HomeMy WebLinkAboutPreliminary Capital Improvements Program FY19-20City of Euless
Preliminary Capital Improvements Program
Fiscal Year Ending September 30, 2020
201 N. Ector Drive, Euless, TX 76039 www.eulesstx.gov
CITY OF EU SS
FISCAL YEAR 2019-2020
Council Members
LINDA MARTIN, MAYOR
Tim Stinneford, Place One
Jeremy Tompkins, Mayor Pro Tem, Place Two
Eddie Price, Place Three
Perry Bynum, Place Four
Harry Zimmer, Place Five
Salman Bhojani, Place Six
Loretta Getchell, City Manager
Bob Freeman, Deputy City Manager
�, Chris Barker, Assistant City Manager
M
OR
TABLE OF CONTENTS
PRELIMINARY CAPITAL IMPROVEMENTS PROGRAM
City Officials
Table of Contents i-iv
Letter vi-vii
FUNDED PROJECTS
Summary of Funded Projects 1
FY2019 Amendments 3
Drainage Projects
Summary of Funded Drainage Projects 5
DR9903 Miscellaneous Drainage Improvements 6
DR1101 Flooding Mitigation 8
DR1201 Miscellaneous Creek Maintenance 10
Street Proiects
Summary of Funded Street Projects
13
PS1203 Miscellaneous Street Repairs
14
PSI 601 East Harwood Road Extension
16
PSI 802 FY2018 Street Reconstruction — Fuller Wiser Rd./Bear Creek Pkwy.
20
PSI 901 FY2019 Street Improvements
24
PSI 902 FY2019 Street Reconstruction — Pipeline/Highland/Harwood/Mills
26
PSI 903 Miscellaneous Screening Wall Repair
30
Wastewater Projects
Summary of Funded Wastewater Projects
33
WW0002 Miscellaneous Wastewater Rehabilitation
34
WW0605 TRA Wastewater Payments — Impact
36
WWI 901 Line Replacement — Cedar Hill Estates North
38
WWI 902 FY2019 44th CDBG LR: Oakwood Terrace Addition Phases III & IV
42
Water Projects
Summary of Funded Water Projects
47
WT0001 Miscellaneous Water Rehabilitation
48
WTO101 Water Tank Debt Payment — Impact
50
WT0104 Well Repairs
52
WT0803 Meters/Transponders/Leak Detection
54
WTI 403 Reclaimed Water Line Extension Debt Payment — Impact
56
WT1603 Miscellaneous Valve Replacement
58
WTI 604 Reclaimed Water Line Extension Phase III
60
WTI 802 Well Replacement — Fuller/Far North
64
WT 1901 Line Replacement — Kynette Drive
68
Other Projects
Summary of Funded Other Projects
73
AC 1901 Texas Star Sports Complex Phase VII Design
74
CM0304 Entry Monument Sign Program
76
CM0804 Redevelopment
78
CM 1701 Municipal Plaza Improvements Phase II
80
DV9901 EDC Incentive Funds
82
ED 1002 EDC Contingency
84
ED1601 Midtown Development
86
FM1201 ADA/TAS Facility Improvements
88
FM1708 Library Remodel
90
GC1801 TSGC Miscellaneous Improvements
92
PR0720 Miscellaneous Park Improvements
94
PR0804 Park Irrigation
96
PR1917 Carr Park Improvements
98
PROPOSED & UNFUNDED PROJECTS
Summary of FY2020 Proposed & Unfunded Projects — Sorted by Type
101
Drainage Proiects
Summary of FY2020 Proposed & Unfunded Drainage Projects
103
Kynette Drive Storm Drain Installation
104
Chittam Drive Storm Drain Installation
106
Little Bear Creek Drainage Improvements
107
Street Proiects
Summary of FY2020 Proposed & Unfunded Street Projects
109
FY2020 Street Improvements
110
Glade Road Reconstruction — East of Highway 360
112
Traffic Signal — Cheek Sparger Road at Heritage Avenue
116
FY2021 Street Improvements
120
FY2022 Street Improvements
122
FY2023 Street Improvements
124
FY2024 Street Improvements
126
Cresthaven Drive Reconstruction
128
E Alexander Lane Reconstruction
129
Ross Avenue Extension
130
Vine Street Reconstruction — SH183 to SH10
131
Wastewater Proiects
Summary of FY2020 Proposed & Unfunded Wastewater Projects
133
FY2020 45th CDBG LR: Midway Park 2nd Addition Phase 1
134
Line Replacement — Midway Park 3rd Addition Phase I
138
Line Replacement — North Main Street
142
FY2021 46th CDBG LR: Del Paso Street Phase I
146
Line Replacement — Midway Park 3rd Addition Phase II
148
Line Replacement — SH10 @ Main Street
150
Line Replacement — Cedar Hill Estates South Phase 1
152
FY2022 47th CDBG LR: Del Paso Street Ph II & Midway Park 2nd Addition Ph II
154
Line Replacement — Cedar Hill Estates South Phase II
156
FY2023 48th CDBG LR: Midway Park 2nd Addition Ph III & Euless Jr. H.S. Ph I
158
FY2024 49th CDBG LR: Euless Junior High School Phase II
160
Line Replacement — Oakwood Terrace North Phase 1
162
Line Replacement — Oakwood Terrace North Phase II
164
'-ON
ia
'-I
Water Proiects
Summary of FY2020 Proposed & Unfunded Water Projects
165
Line Replacement — Alexander Lane
166
Line Replacement — Dunaway Drive
170
Line Replacement — Bell -Hi Addition Phase I
172
Line Replacement — Huntington Drive
174
Line Replacement — Bell -Hi Addition Phase II
176
Line Replacement — Dickey Drive
178
Line Replacement — Midway Park 1 st Addition
180
1 Mil Well Replacement
182
Line Replacement — Midway Park 3rd Addition
183
Reclaimed Water Line Extension Phase IV
184
Line Replacement — Sagebrush Trail
185
SH360 Water Crossing
186
Line Replacement — Sotogrande Boulevard
187
Other Proiects
Summary of FY2020 Proposed & Unfunded Other Projects
189
Fire Station #1
190
Texas Star Slope Wall Protection Phase I
192
Texas Star Sports Complex Phase VII Construction
194
Wilshire Park Upgrades
196
Carr Park Trail Connection
198
Kiddie Carr Park Improvements
200
Blessing Branch Park Improvements
202
Texas Star Sports Complex Phase VIII
204
Animal Shelter Expansion/Renovation
206
South Euless Park Upgrades
207
Trail Enhancements Phase I
208
Trail Enhancements Phase II
209
Trail Enhancements Villages of Bear Creek
210
Trailwood Park Improvements
211
COMPLETED PROJECTS
Drainage Proiects
Summary of Completed Drainage Projects
213
Street Proiects
Summary of Completed Street Projects
215
PSI 102 Glade Parks Improvements
218
PSI 801 FY2018 Street Improvements
220
Wastewater Proiects
Summary of Completed Wastewater Projects 223
WWI 801 SH183 Phase II Wastewater Relocation 224
WWI 802 FY2018 43rd CDBG LR: Oakwood Terrace Addition Phase II 226
Water Proiects
"\
Summary of Completed Water Projects
229
WTI 801 SH183 Phase II Water Relocation
230
Other Proiects
Summary of Completed Other Projects
233
PR1401 Glade Parks Trail Connection
234
.—N
iv
OR
T H E C I T Y O F
SSqf,
July 26, 2019
Honorable Mayor Linda Martin
Honorable City Councilmembers:
Tim Stinneford, Place One
Jeremy Tompkins, Place Two, Mayor Pro Tem
Eddie Price, Place Three
Pent' Bynum, Place Four
Harry Zimmer, Place Five
Salman Bhojani, Place Six
INTRODUCTION
The City of Euless' Capital Improvements Program is a comprehensive document
detailing all projects that have been identified to date. Emphasis has been placed on
organizing this data in a manner that will facilitate decision -making processes, assist in
long-range planning, and provide the citizens of Euless with information regarding
planned projects. This document meets the requirements of the City Charter. Article VI1,
Section 2 (5) requires, "A statement proposing any capital expenditures deemed
necessary for undertaking during the next budget year and recommended provisions for
financing." Section 2 (6) further requires, "A list of capital projects which should be
undertaken within the five (5) next succeeding years."
We extend special appreciation to the directors and the finance staff for their outstanding
performance in creating this document.
UNDERSTANDING THIS BOOK
Although this book contains a large volume of information, the summaries should make it
easy to understand at a glance. The book is divided into three sections: Funded
Projects, FY2020 Proposed and Unfunded Projects, and Completed Projects. Each
section begins with a summary and is followed by detailed data for those wishing to
research individual projects.
The detail provided includes the project's relationship to City master plans, the project
description and justification, the effect on future maintenance and operating costs, and
the estimated total cost. Within each section, you will find the detailed descriptions sorted
by type. There are five basic project types: Drainage, Streets, Wastewater, Water, and
Other.
201 N. Ector Drive, Euless, Texas 76039-3595
817l685-1400 s Metro 817/267-4403 • Fax 817/685-1416
www.culesstK.gov
Vi
The Funded Projects section includes all projects that the City Council has previously
authorized. Many of these projects are on -going and require additional funding from time
to time. For each project, a detailed description has been provided that includes any City
Council authorization, the current status of the project, and a financial summary detailing
funding sources and total project budget. Any amendments or additional appropriations
requested are also identified.
Any project that has been authorized by the City Council that is not fully funded will
include a clear explanation as to how the remainder of the project is expected to be
funded.
The FY2020 Proposed and Unfunded Projects section has been classified into three
categories of priority. Priority A indicates the item is recommended and funding has
been identified in the proposed FY2020 budget. Staff recommends City Council
authorization for these projects. Priority B projects should be presented to Council
within two to five years for consideration. Projects that will not begin for at least five
years have been assigned a Priority C. This system has been used to allow the Council
to evaluate and shift priorities, when necessary, and to provide a means of budgeting
capital projects for at least five years. Recommended funding sources have been
indicated if known.
The Completed Projects section provides a summary for each project type indicating
total project budget, actual expenditure, and variance. Funds remaining have been
returned to the appropriate fund balance account for re -appropriation. Details of projects
closed during the prior year have also been included.
FY2020 PROJECTS:
L' Funding has been identified for all proposed FY2020 projects which are reflected on the
FY2020 Proposed and Unfunded Projects Summary as Priority A. These include:
• FY2020 Street Improvements
• Glade Road Reconstruction — East of Highway 360
• Traffic Signal — Cheek Sparger Road at Heritage Avenue
• FY2020 45th CDBG WW Line Replacement — Midway Park 2"d Addition Ph I
• Midway Park 31d Addition Phase I Wastewater Line Replacement
• North Main Street Wastewater Line Replacement
• Alexander Lane Water Line Replacement
• Fire Station #1
• Texas Star Slope Wall Protection Phase I
• Texas Star Sports Complex Phase VII Construction
• Wilshire Park Upgrades
CLOSING COMMENTS
This document is prepared as a comprehensive summary of capital needs that have
been identified throughout the City of Euless. This document will be updated annually to
aid the City Council in allocating resources and determining priorities.
SRIC
,
Letc ell
City Manager
vii
No
,-IN
viii
CAPITAL IMPROVEMENTS PROGRAM
FUNDED PROJECTS SUMMARY
Project
Number
Project Description
Budget as of
5131/18
Appropriation/
Amendment
Budget as of
5131/19
Expended as
of 5131/19
Remaining
Funds
Revised Project
Cost Estimates
Unfunded/
(Excess
Funding)
DRAINAGE PROJECTS
DR9903
Misc. Drainage Improvements
$
1,117,011
$
80,000
$
1,197,011
$
589,995
$
607,016
$ 1,247,011
$ 50,000
DR1101
Flooding Mitigation
$
500,000
$
$
500,000
$
18,334
$
481,666
$ 500,000
$
DR1201
Misc. Creek Maintenance min bal $100,000
$
270,000
$
$
270,000
$
116,316
$
153,684
$ 270,000
$
FB9902
Fund Balance - Drainage CIP
$
$
$
$
$
$
$ 61,664
Sub -Total Drainage Projects
$
1,887,011
$
B0,000
$
1,967,011
$
724,645
$
1,242,366
$ 2,017,011
$ (11,664)
STREET PROJECTS
PS1203
Misc. Street Repairs (min bal $150,000)
$
811,000
$
115,500
$
926,500
$
732,586
$
193,914
$ 926,500
$
PS1601
East Harwood Road Extension
$
100,000
$
$
100,000
$
$
100,000
$ 100,000
$
PS1802
FY2018 Street Reconstruction -Fuller Wiser Rd./Bear Creek Pk .
$
6.030,620
$
168,189
$
6,198,809
$
130,643
$
6,068,166
$ 6,198,809
$
PS1901
FY2019 Street Improvements
$
-
$
950,000
$
950,000
$
727,465
$
222,535
$ 950,000
$
P81902
FY2019 Street Reconstruction -Pi eline/Hi hland/Harwood/MiOs
$
$
12,464,572
$
12,464,572
$
14,375
$ 12,450,197
$ 12,464,572
$
PS1903
Misc. Screening Wall Repair
$
$
25,000
$
25,000
$
$
25,000
$ 50,000
$ 25,000
FB9907
IFund Balance - Street CIP
$
$
-
$
$
$
$
$ 241,651
Sub -Total Street Projects
$
6,941,620
$
13,723,261
$
20,664,881
$
1,605,069
$ 19,059,812
$ 20,6B9,881
$ (216,651)
WASTEWATER PROJECTS
WW0002
Misc. Wastewater Rehab min bal $100,000
$
756,086
$
25,000
$
781,086
$
665,742
$
115,344
$ 781.086
$
WW0605
TRA Wastewater Payments - Impact
$
960,000
$
100,000
$
1,080,000
$
980,000
$
100,000
$ 1,180,000
$ 100,000
WW1901
Line Replacement - Cedar Hill Estates North
$
-
$
409,903
$
409,903
$
11,134
$
398,769
$ 409,903
$
WW1902
FY2019 44th CDBG LR: Oakwood Terrace Addition Phases III & IV
$
$
408,950
$
408,950
$
$
408,950
$ 377,639
$ 31,311
FB9911
IFB - Wastewater Impact Restricted
$
$
-
$
$
$
$
$ 750,387
Sub -Total Wastewater Projects
$
1,736,086
$
943,853
$
2,679,939
$
1,656,876
$
1,023,063
$ 2,746,626
$ (681,696)
WATER PROJECTS
WT0001
Misc. Water Rehab (min bal $150,000)
$
953,511
$
-
$
953,511
$
795,631
$
157,880
$ 953,511
$
WT0101
Water Tank Debt Payment -impact
$
4,726,414
$
255,674
$
4,982,088
$
4,896,854
$
85,234
$ 5,240,318
$ 258,230
WT0104
Well Repairs
$
1,688,992
$
-
$
1,688,992
$
1,598,065
$
90,927
$ 1,688,992
$
WT0803
Meters/Transponders/Leak Detection annual transfer $158,000
$
2,036,671
$
166,273
$
2,202,944
$
1,260,725
$
942,219
$ 2,360,944
$ 158,000
WT1403
Reclaimed Water Line Extension Debt Payment -impact
$
601,145
$
119,744
$
720,889
$
680,977
$
39,912
$ 838,683
$ 117,794
WT1603
Misc. Valve Replacement min bal $150,000
$
265,000
$
125,000
$
390,000
$
162,869
$
227,131
$ 515,000
$ 125,000
WT1604
JReclaimed Water Line Extension Phase III
$
4,535,354
$
87,344
$
4,622,698
$
1,568,945
$
3,053,753
$ 4,622.698
$
WT1802
Well Replacement-Fuller/Far North
$
783,480
$
9,329,193
$
10,112,673
$
747,635
$
9,365,038
$ 10,712,673
$ 600,000
WT1901
Line Replacement - K nette Drive
$
-
$
635,000
$
635,000
$
$
635,000
$ 635,000
$
FB9910
FB - Water Impact Restricted
$
$
-
$
-
$
$
$
$ 2,167,105
FB9901
FB - Water & Wastewater CIP
$
$
$
$
$
$
$ 262,834
Sub -Total Water Projects
$
15,590,567
$
10.718,228
$
26,308,795
$ 11,711,701
$ 14,597,094
$ 27,567,819
$ 1,170. 15
tXCeSS Tunamg wiii De ZransTerrea to vv/WW uip vuna tlalance.
N
CAPITAL IMPROVEMENTS PROGRAM
FUNDED PROJECTS SUMMARY
Project
Number
Project Description
Budget as of
5131118
Appropriation/
Amendment
Budget as of
5131119
Expended as
of 5/31119
Remaining
Funds
Revised Project
Cost Estimates
Unfunded/
(Excess
Funding)
OTHER
AC1901
ITexas Star Sports Complex Phase VII Design
$
-
$
150,000
$
150,000
$
15,694
$
134,306
$ 150,000
$
CM0304
JEntry Monument
$
135,782
$
-
$
135,782
$
111,058
$
24,724
$ 135,782
$
CM0804
lRedevelopment
$
3,696,002
$
531,619
$
4,227,621
$
3,052,607
$
1,175,014
$ 5,227,621
$ 1,000,000
CM1701
Municipal Plaza Improvements Phase II
$
266,733
$
-
$
266,733
$
67,370
$
199,363
$ 266,733
$
DV9901
EDC Incentive Funds
$
1,375,854
$
25,000
$
1,400,854
$
1,351,148
$
49,706
$ 1,425,854
$ 25,000
ED1002
EDC Contingency
$
217,507
$
32,493
$
250,000
$
-
$
250,000
$ 325,000
$ 75,000
ED1601
Midtown Development
$
16,417,980
$
-
$
16,417,980
$
15,348,780
$
1,069,200
$ 16,417,980
$
FM1201
ADAITAS Facility Improvements min bal $75,000
$
115,000
$
25,000
$
140,000
$
46,140
$
93,860
$ 140,000
$
FM1708
Library Remodel
$
2,125,000
$
5,185,908
$
7,310,908
$
1,321,868
$
6,989,040
$ 7,310,908
$
GC1801
ITSGC Misc. Improvements min bal $150,000
$
247,180
$
115,000
$
362,180
$
280,463
$
81,717
$ 477,180
$ 115,000
PR0720
Misc. Park Improvements min bal$100,000
$
795,500
$
122,753
$
918,253
$
809,522
$
108,731
$ 1,118,253
$ 200,000
PR0804
Park Irrigation
$
250,000
$
-
$
250,000
$
207,472
$
42,528
$ 275,000
$ 25,000
PR1917
Carr Park Improvements
$
-
$
1,688,831
$
1,688,831
$
837,618
$
851,213
$ 1,688,831
$
FB9906
FB-EDC CIP
$
$
_
$
$
_
$
$
$ 166,798
FB9908
FB-Texas Star Sports Complex CIP
$
$
$
$
$
$
$ 200,725
FB9909
FB-General CIP
$
$
$
$
$
$
$ 248,992
FB9913
FB-Car RentafCIP
$
$
$
$
$
$
$ 393,733
FB9916
FB-TSGC CIP
$
$
$
$
$
$
$ (10,889
Sub -Total Other Projects
$ 25,642,538
$
7,876,604
$
33,519,142
$
23,449,740
$
10,069,402
$ 34,959,142
$ 418,863
TOTAL FUNDED PROJECTS
$ 51,797,822
$
33,341,946
$
85,139,768
$ 39,148,031
$ 45,991,737
$ 87,982,481
$ (1,662,065)
> > 1
I CITY or nuum
CAPITAL D VROVXNZXT PROORAM
AM81FD%M M1s — FUND= PROJECTS
PROJECT#
PROJECT DESQRIPTIOR
DATE
AMENDMENTS h ACTIONS
AC1901
Texas Star Sports Complex Phase VII Design
10/01/2018
To provide funding per FY2019 Approved CIP Plan - $150,000 from EDC Operating
Fund.
CM0804
Redevelopment
10/01/2018
To provide additional funding per FY2019 Approved CIP Plan - $S00,000 from Car
Rental Fund.
CM0804
Redevelopment
05/31/2019
To increase funding for earned interest of $31,507 and sale of assets of $112.
DR9903
Miscellaneous Drainage Improvements
10/01/2018
To provide additional funding per FY2019 Approved CIP Plan - $80,000 from
Drainage Operating Fund.
DV9901
EDC Incentive Funds
10/01/2018
To provide additional funding per FY2019 Approved CIP Plan - $25,000 from EDC
Operating Fund.
ED1002
EDC Contingency
10/01/2018
To provide additional funding per FY2019 Approved CIP Plan - $32,493 from EDC
Operating Fund.
FM1201
ADA/TAS Facility Improvements
10/01/2018
To provide additional funding per FY2019 Approved CIP Plan - $2S,000 from Risk
Operating Fund.
FM1708
Library Remodel Construction
10/01/2018
To provide additional funding per FY2019 Approved CIP Plan - $2,964,900 from Car
Rental Fund, $1,59S,100 from Car Rental CIP Fund Balance, and $550,000 from EDC
Operating Fund.
FM1708
Library Remodel Construction
05/31/2019
To provide additional funding of $50,000 for construction from Car Rental Fund.
FM1708
Library Remodel Construction
05/31/2019
To increase funding for grant proceeds of $25,908 from the Texas State Library and
Archives Commission.
GC1801
TSGC Miscellaneous Improvements
10/01/2018
To provide additional funding per FY2019 Approved CIP Plan - $115,000 from TSGC
Reserve Fund.
PR0720
Miscellaneous Park Improvements
10/01/2018
To provide additional funding per FY2019 Approved CIP Plan - $90,000 from EDC
Operating Fund.
PR0720
Miscellaneous Park Improvements
05/31/2019
To increase funding for transfer of $27,753 from ES0283-Bear Creek Park Fund and
$5,000 from ES1901-Barfield Foundation.
PR1401
Glade Parks Trail Connection
05/31/2019
To close project and transfer excess funding of $20,040 to Car Rental CIP Fund
Balance. Grant funding of $237,733 was not used.
PR1917
Carr Park Improvements
10/01/2018
To establish budget per FY2019 Approved CIP Plan - $1,680,320 from future bond
issue.
PR1917
Carr Park Improvements
05/31/2019
To increase funding for earned interest of $8,511.
PS1102
Glade Parks Improvements
05/31/2019
To close project.
PS1203
Miscellaneous Street Repairs
10/01/2018
To provide additional funding per FY2019 Approved CIP Plan - $75,000 from
General Fund.
PS1203
Miscellaneous Street Repairs
OS/31/2019
To provide additional funding of $40,500 for the design of a traffic signal at
Heritage Avenue and Cheek Sparger Road - $10,125 from Street CIP Fund Balance —
(City of Euless) and $30,375 will be reimbursed from other entities (City of Bedford,
City of Colleyville and Tarrant County).
PS1801
FY2018 Street Improvements
05/31/2019
To close project.
PS1802
FY2018 Street Reconstruction -Fuller Wiser Road/Bear
05/31/2019
To increase funding for earned interest of $143,189 and for estimated interest
Creek Parkway
through 9/30/19 of$25,000.
PS1901
FY2019 Street Improvements
10/01/2018
To provide funding per FY2019 Approved CIP Plan - $950,000 from General Fund.
PS1902
FY2019 Street Reconstruction-
10/01/2018
To establish budget per FY2019 Approved CIP Plan - $12,423,813 from future bond
Pipeline/Highland/Harwood/Mills
issue.
PS1902
FY2019 Street Reconstruction-
OS/31/2019
To increase funding for earned interest of $40,759.
Pipeline/Highland/Harwood/Mills
PS1903 IMiscellaneous
Screening Wall Repair
10/01/2018
To provide funding per FY2019 Approved CIP Plan - $25,000 from General Fund.
WT0101
Water Tank Debt Payment -Impact
10/01/2018
To provide additional funding per FY2019 Approved CIP Plan - $255,674from Water
Impact Fee Fund Balance.
WT0803
Meters/Transponders/Leak Detection
10/01/2018
To provide additional funding per FY2019 Approved CIP Plan - $158,000 from
W/WW Operating Fund.
WT0803
Meters/Transponders/Leak Detection
05/31/2019
To increase funding for the sale of old meters in the amount of 58,273.
WT1403
Reclaimed Water Line Extension Debt Payment-
10/01/2018
To provide additional funding per FY2019 Approved CIP Plan - $119,744 from Water
Impact
Impact Fee Fund Balance.
WT1603
Miscellaneous Valve Replacement
10/01/2018
To provide additional funding per FY2019 Approved CIP Plan - $125,000 from
W/WW Operating Fund.
W71604
Reclaimed Water Line Extension Phase III
OS/31/2019
To increase funding for earned interest of $75,173 and estimated interest through
9/30/19 of $12,171.
W71801
SH183 Phase II Water Relocation
OS/31/2019
To close project and transfer excess funding of $77,095 to W/WW CIP Fund
Balance.
WT1802
Well Replacement Construction-Fuller/Far North
10/01/2018
To establish construction budget per FY2019 Approved CIP Plan - $9,275,000 from
future bond issue.
WT1802
Well Replacement Construction-Fuller/Far North
05/31/2019
To increase funding for earned interest of $3,535 and insurance proceeds of
$50,658.
iCmor EMSM
CAPMSL UUMOV8111UNT P;tboORM
AUXIDMM — FUMM Pnoi=ss
PROJECT#
PROJECT DESCRIPTION
DATE
AMENDMENTS & ACTIONS
WT1901
Line Rep - Kynette Drive
10/01/2018
To provide funding per FY2019 Approved CIP Plan - $635,000 from W/WW
Operating Fund.
WW0002
Miscellaneous Wastewater Rehabilitation
10/01/2018
To provide additional funding per FY2019 Approved CIP Plan - $25,000 from W/WW
Operating Fund.
WW0605
TRA Wastewater Payments -Impact
10/01/2018
To provide additional funding per FY2019 Approved CIP Plan - $100,000 from WW
Impact Fee Fund Balance.
WW1801
SH183 Phase II Wastewater Relocation
05/31/2019
To close project and transfer excess funding of $19,463 to W/WW CIP Fund
Balance.
WW1802
FY2018 43rd CDBG LR: Oakwood Terrace Phase II
05/31/2019
To close project. Any unused funds will be allocated to future CDBG projects.
WW1901
Line Rep - Cedar Hill Estates North
10/01/2018
To provide funding per FY2019 Approved CIP Plan - $409,903 from W/WW
Operating Fund.
WW1902
FY201944th CDBG Line Rep -Oakwood Terrace
10/01/2018
To provide funding per FY2019 Approved CIP Plan - $377,639 from Community
Addition Phase III & IV
Development Block Grant and $31,311 from W/WW CIP Fund Balance.
bNO
l
CAPITAL IMPROVEMENTS PROGRAM
FUNDED PROJECTS SUMMARY
Project
Number
Project Description
Budget as of
5131118
Appropriation/
Amendment
Budget as of
6131119
Expended as
of 5131119
Remaining
Funds
Revised
Project Cost
Estimates
Unfunded/
(Excess
Funding)
DRAINAGE PROJECTS
DR9903
Misc. Drainage Improvements
$ 1,117,011
$ 80,000
$ 1,197,011
$ 589,995
$ 607,016
$ 1,247,011
$ 50,000
DR1101
Flooding Mitigation
$ 500,000
$ -
$ 500,000
$ 18,334
$ 481,666
$ 500,000
$ -
DR1201
Misc. Creek Maintenance(min bal $100,000)
$ 270,000
$
$ 270,000
$ 116,316
$ 153,584
$ 270,000
$
FB9902
Fund Balance - Drainage CIP
$ -
$ -
$ -
$ -
$ -
$
$ 81,664)
Sub -Total Drainage Pro"ects
$ 1,887,011
$ 80,000
$ 1,967,011
$ 724,64S
$ 1,242,366
$ 2,017,011
$ (11,664)
w
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: July 23,1999
Submitted By: RON YOUNG Date Completed:
Project Title: MISCELLANEOUS DRAINAGE IMPROVEMENTS
Project Type: DRAINAGE Sub -Type: IMPROVEMENTS
Project Code: DR9903 Priority: A
COUNCIL AUTHORIZATION:
May 27, 2014: Awarded Bid No. 007-14 for a construction contract to Knight Erosion Control, Inc. for Drainage
Channel Improvements along Hurricane Creek and authorized the City Manager to enter into a contract with
Knight Erosion Control, Inc. The estimated expenditure is $135,487.82.
June 23, 2015: Ratified City Manager action to proceed with emergency repairs to City property located along
Hurricane Creek. The estimated expenditure is $74,602.
