HomeMy WebLinkAboutCity of Euless Capital Improvements Program FY2013
CITY OF EULESS
CAPITAL IMPROVEMENTS PROGRAM
Fiscal Year Ending September 30, 2013
201 N. Ector Drive
Euless, TX 76039
Phone (817) 685-1626
Fax (817) 685-1459
www.eulesstx.gov
CITY OF EULESS
CAPITAL IMPROVEMENTS PROGRAM
Fiscal Year Ending September 30, 2013
201 N. Ector Drive
Euless, TX 76039
Phone (817) 685-1626
Fax (817) 685-1459
www.eulesstx.gov
CITY OF EULESS
FISCAL YEAR 2012-2013
Gary McKamie, City Manager
Loretta Getchell, Deputy City Manager
Chris Barker, Assistant City Manager
MARY LIB SALEH, MAYOR
Tim Stinneford, Council Member — Place One
Leon Hogg, Council Member — Place Two
Linda Martin, Council Member — Place Three
Donna Mickan, Council Member — Place Four
Glenn Porterfield, Council Member — Place Five
Perry Bynum, Council Member — Place Six , Mayor Pro Tem
i
TABLE OF CONTENTS
CAPITAL IMPROVEMENTS PROGRAM
City Officials
Table of Contents .............................................................................................................. i-iv
Letter ................................................................................................................... v-vi
Fund Balance Summary .................................................................................................... vii-ix
FUNDED PROJECTS
Summary of Funded Projects ............................................................................................ 01-02
FY12 Amendments ............................................................................................................ 03-04
Drainage Projects
Summary of Funded Drainage Projects .......................................................................... 05
DR9903 Miscellaneous Drainage Improvements ................................................... 06-07
DR1101 Flooding Mitigation ................................................................................... 08-09
DR1201 Miscellaneous Creek Maintenance .......................................................... 10-11
DR0000 Boyd Branch Improvements ..................................................................... 12-13
Street Projects
Summary of Funded Street Projects ............................................................................... 15
PS0605 South Pipeline Road Bridge Replacement ................................................ 16-17
PS1003 Ash Lane-Aransas Drive to N Main Street ................................................ 18-19
PS1102 Glade Parks Improvements ...................................................................... 20-21
PS1201 FY2012 County Overlay-Aransas Drive/Slaughter Lane ........................... 22-23
PS1202 ADA/TAS Infrastructure Improvements..................................................... 24-25
PS1203 Miscellaneous Street Repairs ................................................................... 26-27
Wastewater Projects
Summary of Funded Wastewater Projects ...................................................................... 29
WW0002 Miscellaneous Wastewater Rehabilitation .............................................. 30-31
WW0605 TRA Wastewater Payments – Impact ..................................................... 32-33
WW1102 Line Replacement – E Huitt Lane/Ascot Drive/Dunaway Drive ............... 34-35
WW1201 Line Replacement – Blanco Drive/Aransas Drive/Crane Drive ............... 36-37
WW1203 NTE (SH183) Phase I Wastewater Relocation ....................................... 38-39
Water Projects
Summary of Funded Water Projects ............................................................................... 41
WT0001 Miscellaneous Water Rehabilitation ......................................................... 42-43
WT0101 Water Tank Debt Payment – Impact ....................................................... 44-45
WT0104 Well Repairs ............................................................................................ 46-47
WT0202 Reclaimed Water Main ........................................................................... 48-49
WT0803 Meters and Transponders........................................................................ 50-51
WT0901 TRA Water Payments – Impact ............................................................... 52-53
WT1201 Reclaimed Water Line Extension ............................................................. 54-55
WT1202 Standpipe Storage Tank & Building Demolition ....................................... 56-57
WT1203 Water and Wastewater Impact Fee Update ............................................. 58-59
Other Projects
Summary of Other Funded Projects ............................................................................... 61
AC1201 Texas Star Sports Complex Phase IV ...................................................... 62-63
CM0304 Entry Monument Sign Program................................................................ 64-65
CM0804 Redevelopment ....................................................................................... 66-67
DV9901 EDC Incentive Funds .............................................................................. 68-69
ED0101 Planning Consultants .............................................................................. 70-71
ii
ED1002 EDC Contingency .................................................................................... 72-73
FM1201 ADA/TAS Facility Improvements .............................................................. 74-75
GC1201 TSGC Miscellaneous Improvements ........................................................ 76-77
PD9901 Police & Courts Facility ............................................................................ 78-79
PR0720 Miscellaneous Park Improvements ........................................................... 80-81
PR0804 Park Irrigation ........................................................................................... 82-83
PR1201 Euless FLC Aquatics Design .................................................................... 84-85
PROPOSED & UNFUNDED PROJECTS
Summary of FY13 Proposed & Unfunded Projects – Sorted by Type ................................ 87-90
Drainage Projects
Summary of FY13 Proposed & Unfunded Drainage Projects .......................................... 91
Bell Hi Addition ...................................................................................................... 92-93
Blessing Branch – Main Street to SH360 ............................................................... 94-95
Hollow Oak Channel Erosion ................................................................................. 96-97
Kynette Drive Culvert Modifications ....................................................................... 98-99
Little Bear Creek Drainage Improvements ............................................................. 100-101
Marlene Drive Culvert Replacement ...................................................................... 102-103
Simmons Drive Culvert Improvements ................................................................... 104-105
Street Projects
Summary of FY13 Proposed & Unfunded Street Projects ............................................... 107
FY2013 38th CDBG-ADA/TAS Infrastructure Improvements ................................... 108-109
FY2013 County Overlay – Trailwood Drive/Summit Ridge Drive/Westpark Way .... 110-111
Cullum Drive Design and Right-of-Way .................................................................. 112-113
FY2014 39th CDBG-ADA/TAS Infrastructure Improvements ................................... 114-115
FY2014 County Overlay – Monterrey/Sotogrande/El Camino Real ....................... 116-117
Cullum Drive Construction .................................................................................... 118-119
FY2015 40th CDGB-ADA/TAS Infrastructure Improvements ................................... 120-121
FY2015 County Overlay – Baze Road/Kynette Drive/Signet Drive ........................ 122-123
FY2016 41st CDGB-ADA/TAS Infrastructure Improvements ................................... 124-125
FY2016 County Overlay – Ector Drive/Raider Drive/Texas Star Parkway .............. 126-127
Traffic Signal – Harwood Road at Bear Creek Parkway ......................................... 128-129
FY2017 42nd CDBG-ADA/TAS Infrastructure Improvements .................................. 130-131
FY2017 County Overlay – Aransas Drive/Ector Drive ............................................ 132-133
Bear Creek Parkway .............................................................................................. 134-135
Cresthaven Drive Reconstruction .......................................................................... 136-137
E Alexander Lane Reconstruction .......................................................................... 138-139
Fuller-Wiser Road – Harwood Road to Mid Cities Boulevard ................................. 140-141
Fuller-Wiser Road – SH183 to Harwood Road ....................................................... 142-143
Highland Drive Reconstruction ............................................................................... 144-145
Ross Avenue Extension ......................................................................................... 146-147
S Pipeline Road ..................................................................................................... 148-149
Vine Street – SH183 to SH10 ................................................................................ 150-151
Wastewater Projects
Summary of FY13 Proposed & Unfunded Wastewater Projects ..................................... 153
Line Replacement – Ross Avenue ........................................................................ 154-155
Line Replacement – Slaughter Lane/E Huitt Lane .................................................. 156-157
Line Replacement – W Huitt .................................................................................. 158-159
Line Replacement – Denton Drive ......................................................................... 160-161
Line Replacement – Milam Drive ........................................................................... 162-163
NTE (SH183) Phase II Wastewater Relocation ..................................................... 164-165
iii
Line Replacement – Oakwood Terrace Addition Phase I ....................................... 166-167
Line Replacement – Oakwood Terrace Addition Phase II ...................................... 168-169
Line Replacement – Kynette Drive/Wilshire Drive .................................................. 170-171
Line Replacement – Cedar Hills Estates/Hollywood Boulevard .............................. 172-173
Line Replacement – Collin Drive/Harris Drive/Irion Drive ....................................... 174-175
Line Replacement – Crane Drive ........................................................................... 176-177
Line Replacement – Donley Drive/Shelmar Drive .................................................. 178-179
Line Replacement – Eastcliff Drive/Windlea Drive/Signet Drive ............................. 180-181
Line Replacement – Ector Drive/Donley Drive/Crane Drive.................................... 182-183
Line Replacement – Ector Drive/Fayette Drive....................................................... 184-185
Line Replacement – Evans Drive/Canyon Ridge Drive/N Kynette Drive ................. 186-187
Line Replacement – Glenn Drive ........................................................................... 188-189
Line Replacement – Huntington/Koen/Atkerson/E Huitt/Slaughter/Martin .............. 190-191
Line Replacement – Janann Street/Brownstone Drive/Shelmar Drive .................... 192-193
Line Replacement – Lakewood Boulevard/Dogwood Circle/Bocowood Circle ........ 194-195
Line Replacement – Live Oak Drive/Silver Creek Drive/Marlene Drive .................. 196-197
Line Replacement – Mary/Marlene/Commerce/Wilshire/Greenbriar ....................... 198-199
Line Replacement – N Midway Park ...................................................................... 200-201
Line Replacement – Northcliff/Toplea/Windlea/Signet/Kynette/Westcliff ................ 202-203
Line Replacement – NW Midway/Rusk/Parker/Rockwall ........................................ 204-205
Line Replacement – S Main Street......................................................................... 206-207
Line Replacement – Sagebrush/Toplea/Wilshire/Yorkshire/Tyler ........................... 208-209
Line Replacement – Sierra Drive ........................................................................... 210-211
Line Replacement – Town Creek Drive .................................................................. 212-213
Line Replacement – W Donley/Private/Mimosa/Magnolia/Redbud ......................... 214-215
Line Replacement – W Midway/Victoria/Delta/Lamar/Rockwall .............................. 216-217
Water Projects
Summary of FY13 Proposed & Unfunded Water Projects ............................................... 219
Line Replacement – El Camino Real ..................................................................... 220-221
Water System Security Camera Installation ........................................................... 222-223
Line Replacement – S Pipeline Road West ............................................................ 224-225
NTE (SH183) Phase II Water Relocation ............................................................... 226-227
Residential Meter Replacement Program............................................................... 228-229
Line Replacement – Blessing Creek/Stony Creek/Rock Creek .............................. 230-231
SH360 Water Crossing .......................................................................................... 232-233
Line Replacement – Collin Drive, Dallas Drive to Harwood Road .......................... 234-235
Line Replacement – Collin Drive, Denton Drive to Dallas Drive ............................. 236-237
Line Replacement – Denton Drive, Tarrant Drive to Harwood Road ...................... 238-239
Line Replacement – Dickey Drive North, SH10 to E Huitt Lane ............................. 240-241
Line Replacement – Dickey Drive South, E Huitt Lane to Hilton Drive ................... 242-243
Line Replacement – Dunaway Drive, E Alexander Lane to E Ascot Drive .............. 244-245
Line Replacement – E Huitt Lane, S Main Street to Dunaway Drive ...................... 246-247
Line Replacement – Eastcliff Drive, Toplea Drive to Del Prado Apts ...................... 248-249
Line Replacement – Ector Drive, Trojan Trail to Midway Drive ............................... 250-251
Line Replacement – Fuller Drive, Salem Drive to Carter Drive ............................... 252-253
Line Replacement – Hollow Oak Drive ................................................................... 254-255
Line Replacement – Kynette Drive, Cyclone Creek to Wilshire Drive ..................... 256-257
Line Replacement – Live Oak Court/Live Oak Drive .............................................. 258-259
Line Replacement – Midcreek Drive/Rock Creek Drive/Stony Creek Drive ............ 260-261
Line Replacement – Midway Drive East, N Main Street to Freestone Drive ........... 262-263
Line Replacement – Midway Drive W est, Freestone Drive to Ector Drive .............. 264-265
Line Replacement – Needles Street, Paula Lane to Raider Drive .......................... 266-267
Line Replacement – Paula Lane, Needles Street to S Pipeline Road ..................... 268-269
Line Replacement – S Main Street (North), E Huitt Lane to SH10 ......................... 270-271
iv
Line Replacement – S Main Street (South), Landover Drive to E Huitt Lane .......... 272-273
Line Replacement – S Pipeline Road East, Vine Street to S Main Street .............. 274-275
Line Replacement – Shady Creek Drive/Cliffwood Road ....................................... 276-277
Line Replacement – Springwood Court .................................................................. 278-279
Line Replacement – Sunset Drive, S Pipeline Road to S Main Street .................... 280-281
Line Replacement – Westwood Drive, Fuller Drive to Carter Drive ........................ 282-283
Line Replacement – Wildwood Street .................................................................... 284-285
Line Replacement – Woodvine Drive (East), Cliffwood Road to El Camino Real ... 286-287
Line Replacement – Woodvine Drive (West), Pebble Creek Drive to Ciffwood Rd . 288-289
Water System Security Land Acquisition ............................................................... 290-291
Other Projects
Summary of Other FY13 Proposed & Unfunded Projects ............................................... 293
Euless FLC Aquatics Construction ......................................................................... 294-295
Glade Parks Trail Connection ................................................................................ 296-297
Texas Star Golf Course Bunker Replacement ....................................................... 298-299
Blessing Branch Park Improvements ..................................................................... 300-301
Texas Star Sports Complex Phase V ..................................................................... 302-303
Development/Engineering Building ........................................................................ 304-305
TSGC Greens Replacement .................................................................................. 306-307
Animal Shelter Expansion/Renovation ................................................................... 308-309
Kiddie Carr Park Improvements ............................................................................ 310-311
South Euless Water Feature .................................................................................. 312-313
Trail Connection South Euless ............................................................................... 314-315
Trail Enhancements Phase I .................................................................................. 316-317
Trail Enhancements Phase II ................................................................................. 318-319
Trail Enhancements Villages of Bear Creek ........................................................... 320-321
Trailwood Park Improvements ............................................................................... 322-323
Wilshire Park Water Feature .................................................................................. 324-325
COMPLETED PROJECTS
Drainage Projects
Summary of Completed Drainage Projects ...................................................................... 327
Street Projects
Summary of Completed Street Projects .......................................................................... 329
PS9901 North Main Street ..................................................................................... 330-331
PS9904 Harwood Road, N Main Street to SH360 .................................................. 332-333
PS1001 Baze Road ............................................................................................... 334-335
PS1101 County Overlay – Bear Creek Drive/Lakewood Blvd/Ash Lane ................. 336-337
Wastewater Projects
Summary of Completed Wastewater Projects ................................................................ 339
WW1001 Line Replacement – W Alexander/Norman/Franklin ............................... 340-341
WW1101 Line Replacement – Bayless/Pauline/Jones (CDBG) ............................. 342-343
WW1103 Line Replacement – Bayless/Pauline/Jones Outfall ................................ 344-345
WW1202 Line Replacement – Collin Drive (CDBG) ............................................... 346-347
Water Projects
Summary of Completed Water Projects .......................................................................... 349
Other Projects
Summary of Completed Other Projects .......................................................................... 351
AC1001 TSSC Lighting Improvements .................................................................. 352-353
v
July 27, 2012
Honorable Mayor Mary Lib Saleh
Honorable City Councilmembers:
Tim Stinneford, Place One
Leon Hogg, Place Two
Linda Martin, Place Three
Donna Mickan, Place Four
Glenn Porterfield, Place Five
Perry Bynum, Place Six, Mayor Pro Tem
INTRODUCTION
The City of Euless Capital Improvements Program is a comprehensive document
detailing all projects that have been identified to date. Emphasis has been placed on
organizing this data in a manner that will facilitate decision-making processes, assist in
long-range planning, and provide the citizens of Euless with information regarding
planned projects. This document meets the requirements of the City Charter. Article
VII, Section 2 (5) requires, “A statement proposing any capital expenditures deemed
necessary for undertaking during the next budget year and recommended provisions for
financing.” Section 2 (6) further requires, “A list of capital projects which should be
undertaken within the five (5) next succeeding years.”
We extend special appreciation to the directors and the finance staff for their outstanding
performance in creating this document.
UNDERSTANDING THIS BOOK
Although this book contains a large volume of information, the summaries should make it
easy to understand at a glance. The book is divided into three sections: Funded
Projects, FY2013 Proposed and Unfunded Projects, and Completed Projects. Each
section begins with a summary and is followed by detailed data for those wishing to
research individual projects.
The detail provided includes the project’s relationship to City master plans, the project
description and justification, the effect on future maintenance and operating costs, and
the estimated total cost. Within each section, you will find the detailed descriptions
sorted by type. There are five basic project types: Drainage, Streets, W astewater,
Water, and Other.
201 N. Ector Drive, Euless, Texas 76039-3595
817/685-1400 Metro 817/267-4403 Fax 817/685-1416
www.ci.euless.tx.us
The Funded Projects section includes all projects that the City Council has previously
authorized . Many of these projects are on-going and require additional funding from
time to time . For each project , a detailed description has been provided that includes
any City Council authorization , the current status of the project , and a financial summary
detailing funding sources and total project budget. Any amendments or additional
appropriations requested are also identified.
Any project that has been authorized by the City Council that is not fully funded will
include a clear explanation as to how the remainder of the project is expected to be
funded .
The FY2013 Proposed and Unfunded Projects section has been classified into three
categories of priority. Priority A indicates the item is recommended and funding has
been identified in the proposed FY2013 budget. Staff recommends City Council
authorization for these projects . Priority B projects should be presented to Council
within two to five years for consideration . Projects that will not begin for at least five
years have been assigned a Priority C. This system has been used to allow the Council
to evaluate and shift priorities , when necessary , and to provide a means of budgeting
capital projects for at least five years. Recommended funding sources have been
indicated if known .
The Completed Projects section provides a summary for each project type indicating
total project budget , actual expenditure , and variance. Funds remaining have been
returned to the appropriate fund balance account for re-appropriation . Details of projects
closed during the prior year have also been included .
FY2013 PROJECTS:
Funding has been identified for all proposed FY2013 projects which are reflected on the
FY2013 Proposed and Unfunded Projects Summary as Priority A. These include :
• 38 1h Year CDBG-ADA Infrastructure Improvements
• FY2013 County Overlay (Trailwood/Summit Ridge!Westpark)
• Cullum Drive Design and Right-of-Way
• Ross Avenue Wastewater Line Replacement
• Slaughter Lane/E Huitt Lane Wastewater Line Replacement
• W Huitt Wastewater Line Replacement
• Euless Family Life Center Aquatics Construction
CLOSING COMMENTS
V I
Fund Balance Summary - Capital
Estimated FY11-12 and Budgeted FY12-13 Capital Improvement Projects
Developer's Streets Half-Cent General
Escrow CIP CIP CIP
Beg. Working Capital FY12 $1,484,620 $4,070,628 $1,497,982 $1,509,140
FY12 Estimated Revenues 25,270 384,264 128,600 403,955
Total Available:1,509,890 4,454,892 1,626,582 1,913,095
FY12 Estimated Project Expenditures (81,290)(2,917,310)(271,809)(43,333)
Total Expenses:(81,290)(2,917,310)(271,809)(43,333)
Estimated Working Capital FY12 $1,428,600 $1,537,582 $1,354,773 $1,869,762
FY13 Budgeted Revenues 1,000 10,886,734 327,500 136,000
Total Available:1,429,600 12,424,316 1,682,273 2,005,762
FY13 Project Expenditures 0 (1,100,000)(371,217)(1,393,333)
Budgeted Carryover 0 (10,869,736)(902,258)(29,512)
Total Expenses:0 (11,969,736)(1,273,475)(1,422,845)
Estimated Working Capital FY13 $1,429,600 $454,580 $408,798 $582,917
FY2013 Projects
FY 2013 County Overlay Projects 300,000
ADA Infrastructure Improvements (CDBG)450,000
Cullum Drive Design and Right of Way 200,000
Miscellaneous Street Repair 150,000
Irrigation Projects 25,000
Incentives 25,000
Park Improvements 275,000
Texas Star Sports Complex Phase IV 46,217
Transfer to Car Rental CIP 1,000,000
Transfer to Redevelopment 350,000
G&A Charge 43,333
Total FY2013 Projects $1,100,000 $371,217 $1,393,333
Fund Balance Summary - Capital
Estimated FY11-12 and Budgeted FY12-13 Capital Improvement
Projects
Police Car Rental
Redevelopment Facility Tax TSSC
CIP CIP CIP CIP
Beg. Working Capital FY12 $280,229 $108,507 $195,203 $751,338
FY12 Estimated Revenues 319 118 4,837,664 813
Total Available:280,548 108,625 5,032,867 752,151
FY12 Estimated Project Expenditures 0 0 (86,699)0
Total Expenses:0 0 (86,699)0
Estimated Working Capital FY12 $280,548 $108,625 $4,946,168 $752,151
FY13 Budgeted Revenues 350,500 0 2,213,850 500
Total Available:631,048 108,625 7,160,018 752,651
FY13 Project Expenditures (350,000)0 (6,450,000)0
Budgeted Carryover (278,952)(108,625)(636,055)(3,900)
Total Expenses:(628,952)(108,625)(7,086,055)(3,900)
Estimated Working Capital FY13 $2,096 $0 $73,963 $748,751
FY2013 Projects
Euless FLC Aquatics Construction 6,450,000
Redevelopment 350,000
Total FY2013 Projects $350,000 $0 $6,450,000 $0
Fund Balance Summary - Capital
Estimated FY11-12 and Budgeted FY12-13 Capital Improvement
Projects
Water Wastewater
W&WW Impact Impact Drainage
CIP Fee Fee CIP
Beg. Working Capital FY12 $2,146,361 $2,080,278 $569,423 $999,256
FY12 Estimated Revenues 1,301,487 220,717 12,222 1,300
Total Available:3,447,848 2,300,995 581,645 1,000,556
FY12 Estimated Project Expenditures (1,170,743)(432,626)(60,000)(1,843)
Total Expenses:(1,170,743)(432,626)(60,000)(1,843)
Estimated Working Capital FY12 $2,277,105 $1,868,369 $521,645 $998,713
FY13 Budgeted Revenues 7,878,755 105,000 8,000 279,000
Total Available:10,155,860 1,973,369 529,645 1,277,713
FY13 Project Expenditures (3,221,000)(410,034)(60,000)(505,000)
Budgeted Carryover (6,143,844)(9,886)0 (767,782)
Total Expenses:(9,364,844)(419,920)(60,000)(1,272,782)
Estimated Working Capital FY13 $791,016 $1,553,449 $469,645 $4,931
FY2013 Projects
Reclaimed Water Line Extension 1,893,000
Wastewater Line Replacement 870,000
Meters/Transponders 158,000
Water and Wastewater Rehab 100,000
Well Repairs 200,000
Debt Payments, Refunding Bonds Series 260,334
TRA Payments 150,000 60,000
Miscellaneous Drainage Improvements 450,000
Miscellaneous Creek Maintenance 55,000
Total FY2013 Projects $3,221,000 $410,334 $60,000 $505,000
CAPITAL IMPROVEMENTS PROGRAMFUNDED PROJECTS SUMMARYProject Number Project DescriptionBudget as of 5/31/11Appropriation/ AmendmentBudget as of 5/31/12Expended as of 5/31/12Remaining FundsRevised Project Cost EstimatesUnfunded/ (Excess Funding) DRAINAGE PROJECTSDR9903Misc. Drainage Improvements 362,833$ -$ 362,833$ 121,175$ 241,658$ 812,833$ 450,000$ DR1101Flooding Mitigation500,000$ -$ 500,000$ 17,748$ 482,252$ 500,000$ -$ DR1201 Misc. Creek Maintenance (min bal $100,000)-$ 50,000$ 50,000$ 4,200$ 45,800$ 105,000$ 55,000$ DR0000Boyd Branch Improvements (1)-$ 10,000,000$ 10,000,000$ -$ 10,000,000$ 10,000,000$ -$ FB9902Fund Balance - Drainage CIP-$ -$ -$ -$ -$ -$ (227,262)$ 862,833$ 10,050,000$ 10,912,833$ 143,123$ 10,769,710$ 11,417,833$ 277,738$ STREET PROJECTSPS0605South Pipeline Road Bridge Replacement157,000$ -$ 157,000$ -$ 157,000$ 157,000$ -$ PS1003Ash Lane 2,170,000$ -$ 2,170,000$ 810,931$ 1,359,069$ 2,170,000$ -$ PS1102Glade Parks Improvements (2)7,300,000$ 4,800,604$ 12,100,604$ 2,416,043$ 9,684,561$ 12,100,604$ -$ PS1201FY2012 County Overlay-Aransas Drive/Slaughter Lane-$ 300,000$ 300,000$ 90,015$ 209,985$ 300,000$ -$ PS1202ADA Infrastructure Improvements-$ 413,800$ 413,800$ 45,079$ 368,721$ 413,800$ -$ PS1203 Misc. Street Repairs (min bal $150,000)-$ 150,000$ 150,000$ 6,564$ 143,436$ 300,000$ 150,000$ FB9907Fund Balance - Street CIP-$ -$ -$ -$ -$ -$ (480,070)$ 9,627,000$ 5,664,404$ 15,291,404$ 3,368,632$ 11,922,772$ 15,441,404$ (330,070)$ WASTEWATER PROJECTSWW0002 Misc. Wastewater Rehab (min bal $100,000)316,086$ 25,000$ 341,086$ 239,798$ 101,288$ 341,086$ -$ WW0605 TRA Wastewater Payments - Impact 360,000$ 60,000$ 420,000$ 360,000$ 60,000$ 480,000$ 60,000$ WW1102 Line Rep - E Huitt/Ascot/Dunaway 510,000$ 50,000$ 560,000$ 274,329$ 285,671$ 560,000$ -$ WW1201 Line Rep - Blanco/Aransas/Crane -$ 327,000$ 327,000$ 14,134$ 312,866$ 327,000$ -$ WW1203 NTE (SH183) Phase I Wastewater Relocation -$ 454,000$ 454,000$ -$ 454,000$ 454,000$ -$ FB9911 FB - Wastewater Impact (Restricted) -$ -$ -$ -$ -$ -$ (512,599)$ 1,186,086$ 916,000$ 2,102,086$ 888,261$ 1,213,825$ 2,162,086$ (452,599)$ 1 Debt not yet issued.2 Remaining debt not yet issued.Sub-Total Street ProjectsSub-Total Drainage ProjectsSub-Total Wastewater Projects1
CAPITAL IMPROVEMENTS PROGRAMFUNDED PROJECTS SUMMARYProject Number Project DescriptionBudget as of 5/31/11Appropriation/ AmendmentBudget as of 5/31/12Expended as of 5/31/12Remaining FundsRevised Project Cost EstimatesUnfunded/ (Excess Funding) WATER PROJECTSWT0001 Misc. Water Rehab (min bal $150,000)218,511$ 100,000$ 318,511$ 220,056$ 98,455$ 418,511$ 100,000$ WT0101 Water Tank Debt Payment-Impact 2,957,502$ 262,212$ 3,219,714$ 3,132,310$ 87,404$ 3,479,748$ 260,034$ WT0104 Well Repairs (min bal $200,000)813,594$ 95,000$ 908,594$ 847,135$ 61,459$ 1,108,594$ 200,000$ WT0202 Reclaimed Water Main 1,750,000$ -$ 1,750,000$ 1,497,663$ 252,337$ 1,750,000$ -$ WT0803 Meters/Transponders (annual transfer $158,000)979,750$ 158,000$ 1,137,750$ 775,032$ 362,718$ 1,295,750$ 158,000$ WT0901 TRA Water Payments-Impact 400,000$ 150,000$ 550,000$ 400,000$ 150,000$ 700,000$ 150,000$ WT1201Reclaimed Water Line Extension (3)-$ 4,607,000$ 4,607,000$ -$ 4,607,000$ 6,500,000$ 1,893,000$ WT1202 Standpipe Storage Tank & Bldg Demolition -$ 84,640$ 84,640$ 1,600$ 83,040$ 84,640$ -$ WT1203 Water & Wastewater Impact Fee Update -$ 30,000$ 30,000$ -$ 30,000$ 30,000$ -$ FB9910 FB- Water Impact (Restricted) -$ -$ -$ -$ -$ -$ (1,696,497)$ FB9901 FB - Water & Wastewater CIP -$ -$ -$ -$ -$ -$ (855,776)$ Sub-Total Water Projects7,119,357$ 5,486,852$ 12,606,209$ 6,873,796$ 5,732,413$ 15,367,243$ 208,761$ OTHERAC1201 Texas Star Sports Complex Phase IV-$ 794,470$ 794,470$ -$ 794,470$ 840,687$ 46,217$ CM0304 Entry Monument Sign Program115,782$ -$ 115,782$ 93,027$ 22,755$ 115,782$ -$ CM0804 Redevelopment973,326$ 377$ 973,703$ 694,749$ 278,954$ 1,323,703$ 350,000$ DV9901 EDC Incentive Funds400,854$ 50,000$ 450,854$ 300,854$ 150,000$ 475,854$ 25,000$ ED0101 Planning Consultants204,869$ -$ 204,869$ 104,869$ 100,000$ 204,869$ -$ ED1002 EDC Contingency250,000$ -$ 250,000$ -$ 250,000$ 250,000$ FM1201 ADA Facility Improvements (min bal $50,000)-$ 50,000$ 50,000$ 3,642$ 46,358$ 50,000$ -$ GC1201 TSGC Misc. Improvements (min bal $150,000)-$ 150,000$ 150,000$ 62,323$ 87,677$ 250,000$ 100,000$ PD9901 Police and Courts Facility11,718,034$ 32$ 11,718,066$ 11,609,560$ 108,506$ 11,718,066$ -$ PR0720 Misc. Park Improvements (min bal $100,000)225,000$ 75,000$ 300,000$ 241,128$ 58,872$ 575,000$ 275,000$ PR0804 Park Irrigation100,000$ 25,000$ 125,000$ 47,787$ 77,213$ 150,000$ 25,000$ PR1201 Euless FLC Aquatics Design-$ 786,500$ 786,500$ 9,465$ 777,035$ 550,000$ (236,500)$ (4)FB9906 FB-EDC CIP-$ -$ -$ -$ -$ -$ (482,302)$ FB9908 FB-Texas Star Sports Complex CIP-$ -$ -$ -$ -$ -$ (751,828)$ FB9909 FB-General CIP-$ -$ -$ -$ -$ -$ (1,600,577)$ FB9913 FB-Car Rental CIP-$ -$ -$ -$ -$ -$ (73,146)$ Sub-Total Other Projects13,987,865$ 1,931,379$ 15,919,244$ 13,167,404$ 2,751,840$ 16,503,961$ (2,323,136)$ 32,783,141$ 24,048,635$ 56,831,776$ 24,441,216$ 32,390,560$ 60,892,527$ (2,619,305)$ 3 Debt not yet issued.4 To be reallocated to Euless FLC Aquatics Construction project.TOTAL FUNDED PROJECTS2
CITY OF EULESS
CAPITAL IMPROVEMENT PROGRAM
AMENDMENTS -- FUNDED PROJECTS
PROJECT#PROJECT DESCRIPTION DATE AMENDMENTS & ACTIONS
AC1001 TSSC Lighting Improvements 05/31/2012 Close project and transfer excess funding of $28,954 to TSSC CIP Fund
Balance.
