HomeMy WebLinkAboutFY 2005 Capital Improvements Programe,,,x..,_,, ,y., THE CITY OF EULESS www.euless.org coil, at wae. g4zacyur4171/ cJi/sicat cljeaiv '61n,cling, S30, 2005 201 cit. Wacerig5viAf& %u1P,s&, 9C 76039 9eiaptei 817-685-1826 Ja 817-685-1819 ceovincil Tali, m4,,am, i/d, sue,, Tr16104, Z, Ti eo,n/ 9-(og, T �, Tincii Tim cqeemA/ goitt,EUii culct V711,avo gzoi Zuni ceatulciit geacei Sbci TABLE OF CONTENTS CAPITAL IMPROVEMENTS PROGRAM City Officials Table of Contents Letter i-1 — i-2 CIP Fund Balance i-3 — i-4 FUNDED PROJECTS Summary of Funded Projects 1...3 FY04 Amendments 3a Drainage Proiects Summary of Funded Drainage Projects 4 DR9903 Misc. Drainage Improvements Program 5...6 DR0301 Main Place Channel Stabilization 7...8 DR0302 Flooding Mitigation 9...10 DR0303 Aransas at Glenn Upper System Drainage Relief 11...12 DR0304 Live Oak Drainage Relief 13...14 DR0305 Sierra Drive Drainage Relief 15...16 DR0306 Flood Mitigation Plan (FEMA) 17...18 DR0307 Simmons Drainage Relief 19...20 DR0401 Channel Stabilization on Tributary WFA to the West Fork 21...22 DR0402 Drainage Project Study 23...24 Streets Summary of Funded Street Projects 25 PS9901 North Main Street 26...27 PS9904 Harwood Road, N. Main to SH360 28...29 PS9905 Traffic Studies 30...31 PS9906 Traffic Safety 32...33 PS9908 Signalization 34...35 PS9909 FM 157 North, SH 183 to SH 121 (Landscaping & Lighting) 36...37 PS0002 West Pipeline — Raider/Hwy 10 38...39 PS0301 Mid Cities Roadway Illumination 40...41 PS0302 Driftwood Pipeline Traffic Signal 42...43 PS0303 Aransas/Harwood Traffic Signal 44...45 PS0304 Glade Rd Right of Way Acquisition 46...47 PSO401 West Pipeline — Raider to City Limits 48...49 PS0402 South Pipeline Road Bridge 50...51 PS0403 Raider Drive, SH 10 to South Pipeline Road 52...53 PS0404 South Pipeline Road Overlay 54...55 Wastewater Proiects Summary of Funded Wastewater Projects 56 WW0002 Misc. Sewer Rehab 57...58 WW0103 S. Pipeline, Heather to Vine, Wastewater Mains 59...60 WW0202 Line Replacement, Dunaway 61...62 WW0203 Line Replacement, E. Alexander 63...64 WW0204 Line Replacement, Paula Lane 65...66 WW0205 Midway Park — Mains 67...68 WW0301 CDBG BO2-UC-48-0001-22-50 69...70 WW0302 Inflow & Infiltration 71...72 WW0303 Line Replacement, Canyon Ridge 73...74 WW0304 Line Replacement, Sagebrush 75...76 WW0305 Line Replacement, Short Street 77...78 WW0306 Line Replacement, E. Fuller 79...80 WW0401 CBBG B03-UC-48-0001-22-50 81...82 WW0402 Line Replacement, Carr Park/SH 10 83...84 WW0403 Line Replacement, Midway Park (North) 85...86 Water Proiects Summary of Funded Water Projects 87 WT9902 Water Tank Painting 88...89 WT0001 Misc. Utility Rehab — Water 90...91 WT0101 Water Tank Debt Payment 92...93 WT0104 Well Repairs 94...95 WT0201 Well Rehab — Disinfection 96...97 WT0202 Effluent Water Main 98...99 WT0401 W. Pipeline Watermain Replacement 100...101 WT0402 Water and Wastewater Impact Fee Update 102...103 WT0405 Line Replacement, West Ash Lane 104...105 WT0406 Line Replacement, Westport Cir/Newport Cir/Asbury Cir 106...107 Other Proiects Summary of Other Funded Projects 108 ACO202 Parks at Texas Star Phase III 109...110 DV9901 EDC Incentive Funds 111...112 ED0101 Villages Master Plan 113...114 PD9901 Police and Municipal Court Facility 115...116 PR9901 Hike and Bike Trail 117...118 PR9902 Senior Citizens Remodel 119...120 PR9903 - PR9918 Various EDC Park Projects 121...122 FM0308 Building A Renovations 123...124 FM0309 Fire Station #3 Design 125...126 PR0302 Parking — Bob Eden Park 127...128 PR0303 Texas Rangers Youth Ballpark 129...130 PR0407 Parking Improvements — Midway Park 131...132 PR0408 Parking Improvements — S. Euless Park 133...134 PR0409 Parking Improvements — Simmons Center 135...136 PR0410 Parking — Villages Bear Creek 137...138 PR0411 Preserve at McCormick Park 139...140 PR0412 Splash Pool 141...142 UNFUNDED PROJECTS Summary of Unfunded Projects - Sorted by Type 143...147 Drainage Summary of Unfunded Drainage Projects 148 Boyd Branch Drainage 149...150 Hurricane Creek & Bridge at Marlene — Design 151...152 Hurricane Creek & Bridge at Marlene — R.O.W. 153...154 Hurricane Creek & Bridge at Marlene — Construction 155...156 Bell Hi Addition 157...158 Kynette Drive Culvert Modifications 159...160 Bear Creek Park 161...162 Blessing Branch, Main to SH360 163...164 Bob Eden Park Drainage 165...166 Boyd Branch (FEMA) 167...168 Diversion Line — Oak Lane 169...170 Hurricane Creek, North of SH10 171...172 Oak Lane Channel 173...174 Royal Oaks Addition 175...176 Trailwood Addition (Summit Ridge) 177...178 Streets Summary of Unfunded Street Projects 179 Ross Avenue from S. Main 300' West 180...181 Industrial Blvd. Traffic Signal Timing 182...183 Harwood Road, FM157 to N. Main Overlay 184...185 Town Crossing Bridge 186...187 Fuller Wiser Connector 188...189 East Midway Road Overlay 190...191 Ash Lane — Aransas to N. Main 192...193 Baze Road — Glade to Mid Cities 194...195 Gateway Blvd. — Northern Portion 196...197 Harwood Road — Main to FM 157 198...199 Vine Street — SH 183 to SH 10 200...201 Traffic Signal — Mid Cities @ Baze 202...203 Traffic Signal — Mid Cities @ Gateway Blvd 204...205 Traffic Signal — Harwood @ Bear Creek Parkway 206...207 Wastewater Summary of Unfunded Wastewater Projects 208 Line Replacement, Pebble Creek 209...210 Line Replacement — Arnett Addition 211...212 Line Replacement — Ector Drive 213...214 Line Replacement — Martin Lane 215...216 Line Replacement — McCormick & Copher 217...218 Little Bear Creek Collection Line 219...220 Line Replacement — Fayette Drive 221...222 Line Replacement — Jean Lane 223...224 Line Replacement — Cedar Hills Estate 225...226 Line Replacement — West Fuller Line Replacement — Woodridge Line Replacement, Koen Line Replacement — Faun Drive Line Replacement — Hodges Drive Line Replacement — Arnett Drive Line Replacement — Linda Lane SH 183 Utility Relocation Line Replacement — West Alexander Line Replacement — Norman Drive Line Replacement — Franklin Drive Line Replacement — South Mills Drive Line Replacement — Whitener/Ascot Outfall Line Replacement — Alexander/Ascot Outfall Line Replacement — Ross Avenue Line Replacement — Line Replacement — Line Replacement — Line Replacement — Line Replacement — Line Replacement — Blanco, Arnasas, Crane Denton, Irion, Bell Harris, Bell, Collin Irion, Harris Collin Drive Slaughter/E. Huitt Water Summary of Unfunded Water Projects Water System General Security Updates FY 2005 CDBG Line Replacement — South Atkerson Lane Line Replacement — Blanco Drive Line Replacement — Henslee Line Replacement — John Vernon/Slaughter Water System Security Perimeter Fencing Upgrades SH 360 Water Crossing Line Replacement — Cannon Drive Line Replacement — Canyon Ridge Line Replacement — Hodges Drive Line Replacement — Live Oak Court & Live Oak Drive Line Replacement — Signet Drive Line Replacement — Mesa Drive Line Replacement — Marlene Drive Line Replacement — South Pipeline Road West Water System Security Camera Installation Line Replacement — South Pipeline Road East Line Replacement — Collins Drive, Dallas to Harwood Line Replacement — Collins Drive, Denton to Dallas Line Replacement — S. Mills Drive Line Replacement — Westwood Drive Line Replacement — Fuller Drive SH 183 Water Crossing Line Replacement — Ector Drive Line Replacement — Midway Drive East 227...228 229...230 231...232 233...234 235...236 237...238 239...240 241...242 243...244 245...246 247...248 249...250 251...252 253...254 255...256 257...258 259...260 261...262 263...264 265...266 267...268 269...270 271...272 273...274 275...276 277...278 279...280 281...282 283...284 285...286 287...288 289...290 291...292 293...294 295...296 297...298 299...300 301...302 303...304 305...306 307...308 309...310 311...312 313...314 315...316 317...318 319...320 321...322 Line Replacement — Midway Drive West 323...324 Line Replacement — Simmons Drive North 325...326 Line Replacement — Simmons Drive South 327...328 Line Replacement — Dickey Drive South 329...330 Line Replacement — Dickey Drive North 331...332 Line Replacement — Paula Lane 333...334 Line Replacement — Hollow Oak 335...336 Line Replacement — Denton Drive 337...338 Line Replacement — S. Main Street (North) 339...340 Line Replacement — S. Main Street (South) 341...342 Line Replacement — Sunset Drive 343...344 Line Replacement — Wildwood 345...346 Line Replacement — Woodvine (East) 347...348 Line Replacement — Woodvine (West) 349...350 Line Replacement — Springwood Court 351...352 Line Replacement — Shady Creek & Cliffwood 353...354 Water System Security Land Acquistion 355...356 Other Summary of Other Unfunded Projects 357 Building B - Design 358...359 Slope Protection — Phase 4 360...361 Parking — Preserve at McCormick Park 362...363 Building B - Construction 364...365 Dog Park — Bob Eden Park 366...367 Park Amenities Upgrade 368...369 Pool Renovation — Phase II — Wilshire Park 370...371 Public Works Facility 372...373 Pool Renovation — Phase III — South Euless 374...375 Park Sign Program 376...377 Pool Renovation — Phase IV - Midway 378...379 City Wide Trail Enhancements - Phase I 380...381 Misc. Park Structure Improvements 382...383 Fire Training Facility 384...385 Library Building Out 386...387 Aquatic Center/Recreation Center Expansion — Phase I 388...389 Aquatic Center/Recreation Center Expansion — Phase II 390...391 City Wide Trail Enhancements — Phase II 392...393 City Wide Trail Enhancements — Phase III 394...395 City Wide Trail Enhancements — Phase IV 396...397 Parks at Texas Star — Phase IV 398...399 Simmons Center Expansion 400...401 Ruth Millican Expansion 402...403 Community Golf Course at Bob Eden 404...405 COMPLETED PROJECTS Completed Projects Summary 406...407 Summary of Completed Drainage Projects 408 DR9901 Sulphur Branch Phase II 409...410 DR9902 Windlea & Westcliff Drainage 411...412 DR9904 Hurricane Creek Drainage 413...414 Summary of Completed Street Projects 415 PS9902 Mid Cities Blvd. 416...417 PS9903 Hwy 183 Service Road 418...419 PS9907 Westpark — SH10 to SH183 420...421 PS9910 Sidewalk Projects 422...423 PS9911 Overlay Projects 424...425 PS9912 Harwood -Main Street Intersection 426...427 FM157-S Pipeline to SH10 — Utility Relocation) 428...429 PS0003 Glade From Heritage to SH121 430...431 PS0004 Glade Rd (East) — SH121 to Champagne 432...433 PS0201 Gateway Blvd — Southern Portion 434...435 Summary of Wastewater Projects 436 WW9901 CDBG B/98-UC-48-0001/B95-22-50 437...438 WW9902 Impact Fee Study 439...440 WW9903 Misc. Sewer Rehab FY99 441...442 Hydraulic Analysis 443...444 WW0001 B99-UC-48-0001 445...446 WW0003 TRA Debt Payments 447...448 WW0101 CDBG B00-UC480001-2250 449...450 WW0102 Manhole Rehab Program 451...452 WW0201 CDBG B01-UC-48-0001-22-50 453...454 Summary of Water Projects 455 WT9901 Meter Change Out 456...457 WT9903 Master Plan 458...459 WT9904 Well Repairs 460...461 WT9905 FY99 Misc. Water Rehab 462...463 WT9906 Hwy 10 Water Line 464...465 WT9907 Impact Fee Study 466...467 WT9908 Mid Cities 12" Line 468...469 WT9909 2MG Water Tank 470...471 WT9910 Lines for Elevated Tank 472...473 WT9911 Water Dist — Master Plan 474...475 WT0002 Emergency Repair — Hwy 10 476...477 WT0003 Waterline Replacement, Aransas 478...479 WT0004 Line Replacement, Milam-Ector/Midway 480...481 WT0005 Line Replacement, Milam-Denton/Midway 482...483 WT0006 Central Drive Water Mains 484...485 WT0102 SCADA Upgrade 486...487 WT0103 Fire Hydrant Replacement Program 488...489 WT0403 Line Replacement, Fairlawn Court 490...491 WT0404 Line Replacement, Atkerson Lane 492...493 Summary of Other Completed Projects 494 AC9901 Athletic Complex Phase II 495...496 ED0102 Bell Ranch Terrace Development 497...498 FM0101 Building D Renovation 499...500 FM0209 Midway Recreation Center Upgrade 501...502 PR9922 Tejas Remodel 503...504 PR9927 Park Improvement — Texas Star 505...506 PR0015 Purchase Stars Center 507...508 PR0016 Wilshire Park Improvements 509...510 PR0110 Slope Protection/Screening Wall 511...512 SS9901 Fire Station II Remodel, 1515 Westpark Way 513...514 SS9902 Library Books 515...516 SS9919 Fire Station #3 Structural & Cosmetic Repairs 517...518 SS0010 Former Fire Station #2 Remodel 519...520 SS0113 Parks & Greenhouse 521...522 THE T Y OF EULESS July 26,2004 Honorable Mayor Mary Lib Saleh City Council: Carl Tyson, Place One Leon Hogg, Place Two Linda Martin, Place Three Charles Miller, Place Four Glenn Porterfield, Place Five & Mayor Pro Tem Veva Lou Massey, Place Six INTRODUCTION The City of Euless Capital Improvements Program is a comprehensive document detailing all projects that have been identified to date. Emphasis has been placed on organizing this data in a manner that will facilitate decision making processes, assist in long range planning and provide the citizens of Euless with information regarding planned projects. This document meets the requirements of the City Charter. Article VII, Section 2 (4) requires " A statement proposing any capital expenditures deemed necessary for undertaking during the next budget year and recommended provisions for financing". Section 2 (5) further requires "A list of capital projects which should be undertaken within the five (5) next succeeding years". We extend special appreciation to the directors and the finance staff for their outstanding performance in creating this document. UNDERSTANDING THIS BOOK Although this book contains a large volume of information, the summaries should make it easy to understand at a glance. The book is divided into three sections: Funded Projects, Unfunded Projects, and Completed Projects. Each section begins with a summary and is followed by detailed data for those wishing to research individual projects. The detail provided includes the project's relationship to City master plans, the project description and justification, the effect on future maintenance and operating costs, and the estimated total cost. Within each section, you will find the detailed descriptions sorted by type. There are five basic project types: Drainage, Streets, Water, Wastewater, and Other. Funded projects indicate any City Council authorization and the current status of the project. The current status section recaps all financial information currently reflected on the City's financial reports. Thus, budget amounts in this section only reflect actual dollars available. No budget amounts are added to line items until funding is received. As funds become available, they will be allocated to the appropriate budget line items based on the total estimated cost. Funding sources have also been detailed. 201 N. Ector Dlive, Euless, Texas 76039 3595 817/685-1400 • Metro 817/267-4403 . Fax 8171685-1416 www,ci.euless.tx.us i-1 Projects have been classified as funded if any portion of the funding is available. For those projects that are not fully funded, clear explanations have been provided as to how the remainder of the projects is expected to be funded. The Unfunded Projects section has been classified into three categories of priority. Priority A indicates the item has been funded in the FY2004-05 budget and staff anticipates presenting this project to the Council for action during the upcoming year. Priority B projects should be presented to Council within two to five years. Projects that will not begin for at least five years have been given a Priority C. This system has been used to allow the Council to evaluate and shift priorities, when necessary, and to provide a means of budgeting capital projects for at least five years. Recommended funding sources have been indicated if known. The Completed Projects section provides a summary indicating total project budget, actual expenditure, and variance. Funds remaining have been returned to the appropriate fund balance account for reappropriation. A detail of each project has also been provided. FY2004-05 PROJECTS: Funding has been identified for all projects included in FY2004-05 budget. These are listed on the Unfunded Projects Summary as Priority A. These include: • Ross Avenue from South Main 300' West • Industrial Blvd. Traffic Signal Timing • Harwood Road, FM157 to N. Main Overlay • Line Replacement, Pebble Creek • Water System General Security Updates • FY2005 CDBG • Line Replacement, South Atkerson Lane • Line Replacement, Blanco Drive • Line Replacement, Henslee • Line Replacement, John Vernon/Slaughter • Building B Design • Slope Protection — Phase 4 • Parking -Preserve at McCormick Park CLOSING COMMENTS This document is prepared as a comprehensive summary of capital needs that have been identified throughout the City of Euless. This document will be updated annually to aid the City Council in allocating resources and determining priorities. i-2 Fund Balance Summary - Capital Estimated FY03-04 and Budgeted FY04-05 Capital Improvement Projects 'Beg. Working Capital FY04 FY04 Estimated Revenues Total Available: FY04 Estimated Expenditures Total Expenses: 'Estimated Working Capital FY04 FY05 Budgeted Revenues Total Available: FY05 Projects Budgeted Carryover Total FY05 Budgeted Expenditures 'Estimated Working Capital FY05 FY2005 Projects Ross Avenue from S. Main 300' West Industrial Blvd. Traffic Signal Timing Harwood Road, FM 157 to N. Main Overlay Preserve @ McCormick Park - Parking Building B Design Incentives !Total FY2005 Projects Police Facility Streets CIP CIP $147,169 $5,696,631 263 7.628.930 147,432 13,325,561 (4,637) (2,404,454) (4,637) (2,404,454) $142,795 $10,921,107 0 482.500 142,795 11,403,607 0 (282,500) (142.795) (10.806.068) (142.795) (11.088.568) $0 $315,039 95,500 50,000 137,000 $0 $282,500 General CIP $41,778 282 42,060 0 0 $42,060 0 42,060 0 (2,700) (2,700) $39,360 Car Rental Tax CIP $1,061,994 2.175.305 3,237,299 (1,130,737) (1,130,737) $2,106,562 175.000 2,281,562 (175,000) (1.903.679) (2.078.679) $202,883 75,000 100,000 Half -Cent CIP $300,548 154,931 455,479 (12,112) (12,112) $443,367 I 27,000 470,367 (25,000) (254.703) (279.703) $190,664 I 25,000 $0 $175,000 $25,000 I i-3 Fund Balance Summary - Capital Estimated FY03-04 and Budgeted FY04-05 Capital Improvement Projects 'Beg. Working Capital FY04 FY04 Estimated Revenues Total Available: FY04 Estimated Expenditures Total Expenses: 'Estimated Working Capital FY04 FY05 Budgeted Revenues Total Available: FY05 Projects Budgeted Carryover Total FY05 Budgeted Expenditures 'Estimated Working Capital FY05 FY2005 Projects Debt Service, Cert of Oblig Series 1996/2004 Debt Service, Cert of Oblig Series 1995/2004 Slope Improvement 'Total FY2005 Projects Athletic Complex CIP $1, 543,428 221,694 1,765,122 (1,062,970) (1,062,970) $702,152 0 702,152 0 (702.152) (702.152) Softball CIP $1,729 142,634 144,363 (142,922) (142,922) Golf CIP $730 Parks CIP $7,998 675,180 0 675,910 7,998 (674,488) 0 (674,488) 0 $1,441 $1,422 $7,998 135,699 705.213 0 137,140 706,635 7,998 (135,699) (705,213) 0 0 (577) 0 (135,699) (705.790) 0 $0 $1,441 $845 $7,998 135,699 583,213 122,000 $0 $135,699 $705,213 $0 i-4 Fund Balance Summary - Capital Estimated FY03-04 and Budgeted FY04-05 Capital Improvement Projects 'Beg. Working Capital FY04 FY04 Estimated Revenues Total Available: FY04 Estimated Expenditures Total Expenses: 'Estimated Working Capital FY04 FY05 Budgeted Revenues Total Available: FY05 Projects Budgeted Carryover Total FY05 Budgeted Expenditures 'Estimated Working Capital FY05 FY2005Projects FY2005 CDBG Water System Security Upgrade Line Replacement, Pebble Creek Line Replacement, S. Atkerson Lane Line Replacement, Blanco Drive Line Replacement, Henslee Line Replacement, John Vernon/Slaughter Debt Service, Revenue Bonds Series 2000 'Total FY2005 Projects Water W&S Impact CIP Fee $2,947,711 $1,915,259 3,251,659 6,199,370 (855,490) (855,490) $5,343,880 882,534 6,226,414 (765,300) (4,818,261) (5,583,561) $642,853 69,300 40,000 137,000 79,000 96,000 183,000 161,000 $765,300 720,739 2,635,998 (279,682) (279,682) $2,356,316 320,000 2,676,316 (280,834) (13,239) (294,073) $2,382,243 280,834 $280,834 Wastewater Impact Fee $1,076,713 62,980 1,139,693 Drainage CIP $1,017,762 474,658 1,492,420 0 (248,430) 0 (248,430) $1,139,693 40,000 1,179,693 0 (15,000) (15,000) $1,164,693 $0 $1,243,990 6,000 1,249,990 0 (1,182,397) (1,182,397) $67,593 $0 i-5 ¶tmctect ¶wject& Project Number Protect Description CAPITAL. IMPROVEMENTS PROGRAM FUNDED PROJECTS SUMMARY Unfunded/ Budget as of Appropriations/ Budget as of Expended as (Over) Under Estimated (Excess 5.31.03 Amendment 5131/04 of 5/31/04 Budget Project Coats Fundinal _ DRAINAGE PROJECTS DR9903 Misc Drainage Improvements $151.609 S0 S151,609 $12,833 S138,776 $151,609 $0 DR0301 Main Place Channel Stabilizalicrt $270,000 S0 S270.000 S0 $270,000 $270.000 SO OR0302 Flooding Mitigation $250.000 50 S250.000 $0 S250.000 $250.000 S0 DR0303 Aransas Q Glenn Drainage Relief $250.000 SO $250.000 $86.521 S163.479 $250,000 S0 DR0304 Live Oak Drainage $218,000 S0 5218,000 $175,958 S42.042 $218,000 So DR0305 Sierra Drive Drainage $30,000 50 $30.000 $10.381 $19,619 $30.000 SO DR0306 Flooding Mstlgabori Plan (FEMA) $32.000 S0 $32,000 $19.007 S12,993 $32.000 $0 DR0307 SimmonsDrainan $30,000 _ S0 $30,000 $1,041 S28.959 $30.000 S0 DR0401 Charnel Slabilization an Tritxilaiy WFA S0 $399.000 S399.000 $0 S399,000 $399.000 $0 DR0402 Drainage Project Study 50 S60,000 S60.000 $0 $60,000 $60,000 $0 F89902 Fund Balance- Drainaock C1P S0 S0 S0 $0 S0 $0 ($51,007) r 1-' Sub-Tota(Drainage Projects $1,231.609 $459.000 $1.690.609 S305,741 $1.384,868 $1,690,609 (S51.007) STREET PROJECTS PS9901 North Main Street $7.866.061 S0 $7,866.061 S6,027.880 $1.838.181 $7.866,061 $0 PS9904 Harwood Road $5,813.990 (S86,7791 $5,727,211 S5,528,518 S198,693 $5,727.211 $0 PS9905 Traffic Studies $27.198 S0 527.198 $7.248 S19,951 $27,198 $0 PS9906 Traffic Safety $128,027 SO $128,027 S91,304 S36.723 $128.027 $0 PS9908 Sicinalization $167.285 SO $167,285 $74,452 $92.833 $167.285 $0 FM157 North. SH183 to SH121 (Landscaping & PS9909 Lighting) $75.000 S0 $75,000 S693 S74.308 S75,000 $0 PS0002 West Pipeline - Raider/Hwv 10 $946,206 S4,328,104 $5,274,310 $183,329 S5,090,981 $5.274,310 $0 PS0301 Mid Cities Illumination $160.000 SO $160.000 $120,593 S39.407 $160.000 $0 PS0302 Driftwood/PipelineTraffic Signal $100.000 $0 $100.000 S68.245 S31.755 $100,000 $0 PS0303 Aransas/Harwood Traffic Signal $120,000 S0 $120,000 S88,715 S31,285 $120.000 $0 PS0304 Glade Road 5350.000 $2.725,105 $3.075,105 50 S3.075,105 $3,075.105 $0 PSO401 West Pipeline - Raider to City Limits S0 $525.000 $525,000 S0 $525,000 $525.000 $0 PS0402 South Pipeline Road Bridge S0 $28.208 $28.208 S28,208 S0 $28,208 $0 PS0403 Raider Dr - SH1O to South Pipeline S0 $330.000 $330,000 S0 5330,000 $330.000 $0 PS0404 South Piruvine Road Overlay 50 $78.000 $78,000 SO S78,000 $78.000 $0 FB9907 Fund Balance - Street CIP 50 $0 S0 S0 $0 50 ($237,721) Sub -Total Street Projects S15,753,767 $7,927,638 $23,681,405 S12,219,184 511,462,221 $23,681,405 (S237.721) Protect Number Protect Description CAPITAL IMPROVEMENTS PROGRAM FUNDED PROJECTS SUMMARY Unfunded/ Budget as of Appropriations/ Budget as of Expended as (Over) Under Estimated (Excess 5.31-03 Amendment 5/31/04 of 5/31/04 Budget Protect Costs Funding) WASTEWATER PROJECTS WW0002 Misc Sewer Rehab $152,013 $0 $152,013 $30.580 $121.433 $152,013 $0 WW0103 S. Pipeline, Heather to Vora $500,000 $0 $500,000 $473.640 $26,360 $500.000 50 WW0202 Line Replacement - Dunaway $140.000 $0 5140,000 $139,955 $45 $140.000 $0 WW0203 Line Rep!acernent E. Alexander $20,000 50 $20,000 $20.000 $0 $20,000 $0 WW0204 Line Replacement - Paula Lane $79,000 $0 $79,000 $79.000 S0 $79,000 $0 WW0205 Midway Park Mains $366.000 50 $366,000 $317,044 $48,956 $366,000 50 WW0301 COBG B02.11C-48-0001-22.50 $279.817 50 $279.817 $229.158 S50.659 $279.817 50 WW0302 Inflow& Infiltration 5200,000 S0 $200.000 $0 S200,000 5200.000 $0 WW0303 Line Replacement, Canyon Ridne $175,000 50 $175,000 52,870 $172,130 $175,000 $0 WW0304 Line Repa,rernent, Sagebrush $210,000 $0 $210 000 52.607 $207.393 $210,000 $0 W W0305 Line Replacement, Short S87,000 $0 $87.000 52,852 584,148 $87,000 $0 r WW0306 Line Replacement. E. Fuller $168.000 50 $168.000 $5.359 $162,641 $168.000 $0 tv WW0401 FY2004 CDBG $0 $217,000 $217.000 $9,046 5207,954 $217.000 $0 WW0402 Line Replacement, Carr Park/SH 10 $0 $330,000 $330.000 $0 $330,000 $330,000 $0 WW0403 Line Replacement, Midway Park North $0 $363,000 $363.000 S0 $363.000 $363.000 $0 FB9911 FB- Wastewater Impact (Restricted) 50 50 $0 S0 $0 $0 ($1.099.995) Sub -Total Wastewater Projects $2,376.830 $910,000 $3,286,830 $1,312,110 $1,974.720 $3.286.830 ($1,099.995) WATER PROJECTS WT9902 Water Tank Painting Plans & Specs $200.000 $1.080.000 $1.280,000 552.656 $1.227,344 $1.280,000 $0 WT0001 Misc Utility Rehab- Water $199,231 S0 $199,231 525,021 $174.210 $199,231 $0 WT0101 Water Tank Debt Payment $820.442 $277,921 $1,098.363 $1,005,723 592.640 $1.098.363 $0 WT0104 Well Repairs $75,000 $50.000 $125.000 569.490 $55.510 $125.000 $0 WT0201 Weil Rehab/Disinfecbon $600.000 $0 $600.000 $476,753 $123.247 5600.000 $0 WT0202 FNluent Water Main $250.000 $0 S250,000 50 $250.000 $250.000 $0 WT0401 West Pipeline Water Man Replacement $0 $1.000.000 $1,000,000 S0 $1,000.000 $1,000,000 50 WT0402 Water/Wastewater Impact Fee Update S0 $30.000 $30.000 S0 $30.000 $30.000 50 WT0405 Line Rerlacwnent, West Ash Lane 50 $30,000 $30,000 $0 $30.000 $30.000 $0 WT0406 Line Re;'?. ..ent. Weslpeit tNewport/Asbury 50 $67,000 S67,000 $0 _ $67,000 $67.000 $0 FB9910 FB- Water Impact (Restricted) S0 50 $0 S0 $0 $0 (52.083,704) FB9901 FB - Wafer & Sewer CIP S0 $0 $0 $0 $0 50 (5507.768) Sub -Total Water Projects $2,144,673 52.534 921 $4.679.594 51.629.643 53.049 951 S4,679.594 ($2.591.471) Project Number OTHER ACO202 D V9901 ED0101 PD9901 PR9901 PR9902 PR9903- PR9918 FM0308 FM0309 PR0302 PR0303 PR040 7 PR0408 PR0409 PR0410 PR0411 PR0412 Prolect Description CAPITAL IMPROVEMENTS PROGRAM FUNDED PROJECTS SUMMARY Budget as of Appropriations/ Budget as of Expended as (Over) Under Estimated 5-31-03 Amendment 5/31/04 or 5/31/04 Budget Prolect Costs Unfunded/ (Excess Fundlnal Parks a Texas Star Phasetll S1,207,171 $19,028 $1.226,199 _ $608,630 $617,569 51,226,199 $0 EDC Incentive Funds $69.994 $25,000 $94,994 5853 $94.141 894.994 $0 Villages Master Pan S100,000 $0 $100.000 50 $100.000 $100.000 $0 Police and Municipal Courts Facility $11,712.495 $164 $11.712.659 $11,570,127 $142,532 $11.712,659 $0 Hike and Blke Trail 5237.714 $0 $237,714 $224,502 $13.212 