Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
FY 2022 Capital Improvements Program
City of Euless Capital Improvements Program Fiscal Year Ending September 30, 2022 201 N. Ector Drive, Euless, TX76039 www.oulesstx.gov City of Euless FISCAL YEAR 2021-2022 Council Members LINDA MARTIN, MAYOR Tim Stinneford, Mayor Pro Tom, Place One Jeremy Tompkins, Place Two Eddie Price, Place Three Perry Bynum, Place Four Harry Zimmer, Place Five Tika Paudel, Place Six Loretta Getchell, City Manager Chris Barker, Deputy City Manager Wes Rhodes, Assistant City Manager TABLE OF CONTENTS CAPITAL IMPROVEMENTS PROGRAM City Officials Table of Contents i-iv Letter vi-vii Fund Balance Summary viii-x FUNDED PROJECTS Summary of Funded Projects 1 FY2021 Amendments 3 Drainage Projects Summary of Funded Drainage Projects 5 DR9903 Miscellaneous Drainage Improvements 6 DR1101 Flooding Mitigation 8 DR1201 Miscellaneous Creek Maintenance 10 Street Projects Summary of Funded Street Projects 13 PS 1203 Miscellaneous Street Repairs 14 PS 1601 East Harwood Road Extension 16 PS 1902 FY2019 Street Reconstruction — Pipeline/Highland/Harwood/Mills 20 PS 1903 Miscellaneous Screening Wall Repair 24 PS2101 FY2021 Street Improvements 26 Wastewater Proiects Summary of Funded Wastewater Projects 29 WW0002 Miscellaneous Wastewater Rehabilitation 30 WW0605 TRA Wastewater Payments — Impact 32 WW2002 Line Replacement - Midway Park 3rd Addition Phase I 34 WW2003 Line Replacement - North Main Street 38 WW2101 Line Replacement - El Camino Real 42 WW2102 FY2021 46th CDBG LR: Del Paso Street Phase I & 11 46 WW2103 Line Replacement - SH10 @ Main Street 50 Water Projects Summary of Funded Water Projects 55 WT0001 Miscellaneous Water Rehabilitation 56 WT0104 Well Repairs 58 WT0803 Meters/Transponders/Leak Detection 60 WT 1403 Reclaimed Water Line Extension Debt Payment — Impact 62 WT1603 Miscellaneous Valve Replacement 64 WT1604 Reclaimed Water Line Extension Phase 111 66 WT 1802 Well Replacement — Fuller/Far North 70 WT2001 Line Replacement — Alexander Lane 74 WT2101 Line Replacement - Dickey Drive 78 Other Proiects Summary of Funded Other Projects 83 AC1901 Texas Star Sports Complex Phase VII 84 CM0304 Entry Monument Sign Program 86 CM0804 Redevelopment 88 CM 1701 Municipal Plaza Improvements Phase II 90 DV9901 EDC Incentive Funds 92 ED 1002 EDC Contingency 94 ED 1601 Midtown Development 96 FM1201 ADA/TAS Facility Improvements 98 FM2006 Fire Station #1 100 GC1801 TSGC Miscellaneous Improvements 102 GC2003 Texas Star Slope Wall Protection Phase I 104 PR0720 Miscellaneous Park Improvements 106 PR0804 Park Irrigation 108 PR2011 Wilshire Park Upgrades 110 PR2102 Senior Center Canopy CDBG-CV 112 PROPOSED & UNFUNDED PROJECTS Summary of FY2022 Proposed & Unfunded Projects — Sorted by Type 115 Drainage Projects Summary of FY2022 Proposed & Unfunded Drainage Projects 117 Bear Creek Elementary Drainage Channel Improvements 118 Chittam Drive Storm Drain Installation 120 Kynette Drive Storm Drain Installation 121 Little Bear Creek Drainage Improvements 122 Main Centre Addition Channelized Drainage 123 Street Projects Summary of FY2022 Proposed & Unfunded Street Projects 125 FY2022 Street Improvements 126 FY2023 Street Improvements 128 FY2024 Street Improvements 130 FY2025 Street Improvements 132 FY2026 Street Improvements 134 Heritage Avenue - Cheek-Sparger Road to Guadalupe Trail 136 Cresthaven Drive Reconstruction 138 East Alexander Lane Reconstruction 139 Ross Avenue Extension 140 Sheppard Drive Reconstruction 141 Vine Street Reconstruction— SH183 to SH10 142 Wastewater Projects Summary of FY2022 Proposed & Unfunded Wastewater Projects 143 FY2022 47th CDBG LR: Paula Lane/David Drive/Susan Street/Raider Court 144 Line Replacement — Midway Park 3rd Addition Phase II & Green Hills Park 148 Line Replacement — Cedar Hill Estates South Phase I 152 Line Replacement — Cedar Hill Estates South Phase II 154 FY2023 48th CDBG LR: Parks at Texas Star North/SH10 156 FY2024 49th CDBG LR: Raider Drive/Euless Square Apartments/S Ector Drive 158 Line Replacement — Oakwood Terrace North Phase I 160 FY2025 50th CDBG LR: Aransas Drive/Douglas Street 162 Line Replacement — Oakwood Terrace North Phase II 164 FY2026 51 st CDBG LR: Fair Oaks Boulevard/Shelmar Drive/Kensington Court 166 Line Replacement — Woodvine Drive/Cliffwood Road 168 Line Replacement — Cliffwood Road/Shady Creek Drive 170 Line Replacement — Summit Ridge/Shenandoah/Cripple Creek/Trailwood Drive 171 Water Projects Summary of FY2022 Proposed & Unfunded Water Projects 173 1 Mil Well Replacement 174 Line Replacement — Huntington Drive 178 Line Replacement — Midway Park 1 st Addition 182 Line Replacement — Sagebrush Trail 184 Line Replacement — Sotogrande Boulevard 186 Line Replacement — Bell -Hi Addition Phase I & II 188 Line Replacement — Donley Drive/Donley Court 190 Line Replacement — Dunaway Drive 191 Line Replacement — Midway Park 3rd Addition 192 Line Replacement — Paula Lane 193 Line Replacement — West Euless Boulevard 194 Line Replacement — Westpark Way 195 Other Projects Summary of FY2022 Proposed & Unfunded Other Projects 197 Blessing Branch Park Improvements 198 FY2022 Roof Replacement & Preventative Maintenance 200 Aquatic Park Facility Upgrades 202 Carr Park Trail Connection 204 FY2023 Roof Preventative Maintenance 206 Kiddie Carr Park Improvements 208 Trail Lighting - Mid -Cities 210 FY2024 HVAC System Replacement 212 FY2024 Roof Replacement & Preventative Maintenance 214 Trail Lighting - Heritage Avenue to Bob Eden Park 216 Euless Family Life Center Elevator Replacement 218 FY2025 Roof Restoration & Preventative Maintenance 220 FY2026 HVAC System Replacement 222 FY2026 Roof Restoration & Preventative Maintenance 224 Parks at Texas Star Lighting Upgrade 226 Parks at Texas Star North Additional Parking Lot 228 Parks at Texas Star Phase VIII 230 Fire Station #2 Remodel 232 Police & Courts Building Remodel 233 Parks at Texas Star Turf - Fenway, Shea, and Jacobs Field 234 Animal Shelter Expansion/Renovation 235 South Euless Park Upgrades 236 Trail Enhancements Phase I 237 Trail Enhancements Phase II 238 Trail Enhancements Villages of Bear Creek 239 Trailwood Park Improvements 240 COMPLETED PROJECTS Drainage Proiects Summary of Completed Drainage Projects 241 Street Projects Summary of Completed Street Projects 243 PS 1802 FY2018 Street Reconstruction — Fuller Wiser Rd./Bear Creek Pkwy. 246 PS 1901 FY2019 Street Improvements 248 PS2001 FY2020 Street Improvements 250 PS2002 Glade Road Reconstruction — East of Highway 360 252 PS2003 Traffic Signal — Cheek-Sparger Road at Heritage Avenue 254 Wastewater Projects Summary of Completed Wastewater Projects 257 WW2001 FY2020 45th CDBG LR: Midway Park 2nd Addition Phase I 258 Water Proiects Summary of Completed Water Projects 261 WTO101 Water Tank Debt Payment —Impact 262 Other Proiects Summary of Completed Other Projects 265 FM1708 Library Remodel 266 PR1917 Carr Park Improvements 268 iv H E C I T Y O EULESS T H E C I T Y Q F EULESS July 16, 2021 Honorable Mayor Linda Martin Honorable City Councilmembers: Tim Stinneford, Mayor Pro Tem, Place One Jeremy Tompkins, Place Two Eddie Price, Place Three Perry Bynum, Place Four Harry Zimmer, Place Five Tika Paudel, Place Six INTRODUCTION The City of Euless' Capital Improvements Program is a comprehensive document detailing all projects that have been identified to date. Emphasis has been placed on organizing this data in a manner that will facilitate decision -making processes, assist in long-range planning, and provide the citizens of Euless with information regarding planned projects. This document meets the requirements of the City Charter. Article VII, Section 2 (5) requires, "A statement proposing any capital expenditures deemed necessary for undertakingduring the next budget year and recommended " g g y provisions for financing. Section 2 (6) further requires, "A list of capital projects which should be undertaken within the five (5) next succeeding years." We extend special appreciation to the directors and the finance staff for their outstanding performance in creating this document. UNDERSTANDING THIS BOOK Although this book contains a large volume of information, the summaries should make it easy to understand at a glance. The book is divided into three sections: Funded Projects, FY2022 Proposed and Unfunded Projects, and Completed Projects. Each section begins with a summary and is followed by detailed data for those wishing to research individual projects. The detail provided includes the project's relationship to City master plans, the project description and justification, the effect on future maintenance and operating costs, and the estimated total cost. Within each section, you will find the detailed descriptions sorted by type. There are five basic project types: Drainage, Streets, Wastewater, Water, and Other. The Funded Projects section includes all projects that the City Council has previously authorized. Many of these projects are on -going and require additional funding from time to time. For each project, a detailed description has been provided that includes any City Council authorization, the current status of the project, and a financial summary detailing funding sources and total project budget. Any amendments or additional appropriations requested are also identified. 201 N. Eetor Drive, Euless. Texas 76039-3 59 5 8171685-1400 • Fax 817/685-1416 www.eulesstx.gov v1 Any project that has been authorized by the City Council that is not fully funded will include a clear explanation as to how the remainder of the project is expected to be funded. The FY2022 budget includes replenishing the ongoing miscellaneous projects and impact fee payments, provides additional funds to continue expansion of the reclaimed water system, to construct office space at the Parks at Texas Star Phase VII, and for additional monies to continue redevelopment efforts. The FY2022 Proposed and Unfunded Projects section has been classified into three categories of priority Priority A indicates the item is recommended and funding has been identified in the proposed FY2022 budget. Staff recommends City Council authorization for these projects. Priority B projects should be presented to Council within two to five years for consideration. Projects that will not begin for at least five years have been assigned a Priority C. This system has been used to allow the Council to evaluate and shift priorities, when necessary, and to provide a means of budgeting capital projects for at least five years. Recommended funding sources have been indicated if known. The Completed Projects section provides a summary for each project type indicating total project budget, actual expenditure, and variance. Funds remaining have been returned to the appropriate fund balance account for re -appropriation. Details of projects closed during the prior year have also been included. FY2022 PROJECTS: Funding has been identified for all proposed FY2022 projects which are reflected on the FY2022 Proposed and Unfunded Projects Summary as Priority A These include: • Bear Creek Elementary Drainage Channel Improvements + FY2022 Street Improvements • FY2022 47th CDBG Wastewater Line Replacement — Paula LanelDavid Drive/Susan Street/Raider Court • Midway Park 31 Addition Phase it & Green Hills Park Wastewater Line Replacement • 1 Mil Well Replacement Huntington Drive Water Line Replacement • Blessing Branch Park Improvements • FY2022 Roof Replacement & Preventative Maintenance CLOSING COMMENTS This document is prepared as a comprehensive summary of capital needs that have been identified throughout the City of Euless. This document will be updated annually to aid the City Council in allocating resources and determining priorities. Sincerely, Lor tta Getchel City Manager M Fund Balance Summary - Capital Estimated FY21 and Budgeted FY22 Capital Improvement Projects EDC Developer's Streets Half -Cent General Escrow CIP CIP CIP Beg. Working Capital FY21 $2,214,281 $11,977,112 $3,250,413 $9,269,301 FY21 Estimated Revenues 6,000 6,524,410 252,621 417,215 Total Available: 2,220,281 18,501,522 3,503,034 9,686,516 FY21 Estimated Project Expenditures 0 (18,294,514) (3,383,402) (7,681,597) Total Expenses: 0 (18,294,514) (3,383,402) (7,681,597) Estimated Working Capital FY21 $2,220,281 $207,008 $119,632 $2,004,919 FY22 Budgeted Revenues 0 1,025,000 690,064 575,980 Total Available: 2,220,281 1,232,008 809,696 2,580,899 FY22 Project Expenditures 0 (1,115,000) (690,064) (453,000) Total Expenses: 0 (1,115,000) (690,064) (453,000) Estimated Working Capital FY22 $2,220,281 $117,008 $119,632 $2,127,899 FY22 Projects Miscellaneous Street Repairs 0 65,000 0 0 FY22 Street Improvements 0 1,025,000 0 0 Miscellaneous Screening Wall Repair 0 25,000 0 0 Incentives 0 0 25,000 0 Blessing Branch Park 0 0 365,064 0 TSSC Phase VII 0 0 175,000 0 Miscellaneous Park Improvements 0 0 100,000 0 Park Irrigation 0 0 25,000 0 FY22 Roof Replacement & PM 0 0 0 373,000 Municipal Plaza, Phase II 0 0 0 50,000 ADA/TAS Facility Improvements 0 0 0 30,000 Total FY22 Projects $0 $1,115,000 $690,064 $453,000 viii Fund Balance Summary - Capital Estimated FY21 and Budgeted FY22 Capital Improvement Projects Midtown Redevelopment Development CIP CIP Rental Tax TSGC PATS CIP CIP CIP FY21 Estimated Revenues 2,176,542 999,725 6,000 50,000 0 Total Available: 3,574,117 1,069,200 2,319,552 186,819 144,243 FY21 Estimated Project Expenditures (3,473,222) (1,069,200) (2,295,599) 17( 3,232) 0 Total Expenses: (3,473,222) (1,069,200) (2,295,599) (173,232) 0 Estimated Working Capital FY21 $100,895 $0 $23,953 $13,587 $144,243 FY22 Budgeted Revenues 2,500,000 0 0 60,000 0 Total Available: 2,600,895 0 23,953 73,587 144,243 FY22 Project Expenditures (2,500,000) 0 0 (60,000) 0 Total Expenses: (2,500,000) 0 0 (60,000) 0 Estimated Working Capital FY22 $100,895 $0 $23,953 $13,587 $144,243 FY22 Projects Redevelopment 2,500,000 0 0 0 0 TSGC Misc. Improvements 0 0 0 60,000 0 Total FY22 Projects $2,500,000 $0 $0 $60,000 $0 Fund Balance Summary - Capital Estimated FY21 and Budgeted FY22 Capital Improvement Projects W&WW CIP Water Impact Fee Wastewater Impact Fee Drainage CIP Beg. Working Capital FY21 $6,917,820 $2,232,181 $778,506 $1,237,405 FY21 Estimated Revenues 1,713,692 220,000 70,000 100,000 Total Available: 8,631,512 2,452,181 848,506 1,337,405 FY21 Estimated Project Expenditures (8,477,895) 12( 0,844) 10( 0,000) 79( 4,982) Total Expenses: (8,477,895) (120,844) (100,000) (794,982) Estimated Working Capital FY21 $153,617 $2,331,337 $748,506 $542,423 FY22 Budgeted Revenues 9,200,914 0 0 374,000 Total Available: 9,354,531 2,331,337 748,506 916,423 FY22 Project Expenditures (9,025,000) 11( 8,306) 10( 0,000) 83( 5,000) Total Expenses: (9,025,000) (118,306) (100,000) (835,000) Estimated Working Capital FY22 $329,531 $2,213,031 $648,506 $81,423 FY22 Projects Wastewater Line Replacement 436,000 0 0 0 Wastewater Line Replacement-CDBG 391,000 0 0 0 Meters/Transponders/Leak Detection 158,000 0 0 0 Water Line Replacement 515,000 0 0 0 Miscellaneous Well Rehab 25,000 0 0 0 1 Mil Well Replacement 6,500,000 0 0 0 Reclaimed Water System Expansion/Connectivity 1,000,000 0 0 0 Reclaimed Water Line Extension Debt Payment 0 118,306 0 0 TRA Payments 0 0 100,000 0 Bear Creek Elem. Drainage Channel Imps. 0 0 0 785,000 Miscellaneous Drainage Improvements 0 0 0 50,000 Total FY22 Projects $9,025,000 $118,306 $100,000 $835,000 x CAPITAL IMPROVEMENTS PROGRAM FUNDED PROJECTS SUMMARY Project Number Project Description Budget as of 5/31/20 Appropriation/ Amendment Budget as of 5/31/21 Expended as of 5/31/21 Remaining Funds Revised Project Cost Estimates Unfunded/ (Excess Funding) DRAINAGE PROJECTS DR9903 Misc. Drainage Improvements $ 1,247,011 $ 100,000 $ 1,347,011 $ 875,472 $ 471,539 $ 1,397,011 $ 50,000 DR1101 Flooding Mitigation $ 500,000 $ - $ 500,000 $ 18,334 $ 481,666 $ 500,000 $ - DR1201 Misc. Creek Maintenance (min bal $100,000) $ 270,000 $ $ 270,000 $ 116,316 $ 153,684 $ 270,000 $ FB9902 Fund Balance - Drainage CIP $ - $ $ - $ - $ - $ - $ (81,907) Sub -Total Drainage Projects $ 2,017,011 $ 100,000 $ 2,117,011 $ 1,010,122 $ 1,106,889 $ 2,167,011 $ (31,907) STREET PROJECTS PS1203 Misc. Street Repairs (min bal $150,000) $ 926,500 $ 1,650 $ 928,150 $ 837,746 $ 90,404 $ 993,150 $ 65,000 PS1601 East Harwood Road Extension $ 100,000 $ - $ 100,000 $ - $ 100,000 $ 100,000 $ - PS1902 FY2019 Street Reconstruction - Pipeline/Highland/Harwood/Mills $ 12,704,181 $ 5,522,761 $ 18,226,942 $ 2,148,095 $ 16,078,847 $ 18,226,942 $ - PS1903 Misc. Screening Wall Repair (annual transfer $25,000) $ 50,000 $ - $ 50,000 $ 1,293 $ 48,707 $ 75,000 $ 25,000 PS2101 FY2021 Street Improvements $ - $ 1,000,000 $ 1,000,000 $ 362,731 $ 637,269 $ 1,000,000 $ - FB9907 Fund Balance - Street CIP $ - $ - $ - $ - $ - $ - $ (187,883) Sub -Total Street Projects $ 13,780,681 $ 6,524,411 $ 20,305,092 $ 3,349,865 $ 16,955,227 $ 20,395,092 $ (97,883) WASTEWATER PROJECTS WW0002 Misc. Wastewater Rehab (min bal $100,000) $ 781,086 $ 100,000 $ 881,086 $ 715,826 $ 165,260 $ 881,086 $ - WW0605 TRA Wastewater Payments - Impact $ 1,180,000 $ 100,000 $ 1,280,000 $ 1,180,000 $ 100,000 $ 1,380,000 $ 100,000 WW2002 Line Replacement - Midway Park 3rd Addition Phase 1 $ 446,600 $ - $ 446,600 $ 272,248 $ 174,352 $ 446,600 $ - WW2003 Line Replacement - North Main Street $ 189,000 $ - $ 189,000 $ 18,696 $ 170,304 $ 189,000 $ WW2101 Line Replacement - El Camino Real $ - $ 562,000 $ 562,000 $ 368,345 $ 193,655 $ 562,000 $ WW2102 IFY2021 46th CDBG LR: Del Paso Street Phase I & II $ $ 478,652 $ 478,652 $ 46,049 $ 432,603 $ 478,652 $ WW2103 Line Replacement -SH10 @ Main Street $ $ 121,000 $ 121,000 $ 47,023 $ 73,977 $ 121,000 $ FB9911 I FB - Wastewater Impact Restricted $ $ - $ - $ - $ - $ - $ 732,503 Sub -Total Wastewater Projects $ 2,596,686 $ 1,361,652 $ 3,958,338 $ 2,648,187 $ 1,310,151 $ 4,058,338 $ (632,503) WATER PROJECTS WT0001 Misc. Water Rehab (min bat $150,000) $ 953,511 $ 100,000 $ 1,053,511 $ 801,391 $ 252,120 $ 1,053,511 $ - WT0104 Well Repairs $ 1,688,992 $ - $ 1,688,992 $ 1,654,585 $ 34,407 $ 1,713,992 $ 25,000 WT0803 Meters/Transponders/Leak Detection (annual transfer $158,000) $ 2,360,944 $ 158,000 $ 2,518,944 $ 1,315,853 $ 1,203,091 $ 2,676,944 $ 158,000 WT1403 Reclaimed Water Line Extension Debt Payment - Impact $ 838,683 $ 120,844 $ 959,527 $ 919,243 $ 40,284 $ 1,077,833 $ 118,306 WT1603 Misc. Valve Replacement (min bat $150,000) $ 515,000 $ - $ 515,000 $ 208,741 $ 306,259 $ 515,000 $ - WT1604 Reclaimed Water Line Extension Phase III $ 4,650,205 $ - $ 4,650,205 $ 4,624,803 $ 25,402 $ 5,650,205 $ 1,000,000 WT1802 Well Replacement - Fuller/Far North $ 11,154,816 $ 2,040 $ 11,156,856 $ 9,159,007 $ 1,997,849 $ 11,156,856 $ - WT2001 Line Replacement - Alexander Lane $ 440,000 $ - $ 440,000 $ - $ 440,000 $ 440,000 $ WT2101 Line Replacement - Dickey Drive $ - $ 476,000 $ 476,000 $ 4,637 $ 471,363 $ 476,000 $ FB9910 FB - Water Impact Restricted $ $ - $ - $ - $ - $ - $ 2264972 FB9901 FB - Water & Wastewater CIP $ $ - $ - $ - $ - $ - $ Sub -Total Water Projects $ 22,602,151 $ 856,884 $ 23,459,035 $ 18,688,260 $ 4,770,775 $ 24,760,341 $ :�J CAPITAL IMPROVEMENTS PROGRAM FUNDED PROJECTS SUMMARY Project Number Project Description Budget as of 5/31/20 Appropriation/ Amendment Budget as of 5/31/21 Expended as of 5/31/21 Remaining Funds Revised Project Cost Estimates Unfunded/ (Excess Funding) OTHER AC1901 Texas Star Sports Complex Phase VII $ 4,529,810 $ 2,508 $ 4,532,318 $ 4,309,184 $ 223,134 $ 4,707,318 $ 175,000 CM0304 Entry Monument Sign Program $ 135,782 $ 10,000 $ 145,782 $ 121,427 $ 24,355 $ 145,782 $ CM0804 Redevelopment $ 5,250,979 $ 2,176,542 $ 7,427,521 $ 6,059,873 $ 1,367,648 $ 9,927,521 $ 2,500,000 CM1701 Municipal Plaza Improvements Phase II $ 266,733 $ - $ 266,733 $ 216,445 $ 50,288 $ 316,733 $ 50,000 DV9901 EDC Incentive Funds $ 1,425,854 $ 25,000 $ 1,450,854 $ 1,351,148 $ 99,706 $ 1,475,854 $ 25,000 ED1002 EDC Contingency $ 325,000 $ - $ 325,000 $ 68,772 $ 256,228 $ 325,000 $ ED1601 Midtown Development $ 16,417,980 $ $ 16,417,980 $ 15,348,780 $ 1,069,200 $ 16,417,980 $ - FM1201 ADA/TAS Facility Improvements (min bal $75,000) $ 140,000 $ $ 140,000 $ 93,295 $ 46,705 $ 170,000 $ 30,000 FM2006 Fire Station #1 $ 7,861,413 $ 22,671 $ 7,884,084 $ 1,285,773 $ 6,598,311 $ 7,884,084 $ - GC1801 TSGC Misc. Improvements (min bal $150,000) $ 477,180 $ 50,000 $ 527,180 $ 363,778 $ 163,402 $ 587,180 $ 60,000 GC2003 Texas Star Slope Wall Protection Phase 1 $ 415,337 $ - $ 415,337 $ 286,119 $ 129,218 $ 415,337 $ - PR0720 Misc. Park Improvements (min bal $100,000) $ 1,118,253 $ 200,000 $ 1,318,253 $ 1,140,621 $ 177,632 $ 1,418,253 $ 100,000 PR0804 Park Irrigation $ 275,000 $ 25,000 $ 300,000 $ 213,688 $ 86,312 $ 325,000 $ 25,000 PR2011 Wilshire Park Upgrades $ 1,725,820 $ 22,044 $ 1,747,864 $ 13,135 $ 1,734,729 $ 1,747,864 $ PR2102 Senior Center Canopy CDBG-CV $ - $ 394,544 $ 394,544 $ 7,350 $ 387,194 $ 394,544 $ FB9906 FB-EDC CIP $ $ - $ - $ - $ - $ - $ 118,212 FB9908 FB-Parks at Texas Star CIP $ $ $ $ $ $ $ 44,296 FB9909 FB-General CIP $ $ $ $ $ $ $ 276,129 FB9913 FB-Car Rental CIP $ $ $ $ $ $ $ 22,573 FB9916 FB-TSGC CIP $ $ $ $ $ $ $ 13,661 Sub -Total Other Projects $ 40,365,141 $ 2,928,309 $ 43,293,450 $ 30,879,388 $ 12,414,062 $ 46,258,450 $ 2,490,129 TOTAL FUNDED PROJECTS $ 81,361,670 $ 11,771,256 $ 93,132,926 $ 56,575,822 $ 36,557,104 $ 97,639,232 $ 602,887 CITY OF EULESS CAPITAL IMPROVEMENT PROGRAM AMENDMENTS -- FUNDED PROJECTS PROJECT# PROJECT DESCRIPTION DATE AMENDMENTS 8s ACTIONS AC1901 Texas Star Sports Complex Phase VI 05/31/2021 To increase funding for earned interest of $2,508. CM0304 Entry Monument 10/01/2020 To provide additional funding per FY2021 Approved CIP Plan - $10,000 from Car Rental CIP Fund Balance. CM0804 Redevelopment 10/01/2020 To provide additional funding per FY2021 Approved CIP Plan - $750,000 from Car Rental Fund. CM0804 Redevelopment 05/31/2021 To increase funding for earned interest of $1,542 and sale of property of $100,000. CM0804 Redevelopment 05/31/2021 To provide additional funding of $1,325,000 from General Fund for the purchase of property. DR9903 Miscellaneous Drainage Improvements 10/01/2020 To provide additional funding per FY2021 Approved CIP Plan - $100,000 from Drainage Operating Fund. DV9901 EDC Incentive Funds 10/01/2020 To provide additional funding per FY2021 Approved CIP Plan - $25,000 from EDC Operating Fund. FM1708 Library Remodel 05/31/2021 To close project. FM2006 Fire Station #1 05/31/2021 To increase funding for earned interest of $22,671. GC1801 TSGC Miscellaneous Improvements 10/01/2020 To provide additional funding per FY2021 Approved CIP Plan - $50,000 from Car Rental Fund. PR0720 Miscellaneous Park Improvements 10/01/2020 To provide additional funding per FY2021 Approved CIP Plan - $200,000 from EDC Operating Fund. PRO804 Park Irrigation 10/01/2020 To provide additional funding per FY2021 Approved CIP Plan - $25,000 from EDC Operating Fund. PR1917 Carr Park Improvements 05/31/2021 To increase funding for earned interest of $113. PR1917 Carr Park Improvements 05/31/2021 To close project and transfer excess funding of $22,044 to PR2011-Wilshire Park Upgrades. PR2011 Wilshire Park Upgrades 05/31/2021 To increase budget for transfer of $22,044 from PR1917-Carr Park Improvements. PR2102 Senior Center Canopy CDBG-CV 05/31/2021 To provide funding of $11,767 from General CIP Fund Balance and $382,777 from Community Development Block Grant -CV. PS1203 Misc. Street Repairs 05/31/2021 To increase funding for traffic signal design (Cheek-Spargur @ Heritage) reimbursement of $1,650. PS1802 FY2018 Street Reconstruction -Fuller Wiser Road/Bear 05/31/2021 To close project. Creek Parkway PS1901 FY2019 Street Improvements 05/31/2021 To close project. PS1902 FY2019 Street Reconstruction- 10/01/2020 To provide additional funding per FY2021 Approved CIP Plan - $5,500,000 from Pipeline/Highland/Harwood/Mills 2021 Certificates of Obligation. PS1902 FY2019 Street Reconstruction- 05/31/2021 To increase funding for earned interest of $22,761. Pipeline/Highland/Harwood/Mills PS2001 FY2020 Street Improvements 05/31/2021 To close project. PS2002 Glade Road Reconstruction -East of Highway 360 05/31/2021 To close project and transfer excess funding of $48,357 to Street CIP Fund Balance. PS2003 Traffic Signal-Cheek-Sparger Road at Heritage Avenue 05/31/2021 Reduce budget by $55,200 to match actual reimbursements received from other entities. PS2003 Traffic Signal-Cheek-Sparger Road at Heritage Avenue 05/31/2021 To close project and transfer excess funding of $16,464 to Street CIP Fund Balance. PS2101 FY2021 Street Improvements 10/01/2020 To provide funding per FY2021 Approved CIP Plan - $1,000,000 from General Fund. WT0001 Misc. Water Rehab 10/01/2020 To provide additional funding per FY2021 Approved CIP Plan - $100,000 from W/WW CIP Fund Balance. WT0101 Water Tank Debt Payment -Impact 05/31/2021 To close project. WT0803 Meters/Transponders/Leak Detection 10/01/2020 To provide additional funding per FY2021 Approved CIP Plan - $158,000 from W/WW Operating Fund. WT1403 Reclaimed Water Line Extension Debt Payment -Impact 10/01/2020 To provide additional funding per FY2021 Approved CIP Plan - $120,844 from Water Impact Fee Fund Balance. WT1802 Well Replacement Construction-Fuller/Far North 05/31/2021 To increase funding for earned interest of $2,040. WT2101 Line Replacement - Dickey Drive 10/01/2020 To provide funding per FY2021 Approved CIP Plan - $476,000 from W/WW Operating Fund. WW0002 Misc. Wastewater Rehab 10/01/2020 To provide additional funding per FY2021 Approved CIP Plan - $100,000 from W/WW CIP Fund Balance. WW0605 TRA Wastewater Payments -Impact 10/01/2020 To provide additional funding per FY2021 Approved CIP Plan - $100,000 from WW Impact Fee Fund Balance. WW2001 FY2020 45th CDBG LR: Midway Park 2nd Addition 05/31/2021 To close project. Any unused CDBG funds will be allocated to future CDBG Phase I projects. CITY OF EULESS CAPITAL IMPROVEMENT PROGRAM AMENDMENTS -- FUNDED PROJECTS PROJECT# PROJECT DESCRIPTION DATE AMENDMENTS 8s ACTIONS WW2101 Line Replacement - El Camino Real 10/01/2020 To provide funding per FY2021 Approved CIP Plan - $478,000 from W/WW Operating Fund and from $84,000 W/WW CIP Fund Balance. WW2102 FY2021 46th CDBG LR: Del Paso Street Phase I & II 10/01/2020 To provide funding per FY2021 Approved CIP Plan - $481,029 from Community Development Block Grant (CDBG). WW2102 FY2021 46th CDBG LR: Del Paso Street Phase I & 11 05/31/2021 Reduce budget by $2,377 to match actual CDBG available funds. WW2103 Line Replacement - SH10 @ Main Street 10/01/2020 To provide funding per FY2021 Approved CIP Plan - $121,000 from W/WW Operating Fund. CAPITAL IMPROVEMENTS PROGRAM FUNDED PROJECTS SUMMARY Project Number Project Description Budget as of 5/31/20 Appropriation/ Amendment Budget as of 5/31/21 Expended as of 5/31/21 Remaining Funds Revised Project Cost Estimates Unfunded/ (Excess Funding) DRAINAGE PROJECTS DR9903 Misc. Drainage Improvements $ 1,247,011 $ 100,000 $ 1,347,011 $ 875,472 $ 471,539 $ 1,397,011 $ 50,000 DR1101 Flooding Mitigation $ 500,000 $ - $ 500,000 $ 18,334 $ 481,666 $ 500,000 $ - DR1201 Misc. Creek Maintenance(min bal $100,000) $ 270,000 $ $ 270,000 $ 116,316 $ 153,684 $ 270,000 $ FB9902 Fund Balance - Drainage CIP $ - $ $ - $ - $ $ $ (81,907) Sub -Total Drainage Projects $ 2,017,011 $ 100,000 $ 2,117,011 $ 1,010,122 $ 1,106,889 $ 2,167,011 $ (31,907) City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: July 23,1999 Submitted By: RON YOUNG Date Completed: Project Title: MISCELLANEOUS DRAINAGE IMPROVEMENTS Project Type: DRAINAGE Sub -Type: IMPROVEMENTS Project Code: DR9903 Priority: A COUNCIL AUTHORIZATION: May 27, 2014: Awarded Bid No. 007-14 for a construction contract to Knight Erosion Control, Inc. for Drainage Channel Improvements along Hurricane Creek and authorized the City Manager to enter into a contract with Knight Erosion Control, Inc. The estimated expenditure is $135,487.82. June 23, 2015: Ratified City Manager action to proceed with emergency repairs to City property located along Hurricane Creek. The estimated expenditure is $74,602. February 26, 2019: Authorized the City Manager to execute a construction contract with Knight Erosion Control, Inc. for channel improvements at the Texas Star Golf Course. The estimated expenditure is $121,440. January 12, 2021: Authorized the City Manager to enter into a contract with Knight Erosion Control Retaining Walls and Construction, to proceed with emergency repairs related to the City's Sanitary Sewer Collection System, finding that the procurement is necessary due to unforeseen damage to an eight inch aerial sanitary sewer crossing located along Hurricane Creek near 350 Westpark Way, and finding that the repair is necessary to preserve the public health and protect the safety of the City's residents. The estimated expenditure is $121,000. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: The project provides funding for various drainage projects or emergency repairs identified throughout the year. Often correction of these problems requires design services and other improvements such as bank stabilization. As major projects are identified, they will be tracked separately and assigned a different project number. PROJECT SCHEDULE: JUSTIFICATION: Failure to correct these problems often causes damage to existing infrastructure. PROJECT TITLE: MISCELLANEOUS DRAINAGE IMPROVEMENTS PROJECT CODE: DR9903 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Improvements $1,397,011 Personnel: Full Time Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Total Estimated Capital Cost $1,397,011 Maintenance Costs Funding Source: Transfer from: Drainage Operating Fund $1,079,609 Drainage CIP Fund Balance $183,224 $0 FEMA Reimbursement $84,178 Subtotal: $0 Additional Funding Needed: Annual expense $177,405 Transfer from: Drainage Operating Fund $50,000 Total Estimated Annual Cost $177,405 Total Funding $1,397,011 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Engineering $16,000 $16,000 $0 100% Fence $559 $559 $0 100% Storm Drain $1,380,257 $858,718 $521,539 62% Meters & Setting $195 $195 $0 100% TOTAL PROJECT $1,397,011 $875,472 $521,539 63% City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: June 30,2010 Submitted By: RON YOUNG Date Completed: Project Title: FLOODING MITIGATION Project Type: DRAINAGE Sub -Type: IMPROVEMENTS Project Code: DR1101 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: This project consists of identifying chronic flooding locations within the City of Euless and determining the cost/benefit of property acquisition and protection compared to extensive drainage relief projects. Property acquisition will be recommended after consideration of flooding history, appraisals, and feasible alternative drainage solutions have been evaluated. It is recommended that this be established as an ongoing project. PROJECT SCHEDULE: JUSTIFICATION: Properties throughout the City of Euless situated adjacent to creeks have experienced drainage problems for several years. The cost for implementing drainage improvement projects to mitigate flooding at isolated locations may be much greater than the cost of property acquisition. Chronic flooding lowers the property values and this program will offer a means of relief for affected property owners. PROJECT TITLE: FLOODING MITIGATION PROJECT CODE: DR1101 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Flooding Mitigation $500,000 Personnel: Full Time Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Total Estimated Capital Cost $500,000 Maintenance Costs Funding Source: Transfer from: Drainage CIP Fund Balance $350,000 Drainage Operating Fund $150,000 $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Funding $500,000 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED Storm Sewer $500,000 $18,334 $481,666 4% TOTAL PROJECT $500,000 $18,334 $481,666 4% City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: March 22,2011 Submitted By: RON YOUNG Date Completed: Project Title: MISCELLANEOUS CREEK MAINTENANCE Project Type: DRAINAGE Sub -Type: CREEK MAINTENANCE Project Code: DR1201 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The City of Euless completed drainage master plan studies for the major creeks that traverse the City. They include Little Bear Creek, Hurricane Creek, Boyd Branch and Blessing Branch. PROJECT DESCRIPTION: The project provides for maintenance in the creeks described above including removal of fallen trees that impede the flow of creek water in the natural creek channels, clearing brush and debris at major bridge crossings, and preventative maintenance. This project does not address items that are deemed cosmetic enhancements. PROJECT SCHEDULE: JUSTIFICATION: Natural creek erosion undermines the root systems of trees adjacent to creek banks which results in trees falling into or across creek channels. These fallen trees together with accumulated brush and debris can impede the flow of storm water in the natural creek channels resulting in a rise in the normal water surface elevation. Fallen trees that are conveyed down stream in the natural creek channels may cause damage to the substructure of bridges spanning the creek channels. 