February 26, 2019: Authorized the City Manager to execute a construction contract with Knight Erosion Control,
Inc. for channel improvements at the Texas Star Golf Course. The estimated expenditure is $121,440.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project provides funding for various drainage projects or emergency repairs identified throughout the year.
Often correction of these problems requires design services and other improvements such as bank stabilization.
As major projects are identified, they will be tracked separately and assigned a different project number.
PROJECT SCHEDULE:
JUSTIFICATION:
Failure to correct these problems often causes damage to existing infrastructure.
--A,
,-IN
PROJECT TITLE: MISCELLANEOUS DRAINAGE IMPROVEMENTS PROJECT CODE: DR9903
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
$0
TOTAL ESTIMATED CAPITAL COST:
Improvements $1,247,011
Subtotal:
$0
Total Estimated Capital Cost
$1,247,011
Maintenance Costs
Funding Source:
Transfer from:
Drainage Operating Fund
$929,609
Drainage CIP Fund Balance
$183,224
$0
FEMA Reimbursement
$84,178
Subtotal:
$0
Additional Funding Needed:
Annual expense
$80,156
Transfer from:
Drainage Operating Fund
$50,000
Total Estimated Annual Cost
$80,156
Total Funding
$1,247,011
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED BUDGET (- +)
% EXPENDED
Engineering
$16,000 $16,000 0
100%
Fence
$559 $559 0
100%
Storm Drain
$1,230,257 $573,241 657,016
47%
Meters & Setting
$195 $195 0
100%
$1,247,011 $589,995 $657,016 47% I
7
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: June 30,2010
Submitted By: RON YOUNG Date Completed:
Project Title: FLOODING MITIGATION
Project Type: DRAINAGE Sub -Type: IMPROVEMENTS
Project Code: DR1101 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project consists of identifying chronic flooding locations within the City of Euless and determining the
cost/benefit of property acquisition and protection compared to extensive drainage relief projects. Property
acquisition will be recommended after consideration of flooding history, appraisals, and feasible alternative
drainage solutions have been evaluated. It is recommended that this be established as an ongoing project.
PROJECT SCHEDULE:
JUSTIFICATION:
Properties throughout the City of Euless situated adjacent to creeks have experienced drainage problems for
several years. The cost for implementing drainage improvement projects to mitigate flooding at isolated locations
may be much greater than the cost of property acquisition. Chronic flooding lowers the property values and this
program will offer a means of relief for affected property owners.
W
�a
PROJECT TITLE: FLOODING MITIGATION
PROJECT CODE: DR1101
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Flooding Mitigation $500,000
Personnel: Full Time
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
Subtotal: $0 Total Estimated Capital Cost $500,000
Maintenance Costs Funding Source:
Transfer from:
Drainage CIP Fund Balance $350,000
Drainage Operating Fund $150,000
$0
Subtotal: $0
Total Estimated Annual Cost $01 Total Funding $500,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Storm Sewer $500,000 $18,334 $481,666 4%
TOTAL PROJECT $500,000 $18,334 $481,666 4% I
9
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 22,2011
Submitted By: RON YOUNG Date Completed:
Project Title: MISCELLANEOUS CREEK MAINTENANCE
Project Type: DRAINAGE Sub -Type: CREEK MAINTENANCE
Project Code: DR1201 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The City of Euless completed drainage master plan studies for the major creeks that traverse the City. They
include Little Bear Creek, Hurricane Creek, Boyd Branch and Blessing Branch.
PROJECT DESCRIPTION:
The project provides for maintenance in the creeks described above including removal of fallen trees that impede
the flow of creek water in the natural creek channels, clearing brush and debris at major bridge crossings, and
preventative maintenance. This project does not address items that are deemed cosmetic enhancements.
PROJECT SCHEDULE:
JUSTIFICATION:
Natural creek erosion undermines the root systems of trees adjacent to creek banks which results in trees failing
into or across creek channels. These fallen trees together with accumulated brush and debris can impede the
flow of storm water in the natural creek channels resulting in a rise in the normal water surface elevation. Fallen
trees that are conveyed down stream in the natural creek channels may cause damage to the substructure of
bridges spanning the creek channels.
W
10
L
PROJECT TITLE: MISCELLANEOUS CREEK MAINTENANCE
INET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
I Subtotal:
$0
PROJECT CODE: DR1201
TOTAL ESTIMATED CAPITAL COST:
Improvements
(Minimum balance $100,000)
$OI$0 Total Estimated Capital Cost
Funding Source:
Transfer from:
Drainage CIP Fund Balance $105,000
Drainage Operating Fund $165,000
Subtotal: $0
Annualexpense $0
Total Estimated Annual Cost $01 Total Funding $270,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED
Storm Sewers $270,000 $116,316 $153,684 43%
$270,000 $116,316 $153,684 43% I
T H E ., C I T Y O F
''\
12
CAPITAL IMPROVEMENTS PROGRAM
FUNDED PROJECTS SUMMARY
Project
Number
Project Description
Budget as of
5/31/18
Appropriation/
Amendment
Budget as of
5/31/19
Expended as
of 5131/19
Remaining
Funds
Revised
Project Cost
Estimates
Unfunded/
(Excess
Funding)
STREET PROJECTS
PS1203
Misc. Street Repairs min bal $150 000
$ 811,000
$ 115,500
$ 926,500
$ 732,586
$ 193,914
$ 926,500
$
PS1601
East Harwood Road Extension
$ 100,000
$
$ 100,000
$
$ 100,000
$ 100,000
$
PS1802
FY2018 Street Reconstruction -Fuller Wiser Rd./Bear Creek Pkw .
$ 6,030,620
$ 168,189
$ 6,198,809
$ 130,643
$ 6,068,166
$ 6,198 809
$
PS1901
FY2019 Street Improvements
$
$ 950,000
$ 950,000
$ 727,465
$ 222,535
$ 950,000
$
PS1902
FY2019 Street Reconstruction -Pi eline/Hi hland/Harwood/Mills
$
$ 12,464 572
$ 12,464,572
$ 14,375
$ 12 450,197
$ 12,464 572
$
PS1903
Misc. Screening Wall Repair
$
$ 25,000
$ 25,000
$ -
$ 25,000
$ 50 000
$ 25,000
FB9907
Fund Balance - Street CIP
$
$
$
$
$
$
$ 241 651
Total Street Projects
$ 6,941,620
$ 13.723,261
$ 20,664,881
$ 1,605,069
$ 19,059,812
$ 20,689,881
$ 216,651
W
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 27,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: MISCELLANEOUS STREET REPAIRS
Project Type: STREET Sub -Type: IMPROVEMENTS
Pro'ect Code: PS1203 Priorit : A
COUNCIL AUTHORIZATION:
April 24, 2012: Authorized the City Manager to enter into a contract with Estrada Concrete Co. LLC for concrete
road repairs at various locations on North Main Street, Fuller -Wiser Road and Bear Creek Parkway in the amount
of $93,390.
March 11, 2014: Authorized the City Manager to negotiate and execute a contract for a citywide pavement
management analysis and asset management inventory with Infrastructure Management Services (IMS). The
estimated expenditure is $82,155.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The Master Thoroughfare Plan identifies the various street types within the City of Euless. These street types
include residential streets through regional arterial streets.
PROJECT DESCRIPTION:
This project includes the removal and replacement of deteriorated sections of pavement along identified
roadways.
PROJECT SCHEDULE:
s
JUSTIFICATION:
Continuing repair of the existing street pavement will maintain safe driving conditions and will extend the overall
life of the City streets.
r
'1
14
PROJECT TITLE: MISCELLANEOUS STREET REPAIRS
PROJECT CODE: PS1203
INET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct ODerating Cost Engineering/Construction
Personnel: Full Time (Minimum balance $150,000)
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
$0
Total Estimated Capital Cost
Maintenance Costs
Funding Source:
Transfer from:
Street CIP Fund Balance
$446,125
Car Rental Fund
$225,000
$0
2018 Certificates of Obligation
$150,000
Subtotal:
$0
General Fund
$75,000
Annual expense
$0
Reimbursement -Other Entities
$30,375
Total Estimated Annual Cost
$01
Total Funding
$926,500
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED BUDGET (- +)
% EXPENDED
Engineering
$40,500 $0 $40,500
0%
Other Professional Services
$83,156 $82,331 $825
99%
Construction
$802,844 $650,255 $152,589
81%
PROJECT $926,500 $732,586 $193,914 79% I
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: June 20,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: EAST HARWOOD ROAD EXTENSION
Project Type: STREET Sub -Type: CONSTRUCTION
Project Code: PS1601 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The Texas Department of Transportation and DFW Airport are combining efforts to extend East Harwood Road
through the airport to Rental Car Drive to provide additional access to airport properties. Euless has committed to
share in the cost of the extension in an amount not to exceed $100,000.
PROJECT SCHEDULE:
Anticipate Construction Complete: FY2020
JUSTIFICATION:
Participation in the project will provide Euless residents with an additional route to and through the airport
properties.
W
16
11.1
PROJECT TITLE: EAST HARWOOD ROAD EXTENSION
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
I Subtotal:
PROJECT CODE: PS160
TOTAL ESTIMATED CAPITAL COST:
Construction
$0
$OI$0 Total Estimated I
$0
$0
Funding Source:
Transfer from:
Car Rental Fund
Cost
$100,0001
$100
$100, 000 1
Total Estimated Annual Cost $01 Total Fundina $100,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED
Construction $100,000 $0 $100,000 0%
TOTAL PROJECT
$100,000 $0 $100,000
0%
17
T H E C I T Y O F
ss
18
U
A �► z I
O
O
uONO
r
cc
0 CL
v
a
m
m
0
D
02!-IIV-.31►HM 0
0
BFA/Q �,RFFk p
BEAR CREEK P ^may ^a
r GARDEN KWy
Z
k41'Y
m
v AVE d>
C
RUSTIC LN
MINTERS CHAPEL RD
,-
0
m
HWY 360
M
HWY 360 OgE AN
HWY 360
�
O
o
p9£ �MN
o
A
09E AMH
AMON CARTER BLVD
INTERNATIONAL PKWY
INTERNATIONAL PKWY
m
r
v
v'
X
m
n
0
v
0
v
X
I
z
cn
0
z
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 05,2017
Submitted By: HAL CRANOR Date Completed:
Project Title: FY18 ST RECONSTRUCTION -FULLER WISER/BEAR CREEK
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: PS1802 Priority: A
COUNCIL AUTHORIZATION:
January 23, 2018: Approved Resolution No. 18-1520 authorizing the City Secretary to publish a notice declaring
intention to issue certificates of obligation.
March 13, 2018: Approved the first and final reading of Ordinance No. 2186, authorizing issuance of "City of
Euless, Texas, Tax and Waterworks and Sewer System (Limited Pledge) Revenue Certificates of Obligation,
Series 2018".
November 13, 2018: Authorized the City Manager to execute a Professional Services Agreement with Spooner
and Associates, Inc. for topographic and professional surveying services. The estimated expenditure is $57,479.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project scope includes the removal and replacement of the following concrete streets: Bear Creek Parkway
from Mid Cities Boulevard to Harwood Road; Ash Lane from Fuller Wiser Road to State Highway 360; Fuller
Wiser Road from State Highway 183 to Midway Drive; Fuller Wiser Road from Midway Drive to Harwood Road;
and Midway Drive from just east of International Boulevard to just west of Fuller Wiser Road.
PROJECT SCHEDULE:
Began Design: October 2018
Design Complete: May 2019
Begin Construction: July 2019
Anticipate Construction Complete: July 2020
JUSTIFICATION:
The existing concrete pavement is deteriorating. The new concrete streets will increase safety, reduce
maintenance costs, provide an improved riding surface, and will enhance the appearance of the streets.
W
20
PROJECT TITLE: FY18 ST RECONSTRUCTION -FULLER WISER/BEAR CREEK PROJECT CODE: PS18G
INET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Average debt service
TOTAL ESTIMATED CAPITAL COST:
Engineering
Construction
$0
$0
$420,000
Subtotal: $420,000 Total Estimated Capital Cost
Maintenance Costs Funding Source:
2018 Certificates of Obligation
Interest Earnings
I Subtotal:
$0
$100,000
$6,098,809
$6,198,809
$6,030,620
$168,189
Total Estimated Annual Cost
$420,0001
Total Funding
$6,198,809
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED
BUDGET (-+)
% EXPENDED
Engineering
$100,000 $70,873
$29,127
71%
Construction
$6,098,809 $59,770
$6,039,039
1%
$6,198,809 $130,643 $6,068,166
2%
21
ho
T H E .C I T Y
lo�
22
N
w
v
Lrl
CA
z
0
0
U 4
N rL
(D
CD
0
0
3
0
c
n
0
3
Gl4FSTO�'Off
H1MES DR
BYER$ ST
SALEM DR
m m
a m
TJ To
ttj z
SERENADELN
MOONLIGHT DR
DARLENE TR
Nl til3`JN11
BFGG flRrO-N DR
� ch cn
Cott QRts oR $
;a ;a X p N MAIN ST ��nS
MARSHALL DR
�Q
ALLEY
WINSTON
t
o m
DR w
ATLANTIC DR
pl,
HILLCRFST DR
MEADOWVIEW DR (�
PINEVIEW DR
RIVER BIRCH RD
O�
O a �c
43 BEAR
^
GARI}ENAV PKWY ASTER DR
RUSTIC LN GRAY HAWK LN
�C MINTERS CHAPEL RD
096 WH
09£ �,MN
.
c
�i
2
'on
c
o
CHITTAM DR
?
v
F
WOODPATH DR
o
0
ACORN DR
HWY 360 Qg-� ?,o
-n
IV
O
GO
m
m
m
O
N
n
1
0
Z
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 31,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: FY2019 STREET IMPROVEMENTS
Project Type: STREET Sub -Type: IMPROVEMENTS
Pro'ect Code: PS1901 Priority: A
COUNCIL AUTHORIZATION:
January 22, 2019: Authorized the City Manager to execute an interlocal agreement with Tarrant County for
asphalt overlay improvements to Bayless Road, Rambling Lane, Atkerson Lane (South), Hilton Drive, West Mills
Drive, Commerce Street, Crane Drive, Dock McGinnis Drive, Huffman Road, Northcliff Drive, Del Paso Street and
Canyon Ridge Drive. The estimated expenditure is $298,393.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by their
pavement condition index.
PROJECT SCHEDULE:
Began Construction: October 2018
Anticipate Construction Complete: September 2019
JUSTIFICATION:
The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, will
extend the life of the roadway, and will enhance the appearance of the streets.
24
"I,-,
Om
PROJECT TITLE: FY2019 STREET IMPROVEMENTS
INET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
I Subtotal:
$0
$0
PROJECT CODE: PSI 90
TOTAL ESTIMATED CAPITAL COST:
$950,0001
$0 Total Estimated Capital Cost $950,000
Funding Source:
Transfer from:
General Fund $950,000
$0
$0
Total Estimated Annual Cost $01 Total Funding $950,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED
Construction $950,000 $727,465 $222,535 77%
$950,000 $727,465 $222,535 77% I
25
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 25,2018
Submitted By: HAL CRANOR Date Completed:
Project Title: FY19 ST RECON-PIPELINE/HIGHLAND/HARWOOD/MILLS
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: PS1902 Priority: A
COUNCIL AUTHORIZATION:
December 11, 2018: Approved Resolution No. 18-1539 authorizing the City Secretary to publish a notice
declaring intention to issue certificates of obligation.
January 22, 2019: Approved the first and final reading of Ordinance No. 2212, authorizing issuance of "City of
Euless, Texas, Tax and Waterworks and Sewer System (Limited Pledge) Revenue Certificates of Obligation,
Series 2019".
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project scope includes the removal and replacement of asphalt roadway with concrete pavement at the following locations:
West Pipeline Road between Arwine Court and Raider Drive, South Pipeline Road between Royal Parkway and Highland Drive;
Highland Drive; Harwood Road between Industrial Boulevard and Main Street, and the extension of Mills Drive from S.H. 10 to Carr
Park. Each reconstructed street will maintain the same width and lane configuration with the exception of West Pipeline Road, which
will include the installation of a median between Raider Drive and Monterrey Boulevard; Highland Drive, which will become a standard
31 foot wide street from back of curb to back of curb; and South Pipeline Road, which will become a standard 31 foot wide street. The
Highland Drive project will include new sidewalk, water, sewer, and storm drain utilities; and the South Pipeline Road project will
include new sidewalk and a rehabilitated 16" waterline. Mills Drive will be a new full pavement section, including sidewalk, storm drain
and waterline.
PROJECT SCHEDULE:
Begin Design: September 2019
Anticipate Design Complete: May 2020
Begin Construction: July 2020
Anticipate Construction Complete: July 2021
JUSTIFICATION:
The existing asphalt pavement of these streets is deteriorating. The new concrete streets will increase safety,
reduce maintenance costs, provide an improved riding surface, and will enhance the appearance of the streets.
10�
26
PROJECT TITLE: FYI ST RECON-PIPELINE/HIGHLAND/HARWOOD/MILLS PROJECT CODE: PSI 90
INET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Averaqe debt service
TOTAL ESTIMATED CAPITAL COST:
1Construction
$0
$0
$860,000
Subtotal: $860,000 Total Estimated Capital Cost
Maintenance Costs Funding Source:
2019 Certificates of Obligation
Interest Earnings
I Subtotal:
$1,620,497
$10, 844, 075
$12,464,572
$12,423,813
$40, 759
Total Estimated Annual Cost
$860,0001
Total Funding
$12,464,572
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED
BUDGET (-+)
% EXPENDED
Engineering
$1,620,497 $14,375
$1,606,122
1%
Construction
$10,844,075 $0
$10,844,075
0%
$12,464,572 $14,375 $12,450,197
0%
27
hQ
T H E C I T Y O F
28
N
to
O
(J7
O
O
W
O
oz
w
0
-n o
CD o
CD
r
(D
U3
(D
(n m
WOODRIDGE CIR
CLIFFWOOD RDI
RAIDER DR
v
v
m
r
z
m
�G v
NN
L
ROYAL PKWY O
m
D
z
WESTPARK WAY
X
r
m
m
-i
z
m
0
X
WILSHIRE DR
H
NITA LN
RENEE DR
S INDUSTRIAL BLVD
N INDUSTRIAL BLVD
y
X
2iO'd3NdVd
rn
0
O
z
Cyr
0 DONLEY DR
r
LAKEWOOD BLVD
SIMMONS DR
RANSAS DR
17 MILAM DR
OAKWOOD DR 1S 3NIn
1R1
m O
=
VINE ST
1S dHla'dW
HIMES DRCott,
ON
9
O
CANNON DR
NDR
X z z
g
1S NIVV4 S
N MAIN ST
;
z
m
m
z
v
N
O
�O
m
n
O
CA
n
q
0
Z
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 26,2018
Submitted By: HAL CRANOR Date Completed:
Project Title: MISCELLANEOUS SCREENING WALL REPAIR
Project Type: STREET Sub -Type: IMPROVEMENTS
Pro'ect Code: PS1903 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of maintenance and repair of publicly owned screening walls throughout the City.
PROJECT SCHEDULE:
JUSTIFICATION:
Screening walls that were constructed at locations including, but not limited to, Harwood Road, West Pipeline
Road, Gateway Boulevard, Main Street etc. are in need of periodic maintenance and repair.
30
PROJECT TITLE: MISCELLANEOUS SCREENING WALL REPAIR
PROJECT CODE: PS1K
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Construction $50,000
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: $0 Total Estimated Capital Cost $50,000
Maintenance Costs Funding Source:
Transfer from:
General Fund $25,000
Subtotal: $0 Additional Funding Needed:
Annual expense $0 Transfer from:
Street CIP Fund Balance $25,000
Total Estimated Annual Cost $0 Total Funding $50,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Construction $50,000 $0 $50,000 0%
$50,000 $0 $50,000 0% I
31
T H E C I T Y O F
ss
32
CAPITAL IMPROVEMENTS PROGRAM
FUNDED PROJECTS SUMMARY
Project
Number
Project Description
Budget as of
5131/18
Appropriation)
Amendment
Budget as of
5/31/19
Expended as
of 6131119
Remaining
Funds
Revised
Project Cost
Estimates
Unfunded/
(Excess
Funding)
WASTEWATER PROJECTS
WW0002
Misc. Wastewater Rehab min bal $1100 000
$ 756 086
$ 25,000
$ 781,086
$ 665,742
$ 115,344
$ 781,086
$
WW0605
TRA Wastewater Payments - Impact
$ 980 000
$ 100,000
$ 1,080,000
$ 980,000
$ 100,000
$ 1,180,000
$ 100 000
WW1901
Line Replacement - Cedar Hill Estates North
$
$ 409,903
$ 409,903
$ 11,134
$ 398,769
$ 409,903
$
WW1902
FY2019 44th CDBG LR: Oakwood Terrace Addition Phases III & IV
$
$ 408,950
$ 408,950
$ -
$ 408,950
$ 377,639
$ (31,311)
FB9911
FB - Wastewater Impact Restricted
$
$ -
$
$
$ -
$ -
$ 750,387
Total Wastewater Projects
$ 1,736,086
$ 943,853
$ 2,679,939
$ 1,656,876
$ 1,023,063
$ 2,748,628
$ 681,698
i'i Excess funding will be transferred to W/WW CIP Fund Balance.
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: July 26,1999
Submitted By: RON YOUNG Date Completed:
Project Title: MISCELLANEOUS WASTEWATER REHABILITATION
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Pro'ect Code: WW0002 Priority: A
COUNCIL AUTHORIZATION:
March 8, 2005: Awarded contract to Hall -Albert Construction Company for the replacement of various
wastewater lines in the amount of $977,857.50. (This award was only partially for the WW0002 project.)
March 28, 2006: Authorized the city manager to proceed with emergency repair by GRA-TEX Utilities to the
aerial wastewater main crossing Hurricane Creek at a cost of $55,000.
November 10, 2015: Awarded Bid No. 008-15 for a construction contract to William J. Schultz, Inc. dba Circle C
Construction for the replacement of sanitary sewer mains in portions of the Westwood Village Addition and the
Green Hills Park Addition and authorized the City Manager to enter into a contract including add alternate #1 if
required. The estimated expenditure is $577,357 and will be paid from WW1501, WW1502 and WW0002.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project is for funding of small wastewater main projects identified throughout the fiscal year. Larger projects
will be determined on an "as needed" basis and presented for funding under a new project number.
PROJECT SCHEDULE:
JUSTIFICATION:
Most of these lines are clay tile and are seriously deteriorated.
34
PROJECT TITLE: MISCELLANEOUS WASTEWATER REHABILITATION PROJECT CODE: WW0002
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Wastewater Mains
Personnel: Full Time (Minimum balance $100,000)
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
Subtotal: $0 Total Estimated Capital Cost
Maintenance Costs Funding Source:
Transfer from:
W/WW Operating Fund $240,000
WW9903 $37,013
$0 W/WW CIP Fund Balance $504,073
Subtotal:
ov
Annual expense
$41,335
Total Estimated Annual Cost
$41,335
Total Fundin-q
$781,086
CURRENT STATUS
OVERIUNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED
BUDGET (- +)
%, EXPENDED
Engineering
$17,939 $12,621
5,318
70%
Contingency
$30,580 $30,580
0
100%
Wastewater Mains
$732,567 $622,541
110,026
85%
$781 086 $665,742 $115,344 85% j
35
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 03,2006
Submitted By: RON YOUNG Date Completed:
Project Title: TRINITY RIVER AUTHORITY WASTEWATER PAYMENT
Project Type: WASTEWATER Sub -Type: IMPACT FEE
Proiect Code: M0605 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Based on a review by Birkhoff, Hendricks, and Conway of the water and wastewater impact fees, it was
determined that a substantial portion of the wastewater impact fee is attributed to Trinity River Authority ("TRA")
capital projects. Therefore, these fees should be used to pay a portion of the annual TRA expense, as these
funds are directly attributed to the expansion of TRA. Based on the available fund balance, a systematic
drawdown over a ten year period has been developed.
PROJECT SCHEDULE:
JUSTIFICATION:
The expansion at TRA provides additional capacity and it was determined through the wastewater impact fee
study that these funds could be used to pay a portion of TRA wastewater payments.
,-*IN
36
PROJECT TITLE: TRINITY RIVER AUTHORITY WASTEWATER PAYMENT PROJECT CODE: WW0605
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
($100,000)
TOTAL ESTIMATED CAPITAL COST:
rRA Wastewater Payments $1,180,000
Subtotal: ($100,000) Total Estimated Capital Cost
Maintenance Costs Funding Source:
Transfer from:
WW Impact Fee Fund Balance
$1,180,
$1,080,0001
Subtotal:
$0
Additional Funding Needed:
Transfer from:
WW Impact Fee Fund Balance
$100,000
Total Estimated Annual Cost
($100,000)
Total Funding
$1,180,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED BUDGET (-+)
% EXPENDED
Wastewater- TRA Service
$1,180,000 $980,000 $200,000
83%
PROJECT
$1,180,000 $980,000 $200,000
83%
37
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 12,2017
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEMENT -CEDAR HILL ESTATES NORTH
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Proiect Code: WW1901 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project
is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the wastewater mains in the following locations:
1. From South Euless Elementary School south to Hollywood Boulevard,
2. Hollywood Boulevard from Henslee Drive to South Euless Elementary,
3. Henslee Drive from Hollywood Boulevard to Whitener Road, and
4. Between Hollywood Boulevard and Whitener Road, from South Main Street to Cannon Drive.
PROJECT SCHEDULE:
Begin Construction: July 2019
Anticipate Construction Complete: October 2019
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
"1
38
1-11
PROJECT TITLE: LINE REPLACEMENT -CEDAR HILL ESTATES NORTH PROJECT CODE: WW1901
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
I Subtotal:
I Subtotal:
$0
TOTAL ESTIMATED CAPITAL COST:
ngineering
Total Estimated Capi1
Funding Source:
Transfer from:
N/WW Operating Fund
Cost
$52,228
$357,675
$409,
$409, 9031
Total Estimated Annual Cost
$01
Total Funding
$409,903
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED
BUDGET (-+)
% EXPENDED
Engineering
$52,228 $11,134
$41,094
21 %
Construction
$357,675 $0
$357,675
0%
ITOTAL PROJECT $409,903 $11,134 $398,769 3% I
39
ll,
T H E C I T Y O F
ES S
-IN
40
WASTEWATER LINE REPLACEMENT -
CEDAR HILL ESTATES NORTH
C1
Gi
REXVES CT
--virrTET
14
ui
-T
N
A
200 400 800
Feet
T H E - , C I T Y 0 F
ELESS Legend
�� VWV Line Replacement
41
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 12,2017
Submitted By: HAL CRANOR Date Completed:
Project Title: 44TH CDBG LINE REP-OAKWOOD TERR PHASES III & IV
Project Type: WASTEWATER Sub -Type: CDBG
Proiect Code: WW1902 Priority: A
COUNCIL AUTHORIZATION:
February 13, 2018: Conducted a Public Hearing for the proposed 44th year CDBG project, a wastewater line
rehabilitation along West Huitt Lane and Cannon Drive and approved the recommended CDBG project.
April 24, 2018: Conducted a Public Hearing to add additional projects for the proposed 44th Year CDBG project,
a wastewater line rehabilitation along West Huitt Lane and Cannon Drive including additional rehabilitation along
properties between Cannon Drive and Henslee Drive and approved the recommended CDBG project.