5237,714 $0 Senior Citizens Remodel $16.130 $0 $16.130 814,217 $1.913 $16.130 $0 Various EDC Park Projects S259,566 $0 $259,566 S231,285 $28.281 $259.566 50 Buitdr^.q A Remodel $1,530.960 $132,278 $1.663,238 $1.621.839 541.399 $1.663.238 50 Fire Station 113 S400,000 $1,600,000 52.000,000 $328,414 51.671.586 82.000.000 S0 Bob Eden Parkina $75,000 $0 575,000 $73,394 S1.606 575.000 50 Texas Rangers Youth Balltlold $600,000 $0 $600.000 50 $600.000 $600,000 S0 Parking Imorovoments. Midway S0 511,000 S11,000 50 $11.000 80 ($11,000) Parking Imp overnents, S. Euless Park $0 $55.000 $55.000 SO S55.000 555,000 S0 Parking tmpovements. Simmons Center S0 $49,500 S49,500 S0 S49.500 $6,960 ($42,540) Parkins. Vd!.' es of Bear Creek $0 $150.000 5150,000 S17,295 $132.705 $33.666 (S116.334) Preserve al McCorrnlck Park S0 $125.000 5125.000 $44.702 580.298 S1,000.000 5875,000 Splash Pool 50 S125,000 $125.000 $1,454 $123.546 $125.000 $0 Sub-Tota101her Projects $16.209,030 $2,291,970 $18.501,000 $14,736,712 83.764,288 $19,206,126 $705,126 TOTAL FUNDED PROJECTS $37,715,909 $14,123.529 551,839,438 $30,203,389 $21,636.049 S52,544,564 (S3,275,068) Project # DR0401 DR0402 PS9904 CITY OF EULESS CAPITAL IMPROVEMENT PROGRAM AMENDMENTS - FUNDED PROJECT BUDGETS Project Description Channel Stabilization on Tributary WFA Drainage Project Study Harwood Road PS0002 West Pipeline, Raider/Hwy 10 PS0304 PSO401 PS0402 PS0403 PS0404 WW0401 WW0402 WW0403 WT9902 WT0101 WT0104 WT0401 WT0402 WT0405 WT0406 ACO202 Glade Road West Pipeline - Raider to City Limits South Pipeline Road Bridge Raider Dr - SH10 to South Pipeline South Pipeline Road Overlay FY2004 CDBG Line Replacement, Carr Park/SH10 Line Replacement, Midway Park North Water Tank Painting Water Tank Debt Payment Well Repairs West Pipeline Water Main Replacement Water/Wastewater Impact Fee Study Line Replacement, West Ash Lane Line Replacement, Westport/Newport/Asbury Parks @ Texas Star Phase III DV9901 EDC Incentive Funds PD9901 Police and Municipal Court Facility FM0308 Building A Remodel FM0309 Fire Station # 3, Design PR0407 Parking Improvements, Midway PR0408 Parking Improvements, S. Euless Park PR0409 Parking Improvements, Simmons Center PR0410 Parking, Villages of Bear Creek PR0411 Preserve at McCormick Park PR0412 Splash Pool Amendment Approved in the FY2003-04 budget Approved in the FY2003-04 budget Transferred $86,779 of excess funds to Fund Balance (FB9907). Budgeted interest earnings of $79,924, received bond proceeds of $4,000,000, budgeted expected contribution from City of Bedford of $200,000 and received $48,180 from Glade Road (PS0004). Received bond proceeds of $2,725,000 and budgeted $105 from escrow funds. Approved in the FY2003-04 budget Approved in the FY2003-04 budget Approved in the FY2003-04 budget Approved in the FY2003-04 budget Approved in the FY2003-04 budget Approved in the FY2003-04 budget Approved in the FY2003-04 budget Received Bond Proceeds of $1,080,000 Approved in the FY2003-04 budget Approved in the FY2003-04 budget Approved in the FY2003-04 budget Approved in the FY2003-04 budget Approved in the FY2003-04 budget Approved in the FY2003-04 budget Budgeted interest earnings of $19,028. Approved $25,000 transfer from EDC Operating Fund in the FY2003-04 budget. Budgeted interest earnings of $164. Transferred an additional $109,988 from car rental fund to cover shortfall and transferred $22,290 from fund balance for brick sculpture. Approved in the FY2003-04 budget Approved in the FY2003-04 budget Approved in the FY2003-04 budget Approved in the FY2003-04 budget Approved in the FY2003-04 budget Approved in the FY2003-04 budget Approved in the FY2003-04 budget 3a ¶tmctect wai/i,cir 9)zajec,/s) Project Number Project Description CAPITAL IMPROVEMENTS PROGRAM FUNDED PROJECTS SUMMARY Unfunded/ Budget as of Appropriations/ Budget as of Expended as (Over) Under Estimated (Excess 5-31-03 Amendment 5/31/04 of 5/31/04 Budget Project Costs Funding) DRAINAGE PROJECTS DR9903 Misc Drainage Improvements $151,609 $0 $151,609 $12,833 $138,776 $151,609 $0 DR0301 Main Place Channel Stabilization $270,000 $0 $270,000 $0 $270,000 $270,000 $0 DR0302 Flooding Mitigation $250,000 $0 $250,000 $0 $250,000 $250,000 $0 DR0303 Aransas @ Glenn Drainage Relief $250,000 $0 $250,000 $86,521 $163,479 $250,000 $0 DR0304 Live Oak Drainage $218,000 $0 $218,000 $175,958 $42,042 $218,000 $0 DR0305 Sierra Drive Drainage $30,000 $0 $30,000 $10,381 $19,619 $30,000 $0 DR0306 Flooding Mitigation Plan (FEMA) $32,000 $0 $32,000 $19,007 $12,993 $32,000 $0 DR0307 Simmons Drainage $30,000 $0 $30,000 $1,041 $28,959 $30,000 $0 DR0401 Channel Stabilization on Tributary WFA $0 $399,000 $399,000 $0 $399,000 $399,000 $0 DR0402 Drainage Project Study $0 $60,000 $60,000 $0 $60,000 $60,000 $0 FB9902 Fund Balance - Drainage CIP $0 $0 $0 $0 $0 $0 ($51,007) Sub -Total Drainage Projects $1,231,609 $459,000 $1,690,609 $305,741 $1,384,868 $1,690,609 ($51,007) 4 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: MISC DRAINAGE IMPROVEMENTS PROGRAM Project Type: DRAINAGE Sub -Type: Project No.: DR9903 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Date Prepared: 7-23-99 Date Completed: This project includes funds for various small projects that are identified throughout the year. Often correction of these problems requires design services and the installation of improvements. Large projects that occur will be tracked separately and assigned a different project number. PROJECT SCHEDULE: JUSTIFICATION: Failure to correct these problems can often cause damage to existing infrastructure. 5 PROJECT TITLE: MISC DRAINAGE IMPROVEMENTS PROGRAM PROJECT #: DR9903 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST MAINTENANCE COST (+ OR -) ANNUAL Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Storm Sewers 150,000 (Minimum balance maintained) Total Estimated Capital Cosi $150,000 Subtotal: $0 FUNDING SOURCE: Maintenance Costs Subtotal: $0 Total Estimated Annual Cos Drainage Operating Fund - FY99 51,609 Drainage Operating Fund - FY02 50,000 Drainage Operating Fund - FY03 50,000 $0 Total Fundinc $151,609 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Fence 559 559 0 100% Storm Sewers 150,855 12,079 138,776 8% Meters & Setting 195 195 0 100% TOTAL PROJECT $151,609 $12,833 $138,776 8% 6 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: MAIN PLACE CHANNEL STABILIZATION Project Type: DRAINAGE Sub -Type: Project No.: DR0301 Priority: A COUNCIL AUTHORIZATION RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN 5/9/2002 This is a companion project to the capital project request for Tributary WFA to the West Fork of the Trinity River. PROJECT DESCRIPTION: This project consists of channel stabilization and bank stabilization on Tributary WFA to the W. Fork of the Trinity River south of Huitt Lane between Main Place and Ironbridge Place to Park property. PROJECT SCHEDULE: Engineer selection started Engineer contract award - June, 2004 Plans complete - Nov, 2004 Award construction - Dec, 2004 Anticipated construction completion - June, 2005 JUSTIFICATION: Channel deterioration and bank erosion is undermining fences and encroaching into the rear yards of properties along the tributary. Continued erosion will decrease property values and increase drainage complaints and maintenance work in the tributary. 7 PROJECT TITLE: MAIN PLACE CHANNEL STABILIZATION PROJECT #: DR0301 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Engineering $25,000 Personnel: Full Time Construction $215,000 Part Time Contingency $30,000 Total Salary $0 Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Total Estimated Capital Cost $0 FUNDING SOURCE: Drainage CIP Fund Balance Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE 270,000 270,000 $0 Total Funding $270,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED Engineering Services 25,000 0 25,000 0% Contingencies 30,000 0 30,000 0% Channel Improvements 215,000 0 215,000 0% TOTAL PROJECT $270,000 $0 $270,000 0% 8 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: FLOODING MITIGATION Project Type: DRAINAGE Sub -Type: Project No.: DR0302 Priority: A COUNCIL AUTHORIZATION RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN 5/9/2002 Planning Grants are available on a "first come, first served" basis through TWDB with a 75%/25% cost split. The City must fund the full cost and then apply for reimbursement upon completion. The completion time for the Flooding Mitigation Plan is approximately one year. The Cities of Hurst and Haltom City participate in the Flood Mitigation Assistance Program. The City applied for the grant in April and is awaiting the processing of the application by the TWDB. PROJECT DESCRIPTION: This project consists of identifying chronic flooding locations within the City of Euless and determining the cost/benefit of property acquisition compared to extensive drainage relief projects. Property acquisition will be recommended after consideration of flooding history, appraisals, and feasible alternative drainage solutions have been evaluated. It is recommended that this be established as an ongoing project. PROJECT SCHEDULE: Engineer selected 1st Public meeting held 2nd Public meeting held Final submittal - June, 2004 JUSTIFICATION: Various properties throughout the City of Euless situated adjacent to creeks have experienced chronic flooding for several years. The cost for implementing drainage improvement projects to mitigate flooding at isolated locations may be much greater than property acquisition. Chronic flooding lowers the property values and this program will offer a means of relief for affected property owners. 9 PROJECT TITLE: FLOODING MITIGATION PROJECT #: DR0302 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Flooding Mitigation $250,000 Total Estimated Capital Cost 250,000 Subtotal: $0 FUNDING SOURCE: Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Land Purchases Drainage CIP Fund Balance 25,000 Drainage Operating Fund 225,000 $0 Total Funding $250,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 250,000 0 250,000 0% TOTAL PROJECT $250,000 $0 $250,000 0% 10 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: ARANSAS AT GLENN UPPER SYSTEM DRAINAGE RELIEF Project Type: DRAINAGE Sub -Type: Project No.: DR0303 Priority: A COUNCIL AUTHORIZATION 6/26/2002 Feb 24, 2004 - Awarded bid # 017-04 to Patco Utilities, Inc for construction of drainage improvements for Aransas Franklin, and Sierra Drive in the amount of $263,173. Authorized city manager to execute contract. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN PROJECT DESCRIPTION: Construction of a parallel storm drainage relief system from Aransas Drive east to HEBISD property, south to Harwood Road and continuing east to the storm drainage junction box in Harwood Road in front of North Euless Baptist Church. Additional storm drain pipe will be installed along with an emergency overflow flume, fence removal/replacement, street pavement removal/replacement, and grass replacement. Drainage and constructior easements will need to be donated by the affected property owners. PROJECT SCHEDULE: Construction began Anticipated completion July, 2004 JUSTIFICATION: During heavy rainfalls, the existing drainage system at Aransas and Glenn becomes overloaded and the street fill; with storm water runoff. The high water encroaches on properties to the east and has flooded several houses. 11 PROJECT TITLE: ARANSAS AT GLENN DRAINAGE RELIEF PROJECT #: DR0303 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct ODeratina Cost Engineering $35,000 Personnel: Full Time Construction $200,000 Part Time Surveying $15,000 Total Salary $0 Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Total Estimated Capital Cost $0 FUNDING SOURCE: Car Rental Tax Fund Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE 250,000 250,000 $0 Total Funding $250,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED Surveying Service 15,000 54 14,946 0% Engineer Service 35,000 40,800 (5,800) 117% Storm Sewers 200,000 45,667 154,333 23% TOTAL PROJECT $250,000 $86,521 $163,479 35% 12 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LIVE OAK DRIVE DRAINAGE RELIEF Project Type: DRAINAGE Sub -Type: Project No.: DR0304 Priority: A COUNCIL AUTHORIZATION April 8, 2003 - Authorized Mayor to acquire Lot 5, Block 4 of the Timberline Addition for $150,00( RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN PROJECT DESCRIPTION: 06/26/02 The scope of this project has been modified from reconstruction of the drainage system in the cul-de-sac at the south end of Live Oak Drive. The project now consists of a real property purchase of 713 Live Oak, demo and grade of property. An offer has been made and accepted. Project anticipated to be complete in August 2003. PROJECT SCHEDULE: Property acquired House demolished Flume construction in progress JUSTIFICATION: The existing storm drainage system in the Live Oak cul-de-sac is undersized to handle moderate to heavy rainfall< . The storm water runoff fills the street and rises to a level at which it enters houses on the cul-de-sac. 13 PROJECT TITLE: LIVE OAK DRIVE DRAINAGE RELIEF PROJECT #: DR0304 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct ODeratina Cost Engineering $38,000 Personnel: Full Time Construction $170,000 Part Time Surveying $10,000 Total Salary $0 Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Total Estimated Capital Cost $0 FUNDING SOURCE: Car Rental Tax Fund Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE 218,000 218,000 $0 Total Funding $218,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED Surveying Services 10,000 0 10,000 0% Engineer Services 38,000 7,580 30,420 20% Storm Sewers 170,000 168,378 1,622 99% TOTAL PROJECT $218,000 14 $175,958 $42,042 81% City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: SIERRA DRIVE DRAINAGE RELIEF Project Type: DRAINAGE Sub -Type: Project No.: DR0305 Priority: A COUNCIL AUTHORIZATION 6/26/2002 Feb 24, 2004 - Awarded bid # 017-04 to Patco Utilities, Inc for construction of drainage improvements for Aransas Franklin, and Sierra Drive in the amount of $263,173. Authorized city manager to execute contract. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN PROJECT DESCRIPTION: Construction of a concrete valley gutter in Sierra to redirect storm water runoff from Wilshire Pool parking lot to the existing drainage culvert, construction of a low level retaining wall along a portion of the west side of Sierra and reconstruction of a driveway approach to direct storm water runoff into Sierra. An area drain in Sierra prior to the driveway may be necessary. PROJECT SCHEDULE: Project designed Driveway rebuilt Area drain currently under construction Anticipated completion May, 2005 JUSTIFICATION: The residence at 1800 Kynette has experienced flooding problems during heavy rains in part from storm water runoff overtopping the curb and drive approach. The inability of the street to adequately handle the storm water runoff contributes to the problem. 15 PROJECT TITLE: SIERRA DRIVE DRAINAGE RELIEF PROJECT #: DR0305 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Construction $30,000 Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs $0 Total Estimated Capital Cost $0 FUNDING SOURCE: Drainage Operating Fund Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Storm Sewers TOTAL PROJECT 30,000 30,000 $0 Total Funding $30,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 30,000 10,381 $30,000 16 $10,381 19,619 35% $19,619 35% City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: FLOOD MITIGATION PLAN (FEMA) Project Type: DRAINAGE Sub -Type: Project No.: DR0306 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: 7/1/2002 This project consists of the preparation of a Flood Mitigation Plan that meets the requirements of the Federal Emergency Management Agency (FEMA). The plan will assess flood risks and will require public involvement/inpu. in the planning process. FEMA must approve the plan and the City Council must adopt the plan in order to qualify for FEMA Flood Mitigation Assistance (FMA). The FMA is administered by the Texas Water Development Board (TWDB). PROJECT SCHEDULE: Engineer selected 1st Public meeting held 2nd Public meeting held Final submittal - June, 2004 JUSTIFICATION: FEMA through the Texas Water Development Board provides federal funding to assist communities in implementing measures to reduce or eliminate the long-term risk of flooding to properties insurable under the National Flood Insurance Program (NFIP). The Flood Mitigation Assistance program has the goal of reducing claims under NFIP. In order to receive an FMA Project Grant for property purchase or mitigation, the City must have an approved FMP. The project grants provide a 75% federal share with a city 25% match. 17 PROJECT TITLE: FLOOD MITIGATION PLAN (FEMA) PROJECT #: DR0306 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct ODeratina Cost Engineering $32,000 Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs $0 Total Estimated Capital Cost $0 FUNDING SOURCE: Car Rental Tax Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Engineer Service TOTAL PROJECT 32,000 32,000 $0 Total Funding $32,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 32,000 19,007 12,993 59% $32,000 18 $19,007 $12,993 59% City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: SIMMONS DRAINAGE RELIEF Project Type: DRAINAGE Sub -Type: Project No.: DR0307 Priority: A COUNCIL AUTHORIZATION RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN PROJECT DESCRIPTION: 7/1/2002 Construction of area inlets and drains, street gutter improvements and minor channelizationto redirect storm water runoff overtopping the curb on Franklin Drive and running across private property to Simmons Drive. Drainage and construction easements may have to be donated by the affected property owner. The staff has met with the property owner and he has completed onsite improvements to reduce the flooding potential. Additionally, staff has initiated an in-house engineering analysis to determine the adequacy of the existi ig drainage system which will help determine the need for additional drainage system improvements. PROJECT SCHEDULE: Project designed Area inlets and gutter improvements currently under construction Anticipated completion May, 2005 JUSTIFICATION: Properties in the vicinity of 405 Simmons and 404/406 Franklin experience high water from adjacent streets durinc heavy rains threatening the structures on the properties. 19 PROJECT TITLE: SIMMONS DRAINAGE RELIEF PROJECT #: DR0307 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Construction $30,000 Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs $0 Total Estimated Capital Cost $0 FUNDING SOURCE: Drainage Operating Fund Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Storm Sewers TOTAL PROJECT 30,000 30,000 $0 Total Funding $30,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 30,000 1,041 28,959 3% $30,000 20 $1,041 $28,959 3% City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Date Prepared: 4/1/2002 Date Completed: Project Title: CHANNEL STABILIZATION ON TRIBUTARY WFA TO THE WEST FORK Project Type: DRAINAGE Sub -Type: Project No.: DR0401 Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Tributary WFA to the West Fork of the Trinity River flows in a southeasterly and southerly direction between Ascot Drive and Cliffdale Drive. The portion of this tributary from Landover Drive South to E. Whitener Rd. previously had a concrete pilot channel installed at the flowline of the tributary. Storm water runoff has eroded the banks along the tributary undermining the concrete pilot channel lining. This project will replace the concrete pilot channel and stabilize the tributary banks. PROJECT SCHEDULE: Engineer selection started Anticipated award engineer contract: June 2004 Anticipated plans complete: November 2004 Anticipated award construction: December 2004 Anticipated construction complete: June 2005 JUSTIFICATION: Storm water runoff in the tributary has eroded the soil adjacent to the existing concrete pilot channel lining causing it to fail. The failed concrete disrupts the flow of the storm water resulting in additional slope failures which in turn threatens the rear fences of the homes along Ascot Drive. Additional damage to adjacent property will likely occur without implementation of this project. 21 PROJECT TITLE: CHANNEL STABILIZATION -TRIBUTARY WFA PROJECT #: DR0401 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Engineering Personnel: Full Time Construction Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs $0 Total Estimated Capital Cost $0 FUNDING SOURCE: Drainage Operating Fund Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Engineering Channel Improvements 39,000 360,000 399,000 399,000 $0 Total Funding $399,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET(-+) % EXPENDED 39,000 0 39,000 0% 360,000 0 360,000 0% TOTAL PROJECT $399,000 $0 $399,000 0% 22 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: ROBERT BARKER Date Completed: Project Title: DRAINAGE PROJECT STUDY Project Type: DRAINAGE Sub -Type: Project No.: DR0402 Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This study will supercede any and all previous drainage problem studies. PROJECT DESCRIPTION: 5/28/2003 This study will identify, investigate, and recommend solutions and their costs, and prioritize the known drainage problems that involve the City of Euless drainage systems. PROJECT SCHEDULE: JUSTIFICATION: This analysis of the City's drainage system will help define future capital drainage programs to help alleviate the worst flooding problems. The previous drainage project study was completed in 1990. Many of the proposed projects need to be refined, revised, revisited and re -estimated. 23 PROJECT TITLE: DRAINAGE PROJECT STUDY PROJECT #: DR0402 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Engineering 60,000 Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs $0 Total Estimated Capital Cost $0 FUNDING SOURCE: Drainage Operating Fund Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Engineer Services 60,000 60,000 $0 Total Funding $60,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET(-+) % EXPENDED 60,000 0 60,000 0% TOTAL PROJECT $60,000 $0 $60,000 0% 24 ¶w/tclect StwL g'wi;ect,si Project Number Project Description CAPITAL IMPROVEMENTS PROGRAM FUNDED PROJECTS SUMMARY Unfunded/ Budget as of Appropriations/ Budget as of Expended as (Over) Under Estimated (Excess 5-31-03 Amendment 5/31/04 of 5/31/04 Budget Project Costs Funding) STREET PROJECTS PS9901 North Main Street $7,866,061 $0 $7,866,061 $6,027,880 $1,838,181 $7,866,061 $0 PS9904 Harwood Road $5,813,990 ($86,779) $5,727,211 $5,528,518 $198,693 $5,727,211 $0 PS9905 Traffic Studies $27,198 $0 $27,198 $7,248 $19,951 $27,198 $0 PS9906 Traffic Safety $128,027 $0 $128,027 $91,304 $36,723 $128,027 $0 PS9908 Signalization $167,285 $0 $167,285 $74,452 $92,833 $167,285 $0 FM157 North, SH183 to SH121 (Landscaping PS9909 & Lighting) $75,000 $0 $75,000 $693 $74,308 $75,000 $0 PS0002 West Pipeline - Raider/Hwy 10 $946,206 $4,328,104 $5,274,310 $183,329 $5,090,981 $5,274,310 $0 PS0301 Mid Cities Illumination $160,000 $0 $160,000 $120,593 $39,407 $160,000 $0 PS0302 Driftwood/Pipeline Traffic Signal $100,000 $0 $100,000 $68,245 $31,755 $100,000 $0 PS0303 Aransas/Harwood Traffic Signal $120,000 $0 $120,000 $88,715 $31,285 $120,000 $0 PS0304 Glade Road $350,000 $2,725,105 $3,075,105 $0 $3,075,105 $3,075,105 $0 PSO401 West Pipeline - Raider to City Limits $0 $525,000 $525,000 $0 $525,000 $525,000 $0 PS0402 South Pipeline Road Bridge $0 $28,208 $28,208 $28,208 $0 $28,208 $0 PS0403 Raider Dr - SH10 to South Pipeline $0 $330,000 $330,000 $0 $330,000 $330,000 $0 PS0404 South Pipeline Road Overlay $0 $78,000 $78,000 $0 $78,000 $78,000 $0 FB9907 Fund Balance - Street CIP $0 $0 $0 $0 $0 $0 ($237,721) Sub -Total Street Projects $15,753,767 $7,927,638 $23,681,405 $12,219,184 $11,462,221 $23,681,405 25 ($237,721) City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: NORTH MAIN STREET Project Type: STREET Project No.: PS9901 COUNCIL AUTHORIZATION: Date Prepared: 5-24-99 Date Completed: Sub -Type: CONSTRUCTION Priority: A April 14, 1998 - Authorized bond election for the purpose of funding construction. November 24, 1998 - Approved contract with Cummings & Prewitt, Inc. for paving and drainage design. February 8, 2000 - Authorized the acquisition of r-o-w to allow for widening and paving improvements. August 22, 2000 - Ratified the expenditure of $30,000 of EDC funds for r-o-w acquisition along Main St. August 22, 2000 - Ratified EDC Resolution 11-00 authorizing a project involving facility improvements along North Main Street. November 14, 2000 - Authorized Resolution #00-1083 declaring public necessity for acquisition of row. February 27, 2001 - Authorized publication of notice of intent to issue certificates of obligation. April 9, 2001 - Approved Ord. 1468 authorizing issuance of General Obligation Bonds, Series 2001 in the amount of $6,000,000 September 11, 2001 Authorized city manager to negotiate and execute a contract with TXU Electric for the relocation of utilities along N. Main Street at an estimated cost of $550,000. December 11, 2001 Awarded Bid # 004-02 to Southlake Construction for the demolition and removal of single-family houses along N. Main Street. March 11, 2003 Authorized City Manager to seek competitive bids for paving & drainage construction. April 8, 2003 - Awarded contract to McClendon Construction Co. for construction of street, utility, and drainage for N. Main Street for $3,370,035.15, provided for a $180,000 contingency. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project is a part of the $13.5 million bond package approved by the voters in October 1998. PROJECT DESCRIPTION: The project consists of reconstruction and widening of North Main Street from SH10 to Harwood Road. The project also consists of relocating overhead utilities, the addition of a subsurface drainage system, and the addition of street lights and landscaping improvements. Construction is anticipated to begin in June, 2003. PROJECT SCHEDULE: North half is substantially complete Substantial completion of total project anticipated May, 2004 JUSTIFICATION: 1. Improvement of traffic flow and traffic safety. 2. Improve aesthetics with relocation of overhead utilities and addition of landscaping. 