10 PROJECT TITLE: MISCELLANEOUS CREEK MAINTENANCE PROJECT CODE: DR1201 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Improvements Personnel: Full Time (Minimum balance $100,000) Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Total Estimated Capital Cost Maintenance Costs Funding Source: Transfer from: Drainage CIP Fund Balance $105,000 Drainage Operating Fund $165,000 $0 Subtotal: $0 Annual expense $0 Total Estimated Annual Cost $0 Total Funding $270,000 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED Storm Sewers $270,000 $116,316 $153,684 43% TOTAL PROJECT $270,000 $116,316 $153,684 43% 11 H E C I T Y O EULESS 12 CAPITAL IMPROVEMENTS PROGRAM FUNDED PROJECTS SUMMARY Project Number Project Description Budget as of 5/31/20 Appropriation/ Amendment Budget as of 5/31/21 Expended as of 5/31/21 Remaining Funds Revised Project Cost Estimates Unfunded/ (Excess Funding) STREET PROJECTS PS1203 IMisc. Street Repairs min bal $150,000 $ 926,500 $ 1,650 $ 928,150 $ 837,746 $ 90,404 $ 993,150 $ 65,000 PS1601 East Harwood Road Extension $ 100,000 $ $ 100,000 $ $ 100,000 $ 100,000 $ PS1902 FY2019 Street Reconstruction - Pipeline/Highland/Harwood/Mills $ 12,704,181 $ 5,522,761 $ 18,226,942 $ 2,148,095 $ 16,078,847 $ 18,226,942 $ PS1903 Misc. Screening Wall Repair annual transfer $25,000 $ 50,000 $ $ 50,000 $ 1,293 $ 48,707 $ 75,000 $ 25,000 PS2101 FY2021 Street Improvements $ $ 1,000,000 $ 1,000,000 $ 362,731 $ 637,269 $ 1,000,000 $ FB9907 lFund Balance - Street CIP I $ $ $ $ $ $ $ 187,883 Total Street Projects $ 13,780,681 $ 6,524,411 $ 20,305,092 1 $ 3,349,865 1 $ 16,955,227 1 $ 20,395,092 1 $ 97,883 13 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: March 27,2014 Submitted By: HAL CRANOR Date Completed: Project Title: MISCELLANEOUS STREET REPAIRS Project Type: STREET Sub -Type: IMPROVEMENTS Project Code: PS1203 Priority: A COUNCIL AUTHORIZATION: April 24, 2012: Authorized the City Manager to enter into a contract with Estrada Concrete Co. LLC for concrete road repairs at various locations on North Main Street, Fuller -Wiser Road, and Bear Creek Parkway in the amount of $93,390. March 11, 2014: Authorized the City Manager to negotiate and execute a contract for a citywide pavement management analysis and asset management inventory with Infrastructure Management Services (IMS). The estimated expenditure is $82,155. February 26, 2019: Authorized the City Manager to execute an Interlocal Agreement between the City of Euless, the City of Bedford, the City of Colleyville, and Tarrant County, Texas for the design and construction of a traffic signal at the intersection of Heritage Avenue and Cheek-Sparger Road. Design costs were paid from this project. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The Master Thoroughfare Plan identifies the various street types within the City of Euless. These street types include residential streets through regional arterial streets. PROJECT DESCRIPTION: This project includes the removal and replacement of deteriorated sections of pavement along identified roadways. PROJECT SCHEDULE: JUSTIFICATION: Continuing repair of the existing street pavement will maintain safe driving conditions and will extend the overall life of the City streets. 14 PROJECT TITLE: MISCELLANEOUS STREET REPAIRS PROJECT CODE: PS1203 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Engineering/Construction Personnel: Full Time (Minimum balance $150,000) Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Total Estimated Capital Cost Maintenance Costs Funding Source: Transfer from: Street CIP Fund Balance $446,125 Car Rental & General Fund $300,000 $0 2018 Certificates of Obligation $150,000 Subtotal: $0 Reimbursement -Other Entities $32,025 Annual expense $6,570 Additional Funding Needed: Transfer from: Street CIP FB $65,000 Total Estimated Annual Cost $6,570 Total Funding $993,150 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Other Professional Services $83,156 $82,331 $825 99% Engineering $47,150 $45,500 $1,650 97% Construction $862,844 $709,915 $152,929 82% TOTAL PROJECT $993,150 $837,746 $155,404 84% 15 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: June 20,2014 Submitted By: HAL CRANOR Date Completed: Project Title: EAST HARWOOD ROAD EXTENSION Project Type: STREET Sub -Type: CONSTRUCTION Project Code: PS1601 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: The Texas Department of Transportation and DFW Airport are combining efforts to extend East Harwood Road through the airport to Rental Car Drive to provide additional access to airport properties. Euless has committed to share in the cost of the extension in an amount not to exceed $100,000. PROJECT SCHEDULE: Anticipate Design Complete: May 2022 Anticipate Begin Construction: September 2022 JUSTIFICATION: Participation in the project will provide Euless residents with an additional route to and through the airport properties. 16 PROJECT TITLE: EAST HARWOOD ROAD EXTENSION PROJECT CODE: PS1601 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Construction $100,000 Personnel: Full Time Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Total Estimated Capital Cost $100,000 Maintenance Costs Funding Source: Transfer from: Car Rental Fund $100,000 $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Funding $100,000 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED Construction $100,000 $0 $100,000 0% TOTAL PROJECT $100,000 $0 $100,000 0% 17 H E C I T Y O EULESS 18 EAST HARWOOD ROAD EXTENSION W 0 s ELD D Q� 14 m Y d J Q Z O Q z w w z HA W O RD NTAIN LAUREL D D A� �'O o �o�FTR Lu Q 3 M W z W U � � o J m W U LOT HILL D z N 0 700 1,400 2,800 Feet T H E C I T Y ❑ f EULESSLegend ege d - Road Extension 19 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: May 25, 2018 Submitted By: HAL CRANOR Date Completed: Project Title: FY2019 ST RECON-PIPELINE/HIGHLAN D/HARWOOD/MILLS Project Type: STREET Sub -Type: IMPROVEMENTS Project CODE: PS1902 Priority: A COUNCIL AUTHORIZATION: December 11, 2018: Approved Resolution No. 18-1539 authorizing the City Secretary to publish a notice declaring intention to issue certificates of obligation. January 22, 2019: Approved the first and final reading of Ordinance No. 2212, authorizing issuance of "City of Euless, Texas, Tax and Waterworks and Sewer System (Limited Pledge) Revenue Certificates of Obligation, Series 2019". December 17, 2019: Authorized the City Manager to negotiate and execute an Engineering Design Contract with Halff Associates, Inc. for the design of the FY2019 Street Reconstruction Project. The estimated expenditure is $1,553,600. January 12, 2021: Approved Resolution No. 21-1597 authorizing the City Secretary to publish a notice declaring intention to issue certificates of obligation. January 12, 2021: Awarded Bid No. 001-21 for the FY2019 Street Reconstruction Phase I in the amount of $10,078,330.84, authorized an owner controlled contingency not to exceed 5%, and authorized the City Manager to enter into a construction contract with McMahon Contracting, LP. March 9, 2021: Approved first and final reading of Ordinance No. 2270 authorizing the issuance of "City of Euless, Texas, Tax and Waterworks and Sewer System (Limited Pledge) Revenue Certificates of Obligation, Series 2021 ". RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: The project scope includes the removal and replacement of asphalt roadway with concrete pavement at the following locations: West Pipeline Road between Arwine Court and Raider Drive, South Pipeline Road between Royal Parkway and Highland Drive; Highland Drive; Harwood Road between Industrial Boulevard and Main Street, and the extension of Mills Drive from S.H. 10 to Carr Park. Each reconstructed street will maintain the same width and lane configuration with the exception of Highland Drive, which will become a standard 31 foot wide street from back of curb to back of curb; and South Pipeline Road, which will become a standard 31 foot wide street. The Highland Drive project will include new sidewalk, water, sewer, and storm drain utilities; and the South Pipeline Road project will include new sidewalk and a rehabilitated 16" waterline. Mills Drive will be a new full pavement section, including sidewalk, storm drain and waterline. PROJECT SCHEDULE: Began Design: September 2019 Design Complete: November 2020 Began Construction: March 2021 Anticipate Construction Complete: November 2022 JUSTIFICATION: The existing asphalt pavement of these streets is deteriorating. The new concrete streets will increase safety, reduce maintenance costs, provide an improved riding surface, and will enhance the appearance of the streets. 20 PROJECT TITLE: FY2019 ST RECON-PIPELINE/HIGHLAND/HARWOOD/MILLS PROJECT CODE: PS1902 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Engineering $1,620,497 Direct Operating Cost Paving $12,343,391 Personnel: Full Time Drainage $1,070,900 Part Time Water/Wastewater Rehab $1,734,577 Total Salary $0 Contingency $1,457,577 Purchase of Services Materials & Supplies Utilities 2019 CO's Average Debt Service $860,000 2021 CO's Average Debt Service $333,000 Subtotal: $1,193,000 Total Estimated Capital Cost $18,226,942 FUNDING SOURCE: Maintenance Costs 2019 Certificates of Obligation $12,423,813 2021 Certificates of Obligation $5,500,000 Interest Earnings $303,129 $0 Subtotal: $0 Total Estimated Annual Cost $1,193,000 Total Funding $18,226,942 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Engineering $1,620,497 $1,418,715 $201,782 88% Construction $15,148,868 $729,380 $14,419,488 5% Contingency $1,457,577 $0 $1,457,577 0% TOTAL PROJECT $18,226,942 $2,148,095 $16,078,847 12% 21 H E C I T Y O EULESS 22 FY 2019 STREET RECONSTRUCTION A 0 1,500 3,000 6,000 Feet I'c MID- S BLS T H E C I T Y ❑ F EULESS Legend � Street Reconstruction 23 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: April 26,2018 Submitted By: HAL CRANOR Date Completed: Project Title: MISCELLANEOUS SCREENING WALL REPAIR Project Type: STREET Sub -Type: IMPROVEMENTS Project Code: PS1903 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: The project consists of maintenance and repair of publicly owned screening walls throughout the City. PROJECT SCHEDULE: JUSTIFICATION: Screening walls that were constructed at locations including, but not limited to, Harwood Road, West Pipeline Road, Gateway Boulevard, Main Street etc. are in need of periodic maintenance and repair. 24 PROJECT TITLE: MISCELLANEOUS SCREENING WALL REPAIR PROJECT CODE: PS1903 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Construction $75,000 Personnel: Full Time Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Total Estimated Capital Cost $75,000 Maintenance Costs Funding Source: Transfer from: General Fund $25,000 Street CIP Fund Balance $25,000 $0 Subtotal: $0 Additional Funding Needed: Annual expense $0 Transfer from: Street CIP Fund Balance $25,000 Total Estimated Annual Cost $0 Total Funding $75,000 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED Construction $75,000 $1,293 $73,707 2% TOTAL PROJECT $75,000 $1,293 $73,707 2% 25 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: May 31,2016 Submitted By: HAL CRANOR Date Completed: Project Title: FY2021 STREET IMPROVEMENTS Project Type: STREET Sub -Type: IMPROVEMENTS Project Code: PS2101 Priority: A COUNCIL AUTHORIZATION: April 27, 2021: Authorized the City Manager to execute an Interlocal Agreement between the City of Euless and Tarrant County for asphalt overlay improvements to Vine Street, Martha Street, Sunset Drive, Whitener Road, and Simmons Drive. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by their pavement condition index. PROJECT SCHEDULE: Began Construction: October 2020 Anticipate Construction Complete: October 2021 JUSTIFICATION: The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, extend the life of the roadway, and enhance the appearance of the streets. 26 PROJECT TITLE: FY2021 STREET IMPROVEMENTS PROJECT CODE: PS2101 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Construction $1,000,000 Personnel: Full Time Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Total Estimated Capital Cost $1,000,000 Maintenance Costs Funding Source: Transfer from: General Fund $1,000,000 $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Funding $1,000,000 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED Construction $1,000,000 $362,731 $637,269 36% TOTAL PROJECT $1,000,000 $362,731 $637,269 36% 27 H E C I T Y O EULESS 28 CAPITAL IMPROVEMENTS PROGRAM FUNDED PROJECTS SUMMARY Project Number Project Description Budget as of 5/31/20 Appropriation/ Amendment Budget as of 5/31/21 Expended as of 5/31/21 Remaining Funds Revised Project Cost Estimates Unfunded/ (Excess Funding) WASTEWATER PROJECTS WW0002 IMisc. Wastewater Rehab min bal $100,000 $ 781,086 $ 100,000 $ 881,086 $ 715,826 $ 165,260 $ 881,086 $ WW0605 TRA Wastewater Payments - Impact $ 1,180,000 $ 100,000 $ 1,280,000 $ 1,180,000 $ 100,000 $ 1,380,000 $ 100,000 W W2002 Line Replacement - Midway Park 3rd Addition Phase I $ 446,600 $ $ 446,600 $ 272,248 $ 174,352 $ 446,600 $ WW2003 Line Replacement - North Main Street $ 189,000 $ $ 189,000 $ 18,696 $ 170,304 $ 189,000 $ WW2101 Line Replacement - El Camino Real $ $ 562,000 $ 562,000 $ 368,345 $ 193,655 $ 562,000 $ WW2102 FY2021 46th CDBG LR: Del Paso Street Phase I & II $ $ 478,652 $ 478,652 $ 46,049 $ 432,603 $ 478,652 $ WW2103 Line Replacement - SH10 Main Street $ $ 121,000 $ 121,000 $ 47,023 $ 73,977 $ 121,000 $ FB9911 FB - Wastewater Impact Restricted $ $ $ $ $ $ $ 732,503 Total Wastewater Projects $ 2,596,686 $ 1,361,652 $ 3,958,338 $ 2,648,187 $ 1,310,151 $ 4,058,338 $ 632,503 29 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: July 26,1999 Submitted By: RON YOUNG Date Completed: Project Title: MISCELLANEOUS WASTEWATER REHABILITATION Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT Project Code: WW0002 Priority: A COUNCIL AUTHORIZATION: March 8, 2005: Awarded contract to Hall -Albert Construction Company for the replacement of various wastewater lines in the amount of $977,857.50. (This award was only partially for the WW0002 project.) March 28, 2006: Authorized the City Manager to proceed with emergency repair by GRA-TEX Utilities to the aerial wastewater main crossing Hurricane Creek at a cost of $55,000. November 10, 2015: Awarded Bid No. 008-15 for a construction contract to William J. Schultz, Inc. dba Circle C Construction for the replacement of sanitary sewer mains in portions of the Westwood Village Addition and the Green Hills Park Addition and authorized the City Manager to enter into a contract including add alternate #1 if required. The estimated expenditure is $577,357 and will be paid from WW1501, WW1502, and WW0002. March 10, 2020: Authorized the City Manager to negotiate and execute an Engineering Services Contract with Wier & Associates, Inc. for the design of the El Camino Real sanitary sewer rehabilitation project. The estimated expenditure is $55,000. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: This project is for funding of small wastewater main projects identified throughout the fiscal year. Larger projects will be determined on an "as needed" basis and presented for funding under a new project number. PROJECT SCHEDULE: JUSTIFICATION: Most of these lines are clay tile and are seriously deteriorated. 30 PROJECT TITLE: MISCELLANEOUS WASTEWATER REHABILITATION PROJECT CODE: WW0002 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Wastewater Mains Personnel: Full Time (Minimum balance $100,000) Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Total Estimated Capital Cost Maintenance Costs Funding Source: Transfer from: W/WW Operating Fund $240,000 WW9903 $37,013 $0 W/WW CIP Fund Balance $604,073 Subtotal: $0 Annual expense $44,523 Total Estimated Annual Cost $44,523 Total Funding $881,086 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Engineering $72,939 $62,705 $10,234 86% Contingency $30,580 $30,580 $0 100% Wastewater Mains $777,567 $622,541 $155,026 80% TOTAL PROJECT $881,086 $715,826 $165,260 81% 31 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: March 03,2006 Submitted By: RON YOUNG Date Completed: Project Title: TRINITY RIVER AUTHORITY WASTEWATER PAYMENT Project Type: WASTEWATER Sub -Type: IMPACT FEE Project Code: WW0605 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Based on a review by Birkhoff, Hendricks, and Conway of the water and wastewater impact fees, it was determined that a substantial portion of the wastewater impact fee is attributed to Trinity River Authority ("TRA") capital projects. Therefore, these fees should be used to pay a portion of the annual TRA expense, as these funds are directly attributed to the expansion of TRA. PROJECT SCHEDULE: JUSTIFICATION: The expansion at TRA provides additional capacity and it was determined through the wastewater impact fee study that these funds could be used to pay a portion of TRA wastewater payments. 32 PROJECT TITLE: TRINITY RIVER AUTHORITY WASTEWATER PAYMENT PROJECT CODE: WW0605 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost TRA Wastewater Payments $1,380,000 Personnel: Full Time Part Time $0 Total Salary $0 Purchase of Services ($100,000) Materials & Supplies Utilities Subtotal: ($100,000) Total Estimated Capital Cost $1,380,000 Maintenance Costs Funding Source: Transfer from: WW Impact Fee Fund Balance $1,280,000 $0 Subtotal: $0 Additional Funding Needed: Transfer from: WW Impact Fee Fund Balance $100,000 Total Estimated Annual Cost ($100,000) Total Funding $1,380,000 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED Wastewater -TRA Service $1,380,000 $1,180,000 $200,000 86% TOTAL PROJECT $1,380,000 $1,180,000 $200,000 86% 33 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: April 04,2019 Submitted By: HAL CRANOR Date Completed: Project Title: LINE REPLACEMENT -MIDWAY PARK 3RD ADDITION PHASE I Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT Project Code: WW2002 Priority: A COUNCIL AUTHORIZATION: December 17, 2019: Authorized the City Manager to execute an Engineering Design Contract with Elliott & Hughes, Inc. for the design of the FY2020 Sanitary Sewer Rehabilitation Project. October 27, 2020: Awarded Bid No. 015-20 for a construction contract to Excel 4 Construction for the replacement of sanitary sewer mains in Midway Park 3rd Addition Phase I and authorized the City Manager to enter into a contract with Excel 4 Construction, LLC. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. PROJECT DESCRIPTION: The project consists of the replacement of the following wastewater mains: 1. Between Crane Drive and Donley Drive from Harwood Road to Aransas Drive and 2. Between Ector Drive and Fayette Drive from Lamar Drive to 160 feet east of Ector Drive. PROJECT SCHEDULE: Began Construction: January 2021 Anticipate Construction Complete: June 2021 JUSTIFICATION: Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 34 PROJECT TITLE: LINE REPLACEMENT -MIDWAY PARK 3RD ADDITION PHASE I PROJECT CODE: WW2002 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Engineering $58,500 Personnel: Full Time Construction $388,100 Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Total Estimated Capital Cost $446,600 Maintenance Costs Funding Source: Transfer from: W/WW Operating Fund $446,600 $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Funding $446,600 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED Engineering $58,500 $43,229 $15,271 74% Construction $388,100 $229,019 $159,081 59% TOTAL PROJECT $446,600 $272,248 $174,352 61 % 35 H E C I T Y O EULESS 36 MIDWAY PARK 3RD ADDITION PH I GLENN MAPLEWOOD g a m HARWOOD RD (W) CLINIC 0 125 250 500 MIDWAYOR ERE, Garmin, (c) O T H E C I T Y O F EULESS 750 1,000 Feet the GIS user community Legend Wastewater 37 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: April 4, 2019 Submitted By: HAL CRANOR Date Completed: Project Title: LINE REPLACEMENT - NORTH MAIN STREET Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT Project Code: WW2003 Priority: A COUNCIL AUTHORIZATION: December 17, 2019: Authorized the City Manager to execute an Engineering Design Contract with Elliott & Hughes, Inc. for the design of the FY2020 Sanitary Sewer Rehabilitation Project. October 27, 2020: Awarded Bid No. 015-20 for a construction contract to Excel 4 Construction for the replacement of sanitary sewer mains along North Main Street and authorized the City Manager to enter into a contract with Excel 4 Construction, LLC. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using the worst first approach. PROJECT DESCRIPTION: The project consists of the replacement of the wastewater mains between North Main Street and Salem Drive from 200 feet north of Town Creek Drive to SH183. PROJECT SCHEDULE: Began Construction: January 2021 Anticipate Construction Complete: June 2021 JUSTIFICATION: Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 38 PROJECT TITLE: LINE REPLACEMENT - NORTH MAIN STREET PROJECT CODE: WW2003 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Engineering $25,000 Personnel: Full Time Construction $164,000 Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Total Estimated Capital Cost $189,000 Maintenance Costs Funding Source: Transfer from: W/WW Operating Fund $189,000 $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Funding $189,000 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED Engineering $25,000 $18,696 $6,304 75% Construction $164,000 $0 $164,000 0% TOTAL PROJECT $189,000 $18,696 $170,304 10% 39 H E C I T Y O EULESS 40 NORTH MAIN STREET PRIMROSE HILL a a co h TOWN CREEK LU J N Z Q Z FULLER FJ o ?Wool) 0 oc� AIRPORT = 4/P. y AIRPORT AIRPORT FWY NL (W) AIRPORT F WY NL �E) AIRPORT FWY SL (W) AIRPORT FWY SL (E AIRPORT � AIRPORT Esri, HERE, Garmin, (c) Openstrae a con utars-an the GIS user community N T H E C I T Y O IF EULIESS Legend 0 75 150 300 450 600 Wastewater Feet 41 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: April 04,2019 Submitted By: HAL CRANOR Date Completed: Project Title: LINE REPLACEMENT - EL CAMINO REAL Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT Project Code: WW2101 Priority: A COUNCIL AUTHORIZATION: March 10, 2020: Authorized the City Manager to execute an Engineering Design Contract with Wier & Associates, Inc. for the design of the El Camino Real sanitary sewer rehabilitation. The estimated expenditure is $55,000. October 13, 2020: Awarded Bid No. 017-20 for a construction contract to Excel 4 Construction, LLC, for the replacement of sanitary sewer main along El Camino Real between Sotogrande Boulevard and Woodvine Drive, and authorized the City Manager to enter into a contract with Excel 4 Construction, LLC. The estimated expenditure is $317,330. December 8, 2020: Approved a change order to a construction contract with Excel 4 Construction, LLC, for the replacement of sanitary sewer main along El Camino Real between Sotogrande Boulevard and Woodvine Drive, in the amount of $71,550. The proposed change order will replace the existing sewer lateral line, provide new clean -outs, and repair drive approaches all within existing City right-of-way. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. PROJECT DESCRIPTION: The project consists of the replacement of the wastewater mains along El Camino Real between Sotogrande Boulevard and Woodvine Drive. PROJECT SCHEDULE: Began Construction: November 2020 Anticipate Construction Complete: June 2021 JUSTIFICATION: Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 42 PROJECT TITLE: LINE REPLACEMENT - EL CAMINO REAL PROJECT CODE: WW2101 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Construction $511,000 Personnel: Full Time Contingency $51,000 Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Total Estimated Capital Cost $562,000 Maintenance Costs Funding Source: Transfer from: W/WW Operating Fund $478,000 W/WW CIP Fund Balance $84,000 $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Funding $562,000 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Construction $511,000 $368,345 $142,655 72% Contingency $51,000 $0 $51,000 0% TOTAL PROJECT $562,000 $368,345 $193,655 66% 43 H E C I T Y O EULESS 44 EL CAMINO REAL 1202 1203 1204 1205 ,) N 1205 V 1205 C 0 O 3 1206° 1207 N N 1122 Q' yQ 1208 1209 N N 3902 1211 3808 T ��p P Op 3806 v� � 9% 1306 1301 1300r 1308 d91, o d190, 1303 1302 1303 1310 1312 1314 1316 a 901 1302 O 00 AO 1, 1304 LL �= J 1305 1304 1305 1322 1324 C) 1328 M 1307 1306 1307 w 1306 1334 � 1309 1308 1309 1338 1400 1400 1401 1400 1401 1404 a 1402 1405 1403 1402 a, 1403 1410 0 1404 1405 1404 Z 0 1405 1414 1416 1405 1406 1407 1406 O 1407 1428 1501 1500 1501 1408 1409 1430 1500 1504 1503 1502 1503 1500 1501 1510 1505 1504 1505 1502 1503 1514 1516 1518 1507 0 1507 1504 1505 1524 ro CREEI-O o n m ^ 1530 o .- v o 0 3905 L 1600 0 M 3803 1604 1Rai m 0 1107 sOTOGp�� -W N REPLACEMENT OF A MAIN LINE ON THE Cl T X_g r EL CAMINO REAL BETWEEN SOTOGRANDE EULESS LEGEND BLVD AND WOODVINE DR. WASTEWATER PROJECTS 0 140 280 560 840 1.,120 Feet 45 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: March 27,2020 Submitted By: HAL CRANOR Date Completed: Project Title: 46TH CDBG LINE REPLACEMENT -DEL PASO ST PHASE I & II Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT Project Code: WW2102 Priority: A COUNCIL AUTHORIZATION: February 11, 2020: Conducted a Public Hearing for the proposed 46th year CDBG project and approved the recommendation which includes replacing a wastewater line that is approximately 3,080 feet in length. It's located along Del Paso street adjacent to the Bear Creek Apartments and Mission Pointe Apartments, and continues southward along the western side of the Oakwood Terrace West subdivision. April 27, 2021: Approved Resolution No. 21-1605, recommending award of a construction contract for Community Developing Block Grant (CDBG) Project No. B20-UC-48-0001-22-50 to Douglas Dailey Construction, LLC. for the replacement of the sanitary sewer main along Del Paso Street Phase I and II in the amount of $317,865 and authorized a contingency in the amount of $15,893. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. PROJECT DESCRIPTION: The project consists of the replacement of the following wastewater mains: 1. Along Del Paso Street from South Industrial Boulevard to 1300 feet east of South Industrial Boulevard serving the apartments in Puente Del Oeste and 2. Along Del Paso Street from 200 feet south of SH10 to 800 feet south of SH10. (46th year CDBG project) PROJECT SCHEDULE: Begin Construction: June 2021 Anticipate Construction Complete: September 2021 JUSTIFICATION: Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 46 PROJECT TITLE: 46TH CDBG LINE REPLACEMENT -DEL PASO ST PHASE I & II PROJECT CODE: WW2102 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Engineering $63,189 Personnel: Full Time Construction $415,463 Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Total Estimated Capital Cost $478,652 Maintenance Costs Funding Source: CDBG Award $478,652 $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Funding $478,652 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED Engineering $63,189 $46,049 $17,140 73% Construction $415,463 $0 $415,463 0% TOTAL PROJECT $478,652 $46,049 $432,603 10% 47 H E C I T Y O EULESS 48 DEL PASO ST 8 731 801 1055 o — 1020 605 E 917 917 910 900 RNNY 801 802 CREEK DR r—,�e 800 803 .4 W803 802 8515 806 w 1�41 V 805 80� 808 >- ^� apg 80 N 810 L 807 all OB 812 V 809 eta HIGH CCREe�00" 912 rn 26 T. ❑���� �^ N d gq5 1001 1108 a 1903 1110 c 1005 1112 $ o 1007 1114 1004 833 508 833 $31 _ SOq 612 m 608 BAYLESS DR 508 M 510 51" N O N O �? "4ULINE ST 600 1602 0 60q 608 608 JONES ST srn 61Z r60 i02 r� 70g a o0 O r co 708 710 800 802 WHITENER RD Soa 805 r n M M 806 0 0 n m 808 807 810 708 n g r m co FAUN DR 900 7 9 M 902 403 904 708 O NO 0o N O 906 HODGES DR 908 907 910 r r 909 912 co a N e N o ga WEST MILLS DR 702 7113 0 V N O O O O D N REPLACEMENT OF A MAIN LINE ON _? N F c t e __o r_. DEL PASO STAND EXTENDING SOUTH. EULESS LEGEND WASTEWATER PROJECTS 0 155 310 620 930 1,240 Feet 49 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: April 04,2020 Submitted By: HAL CRANOR Date Completed: Project Title: LINE REPLACEMENT - SH10 @ MAIN STREET Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT Project Code: WW2103 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. PROJECT DESCRIPTION: The project consists of the replacement of the wastewater mains along SH10 from Main Street to 680 feet east of Main Street. PROJECT SCHEDULE: Began Construction: May 2021 Anticipate Construction Complete: June 2021 JUSTIFICATION: Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 50 PROJECT TITLE: LINE REPLACEMENT - SH10 @ MAIN STREET PROJECT CODE: WW2103 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Engineering $16,000 Personnel: Full Time Construction $105,000 Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Total Estimated Capital Cost $121,000 Maintenance Costs Funding Source: Transfer from: W/WW Operating Fund $121,000 $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Funding $121,000 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED Engineering $16,000 $0 $16,000 0% Construction $105,000 $47,023 $57,977 45% TOTAL PROJECT $121,000 $47,023 $73,977 39% 51 H E C I T Y O EULESS 52 HWY 10 - E. EULESS BLVD v/ z a z 106 208 204 CD N O N N OM iw 2 N co M 101 CA JE NIG nQ 200 D R n z v N � o C M 0 r Nr v r cq p _ M n p r r O O O N M �y N O N CV N N M M M O N ROSS AVE REVOLUTION LN z — FD 201 200 201 �I N M Lo f'- IM r ir} O O O O p Lo r r 203 202 Q z 203 r p O r O p r r r r r d 205 204 O 205 N J CONSTITUTION ❑R 207 206 0 207 N REPLACEMENT OF A MAIN LINE ON -{-"—` r ° ` E. EULESS BLVD EXTENDING 600 FEET EULESS LEGEND EAST OF MAIN ST. WASTEWATER PROJECTS 0 85 170 340 510 680 Feet 53 H E C I T Y O EULESS 54 CAPITAL IMPROVEMENTS PROGRAM FUNDED PROJECTS SUMMARY Project Number Project Description Budget as of 5/31/20 Appropriation/ Amendment Budget as of 5/31/21 Expended as of 5/31/21 Remaining Funds Revised Project Cost Estimates Unfunded/ (Excess Funding) WATER PROJECTS WT0001 Misc. Water Rehab (min bal $150,000) $ 953,511 $ 100,000 $ 1,053,511 $ 801,391 $ 252,120 $ 1,053,511 $ WT0104 Well Repairs $ 1,688,992 $ $ 1,688,992 $ 1,654,585 $ 34,407 $ 1,713,992 $ 25,000 WT0803 Meters/Transponders/Leak Detection (annual transfer $158,000) $ 2,360,944 $ 158,000 $ 2,518,944 $ 1,315,853 $ 1,203,091 $ 2,676,944 $ 158,000 WT1403 Reclaimed Water Line Extension Debt Payment - Impact $ 838,683 $ 120,844 $ 959,527 $ 919,243 $ 40,284 $ 1,077,833 $ 118,306 WT1603 Misc. Valve Replacement min bal $150,000 $ 515,000 $ $ 515,000 $ 208,741 $ 306,259 $ 515,000 $ WT1604 lReclaimed Water Line Extension Phase III $ 4,650,205 $ $ 4,650,205 $ 4,624,803 $ 25,402 $ 5,650,205 $ 1,000,000 WT1802 Well Replacement - Fuller/Far North $ 11,154,816 $ 2,040 $ 11,156,856 $ 9,159,007 $ 1,997,849 $ 11,156,856 $ WT2001 Line Replacement - Alexander Lane $ 440,000 $ $ 440,000 $ $ 440,000 $ 440,000 $ WT2101 Line Replacement - Dickey Drive $ $ 476,000 $ 476,000 $ 4,637 $ 471,363 $ 476,000 $ FB9910 FB - Water Impact Restricted $ $ $ $ $ $ $ 2,264,972 FB9901 I FB - Water & Wastewater CIP $ $ $ $ $ $ $ 161,283 Total Water Projects $22,602,151 $856,884 $23,459,035 $18,688,260 $4,770,775 $24,760,341 $ 1,124,949 55 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: April 10,2014 Submitted By: HAL CRANOR Date Completed: Project Title: MISCELLANEOUS WATER REHABILITATION Project Type: WATER Sub -Type: MAIN REPLACEMENT Project Code: WT0001 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: This project provides funding for small water main projects identified throughout the fiscal year. Large projects that are identified will be presented for funding under a new project number. PROJECT SCHEDULE: JUSTIFICATION: Some of the City's older water mains have deteriorated and need replacement or repair. 56 PROJECT TITLE: MISCELLANEOUS WATER REHABILITATION PROJECT CODE: WT0001 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Water Mains Personnel: Full Time (Minimum balance $150,000) Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Total Estimated Capital Cost Maintenance Costs Funding Source: Transfers from: W/WW CIP Fund Balance $490,000 W/WW Operating Fund $710,000 $0 Project Transfers ($146,489) Subtotal: $0 Annual expense $5,760 Total Estimated Annual Cost $5,760 Total Funding $1,053,511 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED Contingency $49,231 $33,734 $15,498 69% Water Mains $1,004,280 $767,657 $236,623 76% TOTAL PROJECT $1,053,511 $801,391 $252,120 76% 57 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: March 27,2014 Submitted By: HAL CRANOR Date Completed: Project Title: WELL REPAIRS Project Type: WATER Sub -Type: WELL REPAIR Project Code: WT0104 Priority: A COUNCIL AUTHORIZATION: April 22, 2003: Awarded bid 018-03 for Far North Well pump repair to Layne -Texas for $32,790. February 14, 2006: Awarded bid 011-06 to Millican Well Service, LLC for rehabilitation and installation of the new Centrilift submersible motor and pump for the Far North Well in the amount of $250,035. January 25, 2011: Authorized Millican Well Service, LLC to repair Fuller Well in an amount not to exceed $117,000, budget increase and additional funding of $117,000 required. July 20, 2011: Transferred $95,000 from FB9901 to WT0104 for emergency well repairs. August 9, 2011: Ratified City Manager action to proceed with emergency repairs to the Far North Well site, by Millican Well Service, LLC in an amount not to exceed $95,000. June 26, 2012: Ratified City Manager action to proceed with emergency repairs to the well located at 1400 North Main Street, by Millican Well Service, LLC for an estimated amount of $64,950. May 14, 2013: Authorized well repairs to the well located at 118 W. Fuller Drive (Fuller Well Site) by Millican Well Service, LLC for an estimated amount of $120,000. August 13, 2013: Ratified the City Manager action to proceed with emergency repairs to the City owned and operated water well located at 1400 North Main Street, by Millican Well Service, LLC. The estimated expenditure is $75,178.02. October 27, 2015: Ratified City Manager action to proceed with emergency repairs to the well located at 2591 North Main Street, by Millican Well Service, LLC. The estimated expenditure is $54,128.23. August 16, 2016: Authorized well repairs to the City owned and operated water wells located at 118 W. Fuller Drive (Fuller Well Site) and 2404 N. Main St. (Far North Well Site) by Millican Well Service, LLC, for an estimated amount of $170,426. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: The funding is being utilized to repair well pumps and for other unexpected well repairs. PROJECT SCHEDULE: JUSTIFICATION: Maintaining the City's wells results in the ability to produce water at a substantial reduction in cost. 58 PROJECT TITLE: WELL REPAIRS PROJECT CODE: WT0104 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Well Rehabilitation Personnel: Full Time Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Total Estimated Capital Cost Maintenance Costs Funding Source: Transfer from: WT0001 - Misc Water Rehab $145,720 W/WW CIP Fund Balance $893,272 $0 W/WW Operating Fund $650,000 Subtotal: $0 Additional Funding Needed: Annual expense $19,341 Transfer from: W/WW CIP Fund Balance $25,000 Total Estimated Annual Cost $19,341 Total Funding $1,713,992 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Well Rehabilitation $1,713,992 $1,654,585 $59,407 97% TOTAL PROJECT $1,713,992 $1,654,585 $59,407 97% 59 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: April 10,2014 Submitted By: HAL CRANOR Date Completed: Project Title: METERS/TRANSPONDERS/LEAK DETECTION Project Type: WATER Sub -Type: METERS/TRANSPONDERS Project Code: WT0803 Priority: A COUNCIL AUTHORIZATION: November 13, 2007: Awarded the annual contract for the purchase of water meters and transponders, and authorized the City Manager to enter into an agreement with Atlas Utility Supply Company in the amount of $383,875. Amount for project not to exceed $331,875. November 11, 2008: Awarded the annual contract for the purchase of water meters and transponders, and authorized the City Manager to enter into an agreement with Atlas Utility Supply Company in the amount of $356,875. Amount for project not to exceed $331,875. February 14, 2012: Awarded the annual contract for the purchase of water meters and transponders, and authorized the City Manager to enter into an agreement with Atlas Utility Company in the amount of $200,000. January 14, 2014: Authorized the City Manager to execute an Engineering Services Contract with Alan Plummer and Associates, Inc. for services in assisting the City with the Texas Water Development Board State Revolving Fund loan applications and the United States Bureau of Reclamation WaterSMART grant application. The estimated amount is $78,000 and a portion of this amount is also authorized for project WT1 201 -Reclaimed Water Line Extension. February 10, 2015: Awarded the annual contract for the purchase of water meters and transponders, and authorized the City Manager to enter into an agreement with Atlas Utility Supply Company. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: This project provides funding for the systematic replacement of meters, transponders, and leak detection on an as needed basis as well as the accumulation of funds for future system -wide replacements. PROJECT SCHEDULE: On -going JUSTIFICATION: This project provides funding for the systematic replacement of meters and transponders on a regular schedule at or near end of asset life. .N PROJECT TITLE: METERS/TRANSPONDERS/LEAK DETECTION PROJECT CODE: WT0803 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost (Annual Funding $158,000) Personnel: Full Time Transponders/Meters Part Time $0 FY2008 through FY2021 $2,518,944 Total Salary $0 Transponders/Meters FY2022 $158,000 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Total Estimated Capital Cost $2,676,944 Maintenance Costs Funding Source: Transfer from: W/WW CIP Fund Balance $247,750 W/WW Operating Fund $2,212,000 $0 Proceeds from Sale of Meters $59,194 Subtotal: $0 Additional Funding Needed: Transfer from: W/WW Operating Fund $158,000 Total Estimated Annual Cost $0 Total Funding $2,676,944 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Meters/Transponders $2,514,787 $1,264,253 $1,250,534 50% Debt Issuance Cost $162,157 $51,600 $110,557 32% TOTAL PROJECT $2,676,944 $1,315,853 $1,361,091 49% 61 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: May 31,2013 Submitted By: CHRIS BARKER Date Completed: Project Title: RECLAIMED WATER LINE EXTENSION DEBT PAYMENT Project Type: WATER Sub -Type: IMPACT FEE Project Code: WT1403 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The reclaimed water system extension was included in the impact fee study. PROJECT DESCRIPTION: This project includes the transfer of funds from the water impact fee to pay debt service (W/S System Revenue Bonds, Series 2013) related to the extension of the reclaimed water system. PROJECT SCHEDULE: Last debt payment is scheduled for July 15, 2033. JUSTIFICATION: The project provides a non -potable water source for irrigation which will offset future potable water purchases by the City and will serve to responsibly conserve potable water resources for the City and the region. Z PROJECT TITLE: RECLAIMED WATER LINE EXTENSION DEBT PAYMENT PROJECT CODE: WT1403 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Debt Service FY2014-FY2021 $1,077,833 Personnel: Full Time Debt Service FY2022 Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities Annual debt payment - water impact fee $120,000 $0 Subtotal: $120,000 Total Estimated Capital Cost $1,077,833 Maintenance Costs Funding Source: Transfer from: WT Impact Fee Fund Balance $959,527 $0 Subtotal: $0 Additional Funding Needed: Transfer from: WT Impact Fee Fund Balance $118,306 Total Estimated Annual Cost $120,000 Total Funding $1,077,833 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED Transfer to Debt Service $1,077,833 $919,243 $158,590 85% TOTAL PROJECT $1,077,833 $919,243 $158,590 85% 63 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: March 11,2015 Submitted By: HAL CRANOR Date Completed: Project Title: MISCELLANEOUS VALVE REPLACEMENT Project Type: WATER Sub -Type: VALVE REPLACEMENT Project Code: WT1603 Priority: A COUNCIL AUTHORIZATION: November 22, 2016: Authorized the City Manager to execute a contract for the replacement of a 24-inch water valve, located near the intersection of SH 183 and Sheppard Drive, with Atkins Brothers Equipment Company, Inc. The estimated expenditure is $53,780. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: This project will allow for the systematic replacement of valves on an as needed basis. PROJECT SCHEDULE: JUSTIFICATION: Old and deteriorated water valves prevent water lines from being isolated in the event of a line break. The inability to isolate the smallest segment possible during a line break increases the labor required to isolate the line, as well as the number of residents and fire hydrants that would be affected by a line break. Systematic annual replacement of old deteriorated water valves will increase efficiency, reduce maintenance costs, and ensure maximum fire protection and water service availability. 64 PROJECT TITLE: MISCELLANEOUS VALVE REPLACEMENT PROJECT CODE: WT1603 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Water Valves Personnel: Full Time (Minimum balance $150,000) Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Total Estimated Capital Cost Maintenance Costs Funding Source: Transfer from: W/WW Operating Fund $285,000 W/WW CIP Fund Balance $230,000 $0 Subtotal: $0 Annual expense $2,673 Total Estimated Annual Cost $2,673 Total Funding $515,000 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED Engineering $10,000 $1,305 $8,695 13% Contingency $10,000 $0 $10,000 0% Construction $495,000 $207,436 $287,564 42% TOTAL PROJECT $515,000 $208,741 $306,259 41 % 65 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: June 15, 2015 Submitted By: CHRIS BARKER Date Completed: Project Title: RECLAIMED WATER LINE EXT. PHASE III Project Type: WATER Sub -Type: RECLAIMED WATER SYSTEM Project CODE: WT1604 Priority: A COUNCIL AUTHORIZATION: March 14, 2017: Authorized the City Manager to negotiate and execute an Engineering Services Contract with Alan Plummer Associates, Inc. for design of the reclaimed water system extension project. Funding is to be provided using remaining unused funds from the Reclaimed Water Line Extension Phase II Project (WT1212) provided through the Texas Water Development Board's Clean Water State Revolving Fund Program. August 29, 2017: Approved Resolution No. 17-1513, requesting financial assistance by authorizing an application to be filed with the Texas Water Development Board. January 9, 2018: Approved Resolution No. 18-1523, requesting financial assistance by authorizing an application to be filed with the Texas Water Development Board (TWDB). The TWDB has requested the City issue a new Resolution authorizing an application to be filed with the TWDB seeking financial assistance in an amount not to exceed $3,260,000 which includes the cost of construction and the TWDB issuance costs. March 13, 2018: Approved the first and final reading of Ordinance No. 2185, authorizing the issuance of City of Euless, Texas, Waterworks and Sewer System Revenue Bonds, Series 2018. March 13, 2018: Approved Resolution No. 18-1528, approving and authorizing the execution of a principle forgiveness agreement with the Texas Water Development Board and an escrow agreement related thereto associated with the City of Euless, Texas, Waterworks and Sewer System Revenue Bonds, Series 2018. December 11, 2018: Awarded Bid No. 008-18, for the construction of the Reclaimed Water Line Extension, Phase III to Joe Funk Construction in the amount of $3,914,798.50. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The reclaimed water line extension is a continuation of the City's Reclaimed Water Utility System. The feasibility study completed in FY2012 initially contemplated six phases; however, due to remaining funds from Phase II and estimated construction costs the project has been reduced to three phases with this being the final phase. PROJECT DESCRIPTION: The project will extend the City's Reclaimed Water Utility System from a point along Bear Creek Parkway north of Little Bear Creek to a point just south of Glade Road. This portion of the project will supply approximately 17 MG annually to 11 additional properties. The project scope also includes additional expansion and connectivity of the reclaimed system. PROJECT SCHEDULE: Began Design: May 2017 Design Complete: August 2018 Began Construction: March 2019 Construction Complete (Bear Creek Parkway etc.): December 2020 Additional Expansion & Connectivity: FY2022 JUSTIFICATION: Construction of the project will provide a non -potable water source for irrigation which will offset future potable water purchases by the City and will serve to responsibly conserve potable water resources for the City and the region. PROJECT TITLE: RECLAIMED WATER LINE EXT. PHASE III PROJECT CODE: WT1604 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Engineering $662,235 Direct Operating Cost Construction $4,940,071 Personnel: Full Time Loan Origination Fee $47,899 Part Time Total Salary $0 Purchase of Services Materials & Supplies Utilities 2018 Rev Bond Avg. Debt Service $160,000 Subtotal: $160,000 Total Estimated Capital Cost $5,650,205 FUNDING SOURCE: Maintenance Costs Transfer from WT1212: 2015B Revenue Bond Issue $1,192,103 W/WW CIP Fund Balance $75,093 2018 Revenue Bond Issue $2,785,000 Loan Forgiveness $473,300 $0 Interest Earnings $124,709 Subtotal: $0 Additional Funding Needed: Transfer from: W/WW Operating Fund $1,000,000 Total Estimated Annual Cost $160,000 Total Funding $5,650,205 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Engineering $662,235 $662,232 $3 100% Construction $4,940,071 $3,914,672 $1,025,399 79% Loan Origination Fee $47,899 $47,899 $0 100% TOTAL PROJECT $5,650,205 $4,624,803 $1,025,402 82% 67 H E C I T Y O EULESS RECLAIMED WATER LINE EXTENSION PHASE III N 0 437.5 875 1,750 mmomlllli Feet T H E C I T Y ❑ F EULESS Legend Reclaimed WL Extension City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: April 5, 2017 Submitted By: HAL CRANOR Date Completed: Project Title: WELL REPLACEMENT - FULLER/FAR NORTH Project Type: WATER Sub -Type: WELL Project CODE: WT1802 Priority: A COUNCIL AUTHORIZATION: November 28, 2017: Authorized the City Manager to negotiate and execute an Engineering Design Contract with Alan Plummer Associates, Inc. for the design of two water wells to replace the existing Fuller Well and Far North Well. The scope of work for this portion of the project includes the design of the above ground well facilities including booster pumps, electrical, and facilities required to operate the new wells. November 28, 2017: Authorized the City Manager to execute an Engineering Design Contract with RW Harden and Associates, Inc. for the design of two water wells to replace the existing Fuller Well and Far North Well. The scope of work for this portion of the project includes all below ground and associated work at the well facilities, the casing, screen, well head, and pump equipment. September 25, 2018: Approved Resolution 18-1537, requesting financial assistance by authorizing an application to be filed with the Texas Water Development Board for a Drinking Water State Revolving Fund Loan. March 26, 2019: Approved the first and final reading of Ordinance No. 2216, authorizing the issuance of City of Euless, Texas, Waterworks and Sewer System Revenue Bonds, Series 2019. June 25, 2019: Authorized award of Bid No. 003-19, for a construction contract to Weisinger Incorporated for well construction and plugging of the Far North and Fuller Wells in the amount of $6,426,500, less Change Order No. 1, a deduction of $577,400, for a total net amount of $5,849,100. April 14, 2020: Approved award of Bid No. 002-20 for a construction contract to Felix Construction Company for the construction of the Fuller and Far North Well project in the amount of $2,631,000. May 12, 2020: Authorized the City Manager to negotiate and execute an Engineering Construction Management Agreement with Alan Plummer Associates. The estimated expenditure is $121,875 for basic services and a budget allowance of up to $40,000 for additional services. August 3, 2020: Authorized the City Manager to purchase and contract for the installation of two water well pumps, motors, and associated appurtenances at the Far North and Fuller Wells, in the amount of $542,060, through Weisinger, Incorporated. August 11, 2020: Authorized the City Manager to execute a professional services agreement with Signature Automation, LLC, for Engineering Services at the Far North and Fuller Well sites. The scope of services include: Program Logic Control (PLC) and Human Machine Interface (HMI) programming, submittal review for proposed equipment, SCADA System testing, operations manuals and training. The estimated expenditure is $73,540. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: RW Harden & Associates completed a Preliminary Well Design Study in FY2017 in preparation for the replacement of the Fuller Well, Far North Well, and the eventual replacement of the 1400 North Main Well. PROJECT DESCRIPTION: The project consists of the engineering design and complete replacement of the Fuller and Far North Wells with new 1,800 foot deep wells. PROJECT SCHEDULE: Began Design: January 2018 Design Complete: May 2019 Began Construction: July 2019 Anticipate Construction Complete: August 2021 JUSTIFICATION: RW Harden & Associates completed a Preliminary Well Design Study in FY2017 in preparation for the replacement of the Fuller Well, Far North Well, and the eventual replacement of the 1400 North Main Well. The Fuller and Far North Well are in need of immediate replacement. New wells will enable the City to provide high quality water to citizens while reducing maintenance and operational costs. 70 PROJECT TITLE: WELL REPLACEMENT - FULLER/FAR NORTH PROJECT CODE: WT1802 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Engineering $783,480 Direct Operating Cost Construction $9,962,043 Personnel: Full Time Equipment $50,658 Part Time $0 Loan Origination Fee $198,800 Total Salary $0 Construction Administration $161,875 Purchase of Services Materials & Supplies Utilities Average Debt Service $381,000 Subtotal: $381,000 Total Estimated Capital Cost $11,156,856 FUNDING SOURCE: Maintenance Costs Transfer from: W/WW Operating Fund $723,000 W/WW CIP Fund Balance $60,480 Rate Stabilization $900,000 2019 Revenue Bond Issue $9,275,000 $0 Interest Earnings $147,718 Subtotal: $0 Insurance Proceeds $50,658 Total Estimated Annual Cost $381,000 Total Funding $11,156,856 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Engineering $809,480 $803,859 $5,621 99% Construction $9,936,043 $8,066,807 $1,869,236 81% Equipment $50,658 $0 $50,658 0% Loan Origination Fee $198,800 $195,215 $3,585 98% Construction Administration $161,875 $93,127 $68,748 58% TOTAL PROJECT $11,156,856 $9,159,007 $1,997,849 82% 71 H E C I T Y O EULESS 72 WELL REPLACEMENT DESIGN - FULLER & FAR NORTH N 0 875 1,750 3,500 moomlllll Feet T H E C I T Y ❑ f EULESS Legend Well Replacement 73 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: April 05,2018 Submitted By: HAL CRANOR Date Completed: Project Title: LINE REPLACEMENT - ALEXANDER LANE Project Type: WATER Sub -Type: MAIN REPLACEMENT Project Code: WT2001 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: The project consists of the replacement of existing 6 inch and 8 inch asbestos concrete water lines located along East Alexander Lane from Cullum Drive to Dickey Drive. PROJECT SCHEDULE: Anticipate Begin Construction: August 2021 Anticipate Construction Complete: October 2021 JUSTIFICATION: The line has had nine leaks repaired since 2007 and was installed in 1959. 74 PROJECT TITLE: LINE REPLACEMENT - ALEXANDER LANE PROJECT CODE: WT2001 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Construction $430,000 Personnel: Full Time Contingency $10,000 Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Total Estimated Capital Cost $440,000 Maintenance Costs Funding Source: Transfer from: W/WW Operating Fund $440,000 $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Funding $440,000 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED Construction $430,000 $0 $430,000 0% Contingency $10,000 $0 $10,000 0% TOTAL PROJECT $440,000 $0 $440,000 0% 75 H E C I T Y O EULESS 76 ALEXANDER LANE AIRPORT FWy NL (E) t AIRPoR FlNYSL (E) EULESS BLVD (E) REVOLUTION J rc o REPUBLIC ALDER AIRPORT user community N T H E C I T Y O F EULIESS Legend 0 125 250 500 750 1,000 Water Feet 77 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: April 04,2019 Submitted By: HAL CRANOR Date Completed: Project Title: LINE REPLACEMENT - DICKEY DRIVE Project Type: WATER Sub -Type: MAIN REPLACEMENT Project Code: WT2101 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: The project consists of the replacement of an existing 6 inch asbestos concrete water line located along Dickey Drive between East Alexander Lane and Copher Court. PROJECT SCHEDULE: Anticipate Begin Construction: August 2021 Anticipate Construction Complete: October 2021 JUSTIFICATION: The line has had nine leaks repaired since 2007 and was installed in 1961. 78 PROJECT TITLE: LINE REPLACEMENT - DICKEY DRIVE PROJECT CODE: WT2101 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Engineering $62,000 Personnel: Full Time Construction $414,000 Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Total Estimated Capital Cost $476,000 Maintenance Costs Funding Source: Transfer from: W/WW Operating Fund $476,000 $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Funding $476,000 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED Engineering $62,000 $4,637 $57,363 7% Construction $414,000 $0 $414,000 0% TOTAL PROJECT $476,000 $4,637 $471,363 1% 79 H E C I T Y O EULESS :E DICKEY DR -"vV1-u ov% 113 330 1 In 0) 100 505 205 183 712 I r 185 0° $ _ r p� c� 0 yg 1 p0 0Ln Lam 187 0 m ow E ALEXANDER LN Ao o a 207 200 � M qp N O O O 3 A 209 208 207 wg AD 208 N Aoo o 0 211 210 a w o iO 1° S 209 `F a o 301 300 of 1 w N LN 211 40 IMAM TI �r- p I 303 302 i a o o o n rn u� m 305 304, s$ 361 `b C N 307 306 p o rn 0 01 308 303 9p9 309 30B a 6 co o v a o o W JONNVgRNOIV�N yOp v u' 311 310 313 �!„� rno 9p'1 morn rn o °' a w $ ° 6'11 o 401 400 SLAl3G}� � gp9 c soN 5 401 0\ o oov yp1 sorn 403 402 N sow s i o N 405 404 Z 403 mp wQ, w'rn a a ow rn 'o ❑ z ! cA> wj A w `9 rn 407 406 Q A 405 Dorn rn corn'w ti 03 ' w $ rn oc, sip 5pp so -' r ` ww .0 409 rn s ww J N a s os a 409 408 rn p w 'e3 410 w O 41j 410 411 rn N 0 a� w woi " sow 412 w 413 rn 1.N rn w aN s' N ATKERO wwN 00 w a a � N 406 ,4p4 SD1 500 w' a26 s 501 N w� o rn 502 A a o 0 0 a w � h i 505 504 503 w ow o� pp� 04 W w'rn 504 w ATKERS ON LN 506 505 wn 'rn rnN LN � r CO 506 o o 500 c 10 _ 508 S ATKERSON m� orn w O N 404 � v m 510 rn 507 ao 00 s 508 5p1 505 503 uoi mo 600 a o O �, n 713 m wp 602 COPHER CT 603 KOEN LN N MCCORM�CKCIV 406 vi .0c o o w$ w o ao a 400 a 406 506 c -0 N 605 o a � 313 607 501 503 505 507 509 511 513 607 609 611 N REPLACEMENT OF A 6" ASBESTOS r r- e C L T Y ° F LEGEND CONCRETE LINE ON DICKEY DR EULESS BETWEEN E. ALEXANDER LN AND COPHER CT. � WATER PROJECTS 0 125 250 500 750 1.000 Feet 81 H E C I T Y O EULESS 82 CAPITAL IMPROVEMENTS PROGRAM FUNDED PROJECTS SUMMARY Project Number Project Description Budget as of 5/31/20 Appropriation/ Amendment Budget as of 5131/21 Expended as of 5131121 Remaining Funds Revised Project Cost Estimates Unfunded/ (Excess Funding) OTHER AC1901 Texas Star Sports Complex Phase VI $ 4,529,810 $ 2,508 $ 4,532,318 $ 4,309,184 $ 223,134 $ 4,707,318 $ 175,000 CM0304 Entry Monument Sign Program $ 135,782 $ 10,000 $ 145,782 $ 121,427 $ 24,355 $ 145,782 $ - CM0804 Redevelopment $ 5,250,979 $ 2,176,542 $ 7,427,521 $ 6,059,873 $ 1,367,648 $ 9,927,521 $ 2,500,000 CM1701 Municipal Plaza Improvements Phase II $ 266,733 $ - $ 266,733 $ 216,445 $ 50,288 $ 316,733 $ 50,000 DV9901 EDC Incentive Funds $ 1,425,854 $ 25,000 $ 1,450,854 $ 1,351,148 $ 99,706 $ 1,475,854 $ 25,000 ED1002 EDC Contingency $ 325,000 $ - $ 325,000 $ 68,772 $ 256,228 $ 325,000 $ - ED1601 Midtown Development $ 16,417,980 $ $ 16,417,980 $ 15,348,780 $ 1,069,200 $ 16,417,980 $ - FM1201 ADA/TAS Facility Improvements (min bal $75,000) $ 140,000 $ $ 140,000 $ 93,295 $ 46,705 $ 170,000 $ 30,000 FM2006 Fire Station #1 $ 7,861,413 $ 22,671 $ 7,884,084 $ 1,285,773 $ 6,598,311 $ 7,884,084 $ - GC1801 TSGC Misc. Improvements (min bal $150,000) $ 477,180 $ 50,000 $ 527,180 $ 363,778 $ 163,402 $ 587,180 $ 60,000 GC2003 Texas Star Slope Wall Protection Phase 1 $ 415,337 $ - $ 415,337 $ 286,119 $ 129,218 $ 415,337 $ - PR0720 Misc. Park Improvements (min bal $100,000) $ 1,118,253 $ 200,000 $ 1,318,253 $ 1,140,621 $ 177,632 $ 1,418,253 $ 100,000 PR0804 Park Irrigation $ 275,000 $ 25,000 $ 300,000 $ 213,688 $ 86,312 $ 325,000 $ 25,000 PR2011 Wilshire Park Upgrades $ 1,725,820 $ 22,044 $ 1,747,864 $ 13,135 $ 1,734,729 $ 1,747,864 $ - PR2102 Senior Center Canopy CDBG-CV $ - $ 394,544 $ 394,544 $ 7,350 $ 387,194 $ 394,544 $ FB9906 FB-EDC CIP $ $ - $ - $ - $ - $ - $ (118,212) FB9908 FB-Parks at Texas Star CIP $ $ $ $ $ $ $ (44,296) FB9909 FB-General CIP $ $ $ $ $ $ $ (276,129) FB9913 FB-Car Rental CIP $ $ $ $ $ $ $ (22,573) FB9916 FB-TSGC CIP $ $ $ $ $ $ $ (13,661) Total Other Projects $ 40,365,141 $ 2,928,309 $43,293,450 $30,879,388 $ 12,414,062 $46,258,450 $ 2,490,129 83 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: April 24, 2018 Submitted By: RAY MCDONALD Date Completed: Project Title: TEXAS STAR SPORTS COMPLEX PHASE VII Project Type: PARK/RECREATION Sub -Type: TSSC IMPROVEMENTS Project CODE: AC1901 Priority: A COUNCIL AUTHORIZATION: August 14, 2018: Ratified the Euless Development Corporation (EDC) action taken on August 13, 2018, approving EDC Resolution No. 21-18, declaring a project for improvements at the Parks at Texas Star including Softball Facilities. October 23, 2018: Ratified the Euless Development Corporation action taken on October 23, 2018, authorizing the Euless Development Corporation President to negotiate and execute an Architectural Services Contract with Oxley Williams Tharp Architects for the planning and design of Texas Star Sports Complex Phase VII (Softball World). November 12, 2019: Approved all matters incident and related to the issuance and sale of "Euless Development Corporation Sales Tax Revenue Bonds, Series 2019," including the adoption of Resolution No. 19-1559. March 24, 2020: Authorized the purchase and installation of sports turf at the Parks at Texas Star Phase VII from GeoSurfaces, Inc. through the TIPS Interlocal Purchasing System (TIPS #170205) in the amount of $681,200, as well as the purchase and installation of an LED Retrofit lighting system from GeoSport Lighting Systems, LLC. through the TIPS Interlocal Purchasing System (TIPS #18120601) in the amount of 434,700. April 28, 2020: Awarded Bid No. 007-20 for the purchase and installation of outfield fence and backstop wall padding for the Parks at Texas Star Phase VII to Sports Graphics, Inc. The estimated expenditure is $188,000. June 9, 2020: Awarded Bid No. 009-20 for the Parks at Texas Star Phase VII renovation to Henthorn Commercial Construction, LLC and authorized the City Manager to enter into a contract with Henthorn Commercial Construction, LLC. The total estimated expenditure is $2,228,500. August 24, 2020: Authorized the purchase, delivery, and installation of 292,000 square feet of TifTuf Bermuda sod from Tri- Tex Grass, for the Parks at Texas Star Phase VII though the BuyBoard Cooperative Purchasing Program No. 611-20. The estimated expenditure is $137,240. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The Texas Star Sports Complex Phase VII includes renovating the existing infields with synthetic turf, renovating the existing concession/restroom building, building new offices for staff, and upgrading the existing lighting from metal -halide to LED. With the growing number of participants in youth baseball, renovating the existing infields with synthetic turf will allow staff the opportunity to expand existing leagues as well as programming for additional leagues in adult softball. Synthetic turf infields will also substantially reduce the number of rain outs which results in lost revenue. The addition of this phase will ensure that the Texas Star Sports Complex remains the premier sports facility for amateur athletics for many years to come. PROJECT DESCRIPTION: The planning, design, and construction for Texas Star Sports Complex Phase VII. The project scope includes renovating the existing infields with synthetic turf, renovating the existing facility to meet current ADA standards, renovating the existing restroom/concession building, creating new office space for staff, and upgrading the lighting system to LED. PROJECT SCHEDULE: Began Design: January 2019 Design Complete: May 2020 Began Construction: July 2020 Construction Substantially Complete: April 2021 Office Building: FY2022 JUSTIFICATION: With the completion of Phase VII, the new infields will increase programming opportunities as well as substantially reduce the number of rain outs. 84 PROJECT TITLE: TEXAS STAR SPORTS COMPLEX PHASE VII PROJECT CODE: AC1901 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Planning and Design $150,000 Direct Operating Cost Construction $4,244,478 Personnel: Full Time Contingency $162,840 Part Time $0 Debt Issuance Cost $150,000 Total Salary $0 Purchase of Services Materials & Supplies Utilities Average Debt Service $279,000 Subtotal: $279,000 Total Estimated Capital Cost $4,707,318 FUNDING SOURCE: Maintenance Costs Transfer from: EDC Operating Fund $150,000 2019 EDC Revenue Bonds $4,358,215 Interest Earnings $24,103 $0 Subtotal: $0 Additional Funding Needed: Transfer from: EDC Operating Fund $175,000 Total Estimated Annual Cost $279,000 Total Funding $4,707,318 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Planning and Design $150,000 $144,335 $5,665 96% Construction $4,244,478 $4,003,235 $241,243 94% Contingency $162,840 $33,208 $129,632 20% Debt Issuance Cost $150,000 $128,405 $21,595 86% TOTAL PROJECT $4,707,318 $4,309,184 $398,134 92% 85 City of Euless Capital Project Request Department: CITY MANAGER Date Prepared: July 11,2006 Submitted By: JOE HENNIG Date Completed: Project Title: ENTRY MONUMENT SIGN PROGRAM Project Type: MISCELLANEOUS Sub -Type: IMPROVEMENTS Project Code: CM0304 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Continuation of the original City of Euless Entry Monument Sign Program. PROJECT DESCRIPTION: Continued construction of City of Euless entry monument signs at key visibility points throughout the City extending Euless beautification and branding efforts. PROJECT SCHEDULE: JUSTIFICATION: To enable continuous efforts to identify, beautify, and brand the City of Euless. PROJECT TITLE: ENTRY MONUMENT SIGN PROGRAM PROJECT CODE: CM0304 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Land Betterments $145,782 Personnel: Full Time Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Total Estimated Capital Cost $145,782 Maintenance Costs Funding Source: Transfer from: Car Rental Fund $135,782 Car Rental CIP Fund Balance $10,000 $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Funding $145,782 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED Land Betterments $145,782 $121,427 $24,355 83% TOTAL PROJECT $145,782 $121,427 $24,355 83% 87 City of Euless Capital Project Request Department: CITY MANAGER Date Prepared: July 11, 2006 Submitted By: GARY MCKAMIE Date Completed: Project Title: REDEVELOPMENT Project Type: MISCELLANEOUS Sub -Type: DEVELOPMENT Project CODE: CM0804 Priority: A COUNCIL AUTHORIZATION: FY2008 Property Acquisitions: 1010 Highland Drive, 1010 Cresthaven Drive, and 710 South Main. FY2009 Property Acquisitions: 1007 Cresthaven Drive, 912 Cresthaven Drive, 1005 Cresthaven Drive, and 1002 Highland Drive. FY2013 Property Acquisitions: North Sheppard Drive (10 lots), 908 Cresthaven Drive, and 910 Cresthaven Drive. FY2015 Property Acquisitions: 903 Cresthaven Drive, 1447 West Euless Boulevard, 901 Highland Drive, 904 Highland Drive, and 215 East Ash Lane. November 10, 2015: Authorized the City Manager to execute an agreement to accept contributions from Gardner Capital Texas, LLC and Bloomfield Homes Fund, LP to a Community Revitalization Fund in the amount of $100,000. November 10, 2015: Authorized the Mayor to negotiate and execute conveyance documents for the sale of City owned property located at 203, 204, and 205 Dickey Drive. FY2016 Property Acquisitions: 905 Cresthaven Drive. FY2017 Property Acquisitions: 909 Highland Drive, 911 Highland Drive, 1000 Highland Drive, and 1011 Cresthaven Drive. October 10, 2017: Authorized the sale of City owned property and structure located at 911 Highland Drive. FY2018 Property Acquisitions: 906 Highland Drive, 917 Highland Drive, 1005 Highland Drive, 902 Cresthaven Drive, and a portion of Block 1, Lot 5 in the S.W. Mills Subdivision. FY2019 Property Acquisitions: 913 Cresthaven Dr., 1001 Cresthaven Dr., 908 Highland Dr., 1001 Highland Dr., 1003 Highland Dr., 109 Ross Ave., and property located at SH183 at Main Street, Tract 16 and 17. FY2020 Property Acquisitions: 909 Cresthaven Drive, 910 Highland Drive, and 913 Highland Drive. FY2021 Sale of Property: 906 Cresthaven Drive and Solomon Huitt Survey, No. 705, Tarrant County TX (N Main Street). FY2021 Property Acquisitions: 901 Cresthaven Drive, 907 Cresthaven Drive, 902 Highland Drive, 1009 Highland Drive, 1011 Highland Drive, and 1451 W Euless Boulevard. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project provides funding to allow the City to participate in redevelopment projects and other community improvements or make acquisitions of property that will be of economic benefit to the City of Euless. PROJECT DESCRIPTION: Project includes City participation in community redevelopment projects and property acquisitions that will be of economic benefit to the City. PROJECT SCHEDULE: Long-term on -going project for continuous improvement of the community. JUSTIFICATION: As the City ages, it is imperative that the economic vitality of the City remain strong. Reinvestment into the community will protect property values from deterioration and keep commercial properties occupied and vibrant. 