AC1201 TSSC Phase IV 10/01/2011 To provide project funding per FY2012 Approved CIP Plan ‐ $794,470.
CM0804 Redevelopment 05/31/2012 Increase funding for additional earned interest of $377.
DR1201 Miscellaneous Creek Maintenance 10/01/2011 To provide project funding per FY2012 Approved CIP Plan ‐$50,000 from
Drainage CIP Fund Balance .
DV9901 EDC Incentive Funds 10/01/2011 To provide additional funding per FY2012 Approved CIP Plan ‐$25,000
transfer from EDC Operating Fund.
DV9901 EDC Incentive Funds 05/31/2012 To provide additional project funding of $25,000 from EDC CIP Fund
Balance.
FM1201 ADA Facility Improvements 10/01/2011 To provide project funding per FY2012 Approved CIP Plan ‐$50,000 from
Car Rental.
GC1201 TSGC Miscellaneous Improvements 10/01/2011 To provide project funding per FY2012 Approved CIP Plan ‐$150,000
from TSGC Reserve Fund.
PD9901 Police and Courts Facility 05/31/2012 Increase funding for additional earned interest of $32.
PR0720 Miscellaneous Park Improvements 10/01/2011 To provide additional funding per FY2012 Approved CIP Plan ‐$75,000
from EDC Operating Fund.
PR0804 Park Irrigation 10/01/2011 To provide additional funding per FY2012 Approved CIP Plan ‐$25,000
from EDC Operating Fund.
PR1201 Euless FLC Aquatics Design 10/01/2011 To provide project funding per FY2012 Approved CIP Plan ‐ $786,500
from Car Rental.
PR1201 Euless FLC Aquatics Design 05/31/2012 Reduce project funding per revised estimate and transfer $236,500 to
Car Rental CIP Fund Balance.
PS9901 North Main Street 05/31/2012 Close project and transfer excess funding of $46,898 to Street CIP Fund
Balance.
PS9904 Harwood Road, North Main Street to SH360 05/31/2012 Close project and transfer excess funding of $83,655 to ADA
Infrastructure Improvements PS1202.
PS1001 Baze Road 05/31/2012 Close project and transfer excess funding of $271,599 to Street CIP Fund
Balance.
PS1101 FY2011 County Overlay 05/31/2012 Close project and transfer excess funding of $34,113 to Street CIP Fund
Balance.
PS1102 Glade Parks Improvements 10/01/2011 To authorize additional funding per FY2012 Approved CIP Plan (Future
Bond Issue).
PS1201 FY2012 County Overlay 10/01/2011 To provide project funding per FY2012 Approved CIP Plan ‐$300,000
from Street CIP Fund Balance.
PS1202 ADA Infrastructure Improvements 10/01/2011 To provide project funding per FY2012 Approved CIP Plan ‐ $250,000
from Car Rental.
PS1202 ADA Infrastructure Improvements 05/31/2012 To provide additional funding of $80,145 from Escrow Funds and
$83,655 from Harwood Road PS9904.
PS1203 Miscellaneous Street Repair 10/01/2011 To provide project funding per FY2012 Approved CIP Plan ‐$150,000
from Street CIP Fund Balance.
WT0001 Miscellaneous Water Rehab 10/01/2011 To provide additional funding per FY2012 Approved CIP Plan ‐$100,000
from W/WW CIP Fund Balance.
WT0101 Water Tank Debt Payment 10/01/2011 To provide additional funding per FY2012 Approved CIP Plan ‐$262,212
from Water Impact Fund Balance.
WT0104 Well Repairs 10/01/2011 To provide additional funding per FY2012 Approved CIP Plan ‐$75,000
from W/WW CIP Fund Balance.
WT0104 Well Repairs 10/01/2011 To provide additional funding of $20,000 for FY2012 emergency well
repairs from W/WW CIP Fund Balance.
WT0803 Transponders/Meters 10/01/2011 To provide additional funding per FY2012 Approved CIP Plan ‐$158,000
from W/WW Operating Fund.
WT0901 TRA Water Payments‐Impact 10/01/2011 To provide additional funding per FY2012 Approved CIP Plan ‐$150,000
from Water Impact Fund Balance.
WT1201 Reclaimed Water Line Extension 10/01/2011 To authorize project funding per FY2012 Approved CIP Plan (Future Bond
Issue).
WT1202 Standpipe Storage Tank and Building Demolition 10/01/2011 To provide project funding per FY2012 Approved CIP Plan ‐$84,640 from
W/WW Operating Fund.
3
CITY OF EULESS
CAPITAL IMPROVEMENT PROGRAM
AMENDMENTS -- FUNDED PROJECTS
PROJECT#PROJECT DESCRIPTION DATE AMENDMENTS & ACTIONS
WT1203 W/WW Impact Fee Update 10/01/2011 To provide project funding per FY2012 Approved CIP Plan ‐$30,000 from
Impact Fee.
WW0002 Miscellaneous Wastewater Rehab 10/01/2011 To provide additional funding per FY2012 Approved CIP Plan ‐$25,000
from W/WW CIP Fund Balance.
WW0605 TRA Wastewater Payments 10/01/2011 To provide additional funding per FY2012 Approved CIP Plan ‐$60,000
from WW Impact Fee Fund Balance.
WW1001 Line Rep ‐ W Alexander/Norman/Franklin 10/01/2011 Reduce project funding per approved FY2012 CIP Plan and transfer
$150,000 to W/WW CIP Fund Balance.
WW1001 Line Rep ‐ W Alexander/Norman/Franklin 05/31/2012 Close project and transfer excess funding of $88,386 to W/WW CIP Fund
Balance.
WW1101 Line Rep ‐ Bayless/Pauline/Jones (CDBG) 05/31/2012 Close project and transfer excess funding of $50,000 to W/WW CIP Fund
Balance.
WW1102 Line Rep ‐ E Huitt/Ascot/Dunaway 10/01/2011 To provide additional funding per FY2012 Approved CIP Plan ‐$50,000
from W/WW CIP Fund Balance.
WW1103 Line Rep ‐ Bayless/Pauline/Jones Outfall 05/31/2012 Close project and transfer excess funding of $19,456 to W/WW CIP Fund
Balance.
WW1201 Line Rep ‐ Blanco/Aransas/Crane 10/01/2011 To provide project funding per FY2012 Approved CIP Plan ‐$327,000
from W/WW Operating Fund.
WW1202 Line Rep ‐ Collin Drive (CDBG)10/01/2011 To provide project funding per FY2012 Approved CIP Plan ‐ $405,000.
WW1202 Line Rep ‐ Collin Drive (CDBG)05/31/2012 To transfer excess funding of $105,000 to W/WW CIP Fund Balance.
WW1202 Line Rep ‐ Collin Drive (CDBG)05/31/2012 Close project and release excess CDBG funding for future project.
WW1203 NTE (SH183) Phase I Wastewater Relocation 10/01/2011 To provide project funding per FY2012 Approved CIP Plan ‐ $454,000.
4
CAPITAL IMPROVEMENTS PROGRAMFUNDED PROJECTS SUMMARYProject Number Project DescriptionBudget as of 5/31/11Appropriation/ AmendmentBudget as of 5/31/12Expended as of 5/31/12Remaining FundsRevised Project Cost EstimatesUnfunded/ (Excess Funding) DRAINAGE PROJECTSDR9903Misc. Drainage Improvements 362,833$ -$ 362,833$ 121,175$ 241,658$ 812,833$ 450,000$ DR1101Flooding Mitigation500,000$ -$ 500,000$ 17,748$ 482,252$ 500,000$ -$ DR1201Misc. Creek Maintenance (min bal $100,000)-$ 50,000$ 50,000$ 4,200$ 45,800$ 105,000$ 55,000$ DR0000Boyd Branch Improvements (1)-$ 10,000,000$ 10,000,000$ -$ 10,000,000$ 10,000,000$ -$ FB9902Fund Balance - Drainage CIP-$ -$ -$ -$ -$ -$ (227,262)$ $862,833 $10,050,000 $10,912,833 $143,123 $10,769,710 $11,417,833 $277,7381 Debt not yet issued.Total Drainage Projects5
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS July 23,1999
RON YOUNG
MISCELLANEOUS DRAINAGE IMPROVEMENTS
DRAINAGE IMPROVEMENTS
DR9903
The project provides funding for various drainage projects or emergency repairs identified throughout the year.
Often correction of these problems requires design services and other improvements such as bank stabilization.
As major projects are identified, they will be tracked separately and assigned a different project number.
Failure to correct these problems often causes damage to existing infrastructure.
6
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
Improvements $812,833
$0
$0
$0
$0 $812,833
Transfer from:
Drainage Operating Fund $351,609
Drainage CIP Fund Balance $11,224
$0 Additional Funding Needed:
$0 Transfer from:
Drainage Operating Fund $278,000
Drainage CIP Fund Balance $172,000
$0 $812,833
Fence $559 $559 0 100%
Storm Drain $812,079 $120,421 691,658 15%
Meters & Setting $195 $195 0 100%
$812,833 $121,175 $691,658 15%
MISCELLANEOUS DRAINAGE IMPROVEMENTS DR9903
7
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS June 30,2010
RON YOUNG
FLOODING MITIGATION
DRAINAGE IMPROVEMENTS
DR1101
This project consists of identifying chronic flooding locations within the City of Euless and determining the
cost/benefit of property acquisition and protection compared to extensive drainage relief projects. Property
acquisition will be recommended after consideration of flooding history, appraisals, and feasible alternative
drainage solutions have been evaluated. It is recommended that this be established as an ongoing project.
Properties throughout the City of Euless situated adjacent to creeks have experienced drainage problems for
several years. The cost for implementing drainage improvement projects to mitigate flooding at isolated locations
may be much greater than the cost of property acquisition. Chronic flooding lowers the property values and this
program will offer a means of relief for affected property owners.
8
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
Flooding Mitigation $500,000
$0
$0
$0
$0 $500,000
Transfers from:
Operating Fund (FY2011) $150,000
Drainage CIP Fund Balance $350,000
$0
$0
$0 $500,000
Storm Sewer $500,000 $17,748 $482,252 4%
$500,000 $17,748 $482,252 4%
FLOODING MITIGATION DR1101
9
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS March 22,2011
RON YOUNG
MISCELLANEOUS CREEK MAINTENANCE
DRAINAGE CREEK MAINTENANCE
DR1201
The City of Euless completed drainage master plan studies for the major creeks that traverse the City. They
include Little Bear Creek, Hurricane Creek, Boyd Branch and Blessing Branch.
The project provides for maintenance in the creeks described above including removal of fallen trees that impede
the flow of creek water in the natural creek channels, clearing brush and debris at major bridge crossings, and
preventative maintenance. This project does not address items that are deemed cosmetic enhancements.
Creek maintenance will occur between mid October and mid March.
Natural creek erosion undermines the root systems of trees adjacent to creek banks which results in trees falling
into or across creek channels. These fallen trees together with accumulated brush and debris can impede the
flow of storm water in the natural creek channels resulting in a rise in the normal water surface elevation. Fallen
trees that are conveyed down stream in the natural creek channels may cause damage to the substructure of
bridges spanning the creek channels.
10
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
Improvements
(Minimum balance $100,000)
$0
$0
$0
$0
Transfer from:
Drainage CIP Fund Balance $50,000
$0 Additional Funding Needed:
$0 Transfer from:
Drainage CIP Fund Balance $55,000
$0 $105,000
Storm Sewers $105,000 $4,200 $100,800 4%
$105,000 $4,200 $100,800 4%
MISCELLANEOUS CREEK MAINTENANCE DR1201
11
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS July 17,2009
RON YOUNG
BOYD BRANCH IMPROVEMENTS
DRAINAGE IMPROVEMENTS
DR0000
Authorized in the FY2011 Capital Improvement Plan.
Drainage improvements are included in the Boyd Branch Watershed Study.
This project includes the portion of Boyd Branch from S Pipeline Road to SH183 and may include structural and
non-structural activities to reduce or minimize the effects of large stormwater events. A large portion of this
project occurs on a section of Boyd Branch that lies in a platted private drainage easement which also shows the
maintenance responsibility to rest on the property owner(s). Since the City of Euless has no easement rights
along these sections of Boyd Branch, the City is of the opinion that improving the capacity of Boyd Branch to
handle large stormwater events is the responsibility of the property owner(s). The City of Euless may have some
utility relocation expenses related to any improvements made to Boyd Branch.
Large stormwater events result in runoff exceeding the capacity of Boyd Branch. This project is intended to
reduce or minimize property losses associated with stormwater runoff exceeding the capacity of Boyd Branch.
12
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
Construction $10,000,000
$0
$0
$0
$0
$0
$0
$0 $10,000,000
$0
$0 Additional Funding Needed:
Developer Contribution $6,000,000
Future Revenue Bond Issue $4,000,000
$0 $10,000,000
Construction $10,000,000 $0 $10,000,000 0%
$10,000,000 $0 $10,000,000 0%
BOYD BRANCH IMPROVEMENTS DR0000
13
14
CAPITAL IMPROVEMENTS PROGRAMFUNDED PROJECTS SUMMARYProject Number Project DescriptionBudget as of 5/31/11Appropriation/ AmendmentBudget as of 5/31/12Expended as of 5/31/12Remaining FundsRevised Project Cost EstimatesUnfunded/ (Excess Funding) STREET PROJECTSPS0605South Pipeline Road Bridge Replacement157,000$ -$ 157,000$ -$ 157,000$ 157,000$ -$ PS1003Ash Lane 2,170,000$ -$ 2,170,000$ 810,931$ 1,359,069$ 2,170,000$ -$ PS1102Glade Parks Improvements (1)7,300,000$ 4,800,604$ 12,100,604$ 2,416,043$ 9,684,561$ 12,100,604$ -$ PS1201FY2012 County Overlay-Aransas Drive/Slaughter Lane-$ 300,000$ 300,000$ 90,015$ 209,985$ 300,000$ -$ PS1202ADA Infrastructure Improvements-$ 413,800$ 413,800$ 45,079$ 368,721$ 413,800$ -$ PS1203Misc. Street Repairs (min bal $150,000)-$ 150,000$ 150,000$ 6,564$ 143,436$ 300,000$ 150,000$ FB9907Fund Balance - Street CIP-$ -$ -$ -$ -$ -$ (480,070)$ 9,627,000$ 5,664,404$ 15,291,404$ 3,368,632$ 11,922,772$ 15,441,404$ (330,070)$ (3)Total Street Projects1 Remaining debt not yet issued. 15
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 15,2005
RON YOUNG
SOUTH PIPELINE ROAD BRIDGE REPLACEMENT
STREET BRIDGE
PS0605
June 26, 2007: Approved an inter-local agreement between the City of Euless and the City of Fort Worth. The
City of Euless' estimated cost is $157,000.
This project is related to the proposed asphalt overlay of South Pipeline Road to be performed by Tarrant County
and jointly funded by the City of Euless and the City of Fort Worth.
Bridge and related channel improvements are planned at South Pipeline Road over Post Oak Channel. The
existing structure is to be replaced because of structural and geometric deficiencies as well as load restrictions.
The City of Fort Worth will manage the project and the City of Euless will contribute 25% of the construction costs
which represents the portion of the project that falls within the city limits of Euless.
July 2012
South Pipeline Road is an important east-west thoroughfare providing access to the southeast portion of the City
of Euless. This project will correct structural and geometric deficiencies as well as alleviate load restrictions.
16
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
Bridge Construction $157,000
$0
$0
$0
$0 $157,000
Transfer from:
Street CIP Fund Balance $157,000
$0
$0
$0 $157,000
Bridge Construction $157,000 $0 157,000 0%
$157,000 $0 $157,000 0%
SOUTH PIPELINE ROAD BRIDGE REPLACEMENT PS0605
17
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 01,2002
RON YOUNG
ASH LANE-ARANSAS DRIVE TO N MAIN STREET
STREET IMPROVEMENTS
PS1003
November 10, 2009: Authorize the City Manager to execute an engineering design contract for Ash Lane with
Freese and Nichols, Inc. in an amount not to exceed $132,200.
September 14, 2010: Approve Resolution #10-1346 declaring a public necessity for the acquisition of real estate.
August 9, 2011: Award construction contract to Stabile & Winn, Inc. in the amount of $991,292.90.
May 8, 2012: Authorize the replacement of water and wastewater utilities associated with Ash Lane
reconstruction.
Ash Lane is identified in the Master Thoroughfare Plan as a four-lane minor arterial roadway from Industrial
Boulevard to Fuller-Wiser Road.
This project consists of the design, right-of-way acquisition, and construction costs necessary to facilitate removal
of the existing two lanes of asphalt pavement on Ash Lane from Aransas Drive to N. Main Street which is to be
replaced by a four lane concrete roadway. The associated sidewalks, storm drainage, and water and wastewater
utility replacements are included in the project scope.
Award Design: November 2009
Plans Complete: March 2011
Right-of-Way Complete: January 2011
Begin Construction: August 2011
Anticipate Construction Complete: November 2012
The portion of Ash Lane from Aransas Drive to N. Main Street is the only portion that is not constructed to the
Master Thoroughfare Plan standards. Completion of this section of Ash Lane will provide an orderly flow of traffic
from Industrial Boulevard to Fuller-Wiser Road.
18
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
Engineering $150,000
Right-of-Way $100,000
$0 Construction $1,920,000
$0
$0
$0 $2,170,000
Transfer from:
Street CIP Fund Bal (2010)$330,000
Street CIP Fund Bal (2011)$126,870
Car Rental (2011)$648,000
Grant Funding $885,000
2011 COs $180,130
$0 $2,170,000
Engineering $150,000 $122,215 27,785 81%
Right-of-Way $100,000 $46,565 53,435 47%
Construction $1,920,000 $642,151 1,277,849 33%
$2,170,000 $810,931 $1,359,069 37%
ASH LANE-ARANSAS DRIVE TO N MAIN STREET PS1003
19
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS June 08,2010
RON YOUNG
GLADE PARKS IMPROVEMENTS
STREET CONSTRUCTION
PS1102
December 14, 2010: Approval of Resolution #10-1352 authorizing the publication of intention to issue COs.
January 25, 2011: Consider all matters incident and related to the issuance of and sale of up to $3.1M in COs.
January 25, 2011: Consider acceptance of ROW and easements necessary for public improvements.
January 25, 2011: Award of Bid #001-11 for a construction contract to McMahon Contracting LP in the amount of
$1,973,615.95 for the construction of Rio Grande Boulevard, Heritage Avenue, and widening of the SH121
service road.
February 24, 2011: Issued COs for funding of first segment of public improvements at Glade Parks.
The infrastructure located in the Glade Parks development is included in the City's Master Thoroughfare Plan.
The project represents the initial funding required for the infrastructure improvements at the Glade Parks
Development as approved in the Project and Financing Plan. The project scope includes the construction of Rio
Grande Boulevard, portions of Heritage Avenue, the Little Bear Creek bridge, SH121 improvements,
landscaping, wetland mitigation, Brazos Boulevard and remaining streets, main entrance and medians,
underground drainage, and associated utility installations, as well as administrative and financing costs.
Design: Winter 2010
ROW: Winter 2010
Construction: Spring 2011
Phase I Complete: FY2012
Phase II Estimated Completion: August 2012
The construction of public infrastructure at Glade Parks will spur economic development in the area and complete
an access route to existing Euless businesses.
20
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
Design $300,000
Construction $11,785,604
$0 Miscellaneous $15,000
$0
Avg annual debt service $640,000
(fiscal years 2012 through 2031)
$640,000 $12,100,604
2011 COs $2,854,870
Street CIP Fund Balance $180,130
$0
$0 Additional Funding Needed:
Future Bond Issue $9,065,604
$640,000 $12,100,604
Design $300,000 $0 $300,000 0%
Construction $11,785,604 $2,401,043 $9,384,561 20%
Transfer to Debt Service $15,000 $15,000 $0 100%
$12,100,604 $2,416,043 $9,684,561 20%
GLADE PARKS IMPROVEMENTS PS1102
21
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS May 20,2010
RON YOUNG
FY2012 COUNTY OVERLAY - ARANSAS DRIVE/SLAUGHTER LANE
STREET OVERLAY
PS1201
October 11, 2011: Authorize the City Manager to execute an Interlocal Agreement with Tarrant County for
roadway reconstruction and asphalt overlay improvements to Slaughter Lane and Aransas Drive and tree/brush
trimming along South Pipeline Road.
Aransas Drive is a collector street in the City of Euless Master Thoroughfare Plan.
The project consists of edge milling, asphalt overlay, and restriping on:
1. Aransas Drive from Midway Drive to Harwood Road, and
2. Slaughter Lane from Dunaway Drive to Dickey Drive.
Begin Construction: May 2012
Anticipated Completion: July 2012
The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, will
extend the life of the roadway, and will enhance the appearance of the streets.
22
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
Construction $300,000
$0
$0
$0
$0 $300,000
Transfer from:
Street CIP Fund Balance $300,000
$0
$0
$0 $300,000
Construction $300,000 $90,015 $209,985 30%
$300,000 $90,015 $209,985 30%
FY2012 COUNTY OVERLAY - ARANSAS DRIVE/SLAUGHTER L PS1201
23
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 11,2011
RON YOUNG
ADA/TAS INFRASTRUCTURE IMPROVEMENTS
STREETS SIDEWALKS
PS1202
The Master Thoroughfare Plan includes and addresses sidewalks, crosswalks, and curb ramps for City streets.
This project provides for the continued improvements to City infrastructure as required by Federal and State
mandated Americans with Disabilities Act/Texas Accessibility Standards ("ADA/TAS"). City sidewalks,
crosswalks, curb ramps, and other areas covered under both ADA and TAS requirements will be part of these
improvements.
Many sidewalks, curb ramps, and other similar items are outdated and do not meet current ADA/TAS standards.
Updating accessibility on a continuing basis will help keep the City in compliance with government standards and
will address the growing needs of citizens with accessibility issues.
24
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
Improvements $413,800
$0
$0
$0
$0 $413,800
Transfer from:
Car Rental $250,000
Harwood Road - PS9904 $83,655
$0 Escrow Funds $80,145
$0
$0 $413,800
Sidewalks/Curbs $330,145 $45,079 $285,066 14%
Utility Relocation $83,655 $0 $83,655 0%
$413,800 $45,079 $368,721 11%
ADA/TAS INFRASTRUCTURE IMPROVEMENTS PS1202
25
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS May 17,2011
RON YOUNG
MISCELLANEOUS STREET REPAIRS
STREET IMPROVEMENTS
PS1203
April 24, 2012: Authorize the City Manager to enter into a contract with Estrada Concrete Co. LLC for concrete
road repairs at various locations on North Main Street, Fuller-Wiser Road and Bear Creek Parkway in the amount
of $93,390.
The Master Thoroughfare Plan identifies the various street types within the City of Euless. These street types
include residential streets through regional arterial streets.
This project includes the removal and replacement of deteriorated sections of pavement along identified
roadways.
Continuing repair of the existing street pavements will maintain safe driving conditions and will extend the overall
life of the City streets.
26
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
Construction
(Minimum balance $150,000)
$0
$0
$0
$0
Transfer from:
Street CIP Fund Balance $150,000
$0
$0 Additional Funding Needed:
Transfer from:
Street CIP Fund Balance $150,000
$0 $300,000
Construction $300,000 $6,564 $293,436 2%
$300,000 $6,564 $293,436 2%
MISCELLANEOUS STREET REPAIRS PS1203
27
28
CAPITAL IMPROVEMENTS PROGRAMFUNDED PROJECTS SUMMARYProject Number Project DescriptionBudget as of 5/31/11Appropriation/ AmendmentBudget as of 5/31/12Expended as of 5/31/12Remaining FundsRevised Project Cost EstimatesUnfunded/ (Excess Funding) WASTEWATER PROJECTSWW0002Misc. Wastewater Rehab (min bal $100,000)316,086$ 25,000$ 341,086$ 239,798$ 101,288$ 341,086$ -$ WW0605 TRA Wastewater Payments - Impact 360,000$ 60,000$ 420,000$ 360,000$ 60,000$ 480,000$ 60,000$ WW1102 Line Rep - E Huitt/Ascot/Dunaway 510,000$ 50,000$ 560,000$ 274,329$ 285,671$ 560,000$ -$ WW1201 Line Rep - Blanco/Aransas/Crane -$ 327,000$ 327,000$ 14,134$ 312,866$ 327,000$ -$ WW1203 NTE (SH183) Phase I Wastewater Relocation -$ 454,000$ 454,000$ -$ 454,000$ 454,000$ -$ FB9911 FB - Wastewater Impact (Restricted) -$ -$ -$ -$ -$ -$ (512,599)$ 1,186,086$ 916,000$ 2,102,086$ 888,261$ 1,213,825$ 2,162,086$ (452,599)$ Total Wastewater Projects29
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS July 26,1999
RON YOUNG
MISCELLANEOUS WASTEWATER REHABILITATION
WASTEWATER MAIN REPLACEMENT
WW0002
March 8, 2005: Award contract to Hall-Albert Construction Company for the replacement of various wastewater
lines in the amount of $977,857.50.
March 28, 2006: Authorized the city manager to proceed with emergency repair by GRA-TEX Utilities to the
aerial wastewater main crossing Hurricane Creek at a cost of $55,000.
This project is for funding of small wastewater main projects identified throughout the fiscal year. Larger projects
will be determined on an "as needed" basis and presented for funding under a new project number.
Most of these lines are clay tile and are seriously deteriorated.
30
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
Wastewater Mains
(Minimum balance $100,000)
$0
$0
$0
$0
Transfers from:
W/WW Operating Fund $165,000
WW9903 $37,013
$0 W/WW CIP Fund Balance $139,073
$0
$0 $341,086
Wastewater Mains $308,567 $207,279 101,288 67%
Engineering $1,939 $1,939 0 100%
Contingency $30,580 $30,580 0 100%
$341,086 $239,798 $101,288 70%
MISCELLANEOUS WASTEWATER REHABILITATION WW0002
31
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS March 03,2006
RON YOUNG
TRINITY RIVER AUTHORITY WASTEWATER PAYMENT
WASTEWATER IMPACT FEE
WW0605
Based on a review by Birkhoff, Hendricks, and Conway of the water and wastewater impact fees, it was
determined that a substantial portion of the wastewater impact fee is attributed to Trinity River Authority ("TRA")
capital projects. Therefore, these fees should be used to pay a portion of the annual TRA expense, as these
funds are directly attributed to the expansion of TRA. Based on the available fund balance, a systematic
drawdown over a ten year period has been developed.
Annual Payment $60,000: FY2006-FY2015
The expansion at TRA provides additional capacity and it was determined through the wastewater impact fee
study that these funds could be used to pay a portion of TRA wastewater payments. It was determined a ten
year drawdown would approximate the Capital Improvement Plan Review time frame, as well as provide for a
systematic drawdown that would not impact the annual budget.
32
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
TRA Wastewater Payments $480,000
$0
$0
($60,000)
($60,000) $480,000
Transfer from:
WW Impact Fee Fund Balance $420,000
$0
$0 Additional Funding Needed:
Transfer from:
WW Impact Fee Fund Balance $60,000
($60,000) $480,000
Wastewater - TRA Service $480,000 $360,000 $120,000 75%
$480,000 $360,000 $120,000 75%
TRINITY RIVER AUTHORITY WASTEWATER PAYMENT WW0605
33
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS May 30, 2003
RON YOUNG
LINE REP- E HUITT LANE/ASCOT DRIVE/DUNAWAY DRIVE
WASTEWATER MAIN REPLACEMENT
WW1102
February 22, 2011: Authorize the City Manager to execute an engineering design contract with Elliot and
Hughes, Inc. in an amount not to exceed $73,314.
November 8, 2011: Award construction contract to Ark Contracting Services in the amount of $421,286.75.
The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan.
The project is part of the systematic replacement of wastewater mains using a worst first approach.
The project consists of the replacement of the following wastewater mains:
1. Ascot Drive to E Huitt Lane along Fuller Branch, and
2. Ascot Drive, Dunaway Court, and Dunaway Drive between Dunaway Court and Ascot Drive.
Award Design: February 2011
Anticipate Plans Complete: August 2011
Anticipate Begin Construction: November 2011
Anticipate Construction Complete: 2nd Quarter 2012
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
34
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
Engineering $73,314
Construction $486,686
$0
$0
$0
$0 $560,000
Transfer from:
W/WW Operating Fund $510,000
W/WW CIP Fund Balance $50,000
$0
$0
$0 $560,000
Engineering $73,314 $63,573 $9,741 87%
Construction $486,686 $210,756 $275,930 43%
$560,000 $274,329 $285,671 49%
LINE REP- E HUITT LANE/ASCOT DRIVE/DUNAWAY DRIVE WW1102
35
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 12,2011
RON YOUNG
LINE REPLACEMENT-BLANCO DR/ARANSAS DR/CRANE DR
WASTEWATER MAIN REPLACEMENT
WW1201
The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan.
The project is part of the systematic replacement of wastewater mains using a worst first approach.
This project consists of the replacement of the following wastewater mains:
1. Between Blanco Drive and Aransas Drive from south of Harwood Road and
2. Between Blanco Drive and Crane Drive from Harwood Road to Aransas Drive.
Award Design Contract: January 2012
Design Complete: July 2012
Award Construction Contract: October 2012
Anticipate Construction Complete: January 2013
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
36
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
Engineering $35,000
Construction $292,000
$0
$0
$0
$0 $327,000
Transfer from:
W/WW Operating Fund $327,000
$0
$0
$0 $327,000
Engineering $35,000 $14,134 $20,866 40%
Construction $292,000 $0 $292,000 0%
$327,000 $14,134 $312,866 4%
LINE REPLACEMENT-BLANCO DR/ARANSAS DR/CRANE DR WW1201
37
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS March 10, 2010
RON YOUNG
NTE (SH183) PHASE I WASTEWATER RELOCATION
WASTEWATER LINE RELOCATION
WW1203
The Texas Department of Transportation ("TxDoT") has entered into a developer agreement with North Tarrant
Express Mobility Partners ("NTEMP") for the expansion of SH183. A portion of the Phase I construction will affect
the City of Euless utilities along SH183 between Westpark Way and FM157.
The City of Euless has approximately 2,400 linear feet of wastewater mains and several manholes located within
the SH183 right-of-way. These facilities must be relocated to accommodate the SH183 expansion. It is
anticipated that the City will enter into a relocation agreement with NTEMP to authorize them to design and
relocate the wastewater lines. The City will be responsible for 50% of the cost of the line relocation.