February 26, 2019: Approved Resolution No. 19-1545, recommending award of a construction contract to PM
Construction & Rehab, LLC dba IPR South Central in the amount of $267,254.50 and authorized a contingency in
the amount of $13,363.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project
is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Along 608 and 610 Martha Street,
2. Between Martha Street and Cannon Drive from Reaves Court to West Huitt Lane, and
3. Between Cannon Drive and Henslee Drive from Reaves Court to Jefflyn Court.
(44th year CDBG project)
PROJECT SCHEDULE:
Began Construction: April 2019
Anticipate Construction Complete: August 2019
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
Ilia
W
42
PROJECT TITLE: 44TH CDBG LINE REP-OAKWOOD TERR PHASES III & IV PROJECT CODE: WW1902
INET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
I Subtotal:
TOTAL ESTIMATED CAPITAL COST:
Engineering $53,341
Construction $324,298
$0
$0
$0 Total Estimated Capital Cost $377,639
Funding Source:
Transfer from:
CDBG Award $377,639
W/WW CIP Fund Balance $31,311
Subtotal:
$0
Transfer to:
W/WW CIP Fund Balance
($31,311)
Total Estimated Annual Cost
$0
Total FundinA
$377,639
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED
BUDGET (- +)
% EXPENDED
Engineering
$53,341 $0
$53,341
0%
Construction
$324,298 $0
$324,298
0%
TOTAL
$377,639 $0 $377,639 0% I
43
r-%k
44
44TH CDBG OAKWOOD TERRACE PH III & IV
-RAYLESS m
HUITT
JEFFLYN
W
W
JEAN
z
W
W
d'
W
a
x
U
K
O
IZCLOW
ROSE -
HOLLYWOOD
a �
Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the Gi user community
N T H E C I T Y O F
EULESS Legend
rO 75 150 300 450 600 — Wastewater
Feet
45
T H E C I T Y O F
EU, 'ESS
'"1
46
CAPITAL IMPROVEMENTS PROGRAM
FUNDED PROJECTS SUMMARY
Project
Number
Project Description
Budget as of
6/31118
Appropriation/
Amendment
Budget as of
5131119
Expended as
of 5131119
Remaining
Funds
Revised
Project Cost
Estimates
Unfunded/
(Excess
Funding)
WATER PROJECTS
WT0001
Misc. Water Rehab (min bal $160,000)
$
953,511
$ -
$
953,511
$
795,631
$
157,880
$ 953,511
$
WT0101
Water Tank Debt Payment -Impact
$
4,726,414
$ 255,674
$
4,982,088
$
4,896 854
$
85,234
$ 5,240,318
$ 258,230
WT0104
Well Repairs
$
1,688,992
$ -
$
1,688,992
$
1,598,065
$
90,927
$ 1,688,992
$ -
WT0803
Meters/Transponders/Leak Detection annual transfer $158 000
$M4,535,354
2036671
$ 166,273
$
2,202,944
$
1,260 725
$
942,219
$ 2,360,944
$ 158,000
WT1403
Reclaimed Water Line Extension Debt Payment -impact
$
$ 119.744
$
720,889
$
680,977
$
39,912
$ 838,683
$ 117,794
WT1603
Misc. Valve Replacement min bal $150 000
$
$ 125,000
$
390,000
$
162,869
$
227,131
$ 515,000
$ 125,000
WT1604
Reclaimed Water Line Extension Phase III
$
$ 87,344
$
4,622,698
$
1,568,945
$
3,053,753
$ 4,622,698
$
WT1802
Well Replacement-Fuller/Far North
$
783 480
$ 9,329,193
$
10,112,673
$
747,635
$
9,365,038
$ 10,712,673
$ 600,000
WT1901
Line Replacement - K nette Drive
$
$ 635,000
$
635,000
$
$
635,000
$ 635,000
$
FB9910
FB - Water Impact Restricted
$
$
$
$
$
$
$ (2,167,105
FB9901
FB - Water & Wastewater CIP
$
$
$
$
$
$
$ (262,834)
Total Water Proyeas
$15,590,567
$10 718,228
$26,308,795
$11,711,701
$14,597,094
$27,567,819
$ 1,170,915
A
4
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 10,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: MISCELLANEOUS WATER REHABILITATION
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: WT0001 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project provides funding for small water main projects identified throughout the fiscal year. Large projects
that are identified will be presented for funding under a new project number.
PROJECT SCHEDULE:
JUSTIFICATION:
Some of the City's older water mains have deteriorated and need replacement or repair.
.-*N
'-1
48
\
PROJECT TITLE: MISCELLANEOUS WATER REHABILITATION PROJECT CODE: WT0001
NET EFFECTS ON OPERATING AND
TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Water Mains
Personnel: Full Time
(Minimum balance $150,000)
Part Time
$0
Total Salary
$0
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal:
$0
Total Estimated Capital Cost
Maintenance Costs
Funding Source:
Transfers from:
W/WW CIP Fund Balance
$390,000
W/WW Operating Fund
$710,000
$0
Project Transfers
($146,489)
Subtotal:
$0
Annual expense
$1,984
Total Estimated Annual Cost
$1,9841
Total Funding
$953,511
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED BUDGET (- +)
% EXPENDED
Contingency
$49,231 $33,734 $15,498
69%
Water Mains
$904,280 $761,897 $142,383
84%
TOTAL PROJECT
$953,511 $795,631 $157,880
83%
49
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 01,2001
Submitted By: RON YOUNG Date Completed:
Project Title: WATER TANK DEBT PAYMENT - IMPACT
Project Type: WATER Sub -Type: IMPACT FEE
Project Code: WT0101 Priority: A
COUNCIL AUTHORIZATION:
Approved in the annual budget.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water tower was included in the water impact fee study.
PROJECT DESCRIPTION:
This project includes the transfer of funds from the water impact fee to pay debt service (W/S System Revenue
Refunding Bonds, Series 2012) related to the construction of the new water tower (Heritage Park).
PROJECT SCHEDULE:
Last debt payment for the water tower is scheduled for July 15, 2020.
JUSTIFICATION:
The water tower provides additional capacity and was included in the water impact fee study.
1111110
50
PROJECT TITLE: WATER TANK DEBT PAYMENT - IMPACT
INET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Annual debt payment - water impact fee
$250
PROJECT CODE: WT010
TOTAL ESTIMATED CAPITAL COST:
Debt Service FY2001-FY2019 $4,982,088
Debt Service FY2020 $258,230
$0
Subtotal: $250,000 Total Estimated Capital Cos
Maintenance Costs Funding Source:
WT Impact Fee Fund Balance
$0
$5,240,3181
$4,982,0881
Subtotal: $0 Additional Funding Needed:
Transfer from:
WT Impact Fee Fund Balance $258,230
Total Estimated Annual Cost $250,000 Total Fundina $5,240,318
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED
Transfer to Debt Service $5,240,318 $4,896,854 343,464 93%
TOTAL
$5,240,318 $4,896,854 $343,464
51
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 27,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: WELL REPAIRS
Project Type: WATER Sub -Type: WELL REPAIR
Proiect Code: WT0104 Priority: A
COUNCIL AUTHORIZATION:
April 22, 2003: Awarded bid 018-03 for Far North Well pump repair to Layne -Texas for $32,790.
February 14, 2006: Awarded bid 011-06 to Millican Well Service, LLC for rehabilitation and installation of the new
Centrilift submersible motor and pump for the Far North Well in the amount of $250,035.
January 25, 2011: Authorized Millican Well Service, LLC to repair Fuller Well in an amount not to exceed
$117,000, budget increase and additional funding of $117,000 required.
July 20, 2011: Transferred $95,000 from FB9901 to WT0104 for emergency well repairs.
August 9, 2011: Ratified City Manager action to proceed with emergency repairs to the Far North Well site, by
Millican Well Service, LLC in an amount not to exceed $95,000.
June 26, 2012: Ratified City Manager action to proceed with emergency repairs to the well located at 1400 North
Main Street, by Millican Well Service, LLC for an estimated amount of $64,950.
May 14, 2013: Authorized well repairs to the well located at 118 W. Fuller Drive (Fuller Well Site) by Millican Well
Service, LLC for an estimated amount of $120,000.
August 13, 2013: Ratified the City Manager action to proceed with emergency repairs to the City owned and
operated water well located at 1400 North Main Street, by Millican Well Service, LLC. The estimated expenditure
is $75,178.02.
October 27, 2015: Ratified City Manager action to proceed with emergency repairs to the well located at 2591
North Main Street, by Millican Well Service, LLC. The estimated expenditure is $54,128.23.
August 16, 2016: Authorized well repairs to the City owned and operated water wells located at 118 W. Fuller
Drive (Fuller Well Site) and 2404 N. Main St. (Far North Well Site) by Millican Well Service, LLC, for an estimated
amount of $170,426.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The funding is being utilized to repair well pumps and for other unexpected well repairs.
PROJECT SCHEDULE:
JUSTIFICATION:
Maintaining the City's wells results in the ability to produce water at a substantial reduction in cost.
v
-IN
52
PROJECT TITLE: WELL REPAIRS
INET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
PROJECT CODE: WT0104
TOTAL ESTIMATED CAPITAL COST:
I Rehabilitation
Subtotal:
$0
Total Estimated Capital Cost
Maintenance Costs
Funding Source:
Transfer from:
WT0001 - Misc Water Rehab
$145,720
W/WW CIP Fund Balance
$893,272
$0
W/WW Operating Fund
$650,000
Subtotal:
$0
Annual expense
$37,525
Total Estimated Annual Cost
$37,525
Total Funding
$1,688,992
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED BUDGET (-+)
% EXPENDED
Well Rehabilitation
$1,688,992 $1,598,065 $90,927
95%
$1,688,992 $1,598,065 $90,927 95% I
53
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 10,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: METERS/TRANSPONDERS/LEAK DETECTION
Project Type: WATER Sub -Type: METERS/TRANSPONDERS
Pro'ect Code: WT0803 Priority: A
COUNCIL AUTHORIZATION:
November 13, 2007: Awarded the annual contract for the purchase of water meters and transponders, and
authorized the City Manager to enter into an agreement with Atlas Utility Supply Company in the amount of
$383,875. Amount for project not to exceed $331,875.
November 11, 2008: Awarded the annual contract for the purchase of water meters and transponders, and
authorized the City Manager to enter into an agreement with Atlas Utility Supply Company in the amount of
$356,875. Amount for project not to exceed $331,875.
February 14, 2012: Awarded the annual contract for the purchase of water meters and transponders, and
authorized the City Manager to enter into an agreement with Atlas Utility Company in the amount of $200,000.
January 14, 2014: Authorized the City Manager to execute an Engineering Services Contract with Alan Plummer
and Associates, Inc. for services in assisting the City with the Texas Water Development Board State Revolving
Fund loan applications and the United States Bureau of Reclamation WaterSMART grant application. The
estimated amount is $78,000 and a portion of this amount is also authorized for project WT1201-Reclaimed
Water Line Extension.
February 10, 2015: Awarded the annual contract for the purchase of water meters and transponders, and
authorized the City Manager to enter into an agreement with Atlas Utility Supply Company.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project provides funding for the systematic replacement of meters, transponders and leak detection on an as
needed basis as well as the accumulation of funds for future system -wide replacements.
PROJECT SCHEDULE:
On -going
JUSTIFICATION:
This project provides funding for the systematic replacement of meters and transponders on a regular schedule at
or near end of asset life.
'1
'_11\
64
PROJECT TITLE: METERS/TRANSPONDERS/LEAK DETECTION PROJECT CODE: WT080:
INET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
TOTAL ESTIMATED CAPITAL COST:
nnual Funding $158,000)
ansponders/Meters
FY2008 through FY2019
ansponders/Meters FY2020
$2,202,
$158,
Subtotal:
$0
Total Estimated Capital Cost
$2,360,944
Maintenance Costs
Funding Source:
Transfer from:
W/WW CIP Fund Balance
$247,750
W/WW Operating Fund
$1,896,000
$0
Proceeds from Sale of Meters
$59,194
Subtotal:
$0
Additional Funding Needed:
Transfer from:
W/WW Operating Fund
$158,000
Total Estimated Annual Cost
$0
Total Funding
$2,360,944
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED BUDGET (- +)
% EXPENDED
Meters/Transponders
$2,198,787 $1,209,125 $989,662
55%
Debt Issuance Cost
$162,157 $51,600 $110,557
32%
'AL PROJECT
360,944 $1,260,725 $1,100,219
53%
65
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 31,2013
Submitted By: CHRIS BARKER Date Completed:
Project Title: RECLAIMED WATER LINE EXTENSION DEBT PAYMENT
Project Type: WATER Sub -Type: IMPACT FEE
Prollect Code: WT1403 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The reclaimed water system extension was included in the impact fee study.
PROJECT DESCRIPTION:
This project includes the transfer of funds from the water impact fee to pay debt service (W/S System Revenue
Bonds, Series 2013) related to the extension of the reclaimed water system.
PROJECT SCHEDULE:
Last debt payment is scheduled for July 15, 2033.
JUSTIFICATION:
The project provides a non -potable water source for irrigation which will offset future potable water purchases by
the City and will serve to responsibly conserve potable water resources for the City and the region.
66
PROJECT TITLE: RECLAIMED WATER LINE EXTENSION DEBT PAYMENT PROJECT CODE: WT1403
NET EFFECTS ON OPERATING AND
TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Debt Service FY2014-FY2019
$720,889
Personnel: Full Time
Debt Service FY2020
$117,794
Part Time
$0
Total Salary
$0
Purchase of Services
Materials & Supplies
Utilities
Annual debt payment - water impact fee
$120,000
$0
Subtotal:
$120,000
Total Estimated Capital Cost
$838,683
Maintenance Costs
Funding Source:
Transfer from:
WT Impact Fee Fund Balance
$720,889
$0
Subtotal:
$0
Additional Funding Needed:
Transfer from:
WT Impact Fee Fund Balance
$117,794
Total Estimated Annual Cost
$120,000
Total Funding
$838,683
CURRENT STATUS
OVERIUNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED BUDGET (- +)
%, EXPENDED
Transfer to Debt Service
$838,683 $680,977 $157,706
81%
AL PROJECT $838,683 $680,977 $157,706 81%
57
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 11,2015
Submitted By: HAL CRANOR Date Completed:
Project Title: MISCELLANEOUS VALVE REPLACEMENT
Project Type: WATER Sub -Type: VALVE REPLACEMENT
Proiect Code: WT1603 Priority: A
COUNCIL AUTHORIZATION:
November 22, 2016: Authorized the City Manager to execute a contract for the replacement of a 24-inch water
valve, located near the intersection of SH 183 and Sheppard Drive, with Atkins Brothers Equipment Company,
Inc. The estimated expenditure is $53,780.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project will allow for the systematic replacement of valves on an as needed basis.
PROJECT SCHEDULE:
JUSTIFICATION:
Old and deteriorated water valves prevent water lines from being isolated in the event of a line break. The
inability to isolate the smallest segment possible during a line break increases the labor required to isolate the
line, as well as the number of residents and fire hydrants that would be affected by a line break. Systematic
annual replacement of old deteriorated water valves will increase efficiency, reduce maintenance costs, and
ensure maximum fire protection and water service availability.
I`
'1
' N
58
M
PROJECT TITLE: MISCELLANEOUS VALVE REPLACEMENT PROJECT CODE: WT1603
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost
Water Valves
Personnel: Full Titne
(Minimum balance $150,000)
Part Time
$0
Total Salary
$0
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal:
$0
Total Estimated Capital Cost
Maintenance Costs
Funding Source:
Transfer from:
W/WW Operating Fund
$285,000
W/WW CIP Fund Balance
$105,000
$0
Subtotal:
$0
Additional Funding Needed:
Annual expense
$41,542
Transfer from:
W/WW CIP Fund Balance
$125,000
Total Estimated Annual Cost
$41,542
Total Funding
$515,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED BUDGET (- +) % EXPENDED
Engineering
$10,000 $0 $10,000
0%
Contingency
$10,000 $0 $10,000
0%
Construction
$495,000 $162,869 $332,131
33%
TOTAL PROJECT
$515,000 $162,869 $352,131
32%
59
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: June 15, 2015
Submitted By: CHRIS BARKER Date Completed:
Project Title: RECLAIMED WATER LINE EXT. PHASE III
Project Type: WATER Sub -Type: RECLAIMED WATER SYSTEM
Project CODE: WT1604 Priority: A
COUNCIL AUTHORIZATION:
March 14, 2017: Authorized the City Manager to negotiate and execute an Engineering Services Contract with Alan
Plummer Associates, Inc. for design of the reclaimed water system extension project. Funding is to be provided using
remaining unused funds from the Reclaimed Water Line Extension Phase II Project (WT1212) provided through the Texas
Water Development Board's Clean Water State Revolving Fund Program.
August 29, 2017: Approved Resolution No. 17-1513, requesting financial assistance by authorizing an application to be
filed with the Texas Water Development Board.
January 9, 2018: Approved Resolution No. 18-1523, requesting financial assistance by authorizing an application to be
filed with the Texas Water Development Board (TWDB). The TWDB has requested the City issue a new Resolution
authorizing an application to be filed with the TWDB seeking financial assistance in an amount not to exceed $3,260,000
which includes the cost of construction and the TWDB issuance costs.
March 13, 2018: Approved the first and final reading of Ordinance No. 2185, authorizing the issuance of City of Euless,
Texas, Waterworks and Sewer System Revenue Bonds, Series 2018.
March 13, 2018: Approved Resolution No. 18-1528, approving and authorizing the execution of a principle forgiveness
agreement with the Texas Water Development Board and an escrow agreement related thereto associated with the
City of Euless, Texas, Waterworks and Sewer System Revenue Bonds, Series 2018.
December 11, 2018: Awarded Bid No. 008-18, for the construction of the Reclaimed Water Line Extension, Phase III to
Joe Funk Construction in the amount of $3,914,798.50.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The reclaimed water line extension is a continuation of the City's Reclaimed Water Utility System. The feasibility study
completed in FY2012 initially contemplated six phases; however, due to remaining funds from Phase 11 and estimated
construction costs the project has been reduced to three phases with this being the final phase.
PROJECT DESCRIPTION:
The overall project will extend the City's Reclaimed Water Utility System from a point along Bear Creek Parkway north of
Little Bear Creek to a point just south of Glade Road. The final phase will extend the project to supply approximately 17 MG
annually to 11 additional properties.
PROJECT SCHEDULE:
Began Design: May 2017
Design Complete: August 2018
Began Construction: March 2019
Anticipate Construction Complete: August 2020
JUSTIFICATION:
Construction of the project will provide a non -potable water source for irrigation which will offset future potable water
purchases by the City and will serve to responsibly conserve potable water resources for the City and the region.
W
-IN
60
PROJECT TITLE: RECLAIMED WATER LINE EXT. PHASE III PROJECT CODE: WT1604
NET EFFECTS ON OPERATING AND
TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Engineering
$660,000
Direct Operating Cost
Construction
$3,914,799
Personnel: Full Time
Loan Origination Fee
$47,899
Part Time
Total Salary
$0
Purchase of Services
Materials & Supplies
Utilities
2018 Rev Bond Avg. Debt Service
$160,000
Subtotal:
$160,000
Total Estimated Capital Cost
$4,622,698
FUNDING SOURCE:
Maintenance Costs
Transfer from WT1212:
2015B Revenue Bond Issue
$1,192,103
WMW CIP Fund Balance
$75,093
2018 Revenue Bond Issue
$2,785,000
Loan Forgiveness
$473,300
$0
Interest Earnings
$97,202
Subtotal:
$0
Total Estimated Annual Cost
$160,000
Total Funding
$4,622,698
CURRENT STATUS
OVERIUNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED BUDGET (- +)
% EXPENDED
Engineering
Construction
$660,000 $624,494 $35,506
$3,914,799 $896,552 $3,018,247
95%
23%
Loan Origination Fee
$47,899 $47,899 $0
100%
AL PROJECT $4 622 698 $1,568 945 $3,053,753 34%
61
9
T H E C I T Y O F
ss4.
'1
62
4�6
U)
4
CA
00
li
CA
r—
CD
to
CD
CD
0
2?.
3
CD
Q.
m
x
CID
=3
Ch.
0
7
'PARK GROVE DR
_n
CHITTAM DR- 0
WOOD
AIQQRN OR PARK MANOR CT
t•! ULLER-Wl$ i �R RD
HWY 360
09E AMH
o9c,kMH
HOLLY CT
itlBONIE)
AIIOH,
NETTLE LN
/A(qrc,/V
BAYBERRY LN
Po�y
.4/V
rr
ERVA PR !r+
0;a
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 05,2017
Submitted By: HAL CRANOR Date Completed:
Project Title: WELL REPLACEMENT-FULLER/FAR NORTH
Project Type: WATER Sub -Type: WELL
Project Code: WT1802 Priority: A
COUNCIL AUTHORIZATION:
November 28, 2017: Authorized the City Manager to negotiate and execute an Engineering Design Contract with
Alan Plummer Associates, Inc. for the design of two water wells to replace the existing Fuller Well and Far North
Well. The scope of work for this portion of the project includes the design of the above ground well facilities
including booster pumps, electrical, and facilities required to operate the new wells.
November 28, 2017: Authorized the City Manager to execute an Engineering Design Contract with RW Harden
and Associates, Inc. for the design of two water wells to replace the existing Fuller Well and Far North Well. The
scope of work for this portion of the project includes all below ground and associated work at the well facilities,
the casing, screen, well head and pump equipment.
September 25, 2018: Approved Resolution 18-1537, requesting financial assistance by authorizing an
application to be filed with the Texas Water Development Board for a Drinking Water State Revolving Fund
(DWSRF) Loan.
March 26, 2019: Approved the first and final reading of Ordinance No. 2216, authorizing the issuance of City of
Euless, Texas, Waterworks and Sewer System Revenue Bonds, Series 2019.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
RW Harden & Associates completed a Preliminary Well Design Study in FY2017 in preparation for the
replacement of the Fuller Well, Far North Well, and the eventual replacement of the 1400 North Main Well.
PROJECT DESCRIPTION:
The project consists of the engineering design and complete replacement of the Fuller and Far North Wells with
new 1,800 foot deep wells.
PROJECT SCHEDULE:
Began Design: January 2018 Begin Construction: July 2019
Design Complete: May 2019 Anticipate Construction Complete: July 2020
JUSTIFICATION:
RW Harden & Associates completed a Preliminary Well Design Study in FY2017 in preparation for the
replacement of the Fuller Well, Far North Well, and the eventual replacement of the 1400 North Main Well. The
Fuller and Far North Well are in need of immediate replacement. New wells will enable the City to provide high
quality water to citizens while reducing maintenance and operational costs.
64
PROJECT TITLE: WELL REPLACEMENT-FULLER/FAR NORTH
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
debt service
Subtotal:
$381,
$381
PROJECT CODE: WT1802
TOTAL ESTIMATED CAPITAL COST:
Engineering $783,480
Construction $9,679,735
Equipment $50,658
Loan Origination Fee $198,800
$10,712,6731
Maintenance Costs
Funding Source:
Transfer from:
W/WW Operating Fund
$723,000
W/WW CIP Fund Balance
$60,480
$0
2019 Revenue Bond Issue
$9,275,000
Subtotal:
$0
Int. Earnings/Ins. Proceeds
$54,193
Additional Funding Needed:
Transfer from Rate Stabilization
$600,000
Total Estimated Annual Cost
$381,000
Total Funding
$10,712,673
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED BUDGET (- +)
% EXPENDED
Engineering
$783,480 $552,420 $231,060
71 %
Construction
$9,679,735 $0 $9,679,735
0%
Equipment
$50,658 $0 $50,658
0%
Loan Origination Fee
$198,800 $195,215 $3,585
98%
$10,712,673 $747,635 $9,965,038
65
"IN
T H E C I T Y O F
Aw
Ess
66
m
4
00
V
01
C'' z
CA
C
Lrl
(D O
m
C� m
V
VJ-n
•r
cD
<D
m Q
X
m
v
m
CD
3
m
QRio Gj;�4NDE BLVD
n
SH 121 SH 121
N INDUSTRIAL BLVD
O
v
< =
SH 121
Q
r
PARKER DR z
m
m
v
4
n
FAYETTE DR
OAK TIMBER DR
W
;u GATEWAY BLVD
cn
"`AAA
O,p
DONLEY DR
CRANE D I#
O
m Lfl2id�g 31111�
p
N EC
p
LAKEWOOp BLVD
m
m
O z
FZ
STON�w�L
�
ARANSAS
DR
BAZE RD
DR
FREEST
L/gjFSO N1pR 9DEN DR o
C7
O
HIMES DR
R COLL1ryOR n z
r
• m N MAIN ST
SALEM DR
� c
MARSHALL OR
mn z
Oy
p
m
WINSTON
DR
Op
c
m
0
m
x
2
>
DARLENE TR
p
NI d13`JNd
O
v
PINEVIEW DR
RIVER BIRCH RD
O
GARDENAV
ASTER
DR
RUSTIC LN
MINTERS CHAPEL RD
� O0
CHITTAM DR � ri
Fz
z
ACORN DR
z
HWY 360
�
h
m
m
z
�
•
v
v
03
v
a
m
z
z
Z
G�
4
o BAYBERRYLN
2
=m
��D
m
W yy
Z
ERWIN DR z v
cn
r
z
rr-
A Z
m
r
c r
r�
rM
m�
0m
3
�M
zz
0 �
00
�m
2�
z
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: June 14,2018
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEMENT-KYNETTE DRIVE
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: WT1901 Priority: A
COUNCIL AUTHORIZATION:
April 9, 2019: Authorized award of a construction contract to Murphy Pipeline Contractors, Inc. for an estimated
expenditure of $577,642.22
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of the replacement of an existing 6 inch cast iron water line located along Kynette Drive from
Canyon Ridge Drive to Wilshire Drive.
PROJECT SCHEDULE:
Begin Construction: June 2019
Anticipate Construction Complete: August 2019
JUSTIFICATION:
This project ranks first on the Ten Year CIP Plan produced by the Engineering Division. The line has had fourteen
leaks repaired since 2007 and was installed between 1963 and 1964.
68
PROJECT TITLE: LINE REPLACEMENT-KYNETTE DRIVE
PROJECT CODE: WT1901
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Construction $575,000
Personnel: Full Time Contingency $60,000
Part Time $0
(Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal: $0 Total Estimated Capital Cost $635,000
Maintenance Costs Funding Source:
Transfer from:
W/WW Operating Fund $635,000
I Subtotal:
Total Estimated Annual Cost $01 Total Funding $635,000
CURRENT STATUS
OVERIUNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Construction $575,000 $0 $575,000 0%
Contingency $60,000 $0 $60,000 0%
$635,000 $0 $635,000 0%
69
T H E C I T Y O F
ss
,-"I's
70
EVANS OR
CIN'YON RIDGE DR
MESA DR
VVMCLIFFDR
0
r,
CD
cc
CD
g &
CL
LIVE OA
DOCK MCGINNIS DR
44513VRY QR',
51
DANA KAY DR
QXOURY DR
�J� KSHIRE-DFZ-
!ADR
STONEHENGEAVE
1. 13UCKINGHAMAIVIL'.
m
A X
< r-
z Z-P
M M
m m
M
>
< 0
m m
ic
m
z
T H E C I T Y O F
U --" L 'ESS
72
V
W
CAPITAL IMPROVEMENTS PROGRAM
FUNDED PROJECTS SUMMARY
Project
Number
Project Description
Budget as of
5/31/18
Appropriation/
Amendment
Budget as of
5/31/19
Expended as
of 5/31/19
Remaining
Funds
Revised
Project Cost
Estimates
Unfunded/
(Excess
Funding)
OTHER
AC1901
Texas Star Sports Complex Phase VII Design
$
-
$
150,000
$
150,000
$
15,694
$
134,306
$
150,000
$
CM0304
Entry Monument
$
135,782
$
-
$
135,782
$
111,058
$
24,724
$
135,782
$
CM0804
Redevelopment
$
3,696,002
$
531,619
$
4,227,621
$
3,052,607
$
1,175.014
$
5,227,621
$ 1,000,000,
CM1701
Municipal Plaza Improvements Phase II
$
266,733
$
-
$
266,733
$
67,370
$
199,363
$
266,733
$
DV9901
EDC Incentive Funds
$
1,375,854
$
25,000
$
1,400,854
$
1,351,148
$
49,706
$
1,425,854
$ 25,000
ED1002
EDC Contingency
$
217,507
$
32,493
$
250,000
$
-
$
250,000
$
325,000
$ 75,000
ED1601
Midtown Development
$
16,417,980
$
-
$ 16,417,980
$
15.348,780
$
1,069,200
$
16,417,980
$ -
FM1201
ADA/TAS Facility Improvements (min bal $76,000)
$
115,000
$
25,000
$
140,000
$
46,140
$
93,860-
$
140,000
$
FM1708
Library Remodel
$
2,125,000
$
5,185,908
$
7,310.908
$
1,321,868
$
5,989,040
$
7,310,908
$ -
GC1801
TSGC Misc. Improvements (min bal $150,000)
$
247,180
$
115,000
$
362,180
$
280,463
$
81,717
$
477,180
$ 115,000
PR0720
Misc. Park Improvements (min bal $100,000)
$
795,500
$
122,753
$
918,253
$
809,522
$
108,731
$
1,118,253
$ 200,00
PR0804
Park Irrigation
$
250,000
$
-
$
250,000
$
207,472
$
42,528
$
275,000
$ 25,000
PR1917
Carr Park Improvements
$
-
$
1,688,831
$
1,688,831
$
837,618
$
851,213
$
1,688,831
$ -
FB9906
FB-EDC CIP
$
$
-
$
-
$
-
$
-
$
-
$ 166,798
FB9908
FB-Texas Star Sports Complex CIP
$
$
$
$
$
$
$ 200,725)
FB9909
FB-General CIP
$
$
$
$
$
$
$ 248,992
F139913
FB-Car Rental CIP
$
$
$
$
$
$
$ (393,733
1769916
FB-TSGC CIP
$
$
$
$
$
$
$ 10,889
Total Other Projects
$
25,642,538
$
7,876,604
$33,519,142
$23,449,740
$ 10,069,402 1
$34,959,142
$ 418,863
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: April 24,2018
Submitted By: RAY MCDONALD Date Completed:
Project Title: TEXAS STAR SPORTS COMPLEX PHASE VII DESIGN
Project Type: PARK/RECREATION Sub -Type: TSSC IMPROVEMENTS
Pro'ect Code: AC1901 Priority: A
COUNCIL AUTHORIZATION:
August 14, 2018: Ratified the Euless Development Corporation (EDC) action taken on August 13, 2018,
approving EDC Resolution No. 21-18, declaring a project for improvements at the Parks at Texas Star including
Softball Facilities.