3. Subsurface drainage system needed. 4. Reduction of maintenance requirements. 26 PROJECT TITLE: NORTH MAIN STREET NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Other Average Annual Debt Service Total Estimated Annual Cos PHASE/FUNDING SOURCE Engineering Right of Way Utility Relocation (City) Appraisal Services Surveying Services Other Professional Services Special Services Landscaping Signs & Markings Construction Lighting Sewer Main Issuance Cost Contract Labor PROJECT #: PS9901 TOTAL ESTIMATED CAPITAL COST *Engineering 641,500 Right of Way 1,550,000 Utility Relocation (City) 722,200 Appraisal Services 60,000 $0 Street Lights 125,000 Landscaping 350,000 Construction 3,787,000 Signs & Markings 430,000 Midway Sewer Rehab 100,000 Issuance Cost 65,361 $0 Contract Labor 35,000 * Added $70,000 for work related to medians. Total Estimated Capital Cosi $7,866,061 FUNDING SOURCE: Street Fund Balance FY99 C.O. Bond Proceeds FY98 $0 G.O. Bond Proceeds FY01 Developer's Escrow Interest Income $412,567 Economic Development Corp W/S Operating Fund 1,416,185 1,012,961 4,820,919 17,276 163,667 430,000 5,053 $412,567 Total Fundinc $7,866,061 CURRENT STATUS BUDGET 676,488 1,478,851 722,200 101,495 5,170 2,155 5,053 350,000 430,000 3,760,760 125,000 100,000 65,361 43,528 TOTAL PROJECT $7,866,061 EXPENDED 688,181 1,447,814 288,368 101,495 5,170 2,155 5,053 0 348,718 2,984,466 3,703 0 62,261 90,496 $6,027,880 OVER/UNDER BUDGET (- +) (11,693) 31,037 433,832 0 0 0 0 350,000 81,282 776,294 121,298 100,000 3,100 (46,968) % EXPENDED 102% 98% 40% 100% 100% 100% 100% 0% 81% 79% 3% 0% 95% 208% $1,838,181 77% 27 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Date Prepared: 7-29-99 Date Completed: Project Title: HARWOOD ROAD, N. MAIN TO 360 Project Type: STREET Sub -Type: CONSTRUCTION Project No.: PS9904 Priority: A COUNCIL AUTHORIZATION: April 14, 1998 - Authorized bond election for the purpose of funding construction. November 24, 1998 - Authorized contract for appraisal services for parcels necessary to project. May 24, 1999 - Approved resolution determining the necessity for and ordering the improvement. May 24, 1999 - Authorized the acquisition of the necessary right-of-way. June 22, 1999 - Approved right-of-way acquisition. December 14, 1999 - Authorized City Manager to negotiate for and acquire additional right-of-ways. February 8, 2000 - Awarded construction contract to Larry H. Jackson Construction March 28, 2000 - Authorized issuance of G.O. bonds for Harwood, Main, and West Pipeline. April 8, 2003 - Awarded contract to J&J Sprinkler & Landscaping for median pavers for $151,836.30. Feb 10, 2004 - Approved bid 009-04 to Whitmore and Sons, Inc for median irrigation and landscaping in the amount of $74,627. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project is part of the $13.5 million bond program approved by the voters in October 1998. Project identified in the 1999 Master Thoroughfare Plan. PROJECT DESCRIPTION: Reconstruction of Harwood Road from a point approximately 350 feet west of N. Main Street to SH 360. New roadway will be a six -lane boulevard with sidewalks, landscaping and lighting. Signals will be added at Fuller - Wiser and Bear Creek Parkway. The paving and storm drain portion of this project was substantially complete in June 2002. The landscape portion of this project was advertised in March 2003. This portion is anticipated to be complete in October 2003. PROJECT SCHEDULE: Irrigation and landscape contract awarded Irrigation system complete Landscape installation in progress Anticipated completion May, 2004 JUSTIFICATION: Existing roadway (two-lane) does not meet existing and future needs. 28 PROJECT TITLE: HARWOOD ROAD, N. MAIN TO 360 PROJECT #: PS9904 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Other Average Annual Debt Service Subtotal: Total Estimated Annual Cos PHASE/FUNDING SOURCE Engineering Construction Right of Way Appraisal Services Issuance Cost Contingencies Other Professional Services Landscaping TOTAL ESTIMATED CAPITAL COST Appraisal Services Professional Services -Soil Test Acquisition $0 Engineering Construction Contingency Landscaping Issuance Cost Total Estimated Capital Cosi $0 FUNDING SOURCE: Developer's Escrow G.O. Bond Proceeds Street Fund Balance 465,722 W/S Operating Fund Sub -Total $465,722 Less: Inter -Project Transfer Pipeline Road - PS0002 $465,722 Total Fundinc CURRENT STATUS BUDGET EXPENDED 415,597 4,021,668 800,637 54,036 70,000 3,150 52,123 310,000 415,597 3,968,262 800,637 53,750 70,000 3,092 52,122 165,058 OVER/UNDER BUDGET (- +) 0 53,406 0 286 0 58 1 144,942 54,036 52,123 800,637 415,597 4,021,668 3,150 310,000 70,000 $5,727,211 301,677 5,392,302 283,634 16,919 5,994,532 (267,321) $5,727,211 % EXPENDED 100% 99% 100% 99% 100% 98% 100% 53% TOTAL PROJECT $5,727,211 $5,528,518 $198,694 97% 29 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Date Prepared: 7-17-99 Date Completed: Project Title: TRAFFIC STUDIES Project Type: STREET Sub -Type: STUDY Project No.: PS9905 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: These funds are utilized with projects PS9906 (Traffic Safety) and PS9908 (Signalization) to address traffic needs throughout the City. PROJECT DESCRIPTION: Staff utilizes these funds to investigate concerns related to traffic movements and volumes. PROJECT SCHEDULE: JUSTIFICATION: Traffic patterns and volumes change causing problems on our streets. Funds are needed to compensate consultants for professional services rendered in the investigation work. 30 PROJECT TITLE: TRAFFIC STUDIES PROJECT #: PS9905 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Engineering 26,352 Personnel: Full Time Other Professional Services 76 Part Time Traffic Signals 770 Total Salary $0 Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Total Estimated Capital Cost $0 FUNDING SOURCE: Street Fund Balance W/S Operating Fund Subtotal: $0 Total Estimated Annual Cost $27,198 7,198 20,000 $0 Total Funding $27,198 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Engineering Services 26,352 6,402 19,950 24% Other Professional Services 76 76 0 100% Traffic Signals 770 770 0 100% TOTAL PROJECT $27,198 31 $7,248 $19,950 27% City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: 7-15-99 Submitted By: RANDY BYERS Date Completed: Project Title: TRAFFIC SAFETY Project Type: STREETS Sub -Type: STUDY Project No.: PS9906 Priority: A COUNCIL AUTHORIZATION: February 24, 1998 - Approved as part of Certificates of Obligation, Series 1998. May 22, 2001 - Authorized construction of a temporary right turn lane on southbound N. Main Street @ SH183 Service Road. Construction to be performed by City staff. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: These funds are utilized with projects PS9905 (Traffic Studies) and PS9908 (Signalization) to address traffic needs throughout the City. PROJECT DESCRIPTION: Staff utilizes these funds to investigate traffic safety concerns. Maintenance activities are paid from the facilities operating budget. PROJECT SCHEDULE: JUSTIFICATION: Traffic patterns and volumes change, causing safety problems on our streets. Funds are needed to compensate consultants for professional services rendered in the investigation work. 32 PROJECT TITLE: TRAFFIC SAFETY PROJECT #: PS9906 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PHASE/FUNDING SOURCE Professional Services Equipment Rental Signalization Systems Traffic Signals TOTAL PROJECT TOTAL ESTIMATED CAPITAL COST: Professional Services Equipment Rental Signalization Systems $0 Traffic Signals Total Estimated Capital Cost $0 FUNDING SOURCE: Street Fund Balance $0 $0 Total Funding CURRENT STATUS BUDGET EXPENDED 5,000 4,128 1,000 1,000 19,780 19,674 102,247 66,503 $128,027 33 OVER/UNDER BUDGET (- +) 872 0 106 35,744 5,000 1,000 19,780 102,247 $128,027 128,027 $128,027 % EXPENDED 83% 100% 99% 65% $91,305 $36,722 71% City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: SIGNALIZATION Project Type: STREET Project No.: PS9908 COUNCIL AUTHORIZATION Date Prepared: 7-22-99 Date Completed: Sub -Type: SIGNALIZATION Priority: A February 24, 1998 - Approved as part of Tax and Waterworks and Sewer System Revenue Certificate: of Obligation, Series 1998. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN These funds are utilized with Projects PS9905 (Traffic Studies) and PS9906 (Traffic Safety) to address traffic needs throughout the City. Arkansas/Harwood and Driftwood/Pipeline traffic signals will be funded by this project. PROJECT DESCRIPTION: 1. Replace or upgrade controllers. 2. Upgrade signals. 3. Install Opticom. PROJECT SCHEDULE: JUSTIFICATION: Signal improvements are often needed to improve traffic safety and vehicular movements through intersections. 34 PROJECT TITLE: SIGNALIZATION PROJECT #: PS9908 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST MAINTENANCE COST (+ OR -) ANNUAL Direct ODeratina Cost Signal System Personnel: Full Time Traffic Signals Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs $0 Total Estimated Capital Cosi $0 FUNDING SOURCE: Certificates of Obligation, 1998 Subtotal: $0 Total Estimated Annual Cos 20,000 147,285 $167,285 167,285 $0 Total Fundinc $167,285 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Signal Systems 20,000 17,179 2,821 86% Traffic Signals 147,285 57,273 90,012 39% TOTAL PROJECT $167,285 $74,452 $92,833 45% 35 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Date Prepared: 7-17-99 Date Completed: Project Title: FM157 NORTH, SH183 TO SH121 (Landscaping & Lighting) Project Type: STREET Sub -Type: CONSTRUCTION Project No.: PS9909 Priority: A COUNCIL AUTHORIZATION February, 2003 - Signed an agreement with Oncor for street light installatior March, 2003 - Began negotiations with TxDot for landscape projects in median: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN The Texas Department of Transportation (TxDOT) widened FM157 between SH183 and SH121 to a seven -lane (5+2) undivided roadway section. PROJECT DESCRIPTION: The addition of landscape and irrigation improvements and street lights along the new street. PROJECT SCHEDULE: JUSTIFICATION: Improved visibility and enhanced aesthetics. 36 PROJECT TITLE: FM157, SH183 and SH121 PROJECT #: PS9909 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Landscaping/Lighting 75,000 Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Total Estimated Capital Cost $75,000 Subtotal: $0 FUNDING SOURCE: Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Landscaping (Expenses prior to FY99 not reflected) Street Fund Balance Transferred to PS0001 Transferred to FB9907 239,820 (26,516) (138,304) $0 Total Funding $75,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 75,000 693 74,308 1 TOTAL PROJECT $75,000 $693 $74,308 1% 37 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Date Prepared: 7-26-99 Date Completed: Project Title: WEST PIPELINE - RAIDER/HWY 10 Project Type: STREET Sub -Type: CONSTRUCTION Project No.: PS0002 Priority: A COUNCIL AUTHORIZATION April 14, 1998 - Authorized bond election for the purpose of funding constructioi January 1, 2000 - Authorized the City Manager to execute an engineering contract for desig June 12, 2001 - Declared intent to reimburse expenditures from proceeds of future deb RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN This project was approved as part of the 1998 bond election along with Main Street and Harwood Road. PROJECT DESCRIPTION: Project consists of widening West Pipeline Road from 2 lanes to a proposed 4 lane boulevard street. This project will encompass the section of W. Pipeline from Hwy 10 to Raider Drive. The City has requested financial participation from Bedford. PROJECT SCHEDULE: Advertise project - Fall, 2004 Award contract, January, 2005 Begin construction, March 2005 JUSTIFICATION: The street exists in an expanded condition on either end of this proposed widening. The traffic greatly overload: the existing roadway. 38 PROJECT TITLE: WEST PIPELINE - RAIDER/HWY 10 PROJECT #: PS0002 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST MAINTENANCE COST (+ OR -) ANNUAL Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Other Average Annual Debt Service Total Estimated Annual Cos PHASE/FUNDING SOURCE Engineering Utility Relocation Contract Labor Appraisal Services Right of Way Construction Issuance Cost Contingency Engineering ROW Appraisal ROW Acquisition $0 Utility Relocation & Gas Line Construction Contingency Issuance Cost Contract Labor $0 Total Estimated Capital Cosi FUNDING SOURCES: Interest Income City of Bedford Contributions Street CIP Fund Balance $0 (Transfer from PS0004) (Transfer from PS9904) GO Bond Proceeds FY01 GO Bond Proceeds $279,745 Certificates of Obligations $279,745 Total Funding CURRENT STATUS BUDGET 365,000 616,556 30,000 20,000 450,000 3,500,000 55,000 237,754 EXPENDED 183,329 0 0 0 0 0 0 0 OVER/UNDER BUDGET (- +) 181,671 616,556 30,000 20,000 450,000 3,500,000 55,000 237,754 365,000 20,000 450,000 616,556 3,500,000 237,754 55,000 30,000 $5,274,310 422,030 200,000 298,180 267,321 86,779 3,200,000 800,000 $5,274,310 % EXPENDED 50% 0% 0% 0% 0% 0% 0% 0% TOTAL PROJECT $5,274,310 $183,329 $5,090,981 50% 39 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: MID CITIES ROADWAY ILLUMINATION Project Type: STREET Sub -Type: LIGHTING Project No.: PS0301 Priority: A COUNCIL AUTHORIZATION RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN This project is a follow-up of the TxDot roadway construction on Mid Cities Boulevard. PROJECT DESCRIPTION: 6/27/2002 Installation of underground conduit foundations, and street light standards on Mid -Cities Blvd from FM157 to N. Main Street. The proposed street lighting will be located in the roadway median. The layout and design has been approved by Oncor. Bids are being received for trenching and conduit installation. PROJECT SCHEDULE: JUSTIFICATION: Roadway illumination was not an included item in the TxDot construction project. The portion of Mid -Cities Boulevard from FM157 to N. Main is extremely dark and poses a potential driving hazard at night. 40 PROJECT TITLE: MID CITIES ROADWAY ILLUMINATION PROJECT #: PS0301 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct ODeratina Cost Lighting Personnel: Full Time Part Time Total Salary $0 Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Total Estimated Capital Cost $0 FUNDING SOURCE: Street CIP Fund Balance Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Lighting TOTAL PROJECT $160,000 160,000 160,000 $0 Total Funding $160,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 160,000 120,593 39,407 75% $160,000 41 $120,593 $39,407 75% City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: DRIFTWOOD PIPELINE TRAFFIC SIGNAL Project Type: STREET Sub -Type: TRAFFIC SIGNAL Project No.: PS0302 Priority: A COUNCIL AUTHORIZATION 05/02/02 Nov 11,2003 - Awarded bid # 008-04 to Durable Specialties, Inc for installation of traffic signals at Harwood/Aransas and West Pipeline Road/Driftwood Drive in the amount of $113,300 with a $10,000 contingenc} Authorized City Manager to execute the contract. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN West Pipeline Road is identified and designated as an arterial thoroughfare in the City's Master Thoroughfare Plari. PROJECT DESCRIPTION: This project consists of the installation of a "tee" intersection traffic actuated traffic signal at the intersection of Driftwood and Pipeline. PROJECT SCHEDULE: Design complete Construction contract awarded Anticipated completion: May, 2005 JUSTIFICATION: A recently completed traffic signal warrant study for the Driftwood /W. Pipeline intersection indicates that Warrant 12 is now met. The traffic volumes and speeds at this intersection in combination with the warrant provide sufficie-it justification for this traffic signal installation. Installation of this traffic signal will provide for the safe and efficient movement of vehicular traffic through this intersection. 42 PROJECT TITLE: DRIFTWOOD PIPELINE TRAFFIC SIGNAL PROJECT #: PS0302 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct ODeratina Cost Engineering Personnel: Full Time Traffic Signals Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs $0 Total Estimated Capital Cost $0 FUNDING SOURCE: Street CIP Fund Balance Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Engineer Service Traffic Signals TOTAL PROJECT $15,000 $85,000 100,000 120,000 $0 Total Funding $120,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 15,000 12,633 2,367 84% 85,000 55,612 29,388 65% $100,000 43 $68,245 $31,755 68% City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: ARANSAS/HARWOOD TRAFFIC SIGNAL Project Type: STREET Sub -Type: TRAFFIC SIGNAL Project No.: PS0303 Priority: A COUNCIL AUTHORIZATION 05/09/02 Nov 11,2003 - Awarded bid # 008-04 to Durable Specialties, Inc for installation of traffic signals at Harwood/Aransas and West Pipeline Road/Driftwood Drive in the amount of $113,300 with a $10,000 contingenc} Authorized City Manager to execute the contract. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN Aransas Drive is designated as a collector thoroughfare in the City's Master Thoroughfare Plan while Harwood Road is designated as an arterial thoroughfare. PROJECT DESCRIPTION: This project consists of the installation of a standard traffic signal at the intersection of Aransas and Harwood Road. A fully traffic actuated controller will be included with the installation. PROJECT SCHEDULE: Design complete Construction contract awarded Anticipated completion: May, 2005 JUSTIFICATION: A recently completed traffic signal warrant study for the Aransas/Harwood intersection indicates that Warrant 7 in combination with school children traffic is now met. The traffic volumes and restricted sight distance at this installation in combination with the warrant provides sufficient justification for this traffic signal installation. Installation of this traffic signal will provide for the safe and efficient movement of vehicular and pedestrian traffic through this intersection. 44 PROJECT TITLE: ARANSAS/HARWOOD TRAFFIC SIGNAL PROJECT #: PS0303 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct ODeratina Cost Engineering $15,000 Personnel: Full Time Traffic Signals $105,000 Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs $0 Total Estimated Capital Cost $0 FUNDING SOURCE: Street CIP Fund Balance Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Engineer Service Traffic Signal TOTAL PROJECT 120,000 120,000 $0 Total Funding $120,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 15,000 12,691 105,000 76,024 $120,000 45 $88,715 2,309 85% 28,976 72% $31,285 74% City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: GLADE RD Project Type: STREET Sub -Type: CONSTRUCTION Project No.: PS0304 Priority: A COUNCIL AUTHORIZATION April, 2003 - The City of Grapevine is scheduled to award a design contrac 7/31/1999 Dec 9, 2003 - Approval of Res # 03-1162 declaring intent to reimburse expenditures with proceeds of future debt. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN Glade Road is identified as a minor arterial in the 1999 master thoroughfare Plan. This project is a continuation of the roadway improvements on Glade Road from SH121 to Champagne Drive completed in 2001. The City of Grapevine is scheduled to award a design contract in April, 2003. The utility reolcation is anticipated to begin in January, 2004. PROJECT DESCRIPTION: The proposed roadway project consists of replacing the existing two-lane asphalt pavement with a four -lane concrete roadway, includinga median and protected turn lanes. Signalizationwill be provided at Baze and at North Main Street. The southern half of the project lies within the City of Euless. Adjustment/relocation of the City of Euless water main along the southside of Glade Road from approximately Roxboro to S.H. 360 in advance of the roadway construction. PROJECT SCHEDULE: City of Grapevine plans under review Anticipate utility relocation - Summer, 2004 Anticipate bid - Fall, 2004 Anticipate start of construction - Spring, 2005 Anticipate completion - Spring, 2006 JUSTIFICATION: The City of Grapevine has scheduled design for Glade Road in 2002-2003 and will assume the entire cost for plar preparation. Since the southern half of the proposed roadway construction lies within the City of Euless, that porti of construction costs lies with the City of Euless. 46 PROJECT TITLE: GLADE RD PROJECT #: PS0304 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Right of Way $90,000 Personnel: Full Time Contract Labor $20,000 Part Time Construction $2,300,000 Total Salary $0 Utility Relocation $326,000 Purchase of Services Issuance Cost $25,000 Materials & Supplies Contingency $314,105 Utilities Total Estimated Capital Cost 3,075,105 Subtotal: $0 FUNDING SOURCE: Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Developer's Escrow Street CIP Fund Balance (PS0004 Transfer $65,651) (Street Fund Balance $140,349) Certificates of Obligation 144,105 206,000 2,725,000 $0 Total Funding $3,075,105 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED Right of Way 90,000 0 90,000 0% Contract Labor 20,000 0 20,000 0% Streets and Highways 2,300,000 0 2,300,000 0% Utility Relocation 326,000 0 326,000 0% Contingency 314,105 0 314,105 0% Issuance Cost 25,000 0 25,000 0% TOTAL PROJECT $3,075,105 $0 $3,075,105 0% 47 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Date Prepared: 6/29/2001 Date Completed: Project Title: WEST PIPELINE - RAIDER TO CITY LIMITS Project Type: STREET Sub -Type: CONSTRUCTION Project No.: PSO401 Priority: A COUNCIL AUTHORIZATION: Dec 9, 2003 Approval of Res # 03-1162 declaring intent to reimburse expenditures with proceeds of future debt. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: West Pipeline Road is identified in the Master Thoroughfare Plan as an arterial roadway. This roadway maintenance project is related to the proposed 12" water main replacement project on West Pipeline Road. PROJECT DESCRIPTION: Provide spot repairs on the existing roadway subgrade, remove and replace deteriorated or damaged curb and gutter, mill the outer edges of the roadway surface, adjust valve covers and manholes, provide asphalt overlay, and restripe centerline and lane lines. PROJECT SCHEDULE: Engineer selected Design contract award - June, 2004 Plans complete - Jan, 2005 Advertise construction - Feb, 2005 Construction begin - April, 2005 Construction completion - Sept, 2005 JUSTIFICATION: West Pipeline Road has been patched and repaired numerous times over the years. The proposed 12" water main replacement project will further cut the roadway increasing the need for this overlay project. This project will improve the riding surface and the appearance of the roadway. 48 PROJECT TITLE: WEST PIPELINE-RAIDER/CITY LIMITS PROJECT #: PSO401 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct ODeratina Cost Engineering $39,000 Personnel: Full Time Construction $486,000 Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs $0 Total Estimated Capital Cost $0 FUNDING SOURCE: Certificate of Obligation Bonds Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Engineering Service Streets/Highways 525,000 525,000 $0 Total Funding $525,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 39,000 0 39,000 0% 486,000 0 486,000 0% TOTAL PROJECT $525,000 $0 $525,000 0% 49 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: 6/27/2002 Submitted By: RON YOUNG Date Completed: Project Title: SOUTH PIPELINE ROAD BRIDGE Project Type: STREET Sub -Type: BRIDGE Project No.: PS0402 Priority: A COUNCIL AUTHORIZATION: June 25, 2002 Approved Res 02-1126 approving an advanced funding agreement and requiring payment of $4,592 to cover preliminary engineering. The balance of $28,208 to be paid 45 days prior to the receipt of bids. Oct 28, 2003 Approved payment to TxDot for reconstruction of bridge in the amount of $28,208. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Reconstruction of the South Pipeline Road bridge over Hurricane Creek. This project is currently included in the approved off -state system federal aid Highway Bridge Replacement and Rehabilitation Program as authorized by Texas Transportation Commission Minute Order number 108912, dated May 30, 2002. The design is currently underway by TxDot. PROJECT SCHEDULE: Currently under construction Anticipated completion - Aug, 2004 JUSTIFICATION: Heavy rains and the resulting flooding along Hurricane Creek on or before April 24, 2002, caused significant substructure damage to the South Pipeline Road bridge over Hurricane Creek. Participation in the project will allow the City of Euless to contribute 10% of the estimated costs of replacement while state and federal funding contribute the remaining 90%. 50 PROJECT TITLE: SOUTH PIPELINE ROAD BRIDGE PROJECT #: PS0402 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct ODeratina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Bridge construction TxDot Funding $328,000 ($295,200) Total Estimated Capital Cost 32,800 Subtotal: $0 FUNDING SOURCE: Fund Balance Transfer 28,208 Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Streets/Highways TOTAL PROJECT FUNDING PENDING: TxDot funding ($295,200) Fund Balance Contigency ($4,592) $0 Total Funding $28,208 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 28,208 28,208 0 100% $28,208 51 $28,208 $0 100% City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Date Prepared: 7-22-99 Date Completed: Project Title: RAIDER DRIVE, SH 10 TO SOUTH PIPELINE ROAD Project Type: STREET Sub -Type: CONSTRUCTION Project No.: PS0403 Priority: A COUNCIL AUTHORIZATION: Dec 9, 2003 - Approval of Res # 03-1162 declaring intent to reimburse expenditures with proceeds of future deb:. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Raider Drive is identified as a minor arterial in need of upgrade in the 1999 Master Thoroughfare Plan. This project is tied to the progress of construction on the TxDot SH10 project. Construction will not begin until tl-e Raider /SH 10 intersection is complete. TxDot project to add one (1) roadway lane in each direction is schedule t to be awarded in May, 2003 and to be completed May 2004 PROJECT DESCRIPTION: This project will consist of removing the existing deteriorated pavement and reconstruct with new concrete pavement, curbs, and underground drainage systems. Four lanes of the ultimate four lane divided roadway will constructed. When traffic volumes warrant additional capacity, the roadway will be widened to provide a median with turn lanes or a continuous left turn lane. PROJECT SCHEDULE: Anticipated construction - Fall, 2005 JUSTIFICATION: The existing roadway section is deteriorated and is in need of reconstruction. The heavy trucks and the volume of traffic continues to have detrimental effects on the roadway. 