Loading...
HomeMy WebLinkAbout03-1156 06-24-2003RESOLUTION NO. 03 -1156 RESOLUTION OF THE CITY OF EULESS SUPPORTING FUNDING FOR THE WIDENING OF SH 183/121 FROM 111 820 to SH 161 IN IRVING WHEREAS, traffic congestion has increased throughout the corridor causing the deterioration of air quality; and WHEREAS, this corridor serves as a regional highway with over 136,092 Tarrant County citizens driving to Dallas County every day and 46,430 Dallas County citizens drive to Tarrant County every day; and WHEREAS, DFW Airport drives the economy for the Dallas /Fort Worth Metroplex and State Highway 183 is the south entrance to the airport; and WHEREAS, the two highest traffic counts in all of Tarrant County are along this 9.3 miles of State Highways 183 and 121; and WHEREAS, this area represents the 4th most congested area in the Metroplex and affects delivery of goods, flight connections, and causes the delay of emergency vehicles; and WHEREAS, the Air Quality of the Metroplex has not reached attainment status and with 50% of air pollutants coming from on -road vehicles, it is imperative this congestion be alleviated in the region. THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF EULESS, TEXAS: THAT we urge the planning, funding and construction of SH 183/121 from IH 820 to SH 161 in Irving be expedited. ADOPTED AND PASSED at a regular meeting of the Euless City Council on the 24th day of June, 2003, by a vote of 7 ayes, 0 nays, and 0 abstentions. APPROVED: kittc "Atli i Mary Lib S /eh, Mayor ATTEST: City Secretary