Anticipate Construction Complete: FY2013
City of Euless wastewater facilities are located within TxDoT right-of-way. As such, the City must provide for
utility relocation to accommodate the roadway expansion.
38
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
Engineering $68,000
Construction $386,000
$0
$0
$0
$0 $454,000
Transfer from:
W/WW Operating Fund $151,000
R-O-W Proceeds $201,000
$0 Plan Review/Inspection Fees $102,000
$0
$0 $454,000
Engineering $68,000 $0 $68,000 0%
Construction $386,000 $0 $386,000 0%
$454,000 $0 $454,000 0%
NTE (SH183) PHASE I WASTEWATER RELOCATION WW1203
39
40
CAPITAL IMPROVEMENTS PROGRAMFUNDED PROJECTS SUMMARYProject Number Project DescriptionBudget as of 5/31/11Appropriation/ AmendmentBudget as of 5/31/12Expended as of 5/31/12Remaining FundsRevised Project Cost EstimatesUnfunded/ (Excess Funding) WATER PROJECTSWT0001Misc. Water Rehab (min bal $150,000)218,511$ 100,000$ 318,511$ 220,056$ 98,455$ 418,511$ 100,000$ WT0101 Water Tank Debt Payment-Impact 2,957,502$ 262,212$ 3,219,714$ 3,132,310$ 87,404$ 3,479,748$ 260,034$ WT0104Well Repairs (min bal $200,000)813,594$ 95,000$ 908,594$ 847,135$ 61,459$ 1,108,594$ 200,000$ WT0202 Reclaimed Water Main 1,750,000$ -$ 1,750,000$ 1,497,663$ 252,337$ 1,750,000$ -$ WT0803Meters/Transponders (annual transfer $158,000)979,750$ 158,000$ 1,137,750$ 775,032$ 362,718$ 1,295,750$ 158,000$ WT0901 TRA Water Payments-Impact 400,000$ 150,000$ 550,000$ 400,000$ 150,000$ 700,000$ 150,000$ WT1201Reclaimed Water Line Extension (3)-$ 4,607,000$ 4,607,000$ -$ 4,607,000$ 6,500,000$ 1,893,000$ WT1202 Standpipe Storage Tank & Bldg Demolition -$ 84,640$ 84,640$ 1,600$ 83,040$ 84,640$ -$ WT1203 Water & Wastewater Impact Fee Update -$ 30,000$ 30,000$ -$ 30,000$ 30,000$ -$ FB9910 FB- Water Impact (Restricted) -$ -$ -$ -$ -$ -$ (1,696,497)$ FB9901 FB - Water & Wastewater CIP -$ -$ -$ -$ -$ -$ (855,776)$ Total Water Projects$7,119,357 $5,486,852 $12,606,209 $6,873,796 $5,732,413 $15,367,243 $208,7611 Debt not yet issued.41
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS July 26,2009
RON YOUNG
MISCELLANEOUS WATER REHABILITATION
WATER MAIN REPLACEMENT
WT0001
This project provides funding for small water main projects identified throughout the fiscal year. Large projects
that are identified will be presented for funding under a new project number.
Some of the City's older water mains have deteriorated and need replacement or repair.
42
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
Water Mains
(Minimum balance $150,000)
$0
$0
$0
$0
Transfers from:
W/WW CIP Fund Balance $365,000
W/WW Operating Fund $100,000
$0 Project Transfers ($146,489)
$0 Additional Funding:
Transfer from:
W/WW Operating Fund $100,000
$0 $418,511
Contingency $49,231 $24,852 $24,379 50%
Water Mains $369,280 $195,204 $174,076 53%
$418,511 $220,056 $198,455 53%
MISCELLANEOUS WATER REHABILITATION WT0001
43
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS May 01,2001
RON YOUNG
WATER TANK DEBT PAYMENT - IMPACT
WATER IMPACT FEE
WT0101
Approved in the annual budget.
The water tower was included in the water impact fee study.
This project includes the transfer of funds from the water impact fee to pay debt service (W/S System Revenue
Refunding Bonds, Series 2006) related to the construction of the new water tower (Heritage Park).
Last debt payment is scheduled for July 15, 2020.
The water tower provides additional capacity and was included in the water impact fee study.
44
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
Debt Service - FY2001-FY2012 $3,219,714
$0 Debt Service - FY2013 $260,034
$0
$0
$0 $3,479,748
WT Impact Fee Fund Balance $3,219,714
$0 Additional Funding Needed:
$0 Transfer from:
WT Impact Fee Fund Balance $260,034
$0 $3,479,748
Transfer to Debt Service $3,479,748 $3,132,310 347,438 90%
$3,479,748 $3,132,310 $347,438 90%
WATER TANK DEBT PAYMENT - IMPACT WT0101
45
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS June 01,2001
RON YOUNG
WELL REPAIRS
WATER WELL REPAIR
WT0104
April 22, 2003: Awarded bid 018-03 for Far North Well pump repair to Layne-Texas for $32,790.
February 14, 2006: Awarded bid 011-06 to Millican Well Service, LLC for rehabilitation and installation of the new
Centrilift submersible motor and pump for the Far North Well in the amount of $250,035.
January 25, 2011: Authorize Millican Well Service, LLC to repair Fuller Well in an amount not to exceed
$117,000, budget increase and additional funding of $117,000 required.
July 20, 2011: Transferred $95,000 from FB9901 to WT0104 for emergency well repairs.
August 9, 2011: Ratify City Manager action to proceed with emergency repairs to the Far North Well site, by
Millican Well Service, LLC in an amount not to exceed $95,000.
The funding is being utilized to repair well pumps and for other unexpected well repairs.
Maintaining the City's wells results in the ability to produce water at a substantial reduction in cost.
46
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
Well Rehabilitation
(Minimum balance $200,000)
Transfer from:
WT0001 - Misc Water Rehab $145,720
W/WW CIP Fund Balance $387,874
W/WW Operating Fund $375,000
Additional Funding Needed:
Transfer from:
W/WW CIP Fund Balance $200,000
$1,108,594
Well Rehabilitation $1,108,594 $847,135 $261,459 76%
$1,108,594 $847,135 $261,459 76%
WELL REPAIRS WT0104
47
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS June 29, 2000
RON YOUNG
RECLAIMED WATER MAIN
WATER RECLAIMED WATER SYSTEM
WT0202
March 11, 2008: Approved resolution 08-1272 to enter into negotiations with the City of Fort Worth (""FW"").
May 26, 2009: Authorized the City Manager to negotiate and execute an agreement with FW for the purchase of
reclaimed water, including the related Memorandum of Understanding (with 20-year term).
October 13, 2009: Authorized the City Manager to execute an engineering design contract with Alan Plummer
Associates Inc. in an amount not to exceed $127,600 for the design of a reclaimed water main.
May 25, 2010: Award bid #007-10 for construction contract in the amount of $1,157,625 including alternate to
William J. Schultz, Inc. dba Circle C Construction for the reclaimed water main adjacent to TSGC.
April 12, 2011: Authorize the City Manager to negotiate and execute an agreement with the City of Fort Worth for
the extension of the reclaimed water service.
May 24, 2011: Ratify negotiated change order to contract with Circle C to extend reclaimed water line for a cost of
$278,425.
May 24, 2011: Authorize the City Manager to negotiate and execute a professional services contract with Alan
Plummer and Associates for the reclaimed water line extension.
The project consists of the construction of a reclaimed water main from the City of Fort Worth Village Creek
Wastewater Treatment Facility to the Texas Star property. Project scope includes the extension of the water
main to other areas of the City that would benefit from the availability of reclaimed water.
Award Design Contract: October 2009
Award Construction Contract: May 2010
Anticipate Construction Completed: September 2012
Utilization of this source of water would ensure the City could continue irrigation in the event of drought and/or
activation of mandatory water restrictions. Continued irrigation is required for the protection of the City's capital
investment in the Texas Star Golf Course and the Texas Star Sports Complex.
48
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
Engineering $240,000
Construction $1,510,000
$1,750,000
Transfers from:
W/WW Operating Fund $970,000
City of Fort Worth $130,000
W/WW CIP Fund Balance $400,000
Developer Contribution $250,000
$1,750,000
Engineering $240,000 $204,289 $35,711 85%
Water Mains $1,510,000 $1,293,374 $216,626 86%
$1,750,000 $1,497,663 $252,337 86%
RECLAIMED WATER MAIN WT0202
49
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS May 31,2007
RON YOUNG
METERS AND TRANSPONDERS
WATER METERS/TRANSPONDERS
WT0803
November 13, 2007: Awarded the annual contract for the purchase of water meters and transponders, and
authorized the City Manager to enter into an agreement with Atlas Utility Supply Company in the amount of
$383,875. Amount for project not to exceed $331,875.
November 11, 2008: Awarded the annual contract for the purchase of water meters and transponders, and
authorized the City Manager to enter into an agreement with Atlas Utility Supply Company in the amount of
$356,875. Amount for project not to exceed $331,875.
February 14, 2012: Awarded the annual contract for the purchase of water meters and transponders, and
authorized the City Manager to enter into an agreement with Atlas Utility Company in the amount of $200,000.
Partial replacement of transponders occurred in FY2006 and FY2007. This project proposes to replace the
balance of the old transponders. The systematic replacement of meters and transponders at or near end of life is
included in the Water System Master Plan.
Purchase and installation of electronic transponders affixed to water meters allowing for electronic or remote
reading of customer water consumption. These water meters (transponders) are read with an electronic device
located inside a vehicle which is driven along a predefined route. System-wide replacement of older meters
beginning with the larger meters first is also included in the scope of the project.
Ongoing
This project provides funding for the systematic replacement of meters and transponders on a regular schedule at
or near end of asset life.
50
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
(Annual Funding $158,000)
Transponders/Meters
$0 FY2008 through FY2012 $1,137,750
$0 Transponders/Meters FY2013 $158,000
$0
$0 $1,295,750
Transfers from:
W/WW CIP Fund Balance $347,750
W/WW Operating Fund $790,000
$0
$0 Additional Funding Needed:
Transfer from:
W/WW Operating Fund $158,000
$0 $1,295,750
Meters/Transponders $1,295,750 $775,032 520,718 60%
$1,295,750 $775,032 $520,718 60%
METERS AND TRANSPONDERS WT0803
51
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS May 31,2008
RON YOUNG
TRINITY RIVER AUTHORITY WATER PAYMENT-IMPACT
WATER IMPACT FEE
WT0901
Based on a review by Birkhoff, Hendricks, and Conway of the water and wastewater impact fees, it was
determined that a substantial portion of the water impact fee is attributed to Trinity River Authority ("TRA") capital
projects. Therefore, these fees should be used to pay a portion of the annual TRA expense, as these funds are
directly attributed to the expansion of TRA. Based on the available fund balance, a systematic drawdown over a
ten year period has been developed.
Annual payment FY2009: $100,000
Annual payments FY2010-2018: $150,000
The expansion at TRA provides additional capacity and it was determined through the water impact fee study that
these funds could be used to pay a portion of TRA water payments. It was determined a ten year drawdown
would approximate the Capital Improvement Plan Review time frame, as well as provide for a systematic
drawdown that would not impact the annual budget.
52
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
TRA Water Pmts FY2009-2012 $550,000
TRA Water Payments FY2013 $150,000
$0
$0
($150,000)
($150,000) $700,000
Transfer from:
WT Impact Fee Fund Balance $550,000
$0
$0 Additional Funding Needed:
Transfer from:
WT Impact Fee Fund Balance $150,000
($150,000) $700,000
Water - TRA Service $700,000 $400,000 $300,000 57%
$700,000 $400,000 $300,000 57%
TRINITY RIVER AUTHORITY WATER PAYMENT-IMPACT WT0901
53
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS May 17,2011
CHRIS BARKER
RECLAIMED WATER LINE EXTENSION
WATER RECLAIMED WATER SYSTEM
WT1201
The reclaimed water line extension is a continuation of the City's Reclaimed Water Utility System. The feasibility
study completed in FY2012 recommends breaking the project into six phases with the first phase beginning in
FY2013.
The project will extend the City's Reclaimed Water Utility System from a point near the northeast corner of Bear
Creek Parkway and Midway Drive, northward to a point near Mid Cities Boulevard. Extension of this system will
ultimately provide reclaimed water service to several multi-family properties from Harwood Road to Mid Cities
Boulevard as well as the City's Bear Creek Park. Additional system expansion would be possible in the future.
Feasibility Study Complete: July 2012
Begin Phase I: FY2013
Construction of the project will provide a non-potable water source for irrigation which will offset future potable
water purchases by the City and will serve to responsibly conserve potable water resources for the City and the
region.
54
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
Preliminary Design/Feasibility $100,000
Engineering $400,000
$0 Construction $5,900,000
$0 Multi-Family Connections &
Customer Education $100,000
Estimated avg. annual debt service $275,000
$275,000 $6,500,000
Transfer from:
W/WW CIP Fund Balance $100,000
Additional Funding Needed:
Transfer from W/WW Op Fund $1,000,000
2013 Revenue Bond Issue $1,500,000
Future Revenue Bond Issue $3,900,000
$275,000 $6,500,000
Engineering $500,000 $0 $500,000 0%
Construction $5,900,000 $0 $5,900,000 0%
Utility Relocation $100,000 $0 $100,000 0%
$6,500,000 $0 $6,500,000 0%
RECLAIMED WATER LINE EXTENSION WT1201
55
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS/FACILITIES March 08, 2010
RON YOUNG
STANDPIPE STORAGE TANK & BUILDING DEMOLITION
FACILITIES DEMOLITION
WT1202
May 22, 2012: Authorize the Mayor to negotiate and execute conveyance documents for the sale of
approximately 2.624 acres of city owned property situated in the James M. Matson Survey, Abstract No. 1080,
Tract 6A, Tarrant County, Texas, located at 1000 Central Drive, Bedford, Texas. Pending sale is for property "AS
IS."
The project does not affect the City's master plan nor is it dependent on other projects.
The project scope includes the demolition of five (5) structures and standpipe located at 1100 Central Drive,
Bedford, Texas. This location was once the site of the City's public works facility which relocated to 1517
Westpark Way, Euless. The buildings are a public nuisance and removal is recommended. An asbestos survey
has been conducted and a minimal amount of non-friable asbestos material was discovered. This will be
remediated as part of the demolition process. Removal of the electric service that supplied power to the well
pumps is included in the project scope.
Upon completion of sale, receipt of proceeds, and conveyance of property "AS IS," this project will be closed and
allocated funding will be returned to W/WW CIP Fund Balance.
Removal of the two million gallon standpipe and site buildings will improve the appearance of the property and
enhance the market value of the land.
56
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
Standpipe Demolition $30,000
Building Demolition Services $35,000
$0 Asbestos Remediation $3,000
$0 Remediation Monitoring Svcs $2,000
Oncor Electrical Svc Removal $11,300
Contingency $3,000
TDLR Filing Fees $340
$0
$0 $84,640
Transfer from:
W/WW Operating Fund $84,640
$0
$0
$0 $84,640
Engineering $2,340 $0 $2,340 0%
Standpipe Demolition $30,000 $0 $30,000 0%
Contingency $3,000 $1,600 $1,400 53%
Building Demolition $35,000 $0 $35,000 0%
Utility Relocation $11,300 $0 $11,300 0%
Asbestos Remediation $3,000 $0 $3,000 0%
$84,640 $1,600 $83,040 2%
STANDPIPE STORAGE TANK & BUILDING DEMOLITION WT1202
57
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS May 31,2009
RON YOUNG
WATER AND WASTEWATER IMPACT FEE UPDATE
WATER IMPACT FEE
WT1203
Water and wastewater impact fee charges were instituted by the City of Euless in 1990 in accordance with
applicable state law to generate revenue for funding of capital improvements attributable to new development.
Impact fees are related to the items identified by the Capital Improvements Plan and the Water and Wastewater
System Master Plan.
This project will consist of reviewing the City's Land Use Assumptions, the costs of future infrastructure needs,
system capacity available for future growth, the cost of Trinity River Authority service, and the cost of updating the
Capital Improvements Plan. Calculations based on state dictated requirements will be made to determine the
maximum allowable impact fees. The city council will determine what percentage of the maximum allowable fee
to impose.
FY2012
Legislation passed in 2001 provided an automatic five year extension to the 2002 update. The impact fees were
updated in 2007 as required. The next impact fee update will be in 2012 barring any new legislative action.
58
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
Engineering $30,000
$0
$0
$0
$0 $30,000
Transfer from:
WT Impact Fee Fund Balance $30,000
$0
$0
$0 $30,000
Engineering $30,000 $0 $30,000 0%
$30,000 $0 $30,000 0%
WATER AND WASTEWATER IMPACT FEE UPDATE WT1203
59
60
CAPITAL IMPROVEMENTS PROGRAMFUNDED PROJECTS SUMMARYProject Number Project DescriptionBudget as of 5/31/11Appropriation/ AmendmentBudget as of 5/31/12Expended as of 5/31/12Remaining FundsRevised Project Cost EstimatesUnfunded/ (Excess Funding) OTHERAC1201 Texas Star Sports Complex Phase IV-$ 794,470$ 794,470$ -$ 794,470$ 840,687$ 46,217$ CM0304 Entry Monument Sign Program115,782$ -$ 115,782$ 93,027$ 22,755$ 115,782$ -$ CM0804 Redevelopment973,326$ 377$ 973,703$ 694,749$ 278,954$ 1,323,703$ 350,000$ DV9901 EDC Incentive Funds400,854$ 50,000$ 450,854$ 300,854$ 150,000$ 475,854$ 25,000$ ED0101 Planning Consultants204,869$ -$ 204,869$ 104,869$ 100,000$ 204,869$ -$ ED1002 EDC Contingency250,000$ -$ 250,000$ -$ 250,000$ 250,000$ FM1201ADA Facility Improvements (min bal $50,000)-$ 50,000$ 50,000$ 3,642$ 46,358$ 50,000$ -$ GC1201TSGC Misc. Improvements (min bal $150,000)-$ 150,000$ 150,000$ 62,323$ 87,677$ 250,000$ 100,000$ PD9901 Police and Courts Facility11,718,034$ 32$ 11,718,066$ 11,609,560$ 108,506$ 11,718,066$ -$ PR0720Misc. Park Improvements (min bal $100,000)225,000$ 75,000$ 300,000$ 241,128$ 58,872$ 575,000$ 275,000$ PR0804 Park Irrigation100,000$ 25,000$ 125,000$ 47,787$ 77,213$ 150,000$ 25,000$ PR1201 Euless FLC Aquatics Design-$ 786,500$ 786,500$ 9,465$ 777,035$ 550,000$ (236,500)$ (1)FB9906 FB-EDC CIP-$ -$ -$ -$ -$ -$ (482,302)$ FB9908 FB-Texas Star Sports Complex CIP-$ -$ -$ -$ -$ -$ (751,828)$ FB9909 FB-General CIP-$ -$ -$ -$ -$ -$ (1,600,577)$ FB9913 FB-Car Rental CIP-$ -$ -$ -$ -$ -$ (73,146)$ Total Other Projects$13,987,865 $1,931,379 $15,919,244 $13,167,404 $2,751,840 $16,503,961 ($2,323,136)(1) To be reallocated to Euless FLC Aquatics Construction project.61
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
COMMUNITY SERVICES May 01,2010
RAY MCDONALD
TEXAS STAR SPORTS COMPLEX PHASE IV
PARK/RECREATION TSSC IMPROVEMENTS
AC1201
January 24, 2012: Authorize the City Manager to negotiate and execute a Field Use and Lease Agreement with
Sting Soccer Group, LP and Texas Titans FC, LLC, (collectively "Sting") for the use of a portion of the property
located at 1501 South Pipeline Road Euless, Texas 76040 (The Parks at Texas Star Sports Complex) as a
practice and training facility for youth soccer. In consideration of its use of the property, Sting will construct
certain facility improvements on the property.
Texas Star Sports Complex Phase IV incorporates the addition of a concession and rest room facility and parking
for 200 vehicles. This addition will ensure that the Texas Star Sports Complex is positioned as a premier facility
that serves the athletic and recreational programming needs of the City.
The project scope includes the design and construction of a parking lot and a concession/rest room facility at the
Texas Star Sports Complex. Related support facilities such as electrical service, lighting, fencing, etc. are also
included in the scope of the project.
Concession Complete: Per contract with Sting, must be complete by October 16, 2013.
Since the completion of Phase III at the Texas Star Sports Complex, the facility has been severely under served
in parking, rest room facilities, and concessions. With the completion of Phase IV, the Texas Star Sports
Complex will be positioned to serve the ever-increasing athletic needs of the community and spur economic
opportunities for the City.
62
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
Parking Lot $412,000
$0 Concessions & Rest Room $195,000
$0 Lights/Electrical $90,000
$0 Material storage bin $15,600
$0 Entry walk $35,000
$7,500 Fencing $18,000
$3,500 Concession equipment $16,000
Retaining Wall $18,000
5% Contingency $41,087
$11,000 $840,687
$0 Transfer from:
EDC CIP Fund Balance $599,470
Contributed Capital (Sting) $195,000
$0 Additional Funding Needed:
Transfer from:
EDC CIP Fund Balance $46,217
$11,000 $840,687
Parking Improvements $412,000 $0 $412,000 0%
Lighting $90,000 $0 $90,000 0%
Equipment $31,600 $0 $31,600 0%
Land Betterments $71,000 $0 $71,000 0%
Contingency $41,087 $0 $41,087 0%
Buildings $195,000 $0 $195,000 0%
$840,687 $0 $840,687 0%
TEXAS STAR SPORTS COMPLEX PHASE IV AC1201
63
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
CITY MANAGER July 11,2006
JOE HENNIG
ENTRY MONUMENT SIGN PROGRAM
MISCELLANEOUS IMPROVEMENTS
CM0304
Continuation of the original City of Euless Entry Monument Sign Program.
Continued construction of City of Euless entry monument signs at key high visibility points throughout the City
extending Euless beautification and branding efforts.
To enable continuous efforts to identify, beautify, and brand the City of Euless.
64
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
Land Betterments $115,782
$0
$0
$0
$0 $115,782
Transfer from:
Car Rental $115,782
$0
$0
$0 $115,782
Land Betterments $115,782 $93,027 22,755 80%
$115,782 $93,027 $22,755 80%
ENTRY MONUMENT SIGN PROGRAM CM0304
65
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
CITY MANAGER July 11,2006
GARY MCKAMIE
REDEVELOPMENT
MISCELLANEOUS DEVELOPMENT
CM0804
Oct 23, 2007: Authorized the purchase of property on Lot 27, Block 2, Cresthaven Addn, 1010 Highland Dr
Nov 27, 2007: Authorized the purchase of property on Lot 24, Block 1, Cresthaven Addn, 1010 Cresthaven Dr
Dec 11, 2007: Authorized the purchase of property on Lots 17&18, Block 8, Cedar Hill Estates Addn, 710 S Main
Oct 28, 2008: Authorized the purchase of property on Lot 3, Block 2, Cresthaven Addn, 1007 Cresthaven Dr
Jan 13, 2009: Authorized the purchase of property on Lot 18, Block 1, Cresthaven Addn, 912 Cresthaven Dr; Lot
4, Block 2, Cresthaven Addn, 1005 Cresthaven Dr; and Lot 23, Block 2, Cresthaven Addn, 1002 Highland Dr
This project provides funding to allow the City to participate in redevelopment projects and other community
improvements or make acquisitions of property that will be of economic benefit to the City of Euless.
Project includes City participation in community redevelopment projects and property acquisitions that will be of
economic benefit to the City.
Long-term on-going project for continuous improvement of the community.
As the City ages, it is imperative that the economic vitality of the City remain strong. Reinvestment into the
community will protect property values from deterioration and keep commercial properties occupied and
vibrant.
66
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
Land Acquisition $902,910
Demolition $60,696
$0 Minor Apparatus $97
$0 Incentives $360,000
$0
$0 $1,323,703
Transfer from:
General Fund $930,000
Interest Earnings $33,703
$0 Drill Site Surface Damage $10,000
$0
Additional Funding Needed:
Transfer from GCIP Fund Bal $350,000
$0 $1,323,703
Land Acquisition $902,910 $626,335 276,575 69%
Demolition $60,696 $58,317 2,379 96%
Minor Apparatus $97 $97 0 100%
Incentives $360,000 $10,000 350,000 3%
$1,323,703 $694,749 $628,954 52%
REDEVELOPMENT CM0804
67
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
ECONOMIC DEVELOPMENT July 26,1999
BILL RIDGWAY
EULESS DEVELOPMENT CORPORATION INCENTIVE
EDC DEVELOPMENT
DV9901
March 27, 2001: Approved transfer of $325,000 to North Main Street for right-of-way to free up funds for a sign
program.
May 30, 2006: Approved payment to Professional Turf Products, Inc. in the amount of $300,000 per agreement.
Euless Development Corporation funds that have been set aside to aid the City of Euless in attracting
development opportunities.
68
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
Will be based on the merits of
each opportunity.
$0
$0
$0
$0
Transfers from:
EDC CIP Fund Balance $913,454
EDC Operating Fund $325,000
$0 Transfer to FS#2 SS0010 ($432,600)
$0 Transfer to N Main PS9901 ($355,000)
Additional Funding Needed:
EDC Operating Fund $25,000
$0 $475,854
Economic Development Incentives $475,000 $300,000 $175,000 63%
Irrigation Supplies $854 $854 $0 100%
$475,854 $300,854 $175,000 63%
EULESS DEVELOPMENT CORPORATION INCENTIVE DV9901
69
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
ECONOMIC DEVELOPMENT July 07,2000
BILL RIDGWAY
PLANNING CONSULTANTS
MISCELLANEOUS DEVELOPMENT
ED0101
This project provides funding for evaluating various development opportunities.
Commission a study to determine the highest and best use of valuable undeveloped commercial land.
Poor planning can result in lower than desired tax revenue, hodge podge development activity, and less than
optimal development quality. The City needs to be proactive to guide the development of these vital tracts.
70
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
Planning Study $204,869
$0
$0
$0
$0 $204,869
Transfer from:
Car Rental $200,000
Car Rental CIP Fund Balance $4,869
$0
$0
$0 $204,869
Planning Study $204,869 $104,869 100,000 51%
$204,869 $104,869 $100,000 51%
PLANNING CONSULTANTS ED0101
71
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
ECONOMIC DEVELOPMENT Sept 30,2010
GARY MCKAMIE
EDC CONTINGENCY
EDC MISCELLANEOUS
ED1002
To provide funding for emergencies or unforeseen projects that arise throughout the year.
This would enable the City to act quickly on emergency or unforeseen projects. Without funding, these types of
projects would have to wait until the next budget cycle which could increase costs or impede economic
development opportunities.
72
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
Contingency $250,000
$0
$0
$0
$0 $250,000
Transfer from:
EDC CIP Fund Balance $250,000
$0
$0
$0 $250,000
Contingency $250,000 $0 $250,000 0%
$250,000 $0 $250,000 0%
EDC CONTINGENCY ED1002
73
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
FACILITIES April 11,2011
KYLE MCADAMS
ADA/TAS FACILITY IMPROVEMENTS
FACILITIES IMPROVEMENTS
FM1201
This project provides for the continued improvements to various City facilities as required by Federal and State
mandated Americans with Disabilities Act/Texas Accessibility Standards ("ADA/TAS"). City facilities, entrances,
lifts, signage, speech and hearing aided devices, and other areas covered under both ADA and TAS
requirements will be part of these improvements. Project funds will be managed by the City Manager's Office and
will be allocated as identified projects are brought forth and approved.
Some City facilities do not meet current ADA/TAS standards. Updating accessibility on a continuing basis will
help keep the City in compliance with government standards and will address the growing needs of citizens with
accessibility issues.
74
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
Improvements
(Minimum balance $50,000)
$0
$0
$0
$0
Transfer from:
Car Rental $50,000
$0
$0
$0 $50,000
Structural Maintenance $50,000 $3,642 $46,358 7%
$50,000 $3,642 $46,358 7%
ADA/TAS FACILITY IMPROVEMENTS FM1201
75
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
TEXAS STAR GOLF COURSE May 17,2011
GLENDA HARTSELL
TSGC MISCELLANEOUS IMPROVEMENTS
PARK/RECREATION TSGC IMPROVEMENTS
GC1201
To provide funding to address small capital projects that arise throughout the year at Texas Star Golf Course.
Without funding for this project, the smaller items identified throughout the year could not be addressed in a
timely manner and would have to be postponed until the next budget cycle for funding consideration. Timely
response preserves the City's investment in a high-profile asset and maintains the quality service levels expected
from patrons.
76
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
Improvements
(Minimum balance $150,000)
$0
$0
$0
$0
Transfer from:
TSGC Reserve Fund $150,000
$0
$0 Additional Funding Needed:
Transfer from:
TSGC Reserve Fund $100,000
$0 $250,000
Land Betterments $113,000 $24,628 $88,372 22%
Land Acquisition $2,000 $2,000 $0 100%
Equipment $50,000 $14,380 $35,620 29%
Improvements $35,000 $0 $35,000 0%
Repair & Maintenance $50,000 $21,315 $28,685 43%
$250,000 $62,323 $187,677 25%
TSGC MISCELLANEOUS IMPROVEMENTS GC1201
77
Department:Date Prepared:July 15, 1999
Submitted By:Date Completed:
Project Title:POLICE & COURTS FACILITY
Project Type:BUILDINGS/FACILITIES Sub-Type:
Project No.:PD9901 Priority: A
COUNCIL AUTHORIZATION:
January 13, 1998 - Authorized contract with Phillips Swager for architectural services.
April 14, 1998 - Authorized the acquisition of the Western Hills Inn and Western Hills Annex.
June 9, 1998 - Awarded Bid No. 98-13 for demolition services.
October 9, 1998 - Awarded change order to West Excavation for abatement of asbestos.
February 23, 1999 - Authorized additional funds for demolition.
June 22, 1999 - Declared expectation to reimburse expenditures with proceeds of future debt.
June 22, 1999 - Authorized City Manager to request qualifications for construction management service.
February 22, 2000 - Public Hearing and approval of Special Use Permit.
February 22, 2000 - Approval of request for site plan.
May 9, 2000 - Approval of Ordinance No. 1426 authorizing sale of Cert. Of Obligation Series 2000A.
May 9, 2000 - Awarded bid for construction to Ratcliff Construction.
November 14, 2000 - Authorized execution of contract for Project Management Services
January 9, 2001 - Granted City Manager approval to authorize change orders not to exceed $25,000.
January 23, 2001 - Ratified contract for inspection services to increase limit to $65,000
January 23, 2001 - Approved Change Order #1 to credit contract $152,391.
January 23, 2001 - Approved Change Order #3 for payment of $48,372.79 on new piers & removal.
March 27, 2001 - Approved Change Order #4 to credit contract $42,871.41.