October 23, 2018: Ratified the Euless Development Corporation action taken on October 23, 2018, authorizing
the Euless Development Corporation President to negotiate and execute an Architectural Services Contract with
Oxley Williams Tharp Architects for the planning and design of Texas Star Sports Complex Phase VII (Softball
World).
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The Texas Star Sports Complex Phase VII includes renovating the existing infields with synthetic turf, renovating
the existing concession/restroom building, building new offices for staff and upgrading the existing lighting from
metal -halide to LED. With the growing number of participants in youth baseball, renovating the existing infields
with synthetic turf will allow staff the opportunity to expand existing leagues as well as programming for additional
leagues in adult softball. Synthetic turf infields will also substantially reduce the number of rain outs which results
in lost revenue. The addition of this phase will ensure that the Texas Star Sports Complex remains the premier
sports facility for amateur athletics for many years to come.
PROJECT DESCRIPTION:
The planning and design for Texas Star Sports Complex Phase VII. The project scope includes renovating the
existing infields with synthetic turf, renovating the existing facility to meet current ADA standards, renovating the
existing restroom/concession building, creating new office space for staff and upgrading the lighting system to
LED.
PROJECT SCHEDULE:
Began Design: January 2019
Anticipate Design Complete: October 2019
JUSTIFICATION:
With the completion of Phase VII, the new infields will increase programming opportunities as well as
substantially reduce the number of rain outs.
.-1
74
PROJECT TITLE: TEXAS STAR SPORTS COMPLEX PHASE VII DESIGN PROJECT CODE: AC1901
INET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
I Subtotal:
TOTAL ESTIMATED CAPITAL COST:
Planning and Design
$0
$0 Total Estimated Ca
Funding Source:
Transfer from:
EDC Operating Fund
$0
$0
Cost
$150,0001
$150,
$150,
Total Estimated Annual Cost $01 Total Funding $150,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED
Planning and Design $150,000 $15,694 $134,306 10%
$150,000 $15,694 $134,306
75
City of Euless
Capital Project Request
Department: CITY MANAGER Date Prepared: July 11,2006
Submitted By: JOE HENNIG Date Completed:
Project Title: ENTRY MONUMENT SIGN PROGRAM
Project Type: MISCELLANEOUS Sub -Type: IMPROVEMENTS
Project Code: CM0304 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Continuation of the original City of Euless Entry Monument Sign Program.
PROJECT DESCRIPTION:
Continued construction of City of Euless entry monument signs at key visibility points throughout the City
extending Euless beautification and branding efforts.
PROJECT SCHEDULE:
JUSTIFICATION:
To enable continuous efforts to identify, beautify, and brand the City of Euless.
w
_'11\
76
��
PROJECT TITLE: ENTRY MONUMENT SIGN PROGRAM
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
I Subtotal:
PROJECT CODE: CM0304
TOTAL ESTIMATED CAPITAL COST:
Land Betterments
$0
$0
$0I $0 Total Estimated I
Funding Source:
Transfer from:
Car Rental Fund
Cost
$135,7821
$135,7821
$135,
Total Estimated Annual Cost $01 Total Funding $135,782
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Land Betterments $135,782 $111,058 24,724 82%
TOTAL PROJECT
$135,782 $111,058 $24,724
77
City of Euless
Capital Project Request
Department: CITY MANAGER Date Prepared: July 11,2006
Submitted By: GARY MCKAMIE Date Completed:
Project Title: REDEVELOPMENT
Project Type: MISCELLANEOUS Sub -Type: DEVELOPMENT
Project Code: CM0804 Priority: A
COUNCIL AUTHORIZATION:
FY2008 Property Acquisitions: 1010 Highland Drive, 1010 Cresthaven Drive, and 710 South Main.
FY2009 Property Acquisitions: 1007 Cresthaven Drive, 912 Cresthaven Drive, 1005 Cresthaven Drive, and 1002
Highland Drive.
FY2013 Property Acquisitions: North Sheppard Drive (10 lots), 908 Cresthaven Drive, and 910 Cresthaven Drive.
FY2015 Property Acquisitions: 903 Cresthaven Drive, 1447 West Euless Boulevard, 901 Highland Drive, 904
Highland Drive, and 215 East Ash Lane.
November 10, 2015: Authorized the City Manager to execute an agreement to accept contributions from Gardner
Capital Texas, LLC and Bloomfield Homes Fund, LP to a Community Revitalization Fund in the amount of
$100,000.
November 10, 2015: Authorized the Mayor to negotiate and execute conveyance documents for the sale of City
owned property located at 203, 204, and 205 Dickey Drive.
FY2016 Property Acquisitions: 905 Cresthaven Drive.
FY2017 Property Acquisitions: 909 Highland Drive, 911 Highland Drive, 1000 Highland Drive, and 1011
Cresthaven Drive.
October 10, 2017: Authorized the sale of City owned property and structure located at 911 Highland Drive.
FY2018 Property Acquisitions: 906 Highland Drive, 917 Highland Drive, 1005 Highland Drive, 902 Cresthaven
Drive, and a portion of Block 1, Lot 5 in the S.W. Mills Subdivision.
FY2019 Property Acquisitions: 908 Highland Drive, 1001 Highland Drive, 1003 Highland Drive, 109 Ross
Avenue, and property located at SH183 at Main Street, Tract 16 and 17.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project provides funding to allow the City to participate in redevelopment projects and other community
improvements or make acquisitions of property that will be of economic benefit to the City of Euless.
PROJECT DESCRIPTION:
Project includes City participation in community redevelopment projects and property acquisitions that will be of
economic benefit to the City.
PROJECT SCHEDULE:
Long-term on -going project for continuous improvement of the community.
JUSTIFICATION:
As the City ages, it is imperative that the economic vitality of the City remain strong. Reinvestment into the
community will protect property values from deterioration and keep commercial properties occupied and
vibrant.
.-N
78
M
PROJECT TITLE: REDEVELOPMENT
INET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
PROJECT CODE: CM0804
TOTAL ESTIMATED CAPITAL COST:
Land Acquisition
Demolition
Minor Apparatus
Incentives
Revitalization Target Area #1
Other Professional Services
$4, 828, 317
$250,194
$197
$10,000
$100,000
$38, 913
Subtotal:
$0
Total Estimated Capital Cost
$5,227,621
Maintenance Costs
Funding Source:
Transfer from:
General Fund
$930,000
Car Rental Operating/CIP Fund
$2,950,000
$0
Miscellaneous Other
$347,621
Subtotal:
$0
Additional Funding Needed:
Transfer from:
Car Rental Fund
$1,000,000
Total Estimated Annual Cost
$0
Total Funding
$5,227,621
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED BUDGET (- +)
% EXPENDED
Land Acquisition
$4,828,317 $2,674,945 $2,153,372
55%
Demolition
$250,194 $235,783 $14,411
94%
Minor Apparatus
$197 $167 $30
85%
Incentives
$110,000 $110,000 $0
100%
Professional Services
$38,913 $31,712 $7,201
81%
TOTAL PROJECT
$5,227,621 $3,052,607 $2,175,014
79
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: June 03, 2014
Submitted By: HAL CRANOR Date Completed:
Project Title: MUNICIPAL PLAZA IMPROVEMENTS PHASE II
Project Type: FACILITIES Sub -Type: IMPROVEMENTS
Project Code: CM1701 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project includes the landscaping and irrigation related to the 40th CDBG ADA accessibility and infrastructure
improvements.
PROJECT DESCRIPTION:
Landscaping and irrigation improvements to the Municipal Plaza following the 40th CDBG ADA accessibility and
infrastructure improvements. Project will extend to the Library entrance from the courtyard.
PROJECT SCHEDULE:
Anticipate Construction Compete: FY2020
JUSTIFICATION:
Beautification of the municipal plaza following the hardscape improvements.
.-"*N
80
PROJECT TITLE: MUNICIPAL PLAZA IMPROVEMENTS PHASE II PROJECT CODE: CM1701
INET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
I Subtotal:
TOTAL ESTIMATED CAPITAL COST:
$0
$266,
$0 Total Estimated Capital Cost $266,733
Funding Source:
Transfer from:
General Fund $150,000
Car Rental Fund (Phase 1) $116,733
Total Estimated Annual Cost
$01
Total Funding
$266,733
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED
BUDGET (-+)
% EXPENDED
Landscaping
$260,733 $61,555
$199,178
24%
Equipment
$6,000 $5,815
$185
97%
$266,733 $67,370 $199,363 ' 25% I
81
City of Euless
Capital Project Request
Department: ECONOMIC DEVELOPMENT Date Prepared: July 26,1999
Submitted By: BILL RIDGWAY Date Completed:
Project Title: EULESS DEVELOPMENT CORPORATION INCENTIVE
Project Type: EDC Sub -Type: DEVELOPMENT
Project Code: DV9901 Priority: A
COUNCIL AUTHORIZATION:
March 27, 2001: Approved transfer of $325,000 to North Main Street for right-of-way to free up funds for a sign
program.
May 30, 2006: Approved payment to Professional Turf Products, Inc. in the amount of $300,000 per agreement.
April 24, 2012: Ratified Euless Development Corporation (EDC) action taken on April 23, 2012, to approve the
first amendment to the lease and incentive agreement by and between the EDC, the City of Euless and U.S.
Concrete, Inc. and its subsidiary Redi-Mix, L.L.C., and authorizing the President to make the modification and
execute such amendment. The agreement called for a $150,000 incentive payment upon the successful
relocation of the US Concrete corporate headquarters to Euless.
December 12, 2017: Approved the EDC projects and actions taken by the EDC Board of Directors on December
12, 2017 which included authorizing the President to negotiate and execute conveyance documents for the
purchase of property located at 411 North Main Street.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Euless Development Corporation funds that have been set aside to aid the City of Euless in attracting
development opportunities.
PROJECT SCHEDULE:
JUSTIFICATION:
Funding this project would enable the City to act quickly on development opportunities that arise throughout the
year.
'1
82
PROJECT TITLE: EULESS DEVELOPMENT CORPORATION INCENTIVE PROJECT CODE: DV9901
INET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
I Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
$0
TOTAL ESTIMATED CAPITAL COST:
Will be based on the merits of
each opportunity.
Maintenance Costs
Funding Source:
Transfer from:
EDC CIP Fund Balance
$1,338,454
EDC Operating Fund
$600,000
ED1002 - EDC Contingency
$250,000
Subtotal:
Transfer to FS#2 & N Main
($787,600)
Additional Funding Needed:
EDC Operating Fund
$25,000
Total Estimated Annual Cost
$0
Total Funding
$1,425,854
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED BUDGET (-+)
% EXPENDED
Economic Development Incentives
$1,425,000 $1,350,295 $74,705
95%
Irrigation Supplies
$854 $853 $1
100%
$1,425,854 $1,351,148 $74,706 95%
83
City of Euless
Capital Project Request
Department: ECONOMIC DEVELOPMENT Date Prepared: Sept 30,2010
Submitted By: GARY MCKAMIE Date Completed:
Project Title: EDC CONTINGENCY
Project Type: EDC Sub -Type: MISCELLANEOUS
Proiect Code: ED1002 Priority: A
COUNCIL AUTHORIZATION:
May 14,2019: Ratified the Euless Development Corporation (EDC) action taken on May 13, 2019, authorizing the
expenditure of funds for the demolition of Wilshire Pool.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
To provide funding for emergencies or unforeseen projects that arise throughout the year.
PROJECT SCHEDULE:
JUSTIFICATION:
This would enable the City to act quickly on emergency or unforeseen projects. Without funding, these types of
projects would have to wait until the next budget cycle which could increase costs or impede economic
development opportunities.
NO
84
PROJECT TITLE: EDC CONTINGENCY
PROJECT CODE: ED1002
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Contingency $325
Personnel: Full Time
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal:
$0
Total Estimated Capital Cost
$325,000
Maintenance Costs
Funding Source:
Transfer from:
EDC Operating/CIP Fund
$282,493
AC1601 - TSSC Phase V
$64,586
$0
ED1401 - Planning Consultants
$152,921
Subtotal:
$0
DV9901 - EDC Incentive Funds
($250,000)
Additional Funding Needed:
EDC CIP Fund Balance
$75,000
Total Estimated Annual Cost
$0
Total Funding
$325,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED BUDGET (-+)
% EXPENDED
Contingency
$325,000 $0 $325,000
0%
TOTAL PROJECT $325,000 $0 $325,000 0%
85
City of Euless
Capital Project Request
Department: CITY MANAGER Date Prepared: June 16,2015
Submitted By: LORETTA GETCHELL Date Completed:
Project Title: MIDTOWN DEVELOPMENT
Project Type: MISCELLANEOUS Sub -Type: DEVELOPMENT
Project Code: ED1601 Priority: A
COUNCIL AUTHORIZATION:
June 23, 2015: Conducted a Public Hearing and approved Planned Development.
August 25, 2015: Approved Resolution No. 15-1471 creating, authorizing, and establishing the Euless Midtown
Public Improvement District.
December 8, 2015: Approved Resolution No. 15-1479 authorizing publication of notice of intention to issue
certificates of obligation to fund public infrastructure improvements including streets, drainage, and water and
wastewater in the Euless Midtown Zone.
December 8, 2015: Approved Ordinance No. 2096 approving the Project and Financing Plan for Tax Increment
Reinvestment Zone Number Four.
January 12, 2016: Approved Ordinance No. 2098 authorizing the issuance and sale of City of Euless, Texas, Tax
and Waterworks and Sewer System (Limited Pledge) Revenue Certificates of Obligation, Series 2016.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project provides funding for City participation in a public/private development opportunity.
PROJECT DESCRIPTION:
Project includes City participation in a public/private community development project of approximately 56 acres
located in the A.J. Huitt Survey, Abstract 684. Project costs will include land, right-of-way, remediation, paving,
storm drainage, water, wastewater, landscaping, hardscaping, amenities, design and administrative costs.
PROJECT SCHEDULE:
Began Demolition: Spring 2016
Construction Complete: FY2019
JUSTIFICATION:
This is a significant development opportunity within the heart of Euless. The development is projected to include
residential development including villas, townhomes and rowhouses, cluster housing, and urban lofts; commercial
development including retail and restaurant development; and landscaped bioswales and water detention areas
for stormwater management.
,._14\
86
PROJECT TITLE: MIDTOWN DEVELOPMENT
PROJECT CODE: ED1601
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Public Improvements $16,417
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: $0 Total Estimated Capital Cost $16,417,
Maintenance Costs Funding Source:
Certificates of Obligation $16,417,
Subtotal:
Total Estimated Annual Cost $01 Total Funding $16,417,980
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED
Public Improvements $16,417,980 $15,348,780 $1,069,200 93%
TOTAL PROJECT $16,417,980 $15,348,780 $1,069,200 93%
87
City of Euless
Capital Project Request
Department: FACILITIES Date Prepared: April 11,2011
Submitted By: KYLE MCADAMS Date Completed:
Project Title: ADA/TAS FACILITY IMPROVEMENTS
Project Type: FACILITIES Sub -Type: IMPROVEMENTS
Pro'ect Code: FM1201 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project provides for the continued improvements to various City facilities as required by Federal and State
mandated Americans with Disabilities Act/Texas Accessibility Standards ("ADA/TAS"). City facilities, entrances,
lifts, signage, speech and hearing aided devices, and other areas covered under both ADA and TAS
requirements will be part of these improvements. Project funds will be managed by the City Manager's Office and
will be allocated as identified projects are brought forth and approved.
PROJECT SCHEDULE:
JUSTIFICATION:
Some City facilities do not meet current ADA/TAS standards. Updating accessibility on a continuing basis will
help keep the City in compliance with government standards and will address the growing needs of citizens with
accessibility issues.
'_11\
88
PROJECT TITLE: ADA/TAS FACILITY IMPROVEMENTS
PROJECT CODE: FM120
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Improvements
Personnel: Full Time (Minimum balance $75,000)
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
Subtotal: $01 Total Estimated Capital Cost
Funding Source:
Transfer from. -
Car Rental Fund $65,000
General Fund $50,000
Risk Operating Fund $25,000
Subtotal:
$0
Annual expense
$2,510
Total Estimated Annual Cost
$2,510
Total Funding
$140,000
CURRENT STATUS
OVERIUNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED
BUDGET (- +)
% EXPENDED
Structural Maintenance
$134,000 $40,727
$93,273
30%
Training
$6,000 $5,413
$587
90%
�,_, I TOTAL PROJECT $140,000 $46,140 $93,860 33% I
89
City of Euless
Capital Project Request
Department: FLEET & FACILITY OPERATIONS Date Prepared: April 01,2013
Submitted By: KYLE MCADAMS Date Completed:
Project Title: LIBRARY REMODEL
Project Type: FACILITIES Sub -Type: REMODEL
Project Code: FM1708 Priority: A
COUNCIL AUTHORIZATION:
February 14, 2017: Authorized the City Manager to negotiate and execute an Architectural Services Contract
with Oxley Williams Tharp Architects for the planning and design of the remodel of the Library building. The
estimated expenditure is $95,000 (Schematic and Development Design Phase Only).
August 15, 2017: Ratified the EDC action taken on August 14, 2017, approving EDC Resolution No. 18-17 to
provide for the expenditure of funds for a project involving the remodeling of the Euless Public Library.
October 10, 2017: Authorized the City Manager to negotiate and execute an Architectural Services Contract with
Oxley Williams Tharp Architects for the construction documents development, bidding and negotiation, and
contract administration phases of the remodel of the Library building. The estimated expenditure is $172,250.
November 13,2018: Awarded Bid No. 009-18 to JC Commercial for the remodel of the Mary Lib Saleh Euless
Public Library for an estimated expenditure of $6,360,000.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The library facility remodel project scope includes the following: planning and design, reconfiguration of the
general interior layout, replacement of the chilled water HVAC system, replacement of furnishings, updating
overall facility decor, lighting upgrades, and electrical work.
PROJECT SCHEDULE:
Began Design: March 2017 Award Bid: October 2018
Design Complete: August 2017 Began Construction: December 2018
Bid Project: July/September 2018 Anticipate Construction Complete: March 2020
JUSTIFICATION:
The Library was constructed in 1996, pre-internet and pre -digital age. Electrical plugs and data ports are currently
in limited areas but are needed throughout the building to provide increased access to computers and
technology. Patrons are requesting more space for quiet study, group study, and collaboration. The Young Adult/
Teen collection is one of the highest circulation and this group needs a space in the Library.
..ON
t
90
PROJECT TITLE: LIBRARY REMODEL
PROJECT CODE: FM170
NET EFFECTS ON OPERATING AND
TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Schematic/Design Dev.
$92,750
Personnel: Full Time
Construction Documents &
Part Time
$0
Administration
$172,250
Total Salary
$0
Other Professional Services
$10,000
Purchase of Services
Construction
$6,410,000
Materials & Supplies
Furnishings & Fixtures
$600,000
Utilities
Equipment
$25,908
$0
Subtotal: $0 Total Estimated Capital Cost $7,310,908
Maintenance Costs Funding Source:
Transfer from:
EDC Operating Fund $2,675,000
Car Rental Operating Fund $3,014,900
Car Rental CIP Fund $1,595,100
Subtotal: Grant Award $25,908
Total Estimated Annual Cost
$01
Total Funding
$7,310,908
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED
BUDGET (- +)
% EXPENDED
Schematic/Design Dev. & Const. Admin
$265,000 $242,445
$22,555
91%
Other Professional Services
$10,000 $0
$10,000
0%
Construction
$6,410,000 $1,079,423
$5,330,577
17%
Furnishings & Fixtures
$600,000 $0
$600,000
0%
Equipment
$25,908 $0
$25,908
0%
ECT $7,310,908 $1,321,868 $5,989,040 18%
91
City of Euless
Capital Project Request
Department: TEXAS STAR GOLF COURSE Date Prepared: May 17,2011
Submitted By: GLENDA HARTSELL Date Completed:
Project Title: TSGC MISCELLANEOUS IMPROVEMENTS
Project Type: PARK/RECREATION Sub -Type: TSGC IMPROVEMENTS
Project Code: GC1801 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
To provide funding to address small capital projects that arise throughout the year at Texas Star Golf Course.
PROJECT SCHEDULE:
JUSTIFICATION:
Without funding for this project, the smaller items identified throughout the year could not be addressed in a
timely manner and would have to be postponed until the next budget cycle for funding consideration. Timely
response preserves the City's investment in a high -profile asset and maintains the quality service levels expected
from patrons.
'h1
92
Mm
PROJECT TITLE: TSGC MISCELLANEOUS IMPROVEMENTS
INET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
$0
PROJECT CODE: GC1801
TOTAL ESTIMATED CAPITAL COST:
Improvements
(Minimum balance $150,000)
Subtotal:
$0
Total Estimated Capital Cost
Maintenance Costs
Funding Source:
Transfer from:
TSGC Reserve Fund
$215,000
Hotel/Motel Fund
$120,000
$0
GC1201 - TSGC Misc. Imp.
$25,180
Subtotal:
$0
Tree Replacement Reimb.
$2,000
Annual expense
$264,568
Additional Funding Needed:
TSGC Reserve Fund
$115,000
Total Estimated Annual Cost
$264,568
Total Funding
$477,180
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED BUDGET (- +)
% EXPENDED
Improvements
$370,000 $197,795 $172,205
53%
Equipment
$105,180 $80,669 $24,511
77%
Botanical
$2,000 $2,000 $0
100%
$477,180 $280,463 $196,717 59%
93
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: March 23,2004
Submitted By: RAY MCDONALD Date Completed:
Project Title: MISCELLANEOUS PARK IMPROVEMENTS
Project Type: EDC Sub -Type: PARKS
Project Code: PR0720 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The adopted Parks Master Plan recommends funding for system -wide park facilities and amenities upgrades.
PROJECT DESCRIPTION:
The project provides funding for the upgrade and modernization of City parks to include replacement of aged
structures such as pavilions, picnic tables, gazebos, signs, safety components, and other park amenities
including the addition of a gazebo on Main Street. Park infrastructure and structure painting are included in the
scope of the project. Additionally, the project encompasses the installation of trail lighting along the Trails of
Euless similar to the lighting installed along the trail through Midway Park. Trailwood Park, Bob Eden Trail, The
Preserve at McCormick Park, The Villages of Bear Creek Park and Heritage Park would also benefit from trail
lighting.
PROJECT SCHEDULE:
JUSTIFICATION:
Pursuant to the recommendations in the Parks Master Plan, park accessibility should be in compliance with the
Americans with Disabilities Act. The existing equipment in many park areas is becoming aged and will require
refurbishment or replacement in the near term. Additionally, park infrastructure should be maintained at a level
that meets citizen expectations.
94
PROJECT TITLE: MISCELLANEOUS PARK IMPROVEMENTS
PROJECT CODE: PR072(
INET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
uirect uperating cost Fixtures, landscaping, lighting,
Personnel: Full Time & other park and infrastructure
Part Time $0 improvements
Total Salary $0
Purchase of Services (Minimum balance $100,000)
Materials & Supplies
Utilities
Subtotal:
$0
Total Estimated Capital Cost
Maintenance Costs
Funding Source:
Transfer from:
EDC Operating Fund
$875,000
Developer Contribution (TRA)
$10,500
$0
ES0283 & ES1901
$32,753
Subtotal:
$0
Additional Funding Needed:
Annual expense
$74,332
Transfer from:
EDC Operating Fund
$200,000
Total Estimated Annual Cost
$74,3321
Total Funding
$1,118,253
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED BUDGET (-+)
% EXPENDED
Park Furnishings
$915,848 $662,955 252,893
72%
Landscaping
$55,942 $40,981 14,961
73%
Contingency
$58,540 $57,702 838
99%
Park Lighting
$10,000 $3,706 6,294
37%
Equipment
$3,170 $3,170 0
100%
Trail/Sidewalk Improvements
$31,000 $30,795 205
99%
Professional Services
$11,000 $10,212 788
93%
Improvements (ES0283-Bear Creek Park)
$27,753 $0 27,753
0%
Botanical (ES1901-Barfield Foundation)
$5,000 $0 5,000
0%
(TOTAL PROJECT $1,118,253 $809,522 $308,731 72% I
95
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: October 01,2007
Submitted By: RAY MCDONALD Date Completed:
Project Title: PARK IRRIGATION
Project Type: EDC Sub -Type: PARKS
Proiect Code: PR0804 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project provides annual funding to continue efforts to meet irrigation needs throughout the City's park
system.
PROJECT SCHEDULE:
Projects will be identified and completed on an as needed basis.
JUSTIFICATION:
This project allows for maintenance and expansion of the irrigation systems throughout the parks system to
enhance the overall condition of the landscape and green space.
--'IN
96
PROJECT TITLE: PARK IRRIGATION
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
PROJECT CODE: PR0804
TOTAL ESTIMATED CAPITAL COST:
Irrigation $275
Subtotal: $0 Total Estimated Capital Cost $275,000
Maintenance Costs Funding Source:
Transfer from:
EDC Operating Fund $250,000
$0
Subtotal: $0 Additional Funding Needed:
Transfer from:
EDC Operating Fund $25,000
Total Estimated Annual Cost $0 Total Funding $275,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Irrigation $275,000 $207,472 67,528 75%
AL
$275,000 $207,472 $67,528 75%
97
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: March 2, 2017
Submitted By: RAY MCDONALD Date Completed:
Project Title: CARR PARK IMPROVEMENTS
Project Type: PARK/RECREATION Sub -Type: PARK IMPROVEMENTS
Project CODE: PR1917 Priority: A
COUNCIL AUTHORIZATION:
August 14, 2018: Ratified the Euless Development Corporation (EDC) action taken on August 13, 2018, approving EDC
Resolution No. 20-18, declaring a project for improvements at Carr Park.
October 23, 2018: Approved all matters incident and related to the issuance and sale of "Euless Development Corporation
Sales Tax Revenue Bonds, Series 2018," including the adoption of Resolution No. 18-1538.
November 13, 2018: Authorized the purchase and installation of various types of playground equipment and amenities
to Whirlix Design, Inc. The estimated expenditure is $487,665.
November 13, 2018: Authorized the purchase of various park furnishings to K. Hanes, Inc. dba BJ's Park and Recreation
Products. The estimated expenditure is $58,093.60.
December 11,2018: Approved award of Bid No. 001-19 for the purchase and installation of pedestrian bridges
and authorized the City Manager to enter into a contract with North Rock Construction, Inc. for an estimated expenditure
of $174,675.71.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The adopted Parks Master Plan recommends funding for system -wide park facilities and amenities upgrades.
PROJECT DESCRIPTION:
This project includes the construction or installation of additional picnic stations, upgrade of existing trail lighting, new trail
paving, fitness stations along trail, upgrading the existing playground, expanding the existing parking lot and creating a new
ingress/egress to the park, new entry signage, and other ancillary amenities.
PROJECT SCHEDULE:
Began Construction: January 2019
Anticipate Construction Complete: August 2019
JUSTIFICATION:
As identified in the adopted Parks Master Plan, the municipal park is the foundation of any solid parks and recreation system.
The City of Euless parks and recreation system provides residents and visitors with significant personal, social,
environmental, and economic benefits. The revitalization efforts that the Euless City Council has focused on over the years
has increased the sense of community pride. Carr Park is a five acre park located adjacent to Kiddie Carr Park off Simmons
Drive. The current amenities at this park include a .25 mile soft surface trail, sand volleyball court, playground, benches,
drinking fountains and a gazebo. The proposed project will continue the City Council's revitalization efforts by creating an
area that will serve both the passive and active leisure needs of the residents in this area.