29 PROJECT TITLE: REDEVELOPMENT PROJECT CODE: CM0804 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Land Acquisition $9,248,217 Direct Operating Cost Demolition $425,194 Personnel: Full Time Minor Apparatus $197 Part Time $0 Incentives $10,000 Total Salary $0 Revitalization Target Area #1 $150,000 Purchase of Services Other Professional Services $93,913 Materials & Supplies Utilities Subtotal: $0 Total Estimated Capital Cost $9,927,521 FUNDING SOURCE: Maintenance Costs Transfer from: General Fund $2,255,000 Car Rental Operating/CIP Fund $4,700,000 Miscellaneous Other $472,521 $0 Additional Funding Needed: Subtotal: $0 Transfer from: General Fund $1,500,000 Car Rental Fund $1,000,000 Total Estimated Annual Cost $0 Total Funding $9,927,521 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Land Acquisition $9,248,217 $5,423,777 $3,824,440 59% Demolition $425,194 $386,017 $39,177 91% Minor Apparatus $197 $167 $30 85% Incentives $160,000 $160,000 $0 100% Professional Services $93,913 $89,913 $4,000 96% TOTAL PROJECT $9,927,521 $6,059,873 $3,867,648 61 % City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: June 03, 2014 Submitted By: HAL CRANOR Date Completed: Project Title: MUNICIPAL PLAZA IMPROVEMENTS PHASE II Project Type: FACILITIES Sub -Type: IMPROVEMENTS Project Code: CM1701 Priority: A COUNCIL AUTHORIZATION: May 12, 2020: Awarded Bid No. 010-20 for the purchase and installation of an operable louvered canopy for the Mary Lib Saleh Euless Public Library, to Equinox Louvered Roof. The estimated expenditure is $83,960. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project includes the landscaping and irrigation related to the 40th CDBG ADA accessibility and infrastructure improvements. PROJECT DESCRIPTION: Landscaping and irrigation improvements to the Municipal Plaza following the 40th CDBG ADA accessibility and infrastructure improvements. Project will extend to the Library entrance from the courtyard. PROJECT SCHEDULE: Anticipate Construction Compete: FY2022 JUSTIFICATION: Beautification of the municipal plaza following the hardscape improvements. .E PROJECT TITLE: MUNICIPAL PLAZA IMPROVEMENTS PHASE II PROJECT CODE: CM1701 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Landscaping $316,733 Personnel: Full Time Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Total Estimated Capital Cost $316,733 Maintenance Costs Funding Source: Transfer from: General Fund $150,000 Car Rental Fund (Phase 1) $116,733 $0 Subtotal: $0 Additional Funding Needed: Transfer from: General CIP Fund Balance $50,000 Total Estimated Annual Cost $0 Total Funding $316,733 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED Landscaping $309,532 $209,244 $100,288 68% Equipment $7,201 $7,201 $0 100% TOTAL PROJECT $316,733 $216,445 $100,288 68% 91 City of Euless Capital Project Request Department: ECONOMIC DEVELOPMENT Date Prepared: July 26,1999 Submitted By: BILL RIDGWAY Date Completed: Project Title: EULESS DEVELOPMENT CORPORATION INCENTIVE Project Type: EDC Sub -Type: DEVELOPMENT Project Code: DV9901 Priority: A COUNCIL AUTHORIZATION: March 27, 2001: Approved transfer of $325,000 to North Main Street for right-of-way to free up funds for a sign program. May 30, 2006: Approved payment to Professional Turf Products, Inc. in the amount of $300,000 per agreement. April 24, 2012: Ratified Euless Development Corporation (EDC) action taken on April 23, 2012, to approve the first amendment to the lease and incentive agreement by and between the EDC, the City of Euless and U.S. Concrete, Inc. and its subsidiary Redi-Mix, L.L.C., and authorizing the President to make the modification and execute such amendment. The agreement called for a $150,000 incentive payment upon the successful relocation of the US Concrete corporate headquarters to Euless. December 12, 2017: Approved the EDC projects and actions taken by the EDC Board of Directors on December 12, 2017 which included authorizing the President to negotiate and execute conveyance documents for the purchase of property located at 411 North Main Street. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Euless Development Corporation funds that have been set aside to aid the City of Euless in attracting development opportunities. PROJECT SCHEDULE: JUSTIFICATION: Funding this project would enable the City to act quickly on development opportunities that arise throughout the year. PROJECT TITLE: EULESS DEVELOPMENT CORPORATION INCENTIVE PROJECT CODE: DV9901 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Will be based on the merits of Personnel: Full Time each opportunity. Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Total Estimated Capital Cost Maintenance Costs Funding Source: Transfer from: EDC CIP Fund Balance $1,338,454 EDC Operating Fund $650,000 ED1002 - EDC Contingency $250,000 Subtotal: Transfer to FS#2 & N Main ($787,600) Additional Funding Needed: EDC Operating Fund $25,000 Total Estimated Annual Cost $0 Total Funding $1,475,854 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Economic Development Incentives $1,475,000 $1,350,295 $124,705 92% Irrigation Supplies $854 $853 $1 100% TOTAL PROJECT $1,475,854 $1,351,148 $124,706 92% 93 City of Euless Capital Project Request Department: ECONOMIC DEVELOPMENT Date Prepared: Sept 30,2010 Submitted By: GARY MCKAMIE Date Completed: Project Title: EULESS DEVELOPMENT CORPORATION CONTINGENCY Project Type: EDC Sub -Type: MISCELLANEOUS Project Code: ED1002 Priority: A COUNCIL AUTHORIZATION: May 14,2019: Ratified the Euless Development Corporation (EDC) action taken on May 13, 2019, authorizing the expenditure of funds for the demolition of Wilshire Pool. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: To provide funding for emergencies or unforeseen projects that arise throughout the year. PROJECT SCHEDULE: JUSTIFICATION: This would enable the City to act quickly on emergency or unforeseen projects. Without funding, these types of projects would have to wait until the next budget cycle which could increase costs or impede economic development opportunities. 94 PROJECT TITLE: EULESS DEVELOPMENT CORPORATION CONTINGENCY PROJECT CODE: ED1002 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Contingency $325,000 Personnel: Full Time Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Total Estimated Capital Cost $325,000 Maintenance Costs Funding Source: Transfer from: EDC Operating/CIP Fund $357,493 AC1601 - TSSC Phase V $64,586 $0 ED1401 - Planning Consultants $152,921 Subtotal: $0 DV9901 - EDC Incentive Funds ($250,000) Total Estimated Annual Cost $0 Total Funding $325,000 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED Contingency $325,000 $68,772 $256,228 21 % TOTAL PROJECT $325,000 $68,772 $256,228 21 % 95 City of Euless Capital Project Request Department: CITY MANAGER Date Prepared: June 16,2015 Submitted By: LORETTA GETCHELL Date Completed: Project Title: MIDTOWN DEVELOPMENT Project Type: MISCELLANEOUS Sub -Type: DEVELOPMENT Project Code: ED1601 Priority: A COUNCIL AUTHORIZATION: June 23, 2015: Conducted a Public Hearing and approved Planned Development. August 25, 2015: Approved Resolution No. 15-1471 creating, authorizing, and establishing the Euless Midtown Public Improvement District. December 8, 2015: Approved Resolution No. 15-1479 authorizing publication of notice of intention to issue certificates of obligation to fund public infrastructure improvements including streets, drainage, and water and wastewater in the Euless Midtown Zone. December 8, 2015: Approved Ordinance No. 2096 approving the Project and Financing Plan for Tax Increment Reinvestment Zone Number Four. January 12, 2016: Approved Ordinance No. 2098 authorizing the issuance and sale of City of Euless, Texas, Tax and Waterworks and Sewer System (Limited Pledge) Revenue Certificates of Obligation, Series 2016. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project provides funding for City participation in a public/private development opportunity. PROJECT DESCRIPTION: Project includes City participation in a public/private community development project of approximately 56 acres located in the A.J. Huitt Survey, Abstract 684. Project costs will include land, right-of-way, remediation, paving, storm drainage, water, wastewater, landscaping, hardscaping, amenities, design, and administrative costs. PROJECT SCHEDULE: Began Demolition: Spring 2016 Construction Complete: FY2019 JUSTIFICATION: This is a significant development opportunity within the heart of Euless. The development is projected to include residential development including villas, townhomes and rowhouses, cluster housing, and urban lofts; commercial development including retail and restaurant development; and landscaped bioswales and water detention areas for stormwater management. PROJECT TITLE: MIDTOWN DEVELOPMENT PROJECT CODE: ED1601 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Public Improvements $16,417,980 Personnel: Full Time Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Total Estimated Capital Cost $16,417,980 Maintenance Costs Funding Source: Certificates of Obligation $16,417,980 $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Funding $16,417,980 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Public Improvements $16,417,980 $15,348,780 $1,069,200 93% TOTAL PROJECT $16,417,980 $15,348,780 $1,069,200 93% 97 City of Euless Capital Project Request Department: FACILITIES Date Prepared: April 11,2011 Submitted By: KYLE MCADAMS Date Completed: Project Title: ADA/TAS FACILITY IMPROVEMENTS Project Type: FACILITIES Sub -Type: IMPROVEMENTS Project Code: FM1201 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: This project provides for the continued improvements to various City facilities as required by Federal and State mandated Americans with Disabilities Act/Texas Accessibility Standards ("ADA/TAS"). City facilities, entrances, lifts, signage, speech and hearing aided devices, and other areas covered under both ADA and TAS requirements will be part of these improvements. Project funds will be managed by the City Manager's Office and will be allocated as identified projects are brought forth and approved. PROJECT SCHEDULE: JUSTIFICATION: Some City facilities do not meet current ADA/TAS standards. Updating accessibility on a continuing basis will help keep the City in compliance with government standards and will address the growing needs of citizens with accessibility issues. im PROJECT TITLE: ADA/TAS FACILITY IMPROVEMENTS PROJECT CODE: FM1201 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Improvements Personnel: Full Time (Minimum balance $75,000) Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Total Estimated Capital Cost Maintenance Costs Funding Source: Transfer from: Car Rental Fund $65,000 General Fund $50,000 $0 Risk Operating Fund $25,000 Subtotal: $0 Additional Funding Needed: Annual expense $32,436 Transfer from: General CIP Fund Balance $30,000 Total Estimated Annual Cost $32,436 Total Funding $170,000 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED Structural Maintenance $164,000 $88,659 $75,341 54% Training $6,000 $4,637 $1,363 77% TOTAL PROJECT $170,000 $93,295 $76,705 55% IN City of Euless Capital Project Request Department: FIRE DEPARTMENT Date Prepared: March 14, 2019 Submitted By: WES RHODES Date Completed: Project Title: FIRE STATION #1 Project Type: FACILITIES Sub -Type: BUILDING Project CODE: FM2006 Priority: A COUNCIL AUTHORIZATION: October 8, 2019: Approved Resolution No. 19-1557, authorizing the City Secretary to publish a notice declaring intention to issue certificates of obligation in an amount not to exceed $7,500,000 for public improvements to fire department facilities. October 8, 2019: Approved Resolution No. 19-1558, declaring expectation to reimburse expenditures with proceeds of future debt. The City expects to expend funds for acquiring, designing, constructing, improving, expanding, and equipping one or more fire stations (including the demolition of existing Fire Station #1). October 22, 2019: Authorized the City Manager to negotiate and execute an Architectural Services Contract with Oxley Williams Tharp Architects for the construction of Fire Station No. 1. January 14, 2020: Approved the first and final reading of Ordinance No. 2235, authorizing the issuance of "City of Euless, Texas, Tax and Waterworks and Sewer System (Limited Pledge) Revenue Certificates of Obligation, Series 2020". May 12, 2020: Awarded Bid No. 008-20 for the purchase of a double -wide manufactured home to Clayton Homes. This unit will serve as temporary housing for Fire Station No. 1 staff during the renovations of the existing site. The estimated expenditure is $80,350. May 26, 2020: Approved first and final reading of Ordinance No. 2244 authorizing the issuance of "City of Euless, Texas Tax Notes, Series 2020". May 26, 2020: Approved Resolution No. 20-1577 declaring expectation to reimburse expenditures with proceeds of future debt. August 11, 2020: Approved the full demolition of Fire Station No. 1, 201 East Ash Lane, to GFC Contracting, to include removal of the structure, driveways and approaches, and return the site to rough grade. Demolition services are provided through the BuyBoard Job Ordering Contract (JOC) program #520-16. The estimated expenditure is $65,882. February 9, 2021: Awarded Request For Competitive Sealed Proposal (RFCSP) No. 002-21 for the construction of Fire Station No. 1 in the amount of $5,147,500, authorized an owner controlled contingency not to exceed 10%, and authorized the City Manager to enter into a construction contract with Modern Contractors. April 13, 2021: Authorized the purchase of a fire station alerting system for Fire Station No. 1 from US Digital Designs, Inc. using HGAC Contract No. EC07-20. The estimated expenditure is $150,372.29. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: The project consists of the demolition of fire station No.1 located at 201 E. Ash lane. The station was originally constructed 30+ years ago and can no longer meet the functional demands of a full service fire station. The building has had small improvements and minor upgrades to the living areas but no major modifications to the overall building structure. The project scope includes professional services and construction of a new 12,000-15,000 sq ft. station to include four (4) double deep bays to accommodate an aerial ladder truck, fire engine, and ambulance; living quarters; and operation offices for staff. The additional bay space planned in the facility allows for the housing of reserve vehicles and equipment. The professional services includes architecture services, engineering, and construction cost estimates. PROJECT SCHEDULE: Began Design: December 2019 Design Complete: August 2020 Began Construction: March 2021 Anticipate Construction Complete: February 2022 JUSTIFICATION: The current station cannot be upgraded to current codes and standards without incurring significant expenses. The new construction will provide the following: 1. An ADA and construction code compliant building; 2. A facility to support increasing demand in an area of the City experiencing rapid growth; 3. Allow for the deployment of a double company response station: Ladder / Engine / Medic. 4. New facility that is user friendly and meets the needs of station personnel. 5. A building that will meet current energy / ventilation / electrical codes and function more efficiently. 100 PROJECT TITLE: FIRE STATION #1 PROJECT CODE: FM2006 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Professional Services $510,000 Direct Operating Cost Construction $5,785,979 Personnel: Full Time Furniture, Fixtures & Equip. $550,000 Part Time $0 Debt Issuance Costs $133,105 Total Salary $0 Contingency $525,000 Purchase of Services Demolition & Temporary Materials & Supplies Fire Station $380,000 Utilities Average Debt Service $453,000 Subtotal: $453,000 Total Estimated Capital Cost $7,884,084 FUNDING SOURCE: Maintenance Costs Transfer from: Debt Service Fund $133,105 2020 Certificates of Obligation $7,335,000 2020 Tax Notes $380,000 $0 Interest Earnings $35,979 Subtotal: $0 Total Estimated Annual Cost $453,000 Total Funding $7,884,084 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED Professional Services $510,000 $403,141 $106,859 79% Construction Furniture, Fixtures & Equipment $5,785,979 $382,350 $5,403,629 $550,000 $8,497 $541,503 7% 2% Demolition & Temporary Fire Station $380,000 $358,680 $21,320 94% Contingency $525,000 $0 $525,000 0% Debt Issuance Costs $133,105 $133,105 $0 100% TOTAL PROJECT $7,884,084 $1,285,773 $6,598,312 16% 101 City of Euless Capital Project Request Department: TEXAS STAR GOLF COURSE Date Prepared: May 17,2011 Submitted By: GLENDA HARTSELL Date Completed: Project Title: TSGC MISCELLANEOUS IMPROVEMENTS Project Type: PARK/RECREATION Sub -Type: TSGC IMPROVEMENTS Project Code: GC1801 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: To provide funding to address small capital projects that arise throughout the year at Texas Star Golf Course. PROJECT SCHEDULE: JUSTIFICATION: Without funding for this project, the smaller items identified throughout the year could not be addressed in a timely manner and would have to be postponed until the next budget cycle for funding consideration. Timely response preserves the City's investment in a high -profile asset and maintains the quality service levels expected by patrons. 102 PROJECT TITLE: TSGC MISCELLANEOUS IMPROVEMENTS PROJECT CODE: GC1801 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Improvements Personnel: Full Time (Minimum balance $150,000) Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Total Estimated Capital Cost Maintenance Costs Funding Source: Transfer from: TSGC Reserve Fund $330,000 Hotel/Motel Fund $120,000 $0 Car Rental Fund $50,000 Subtotal: $0 Miscellaneous Other $27,180 Annual expense $2,750 Additional Funding Needed: TSGC Reserve Fund $60,000 Total Estimated Annual Cost $2,750 Total Funding $587,180 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED Improvements $498,110 $281,110 $217,000 56% Equipment $87,070 $80,669 $6,401 93% Botanical $2,000 $2,000 $0 100% TOTAL PROJECT $587,180 $363,778 $223,402 62% 103 City of Euless Capital Project Request Department: TEXAS STAR GOLF COURSE Date Prepared: April 30, 2019 Submitted By: GLENDA HARTSELL-SHELTON Date Completed: Project Title: TEXAS STAR SLOPE WALL PROTECTION PHASE I Project Type: DRAINAGE Sub -Type: IMPROVEMENTS Project Code: GC2003 Priority: A COUNCIL AUTHORIZATION: August 3, 2020: Awarded Bid No. 013-20 for Channel Improvements at the Texas Star Golf Course, Hole No. 9, and authorized the City Manager to execute a construction contract with Knight Erosion Control, Inc. The estimated expenditure is $124,771.28. September 8, 2020: Awarded Bid No. 016-20 for Channel Improvements at the Texas Star Golf Course, Hole No. 9, and authorized the City Manager to execute a construction contract with Knight Erosion Control, Inc. The estimated expenditure is $129,970. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Project scope includes the materials and labor for the installation of slope wall protection at the pedestrian and cart bridges at Texas Star Golf Course on hole #9, along the banks of Hurricane Creek. PROJECT SCHEDULE: Began Construction: September 2020 Anticipate Construction Complete: June 2021 JUSTIFICATION: Continued deterioration of creek embankment could threaten the structural integrity of the bridge structures and the ability to navigate the cart path. 104 PROJECT TITLE: TEXAS STAR SLOPE WALL PROTECTION PHASE I PROJECT CODE: GC2003 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Rip -rap wall $415,337 Personnel: Full Time Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Total Estimated Capital Cost $415,337 Maintenance Costs Funding Source: Transfer from: Car Rental CIP Fund Balance $315,000 GC2001- #9 Fairway Gabion $0 Wall $100,337 Subtotal: $0 Total Estimated Annual Cost $0 Total Funding $415,337 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED Improvements $415,337 $286,119 $129,218 69% TOTAL PROJECT $415,337 $286,119 $129,218 69% 105 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: March 23,2004 Submitted By: RAY MCDONALD Date Completed: Project Title: MISCELLANEOUS PARK IMPROVEMENTS Project Type: EDC Sub -Type: PARKS Project Code: PR0720 Priority: A COUNCIL AUTHORIZATION: June 9, 2020: Authorized the purchase and installation of sod and irrigation at the Villages of Bear Creek Park, from Tri-Tex Grass, through the BuyBoard Cooperative Purchasing Program. The estimated expenditure is $46,500. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The adopted Parks Master Plan recommends funding for system -wide park facilities and amenities upgrades. PROJECT DESCRIPTION: The project provides funding for the upgrade and modernization of City parks to include replacement of aged structures such as pavilions, picnic tables, gazebos, signs, safety components, and other park amenities including the addition of a gazebo on Main Street. Park infrastructure and structure painting are included in the scope of the project. Additionally, the project encompasses the installation of trail lighting along the Trails of Euless similar to the lighting installed along the trail through Midway Park. Trailwood Park, Bob Eden Trail, The Preserve at McCormick Park, The Villages of Bear Creek Park, and Heritage Park would also benefit from trail lighting. PROJECT SCHEDULE: JUSTIFICATION: Pursuant to the recommendations in the Parks Master Plan, park accessibility should be in compliance with the Americans with Disabilities Act. The existing equipment in many park areas is becoming aged and will require refurbishment or replacement in the near term. Additionally, park infrastructure should be maintained at a level that meets citizen expectations. E PROJECT TITLE: MISCELLANEOUS PARK IMPROVEMENTS PROJECT CODE: PR0720 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Fixtures, landscaping, lighting, Personnel: Full Time & other park and infrastructure Part Time $0 improvements Total Salary $0 Purchase of Services (Minimum balance $100,000) Materials & Supplies Utilities $0 Subtotal: $0 Total Estimated Capital Cost Maintenance Costs Funding Source: Transfer from: EDC Operating Fund $1,275,000 Developer Contribution (TRA) $10,500 $0 ES0283 & ES1901 $32,753 Subtotal: $0 Additional Funding Needed: Annual expense $221,860 Transfer from: EDC Operating Fund $100,000 Total Estimated Annual Cost $221,860 Total Funding $1,418,253 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED Park Furnishings $1,099,848 $875,928 $223,920 80% Landscaping $55,942 $42,021 $13,921 75% Contingency $58,540 $57,702 $838 99% Park Lighting $10,000 $5,201 $4,799 52% Equipment $3,170 $3,170 $0 100% Trail/Sidewalk Improvements $31,000 $30,795 $205 99% Professional Services $11,000 $10,212 $788 93% Improvements $116,000 $115,591 $409 100% Improvements (ES0283-Bear Creek Park) $27,753 $0 $27,753 0% Botanical (ES1 901 -Barfield Foundation) $5,000 $0 $5,000 0% TOTAL PROJECT $1,418,253 $1,140,621 $277,632 80% 107 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: October 01,2007 Submitted By: RAY MCDONALD Date Completed: Project Title: PARK IRRIGATION Project Type: EDC Sub -Type: PARKS Project Code: PR0804 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: This project provides annual funding to continue efforts to meet irrigation needs throughout the City's park system. PROJECT SCHEDULE: Projects will be identified and completed on an as needed basis. JUSTIFICATION: This project allows for maintenance and expansion of the irrigation systems throughout the parks system to enhance the overall condition of the landscape and green space. 108 PROJECT TITLE: PARK IRRIGATION PROJECT CODE: PR0804 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Irrigation $325,000 Personnel: Full Time Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Total Estimated Capital Cost $325,000 Maintenance Costs Funding Source: Transfer from: EDC Operating Fund $300,000 $0 Subtotal: $0 Additional Funding Needed: Transfer from: EDC Operating Fund $25,000 Total Estimated Annual Cost $0 Total Funding $325,000 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED Irrigation $325,000 $213,688 $111,312 66% TOTAL PROJECT $325,000 $213,688 $111,312 66% 109 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: March 02,2017 Submitted By: RAY MCDONALD Date Completed: Project Title: WILSHIRE PARK UPGRADES Project Type: PARK/RECREATION Sub -Type: PARK IMPROVEMENTS Project Code: PR2011 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The adopted Parks Master Plan calls for general upgrades and improvements in the overall quality of parks in the City and to develop a high quality parks system that provides activities for all age and interest groups and enhances the adjoining neighborhoods. PROJECT DESCRIPTION: Overall park enhancements and improvements to include expanding parking lot, additional amenities such as a pavilion, upgrading playground and playground surface, additional trails with connections to adjacent neighborhood, bridge connections for trail, expanding the floating dock, additional sidewalks, and adding park lighting. PROJECT SCHEDULE: Began Design: April 2021 Anticipate Design Complete: July/August 2021 Anticipate Begin Construction: November/December 2021 Anticipate Construction Complete: July 2022 JUSTIFICATION: As identified in the adopted Parks Master Plan, the municipal park is the foundation of any solid parks and recreation system. The City of Euless parks and recreation system provides residents and visitors with significant personal, social, environmental, and economic benefits. The revitalization efforts that the Euless City Council has focused on over the years has increased the sense of community pride. Wilshire Park is a four acre park located adjacent to Wilshire Elementary School off Sierra Drive. The current amenities at this park include a playground, .25 mile trail and a fishing pier/pond. The project will continue the City Council's revitalization efforts by creating an area that will serve both the passive and active leisure needs of the residents in this area. 110 PROJECT TITLE: WILSHIRE PARK UPGRADES PROJECT CODE: PR2011 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Demolition $34,500 Personnel: Full Time Site Work $130,500 Part Time $0 Hardscape $778,044 Total Salary $0 Landscape $76,500 Purchase of Services Fixtures/Furnishings $199,000 Materials & Supplies Development/Prof Services $512,820 Utilities Survey $10,000 TDLR $1,500 Geotech $5,000 $0 Subtotal: $0 Total Estimated Capital Cost $1,747,864 Maintenance Costs Funding Source: Transfer from: Car Rental Fund $1,953,820 PR1917-Carr Park Imp. $22,044 $0 Subtotal: $0 Transfer to: PR1917-Carr Park Imp. ($228,000) Total Estimated Annual Cost $0 Total Funding $1,747,864 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED Development/Professional Svcs $529,320 $13,135 $516,185 2% Land Betterment $1,019,544 $0 $1,019,544 0% Fixtures/Furnishings $199,000 $0 $199,000 0% TOTAL PROJECT $1,747,864 $13,135 $1,734,729 1% 111 City of Euless Capital Project Request Department: FLEET & FACILITY OPERATIONS Date Prepared: April 13,2021 Submitted By: KYLE MCADAMS Date Completed: Project Title: SENIOR CENTER CANOPY CDBG-CV Project Type: FACILITIES Sub -Type: IMPROVEMENTS Project Code: PR2102 Priority: A COUNCIL AUTHORIZATION: November 24, 2020: Held a public hearing and approved the recommended project selection for the Community Development Block Grant -CV (CDBG-CV) program. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: The project scope includes the installation of an operable louvered canopy on the north side of the Euless Family Life Center - Senior Center outside the main ballroom. This addition will include additional patio area, lighting, and enhanced landscape beds. Canopy will be powered and fully adjustable by remote control. PROJECT SCHEDULE: Began Design: January 2021 Design Complete: April 2021 Anticipate Begin Construction: August 2021 Anticipate Construction Complete: October 2021 JUSTIFICATION: The addition of a canopy to the north side of the Euless Family Life Center - Senior Center will allow for full usage of the patio area and will encourage citizens to use the exterior of the building for programmed activities, gatherings, and enjoyment of the outdoor area. The canopy will be a fully functional louvered type and will allow for the movement of the slats to keep the area either covered from the sunlight or allow a minimal amount of light to fall upon the patio area. 112 PROJECT TITLE: SENIOR CENTER CANOPY CDBG-CV PROJECT CODE: PR2102 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Design $11,767 Personnel: Full Time Construction $382,777 Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Total Estimated Capital Cost $394,544 Maintenance Costs Funding Source: Transfer from: General CIP Fund Balance $11,767 $0 CDBG-CV Award $382,777 Subtotal: $0 Total Estimated Annual Cost $0 Total Funding $394,544 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED Design $11,767 $7,350 $4,417 62% Construction* $382,777 $0 $382,777 0% *Project is contingent upon actual CDBG-CV funding availability. TOTAL PROJECT $394,544 $7,350 $387,194 2% 113 H E C I T Y O EULESS 114 CAPITAL IMPROVEMENT PROGRAMS FY2022 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE PROPOSED METHOD OF FINANCING Project Description Priority Estimated Cost Operating Fund CIP Fund Balance Bond/Tax Note Grants/ Contributions Impact Fees Escrow Funds Car Rental Tax Other EDC To Be Determined DRAINAGE PROJECTS Bear Creek Elementary Drainage Channel Improvements A $ 785,000 XX Sub -Total Drainage Priority A -Proposed FY2022 $ 785,000 None Currently B $ - Sub -Total Drainage Priority B-Unfunded $ Chittam Drive Storm Drain Installation C TBD l'i XX Kynette Drive Storm Drain Installation C TBD XX Little Bear Creek Drainage Improvements C TBD XX Main Centre Addition Channelized Drainage C TBD XX Sub -Total Drainage Priority C-Unfunded $ DRAINAGE PROJECTS - TOTAL $ 785,000 STREET PROJECTS FY2022 Street Improvements A $ 1,025,000 XX Sub -Total Street Priority A -Proposed FY2022 $ 1,025,000 FY2023 Street Improvements (23) B $ 1,050,000 XX FY2024 Street Improvements (24) B $ 1,075,000 XX FY2025 Street Improvements (25) B $ 1,100,000 XX FY2026 Street Improvements (26) B $ 1,125,000 XX Heritage Avenue - Cheek-Sparger Road to Guadalupe Trail (26) B $ 260,275 $ 247,987 $ 12,288 Sub -Total Street Priority B-Unfunded $ 4,610,275 Cresthaven Drive Reconstruction C TBD XX East Alexander Lane Reconstruction C TBD XX Ross Avenue Extension C TBD XX Sheppard Drive Reconstruction C TBD XX Vine Street Reconstruction - SH183 to SH10 C TBD XX Sub -Total Street Priority C-Unfunded $ STREET PROJECTS - TOTAL $ 5,635,275 WASTEWATER PROJECTS FY2022 47th CDBG LR: Paula Lane/David Drive/Susan Street/Raider Court A $ 391,000 XX LR: Midway Park 3rd Addition Phase II & Green Hills Park A $ 436,000 XX Sub -Total Wastewater Priority A -Proposed FY2022 $ 827,000 LR: Cedar Hill Estates South Phase 1 (23) B $ 385,000 XX LR: Cedar Hill Estates South Phase 11 (23) B $ 391,000 XX FY2023 48th CDBG LR: Parks at Texas Star North/SH10 (23) B $ 408,000 XX FY2024 49th CDBG LR: Raider Drive/Euless Square Apartments/S Ector Drive �24) B $ 385,000 XX LR: Oakwood Terrace North Phase 1 (24, B $ 506,000 XX FY2025 50th CDBG LR: Aransas Drive/Douglas Street (25) B $ 401,000 XX LR: Oakwood Terrace North Phase 11 (25) B $ 380,000 XX FY2026 51 st CDBG LR: Fair Oaks Boulevard/Shelmar Drive/Kensington Court B $ 397,000 XX LR: Woodvine Drive/Cliffwood Road B $ 552,000 XX Sub -Total Wastewater Priority B-Unfunded $ 3,805,000 LR: Cliffwood Road/Shady Creek Drive C TBD XX LR: Summit Ridge/Shenandoah/Cripple Creek/Trailwood Drive C TBD XX Sub -Total Wastewater Priority -Un unded WASTEWATER PROJECTS - TOTAL $ 4,632,000 LR = Line Replacement ' Preliminary cost estimate of $1,186,000. 115 CAPITAL IMPROVEMENT PROGRAMS FY2022 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE PROPOSED METHOD OF FINANCING Project Description Priority Estimated Cost Operating Fund CIP Fund Balance Bond/Tax Note Grants/ Contributions Impact Fees Escrow Funds Car Rental Tax Other EDC To Be Determined WATER PROJECTS 1 Mil Well Replacement A $ 6,500,000 XX LR: Huntington Drive A $ 515,000 XX Sub -Total Water Priority A -Proposed FY2022 $ 7,015,000 LR: Midway Park 1 st Addition (23) B $ 555,000 XX LR: Sagebrush Trail (24) B $ 435,000 XX LR: Sotogrande Boulevard (25) B $ 438,000 XX LR: Bell -Hi Addition Phase I & II (26) B $ 472,000 XX Sub -Total Water Priority B-Unfunded $ 1,900,000 LR: Donley Drive/Donley Court C TBD XX LR: Dunaway Drive C TBD XX LR: Midway Park 3rd Addition C TBD XX LR: Paula Lane C TBD XX LR: West Euless Boulevard C TBD XX LR: Westpark Way C TBD XX Sub -Total Water Priority C-Unfunded $ WATER PROJECTS -TOTAL $ 8,915,000 OTHER PROJECTS Blessing Branch Park Improvements A $ 365,064 XX FY2022 Roof Replacement & Preventative Maintenance A $ 373,000 XX Sub -Total Other Priority A -Proposed FY2022 $ 738,064 Aquatic Park Facility Upgrades B $ 245,000 XX Carr Park Trail Connection (23) B $ 241,100 XX FY2023 Roof Preventative Maintenance (23) B $ 75,000 XX Kiddie Carr Park Improvements (23) B $ 893,500 XX Trail Lighting - Mid -Cities (23) B $ 115,000 XX FY2024 HVAC System Replacement (24) B $ 65,000 XX FY2024 Roof Replacement & Preventative Maintenance (24) B $ 400,000 XX Trail Lighting - Heritage Avenue to Bob Eden Park (24) B $ 100,000 XX Euless Family Life Center Elevator Replacement (25) B $ 350,000 XX FY2025 Roof Restoration & Preventative Maintenance (25) B $ 785,000 XX FY2026 HVAC System Replacement (26) B $ 605,000 XX FY2026 Roof Restoration & Preventative Maintenance (26) B $ 800,000 XX Parks at Texas Star Lighting Upgrade (26) B $ 800,000 XX Parks at Texas Star North Additional Parking Lot (26) B $ 550,000 XX Parks at Texas Star Phase VIII'26) B $ 3,966,945 XX Sub -Total Other Priority B-Unfunded $ 9,991,545 Fire Station #2 Remodel C TBD XX Police & Courts Building Remodel C TBD XX Parks at Texas Star Turf - Fenwa , Shea, and Jacobs Field C TBD XX Animal Shelter Expansion/Renovation C TBD XX South Euless Park Upgrades C TBD XX Trail Enhancements Phase I C TBD XX Trail Enhancements Phase II C TBD XX Trail Enhancements Villages of Bear Creek C TBD XX Trailwood Park Improvements C TBD XX Sub -Total Other Priority C-Unfunded $ OTHER PROJECTS - TOTAL $ 10,729,609 LR = Line Replacement 116 CAPITAL IMPROVEMENT PROGRAMS FY2022 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE PROPOSED METHOD OF FINANCING Project Description Priority Estimated Cost Operating Fund CIP Fund Balance Bond/Tax Note Grants/ Contributions Impact Fees Escrow Funds Car Rental Tax Other EDC To Be Determined DRAINAGE PROJECTS Bear Creek Elementary Drainage Channel Improvements A $ 785,000 XX Sub -Total Drainage Priority A -Proposed FY2022 $ 785,000 None Currently B $ - Sub -Total Drainage Priority B-Unfunded $ Chittam Drive Storm Drain Installation C TBD i XX Kynette Drive Storm Drain Installation C TBD XX Little Bear Creek Drainage Improvements C TBD XX Main Centre Addition Channelized Drainage C TBD XX Sub -Total Drainage Priority C-Unfunded $ DRAINAGE PROJECTS - TOTAL I $ 785,000 Preliminary cost estimate of $1,186,000. 