May 22, 2001 - Awarded bid #044-01 for furniture in the amount of $332,400.70.
June 12, 2001 - Authorize City Manager to execute contract with DataTex not to exceed $74,257.86.
installing police and public works radio system.
PROJECT DESCRIPTION AND RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT SCHEDULE:
JUSTIFICATION:
Current facility space is grossly inadequate for these areas.
This 53,000 square foot facility will accommodate police, jail and courts.
August 28, 2001 - Awarded contract to DFW Communication in the amount of $33,009 for relocating and
CONSTRUCTION
City of Euless
Capital Project Request
POLICE DEPARTMENT
GARY MCKAMIE
78
PROJECT TITLE:PROJECT #:PD9901
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Bond Issuance Cost 76,000$
Direct Operating Cost Construction 9,071,257
Personnel:Full Time 128,000 Contingency 128,075
Part Time Demolition 606,709
Architectural/ Surveying/ Geotech 826,439
Other Professional Services 36,310
106,000 Equipment 67,912
Furnishings 350,000
Land Purchase 43,592
Planning Services 70,428
$234,000 Owner Equipment 441,344
Total Estimated Capital Cost $11,718,066
Maintenance Costs
HVAC Maintenance 18,084 FUNDING SOURCE:
Maintenance 24,850 Transfers from:
Janitorial Services & Supplies 37,500 General Fund $394,890
8,000 W/S Operating Fund $175,000
1,500 CCPD Operating Fund 2,160,000
$89,934 DEA Funds 450,000
Bond Proceeds 8,600,000
Interest Income 576,979
$750,815 Less Inter-project Transfer to:
Building D FM0101 (638,803)
Total Estimated Annual Cost $1,074,749 Total Funding $11,718,066
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Bond Issuance Cost 76,000 76,000 0 100%
Construction 9,071,257 9,071,257 0 100%
Contingency plus interest earnings 128,075 61,264 66,811 48%
Demolition 606,709 606,709 0 100%
Architectural Services 745,369 745,369 0 100%
Surveying Services 6,070 6,071 (1) 100%
Geo-Technical Services 75,000 72,511 2,489 97%
Other Professional Services 36,310 36,310 0 100%
Equipment 67,912 67,912 0 100%
Furnishings 350,000 348,347 1,653 100%
Land Purchase 43,592 43,591 1 100%
Off-Site Utilities 0 0 0 0%
Owner Equipment 441,344 403,791 37,553 91%
Planning Services 70,428 70,428 0 100%
* - This project transferred $638,803 to FM0101.
$11,718,066 $11,609,560 $108,506 99%
POLICE & COURTS FACILITY
Subtotal:
Utilities
Elect. Supplies
Pest Control
Subtotal:
TOTAL PROJECT
Average Annual Debt Service
Other
CURRENT STATUS
79
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
COMMUNITY SERVICES March 23,2004
RAY MCDONALD
MISCELLANEOUS PARK IMPROVEMENTS
EDC PARKS
PR0720
The adopted Parks Master Plan recommends funding for system-wide park facilities and amenities upgrades.
The project provides funding for the upgrade and modernization of City parks to include replacement of aged
structures such as pavilions, picnic tables, gazebos, signs, safety components, and other park amenities
including the addition of a gazebo on Main Street. Park infrastructure and structure painting are included in the
scope of the project. Additionally, the project encompasses the installation of trail lighting along the Trails of
Euless similar to the lighting installed along the trail through Midway Park. Trailwood Park, Bob Eden Trail, The
Preserve at McCormick Park, The Villages of Bear Creek Park and Heritage Park would also benefit from trail
lighting.
Pursuant to the recommendations in the Parks Master Plan, park accessibility should be in compliance with the
Americans with Disabilities Act. The existing equipment in many park areas is becoming aged and will require
refurbishment or replacement in the near term. Additionally, park infrastructure should be maintained at a level
that meets citizen expectations. The popularity of the trails have necessitated the installation of lighting to extend
the hours of usage and to provide increased visibility in remote areas of the trail system.
80
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
Fixtures, landscaping, lighting,
& other park and infrastructure
$0 improvements
$0
(Minimum balance $100,000)
$0
$0
Transfer from:
EDC Operating Fund $300,000
$0 Additional Funding Needed:
$0 Transfer from:
EDC Operating Fund $275,000
$0 $575,000
Park Furnishings $169,848 $169,848 0 100%
Landscaping $24,870 $24,870 0 100%
Contingency $127,112 $43,240 83,872 34%
Park Lighting $50,000 $0 50,000 0%
Equipment $3,170 $3,170 0 100%
Other $200,000 $0 200,000 0%
$575,000 $241,128 $333,872 42%
MISCELLANEOUS PARK IMPROVEMENTS PR0720
81
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
COMMUNITY SERVICES October 01,2007
RAY MCDONALD
PARK IRRIGATION
EDC PARKS
PR0804
This project provides annual funding to continue efforts to meet irrigation needs throughout the City's park
system.
Projects will be identified and completed on an as needed basis.
This project allows for maintenance and expansion of the irrigation systems throughout the parks system to
enhance the overall condition of the landscape and green space.
82
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
(Annual Transfer $25,000)
Irrigation $150,000
$0
$0
$0
$0 $150,000
Transfer from:
EDC Operating Fund $125,000
$0 Additional Funding Needed:
$0 Transfer from:
EDC Operating Fund $25,000
$0 $150,000
Irrigation $150,000 $47,787 102,213 32%
$150,000 $47,787 $102,213 32%
PARK IRRIGATION PR0804
83
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
COMMUNITY SERVICES February 11, 2009
RAY MCDONALD
EULESS FLC AQUATICS DESIGN
PARK/RECREATION AQUATICS
PR1201
April 10, 2012: Authorize the City Manager to negotiate and execute an architectural contract for certain
components of the Euless Family Life Center ("FLC") aquatics facilities to John Kirksey Associates, Architects,
Inc. d/b/a Kirksey, Houston, Texas. Fee is anticipated at 8% of construction costs of the buildings.
April 10, 2012: Authorize the City Manager to solicit statements of qualifications for Design Build Services related
to the Euless FLC Indoor and Outdoor Aquatics Facilities.
The City of Euless has for many years recognized the importance of planning for parks, recreation, and open
space based on the needs as expressed by the citizens. For the update to the Parks Master Plan and as part of
the City’s five year master plan, a survey of park, recreation, and open space needs was conducted from a
sample of randomly selected citizens in Euless. The survey identified a new aquatic center as a top priority of the
citizens. Project approval requires revision of the master planning of Midway Park as the aquatics center
eliminates the current ball fields and requires the relocation of the existing tennis courts in order to provide
support facilities and amenities for the FLC.
The project consists of the design of indoor and outdoor family aquatic facilities. The indoor facility includes a
lap/leisure pool, current channel, slide, and therapy pool. This multi-purpose facility will be attached to the senior
center and will offer aquatic programs for the senior population and the general public. The outdoor aquatics
center will include various play components such as a leisure pool, slides, aqua play features, shade structures, a
bath house, and all the necessary filtration systems. The project scope also includes redevelopment and
improvement of the entire site such as relocating the tennis courts and the construction of various trails, a group
pavilion, an amphitheater, multi-use sport courts, additional picnic stations with grills, a nature area, a botanical
garden, and public art display(s).
The City's population is sufficient to support a family aquatic center. The City's existing aquatic facilities have
aged and maintaining the pools and support facilities has been an ongoing issue and concern. The operating
expenses continue to increase, far exceeding the revenue generated by the pools. Continuing in repair mode is
no longer possible at the Wilshire and South Euless Pools and a long-term plan is necessary. Given the fact that
two of the neighborhood pools are over thirty years old and the cost to renovate, repair, or replace them is
estimated at over one million dollars each, it is recommended that the City concentrate efforts and resources
toward the family aquatic facility to serve the citizens of Euless.
84
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
Engineering $550,000
$550,000
Transfer from:
Car Rental $786,500
Transfer to:
Car Rental CIP Fund Balance ($236,500)
$550,000
Engineering $550,000 $9,465 $540,535 2%
$550,000 $9,465 $540,535 2%
EULESS FLC AQUATICS DESIGN PR1201
85
86
Project DescriptionPriority Estimated Cost Operating FundCIP Fund BalanceBond SaleGrants/ ContribImpact FeesEscrow FundsCar Rental TaxOther EDCTo Be DeterminedDRAINAGE PROJECTSNone CurrentlyA $ - Sub-Total Drainage Priority A-Proposed FY13 $ - None CurrentlyB $ - Sub-Total Drainage Priority B-Unfunded $ - Bell Hi Addition C TBD XX Blessing Branch-Main Street to SH 360C TBD XX Hollow Oak Channel ErosionC TBD XX Kynette Drive Culvert Modifications C TBD XX Little Bear Creek Drainage ImprovementsC TBD XX Marlene Drive Culvert ReplacementC TBD XX Simmons Drive Culvert ImprovementsC TBD XX Sub-Total Drainage Priority C-Unfunded $ - DRAINAGE PROJECTS - TOTAL$ - STREET PROJECTSFY2013 38th CDBG-ADA Infrastructure Improvements A $ 450,000 XX FY2013 County Overlay-Trailwood/Summit Ridge/ Westpark A $ 300,000 XX Cullum Drive Design and ROWA $ 200,000 XX Sub-Total Street Priority A-Proposed FY13 $ 950,000 FY2014 39th CDBG-ADA Infrastructure Improvements (14)B $ 300,000 XX FY2014 County Overlay-Monterrey/Sotogrande/El Camino Real (14)B $ 300,000 XX Cullum Drive Construction (14)B $ 565,000 $100,786 $ 67,214 $397,000 FY2015 40th CDBG-ADA Infrastructure Improvements (15)B $ 300,000 XX FY2015 County Overlay-Baze Road/Kynette Drive/Signet Drive (15)B $ 300,000 XX FY2016 41st CDBG-ADA Infrastructure Improvements (16)B $ 300,000 XX FY2016 County Overlay-Ector Drive/Raider Drive/Texas Star Pkwy (16)B $ 300,000 XX Traffic Signal-Harwood Rd at Bear Creek Pkwy (16)B $ 180,000 XX FY2017 42nd CDBG-ADA Infrastructure Improvements (17)B $ 300,000 XX FY2017 County Overlay-Aransas Drive/Ector Drive (17)B $ 300,000 XX Sub-Total Street Priority B-Unfunded $ 3,145,000 Bear Creek Parkway C TBD XX Cresthaven Drive C TBD XX E Alexander Lane C TBD XX Fuller-Wiser Road-Harwood Road to Mid Cities Blvd C TBD XX Fuller-Wiser Road-SH183 to Harwood Road C TBD XX Highland Drive C TBD XX Ross Avenue C TBD XX South Pipeline Road C TBD XX Vine Street-SH183 to SH10 C TBD XX Sub-Total Street Priority C-Unfunded $ - PROPOSED METHOD OF FINANCINGCAPITAL IMPROVEMENT PROGRAMSFY13 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE87
Project DescriptionPriority Estimated Cost Operating FundCIP Fund BalanceBond SaleGrants/ ContribImpact FeesEscrow FundsCar Rental TaxOther EDCTo Be DeterminedPROPOSED METHOD OF FINANCINGCAPITAL IMPROVEMENT PROGRAMSFY13 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPESTREET PROJECTS - TOTAL$ 4,095,000 WASTEWATER PROJECTSLR: Ross Avenue A $ 215,000 XX LR: Slaughter Lane/E Huitt LaneA $ 475,000 XX LR: W Huitt A $ 180,000 XX Sub-Total Wastewater Priority A-Proposed FY13 $ 870,000 LR: Denton Drive (14)B $ 539,000 XX LR: Milam Drive (14)B $ 253,000 XX NTE (SH183) Phase II Wastewater Relocation (15)B $ 600,000 XX LR: Oakwood Terrace Phase I (15)B $ 345,000 XX LR: Oakwood Terrace Phase II (15)B $ 635,000 XX LR: Kynette Drive/Wilshire Drive (16)B $ 663,000 XX LR: Cedar Hills Estates/Hollywood Blvd. (17)B $ 112,000 XX Sub-Total Wastewater Priority B-Unfunded $ 3,147,000 LR: Collin Drive/Harris Drive/Irion DriveC TBD XX LR: Crane DriveC TBD XX LR: Donley Drive/Shelmar DriveC TBD XX LR: Eastcliff/Windlea/SignetC TBD XX LR: Ector Dr/Donley Dr/Crane DrC TBD XX LR: Ector Drive/Fayette DriveC TBD XX LR: Evans/Canyon Ridge/N KynetteC TBD XX LR: Glenn DriveC TBD XX LR: Huntington/Koen/Atkerson/E Huitt/Slaughter/MartinC TBD XX LR: Janann/Brownstone/Shelmar DriveC TBD XX LR: Lakewood/Dogwood/BocowoodC TBD XX LR: Live Oak Drive/Silver Creek Drive/Marlene Drive C TBD XX LR: Mary/Marlene/Commerce/ Wilshire/GreenbriarC TBD XX LR: N Midway Park C TBD XX LR: Northcliff/Toplea/Windlea/Signet/ Kynette/Westcliff C TBD XX LR: NW Midway/Rusk/Parker/Rockwall C TBD XX LR: S Main Street C TBD XX LR: Sagebrush/Toplea/Wilshire/Yorkshire/Tyler C TBD XX LR: Sierra Drive C TBD XX LR: Town Creek Drive C TBD XX LR: W Donley/Private Drive/Mimosa/Magolia/Redbud C TBD XX LR: W Midway/Victoria/Delta/ Lamar/Rockwall C TBD XX Sub-Total Wastewater Priority C-Unfunded $ - WASTEWATER PROJECTS - TOTAL$ 4,017,000 LR = Line Replacement88
Project DescriptionPriority Estimated Cost Operating FundCIP Fund BalanceBond SaleGrants/ ContribImpact FeesEscrow FundsCar Rental TaxOther EDCTo Be DeterminedPROPOSED METHOD OF FINANCINGCAPITAL IMPROVEMENT PROGRAMSFY13 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPEWATER PROJECTSNone Currently $ - Sub-Total Water Priority A-Proposed FY13 $ - LR: El Camino Real (14) B $ 410,000 XX Water System Security Camera Installation (14)B $ 75,000 XX LR: S Pipeline Road West (15) B $ 300,000 XX NTE (SH183) Phase II Water Relocation (15)B $ 1,200,000 XX Residential Meter Replacement Program (15)B $ 3,690,350 XX LR: Blessing Creek/Stony Creek/Rock Creek (16)B $ 315,000 XX SH360 Water Crossing (17)B $ 735,500 XX Sub-Total Water Priority B-Unfunded $ 6,725,850 LR: Collin Drive-Dallas Dr to Harwood Rd C TBD XX LR: Collin Drive-Denton Dr to Dallas Dr C TBD XX LR: Denton Drive C TBD XX LR: Dickey Drive North C TBD XX LR: Dickey Drive South C TBD XX LR: Dunaway Drive C TBD XX LR: E Huitt Lane C TBD XX LR: Eastcliff Drive C TBD XX LR: Ector Drive C TBD XX LR: Fuller Drive C TBD XX LR: Hollow Oak Drive C TBD XX LR: Kynette Drive C TBD XX LR: Live Oak Court/Live Oak Drive C TBD XX LR: Midcreek/Rock Creek/Stony Creek C TBD XX LR: Midway Drive East C TBD XX LR: Midway Drive West C TBD XX LR: Needles Street C TBD XX LR: Paula Lane C TBD XX LR: S Main Street (North) C TBD XX LR: S Main Street (South) C TBD XX LR: S Pipeline Road East C TBD XX LR: Shady Creek Drive/Cliffwood Drive C TBD XX LR: Springwood Court C TBD XX LR: Sunset Drive C TBD XX LR: Westwood Drive C TBD XX LR: Wildwood Street C TBD XX LR: Woodvine (East) C TBD XX LR: Woodvine (West) C TBD XX Water System Security Land Acquisition C TBD XX Sub-Total Water Priority C-Unfunded $ - WATER PROJECTS - TOTAL$ 6,725,850 LR = Line Replacement89
Project DescriptionPriority Estimated Cost Operating FundCIP Fund BalanceBond SaleGrants/ ContribImpact FeesEscrow FundsCar Rental TaxOther EDCTo Be DeterminedPROPOSED METHOD OF FINANCINGCAPITAL IMPROVEMENT PROGRAMSFY13 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPEOTHER PROJECTSEuless FLC Aquatics ConstructionA $ 6,450,000 $5,236,500* $ 1,213,500 Sub-Total Other Priority A-Proposed FY13 $ 6,450,000 Glade Parks Trail Connection (14)B $ 359,625 XX Texas Star Golf Course Bunker Replacement (14)B $ 195,000 XX Blessing Branch Park Improvements (15)B $ 225,120 XX Texas Star Sports Complex Phase V (15)B $ 4,152,000 XX Development/Engineering Building (16)B $ 1,579,800 XX TSGC Greens Replacement (16)B $ 800,000 XX Sub-Total Other Priority B-Unfunded $ 7,311,545 Animal Shelter Expansion/Renovation C TBD XX Kiddie Carr Park Improvements C TBD XX South Euless Water Feature C TBD XX Trail Connection South Euless C TBD XX Trail Enhancements Phase I C TBD XX Trail Enhancements Phase II C TBD XX Trail Enhancements Villages Bear Creek C TBD XX Trailwood Park Improvements C TBD XX Wilshire Park Water Feature C TBD XX Sub-Total Other Priority C-Unfunded $ - OTHER PROJECTS - TOTAL$ 13,761,545 * Car Rental CIP - $4,236,500 including reallocation from Euless FLC Aquatics Design project.* General CIP - $1,000,00090
Project DescriptionPriority Estimated Cost Operating FundCIP Fund BalanceBond SaleGrants/ ContribImpact FeesEscrow FundsCar Rental TaxOther EDCTo Be DeterminedDRAINAGE PROJECTSNone CurrentlyA $ - Sub-Total Drainage Priority A-Proposed FY13 $ - None CurrentlyB $ - Sub-Total Drainage Priority B-Unfunded $ - Bell Hi Addition C TBD XX Blessing Branch-Main Street to SH 360C TBD XX Hollow Oak Channel ErosionC TBD XX Kynette Drive Culvert Modifications C TBD XX Little Bear Creek Drainage ImprovementsC TBD XX Marlene Drive Culvert ReplacementC TBD XX Simmons Drive Culvert ImprovementsC TBD XX Sub-Total Drainage Priority C-Unfunded $ - DRAINAGE PROJECTS - TOTAL$ - CAPITAL IMPROVEMENT PROGRAMSFY13 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPEPROPOSED METHOD OF FINANCING91
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS July 26,1999
RON YOUNG
BELL HI ADDITION
DRAINAGE IMPROVEMENTS
C
In 2005, the City commissioned and received a drainage plan from Freese and Nichols, Inc. In this plan, the
Bell Hi Addition was identified as an area in need of flood relief.
The proposed project ties into an existing storm drainage system on Needles Street. A substantial portion of the
cost of this project is related to street repair which would indicate the need to combine this project with a street
reconstruction project.
The construction of this project will prevent the flooding of Paula Lane, David Drive, and Needles Street during
the most intense rainfall events. The terrain in this location is very flat, which causes the streets to have a very
low capacity to remove storm water.
92
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
BELL HI ADDITION
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
93
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS July 26,1999
RON YOUNG
BLESSING BRANCH-MAIN STREET TO SH360
DRAINAGE IMPROVEMENTS
C
The Blessing Branch Drainage Master Plan included a conceptual plan to convey storm water through the creek
more efficiently.
This project involves the channeling and lining of Blessing Branch in accordance with the Blessing Branch
Master Plan.
The City expects to receive significant developer contributions toward this project. However, the City may be
required to fund a portion of this project.
94
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
BLESSING BRANCH-MAIN STREET TO SH360
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
95
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 03,2008
RON YOUNG
HOLLOW OAK CHANNEL EROSION
DRAINAGE IMPROVEMENTS
C
In May 2008, the City authorized a drainage study for the creek area that runs at the rear of the lots fronting on
Hollow Oak Drive and Linkwood Drive. The completed drainage study was received in July 2008.
The creek area along the rear of the lots on Hollow Oak Drive and Linkwood Drive exists in a natural state. The
creek bank along the south has experienced some slope failure. The drainage study recommends installation of
"bag wall" slope protection.
The City has received complaints that fences and other improvements on private property will be threatened if
additional slope failures take place. Currently no residences are threatened.
96
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
HOLLOW OAK CHANNEL EROSION
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
Due to the expected impact to the native conditions, this project would require broad support from all impacted
neighbors. Alternatives, such as possible assistance with removal or relocation of improvements on affected
properties, should also be considered.
97
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS July 21,1999
RON YOUNG
KYNETTE DRIVE CULVERT MODIFICATIONS
DRAINAGE IMPROVEMENTS
C
Wilshire Village Addition was constructed prior to the adoption of the City's Uniform Development Code ("UDC").
The requirements prior to the UDC were lower than what the City now requires. The current construction
configuration of Wilshire Village causes more water to remain above ground than is acceptable under current
standards. The drainage system in the Wilshire Village Addition needs to be upgraded to meet the current
requirements.
The project involves the installation of a small drainage system on Kynette Drive up to Sierra Drive. It is Project
No. 16 in the 1990 Knowlton, English, Flowers Drainage Utility System Study of Selected Improvement Projects.
Surface water flow within Kynette Drive exceeds the City's current development standards. A large amount of
storm water drains to an existing culvert on Kynette Drive between East Cliff and West Cliff Drives. The existing
drainage facilities collecting this storm water are inadequate according to current standards.
98
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
KYNETTE DRIVE CULVERT MODIFICATIONS
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
99
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS July 21,1999
RON YOUNG
LITTLE BEAR CREEK DRAINAGE IMPROVEMENTS
DRAINAGE IMPROVEMENTS
C
The improvements proposed for Bob Eden Park are identified in the Little Bear Creek Watershed Master Plan.
The Little Bear Creek Park portion of this project was identified in the 1990 Knowlton, English and Flowers
Drainage Utility System Study of Selected Improvement Projects.
Both parts of this drainage project involve erosion control and channelization improvements to Little Bear Creek.
The Bear Creek Park part is a portion of Project No. 11 in the above-referenced study. This project will be re-
evaluated to determine if the scope and proposed improvements should be modified. This part of the project will
be redefined and re-estimated.
Continued erosion will eventually undermine the creek in both parks and cause damage to existing City facilities.
100
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LITTLE BEAR CREEK DRAINAGE IMPROVEMENTS
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
101
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 10,2008
RON YOUNG
MARLENE DRIVE CULVERT REPLACEMENT
DRAINAGE IMPROVEMENTS
C
Marlene Drive is noted as a collector street on the City's Master Thoroughfare Plan.
The scope of the project includes construction of a new culvert at Cyclone Branch to meet current load and
drainage capacity standards. A portion of the concrete channel will also need to be reconstructed both
upstream and downstream to ensure a smooth transition.
The existing culvert is load limited. The new culvert will be designed to convey sufficient drainage to comply
with current standards.
102
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
MARLENE DRIVE CULVERT REPLACEMENT
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
103
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 15,2005
RON YOUNG
SIMMONS DRIVE CULVERT IMPROVEMENTS
DRAINAGE IMPROVEMENTS
C
In 2005, the City commissioned and received a drainage plan from Freese and Nichols, Inc.
An additional culvert will extend from the apartment complex on the east side of Simmons Drive and will outfall
into the creek area on the north side of Carr Park.
In intense storms, the capacity of the existing culvert is exceeded. Additional culverts will be required to convey
the storm flows. The construction of this project will enable the safe use of Simmons Drive in intense storm
events.
104
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
SIMMONS DRIVE CULVERT IMPROVEMENTS
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
105
106
Project DescriptionPriority Estimated Cost Operating FundCIP Fund BalanceBond SaleGrants/ ContribImpact FeesEscrow FundsCar Rental TaxOther EDCTo Be DeterminedSTREET PROJECTSFY2013 38th CDBG-ADA Infrastructure Improvements A $ 450,000 XX FY2013 County Overlay-Trailwood/Summit Ridge/ Westpark A $ 300,000 XX Cullum Drive Design and ROWA $ 200,000 XX Sub-Total Street Priority A-Proposed FY13 $ 950,000 FY2014 39th CDBG-ADA Infrastructure Improvements (14)B $ 300,000 XX FY2014 County Overlay-Monterrey/Sotogrande/El Camino Real (14)B $ 300,000 XX Cullum Drive Construction (14)B $ 565,000 $100,786 $ 67,214 $397,000 FY2015 40th CDBG-ADA Infrastructure Improvements (15)B $ 300,000 XX FY2015 County Overlay-Baze Road/Kynette Drive/ Signet Drive (15)B $ 300,000 XX FY2016 41st CDBG-ADA Infrastructure Improvements (16)B $ 300,000 XX FY2016 County Overlay-Ector Drive/Raider Drive/Texas Star Pkwy (16)B $ 300,000 XX Traffic Signal-Harwood Rd at Bear Creek Pkwy (16)B $ 180,000 XX FY2017 42nd CDBG-ADA Infrastructure Improvements (17)B $ 300,000 XX FY2017 County Overlay-Aransas Drive/Ector Drive (17)B $ 300,000 XX Sub-Total Street Priority B-Unfunded$ 3,145,000 Bear Creek Parkway C TBD XX Cresthaven Drive C TBD XX E Alexander Lane C TBD XX Fuller-Wiser Road-Harwood Road to Mid Cities Blvd C TBD XX Fuller-Wiser Road-SH183 to Harwood Road C TBD XX Highland Drive C TBD XX Ross Avenue C TBD XX South Pipeline Road C TBD XX Vine Street-SH183 to SH10 C TBD XX Sub-Total Street Priority C-Unfunded $ - STREET PROJECTS - TOTAL$ 4,095,000 CAPITAL IMPROVEMENT PROGRAMSFY13 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPEPROPOSED METHOD OF FINANCING107
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS May 17,2011
CHRIS BARKER
FY2013 38TH CDBG-ADA/TAS INFRASTRUCTURE IMPROVEMENTS
STREET CDBG
A
This project provides for continued improvements to accessibility ramps by removing architectural barriers to
accessibility as required by Federal and State mandated Americans with Disabilities Act/Texas Accessibility
Standards ("ADA/TAS"). The project scope includes identification of architectural barriers to accessibility that
meet CDBG eligibility guidelines and the subsequent replacement thereof.
(38th year CDBG project)
FY2013
Removing architectural barriers to accessibility is an eligible CDBG activity and will assist in the City's efforts to
maintain compliance with applicable Federal and State ADA/TAS codes.
108
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
FY2013 38TH CDBG-ADA/TAS INFRASTRUCTURE IMPROVEMENTS
Engineering $67,500
Construction $382,500
$0
$0
$0
$0
$0
$0
$0 $450,000
0%
0%
0%
0%
XX 0%
Council Action:
February 28, 2012: Conduct a Public Hearing regarding the proposed 38th year CDBG project, including the
installation of sidewalk accessibility ramps located along South Main Street, Fair Oaks Boulevard, Limestone
Drive, Himes Drive, Collin Drive, Sixpence Lane and Newport Way and motion to approve a recommendation
regarding the selected CDBG project.
109
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS May 20, 2010
RON YOUNG
FY2013 COUNTY OVERLAY - TRAILWOOD DR/SUMMIT RIDGE DR/WESTPARK WAY
STREET OVERLAY
A
Trailwood Drive and Summit Ridge Drive are collector streets in the City's Master Thoroughfare Plan. Westpark
Way is an undivided arterial street in the City's Master Thoroughfare Plan.
The project consists of edge milling, asphalt overlay, and restriping on:
1. Trailwood Drive from N Main Street to Summit Ridge Drive (west end),
2. Summit Ridge Drive from Lakewood Boulevard to Trailwood Drive, and
3. Westpark Way from S Pipeline to SH10.
Anticipate Construction Beginning: May 2013
Anticipate Construction Complete: July 2013
The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, will
extend the life of the roadway, and will enhance the appearance of the streets.
110
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
FY2013 COUNTY OVERLAY - TRAILWOOD DR/SUMMIT RIDGE DR/WESTPARK WAY
Construction $300,000
$0
$0
$0
$0
$0
$0
$0 $300,000
0%
0%
0%
0%
0%
XX
111
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS June 28,2012
RON YOUNG
CULLUM DRIVE DESIGN AND ROW-SH10 TO HUITT LANE
STREET CONSTRUCTION
A
Cullum Drive is a roadway that connects an arterial thoroughfare (SH10) and a residential collector thoroughfare
(Huitt Lane) both of which are identified in the City's Master Thoroughfare Plan.
The project consists of the engineering and required right-of-way acquisition for a 31' wide concrete roadway to
replace an existing deteriorating asphalt roadway from SH10 to Huitt Lane. The project scope includes
underground storm drainage, sidewalks and wastewater main replacement.
FY2013
Reconstruction of this street will decrease the annual maintenance and provide a residential street in
compliance with current City standards.
112
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Escrow Funds
Other
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
CULLUM DRIVE DESIGN AND ROW-SH10 TO HUITT LANE
Engineering $180,000
Right-of-Way $20,000
$0
$0
$0
$0
$0
$0
$0 $200,000
0%
$200,000 0%
0%
0%
0%
Street CIP Fund Balance
113
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS May 17,2011
CHRIS BARKER
FY2014 39TH CDBG-ADA/TAS INFRASTRUCTURE IMPROVEMENTS
STREET CDBG
B
This project provides for continued improvements to accessibility ramps by removing architectural barriers to
accessibility as required by Federal and State mandated Americans with Disabilities Act/Texas Accessibility
Standards ("ADA/TAS"). The project scope includes identification of architectural barriers to accessibility that
meet CDBG eligibility guidelines and the subsequent replacement thereof.
(39th year CDBG project)
FY2014
Removing architectural barriers to accessibility is an eligible CDBG activity and will assist in the City's efforts to
maintain compliance with applicable Federal and State ADA/TAS codes.
114
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
FY2014 39TH CDBG-ADA/TAS INFRASTRUCTURE IMPROVEMENTS
Engineering $45,000
Construction $255,000
$0
$0
$0
$0
$0
$0
$0 $300,000
0%
0%
0%
0%
XX 0%
Project funding is subject to actual CDBG funding availability.
115
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS May 20, 2010
RON YOUNG
FY2014 COUNTY OVERLAY-MONTERREY/SOTOGRANDE/EL CAMINO REAL
STREET OVERLAY
B
Monterrey Boulevard, Sotogrande Boulevard, and El Camino Real are collector streets in the City's Master
Thoroughfare Plan.