52 PROJECT TITLE: RAIDER-SH10-PIPELINE PROJECT #: PS0403 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct ODeratina Cost Engineering $30,000 Personnel: Full Time Construction $275,000 Part Time Right of Way $25,000 Total Salary $0 Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Total Estimated Capital Cost $0 FUNDING SOURCE: Bond Proceeds Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE 330,000 330,000 $0 Total Funding $330,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED Engineering 30,000 30,000 0% Right of Way 25,000 25,000 0% Streets/Highways 275,000 275,000 0% TOTAL PROJECT $330,000 $0 $330,000 0% 53 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: SOUTH PIPELINE ROAD OVERLAY Project Type: STREET Sub -Type: Project No.: PS0404 Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: A multi -jurisdictional project between the City of Euless, the City of Fort Worth, and Tarrant County. PROJECT DESCRIPTION: 6/3/2003 The project consists of an asphalt overlay on South Pipeline Road from FM157 to American Way. Tarrant County will provide the equipment and labor for the overlay while the City of Euless and the City of Fort Worth will pay for the asphalt materials. The City of Euless frontage along this portion of S. Pipeline is approximately 7900 feet while the City of Fort Worth has approximately 9500 feet of frontage. The City of Euless contribution will be approximately 45% of the total asphalt material costs. PROJECT SCHEDULE: Anticipate start of construction - Summer, 2004 JUSTIFICATION: South Pipeline Road is an important east -west thoroughfare providing access to the southeast portion of the City of Euless. This project will improve the riding surface of the roadway. 54 PROJECT TITLE: SOUTH PIPELINE ROAD OVERLAY PROJECT #: PS0404 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct ODeratina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Construction (City of Fort Worth Contribution) $183,000 ($105,000) Total Estimated Capital Cost 78,000 Subtotal: $0 FUNDING SOURCE: CIP Fund Balance 78,000 Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Overlay TOTAL PROJECT FUNDING PENDING: City of Fort Worth Contribution ($105,000) $0 Total Funding $78,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 78,000 0 78,000 0% $78,000 55 $0 $78,000 0% ¶unc1et W gswieasi Project Number Project Description CAPITAL IMPROVEMENTS PROGRAM FUNDED PROJECTS SUMMARY Unfunded/ Budget as of Appropriations/ Budget as of Expended as (Over) Under Estimated (Excess 5-31-03 Amendment 5/31/04 of 5/31/04 Budget Project Costs Funding) WASTEWATER PROJECTS WW0002 Misc Sewer Rehab $152,013 $0 $152,013 $30,580 $121,433 $152,013 $0 WW0103 S. Pipeline, Heather to Vine $500,000 $0 $500,000 $473,640 $26,360 $500,000 $0 WW0202 Line Replacement - Dunaway $140,000 $0 $140,000 $139,955 $45 $140,000 $0 WW0203 Line Replacement - E. Alexander $20,000 $0 $20,000 $20,000 $0 $20,000 $0 WW0204 Line Replacement - Paula Lane $79,000 $0 $79,000 $79,000 $0 $79,000 $0 WW0205 Midway Park Mains $366,000 $0 $366,000 $317,044 $48,956 $366,000 $0 WW0301 CDBG B02-UC-48-0001-22-50 $279,817 $0 $279,817 $229,158 $50,659 $279,817 $0 WW0302 Inflow & Infiltration $200,000 $0 $200,000 $0 $200,000 $200,000 $0 WW0303 Line Replacement, Canyon Ridge $175,000 $0 $175,000 $2,870 $172,130 $175,000 $0 WW0304 Line Replacement, Sagebrush $210,000 $0 $210,000 $2,607 $207,393 $210,000 $0 WW0305 Line Replacement, Short $87,000 $0 $87,000 $2,852 $84,148 $87,000 $0 WW0306 Line Replacement, E. Fuller $168,000 $0 $168,000 $5,359 $162,641 $168,000 $0 WW0401 FY2004 CDBG $0 $217,000 $217,000 $9,046 $207,954 $217,000 $0 WW0402 Line Replacement, Carr Park/SH10 $0 $330,000 $330,000 $0 $330,000 $330,000 $0 WW0403 Line Replacement, Midway Park North $0 $363,000 $363,000 $0 $363,000 $363,000 $0 FB9911 FB - Wastewater Impact (Restricted) $0 $0 $0 $0 $0 $0 ($1,099,995) Sub -Total Wastewater Projects $2,376,830 $910,000 $3,286,830 $1,312,110 $1,974,720 $3,286,830 ($1,099,995) 56 Department: Submitted By: Project Title: Project Type: Project No.: City of Euless Capital Project Request PUBLIC WORKS RANDY BYERS MISC. SEWER REHAB WASTEWATER WW0002 COUNCIL AUTHORIZATION: Sub -Type: MAINS Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Date Prepared: Date Completed: 7-26-99 This project is for small unidentified sewer main problems that may be found during the fiscal year. Large projects will be determined on an "as needed" basis and presented for funding under a new project number. PROJECT SCHEDULE: JUSTIFICATION: Most of these lines are clay tile and are seriously deteriorated. 57 PROJECT TITLE: MISC. SEWER REHAB PROJECT #: WW0002 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Sewer Mains (Minimum balance to be maintained $100,000) Total Estimated Capital Cost Subtotal: $0 FUNDING SOURCE: Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE W/S Operating Fund Inter -project Transfer from: Misc Sewer Rehab FY99 WW9903 W/S Fund Balance FB9901 65,000 37,013 50,000 $0 Total Funding $152,013 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED Sewer Mains 121,433 0 121,433 0% Contingency 30,580 30,580 0 100% TOTAL PROJECT $152,013 58 $30,580 $121,433 20% City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: S. PIPELINE, HEATHER TO VINE Project Type: WASTEWATER Sub -Type: MAINS Project No.: WW0103 Priority: A COUNCIL AUTHORIZATION: Date Prepared: Date Completed: May 14, 2002 Engineering Design Contract with Elliott and Hughes, approved by Council. May 13, 2003 Awarded contract for construction to Horseshoe Construction. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The existing wastewater main in South Pipeline has aged and deteriorated. The main needs to be replaced and enlarged from Heather to Vine Street. PROJECT DESCRIPTION: 7/26/1999 The EPA regulates contamination of soil from wastewater mains. It is necessary to correct deterioration found in our system. PROJECT SCHEDULE: Construction complete Final clean up stages underway JUSTIFICATION: Line has deteriorated and needs to be replaced. 59 PROJECT TITLE: S. PIPELINE, HEATHER TO VINE PROJECT #: WW0103 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Engineering Personnel: Full Time Sewer Main Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs $0 Total Estimated Capital Cost $0 FUNDING SOURCE: W/S Operating Fund Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Engineering Sewer Mains 50,000 450,000 $500,000 500,000 $0 Total Funding $500,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 50,000 26,806 450,000 446,834 *Impact fees paid TRA debt service to free operating funds for this project. TOTAL PROJECT $500,000 60 $473,640 23,194 54% 3,166 99% $26,360 95% City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: WASTEWATER Date Completed: Project Title: LINE REPLACEMENT, DUNAWAY Project Type: WASTEWATER Sub -Type: MAIN Project No.: WW0202 Priority: A COUNCIL AUTHORIZATION: May 14, 2002 - Engineering Design Contract with Elliott and Hughes. May 13, 2003 - Awarded contract for construction to Horseshoe Construction. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Replace sanitary sewer lines on Dunaway - E. Alexander to Ascot. PROJECT SCHEDULE: Construction complete Final clean up stages underway JUSTIFICATION: 7/10/2000 Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. 61 PROJECT TITLE: LINE REPLACEMENT, DUNAWAY PROJECT #: WW0202 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Sewer Line Replacement 140,000 Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs $0 Total Estimated Capital Cost $0 FUNDING SOURCE: W/S Operating Fund Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Sewer Mains $140,000 140,000 $0 Total Funding $140,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 140,000 139,955 45 100°/a TOTAL PROJECT 140,000 139,955 45 100% 61 City of Euless Capital Project Request - Unfunded Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: LINE REPLACEMENT, E. ALEXANDER Type: WASTEWATER Sub -Type: Project No.: WW0203 Priority: A COUNCIL AUTHORIZATION Date Prepared: 7-10-00 Date Completed: May 14, 2002 - Engineering Design Contract with Elliott and Hughes. May 13, 2003 - Awarded contract for construction to Horseshoe Constructior RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Replace sanitary sewer lines on E. Alexander Dr. from creek to Dunaway Dr. PROJECT SCHEDULE: Construction complete Final clean up stages underway JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. 63 PROJECT TITLE: LINE REPLACEMENT, E. ALEXANDER PROJECT #: WW0203 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Sewer Line Replacement 20,000 Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs $0 Total Estimated Capital Cost $0 FUNDING SOURCE: W/S Operating Fund Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Sewer Mains $20,000 20,000 $0 Total Estimated Capital Cost $20,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 20,000 20,000 0 100°/a TOTAL PROJECT 20,000 20,000 0 100% 64 City of Euless Capital Project Request - Unfunded Department: PUBLIC WORK Submitted By: RANDY BYERS Project Title: LINE REPLACEMENT, PAULA LANE Type: WASTEWATER Sub -Type: Project No.: WW0204 Priority: A COUNCIL AUTHORIZATION: Date Prepared: 7-10-00 Date Completed: May 14, 2002 - Engineering Design Contract with Elliott and Hughes. May 13, 2003 - Awarded contract for construction to Horseshoe Construction. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Replace sanitary sewer lines on Paula Lane - Needles to W. Pipeline. PROJECT SCHEDULE: Construction Complete Final clean up stages underway JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. 65 PROJECT TITLE: LINE REPLACEMENT, PAULA LANE PROJECT #: WW0204 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Sewer Line Replacement 79,000 Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Sewer Mains Total Estimated Capital Cost FUNDING SOURCE: W/S Operating Fund $79,000 79,000 $0 Total Funding $79,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 79,000 79,000 0 100% TOTAL PROJECT 79,000 79,000 0 100% 66 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Project Title: MIDWAY PARK - MAINS Project Type: WASTEWATER Sub -Type: Project No.: WW0205 Priority: A COUNCIL AUTHORIZATION Date Prepared: Date Completed: 5/25/01 May 14, 2002 - Engineering Design Contract with Elliott and Hughes. May 13, 2003 - Awarded contract for construction to Horseshoe Constructior RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN This project is a companion project to the FY 2002 CDBG project and the FY2003 CDBG project and is a continuation of the wastewater main replacements. PROJECT DESCRIPTION: Design and construction of wastewater mains in the Southeast portion of the Midway Park Addition including Between Ector and Aransas south of Midway Drive Between Aransas and Stonewall south of Midway Drive Between Stonewall and Milam south of Midway Drive PROJECT SCHEDULE: Construction complete Final clean up stages underway JUSTIFICATION: Wastewater mains in the Midway Park area have deteriorated as they have aged and they need to be replaced. 67 PROJECT TITLE: MIDWAY PARK - MAINS PROJECT #: WW0205 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Engineering Personnel: Full Time Construction Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Engineer Services Sewer Mains Total Estimated Capital Cost FUNDING SOURCE: W/S Operating Fund 32,000 334,000 $366,000 366,000 $0 Total Estimated Capital Cost $366,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 32,000 19,195 12,805 60% 334,000 297,849 36,151 89% TOTAL PROJECT 366,000 317,044 48,956 87% 68 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: CDBG B02-UC-48-0001-22-50 Project Type: WASTEWATER Sub -Type: MAINS Project No.: WW0301 Priority: A COUNCIL AUTHORIZATION: January 22, 2002- Held public hearing and approved recommended project. March 19, 2003 - Tarrant County received bids. May 13, 2003 - Awarded contract to Patco Utilities for $345,664 with Tarrant County paying $90,001, and the City paying the balance of $255,663 with a contingency of $6,913 for change orders. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: 6/8/2001 This funding is the 28th year project administered by Tarrant County. This project addresses the aging and deteriorating wastewater mains in the Midway Park area and is related to the 27th year CDBG project. PROJECT DESCRIPTION: Design and construction of wastewater mains in the central portion of the Midway Park Addition. PROJECT SCHEDULE: Construction complete Final clean up stages underway JUSTIFICATION: Wastewater mains in the Midway Park area have deteriorated as they have aged and they need to be replaced. 69 PROJECT TITLE: CDBG B02-UC-48-0001-22-50 PROJECT #: WW0301 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Engineering $17,241 Personnel: Full Time Construction $345,664 Part Time Contingency $6,913 Total Salary $0 Tarrant County CDBG Contribution Purchase of Services (estimated) ($90,001) Materials & Supplies Utilities Total Estimated Capital Cost 279,817 Subtotal: $0 FUNDING SOURCE: Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE W/S Operating Fund 270,000 W/S CIP Fund Balance 9,817 $0 Total Funding $279,817 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED Sewer Mains 255,663 214,330 41,333 84% Engineering Services 17,241 14,827 2,414 86% Contingency 6,913 0 6,913 0% TOTAL PROJECT $279,817 70 $229,158 $50,659 82% City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: INFLOW & INFILTRATION Project Type: WASTEWATER Sub -Type: Project No.: WW0302 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: 5/9/2002 This project consists of inflow/infiltration investigations in areas of the City that experience wastewater flow problems during heavy rains. After a problem is identified, wastewater laterals or mains will be replaced to minimize the identified I&I. PROJECT SCHEDULE: JUSTIFICATION: 71 PROJECT TITLE: INFLOW & INFILTRATION PROJECT #: WW0302 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct ODeratina Cost Engineering $20,000 Personnel: Full Time Construction $180,000 Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs $0 Total Estimated Capital Cost $0 FUNDING SOURCE: W/S CIP Fund Balance Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE 200,000 200,000 $0 Total Funding $200,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED Engineer Services 20,000 Sewer Mains 180,000 20,000 0% 180,000 0% TOTAL PROJECT $200,000 $0 $200,000 0% 72 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, CANYON RIDGE Project Type: WASTEWATER Sub -Type: MAINS Project No.: WW0303 Priority: A COUNCIL AUTHORIZATION: 7/10/2000 December 9, 2003 - Authorized City Manager to execute a contract with Elliott and Hughes Inc. for the engineering design of Canyon Ridge, Toplea/Sagebrush, Short St. to E. Huitt Lane, and E. Fuller St. in an amount not to exceed $80,885. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Replace a sanitary sewer line on Canyon Ridge. PROJECT SCHEDULE: Engineer selected Anticipate plans complete: June, 2004 Anticipate construction begin: September, 2004 Anticipate construction completion: February, 2005 JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. 73 PROJECT TITLE: LINE REPLACEMENT, CANYON RIDGE PROJECT #: WW0303 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Engineering Sewer Line Replacement $13,000 $162,000 Total Estimated Capital Cost 175,000 Subtotal: $0 FUNDING SOURCE: Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Engineer Services Sewer Mains W/S CIP Fund Balance (W/S CIP Fund Balance $68,246) (Transfer from WT9909 $106,754) 175,000 $0 Total Funding $175,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 13,000 2,870 10,130 22% 162,000 0 162,000 0% TOTAL PROJECT $175,000 $2,870 $172,130 2% 74 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, SAGEBRUSH Project Type: WASTEWATER Sub -Type: MAINS Project No.: WW0304 Priority: A COUNCIL AUTHORIZATION: 7/10/2000 December 9, 2003 - Authorized City Manager to execute a contract with Elliott and Hughes Inc. for the engineering design of Canyon Ridge, Toplea/Sagebrush, Short St. to E. Huitt Lane, and E. Fuller St. in an amount not to excel $80,885. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Replace sanitary sewer lines on the north and south sides of Sagebrush Trail. PROJECT SCHEDULE: Engineer selected Anticipate plans complete: June, 2004 Anticipate construction begin: September, 2004 Anticipate construction completion: February, 2005 JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. 75 PROJECT TITLE: LINE REPLACEMENT, SAGEBRUSH PROJECT #: WW0304 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Engineering Sewer Line Replacement $15,000 $195,000 Total Estimated Capital Cost 210,000 Subtotal: $0 FUNDING SOURCE: Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Engineer Services W/S CIP Fund Balance (Transfer from WT9909 $34,555) (Transfer from WT9910 $175,445) 210,000 $0 Total Funding $210,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 15,000 2,607 Sewer Mains 195,000 12,393 17% 195,000 0% TOTAL PROJECT $210,000 $2,607 $207,393 1% 76 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, SHORT ST. Project Type: WASTEWATER Sub -Type: MAINS Project No.: WW0305 Priority: A COUNCIL AUTHORIZATION: 7/10/2000 December 9, 2003 - Authorized City Manager to execute a contract with Elliott and Hughes Inc. for the engineering design of Canyon Ridge, Toplea/Sagebrush, Short St. to E. Huitt Lane, and E. Fuller St. in an amount not to excel $80,885. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Replace sanitary sewer lines - 8" outfall - Short St. to Copher Ct. PROJECT SCHEDULE: Engineer selected Anticipate plans complete: June, 2004 Anticipate construction begin: September, 2004 Anticipate construction completion: February, 2005 JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. 77 PROJECT TITLE: LINE REPLACEMENT, SHORT ST. PROJECT #: WW0305 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Engineering $7,000 Personnel: Full Time Sewer Line Replacement $80,000 Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Total Estimated Capital Cost 87,000 Subtotal: $0 FUNDING SOURCE: Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Engineer Services W/S CIP Fund Balance 87,000 (Transfer from WT9910) $0 Total Funding $87,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 7,000 2,852 Sewer Mains 80,000 TOTAL PROJECT $87,000 78 $2,852 4,148 41% 80,000 0% $84,148 3% City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, E. FULLER Project Type: WASTEWATER Sub -Type: MAINS Project No.: WW0306 Priority: A COUNCIL AUTHORIZATION: 7/10/2000 December 9, 2003 - Authorized City Manager to execute a contract with Elliott and Hughes Inc. for the engineering design of Canyon Ridge, Toplea/Sagebrush, Short St. to E. Huitt Lane, and E. Fuller St. in an amount not to excel $80,885. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Replace sanitary sewer line on E. Fuller Dr. - north and south sides. PROJECT SCHEDULE: Engineer selected Anticipate plans complete: June, 2004 Anticipate construction begin: September, 2004 Anticipate construction completion: February, 2005 JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. 79 PROJECT TITLE: LINE REPLACEMENT, E. FULLER PROJECT #: WW0306 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Engineering Sewer Line Replacement $12,000 $156, 000 Total Estimated Capital Cost 168,000 Subtotal: $0 FUNDING SOURCE: Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Engineer Services W/S CIP Fund Balance (Transfer from WT 9910) Interest Income 145,475 22,525 $0 Total Funding $168,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 12,000 5,359 Sewer Mains 156,000 6,641 45% 156,000 0% TOTAL PROJECT $168,000 $5,359 $162,641 3% 80 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Project Title: CDBG B03-UC-48-0001-22-50 Project Type: WASTEWATER Sub -Type: Project No.: WW0401 Priority: A Date Prepared: 3/27/2003 Date Completed: COUNCIL AUTHORIZATION: January 28, 2003 - Held public hearing and approved recommended project selection. March 13, 2003 - Held public hearing and approved recommendation to amend project selection. March 25, 2004 - Recommend to Tarrant County to award a contract to Horseshoe Construction in the amount of $295,401. Tarrant County Community Dev will pay $95,001, with the City of Euless paying $200,400 and agreeing to authorize up to $10,000 to cover authorized change orders. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This funding is the 29th year project administered by Tarrant County. This project addresses aging and deteriorating wastewater mains west of South Ector between S.H. 183 and S.H. 10. PROJECT DESCRIPTION: Design and construction of wastewater mains west of South Ector Drive between S.H. 183 and S.H. 10. The existing wastewater mains will be replaced. Lines to be replaced: 1.) Along west side of Park Crestmore addition 2.) Between Windward Way and Sheppard Drive 3.) Between Windward Way and Ridgecrest Drive 4.) Between Ridgecrest Drive and Fairlawn CT 5.) Along Skyway Drive PROJECT SCHEDULE: Engineer to be selected by Tarrant County Anticipated plans complete - Jan, 2005 Anticipated construction award - April, 2005 Anticipated completion - Sept, 2005 JUSTIFICATION: The existing wastewater mains in the Park Crestmore addition have deteriorated through age and use and they need to be replaced. 81 PROJECT TITLE: FY 2004 CDBG PROJECT #: WW0401 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Engineering 26,000 Personnel: Full Time Construction 322,000 Part Time Total Salary $0 Tarrant County Contribution (131,000) Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Total Estimated Capital Cost $0 FUNDING SOURCE: Water Sewer Operating Fund Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Engineering Service 217,000 217,000 $0 Total Funding $217,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 26,000 9,046 Sewer Mains 191,000 16,954 35% 191,000 0% TOTAL PROJECT $217,000 $9,046 $207,954 4% 82 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Project Title: LINE REPLACEMENT, CARR PARK/SH 10 Project Type: WASTEWATER Sub -Type: MAINS Project No.: WW0402 Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 3/27/2003 Date Completed: Systematic replacement of wastewater lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Design and construction of wastewater mains along south side of State Highway 10 from Martha west to Carr Park and along the north side of Carr Park. Existing deteriorated wastewater mains will be replaced. PROJECT SCHEDULE: Engineer Selected Anticipated plans complete - Sept, 2004 Anticipate advertisment - Nov, 2004 Construction award - Jan, 2005 Complete construction - July, 2005 JUSTIFICATION: Wastewater mains in the vicinity of State Highway 10 have deteriorated as they have aged and they need to be replaced. The wastewater main in the creek along the north side of Carr Park is exposed in several locations and is susceptible to damage and a subsequent release of wastewater into the creek. 83 PROJECT TITLE: LINE REPLACEMENT - CARR PARK/SH10 PROJECT #: WW0402 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Engineering Personnel: Full Time Construction Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 30,000 300,000 Total Estimated Capital Cost 330,000 Subtotal: $0 FUNDING SOURCE: Water and Sewer Operating Fund 330,000 Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE $0 Total Funding $330,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED Engineering Services 30,000 Sewer Mains 300,000 30,000 0% 300,000 0% TOTAL PROJECT $330,000 $0 $330,000 0% 84 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Project Title: LINE REPLACEMENT - MIDWAY PARK (NORTH) Project Type: WASTEWATER Sub -Type: MAINS Project No.: WW0403 Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 3/27/2003 Date Completed: Systematic replacement of wastewater lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Design and construction of wastewater mains in the Midway Park Addition. Existing deteriorated wastewater mains will be replaced. PROJECT SCHEDULE: Engineer Selected Anticipated plans complete - Sept, 2004 Anticipate advertisment - Nov, 2004 Construction award - Jan, 2005 Complete construction - July, 2005 JUSTIFICATION: Wastewater mains in the Midway Park area have deteriorated as they have aged and they need to be replaced. 