117 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: April 1, 2021 Submitted By: HAL CRANOR Date Completed: Project Title: BEAR CREEK ELEMENTARY DRAINAGE CHANNEL IMPROVEMENTS Project Type: DRAINAGE Sub -Type: IMPROVEMENTS Project Code: Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: The existing concrete lined drainage channel will be removed and replaced by a new concrete lined drainage channel on the west side of Bear Creek Elementary School. An access drive would be constructed adjacent to Bear Creek Drive that would allow for future maintenance of the channel. Project scope may be reduced based on final engineering study. The City of Euless will be participating with the Grapevine-Colleyville ISD to assist with the cost of the project. PROJECT SCHEDULE: FY2022 JUSTIFICATION: The evaluation of the channel by Pacheo Koch indicates the need for the concrete lined channel to be replaced. The drainage from the Elementary School property has undermined the channel and has caused it to deteriorate. 118 PROJECT TITLE: BEAR CREEK ELEMENTARY DRAINAGE CHANNEL IMPROVEMENTS NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Engineering $71,000 Personnel: Full Time Construction* $714,000 Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $785,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % 0 Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund Transfer from DR9903/GCISD Reimb. XX ADDITIONAL COMMENTS: Proposed funding: City of Euless Participation - $461,000 Transfer from project DR9903-Miscellaneous Drainage Improvements. Grapevine-Colleyville ISD Participation - $324,000 *Project scope may be reduced based on final engineering study. 119 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: April 17,2018 Submitted By: HAL CRANOR Date Completed: Project Title: CHITTAM DRIVE STORM DRAIN INSTALLATION Project Type: DRAINAGE Sub -Type: IMPROVEMENTS Project Code: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The design and development of the Ashlyn Estates residential subdivision along Ash Lane has revealed an existing drainage concern for the downstream areas along Chittam Drive to Little Bear Creek. Drainage studies performed by both the design engineer for Ashlyn Estates and Halff Associates show the flow of water exceeding the street ROW along Chittam Drive, Fountain Side Drive, and Park Meadows Drive. The proposed detention pond to be constructed with Ashlyn Estates does not increase the 100-year discharge or the depth of flow along Chittam Drive. The proposed project will reduce the depth of flow by 1.49 feet at the low point along Chittam Drive. The overland flow to Chittam Drive from the Ashlyn Estates detention pond will be substantially reduced. PROJECT DESCRIPTION: The project will add 1000 linear feet of 48-inch reinforced concrete pipe and 160 linear feet of curb inlets along Chittam Drive. PROJECT SCHEDULE: JUSTIFICATION: The drainage report prepared by Halff Associates identified the additional pipe and inlets to Chittam Drive as an improvement to alleviate current flooding conditions at this location. 120 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: April 05,2017 Submitted By: HAL CRANOR Date Completed: Project Title. KYNETTE DRIVE STORM DRAIN INSTALLATION Project Type: DRAINAGE Sub -Type: IMPROVEMENTS Project Code: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Teague Nall & Perkins completed the Phase III Storm Drainage Master Plan which included a study of the Hurricane Creek Watershed. One of the improvements identified within the plan involved the replacement of the Kynette Drive Culvert on Cyclone Branch. A previous Storm Drainage Master Plan of the watershed also identified the need for a storm drain system beneath Kynette Drive from Cyclone Branch east to Wilshire Elementary School. PROJECT DESCRIPTION: The project consists of the removal of the existing box culvert and replacement with three 10' x 7' box culverts and concrete pavement over the culverts. PROJECT SCHEDULE: JUSTIFICATION: The Phase III Storm Drainage Master Plan identified the Kynette Drive crossing as an improvement to alleviate flooding conditions at this location. This crossing is frequently closed during heavy storms and is undersized. 121 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: July 21,1999 Submitted By: RON YOUNG Date Completed: Project Title. LITTLE BEAR CREEK DRAINAGE IMPROVEMENTS Project Type: DRAINAGE Sub -Type: IMPROVEMENTS Project Code: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The improvements proposed for Bob Eden Park are identified in the Little Bear Creek Watershed Master Plan. The Little Bear Creek Park portion of this project was identified in the 1990 Knowlton, English, and Flowers Drainage Utility System Study of Selected Improvement Projects. PROJECT DESCRIPTION: The scope of this project includes erosion control and channelization improvements to Little Bear Creek. Bear Creek Park is a portion of Project No. 11 in the above -referenced study. This project will be re-evaluated to determine if the scope and proposed improvements should be modified, redefined, and re -estimated. PROJECT SCHEDULE: JUSTIFICATION: Continued erosion will eventually undermine the creek in both parks and cause damage to existing City facilities. 122 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: March 31, 2021 Submitted By: HAL CRANOR Date Completed: Project Title: MAIN CENTRE ADDITION CHANNELIZED DRAINAGE Project Type: DRAINAGE Sub -Type: IMPROVEMENTS Project Code: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: The underground storm drain detention area is required for the increased development of the area. PROJECT SCHEDULE: JUSTIFICATION: The additional storm drain detention will allow for additional development to the area. 123 H E C I T Y O EULESS 124 CAPITAL IMPROVEMENT PROGRAMS FY2022 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE PROPOSED METHOD OF FINANCING Project Description Priority Estimated Cost Operating Fund CIP Fund Balance Bond/Tax Note Grants/ Contributions Impact Fees Escrow Funds Car Rental Tax Other EDC To Be Determined STREET PROJECTS FY2022 Street Improvements A $ 1,025,000 XX Sub -Total Street Priority A -Proposed FY2022 $ 1,025,000 FY2023 Street Improvements (23) B $ 1,050,000 XX FY2024 Street Improvements (24) B $ 1,075,000 XX FY2025 Street Improvements (25) B $ 1,100,000 XX FY2026 Street Improvements (26) B $ 1,125,000 XX Heritage Avenue - Cheek-Sparger Road to Guadalupe Trail (26) B $ 260,275 $247,987 $ 12,288 Sub -Total Street Priority B-Unfunded $ 4,610,275 Cresthaven Drive Reconstruction C TBD XX East Alexander Lane Reconstruction C TBD XX Ross Avenue Extension C TBD XX Sheppard Drive Reconstruction C TBD XX Vine Street Reconstruction - SH183 to SH10 C TBD XX Sub -Total Street Priority C-Unfunded $ STREET PROJECTS - TOTAL 5,635,275 125 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: May 31,2017 Submitted By: HAL CRANOR Date Completed: Project Title: FY2022 STREET IMPROVEMENTS Project Type: STREET Sub -Type: IMPROVEMENTS Project Code: Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by their pavement condition index. PROJECT SCHEDULE: FY2022 JUSTIFICATION: The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, extend the life of the roadway, and enhance the appearance of the streets. 126 PROJECT TITLE: FY2022 STREET IMPROVEMENTS NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Construction $1,025,000 Personnel: Full Time Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $1,025,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund XX Conceptual Design % 0% Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: Proposed funding is from General Fund. 127 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: May 31,2018 Submitted By: HAL CRANOR Date Completed: Project Title: FY2023 STREET IMPROVEMENTS Project Type: STREET Sub -Type: IMPROVEMENTS Project Code: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by their pavement condition index. PROJECT SCHEDULE: FY2023 JUSTIFICATION: The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, extend the life of the roadway, and enhance the appearance of the streets. 128 PROJECT TITLE: FY2023 STREET IMPROVEMENTS NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Construction $1,050,000 Personnel: Full Time Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $1,050,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund XX Conceptual Design % 0% Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: Proposed funding is from General Fund. 129 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: May 31,2019 Submitted By: HAL CRANOR Date Completed: Project Title: FY2024 STREET IMPROVEMENTS Project Type: STREET Sub -Type: IMPROVEMENTS Project Code: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by their pavement condition index. PROJECT SCHEDULE: FY2024 JUSTIFICATION: The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, extend the life of the roadway, and enhance the appearance of the streets. 130 PROJECT TITLE: FY2024 STREET IMPROVEMENTS NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Construction $1,075,000 Personnel: Full Time Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $1,075,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund XX Conceptual Design % 0% Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: Proposed funding is from General Fund. 131 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: May 31,2020 Submitted By: HAL CRANOR Date Completed: Project Title: FY2025 STREET IMPROVEMENTS Project Type: STREET Sub -Type: IMPROVEMENTS Project Code: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by their pavement condition index. PROJECT SCHEDULE: FY2025 JUSTIFICATION: The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, extend the life of the roadway, and enhance the appearance of the streets. 132 PROJECT TITLE: FY2025 STREET IMPROVEMENTS NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Construction $1,100,000 Personnel: Full Time Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $1,100,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund XX Conceptual Design % 0% Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: Proposed funding is from General Fund. 133 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: May 31,2020 Submitted By: HAL CRANOR Date Completed: Project Title: FY2026 STREET IMPROVEMENTS Project Type: STREET Sub -Type: IMPROVEMENTS Project Code: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by their pavement condition index. PROJECT SCHEDULE: FY2026 JUSTIFICATION: The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, extend the life of the roadway, and enhance the appearance of the streets. 134 PROJECT TITLE: FY2026 STREET IMPROVEMENTS NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Construction $1,125,000 Personnel: Full Time Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $1,125,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund XX Conceptual Design % 0% Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: Proposed funding is from General Fund. 135 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: April 1, 2021 Submitted By: HAL CRANOR Date Completed: Project Title: HERITAGE AVENUE - CHEEK-SPARGER ROAD TO GUADALUPE TRAIL Project Type: STREET Sub -Type: IMPROVEMENTS Project Code: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Heritage Avenue is currently a 2-lane asphalt road. The project would improve the road to a 2-lane concrete street with curb and gutter that includes underground drainage. This project is part of the Tarrant County Bond Program and will be managed by the City of Colleyville if approved. The City of Euless would participate in this project with the City of Colleyville to assist with a portion of the project cost. PROJECT SCHEDULE: FY2026 JUSTIFICATION: The existing asphalt pavement is deteriorating. The new concrete street will increase safety, reduce maintenance costs, provide an improved riding surface, and will enhance the appearance of the streets. 136 PROJECT TITLE: HERITAGE AVENUE - CHEEK-SPARGER ROAD TO GUADALUPE TRAIL NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost City of Euless Participation $260,275 Personnel: Full Time Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $260,275 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund $247,987 Conceptual Design % 0% Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund Escrow Funds $12,288 ADDITIONAL COMMENTS: Proposed funding is from General Fund and Escrow Funds. The total estimated project cost is $2,682,503. 137 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: April 26,2017 Submitted By: HAL CRANOR Date Completed: Project Title: CRESTHAVEN DRIVE RECONSTRUCTION Project Type: STREET Sub -Type: IMPROVEMENTS Project Code: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: This project includes the reconstruction of Cresthaven Drive from a two-lane asphalt roadway to a 31' wide curb and gutter concrete street from SH10 to S Pipeline Road. PROJECT SCHEDULE: JUSTIFICATION: To upgrade Cresthaven Drive to a standard City concrete curb and gutter street. 138 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: July 23,1999 Submitted By: RON YOUNG Date Completed: Project Title. EAST ALEXANDER LANE RECONSTRUCTION Project Type: STREET Sub -Type: IMPROVEMENTS Project Code: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This minor street serves as a collector type street by conveying traffic to major roadways. PROJECT DESCRIPTION: East Alexander Lane will be reconstructed from Main Street to Cullum Drive. It will be reconstructed from a two- lane county type road to a standard 31' wide residential street with underground drainage and sidewalks. PROJECT SCHEDULE: JUSTIFICATION: Reconstruction of this street will decrease the annual maintenance and provide compliance with current City standards. 139 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: May 31,2005 Submitted By: RON YOUNG Date Completed: Project Title. ROSS AVENUE EXTENSION Project Type: STREET Sub -Type: CONSTRUCTION Project Code: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This extension of Ross Avenue from the completed section adjacent to the fire station will complete the upgrading of this street. PROJECT DESCRIPTION: The construction of the remainder of Ross Avenue from the fire station to the west limit will be in accordance with City standards which includes concrete pavement. PROJECT SCHEDULE: JUSTIFICATION: This construction, in accordance with City standards, will allow the road a long service life and lower the annual maintenance costs. 140 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: June 12,2020 Submitted By: HAL CRANOR Date Completed: Project Title: SHEPPARD DRIVE RECONSTRUCTION Project Type: STREET Sub -Type: IMPROVEMENTS Project Code: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: This project includes the reconstruction of Sheppard Drive from the west bound service road of SH183 to Trojan Trail. Sheppard Drive is currently an open section asphalt street that includes a small section of concrete curb and gutter. The road will be reconstructed as a concrete roadway with curb and gutter. No storm drain system will need to be constructed. PROJECT SCHEDULE: JUSTIFICATION: To upgrade Sheppard Drive to a standard City concrete curb and gutter street. 141 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: April 28,2015 Submitted By: HAL CRANOR Date Completed: Project Title: VINE STREET RECONSTRUCTION - SH183 TO SH10 Project Type: STREET Sub -Type: IMPROVEMENTS Project Code: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Vine Street is not identified in the City's Master Thoroughfare Plan. PROJECT DESCRIPTION: The project consists of the reconstruction of Vine Street from SH183 to SH10. PROJECT SCHEDULE: JUSTIFICATION: The City has received street escrow funds from several developments along Vine Street. When development is complete, it would be appropriate for the City to reconstruct the existing roadway. 142 CAPITAL IMPROVEMENT PROGRAMS FY2022 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE PROPOSED METHOD OF FINANCING Project Description Priority Estimated Cost Operating Fund CIP Fund Balance Bond/Tax Note Grants/ Contributions Impact Fees Escrow Funds Car Rental Tax Other EDC To Be Determined WASTEWATER PROJECTS FY2022 47th CDBG LR: Paula Lane/David Drive/Susan Street/Raider Court A $ 391,000 XX LR: Midway Park 3rd Addition Phase II & Green Hills Park A $ 436,000 XX Sub -Total Wastewater Priority A -Proposed FY2022 $ 827,000 LR: Cedar Hill Estates South Phase I (23) B $ 385,000 XX LR: Cedar Hill Estates South Phase 11(23) B $ 391,000 XX FY2023 48th CDBG LR: Parks at Texas Star North/SH10 (23) B $ 408,000 XX FY2024 49th CDBG LR: Raider Drive/Euless Square Apartments/S Ector Drive(14) B $ 385,000 XX LR: Oakwood Terrace North Phase 1 (24) B $ 506,000 XX FY2025 50th CDBG LR: Aransas Drive/Douglas Street(25) B $ 401,000 XX LR: Oakwood Terrace North Phase II (25) B $ 380,000 XX FY2026 51st CDBG LR: Fair Oaks Boulevard/Shelmar Drive/Kensington Court B $ 397,000 XX LR: Woodvine Drive/Cliffwood Road(21) B $ 552,000 XX Sub -Total Wastewater Priority B-Unfunded $ 3,805,000 LR: CliHwood Road/Shady Creek Drive C TBD XX LR: Summit Ridge/Shenandoah/Cripple Creek/Trailwood Drive C TBD XX Sub -Total Wastewater Priority C-Unfunded WASTEWATER PROJECTS - TOTAL $ 4,632,000 LR = Line Replacement 143 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: March 30,2021 Submitted By: HAL CRANOR Date Completed: Project Title: 47TH CDBG LINE REPLACEMENT-PAULA LN/DAVID DR/SUSAN ST/RAIDER COURT Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT Project Code: Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. PROJECT DESCRIPTION: The project consists of the replacement of the following wastewater mains: 1. Between West Pipeline Road and Susan Street from Paula Lane to Raider Drive, 2. Between Paula Lane and David Drive from Susan Street and Needles Street, and 3. Raider Court. (47th year CDBG project) PROJECT SCHEDULE: FY2022 JUSTIFICATION: Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 144 PROJECT TITLE: 47TH CDBG LINE REPLACEMENT-PAULA LN/DAVID DR/SUSAN ST/RAIDER COURT NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Engineering $51,000 Personnel: Full Time Construction $340,000 Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $391,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % 0 Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding XX Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: Project is contingent upon actual CDBG funding availability. Council Authorization: February 9, 2021: Conducted a Public Hearing for the proposed 47th year CDBG project and approved the recommendation which includes replacing a wastewater line that is approximately 2,873 feet in length. It's located through properties adjacent to Susan Street, Paula Lane, Needles Street, and Raider Court. 145 H E C I T Y O EULESS 146 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: April 04,2020 Submitted By: HAL CRANOR Date Completed: Project Title: LINE REPLACEMENT - MIDWAY PARK 3RD ADDITION PHASE II & GREEN HILLS PARK Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT Project Code: Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. PROJECT DESCRIPTION: The project consists of the replacement of the following wastewater mains: 1. Between Fayette Drive and Ector Drive from Harwood Road to Lamar Drive, 2. Along Donley Drive from a point 1000 feet north of Harwood Road to Harwood Road, and 3. 606, 608, 1304, 1306 and 1308 Glenn Drive. PROJECT SCHEDULE: FY2022 JUSTIFICATION: Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 148 PROJECT TITLE: LINE REPLACEMENT - MIDWAY PARK 3RD ADDITION PHASE II & GREEN HILLS PARK NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Engineering $57,000 Personnel: Full Time Construction $379,000 Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $436,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund XX Conceptual Design % 0% Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: Proposed funding is from W/WW Operating Fund. 149 H E C I T Y O EULESS 150 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: March 25,2020 Submitted By: HAL CRANOR Date Completed: Project Title: LINE REPLACEMENT - CEDAR HILL ESTATES SOUTH PHASE I Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT Project Code: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. PROJECT DESCRIPTION: The project consists of the replacement of the following wastewater mains: 1. Along Sunset Drive between Vine Street and South Main Street and 2. Along Henslee Drive between Whitener Road and Henslee Drive. PROJECT SCHEDULE: FY2023 JUSTIFICATION: Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 152 PROJECT TITLE: LINE REPLACEMENT - CEDAR HILL ESTATES SOUTH PHASE I NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Engineering $50,000 Personnel: Full Time Construction $335,000 Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $385,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund XX Conceptual Design % 0% Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: Proposed funding is from W/WW Operating Fund. 153 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: March 25,2020 Submitted By: HAL CRANOR Date Completed: Project Title: LINE REPLACEMENT - CEDAR HILL ESTATES SOUTH PHASE II Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT Project Code: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. PROJECT DESCRIPTION: The project consists of the replacement of the following wastewater mains: 1. Along South Main Street from Whitener Road to South Pipeline Road and 2. Along South Pipeline Road from west of Cannon Drive to South Main Street. PROJECT SCHEDULE: FY2023 JUSTIFICATION: Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 154 PROJECT TITLE: LINE REPLACEMENT - CEDAR HILL ESTATES SOUTH PHASE II NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Engineering $51,000 Personnel: Full Time Construction $340,000 Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $391,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund XX Conceptual Design % 0% Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: Proposed funding is from W/WW Operating Fund. 155 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: March 31,2021 Submitted By: HAL CRANOR Date Completed: Project Title: 48TH CDBG LINE REPLACEMENT - PARKS AT TEXAS STAR NORTH/SH10 Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT Project Code: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. PROJECT DESCRIPTION: The project consists of the replacement of the following wastewater mains: 1. Along the east side of Parks at Texas Star North from South Pipeline Road north to SH10 and 2. Along the south side of SH10 from 900 feet west of FM157 to FM157. (48th year CDBG project) PROJECT SCHEDULE: FY2023 JUSTIFICATION: Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 156 PROJECT TITLE: 48TH CDBG LINE REPLACEMENT - PARKS AT TEXAS STAR NORTH/SH10 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Engineering $53,000 Personnel: Full Time Construction $355,000 Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $408,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % 0 Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding XX Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: Project is contingent upon actual CDBG funding availability. 157 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: March 31,2021 Submitted By: HAL CRANOR Date Completed: Project Title: 49TH CDBG LINE REP - RAIDER DRIVE/EULESS SQUARE APARTMENTS/S ECTOR DRIVE Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT Project Code: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. PROJECT DESCRIPTION: The project consists of the replacement of the following wastewater mains: 1. Along Raider Drive from SH10 to 440 feet north of SH10, 2. Euless Square Apartments, and 3. South Ector Drive from SH10 to 665 feet north of SH10. (49th year CDBG project) PROJECT SCHEDULE: FY2024 JUSTIFICATION: Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 158 PROJECT TITLE: 49TH CDBG LINE REP - RAIDER DRIVE/EULESS SQUARE APARTMENTS/S ECTOR DRIVE NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Engineering $52,000 Personnel: Full Time Construction $333,000 Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $385,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % 0 Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding XX Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: Project is contingent upon actual CDBG funding availability. 159 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: March 25,2020 Submitted By: HAL CRANOR Date Completed: Project Title: LINE REPLACEMENT - OAKWOOD TERRACE NORTH PHASE I Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT Project Code: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. PROJECT DESCRIPTION: The project consists of the replacement of the following wastewater mains: 1. Between Mary Drive and Marlene Drive from Eastcliff Drive to Marlene Drive and 2. Between Wilshire Drive and Commerce Street from Marlene Drive to SagebrushTrail. PROJECT SCHEDULE: FY2024 JUSTIFICATION: Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 160 PROJECT TITLE: LINE REPLACEMENT - OAKWOOD TERRACE NORTH PHASE I NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Engineering $66,000 Personnel: Full Time Construction $440,000 Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $506,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund XX Conceptual Design % 0% Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: Proposed funding is from W/WW Operating Fund. 161 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: March 31,2021 Submitted By: HAL CRANOR Date Completed: Project Title: 50TH CDBG LINE REPLACEMENT - ARANSAS DRIVE/DOUGLAS STREET Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT Project Code: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. PROJECT DESCRIPTION: The project consists of the replacement of the following wastewater mains: 1. Along Aransas Drive from Glenn Drive to 440 feet north of Douglas Street and 2. Along Douglas Street from Aransas Drive to Fair Oaks Boulevard. (50th year CDBG project) PROJECT SCHEDULE: FY2025 JUSTIFICATION: Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 162 PROJECT TITLE: 50TH CDBG LINE REPLACEMENT - ARANSAS DRIVE/DOUGLAS STREET NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Engineering $52,000 Personnel: Full Time Construction $349,000 Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $401,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % 0 Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding XX Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: Project is contingent upon actual CDBG funding availability. 163 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: March 25,2020 Submitted By: HAL CRANOR Date Completed: Project Title: LINE REPLACEMENT - OAKWOOD TERRACE NORTH PHASE II Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT Project Code: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. PROJECT DESCRIPTION: The project consists of the replacement of the following wastewater mains: 1. Along Eastcliff Drive from Mary Drive to Tyler Avenue and 2. Between Tyler Avenue and Marlene Drive from Eastcliff Drive to Commerce Street. PROJECT SCHEDULE: FY2025 JUSTIFICATION: Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 164 PROJECT TITLE: LINE REPLACEMENT - OAKWOOD TERRACE NORTH PHASE II NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Engineering $50,000 Personnel: Full Time Construction $330,000 Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $380,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund XX Conceptual Design % 0% Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: Proposed funding is from W/WW Operating Fund. 165 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: March 31,2021 Submitted By: HAL CRANOR Date Completed: Project Title: 51ST CDBG LINE REPLACEMENT - FAIR OAKS BLVD/SHELMAR DR/KENSINGTON CT Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT Project Code: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. PROJECT DESCRIPTION: The project consists of the replacement of the following wastewater mains: 1. Along Fair Oaks Boulevard from Shelmar Drive to Ash Lane, 2. Along Shelmar Drive from Aransas Drive to Cedar Ridge Terrace, and 3. Kensington Court. (51 st year CDBG project) PROJECT SCHEDULE: FY2026 JUSTIFICATION: Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. PROJECT TITLE: 51ST CDBG LINE REPLACEMENT - FAIR OAKS BLVD/SHELMAR DR/KENSINGTON CT NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Engineering $52,000 Personnel: Full Time Construction $345,000 Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $397,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % 0 Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding XX Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: Project is contingent upon actual CDBG funding availability. 167 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: March 31,2021 Submitted By: HAL CRANOR Date Completed: Project Title: LINE REPLACEMENT - WOODVINE DRIVE/CLIFFWOOD ROAD Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT Project Code: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. PROJECT DESCRIPTION: The project consists of the replacement of the following wastewater mains: 1. Along Woodvine Drive from Cliffwood Road to El Camino Real and 2. Along Cliffwood Road from 400 feet north of Woodvine Drive to 450 feet south of Woodvine Drive. PROJECT SCHEDULE: FY2026 JUSTIFICATION: Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 168 PROJECT TITLE: LINE REPLACEMENT - WOODVINE DRIVE/CLIFFWOOD ROAD NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Engineering $72,000 Personnel: Full Time Construction $480,000 Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $552,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund XX Conceptual Design % 0% Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: Proposed funding is from W/WW Operating Fund. 169 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: April 01,2021 Submitted By: HAL CRANOR Date Completed: Project Title. LINE REPLACEMENT-CLIFFWOOD ROAD/SHADY CREEK DRIVE Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT Project Code: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. PROJECT DESCRIPTION: The project consists of the replacement of the following wastewater mains: 1. Along Cliffwood Drive from 400 feet south of Woodvine Drive to Shady Creek Drive and 2. Shady Creek Drive from Woodvine Drive to Cliffwood Drive. PROJECT SCHEDULE: JUSTIFICATION: Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 170 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: April 01,2021 Submitted By: HAL CRANOR Date Completed: Project Title. LINE REPLACEMENT -SUMMIT RIDGE/SHENANDOAH/CRIPPLE CREEK/TRAILWOOD DR Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT Project Code: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. PROJECT DESCRIPTION: The project consists of the replacement of the following wastewater mains: 1. Along Summit Ridge Drive from Shenandoah Drive to Trailwood Drive, 2. Along Shenandoah Drive from Summit Ridge Drive to Trailwood Drive, 3. Along Trailwood Drive from Summit Ridge Drive to Cripple Creek Drive, 4. Along Trailwood Drive from Cripple Creek Drive to Shenandoah Drive, and 5. Cripple Creek Drive. PROJECT SCHEDULE: JUSTIFICATION: Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 171 H E C I T Y O EULESS 172 CAPITAL IMPROVEMENT PROGRAMS FY2022 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE PROPOSED METHOD OF FINANCING Project Description Priority Estimated Cost Operating Fund CIP Fund Balance Bond/Tax Note Grants/ Contributions Impact Fees Escrow Funds Car Rental Tax Other EDC To Be Determined WATER PROJECTS 1 Mil Well Replacement A $ 6,500,000 XX LR: Huntington Drive A $ 515,000 XX Sub -Total Water Priority A -Proposed FY2022 $ 7,015,000 LR: Midway Park 1st Addition (23) B j $ 555,000 XX LR: Sagebrush Trail (24) B $ 435,000 XX LR: Sotogrande Boulevard (21) B $ 438,000 XX LR: Bell -Hi Addition Phase I & II (21) B $ 472,000 XX Sub -Total Water Priority B-Unfunded $ 1,900,000 LR: Donley Drive/Donley Court C TBD XX LR: Dunaway Drive C TBD XX LR: Midway Park 3rd Addition C TBD XX LR: Paula Lane C TBD XX LR: West Euless Boulevard C TBD XX LR: Westpark Way C TBD XX Sub -Total Water Priority C-Unfunded $ - WATER PROJECTS -TOTAL 8,915,000 LR = Line Replacement 173 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: April 15,2019 Submitted By: HAL CRANOR Date Completed: Project Title: 1 MIL WELL REPLACEMENT Project Type: WATER Sub -Type: WELL Project Code: Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: RW Harden & Associates completed a Preliminary Well Design Study in FY2017 in preparation for the replacement of the Fuller Well, Far North Well, and the eventual replacement of the 1 Mil Well. PROJECT DESCRIPTION: The project consists of the complete replacement of the 1 Mil Well with a new well. PROJECT SCHEDULE: FY2022 JUSTIFICATION: A new well will enable the City to continue to provide high quality water to citizens while reducing maintenance and operational costs. 