The project consists of edge milling, asphalt overlay, and restriping on:
1. Monterrey Boulevard from Sotogrande Boulevard to W Pipeline Road,
2. Sotogrande Boulevard from El Camino Real to Monterrey Boulevard, and
3. El Camino Real from W Pipeline Road to south city limits.
Anticipate Construction Beginning: May 2014
Anticipate Construction Complete: July 2014
The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, will
extend the life of the roadway, and will enhance the appearance of the streets.
116
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
FY2014 COUNTY OVERLAY-MONTERREY/SOTOGRANDE/EL CAMINO REAL
Construction $300,000
$0
$0
$0
$0
$0
$0
$0 $300,000
0%
0%
0%
0%
0%
XX
117
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS June 28,2012
RON YOUNG
CULLUM DRIVE CONSTRUCTION-SH10 TO HUITT LANE
STREET CONSTRUCTION
B
Cullum Drive is a roadway that connects an arterial thoroughfare (SH10) and a residential collector thoroughfare
(Huitt Lane) both of which are identified in the City's Master Thoroughfare Plan.
The project consists of the construction of a 31' wide concrete roadway to replace an existing deteriorating
asphalt roadway from SH10 to Huitt Lane. The project scope includes underground storm drainage, sidewalks
and wastewater main replacement.
FY2014
Reconstruction of this street will decrease the annual maintenance and provide a residential street in
compliance with current City standards.
118
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Escrow Funds
Other
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
CULLUM DRIVE CONSTRUCTION-SH10 TO HUITT LANE
Construction $565,000
$0
$0
$0
$0
$0
$0
$0 $565,000
0%
$100,786 0%
0%
0%
0%
$67,214
$397,000
Street CIP Fund Balance
Escrow accounts:
ES0284 $61,370
ES0297 $ 5,844
119
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS May 17,2011
CHRIS BARKER
FY2015 40TH CDBG-ADA/TAS INFRASTRUCTURE IMPROVEMENTS
STREET CDBG
B
This project provides for continued improvements to accessibility ramps by removing architectural barriers to
accessibility as required by Federal and State mandated Americans with Disabilities Act/Texas Accessibility
Standards ("ADA/TAS"). The project scope includes identification of architectural barriers to accessibility that
meet CDBG eligibility guidelines and the subsequent replacement thereof.
(40th year CDBG project)
FY2015
Removing architectural barriers to accessibility is an eligible CDBG activity and will assist in the City's efforts to
maintain compliance with applicable Federal and State ADA/TAS codes.
120
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
FY2015 40TH CDBG-ADA/TAS INFRASTRUCTURE IMPROVEMENTS
Engineering $45,000
Construction $255,000
$0
$0
$0
$0
$0
$0
$0 $300,000
0%
0%
0%
0%
XX 0%
Project funding is subject to actual CDBG funding availability.
121
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS May 20, 2010
RON YOUNG
FY2015 COUNTY OVERLAY-BAZE ROAD/KYNETTE DRIVE/SIGNET DRIVE
STREET OVERLAY
B
Baze Road, Kynette Drive, and Signet Drive are collector streets in the City's Master Thoroughfare Plan.
The project consists of edge milling, asphalt overlay, and restriping on:
1. Baze Road from Mid Cities Boulevard to Priest Lane,
2. Kynette Drive from Evans Drive to Wilshire Drive, and
3. Signet Drive from Eastcliff Drive to Yorkshire Drive.
Anticipate Construction Beginning: May 2015
Anticipate Construction Complete: July 2015
The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, will
extend the life of the roadways, and will enhance the appearance of the streets.
122
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
FY2015 COUNTY OVERLAY-BAZE ROAD/KYNETTE DRIVE/SIGNET DRIVE
Construction $300,000
$0
$0
$0
$0
$0
$0
$0 $300,000
0%
0%
0%
0%
0%
XX
123
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS May 17,2011
CHRIS BARKER
FY2016 41ST CDBG-ADA/TAS INFRASTRUCTURE IMPROVEMENTS
STREET CDBG
B
This project provides for continued improvements to accessibility ramps by removing architectural barriers to
accessibility as required by Federal and State mandated Americans with Disabilities Act/Texas Accessibility
Standards ("ADA/TAS"). The project scope includes identification of architectural barriers to accessibility that
meet CDBG eligibility guidelines and the subsequent replacement thereof.
(41st year CDBG project)
FY2016
Removing architectural barriers to accessibility is an eligible CDBG activity and will assist in the City's efforts to
maintain compliance with applicable Federal and State ADA/TAS codes.
124
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
FY2016 41ST CDBG-ADA/TAS INFRASTRUCTURE IMPROVEMENTS
Engineering $45,000
Construction $255,000
$0
$0
$0
$0
$0
$0
$0 $300,000
0%
0%
0%
0%
XX 0%
Project funding is subject to actual CDBG funding availability.
125
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS May 20, 2010
RON YOUNG
FY2016 COUNTY OVERLAY-ECTOR DR/RAIDER DR/TEXAS STAR PKWY
STREET OVERLAY
B
Ector Drive, Raider Drive and Texas Star Parkway are collector streets in the City's Master Thoroughfare Plan.
The project consists of edge milling, asphalt overlay, and restriping on:
1. Ector Drive from SH10 to SH183,
2. Raider Drive from SH10 to W Pipeline, and
3. Texas Star Parkway from SH10 to S Pipeline.
Anticipate Construction Beginning: May 2016
Anticipate Construction Complete: July 2016
The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, will
extend the life of the roadways, and will enhance the appearance of the streets.
126
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
FY2016 COUNTY OVERLAY-ECTOR DR/RAIDER DR/TEXAS STAR PKWY
Construction $300,000
$0
$0
$0
$0
$0
$0
$0 $300,000
0%
0%
0%
0%
0%
XX
127
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 12,2004
RON YOUNG
TRAFFIC SIGNAL-HARWOOD ROAD @ BEAR CREEK PARKWAY
STREET SIGNALIZATION
B
Traffic signals are located at the intersections of arterial and collector thoroughfares identified in the City's
Master Thoroughfare Plan adopted in 1999.
The project consists of the installation of traffic signal poles, mast arms, signal heads, pedestrian indicators,
underground conduit, vehicle detection, and signal controller for the intersection of Harwood Road and Bear
Creek Parkway.
FY2016
Traffic volumes at this intersection will be monitored and signal warrant studies will be performed to justify signal
installation. This intersection will ultimately require a traffic signal.
128
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
TRAFFIC SIGNAL-HARWOOD ROAD @ BEAR CREEK PARKWAY
Engineering $30,000
Traffic Signals $150,000
$0
$0
$0
$0
$0
$0
$0 $180,000
0%
0%
0%
0%
0%
XX
129
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 16,2012
CHRIS BARKER
FY2017 42ND CDBG-ADA/TAS INFRASTRUCTURE IMPROVEMENTS
STREET CDBG
B
This project provides for continued improvements to accessibility ramps by removing architectural barriers to
accessibility as required by Federal and State mandated Americans with Disabilities Act/Texas Accessibility
Standards ("ADA/TAS"). The project scope includes identification of architectural barriers to accessibility that
meet CDBG eligibility guidelines and the subsequent replacement thereof.
(42nd year CDBG project)
FY2017
Removing architectural barriers to accessibility is an eligible CDBG activity and will assist in the City's efforts to
maintain compliance with applicable Federal and State ADA/TAS codes.
130
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
FY2017 42ND CDBG-ADA/TAS INFRASTRUCTURE IMPROVEMENTS
Engineering $45,000
Construction $255,000
$0
$0
$0
$0
$0
$0
$0 $300,000
0%
0%
0%
0%
XX 0%
Project funding is subject to actual CDBG funding availability.
131
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS May 14, 2012
RON YOUNG
FY2017 COUNTY OVERLAY-ARANSAS DRIVE/ECTOR DRIVE
STREET OVERLAY
B
Aransas Drive and Ector Drive are collector streets in the City's Master Thoroughfare Plan.
The project consists of edge milling, asphalt overlay, and restriping on:
1. Aransas Drive from Harwood Road to W Ash Lane, and
2. Ector Drive from SH183 to Midway Drive.
Anticipate Construction Beginning: May 2017
Anticipate Construction Complete: July 2017
The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, will
extend the life of the roadways, and will enhance the appearance of the streets.
132
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
FY2017 COUNTY OVERLAY-ARANSAS DRIVE/ECTOR DRIVE
Construction $300,000
$0
$0
$0
$0
$0
$0
$0 $300,000
0%
0%
0%
0%
0%
XX
133
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 03,2008
RON YOUNG
BEAR CREEK PARKWAY
STREET IMPROVEMENTS
C
Bear Creek Parkway is identified as a local collector thoroughfare in the City's Master Thoroughfare Plan.
This project consists of the complete reconstruction of Bear Creek Parkway from Harwood Road to Ash Lane to
meet current City standards.
Bear Creek Parkway is an aging roadway nearing the end of its service life. Portions of the roadway are
beginning to deteriorate and require additional maintenance. As the pavement deteriorates and fails,
maintenance costs increase.
134
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
BEAR CREEK PARKWAY
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
135
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 13,2007
RON YOUNG
CRESTHAVEN DRIVE RECONSTRUCTION
STREET IMPROVEMENTS
C
Cresthaven Drive is not identified in the City's Master Thoroughfare Plan.
This project includes the reconstruction of Cresthaven Drive from a two-lane asphalt roadway to a 31' wide curb
and gutter concrete street from SH10 to S Pipeline Road.
To upgrade Cresthaven Drive to a standard City concrete curb and gutter street.
136
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
CRESTHAVEN DRIVE RECONSTRUCTION
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
137
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS July 23,1999
RON YOUNG
E ALEXANDER LANE RECONSTRUCTION
STREET IMPROVEMENTS
C
This minor street serves as a collector type street by conveying traffic to major roadways.
E Alexander Lane will be reconstructed from Main Street to Cullum Drive. It will be reconstructed from a two-
lane county type road to a standard 31' wide residential street with underground drainage and sidewalks.
Reconstruction of this street will decrease the annual maintenance and provide a standard residential street in
compliance with current City standards.
138
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Other
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
E ALEXANDER LANE RECONSTRUCTION
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
XX
Escrow Funds will be used to finance a portion of this project.
139
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS February 16,2009
ROBERT BARKER
FULLER-WISER ROAD-HARWOOD ROAD TO MID CITIES BLVD
STREET IMPROVEMENTS
C
Fuller-Wiser Road is identified as a minor arterial in the City's Master Thoroughfare Plan.
This project consists of the complete reconstruction of Fuller-Wiser Road to current City standards from
Harwood Road to Mid Cities Boulevard.
Fuller-Wiser Road is an aging roadway nearing the end of its service life. Portions of the roadway are beginning
to deteriorate and require additional maintenance. As the pavement deteriorates and fails, maintenance costs
increase.
140
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
FULLER-WISER ROAD-HARWOOD ROAD TO MID CITIES BLVD
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
141
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS February 16,2009
ROBERT BARKER
FULLER-WISER ROAD-SH183 TO HARWOOD ROAD
STREET IMPROVEMENTS
C
Fuller-Wiser Road is identified as a minor arterial in the City's Master Thoroughfare Plan.
The project consists of the complete reconstruction of Fuller-Wiser Road to current standards from SH183 to
Harwood Road.
Fuller-Wiser Road is an aging roadway nearing the end of its service life. Portions of the roadway are beginning
to deteriorate and require additional maintenance. As the pavement deteriorates and fails, maintenance costs
increase.
142
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
FULLER-WISER ROAD-SH183 TO HARWOOD ROAD
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
143
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 13,2007
RON YOUNG
HIGHLAND DRIVE RECONSTRUCTION
STREET IMPROVEMENTS
C
Highland Drive is not identified in the City's Master Thoroughfare Plan.
The project includes the reconstruction of Highland Drive from SH10 to S Pipeline Road from a two-lane asphalt
roadway to a 31' wide curb and gutter concrete street.
To upgrade Highland Drive to a standard City concrete curb and gutter street.
144
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
HIGHLAND DRIVE RECONSTRUCTION
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
145
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS May 31,2005
RON YOUNG
ROSS AVENUE EXTENSION
STREET CONSTRUCTION
C
This extension of Ross Avenue from the recently completed section adjacent to the fire station will complete the
upgrading of this street.
The construction of the remainder of Ross Avenue from the fire station to the west limit will be in accordance
with City standards which includes concrete pavement.
This construction, in accordance with City standards, will allow the road a long service life and lower the annual
maintenance costs.
146
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
ROSS AVENUE EXTENSION
Engineering - To Be Determined
Right-of-Way - To Be Determined
$0 Construction - To Be Determined
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
147
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 13,2007
RON YOUNG
SOUTH PIPELINE ROAD
STREET IMPROVEMENTS
C
South Pipeline Road is not identified in the City's Master Thoroughfare Plan.
The project consists of reconstruction of South Pipeline Road from a two-lane asphalt roadway to a 31' wide
curb and gutter concrete street from east of Royal Parkway to east of Highland Drive.
To upgrade South Pipeline Road to a standard City concrete curb and gutter street.
148
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
SOUTH PIPELINE ROAD
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
149
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS July 23,1999
RON YOUNG
VINE STREET-SH183 TO SH10
STREET IMPROVEMENTS
C
Vine Street is not identified in the City's Master Thoroughfare Plan.
The project consists of the reconstruction of Vine Street from SH183 to SH10.
The City has received street escrow funds from several developments along Vine Street. When development is
complete, it would be appropriate for the City to reconstruct the existing roadway.
150
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Other
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
VINE STREET-SH183 TO SH10
Engineering - To be Determined
Construction - To be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
Escrow Funds will be used to finance a portion of this project.
151
152
Project DescriptionPriority Estimated Cost Operating FundCIP Fund BalanceBond SaleGrants/ ContribImpact FeesEscrow FundsCar Rental TaxOther EDCTo Be DeterminedWASTEWATER PROJECTSLR: Ross Avenue A $ 215,000 XX LR: Slaughter Lane/E Huitt LaneA $ 475,000 XX LR: W Huitt A $ 180,000 XX Sub-Total Wastewater Priority A-Proposed FY13 $ 870,000 LR: Denton Drive (14)B $ 539,000 XX LR: Milam Drive (14)B $ 253,000 XX NTE (SH183) Phase II Wastewater Relocation (15)B $ 600,000 XX LR: Oakwood Terrace Phase I (15)B $ 345,000 XX LR: Oakwood Terrace Phase II (15)B $ 635,000 XX LR: Kynette Drive/Wilshire Drive (16)B $ 663,000 XX LR: Cedar Hills Estates/Hollywood Blvd. (17)B $ 112,000 XX Sub-Total Wastewater Priority B-Unfunded $ 3,147,000 LR: Collin Drive/Harris Drive/Irion Drive C TBD XX LR: Crane Drive C TBD XX LR: Donley Drive/Shelmar Drive C TBD XX LR: Eastcliff/Windlea/Signet C TBD XX LR: Ector Dr/Donley Dr/Crane Dr C TBD XX LR: Ector Drive/Fayette Drive C TBD XX LR: Evans/Canyon Ridge/N Kynette C TBD XX LR: Glenn Drive C TBD XX LR: Huntington/Koen/Atkerson/E Huitt/Slaughter/MartinCTBD XX LR: Janann/Brownstone/Shelmar DriveC TBD XX LR: Lakewood/Dogwood/BocowoodC TBD XX LR: Live Oak Drive/Silver Creek Drive/Marlene DriveC TBD XX LR: Mary/Marlene/Commerce/ Wilshire/GreenbriarCTBD XX LR: N Midway ParkC TBD XX LR: Northcliff/Toplea/Windlea/Signet/ Kynette/WestcliffCTBD XX LR: NW Midway/Rusk/Parker/RockwallC TBD XX LR: S Main StreetC TBD XX LR: Sagebrush/Toplea/Wilshire/Yorkshire/TylerC TBD XX LR: Sierra DriveC TBD XX LR: Town Creek DriveC TBD XX LR: W Donley/Private Drive/Mimosa/Magolia/RedbudC TBD XX LR: W Midway/Victoria/Delta/ Lamar/RockwallCTBD XX Sub-Total Wastewater Priority C-Unfunded $ - WASTEWATER PROJECTS - TOTAL$ 4,017,000 LR = Line ReplacementCAPITAL IMPROVEMENT PROGRAMSFY13 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPEPROPOSED METHOD OF FINANCING153
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS May 30,2003
RON YOUNG
LINE REPLACEMENT-ROSS AVENUE
WASTEWATER MAIN REPLACEMENT
A
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
The project consists of the replacement of the wastewater mains located on Ross Avenue and outfall to West
Alexander Lane.
FY2013
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce
maintenance costs and customer problems.
154
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-ROSS AVENUE
Engineering $25,000
Construction $190,000
$0
$0
$0
$0
$0
$0
$0 $215,000
XX 0%
0%
0%
0%
0%
155
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 12,2004
RON YOUNG
LINE REPLACEMENT-SLAUGHTER LANE/E HUITT LANE
WASTEWATER MAIN REPLACEMENT
A
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
The project consists of the replacement of the following wastewater mains:
1. Between John Vernon Lane and Slaughter Lane east of Dunaway Drive,
2. East of Dunaway Drive from Slaughter Lane to E Huitt Lane, and
3. Along E Huitt Lane from S Main Street to Dunaway Drive.
FY2013
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
156
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-SLAUGHTER LANE/E HUITT LANE
Engineering $55,000
Construction $420,000
$0
$0
$0
$0
$0
$0
$0 $475,000
XX 0%
0%
0%
0%
0%
157
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS May 13,2010
RON YOUNG
LINE REPLACEMENT-W HUITT
WASTEWATER MAIN REPLACEMENT
A
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
The project consists of the replacement of the wastewater mains between Linda Lane and W Huitt Lane.
FY2013
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
158
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-W HUITT
Engineering $20,000
Construction $160,000
$0
$0
$0
$0
$0
$0
$0 $180,000
XX 0%
0%
0%
0%
0%
159
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 05,2007
RON YOUNG
LINE REPLACEMENT-DENTON DRIVE
WASTEWATER MAIN REPLACEMENT
B
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
This project consists of the replacement of wastewater mains located on Denton Drive between Collin Drive and
Harwood Road to include Bell Drive.
FY2014
Many wastewater mains throughout the city are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
160
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-DENTON DRIVE
Construction $477,000
Engineering $62,000
$0
$0
$0
$0
$0
$0
$0 $539,000
XX 0%
0%
0%
0%
0%
161
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 05,2007
RON YOUNG
LINE REPLACEMENT-MILAM DRIVE
WASTEWATER MAIN REPLACEMENT
B
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
The project consists of the replacement of the wastewater mains located along Milam Drive from Blanco Drive to
south of Bell Drive.
FY2014
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
162
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-MILAM DRIVE
Construction $224,000
Engineering $29,000
$0
$0
$0
$0
$0
$0
$0 $253,000
XX 0%
0%
0%
0%
0%
163
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS March 10, 2010
RON YOUNG
NTE (SH 183) PHASE II WASTEWATER RELOCATION
WASTEWATER LINE RELOCATION
B
The Texas Department of Transportation ("TxDoT") has entered into a developer agreement with North Tarrant
Express Mobility Partners ("NTEMP") for the expansion of SH183. The Phase II construction will affect the City
of Euless' utilities along and crossing SH183 between FM157 and the east city limits.
The City of Euless has wastewater mains and associated items located within the SH183 right-of-way. These
facilities must be relocated to accommodate the SH183 expansion. It is anticipated that the City of Euless will
enter into a relocation agreement with NTEMP to authorize them to design and relocate wastewater lines. The
City will be responsible for the cost of the relocation of the utilities.
Est. FY2015
City of Euless wastewater facilities are located within TxDoT right-of-way. As such, the City must provide for
utility relocation to accommodate the roadway expansion.
164
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
NTE (SH 183) PHASE II WASTEWATER RELOCATION
City Funding $600,000
$0
$0
$0
$0
$0
$0
$0 $600,000
0%
0%
0%
0%
XX 0%
This project may qualify for a State Infrastructure Bank ("SIB") loan. Staff is currently researching requirements
and repayment terms of SIB loans. SIB loans allow borrowers to access capital funds at or lower-than-market
interest rates. If the SIB loan option is not feasible, a bond sale will be considered as an alternate source of
funding.
165
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 13,2006
RON YOUNG
LINE REPLACEMENT-OAKWOOD TERRACE ADDITION PHASE I
WASTEWATER MAIN REPLACEMENT
B
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
This project consists of the replacement of the following wastewater mains:
1. Between Hollywood Boulevard and Reaves Court from Vine Street to the end of Reaves Court and
2. From Hollywood Boulevard to Reaves Court along 306 Hollywood Boulevard.
FY2015
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
166
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-OAKWOOD TERRACE ADDITION PHASE I
Engineering $40,000
Cosntruction $305,000
$0
$0
$0
$0
$0
$0
$0 $345,000
XX 0%
0%
0%
0%
0%
167
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 13,2006
RON YOUNG
LINE REPLACEMENT-OAKWOOD TERRACE ADDITION PHASE II
WASTEWATER MAIN REPLACEMENT
B
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
The project consists of the replacement of the following wastewater mains:
1. Along 608 and 610 Martha Street,
2. Between Martha Street and Cannon Drive from Reaves Court to W Huitt Lane,
3. Between Jefflyn Court and W Huitt Lane from Martha Street to S Main Street, and
4. Between Henslee Drive and Cannon Drive from Reaves Court to Jefflyn Court.
FY2015
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
168
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-OAKWOOD TERRACE ADDITION PHASE II
Engineering $75,000
Construction $560,000
$0
$0
$0
$0
$0
$0
$0 $635,000
XX 0%
0%
0%
0%
0%
169
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS February 16,2009
RON YOUNG
LINE REPLACEMENT-KYNETTE DRIVE/WILSHIRE DRIVE
WASTEWATER MAIN REPLACEMENT
B
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains.
The project consists of the replacement of the following wastewater mains:
1. Kynette Drive from Eastcliff Drive to Wilshire Drive and
2. Wilshire Drive from Kynette Drive extending 1000' north.
FY2016
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
170
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-KYNETTE DRIVE/WILSHIRE DRIVE
Engineering $64,000
Construction $599,000
$0
$0
$0
$0
$0
$0
$0 $663,000
XX 0%
0%
0%
0%
0%
171
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 15,2005
RON YOUNG
LINE REPLACEMENT-CEDAR HILLS ESTATES/HOLLYWOOD BOULEVARD
WASTEWATER MAIN REPLACEMENT
B
This project is part of the systematic replacement of wastewater mains using a worst first approach.
The project consists of the replacement of wastewater mains in the Cedar Hill Addition along Hollywood
Boulevard from Vine Street to east of Cannon Drive.
FY2017
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
172
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-CEDAR HILLS ESTATES/HOLLYWOOD BOULEVARD
Engineering $12,000
Construction $100,000
$0
$0
$0
$0
$0
$0
$0 $112,000
XX 0%
0%
0%
0%
0%
173
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 05,2007
RON YOUNG
LINE REPLACEMENT-COLLIN DRIVE/HARRIS DRIVE/IRION DRIVE
WASTEWATER MAIN REPLACEMENT
C
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
The project consists of the following wastewater main replacements:
1. West of Collin Drive between Denton Drive and Harwood Road,
2. West of Harris Drive from Dallas Drive to Harwood Road,
3. Dallas Drive from west of Collin Drive to west of Harris Drive,
4. South of Dallas Drive from west of Collin Drive to Dallas Drive, and
5. West of Irion Drive from Dallas Drive to Harwood Road
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
174
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-COLLIN DRIVE/HARRIS DRIVE/IRION DRIVE
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
175
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 01,2011
RON YOUNG
LINE REPLACEMENT-CRANE DRIVE
WASTEWATER MAIN REPLACEMENT
C
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
The project consists of the replacement of wastewater mains between Crane Drive and Donley Drive north of
Harwood Road to the upper end of the main north of Glenn Drive.
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
176
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-CRANE DRIVE
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
177
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS February 16,2009
RON YOUNG
LINE REPLACEMENT-DONLEY DRIVE/SHELMAR DRIVE
WASTEWATER MAIN REPLACEMENT
C
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains.
This project consists of the replacement of the following wastewater lines:
1. Donley Drive from Shelmar Drive to W Ash Lane,
2. Donley Drive from Harwood Road to Shelmar Drive, and
3. Shelmar Drive from Green Hill Street to the end of Shelmar Drive.
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
178
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-DONLEY DRIVE/SHELMAR DRIVE
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
179
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS February 16,2009
RON YOUNG
LINE REPLACEMENT-EASTCLIFF DRIVE/WINDLEA DRIVE/SIGNET DRIVE
WASTEWATER MAIN REPLACEMENT
C
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains.
This project includes the replacement of the following wastewater mains:
1. Eastcliff Drive from Tyler Avenue to Signet Drive,
2. Windlea Drive from Eastcliff Drive to Wilshire Drive, and
3. Between Windlea Drive and Signet Drive from Eastcliff Drive to Wilshire Drive.
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
180
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-EASTCLIFF DRIVE/WINDLEA DRIVE/SIGNET DRIVE
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
181
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS February 16,2009
RON YOUNG
LINE REPLACEMENT-ECTOR DRIVE/DONLEY DRIVE/CRANE DRIVE
WASTEWATER MAIN REPLACEMENT
C
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains.
The project consists of the replacement of the following wastewater mains:
1. Between Ector Drive and Donley Drive from Aransas Drive to Harwood Road and
2. Between Donley Drive and Crane Drive from Aransas Drive to Harwood Road.
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
182
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-ECTOR DRIVE/DONLEY DRIVE/CRANE DRIVE
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
183
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 15,2005
RON YOUNG
LINE REPLACEMENT-ECTOR DRIVE/FAYETTE DRIVE
WASTEWATER MAIN REPLACEMENT
C
This project is part of the systematic replacement of wastewater mains using a worst first approach.
The project consists of the replacement of the wastewater mains between Fayette Drive and Ector Drive from
Harwood Road to the end of the line.
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
184
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-ECTOR DRIVE/FAYETTE DRIVE
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
185
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS February 16,2009
RON YOUNG
LINE REPLACEMENT-EVANS DRIVE/CANYON RIDGE DRIVE/N KYNETTE DRIVE
WASTEWATER MAIN REPLACEMENT
C
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains.
The project consists of the replacement of the following wastewater mains:
1. Between Evans Drive and Canyon Ridge Drive from Cyclone Branch to north of Kynette Drive and
2. North of Kynette Drive from Canyon Ridge Drive to Cyclone Branch.
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
186
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-EVANS DRIVE/CANYON RIDGE DRIVE/N KYNETTE DRIVE
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
187
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 05,2007
RON YOUNG
LINE REPLACEMENT-GLENN DRIVE
WASTEWATER MAIN REPLACEMENT
C
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
The project consists of the replacement of the wastewater mains located west of Glenn Drive from Aransas
Drive to Glenn Drive.
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
188
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-GLENN DRIVE
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
189
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS February 16,2009
RON YOUNG
LINE REP-HUNTINGTON/KOEN/ATKERSON/E HUITT/SLAUGHTER/MARTIN
WASTEWATER MAIN REPLACEMENT
C
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains.
This project consists of the replacement of the following wastewater mains:
1. East of Huntington Drive from S Atkerson Lane to E Alexander Lane,
2. Between Koen Lane and S Atkerson Lane from Huntington Drive to FAA Road,
3. Between S Atkerson Lane and N Atkerson Lane from Huntington Drive to FAA Road,
4. Between N Atkerson Lane and E Huitt Lane from Huntington Drive to FAA Road,
5. Between E Huitt Lane and Slaughter Lane from Huntington Drive to FAA Road,
6. Between Slaughter Lane and Martin Lane from Huntington to FAA Road, and
7. Between Martin Lane and E Alexander Lane from Huntington Drive to FAA Road.
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
190
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REP-HUNTINGTON/KOEN/ATKERSON/E HUITT/SLAUGHTER/MARTIN
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
191
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS February 16,2009
RON YOUNG
LINE REPLACEMENT-JANANN STREET/BROWNSTONE DRIVE/SHELMAR DRIVE
WASTEWATER MAIN REPLACEMENT
C
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains.
The project consists of the replacement of the following wastewater mains:
1. Janann Street from Aransas Drive to Donley Drive,
2. Brownstone Drive from Aransas Drive to Donley Drive,
3. Shelmar Drive from Greenhill Street to Aransas Drive, and
4. Aransas Drive from 500' south of Shelmar Drive to Janann Street.
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
192
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-JANANN STREET/BROWNSTONE DRIVE/SHELMAR DRIVE
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
193
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS February 16,2009
RON YOUNG
LINE REPLACEMENT-LAKEWOOD BLVD/DOGWOOD CIRCLE/BOCOWOOD CIRCLE
WASTEWATER MAIN REPLACEMENT
C
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains.
The project consists of the replacement of the following wastewater mains:
1. Lakewood Boulevard from Dogwood Circle north to Private Drive and
2. Dogwood Circle, Cypress Circle, Bocowood Circle, and Aspenway Circle.
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
194
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-LAKEWOOD BLVD/DOGWOOD CIRCLE/BOCOWOOD CIRCLE
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
195
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 16,2012
RON YOUNG
LINE REP-LIVE OAK DRIVE/SILVER CREEK DRIVE/MARLENE DRIVE
WASTEWATER MAIN REPLACEMENT
C
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
The project consists of the replacement of the following wastewater mains:
1. Live Oak Drive from Silver Creek Drive south to Hurricane Creek,
2. Mains in the cul-de-sacs on the east side of Live Oak Drive,
3. Silver Creek Drive between Westpark Way and Evans Drive, and
4. Marlene Drive between Live Oak and Marlene Court.
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
196
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REP-LIVE OAK DRIVE/SILVER CREEK DRIVE/MARLENE DRIVE
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
XX
197
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS February 16,2009
RON YOUNG
LINE REPLACEMENT-MARY/MARLENE/COMMERCE/WILSHIRE/GREENBRIAR
WASTEWATER MAIN REPLACEMENT
C
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains.
The project consists of the replacement of the following wastewater mains:
1. Between Mary Drive and Marlene Drive from Cyclone Branch to Marlene Drive,
2. Between Commerce Street and Wilshire Drive from Marlene Drive to Sagebrush Trail,
3. South of Greenbriar Drive from Cyclone Branch to Debra Drive,
4. Between Greenbriar Drive and Mary Street from Eastcliff Drive to Debra Drive, and
5. East of Debra Drive and south of Mary Drive.
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
198
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-MARY/MARLENE/COMMERCE/WILSHIRE/GREENBRIAR
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
199
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 13,2006
RON YOUNG
LINE REPLACEMENT-N MIDWAY PARK
WASTEWATER MAIN REPLACEMENT
C
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
The project consists of the replacement of the following wastewater mains:
1. East of Denton Drive between Bell Drive and Dallas Drive,
2. Between Denton Drive and Irion Drive from Dallas Drive to Harwood Road,
3. Along Denton Drive from Harwood Road to Collin Drive, and
4. Along Milam Drive from Blanco Drive to Midway Park Drive.
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, open joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
200
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-N MIDWAY PARK
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
201
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS February 16,2009
RON YOUNG
LINE REP-NORTHCLIFF/TOPLEA/WINDLEA/SIGNET/KYNETTE/WESTCLIFF
WASTEWATER MAIN REPLACEMENT
C
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains.