—,IN
98
M,
PROJECT TITLE: CARR PARK IMPROVEMENTS
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Average debt service
Subtotal:
Subtotal:
PROJECT CODE: PR1917
TOTAL ESTIMATED CAPITAL COST:
Demolition
Site Work
$0 Fixtures/Furnishings
Development/Prof. Services
Survey
TDLR
Geotech
$118,000 Debt Issuance Cost
$118,000 Total Estimated Capital Cost
FUNDING SOURCE:
2018 EDC Revenue Bonds
Interest Earnings
$24, 500
$61, 500
$746, 000
$35,500
$270, 011
$451,600
$10, 000
$1,500
$3,000
$85, 220
$1,688,831 1
$1,674, 041
$14, 790
Total Estimated Annual Cost $118,000 Total Funding $1,688,831
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET
EXPENDED
BUDGET (- +)
% EXPENDED
Development/Professional Svcs
$1,000
$481
$519
48%
Land Betterments
$867,500
$511,351
$356,149
59%
Park Furnishings
$735,111
$262,563
$472,548
36%
Debt Issuance Cost
$85,220
$63,223
$21,997
74%
'AL PROJECT
$1,688,831 $837,618
$851, 213 50%
99
c
100
I
CAPITAL IMPROVEMENT PROGRAMS
FY2020 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE
PROPOSED METHOD OF FINANCING
Project Description
Priority
Estimated Cost
Operating
Fund
CIP Fund
Balance
good Sale
Grants/
Contributions
Impact
Fees
Escrow
Funds
Car Rental
Tax
Other
EDC
To Be
Determined
DRAINAGE PROJECTS
None Currently
A
$
Sub -Total Drainage Priority A -Proposed FY2020
$
Kynette Drive Storm Drain Installation" B
$ 300,000
xx
Sub -Total Drainage Priority B-Unfunded
$ 300,000
Chittam Drive Storm Drain Installation
C
TBD i'i
XX
Little Bear Creek Drainage Improvements
C
TBD
XX
Sub -Total Drainage Priority C-Unfunded
$
DRAINAGE PROJECTS - TOTAL
$ 300,000
STREET PROJECTS
FY2020 Street Improvements
A
$ 975,000
XX
Glade Road Reconstruction -East of Highway 360
A
$ 150,000
XX
Traffic Signal -Cheek S ar er Road at Heritage Avenue
A
$ 315,000
$ 66,250
$ 50,000
$ 198,750
Sub -Total Street Priority A -Proposed FY2020
$ 1,440,000
FY2021 Street Improvements (21)
8
$ 1,000,000
XX
FY2022 Street Improvements (22)
8
$ 1,025,000
XX
FY2023 Street Improvements (23)
B
$ 1,050,000
XX
FY2024 Street Improvements (24)
B
$ 1,075,000
XX
Sub -Total Street Priority B-Unfunded
$ 4,150,000
Cresthaven Drive Reconstruction
C
TBD
XX
E Alexander Lane Reconstruction
C
TBD
XX
Ross Avenue Extension
C
TBD
XX
Vine Street Reconstruction-SH183 to SH10
C
TBD
XX
Sub -Total Street Priority C-Unfunded
$
STREET PROJECTS - TOTAL
5 9090,000
WASTEWATER PROJECTS
FY2020 45th CDBG LR: Midway Park 2nd Addition Phase I
A
$ 392,886
XX
LR: Midway Park 3rd Addition Phase I
A
$ 446,600
XX
LR: North Main Street
A
$ 189,000
XX
Sub -Total Wastewater Priority A -Proposed FY2020
$ 1,028,486
FY2021 46th CDBG LR: Del Paso Street Phase I i
B
$ 299,000
XX
LR: Midway Park 3rd Addition Phase II
B
$ 487,400
XX
LR: SH10 @ Main Street (21)
B
$ 121,000
XX
LR: Cedar Hill Estates South Phase I
B
$ 378,000
XX
FY2022 47th CDBG LR: Del Paso Street Ph 11 & Midway Park 2nd Addition Ph II
B
$ 282,000
XX
LR: Cedar Hill Estates South Phase II
B
$ 368,000
XX
FY2023 48th CDBG LR: Midway Park 2nd Addition Ph III & Euless Jr. H.S. Ph I
B
$ 287,000
XX
FY2024 49th CDBG LR: Euless Junior High School Phase II
B
$ 284,000
XX
LR: Oakwood Terrace North Phase I
B
$ 352,000
XX
Sub -Total Wastewater Priority El -Unfunded
$ 2,858,400
LR: Oakwood Terrace North Phase II C
TBD
XX
u ota as ewater Priority C -Unfunded
WASTEWATER PROJECTS - TOTAL 1$
3,886,886
' Preliminary cost estimate of $1,186,000.
O
N
CAPITAL IMPROVEMENT PROGRAMS
FY2020 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE
PROPOSED METHOD OF FINANCING
Project Description
Priority
Estimated Cost
Operating
Fund
CIP Fund
Balance
Bond Sale
Grants/
Contributions
Impact
Fees
Escrow
Funds
Car Rental
Tax
Other
EDC
To Be
Determined
WATER PROJECTS
LR: Alexander Lane
A
$ 440,000
XX
Sub -Total Water Priority A -Proposed FY2020
$ 440,000
LR: Dunaway Drive j211
B
$ 450,000
XX
LR: Bell -Hi Addition Phase 1 (22)
B
$ 225,000
XX
LR: Huntington Drive (22)
B
$ 450,000
XX
LR: Bell -Hi Addition Phase II (21)
B
$ 200,000
XX
LR: Dickey Drive (21)
B
$ 565,000
XX
LR: Midway Park 1st Addition (21)
B
$ 475,000
XX
Sub -Total Water Priority B-Unfunded
$ 2,365,000
1 Mil Well Replacement
C
TBD
XX
LR: Midway Park 3rd Addition
C
TBD
XX
Reclaimed Water Line Extension Phase IV
C
TBD
XX
LR: Sagebrush Trail
C
TBD
XX
SH360 Water CrossingC
TBD
XX
LR: Soto rande Boulevard
C
TBD
XX
Sub -Total Water Priority C-Unfunded
$
WATER PROJECTS -TOTAL
2,805,0 00
OTHER PROJECTS
Fire Station #1
A
$ 7,550,000
$ 215.000
$ 7,335,000
Texas Star Sloe Wall Protection Phase I
A
$ 315,000
XX
Texas Star Sports Complex Phase VII Construction
A
$ 4,379,810
XX
Wilshire Park Upgrades
A
$ 1,953,820
XX
Sub -Total Other Priority A -Proposed FY2020
$ 14,198,630
Carr Park Trail Connection
B
$ 241,100
XX
Kiddie Carr Park Improvements 12'1
B
$ 893,500
XX
Blessing Branch Park Improvements
B
$ 365,064
XX
Texas Star Sports Complex Phase VIII
B
$ 3,816,945
XX
Sub -Total Other Priority B-Unfunded
$ 5,316,609
Animal Shelter Expansion/Renovation
C
TBD
XX
South Euless Park Upgrades
C
TBD
XX
Trail Enhancements Phase I
C
TBD
XX
Trail Enhancements Phase II
C
TBD
XX
Trail Enhancements Villages of Bear Creek
C
TBD
XX
Trailwood Park Improvements
C
TBD
XX
Sub -Total Other Priority C-Unfunded Is
OTHER PROJECTS - TOTAL 1
$ 19,515,239
CAPITAL IMPROVEMENT PROGRAMS
FY2020 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE
PROPOSED METHOD OF FINANCING
Project Description
Priority
I
Estimated Cost
Operating
Fund
CIP Fund
Balance
Bond Sale
Grants/
Contrib
Impact
Fees
Escrow
Funds
Car Rental
Tax
Other
EDC
To Be
Determined
DRAINAGE PROJECTS
None Currently
A
$
Sub -Total Drainage Priority A -Proposed FY2020
$ -
_T_
Kynetter Drive Storm Drain Installation (22) B
$ 300,000
XX
I I J
Sub -Total Drainage Priority 8-Unfunded
$ 300,000
Chiftarn Drive Storm Drain Installation
C
TBD
XX
Little Bear Creek Drainage Improvements
C
T130
XX
Sub -Total Drainage Priority C-Unfunded
$
DRAINAGE PROJECTS - TOTAL
0
' Preliminary cost estimate of $1,186,000.
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 05,2017
Submitted By: HAL CRANOR Date Completed:
Project Title: KYNETTE DRIVE STORM DRAIN INSTALLATION
Project Type: DRAINAGE Sub -Type: IMPROVEMENTS
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Teague Nall & Perkins completed the Phase III Storm Drainage Master Plan which included a study of the Hurricane
Creek Watershed. One of the improvements identified within the plan involved the replacement of the Kynette Drive
Culvert on Cyclone Branch. A previous Storm Drainage Master Plan of the watershed also identified the need for a
storm drain system beneath Kynette Drive from Cyclone Branch east to Wilshire Elementary School.
PROJECT DESCRIPTION:
The project consists of the removal of the existing box culvert and replacement with three 10' x 7' box culverts and
concrete pavement over the culverts.
PROJECT SCHEDULE:
FY2022
JUSTIFICATION:
The Phase III Storm Drainage Master Plan identified the Kynette Drive crossing as an improvement to alleviate
flooding conditions at this location. This crossing is frequently closed during heavy storms and is undersized.
bo
104
PM
PROJECT TITLE: KYNETTE DRIVE STORM DRAIN INSTALLATION
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
AINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Engineering
Personnel: Full Time
Construction
Part Time $0
Contingency
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
$25,000
$250, 000
$25,000
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$300,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
Transfer from DR9903
XX
ADDITIONAL COMMENTS:
Proposed funding is a transfer from project DR9903-Miscellaneous Drainage Improvements
105
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 17,2018
Submitted By: HAL CRANOR Date Completed:
Project Title: CHITTAM DRIVE STORM DRAIN INSTALLATION
Project Type: DRAINAGE Sub -Type: IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The design and development of the Ashlyn Estates residential subdivision along Ash Lane has revealed an
existing drainage concern for the downstream areas along Chittam Drive to Little Bear Creek. Drainage studies
performed by both the design engineer for Ashlyn Estates and Halff Associates show the flow of water
exceeding the street ROW along Chittam Drive, Fountain Side Drive, and Park Meadows Drive. The proposed
detention pond to be constructed with Ashlyn Estates does not increase the 100-year discharge or the depth of
flow along Chittam Drive. The proposed project will reduce the depth of flow by 1.49 feet at the low point along
Chittam Drive. The overland flow to Chittam Drive from the Ashlyn Estates detention pond will be substantially
reduced.
PROJECT DESCRIPTION:
The project will add 1000 linear feet of 48-inch reinforced concrete pipe and 160 linear feet of curb inlets along
Chittam Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
The drainage report prepared by Halff Associates identified the additional pipe and inlets to Chittam Drive as an
improvement to alleviate current flooding conditions at this location.
,r*N
106
M
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: July 21,1999
Submitted By: RON YOUNG Date Completed:
Project Title: LITTLE BEAR CREEK DRAINAGE IMPROVEMENTS
Project Type: DRAINAGE Sub -Type: IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The improvements proposed for Bob Eden Park are identified in the Little Bear Creek Watershed Master Plan.
The Little Bear Creek Park portion of this project was identified in the 1990 Knowlton, English and Flowers
Drainage Utility System Study of Selected Improvement Projects.
PROJECT DESCRIPTION:
The scope of this project includes erosion control and channelization improvements to Little Bear Creek. Bear
Creek Park is a portion of Project No. 11 in the above -referenced study. This project will be re-evaluated to
determine if the scope and proposed improvements should be modified, redefined, and re -estimated.
PROJECT SCHEDULE:
JUSTIFICATION:
Continued erosion will eventually undermine the creek in both parks and cause damage to existing City facilities.
107
n
Ap8
( C C
CAPITAL IMPROVEMENT PROGRAMS
FY2020 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE
PROPOSED METHOD OF FINANCING
Project Description
Priority
Estimated Cost
Operating
Fund
CIP Fund
Balance
Bond Sale
Grants/
Contrib
Impact
Fees
Escrow
Funds
Car Rental
Tax
Other
EDC
To Be
Determined
STREET PROJECTS
FY2020 Street Improvements
A
$ 975,000
XX
Glade Road Reconstruction -East of Highway 360
A
$ 150,000
XX
Traffic Signal -Cheek S ar er Road at Herita a Avenue
A
$ 315,000
$ 66,250
$ 50,000
$ 198,750
Sub -Total Street Priority A -Proposed FY2020
1,440,000
FY2021 Street Improvements (21)
B
$ 1,000,100
XX
FY2022 Street Improvements (22)
B
$ 1,025,000
XX
FY2023 Street Improvements(23)
B
$ 1,050,000
XX
FY2024 Street Im rovements(24)
B
$ 1,075,000
XX
Sub -Total Street Priority B-Unfunded
4,150,000
Cresthaven Drive Reconstruction
C
TBD
XX
E Alexander Lane Reconstruction
C
TBD
XX
Ross Avenue Extension
C
TBD
XX
Vine Street Reconstruction-SH183 to SH10
C
TBD
XX
Sub -Total Street Priority -Unfunded
STREET PROJECTS - TOTAL
5,5901000
O
to
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 31,2014
Submitted By: HAL CRANOR Date Completed:
Project Title: FY2020 STREET IMPROVEMENTS
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: Priori A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by their pavement
condition index.
PROJECT SCHEDULE:
FY2020
JUSTIFICATION:
The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, will
extend the life of the roadway, and will enhance the appearance of the streets.
---N
''\
110
11.1
PROJECT TITLE: FY2020 STREET IMPROVEMENTS
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
I Subtotal:
$0
$0
$0
$0
$0
TOTAL ESTIMATED CAPITAL COST:
Construction
$975,000
Subtotal:
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$975,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
XX
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from General Fund
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 26,2019
Submitted By: HAL CRANOR Date Completed:
Project Title: GLADE ROAD RECONSTRUCTION -EAST OF HIGHWAY 360
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of reconstructing Glade Road from Highway 360 to DFW property from a one -lane street to a two-
lane street. Developer will pay for initial installation costs and the City will reimburse their pro rate share of $150,000.
PROJECT SCHEDULE:
FY2020
JUSTIFICATION:
Participation in the project will create an opportunity to coordinate and facilitate the reconstruction of Glade Road for
continued development in the area.
W
112
L
M
PROJECT TITLE: GLADE ROAD RECONSTRUCTION -EAST OF HIGHWAY 360
NET EFFECTS ON OPERATING AND
TOTAL ESTIMATED CAPITAL COST:
AINTENANCE COST (+ OR -) ANNUAL:
Direct O eratin Cost
Construction
$150,000
Personnel: Full Time
Part Time
$0
Total Salary
$0
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal:
$0
Maintenance Costs
$0
Subtotal:
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$150,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance XX
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from Street CIP Fund Balance.
113
T H E C I T Y O F
EULESS
I-,
t
114
GLADE ROAD RECONSTRUCTION
GLADE
RD rCREPE��(—.—fir
f-
(W) = MYRTLE -, CREPE MYRTLE z
x
_w,, >.y II O
W g
IX oW Zv � ��u
GLADE LLa a _
SHADOW �z w CHANNING
a a
GK�y L �� Q. SLER
LU
— i I \
NUTMEG
OP'� —� KES;
I r o ,
HICKORY LEXINGTON JAMBOREE
SPRINGS
ROSEMARY 1
;GINGER \ty �c C
z i MINT�2 O" SAE JX
4� P�
Cl) LU
W
Q _ �01,
J ANICE W
CINNAMON J
BALSAM
(-� SPRINGRIDGE LL
i
BASSWOOD'
LARK C'44d �l
:BEAR j i Pq /�TARRAGON
CARAWAYCREEK � COUNTRY mw
to!
i Z
11 ; ca II a
I u'► LAUREL —, � t SAFFRON Qom: PARSLEY-
PINION m' ,
j MID -CITIES BLVD (E)
W yylN ; {; HOLIDAY (�
20SEMEAD
GLADE RD (E)
N T H E C I T Y O F
EUL-,ESS Legend
0 430 860 1,720 2,580 Street Reconstruction
FM Feet
115
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 25,2018
Submitted By: HAL CRANOR Date Completed:
Project Title: TRAFFIC SIGNAL -CHEEK SPARGER ROAD @ HERITAGE AVENUE
Project Type: STREET Sub -Type: SIGNALIZATION
Project Code: Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Traffic signals are located at the intersections of arterial and collector thoroughfares identified in the City's Master
Thoroughfare Plan adopted in 1999. The development of Glade Parks along with increased development in
Colleyville, will necessitate a traffic signal at the intersection of Cheek Sparger Road and Heritage Avenue.
PROJECT DESCRIPTION:
The project consists of the installation of four traffic signals at the intersection of Cheek Sparger Road and Heritage
Avenue. The City of Euless will be participating with the City of Bedford, the City of Colleyville, and Tarrant County to
assist with the cost of the project.
PROJECT SCHEDULE:
FY2020
JUSTIFICATION:
Development and traffic volume in the Glade Parks area warrant the installation of traffic signals at Cheek Sparger
Road and Heritage Avenue intersection.
1-N
116
PROJECT TITLE: TRAFFIC SIGNAL -CHEEK SPARGER ROAD @ HERITAGE AVENUE
NET EFFECTS ON OPERATING AND
TOTAL ESTIMATED CAPITAL COST:
AINTENANCE COST (+ OR -) ANNUAL:
Direct O eratin Cost
Traffic Signals
$315,000
Personnel: Full Time
Part Time
$0
Total Salary
$0
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal:
$0
Maintenance Costs
$0
Subtotal:
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$315,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
$66,250
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
Escrow/Other Entities
$248,750
ADDITIONAL COMMENTS:
Proposed funding:
$66,250 Car Rental CIP Fund Balance
$198,750 Other Entities
$50,000 Escrow Funds
Council Authorization:
February 26, 2019: Authorized the City Manager to execute an Interlocal Agreement between the City of
Euless, the City of Bedford, the City of Colleyville, and Tarrant County, Texas for the design and construction of a
traffic signal at the intersection of Heritage Avenue and Cheek Sparger Road.
117
'-1
118
TRAFFIC SIGNAL - CHEEK SPARGER RD @ HERITAGE AVE
T H E C I T Y O F
N
'A EULESS Legend
0 62.5 125 250 375 500 MTraffic Signal
Feet
119
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 31,2016
Submitted By: HAL CRANOR Date Completed:
Project Title: FY2021 STREET IMPROVEMENTS
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by their pavement
condition index.
PROJECT SCHEDULE:
FY2021
JUSTIFICATION:
The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, will
extend the life of the roadway, and will enhance the appearance of the streets.
'-**N
'-**N
120
I'll
PROJECT TITLE: FY2021 STREET IMPROVEMENTS
NET EFFECTS ON OPERATING AND
TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Construction
$1,000,000
Personnel: Full Time
Part Time
$0
Total Salary
$0
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal:
$0
Maintenance Costs
$0
Subtotal:
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$1,000,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
XX
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from General Fund.
121
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 31,2017
Submitted By, HAL CRANOR Date Completed:
Project Title: FY2022 STREET IMPROVEMENTS
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by their pavement
condition index.
PROJECT SCHEDULE:
FY2022
JUSTIFICATION:
The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, will
extend the life of the roadway, and will enhance the appearance of the streets.
122
on
PROJECT TITLE: FY2022 STREET IMPROVEMENTS
NET EFFECTS ON OPERATING AND
TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Construction
$1,025,000
Personnel: Full Time
Part Time
$0
Total Salary
$0
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal:
$0
Maintenance Costs
$0
Subtotal:
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$1,025,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
XX
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from General Fund.
123
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 31,2018
Submitted By: HAL CRANOR Date Completed:
Project Title: FY2023 STREET IMPROVEMENTS
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by their pavement
condition index.
PROJECT SCHEDULE:
FY2023
JUSTIFICATION:
The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, will
extend the life of the roadway, and will enhance the appearance of the streets.
--,*N
—1
0
124
PROJECT TITLE: FY2023 STREET IMPROVEMENTS
NET EFFECTS ON OPERATING AND
TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Construction
$1,050,000
Personnel: Full Time
Part Time
$0
Total Salary
$0
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal:
$0
Maintenance Costs
$0
Subtotal:
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$1,050,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
XX
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from General Fund
125
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 31,2019
Submitted By: HAL CRANOR Date Completed:
Project Title: FY2024 STREET IMPROVEMENTS
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by their pavement
condition index.
PROJECT SCHEDULE:
FY2024
JUSTIFICATION:
The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, will
extend the life of the roadway, and will enhance the appearance of the streets.
--"N
is
1
126
PROJECT TITLE: FY2024 STREET IMPROVEMENTS
NET EFFECTS ON OPERATING AND
TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Construction
$1,075,000
Personnel: Full Time
Part Time
$0
Total Salary
$0
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal:
$0
Maintenance Costs
$0
Subtotal:
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$1,075,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
XX
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from General Fund.
127
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 26,2017
Submitted By. HAL CRANOR Date Completed:
Project Title: CRESTHAVEN DRIVE RECONSTRUCTION
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project includes the reconstruction of Cresthaven Drive from a two-lane asphalt roadway to a 31' wide curb
and gutter concrete street from SH10 to S Pipeline Road.
PROJECT SCHEDULE:
JUSTIFICATION:
To upgrade Cresthaven Drive to a standard City concrete curb and gutter street.
.."N
"'1
128
M
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: July 23,1999
Submitted By: RON YOUNG Date Completed:
Project Title: E ALEXANDER LANE RECONSTRUCTION
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: Priori C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This minor street serves as a collector type street by conveying traffic to major roadways.
PROJECT DESCRIPTION:
E Alexander Lane will be reconstructed from Main Street to Cullum Drive. It will be reconstructed from a two-
lane county type road to a standard 31' wide residential street with underground drainage and sidewalks.
PROJECT SCHEDULE:
JUSTIFICATION:
Reconstruction of this street will decrease the annual maintenance and provide compliance with current City
standards.
129
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 31,2005
Submitted By: RON YOUNG Date Completed:
Project Title: ROSS AVENUE EXTENSION
Project Type: STREET Sub -Type: CONSTRUCTION
Project Code: Priori C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This extension of Ross Avenue from the completed section adjacent to the fire station will complete the
upgrading of this street.
PROJECT DESCRIPTION:
The construction of the remainder of Ross Avenue from the fire station to the west limit will be in accordance
with City standards which includes concrete pavement.
PROJECT SCHEDULE:
JUSTIFICATION:
This construction, in accordance with City standards, will allow the road a long service life and lower the annual
maintenance costs.
130
M
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 28,2015
Submitted By: HAL CRANOR Date Completed:
Project Title: VINE STREET RECONSTRUCTION-SH183 TO SH10
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Vine Street is not identified in the City's Master Thoroughfare Plan.
PROJECT DESCRIPTION:
The project consists of the reconstruction of Vine Street from SH183 to SH10.
PROJECT SCHEDULE:
JUSTIFICATION:
The City has received street escrow funds from several developments along Vine Street. When development is
complete, it would be appropriate for the City to reconstruct the existing roadway.
131
.-.N
T H E C 1 T Y O F
EULE,SS
'1
132
C
CAPITAL IMPROVEMENT PROGRAMS
FY2020 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE
PROPOSED METHOD OF FINANCING
Project Description
Priority
Estimated Cost
Operating
Fund
CIP Fund
Balance
Bond Sale
Grants/
Contrib
Impact
Fees
Escrow
Funds
Car Rental
Tax
Other
EDC
To Be
Determined
WASTEWATER PROJECTS
FY2020 45th CDBG LR: Midway Park 2nd Addition Phase I
A
$ 392,886
XX
LR: Midway Park 3rd Addition Phase I
A
$ 446,600
XX
LR: North Main Street
A
$ 189,000
XX
Sub -Total Wastewater Priority A -Proposed FY2020
$ 1,028,486
FY2021 46th CDBG LR: Del Paso Street Phase 1(21)
B
$ 299,000
XX
LR: Midway Park 3rd Addition Phase Ili'"
B
$ 487,400
XX
LR: SH10 @ Main Street"')
B
$ 121,000
XX
LR: Cedar Hill Estates South Phase 1(22)
B
$ 378,000
XX
FY2022 47th CDBG LR: Del Paso Street Ph 11 & Midway Park 2nd Addition Ph II (22)
B
$ 282,000
XX
LR: Cedar Hill Estates South Phase II
B
$ 368,000
XX
FY2023 48th CDBG LR: Midway Park 2nd Addition Ph III & Euless Jr. H.S. Ph I
B
$ 287,000
XX
FY2024 49th CDBG LR: Euless Junior High School Phase II
B
$ 284,000
XX
LR: Oakwood Terrace North Phase I
B
$ 352,000
XX
Sub -Total Wastewater Priority B-Unfunded
$ 2,858,400
LR: Oakwood Terrace North Phase II C
TBD
XX
Sub -Total as ewa er Priority C-Unfunded
WASTEWATER PROJECTS - TOTAL
$ 3,886,886
�n - ui�v ncN�o�c���ain
thi
W
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 22,2019
Submitted By: HAL CRANOR Date Completed:
Project Title: 45TH CDBG LINE REPLACEMENT -MIDWAY PARK 2ND ADDITION PHASE I
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project is
part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Between Stonewall Drive and Milam Drive and from Limestone Drive to Ector Drive, and
2. Between Freestone Drive and Ector Drive on the southside of Milam Drive and Limestone Drive.
(45th year CDBG project)
PROJECT SCHEDULE:
FY2020
JUSTIFICATION:
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are susceptible to
ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard
in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains
using a worst first approach to reduce maintenance costs and customer problems.
134
PROJECT TITLE: 45TH CDBG LINE REPLACEMENT -MIDWAY PARK 2ND ADDITION PHASE I
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering $49,100
Personnel: Full Time Construction $328,128
Part Time $0 Contingency $15,658
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost $0 I Total Estimated Capital Cost $392,886
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
CURRENT STATUS:
Conceptual Design % 0%
Preliminary Design % 0%
Final Plans % 0%
Specifications % 0%
XX Construction % 0%
ADDITIONAL COMMENTS:
Project funding is subject to actual CDBG funding availability.
Council Authorization:
February 26, 2019: Conducted a Public Hearing for the proposed 45th year CDBG project and approved the
recommendation which includes replacing a wastewater line that is approximately 2,321 feet in length. It's located
along the rear property line of homes facing onto Stonewall Drive, Milam Drive, Freestone Drive and Limestone Drive.
A portion of the project will be along the western side of Ector Drive.
135
136
FY 2020 45TH CDBG MIDWAY PARK 2ND ADDITION PH I
N T H E C I T Y O F
EULESS
'- Legend
0 100 200 400 600 800 — Wastewater
Feet
137
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 04,2019
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEMENT -MIDWAY PARK 3RD ADDITION PHASE I
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project is
part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Between Crane Drive and Donley Drive from Harwood Road to Aransas Drive, and
2. Between Ector Drive and Fayette Drive from Lamar Drive to 160 feet east of Ector Drive.
PROJECT SCHEDULE:
FY2020
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to
ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard
in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains
using a worst first approach to reduce maintenance costs and customer problems.
1
138
PROJECT TITLE: LINE REPLACEMENT -MIDWAY PARK 3RD ADDITION PHASE I
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
TOTAL ESTIMATED CAPITAL COST:
Engineering $58,500
Construction $388,100
$0
$0
$0
$0
$0
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$446,600
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
XX
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from W/WW Operating Fund.
139
T H E C I T Y O F
E U",T
SS
;...,, , .
''1
140
MIDWAY PARK 3RD ADDITION PH I
N
G ENN
HARWOOD RD (W)
BELL
5
"DMYO �
u R Q'
w 0 � Z
Esn, HERE, Garmin, (c) OpegmetMap contributors, and the GIS user community
N T H E C I T Y O F
EULESS Legend
0 125 250 500 750 1,000 — Wastewater
Feet
141
City of Euless
wo
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 4, 2019
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEMENT -NORTH MAIN STREET
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project is
part of the systematic replacement of wastewater mains using the worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the wastewater mains between North Main Street and Salem Drive from
200 feet north of Town Creek Drive to SH183.
PROJECT SCHEDULE:
FY2020
JUSTIFICATION:
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are susceptible to
ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard
in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains
using a worst first approach to reduce maintenance costs and customer problems.