174 PROJECT TITLE: 1 MIL WELL REPLACEMENT NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Engineering $466,700 Personnel: Full Time Construction Administration $96,200 Part Time $0 Construction $5,937,100 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $6,500,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % 0 Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding XX Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: Proposed funding is from American Rescue Plan Fund. 175 H E C I T Y O EULESS 176 1 Mil Well Replacement Construction ti z ¢ NU- 0 - RMANDI AU YJ Q �z++ a o 0 GUSTINE a HICKORY W LEXINGTON kJAMBp�� SPRINGS! � U BORDEAU,r = w BR1TTi\NY n r ROSEMARY �� z Y w C NTERBURY p ti m GINGER p z �0 z y ©`` 0 3 w CANTERB : RY J u' MINT �yO�P�Q�`�� SAGE ,y 1 !O--TT�W MOSS HIL=L=� J () j iP r 6' SWEET UM=z m00 o] w Alt ANICE y �P ST A WESTOVERSAM � J�WESTVER m CINNAMON BAL� ROSEMEAD� �,so �COL=D MORRISON=YRIDGE 11 BAY X m BEA� LARK C%9Iq4P n z A CARAWAY O z o w m m CHERR-Y-ANN BEAR=CREEK=Z CREEK �w � m ¢ COUNTRY --� w eL \ z = w 00 O TARRAGON AL=LEN AL=L=EN� w a z a m a z w LU a FL}1URELII`PARS EE=YROO0�AA PINION cw c MIDIT_IfB_L=V(E)� umi wDX AN=T=HOIVY SUNSHI z x J a Y 1WU�— G o- HOLIDAY ImI Q�RUN0.NELLUWITTEN o // LU _j �OARIBOU mWADE� ✓w�� �R\DG OOD IL CECIL DEACON--4f Q MACK e AMID-C-ITIE� Ul ABBEY INCHESTER `�Hq �—-MACK--3 A "G-0 RRI 7, z 0 9OEN� N_�o—z1 \\ O 60 2 g w oQ� I FOUNTAINVIE Y w iOL a .K p > rBENT Fo REE —GR\P �� ��P PARK=a LL I 0 MEADOWS z �AlBER1 AN o ° o PARK HAVEN�FOIiNTAIN < FOUNTAIN o SIDE ra :X—SATE RAILIw m—Z- SUMMITIRI�GE��== SHAD LIFFITHv; PARK E FOUTAIN� a s AKE= m CREST 0 PARK PRIVATE Q WOODDALE - THORN -WOOD o ASPENWAY m ^ � // C n l — GKNOLLWOOD 0 OAK a WIL-DBRIAR � I � LBOCOWOOD E TEAL=WOODJI EDINBOROU= I=T=H� uCYPRESS �L7U IfIL=U=OAK ©�DOGWOOD 0 a PHL� y �P ASH=LW(W) =--1 a ��JANANN � L=TIMBERS KENSINGER--D 7WALNU- 0W=BROWNSTONE=9 Y- � �o SHEL=MAR a LU SHELMAR-�— " �-aL C w Z=0a=OAK-FOREST �OPN No o= JOHNS-OQb Q T H 'E C I T Y O F N EULESS Legend 0 395 790 1,580 2,370 3,160 O Existing 1 Mil Well Feet O Proposed i Mil Well 177 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: March 25,2020 Submitted By: HAL CRANOR Date Completed: Project Title: LINE REPLACEMENT - HUNTINGTON DRIVE Project Type: WATER Sub -Type: MAIN REPLACEMENT Project Code: Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: The project consists of the replacement of an existing 6 inch asbestos concrete water line located along Huntington Drive between East Alexander Lane and Koen Lane. PROJECT SCHEDULE: FY2022 JUSTIFICATION: The line has had nine leaks repaired since 2007 and was installed in 1961. 178 PROJECT TITLE: LINE REPLACEMENT - HUNTINGTON DRIVE NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Construction $448,000 Personnel: Full Time Engineering $67,000 Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $515,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund XX Conceptual Design % 0% Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: Proposed funding is from W/WW Operating Fund. 179 H E C I T Y O EULESS 180 Huntington Drive Water Line Replacement Water Line Replacement T H E c 1 r Y o f -Huntington Dr. EULESS Legend 0 120 240 480 720 960 Water Feet 181 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: March 25,2020 Submitted By: HAL CRANOR Date Completed: Project Title: LINE REPLACEMENT - MIDWAY PARK 1ST ADDITION Project Type: WATER Sub -Type: MAIN REPLACEMENT Project Code: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: The project consists of the replacement of an existing 6 inch cast iron water line located along Collin Drive from Denton Drive to Harwood Road. PROJECT SCHEDULE: FY2023 JUSTIFICATION: The line has had three leaks repaired since 2007 and was installed in 1953. 182 PROJECT TITLE: LINE REPLACEMENT - MIDWAY PARK 1 ST ADDITION NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Engineering $72,000 Personnel: Full Time Construction $483,000 Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $555,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund XX Conceptual Design % 0% Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: Proposed funding is from W/WW Operating Fund. 183 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: March 25,2020 Submitted By: HAL CRANOR Date Completed: Project Title: LINE REPLACEMENT - SAGEBRUSH TRAIL Project Type: WATER Sub -Type: MAIN REPLACEMENT Project Code: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: The project consists of the replacement of an existing 8 inch cast iron water line located along Sagebrush Trail from Wilshire Drive to the end of Sagebrush Trail. PROJECT SCHEDULE: FY2024 JUSTIFICATION: The line has had two leaks repaired since 2007 and was installed in 1961. 184 PROJECT TITLE: LINE REPLACEMENT - SAGEBRUSH TRAIL NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Construction $378,000 Personnel: Full Time Engineering $57,000 Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $435,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund XX Conceptual Design % 0% Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: Proposed funding is from W/WW Operating Fund. 185 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: March 25,2020 Submitted By: HAL CRANOR Date Completed: Project Title: LINE REPLACEMENT - SOTOGRANDE BLVD Project Type: WATER Sub -Type: MAIN REPLACEMENT Project Code: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: The project consists of the replacement of an existing 10 inch asbestos concrete water line located along Sotogrande Boulevard from El Camino Real to Monterrey Boulevard. PROJECT SCHEDULE: FY2025 JUSTIFICATION: The line has had seven leaks repaired since 2007 and was installed in 1969. W. PROJECT TITLE: LINE REPLACEMENT - SOTOGRANDE BLVD NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Construction $381,000 Personnel: Full Time Engineering $57,000 Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $438,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund XX Conceptual Design % 0% Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: Proposed funding is from W/WW Operating Fund. 187 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: March 29, 2021 Submitted By: HAL CRANOR Date Completed: Project Title: LINE REPLACEMENT - BELL -HI ADDITION PHASE I & II Project Type: WATER Sub -Type: MAIN REPLACEMENT Project Code: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: The project consists of the replacement of an existing 6 inch cast iron water line located along Needles Street from Raider Drive to Paula Lane and along Paula Lane from Needles Street to West Pipeline Road. PROJECT SCHEDULE: FY2026 JUSTIFICATION: The line along Needles Street has had five leaks repaired since 2007 and was installed in 1964. The line along Paula Lane has had six leaks repaired since the 2007 and was installed in 1964. 188 PROJECT TITLE: LINE REPLACEMENT - BELL -HI ADDITION PHASE I & II NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Construction $410,000 Personnel: Full Time Engineering $62,000 Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $472,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund XX Conceptual Design % 0% Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: Proposed funding is from W/WW Operating Fund. 189 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: March 26,2020 Submitted By: HAL CRANOR Date Completed: Project Title. LINE REPLACEMENT - DONLEY DRIVE/DONLEY COURT Project Type: WATER Sub -Type: MAIN REPLACEMENT Project Code: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: The project consists of the replacement of an existing 6 inch water line located in the following areas: 1. Donley Drive from Glenn Drive to Harwood Road and 2. Donley Court. PROJECT SCHEDULE: JUSTIFICATION: The line has had eight leaks repaired since 2007 and the line was installed in 1979. 190 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: April 05,2018 Submitted By: HAL CRANOR Date Completed: Project Title. LINE REPLACEMENT - DUNAWAY DRIVE Project Type: WATER Sub -Type: MAIN REPLACEMENT Project Code: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: The project consists of the replacement of an existing 6 inch asbestos concrete water line located along Dunaway Drive between East Alexander Lane and McCormick Court. PROJECT SCHEDULE: JUSTIFICATION: The line has had nine leaks repaired since 2007 and was installed in 1961. 191 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: April 05,2018 Submitted By: HAL CRANOR Date Completed: Project Title. LINE REPLACEMENT - MIDWAY PARK 3RD ADDITION Project Type: WATER Sub -Type: MAIN REPLACEMENT Project Code: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: The project consists of the replacement of an existing 6 inch cast iron water line located along Ector Drive between Fayette Drive and West Harwood Road. PROJECT SCHEDULE: JUSTIFICATION: The line has had eight leaks repaired since 2007 and was installed in 1953. 192 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: March 26,2020 Submitted By: HAL CRANOR Date Completed: Project Title. LINE REPLACEMENT - PAULA LANE Project Type: WATER Sub -Type: MAIN REPLACEMENT Project Code: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: The project consists of the replacement of an existing 6 inch cast iron water line located along Paula Lane between West Pipeline Road and Needles Street. PROJECT SCHEDULE: JUSTIFICATION: The line has had six leaks repaired since 2007 and was installed in 1964. 193 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: March 26,2020 Submitted By: HAL CRANOR Date Completed: Project Title. LINE REPLACEMENT - WEST EULESS BOULEVARD Project Type: WATER Sub -Type: MAIN REPLACEMENT Project Code: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: The project consists of the replacement of an existing 8 inch water line located between 2219 and 2603 West Euless Boulevard. PROJECT SCHEDULE: JUSTIFICATION: The line has had eight leaks since 2007. Separate sections of the line were installed in 1976 and 1988. 194 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: March 26,2020 Submitted By: HAL CRANOR Date Completed: Project Title. LINE REPLACEMENT - WESTPARK WAY Project Type: WATER Sub -Type: MAIN REPLACEMENT Project Code: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: The project consists of the replacement of an existing 12 inch concrete water line located along Westpark Way between SH10 and South Pipeline Road. PROJECT SCHEDULE: JUSTIFICATION: The line has had twelve leaks since 2007 and was installed in 1972. 195 H E C I T Y O EULESS M. CAPITAL IMPROVEMENT PROGRAMS FY2022 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE PROPOSED METHOD OF FINANCING Project Description Priority Estimated Cost Operating Fund CIP Fund Balance Bond/Tax Note Grants/ Contributions Impact Fees Escrow Funds Car Rental Tax Other EDC To Be Determined OTHER PROJECTS Blessing Branch Park Improvements A $ 365,064 XX FY2022 Roof Replacement & Preventative Maintenance A $ 373,000 XX Sub -Total Other Priority A -Proposed FY2022 $ 738,064 Aquatic Park Facility Upgrades B $ 245,000 XX Carr Park Trail Connection B $ 241,100 XX FY2023 Roof Preventative Maintenance B $ 75,000 XX Kiddie Carr Park Improvements (23) B $ 893,500 XX Trail Lighting - Mid -Cities (23) B $ 115,000 XX FY2024 HVAC System Replacement (24) B $ 65,000 XX FY2024 Roof Replacement & Preventative Maintenance (24) B $ 400,000 XX Trail Lighting - Heritage Avenue to Bob Eden Park (24) B $ 100,000 XX Euless Family Life Center Elevator Replacement (25) B $ 350,000 XX FY2025 Roof Restoration & Preventative Maintenance(25) B $ 785,000 XX FY2026 HVAC System Replacement(26) B $ 605,000 XX FY2026 Roof Restoration & Preventative Maintenance(26) B $ 800,000 XX Parks at Texas Star Lighting Upgrade (26) B $ 800,000 XX Parks at Texas Star North Additional Parking Lot (26) B $ 550,000 XX Parks at Texas Star Phase VIII B $ 3,966,945 XX Sub -Total Other Priority B-Unfunded $ 9,991,545 Fire Station #2 Remodel C TBD XX Police & Courts Building Remodel C TBD XX Parks at Texas Star Turf - Fenway, Shea, and Jacobs Field C TBD XX Animal Shelter Expansion/Renovation C TBD XX South Euless Park Upgrades C TBD XX Trail Enhancements Phase I C TBD XX Trail Enhancements Phase II C TBD XX Trail Enhancements Villages of Bear Creek C TBD XX Trailwood Park Improvements C TBD XX Sub -Total Other Priority C-Unfunded $ OTHER PROJECTS - TOTAL $ 10,729,609 197 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: April 30,2008 Submitted By: RAY MCDONALD Date Completed: Project Title: BLESSING BRANCH PARK IMPROVEMENTS Project Type: PARK/RECREATION Sub -Type: PARK IMPROVEMENTS Project Code: Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project is a continuation of the overall trail system expansion and general park improvements as identified in the Parks Master Plan. PROJECT DESCRIPTION: Blessing Branch Park is a 7.3 acre linear park located on the east side of Main Street across from Midway Park. Currently, the park has only one swing set. This project includes construction of a trail connection from Main Street to the west and Fuller Wiser to the east. Additionally, the project includes a new playground, picnic pads with grills, and some type of shade shelter/pavilion/gazebo. This area currently gets a high volume of foot traffic. Constructing a trail in this linear greenbelt would not only provide a safe paved access for the residents east of Main Street to Midway Park, Midway Park Elementary, and to Trinity High School, but also help create a renewed sense of quality of life for the residents in that area by enhancing the recreational amenities available. PROJECT SCHEDULE: FY2022 JUSTIFICATION: The number one request from Euless citizens as it relates to trails, based on the responses to the needs assessment survey as identified in the Parks Master Plan, was to construct trail connections between existing and/or future park developments. This project not only satisfies that request, but also provides trail connections to neighborhoods, schools, between major thoroughfares, and potentially to future commercial developments to the southeast. 198 PROJECT TITLE: BLESSING BRANCH PARK IMPROVEMENTS NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Approximately 28,000 square feet of Personnel: Full Time 4"x8' concrete trail $158,480 Part Time $0 Playground/Border $60,000 Total Salary $0 Picnic pads w/grills $20,000 Purchase of Services Shade shelter/pavilion/gazebo $30,000 Materials & Supplies Trail Lighting $50,000 Utilities $0 Playground chips $5,400 Design/Survey/Engineering $23,800 Contingency $17,384 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $365,064 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund XX Conceptual Design % 0% Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: Proposed funding is from EDC Operating Fund. 199 City of Euless Capital Project Request Department: FLEET & FACILITY OPERATIONS Date Prepared: April 19,2021 Submitted By: KYLE MCADAMS Date Completed: Project Title: FY2022 ROOF REPLACEMENT & PREVENTATIVE MAINTENANCE Project Type: FACILITIES Sub -Type: ROOF REPLACEMENT/PM Project Code: Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: 1. Finance Building - Replacement of a Built -Up Roof (BUR) system down to the concrete decking. Build back-up with a new Polyisocya n u rate (ISO) foam board over deck and apply new cap sheet with bitumen seals. Exterior edge trim will also be repaired and painted. 2. Euless Family Life Center (EFLC) Building - Preventative maintenance (PM) will be performed. Roof penetrations will be sealed or cover caps replaced, edge trim and flashing checked and sealed or replaced, and heating, ventilation, and air conditioning (HVAC) roof curbs will be checked and resealed. The roof structure will be scanned for water pockets and sections will be cut-out and replaced, as needed. This will prolong the life of the roof system. PROJECT SCHEDULE: Finance Building: Fall FY2022 EFLC Building: Spring FY2022 JUSTIFICATION: 1. Finance Building - The original roof was replaced during the building remodel in 2006. It is a BUR system with a Styrene-Butadiene-Styrene (SBS) modified cap sheet (20 year warranty). There are numerous voids and granular loss on the cap sheet due to weather events over several years. Roof leaks have been repaired but have become increasingly common over the last few years. Flashing, pitch pans, HVAC curbs, and penetrations have all deteriorated and will be replaced with the roof system. 2. EFLC Building - Roof system was replaced in 2011 during the construction and remodel of the facility. The roof system has a 20 year roof cap sheet warranty with flashing, pitch pans, HVAC curbs and penetrations excluded. The PM would repair small voids, split cap sheets, reseal or replace flashings, reseal curbs, and reinstall pitch pans. The roof system will also be scanned for any water pockets and alert the City of any other potential issues that could cause leakage or damage to the roofing system. This service will help in maintaining the full warranty and extend the overall life of the roofing system. 200 PROJECT TITLE: FY2022 ROOF REPLACEMENT & PREVENTATIVE MAINTENANCE NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Finance Building - Roof Replacement $278,000 Personnel: Full Time EFLC Building - Roof PM $95,000 Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost $373,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund XX Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: Proposed funding is from General Fund. 201 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: May 14,2021 Submitted By: RAY MCDONALD Date Completed: Project Title: AQUATIC PARK FACILITY UPGRADES Project Type: PARK/RECREATION Sub -Type: PARK IMPROVEMENTS Project Code: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The adopted Parks Master Plan calls for general upgrades and improvements in the overall quality of parks and park amenities in the City and to develop a high quality parks system that provides for all age and interest groups and enhances the adjoining neighborhoods. PROJECT DESCRIPTION: Overall aquatic park improvements include amenities such as expanding the lifeguard "shack" area, replacing the netting for the lily pad play feature, weather proofing the pump room, resurfacing the pool deck, installing an additional ultra violet filtration system, and replacing the outdoor sand filters. PROJECT SCHEDULE: FY2023 JUSTIFICATION: As identified in the adopted Parks Master Plan, the municipal park is the foundation of any solid parks and recreation system. The City of Euless parks and recreation system provides residents and visitors with significant personal, social, environmental, and economic benefits. The revitalization efforts that the Euless City Council has focused on over the years has increased the sense of community pride. The aquatic park continues to serve about 40,000 patrons each year since it opened in 2013. The proposed project will continue the City Council's commitment to the citizens to provide safe, high quality park and recreational facilities for years to come. 202 PROJECT TITLE: AQUATIC PARK FACILITY UPGRADES NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Expand Lifeguard Area $100,000 Personnel: Full Time Lily Pad Netting $10,000 Part Time $0 Weather Proof Pump Room $75,000 Total Salary $0 Resurface Pool Deck $50,000 Purchase of Services Outdoor Sand Filter $10,000 Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $245,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund XX Conceptual Design % 0% Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: Proposed funding is from EDC Operating Fund. 203 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: March 02,2017 Submitted By: RAY MCDONALD Date Completed: Project Title: CARR PARK TRAIL CONNECTION Project Type: PARK/RECREATION Sub -Type: PARK IMPROVEMENTS Project Code: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The adopted Parks Master Plan recommends funding for system -wide trail, park facilities, and amenities upgrades. PROJECT DESCRIPTION: This project includes the construction of a sidewalk/trail connection from Carr and Kiddie Carr Parks to South Pipeline Road along Mills Drive and through the TRA easement. PROJECT SCHEDULE: FY2023 JUSTIFICATION: As identified in the adopted Parks Master Plan, the municipal park is the foundation of any solid parks and recreation system. The City of Euless parks and recreation system provides residents and visitors with significant personal, social, environmental, and economic benefits. The revitalization efforts that the Euless City Council has focused on over the years has increased the sense of community pride. The proposed project will continue the City Council's revitalization efforts by creating an area that will serve both the passive and active leisure needs of the residents in this area. 204 PROJECT TITLE: CARR PARK TRAIL CONNECTION NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Hardscape $164,000 Personnel: Full Time Development/Professional Svcs $65,600 Part Time $0 Survey $10,000 Total Salary $0 TDLR $1,500 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $241,100 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund XX Conceptual Design % 0% Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: Proposed funding is from EDC Operating Fund. 205 City of Euless Capital Project Request Department: FLEET & FACILITY OPERATIONS Date Prepared: April 19,2021 Submitted By: KYLE MCADAMS Date Completed: Project Title: FY2023 ROOF PREVENTATIVE MAINTENANCE Project Type: FACILITIES Sub -Type: ROOF PREVENTATIVE MAINTENANCE Project Code: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: A roof condition assessment is planned to be performed in FY2022 if approved by City Council. PROJECT DESCRIPTION: Parks & Community Services (PACS) Building - Application of an Elastomeric Roof Coating over the existing metal roof system. PROJECT SCHEDULE: FY2023 JUSTIFICATION: PACS Building - The existing metal roof system was originally installed in 1993 and is fully intact with no rusted out sections present. However, there are a large number of metal screw fasteners that hold the metal sheets in place which have lost tension and the rubber seals below have deteriorated. This rubberized coating will cover the metal roof, seal all of the surface area, and will give the roof an additional 10-15 year lifespan. o. PROJECT TITLE: FY2023 ROOF PREVENTATIVE MAINTENANCE NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost PACS - Roof Coating $75,000 Personnel: Full Time Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $75,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund XX Conceptual Design % 0% Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: Proposed funding is from General Fund. 207 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: March 02,2017 Submitted By: RAY MCDONALD Date Completed: Project Title: KIDDIE CARR PARK IMPROVEMENTS Project Type: PARK/RECREATION Sub -Type: PARK IMPROVEMENTS Project Code: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The adopted Parks Master Plan recommends funding for system -wide park facilities and amenities upgrades. PROJECT DESCRIPTION: This project includes the necessary demolition and site work to complete a renovated park project that will include additional parking, benches with pads, picnic tables with pads, additional sidewalks, trail projects, general park lighting, a sport court, drinking fountain, trash cans, bbq grills, bicycle racks, signage, and additional landscaping. PROJECT SCHEDULE: FY2023 JUSTIFICATION: As identified in the adopted Parks Master Plan, the municipal park is the foundation of any solid parks and recreation system. The City of Euless parks and recreation system provides residents and visitors with significant personal, social, environmental, and economic benefits. The revitalization efforts that the Euless City Council has focused on over the years has increased the sense of community pride. Kiddie Carr Park is a four acre park located adjacent to Carr Park off Pauline. The current amenities at this park include the Parks Department's in -ground tree farm, a greenhouse, and an outdoor basketball court. The proposed project will continue the City Council's revitalization efforts by creating an area that will serve both the passive and active leisure needs of the residents in this area. 208 PROJECT TITLE: KIDDIE CARR PARK IMPROVEMENTS NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Demolition $5,500 Personnel: Full Time Site work $155,000 Part Time $0 Hardscape $322,000 Total Salary $0 Landscape $60,500 Purchase of Services Fixtures/Furnishings $92,000 Materials & Supplies Development/Professional Svcs $254,000 Utilities $0 TDLR $1,500 Geotech $3,000 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $893,500 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % 0% Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: Proposed funding is from EDC Operating Fund. 209 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: May 14,2021 Submitted By: RAY MCDONALD Date Completed: Project Title: TRAIL LIGHTING - MID -CITIES Project Type: PARK/RECREATION Sub -Type: PARK IMPROVEMENTS Project Code: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Trail -related improvements were included in the Needs Assessment and Identification section of the adopted Parks Master Plan. PROJECT DESCRIPTION: Project scope consists of the installation of low level lighting along the trail from Bob Eden Park to Euless Main Street. PROJECT SCHEDULE: FY2023 JUSTIFICATION: The City of Euless has experienced significant progress in the last few years in the area of trail development with an extensive network of paved and unpaved trails. The trails system is a valuable asset to the community as it provides a safe means for non -vehicular travel, and also provides an opportunity for a variety of unstructured, low -impact recreational pursuits. The addition of well -placed trail lighting that is frequently maintained improves visibility, increases trail access, and provides convenience for trail users. The development and maintenance of the trails system continues to receive significant support from the citizens as indicated in the responses to the needs assessment survey conducted as a part of the Parks Master Plan update. 210 PROJECT TITLE: TRAIL LIGHTING - MID -CITIES NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Lighting $115,000 Personnel: Full Time Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $115,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund XX Conceptual Design % 0% Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: Proposed funding is from EDC Operating Fund. 211 City of Euless Capital Project Request Department: FLEET & FACILITY OPERATIONS Date Prepared: April 19,2021 Submitted By: KYLE MCADAMS Date Completed: Project Title: FY2024 HVAC SYSTEM REPLACEMENT Project Type: FACILITIES Sub -Type: HVAC REPLACEMENT Project Code: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Parks Maintenance Building - Replacement of eight (8) commercial split heating, ventilation, and air conditioning (HVAC) systems to include thermostats, control wires, liquid/gas lines, and power disconnects. PROJECT SCHEDULE: FY2024 JUSTIFICATION: The major components of the Parks Maintenance building HVAC split systems were installed during the original construction in 2002. Over the last several years, repairs or replacement services have been performed on the units as needed. The system utilizes R-22 type gas which is currently being phased out nationally. The new units will be equipped with the new generation of R-410A gases. 212 PROJECT TITLE: FY2024 HVAC SYSTEM REPLACEMENT NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost HVAC Replacement $65,000 Personnel: Full Time Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $65,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % 0 Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund Tax Note XX ADDITIONAL COMMENTS: 213 City of Euless Capital Project Request Department: FLEET & FACILITY OPERATIONS Date Prepared: April 19,2021 Submitted By: KYLE MCADAMS Date Completed: Project Title: FY2024 ROOF REPLACEMENT & PREVENTATIVE MAINTENANCE Project Type: FACILITIES Sub -Type: ROOF REPLACEMENT/PM Project Code: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: A roof condition assessment is planned to be performed in FY2022 if approved by City Council. PROJECT DESCRIPTION: 1. Parks Maintenance Building - Application of an Elastomeric Roof Coating over the existing metal roof system. 2. City Hall Building - Replacement of a Built-up Roof (BUR) and Styrene-Butadiene-Styrene (SBS) modified cap sheet system. This will also replace all roof penetrations, flashing, gas line blocking, and heating, ventilation, and air conditioning (HVAC) unit curbs. PROJECT SCHEDULE: Parks Building: Fall FY2024 City Hall Building: Spring FY2024 JUSTIFICATION: 1. Parks Maintenance Building - The existing metal roof system was installed during construction in 2002 and is fully intact with no rusted out sections present. However, there are a large number of metal screw fasteners that hold the metal sheets in place which have lost tension and the rubber seals below have deteriorated. This rubberized coating will cover the metal roof and will seal all of the surface area and give the roof an additional 10-15 year lifespan. 2. City Hall Building - The original roof was replaced during the 2003 remodel. The roof was constructed using a BUR and SBS modified cap sheet system. The roof is currently intact and there are no leaks present. The four (4) lower roof sections above the outcrops are the same type construction but each section has one internal drain to manage the water load. The roofs over the City Secretary's area has had a persistent leak for a number of years and the decking in this section may need to be replaced during the roof replacement. Proposed system will have a 20 year warranty. 214 PROJECT TITLE: FY2024 ROOF REPLACEMENT & PREVENTATIVE MAINTENANCE NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Parks Maintenance - Roof Coating $110,000 Personnel: Full Time City Hall - Roof Replacement $290,000 Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $400,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % 0 Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund Tax Note XX ADDITIONAL COMMENTS: 215 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: May 14,2021 Submitted By: RAY MCDONALD Date Completed: Project Title: TRAIL LIGHTING - HERITAGE AVENUE TO BOB EDEN PARK Project Type: PARK/RECREATION Sub -Type: PARK IMPROVEMENTS Project Code: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Trail -related improvements were included in the Needs Assessment and Identification section of the adopted Parks Master Plan. PROJECT DESCRIPTION: Project scope consists of the installation of low level lighting along the trail from Heritage Avenue to Bob Eden Park. PROJECT SCHEDULE: FY2024 JUSTIFICATION: The City of Euless has experienced significant progress in the last few years in the area of trail development with an extensive network of paved and unpaved trails. The trails system is a valuable asset to the community as it provides a safe means for non -vehicular travel, and also provides an opportunity for a variety of unstructured, low -impact recreational pursuits. The addition of well -placed trail lighting that is frequently maintained improves visibility, increases trail access, and provides convenience for trail users. The development and maintenance of the trails system continues to receive significant support from the citizens as indicated in the responses to the needs assessment survey conducted as a part of the Parks Master Plan update. 