85 PROJECT TITLE: LINE REPLACEMENT - MIDWAY PARK N PROJECT #: WW0403 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Engineering Personnel: Full Time Construction Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 32,000 331,000 Total Estimated Capital Cost 363,000 Subtotal: $0 FUNDING SOURCE: Water and Sewer Operating Fund 363,000 Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Engineering Service Sewer Mains $0 Total Funding $363,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 32,000 0 32,000 0% 331,000 0 331,000 0% TOTAL PROJECT $363,000 $0 $363,000 0% 86 ¶u'nclect Wa/tev 9)zoyects) Project Number Project Description CAPITAL IMPROVEMENTS PROGRAM FUNDED PROJECTS SUMMARY Unfunded/ Budget as of Appropriations/ Budget as of Expended as (Over) Under Estimated (Excess 5-31-03 Amendment 5/31/04 of 5/31/04 Budget Project Costs Funding) WATER PROJECTS WT9902 Water Tank Painting Plans & Specs $200,000 $1,080,000 $1,280,000 $52,656 $1,227,344 $1,280,000 $0 WT0001 Misc Utility Rehab - Water $199,231 $0 $199,231 $25,021 $174,210 $199,231 $0 WT0101 Water Tank Debt Payment $820,442 $277,921 $1,098,363 $1,005,723 $92,640 $1,098,363 $0 WT0104 Well Repairs $75,000 $50,000 $125,000 $69,490 $55,510 $125,000 $0 WT0201 Well Rehab/Disinfection $600,000 $0 $600,000 $476,753 $123,247 $600,000 $0 WT0202 Effluent Water Main $250,000 $0 $250,000 $0 $250,000 $250,000 $0 WT0401 West Pipeline Water Main Replacement $0 $1,000,000 $1,000,000 $0 $1,000,000 $1,000,000 $0 WT0402 Water/Wastewater Impact Fee Update $0 $30,000 $30,000 $0 $30,000 $30,000 $0 WT0405 Line Replacement, West Ash Lane $0 $30,000 $30,000 $0 $30,000 $30,000 $0 WT0406 Line Replacement, Westport,/Newport/Asbury $0 $67,000 $67,000 $0 $67,000 $67,000 $0 FB9910 FB- Water Impact (Restricted) $0 $0 $0 $0 $0 $0 ($2,083,704) FB9901 FB - Water & Sewer CIP $0 $0 $0 $0 $0 $0 ($507,768) Sub -Total Water Projects $2,144,673 $2,534,921 $4,679,594 $1,629,643 $3,049,951 $4,679,594 87 ($2,591,471) City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: WATER TANK PAINTING PLANS & SPECS Project Type: WATER Sub -Type: TANK Project No.: WT9902 Priority: A COUNCIL AUTHORIZATION August 27, 1996- Included in Fiscal 1996-97 Budgel Date Prepared: 7-26-99 Date Completed: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN Incorporated 1.0MG water tank painting and 2.0MG water tank painting in this project. PROJECT DESCRIPTION: This project includes the preparation of bid documents to paint both elevated water storage facilities. Depending on the type of paint presently on the tanks, this account may be under funded. If the present paint is lead -based, EPA requires an expensive removal and disposal process. Plans, specs and bid document expected to be completed by September 2003. PROJECT SCHEDULE: Plans & Specifications complete Painting in process JUSTIFICATION: As time passes, the appearance and protective qualities of paint diminish. To prevent corrosive damage, the elevated storage tanks must be repainted. 88 PROJECT TITLE: WATER TANK PAINTING PLANS & SPECS PROJECT #: WT9902 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct ODeratina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PHASE/FUNDING SOURCE Water Tank Painting 1.0 MG Tank Painting 2.0 MG Tank Painting TOTAL PROJECT TOTAL ESTIMATED CAPITAL COST: Water Tank Painting 1.0 MG Tank Painting 2.0 MG Tank Painting $0 Total Estimated Capital Cost $0 FUNDING SOURCE: W/S Fund Balance FUNDING PENDING: Bonds Proceeds (1.0MG &2.0MG) $0 $0 Total Funding CURRENT STATUS BUDGET 200,000 490,000 590,000 $1,280,000 89 EXPENDED 52,656 0 0 OVER/UNDER BUDGET (- +) 147,344 490,000 590,000 200,000 490,000 590,000 $1,280,000 200,000 1,080,000 $1,280,000 EXPENDED 26% 0% 0% $52,656 $1,227,344 4% City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: MISC UTILITY REHAB - WATER Project Type: WATER Sub -type: MAINS Project No.: WT0001 Priority: A COUNCIL AUTHORIZATION RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN PROJECT DESCRIPTION: Date Prepared: Date Completed: 7/26/1999 This project is for connection of small unidentified water main problems that may arise throughout the fiscal year, Large projects that are identified will be prepared on as "as needed" basis and funded under a new project number PROJECT SCHEDULE: JUSTIFICATION: Some of the City's older water mains have deteriorated and need replacement or repair. Staff requests that this project be funded on an annual basis. 90 PROJECT TITLE: MISC UTILITY REHAB - WATER PROJECT #: WT0001 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost $0 Water Mains 150,000 (Annual minimum funding $150,000) Total Estimated Capital Cost $0 FUNDING SOURCE: W/S Fund Balance Inter -project Transfer to: Milam - Denton/Midway WT0005 Inter -project Transfer from: Misc Water Rehab WT9905 $0 $150,000 200,000 (7,020) 6,251 $0 Total Funding $199,231 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % Expended Contingencies 49,231 18,418 30,813 37% Water Mains 150,000 6,603 143,397 4% TOTAL PROJECT $199,231 $25,021 $174,210 13% 91 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: WATER TANK DEBT PAYMENT Project Type: WATER Sub -type: Project No.: WT0101 Priority: A COUNCIL AUTHORIZATION Approved in Annual Budget. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN PROJECT DESCRIPTION: Date Prepared: Date Completed: 5/1/2001 This project includes the transfer of funds from the water impact fee to pay the debt service related to constructic of the new water tower. PROJECT SCHEDULE: JUSTIFICATION: The water tower provides additional capacity and was included in the water impact fee study. 92 PROJECT TITLE: WATER TANK DEBT PAYMENT PROJECT #: WT0101 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PHASE/FUNDING SOURCE Water & WW Debt TOTAL PROJECT TOTAL ESTIMATED CAPITAL COST: Debt Service - FY01 Debt Service - FY02 Debt Service - FY03 Debt Service - FY04 $0 Total Estimated Capital Cost $0 FUNDING SOURCE: Water Impact Fees Funding Needed in FY2002-03: Water Impact Fees Water Impact Fees FY'04 $0 $0 Total Funding CURRENT STATUS BUDGET EXPENDED 1,098,363 1,005,723 $1,098,363 93 $1,005,723 OVER/UNDER BUDGET (- +) 92,640 249,012 291,759 279,671 277,921 $1,098,363 540,771 279,671 277,921 $1,098,363 Expended 92% $92,640 92% City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: WELL REPAIRS Project Type: WATER Project No.: WT0104 COUNCIL AUTHORIZATION: Date Prepared: 6-1-01 Date Completed: Sub -Type: WELL REPAIR Priority: A April 22, 2003 - Awarded Bid # 018-03 for Far North Well Pump Repair to Layne -Texas for $32,790. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: This funding is being utilized to repair well pumps and unexpected well repairs. PROJECT SCHEDULE: JUSTIFICATION: Maintaining the City's wells results in the ability to produce water at a substantial reduction in cost. 94 PROJECT TITLE: WELL REPAIRS PROJECT #: WT0104 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Well Rehabilitation 125,000 (Minimum Balance Maintained $75,000) $0 Total Estimated Capital Cost $0 FUNDING SOURCE: W/S Operating Fund Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Well Rehabilitation 125,000 $0 Total Funding $125,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 125,000 69,490 55,510 56% TOTAL PROJECT 125,000 69,490 55,510 56% 95 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: 7-26-99 Submitted By: RON YOUNG Date Completed: Project Title: WELL REHAB/DISINFECTION Project Type: WATER Sub -Type: WATER PRODUCTION Project No.: WT0201 Priority: A COUNCIL AUTHORIZATION: October 9, 2001 Bid #054-01 awarded to Millican Well Service for $55,130 for plugging (3) water at 110 Central Drive with a contingency of $13,750. October 23, 2001 Authorized city manager to proceed with emergency plugging of Harwood Trinity water well b- Layne -Texas in the amount of $29,450. October 23, 2001 Authorized city manager to proceed with emergency rehabilitation of the Far North Trinity wat, well by Layne -Texas at an estimated expenditure of $92,254. October 8, 2002 Awarded contract to Tank Builders for Fuller ground storage reservoir in the amount of $222,600 plus a 5% contingency in the amount of $11,180. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: This project consists of inspecting deep wells to determine condition of well pipe, casing, screens and gravel packing and rehabilitating items that are found to be in need. It also includes adding ammonia injection facilities at each of our three well sites. PROJECT SCHEDULE: Fuller Tank Complete Designs complete: Ammonia/Chlorine Free Bldgs Construction in process JUSTIFICATION: Wells are old and heavily used. All three deep wells need to be rehabilitated according to needs determined by inspection. The EPA, TNRCC, and SDWA mandate disinfection by-product limits. If our test results indicate non- compliance, we will need to modify our disinfection process or cease well operations. 96 PROJECT TITLE: WELL REHAB/DISINFECTION PROJECT #: WT0201 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Modification 600,000 Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs $0 Total Estimated Capital Cost $0 FUNDING SOURCE: W/S Operating Fund Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Well Rehabilitation $600,000 600,000 $0 Total Funding $600,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 600,000 476,753 123,247 79% TOTAL PROJECT 600,000 476,753 123,247 79% 97 City of Euless Capital Project Request Department: COMMUNITY SERVICES Submitted By: RICK HEROLD Date Prepared: 6-29-00 Date Completed: Project Title: EFFLUENT WATER MAIN Project Type: WATER Sub -Type: INSTALLATION Project No.: WT0202 Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN PROJECT DESCRIPTION: Effluent water main from City of Ft. Worth, Village Creek Wastewater Treatment Facility to the Texas Star property. PROJECT SCHEDULE: JUSTIFICATION: This source of water would ensure that we could continue water in the event of drought and mandatory water restrictions. 98 PROJECT TITLE: EFFLUENT WATER MAIN PROJECT #: WT0202 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Installation 250,000 Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Water Mains Total Estimated Capital Cost FUNDING SOURCE: W/S Operating Fund $250,000 250,000 $0 Total Funding $250,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 250,000 0 250,000 0% TOTAL PROJECT 250,000 0 250,000 0% 99 City of Euless Capital Project Request Department: WATER DISTRIBUTION Submitted By: RON YOUNG Project Title: W. PIPELINE WATERMAIN REPLACEMENT Project Type: WATERLINE REPLACEMENT Sub -Type: Project No.: WT0401 Priority: A COUNCIL AUTHORIZATION: Date Prepared: 6-15-00 Date Completed: Dec 9, 2003 Approval of Resolution 03-1161 declaring intent to reimburse expenditures with proceeds of future debt. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Needs to be completed prior to maintenance of roadway. PROJECT DESCRIPTION: Replace approximately two (2) miles of 12" water main on W. Pipeline Road from Central Drive to West City Limits. PROJECT SCHEDULE: Engineer selected Design contract award - June, 2004 Plans complete - Jan, 2005 Advertise construction - Feb, 2005 Begin construction - April, 2005 Anticipated construction completion - Sept, 2005 JUSTIFICATION: This waterline is large and deep. It suffers from deterioration and many leaks have had to be repaired. Needed roadway maintenance is being delayed until this line is replaced. 100 PROJECT TITLE: W. PIPELINE WATER MAIN REPLACEMENT PROJECT #: WT0401 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Water Main Replacement $1,000,000 Total Estimated Capital Cost Subtotal: $0 FUNDING SOURCE: Revenue Bonds Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Water Mains 1,000,000 1,000,000 $0 Total Funding $1,000,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 1,000,000 1,000,000 0% TOTAL PROJECT $1,000,000 $0 $1,000,000 0% 101 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Date Prepared: 3/28/2003 Date Completed: Project Title: WATER AND WASTEWATER IMPACT FEE UPDATE Project Type: WATER Sub -Type: Project No.: WT0402 Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Water and Wastewater Impact Fee charges were instituted by the City of Euless in 1990 in accordance with applicable State law to generate revenue for funding of capital improvements attributable to new development. Impact fees are related to the items identified by the Capital Improvements Plan and the Water and Wastewater System Master Plan. PROJECT DESCRIPTION: The project will consist of reviewing the City's Land Use Assumptions, the costs of future infrastructure needs, system capacity available for future growth, the cost of TRA service and update the Capital Improvements Plan. Calculations based on State dictated requirements will be made to determine the maximum allowable impact fees. The City Council will determine what percentage of the maximum allowable fees to impose. PROJECT SCHEDULE: JUSTIFICATION: State legislation required an update every three years. The last update for the City of Euless was performed in 1999. Under the 1990 legislation, an update would have been needed in 2002, however, in 2001 the Legislature passed Senate Bill 243 which extended the time between updates from 3 to 5 years. Year 2004 will be the 5th year since the last update. 102 PROJECT TITLE: WATER & WASTEWATER IMPACT FEE UPDATE PROJECT #: WT0402 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Engineering $30,000 Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs $0 Total Estimated Capital Cost 30,000 $0 FUNDING SOURCE: Impact Fees Wastewater Impact Fees Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Engineering Services TOTAL PROJECT 15,000 15,000 $0 Total Funding $30,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 30,000 0 30,000 0% $30,000 103 $0 $30,000 0% City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, WEST ASH LANE Project Type: WATER Sub -Type: MAINS Project No.: WT0405 Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This water main is included in the City's Water Master Plan. PROJECT DESCRIPTION: Systematic annual replacement of old deteriorated or substandard size water mains. Replace main from Oak Lane to N. Main. Abandon 2" GI main and reconnect existing services to existing 8" and 12" mains. Connect 6" main to existing 12" main. PROJECT SCHEDULE: Engineer selected Award design contract - June, 2004 Plans complete - Oct, 2004 Advertise for bids - Nov, 2004 Award construction contract - Jan, 2005 Anticipated construction completion - June, 2005 JUSTIFICATION: 5/28/2003 Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provides inadequate flow of water for fire protection. 104 PROJECT TITLE: LINE REPLACEMENT -WEST ASH LANE PROJECT #: WT0405 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Engineering Personnel: Full Time Construction Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs $0 Total Estimated Capital Cost $0 FUNDING SOURCE: W/S Operating Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE $3,000 $27,000 30,000 30,000 $0 Total Funding $30,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED Engineering Service 3,000 Water Mains 27,000 TOTAL PROJECT $30,000 105 3,000 0% 27,000 0% $0 $30,000 0% City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, WESTPORT CIR/NEWPORT CIR/ASBURY CIR Project Type: WATER Sub -Type: MAINS Project No.: WT0406 Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This water main is included in the City's Water Master Plan. PROJECT DESCRIPTION: Systematic annual replacement of old deteriorated or substandard size water mains. Replace existing 2" GI mains with 8" PVC. PROJECT SCHEDULE: Engineer selected Award design contract - June, 2004 Plans complete - Oct, 2004 Advertise for bids - Nov, 2004 Award construction contract - Jan, 2005 Anticipated construction completion - June, 2005 JUSTIFICATION: 5/28/2003 Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provides inadequate flow of water for fire protection. 106 PROJECT TITLE: LINE RPL WESTPORT/NEWPORT/ASBURY CIR PROJECT #: WT0406 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct ODeratina Cost Engineering Personnel: Full Time Construction Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs $0 Total Estimated Capital Cost $0 FUNDING SOURCE: Water/Waster CIP fund Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE 6,000 61,000 67,000 67,000 $0 Total Funding $67,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED Engineering Service 6,000 Water Mains 61,000 TOTAL PROJECT $67,000 107 6,000 0% 61,000 0% $0 $67,000 0% (OM,ei-i. ¶u,nc1et 9)zayects) CAPITAL IMPROVEMENTS PROGRAM FUNDED PROJECTS SUMMARY Unfunded/ Project Budget as of Appropriations/ Budget as of Expended as (Over) Under Estimated (Excess Number Project Description 5-31-03 Amendment 5/31/04 of 5/31/04 Budget Project Costs Funding) OTHER ACO202 Parks @ Texas Star Phase III $1,207,171 $19,028 $1,226,199 $608,630 $617,569 $1,226,199 $0 DV9901 EDC Incentive Funds $69,994 $25,000 $94,994 $853 $94,141 $94,994 $0 ED0101 Villages Master Pan $100,000 $0 $100,000 $0 $100,000 $100,000 $0 PD9901 Police and Municipal Courts Facility $11,712,495 $164 $11,712,659 $11,570,127 $142,532 $11,712,659 $0 PR9901 Hike and Bike Trail $237,714 $0 $237,714 $224,502 $13,212 $237,714 $0 PR9902 Senior Citizens Remodel $16,130 $0 $16,130 $14,217 $1,913 $16,130 $0 PR9903- Various EDC Park Projects PR9918 $259,566 $0 $259,566 $231,285 $28,281 $259,566 $0 FM0308 Building A Remodel $1,530,960 $132,278 $1,663,238 $1,621,839 $41,399 $1,663,238 $0 FM0309 Fire Station # 3 $400,000 $1,600,000 $2,000,000 $328,414 $1,671,586 $2,000,000 $0 PR0302 Bob Eden Parking $75,000 $0 $75,000 $73,394 $1,606 $75,000 $0 PR0303 Texas Rangers Youth Ballfield $600,000 $0 $600,000 $0 $600,000 $600,000 $0 PR0407 Parking Improvements, Midway $0 $11,000 $11,000 $0 $11,000 $0 ($11,000) PR0408 Parking Improvements, S. Euless Park $0 $55,000 $55,000 $0 $55,000 $55,000 $0 PR0409 Parking Improvements, Simmons Center $0 $49,500 $49,500 $0 $49,500 $6,960 ($42,540) PR0410 Parking, Villages of Bear Creek $0 $150,000 $150,000 $17,295 $132,705 $33,666 ($116,334) PR0411 Preserve at McCormick Park $0 $125,000 $125,000 $44,702 $80,298 $1,000,000 $875,000 PR0412 Splash Pool $0 $125,000 $125,000 $1,454 $123,546 $125,000 $0 Sub -Total Other Projects $16,209,030 $2,291,970 $18,501,000 $14,736,712 $3,764,288 $19,206,126 $705,126 108 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: 7/7/2000 Submitted By: RAY MCDONALD Date Revised: 3/12/2003 Date Completed: Project Title: PARKS AT TEXAS STAR, PHASE III Project Type: LAND Sub -Type: IMPROVEMENTS Project No.: ACO202 Priority: A COUNCIL AUTHORIZATION: FY2001-02 - Approved $100,000 transfer from General Fund for Design. May 13, 2003 - Awarded contract to Schrickel, Rollins & Assc. for the design of Phase III of the Parks at Texas Star. January 13, 2004- Awarded contract to Carter Construction. May 13, 2003 - Authorized City Manager to negotiate and execute contract with Schrickel, Rollins and Associates for the design of Phase III Sept 9, 2003 - Authorized City Manager to seek bids for construction of Phase III. Nov 25, 2003 - Awarded bid # 010-04 to GC Carter Constuction in the amount of $1,548,686 with alternate 4 for $20,837, and alternate 6 for $19,300 and alternate 8 for $18,126 for a total of $1,606,949. Authorized city manager to execute contract. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project includes the design and construction of Phase III of The Parks at Texas Star in accordance with the Parks Master Plan as approved June 2002. PROJECT DESCRIPTION: These funds will be used for engineering, planning and construction of Phase III of the Parks at Texas Star in accordance with the Parks Master Plan as approved in June 2002. Phase III will have emphasis on athletic fields such as soccer, tee -ball, baseball, and related infrastructure to include shelters and mall pavement areas. PROJECT SCHEDULE: Contract Awarded : Carter Construction, 1/13/04 Construction Started: March, 2004 Anticipated Completion: December, 2004 JUSTIFICATION: This phase will be a continued build -out of Parks at Texas Star as committed to the citizens of Euless with the passage of the 1/2 Cent Sales Tax. 109 PROJECT TITLE: PARKS @ TEXAS STAR, PHASE III PROJECT #: ACO202 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Part Time Water Materials & Supplies Utilities Subtotal: Maintenance Costs Structural Maintenance Athletic Field Supplies Subtotal: Operating Revenue Total Estimated Annual Cost PHASE/FUNDING SOURCE Land Betterment Engineering Services GeoTech Services Contingency (Includes Interest ) Building Construction Utility Installation TOTAL PROJECT TOTAL ESTIMATED CAPITAL COST: Professional Services (Geotech) Design & Engineering 30,000 Contingency Soccer Fields Tee -Ball Fields 25,000 Volleyball Field Relocation 11,500 Utility Development 12,000 Pavement Shelters & Structures Total Estimated Capital Cost $78,500 FUNDING SOURCE: EDC Operating Fund 21,500 Car Rental Tax Fund 25,000 Inter -Project Transfer From: Athletic Complex Phase II Interest Income $46,500 Inter -Project Transfer To: Tx Rangers Youth Park PR0303 ($125,000) $0 Total Funding CURRENT STATUS $133,000 $100,000 $65,607 $150,000 $280,000 $100,000 $150,000 $150,000 $70,000 1,198,607 350,000 900,000 148,607 27,593 (200,000) $1,226,200 OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 680,000 119,029 133,000 74,171 70,000 150,000 $1,226,200 110 438,008 82,772 87,850 0 0 0 $608,630 241,992 36,257 45,150 74,171 70,000 150,000 64% 70% 66% 0% 0% 0% $617,570 50% City of Euless Capital Project Request Department: ECONOMIC DEVELOPMENT Date Prepared: 7-26-99 Submitted By: BILL RIDGEWAY Date Completed: Project Title: EDC INCENTIVE FUNDS Project Type: HALF -CENT SALES TAX Sub -Type: DEVELOPMENT PROJECT Project No.: DV9901 Priority: A COUNCIL AUTHORIZATION: Approved in Sales Tax Revenue Bonds, Series 1994. March 27, 2001 - Approved transfer of $325,000 to N. Main Street for r-o-w to free up funds for a sign program. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Euless Development Corporation funds that have been set aside to aid the City of Euless in attracting development opportunities. PROJECT SCHEDULE: JUSTIFICATION: 111 PROJECT TITLE: EDC INCENTIVE FUNDS PROJECT #: DV9901 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Will be based on the merits of each opportunity. Total Estimated Capital Cost Unknown Subtotal: $0 FUNDING SOURCE: Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Economic Development Incentives* TOTAL PROJECT Half Cent Fund Balance Half Cent Operating Fund Inter -project Transfer to: Fire Station #2 SS0010 N. Main Street 732,594 150,000 (432,600) (355,000) $0 Total Funding $94,994 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 94,994 853 94,141 1% $94,994 112 $853 $94,141 1% City of Euless Capital Project Request Department: ECONOMIC DEVELOPMENT Date Prepared: 7-7-00 Submitted By: BILL RIDGEWAY Date Completed: Project Title: VILLAGES MASTER PLAN Project Type: ECONOMIC DEVELOPMENT Sub -Type: DEVELOPMENT PROJECT Project No.: ED0101 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project involves the preliminary development of a Master Plan for the land bounded by 360 on the east, Harwood on the north, existing development on the west, and 183 on south (old mall site plus Van Riet, Ardinger and DFW properties). PROJECT DESCRIPTION: Commission a study to determine the highest and best use of this valuable commerical land. PROJECT SCHEDULE: JUSTIFICATION: Poor planning can result in lower than desired tax revenue, hodge podge development activity, and less than optimal development quality. City needs to be proactive to guide the development of these vital tracts. 1 113 PROJECT TITLE: VILLAGES MASTER PLAN PROJECT #: ED0101 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Planning Study 100,000 $0 Total Estimated Capital Cost $0 FUNDING SOURCE: Car Rental Tax Fund Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Planning Study $100,000 100,000 $0 Total Funding $100,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 100,000 0 100,000 0% TOTAL PROJECT $100,000 $0 $100,000 0% 114 City of Euless Capital Project Request Department: POLICE DEPARTMENT Submitted By: GARY McKAMIE Date Prepared: 7-15-99 Date Completed: Project Title: POLICE & COURTS FACILITY Project Type: BUILDINGS/FACILITIES Sub -Type: CONSTRUCTION Project No.: PD9901 Priority: A COUNCIL AUTHORIZATION January 13, 1998 - Authorized contract with Phillips Swager for architectural service: April 14, 1998 - Authorized the acquisition of the Western Hills Inn and Western Hills Anne June 9, 1998 - Awarded Bid No. 98-13 for demolition services October 9, 1998 -Awarded change order to West Excavation for abatement of asbestos February 23, 1999 - Authorized additional funds for demolitior June 22, 1999 - Declared expectation to reimburse expenditures with proceeds of future det June 22, 1999 • Authorized City Manager to request qualifications for construction management servic February 22, 2000- Public Hearing and approval of Special Use Permit February 22, 2000 - Approval of request for site plan May 9, 2000 - Approval of Ordinance No. 1426 authorizing sale of Cert. Of Obligation Series 2000/ May 9, 2000 - Awarded bid for construction to Ratcliff Constructior November 14, 2000 - Authorized execution of contract for Project Management Service January 9, 2001 - Granted City Manager approval to authorize change orders not to exceed $25,00: January 23, 2001 - Ratified contract for inspection services to increase limit to $65,00 January 23, 2001 - Approved Change Order #1 to credit contract $152,391 January 23, 2001 - Approved Change Order #3 for payment of $48,372.79 on new piers & remova March 27, 2001 - Approved Change Order #4 to credit contract $42,871.41 May 22, 2001 - Awarded bid #044-01 for furniture in the amount of $332,400.7C June 12, 2001 - Authorize City Manager to execute contract with DataTex not to exceed $74,257.8: August 28, 2001- Awarded contract to DFW Communication in the amount of $33,009 for relocatio and reinstallation of police and public works radio system. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN PROJECT DESCRIPTION: This 53,000 square foot facility will accommodate police, jail and courts. JUSTIFICATION: Current facility space is grossly inadequate for these areas. 