'1
142
LIM
LJ
Pa
PROJECT TITLE: LINE REPLACEMENT -NORTH MAIN STREET
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
TOTAL ESTIMATED CAPITAL COST:
Engineering
Construction
$0
$0
$0
$0
$0
$0
$25,000
$164,000
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$189,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
XX
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from W/WW Operating Fund.
143
I•
T H E C I T Y O F
EUL,
'-IN
w
144
- - --
FULLER
NORTH MAIN STREET
PRIMROSE HILL
TOWN CREEK
w
Q
fA
FJl-l"I"
z
0
a
cn
S
kES .
" ART
- --- --_.
AIRPORT
FW1' NL
A'RPORT Fwy SL (E)
AIRPORT
Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community
N T H E C I T Y O F
EULESS Legend
0 75 150 300 450 600 --- Wa stewate r
Feet
145
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 14,2019
Submitted By: HAL CRANOR Date Completed:
Project Title: 46TH CDBG LINE REPLACEMENT -DEL PASO STREET PHASE I
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project is
part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the wastewater mains along Del Paso Street, 650 feet east of South
Industrial Boulevard to 1300 feet east of South Industrial Boulevard serving the apartments in Puente Del Oeste.
(46th year CDBG project)
PROJECT SCHEDULE:
FY2021
JUSTIFICATION:
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay the and are susceptible to
ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard
in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains
using a worst first approach to reduce maintenance costs and customer problems.
No
W
146
PROJECT TITLE: 46TH CDBG LINE REPLACEMENT -DEL PASO STREET PHASE I
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering $39,000'
Personnel: Full Time Construction $260,000
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$299,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
00 0
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
00 0
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
XX
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Project is contingent upon actual CDBG funding availability and continued project eligibility based on updated census
data.
147
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 04,2019
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEMENT -MIDWAY PARK 3RD ADDITION PHASE II
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project is
part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Between Fayette Drive and Ector Drive from Harwood Road to Lamar Drive,
2. Along Harwood Drive between Fayette Drive and Donley Drive, and
3. Along Donley Drive from a point 630 feet north of Harwood Road to Harwood Road.
PROJECT SCHEDULE:
FY2021
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to
ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard
in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains
using a worst first approach to reduce maintenance costs and customer problems.
148
L
PROJECT TITLE: LINE REPLACEMENT -MIDWAY PARK 3RD ADDITION PHASE II
NET
EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
TOTAL ESTIMATED CAPITAL COST:
Engineering $63,600
Construction $423,800
$0
$0
$0
$0
$0
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$487,400
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
XX
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
00 0
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
00 0
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from W/WW Operating Fund
149
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 04,2019
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEMENT-SH10 @ MAIN STREET
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project is
part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the wastewater mains along SH10 from Main Street to 680 feet east of
Main Street.
PROJECT SCHEDULE:
FY2021
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to
ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard
in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains
using a worst first approach to reduce maintenance costs and customer problems.
.-IN
.\
150
IOw
PROJECT TITLE: LINE REPLACEMENT-SH10 @ MAIN STREET
NET
EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
TOTAL ESTIMATED CAPITAL COST:
Engineering $16,000
Construction $105,000
$0
$0
$0
$0
$0
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$121,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
XX
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from W/WW Operating Fund
151
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 10,2019
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEMENT -CEDAR HILL ESTATES SOUTH PHASE I
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project is
part of the systematic replacement of wastewater mains using a worst first approach. .
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Along South Main Street from Whitener Road to South Pipeline Road, and
2. Along South Pipeline Road from west of Cannon Drive to South Main Street.
PROJECT SCHEDULE:
FY2022
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to
ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard
in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains
using a worst first approach to reduce maintenance costs and customer problems.
162
Ow
PROJECT TITLE: LINE REPLACEMENT -CEDAR HILL ESTATES SOUTH PHASE I
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
I Subtotal:
TOTAL ESTIMATED CAPITAL COST:
Engineering $49,000
Construction $329,000
$0
$0
$0
$0
$0
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$378,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
XX
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
S P
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from W/WW Operating Fund
153
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 05,2018
Submitted By: HAL CRANOR Date Completed:
Project Title: 47TH CDBG LINE REPLACEMENT -DEL PASO ST PH II & MIDWAY PARK 2ND ADD PH II
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priori , B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project is
part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains..
1. Along Del Paso Street from South Industrial Boulevard to 650 feet east of South Industrial Boulevard,
2. Between Freestone Drive and Limestone Drive from Limestone Drive and Lee Drive, and
3. Between Limestone Drive and Himes Drive Between Lee Drive and Euless Junior High School.
(47th year CDBG project)
PROJECT SCHEDULE:
FY2022
JUSTIFICATION:
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are susceptible to
ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard
in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains
using a worst first approach to reduce maintenance costs and customer problems.
-IN
No
154
PROJECT TITLE: 47TH CDBG LINE REPLACEMENT -DEL PASO ST PH II & MIDWAY PARK 2ND ADD PH II
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering $37,000
Personnel: Full Time Construction $245,000
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$282,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
XX
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Project is contingent upon actual CDBG funding availability and continued project eligibility based on updated census
data.
155
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 04,2019
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEMENT -CEDAR HILL ESTATES SOUTH PHASE II
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project is
part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Along Sunset Drive between Vine Street and South Main Street, and
2. Along Henslee Drive between Whitener Road and Henslee Drive.
PROJECT SCHEDULE:
FY2023
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to
ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard
in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains
using a worst first approach to reduce maintenance costs and customer problems.
--**N
.-N
'1
156
on
IL
PROJECT TITLE: LINE REPLACEMENT -CEDAR HILL ESTATES SOUTH PHASE 11
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
I Subtotal:
TOTAL ESTIMATED CAPITAL COST:
Engineering $48,000
Construction $320,000
$0
$0
$0
$0
$0
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$368,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
XX
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from W/WW Operating Fund
157
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 05,2018
Submitted By: HAL CRANOR Date Completed:
Project Title: 48TH CDBG LINE REP -MIDWAY PARK 2ND ADD PHASE III & EULESS JR. H.S. PH I
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project is
part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the wastewater mains at 412-416 Limestone Drive and Euless Junior High
School from the south end of Freestone Drive to SH183.
(48th year CDBG project)
PROJECT SCHEDULE:
FY2023
JUSTIFICATION:
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are susceptible to
ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard
in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains
using a worst first approach to reduce maintenance costs and customer problems.
158
M
PROJECT TITLE: 48TH CDBG LINE REP -MIDWAY PARK 2ND ADD PHASE III & EULESS JR. H.S. PH I
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering $37,000
Personnel: Full Time Construction $250,000
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$287,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
XX
Construction %
pore
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Project is contingent upon actual CDBG funding availability and continued project eligibility based on updated census
data.
159
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 05,2018
Submitted By: HAL CRANOR Date Completed:
Project Title: 49TH CDBG LINE REPLACEMENT - EULESS JUNIOR HIGH SCHOOL PHASE II
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project is
part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the wastewater mains at Euless Junior High School from Byers Street to
Ector Drive.
(49th year CDBG project)
PROJECT SCHEDULE:
FY2024
JUSTIFICATION:
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are susceptible to
ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard
in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains
using a worst first approach to reduce maintenance costs and customer problems.
160
PROJECT TITLE: 49TH CDBG LINE REPLACEMENT - EULESS JUNIOR HIGH SCHOOL PHASE II
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering $37,000
Personnel: Full Time Construction $247,000,
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$284,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
00 0
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
XX
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Project is contingent upon actual CDBG funding availability and continued project eligibility based on updated census
data.
161
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 04,2019
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEMENT-OAKWOOD TERRACE NORTH PHASE I
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project is
part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Along Eastcliff Drive from Mary Drive to Tyler Avenue, and
2. Between Tyler Avenue and Marlene Drive from Eastcliff Drive to Commerce Street.
PROJECT SCHEDULE:
FY2024
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to
ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard
in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains
using a worst first approach to reduce maintenance costs and customer problems.
'.1
a
162
0J
PROJECT TITLE: LINE REPLACEMENT-OAKWOOD TERRACE NORTH PHASE I
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
I Subtotal:
TOTAL ESTIMATED CAPITAL COST:
Engineering $46,000
Construction $306,000
$0
$0
$0
$0
$0
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$352,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
XX
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from W/WW Operating Fund
163
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 04,2019
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEMENT-OAKWOOD TERRACE NORTH PHASE II
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priori : C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains..
1. Between Mary Drive and Marlene Drive from Eastcliff Drive to Marlene Drive, and
2. Between Wilshire Drive and Commerce Street from Marlene Drive to SagebrushTrail.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
''IN
164
CAPITAL IMPROVEMENT PROGRAMS
FY2020 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE
PROPOSED METHOD OF FINANCING
Project Description
Priority
Estimated Cost
Operating
Fund
CIP Fund
Balance
good Sale
Grants/
Contrib
Impact
Fees
Escrow
Funds
Car Rental
Tax
Other
EDC
To Be
Determined
WATER PROJECTS
LR: Alexander Lane
A
$ 440,000
XX
Sub -Total Water Priority A -Proposed FY2020
$ 440,000
LR: Dunaway Drive (21)
B
$ 450,000
XX
LR: Bell -Hi Addition Phase 1
B
$ 225,000
XX
LR: Huntington Drive (22)
B
$ 450,000
XX
LR: Bell -Hi Addition Phase II (23)
B
$ 200,000
XX
LR: Dickey Drive (23)
B
$ 565,000
XX
LR: Midway Park 1 st Addition (24)
B
$ 475,000
XX
Sub -Total Water Priority B-Unfunded
$ 2,366,000
1 Mil Well Replacement
C
TBD
XX
LR: Midway Park 3rd Addition
C
TBD
XX
Reclaimed Water Line Extension Phase IV
C
TBD
XX
LR: Sagebrush Trail
C
TBD
XX
SH360 Water CrossingC
TBD
XX
LR: Soto rande Boulevard
C
TBD
XX
Sub -Total Water Priority C-Unfunded
$
WATER PROJECTS -TOTAL
4 2,805,000
LR = Line Replacement
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 05,2018
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEM ENT-ALEXAN DER LANE
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priori : A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of the replacement of existing 6 inch and 8 inch asbestos concrete water lines located along East
Alexander Lane from Cullum Drive to Dickey Drive.
PROJECT SCHEDULE:
FY2020
JUSTIFICATION:
The line has had nine leaks repaired since 2007 and was installed in 1959.
,IN
r
166
M
PROJECT TITLE: LINE REPLACEMENT-ALEXANDER LANE
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
TOTAL ESTIMATED CAPITAL COST:
Construction
Contingency
$0
$0
$0
$0
$0
$0
$430,000
$10,000
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$440,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
XX
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from W/WW Operating Fund
167
T H E C I T Y O F
ss
.-**N
168
ALEXANDER LANE
AIRPCRr
REVOLUTION
REPUBLIC
C
r
ALERRNDER
JERNMN
REVOLUTON
69010
a�FlVy M, (�7
AIRPp FWV SL (Ej
EULESS BLVD (E)
NnanN
M
MRPORT
AIDES
r'r'
NV��\�\ I
Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community
N __L H E C I T Y O F
EULESS Legend
0 125 250 500 750 1,000 — Water
Feet
169
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 05,2018
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEMENT-DUNAWAY DRIVE
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of the replacement of an existing 6 inch asbestos concrete water line located along Dunaway
Drive between East Alexander Lane and McCormick Court.
PROJECT SCHEDULE:
FY2021
JUSTIFICATION:
The line has had nine leaks repaired since 2007 and was installed in 1961.
no
170
11.1
Ow
PROJECT TITLE: LINE REPLACEMENT-DUNAWAY DRIVE
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
TOTAL ESTIMATED CAPITAL COST:
Construction $440,000
Contingency $10,000
$0
$0
$0
$0
$0
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$450,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
XX
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
00 0
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from W/WW Operating Fund
171
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 04,2019
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEMENT -BELL -HI ADDITION PHASE I
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of the replacement of an existing 6 inch cast iron water line located along Needles Street from
Raider Drive to Paula Lane.
PROJECT SCHEDULE:
FY2022
JUSTIFICATION:
The line has had five leaks repaired since 2007 and was installed in 1964.
172
L
PROJECT TITLE: LINE REPLACEMENT -BELL -HI ADDITION PHASE I
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
TOTAL ESTIMATED CAPITAL COST:
Construction $205,000
Contingency $20,000
$0
$0
$0
$0
$0
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$225,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
XX
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from W/WW Operating Fund
173
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 04,2019
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEMENT-HUNTINGTON DRIVE
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of the replacement of an existing 6 inch asbestos concrete water line located along Huntington
Drive between East Alexander Lane and Koen Lane.
PROJECT SCHEDULE:
FY2022
JUSTIFICATION:
The line has had nine leaks repaired since 2007 and was installed in 1961.
'"\
174
PROJECT TITLE: LINE REPLACEMENT-HUNTINGTON DRIVE
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
TOTAL ESTIMATED CAPITAL COST:
Construction $440,000
Contingency $10,000
$0
$0
$0
$0
$0
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$450,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
XX
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from W/WW Operating Fund
176
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 04,2019
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEMENT -BELL -HI ADDITION PHASE II
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of the replacement of an existing 6 inch cast iron water line located along Paula Lane from
Needles Street to West Pipeline Road.
PROJECT SCHEDULE:
FY2023
JUSTIFICATION:
The line has had five leaks repaired since 2007 and was installed in 1964.
176
PROJECT TITLE: LINE REPLACEMENT -BELL -HI ADDITION PHASE II
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
I Subtotal:
I Subtotal:
TOTAL ESTIMATED CAPITAL COST:
Construction $180,000
Contingency $20,000
$0
$0
$0
$0
$0
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$200,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
XX
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from W/WW Operating Fund
177
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 10,2019
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEMENT -DICKEY DRIVE
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of the replacement of an existing 6 inch asbestos concrete water line located along Dickey Drive
between East Alexander Lane and Copher Court.
PROJECT SCHEDULE:
FY2023
JUSTIFICATION:
The line has had nine leaks repaired since 2007 and was installed in 1961.
178
PROJECT TITLE: LINE REPLACEMENT -DICKEY DRIVE
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
I Subtotal:
I Subtotal:
TOTAL ESTIMATED CAPITAL COST:
Construction $515,000
Contingency $50,000
$0
$0
$0
$0
$0
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$565,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
XX
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from W/WW Operating Fund
179
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 04,2019
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEMENT -MIDWAY PARK 1 ST ADDITION
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of the replacement of an existing 6 inch cast iron water line located along Collin Drive from
Denton Drive to Harwood Road.
PROJECT SCHEDULE:
FY2024
JUSTIFICATION:
The line has had three leaks repaired since 2007 and was installed in 1953.
W
'1
W0
180
PROJECT TITLE: LINE REPLACEMENT -MIDWAY PARK 1 ST ADDITION
NET EFFECTS ON OPERATING AND
AINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
I Subtotal:
I Subtotal:
TOTAL ESTIMATED CAPITAL COST:
Construction $425,000
Contengency $50,000
$0
$0
$0
$0
$0
$0
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$475,000
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
XX
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from W/WW Operating Fund.
181
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 15,2019
Submitted By: HAL CRANOR Date Completed:
Project Title: 1 MIL WELL REPLACEMENT CONSTRUCTION
Project Type: WATER Sub -Type: WELL
Project Code: Priori : C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
RW Harden & Associates completed a Preliminary Well Design Study in FY2017 in preparation for the
replacement of the Fuller Well, Far North Well and the eventual replacement of the 1 Mil well.
PROJECT DESCRIPTION:
The project consists of the complete replacement of the 1 Mil Well with a new well.
PROJECT SCHEDULE:
JUSTIFICATION:
All three City wells are in need of replacement and the new wells will enable the City to continue to provide high
quality water to citizens while reducing maintenance and operational costs. The Fuller and Far North Wells will
be replaced in 2019-2020.
W
'-IN
182
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 05,2018
Submitted By: HAL CRANOR Date Com leted:
Project Title: LINE REPLACEMENT- MIDWAY PARK 3RD ADDITION
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of the replacement of an existing 6 inch cast iron water line located along Ector Drive
between Fayette Drive and West Harwood Road.
PROJECT SCHEDULE:
JUSTIFICATION:
The line has had eight leaks repaired since 2007 and was installed in 1953.
183
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared:
Submitted By: CHRIS BARKER Date Completed:
Project Title: RECLAIMED WATER LINE EXT. PHASE IV
Project Type: WATER Sub -Type: RECLAIMED WATER SYSTEM
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The reclaimed water line extension is a continuation of the City's Reclaimed Water Utility System.
PROJECT DESCRIPTION:
The overall project will extend the City's Reclaimed Water Utility System from the pump station along Bear
Creek Parkway along Midway Drive to North Main Street. The project will serve the Euless Family Life Center,
Blessing Branch Linear Park, and the new Elementary School along Midway Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Construction of the project will provide a non -potable water source for irrigation which will offset future potable
water purchases by the City and will serve to responsibly conserve potable water resources for the City and the
region.
.-1
we
184
ON
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 05,2018
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEMENT -SAGEBRUSH TRAIL
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of the replacement of an existing 8 inch cast iron water line located along Sagebrush Trail
from Wilshire Drive to the end of Sagebrush Trail.
PROJECT SCHEDULE:
JUSTIFICATION:
The line has had two leaks repaired since 2007 and was installed in 1961.
185
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: July 21,2000
Submitted By: RON YOUNG Date Completed:
Project Title: SH360 WATER CROSSING
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project is related to the DFW International Airport Master Plan for property in Euless.
PROJECT DESCRIPTION:
The project scope includes the extension of two (2) 12" diameter water mains through the SH360 right-of-way to
provide service to the southwest portion of the DFW Airport property. The water mains will be bored under
SH360 at the Midway Drive intersection and between Harwood Road and Ash Lane. The mains will be located
within the Texas Department of Transportation right-of-way. The mains will be plugged at the east right-of-way
of SH360 in anticipation of the likely extension into DFW Airport property to serve future development.
PROJECT SCHEDULE:
JUSTIFICATION:
Development on the airport property could potentially increase the City's tax revenues. Future development is
dependent upon the availability of water service to this area.
�N
186
�.-
M
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 05,2018
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLAC EM ENT-SOTOG RAND E BLVD
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of the replacement of an existing 4 inch asbestos concrete water line located along
Sotogrande Blvd from El Camino Real.
PROJECT SCHEDULE:
JUSTIFICATION:
The line has had seven leaks repaired since 2007 and was installed in 1969.
187
.-N
T H E C I T Y O F
'1
188
r � �
CAPITAL IMPROVEMENT PROGRAMS
FY2020 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE
PROPOSED METHOD OF FINANCING
Project Description
Priority
Estimated Cost
Operating
Fund
CIP Fund
Balance
Bond Sale
Grants/
Contrib
Impact
Fees
Escrow
Funds
Car Rental
Tax
Other
EDC
To Be
Determined
OTHER PROJECTS
Fire Station #1
A
$ 7,550,000
$ 215,000
$ 7,335,000
Texas Star Slope Wall Protection Phase I
A
$ 315,000
XX
Texas Star Sports Complex Phase VII Construction
A
$ 4,379,810
XX
Wilshire Park Upgrades
A
$ 1,953,820
XX
Sub -Total Other Priority A -Proposed FY2020
$ 14,198,630
Carr Park Trail Connection
B
$ 241,100
XX
Kiddie Carr Park Improvements (21)
B
$ 893,500
XX
Blessing Branch Park Improvements
B
$ 365,064
XX
Texas Star Sports Complex Phase VIII rZ41
B
$ 3,816,945
XX
Sub -Total Other Priority 8-Unfunded
j $ 5,316,609
Animal Shelter Expansion/Renovation
C
TBD
XX
South Euless Park Upgrades
C
TBD
XX
Trail Enhancements Phase I
C
TBD
XX
Trail Enhancements Phase II
C
TBD
XX
Trail Enhancements Villages of Bear Creek
C
TBD
XX
Trailwood Park Improvements
C
TBD
XX
Sub -Total Other Priority U.—Unfunded
OTHER PROJECTS - TOTAL
9,515,239
City of Euless
Capital Project Request
Department: FIRE DEPARTMENT Date Prepared: March 14, 2019
Submitted By: WES RHODES Date Completed:
Project Title: FIRE STATION #1
Project Type: FACILITIES Sub -Type: BUILDING
Project Code: Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of the demolition of fire station No.1 located at 201 E. Ash lane. The station was originally
constructed 30+ years ago and can no longer meet the functional demands of a full service fire station. The
building has had small improvements and minor upgrades to the living areas but no major modifications to the
overall building structure. The project scope includes professional services and construction of a new
12,000-15,000 sq ft. station to include four (4) double deep bays to accommodate an aerial ladder truck, fire
engine, and ambulance; living quarters; and operation offices for staff. The additional bay space planned in the
facility allows for the housing of reserve vehicles and equipment. The professional services includes
architecture services, engineering, and construction cost estimates.
PROJECT SCHEDULE:
FY2020
JUSTIFICATION:
The current station cannot be upgraded to current codes and standards without incurring significant expenses.
The new construction will provide the following:
1. An ADA and construction code compliant building;
2. A facility to support increasing demand in an area of the City experiencing rapid growth;
3. Allow for the deployment of a double company response station: Ladder / Engine / Medic.
4. New facility that is user friendly and meets the needs of station personnel.
5. A building that will meet current energy / ventilation / electrical codes and function more efficiently.
190
PROJECT TITLE: FIRE STATION #1
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct ODerating Cost Professional Services $460,000
Personnel: Full Time Construction $5,750,000
Part Time $0 Furniture, Fixtures & Equipment $550,000
Total Salary $0 Debt Issuance Costs $215,000
Purchase of Services Contingency $575,000
Materials & Supplies
Utilities $0
Subtotal: $0
Subtotal:
Total Estimated Annual Cost $0 Total Estimated Capital Cost $7,550,000
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund
$215,000
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0
0%
Certificate of Obligation
$7,335,000
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding for debt issuance costs is from Debt Service Fund
191
City of Euless
Capital Project Request
Department: TEXAS STAR GOLF COURSE Date Prepared: April 30, 2019
Submitted By: GLENDA HARTSELL-SHELTON Date Completed:
Project Title: TEXAS STAR SLOPE WALL PROTECTION, PH I
Project Type: DRAINAGE Sub -Type:
Project Code: Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Project scope includes the materials and labor for the installation of approximately 284 linear feet of 18 foot high rip -
rap wall along the creek embankment located near #9 tee box area.
PROJECT SCHEDULE:
June/July/August 2020
JUSTIFICATION:
Continued deterioration of creek embankment could leave tee box unsupported.
W
192
11.1
PROJECT TITLE: TEXAS STAR SLOPE WALL PROTECTION, PH I
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
TOTAL ESTIMATED CAPITAL COST:
Rip -rap wall
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Operating Fund
Fund Balance XX
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
Other -plan review/inspection fees
ADDITIONAL COMMENTS:
Proposed is funding is from Car Rental CIP Fund Balance.
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
$315,000
$315,000 1
0%
0%
0%
0%
0%
193
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: April 27,2015
Submitted By: RAY MCDONALD Date Completed:
Project Title: TEXAS STAR SPORTS COMPLEX PHASE VII CONSTRUCTION
Project Type: PARK/RECREATION Sub -Type: TSSC IMPROVEMENTS
Project Code: Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The Texas Star Sports Complex Phase VII includes renovating the existing infields with synthetic turf, renovating the
existing concession/restroom building, building new offices for staff and upgrading the existing lighting from metal -
halide to LED.
With the growing number of participants in youth baseball, renovating the existing infields with synthetic turf will allow
staff the opportunity to expand existing leagues as well as programming for additional leagues in adult softball.
Synthetic turf infields will also substantially reduce the number of rain outs which results in lost revenue. The addition
of this phase will ensure that the Texas Star Sports Complex remains the premier sports facility for amateur athletics
for many years to come.
PROJECT DESCRIPTION:
The project includes the renovation of the existing infields with synthetic turf, renovating the existing facility to meet
current ADA standards, renovating the existing restroom/concession building, creating new office space for staff and
upgrading the lighting system to LED.
PROJECT SCHEDULE:
FY2020
JUSTIFICATION:
With the completion of Phase VII, the new infields will increase programming opportunities as well as substantially
reduce the number of rain outs.
--,"N
194
PROJECT TITLE: TEXAS STAR SPORTS COMPLEX PHASE VII CONSTRUCTION
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost Construction
Personnel: Full Time Contingency
Part Time $0 Debt Issuance Cost
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
Subtotal: $0
$3,916,970
$312, 840
$150, 000
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$4,379,810
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
XX
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from EDC Bond Sale
195
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: March 02,2017
Submitted By: RAY MCDONALD Date Completed:
Project Title: WILSHIRE PARK UPGRADES
Project Type: PARK/RECREATION Sub -Type: PARK IMPROVEMENTS
Project Code: Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The adopted Parks Master Plan calls for general upgrades and improvements in the overall quality of parks in the City
and to develop a high quality parks system that provides activities for all age and interest groups and enhances the
adjoining neighborhoods.
PROJECT DESCRIPTION:
Overall park enhancements and improvements to include expanding parking lot, additional amenities such as a
pavilion, upgrading playground and playground surface, additional trails with connections to adjacent neighborhood,
bridge connections for trail, expanding the floating dock, additional sidewalks and adding park lighting.
PROJECT SCHEDULE:
FY2020
JUSTIFICATION:
As identified in the adopted Parks Master Plan, the municipal park is the foundation of any solid parks and recreation
system. The City of Euless parks and recreation system provides residents and visitors with significant personal,
social, environmental, and economic benefits. The revitalization efforts that the Euless City Council has focused on
over the years has increased the sense of community pride. Wilshire Park is a four acre park located adjacent to
Wilshire Elementary School off Sierra Drive. The current amenities at this park include a playground, .25 mile trail and
a fishing pier/pond. The proposed project will continue the City Council's revitalization efforts by creating an area that
will serve both the passive and active leisure needs of the residents in this area.
1_*N
111111111112
196
PROJECT TITLE: WILSHIRE PARK UPGRADES
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost
Demolition
Personnel: Full Time
Site Work
Part Time $0
Hardscape
Total Salary $0
Landscape
Purchase of Services
Fixtures/Furnishings
Materials & Supplies
Development/Professional Svcs
Utilities $0
Survey
TDLR
Geotech
Subtotal: $0
$0
Subtotal: $0
$34, 500
$130,500
$984,000
$76, 500
$199,000
$512,820
$10,000
$1,500
$5,000
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$1,953,820
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
XX
To Be Determined
ADDITIONAL COMMENTS:
197
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: March 02,2017
Submitted By: RAY MCDONALD Date Completed:
Project Title: CARR PARK TRAIL CONNECTION
Project Type: PARK/RECREATION Sub -Type: PARK IMPROVEMENTS
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The adopted Parks Master Plan recommends funding for system -wide trail, park facilities and amenities upgrades.
PROJECT DESCRIPTION:
This project includes the construction of a sidewalk/trail connection from Carr and Kiddie Carr Parks to South Pipeline
Road along Mills Drive and through the TRA easement.
PROJECT SCHEDULE:
FY2021
JUSTIFICATION:
As identified in the adopted Parks Master Plan, the municipal park is the foundation of any solid parks and recreation
system. The City of Euless parks and recreation system provides residents and visitors with significant personal,
social, environmental, and economic benefits. The revitalization efforts that the Euless City Council has focused on
over the years has increased the sense of community pride. The proposed project will continue the City Council's
revitalization efforts by creating an area that will serve both the passive and active leisure needs of the residents in
this area.
198
I...
U
PROJECT TITLE: CARR PARK TRAIL CONNECTION
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost Hardscape
Personnel: Full Time Development/Professional Svcs
Part Time $0 Survey
Total Salary $0 TDLR
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal: $0
$0
$164, 000
$65,600
$10,000
$1,500
Subtotal:
Total Estimated Annual Cost
$0
$0
Total Estimated Capital Cost
$241,100
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
XX
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from EDC Operating Fund
199
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: March 02,2017
Submitted By: RAY MCDONALD Date Completed:
Project Title: KIDDIE CARR PARK IMPROVEMENTS
Project Type: PARK/RECREATION Sub -Type: PARK IMPROVEMENTS
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The adopted Parks Master Plan recommends funding for system -wide park facilities and amenities upgrades.
PROJECT DESCRIPTION:
This project includes the necessary demolition and site work to complete a renovated park project that will include
additional parking, benches with pads, picnic tables with pads, additional sidewalks, trail projects, general park
lighting, a sport court, drinking fountain, trash cans, bbq grills, bicycle racks, signage and additional landscaping.