216 PROJECT TITLE: TRAIL LIGHTING - HERITAGE AVENUE TO BOB EDEN PARK NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Lighting $100,000 Personnel: Full Time Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $100,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund XX Conceptual Design % 0% Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: Proposed funding is from EDC Operating Fund. 217 City of Euless Capital Project Request Department: FLEET & FACILITY OPERATIONS Date Prepared: April 19,2021 Submitted By: KYLE MCADAMS Date Completed: Project Title: EULESS FAMILY LIFE CENTER ELEVATOR REPLACEMENT Project Type: FACILITIES Sub -Type: ELEVATOR REPLACEMENT Project Code: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Replacement of an in -ground passenger hydraulic elevator at the Euless Family Life Center. PROJECT SCHEDULE: FY2025 JUSTIFICATION: The current passenger elevator was installed in 1989 during the building's original construction. This type of unit has a typical life -span of approximately 20 years in a high traffic environment. The Euless Family Life Center elevator will be 36 years old in FY2025 and due to the low usage, the life cycle has been safely extended to this date. The City maintains a service contract with Otis Elevators to inspect and perform services as needed to keep the unit functional. Replacement of the system with a modernized lift system with self -enclosed hydraulics and computerized controls is recommended. 218 PROJECT TITLE: EULESS FAMILY LIFE CENTER ELEVATOR REPLACEMENT NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Elevator Replacement $350,000 Personnel: Full Time Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $350,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % 0 Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund Tax Note XX ADDITIONAL COMMENTS: 219 City of Euless Capital Project Request Department: FLEET & FACILITY OPERATIONS Date Prepared: April 19,2021 Submitted By: KYLE MCADAMS Date Completed: Project Title: FY2025 ROOF RESTORATION & PREVENTATIVE MAINTENANCE Project Type: FACILITIES Sub -Type: ROOF RESTORATION/PM Project Code: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: A roof condition assessment is planned to be performed in FY2022 if approved by City Council. PROJECT DESCRIPTION: 1. Police & Courts Building - Roof repairs to and restoration of the existing roof system. 2. Public Works Building - Application of an Elastomeric Roof Coating over the existing metal roof system. PROJECT SCHEDULE: Police & Courts Building: Fall FY2025 Public Works Building: Spring FY2025 JUSTIFICATION: 1. Police & Courts Building - The original roof was installed during construction in 2001. There are four (4) main roof sections constructed using the Built-up Roof (BUR) and Styrene-Butadiene-Styrene (SBS) modified cap sheet system. The roof is currently intact and there have been only minor leaks present over the years. Proposed restoration will increase the lifespan of the roof system. 2. Public Works Building - The existing metal roof was installed in 2007 and is fully intact with no rusted -out sections present. However, there are a large number of metal screw fasteners that hold the metal sheets in place which have lost tension and the rubber seals below have deteriorated. This rubberized coating will cover the metal roof and will seal all of the surface area and give the roof an additional 10-15 year lifespan. 220 PROJECT TITLE: FY2025 ROOF RESTORATION & PREVENTATIVE MAINTENANCE NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Police & Courts - Roof Restoration $545,000 Personnel: Full Time Public Works - Roof Coating $240,000 Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $785,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % 0 Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund Tax Note XX ADDITIONAL COMMENTS: 221 City of Euless Capital Project Request Department: FLEET & FACILITY OPERATIONS Date Prepared: April 19,2021 Submitted By: KYLE MCADAMS Date Completed: Project Title: FY2026 HVAC SYSTEM REPLACEMENT Project Type: FACILITIES Sub -Type: HVAC REPLACEMENT Project Code: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: 1. City Hall - Replacement of nine (9) heating, ventilation, and air conditioning (HVAC) roof top units (RTU). 2. Public Works - Replacement of ten (10) HVAC commercial split systems and mini -split systems. 3. Euless Family Life Center (EFLC) - Replacement of (31) HVAC RTUs and mini -split systems. PROJECT SCHEDULE: FY2026 JUSTIFICATION: The major components of all three (3) buildings HVAC split systems were installed during the original construction of each facility. Over the last several years, repairs or replacement services have been performed on the units as needed. Each of the systems utilize R-22 type gas which is being phased out nationally. The new units will be equipped with the new generation of R-410A gases. 1. City Hall - HVAC units were installed during the 2003 construction. 2. Public Works - HVAC units were installed during the 2007 construction. 3. Euless Family Life Center - The majority of HVAC units were installed in 2010. 222 PROJECT TITLE: FY2026 HVAC SYSTEM REPLACEMENT NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost City Hall - HVAC $105,000 Personnel: Full Time Public Works - HVAC $50,000 Part Time $0 Euless Family Life Center - HVAC $450,000 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $605,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % 0 Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund Tax Note XX ADDITIONAL COMMENTS: 223 City of Euless Capital Project Request Department: FLEET & FACILITY OPERATIONS Date Prepared: April 19,2021 Submitted By: KYLE MCADAMS Date Completed: Project Title: FY2026 ROOF RESTORATION & PREVENTATIVE MAINTENANCE Project Type: FACILITIES Sub -Type: ROOF RESTORATION/PM Project Code: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: A roof condition assessment is planned to be performed in FY2022 if approved by City Council. PROJECT DESCRIPTION: 1. Main Centre Addition - Roof repairs to and restoration of the existing roof system. 2. Texas Star Conference Center - Acid wash of metal roof and replace or reseal fasteners and clips, as needed. Seal control joints and caulk all flashings or replace, as needed. Power wash stucco facade, check flat -roof, and reseal flashings and penetrations. PROJECT SCHEDULE: Main Centre Addition: Fall FY2026 Texas Star Conference Center: Spring FY2026 JUSTIFICATION: 1. Main Centre Addition - The original roof was installed during the construction in 2010. There are two (2) main roof sections with six (6) auxiliary roofs constructed using the Built-up Roof (BUR) and Styrene- B utad ien e-Styrene (SBS) modified cap sheet system. The center entrance of the building is a barrel vault that is constructed using a standing seam metal roof system. All roof systems are currently intact and there have been only minor leaks present over the years. Proposed restoration will add an additional 10-15 year to the life of the roof. 2. Texas Star Conference Center - The north side of the roof was installed during the original construction in 1996 and the remaining roof was installed in 2006. The metal roof is fully intact with no evidence of rusted out sections present. However, there are a minimal number of metal screw fasteners holding the metal sheets in place which have lost tension and the rubber seals below have deteriorated. This is a standing seemed metal roofing system with the majority of the panels being held in place with clip fasteners. Both fastener systems need to be inspected and replaced or sealed. All flashing needs to be replaced or sealed and the gutters need to be inspected and repaired. 224 PROJECT TITLE: FY2026 ROOF RESTORATION & PREVENTATIVE MAINTENANCE NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Texas Star - Roof PM $190,000 Personnel: Full Time Main Centre Add. - Roof Restoration $610,000 Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $800,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % 0 Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund Tax Note XX ADDITIONAL COMMENTS: 225 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: May 14,2021 Submitted By: RAY MCDONALD Date Completed: Project Title: PARKS AT TEXAS STAR LIGHTING UPGRADE Project Type: PARK/RECREATION Sub -Type: PARK IMPROVEMENTS Project Code: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: This project would replace the halide lighting with LED lighting fixtures on Wrigley, Royal, Yankee and Arlington fields, as well as on Vets and McGrady fields. PROJECT SCHEDULE: FY2026 JUSTIFICATION: The recent addition of Legends Field as well as the newly renovated Parks at Texas Star Phase VII included the addition of LED sports lighting. Upgrading the remaining field lights to LED lighting will not only make the entire sports complex lighting universal, but will reduce the overall energy consumed, reduce maintenance cost, and significantly increase the overall sports lighting performance with state of the art lighting controls. 226 PROJECT TITLE: PARKS AT TEXAS STAR LIGHTING UPGRADE NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Lighting $800,000 Personnel: Full Time Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $800,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund XX Conceptual Design % 0% Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: Proposed funding is from EDC Operating Fund. 227 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: May 14,2021 Submitted By: RAY MCDONALD Date Completed: Project Title: PARKS AT TEXAS STAR NORTH ADDITIONAL PARKING LOT Project Type: PARK/RECREATION Sub -Type: PARK IMPROVEMENTS Project Code: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Project scope includes the design and construction of a parking lot at the recently renovated Parks at Texas Star North facility. Approximately 160 to 180 additional parking spaces will be created at the facility. PROJECT SCHEDULE: FY2026 JUSTIFICATION: For quite some time, and most recently since the completion of Parks at Texas Star North, the facility has been severely under -served in parking. With the completion of the additional parking lot, the Parks at Texas Star Complex will be positioned to serve the ever-increasing athletic needs of the community and spur economic opportunities for the City. 228 PROJECT TITLE: PARKS AT TEXAS STAR NORTH ADDITIONAL PARKING LOT NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Parking Lot $500,000 Personnel: Full Time Contingency $50,000 Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $550,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund XX Conceptual Design % 0% Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding Construction % 0% General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: Proposed funding is from EDC Operating Fund. 229 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: March 21,2019 Submitted By: RAY MCDONALD Date Completed: Project Title: PARKS AT TEXAS STAR PHASE VIII Project Type: PARK/RECREATION Sub -Type: TSSC IMPROVEMENTS Project Code: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Parks at Texas Star Phase VIII includes construction of a multi -use, lighted open space that could be programmed for multiple activities. With the growing number of participants in youth sports, creating additional open space will allow staff the opportunity to expand existing leagues as well as programming for additional leagues in multiple sports. The addition of this phase will ensure that the Texas Star Sports Complex remains the premier sports facility for amateur athletics for many years to come. PROJECT DESCRIPTION: The project includes the design and construction of additional lighted playing surfaces to accommodate multiple sports. Additionally, this project will include substantial drainage and utility work, additional parking, and sidewalks. PROJECT SCHEDULE: FY2026 JUSTIFICATION: With the completion of Phase VIII, the new infields will increase programming opportunities to accommodate multiple sports. 230 PROJECT TITLE: PARKS AT TEXAS STAR PHASE VIII NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Earthwork $267,750 Personnel: Full Time Drainage $66,250 Part Time $0 Parking & Sidewalks $618,950 Total Salary $0 Lighted Multi -use Fields $1,400,000 Purchase of Services Utilities $162,000 Materials & Supplies Restroom $300,000 Utilities $0 Pavilion/Fencing/Equipment $355,000 Design $300,000 Irrigation $150,000 Contingency $346,995 Subtotal: $0 Maintenance Costs $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $3,966,945 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % 0 Fund Balance Preliminary Design % 0% Special Project Fund Final Plans % 0% Certificate of Obligation Specifications % 0% County, State, Federal Funding Construction % 0% General Obligation Bonds Revenue Bonds XX Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: Proposed funding is from EDC Bond Sale. 231 City of Euless Capital Project Request Department: FLEET & FACILITY OPERATIONS Date Prepared: April 14,2021 Submitted By: KYLE MCADAMS Date Completed: Project Title. FIRE STATION #2 REMODEL Project Type: FACILITIES Sub -Type: REMODEL Project Code: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: A needs assessment is planned to be performed in FY2022 if approved by City Council. PROJECT DESCRIPTION: Remodel or potential expansion of current facility to better accommodate station staff, apparatus, and to improve department operations. PROJECT SCHEDULE: JUSTIFICATION: Fire Station #2 was constructed in 1998 from the former Fleet Service Center (Built 1978). The station was required to relocate due to the planned expansion of Westpark Way. The facility was remodeled to accommodate the fire staff and apparatus bays were constructed on the west side of the building for equipment and vehicles. Minor cosmetic upgrades were performed in 2015 with paint and appliance updates being the primary focus. The needs assessment that is scheduled as a one-time project in FY2022 is to determine if Fire Station #2 needs to be remodeled or reconstructed in order to accommodate staff growth and to house all fire department equipment and vehicles in this district. Currently, this facility does not have separate sleeping quarters or bathrooms to accommodate female firefighters. 232 City of Euless Capital Project Request Department: FLEET & FACILITY OPERATIONS Date Prepared: April 14,2021 Submitted By: KYLE MCADAMS Date Completed: Project Title: POLICE & COURTS BUILDING REMODEL Project Type: FACILITIES Sub -Type: REMODEL Project Code: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: A needs assessment is planned to be performed in FY2022 if approved by City Council. PROJECT DESCRIPTION: Interior remodel of the Police and Courts building to accommodate personnel growth and to better utilize the interior space. PROJECT SCHEDULE: JUSTIFICATION: The Police and Courts building was completed and occupied in 2001. Since then, both departments have experienced personnel growth and have assumed additional responsibilities. PD has added code enforcement, enhanced neighborhood services, and provided drone services. The need for more office space is a primary focus of the needs assessment that is scheduled as a one-time project in FY2022. Additional storage space is needed for all of the extra gear police officers are now required to carry while on duty. Internal security updates are necessary to meet current needs. 233 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: May 14,2021 Submitted By: RAY MCDONALD Date Completed: Project Title: PARKS AT TEXAS STAR TURF - FENWAY, SHEA & JACOBS FIELD Project Type: PARK/RECREATION Sub -Type: PARK IMPROVEMENTS Project Code: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Project scope includes the installation of turf on the infields of the three remaining fields at the Parks at Texas Star. These infields are much smaller because they are only used for coach pitch and t-ball. PROJECT SCHEDULE: JUSTIFICATION: Going back to 2016, when the first turf infields were installed at the Parks at Texas Star, the number of rain outs were significantly reduced. Even after the heaviest rain events, the infields were still playable; any rain out of games is either due to satellite locations being rained out or the outfields being too wet to play. Currently, the infields are clay at these three locations. 234 City of Euless Capital Project Request Department: FLEET & FACILITY OPERATIONS Date Prepared: May 07,2007 Submitted By: KYLE MCADAMS Date Completed: Project Title. ANIMAL SHELTER - EXPANSION/RENOVATION Project Type: FACILITIES Sub -Type: REMODEL Project Code: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: The project consists of the expansion of the current animal shelter facility to better accommodate visitors, adoptions, and animal services. The project scope includes the addition of ten (10) enclosed dog runs, six (6) quarantine runs, an adoption room, additional room for cat containment, and an area for animal washing. Office space expansion will be included in the renovation as well as updates to the public/employee restrooms. PROJECT SCHEDULE: JUSTIFICATION: The current animal control facility has insufficient space to meet current and future demands. 235 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: April 02,2013 Submitted By: RAY MCDONALD Date Completed: Project Title: SOUTH EULESS PARK UPGRADES Project Type: PARK/RECREATION Sub -Type: PARK IMPROVEMENTS Project Code: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The adopted Parks Master Plan calls for general upgrades and improvements in the overall quality of parks in the City and to develop a high quality parks system that provides activities for all age and interest groups and enhances the adjoining neighborhoods. PROJECT DESCRIPTION: Overall park enhancements and improvements to include amenities such as new playground equipment, park redevelopment, improved lighting, water features, upgrade and expansion of existing splashpad, and additional landscaping. PROJECT SCHEDULE: JUSTIFICATION: This has been documented in the adopted Parks Master Plan. 236 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: May 12,2008 Submitted By: RAY MCDONALD Date Completed: Project Title. TRAIL ENHANCEMENTS PHASE I Project Type: PARK/RECREATION Sub -Type: TRAIL SYSTEM Project Code: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Trail -related improvements were included in the Needs Assessment and Identification section of the adopted Parks Master Plan. PROJECT DESCRIPTION: This project consists of the first phase of implementation of park improvements identified in the adopted Parks Master Plan which includes additional water fountains, additional benches, construction of shaded seating areas along the trail, addition and/or installation of new exercise equipment along the trails, picnic stations, and construction of additional pedestrian bridges in high water areas. Also identified, is the need to address various areas in our trails system that might need to be converted from unpaved to paved trails. PROJECT SCHEDULE: JUSTIFICATION: The City of Euless has experienced significant progress in the last few years in the area of trail development with an extensive network of paved and unpaved trails. The trails system is a valuable asset to the community as it provides a safe means for non -vehicular travel, and also provides an opportunity for a variety of unstructured, low -impact recreational pursuits. The development and maintenance of the trails system continues to receive significant support from the citizens as indicated in the responses to the needs assessment survey conducted as a part of the Parks Master Plan update. 237 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: May 13,2008 Submitted By: RAY MCDONALD Date Completed: Project Title. TRAIL ENHANCEMENTS PHASE II Project Type: PARK/RECREATION Sub -Type: TRAIL SYSTEM Project Code: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Trail -related improvements were included in the Needs Assessment and Identification section of the adopted Parks Master Plan. PROJECT DESCRIPTION: This project is Phase II of the trail enhancements that continues implementation of park improvements identified in the adopted Parks Master Plan which includes additional water fountains, additional benches, construction of shaded seating areas along the trail, addition and/or installation of new exercise equipment along the trails, picnic stations, and construction of additional pedestrian bridges in high water areas. Also identified, is the need to address various areas along the trail that need to be converted from unpaved to paved trails. PROJECT SCHEDULE: JUSTIFICATION: The City of Euless has experienced significant progress in the last few years in the area of trail development with an extensive network of paved and unpaved trails. The trails system is a valuable asset to the community as it provides a safe means for non -vehicular travel, and also provides an opportunity for a variety of unstructured, low -impact recreational pursuits. The development and maintenance of the trails system continues to receive significant support from the citizens as indicated in the responses to the needs assessment survey conducted as a part of the Parks Master Plan update. 238 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: March 23,2004 Submitted By: RAY MCDONALD Date Completed: Project Title. TRAIL ENHANCEMENTS VILLAGES OF BEAR CREEK Project Type: PARK/RECREATION Sub -Type: TRAIL SYSTEM Project Code: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project includes infrastructure improvements which were identified as a high priority in the adopted Parks Master Plan. PROJECT DESCRIPTION: This project includes the redevelopment/redesign and improvement of the trail at the Villages of Bear Creek Park to offer multiple uses for the citizens of Euless. PROJECT SCHEDULE: JUSTIFICATION: Trail development and enhancement opportunities will be consistent with available land, funding, and time variables. This Master Plan recommendation will be part of a city-wide comprehensive trail enhancement project. Due to the continual erosion of the existing trail, a redevelopment/redesign of the trail system at Villages of Bear Creek will be necessary. 239 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: May 13,2008 Submitted By: RAY MCDONALD Date Completed: Project Title. TRAILWOOD PARK IMPROVEMENTS Project Type: PARK/RECREATION Sub -Type: PARK IMPROVEMENTS Project Code: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project is a continuation of the overall park improvement plan as identified in the Parks Master Plan. PROJECT DESCRIPTION: Trailwood Park is an eleven acre site that currently has a playground and a half -mile hike/bike trail. This project includes the installation of a new pavilion, a parking lot, upgraded playground to meet American with Disabilities Act standards, park lighting, new park signs, benches along the trail, and trail lighting. PROJECT SCHEDULE: JUSTIFICATION: As identified in the adopted Parks Master Plan, the municipal park is the foundation of any solid parks and recreation system. The City of Euless parks and recreation system provides the residents and visitors with significant personal, social, environmental, and economic benefits. The revitalization efforts that the Euless City Council has focused on over the years has increased the sense of community pride. This proposed project will continue those efforts by creating an area that will serve both the passive and active leisure needs of the residents in the vicinity. 240 CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Project Number Project Description Date Total Project (Over) Under Completed Total Budget Costs Budget DRAINAGE PROJECTS DR9901 Sulphur Branch Phase II 08/01/99 $ 123,404 $ 120,128 $ 3,276 DR9902 Windlea & WestCliff 08/01/99 $ 4,396 $ 1,159 $ 3,237 DR9904 Hurricane Creek 04/30/02 $ 257,500 $ 69,906 $ 187,594 DR0302 Flooding Mitigation Cancelled $ 250,000 $ - $ 250,000 DR0303 Aransas @ Glenn 12/31/04 $ 250,000 $ 250,000 $ - DR0304 Live Oak Drainage 04/15/05 $ 218,000 $ 175,958 $ 42,042 DR0305 Sierra Drive Drainage 04/15/05 $ 40,738 $ 40,738 $ 0 DR0306 Flood Mitigation Plan FEMA 04/15/05 $ 32,000 $ 7,750 $ 24,250 DR0307 Simmons Drainage 04/15/05 $ 22,995 $ 22,995 $ - DR0301 Fuller Branch Channel Stabilization 05/31/07 $ 279,136 $ 232,176 $ 46,960 DR0401 Channel Stabilization Tributary WFA 05/31/07 $ 437,462 $ 438,070 $ 608 DR0402 Drainage Project Stud 05/31/07 $ 60,000 $ 51,000 $ 9,000 DR0601 Little Bear Creek Study Update 04/25/08 $ 50,000 $ 49,000 $ 1,000 DR0602 McCormick Park 04/25/08 $ 250,000 $ 247,925 $ 2,075 DR0701 Eastcliff Drive/Greenbriar Drive Drainage Imp. 04/17/10 $ 340,000 $ 246,584 $ 93,416 DR0801 Rockwall Drive/Lamar Drive Drainage Imp. 04/17/10 $ 430,000 $ 272,554 $ 157,446 DR0901 Bear Creek Parkway Erosion Repair 02/17/11 $ 530,000 $ 464,465 $ 65,535 DR0802 Hurricane Creek & Bridge at Marlene Improvements 04/14/11 $ 378,500 $ 344,574 $ 33,926 DR0000 Boyd Branch Improvements Cancelled $ 10,000,000 $ - $ 10,000,000 Drainage Projects - Prior Years $ 13,954,131 $ 3,034,982 $ 10,919,149 Drainage Projects - Current Year $ - $ - $ - Total Drainage Projects $ 13,954,131 $ 3,034,982 $ 10,919,149 241 H E C I T Y O EULESS 242 CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Project Number Project Description Date Total Project (Over) Under Completed Total Budget Costs Budget STREET PROJECTS PS9911 Overlay Projects 03/30/00 $ 294,687 $ 294,687 $ PS9912 Harwood -Main Intersection 04/30/00 $ 1,126,935 $ 1,077,303 $ 49,632 PS9907 West ark Way- SH10 to SH183 09/30/00 $ 605,542 $ 479,915 $ 125,627 PS9902 Mid Cities Blvd. 05/02/02 $ 1,075,074 $ 963,635 $ 111,439 PS9910 Sidewalks 06/30/03 $ 200,000 $ 200,000 $ - PS0001 IFM 157 S Pipeline to SH10(Utility Relocation 04/30/04 $ 378,207 $ 371,318 $ 6,889 PS0003 Glade from Heritage to SH121 04/30/04 $ 1,866,612 $ 1,866,612 $ - PS0004 Glade Rd East - SH121 to Champagne 04/30/04 $ 1,210,014 $ 1,162,009 $ 48,005 PS0201 Gateway Blvd - Southern Portion 04/30/04 $ 510,000 $ 473,817 $ 36,183 PS0301 Mid Cities Roadway Illumination 04/15/05 $ 160,000 $ 148,115 $ 11,885 PS0302 Driftwood Pipeline Traffic Signal 04/15/05 $ 100,000 $ 68,665 $ 31,335 PS0303 Aransas/Harwood Traffic Signal 04/15/05 $ 120,000 $ 89,118 $ 30,882 PSO402 South Pipeline Road Bride 04/30/05 $ 28,208 $ 28,208 $ - PS9908 Si nalization 05/31/06 $ 168,055 $ 168,055 $ - PSO401 West Pipeline - Raider to City Limits 05/31/06 $ 223,000 $ 104,859 $ 118,141 PSO403 Raider Dr - SH10 to South Pipeline 05/31/06 $ 330,000 $ 293,435 $ 36,565 PS0501 Ross Avenue/S.Main 300' W 05/31/06 $ 95,688 $ 95,638 $ 50 PS0502 Industrial Signal Timing 05/31/06 $ 50,000 $ 50,000 $ - PS0503 Overlay -Harwood 157/Main 05/31/06 $ 137,000 $ 119,816 $ 17,184 PS0604 Overla-S.Main, SH10/S.Pi eline 05/31/06 $ 137,000 $ 140,211 $ 3,211 PS0601 Overlay -East Midway 05/31/07 $ 83,000 $ 73,550 $ 9,450 PS0602 Overlay -Midway, N Main,/FM157 05/31/07 $ 105,000 $ 67,632 $ 37,368 PS0603 Overlay -Fuller Wiser, Midway/Harwood 05/31/07 $ 40,000 $ 28,695 $ 11,305 PS9906 Traffic Safet /Si nalization 05/31/08 $ 128,027 $ 127,939 $ 88 PSO404 South Pipeline Road Overlay 05/31/08 $ 114,750 $ 85,062 $ 29,688 PS0701 Overlay -Dickey Drive 05/31/08 $ 122,200 $ 48,435 $ 73,765 PS0702 Overlay -East Huitt 05/31/08 $ 89,000 $ 64,895 $ 24,105 PS0703 Overlay -Huntington Drive 05/31/08 $ 69,500 $ 42,884 $ 26,616 PS0706 Gateway Blvd Screening Wall 05/31/08 $ 135,800 $ 138,862 $ 3,062 PS0705 Signal Gateway Blvd @ Glade 10/28/08 $ 98,000 $ 98,000 $ - PS0002 West Pipeline Road-Raider/H 10 12/01/08 $ 6,082,621 $ 6,081,392 $ 1,229 PS0801 Overlay -North Main/Cullum Drive 12/31/08 $ 290,000 $ 211,130 $ 78,870 PS9905 Traffic Studies 05/30/09 $ 27,286 $ 27,197 $ 89 PS0704 Disability Access Stud 05/31/09 $ 30,000 $ 13,950 $ 16,050 PS0901 Ash/Denton/Fair Oaks Overlay 09/30/09 $ 320,000 $ 231,984 $ 88,016 PS0902 Vine Street Design Cancelled $ 100,000 $ - $ 100,000 PS9903 HWY 183 Service Road Cancelled $ - $ - $ - PS0304 Glade Road 04/16/10 $ 3,077,977 $ 2,905,205 $ 172,772 PS9909 FM157 North - SH183 to SH121 04/16/10 $ 267,519 $ 129,215 $ 138,304 PS0903 Mid Cities @ Gateway & Baze Traffic Signals 04/16/10 $ 320,000 $ 250,702 $ 69,298 PS0802 Fuller -Wiser Connector 02/17/11 $ 495,000 $ 441,491 $ 53,509 PS1002 FY10County Overlay -Wilshire/Marlene 05/17/11 $ 288,000 $ 200,890 $ 87,110 PS9901 North Main Street 05/31/12 $ 6,745,047 $ 6,698,149 $ 46,898 PS9904 Harwood Road 05/31/12 $ 5,770,211 $ 5,686,556 $ 83,655 PS1001 Baze Road 05/31/12 $ 1,830,000 $ 1,558,401 $ 271,599 PS1101 FY2011 County Overlay -Bear Creek Drive/Lakewood Blvd/Ash Lane 05/31/12 $ 300,000 $ 265,887 $ 34,113 PS0605 South Pipeline Road Bridge Replacement 05/31/13 $ 157,000 $ 157,000 $ - PS1003 Ash Lane -Aransas Drive to N. Main Street 05/31/13 $ 1,959,230 $ 1,597,270 $ 361,960 PS1201 FY2012 County Overlay -Aransas Drive/Slaughter Lane 05/31/13 $ 300,000 $ 228,759 $ 71,241 PS1301 FY2013 38th CDBG-ADA/TAS Infrastructure Improvements 05/31/14 $ 450,000 $ 284,581 $ 165,419 PS1302 FY2013 County Overlay-Trailwood/Summit Ridge/Westpark/Baze 05/31/14 $ 280,000 $ 273,995 $ 6,005 PS1402 FY2014 County Overlay-Ector Drive/Midway Drive/Trojan Trail 05/31/14 $ 300,000 $ 300,000 $ - PS1401 FY2014 39th CDBG-ADA/TAS Infrastructure Improvements 02/28/15 $ 300,000 $ 272,057 $ 27,943 PS1303 Cullum Drive Improvements 03/31/15 $ 1,295,738 $ 1,210,748 $ 84,990 243 H E C I T Y O EULESS 244 CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Project Number Project Description Date Total Project (Over) Under Completed Total Budget Costs Budget STREET PROJECTS - CONTINUED PS1202 ADA/TAS Infrastructure Improvements 05/31/16 $ 463,800 $ 460,996 $ 2,804 PS1502 FY2015 Street Overlay 05/31/16 $ 300,000 $ 217,182 $ 82,818 PS1602 FY2016 Street Overlay 09/30/16 $ 600,000 $ 600,000 $ - PS1501 FY2015 40th CDBG-ADA/TAS Infrastructure Improvements 05/31/17 $ 519,600 $ 392,693 $ 126,907 PS1602 FY2016 Street Overlay 05/31/17 $ 600,000 $ 600,000 $ - PS1603 FY2016 41 st CDBG-ADA/TAS Infrastructure Improvements 05/31/17 $ 79,301 $ 70,194 $ 9,107 PS1701 FY2017 42nd CDBG-ADA/TAS Infrastructure Improvements 05/31/18 $ 91,000 $ 65,240 $ 25,760 PS1702 FY2017 Street Improvements 05/31/18 $ 600,000 $ 600,000 $ - PS1703 Traffic Signal -Harwood Road at Bear Creek Parkway 05/31/18 $ 180,000 $ 180,000 $ PS1102 JGlade Parks Improvements 05/31/19 $ 15,369,514 $ 15,369,514 $ PS1801 I FY2018 Street Improvements 05/31/19 $ 425,000 $ 425,000 $ - Street Projects - Prior Years $ 60,015,143 $ 56,978,747 $ 3,036,396 PS1802 FY2018 Street Reconstruction -Fuller Wiser Rd./Bear Creek Pkwy. 05/31/21 $ 6,270,329 $ 6,270,329 $ - PS1901 FY2019 Street Improvements 05/31/21 $ 950,000 $ 950,000 $ PS2001 FY2020 Street Improvements 05/31/21 $ 975,000 $ 975,000 $ - PS2002 Glade Road Reconstruction -East of Highway 360 05/31/21 $ 150,000 $ 101,643 $ 48,357 PS2003 Traffic Signal-Cheek-Sparger Road at Heritage Avenue 05/31/21 $ 259,800 $ 243,336 $ 16,464 Street Projects - Current Year $ 8,605,129 $ 8,540,308 $ 64,821 Total Street Projects $ 68,620,272 $ 65,519,055 $ 3,101,217 245 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: April 05,2017 Submitted By: HAL CRANOR Date Completed: May 31, 2021 Project Title: FY18 ST RECONSTRUCTION -FULLER WISER/BEAR CREEK Project Type: STREET Sub -Type: IMPROVEMENTS Project Code: PS1802 Priority: A COUNCIL AUTHORIZATION: January 23, 2018: Approved Resolution No. 18-1520 authorizing the City Secretary to publish a notice declaring intention to issue certificates of obligation. March 13, 2018: Approved the first and final reading of Ordinance No. 2186, authorizing issuance of "City of Euless, Texas, Tax and Waterworks and Sewer System (Limited Pledge) Revenue Certificates of Obligation, Series 2018". November 13, 2018: Authorized the City Manager to execute a Professional Services Agreement with Spooner and Associates, Inc. for topographic and professional surveying services. The estimated expenditure is $57,479. June 25, 2019: Authorized award of Bid No. 010-19, for a construction contract to McMahon Contracting LP. for the reconstruction of Fuller -Wiser, Bear Creek Parkway, Ash Lane, and Midway Drive, and authorized the City Manager to enter into a contract with McMahon Contracting LP. The estimated expenditure is $6,030,519.25. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: The project scope includes the removal and replacement of the following concrete streets: Bear Creek Parkway from Mid Cities Boulevard to Harwood Road; Ash Lane from Fuller Wiser Road to State Highway 360; Fuller Wiser Road from State Highway 183 to Midway Drive; Fuller Wiser Road from Midway Drive to Harwood Road; and Midway Drive from just east of International Boulevard to just west of Fuller Wiser Road. PROJECT SCHEDULE: Began Design: October 2018 Began Construction: August 2019 Design Complete: May 2019 Construction Complete: July 2020 JUSTIFICATION: The existing concrete pavement is deteriorating. The new concrete streets will increase safety, reduce maintenance costs, provide an improved riding surface, and will enhance the appearance of the streets. M. PROJECT TITLE: FY18 ST RECONSTRUCTION -FULLER WISER/BEAR CREEK PROJECT CODE: PS1802 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Engineering $100,000 Personnel: Full Time Construction $6,170,329 Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities Average debt service $420,000 $0 Subtotal: $420,000 Total Estimated Capital Cost $6,270,329 Maintenance Costs Funding Source: 2018 Certificates of Obligation $6,030,620 Interest Earnings $239,709 $0 Subtotal: $0 Total Estimated Annual Cost $420,000 Total Funding $6,270,329 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Engineering $82,719 $82,719 $0 100% Construction $6,187,610 $6,187,610 $0 100% TOTAL PROJECT $6,270,329 $6,270,329 $0 100% 247 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: May 31,2014 Submitted By: HAL CRANOR Date Completed: May 31, 2021 Project Title: FY2019 STREET IMPROVEMENTS Project Type: STREET Sub -Type: IMPROVEMENTS Project Code: PS1901 Priority: A COUNCIL AUTHORIZATION: January 22, 2019: Authorized the City Manager to execute an interlocal agreement with Tarrant County for asphalt overlay improvements to Bayless Road, Rambling Lane, Atkerson Lane (South), Hilton Drive, West Mills Drive, Commerce Street, Crane Drive, Dock McGinnis Drive, Huffman Road, Northcliff Drive, Del Paso Street, and Canyon Ridge Drive. The estimated expenditure is $298,393. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by their pavement condition index. PROJECT SCHEDULE: Began Construction: October 2018 Construction Complete: September 2019 JUSTIFICATION: The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, extend the life of the roadway, and enhance the appearance of the streets. 248 PROJECT TITLE: FY2019 STREET IMPROVEMENTS PROJECT CODE: PS1901 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Construction $950,000 Personnel: Full Time Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Total Estimated Capital Cost $950,000 Maintenance Costs Funding Source: Transfer from: General Fund $950,000 $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Funding $950,000 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED Construction $950,000 $950,000 $0 100% TOTAL PROJECT $950,000 $950,000 $0 100% 249 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: May 31,2014 Submitted By: HAL CRANOR Date Completed: May 31, 2021 Project Title: FY2020 STREET IMPROVEMENTS Project Type: STREET Sub -Type: IMPROVEMENTS Project Code: PS2001 Priority: A COUNCIL AUTHORIZATION: January 28, 2020: Authorized the City Manager to execute an interlocal agreement with Tarrant County for asphalt overlay improvements to Broadway Drive, Delta Drive, East Midway Drive, Erwin Drive, Freestone Drive, Heather Drive, Lamar Drive, Little Creek Drive, Martha Street, Royce Drive, Sage Lane, Sheppard Drive, and Simmons Street. The estimated expenditure is $592,145. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by their pavement condition index. PROJECT SCHEDULE: Began Construction: October 2019 Construction Complete: October 2020 JUSTIFICATION: The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, extend the life of the roadway, and enhance the appearance of the streets. 250 PROJECT TITLE: FY2020 STREET IMPROVEMENTS PROJECT CODE: PS2001 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Construction $975,000 Personnel: Full Time Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Total Estimated Capital Cost $975,000 Maintenance Costs Funding Source: Transfer from: General Fund $975,000 $0 Subtotal: $0 Total Estimated Annual Cost $0 Total Funding $975,000 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED Construction $975,000 $975,000 $0 100% TOTAL PROJECT $975,000 $975,000 $0 100% 251 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: April 26,2019 Submitted By: HAL CRANOR Date Completed: May 31, 2021 Project Title: GLADE ROAD RECONSTRUCTION -EAST OF HIGHWAY 360 Project Type: STREET Sub -Type: IMPROVEMENTS Project Code: PS2002 Priority: A COUNCIL AUTHORIZATION: June 25, 2019: Authorized the City Manager to negotiate and execute a Participation Agreement for Oversize Reimbursement between Victron, LLC and the City of Euless related to the construction of Glade Road from the eastern State Highway (SH) 360 right-of-way line to a point approximately 385 feet east along Glade Road to the Dallas/Fort Worth International Airport property boundary. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: The project consists of reconstructing Glade Road from Highway 360 to DFW property from a one -lane street to a two-lane street. Developer will pay for initial installation costs and the City will reimburse their pro rate share of $150,000. PROJECT SCHEDULE: Began Construction: January 2020 Construction Complete: April 2020 JUSTIFICATION: Participation in the project will create an opportunity to coordinate and facilitate the reconstruction of Glade Road for continued development in the area. 252 PROJECT TITLE: GLADE ROAD RECONSTRUCTION -EAST OF HIGHWAY 360 PROJECT CODE: PS2002 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Construction $150,000 Personnel: Full Time Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Total Estimated Capital Cost $150,000 Maintenance Costs Funding Source: Transfer from: Street CIP Fund Balance $150,000 $0 Subtotal: $0 Transfer to: Street CIP Fund Balance ($48,357) Total Estimated Annual Cost $0 Total Funding $101,643 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED Construction $150,000 $101,643 $48,357 68% TOTAL PROJECT $150,000 $101,643 $48,357 68% 253 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: May 25,2018 Submitted By: HAL CRANOR Date Completed: May 31, 2021 Project Title: TRAFFIC SIGNAL-CHEEK-SPARGER ROAD @ HERITAGE AVENUE Project Type: STREET Sub -Type: SIGNALIZATION Project Code: PS2003 Priority: A COUNCIL AUTHORIZATION: February 26, 2019: Authorized the City Manager to execute an Interlocal Agreement between the City of Euless, the City of Bedford, the City of Colleyville, and Tarrant County, Texas for the design and construction of a traffic signal at the intersection of Heritage Avenue and Cheek-Sparger Road. Design costs were paid from PS1203. June 25, 2019: Authorized the City Manager to negotiate and execute an Interlocal Agreement with the City of Bedford relating to roadway improvements at the intersection of Heritage Avenue, Woodpark Lane, and Cheek- Sparger Road. The City of Bedford will be responsible for the total cost of construction for the roadway improvements. January 14, 2020: Awarded Bid No. 001-20, for a construction contract to Bean Electrical, Inc. for the traffic signal and roadway improvements at the intersection of Heritage Avenue and Cheek-Sparger Road, in the amount of $519,279.75, less Change Order No. 1-Value Engineering, a deduction of $16,951.00, for a total net amount of $502,328.75, and authorized the City Manager to enter into a contract with Bean Electrical, Inc. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Traffic signals are located at the intersections of arterial and collector thoroughfares identified in the City's Master Thoroughfare Plan adopted in 1999. The development of Glade Parks along with increased development in Colleyville, will necessitate a traffic signal at the intersection of Cheek Sparger Road and Heritage Avenue. PROJECT DESCRIPTION: The project consists of the installation of four traffic signals at the intersection of Cheek-Sparger Road and Heritage Avenue. The City of Euless will be participating with the City of Bedford, the City of Colleyville, and Tarrant County to assist with the cost of the project. PROJECT SCHEDULE: Began Construction: February 2020 Construction Complete: September 2020 JUSTIFICATION: Development and traffic volume in the Glade Parks area warrant the installation of traffic signals at Cheek- Sparger Road and Heritage Avenue intersection. 254 PROJECT TITLE: TRAFFIC SIGNAL-CHEEK-SPARGER ROAD @ HERITAGE AVEPROJECT CODE: PS2003 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Traffic Signals $259,800 Personnel: Full Time Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Total Estimated Capital Cost $259,800 Maintenance Costs Funding Source: Transfer from: Reimbursement -Other Entities $143,550 Car Rental CIP Fund Balance $66,250 $0 Escrow Funds $50,000 Subtotal: $0 Transfer to: Street CIP Fund Balance ($16,464) Total Estimated Annual Cost $0 Total Funding $243,336 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Traffic Signals $259,800 $243,336 $16,464 94% TOTAL PROJECT $259,800 $243,336 $16,464 94% 255 H E C I T Y O EULESS 256 CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Project Number Project Description Date Total Project (Over) Under Completed Total Budget Costs Budget WASTEWATER PROJECTS WW9902 Im act Fee Stud 09/30/99 $ 13,000 $ 12,238 $ 762 WW9903 Misc Sewer Rehab FY99 09/30/99 $ 50,000 $ 12,987 $ 37,013 WW9904 Hydraulic Analsis 06/30/00 $ 27,000 $ 27,000 $ - WW9901 CDBG B/98-UC-48-0001/B95-22-50 08/19/00 $ 150,000 $ 72,927 $ 77,073 WW0003 TRA Debt Payment 05/31/01 $ 822,037 $ 822,037 $ - WW0001 CDBG B/99-UC-48-0001 09/30/01 $ 150,000 $ 121,682 $ 28,318 WW0101 CDBG BOO-UC480001-2250 02/20/02 $ 251,485 $ 247,790 $ 3,695 WW0102 Manhole Rehab. Program 03/31/03 $ 250,000 $ 184,520 $ 65,480 WW0201 CDBG - B01-UC-48-0001-22-50 03/31/03 $ 237,086 $ 172,948 $ 64,138 WW0202 Line Replacement -Dunawa 02/28/05 $ 140,000 $ 139,955 $ 45 WW0203 Line Replacement - E. Alexander 02/28/05 $ 20,000 $ 20,000 $ WW0204 Line Replacement - Paula Lane 02/28/05 $ 79,000 $ 79,000 $ - WWO103 Line replacement-S. Pi eline,Heather-Vine 04/15/05 $ 489,759 $ 464,504 $ 25,255 WW0205 Line Replacement - MidwaPark 04/30/05 $ 366,000 $ 318,149 $ 47,851 WW0401 CDBG B03-UC-48-0001-22-50 04/30/05 $ 217,000 $ 161,170 $ 55,830 WW0301 CDBG B02-UC-48-0001-22-50 07/26/05 $ 271,455 $ 271,454 $ 1 WW0302 Inflow & Infiltration Cancelled $ 200,000 $ - $ 200,000 WW0303 Line Replacement, Canyon Ride 08/31/06 $ 196,200 $ 173,516 $ 22,684 WW0304 Line Replacement, Sagebrush 08/31/06 $ 160,900 $ 136,470 $ 24,430 WW0305 Line Replacement, Short 08/31/06 $ 251,400 $ 219,932 $ 31,468 WW0306 Line Replacement, E. Fuller 08/31/06 $ 231,372 $ 180,089 $ 51,283 WW0501 Line Replacement, Pebble Creek 08/31/06 $ 172,600 $ 145,655 $ 26,945 WW0604 Line Replacement, CDBG-Oakwood Terrace 05/31/07 $ 293,723 $ 232,274 $ 61,449 WW0402 Line Replacement, Carr Park/SH10 05/31/08 $ 588,000 $ 528,302 $ 59,698 WW0403 Line Replacement, Ector Drive 05/31/08 $ 373,000 $ 328,309 $ 44,691 WW0601 Line Replacement, Cedar Hills Estate 05/31/08 $ 319,000 $ 200,201 $ 118,799 WW0602 Line Replacement, Ector Drive 05/31/08 $ 425,000 $ 285,758 $ 139,242 WW0603 Little Bear Creek Collection Line 05/31/08 $ 575,000 $ 464,293 $ 110,707 WW0701 Line Replacement, McCormick & Co her 02/05/09 $ 243,000 $ 194,254 $ 48,746 WW0702 Line Replacement, Arnett Addition 02/05/09 $ 313,322 $ 229,006 $ 84,316 WW0703 Line Replacement, Jean Lane 02/05/09 $ 111,000 $ 70,603 $ 40,397 WW0704 Line Replacement, W. Fuller 02/05/09 $ 132,000 $ 82,708 $ 49,292 WW0902 Line Replacement, West Mills Drive-34th CDBG 04/16/10 $ 46,855 $ 46,855 $ WW0802 Line Replacement South Mills Drive CDBG-R 11/01/10 $ 253,710 $ 165,867 $ 87,843 WW0901 Line Replacement Woodridge Circle/Koen Lane 11/01/10 $ 407,000 $ 309,410 $ 97,590 WW0801 Line Replacement Fayette Drive 04/14/11 $ 357,000 $ 325,676 $ 31,324 WW1001 Line Rep - W Alexander Ln/Norman Dr/Franklin Dr 05/31/12 $ 420,000 $ 331,614 $ 88,386 WW1101 Line Rep - Bayless/Pauline/Jones (CDBG) 05/31/12 $ 350,000 $ 208,903 $ 141,097 WW1103 Line Re - Bayless/Pauline/Jones Outfall 05/31/12 $ 57,000 $ 37,544 $ 19,456 WW1202 Line Re - Collin Drive 37th CDBG 05/31/12 $ 300,000 $ 231,173 $ 68,827 WW1102 Line Re - E Huit Lane/Ascot Drive/Dunaway Drive 05/31/13 $ 560,000 $ 468,932 $ 91,068 WW1201 Line Re - Blanco/Aransas/Crane 05/31/13 $ 327,000 $ 284,321 $ 42,679 WW1301 Line Re - Ross/Slaughter/East & West Huitt 05/31/14 $ 670,000 $ 566,640 $ 103,360 WW1203 SH183 Phase I Wastewater Relocation 10/31/14 $ 372,243 $ 372,243 $ - WW1401 Line Re - Denton Drive 06/01/15 $ 629,000 $ 506,466 $ 122,534 WW1501 Line Re - Crane Drive 05/31/16 $ 264,823 $ 264,823 $ - WW1502 Line Re -Town Creek Drive 05/31/16 $ 440,665 $ 395,896 $ 44,769 WW1601 Line Re - Glenn Drive 05/31/17 $ 293,000 $ 264,370 $ 28,630 WW1702 FY201742nd CDBG LR: Oakwood Terrace Phase I O5/31/17 $ 242,000 $ 190,474 $ 51,526 WW1701 Line Re - Cedar Hill Estates/Hollywood Boulevard 05/31/18 $ 134,165 $ 89,001 $ 45,164 WW1801 SH183 Phase II Wastewater Relocation 05/31/19 $ 700,672 $ 681,209 $ 19,463 WW1802 FY2018 43rd CDBG LR: Oakwood Terrace Phase II 05/31/19 $ 223,125 $ 183,337 $ 39,788 WW1901 Line Rep - Cedar Hill Estates North 05/31/20 $ 409,903 $ 250,838 $ 159,065 WW1902 I FY2019 44th CDBG LR: Oakwood Terrace Phases III & IV 05/31/20 $ 377,639 $ 248,838 $ 128,801 WastewaterPro"ects - Prior Years $ 15,955,139 $ 13,024,161 $ 2,930,978 WW2001 I FY2020 45th CDBG LR: Midway Park 2nd Addition Phase 1 05/31/21 $ 444,244 $ 400,484 $ 43,760 Wastewater Projects- Current Year $ 444,244 $ 400,484 $ 43,760 Total Wastewater Projects $ 16,399,383 $ 13,424,645 $ 2,974,738 257 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: March 22,2019 Submitted By: HAL CRANOR Date Completed: May 31, 2021 Project Title: 45TH CDBG LINE REP -MIDWAY PARK 2ND ADDN. PHASE I Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT Project Code: WW2001 Priority: A COUNCIL AUTHORIZATION: February 26, 2019: Conducted a Public Hearing for the proposed 45th year CDBG project and approved the recommendation which includes replacing a wastewater line that is approximately 2,321 feet in length. It's located along the rear property line of homes facing onto Stonewall Drive, Milam Drive, Freestone Drive and Limestone Drive. A portion of the project will be along the western side of Ector Drive. December 17, 2019: Approved Resolution No. 19-1562, recommending award of a construction contract for Community Development Block Grant (CDBG) Project No. B19-UC-48-0001-22-50 to PM Construction & Rehab, LLC dba IPR South Central in the amount of $330,605.48 and authorized a contingency in the amount of $16,530. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. PROJECT DESCRIPTION: The project consists of the replacement of the following wastewater mains: 1. Between Stonewall Drive and Milam Drive and from Limestone Drive to Ector Drive and 2. Between Freestone Drive and Ector Drive on the southside of Milam Drive and Limestone Drive. (45th year CDBG project) PROJECT SCHEDULE: Began Construction: January 2020 Construction Complete: September 2020 JUSTIFICATION: Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 258 PROJECT TITLE:45TH CDBG LINE REP -MIDWAY PARK 2ND ADDN. PHASE I PROJECT CODE: WW2001 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Engineering $49,100 Personnel: Full Time Construction $395,144 Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Total Estimated Capital Cost $444,244 Maintenance Costs Funding Source: CDBG Award $444,244 $0 Subtotal: $0 Unused 45th CDBG Funding ($43,760) Total Estimated Annual Cost $0 Total Funding $400,484 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED Engineering $49,100 $41,244 $7,856 84% Construction $395,144 $359,240 $35,904 91% TOTAL PROJECT $444,244 $400,484 $43,760 90% 259 H E C I T Y O EULESS 260 CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Project Number Project Description Total Project (Over) Under Date Completed Total Budget Costs Budget WATER PROJECTS WT9903 Master Plan 08/30/99 $ 42,000 $ 5,445 $ 36,555 WT9904 Well Repairs 09/30/99 $ 66,921 $ 66,921 $ WT9907 Impact Fee Stud 09/30/99 $ 13,000 $ 12,238 $ 762 WT9911 Water Distribution - Master Plan 09/30/99 $ 25,600 $ 24,000 $ 1,600 WT9901 Meter Change Out Program 10/30/99 $ 101,917 $ 98,365 $ 3,552 WT0002 Emergency Repair - H10 11/30/99 $ 15,450 $ 14,214 $ 1,236 WT9906 Hwy 10 Water Line 01/30/00 $ 150,000 $ 138,883 $ 11,117 WT0006 Central Drive Water Mains 03/31/00 $ 92,814 $ 90,742 $ 2,072 WT9905 Misc Water Rehab 06/30/00 $ 50,000 $ 43,749 $ 6,251 WT0004 Water Line Milam - Ector/Midwa 06/30/00 $ 18,248 $ 13,743 $ 4,505 WT0102 SCADA Upgrade 04/09/01 $ 93,400 $ 93,400 $ WT0003 Waterline Replacement - Aransas 06/30/01 $ 12,057 $ 7,089 $ 4,968 WT0005 Waterline Replacement - Milam- Denton/Mid 04/30/02 $ 26,988 $ 26,988 $ - WT9910 Water Line for Elevated Tank 05/31/02 $ 1,608,386 $ 1,201,698 $ 406,688 WT9909 2MGWater Tank 03/31/03 $ 2,430,881 $ 2,289,571 $ 141,310 WT0103 Fire Hydrant Replacement Program 03/31/03 $ 50,000 $ 49,626 $ 374 WT9908 Mid Cities Blvd. 12" Line 04/30/04 $ 342,080 $ 313,354 $ 28,726 WT0401 Line Replacement, West Pipeline Main 05/31/06 $ 1,215,663 $ 1,215,663 $ WT0403 Waterline Replacement - Fairlawn Court Cancelled $ 35,000 $ - $ 35,000 WT0404 Waterline Replacement - Atkerson Lane Cancelled $ 104,000 $ - $ 104,000 WT0405 Line Replacement, West Ash Lane 08/31/06 $ 30,000 $ 11,626 $ 18,374 WT0406 Line Replacement, West ort/New orUAsbu 08/31/06 $ 67,000 $ 9,866 $ 57,134 WT0502 FY'2005 CDBG 08/31/06 $ 69,300 $ 29,549 $ 39,751 WT0503 Line Replacement, S. Atkerson Lane 08/31/06 $ 79,000 $ 51,294 $ 27,706 WT0504 Line Replacement, Blanco Drive 08/31/06 $ 112,620 $ 112,620 $ - WT0505 Line Replacement, Henslee 08/31/06 $ 183,000 $ 123,859 $ 59,141 WT0506 Line Replacement, Vernon/Slaughter 08/31/06 $ 161,000 $ 113,052 $ 47,948 WT9902 Tank Painting 05/31/07 $ 1,317,763 $ 957,542 $ 360,221 WT0501 System Security Upgrade 05/31/08 $ 40,000 $ 28,319 $ 11,681 WT0601 Wtr Sys Security Perimeter Fence Upgrade 05/31/08 $ 75,000 $ 49,567 $ 25,433 WT0602 Line Replacement, Cannon Drive 05/31/08 $ 250,000 $ 223,055 $ 26,945 WT0701 Line Replacement, Canyon Ride 05/31/08 $ 116,000 $ 78,136 $ 37,864 WT0702 CDBG FY07 - 32nd Oakwood Terrace 05/31/08 $ 334,481 $ 296,223 $ 38,258 WT0802 CDBG-33rd Oakwood Terrace -Simmons 12/31/08 $ 451,639 $ 384,173 $ 67,466 WT0402 Water & Wastewater Impact Fee Update 05/31/09 $ 30,000 $ 17,729 $ 12,271 WT0801 Line Replacement, Signet/Mesa 05/31/09 $ 255,000 $ 218,663 $ 36,337 WT0201 Well Rehabilitation/Disinfection 04/17/10 $ 600,000 $ 522,308 $ 77,692 WT0202 Reclaimed Water Main 05/31/13 $ 1,750,000 $ 1,606,337 $ 143,663 WT1202 Standpipe Storage Tank & Building Demolition 05/31/13 $ 134,640 $ 70,089 $ 64,551 WT1203 Water & Wastewater Impact Fee Update 05/31/13 $ 34,575 $ 34,575 $ WT1401 El Camino Real 02/28/15 $ 460,000 $ 420,462 $ 39,538 WT0901 Trinity River Authority Water Payment -Impact 05/31/16 $ 750,000 $ 750,000 $ - WT1201 Reclaimed Water Line Extension Phase 1 05/31/16 $ 3,239,452 $ 3,239,452 $ - WT1501 24-Inch Valve Replacement 05/31/16 $ 180,000 $ 131,370 $ 48,630 WT1601 Line Re - Donley Drive/Shelmar Drive 05/31/16 $ 212,000 $ 152,990 $ 59,010 WT1602 FY2016 41st CDBG Line Re - Ector Drive 05/31/17 $ 310,925 $ 309,151 $ 1,774 WT1212 Reclaimed Water Line Extension Phase II 05/31/18 $ 2,591,496 $ 1,868,473 $ 723,023 WT1402 Fixed Base Meter Reading and Water Meter Chan eout 05/31/18 $ 5,503,719 $ 5,503,719 $ WT1801 ISH183 Phase II Water Relocation 05/31/19 $ 780,672 $ 703,577 $ 77,095 WT1901 I Line Re - K nette Drive 05/31/20 $ 635,000 $ 593,793 $ 41,207 WaterPro'ects - Prior Years $ 27,248,687 $ 24,317,258 $ 2,931,429 WT0101 lWat.r Tank Debt Payment -impact 05/31/21 $ 5,240,318 $ 5,240,318 $ WaterPro"ects- Current Year $ 5,240,318 $ 5,240,318 $ Total Water Projects $ 32,489,005 $ 29,557,576 $ 2,931,429 261 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: May 01,2001 Submitted By: RON YOUNG Date Completed: May 31, 2021 Project Title: WATER TANK DEBT PAYMENT - IMPACT Project Type: WATER Sub -Type: IMPACT FEE Project Code: WT0101 Priority: A COUNCIL AUTHORIZATION: Approved in the annual budget. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The water tower was included in the water impact fee study. PROJECT DESCRIPTION: This project includes the transfer of funds from the water impact fee to pay debt service (W/S System Revenue Refunding Bonds, Series 2012) related to the construction of the new water tower (Heritage Park). PROJECT SCHEDULE: Last debt payment for the water tower is scheduled for July 15, 2020. JUSTIFICATION: The water tower provides additional capacity and was included in the water impact fee study. 262 PROJECT TITLE: WATER TANK DEBT PAYMENT - IMPACT PROJECT CODE: WT0101 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Debt Service FY2001-FY2020 $5,240,318 Personnel: Full Time Part Time $0 Total Salary $0 Purchase of Services Materials & Supplies Utilities $0 Annual debt payment - water impact fee $250,000 $0 Subtotal: $250,000 Total Estimated Capital Cost $5,240,318 Maintenance Costs Funding Source: WT Impact Fee Fund Balance $5,240,318 $0 Subtotal: $0 Total Estimated Annual Cost $250,000 Total Funding $5,240,318 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED Transfer to Debt Service $5,240,318 $5,240,318 0 100% TOTAL PROJECT $5,240,318 $5,240,318 $0 100% 263 H E C I T Y O EULESS 264 CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Project Number Project Description Date Total Project (Over) Under Completed Total Budget Costs Budget OTHER PROJECTS AC9901 Athletic Complex Phase II 06/30/02 $ 123,654 $ 75,047 $ 48,607 ACO202 Athletic Complex Phase III 05/31/06 $ 1,252,221 $ 1,251,915 $ 306 AC1001 Texas Star Sports Complex Lighting Improvements 05/31/12 $ 504,200 $ 475,246 $ 28,954 AC1201 Texas Star Sports Complex Phase IV 05/31/16 $ 645,687 $ 575,653 $ 70,034 AC1702 Texas Star Sports Complex Phase A 05/31/17 $ 1,258,892 $ 1,258,470 $ 422 AC1601 Texas Star Sports Complex Phase V 05/31/18 $ 2,602,877 $ 2,538,291 $ 64,586 CM1508 Car Rental Contingency 05/31/16 $ 700,000 $ 700,000 $ CM1509 Municipal Plaza Improvements Phase 1 05/31/17 $ 158,500 $ 41,767 $ 116,733 ED0102 Bell Ranch Terrace Cancelled $ 200,000 $ - $ 200,000 ED0101 Planning Consultants 05/31/18 $ 204,869 $ 104,869 $ 100,000 FMO101 Building D 09/30/02 $ 930,610 $ 930,608 $ 2 FM0209 Midway Recreation Upgrade 06/30/02 $ 557,125 $ 557,125 $ FM0308 Building A Remodel 05/31/07 $ 1,663,238 $ 1,651,325 $ 11,913 FM0309 Fire Station #3 05/31/07 $ 2,286,798 $ 2,286,229 $ 569 FM0504 Building "B" Remodel 05/31/09 $ 1,322,490 $ 1,315,697 $ 6,793 FM0601 Public Works Facility 05/31/08 $ 2,210,956 $ 2,213,507 $ 2,551 FM0801 TX Star Golf Course & Conference Ctr Expand 05/31/09 $ 3,630,079 $ 3,630,079 $ FMO802 Senior Citizen Center Design cancelled $ 250,000 $ - $ 250,000 FMO803 Midway Recreation Improvements 03/31/09 $ 293,500 $ 75,976 $ 217,524 FMO804 Library -Shell Expansion 12/31/08 $ 307,034 $ 305,664 $ 1,370 FM1510 Development/Engineering Building Improvements 05/31/18 $ 2,589,125 $ 2,588,793 $ 332 GC1201 TSGC Misc. Improvements 05/31/18 $ 430,000 $ 404,820 $ 25,180 GC1701 TSGC Maintenance Building 05/31/18 $ 100,000 $ 97,934 $ 2,066 GR1401 Golf Course Upgrades 09/30/14 $ 587,000 $ 581,296 $ 5,704 PD9901 Police and Courts Facility 05/31/15 $ 11,718,304 $ 11,718,304 $ PR9901 Hike/Bike Trail 04/30/05 $ 237,714 $ 237,714 $ PR9902 Senior Citizen Remodel 04/30/05 $ 16,130 $ 16,130 $ PR9903- PR9918 Various EDC Park Projects 09/30/06 $ 259,566 $ 248,891 $ 10,675 PR9922 Teas Remodel 11/30/01 $ 430,000 $ 455,885 $ 25,885 PR9927 Park Improvements - Texas Star 09/30/01 $ 1,036,500 $ 1,025,298 $ 11,202 PR0015 Purchase of Dallas Stars Center 05/31/00 $ 10,327,978 $ 10,327,978 $ PR0016 Wilshire Park Improvements 06/30/02 $ 150,000 $ 149,926 $ 74 PRO110 Slope Protection/Screening Wall 03/31/03 $ 1,275,203 $ 1,273,923 $ 1,280 PR0302 Bob Eden Parkin 04/30/05 $ 75,000 $ 74,854 $ 146 PR0303 Youth Ballpark 04/30/05 $ 600,000 $ 600,000 $ PRO407 Parking Improvements, Midway Cancelled $ 11,000 $ - $ 11,000 PRO408 Parking Improvements, S. Euless Park 05/31/06 $ 55,000 $ 20,991 $ 34,009 PRO409 Parking Improvements, Simmons 07/29/04 $ 6,960 $ 6,960 $ PRO410 Parking Improvements, Villages Bear Creek 07/29/04 $ 33,666 $ 33,666 $ PR0411 Preserve at McCormick Park 05/31/06 $ 1,168,427 $ 1,168,427 $ PR0412 Splash Pool 05/31/06 $ 125,000 $ 124,477 $ 523 PR0601 Park Amenities Upgrade 04/17/10 $ 150,000 $ 145,316 $ 4,684 PR0602 Mid Cities Landscaping 05/31/09 $ 40,000 $ 33,199 $ 6,801 PR0719 Midway Park Trail 05/31/09 $ 210,000 $ 190,473 $ 19,527 PR0901 Trail Enhancements - Bob Eden Park 04/17/10 $ 135,000 $ 101,673 $ 33,327 PR0902 Senior Citizen Center at Midway Park 05/31/11 $ 4,763,661 $ 3,888,892 $ 874,769 PRO907 Euless Family Life Center Phase 1 05/31/11 $ 2,105,000 $ 2,099,281 $ 5,719 PR1201 Euless Family Life Center Aquatics 09/30/14 $ 7,504,972 $ 7,319,299 $ 185,673 PR1401 Glade Parks Trail Connection 05/31/19 $ 1,396,545 $ 1,138,772 $ 257,773 PW1704 Public Works Yard Improvements 05/31/17 $ 100,000 $ 97,686 $ 2,314 SS9901 Fire Station 11 03/30/00 $ 49,688 $ 49,688 $ SS9919 Fire Station #3 - Structural Repairs 03/30/00 $ 30,000 $ 17,344 $ 12,656 SS9902 Library Books 08/15/00 $ 3,302 $ 3,302 $ SS0010 Former Fire Station #2 06/30/02 $ 599,600 $ 595,257 $ 4,343 SS0113 I Park Building 06/30/02 $ 1,492,400 $ 1,492,100 $ 300 Other Projects - Prior Years $ 70,915,471 $ 68,316,017 $ 2,599,454 FM1708 I Library Remodel 05/31/21 $ 7,546,908 $ 7,546,908 $ PR1917 JCarr Park Improvements 05/31/21 $ 1,928,548 $ 1,906,504 $ 22,044 Other Projects- Current Year $ 9,475,456 $ 9,453,412 $ 22,044 Total Other Projects $ 80,390,927 $ 77,769,429 $ 2,621,498 265 City of Euless Capital Project Request Department: FLEET & FACILITY OPERATIONS Date Prepared: April 01,2013 Submitted By: KYLE MCADAMS Date Completed: May 31, 2021 Project Title: LIBRARY REMODEL Project Type: FACILITIES Sub -Type: REMODEL Project Code: FM1708 Priority: A COUNCIL AUTHORIZATION: February 14, 2017: Authorized the City Manager to negotiate and execute an Architectural Services Contract with Oxley Williams Tharp Architects for the planning and design of the remodel of the Library building. The estimated expenditure is $95,000 (Schematic and Development Design Phase Only). August 15, 2017: Ratified the EDC action taken on August 14, 2017, approving EDC Resolution No. 18-17 to provide for the expenditure of funds for a project involving the remodeling of the Euless Public Library. October 10, 2017: Authorized the City Manager to negotiate and execute an Architectural Services Contract with Oxley Williams Tharp Architects for the construction documents development, bidding and negotiation, and contract administration phases of the remodel of the Library building. The estimated expenditure is $172,250. November 13,2018: Awarded Bid No. 009-18 to JC Commercial for the remodel of the Mary Lib Saleh Euless Public Library for an estimated expenditure of $6,360,000. November 26, 2019: Approved Ordinance 2236 which authorized an additional $150,000 for construction from Car Rental Tax Fund. December 17, 2019: Authorized the purchase of seating, tables, lounge, office furniture, and installation services from KI, Inc. for the library remodel project under the National Joint Purchasing Alliance (NJPA) Contract No. 031715-KII. The estimated expenditure is $459,635. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: The library facility remodel project scope includes the following: planning and design, reconfiguration of the general interior layout, replacement of the chilled water HVAC system, replacement of furnishings, updating overall facility decor, lighting upgrades, and electrical work. PROJECT SCHEDULE: Began Design: March 2017 Award Bid: October 2018 Design Complete: August 2017 Began Construction: December 2018 Bid Project: July/September 2018 Construction Complete: December 2020 JUSTIFICATION: The Library was constructed in 1996, pre-internet and pre -digital age. Electrical plugs and data ports are currently in limited areas but are needed throughout the building to provide increased access to computers and technology. Patrons are requesting more space for quiet study, group study, and collaboration. The Young Adult/ Teen collection is one of the highest circulation and this group needs a space in the Library. M. PROJECT TITLE: LIBRARY REMODEL PROJECT CODE: FM1708 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Schematic/Design Dev. $92,750 Personnel: Full Time Construction Documents & Part Time $0 Administration $172,250 Total Salary $0 Other Professional Services $10,000 Purchase of Services Construction $6,646,000 Materials & Supplies Furnishings & Fixtures $600,000 Utilities Equipment $25,908 $0 Subtotal: $0 Total Estimated Capital Cost $7,546,908 Maintenance Costs Funding Source: Transfer from: EDC Operating Fund $2,675,000 Car Rental Operating Fund $3,164,900 Car Rental CIP Fund $1,681,100 Subtotal: Grant Award $25,908 Total Estimated Annual Cost $0 Total Funding $7,546,908 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Schematic/Design Dev., Const. Admin & $275,485 $275,485 $0 100% Other Professional Services Construction $6,672,909 $6,672,909 $0 100% Furnishings & Fixtures $572,607 $572,607 $0 100% Equipment $25,907 $25,907 $0 100% TOTAL PROJECT $7,546,908 $7,546,908 $0 100% 267 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: March 2, 2017 Submitted By: RAY MCDONALD Date Completed: May 31, 2021 Project Title: CARR PARK IMPROVEMENTS Project Type: PARK/RECREATION Sub -Type: PARK IMPROVEMENTS Project CODE: PR1917 Priority: A COUNCIL AUTHORIZATION: August 14, 2018: Ratified the Euless Development Corporation (EDC) action taken on August 13, 2018, approving EDC Resolution No. 20-18, declaring a project for improvements at Carr Park. October 23, 2018: Approved all matters incident and related to the issuance and sale of "Euless Development Corporation Sales Tax Revenue Bonds, Series 2018," including the adoption of Resolution No. 18-1538. November 13, 2018: Authorized the purchase and installation of various types of playground equipment and amenities to Whirlix Design, Inc. The estimated expenditure is $487,665. November 13, 2018: Authorized the purchase of various park furnishings to K. Hanes, Inc. dba BJ's Park and Recreation Products. The estimated expenditure is $58,093.60. December 11,2018: Approved award of Bid No. 001-19 for the purchase and installation of pedestrian bridges and authorized the City Manager to enter into a contract with North Rock Construction, Inc. for an estimated expenditure of $174,675.71. November 26, 2019: Authorized the purchase of restroom facilities related to the JA Carr Park renovation project from Restroom Facilities Ltd. through the BuyBoard Cooperative Purchasing Program Contract No. 592-19. The estimated expenditure is $112,374. February 11, 2020: Approved award of Bid No. 003-20, for the purchase and installation of an irrigation system at JA Carr Park, to Perfect Finish Landscaping and authorized the City Manager to enter into a contract with Perfect Finish Landscaping. The estimated expenditure is $59,000. June 9, 2020: Authorized the Mayor to negotiate and execute conveyance documents related to the purchase of 4.704 acres of property located at 601-715 West Euless Boulevard, Euless, Texas. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The adopted Parks Master Plan recommends funding for system -wide park facilities and amenities upgrades. PROJECT DESCRIPTION: This project includes the construction or installation of additional picnic stations, upgrade of existing trail lighting, new trail paving, fitness stations along trail, upgrading the existing playground, expanding the existing parking lot and creating a new ingress/egress to the park, new entry signage, and other ancillary amenities. PROJECT SCHEDULE: Began Construction: January 2019 Construction Complete: April 2020 JUSTIFICATION: As identified in the adopted Parks Master Plan, the municipal park is the foundation of any solid parks and recreation system. The City of Euless parks and recreation system provides residents and visitors with significant personal, social, environmental, and economic benefits. The revitalization efforts that the Euless City Council has focused on over the years has increased the sense of community pride. Carr Park is a five acre park located adjacent to Kiddie Carr Park off Simmons Drive. The current amenities at this park include a .25 mile soft surface trail, sand volleyball court, playground, benches, drinking fountains, and a gazebo. The proposed project will continue the City Council's revitalization efforts by ,creating an area that will serve both the passive and active leisure needs of the residents in this area. 268 PROJECT TITLE: CARR PARK IMPROVEMENTS PROJECT CODE: PR1917 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Demolition $24,500 Direct Operating Cost Site Work $61,500 Personnel: Full Time Hardscape $746,000 Part Time $0 Landscape $35,500 Total Salary $0 Fixtures/Furnishings $281,728 Purchase of Services Development/Prof. Services $451,600 Materials & Supplies Survey $10,000 Utilities TDLR $1,500 Geotech $3,000 Average Debt Service $118,000 Debt Issuance Cost $85,220 Land Acquisition $228,000 Subtotal: $118,000 Total Estimated Capital Cost $1,928,548 Maintenance Costs FUNDING SOURCE: 2018 EDC Revenue Bonds $1,674,041 Interest Earnings $26,394 Transfer from: PR201 1 -Wilshire Park Upgrades $228,000 $0 Subtotal: $0 Transfer to: PR201 1 -Wilshire Park Upgrades ($22,044) Total Estimated Annual Cost $118,000 Total Funding $1,906,391 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Development/Professional Svcs $481 $481 $0 100% Land Betterments $733,112 $733,112 $0 100% Park Furnishings $558,425 $558,425 $0 100% Debt Issuance Cost $63,223 $63,223 $0 100% Land Acquisition $573,307 $551,263 $22,044 96% TOTAL PROJECT $1,928,548 $1,906,504 $22,044 99% 269 H E C I T Y O EULESS 270