The project consists of the replacement of the following wastewater mains:
1. Between Northcliff Drive and Toplea Drive from Canyon Ridge to Cyclone Branch,
2. Between Toplea Drive and Windlea Drive from Canyon Ridge to Cyclone Branch,
3. Between Windlea Drive and Signet Drive from Canyon Ridge to Cyclone Branch,
4. Between Signet Drive and Kynette Drive from the church to Cyclone Branch, and
5. Westcliff Drive from Toplea Drive to north of Windlea Drive.
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
202
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REP-NORTHCLIFF/TOPLEA/WINDLEA/SIGNET/KYNETTE/WESTCLIFF
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
203
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS February 16,2009
RON YOUNG
LINE REPLACEMENT-NW MIDWAY/RUSK/PARKER/ROCKWALL
WASTEWATER MAIN REPLACEMENT
C
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains.
The project consists of the replacement of the following wastewater mains:
1. North of West Midway Drive from FM157 to Parker Drive,
2. West Midway Drive from Parker Drive to Rusk Drive,
3. Rusk Drive from West Midway Drive to Parker Drive,
4. Parker Drive from West Midway Drive to Rockwall Drive, and
5. Rockwall Drive from west of Parker Drive to 400' west of Lamar Drive.
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
204
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-NW MIDWAY/RUSK/PARKER/ROCKWALL
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
205
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 13,2006
RON YOUNG
LINE REPLACEMENT-S MAIN STREET
WASTEWATER MAIN REPLACEMENT
C
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
The project consists of the replacement of the wastewater main along S Main Street from Jean Lane to W
Alexander Lane.
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
206
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-S MAIN STREET
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
207
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS February 16,2009
RON YOUNG
LINE REP-SAGEBRUSH/TOPLEA/WILSHIRE/YORKSHIRE/TYLER
WASTEWATER MAIN REPLACEMENT
C
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains.
The project consists of the replacement of the following wastewater mains:
1. Between Sagebrush Trail and Toplea Drive from Cyclone Branch to east of Wilshire Drive,
2. Between Wilshire Drive and Yorkshire Drive from Signet Drive to south of Toplea Drive,
3. Between Sagebrush Trail and Tyler Avenue from Cyclone Branch to Commerce Street,
4. Eastcliff Drive from Tyler Avenue to the apartments, and
5. Between Marlene Drive and Tyler Avenue from Eastcliff Drive to Commerce Street.
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
208
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REP-SAGEBRUSH/TOPLEA/WILSHIRE/YORKSHIRE/TYLER
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
209
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 01,2011
RON YOUNG
LINE REPLACEMENT-SIERRA DRIVE
WASTEWATER MAIN REPLACEMENT
C
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
This project consists of replacement of the following wastewater mains:
1. Between Sierra Drive and Eastcliff Drive from Kynette Drive to Signet Drive and
2. East of Sierra Drive from Wilshire Park to Signet Drive.
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
210
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-SIERRA DRIVE
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
211
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 16,2012
RON YOUNG
LINE REPLACEMENT-TOWN CREEK DRIVE
WASTEWATER MAIN REPLACEMENT
C
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
The project consists of the replacement of the following wastewater mains:
1. Town Creek Drive from Salem Drive to Carter Drive,
2. Carter Drive south of Town Creek Drive,
3. Westport Court,
4. Newport Court,
5. Asbury Court, and
5. the outfall between Westport Court and Newport Court.
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
212
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-TOWN CREEK DRIVE
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
XX
213
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS February 16,2009
RON YOUNG
LINE REPLACEMENT-W DONLEY/PRIVATE DRIVE/MIMOSA/MAGNOLIA/REDBUD
WASTEWATER MAIN REPLACEMENT
C
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of wastewater mains using a worst first approach.
The project consists of the replacement of the following wastewater mains:
1. West of Donley Drive from West Ash Lane to Private Drive,
2. Private Drive from west of Redbud Drive to Lakewood Boulevard,
3. Mimosa Lane from Bocowood Drive to Private Drive,
4. Magnolia Lane from Bocowood Drive to Private Drive, and
5. Redbud Drive from Bocowood Drive to Private Drive.
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
214
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-W DONLEY/PRIVATE DRIVE/MIMOSA/MAGNOLIA/REDBUD
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
215
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS February 16,2009
RON YOUNG
LINE REP-W MIDWAY/VICTORIA/DELTA/LAMAR/ROCKWALL
WASTEWATER MAIN REPLACEMENT
C
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The
project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains.
The project consists of the replacement of the following wastewater mains:
1. West Midway Drive from FM157 to Victoria Drive,
2. Victoria Drive from West Midway Drive north 700',
3. Delta Drive from West Midway Drive north 1000',
4. Lamar Drive from West Midway Drive north to Fayette Drive, and
5. Rockwall Drive from Lamar Drive west and north 800'.
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
216
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REP-W MIDWAY/VICTORIA/DELTA/LAMAR/ROCKWALL
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
217
218
Project DescriptionPriority Estimated Cost Operating FundCIP Fund BalanceBond SaleGrants/ ContribImpact FeesEscrow FundsCar Rental TaxOther EDCTo Be DeterminedWATER PROJECTSNone Currently $ - Sub-Total Water Priority A-Proposed FY13$ - LR: El Camino Real (14) B $ 410,000 XX Water System Security Camera Installation (14)B $ 75,000 XX LR: S Pipeline Road West (15) B $ 300,000 XX NTE (SH183) Phase II Water Relocation (15)B $ 1,200,000 XX Residential Meter Replacement Program (15)B $ 3,690,350 XX LR: Blessing Creek/Stony Creek/Rock Creek (16)B $ 315,000 XX SH360 Water Crossing (17)B $ 735,500 XX Sub-Total Water Priority B-Unfunded $ 6,725,850 LR: Collin Drive-Dallas Dr to Harwood Rd C TBD XX LR: Collin Drive-Denton Dr to Dallas Dr C TBD XX LR: Denton Drive C TBD XX LR: Dickey Drive North C TBD XX LR: Dickey Drive South C TBD XX LR: Dunaway Drive C TBD XX LR: E Huitt Lane C TBD XX LR: Eastcliff Drive C TBD XX LR: Ector Drive C TBD XX LR: Fuller Drive C TBD XX LR: Hollow Oak Drive C TBD XX LR: Kynette Drive C TBD XX LR: Live Oak Court/Live Oak Drive C TBD XX LR: Midcreek/Rock Creek/Stony Creek C TBD XX LR: Midway Drive East C TBD XX LR: Midway Drive West C TBD XX LR: Needles Street C TBD XX LR: Paula Lane C TBD XX LR: S Main Street (North) C TBD XX LR: S Main Street (South) C TBD XX LR: S Pipeline Road East C TBD XX LR: Shady Creek Drive/Cliffwood Drive C TBD XX LR: Springwood Court C TBD XX LR: Sunset Drive C TBD XX LR: Westwood Drive C TBD XX LR: Wildwood Street C TBD XX LR: Woodvine (East) C TBD XX LR: Woodvine (West) C TBD XX Water System Security Land Acquisition C TBD XX Sub-Total Water Priority C-Unfunded $ - WATER PROJECTS - TOTAL$ 6,725,850 LR = Line ReplacementCAPITAL IMPROVEMENT PROGRAMSFY13 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPEPROPOSED METHOD OF FINANCING219
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 16,2012
RON YOUNG
LINE REPLACEMENT-EL CAMINO REAL
WATER MAIN REPLACEMENT
B
This water main is included in the City's Water System Master Plan. El Camino Real is the FY2014 County
Overlay project.
The project consists of the replacement of an existing 8" AC water main with a 10" PVC water main on El
Camino Real from W Pipeline Road to the south city limits. The project scope includes approximately 3200
linear feet of 10" PVC, 800 linear feet of 8" PVC, 20 valves, and 8 fire hydrants. New water service connections
to the apartments and townhomes will also be included in the project.
FY2014 to coincide with the anticipated County overlay on El Camino Real.
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic replacement of old deteriorated or substandard size water mains will
reduce maintenance costs. The water main on El Camino Real has experienced several breaks within the last
two years.
220
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-EL CAMINO REAL
Engineering $45,000
Construction $365,000
$0
$0
$0
$0
$0
$0
$0 $410,000
XX
221
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 12,2004
RON YOUNG
WATER SYSTEM SECURITY CAMERA INSTALLATION
WATER SYSTEM SECURITY
B
This project is a result of the findings included in the 2004 Water System Vulnerability Assessment of the City's
Water System Master Plan.
The project provides for the installation of security cameras at the water production and storage sites (ground
storage tanks and towers) located at West Fuller Drive, Heritage Park, 1400 N Main Street, 2591 N Main Street,
and 2700 N Main Street.
FY2014
Increase water system security by addressing vital elements as recommended in the 2004 Water System
Vulnerability Assessment as identified by Lockwood, Andrews, and Newman, Inc. and submitted to the
Environmental Protection Agency (EPA).
222
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
WATER SYSTEM SECURITY CAMERA INSTALLATION
Equipment Installation $75,000
$0
$0
$0
$0
$0
$0
$0 $75,000
0%
XX 0%
0%
0%
0%
223
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS May 28,2003
RON YOUNG
LINE REPLACEMENT-S PIPELINE ROAD WEST
WATER MAIN REPLACEMENT
B
This water main is included in the City's Water System Master Plan.
The project consists of the replacement of the existing 6" cast iron water main with an 8" PVC water main along
S Pipeline Road west from Simmons Drive to Vine Street.
FY2015
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
224
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-S PIPELINE ROAD WEST
Engineering $30,000
Construction $270,000
$0
$0
$0
$0
$0
$0
$0 $300,000
XX 0%
0%
0%
0%
0%
225
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS March 10, 2010
RON YOUNG
NTE (SH183) PHASE II WATER RELOCATION
WATER LINE RELOCATION
B
The Texas Department of Transportation ("TxDoT") has entered into a developer agreement with North Tarrant
Express Mobility Partners ("NTEMP") for the expansion of SH183. The Phase II construction will affect the City
of Euless' utilities along and crossing SH183 between FM157 and the east city limits.
The City of Euless has water mains and associated items located within the SH183 right-of-way. These facilities
must be relocated to accommodate Phase II the SH183 expansion. It is anticipated that the City of Euless will
enter into a relocation agreement with NTEMP to authorize them to design and relocate water lines and
associated infrastructure. The City will be responsible for the cost of relocating the utilities.
Est. FY2015
City of Euless water facilities are located within TxDoT right-of-way. As such, the City must provide for utility
relocation to accommodate the roadway expansion.
226
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
NTE (SH183) PHASE II WATER RELOCATION
City Funding $1,200,000
$0
$0
$0
$0
$0
$0
$0 $1,200,000
0%
0%
0%
0%
$1,200,000 0%
This project may qualify for a State Infrastructure Bank ("SIB") loan. Staff is currently researching requirements
and repayment terms of SIB loans. SIB loans allow borrowers to access capital funds at or lower-than-market
interest rates. If the SIB loan option is not feasible, a bond sale will be considered as an alternate source of
funding.
227
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS June 07,2012
RON YOUNG
RESIDENTIAL METER REPLACEMENT PROGRAM
WATER METERS/TRANSPONDERS
B
The systematic replacement of meters and transponders at or near end of life is included in the Water System Master
Plan.
The project includes the system-wide replacement of residential water meters one inch and less in size. The reading
equipment and associated software are included in the scope of the project as well.
FY2015
The project will upgrade the current residential meters and transponders to the latest in auto-read technology and
provide funding for the reading equipment and software necessary for the system upgrade.
228
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
ADDITIONAL COMMENTS:
RESIDENTIAL METER REPLACEMENT PROGRAM
Meters $3,690,350
$0
$0
$0
$0
$0 $3,690,350
0%
0%
0%
0%
0%
XX
Other-plan review/inspection fees
229
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 05,2007
RON YOUNG
LINE REPLACEMENT-BLESSING CREEK/STONY CREEK/ROCK CREEK
WATER MAIN REPLACEMENT
B
The water mains are included in the City's Water System Master Plan.
This project will replace the 6" AC main with an 8" PVC main for Blessing Creek, Stony Creek, and Rock Creek.
FY2016
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
230
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-BLESSING CREEK/STONY CREEK/ROCK CREEK
Engineering/Surveying $45,000
Construction $270,000
$0
$0
$0
$0
$0
$0
$0 $315,000
XX 0%
0%
0%
0%
0%
231
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS July 21,2000
RON YOUNG
SH360 WATER CROSSING
WATER MAIN REPLACEMENT
B
This project is related to the DFW International Airport Master Plan for property in Euless.
The project scope includes the extension of two (2) 12" diameter water mains through the SH360 right-of-way to
provide service to the southwest portion of the DFW Airport property. The water mains will be bored under
SH360 at the Midway Drive intersection and between Harwood Road and Ash Lane. The mains will be located
within the Texas Department of Transportation right-of-way. The mains will be plugged at the east right-of-way
of SH360 in anticipation of the likely extension into DFW Airport property to serve future development.
FY2017
Development on the airport property could potentially increase the City's tax revenues. Future development is
dependent upon the availability of water service to this area.
232
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
SH360 WATER CROSSING
Engineering/Surveying $90,000
Construction $645,500
$0
$0
$0
$0
$0
$0
$0 $735,500
XX 0%
0%
0%
0%
0%
233
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS May 28,2003
RON YOUNG
LINE REPLACEMENT-COLLIN DRIVE, DALLAS DRIVE TO HARWOOD ROAD
WATER MAIN REPLACEMENT
C
This water main is included in the City's Water System Master Plan.
The project will replace a 6" cast iron main with an 8" PVC main along Collin Drive from Dallas Drive to Harwood
Road.
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
234
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-COLLIN DRIVE, DALLAS DRIVE TO HARWOOD ROAD
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
235
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS May 28,2003
RON YOUNG
LINE REPLACEMENT-COLLIN DRIVE, DENTON DRIVE TO DALLAS DRIVE
WATER MAIN REPLACEMENT
C
This water main is included in the City's Water System Master Plan.
The project will replace a 6" cast iron main to an 8" PVC main along Collin Drive from Denton Drive to Dallas
Drive.
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
236
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-COLLIN DRIVE, DENTON DRIVE TO DALLAS DRIVE
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
237
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS May 28,2003
RON YOUNG
LINE REPLACEMENT-DENTON DRIVE, TARRANT DRIVE TO HARWOOD ROAD
WATER MAIN REPLACEMENT
C
This water main is included in the City's Water System Master Plan.
The project consists of the replacement of the 6" cast iron water main with an 8" PVC main along Denton Drive
from Tarrant Drive to Harwood Road.
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
238
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-DENTON DRIVE, TARRANT DRIVE TO HARWOOD ROAD
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
239
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS May 28,2003
RON YOUNG
LINE REPLACEMENT-DICKEY DRIVE NORTH, SH10 TO E HUITT LANE
WATER MAIN REPLACEMENT
C
This water main is included in the City's Water System Master Plan.
This project consists of replacing the 6" cast iron water main with an 8" PVC main along Dickey Drive north from
SH10 to E Huitt Lane.
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
240
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-DICKEY DRIVE NORTH, SH10 TO E HUITT LANE
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
241
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS May 28,2003
RON YOUNG
LINE REPLACEMENT-DICKEY DRIVE SOUTH, E HUITT LANE TO HILTON DRIVE
WATER MAIN REPLACEMENT
C
This water main is included in the City's Water System Master Plan.
This project consists of the replacement of a 6" cast iron water main with an 8" PVC main along Dickey Drive
south from E Huitt Lane to Hilton Drive.
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
242
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-DICKEY DRIVE SOUTH, E HUITT LANE TO HILTON DRIVE
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
243
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 15,2005
RON YOUNG
LINE REPLACEMENT-DUNAWAY DRIVE, E ALEXANDER LANE TO E ASCOT DRIVE
WATER MAIN REPLACEMENT
C
This water main is included in the City's Water System Master Plan.
The project consists of the replacement of the existing 6" AC water main with an 8" PVC water main on
Dunaway Drive from E Alexander Lane to E Ascot Drive.
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
244
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-DUNAWAY DRIVE, E ALEXANDER LANE TO E ASCOT DRIVE
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
245
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 15,2005
RON YOUNG
LINE REPLACEMENT-E HUITT LANE, S MAIN STREET TO DUNAWAY DRIVE
WATER MAIN REPLACEMENT
C
This water main is included in the City's Water System Master Plan.
The project consists of the replacement of the existing 6" PVC water main with an 8" PVC water main along
E Huitt Lane from S Main Street to Dunaway Drive.
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
246
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-E HUITT LANE, S MAIN STREET TO DUNAWAY DRIVE
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
247
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 15,2005
RON YOUNG
LINE REPLACEMENT-EASTCLIFF DRIVE, TOPLEA DRIVE TO DEL PRADO APTS.
WATER MAIN REPLACEMENT
C
This water main is included in the City's Water System Master Plan.
The project consists of the replacement of the 6" AC main to an 8" PVC main along Eastcliff Drive from Toplea
Drive to Del Prado Apartments.
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
248
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-EASTCLIFF DRIVE, TOPLEA DRIVE TO DEL PRADO APTS.
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
249
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS May 28,2003
RON YOUNG
LINE REPLACEMENT-ECTOR DRIVE, TROJAN TRAIL TO MIDWAY DRIVE
WATER MAIN REPLACEMENT
C
This water main is included in the City's Water System Master Plan.
The project consists of the replacement of the 6" cast iron water main with an 8" PVC main on Ector Drive from
Trojan Trail to Midway Drive.
Old and deteriorated water mains increase the City's maintenance costs. Substandard size mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
250
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-ECTOR DRIVE, TROJAN TRAIL TO MIDWAY DRIVE
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
251
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS May 28,2003
RON YOUNG
LINE REPLACEMENT-FULLER DRIVE, SALEM DRIVE TO CARTER DRIVE
WATER MAIN REPLACEMENT
C
This water main is included in the City's Water System Master Plan.
The project consists of replacing a 6" cast iron water main with an 8" PVC water main along Fuller Drive from
Salem Drive to Carter Drive.
Old and deteriorated water mains increase the City's maintenance costs. Substandard size mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
252
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-FULLER DRIVE, SALEM DRIVE TO CARTER DRIVE
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
253
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS May 28,2003
RON YOUNG
LINE REPLACEMENT-HOLLOW OAK DRIVE
WATER MAIN REPLACEMENT
C
This water main is included in the City's Water System Master Plan.
The project consists of the replacement of the 6" cast iron main with an 8" PVC main along Hollow Oak Drive
from Woodridge Circle to Pebble Creek Drive and Woodridge Circle south of Hollow Oak Drive.
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
254
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-HOLLOW OAK DRIVE
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
255
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 15,2005
RON YOUNG
LINE REPLACEMENT-KYNETTE DRIVE, CYCLONE CREEK TO WILSHIRE DRIVE
WATER MAIN REPLACEMENT
C
This water main is included in the City's Water System Master Plan.
The project consists of the replacement of a 6" cast iron water main with an 8" PVC main along Kynette Drive
from Cyclone Creek to Wilshire Drive.
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
256
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-KYNETTE DRIVE, CYCLONE CREEK TO WILSHIRE DRIVE
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
257
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS May 28,2003
RON YOUNG
LINE REPLACEMENT-LIVE OAK CT/LIVE OAK DRIVE
WATER MAIN REPLACEMENT
C
The water mains included in this project are included in the City's Water System Master Plan.
The project consists of the replacement of the existing 4" cast iron water main with an 8" PVC main along Live
Oak Drive from Cedar Court to the south end of Live Oak Drive. Additionally, the replacement of the existing 8"
cast iron water main with an 8" PVC water main from Canyon Ridge to West Cliff Drive is also included in the
scope of the project.
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
258
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-LIVE OAK CT/LIVE OAK DRIVE
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
259
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 05,2007
RON YOUNG
LINE REP-MIDCREEK DRIVE/ROCK CREEK DRIVE/STONY CREEK DRIVE
WATER MAIN REPLACEMENT
C
The water main is included in the City's Water System Master Plan.
This project consists of the replacement of a 6" AC main with an 8" PVC main on Midcreek Drive, Rock Creek
Drive, and Stony Creek Drive.
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
260
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REP-MIDCREEK DRIVE/ROCK CREEK DRIVE/STONY CREEK DRIVE
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
261
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS May 28,2003
RON YOUNG
LINE REPLACEMENT-MIDWAY DRIVE EAST, N MAIN ST TO FREESTONE DR
WATER MAIN REPLACEMENT
C
This water main is included in the City's Water System Master Plan.
This project replaces the 6" cast iron water main with an 8" PVC main on Midway Drive east from N Main Street
to Freestone Drive.
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
262
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-MIDWAY DRIVE EAST, N MAIN ST TO FREESTONE DR
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
263
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS May 28,2003
RON YOUNG
LINE REPLACEMENT-MIDWAY DRIVE WEST, FREESTONE DRIVE TO ECTOR DRIVE
WATER MAIN REPLACEMENT
C
This water main is included in the City's Water System Master Plan.
This project replaces the 6" cast iron water main with an 8" PVC main along Midway Drive west from Freestone
Drive to Ector Drive.
Old and deteriorated water mains increase the City's maintenance costs. Substandard size mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
264
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-MIDWAY DRIVE WEST, FREESTONE DRIVE TO ECTOR DRIVE
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
265
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 15,2005
RON YOUNG
LINE REPLACEMENT-NEEDLES STREET, PAULA LANE TO RAIDER DRIVE
WATER MAIN REPLACEMENT
C
This water main is included in the City's Water System Master Plan.
The project consists of the replacement of the existing 6" cast iron water main with an 8" PVC water main along
Needles Street from Paula Lane to Raider Drive.
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
266
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-NEEDLES STREET, PAULA LANE TO RAIDER DRIVE
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
267
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS May 28,2003
RON YOUNG
LINE REPLACEMENT-PAULA LANE, NEEDLES STREET TO S PIPELINE ROAD
WATER MAIN REPLACEMENT
C
This water main is included in the City's Water System Master Plan.
The project consists of the replacement of the 6" cast iron water main with an 8" PVC main along Paula Lane
from Needles Street to S Pipeline Road.
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
268
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-PAULA LANE, NEEDLES STREET TO S PIPELINE ROAD
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
269
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 12,2004
RON YOUNG
LINE REPLACEMENT-S MAIN STREET (NORTH), E HUITT LANE TO SH10
WATER MAIN REPLACEMENT
C
The water mains included in this project are part of the City's Water System Master Plan.
The project will replace and upgrade the water main along S Main Street from E Huitt Lane to SH10 from a 6"
cast iron main to an 8" PVC main.
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
270
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-S MAIN STREET (NORTH), E HUITT LANE TO SH10
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
271
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 12,2004
RON YOUNG
LINE REPLACEMENT-S MAIN STREET (SOUTH), LANDOVER DR TO E HUITT LN
WATER MAIN REPLACEMENT
C
The water mains included in this project are part of the City's Water System Master Plan.
This project will replace and upgrade the water main along S Main Street from Landover Drive to E Huitt Lane
from a 6" cast iron main to an 8" PVC.
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
272
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-S MAIN STREET (SOUTH), LANDOVER DR TO E HUITT LN
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
273
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS May 28,2003
RON YOUNG
LINE REPLACEMENT-S PIPELINE ROAD EAST, VINE STREET TO S MAIN STREET
WATER MAIN REPLACEMENT
C
This water main is included in the City's Water System Master Plan.
The project will replace the existing 6" cast iron water main with an 8" PVC water main along S Pipeline Road
east from Vine Street to S Main Street.
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
274
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-S PIPELINE ROAD EAST, VINE STREET TO S MAIN STREET
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
275
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 12,2004
RON YOUNG
LINE REPLACEMENT-SHADY CREEK DRIVE/CLIFFWOOD ROAD
WATER MAIN REPLACEMENT
C
The water mains included in this project are part of the City's Water System Master Plan.
This project will replace and upgrade the water mains along Shady Creek Drive and Cliffwood Road from the
existing 6" cast iron mains to 8" PVC.
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
276
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-SHADY CREEK DRIVE/CLIFFWOOD ROAD
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
277
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 12,2004
RON YOUNG
LINE REPLACEMENT-SPRINGWOOD COURT
WATER MAIN REPLACEMENT
C
The water mains included in this project are part of the City's Water System Master Plan.
The project consists of the replacement of 4" water main with an 8" main on Springwood Court.
Old and deteriorated water mains increase the City's maintenance cost. Substandard size water mains provide
a reduced flow of water. Systematic annual replacement of deteriorated and substandard size water mains will
reduce maintenance costs.
278
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-SPRINGWOOD COURT
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
279
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 12,2004
RON YOUNG
LINE REPLACEMENT-SUNSET DRIVE, S PIPELINE ROAD TO S MAIN STREET
WATER MAIN REPLACEMENT
C
The water mains included in this project are part of the City's Water System Master Plan.
The project will replace and upgrade the water main along Sunset Drive from S Pipeline Road to S Main Street
from a 6" cast iron main to an 8" PVC main.
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
280
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-SUNSET DRIVE, S PIPELINE ROAD TO S MAIN STREET
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
281
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS May 28,2003
RON YOUNG
LINE REPLACEMENT-WESTWOOD DRIVE, FULLER DRIVE TO CARTER DRIVE
WATER MAIN REPLACEMENT
C
This water main is included in the City's Water System Master Plan.
The project will replace a 6" cast iron main with an 8" PVC main along Westwood Drive from Fuller Drive to
Carter Drive.
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance costs.
282
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-WESTWOOD DRIVE, FULLER DRIVE TO CARTER DRIVE
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
283
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 12,2004
RON YOUNG
LINE REPLACEMENT-WILDWOOD STREET
WATER MAIN REPLACEMENT
C
The water mains included in this project are part of the City's Water System Master Plan.
This project will replace and upgrade the water main along Wildwood Street from a 6" cast iron main to an 8"
PVC main.
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
284
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REPLACEMENT-WILDWOOD STREET
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
285
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 12,2004
RON YOUNG
LINE REP-WOODVINE DRIVE (EAST), CLIFFWOOD ROAD TO EL CAMINO REAL
WATER MAIN REPLACEMENT
C
The water mains included in this project are part of the City's Water System Master Plan.
The project will replace and upgrade the water main along Woodvine Drive from Cliffwood Road to El Camino
Real from a 6" cast iron main to an 8" PVC main.
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
286
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REP-WOODVINE DRIVE (EAST), CLIFFWOOD ROAD TO EL CAMINO REAL
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
287
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 12,2004
RON YOUNG
LINE REP-WOODVINE DRIVE (WEST), PEBBLE CREEK DR TO CLIFFWOOD RD
WATER MAIN REPLACEMENT
C
The water mains included in this project are part of the City's Water System Master Plan.
This project will replace and upgrade the water main along Woodvine Drive from Pebble Creek to Cliffwood
Road from a 6" cast iron main to an 8" PVC main.
Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide
inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains
will reduce maintenance cost.
288
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
LINE REP-WOODVINE DRIVE (WEST), PEBBLE CREEK DR TO CLIFFWOOD RD
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
289
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 12,2004
RON YOUNG
WATER SYSTEM SECURITY LAND ACQUISITION
WATER SYSTEM SECURITY
C
This project is a result of the findings of the 2004 Water System Vulnerability Assessment of the City's Water
System Master Plan.
The project consists of the acquisition of a small residential property which shields the Fuller ground storage
tank from public view. Removal of the residence in order to provide greater security, access, and visibility is
also included in the scope of the project.
Increase water system security by addressing vital elements as recommended in the 2004 Water System
Vulnerability Assessment as identified by Lockwood, Andrews and Newman, Inc. and submitted to the
Environmental Protection Agency (EPA).
290
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
WATER SYSTEM SECURITY LAND ACQUISITION
Land Acquisition - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
291
292
Project DescriptionPriority Estimated Cost Operating FundCIP Fund BalanceBond SaleGrants/ ContribImpact FeesEscrow FundsCar Rental TaxOther EDCTo Be DeterminedOTHER PROJECTSEuless FLC Aquatics ConstructionA $ 6,450,000 $5,236,500* $ 1,213,500 Sub-Total Other Priority A-Proposed FY13 $ 6,450,000 Glade Parks Trail Connection (14)B $ 359,625 XX Texas Star Golf Course Bunker Replacement (14)B $ 195,000 XX Blessing Branch Park Improvements (15)B $ 225,120 XX Texas Star Sports Complex Phase V (15)B $ 4,152,000 XX Development/Engineering Building (16)B $ 1,579,800 XX TSGC Greens Replacement (16)B $ 800,000 XX Sub-Total Other Priority B-Unfunded $ 7,311,545 Animal Shelter Expansion/Renovation C TBD XX Kiddie Carr Park Improvements C TBD XX South Euless Water Feature C TBD XX Trail Connection South Euless C TBD XX Trail Enhancements Phase I C TBD XX Trail Enhancements Phase IIC TBD XX Trail Enhancements Villages Bear CreekC TBD XX Trailwood Park ImprovementsC TBD XX Wilshire Park Water FeatureC TBD XX Sub-Total Other Priority C-Unfunded$ - OTHER PROJECTS - TOTAL$ 13,761,545 * Car Rental CIP - $4,236,500* General CIP - $1,000,000CAPITAL IMPROVEMENT PROGRAMSFY13 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPEPROPOSED METHOD OF FINANCING293
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
COMMUNITY SERVICES February 11, 2009
RAY MCDONALD
EULESS FLC AQUATICS CONSTRUCTION
PARK/RECREATION AQUATICS
PR1201 A
The City of Euless has for many years recognized the importance of planning for parks, recreation, and open space
based on the needs as expressed by the citizens. For the update to the Parks Master Plan and as part of the City’s
five year master plan, a survey of park, recreation, and open space needs was conducted from a sample of randomly
selected citizens in Euless. The survey identified a new aquatic center as a top priority of the citizens. Project
approval requires revision of the master planning of Midway Park as the aquatics center eliminates the current ball
fields and requires the relocation of the existing tennis courts in order to provide support facilities and amenities for the
FLC.
The project consists of the construction of indoor and outdoor family aquatic facilities. The indoor facility includes a
lap/leisure pool, current channel, slide, and therapy pool. This multi-purpose facility will be attached to the senior
center and will offer aquatic programs for the senior population and the general public. The outdoor aquatics center
will include various play components such as a leisure pool, slides, aqua play features, shade structures, a bath
house, and all the necessary filtration systems. The project scope also includes redevelopment and improvement of
the entire site such as relocating the tennis courts and the construction of various trails, a group pavilion, an
amphitheater, multi-use sport courts, additional picnic stations with grills, a nature area, a botanical garden, and public
art display(s).