115 PROJECT TITLE: POLICE & COURTS FACILITY PROJECT #: PD9901 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Utilities Subtotal: Maintenance Costs HVAC Maintenance Maintenance Janitorial Services & Supplies Elect. Supplies Pest Control Subtotal: Other Average Annual Debt Service Total Estimated Annual Cost PHASE/FUNDING SOURCE Bond Issuance Cost Construction Contingency plus interest earnings Demolition Architectural Services Surveying Services Geo-Technical Services Other Professional Services Equipment Furnishings Land Purchase Off -Site Utilities Owner Equipment Planning Services General CIP(FM0101) TOTAL ESTIMATED CAPITAL COST: Bond Issuance Cost Construction 128,000 Contingency Demolition Architectural/ Surveying/ Geotech Other Professional Services 106,000 Equipment Furnishings Land Purchase Planning Services $234,000 Owner Equipment Total Estimated Capital Cost 18,084 14,850 37,500 5,000 1,000 $76,434 $750,815 FUNDING SOURCE: General Fund W/S Operating Fund CCPD Operating Fund Bond Proceeds Interest Income DEA Funds Inter -project Transfer to: Building D FM0101 $1,061,249 Total Estimated Capital Cost CURRENT STATUS BUDGET 76,000 9,071,257 122,668 606,709 745,369 6,070 75,000 36,310 67,912 350,000 43,592 0 441,344 70,428 * - This project transferred $638,803 to FM0101. TOTAL PROJECT $11,712,659 EXPENDED 76,000 9,071,257 32,340 606,709 745,369 6,071 72,511 36,310 67,912 348,347 43,591 0 393,281 70,428 $11,570,126 OVER/UNDER BUDGET (-+) 0 0 (90,328) (0) 0 1 (2,489) 0 0 (1,653) (1) 0 (48,063) 0 76,000 9,071,257 126,874 606,709 826,439 36,310 65,397 350,000 43,592 68,573 441,344 $11,712,495 $394,890 $175,000 2,160,000 8,600,000 571,572 450,000 (638,803) $11,712,659 EXPENDED 100% 100% 26% 100% 100% 100% 97% 100% 100% 100% 100% 0% 89% 100% ($142,533) 99% 116 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: 8-2-99 Submitted By: RAY MCDONALD Date Revised: 3-12-03 Date Completed: Project Title: HIKE AND BIKE TRAIL Project Type: HALF -CENT SALES TAX Sub -Type: PARK PROJECT Project No.: PR9901 Priority: A COUNCIL AUTHORIZATION FY 1993 - ISTEA Application Approved for submission FY 1994 - Engineering contract awarded November 7,1994 - Approved Resolution 94-880 authorizing an agreement with TxDot for desig and construction of the Trails of Euless, Phase I. September 8, 1999 - Approved additional funding in the Fiscal Year 1998-99 Budge November 14, 2000 - Authorized $108,504 for the construction of the Trails of Eules: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN Provide linkage of Bob Eden, Trailwood, and McCormick Parks with future linkage to Villages of Bear Creek Par Construction is anticipated to start in July 2003 as TxDot is expected to let the project in May 2003. PROJECT DESCRIPTION: This long-awaited and necessary project is primarily funded through ISTEA funding. It provides approximatelytwo miles of concrete trails, linking many of our major parks in the northern quadrant of Euless. With the recent land acquisition, the project is ready for implementation. Project start date will be determined by TxDOT. PROJECT SCHEDULE: Trail Work in Progress: October, 2003 Concrete Trail Finished: March, 2004 Completion Anticipated: September, 2004 JUSTIFICATION: This will allow Euless to take advantage of grant funds that were awarded to Euless over five years ago. This project was delayed due to TxDOT and cost overruns on statewide trail projects. The scope of this project was cut to fit within the proposed TxDOT budget. 117 PROJECT TITLE: HIKE AND BIKE TRAIL PROJECT #: PR9901 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PHASE/FUNDING SOURCE Hike and Bike Trail Engineering Services Planning Services Advertising TOTAL PROJECT TOTAL ESTIMATED CAPITAL COST: Hike and Bike Trail Engineering Services $0 Planning Services Advertising Total Estimated Capital Cost $0 FUNDING SOURCE: Half -Cent Sales Tax Operations Half -Cent Fund Balance $0 $0 Total Funding CURRENT STATUS BUDGET 217,607 7,600 9,914 2,593 $237,714 118 EXPENDED 204,394 7,600 9,914 2,593 $224,501 OVER/UNDER BUDGET (- +) 13,213 0 0 0 217,607 7,600 9,914 $2,593 $237,714 100,000 137,714 $237,714 % EXPENDED 94% 100% 100% 100% $13,213 94% City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: 8-2-99 Date Revised: 3-12-03 Submitted By: RAY MCDONALD Date Completed: Project Title: SENIOR CITIZENS REMODEL Project Type: HALF -CENT SALES TAX Sub -Type: PARK PROJECT Project No.: PR9902 Priority: A COUNCIL AUTHORIZATION September 9, 1997 - Included in Fiscal Year 1997-98 Budget RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN PROJECT DESCRIPTION: This project includes continued remodel of the Simmons Center due to the needs of Euless' aging population. This project includes structural and cosmetic needs as well as purchasing new kitchen equipment and other furniture per request of the senior citizens. PROJECT SCHEDULE: Anticipate completion: September, 2004 JUSTIFICATION: To better serve the expanding Euless senior citizen population. Improvements in previous years has lead to greater usage of the facility. 119 PROJECT TITLE: SENIOR CITIZENS REMODEL PROJECT #: PR9902 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct ODeratina Cost Personnel: Full Time Remodel 16,130 Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs $0 Total Estimated Capital Cost $0 FUNDING SOURCE: Half -Cent Sales Tax Fund Balance Subtotal: $0 Total Estimated Annual Cost $16,130 16,130 $0 Total Funding $16,130 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Senior Citizens - Lighting 8,618 8,618 0 100% Senior Citizens - Remodel 7,512 5,599 1,913 75% TOTAL PROJECT $16,130 120 $14,217 $1,913 88% City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: 8-2-99 Submitted By: RAY MCDONALD Date Revised: 3-12-03 Date Completed: Project Title: VARIOUS EDC PARK PROJECTS Project Type: HALF -CENT SALES TAX Sub -Type: PARK PROJECT Project No.: PR9903 - PR9918 Priority: A COUNCIL AUTHORIZATION: Approved as part Sales Tax Revenue Bonds, Series 1994. December 5, 2000 - Awarded bid of playground to Game Time Modlin Rec. Equip. for McCormick Park in the amount of $18,948. December 5, 2000 - Awarded bid of playground to Little Tikes Commercial Play Sys. for West Park in the amount of $24,212. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: The following portions of this project are complete: Playground improvements Bench upgrades, table upgrades and trash receptacles throughout the park system. Portable restroom enclosures at Midway, Villages of Bear Creek and Bob Eden parks. System upgrades New playgrounds at Westpark, Wilshire Park and McCormick parks. Adopt a Spot Signs and Marketing as well as marketing assistance and beautification projects. Special event tables PROJECT SCHEDULE: EDC Marquee Sign: Anticipate completion September 2004 BB Goal-S. Euless: Anticipate completion December 2004 Floor -Midway Recreation Misc Projects: Anticipate completion September 2004 JUSTIFICATION: These are various upgrades that would enhance the park system throughout the City of Euless. PROJECT TITLE: VARIOUS EDC PARK PROJECTS PROJECT #: PR9903-PR9918 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST MAINTENANCE COST (+ OR -) ANNUAL Direct Operating Cost Personnel: Full Time Park Furnishings 279,566 Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: $0 Total Estimated Capital Cosi $0 FUNDING SOURCE: $279,566 Maintenance Costs Half -Cent Sales Tax Fund Balance 269,566 Donation 10,000 Transfer to Fund Balance (Interfund Project # PR9911) (15,000) (Interfund Project # PR9913) (5,000) Subtotal: $0 Total Estimated Annual Cos $0 Total Fundinc $259,566 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED EDC Marquee Sign 15,000 4,548 10,452 30% BB Goal - S. Euless 20,000 13,332 6,668 67% Playground Imprvmnts(Completed) 10,000 10,000 0 100% Bench Upgrades (Completed) 10,044 10,044 0 100% Table Upgrades(Completed) 15,000 15,000 0 100% Trash Receptacles (Completed) 15,000 15,000 0 100% Port RR Enclosures(Completed) 15,000 15,000 0 100% System Upgrades (Completed) 10,598 10,598 0 100% Disc Golf Course (Cancelled) 0 0 0 0% Playgrounds (Completed) 75,000 75,000 0 100% S. Euless Trails (Cancelled) 0 0 0 0% EDC Adopt A Spot Signs(Complete) 3,000 3,000 0 100% Mkt Asst/Beautification(Completed) 7,500 7,500 0 100% Floor - Midway Recreation 10,000 3,276 6,724 33% Special Event Tables(Complete) 9,000 9,000 0 100% Misc. Project 44,424 39,987 4,437 90% TOTAL PROJECT $259,566 $231,285 $28,281 89% 122 City of Euless Capital Project Request Date Prepared: 6/27/2000 Department: FACILITY OPERATIONS Date Revised: 5/28/2001 Submitted By: GARY MCKAMIE/KYLE MCADAMS Date Completed: Project Title: BUILDING A Project Type: BUILDING Sub -Type: REMODEL Project No.: FM0308 Priority: A COUNCIL AUTHORIZATION October 8, 2002 - Authorized City Manager to execute contracts for architectural services for 7.5°J January 28, 2003 - Authorized City Manager to seek competitive bids for remodeling service: March 25, 2003 - Award Bid # 011-03 to Smith Contractors in the amount of $1,287,000 for the base bid, $75,000 for alternate #1, and $2,800 for alternate #2. June 24, 2003- Authorized city manager to negotiate and execute a contract with Paula Blincoe Collins for the design and installation of a brick sculpture in the amount of $22,290. December 16, 2003 Contractor reached substantial completior RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN Building A is the fourth project of the master plan. PROJECT DESCRIPTION: Building A (Downstairs area) will be renovated to accommodate the new City Council Chambers and Pre -Councils and conference rooms. The upstairs area will be renovated to allow for easier flow of operations and to insure security within these areas. As part of this project a new entrance focal point will be added to the east side of Building A with a water/art feature to celebrate the City's 50th anniversary. JUSTIFICATION: Relocating the Fire Administration and Purchasing Departments to the renovated Building D in the fall of 2002 will allow opportunity to renovate the downstairs area to accommodate the City Council Chambers, which are currentl•, located in Building B. 123 PROJECT TITLE: BUILDING A PROJECT #: FM0308 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Maintenance Costs Janitorial Services & Supplies Pest Control Subtotal: Total Estimated Annual Cost PHASE/FUNDING SOURCE Remodel/Improvements Owner Equipment Architectural Services Asbestos Remediation Moving Expeses Contingency Art Sculptures Parking Improvements TOTAL PROJECT TOTAL ESTIMATED CAPITAL COST: Remodel Architectural fees (7.5%) $0 Owner Equipment Moving expenses Art Sculpture 9,500 Asbestos Remediation Parking Improvements Total Estimated Capital Cost $9,500 FUNDING SOURCE: Car Rental Tax Fund - FY03 2,500 EDC Operating Fund - Art Budget 8,500 Car Rental CIP Fund Balance 600 FUNDING PENDING: $11,600 Car Rental - FY '04 $21,100 Total Funding CURRENT STATUS $1,409,961 $120,815 $39,800 $4,593 $22,290 $952 $64,827 1,663,238 1,373,476 157,484 22,290 109,988 $1,663,238 OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 1,409,961 39,800 120,815 952 4,593 0 22,290 64,827 $1,663,238 124 1,373,831 25,180 129,171 0 5,051 579 23,200 64,827 $1,621,838 36,130 14,620 (8,356) 952 (458) (579) (910) 0 97% 63% 107% 0% 110% 104% 100% $41,400 98% City of Euless Capital Project Request Department: FACILITIES OPERATIONS Date Prepared: Submitted By: KYLE MCADAMS Date Completed: Project Title: FIRE STATION # 3 Project Type: BUILDING Sub -Type: CONSTRUCTION Project No.: FM0309 Priority: A COUNCIL AUTHORIZATION: October 8, 2002 - Authorize City Manger to execute contract for architectural services for 7%. April 27, 2004 - Authorize City Manager to seek bids for construction of Fire Station # 3. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Fire station # 3 will be the fourth project in the master plan. PROJECT DESCRIPTION: 7/19/2000 Construction of a new city Fire Station at 210 South Main Street for the relocation of station # 3. Building will consist of land development and construction of a 10,000 sq. ft. facility. Building will include the apparatus bays, living quarters, day rooms and general office space for approximately 8-15 fire personnel. Construction will begin in June 2004 and will take 12 months to complete. PROJECT SCHEDULE: JUSTIFICATION: The original structure currently housing station # 3 is 30-40 years old and has received three separate renovations. The building consists of various different structures added to the original shell situated on a narrow tract of land with difficult ingress and egress. Structure is of a slab on grade cinder block type construction and has begun to show signs of stress and building separation. Construction of a new station or remodel at the current site is not feasible due to the current size requirements of the station and the size of the tract. 125 PROJECT TITLE: FIRE STATION # 3 PROJECT #: FM0309 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Maintenance Costs Pest Control Janitorial Supplies Subtotal: Total Estimated Annual Cost PHASE/FUNDING SOURCE Surveying Service Architectural Service Contingencies Land Purchase Construction Landscaping Irrigation System Instr. & Apparat Furniture Owner Equipment TOTAL ESTIMATED CAPITAL COST: Design/Land Purchase Construction Architech Services Surveyor Services $0 Furniture Telephone/Data Intercom 5,500 Landscaping Irrigation Appliances Total Estimated Capital Cost $5,500 FUNDING SOURCE: Car Rental Tax Fund 2,000 450 500 $2,950 $8,450 Total Funding CURRENT STATUS BUDGET 5,000 270,000 0 250,000 1,447,500 3,000 3,500 6,000 10,000 5,000 $400,000 $1,447,500 $120,000 $5,000 $10,000 $4,000 $2,000 $3,000 $3,500 $5,000 2,000,000 2,000,000 $2,000,000 OVER/UNDER EXPENDED BUDGET (- +) % EXPENDED 2,605 325,345 14 450 2,395 (55,345) (14) 249,550 1,447,500 3,000 3,500 6,000 10,000 5,000 52% 120% -100% 0% 0% 0% 0% 0% 0% 0% TOTAL PROJECT $2,000,000 $328,414 $1,671,586 16% 126 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: 4/1/2002 Submitted By: RAY MCDONALD Date Revised: 3/12/2003 Date Completed: Project Title: PARKING - BOB EDEN Project Type: LAND Sub -Type: IMPROVEMENTS Project No.: PR0302 Priority: A COUNCIL AUTHORIZATION RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN With approval of the Parks Master Plan in June 2002, this project was identified as an immediate need. PROJECT DESCRIPTION: With the completion of Mid -Cities Blvd, parking infrastructure will require improvements/expansionto accommodate user vehicle(s). These improvement/expansion plans will ensure the existing parking areas are improved to levels that will accommodate both user demand as well as tie into future expansion/upgrades for the park facility as outlined in proposed Master Plan. PROJECT SCHEDULE: Survey - March, 2003 Overlay Start - December, 2003 Completion Anticipated - September, 2004 JUSTIFICATION: Realignment of Mid -Cities has increased the need to update the existing park infrastructure. Taking advantage of the new park land and providing needed improvements will ensure Euless' most utilized park facility will meet and exceed user expectations. 127 PROJECT TITLE: PARKING - BOB EDEN PROJECT #: PR0302 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Design/Contingency Construction Overlay - 2 inch Asphalt $0 Total Estimated Capital Cost $0 FUNDING SOURCE: Car Rental Tax Fund $0 $0 Total Funding CURRENT STATUS PHASE/FUNDING SOURCE BUDGET Engineer Services Land Betterment TOTAL PROJECT $5,000 $70,000 75,000 75,000 $75,000 OVER/UNDER EXPENDED BUDGET (- +) % EXPENDED 5,000 1,500 70,000 71,894 $75,000 128 $73,394 3,500 (1,894) 30% 103% $1,606 98% City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: 6/25/2002 Submitted By: RAY MCDONALD Date Revised: 3/12/2003 Date Completed: Project Title: YOUTH BALLPARK Project Type: LAND Sub -Type: IMPROVEMENTS Project No.: PR0303 Priority: A COUNCIL AUTHORIZATION Jan 13, 2004 - Approved Ordinance 1621 to amend the FY2004 budget to provide funding for projec RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN With the approval of the Parks Master Plan in June 2002, this project was identified as an immediate need. This project involves a partnership agreement and commitment with Texas Rangers to build and design a youth ballpai k. Phase III of the Parks at Texas Star (see ACO202) contains further provisions for the development of this park anc related infrastructure. PROJECT DESCRIPTION: Park facility that will have emphasis on athletic fields and like furnishings for youth baseball activities. PROJECT SCHEDULE:: Contract Awarded - January 13, 2004 Construction Start - March, 2004 Completion- December, 2004 JUSTIFICATION: Taking advantage of the park land located at Parks at Texas Star Sports Centre and providing needed improvements will ensure the park facility will meet and exceed user expectations with respect to youth sport activities. This project will enhance the build -out of the Parks at Texas Star as committed to the citizens of Euless with the passage of the 1/2 Cent Sales Tax. 129 PROJECT TITLE: YOUTH BALLPARK PROJECT #: PR0303 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Part Time Purchase of Services Materials & Supplies Utilities Advertising Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PHASE/FUNDING SOURCE Land Betterment TOTAL PROJECT TOTAL ESTIMATED CAPITAL COST: Design & Construction 20,000 Site Work & Appurtenances Bleachers & Shelters Entrance 5,000 10,000 12,000 15,000 Total Estimated Capital Cost $62,000 FUNDING SOURCE: Car Rental Tax Fund Sponsorship (Not yet received) Inter -Project Transfer: Project ACO202 $0 $62,000 Total Funding CURRENT STATUS $280,000 $50,000 $230,000 $40,000 600,000 400,000 200,000 $600,000 OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 600,000 0 600,000 $600,000 130 0% $0 $600,000 0% City of Euless Capital Project Request Department: COMMUNITY SERVICES Submitted By: RAY MCDONALD Date Prepared: 3/27/2003 Date Completed: Project Title: PARKING IMPROVEMENTS - MIDWAY PARK Project Type: LAND Sub -Type: IMPROVEMENTS Project No.: PR0407 Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: To resurface parking areas located at Midway Park for demolished Parks Department Building. PROJECT SCHEDULE: Project cancelled. Current parking is adequate for the facility JUSTIFICATION: Parking area is deteriorated and beyond patch repair. 131 PROJECT TITLE: Parking Improvement Midway PROJECT #:PR0407 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct ODeratina Cost Construction Personnel: Full Time Contingency Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs $0 0 0 Total Estimated Capital Cost 0 $0 FUNDING SOURCE: Car Rental Interproject Transfer: FB9913 - 6/30/04 Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Parking Improvments 11,000 (11,000) $0 Total Funding $0 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET(-+) % EXPENDED 11,000 11,000 0% TOTAL PROJECT $11,000 $0 $11,000 0% 132 City of Euless Capital Project Request Department: COMMUNITY SERVICES Submitted By: RAY MCDONALD Date Prepared: 3/27/2003 Date Completed: Project Title: PARKING IMPROVEMENTS - S EULESS PARK Project Type: LAND Sub -Type: IMPROVEMENTS Project No.: PR0408 Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project includes the infrastructure improvements as recommended in the Parks Master Plan as approved in June 2002. Project to begin after completion of Splash Pool(PR0412). PROJECT DESCRIPTION: To resurface parking areas located at S. Euless Park. PROJECT SCHEDULE: Anticipated Bid Date: December 2004 Anticipated Start Date: March 2005 Anticipated Completion Date: April 2005 JUSTIFICATION: Current parking areas are deteriorated and beyond patch repair. 133 PROJECT TITLE: Parking Improvements S Euless PROJECT #:PR0408 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct ODeratina Cost Construction Personnel: Full Time Contingency Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 50,000 5,000 Total Estimated Capital Cost 55,000 Subtotal: $0 FUNDING SOURCE: Car Rental Tax 55,000 Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Parking Improvements $0 Total Funding $55,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET(-+) % EXPENDED 55,000 55,000 0% TOTAL PROJECT $55,000 $0 $55,000 0% 134 City of Euless Capital Project Request Department: COMMUNITY SERVICES Submitted By: RAY MCDONALD Date Prepared: 3/27/2003 Date Completed: Project Title: PARKING IMPROVEMENTS - SIMMONS CENTER Project Type: LAND Sub -Type: IMPROVEMENT Project No.: PR0409 Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project includes the infrastructure improvements as recommended in the Parks Master Plan as approved in June 2002. PROJECT DESCRIPTION: To resurface parking areas located at Simmons Center Senior Complex. PROJECT SCHEDULE: Anticipated Bid Date: June 2004 Anticipated Completion Date: August 2004 JUSTIFICATION: Current parking areas are deteriorated and beyond patch repair. 135 PROJECT TITLE: PARKING IMPROVEMENTS-SIMMONS CENTER PROJECT #:PR0409 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct ODeratina Cost Construction Personnel: Full Time Contingency Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs $0 Total Estimated Capital Cost $0 FUNDING SOURCE: Car Rental Tax Interproject Transfer: FB9913 - 7/29/04 Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Parking Improvements 6,960 6,960 49,500 (42,540) $0 Total Funding $6,960 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET(-+) % EXPENDED 49,500 0 49,500 0% TOTAL PROJECT $49,500 $0 $49,500 0% 136 City of Euless Capital Project Request Department: COMMUNITY SERVICES Submitted By: RAY MCDONALD Date Prepared: Date Revised: Date Completed: Project Title: PARKING - VILLAGES BEAR CREEK Project Type: LAND Sub -Type: IMPROVEMENTS Project No.: PRO410 Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN; 4-1-02 3-12-03 This project includes the infrastructure improvements as recommended in the Parks Master Plan as approved in June 2002. In March 2004, drainage improvements made on southwest parking lot. Remaining parking areas are under evaluation for required improvements(TBD). PROJECT DESCRIPTION: With recent land acquisition, parking infrastructure will require improvements/expansion to accommodate user vehicle(s). These improvements/expansion plans will ensure parking areas are improved/increased to levels that will accommodate both user demand and future expansion/upgrade plans as outlined in Master Plan. PROJECT SCHEDULE: Drainage Improvement made on southwest parking lot: March 2004 Remaining improvements: TBD JUSTIFICATION: Land acquisition will require increased parking infrastructure. Taking advantage of the new park land and providing needed improvements will ensure the park facility will meet and exceed user expectations. 137 PROJECT TITLE: PARKING -VILLAGES BEAR CREEK PROJECT #:PRO410 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct ODeratina Cost Design Personnel: Full Time Construction Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs $0 Total Estimated Capital Cost $0 FUNDING SOURCE: Car Rental Tax Interproject Transfer: FB9913 - 7/29/04 Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Parking Improvements 33,666 33,666 150,000 (116,334) $0 Total Funding $33,666 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET(-+) % EXPENDED 150,000 17,295 132,705 12% TOTAL PROJECT $150,000 $17,295 $132,705 12% 138 City of Euless Capital Project Request Department: COMMUNITY SERVICES Submitted By: RAY MCDONALD Date Prepared: Date Revised: Date Completed: Project Title: PRESERVE AT McCORMICK PARK Project Type: LAND Sub -Type: IMPROVEMENTS Project No.: PR0411 Priority: A COUNCIL AUTHORIZATION: 6-25-02 3-12-03 March 25, 2004 - Authorized city manager to execute a contract with Ion Design for the design of McCormick Park. March 25, 2004 - Authorized city manager to enter into a contract with Texas Parks and Wildlife for a $500,000 grant to be utilized for the Preserve at McCormick Park. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The Parks Master Plan as approved in June 2002 contains provision(s) for trail and infrastructure enhancements within the City of Euless parks system. Additionally, Outdoor Learning/Nature Center areas for the citizens of Euless will be given consideration in the Preserve Park project. PROJECT DESCRIPTION: Parking infrastructure, support structures (i.e. restrooms), trail -head linkage to accommodate city-wide trail enhancement program, boardwalk and small playground area. This park will preserve open space and provide for outdoor nature and preservation education opportunities. PROJECT SCHEDULE: Design Complete: May 2004 Anticipated Bid Date Construction: July 2004 Anticipated Completion Date: April 2005 JUSTIFICATION: Trail development and enhancement opportunities will be consistent with available land, funding and time variables. This Master Plan recommendation addresses the top 10 items on the priority list in the Parks Master Plan. The plan will be funded through a grant from Texas Parks and Wildlife in the amount of $500,000. Land will be contributed in -kind from Sandlin Properties and offset the matching funds required for the grant. 139 PROJECT TITLE: PRESERVE AT McCORMICK PARK PROJECT #:PRO411 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct ODeratina Cost Engineering 75,000 Personnel: Full Time Construction 550,000 Part Time Land (Donated) 375,000 Total Salary $0 Purchase of Services Materials & Supplies Utilities Total Estimated Capital Cost 1,000,000 Subtotal: $0 FUNDING SOURCE: Car Rental Tax 125,000 Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Land Betterments *Note: Additional funding to come from Grants ($550,000) and donated land ($325,000) $0 Total Funding $125,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET(-+) % EXPENDED 125,000 44,702 80,298 36% TOTAL PROJECT $125,000 $44,702 $80,298 36% 140 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: 3/27/2003 Submitted By: RAY MCDONALD Date Completed: Project Title: SPLASH POOL Project Type: EDC Sub -Type: RENOVATION Project No.: PR0412 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The Parks Master Plan in the approved form includes provisions/recommendations to construct an Aquatic Center at Midway Park to address the current state and age of city pools (30+ years). Phase I of the Pools project includes a study and design for pools located in S. Euless and Wilshire Park. Ultimately, Phase II of this project will address the renovation of the pools at S. Euless and in Wilshire Park. An additional CIP project addresses the addition of an Aquatic Center at Midway Park. PROJECT DESCRIPTION: Phase I of the two phase project plan for pools will be for the engineering and design studies on renovation of pools at S. Euless and Wilshire Park. This phase also includes proposed funding to add a water park feature at one of the pool sites. This feature will be available for users of the pool who might be inconvenienced by refurbishment to occur in Phase II. Midway park pool facilities are further addressed in a proposed CIP Aquatic Center Project. PROJECT SCHEDULE: Design Splash Pad: May 2004 Bid Opening - June, 2004 Construction Anticipated - August, 2004 Construction Complete - December, 2004 JUSTIFICATION: Three (3), thirty year old pools are outdated and the City should upgrade aquatic offerings for growing citizen population. 