PROJECT SCHEDULE:
FY2021
JUSTIFICATION:
As identified in the adopted Parks Master Plan, the municipal park is the foundation of any solid parks and recreation
system. The City of Euless parks and recreation system provides residents and visitors with significant personal,
social, environmental, and economic benefits. The revitalization efforts that the Euless City Council has focused on
over the years has increased the sense of community pride. Kiddie Carr Park is a four acre park located adjacent to
Carr Park off Pauline. The current amenities at this park include the Parks Department's in -ground tree farm, a
greenhouse, and an outdoor basketball court. The proposed project will continue the City Council's revitalization
efforts by creating an area that will serve both the passive and active leisure needs of the residents in this area.
--,IN
1
200
PROJECT TITLE: KIDDIE CARR PARK IMPROVEMENTS
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost
Demolition
Personnel: Full Time
Site work
Part Time $0
Hardscape
Total Salary $0
Landscape
Purchase of Services
Fixtures/Furnishings
Materials & Supplies
Development/Professional Svcs
Utilities $0
TDLR
Geotech
Subtotal: $0
$0
Subtotal: $0
$5,500
$155,000
$322,000
$60, 500
$92,000
$254,000
$1,500
$3,000
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$893,500
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
XX
To Be Determined
ADDITIONAL COMMENTS:
201
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: April 30,2008
Submitted By: RAY MCDONALD Date Completed:
Project Title: BLESSING BRANCH PARK IMPROVEMENTS
Project Type: PARK/RECREATION Sub -Type: PARK IMPROVEMENTS
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project is a continuation of the overall trail system expansion and general park improvements as identified in the
Parks Master Plan.
PROJECT DESCRIPTION:
Blessing Branch Park is a 7.3 acre linear park located on the east side of Main Street across from Midway Park.
Currently, the park has only one swing set. This project includes construction of a trail connection from Main Street to
the west and Fuller -Wiser to the east. Additionally, the project includes a new playground, picnic pads with grills, and
some type of shade shelter/pavilion/gazebo. This area currently gets a high volume of foot traffic. Constructing a trail
in this linear greenbelt would not only provide a safe paved access for the residents east of Main Street to Midway
Park, Midway Park Elementary, and to Trinity High School, but also help create a renewed sense of quality of life for
the residents in that area by enhancing the recreational amenities available.
PROJECT SCHEDULE:
FY2024
JUSTIFICATION:
The number one request from Euless citizens as it relates to trails, based on the responses to the needs assessment
survey as identified in the Parks Master Plan, was to construct trail connections between existing and/or future park
developments. This project not only satisfies that request, but also provides trail connections to neighborhoods,
schools, between major thoroughfares, and potentially to future commercial developments to the southeast.
W
202
PROJECT TITLE: BLESSING BRANCH PARK IMPROVEMENTS
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost
Approximately 28,000 square feet of
Personnel: Full Time
4"x8' concrete trail
Part Time $0
Playground/Border
Total Salary $0
Picnic pads w/grills
Purchase of Services
Shade shelter/pavilion/gazebo
Materials & Supplies
Trail Lighting
Utilities $0
Playground chips
Design/Survey/Engineering
Contingency
Subtotal: $0
$0
$158,480
$60,000
$20,000
$30,000
$50,000
$5,400
$23, 800
$17,384
Subtotal:
Total Estimated Annual Cost
$0
$0
Total Estimated Capital Cost
$365,064
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
XX
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from EDC Operating Fund
203
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: March 21,2019
Submitted By: RAY MCDONALD Date Completed:
Project Title: TEXAS STAR SPORTS COMPLEX PHASE VIII
Project Type: PARK/RECREATION Sub -Type: TSSC IMPROVEMENTS
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The Texas Star Sports Complex Phase VIII includes construction of a multi -use, lighted open space that could be
programmed for multiple activities.
With the growing number of participants in youth sports, creating additional open space will allow staff the opportunity
to expand existing leagues as well as programming for additional leagues in multiple sports. The addition of this
phase will ensure that the Texas Star Sports Complex remains the premier sports facility for amateur athletics for
many years to come.
PROJECT DESCRIPTION:
The project includes the design and construction of additional lighted playing surfaces to accommodate multiple
sports. Additionally, this project will include substantial drainage and utility work, additional parking and sidewalks.
PROJECT SCHEDULE:
FY2024
JUSTIFICATION:
With the completion of Phase VIII, the new infields will increase programming opportunities to accommodate multiple
sports.
--N,
204
PROJECT TITLE: TEXAS STAR SPORTS COMPLEX PHASE VIII
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
TOTAL ESTIMATED CAPITAL COST:
Direct Operating Cost
Earthwork
Personnel: Full Time
Drainage
Part Time $0
Parking & Sidewalks
Total Salary $0
Lighted Multi -use Fields
Purchase of Services
Utilities
Materials & Supplies
Restroom
Utilities $0
Pavilion/Fencing/Equipment
Design
Contingency
Subtotal: $0
$0
Subtotal: $0
$267, 750
$66,250
$618,950
$1,400,000
$162, 000
$300,000
$355, 000
$300, 000
$346,995
Total Estimated Annual Cost
$0
Total Estimated Capital Cost
$3,816,945
PROPOSED METHOD OF FINANCE:
CURRENT STATUS:
Operating Fund
Conceptual Design %
0%
Fund Balance
Preliminary Design %
0%
Special Project Fund
Final Plans %
0%
Certificate of Obligation
Specifications %
0%
County, State, Federal Funding
Construction %
0%
General Obligation Bonds
Revenue Bonds
XX
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from EDC Bond Sale
205
City of Euless
Capital Project Request
Department: FLEET & FACILITY OPERATIONS Date Prepared: May 07,2007
Submitted By: KYLE MCADAMS Date Completed:
Project Title: ANIMAL SHELTER-EXPANSION/RENOVATION
Project Type: FACILITIES Sub -Type: REMODEL
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of the expansion of the current animal shelter facility to better accommodate visitors,
adoptions, and animal services. The project scope includes the addition of ten (10) enclosed dog runs, six (6)
quarantine runs, an adoption room, additional room for cat containment, and an area for animal washing. Office
space expansion will be included in the renovation as well as updates to the public/employee restrooms.
PROJECT SCHEDULE:
JUSTIFICATION:
The current animal control facility has insufficient space to meet current and future demands.
W
'-,*N
206
MW
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: April 02,2013
Submitted By: RAY MCDONALD Date Completed:
Project Title: SOUTH EULESS PARK UPGRADES
Project Type: PARK/RECREATION Sub -Type: PARK IMPROVEMENTS
Project Code: Priori : C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The adopted Parks Master Plan calls for general upgrades and improvements in the overall quality of parks in
the City and to develop a high quality parks system that provides activities for all age and interest groups and
enhances the adjoining neighborhoods.
PROJECT DESCRIPTION:
Overall park enhancements and improvements to include amenities such as new playground equipment, park
redevelopment, improved lighting, water features, upgrade and expansion of existing splashpad, and additional
landscaping.
PROJECT SCHEDULE:
JUSTIFICATION:
This has been documented in the adopted Parks Master Plan.
207
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: May 12,2008
Submitted By: RAY MCDONALD Date Completed:
Project Title: TRAIL ENHANCEMENTS PHASE I
Project Type: PARK/RECREATION Sub -Type: TRAIL SYSTEM
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Identified in the Needs Assessment and Identification section of the adopted Parks Master Plan are a number of
trail related improvements.
PROJECT DESCRIPTION:
This project consists of the first phase of implementation of park improvements identified in the adopted Parks
Master Plan which includes additional water fountains, additional benches, construction of shaded seating areas
along the trail, addition and/or installation of new exercise equipment along the trails, picnic stations, and
construction of additional pedestrian bridges in high water areas. Also identified, is the need to address various
areas in our trails system that might need to be converted from unpaved to paved trails.
PROJECT SCHEDULE:
JUSTIFICATION:
The City of Euless has experienced significant progress in the last few years in the area of trail development
with an extensive network of paved and unpaved trails. The trails system is a valuable asset to the community
as it assists not only in providing a safe means for non -vehicular travel, but also in providing an opportunity for a
variety of unstructured, low -impact recreational pursuits. The development and maintenance of the trails system
continued to receive significant support from the citizens as indicated in the responses to the needs assessment
survey conducted as a part of the Parks Master Plan update.
208
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: May 13,2008
Submitted By: RAY MCDONALD Date Completed:
Project Title: TRAIL ENHANCEMENTS PHASE II
Project Type: PARK/RECREATION Sub -Type: TRAIL SYSTEM
Project Code: Priori C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This enhancement was identified in the Needs Assessment and Identification section of the adopted Parks
Master Plan.
PROJECT DESCRIPTION:
This project is Phase II of the trail enhancements that continues implementation of park improvements identified
in the adopted Parks Master Plan which includes additional water fountains, additional benches, construction of
shaded seating areas along the trail, addition and/or installation of new exercise equipment along the trails,
picnic stations, and construction of additional pedestrian bridges in high water areas. Also identified, is the need
to address various areas along the trail that need to be converted from unpaved to paved trails.
PROJECT SCHEDULE:
JUSTIFICATION:
The City of Euless has experienced significant progress in the last few years in the area of trail development
with an extensive network of paved and unpaved trails. The trails system is a valuable asset to the community
as it assists not only in providing a safe means for non -vehicular travel, but also in providing an opportunity for a
variety of unstructured, low -impact recreational pursuits. The development and maintenance of the trails system
continued to receive significant support from the citizens as indicated in the responses to the needs assessment
survey conducted as a part of the Parks Master Plan update.
209
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: March 23,2004
Submitted By: RAY MCDONALD Date Completed:
Project Title: TRAIL ENHANCEMENTS VILLAGES OF BEAR CREEK
Project Type: PARK/RECREATION Sub -Type: TRAIL SYSTEM
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project includes infrastructure improvements which were identified as a high priority in the adopted Parks
Master Plan.
PROJECT DESCRIPTION:
This project includes the redevelopment/redesign and improvement of the trail at the Villages of Bear Creek
Park to offer multiple uses for the citizens of Euless.
PROJECT SCHEDULE:
JUSTIFICATION:
Trail development and enhancement opportunities will be consistent with available land, funding and time
variables. This Master Plan recommendation will be part of a city-wide comprehensive trail enhancement
project. Due to the continual erosion of the existing trail, a redevelopment/redesign of the trail system at Villages
of Bear Creek will be necessary.
210
L
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: May 13,2008
Submitted By: RAY MCDONALD Date Completed:
Project Title: TRAILWOOD PARK IMPROVEMENTS
Project Type: PARK/RECREATION Sub -Type: PARK IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project is a continuation of the overall park improvement plan as identified in the Parks Master Plan.
PROJECT DESCRIPTION:
Trailwood Park is an eleven acre site that currently has a playground and a half -mile hike/bike trail. This project
includes the installation of a new pavilion, a parking lot, upgraded playground to meet American with Disabilities
Act standards, park lighting, new park signs, benches along the trail, and trail lighting.
PROJECT SCHEDULE:
JUSTIFICATION:
As identified in the adopted Parks Master Plan, the municipal park is the foundation of any solid parks and
recreation system. The City of Euless parks and recreation system provides the residents and visitors with
significant personal, social, environmental and economic benefits. The revitalization efforts that the Euless City
Council has focused on over the years has increased the sense of community pride. This proposed project will
continue those efforts by creating an area that will serve both the passive and active leisure needs of the
residents in the vicinity.
211
V
C � j
t � i � Y r-'•
212
l
CAPITAL IMPROVEMENTS PROGRAM
COMPLETED PROJECTS SUMMARY
Project
Number
Project Description
Total Project (Over) Under
Date Completed Total Budget Costs Budget
DRAINAGE PROJECTS
DR9901
Sulphur Branch Phase II
08/01/99
$ 123,404
$ 120,128
$ 3,276
DR9902
VVindlea & WestCliff
08/01/99
$ 4,396
$ 1,159
$ 3,237
DR9904
Hurricane Creek
04/30/02
$ 257,500
$ 69,906
$ 187,594
DR0302
Flooding Mitigation
Cancelled
$ 250,000
$ -
$ 250,000
DR0303
Aransas CW Glenn
12/31/04
$ 250,000
$ 250,000
$
DR0304
Live Oak Drainage
04/15/05
$ 218,000
$ 175,958
$ 42,042
DR0305
Sierra Drive Drainage
04/15/05
$ 40,738
$ 40,738
$ 0
DR0306
Flood Mitigation Plan FEMA
04/15/05
$ 32,000
$ 7,750
$ 24,250
DR0307
Simmons Drainage
04/15/05
$ 22,995
$ 22,995
$
DR0301
Fuller Branch Channel Stabilization
05/31/07
$ 279,136
$ 232,176
$ 46,960
DR0401
Channel Stabilization Tributary WFA
05/31/07
$ 437,462
$ 438,070
$ 608
DR0402
Drainage Pro'ect Stud
05/31/07
$ 60,000
$ 51,000
$ 9,000
DR0601
Little Bear Creek Study Update
04/25/08
$ 50,000
$ 4%000
$ 1,000
DR0602
McCormick Park
04/25/08
$ 250,000
$ 247,925
$ 2,075
DR0701
Eastdiff Drive/Greenbriar Drive Drainage Imp.
04/17/10
$ 340,000
$ 246,584
$ 93,416
DR0801
Rockwall Drive/Lamar Drive Drainage Imp.
04/17/10
$ 430,000
$ 272,554
$ 157,446
DR0901
Bear Creek Parkway Erosion Repair
02/17/11
$ 530,000
$ 464,465
$ 65,535
DR0802
Hurricane Creek & Bridge at Marlene
Improvements
04/14/11
$ 378,500
$ 344,574
$ 33,926
DR0000
Boyd Branch Improvements
Cancelled
$ 10,000,000
$ -
$ 10,000,000
Drainage Projects - Prior Years
$ 13,954,131
$ 3,034,982
$ 10,919,149
Drainage Projects - Current Year
$
$ -
$
Total Drainage Projects
$ 13,954,131
$ 3,034,982
$ 10.919,149
213
T H E "C I T Y O F
ss
F.;
1
214
l
CAPITAL IMPROVEMENTS PROGRAM
COMPLETED PROJECTS SUMMARY
Project
Number
Project Descri lion
Total Project (Over) Under
Date Com leted Total Bud et Costs Budget
STREET PROJECTS
PS9911
Overlay Projects
03/30/00
$ 294,687F$1'479,915
294,687
$
PS9912
Harwood -Main Intersection
04/30/00
$ 1,126,935077,30
$$ 49,632
PS9907
West ark Way- SH10 to SH183
09/30/00
$ 605,542
$ 125,627
PS9902
Mid Cities Blvd.
05/02/02
$ 1,075,074963
635
$ 111,439
PS9910
Sidewalks
06/30/03
$ 200,000
$ 200,000
$
PS0001
FM 157 S Pirieline to SH10(Utility Relocation
04/30/04
$ 378,207
$ 371,318
$ 6,889
PS0003
Glade from Heritage to SH121
04/30/04
$ 1,866,612
$ 1,866,612
$
PS0004
Glade Rd (East)- SH121 to Champagne
04/30/04
$ 1,210,014
$ 1,162,009
$ 48,005
PS0201
Gateway Blvd - Southern Portion
04/30/04
$ 510,000
$ 473,817
$ 36,183
PS0301
Mid Cities Roadway Illumination
04/15/05
$ 160,000
$ 148,115
$ 11,885
PS0302
Driftwood Pipeline Traffic Signal
04/15/05
$ 100,000
$ 68,665
$ 31,335
PS0303
Aransas/Harwood Traffic Signal
04/15/05
$ 120,000
$ 89,118
$ 30,882
PSO402
South Pipeline Road Bride
04/30/05
$ 28,208
$ 28,208
$
PS9908
Si nalization
05/31/06
$ 168,055
$ 168,055
$
PSO401
West Pipeline - Raider to City Limits
05/31/06
$ 223,000
$ 104,859
$ 118,141
PSO403
Raider Dr- SH10 to South Pipeline
05/31/06
$ 330,000
$ 293,435
$ 36,565
PS0501
Ross Avenue/S.Main 300' W
05/31/06
$ 95,688
$ 95,638
$ 50
PS0502
Industrial Signal Timing
05/31/06
$ 50,000
$ 50,000
$
P60503
Overlay -Harwood 157/Main
05/31/06
$ 137,000
$ 119,816
$ 17,184
PS0604
Oveda-S.Main, SH10/S.Pi eline
05/31/06
$ 137,000
$ 140,211
$ 3,211
PS0601
Overlay -East Midway
05/31/07
$ 83,000
$ 73,550
$ 9,450
PS0602
Oveda -Midwa , N Main,/FM157
05/31/07
$ 105,000
$ 67,632
$ 37,368
PS0603
Overlay -Fuller Wiser, Midway/Harwood
05/31/07
$ 40,000
$ 28,695
$ 11,305
PS9906
Traffic Safe /Si nalization
05/31/08
$ 128,027
$ 127,939
$ 88
PSO404
South Pipeline Road Overlay
05/31/08
$ 114,750
$ 85,062
$ 29,688
PS0701
Oveda -Dicke Drive
05/31/08
$ 122,200
$ 48,435
$ 73,765
PS0702
Overia-EastHuitt
05/31/08
$ 89,000
$ 64895
$ 24,105
PS0703
Oveda-Huntin ton Drive
05/31/08
$ 69,500
$ 42,884
$ 26,616
PS0706
Gateway Blvd Screening Wall
05/31/08
$ 135,800
$ 138,862
$ 3,062
PS0705
Signal Gateway Blvd Glade
10/28/08
$ 98,000
$ 98,000
$
PS0002
West Pipeline Road-Raider/Hwy 10
12/01/08
$ 6,082,621
$ 6,081,392
$ 1,229
PS0801
Overlay -North Main/Cullum Drive
12/31/08
$ 290,000
$ 211,130
$ 78,870
PS9905
Traffic Studies
05/30/09
$ 27,286
$ 27,197
$ 89
PS0704
Disability Access Stu
05/31/09
$ 30,000
$ 13,950
$ 16,050
PS0901
Ash/Denton/Fair Oaks Overlay
09/30/09
$ 320,000
$ 231,984
$ 88,016
PS0902
Vine Street Design
Cancelled
$ 100,000
$ -
$ 100,000
PS9903
HWY 183 Service Road
Cancelled
$ -
$ -
$
PS0304
Glade Road
04/16/10
$ 3,077,977
$ 2,905,205
$ 172,772
PS9909
FM157 North - SH183 to SH121
04/16/10
$ 267,519
$ 129,215
$ 138,304
PS0903
Mid Cities 6M Gateway & Baze Traffic Signals
04/16/10
$ 320,000
$ 250,702
$ 69,298
PS0802
Fuller -Wiser Connector
02/17/11
$ 495,000
$ 441,491
$ 53,509
PS1002
FY10 County Overly - Wilshire/Marlene
05/17/11
$ 288,000
$ 200,890
$ 87,110
PS9901
North Main Street
05/31/12
$ 6,745,047
$ 6,698,149
$ 46,898
PS9904
Harwood Road
05/31/12
$ 5,770,211
$ 5,686,556
$ 83,655
PS1001
Baze Road
05/31/12
$ 1,830,000
$ 1,558,401
$ 271,599
PS1101
FY2011 County Overlay -Bear Creek Drive/Lakewood
Blvd/Ash Lane
05/31/12
$ 300,000
$ 265,887
$ 34,113
PS0605
South Pipeline Road Bride Replacement
05/31/13
$ 157,000
$ 157,000
$
PS1003
Ash Lane -Aransas Drive to N. Main Street
05/31/13
$ 1,959,230
$ 1,597,270
$ 361,960
FY2012
PS1201 Lane
County Oveday-Aransas Drive/Slaughter
05/31/13
$ 300,000
$ 228,759
$ 71,241
FY2013
PS1301 Improvements
38th CDBG-ADA/TAS Infrastructure
05/31/14
$ 450,000
$ 284,581
$ 165,419
FY2013
PS1302 Rid
County Overlay-Trailwood/Summit
e/West ark/Baze
05/31/14
$ 280,000
$ 273,995
$ 6,005
FY2014
PS1402 Drive/TroanTrail
County Overlay-Ector Drive/Midway
05/31/14
$ 300,000
$ 300,000
$
FY2014
PS1401 Improvements
39th CDBG-ADA/TAS Infrastructure
02/28/15
$ 300,000
$ 272,057
$ 27,943
PS1303 lCullum
Drive improvements
03/31/15
$ 1,295,738
$ 1,210,748
$ 84,990
215
T H
C I T Y O F
3SS
'"\
216
OR
CAPITAL IMPROVEMENTS PROGRAM
COMPLETED PROJECTS SUMMARY
Project
Number
Project Description
Total Project (Over) Under
Date Completed Total Budget Costs Budget
STREET PROJECTS - CONTINUED
PS1202 JADArrAs
Infrastructure improvements
05/31/16
$ 463,800
$ 460,996
$ 2,804
PS1502
FY2015 Street Overly
05/31/16
$ 300,000
$ 217,182
$ 82,818
PS1602
FY2016 Street Overly
09/30/16
$ 600,000
$ 600,000
$ -
PS1501
FY2015 40th CDBG-ADA/TAS Infrastructure
Improvements
05/31/17
$ 519,600
$ 392,693
$ 126,907
PS1602
FY2016 Street Overly
05/31/17
$ 600.000
$ 600,000
$ -
PS1603
FY2016 41 st CDBG-ADA/TAS Infrastructure
Improvements
05/31/17
$ 79,301
$ 70,194
$ 9,107
PS1701
FY2017 42nd CDBG-ADA/TAS Infrastructure
Improvements
05/31/18
$ 91,000
$ 65,240
$ 25,760
PS1702
FY2017 Street Improvements
05/31/18
$ 600,000
$ 600,000
$ -
PS1703
Traffic Signal -Harwood Road at Bear Creek Parkway
05/31/18
$ 180,000
$ 180,000
$
StreetPro"ects - Prior Years
$ 44,220,629
$ 41,184,233
$ 3,036,396
PSI 102
1GIade Parks Improvements
1 05/31/19
$ 15,369,514
$ 15,369,514
$ -
PS1801
FY2018 S[reet Im rovements
05/31/19
$ 425,000
$ 425,000
$
Street projects - Current Year
$ 15,794,514
$ 15,794,514
$
Total Street Projects
$ 60,015,143
1 $ 56,978,747
1 $ 3,036,396
217
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 27, 2014
Submitted By: HAL CRANOR Date Completed: May 31, 2019
Project Title: GLADE PARKS IMPROVEMENTS
Project Type: STREET Sub -Type: CONSTRUCTION
Project CODE: PS1102 Priority: A
COUNCIL AUTHORIZATION:
December 14, 2010: Approval of Resolution #10-1352 authorizing the publication of intention to issue COs.
January 25, 2011: Consider all matters incident and related to the issuance of and sale of up to $3.1 M in COs.
January 25, 2011: Consider acceptance of ROW and easements necessary for public improvements.
January 25, 2011: Awarded Bid #001-11 for a construction contract to McMahon Contracting LP in the amount of
$1,973,615.95 for the construction of Rio Grande Boulevard, Heritage Avenue, and widening of the SH121 service road.
February 24, 2011: Issued COs for funding of first segment of public improvements at Glade Parks.
February 14, 2012: Authorized the City Manager to enter into a contract with Jackson Construction, LTD in the amount
of $1,696,277.25 for the construction of Glade Parks Phase II streets (Brazos Drive, Red River Drive, and Heritage Avenue).
October 23, 2012: Authorized the City Manager to enter into a contract with All Around Lawn Care, Inc. in the amount
of $213,925.65 for the construction of the Glade Parks Phase II Streetscape project.
August 13, 2013: Authorized the City Manager to execute an Engineering Design Contract with Mycoskie, McInnis &
Associates for the design of portions of the Glade Parks Infrastructure. The estimated expenditure is $114,800, plus
reimbursable expenses and additional services.
August 24, 2014: Approved Ordinance No. 2015, considering all matters incident and related to the issuance and sale
of "City of Euless, Texas, Tax and Waterworks and Sewer System (Limited Pledge) Revenue Certificates of Obligation,
Series 2014," and authorizing the issuance of such certificates.
August 11, 2015: Approved Ordinance No. 2079 approving the Amended Project and Financing Plan for Tax Increment
Reinvestment Zone Number Three. The amended Project and Financing Plan increased total project costs by $3,268,910.
September 8, 2015: Authorized the Mayor to negotiate and execute a public parking deck and park easement agreement
with Glade Lifestyle, LLC.
October 27, 2015: Approved Ordinance No. 2092, considering all matters incident and related to the issuance and sale
of "City of Euless, Texas, Tax and Waterworks and Sewer System (Limited Pledge) Revenue Certificates of Obligation,
Series 2015," and authorizing the issuance of such certificates.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The infrastructure located in the Glade Parks development is included in the City's Master Thoroughfare Plan.
PROJECT DESCRIPTION:
The project represents the funding required for the infrastructure improvements at the Glade Parks Development per the
Project and Financing Plan. The project scope includes the construction of Rio Grande Blvd., portions of Heritage Ave., the
Little Bear Creek bridge, SH121 improvements, landscaping, wetland mitigation, Brazos Blvd. and remaining streets, main
entrance and medians, underground drainage and associated utility installations, parking garage, park and amenities, as well
as administrative and financing costs.
PROJECT SCHEDULE:
Design: Winter 2010 Phase II Complete: August 2012
ROW: Winter 2010 Phase III Complete: April 2015
Begin Construction: Spring 2011 Phase IV Construction: FY2017-FY2018
Phase I Complete: FY2012
JUSTIFICATION:
The construction of public infrastructure at Glade Parks will spur economic development in the area and complete an access
route to existing Euless businesses.
218
PROJECT TITLE: GLADE PARKS IMPROVEMENTS
PROJECT CODE: PS1102
NET EFFECTS ON OPERATING AND
TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Rio Grande Blvd.
$3,911,023
Direct Operating Cost
Little Bear Creek Bridge
$1,016,065
Personnel: Full Time
Heritage Ave.
$231,767
Part Time
$0
Highway 121 Improvements
$1,297,164
Total Salary
$0
Landscaping
$517,029
Purchase of Services
Wetland Mitigation
$296,000
Materials & Supplies
Brazos and Remaining Streets
$3,494,309
Utilities
Main Entrance and Median
$587,247
Parking Garage
$1,901,793
Park and Park Amenities
$1,287,387
Administrative Costs
$829,730
$0
Total Estimated Capital Cost
$15,369,514
Subtotal: $0
FUNDING SOURCE:
Maintenance Costs
2011 Certificates of Obligation
$2,854,870
Street CIP Fund Balance
$180,130
2014 Certificates of Obligation
$6,000,000
2015 Certificates of Obligation
$3,065,604
Transfer from General Fund
$3,268,910
$0
Sii6total
$0
Total Estimated Annual Cost
$0
Total Funding
$15,369,514
CURRENT STATUS
OVERIUNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED
BUDGET (- +)
% EXPENDED
Design
$226,292 $226,292
$0
100%
Construction/Administrative Costs
$11,834,589 $11,834,589
$0
100%
Other Professional Services
$39,723 $39,723
$0
100%
Park and Park Amenities
$1,287,387 $1,287,387
$0
100%
Parking Garage
$1,901,793 $1,901,793
$0
100%
Debt Issuance Cost
$79,730 $79,730
$0
100%
'AL PROJECT $15,369,514 $15,369,514 $0 100%1
219
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 31,2014
Submitted By: HAL CRANOR Date Completed: May 31, 2019
Project Title: FY2018 STREET IMPROVEMENTS
Project Type: STREET Sub -Type: IMPROVEMENTS
Pro'ect Code: PS1801 Priority: A
COUNCIL AUTHORIZATION:
February 13, 2018: Approved award of Bid No. 002-18 for asphalt street repairs, overlays, materials and street
maintenance services to JLB Contracting as the primary supplier of asphalt material; Viking Construction as the
primary supplier of micro -seal, and slurry seal; Pavement Services as the primary supplier for asphalt street
repairs, asphalt street overlay, tack coating, milling, and base stabilization and tertiary supplier of asphalt
material; Reynolds Asphalt as the secondary supplier for asphalt street overlay, tack coating, asphalt material,
and milling and tertiary supplier of asphalt street repairs; and Reliable Paving as a secondary supplier for asphalt
street repairs, base stabilization, micro -seal, and slurry seal and tertiary supplier of asphalt street overlay, tack
coating, and milling.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by their
pavement condition index.
