace Phase II $223,125 CDBG
Wastewater"A" SH183 Phase II Wastewater Relocation $156,000 W/WW Operating Fund
$379,125
Water"A" Reclaimed Water Line Extension Phase III Construction $3,211,977 TWDB Bond Sale
Water"A" Reclaimed Water Line Extension Phase III Construction $723,023 Transfer from WT1212
Water"A" SH183 Phase II Water Relocation $196,000 W/WW Operating Fund
Water"A" Well Replacement Design:Fuller/Far North $723,000 W/WW Operating Fund
Water"A" Well Replacement Design:Fuller/Far North $60,480 W/WW CIP Fund Balance-FB9901
$4,914,480
Other"A" Library Remodel Construction $900,000 FY2018 EDC Operating Fund
Other"A" Library Remodel Construction $4,500,000 FY2018 EDC Bond Sale
Other"B" Carr Park Improvements Phase I $1,595,100 Car Rental CIP
$6,995,100
Grand Totals $18,744,325
Library Remodel Construction Funding by Year
$950,000 FY2017 EDC CIP Restricted Fund Balance-FB9917
$900,000 FY2018 EDC Operating Fund
$4,500,000 FY2018 EDC Bond Sale
$550,000 FY2019 EDC Operating Fund
$6,900,000
Totals for Funding Sources(Does not include future Library funding)
$0 Car Rental Fund
$1,595,100 Car Rental CIP
$223,125 CDBG
$6,030,620 CO Bond Sale
$0 Drainage Operating Fund
$4,500,000 EDC Bond Sale
$0 EDC CIP Fund Balance-FB9906
$900,000 EDC Operating Fund
$0 EDC Operating Fund(Baseline)
$425,000 General Fund
$0 Street CIP Fund Balance-FB9907
$723,023 Transfer from WT1212
$0 TSGC Reserves
$0 TSSC CIP Fund Balance-FB9908
$3,211,977 TWDB Bond Sale
$60,480 W/WW CIP Fund Balance-FB9901
$1,075,000 W/WW Operating Fund
$0 WT Impact Fees-FB9910
$0 WW Impact Fees-FB9911
$18,744,325
$0
Water & Wastewater Operating Transfers
FY2018 Budget Preparation
Annual Transfer/
Project Estimate Balance
Annual Transfer: FY2018 $ 1,075,000 1,075,000
Appropriation of Fund Balance-FB9901 60,480 1,135,480
SH183 Phase II Wastewater Relocation (156,000) 979,480
SH183 Phase II Water Relocation (196,000) 783,480
WT LR: Well Replacement Design (783,480) -
Annual Transfer: FY2019 $ 1,075,000 1,075,000
WW LR: Cedar Hill Estates North (438,253) 636,747
WT LR: Kynette Drive Phase I (285,000) 351,747
Annual Transfer: FY2020 $ 1,075,000 1,426,747
WW LR: Cedar Hill Estates South Phase I (389,400) 1,037,347
WT LR: Kynette Drive Phase II (425,705) 611,642
WT LR: Alexander Lane (440,000) 171,642
Annual Transfer: FY2021 $ 1,075,000 1,246,642
WW LR: Cedar Hill Estates South Phase II (446,300) 800,342
WT LR: Dunaway Drive (450,000) 350,342
WT LR: Fort Worth Interconnect (300,000) 50,342
Annual Transfer: FY2022 $ 1,075,000 1,125,342
WW LR: Midway Park 3rd Addition Phase I (398,800) 726,542
WW LR: Midway Park 3rd Addition Phase II (348,068) 378,474
WT LR: Huntington Drive (450,000) (71,526)