141 PROJECT TITLE: SPLASH POOL PROJECT #:PR0412 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PHASE/FUNDING SOURCE Engineer Service Remodel TOTAL ESTIMATED CAPITAL COST: Engineering Water Feature - Spray Park Amenities $0 Total Estimated Capital Cost $0 FUNDING SOURCE: 1/2 Cent Operating $0 $0 Total Funding CURRENT STATUS BUDGET 25,000 100,000 25,000 100,000 125,000 125,000 $125,000 OVER/UNDER EXPENDED BUDGET(-+) % EXPENDED 1,454 23,546 0 100,000 6% 0% TOTAL PROJECT $125,000 $1,454 $123,546 1% 142 Pro)oct Description DRAINAGE PROJECTS Boyd Branch Iel Hurricane Creek. Bridge al Marlene Design." Hurricane Creek. Bridge at Marlene ROW aI Hurricane Creek, Bridge al Marlene Const ta> Bell Hi Addition w1 Sub -Total Drainage Priority B Kynetle Dive Culvert Modifications Bear Creek Park Blessing Branch, Main to SH 301 Bob Eden Park Boyd Branch (FEMA) Diversion Line - Oak Lane Hurricane Crook -North of SH 10 1-' Oak Lane Channel Royal Oaks Addition Tral'Wood Addition (Summit Ridge) 5ub• Total Drainage Priority C DRAINAGE PROJECTS - TOTAL STREET PROJECTS Ross Aiionue from S. Main 300' West Industrial Blvd Traffic Signal Timing Harwood Road, FM157 to N. Main Overlay Sub -Total Street Priority Trt+unn Crossing Bridge an Fuller W iserConnector ro> East Midway Road Overlay rol Sub -Total Street Priority 8 Ash Lone - Aransas to N. Main (faze Road - Glade to Md•Citles Gateway Boulevard - Northern Portion Harwood Road - Main to SH 157 A - Prorecls that euI De preserved to Counnl Wong the .Ccornrg near 8- Prefect tintwtl be preserved Io Courr:lwhn two to fne wort C• Prokces Oral a1 be oretericd 10 Council ►e we yew: Priority Estimated Cost 8 S 5o0.ao0 8 S 125.000 B S 200.090 B S 850.000 B S 1390,000 S 2.475,000 C S 120.000 C S 2,200,000 C S 5.285,000 C S 550.000 C S 880.000 C S 45.000 C $ 4,590,000 C S 450.090 C TBD C $ 185,000 $ 14,305,000 $ 10,780,000 A $ 95.500 A $ 50,000 A S 137.000 S 282,500 B S 775.000 B $ 495.090 B $ 83,000 $ 1,353,000 C $ 935,000 c TBD C $ 1,000.000 C TBD CAPITAL IMPROVEMENT PROGRAMS UNFUNDED PROJECTS • SORTED BY TYPE PROPOSED METHOD OF FINANCING Operating CIP Fund Bond Selo Fund Balance XX XX XX Grants! Impact Escrow Car Rental Hotel Contrib Fees Funds Tax Tax XX XX XX XX XX XX XX XX EDC To Be Determinod XX XX XX XX XX XX XX XX XX XX XX XX XX XX CAPITAL IMPROVEMENT PROGRAMS UNFUNDED PROJECTS - SORTED BY TYPE PROPOSED METHOD OF FINANCING Operating CIP Fund Grants/ Impact Escrow Car Rontal Hotel To Bo Project Description Priority Estimated Cost Fund Balance Contrib Salo Contrib Fees Funds Tax Tax EDC Determined Vine St - SH 183 to SH 10 C TBD XX Traffic Signal Mid -Cities at Gaze C TBD XX Traffic Signal Mid -Cities at Gateway Blvd C TBD XX Traffic SiCmttt Harwood at Bear Creek Parkway C TBO XX Sub -Total Street Priority C S 1,035,000 STREETS PROJECTS - TOTAL $ 3,570,500 WASTEWATER PROJECTS Line Replacement, Pebble Creek 1 A 5 137.000 XX Sub-Tote/Was tet.wterPriority A $ 137,000 Line Replacement, Arnettt'1 B $ 304,000 XX Line Replacement. Eclor OrlveO°I B $ 230,000 XX Line Replacement, Merlin Lane ('') B S 75,000 XX I Line Replacement, McCormick & Copher rot B $ 75,000 XX Litde Bear Creek Collection Line Ic] ..A B 5 460,000 XX 41. Line Replacement. Fayette") B $ 325,000 XX r Line Replacement. Jean Lefler' B 5 85,000 XX Line Replacement, Ceder Hill Estates I61 B 5 310,000 XX Line Replacement W. Fulkr at 8 $ 80,000 XX Line Replacement, Wood Ridge Circle 114 B $ 165,000 XX Line Replacement, Keen(O' B $ 275,000 XX Line Replacement Faun Drive on B $ 110,000 XX Linc Replacement, Hodges Drive 6') B $ 130,000 XX Line Replacement, Arneti drive t•) B $ 140,000 XX Sub•Tofal Wastemeter Priority 8 $ 2,833,000 Lino Replacement, Linda Lane C 5 200,000 Sli 103 Utility Relocation C TBD XX Line Replacement, West Alexander C $ 160,000 XX Line Replacement, Norman Dnve C 5 100,000 XX Line Replacement, Franklin Drive C 5 160,000 XX Line Replacement, South MIIs Drive C S 308,000 XX Line Replacement, Whitener/Ascot Outfall C $ 178,000 XX Line Replacement, Alexander/Ascot 041011 C $ 242,000 XX Line Replacement, Ross Avenue C $ 150,000 XX A - Proixl, that v.I be D rr-varied to Co ono! donne 1}r egcanro yo ar B - Proiecl a that wl be D rezerred to Co uncl *Mho two to five year. C-ProjeetsIicvlssiIbet:eremedloCaroiIboyordlAreyo re. Project Description Lino Replacement. Blanco. Aransas Crane Line Roplacemenl, Denton. Ilion, Bell Lino Replacement. Herne. Bell. Collin Lone Replacement. Ilion. Harris Line Replacement. Collin Dnve Line R•:;.iacemertt, Slaughter1E Huai Sub -Total Wastexclter Priority C WASTEWATER PROJECTS - TOTAL WATER PROJECTS Priority Estimated Cost Operating Fund C TBD c 781i C TBD C TBD C TBD C TBD $ 1,49e,000 $ 4,466.000 Water Sr,"tem General Security Updates A S 40.000 XX FY2065 CttiBG A $ 164.300 S 69,300 Line Replacement. South Atkerson Lane A $ 79.000 XX Lone Replacement, Blanco Drive A $ 06.000 XX Line Replacement. Honslee A $ 183,000 XX Line Replacement John VernorttSletghter A $ 161.000 XX CAPITAL IMPROVEMENT PROGRAMS UNFUNDED PROJECTS • SORTED BY TYPE PROPOSEQ METHOD OF FINANCING CIP Fund Grants! Impact Escrow Car Rental Hotel Balance Contrib Fees Funds Tax Tax Bond Sale $ 95,000 Sub -Total Water Priority A $ 723,300 Water Sr Security Perimeter Fencing Upgrade' B $ 75.000 XX Hwy 360 W ator Crossing B $ 395.000 XX XX Line Replacement, Cannon Drive (s) B $ 248,000 XX Lone Replacement. Canyon Ridge m1 B $ 84,000 XX Line Replacement, Hodges Drive tr) B $ 101,000 XX Line Replacement, Live Oak CULrue Oak Dr 1') B $ 77.000 XX Lone Replacement, Sonnet Driver') B $ 80.000 XX Line Replacement. Mesa Drive(') B $ 55.000 XX Line Replecomoni.Marione Drivel1) B $ 73,000 XX Line Replacement, S. Pipeline Road West (1) B $ 122,000 XX Water System Security Camera Installation m B $ 70,000 XX Line Replacement. S. Pipeline Road East B $ 125,000 XX Line Repiacomcnt. Collins. Dallas to Harwood B $ 132.000 XX Line Repl8cemer'bt. Collins, Denton to Dallas i'1 B $ 118,000 XX Line Replacement, S. Mitts Drive t9i B S 101.000 XX Line Replacement. Westwood Drive N) 8 S 151,000 XX Sub -Total Water Priority B $ 2,070.000 A Proreets that ool be preeoerled to Corner I citing the Wcannp year 8-Protect: that owl be pr o rfedto Cana Ielhntno ornv)ear& C - Pforces that vnl be pre:e rated to Cowell beyond h.w y rs EDC To Bo Determined XX XX XX XX XX XX Project Description Line Replacement, Fuller Drive Hwy 163 Water Crossing Line Replacement, Eci r Drive Line Replacement, A6dway Dr East Line Replacement. fvldvvwy Dr West Line Replacement- Simmons Drive North Line Replacement. Simmons Drive South line Replacement, Dickey Orive South Line Rerlacement. Dickey Orme North Line Replacement. Paula Lane Line Replacement, Hollow Oak Lino Realacement. Denton Dirve Line Replacement. S. Main Street (North) Line Replacement, S. Main Street (South) Line Replacement. Ststset Dr Line Replacement. W ildvvood Line Renlecemenl, Woodvine(East) line Replacement, W ao d vi ne (Vd esll Line Renlocoment, Sofinslwoorl Ct Line Replacement. Shady Creek & CI;ftwood Water System Security Land Acquistion Sub- Total Water Priority C WATER PROJECTS - TOTAL OTHER PROJECTS Building B Design Slope Protection -Phase 4 Parking•Presenv M CormRck Park Sub -Tote! Other Prforfty A 840l6ng B Cortstruclionl01 Dog Park - Bob Eden Park Park Amenities Upgrade l" Pool Renovations - Phase II - Wilshire Parkni Public Works Facility m A- Project: bet el be twee -cried to Corner drs+r9 the Wcpring Veer fi-ProioC1ethat el be preeer,led to CornciIwthin too 10 We Mils C - Pro]ocee bell will be rrece oted 10 Co well Dope ird frgyears Priority Estimated Cost Operating Fund C $ 142.000 C TBD C TBD C TBD C TBD C TBD C TBD C TBD C TBD C TBD C TBD C TBD C TBD C TBD C TBD C TBD C TBD C TBD C TBD C T60 C TBD $ 142.000 S 2.944.300 A S 100.000 A S 122,000 A S 75.000 S 297,000 B S 045,104 B S 75,000 B S 150.000 B S 1.000,000 B S 1.729,050 CAPITAL IMPROVEMENT PROGRAMS UNFUNDED PROJECTS -SORTED BY TYPE PROPOSQ METHOD OF FINANCING CIP Fund Grants/ Impact Escrow Car Rental Hotel Balance Contrib Fees Funds Tax Tax XX Bond Sale XX XX XX XX XX XX XX EDC To Bo Determined XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX CAPITAL IMPROVEMENT PROGRAMS UNFUNDED PROJECTS - SORTED BY TYPE PROPOSED METHOD OF FINANCING Operating CIP Fund Grants/ Impact Escrow Car Rental Hotel Project Description Priority Estimated Cost Bond Sala Fund Balance Contrib Fees Funds Tax Tax Pool Renovations • Phase 111 - South Euless t°B $ 1,000,000 XX Parks Sign Program B $ 125.000 XX Pool Renovations - Phase (V - NFdv1l$y x) B $ 1.000.000 XX City Wide Trail Enhancements -Phase I a1 8 $ 250,000 XX tv1iSe Park Shucture Impro‘emente 0'1 B $ 150,000 XX Sub. Total Other PstruityB $ 0,424,244 Fire Training Facility C $ 1,315.000 Library Build Out C $ 2,202.500 Acuatres ContcrlRec Center Exp Phase 1 C $ 5,500.000 Arlu hits Center/Rec Center El , Phase II C $ 4,400,000 City Wide Trail Enhancements • Phase 11 C $ 350.000 City Wide Trail Enhancements • Phase III C $ 200.000 City Wide Trail Enhancements - Phase IV C $ 150,000 Perks Texas Star, Phase iV C $ 2,000.000 Simmons Center Expansion C $ 850,000 Ruth Mittican Expansion C $ 1,150,000 Commuting Golf Course a Bob Eden C $ 4,000.000 Sub•TotalOther Priority C $ 22,117,500 OTHER PROJECTS - TOTAL A . Protect: list wl ba pre:er» ed to Cauctdurng the vocemegym* 8 Protect:liar vol be pre:erfed fo CeucA..lhn t o to hve years. C Prolccis that.wl be Rrerted Oo Counol trepord IMe )ears $ 28,838,744 EDC To 8a Determined XX XX XX XX XX XX XX XX XX XX XX 9)?/01/exls' Project Description Priority Estimated Cost CAPITAL IMPROVEMENT PROGRAMS UNFUNDED PROJECTS - SORTED BY TYPE PROPOSED METHOD OF FINANCING Operating Fund CIP Fund Balance Bond Sale Grants/ Impact Escrow Car Rental Contrib Fees Funds Tax DRAINAGE PROJECTS Boyd Branch (6) B $ 500,000 XX Hurricane Creek, Bridge at Marlene Design(6) B $ 125,000 XX Hurricane Creek, Bridge at Marlene ROW') B $ 200,000 XX Hurricane Creek, Bridge at Marlene Const tat B $ 850,000 XX Bell Hi Addition (9) B $ 800,000 XX Hotel Tax EDC To Be Determined Sub -Total Drainage Priority B $ 2,475,000 Kynette Drive Culvert Modifications C $ 120,000 XX Bear Creek Park C $ 2,200,000 XX Blessing Branch, Main to SH 360 C $ 5,285,000 XX Bob Eden Park C $ 550,000 XX Boyd Branch (FEMA) C $ 880,000 XX Diversion Line - Oak Lane C $ 45,000 XX Hurricane Creek, North of SH 10 C $ 4,590,000 XX Oak Lane Channel C $ 450,000 XX Royal Oaks Addition C TBD XX Trailwood Addition (Summit Ridge) C $ 185,000 XX Sub -Total Drainage Priority C $ 14,305,000 DRAINAGE PROJECTS - TOTAL A - Projects that will be presented to Council during the upcoming year. B - Projects that will be presented to Council wthin two to five years. C - Projects that will be presented to Council beyond five years. $ 16,780,000 148 Department: Submitted By: Project Title: Project Type: Project No.: City of Euless Capital Project Request PUBLIC WORKS RANDY BYERS BOYD BRANCH DRAINAGE Sub -Type: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-7-00 Date Completed: Channel improvements are shown as being necessary for development in the City's Master Drainage Plan for Boyd Branch. PROJECT DESCRIPTION: Rebuild and enlarge the existing concrete and rock lined channel from S.H. 10 to the south end of the apartment complex to provide protection in a 100 year storm event. PROJECT SCHEDULE: JUSTIFICATION: To address the flooding of several apartment buildings and prevent the flooding of other buildings located within the 100-year floodplain. 149 PROJECT TITLE: BOYD BRANCH PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 500,000 $500,000 0% 0% 0% 0% 0% 150 City of Euless Capital Project Request Date Prepared: 7-26-99 Department: PUBLIC WORKS Date Revised: 5/28/2003 Submitted By: ROBERT BARKER Date Completed: Project Title: HURRICANE CREEK & BRIDGE AT MARLENE DESIGN Project Type: DRAINAGE Sub -Type: Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN In 1996, the City received the storm drainage master plan for Hurricane Creek. PROJECT DESCRIPTION: This project includes the design of a larger culvert at Marlene Drive and for the improved concrete channel lininc that will extend approximately 1300 feet downstream. The design is proposed to be initiated in fiscal year 2005. PROJECT SCHEDULE: JUSTIFICATION: The undersized culvert and concrete channel will be rebuilt so as to prevent structural flooding of approximately to eight houses in a 100-year flood event. 151 PROJECT TITLE: HURRICANE CREEK & BRIDGE AT MARLENE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cos PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST Engineering $0 $0 $0 $0 Total Estimated Capital Cosi CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 125,000 $125,000 152 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: ROBERT BARKER Date Completed: Project Title: HURRICANE CREEK & BRIDGE AT MARLENE R.O.W Project Type: DRAINAGE Sub -Type: Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: In 1996, the City received the storm drainage master plan for Hurricane Creek. PROJECT DESCRIPTION: 5/28/2003 This project includes the easement acquisition for the larger culvert at Marlene and the improved concrete channel that will extend approximately 1300 feet downstream. PROJECT SCHEDULE: Anticipated easement acquisition: FY '06 JUSTIFICATION: The undersized culvert and concrete channel will be rebuilt so as to prevent structural flooding of approximately six to eight houses in a 100-year flood event. 153 PROJECT TITLE: HURRICANE CREEK & BRIDGE AT MARLENE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cos PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST Right of Way $0 $0 $0 $0 Total Estimated Capital Cosi CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % The easement acquistion is proposed to be initiated in fiscal year 2006. 200,000 $200,000 154 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: ROBERT BARKER Date Completed: Project Title: HURRICANE CREEK & BRIDGE AT MARLENE CONSTRUCTION Project Type: DRAINAGE Sub -Type: Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: In 1996, the City received the storm drainage master plan for Hurricane Creek. PROJECT DESCRIPTION: 5/28/2003 This project includes the construction of a larger culvert at Marlene Drive and for the improved concrete channel lining that will extend approximately 1300 feet downstream. PROJECT SCHEDULE: Anticipated construction start: FY'07 JUSTIFICATION: The undersized culvert and concrete channel will be rebuilt so as to prevent structural flooding of approximately six to eight houses in a 100-year flood event. 155 PROJECT TITLE: HURRICANE CREEK & BRIDGE AT MARLENE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cos PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cosi CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % The construction is proposed to be initiated in fiscal year 2007. 70,000 780,000 $850,000 156 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Project Title: BELL HI ADDITION Project Type: DRAINAGE Sub -Type: Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-26-99 Date Completed: In 1990 the City commissioned and received a report from Knowlton, English & Flowers titled Drainage Utility System Study of Selected Improvement Projects. This project was the 5th project identified in this study. PROJECT DESCRIPTION: The terrain in this location is very flat, which causes the streets to have a very low capacity to remove storm water without flooding. The proposed project ties into an existing storm drainage system in Needles Drive. Construction of this project will remove the surface water from the street. A substantial portion of the cost of this project is related to street repair, indicating the need to combine this project with a street reconstruction project. PROJECT SCHEDULE: JUSTIFICATION: The construction of this project will prevent the flooding of Paula, David, and Needles during most intense rainfall events. 157 PROJECT TITLE: BELL HI ADDITION PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cos PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cosi CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 70,000 730,000 $800,000 158 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Project Title: KYNETTE DRIVE CULVERT MODIFICATIONS Project Type: DRAINAGE Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-21-99 Date Completed: Wilshire Village Addition was constructed prior to the adoption of the City's Uniform Development Code. The requirements prior to the UDC were lower than what the City now requires. This causes more water to remain above ground. The drainage system in the Woodlands Addition needs to be upgraded to meet current requirements. PROJECT DESCRIPTION: A large amount of storm water drains to an existing culvert on Kynette between East Cliff and West Cliff drives. The existing drainage facilities collecting this storm water are inadequate according to current standards. This project involves the installation of a small drainage system in Kynette up to Sierra. It is Project No. 16 in the 1990 Knowlton, English & Flowers study. PROJECT SCHEDULE: JUSTIFICATION: Excessive surface water flow within Kynette. 159 PROJECT TITLE: KYNETTE DRIVE CULVERT MODIFICATIONS PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cos PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cosi CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 20,000 100,000 $120,000 160 Department: Submitted By: Project Title: Project Type: Project No.: City of Euless Capital Project Request PUBLIC WORKS Date Prepared: 7-21-99 RON YOUNG Date Completed: BEAR CREEK PARK DRAINAGE Sub -Type: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN This project was identified in the 1990 Knowlton, English & Flowers Drainage Utility System Study of Selected Improvement Projects. PROJECT DESCRIPTION: The Bear Creek Park drainage project involves erosion control and channelization improvements to Little Bear Creek. It is a portion of Project No. 11 in the above referenced study. This project will be re-evaluated to determine if the scope and proposed improvements should be modified. The project will be redefined and re - estimated. PROJECT SCHEDULE: JUSTIFICATION: Continued erosion will eventually undermine the creek and adjacent park. 161 PROJECT TITLE: BEAR CREEK PARK PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cos PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cosi CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 200,000 2,000,000 $2,200,000 162 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: 7-26-99 Submitted By: RANDY BYERS Date Completed: Project Title: BLESSING BRANCH, MAIN TO SH 360 Project Type: DRAINAGE Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The Blessing Branch Drainage Master Plan included a conceptual plan to convey stormwater through the creek more efficiently. PROJECT DESCRIPTION: This project involves the channeling and lining of Blessing Branch in accordance with the Blessing Branch Master Plan. The project costs shown on the report breaks the project into engineering and construction cost. PROJECT SCHEDULE: JUSTIFICATION: The City expects to receive significant developer contributions toward this project. However, the City may be required to fund a portion of this project. 163 PROJECT TITLE: BLESSING BRANCH, MAIN TO SH 360 PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cos PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cosi CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 385,000 4,900,000 $5,285,000 164 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: BOB EDEN PARK Project Type: DRAINAGE Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-21-99 Date Completed: The improvements proposed are identified in the Little Bear Creek Watershed Master Plan. PROJECT DESCRIPTION: This project involves erosion control and channelization improvements to Little Bear Creek. This project ties to the Bear Creek Park Project. PROJECT SCHEDULE: JUSTIFICATION: Continued erosion will eventually cause damage to existing City facilities. 165 PROJECT TITLE: BOB EDEN PARK PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cos PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cosi CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 50,000 500,000 $550,000 166 Department: Submitted By: Project Title: Project Type: Project No.: City of Euless Capital Project Request PUBLIC WORKS RANDY BYERS BOYD BRANCH (FEMA) DRAINAGE Sub -Type: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-21-99 Date Completed: The reconstruction of FM 157 south of SH 183 by TxDOT did not include drainage improvements of a sufficient size to accommodate the 100-year storm event. This has created problems with the 100-year floodplain elevation. PROJECT DESCRIPTION: This project involves the installation of storm drainage improvements in Boyd Branch and SH 157 to correct the problems associated with the TxDOT construction. PROJECT SCHEDULE: JUSTIFICATION: This is an item of work that may be required by FEMA. 167 PROJECT TITLE: BOYD BRANCH (FEMA) NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cos PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX PROJECT #: TOTAL ESTIMATED CAPITAL COST Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cosi CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 80,000 800,000 $880,000 Staff is reevaluating cost estimates. No issues relating to flooding or FEMA have occurred in the last 5 years. 168 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Project Title: DIVERSION LINE - OAK LANE Project Type: DRAINAGE Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project was identified in the 1990 Knowlton, English & Flowers study. PROJECT DESCRIPTION: Date Prepared: 7-22-99 Date Completed: This is identified as Project No. 15 in the study. The homes along the west side of Oak Lane receive a considerable amount of storm water from the Lakewood Park Addition. This project involves grading and the installation of a small drainage system to reduce the problems associated with this lot -to -lot drainage. PROJECT SCHEDULE: JUSTIFICATION: Lot to lot drainage continues to be one of the most prolific problems in the City. The cost of the solution may be too expensive for homeowners to afford. 169 PROJECT TITLE: DIVERSION LINE - OAK LANE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cos PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST Construction $0 $0 $0 $0 Total Estimated Capital Cosi CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % This project will be re-evaluated to determine the scope, feasibility and benefits. 45,000 $45,000 170 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: 7-26-99 Submitted By: RANDY BYERS Date Completed: Project Title: HURRICANE CREEK, NORTH OF SH 10 Project Type: DRAINAGE Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: In 1990 the City commissioned and received a report from Knowlton, English & Flowers titled Drainage Utility System Study of Selected Improvement Projects. Conceptually shown on the Hurricane Creek Watershed Master Plan . PROJECT DESCRIPTION: This project involves channelizing and lining Hurricane Creek from the convergence of two tributaries to SH 10 and construction of a detention pond. The project costs are broken into engineering and construction costs. PROJECT SCHEDULE: JUSTIFICATION: SH 10 bridge and culvert does not convey the 100 year storm. Detention and channel lining are needed to control erosion. 171 PROJECT TITLE: HURRICANE CREEK, NORTH OF SH 10 PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cos PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cosi CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % This project should be deferred until development occurs on the property north of S.H. 10. 220,000 4,370,000 $4,590,000 172 Department: Submitted By: Project Title: Project Type: Project No.: City of Euless Capital Project Request PUBLIC WORKS RANDY BYERS OAK LANE CHANNEL DRAINAGE Sub -Type: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-21-99 Date Completed: Oakland Estates Addition was constructed prior to the adoption of the City's Uniform Development Code. The requirements prior to the UDC were lower than what the City now requires. PROJECT DESCRIPTION: This project includes significant drainage improvements in the Oakland Estates Addition. The project was also included in the 1990 Knowlton, English, Flowers study but has been expanded to include a concrete lined channel instead of an earthen channel. PROJECT SCHEDULE: JUSTIFICATION: Excessive surface water flow and ponding. 173 PROJECT TITLE: OAK LANE CHANNEL PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cos PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cosi CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % This project will be re-evaluated to determine the scope, feasibility and benefits. 50,000 400,000 $450,000 174 Department: Submitted By: Project Title: Project Type: Project No.: City of Euless Capital Project Request PUBLIC WORKS RANDY BYERS ROYAL OAKS ADDITION DRAINAGE Sub -Type: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: Date Completed: 7-26-99 The City's awareness of the need for this project came with the water seepage problems on Walnut Way west of North Main Street. PROJECT DESCRIPTION: This project involves the installation of a storm drainage system in the backyards of lots in the Royal Oaks Addition to alleviate problems associated with excessive lot -to -lot drainage. PROJECT SCHEDULE: JUSTIFICATION: Lot to lot drainage solutions may cost much more than individual homeowners can afford. 175 PROJECT TITLE: ROYAL OAKS ADDITION PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cos PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST Cost is yet to be determined $0 $0 $0 $0 Total Estimated Capital Cosi CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % This project will be re-evaluated to determine the scope, feasibility and benefits. City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: 7-26-99 Submitted By: RANDY BYERS Date Completed: Project Title: TRAILWOOD ADDITION (SUMMIT RIDGE) Project Type: DRAINAGE Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: In 1990 the City commissioned and received a report from Knowlton, English & Flowers titled Drainage Utility System Study of Selected Improvement Projects. This project is the 6th project identified in this study. PROJECT DESCRIPTION: This project involves the correction of a number of drainage problems and expansion of the existing drainage system. PROJECT SCHEDULE: JUSTIFICATION: Drainage system does not meet current standards. 