PROJECT SCHEDULE:
Began Construction: October 2017
Construction Complete: September 2018
JUSTIFICATION:
The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, will
extend the life of the roadway, and will enhance the appearance of the streets.
--IN
220
L�
PROJECT TITLE: FY2018 STREET IMPROVEMENTS
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Subtotal:
$0
$0
PROJECT CODE: PS1801
TOTAL ESTIMATED CAPITAL COST:
:,onstruction $425,000
Total Estimated Capital Cost $425,000
Funding Source:
2018 Certificates of Obligation $425,000
Total Estimated Annual Cost $01 Total Fundin-q $425,000
CURRENT S TA TUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Construction $425,000 $425,000 $0 100%
$425,000 $425,000 $0 100% I
221
T H E C I T Y O F
ESS
'-N,
222
M
CAPITAL IMPROVEMENTS PROGRAM
COMPLETED PROJECTS SUMMARY
Project
Number
Project Description
Total Project (Over) Under
Date Completed Total Budget Costs Budget
WASTEWATER PROJECTS
WW9902
limpact Fee Stud
09/30/99
$ 13,000
$ 12,238
$ 762
WW9903
Misc Sewer Rehab FY99
09/30/99
$ 50,000
$ 12,987
$ 37,013
WW9904
Hydraulic Anasis
06/30/00
$ 27,000
$ 27,000
$
WW9901
CDBG B/98-UC-48-0001/B95-22-50
08/19/00
$ 150,000
$ 72,927
$ 77,073
WW0003
TRADebt Payment
05/31/01
$ 822,037
$ 822,037
$
WVV0001
CDBG B/99-UC-48-0001
09/30101
$ 150,000
$ 121,682
$ 28,318
WW0101
CDBG B00-UC480001-2250
02/20/02
$ 251,485
$ 247,790
$ 3,695
UWV0102
Manhole Rehab. Program
03/31/03
$ 250,000
$ 184,520
$ 65,480
WW0201
CDBG -B0I-UC-48-0001-22-50
03/31/03
$ 237086
$ 172948
$ 64138
WW0202
Line Replacement -Dunaway
02/28/05
$ 140,000
$ 139,955
$ 45
WVV0203
Line Replacement - E. Alexander
02/28/05
$ 20,000
$ 20,000
$
W W0204
Line Replacement - Paula Lane
02/28/05
$ 79,000
$ 79,000
$
WWO103
Line replacement-S. Pi eline,Heather-Vine
04/15/05
$ 489,759
$ 464,504
$ 25,255
WW0205
Line Replacement - Midway Park
04/30/05
$ 366,000
$ 318,149
$ 47,851
WW0401
CDBG B03-UC-48-0001-22-50
04/30/05
$ 217,000
$ 161,170
$ 55,830
WW030i
CDBGB02-UC-48-0001-22-50
07/26/05
$ 271,455
$ 271,454
$ 1
WW0302
Inflow & Infiltration
Cancelled
$ 200,000
$ -
$ 200,000
WW0303
Line Replacement, Canyon Ride
08/31/06
$ 196,200
$ 173,516
$ 22,684
WW0304
Line Replacement, Sagebrush
08/31/06
$ 160,900
$ 136,470
$ 24,430
VWV0305
Line Replacement, Short
08131/06
$ 251,400
$ 219,932
$ 31,468
VWV0306
Line Replacement, E. Fuller
08/31/06
$ 231,372
$ 180,089
$ 51,283
WVV0501
Line Replacement, Pebble Creek
08/31/06
$ 172,600
$ 145,655
$ 26,945
WWO604
Line Replacement, CDBG-Oakwood Terrace
05/31/07
$ 293,723
$ 232,274
$ 61,449
WWO402
Line Replacement, Carr Park/SH10
05/31/08
$ 588,000
$ 528,302
$ 59,698
WW0403
Line Replacement, Edor Drive
05/31/08
$ 373,000
$ 328,309
$ 44,691
WW0601
Line Replacement, Cedar Hills Estate
05/31/08
$ 319,000
$ 200,201
$ 118,799
WW0602
Line Replacement, Ector Drive
05/31/08
$ 425,000
$ 285,758
$ 139,242
VVVV0603
Little Bear Creek Collection Line
05/31/08
$ 575,000
$ 464,293
$ 110,707
WM701
Line Replacement, McCormick & Co her
02/05/09
$ 243,000
$ 194,254
$ 48,746
WVV0702
Line Replacement, Arnett Addition
02/05/09
$ 313,322
$ 229,006
$ 84,316
W W0703
Line Replacement, Jean Lane
02/05/09
$ 111,000
$ 70,603
$ 40,397
M0704
Line Replacement, W. Fuller
02/05/09
$ 132,000
$ 82,708
$ 49,292
WVV0902
Line Replacement, West Mills Drive-34th CDBG
04/16/10
$ 46,855
$ 46,855
$ -
VVW0802
Line Replacement South Mills Drive CDBG-R
11 /01110
$ 253,710
$ 165,867
$ 87,843
WW0901
Line Replacement Woodridge Circle/Koen Lane
11/01/10
$ 407,000
$ 309,410
$ 97,590
VVW0801
Line Replacement Fayette Drive
04/14/11
$ 357,000
$ 325,676
$ 31,324
WW1001
Line Re - W Alexander Ln/Norman Dr/Franklin Dr
05/31/12
$ 420,000
$ 331,614
$ 88,386
WVV1101
Line Re -Ba less/Pauline/Jones CDBG
05/31/12
$ 350,000
$ 208,903
$ 141,097
WW1103
Line Re -Ba less/Pauline/Jones Outfall
05131112
$ 57,000
$ 37,544
$ 19,456
WW1202
Line Re - Collin Drive 37th CDBG
05/31/12
$ 300,000
$ 231,173
$ 68,827
WVV1102
Line Re - E Huit Lane/Ascot Drive/Dunaway Drive
05/31/13
$ 560,000
$ 468,932
$ 91,068
WW1201
Line Re -Blanco/Aransas/Crane
05/31/13
$ 327,000
$ 284,321
$ 42,679
WWI 301
Line Re - Ross/Slaughter/East & West Huitt
05/31/14
$ 670,000
$ 566,640
$ 103,360
WW1203
SH183 Phase I Wastewater Relocation
10/31/14
$ 372,243
$ 372,243
$ -
WW1401
Line Re - Denton Drive
06/01/15
$ 629,000
$ 506,466
$ 122,534
WWI 501
Line Re - Crane Drive
05/31116
$ 264,823
$ 264,823
$ -
WW1502
Line Re -Town Creek Drive
05/31/16
$ 440,665
$ 395,896
$ 44,769
WW1601
Line Re - Glenn Drive
05/31/17
$ 293,000
$ 264,370
$ 28,630
WW1702
FY2017 42nd CDBG LR: Oakwood Terrace Phase 1
05/31/17
$ 242,000
$ 190,474
$ 51,526
WW1701
Line Re - Cedar Hill EstatesiHollywood Boulevard
05/31/18
$ 134,165
$ 89,001
$ 45,164
WastewaterPro'ects - Prior Years
$ 14,243,800
$ 11,659,939
$ 2,583,861
WW1801
ISH183 Phase II Wastewater Relocation
05/31/19
$ 700,672
$ 681,209
$ 19,463
WWI 802
IFY2018 43rd CDBG LR: Oakwood Terrace Phase II
05131119
$ 223,125
$ 183,337
$ 39,788
Wastewater Pro"ects- CurrentYear
$ 923.797
$ 864,546
$ 59,251
Total Wastewater Projects $ 15,167,597 $ 12,524,485 $ 2,643,112
223
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 06,2015
Submitted By: HAL CRANOR Date Completed: May 31, 2019
Project Title: SH183 PHASE II WASTEWATER RELOCATION
Project Type: WASTEWATER Sub -Type: LINE RELOCATION
Protect Code: WW1801 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The Texas Department of Transportation ("TxDoT") is expanding SH183. The Phase II construction will affect the
City of Euless' utilities along and crossing SH183 between FM157 and the east city limits.
PROJECT DESCRIPTION:
The City of Euless has wastewater mains and associated items located within the SH183 right-of-way. These
facilities must be relocated to accommodate Phase II of the SH183 expansion. The City of Euless has entered
into a relocation agreement with Southgate, the TxDoT contractor, authorizing them to design and relocate
wastewater lines. The City will be responsible for the cost of the relocation of the utilities.
PROJECT SCHEDULE:
Began Construction: June 2016
Construction Complete: October 2018
JUSTIFICATION:
City of Euless wastewater facilities are located within TxDoT right-of-way. As such, the City must provide for
utility relocation to accommodate the roadway expansion.
W
224
11 .
L
PROJECT TITLE: SH183 PHASE II WASTEWATER RELOCATION PROJECT CODE: WW1801
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatino Cost WW Line Relocation Reimb. $700,672
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: $0 Total Estimated Capital Cost $700,672
Maintenance Costs Funding Source:
$0 Transfer from:
W/WW Operating Fund $586,000
Right -of -Way Proceeds $114,672
Subtotal: ,Pu
Transfer to:
W/WW CIP Fund Balance ($19,463)
Total Estimated Annual Cost $0 Total Funding $681,209
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Construction $700,672 $681,209 $19,463 97%
$700,672 $681,209 $19,463 97%
225
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 31,2017
Submitted By: HAL CRANOR Date Completed: May 31, 2019
Project Title: 43RD CDBG LINE REPLACEMENT-OAKWOOD TERR PH II
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: WW1802 Priority: A
COUNCIL AUTHORIZATION:
February 14, 2017: Conducted a Public Hearing for the proposed 43rd year CDBG project and approved the
recommendation which includes replacing a wastewater line that is approximately 1,040 feet in length. It's
located along the rear property line of homes facing onto West Huitt Lane and Jefflyn Court and Gaye Court. The
total estimated cost of the project is $223,125 which is based on recent actual bids for similar work.
January 23, 2018: Approved Resolution No. 18-1524, recommending award of a construction contract for
Community Development Block Grant (CDBG) Project No. B17-UC-48-0001-22-50 to William J. Schultz, Inc., dba
Circle C Construction for the replacement of the sanitary sewer main in the Oakwood Terrace East and Anglin
Additions in the amount of $171,235 and authorized a contingency in the amount of $8,562.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project
is part of the systematic replacement of wastewater mains using a worst first approach.
PROJECT DESCRIPTION:
The project consists of the replacement of the wastewater mains between Jefflyn Court and W Huitt Lane from
Henslee Drive to S Main Street.
(43rd year CDBG project)
PROJECT SCHEDULE:
Began Construction: March 2018
Construction Complete: June 2018
JUSTIFICATION:
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
--*IN
226
L
PROJECT TITLE: 43RD CDBG LINE REPLACEMENT-OAKWOOD TERR PH II PROJECT CODE: WW1802
INET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
I Subtotal:
TOTAL ESTIMATED CAPITAL COST:
Engineering
$0 Total Estimated I
Funding Source:
CDBG Award
$26,
$196,
$223,1251
$223,1251
Unused 43rd CDBG Funding
($39,788)
Total Estimated Annual Cost
$0
Total Funding$183,337
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE
BUDGET EXPENDED
BUDGET (-+)
% EXPENDED
Engineering
$30,000 $29,452
$548
98%
Construction
$193,125 $153,885
$39,240
80%
'AL PROJECT
$223,125 $183,337 $39,788
227
225
L�
CAPITAL IMPROVEMENTS PROGRAM
COMPLETED PROJECTS SUMMARY
Project
Number
Project Description
Total Project (Over) Under
Date Completed Total Budget Costs Budget
WATER PROJECTS
WT9903
Master Plan
08/30/99 Is
42,000
$ 5,445
$ 36,555
WT9904
Well Repairs
09/30/99
$ 66,921
$ 66,921
$ -
WT9907
Impact Fee Stud
09/30/99
$ 13,000
$ 12,238
$ 762
WT9911
Water Distribution - Master Plan
09/30/99
$ 25,600
$ 24,000
$ 1,600
WT9901
Meter Change Out Program
10/30/99
$ 101,917
$ 98,365
$ 3,552
WT0002
Emergency Repair - H10
11/30/99
$ 15,450
$ 14214
$ 1236
WT9906
Hwy 10 Water Line
01130/00
$ 150,000
$ 138,883
$ 11 117
WT0006
Central Drive Water Mains
03/31/00
$ 92,814
$ 90,742
$ 2,072
WT9905
Misc Water Rehab
06/30/00
$ 50,000
$ 43,749
$ 6,251
WT0004
Water Line Milam - Ector/Midwa
06/30/00
$ 18,248
$ 13,743
$ 4,505
VVTO102
SCADA Upqrade
04/09/01
$ 93,400
$ 93,400
$ -
WT0003
Waterline Replacement - Aransas
06/30/01
$ 12,057
$ 7,089
$ 4,968
VVT0005
Waterline Replacement - Milam- Denton/Mid
04/30/02
$ 26,988
$ 26,988
$ -
WT9910
Water Line for Elevated Tank
05/31/02
$ 1,608,386
$ 1,201,698
$ 406,688
WT9909
2MG Water Tank
03/31/03
$ 2,430,881
$ 2,289,571
$ 141,310
WT0103
Fire Hydrant Replacement Program
03/31/03
$ 50,000
$ 49,626
$ 374
WT9908
Mid Cities Blvd. 12" Line
04/30/04
$ 342,080
$ 313,354
$ 28,726
WT0401
Line Replacement, West Pipeline Main
05/31106
$ 1,215,663
$ 1,215,663
$ -
WT0403
Waterline Replacement - Fairlawn Court
Cancelled
$ 35,000
$ -
$ 35,000
WT0404
Waterline Replacement - Atkerson Lane
Cancelled
$ 104,000
$ -
$ 104,000
WT0405
Line Replacement, West Ash Lane
08/31/06 Is
30,000
$ 11,626
$ 18,374
WT0406
Line Replacement, Westport/Newport/Asbury
08/31/06
$ 67,000
$ 9,866
$ 57,134
WT0502
FY'2005 CDBG
08/31/06
$ 69,300
$ 29,549
$ 39,751
W1-0503
Line Replacement, S. Atkerson Lane
08/31/06
$ 79,000
$ 51.294
$ 27,706
WT0504
Line Replacement, Blanco Drive
08131106 Is
112,620
$ 112,620
$ -
WT0505
Line Replacement, Henslee
08/31/06 Is
183,000
$ 123,859
$ 59,141
W1-0506
Line Replacement, Vemon/Slau hter
08/31/06
$ 161,000
$ 113,052
$ 47,948
WT9902
Tank Painting
05/31/07
$ 1,317,763
$ 957,542
$ 360,221
WT0501
System Security Upgrade
05/31/08
$ 40,000
$ 28,319
$ 11,681
WT0601
Mr Sys Security Perimeter Fence Upgrade
05/31/08
$ 75,000
$ 49,567
$ 25,433
WT0602
Line Replacement, Cannon Drive
05/31/08
$ 250,000
$ 223,055
$ 26,945
WT0701
Line Replacement, Canyon Ride
05/31/08
$ 116,000
$ 78,136
$ 37,864
W1-0702
CDBG FY07 - 32nd Oakwood Terrace
05/31/08
$ 334,481
$ 296,223
$ 38,258
WT0802
CDBG-33rd Oakwood Terrace -Simmons
12/31/08
$ 451,639
$ 384,173
$ 67,466
WT0402
Water & Wastewater Impact Fee Update
05/31/09
$ 30,000
$ 17,729
$ 12,271
WT0801
Line Replacement, Signet/Mesa
05/31/09
$ 255,000
$ 218,663
$ 36,337
W1-0201
Well Rehabilitation/Disinfection
04/17/10
$ 600,000
$ 522,308
$ 77,692
WT0202
Reclaimed Water Main
05/31/13
$ 1,750,000
$ 1,606,337
$ 143,663
WT1202
Standpipe Storage Tank & Building Demolition
05/31/13
$ 134,640
$ 70,089
$ 64,551
WT1203
Water & Wastewater Impact Fee Update
05/31/13
$ 34,575
$ 34,575
$ -
WT1401
El Camino Real
02/28/15
$ 460,000
$ 420,462
$ 39,538
WT0901
Trinity River Authority Water Payment -impact
05/31/16
$ 750,000
$ 750,000
$ -
WTI 201
Reclaimed Water Line Extension Phase 1
05/31/16
$ 3,239,452
$ 3,239,452
$ -
WT1501
24-Inch Valve Replacement
05/31/16
$ 180,000
$ 131,370
$ 48,630
WT1601
Line DDrive/Sh.1mar Drive
59,010
WT1602
FY2016 41 st CDBG Line Re - Ector Drive
05/31/17
$ 310,925
$ 309,151
$ 1,774
WT1212
Reclaimed Water Line Extension Phase II
05/31/18
$ 2,591 496
1 $ 1,868,473
$ 723.023
VVT1402
Fixed Base Meter Reading and Water Meter Chan eout
05/31/18
$ 5,503 719
$ 5,503,719
$
WaterPro"ects- PriorYears
$ 25.833015
$ 23,019,888
$ 2,813,127
WT1801 ISH183 Phase II Water Relocation 1 05/31/19
$ 780,672
$ 703,577
$ 77,095
WaterPro'ects- Current Year
$ 780,672
$ 703,577
$ 77,095
Total Water Projects
$ 26,613,687
1 $ 23,723,465
$ 2,890,929
229
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 06,2015
Submitted By: HAL CRANOR Date Completed: May 31, 2019
Project Title: SH183 PHASE II WATER RELOCATION
Project Type: WATER Sub -Type: LINE RELOCATION
Proiect Code: WT1801 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The Texas Department of Transportation ("TxDoT") is expanding SH183. The Phase II construction will affect the
City of Euless' utilities along and crossing SH183 between FM157 and the east city limits.
PROJECT DESCRIPTION:
The City of Euless has water mains and associated items located within the SH183 right-of-way. These facilities
must be relocated to accommodate Phase II of the SH183 expansion. The City of Euless had entered into a
relocation agreement with Southgate, the TxDoT contractor, authorizing them to design and relocate water lines
and associated infrastructure. The City will be responsible for the cost of relocating the utilities.
PROJECT SCHEDULE:
Began Construction: June 2016
Construction Complete: October 2018
JUSTIFICATION:
City of Euless water facilities are located within TxDoT right-of-way. As such, the City must provide for utility
relocation to accommodate the roadway expansion.
''1
__,N
230
PROJECT TITLE: SH183 PHASE II WATER RELOCATION
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
PROJECT CODE: WT1801
TOTAL ESTIMATED CAPITAL COST:
WT Relocation Reimbursement $780,672
Subtotal: $01 Total Estimated Capital Cost $780
Maintenance Costs Funding Source:
Transfer from:
WMIW Operating Fund $666,000
Right -of -Way Proceeds $114,672
$0
Subtotal: $0
Transfer to:
WWN CIP Fund Balance ($77,095)
Total Estimated Annual Cost $0 Total Funding $703,577
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) %, EXPENDED
Construction $780,672 $703,577 $77,095 90%
PROJECT $780,672 $703,577 $77,095 90%
231
T H E
T Y 0 F
232
CAPITAL IMPROVEMENTS PROGRAM
COMPLETED PROJECTS SUMMARY
Project
Number
Project Desert ion
Date Total Project (Over) Under
Completed Total Budget Costs Budget
OTHER PROJECTS
AC9901
Athletic Complex Phase II
06/30/02
$ 123,654
$ 75,047
$ 48,607
ACO202
Athletic Complex Phase 11
05/31106
$ 1,252,221
$ 1,251,915
$ 306
AC1001
Texas Star Sports Complex Lighting Improvements
05/31/12
$ 504,200
$ 475,246
$ 28,954
AC1201
Texas Star Sports Complex Phase N
05/31/16
$ 645,687
$ 575,653
$ 70,034
AC1702
Texas Star Sports Complex Phase VI
05/31/17
$ 1,258,892
$ 1,258,470
$ 422
AC1601
Texas Star Sports Complex Phase V
05f31118
$ 2,602,877
$ 2,538,291
$ 64,586
GM1508
Car Rental Contingency
05/31/16
$ 700,000
$ 700,000
$
GM1509
Municipal Plaza Improvements Phase 1
05/31/17
$ 158.500
$ 41,767
$ 116,733
ED0102
Bell Ranch Terrace
Cancelled
$ 200,000
$ -
$ 200,000
ED0101
Planning Consultants
05/31/18
$ 204,869
$ 104,869
$ 100,000
FM0101
Building D
09/30/02
$ 930,610
$ 930,608
$ 2
FMO209
Midway Recreation Upgrade
06/30/02
$ 557,125
$ 557,125
$
FM0308
Building ARemodel
05/31/07
$ 1,663238
$ 1,651,325
$ 11,913
FM0309
Fire Station #3
05/31/07
$ 2,286,798
$ 2,286,229
$ 569
FMO504
Building 'B" Remodel
05/31/09
$ 1,322,490
$ 1,315,697
$ 6,793
FM0601
Public Works Facility
05f31108
$ 2,210,956
$ 2,213,507
$ 2,551
FM0801
TX Star Golf Course & Conference Ctr Expand
05/31/09
$ 3,630,079
$ 3,630,079
$
FM0802
Senior Citizen Center Design
cancelled
$ 250,000
$ -
$ 250,000
FMC803
Midway Recreation Improvements
03i31109
$ 293,500
$ 75,976
$ 217,524
FMO804
Library -Shell Expansion
12/31/08
$ 307,034
$ 305,664
$ 1,370
FM1510
Develop ent/Engineering Building Improvements
05/31/18
$ 2,589,125
$ 2,588,793
$ 332
GC1201
TSGC Misc. Improvements
05/31/18
$ 430,000
$ 404,820
$ 25,180
GC1701
TSGC Maintenance Building
05/31/18
$ 100,000
$ 97,934
$ 2,066
GR1401
Golf Course Upgrades
09/30/14
$ 587,000
$ 581,296
$ 5,704
PD9901
Police and Courts Facility
05/31/15
$ 11,718,304
$ 11,718,304
$ -
PR9901
HikeBike Trail
04/30/05
$ 237,714
$ 237,714
$
PR9902
Senior Citizen Remodel
04/30/05
$ 16,130
$ 16,130
$ -
PR9903-
PR9918
Various EDC Park Projects
09/30/06
$ 259,566
$ 248,891 1
$ 10,675
PR9922
Teas Remodel
11/30/01
$ 430,000
$ 455,885
$ 25,885
PR9927
ParkImprovements -Texas Star
09/30/01
$ 1,036,500
$ 1,025,298
$ 11,202
PR0015
Purchase of Dallas Stars Center
05/31/00
$ 10,327,978
$ 10,327,978
$ -
PR0016
Wilshire Park Improvements
06/30/02
$ 150,000
$ 149,926
$ 74
PRO110
Slope Protection/Screenin Wall
03/31/03
$ 1,275,2D3
$ 1,273,923
$ 1,280
PRO302
Bob Eden Parking
04/30/05
$ 75,000
$ 74,854
$ 146
PR0303
Youth Ballpark
04/30/05
$ 600,000
$ 6D0,000
$ -
PR0407
Parkin Improvements, MidwayCancelled
$ 11,000
$ -
$ 11,D00
PR04DB
Parkin Improvements, S. Euless Park
05/31/06
$ 55,D00
$ 20,991
$ 34,009
PRO409
Parkin Improvements, Simmons
07/29/04
$ 6,960
$ 6,960
$
PRO410
Parkin Im rovements, Villages Bear Creek
07/29/04
$ 33,666
$ 33,666
$ -
PR0411
Preserve at McCormick Park
05/31/06
$ 1,168,427
$ 1,168,427
$
PRO412
Splash Pool
05131/06
$ 125,000
$ 124,477
$ 523
1
ParkAmenities U rade
04/17/10
$ 150,000
$ 145,316
$ 4,684
Mid Cities Landscaping
05/31/09
$ 40,000
$ 33,199
$ 6,801
Midwa Park Trail
05/31/09
$ 210,000
$ 190,473
$ 19,527
1
Trail Enhancements - Bob Eden Park
04/17/10
$ 135,000
$ 101,673
$ 33,327
2
Senior Citizen Center at MidwayPark
05/31/11
$ 4,763,661
$ 31888,892
$ 874,769
7
I
Euless Famil Life Center Phase 1
05/31/11
$ 2,105,000
$ 2,099,281
$ 5,719
1
Euless FamilLife Center A uatics
09/30/14
$ 7,504,972
$ 7,319,299
$ 185,673
4
Public Works Yard Im rovements
05/31/17
$ 100,000
$ 97,686
$ 2,314
1
Fire Station II
03/30/00
$ 49,688
$ 49,688
$ -
Fire Station #3 - Structural Re airs
03/30/00
$ 30,000
$ 17,344
$ 12,656
Libra Books
08/15/00
$ 3,302
$ 3,302
$0
Former Fire Station #2
06/30/02
$ 599,600
$ 595,257
$ 4,343
SS0113
Park Building
W30102
$ 1,492,400
$ 1,492,100
$ 300
Other Projects - Prior Years
$ 69,518,926
1 $ 67,177,245
$ 2,341,681
PR1401 Glade Parks Trail Connection 05/31/19
$ 1,396,545
$ 1,138,772
1 $ 257,773
Other Projects, Current Year
$ 1,396,545
$ 1,138,772
$ 257,773
Total Other Projects
$ 70,915,471
1 $ 68,316,017
$ 2,5991454
233
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: May 05,2008
Submitted By: RAY MCDONALD Date Completed: May 31, 2019
Project Title: GLADE PARKS TRAIL CONNECTION
Project Type: PARK/RECREATION Sub -Type: TRAIL SYSTEM
Proiect Code: PR1401 Priority: A
COUNCIL AUTHORIZATION:
March 25, 2014: Authorized the City Manager to execute an Engineering Design Contract with Mycoskie McInnis
Associates, Inc. for the design of the Glade Parks Trail Connection Project with an estimated expenditure of
$119,000.
August 11, 2015: Approved Resolution No. 15-1465 which allows the City of Euless to enter into a Local Project
Advance Funding Agreement for the Trails of Euless — Western Extension project, CSJ # 0902-90-023. The City
was awarded $912,000 to complete the Trails of Euless — Western Extension project.
August 16, 2016: Awarded Bid No. 010-16 in the amount of $898,247.95 to C. Green Scaping, LP for the
construction of the Trails of Euless — Western Extension.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
As identified in the Glade Parks development, this project proposes to connect the existing Trails of Euless to the
City of Colleyville trails through the Glade Parks Development.
PROJECT DESCRIPTION:
This phase of the project consists of the design, engineering, surveying, geotech and construction for a trail that
will connect to the existing trail at Creekwood Estates, run underneath the northbound service road, SH121, and
the southbound service road to the southeast corner of the Glade Parks Development. Future connectivity
through Glade Parks is planned within the overall development of that site.
PROJECT SCHEDULE:
Design Complete: July 2016
Construction Complete: October 2017
JUSTIFICATION:
The City of Euless has experienced significant progress in the last few years in the area of trail development with
an extensive network of paved and unpaved trails. The trails system is a valuable asset to the community as it
assists not only in providing a safe means for non -vehicular travel, but also in providing an opportunity for a
variety of unstructured, low -impact recreational pursuits. The development and maintenance of the trails system
continued to receive significant support from the citizens as indicated in the responses to the needs assessment
survey conducted as a part of the Parks Master Plan update.
,-**A
234
OW
PROJECT TITLE: GLADE PARKS TRAIL CONNECTION
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
I Subtotal:
I Subtotal:
I Tota
Cost
PHASE/FUNDING SOURCE
Design, Engineering, Surveying & Geotech
Construction
Contingency
PROJECT CODE: PR1401
TOTAL ESTIMATED CAPITAL COST:
Design
Engineering, Surveying and
Geotech
Construction
Contingency
$01 Total Estimated Capital Cost
Funding Source:
Transfer from:
Car Rental Fund
Grant Award
$0
$0 Transfer to:
Car Rental CIP Fund Balance
Unused Grant Funding
$01 Total Funding
CURRENT STATUS
OVER/UNDER
BUDGET EXPENDED BUDGET (-+)
$175,000 $166,001 $8,999
$998,248 $968,721 $29,527
$223,297 $4,050 $219,247
$1,396,545 $1,138,772 $257,773
$55
$72
$1,237
$32
$1,396
$484
$912
($20, 040)
($237,733)
$1,138,772
% EXPENDED
95%
97%
2%
235
T H E C I T Y O F
ESS
236