FY2013
The City's population is sufficient to support a family aquatic center. The City's existing aquatic facilities have aged
and maintaining the pools and support facilities has been an ongoing issue and concern. The operating expenses
continue to increase, far exceeding the revenue generated by the pools. Continuing in repair mode is no longer
possible at the Wilshire and South Euless Pools and a long-term plan is necessary. Given the fact that two of the
neighborhood pools are over thirty years old and the cost to renovate, repair, or replace them is estimated at over one
million dollars each, it is recommended that the City concentrate efforts and resources toward the family aquatic
facility to serve the citizens of Euless.
294
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
ADDITIONAL COMMENTS:
EULESS FLC AQUATICS CONSTRUCTION
Construction $6,450,000
$0
$114,000
$114,000
$114,000 $6,450,000
0%
$5,236,500 0%
0%
0%
0%
$1,213,500
Other
Proposed fund balance allocation is as follows:
Car Rental CIP - $4,236,500 ($236,500 excess design funding)
General CIP - $1,000,000
295
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
COMMUNITY SERVICES May 05,2008
RAY MCDONALD
GLADE PARKS TRAIL CONNECTION
PARK/RECREATION TRAIL SYSTEM
B
As identified in the Glade Parks development, this project proposes to connect the existing Trails of Euless to
the City of Colleyville trails through the Glade Park Development.
Construction of this trail will connect to the existing trail at Creekwood Estates, run underneath the northbound
service road, SH121, and the southbound service road to the southeast corner of the Glade Parks Development.
Future connectivity through Glade Parks is planned within the overall development of that site.
FY2014
Very high interest in trails and trail connectivity were identified in the scientific survey conducted for the adopted
Parks Master Plan. 88% of those who participated in the survey singled out trail connections between existing
and future park developments as the number one priority. Additionally, 76% identified the need for trail
connectivity to other cities as a top priority.
The City of Euless has experienced significant progress in the last few years in the area of trail development
with an extensive network of paved and unpaved trails. The trails system is a valuable asset to the community
as it assists not only in providing a safe means for non-vehicular travel, but also in providing an opportunity for a
variety of unstructured, low-impact recreational pursuits. The development and maintenance of the trails system
continued to receive significant support from the citizens as indicated in the responses to the needs assessment
survey conducted as a part of the Parks Master Plan update.
296
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
GLADE PARKS TRAIL CONNECTION
Engineering, surveying, geotech, etc.$72,000
$0 Construction $270,500
$0 Contingency 5%$17,125
$0
$0
$0
$0
$0 $359,625
0%
0%
0%
0%
0%
XX
297
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
TEXAS STAR GOLF COURSE June 19,2012
GLENDA HARTSELL
TSGC BUNKER REPLACEMENT
PARK/RECREATION TSGC IMPROVEMENTS
B
The project would include the simultaneous reconstruction of all sand bunkers to consistent standards and
specifications including the removal of existing sand material and drainage, reshaping the sand bunker as
needed, installation of new drainage and bunker liner material, and refilling with USGA specification bunker sand
material to a uniform depth. Golf course maintenance staff would use the existing bunker sand for agronomic
practices around the course and practice areas.
Weather permitting, reconstruction of the sand bunkers should take approximately sixty days. Staff
recommends that the process be completed during a time that traditionally exhibits slow play, specifically
January-February or July-August. Reconstruction would occur on two to three holes simultaneously in order to
minimize disruption to play. At no time will it be necessary for the golf course to close due to the project.
Texas Star is a championship daily fee golf facility known for its high level of service and excellent course
conditions. Due to the nature of their initial construction, the sand bunkers have been a consistent area of
concern despite continual efforts to maintain and improve their playability. Over the life of the course, staff has
repaired and replaced both the bunker sand as well as the underlying drainage in an effort to improve
conditions. Specifically, over the past few years, staff has experimented with a variety of different methods and
products designed to improve draining, prevent contamination from underlying silt and gravel and enhance the
performance of each bunker. Due to the number of bunkers on the course, coupled with the necessary labor
needed, staff has only been able to complete a limited number of sand bunker renovations each year. As a
result, Texas Star suffers from inconsistent playing conditions and aesthetics. Simultaneous reconstruction of
all sand bunkers to the consistent standards and specifications would result in not only an aesthetically pleasing
look, but optimal playing conditions as well.
298
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
TSGC BUNKER REPLACEMENT
Construction $195,000
$195,000
XX
Proposed funding source is TSGC reserves.
299
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
COMMUNITY SERVICES April 30,2008
RAY MCDONALD
BLESSING BRANCH PARK IMPROVEMENTS
PARK/RECREATION PARK IMPROVEMENTS
B
This project is a continuation of the overall trail system expansion and general park improvements as identified
in the Parks Master Plan.
Blessing Branch Park is a 7.3 acre linear park located on the east side of Main Street across from Midway Park.
Currently, the park has only one swing set. This project includes construction of a trail connection from Main
Street to the west and Fuller-Wiser to the east. Additionally, the project includes a new playground, picnic
pads with grills, and some type of shade shelter/pavilion/gazebo. This area currently gets a high volume of foot
traffic. Constructing a trail in this linear greenbelt would not only provide a safe paved access for the residents
east of Main Street to Midway Park, Midway Park Elementary, and to Trinity High School, but also help create a
renewed sense of quality of life for the residents in that area by enhancing the recreational amenities available.
FY2015
The number one request from Euless citizens as it relates to trails, based on the responses to the needs
assessment survey as identified in the Parks Master Plan, was to construct trail connections between existing
and/or future park developments. This project not only satisfies that request, but also provides trail connections
to neighborhoods, schools, between major thoroughfares, and potentially to future commercial developments to
the southeast.
300
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
BLESSING BRANCH PARK IMPROVEMENTS
Approximately 28,000 square feet of
4"x8' concrete trail @ $4.25 square foot $119,000
$0 Playground/Border $30,000
$0 Picnic pads w/grills $10,000
Shade shelter/pavilion/gazebo $30,000
Trail Lighting $20,000
$0 Playground chips $5,400
Contingency 5%$10,720
$0
$0
$0
$0 $225,120
0%
XX 0%
0%
0%
0%
The proposed method of finance is EDC CIP Fund Balance.
301
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
COMMUNITY SERVICES May 01,2010
RAY MCDONALD
TEXAS STAR SPORTS COMPLEX PHASE V
PARK/RECREATION TSSC IMPROVEMENTS
B
Texas Star Sports Complex Phase V incorporates the addition of four (4) additional multi-use playing fields
(four-plex). This addition could also incorporate a multi-use all-season playing surface that will allow for
additional recreational sports programming, baseball league and tournament play, and softball (adult and girls
fast-pitch). With the closure of athletic fields at Midway Park, and the proposed relocation of Softball World, the
addition of this complex will ensure that the Texas Star Sports Complex is positioned as a premier facility that
serves the athletic and recreational programming needs of the City.
The project includes the design and construction of four (4) multi-use playing fields (four-plex). The four-plex will
feature bleacher/terraced sitting similar to that of the existing structures at the facility, as well as a location for
softball (adult and girl's fast pitch), youth baseball (recreational and select), and other recreational sports.
FY2015
The aging facility of Softball World would require a significant capital investment; this investment would not be
required with the consolidation and movement of this operation to the Parks At Texas Star, collectively known as
Texas Star Sports Complex. With the completion of Phase V, the new multi-use Texas Star Sports Complex will
serve the athletic needs of the community and spur economic opportunities for the City.
302
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
TEXAS STAR SPORTS COMPLEX PHASE V
Grounds/Utilities $290,000
Fencing (Est)$125,000
$0 Turf/Irrigation $360,000
$0 Terrace Seating/Bleacher/Dug Outs $2,162,000
Lighting (Piers / Relocation / Concrete)$250,000
Alt 1 (All Season Play Surface)$425,000
5% Contingency $180,000
10% Indirect Cost $360,000
$0
$0
$0 $4,152,000
0%
0%
0%
0%
0%
XX
Note: Operating currently under the TSSC umbrella, Softball World's proposed relocation to Parks At Texas
Star, under this phase, will cover all operating costs of the new operations. Accordingly, no additional baseline
expenses are anticipated.
303
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
FLEET & FACILITY OPERATIONS May 07,2007
KYLE MCADAMS
DEVELOPMENT/ENGINEERING BUILDING
FACILITIES REMODEL
B
This project is part of the City's five year master plan.
The development and engineering building received a major remodel in 1996 with renovation of the building's
interior. Due to limited funding at that time, certain elements could not be justified as part of the remodel. This
upgrade will allow for construction of a new entrance facade to match the other campus structures. Security
issues pertaining to controlled access will be addressed as well as renovation of the Fuller Room into a
functional conference area. Public rest room facilities will be relocated to meet American with Disabilities Act/
Texas Accessibility Standards, the interior will be upgraded, and new carpet will be installed throughout the
facility.
Bid Specifications: August 1, 2015
Bid Project: December 1, 2015
Receive Bids: January 1, 2016
Council Approval: February 1, 2016
Start Construction: February 1, 2016
304
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
DEVELOPMENT/ENGINEERING BUILDING
Construction $1,020,000
$0 Architect (10%)$102,000
$0 Survey & Testing Fees $8,000
$0 Contingency (20%)$204,000
$2,000 Furniture
$175,000
$3,500 Fixtures
$40,000
Instruments & Apparatus $6,000
Insurance $750 Data & Telephone
$10,500
Alarm & Security Services $5,800
Interior & Exterior Signage $8,500
$6,250
Janitorial Service/Pest Control $2,230
PM & Minor Repairs $10,100
Unscheduled Maintenance $11,250
Renewal & Replacement $25,000
$48,580
$54,830 $1,579,800
25%
0%
0%
0%
0%
XX
305
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
GOLF COURSE April 12,2011
GLENDA HARTSELL
GOLF COURSE GREENS REPLACEMENT
PARK/RECREATION TSGC IMPROVEMENTS
B
Replace and rebuild the 20 Bentgrass greens on the course. Kill and fumigate all 20 greens, remove drainage
and soil. Replace drainage, replace and contour soil to the original design of each green. Seed the greens and
wait for grow in of Bentgrass over a three-month period.
(Bermuda greens would require less construction and have a shorter down time.)
2016 or when needed. The ideal schedule for the replacement and reconstruction would be August through
October during the optimum growing period.
With continued play on the course after 15-20 years, the sand based greens will start to deteriorate. As they
decline, it will become more difficult to maintain the health of the greens during the growing season and through
the heavy play time on the course. The result will be reduced play and declining revenues, as well as increased
maintenance cost. The end result will be the deterioration of the quality of playing surface and experience
provided to customers.
306
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
GOLF COURSE GREENS REPLACEMENT
Landscaping Architect & Maintenance $800,000
$0
$0
$0
(Bermuda $250,000-$300,000)
$0
$0
$0
$0 $800,000
0%
0%
0%
0%
0%
XX
If the greens could be replaced with Bermuda grass, this process would not require as much rebuilding and the
greens would be sprigged as opposed to seeding of Bentgrass, this process would cost $250,000 to $300,000.
307
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
FLEET & FACILITY OPERATIONS May 07,2007
KYLE MCADAMS
ANIMAL SHELTER-EXPANSION/RENOVATION
FACILITIES REMODEL
C
This project is part of the City's five year master plan.
The project consists of the expansion of the current animal shelter facility to better accommodate visitors,
adoptions, and animal services. The project scope includes the addition of ten (10) enclosed dog runs, six (6)
quarantine runs, an adoption room, additional room for cat containment, and an area for animal washing . Office
space expansion will be included in the renovation as well as updates to the public/employee rest rooms.
The current animal control facility has insufficient space to meet current and future demands.
308
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
ANIMAL SHELTER-EXPANSION/RENOVATION
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
Insurance
$0
PM & Minor Repairs $0
Unscheduled Maintenance
Renewal & Replacement
Pest Control
$0
$0
25%
0%
0%
0%
0%
XX
309
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
COMMUNITY SERVICES May 13,2008
RAY MCDONALD
KIDDIE CARR PARK IMPROVEMENTS
PARK/RECREATION PARK IMPROVEMENTS
C
The adopted Parks Master Plan recommends funding for system-wide park facilities and amenities upgrades.
This project includes the construction or installation of a pavilion, a concrete trail connection to Carr Park, bank
stabilization along Boyd Branch Creek which runs through the park, a playground, park lighting, picnic stations,
an irrigation system, new perimeter fencing, a drinking fountain, benches, and a dedicated parking lot at Kiddie
Carr Park.
As identified in the adopted Parks Master Plan, the municipal park is the foundation of any solid parks and
recreation system. The City of Euless parks and recreation system provides residents and visitors with
significant personal, social, environmental, and economic benefits. The revitalization efforts that the Euless City
Council has focused on over the years has increased the sense of community pride. Kiddie Carr Park is a four
acre park located adjacent to Carr Park off Pauline. The current amenities at this park include the Parks
Department's in-ground tree farm, a greenhouse, and an outdoor basketball court. The park is located in a
section of town that needs something to stimulate community pride. The proposed project will continue the City
Council's revitalization efforts by creating an area that will serve both the passive and active leisure needs of the
residents in this area.
310
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
KIDDIE CARR PARK IMPROVEMENTS
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
311
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
COMMUNITY SERVICES May 05,2008
RAY MCDONALD
SOUTH EULESS WATER FEATURE
PARK/RECREATION AQUATICS
C
The adopted Parks Master Plan calls for the renovation of the South Euless Pool. This aquatic facility has not
received any major renovations since it opened in 1972. This request will probably be revised and/or withdrawn
upon completion of the aquatic portion of the Euless Family Life Center.
Recommendations made in both the adopted Parks Master Plan and the Swimming Pool Audit addressed major
renovations that were needed at South Euless Pool. The estimated cost for these renovations was
approximately $1.3 million. Because of limited space as well as parking, this project will need to be carefully
thought through and a decision will need to be made to either spend the money to renovate this existing facility
or use the funds toward the construction of a family aquatic facility.
This has been documented in both the Swimming Pool Audit and the adopted Parks Master Plan.
312
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
SOUTH EULESS WATER FEATURE
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
313
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
COMMUNITY SERVICES May 12,2008
RAY MCDONALD
TRAIL CONNECTION SOUTH EULESS
PARK/RECREATION TRAIL SYSTEM
C
Identified in the adopted Parks Master Plan is the need for additional trail connections from neighborhoods to
parks.
There is as very high interest in trails and trail connectivity as identified in the scientific survey in the adopted
Parks Master Plan. 88% of those participating in the survey identified the need for trail connections between
neighborhoods and parks. Additionally, 68% percent identified the need for trail connectivity to schools as a top
priority. This project would allow for safe access to South Euless Park from adjacent neighborhoods as well as
South Euless Elementary from the adjacent neighborhood to the south.
The City of Euless has experienced significant progress in the last few years in the area of trail development
with an extensive network of paved and unpaved trails. The trails system is a valuable asset to the community
as it assists not only in providing a safe means for non-vehicular travel, but also in providing an opportunity for a
variety of unstructured, low-impact recreational pursuits. The development and maintenance of the trails system
continued to receive significant support from the citizens as indicated in the responses to the needs assessment
survey conducted as a part of the Parks Master Plan update.
314
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
TRAIL CONNECTION SOUTH EULESS
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
315
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
COMMUNITY SERVICES May 12,2008
RAY MCDONALD
TRAIL ENHANCEMENTS PHASE I
PARK/RECREATION TRAIL SYSTEM
C
Identified in the Needs Assessment and Identification section of the adopted Parks Master Plan are a number of
trail related improvements.
This project consists of the first phase of implementation of park improvements identified in the adopted Parks
Master Plan which includes additional water fountains, additional benches, construction of shaded seating areas
along the trail, addition and/or installation of new exercise equipment along the trails, picnic stations, and
construction of additional pedestrian bridges in high water areas. Also identified, is the need to address various
areas along the trail that need to be converted from unpaved to paved trails.
The City of Euless has experienced significant progress in the last few years in the area of trail development
with an extensive network of paved and unpaved trails. The trails system is a valuable asset to the community
as it assists not only in providing a safe means for non-vehicular travel, but also in providing an opportunity for a
variety of unstructured, low-impact recreational pursuits. The development and maintenance of the trails system
continued to receive significant support from the citizens as indicated in the responses to the needs assessment
survey conducted as a part of the Parks Master Plan update.
316
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
TRAIL ENHANCEMENTS PHASE I
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
317
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
COMMUNITY SERVICES May 13,2008
RAY MCDONALD
TRAIL ENHANCEMENTS PHASE II
PARK/RECREATION TRAIL SYSTEM
C
This enhancement was identified in the Needs Assessment and Identification section of the adopted Parks
Master Plan.
This project is Phase II of the trail enhancements that continues implementation of park improvements identified
in the adopted Parks Master Plan which includes additional water fountains, additional benches, construction of
shaded seating areas along the trail, addition and/or installation of new exercise equipment along the trails,
picnic stations, and construction of additional pedestrian bridges in high water areas. Also identified, is the need
to address various areas along the trail that need to be converted from unpaved to paved trails.
The City of Euless has experienced significant progress in the last few years in the area of trail development
with an extensive network of paved and unpaved trails. The trails system is a valuable asset to the community
as it assists not only in providing a safe means for non-vehicular travel, but also in providing an opportunity for a
variety of unstructured, low-impact recreational pursuits. The development and maintenance of the trails system
continued to receive significant support from the citizens as indicated in the responses to the needs assessment
survey conducted as a part of the Parks Master Plan update.
318
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
TRAIL ENHANCEMENTS PHASE II
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
319
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
COMMUNITY SERVICES March 23,2004
RAY MCDONALD
TRAIL ENHANCEMENTS VILLAGES OF BEAR CREEK
PARK/RECREATION TRAIL SYSTEM
C
This project includes infrastructure improvements which were identified as a high priority in the adopted Parks
Master Plan.
This project includes the redevelopment/redesign and improvement of the trail at the Villages of Bear Creek
Park to offer multiple uses for the citizens of Euless.
Trail development and enhancement opportunities will be consistent with available land, funding and time
variables. This Master Plan recommendation will be part of a city-wide comprehensive trail enhancement
project. Due to the continual erosion of the existing trail, a redevelopment/redesign of the trail system at Villages
of Bear Creek will be a high priority.
320
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
TRAIL ENHANCEMENTS VILLAGES OF BEAR CREEK
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
321
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
COMMUNITY SERVICES May 13,2008
RAY MCDONALD
TRAILWOOD PARK IMPROVEMENTS
PARK/RECREATION PARK IMPROVEMENTS
C
This project is a continuation of the overall park improvement plan as identified in the Parks Master Plan.
Trailwood Park is an eleven acre site that currently has a playground and a half-mile hike/bike trail. This project
includes the installation of a new pavilion, a parking lot, a non-paved nature trail on the east end of the park,
upgraded playground to meet American with Disabilities Act standards, park lighting, new park signs, benches
along the trail, and trail lighting.
As identified in the adopted Parks Master Plan, the municipal park is the foundation of any solid parks and
recreation system. The City of Euless parks and recreation system provides the residents and visitors with
significant personal, social, environmental and economic benefits. The revitalization efforts that the Euless City
Council has focused on over the years has increased the sense of community pride. This proposed project will
continue those efforts by creating an area that will serve both the passive and active leisure needs of the
residents in the vicinity.
322
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
TRAILWOOD PARK IMPROVEMENTS
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
323
City of Euless
Capital Project Request
Department: Date Prepared:
Submitted By: Date Completed:
Project Title:
Project Type: Sub-Type:
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
COMMUNITY SERVICES May 05,2008
RAY MCDONALD
WILSHIRE PARK WATER FEATURE
PARK/RECREATION AQUATICS
C
The adopted Parks Master Plan calls for the renovation of Wilshire Pool. This aquatic facility has not received
any major renovations since it opened in 1972. This request will most likely be revised or withdrawn upon
completion of the aquatic portion of the Euless Family Life Center.
Recommendations made in both the adopted Parks Master Plan and the Swimming Pool Audit addressed major
renovations that were needed at Wilshire Pool. The estimated cost for these renovations was approximately
$1.3 million. Because of limited space as well as parking, this project will need to be carefully thought through
and a decision will need to be made to either spend the money to renovate this existing facility or use the funds
toward the construction of a family aquatic facility.
Documented in both the Swimming Pool Audit and the adopted Parks Master Plan.
324
PROJECT TITLE:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
WILSHIRE PARK WATER FEATURE
Engineering - To Be Determined
Construction - To Be Determined
$0
$0
$0
$0
$0
$0
$0
0%
0%
0%
0%
0%
XX
325
326
CAPITAL IMPROVEMENTS PROGRAM
COMPLETED PROJECTS SUMMARY
Date Completed Total Budget
Total Project
Costs
(Over) Under
Budget
DRAINAGE PROJECTS
DR9901 Sulphur Branch Phase II 08/01/99 123,404$ 120,128$ 3,276$
DR9902 Windlea & WestCliff 08/01/99 4,396$ 1,159$ 3,237$
DR9904 Hurricane Creek 04/30/02 257,500$ 69,906$ 187,594$
DR0302 Flooding Mitigation Cancelled 250,000$ -$ 250,000$
DR0303 Aransas @ Glenn 12/31/04 250,000$ 250,000$ -$
DR0304 Live Oak Drainage 04/15/05 218,000$ 175,958$ 42,042$
DR0305 Sierra Drive Drainage 04/15/05 40,738$ 40,738$ 0$
DR0306 Flood Mitigation Plan(FEMA)04/15/05 32,000$ 7,750$ 24,250$
DR0307 Simmons Drainage 04/15/05 22,995$ 22,995$ -$
DR0301 Fuller Branch Channel Stabilization 05/31/07 279,136$ 232,176$ 46,960$
DR0401 Channel Stabilization Tributary WFA 05/31/07 437,462$ 438,070$ (608)$
DR0402 Drainage Project Study 05/31/07 60,000$ 51,000$ 9,000$
DR0601 Little Bear Creek Study Update 04/25/08 50,000$ 49,000$ 1,000$
DR0602 McCormick Park 04/25/08 250,000$ 247,925$ 2,075$
DR0701 Eastcliff Drive/Greenbriar Drive Drainage Imp.04/17/10 340,000$ 246,584$ 93,416$
DR0801 Rockwall Drive/Lamar Drive Drainage Imp.04/17/10 430,000$ 272,554$ 157,446$
DR0901 Bear Creek Parkway Erosion Repair 02/17/11 530,000$ 464,465$ 65,535$
DR0802 Hurricane Creek & Bridge at Marlene Improvements 04/14/11 378,500$ 344,574$ 33,926$
3,954,131$ 3,034,982$ 919,149$
-$ -$ -$
Sub-Total Drainage Projects 3,954,131$ 3,034,982$ 919,149$
Project
Number Project Description
Drainage Projects - Prior Years
Drainage Projects - Current Year
327
328
CAPITAL IMPROVEMENTS PROGRAM
COMPLETED PROJECTS SUMMARY
Date Completed Total Budget
Total Project
Costs
(Over) Under
Budget
Project
Number Project Description
STREET PROJECTS
PS9911 Overlay Projects 03/30/00 294,687$ 294,687$ -$
PS9912 Harwood-Main Intersection 04/30/00 1,126,935$ 1,077,303$ 49,632$
PS9907 Westpark Way -SH10 to SH183 09/30/00 605,542$ 479,915$ 125,627$
PS9902 Mid Cities Blvd.05/02/02 1,075,074$ 963,635$ 111,439$
PS9910 Sidewalks 06/30/03 200,000$ 200,000$ -$
PS0001 FM 157 S Pipeline to SH10 (Utility Relocation)04/30/04 378,207$ 371,318$ 6,889$
PS0003 Glade from Heritage to SH121 04/30/04 1,866,612$ 1,866,612$ -$
PS0004 Glade Rd (East) - SH121 to Champagne 04/30/04 1,210,014$ 1,162,009$ 48,005$
PS0201 Gateway Blvd - Southern Portion 04/30/04 510,000$ 473,817$ 36,183$
PS0301 Mid Cities Roadway Illumination 04/15/05 160,000$ 148,115$ 11,885$
PS0302 Driftwood Pipeline Traffic Signal 04/15/05 100,000$ 68,665$ 31,335$
PS0303 Aransas/Harwood Traffic Signal 04/15/05 120,000$ 89,118$ 30,882$
PS0402 South Pipeline Road Bridge 04/30/05 28,208$ 28,208$ -$
PS9908 Signalization 05/31/06 168,055$ 168,055$ -$
PS0401 West Pipeline - Raider to City Limits 05/31/06 223,000$ 104,859$ 118,141$
PS0403 Raider Dr -SH10 to South Pipeline 05/31/06 330,000$ 293,435$ 36,565$
PS0501 Ross Avenue/S.Main 300' W 05/31/06 95,688$ 95,638$ 50$
PS0502 Industrial Signal Timing 05/31/06 50,000$ 50,000$ -$
PS0503 Overlay-Harwood 157/Main 05/31/06 137,000$ 119,816$ 17,184$
PS0604 Overlay-S.Main, SH10/S.Pipeline 05/31/06 137,000$ 140,211$ (3,211)$
PS0601 Overlay-East Midway 05/31/07 83,000$ 73,550$ 9,450$
PS0602 Overlay-Midway, N Main,/FM157 05/31/07 105,000$ 67,632$ 37,368$
PS0603 Overlay-Fuller Wiser, Midway/Harwood 05/31/07 40,000$ 28,695$ 11,305$
PS9906 Traffic Safety/Signalization 05/31/08 128,027$ 127,939$ 88$
PS0404 South Pipeline Road Overlay 05/31/08 114,750$ 85,062$ 29,688$
PS0701 Overlay-Dickey Drive 05/31/08 122,200$ 48,435$ 73,765$
PS0702 Overlay-East Huitt 05/31/08 89,000$ 64,895$ 24,105$
PS0703 Overlay-Huntington Drive 05/31/08 69,500$ 42,884$ 26,616$
PS0706 Gateway Blvd Screening Wall 05/31/08 135,800$ 138,862$ (3,062)$
PS0705 Signal Gateway Blvd @ Glade 10/28/08 98,000$ 98,000$ -$
PS0002 West Pipeline Road-Raider/Hwy10 12/01/08 6,082,621$ 6,081,392$ 1,229$
PS0801 Overlay-North Main/Cullum Drive 12/31/08 290,000$ 211,130$ 78,870$
PS9905 Traffic Studies 05/30/09 27,286$ 27,197$ 89$
PS0704 Disability Access Study 05/31/09 30,000$ 13,950$ 16,050$
PS0901 Ash/Denton/Fair Oaks Overlay 09/30/09 320,000$ 231,984$ 88,016$
PS0902 Vine Street Design Cancelled 100,000$ -$ 100,000$
PS9903 HWY 183 Service Road Cancelled -$ -$ -$
PS0304 Glade Road 04/16/10 3,077,977$ 2,905,205$ 172,772$
PS9909 FM157 North - SH183 to SH121 04/16/10 267,519$ 129,215$ 138,304$
PS0903 Mid Cities @ Gateway & Baze Traffic Signals 04/16/10 320,000$ 250,702$ 69,298$
PS0802 Fuller-Wiser Connector 02/17/11 495,000$ 441,491$ 53,509$
PS1002 FY10 County Overlay - Wilshire/Marlene 05/17/11 288,000$ 200,890$ 87,110$
21,099,702$ 19,464,525$ 1,635,177$
PS9901 North Main Street 05/31/12 6,745,047$ 6,698,149$ 46,898$
PS9904 Harwood Road 05/31/12 5,770,211$ 5,686,556$ 83,655$
PS1001 Baze Road 05/31/12 1,830,000$ 1,558,401$ 271,599$
PS1101
FY2011 County Overlay-Bear Creek Drive/Lakewood
Blvd/Ash Lane 05/31/12 300,000$ 265,887$ 34,113$
300,000$ 265,887$ 34,113$
Sub-Total Street Projects 21,399,702$ 19,730,412$ 1,669,290$
Street Projects - Prior Years
Street Projects - Current Year
329
Department:Date Prepared:May 24, 1999
Submitted By:Date Completed:May 31, 2012
Project Title:NORTH MAIN STREET
Project Type:STREET Sub-Type:
Project Code:PS9901 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
City of Euless
Capital Project Request
PUBLIC WORKS
RON YOUNG
August 22, 2000: Ratified EDC Resolution 11-00 authorizing a project involving facility improvements along
North Main Street.
CONSTRUCTION
This project is a part of the $13.5 million bond package approved by the voters in October 1998.
April 26, 2005: Award bid to Durable Specialties, Inc., for traffic signalization in the amount of $68,780.
The project consists of reconstruction and widening of North Main Street from SH10 to Harwood Road. It
April 14, 1998: Authorized bond election for the purpose of funding construction.
November 24, 1998: Approved contract with Cummings & Prewitt, Inc. for paving and drainage design.
February 8, 2000: Authorized the acquisition of ROW to allow for widening and paving improvements.
August 22, 2000: Ratified the expenditure of $30,000 of EDC funds for ROW acquisition along Main Street.
November 14, 2000: Authorized Resolution #00-1083 declaring public necessity for acquisition of ROW.
February 27, 2001: Authorized publication of notice of intent to issue certificates of obligation.
1. Improvement of traffic flow and traffic safety.
April 9, 2001: Approved Ord. 1468 authorizing issuance of General Obligation Bonds, Series 2001 in the
amount of $6,000,000.
September 11, 2001: Authorized city manager to negotiate and execute a contract with TXU Electric for
the relocation of utilities along North Main Street at an estimated cost of $550,000.
December 11, 2001: Awarded Bid #004-02 to Southlake Construction for the demolition and removal of
single-family houses along North Main Street.
also consists of relocating overhead utilities, the addition of a subsurface drainage system, and the
addition of street lights and landscaping improvements.
2. Improve aesthetics with relocation of overhead utilities and addition of landscaping.
3. Subsurface drainage system needed.
4. Reduction of maintenance requirements.
Construction complete: October 2005
Landscaping and compliance of Americans with Disabilities Act for sidewalks: FY 2010
March 11, 2003: Authorized City Manager to seek competitive bids for paving & drainage construction.
April 8, 2003: Awarded contract to McClendon Construction Co. for construction of street, utility, and
September 28, 2004: Award bid contract to Whitmore and Sons for landscaping/irrigation for $83,275.
drainage for North Main Street for $3,370,035.15, provided for a $180,000 contingency.
330
PROJECT TITLE:PROJECT CODE:PS9901
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
*Engineering $698,156
Direct Operating Cost Right-of-Way $1,447,814
Personnel: Full Time Utility Relocation (City) $290,878
Part Time Appraisal Services $114,673
$0 Street Lights $27,443
Landscaping $115,808
Construction $3,386,609
Signs & Markings $497,419
Contingency $824
Issuance Cost $62,261
$0 Contract Labor $103,162
* Added $70,000 for work related to medians.
Total Estimated Capital Cost $6,745,047
Maintenance Costs FUNDING SOURCE:
Transfer from:
Street CIP Fund Balance FY99 $1,416,185
Developer's Escrow $17,276
$0 EDC Operating Fund $430,000
W/S Operating Fund $5,053
C.O. Bond Proceeds FY01 $1,012,961
G.O. Bond Proceeds FY01 $4,820,919
Interest Income $163,667
$412,567 Miscellaneous $450
Less Transfer To:
Street CIP Fund Balance ($1,046,464)
Harwood Road PS9904 ($75,000)
Street CIP Fund Balance ($46,898)
Total Estimated Annual Cost $412,567 Total Funding $6,698,149
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
$698,156 $698,156 $0 100%
Right-of-Way $1,017,814 $1,017,814 $0 100%
Utility Relocation (City)$290,878 $290,878 $0 100%
Appraisal Services $101,495 $101,495 $0 100%
Surveying Services $5,170 $5,170 $0 100%
$2,955 $2,955 $0 100%
$5,053 $5,053 $0 100%
Landscaping $115,808 $115,808 $0 100%
Signs & Markings $497,419 $467,340 $30,079 94%
Construction $3,386,609 $3,386,609 $0 100%
Lighting $27,443 $10,624 $16,819 39%
$824 $824 $0 0%
$62,261 $62,261 $0 100%
Contract Labor $103,162 $103,162 $0 100%
Other Expenditures $430,000 $430,000 $0 100%
$6,745,047 $6,698,149 $46,898 99%
Special Services
Other
TOTAL PROJECT
Average Annual Debt Service
CURRENT STATUS
Engineering
Issuance Cost
Other Professional Services
Contingency
Subtotal:
Subtotal:
NORTH MAIN STREET
Total Salary
Purchase of Services
Materials & Supplies
Utilities
331
Department:Date Prepared:July 29, 1999
Submitted By:Date Completed:May 31, 2012
Project Title:
Project Type:STREET Sub-Type:
Project CODE:PS9904 Priority: A
COUNCIL AUTHORIZATION:
April 14, 1998: Authorized bond election for the purpose of funding construction.
November 24, 1998: Authorized contract for appraisal services for parcels necessary to project.
May 24, 1999: Approved resolution determining the necessity for and ordering the improvement.
May 24, 1999: Authorized the acquisition of the necessary right-of-way.
June 22, 1999: Approved right of way acquisition.
December 14, 1999: Authorized City Manager to negotiate for and acquire additional rights-of-way.
February 8, 2000: Awarded construction contract to Larry H. Jackson Construction.
March 28, 2000: Authorized issuance of G.O. bonds for Harwood, Main, and West Pipeline.
April 8, 2003: Awarded contract to J&J Sprinkler & Landscaping for median pavers for $151,836.30.
in the amount of $74,627.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
Construction complete: June 2002
Landscaping Improvements: FY2010
JUSTIFICATION:
The existing two lane roadway does not meet current and future needs.
City of Euless
Capital Project Request
PUBLIC WORKS
RON YOUNG
HARWOOD ROAD, N. MAIN STREET TO SH360
New roadway will be a six lane boulevard with sidewalks, landscaping, and lighting. Signals will be
February 10, 2004: Approved bid 009-04 to Whitmore and Sons, Inc. for median irrigation and landscaping
added at Fuller-Wiser Road and Bear Creek Parkway.
CONSTRUCTION
identified in the 1999 Master Thoroughfare Plan.
This project is part of the $13.5 million bond program approved by the voters in October 1998. Project is
Reconstruction of Harwood Road from a point approximately 350 feet west of North Main Street to SH360.
332
PROJECT TITLE:PROJECT CODE:PS9904
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Appraisal Services $53,750
Personnel:Full Time Professional Services-Soil Test $52,123
Part Time Acquisition $800,637
$0 Engineering $415,597
$4,004,091
$78,150
$295,863
$70,000
Total Estimated Capital Cost $5,770,211
$0
Maintenance Costs
$301,677
$283,634
$465,722 $16,919
$5,392,302
$75,000
$465,722 Less Inter-Project Transfer to:
($299,321)
($83,655)
Total Estimated Annual Cost $465,722 Total Funding $5,686,556
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
$415,597 $415,597 $0 100%
$4,021,668 $4,036,882 ($15,214) 100%
$800,637 $800,637 $0 100%
$54,036 $53,750 $286 99%
$70,000 $70,000 $0 100%
Contingencies $78,150 $3,092 $75,058 4%
$52,123 $52,123 $0 100%
$278,000 $254,475 $23,525 92%
$5,770,211 $5,686,556 $83,655 99%
Developer's Escrow
FUNDING SOURCE:
Transfer from:
G.O. Bond Proceeds
W/S Operating Fund
TOTAL PROJECT
Construction
Contingency
Landscaping
Transfer from N Main PS9901
Right-of-Way
Landscaping
Other Professional Services
Issuance Cost
Appraisal Services
Pipeline Road - PS0002
Construction
CURRENT STATUS
ADA Infrastructure - PS1202
Engineering
Materials & Supplies
Utilities
Subtotal:
Other
Average Annual Debt Service
HARWOOD ROAD, N. MAIN STREET TO SH360
Issuance Cost
Street CIP Fund Balance
Subtotal:
Total Salary
Purchase of Services
333
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS July 22,1999
RON YOUNG May 31, 2012
BAZE ROAD
STREET CONSTRUCTION
PS1001
November 10, 2009: Authorize the City Manager to execute an engineering design contract with Neel-Schaffer,
Inc. in an amount not to exceed $128,600.
September 14, 2010: Approve Resolution #10-1348 declaring a public necessity for the acquisition of real estate.
May 10, 2011: Award construction contract to McClendon Construction in the amount of $1,269,134.50.
June 14, 2011: Authorize the Mayor to execute an Interlocal Agreement between Grapevine-Colleyville ISD and
the City of Euless for school bus service in the amount of $5,464.
The reconstruction and expansion of Baze Road was identified in the 1999 Master Thoroughfare Plan.
This project consists of the detailed engineering design, right-of-way acquisition, and construction of a 31' back-
to-back concrete roadway to replace an existing deteriorating two-lane asphalt roadway. The project includes
underground drainage, sidewalks, and street lighting.
Award Design: December 2009
Plans Complete: February 2011
Right-of-Way Complete: October 2010
Begin Construction: June 2011
Construction Complete: May 2012
Baze Road is an important north-south residential collector that is planned to connect Glade Road and Mid Cities
Boulevard. This roadway exists as a four-lane divided roadway north of Glade Road in Grapevine. In Euless, it
is constructed partially as a 40 foot undivided roadway and as a 36 foot (two-lane) undivided roadway from Mid
Cities Boulevard to Priest Lane. The portion of Baze Road from Priest Lane to Glade Road is the only portion
that is not constructed to City standards.
334
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
Engineering $150,000
Right-of-Way $90,000
Construction $1,590,000
$1,830,000
Transfer from Car Rental $164,938
Transfer from Escrow Funds $125,062
Transfer from Car Rental $1,540,000
Transfer to:
Street CIP Fund Balance ($271,599)
$1,558,401
Engineering $150,000 $144,103 $5,897 96%
Right-of-Way $90,000 $4,249 $85,751 5%
Construction $1,590,000 $1,410,049 $179,951 89%
$1,830,000 $1,558,401 $271,599 85%
BAZE ROAD PS1001
335
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS March 10,2010
RON YOUNG May 31, 2012
FY2011 COUNTY OVERLAY - BEAR CREEK DR/LAKEWOOD BLVD/ASH LANE
STREET OVERLAY
PS1101
February 8, 2011: Authorize the City Manager to execute an Interlocal Agreement with Tarrant County for
asphalt overlay improvements to Lakewood Boulevard, Bear Creek Drive, and Ash Lane.
Bear Creek Drive, Lakewood Boulevard, and Ash Lane are collector streets in the City of Euless Master
Thoroughfare Plan.
The project consists of edge milling, asphalt overlay, and restriping on:
1. Bear Creek Drive from Mid Cities Boulevard to N. Main Street,
2. Lakewood Boulevard from Ash Lane to Bent Tree Drive, and
3. Ash Lane from N. Main Street to Fuller-Wiser Road.
Begin Construction: May 2011
Construction Complete: July 2011
The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, will
extend the life of the roadways, and will enhance the appearance of the streets.
336
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
Construction $300,000
$0
$0
$0
$0 $300,000
Transfer from:
Car Rental $300,000
$0
$0 Transfer to:
Street CIP Fund Balance ($34,113)
$0 $265,887
Construction $300,000 $265,887 $34,113 89%
$300,000 $265,887 $34,113 89%
FY2011 COUNTY OVERLAY - BEAR CREEK DR/LAKEWOOD B PS1101
337
338
CAPITAL IMPROVEMENTS PROGRAM
COMPLETED PROJECTS SUMMARY
Date Completed Total Budget
Total Project
Costs
(Over) Under
Budget
WASTEWATER PROJECTS
WW9902 Impact Fee Study 09/30/99 13,000$ 12,238$ 762$
WW9903 Misc Sewer Rehab FY99 09/30/99 50,000$ 12,987$ 37,013$
WW9904 Hydraulic Analysis 06/30/00 27,000$ 27,000$ -$
WW9901 CDBG B/98-UC-48-0001/B95-22-50 08/19/00 150,000$ 72,927$ 77,073$
WW0003 TRA Debt Payment 05/31/01 822,037$ 822,037$ -$
WW0001 CDBG B/99-UC-48-0001 09/30/01 150,000$ 121,682$ 28,318$
WW0101 CDBG B00-UC480001-2250 02/20/02 251,485$ 247,790$ 3,695$
WW0102 Manhole Rehab. Program 03/31/03 250,000$ 184,520$ 65,480$
WW0201 CDBG - B01-UC-48-0001-22-50 03/31/03 237,086$ 172,948$ 64,138$
WW0202 Line Replacement -Dunaway 02/28/05 140,000$ 139,955$ 45$
WW0203 Line Replacement - E. Alexander 02/28/05 20,000$ 20,000$ -$
WW0204 Line Replacement - Paula Lane 02/28/05 79,000$ 79,000$ -$
WW0103 Line replacement-S. Pipeline,Heather-Vine 04/15/05 489,759$ 464,504$ 25,255$
WW0205 Line Replacement - Midway Park 04/30/05 366,000$ 318,149$ 47,851$
WW0401 CDBG B03-UC-48-0001-22-50 04/30/05 217,000$ 161,170$ 55,830$
WW0301 CDBG B02-UC-48-0001-22-50 07/26/05 271,455$ 271,454$ 1$
WW0302 Inflow & Infiltration Cancelled 200,000$ -$ 200,000$
WW0303 Line Replacement, Canyon Ridge 08/31/06 196,200$ 173,516$ 22,684$
WW0304 Line Replacement, Sagebrush 08/31/06 160,900$ 136,470$ 24,430$
WW0305 Line Replacement, Short 08/31/06 251,400$ 219,932$ 31,468$
WW0306 Line Replacement, E. Fuller 08/31/06 231,372$ 180,089$ 51,283$
WW0501 Line Replacement, Pebble Creek 08/31/06 172,600$ 145,655$ 26,945$
WW0604 Line Replacement, CDBG-Oakwood Terrace 05/31/07 293,723$ 232,274$ 61,449$
WW0402 Line Replacement, Carr Park/SH10 05/31/08 588,000$ 528,302$ 59,698$
WW0403 Line Replacement, Ector Drive 05/31/08 373,000$ 328,309$ 44,691$
WW0601 Line Replacement, Cedar Hills Estate 05/31/08 319,000$ 200,201$ 118,799$
WW0602 Line Replacement, Ector Drive 05/31/08 425,000$ 285,758$ 139,242$
WW0603 Little Bear Creek Collection Line 05/31/08 575,000$ 464,293$ 110,707$
WW0701 Line Replacement, McCormick & Copher 02/05/09 243,000$ 194,254$ 48,746$
WW0702 Line Replacement, Arnett Addition 02/05/09 313,322$ 229,006$ 84,316$
WW0703 Line Replacement, Jean Lane 02/05/09 111,000$ 70,603$ 40,397$
WW0704 Line Replacement, W. Fuller 02/05/09 132,000$ 82,708$ 49,292$
WW0902 Line Replacement, West Mills Drive-34th CDBG 04/16/10 46,855$ 46,855$ -$
WW0802 Line Replacement South Mills Drive CDBG-R 11/01/10 253,710$ 165,867$ 87,843$
WW0901 Line Replacement Woodridge Circle/Koen Lane 11/01/10 407,000$ 309,410$ 97,590$
WW0801 Line Replacement Fayette Drive 04/14/11 357,000$ 325,676$ 31,324$
9,183,904$ 7,447,539$ 1,736,365$
WW1001 Line Rep - W Alexander Ln/Norman Dr/Franklin Dr 05/31/12 420,000$ 331,614$ 88,386$
WW1101 Line Rep - Bayless/Pauline/Jones (CDBG)05/31/12 350,000$ 208,903$ 141,097$
WW1103 Line Rep - Bayless/Pauline/Jones Outfall 05/31/12 57,000$ 37,544$ 19,456$
WW1202 Line Rep - Collin Drive (37th CDBG)05/31/12 300,000$ 231,173$ 68,827$
1,127,000$ 809,234$ 317,766$
Sub-Total Wastewater Projects 10,310,904$ 8,256,773$ 2,054,131$
Wastewater Projects- Current Year
Project
Number Project Description
Wastewater Projects - Prior Years
339
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS May 30,2003
RON YOUNG May 31, 2012
LINE REPLACEMENT-W ALEXANDER/NORMAN/FRANKLIN
WASTEWATER MAIN REPLACEMENT
WW1001
November 24, 2009: Authorized the City Manager to execute an engineering design contract with Elliott and
Hughes, Inc. in an amount not to exceed $66,300.
August 17, 2010: Authorized the City Manager to execute a contract in the amount of $268,354 with William J.
Schultz, Inc. dba Circle C Construction to rehabilitate the W Alexander/Norman/Franklin sanitary sewer lines.
The wastewater mains included in this project are part of the City's Wastewater System Master Plan and are
included in the plan for the systematic replacement of wastewater mains using a worst first approach.
The project consists of the replacement of the following wastewater mains:
1. Between Ross Avenue and West Alexander Lane,
2. Between Norman Drive and Franklin Drive, and
3. Between Franklin Drive and Simmons Drive, North of Bayless Drive.
Design Award: November 2009
Construction Award: September 2010
Begin Construction: September 2010
Construction Complete: April 2011
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce
maintenance costs and customer problems.
340
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
Engineering $70,000
Construction $350,000
$0
$0
$0
$0 $420,000
Transfer from:
W/WW Operations $570,000
$0 Transfer to:
$0 W/WW CIP Fund Balance ($150,000)
W/WW CIP Fund Balance ($88,386)
$0 $331,614
Wastewater Mains $350,000 $267,611 $82,389 76%
Engineering $70,000 $64,003 $5,997 91%
$420,000 $331,614 $88,386 79%
LINE REPLACEMENT-W ALEXANDER/NORMAN/FRANKLIN WW1001
341
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 15, 2005
RON YOUNG May 31, 2012
LINE REPLACEMENT-BAYLESS/PAULINE/JONES (CDBG)
WASTEWATER CDBG
WW1101
June 15, 2010: Tarrant County awarded the engineering contract to Elliott & Hughes in the amount of $38,293.
January 11, 2011: Recommend Tarrant County award construction contract to Hall Albert Construction Company
of Benbrook, Texas in the amount of $187,978.
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project
is part of the systematic replacement of wastewater mains using a worst first approach.
The project consists of the replacement of the following wastewater mains along:
1. Bayless Drive,
2. Pauline Street,
3. Jones Street, and
4. East of S Mills to the outfall.
(36th year CDBG project)
Award Design: June 2010 (Tarrant County)
Plans Complete: September 2010
Begin Construction: February 2011
Construction Complete: June 2011
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce
maintenance costs and customer problems.
342
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
Engineering $50,000
Construction $300,000
$0
$0
$0
$0 $350,000
Transfer from Operations $50,000
CDBG Award $300,000
$0
$0 Transfer to:
W/WW CIP Fund Balance ($50,000)
Unused 36th CDBG Funding ($91,097)
$0 $208,903
Engineering $50,000 $38,293 $11,707 77%
Construction $300,000 $170,610 $129,390 57%
$350,000 $208,903 $141,097 60%
LINE REPLACEMENT-BAYLESS/PAULINE/JONES (CDBG)WW1101
343
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 01,2011
RON YOUNG May 31, 2012
LINE REPLACEMENT-BAYLESS/PAULINE/JONES OUTFALL
WASTEWATER MAIN REPLACEMENT
WW1103
February 2010: City Manager executed a construction contract in the amount of $42,822 to Texas ReExcavation
for the construction of Bayless/Pauline/Jones Outfall sanitary sewer project.
The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project
is part of the systematic replacement of wastewater mains using a worst first approach.
The project consists of the replacement of the following wastewater mains along:
1. Bayless Drive,
2. Pauline Street,
3. Jones Street, and
4. East of S Mills to the outfall.
The City of Euless project is replacing the sanitary sewer lines located within the 100-year floodplain. These lines
are not included in the CDBG project.
Begin Construction: March 2011
Construction Complete: June 2011
Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce
maintenance costs and customer problems.
344
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
Engineering $7,000
Construction $50,000
$0
$0
$0
$0 $57,000
Transfer from:
W/WW CIP Fund Balance $57,000
$0
$0 Transfer to:
W/WW CIP Fund Balance ($19,456)
$0 $37,544
Engineering $7,000 $5,749 $1,251 82%
Construction $50,000 $31,795 $18,205 64%
$57,000 $37,544 $19,456 66%
LINE REPLACEMENT-BAYLESS/PAULINE/JONES OUTFALL WW1103
345
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
PUBLIC WORKS April 12,2011
RON YOUNG
LINE REPLACEMENT-COLLIN DRIVE (CDBG)
WASTEWATER CDBG
WW1202
December 13, 2011: Recommend Tarrant County award construction contract to Horseshoe Construction, Inc. in
the amount of $216,671.50.
The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan.
The project is part of the systematic replacement of wastewater mains using a worst first approach.
This project consists of the replacement of the following wastewater mains:
1. Along Collin Drive from Falls Drive to Travis Drive,
2. Between Falls Drive and Fannin Drive east of Collin Drive,
3. Between Fannin Drive and Travis Drive east of Collin Drive,
4. Between Travis Drive and Dallas Drive east of Collin Drive, and
5. Between Dallas Drive and Tarrant Drive east of Collin Drive.
(37th year CDBG project)
Award Design Contract: June 2011
Design Complete: October 2011
Award Construction Contract: January 2012
Anticipate Construction Complete: June 2012
Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. The project is part of the systematic
replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer
problems.
346
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
Engineering $45,000
Construction $255,000
$0
$0
$0
$0 $300,000
Transfer from:
W/WW Operating Fund $105,000
CDBG Award $300,000
$0
$0 Transfer to:
W/WW CIP Fund Balance ($105,000)
Unused 37th CDBG Funding ($68,827)
$0 $231,173
Engineering $45,000 $42,544 $2,456 95%
Construction $255,000 $188,629 $66,371 74%
$300,000 $231,173 $68,827 77%
LINE REPLACEMENT-COLLIN DRIVE (CDBG)WW1202
347
348
CAPITAL IMPROVEMENTS PROGRAM
COMPLETED PROJECTS SUMMARY
Date Completed Total Budget
Total Project
Costs
(Over) Under
Budget
Project
Number Project Description
WATER PROJECTS
WT9903 Master Plan 08/30/99 42,000$ 5,445$ 36,555$
WT9904 Well Repairs 09/30/99 66,921$ 66,921$ -$
WT9907 Impact Fee Study 09/30/99 13,000$ 12,238$ 762$
WT9911 Water Distribution - Master Plan 09/30/99 25,600$ 24,000$ 1,600$
WT9901 Meter Change Out Program 10/30/99 101,917$ 98,365$ 3,552$
WT0002 Emergency Repair - Hwy 10 11/30/99 15,450$ 14,214$ 1,236$
WT9906 Hwy 10 Water Line 01/30/00 150,000$ 138,883$ 11,117$
WT0006 Central Drive Water Mains 03/31/00 92,814$ 90,742$ 2,072$
WT9905 Misc Water Rehab 06/30/00 50,000$ 43,749$ 6,251$
WT0004 Water Line Milam - Ector/Midway 06/30/00 18,248$ 13,743$ 4,505$
WT0102 SCADA Upgrade 04/09/01 93,400$ 93,400$ -$
WT0003 Waterline Replacement - Aransas 06/30/01 12,057$ 7,089$ 4,968$
WT0005 Waterline Replacement - Milam- Denton/Mid 04/30/02 26,988$ 26,988$ -$
WT9910 Water Line for Elevated Tank 05/31/02 1,608,386$ 1,201,698$ 406,688$
WT9909 2MG Water Tank 03/31/03 2,430,881$ 2,289,571$ 141,310$
WT0103 Fire Hydrant Replacement Program 03/31/03 50,000$ 49,626$ 374$
WT9908 Mid Cities Blvd. 12" Line 04/30/04 342,080$ 313,354$ 28,726$
WT0401 Line Replacement, West Pipeline Main 05/31/06 1,215,663$ 1,215,663$ -$
WT0403 Waterline Replacement - Fairlawn Court Cancelled 35,000$ -$ 35,000$
WT0404 Waterline Replacement - Atkerson Lane Cancelled 104,000$ -$ 104,000$
WT0405 Line Replacement, West Ash Lane 08/31/06 30,000$ 11,626$ 18,374$
WT0406 Line Replacement, Westport/Newport/Asbury 08/31/06 67,000$ 9,866$ 57,134$
WT0502 FY'2005 CDBG 08/31/06 69,300$ 29,549$ 39,751$
WT0503 Line Replacement, S. Atkerson Lane 08/31/06 79,000$ 51,294$ 27,706$
WT0504 Line Replacement, Blanco Drive 08/31/06 112,620$ 112,620$ -$
WT0505 Line Replacement, Henslee 08/31/06 183,000$ 123,859$ 59,141$
WT0506 Line Replacement, Vernon/Slaughter 08/31/06 161,000$ 113,052$ 47,948$
WT9902 Tank Painting 05/31/07 1,317,763$ 957,542$ 360,221$
WT0501 System Security Upgrade 05/31/08 40,000$ 28,319$ 11,681$
WT0601 Wtr Sys Security Perimeter Fence Upgrade 05/31/08 75,000$ 49,567$ 25,433$
WT0602 Line Replacement, Cannon Drive 05/31/08 250,000$ 223,055$ 26,945$
WT0701 Line Replacement, Canyon Ridge 05/31/08 116,000$ 78,136$ 37,864$
WT0702 CDBG FY07 - 32nd Oakwood Terrace 05/31/08 334,481$ 296,223$ 38,258$
WT0802 CDBG-33rd Oakwood Terrace-Simmons 12/31/08 451,639$ 384,173$ 67,466$
WT0402 Water & Wastewater Impact Fee Update 05/31/09 30,000$ 17,729$ 12,271$
WT0801 Line Replacement, Signet/Mesa 05/31/09 255,000$ 218,663$ 36,337$
WT0201 Well Rehabilitation/Disinfection 04/17/10 600,000$ 522,308$ 77,692$
10,666,208$ 8,933,270$ 1,732,938$
-$ -$ -$
Sub-Total Water Projects 10,666,208$ 8,933,270$ 1,732,938$
Water Projects - Prior Years
Water Projects- Current Year
349
350
CAPITAL IMPROVEMENTS PROGRAM
COMPLETED PROJECTS SUMMARY
Date Completed Total Budget
Total Project
Costs
(Over) Under
Budget
Project
Number Project Description
OTHER PROJECTS
AC9901 Athletic Complex Phase II 06/30/02 123,654$ 75,047$ 48,607$
AC0202 Athletic Complex Phase Ill 05/31/06 1,252,221$ 1,251,915$ 306$
ED0102 Bell Ranch Terrace Cancelled 200,000$ -$ 200,000$
FM0209 Midway Recreation Upgrade 06/30/02 557,125$ 557,125$ -$
FM0101 Building D 09/30/02 930,610$ 930,608$ 2$
FM0308 Building A Remodel 05/31/07 1,663,238$ 1,651,325$ 11,913$
FM0309 Fire Station #3 05/31/07 2,286,798$ 2,286,229$ 569$
FM0601 Public Works Facility 05/31/08 2,210,956$ 2,213,507$ (2,551)$
FM0802 Senior Citizen Center Design cancelled 250,000$ -$ 250,000$
FM0804 Library-Shell Expansion 12/31/08 307,034$ 305,664$ 1,370$
FM0803 Midway Recreation Improvements 03/31/09 293,500$ 75,976$ 217,524$
FM0504 Building "B" Remodel 05/31/09 1,322,490$ 1,315,697$ 6,793$
FM0801 TX Star Golf Course & Conference Ctr Expand 05/31/09 3,630,079$ 3,630,079$ -$
PR0015 Purchase of Dallas Stars Center 05/31/00 10,327,978$ 10,327,978$ -$
PR0016 Wilshire Park Improvements 06/30/02 150,000$ 149,926$ 74$
PR0110 Slope Protection/Screening Wall 03/31/03 1,275,203$ 1,273,923$ 1,280$
PR0409 Parking Improvements, Simmons 07/29/04 6,960$ 6,960$ -$
PR0410 Parking Improvements, Villages Bear Creek 07/29/04 33,666$ 33,666$ -$
PR0302 Bob Eden Parking 04/30/05 75,000$ 74,854$ 146$
PR0303 Youth Ballpark 04/30/05 600,000$ 600,000$ -$
PR9901 Hike/Bike Trail 04/30/05 237,714$ 237,714$ -$
PR9902 Senior Citizen Remodel 04/30/05 16,130$ 16,130$ -$
PR0407 Parking Improvements, Midway Cancelled 11,000$ -$ 11,000$
PR0408 Parking Improvements, S. Euless Park 05/31/06 55,000$ 20,991$ 34,009$
PR0411 Preserve at McCormick Park 05/31/06 1,168,427$ 1,168,427$ -$
PR0412 Splash Pool 05/31/06 125,000$ 124,477$ 523$
PR9903-
PR9918 Various EDC Park Projects 09/30/06 259,566$ 248,891$ 10,675$
PR0602 Mid Cities Landscaping 05/31/09 40,000$ 33,199$ 6,801$
PR0719 Midway Park Trail 05/31/09 210,000$ 190,473$ 19,527$
PR0601 Park Amenities Upgrade 04/17/10 150,000$ 145,316$ 4,684$
PR0901 Trail Enhancements - Bob Eden Park 04/17/10 135,000$ 101,673$ 33,327$
PR0902 Senior Citizen Center at Midway Park 05/31/11 4,763,661$ 3,888,892$ 874,769$
PR0907 Euless Family Life Center Phase I 05/31/11 2,105,000$ 2,099,281$ 5,719$
PR9922 Tejas Remodel 11/30/01 430,000$ 455,885$ (25,885)$
PR9927 Park Improvements - Texas Star 09/30/01 1,036,500$ 1,025,298$ 11,202$
SS9901 Fire Station II 03/30/00 49,688$ 49,688$ -$
SS9919 Fire Station #3 - Structural Repairs 03/30/00 30,000$ 17,344$ 12,656$
SS9902 Library Books 08/15/00 3,302$ 3,302$ -$
SS0010 Former Fire Station #2 06/30/02 599,600$ 595,257$ 4,343$
SS0113 Park Building 06/30/02 1,492,400$ 1,492,100$ 300$
40,414,500$ 38,674,817$ 1,739,683$
AC1001 Texas Star Sports Complex Lighting Improvements 05/31/12 504,200$ 475,246$ 28,954$
504,200$ 475,246$ 28,954$
Sub-Total Other Projects 40,918,700$ 39,150,063$ 1,768,637$
86,949,645$ 78,874,327$ 8,075,318$ TOTAL COMPLETED PROJECTS
Other Projects - Prior Years
Other Projects- Current Year
351
City of Euless
Capital Project Request
Department:Date Prepared:
Submitted By:Date Completed:
Project Title:
Project Type:Sub-Type:
Project Code:Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
PROJECT SCHEDULE:
JUSTIFICATION:
COMMUNITY SERVICES April 29,2008
RAY MCDONALD May 31, 2012
TEXAS STAR SPORTS COMPLEX LIGHTING IMPROVEMENTS
PARK/RECREATION TSSC IMPROVEMENTS
AC1001
November 9, 2010: Award of Bid #018-10 for a construction contract to Falkenberg Construction Company, Inc.
in the amount of $469,027.
Identified in the feasibility study was the recommendation to remove the existing light fixtures, poles, and
foundations, and the replacement with new Sports lighting poles and fixtures.
The project replaces the existing field lighting fixtures, poles, and foundations with Musco "Light Structure Green"
or "LSG" lighting which is the best product on the market for spill/glare control and maintaining constant light
levels. The system includes a remote ballast for easy maintenance, constant illumination levels, pre-wired and
pre-aimed fixtures from the factory, and a 25-year maintenance free warranty. The "LSG" is considerably more
efficient than the existing sport lighting fixtures installed, requires approximately 30% fewer fixtures than the
existing system to achieve 50/30 foot-candle levels, and reduces utility costs.
Grant Award: November 2009
Award Contract: November 2010 (Grant Deadline 18 months)
Project Completion: June 2011 (Grant Deadline 36 months)
The existing poles, which were originally installed in 1982, are integral ballasted 1500 watt metal halide sports
lighting fixtures that require maintenance approximately two times per year to replace fixtures, lenses and bulbs.
There are numerous cracks and erosion points in the light pole foundations and existing poles do not meet
current wind load requirements.
352
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal: Total Estimated Capital Cost
Maintenance Costs Funding Source:
Subtotal:
Total Estimated Annual Cost Total Funding
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED
TOTAL PROJECT
PROJECT TITLE:PROJECT CODE:
Lighting $398,000
Concrete Piers/Bolts $71,000
$0 Design/Engineering $10,000
$0 Contingency $25,200
($25,000)
($25,000) $504,200
Dept of Energy ARRA Grant $454,200
TSSC CIP Fund Balance $50,000
(Gas Royalties)
$0
$0 Transfer to:
TSSC CIP Fund Balance ($28,954)
($25,000) $475,246
Equipment - Lighting System $469,000 $470,446 ($1,446)100%
Design/Engineering $10,000 $4,800 $5,200 48%
Contingency $25,200 $0 $25,200 0%
$504,200 $475,246 $28,954 94%
TEXAS STAR SPORTS COMPLEX LIGHTING IMPROVEMENTS AC1001
353
354