177 PROJECT TITLE: TRAILWOOD ADDITION (SUMMIT RIDGE) PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cos PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cosi CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % This project will be re-evaluated to determine the scope, feasibility and benefits. 25,000 160,000 $185,000 178 St71,e,a Project Description STREET PROJECTS Ross Avenue from S. Main 300' West Industrial Blvd Traffic Signal Timing Harwood Road, FM157 to N. Main Overlay Sub -Total Street Priority A Town Crossing Bridge (6) Fuller Wiser Connector (6) East Midway Road Overlay(6) Priority Estimated Cost A $ 95,500 A $ 50,000 A $ 137,000 $ 282,500 B $ 775,000 B $ 495,000 B $ 83,000 CAPITAL IMPROVEMENT PROGRAMS UNFUNDED PROJECTS -SORTED BY TYPE PROPOSED METHOD OF FINANCING Operating Fund CIP Fund Balance XX Bond Sale Grants/ Impact Escrow Contrib Fees Funds XX XX Car Rental Tax XX XX XX Hotel Tax EDC To Be Determined Sub -Total Street Priority B $ 1,353,000 Ash Lane - Aransas to N. Main C $ 935,000 XX Baze Road - Glade to Mid -Cities C TBD XX Gateway Boulevard - Northern Portion C $ 1,000,000 XX Harwood Road - Main to SH 157 C TBD XX Vine St. - SH 183 to SH 10 C TBD XX Traffic Signal Mid -Cities at Baze C TBD XX Traffic Signal Mid -Cities at Gateway Blvd C TBD XX Traffic Signal Harwood at Bear Creek Parkway C TBD XX Sub -Total Street Priority C $ 1,935,000 STREETS PROJECTS - TOTAL $ 3,570,500 A - Projects that will be presented to Council during the upcoming year. B - Projects that will be presented to Council wthin two to five years. C - Projects that will be presented to Council beyond five years. 179 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: ROSS AVENUE FROM S MAIN 300' WEST Project Type: STREET Sub -Type: EXPANSION Project No.: Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN 4/12/2004 Ross Avenue is the primary route for fire fighting equipment entering the new fire station at Ross and S. Main. The existing pavement is substandard in width and does not have sufficient strength to support heavy fire fighting equipment. This project is in support of the fire station operations. PROJECT DESCRIPTION: The existing substandard asphalt pavement will be removed and replaced with reinforced concrete pavement for the full length of the fire station site. An asphalt transition will be provided between the new and existing pavement surfaces. Traffic signals will be relocated from SH 10 to serve the fire station. PROJECT SCHEDULE: Anticipated Bid Construction: August 2004 Anticipated Council Consideration: October 2004 Anticipated Start Date: November 2004 Anticipated Completion Date: March 2005 JUSTIFICATION: The existing pavement on Ross Avenue is incapable of supporting the fire fighting equipment to be housed at the new fire station. 180 PROJECT TITLE: ROSS AVE FROM S MAIN 300' WEST PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds Car Rental Tax ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction Roadway design performed by Public Works Engineering 95,500 $95,500 0% 0% 0% 0% 0% 181 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Date Prepared: 4/15/2003 Date Completed: Project Title: INDUSTRIAL BLVD TRAFFIC SIGNAL TIMING Project Type: STREETS Sub -Type: SIGNALIZATION Project No.: Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Industrial Blvd. is identified in the City of Euless Master Thoroughfare Plan as a strategic regional arterial thoroughfare. PROJECT DESCRIPTION: This project consists of obtaining traffic counts at the a.m., noon, and p.m. periods, preparing a traffic signal timing/coordination plan based on the observed traffic volumes, coordination with TxDOT to manipulate their signal timing, installation of the signal timing/coordination plan, and fine tuning the plan after installation. The limits of the project on Industrial Blvd is from S. Pipeline Road to Mid -Cities Blvd. PROJECT SCHEDULE: Engineer selection - Nov, 2004 Design award - Jan, 2005 Plans complete - April, 2005 Plans implemented - June, 2005 JUSTIFICATION: Uncoordinated signal timing along Industrial Blvd results in wasted fuel consumption by idling vehicles, lost time by motorists delayed at traffic signals and contributes to "red light running" by frustrated drivers. This project will help in the effort to reduce vehicle emissions in the Dallas/Fort Worth area. 182 PROJECT TITLE: INDUSTRIAL BLVD TRAFFIC SIGNAL TIMING PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations Car Rental Tax ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 50,000 $50,000 Additional traffic signal timing projects will be proposed in future years. These will include S.H. 10, Main Street, Harwood Road, Mid Cities Blvd. and Fuller Wiser. Once a signal timing plan is implemented, annual maintenance on the timing will need to be provided by Facilities. 183 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: HARWOOD ROAD, FM157 TO N. MAIN OVERLAY Project Type: STREET Sub -Type: Project No.: Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN Harwood Road is classified as an arterial thoroughfare in the City of Euless Master Thoroughfare Plan. PROJECT DESCRIPTION: 6-3-03 This project consists of edge mill, asphalt overlay and restriping Harwood Road from FM 157 to N. Main Street (approximately 5200 linear feet). It will also include adjusting manholes and water valve covers. PROJECT SCHEDULE: Crack seal pavement - May, 2005 Edge mill pavement - June, 2005 Overlay pavement - July -Aug, 2005 JUSTIFICATION: The existing asphalt pavement is deteriorating and will soon become a maintenance problem. The asphalt overly will provide an improved riding surface, will extend the life of the roadway and will enhance the life of the roadway and appearance of this thoroughfare. 184 PROJECT TITLE: HARWOOD ROAD, FM157 TO N. MAIN PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cos PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST Construction $0 $0 $0 $0 Total Estimated Capital Cosi CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 137,000 $137,000 185 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Date Prepared: 7-7-00 Date Completed: Project Title: TOWN CROSSING BRIDGE Project Type: STREETS Sub -Type: BRIDGE Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The bridge over Little Bear Creek is required in the City's Master Thoroughfare Plan. PROJECT DESCRIPTION: Infrastructure assistance through the construction of a four (4) lane bridge north of Cheek-Sparger Road (crossing Little Bear Creek). PROJECT SCHEDULE: JUSTIFICATION: Financial assistance will be required for development of the portion of 121 Gateway district west of S.H. 121. Development will increase the City's ad valorem and sales tax revenues. 186 PROJECT TITLE: TOWN CROSSING BRIDGE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cos PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cosi CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 75,000 700,000 $775,000 0% 0% 0% 0% 0% 187 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Date Prepared: 7-23-99 Date Completed: Project Title: FULLER WISER CONNECTOR Project Type: STREET Sub -Type: CONSTRUCTION Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project is identified in the 1999 Master Thoroughfare Plan. PROJECT DESCRIPTION: Fuller -Wiser Road - Type DA and Type DC. Fuller -Wiser is a minor local arterial connection between SH 360 on the north and SH 183 on the south. This facility is presently constructed to a design standard of four lanes undivided in a 70 ft. right-of-way. The recommended ultimate design standard should be a four lane divided roadway in an 85 ft. right-of-way for the sections that are north of Mid -Cities Blvd. and south of Harwood Road. PROJECT SCHEDULE: JUSTIFICATION: Staff hopes to receive street escrow funds to assist in the construction of this project. 188 PROJECT TITLE: FULLER WISER CONNECTOR PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cos PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined Car Rental Fund ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cosi CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % Staff is in the process of reevaluting the cost and schedule for this project. 45,000 450,000 $495,000 189 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: EAST MIDWAY ROAD OVERLAY Project Type: STREET Sub -Type: Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN Midway Road is classified as a collector thoroughfare in the City of Euless Master Thoroughfare Plan. PROJECT DESCRIPTION: 6-3-03 This project consists of edge mill, asphalt overlay and restriping Midway Road from N. Main Street to Fuller -Wiser Road. It will also include adjusting manholes and water valve covers. PROJECT SCHEDULE: JUSTIFICATION: The existing asphalt pavement is deteriorating and will soon become a maintenance problem. The asphalt over1,4y will provide an improved riding surface, will extend the life of the roadway and will enhance the life of the roadway and appearance of this thoroughfare. 190 PROJECT TITLE: EAST MIDWAY ROAD OVERLAY NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cos PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX $0 $0 $0 PROJECT #: TOTAL ESTIMATED CAPITAL COST Construction $0 Total Estimated Capital Cosi CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 83,000 $83,000 Public Works will begin cutting, patching, and repairing the subgrade on Midway Road in FY04-05. Funding is requested in FY05-06 for the overlay. 191 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: ASH LANE - ARANSAS TO N. MAIN Project Type: STREET Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: 4/1/2002 Ash Lane is identified in the Master Thoroughfare Plan as a four lane minor arterial roadway from Industrial Boulevard to Fuller Wiser Road. PROJECT DESCRIPTION: This project consists of the removal of the existing two lanes of asphalt pavement from Aransas drive to N. Main Street to be replaced by a four lane concrete roadway. The associated sidewalks and strom drainage will be included. PROJECT SCHEDULE: JUSTIFICATION: The portion of Ash Lane from Aransas Drive to N. Main Street is the only portion that is not constructed to the Master Thoroughfare Plan standards. Completion of this section of Ash Lane will provide an orderly flow of traffic from Industrial Boulevard to Fuller -Wiser Road. 192 PROJECT TITLE: ASH LANE - ARANSAS TO N. MAIN PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cos PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST Engineering Construction $0 Right of Way Surveying $0 $0 $0 Total Estimated Capital Cosi CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 85,000 725,000 100,000 25,000 $935,000 193 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Date Prepared: 7-22-99 Date Completed: Project Title: BAZE ROAD - GLADE TO MID CITIES Project Type: STREET Sub -Type: CONSTRUCTION Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN Project identified in 1999 Master Thoroughfare Plan. PROJECT DESCRIPTION: Baze Road - Type EC. Baze Road is an important north -south residential collector that is planned to connect Glade Road and Mid -Cities Blvd. This roadway exists as a four -lane divided roadway north of Glade Road in Grapevine. In Euless, it is constructed partially as a 40 foot undivided roadway and as a 36 feet (two lanes) undivided roadway in a 60 foot right-of-way. The possible extension of Baze south of Anthony Drive to connect with Mid -Cities Blvd. is recommended only if future access to Baze from Mid -Cities is restricted through geometric design measures to prevent neighborhood "cut -through" traffic. PROJECT SCHEDULE: JUSTIFICATION: Vehicular traffic is currently forced to travel on residential streets to access Mid -Cities. 194 PROJECT TITLE: BAZE ROAD - GLADE TO MID CITIES PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cos PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST Cost yet to be determined. $0 $0 $0 $0 Total Estimated Capital Cosi CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % City currently has approximately $300,000 in street escrow for this project. City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Date Prepared: 7-7-00 Date Completed: Project Title: GATEWAY BLVD - NORTHERN PORTION Project Type: STREET Sub -Type: CONSTRUCTION Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project is required on the City's Master Thoroughfare Plan. PROJECT DESCRIPTION: Design and construction of portions of Gateway Boulevard between Glade Road and Mid -Cities Boulevard east of S.H. 121. PROJECT SCHEDULE: JUSTIFICATION: There are likely to be portions of this proposed boulevard that will not be constructed with the development in the 121 Gateway district. 196 PROJECT TITLE: GATEWAY BLVD - NORTHERN PORTION PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 1,000,000 $1,000,000 197 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Project Title: HARWOOD ROAD - MAIN TO FM 157 Project Type: STREET Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN Date Prepared: 7-22-99 Date Completed: Project identified in the 1999 Master Thoroughfare Plan. Project is being upgraded in NCTCOG's 1999 Regional Thoroughfare Plan. PROJECT DESCRIPTION: Harwood Road - Type B and Type C. Harwood Road is a major east -west arterial roadway connecting Euless, Bedford, and Hurst with DFW Airport. In Euless, Harwood exists as a four -lane divided roadway between Main Street and Industrial Blvd., and as a two-lane undivided roadway east of Main Street. It currently serves substantial commercial development in Bedford and Hurst, and Harwood will serve similar future development in Euless. The long-range impact of planned commercial and industrial development at DFW Airport is presently uncertain. Consequently, the recommended roadway design standard is six lanes divided. The right-of-way standard for the section east of Main Street is 120 feet. In recognition of the limited existing right-of-way corridor available west of Main, the right-of-way for this section may be reduced. At locations approved by the City Engineer, a minimum width of 104 feet may be permitted. Both sections require a 6-lane boulevard street sectioN. PROJECT SCHEDULE: JUSTIFICATION: See Project Description. The upgrade on the NCTCOG's Regional Thoroughfare Plan may accelerate the need for this reconstruction. 198 PROJECT TITLE: HARWOOD ROAD - MAIN TO FM 157 PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cos PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST Cost yet to be determined. $0 $0 $0 $0 Total Estimated Capital Cosi CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % Staff needs to reevaluate the estimate and scheduling of this project. City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Project Title: VINE ST. - SH183 TO SH10 Project Type: STREET Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Vine Street is not identified in the 1999 Master Thoroughfare Plan. PROJECT DESCRIPTION: Date Prepared: 7-23-99 Date Completed: The City has received street escrow funds from several developments along Vine Street. When development is complete, it would be appropriate for the City to reconstruct the existing roadway. PROJECT SCHEDULE: JUSTIFICATION: Street escrow funds are being deposited for use in reconstruction. 200 PROJECT TITLE: VINE ST. - SH183 TO SH10 PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Cost yet to be determined. $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction Staff will reevaluate the cost of this project. Street escrow will not cover the anticipated cost. City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: TRAFFIC SIGNAL - MID CITES @ BAZE Project Type: STREET Sub -Type: LIGHTING Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: 4/12/2004 Traffic Signals are located at the intersections of arterial and collector thoroughfares identified in the City of Euless Master Thoroughfare Plan adopted in 1999. PROJECT DESCRIPTION: This project consists of the installation of traffic signal poles, mast arms, signal heads, pedestrian indicators, underground conduit, vehicle detection and signal controller for the intersection of Mid -Cities Blvd and Baze Road. PROJECT SCHEDULE: JUSTIFICATION: Traffic volumes at this intersection will be monitored and signal warrant studies will be performed to determine the justification for signal installation. This intersection will ultimately require a traffic signal. 202 PROJECT TITLE: TRAFFIC SIGNAL - MID CITIES a BAZE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Traffic Signals $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction TBD 0% 0% 0% 0% 0% 203 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: TRAFFIC SIGNAL - MID CITIES @ GATEWAY BLVD Project Type: STREET Sub -Type: LIGHTING Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: 4/12/2004 Traffic Signals are located at the intersections of arterial and collector thoroughfares identified in the City of Euless Master Thoroughfare Plan adopted in 1999. PROJECT DESCRIPTION: This project consists of the installation of traffic signal poles, mast arms, signal heads, pedestrian indicators, underground conduit, vehicle detection and signal controller for the intersection of Mid -Cities Blvd and Gateway Blvd. PROJECT SCHEDULE: JUSTIFICATION: Traffic volumes at this intersection will be monitored and signal warrant studies will be performed to determine the justification for signal installation. This intersection will ultimately require a traffic signal. 204 PROJECT TITLE: TRAFFIC SIGNAL - MID CITIES a GATEWAY PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Traffic Signals $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction TBD 0% 0% 0% 0% 0% 205 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: TRAFFIC SIGNAL - HARWOOD @ BEAR CREEK PARKWAY Project Type: STREET Sub -Type: LIGHTING Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: 4/12/2004 Traffic Signals are located at the intersections of arterial and collector thoroughfares identified in the City of Euless Master Thoroughfare Plan adopted in 1999. PROJECT DESCRIPTION: This project consists of the installation of traffic signal poles, mast arms, signal heads, pedestrian indicators, underground conduit, vehicle detection and signal controller for the intersection of Harwood Road and Bear Creek Parkway. PROJECT SCHEDULE: JUSTIFICATION: Traffic volumes at this intersection will be monitored and signal warrant studies will be performed to determine the justification for signal installation. This intersection will ultimately require a traffic signal. 206 PROJECT TITLE: TRAFFIC SIGNAL HARWOOD @ BEAR CK PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Traffic Signals $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction TBD 0% 0% 0% 0% 0% 207 Project Description WASTEWATER PROJECTS Line Replacement, Pebble Creek Sub -Total Wastewater Priority A Line Replacement, Arnettt6l Line Replacement, Ector Drivet6l Line Replacement, Martin Lanet6l Line Replacement, McCormick & Copherl6l Little Bear Creek Collection Line(6) Line Replacement, Fayettet7l Line Replacement, Jean Lanet7l Line Replacement, Cedar Hill Estates Line Replacement, W. Fuller (8) Line Replacement, Wood Ridge Circle (8) Line Replacement, Koenl9l Line Replacement, Faun Drive(9) Line Replacement, Hodges Drive (9) Line Replacement, Arnett Drive(9) Priority CAPITAL IMPROVEMENT PROGRAMS UNFUNDED PROJECTS - SORTED BY TYPE PROPOSED METHOD OF FINANCING Estimated Cost Operating Fund CIP Fund Balance Bond Sale Grants/ Impact Escrow Contrib Fees Funds A $ 137,000 XX 1 $ 137,000 B $ 394,000 XX B $ 230,000 XX B $ 75,000 XX B $ 75,000 XX B $ 450,000 XX B $ 325,000 XX B $ 65,000 XX B $ 319,000 XX B $ 80,000 XX B $ 165,000 XX B $ 275,000 XX B $ 110,000 XX B $ 130,000 XX B $ 140,000 XX Sub -Total Wastewater Priority B $ 2,833,000 Line Replacement, Linda Lane C $ 200,000 SH 183 Utility Relocation C TBD Line Replacement, West Alexander C $ 160,000 Line Replacement, Norman Drive C $ 100,000 Line Replacement, Franklin Drive C $ 160,000 Line Replacement, South Mills Drive C $ 308,000 Line Replacement, Whitener/Ascot Outfall C $ 176,000 Line Replacement, Alexander/Ascot Outfall C $ 242,000 Line Replacement, Ross Avenue C $ 150,000 Line Replacement, Blanco, Aransas, Crane C TBD Line Replacement, Denton, Irion, Bell C TBD Line Replacement, Harris, Bell, Collin C TBD Line Replacement, Irion, Harris C TBD Line Replacement, Collin Drive C TBD Line Replacement, Slaughter/E. Huitt C TBD Sub -Total Wastewater Priority C $ 1,496,000 (WASTEWATER PROJECTS - TOTAL $ 4,466,000 Car Rental Tax Hotel Tax EDC To Be Determined XX XX XX XX XX XX XX XX XX XX XX XX XX XX A - Projects that will be presented to Council during the upcoming year. B - Projects that will be presented to Council wthin two to five years. C - Projects that will be presented to Council beyond five years. 208 City of Euless Capital Project Request - Unfunded Department: PUBLIC WORKS Submitted By: RON YOUNG Project Title: LINE REPLACEMENT, PEBBLE CREEK Type: WASTEWATER Sub -Type: Project No.: Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-10-00 Date Completed: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Replace sanitary sewer lines on Pebble Creek from Woodvine to Wood Ridge. PROJECT SCHEDULE: Design underway Advertise - Aug, 2004 Award bid - Sept, 2004 Begin Construction - Oct, 2004 Anticipated construction completion - Feb, 2005 JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. 209 PROJECT TITLE: LINE REPLACEMENT, PEBBLE CREEK PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Sewer Line Replacement $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 10,000 127,000 $137,000 210 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Project Title: LINE REPLACEMENT - ARNETT ADDITION Project Type: WASTEWATER Sub -Type: MAINS Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 3/27/2003 Date Completed: Systematic replacement of wastewater lines in drainage basin areas using a worst first approach. PROJECT SCHEDULE: Anticipated Engineer Selection: October 2005 Anticipated Award Engineer Contract: November 2005 Anticipated Design Complete: April 2006 Anticipated Construction Bids: May 2006 Anticipated Award Construction Contract: June 2006 Anticipated Completion Date: December 2006 PROJECT DESCRIPTION: Design and construction of wastewater mains in the northern portion of the Arnett Addition. Existing deteriorated wastewater mains will be replaced. JUSTIFICATION: Wastewater mains in the Arnett Addition have deteriorated as they have aged and they need to be replaced. 211 PROJECT TITLE: LINE REPLACEMENT - ARNETT ADDITION PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Oaeratina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund County, State, Federal Funding General Obligation Bonds Revenue bonds Certificate of Obligation Donations Supplemental Sales Tax ADDITIONAL COMMENTS: Lines to be replaced: 1. Ross Avenue and north of Ross Avenue. 2. Between Ross and West Alexander. 3. Between Arnett and West Alexander. 4. Between Linda Lane and Arnett. 5. Linda Lane. TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: XX Conceptual Design % Preliminary Design Final Plans % Specifications % Construction % 34,000 360,000 $394,000 100% -212- City of Euless Capital Project Request - Unfunded Department: PUBLIC WORKS Submitted By: RON YOUNG Project Title: LINE REPLACEMENT, ECTOR DRIVE Type: WASTEWATER Sub -Type: Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-10-00 Date Completed: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Replace sanitary sewer lines on east and west sides of Ector Drive from Harwood to end of lines. PROJECT SCHEDULE: JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. 213 PROJECT TITLE: LINE REPLACEMENT, ECTOR DRIVE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Sewer Line Replacement $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 25,000 205,000 $230,000 214 City of Euless Capital Project Request - Unfunded Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: LINE REPLACEMENT, MARTIN LANE Type: WASTEWATER Sub -Type: Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-10-00 Date Completed: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Replace sanitary sewer line on Martin Lane. PROJECT SCHEDULE: JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. 215 PROJECT TITLE: LINE REPLACEMENT, MARTIN LANE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Sewer Line Replacement $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 5,000 70,000 $75,000 216 City of Euless Capital Project Request - Unfunded Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: LINE REPLACEMENT, McCORMICK & COPHER Type: WASTEWATER Sub -Type: Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-10-00 Date Completed: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Replace sanitary sewer line servicing McCormick and Copher Courts. PROJECT SCHEDULE: JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often innundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. 217 PROJECT TITLE: LINE REPLACEMENT, McCORMICK & COPHEF PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Sewer Line Replacement $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 5,000 70,000 $75,000 218 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: 7-26-99 Submitted By: RANDY BYERS Date Completed: Project Title: LITTLE BEAR CREEK COLLECTION LINE Project Type: WASTEWATER Sub -Type: Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Project identified as necessary in the Wastewater Impact Fee Map. PROJECT DESCRIPTION: Design and construction of the Little Bear Creek Major Collection Line identified in the 1999 Wastewater Impact Fee Review. PROJECT SCHEDULE: JUSTIFICATION: Existing wastewater main does not have adequate capacity to serve future growth in the basin. Impact fee funds are currently available to fund this project. 219 PROJECT TITLE: LITTLE BEAR CREEK COLLECTION LINE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cos PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST Engineering Construction $0 Right of Way $0 $0 $0 Total Estimated Capital Cosi CURRENT STATUS: Conceptual Design % Preliminary Design Final Plans % Specifications % Construction % 75,000 325,000 50,000 $450,000 220 City of Euless Capital Project Request - Unfunded Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: LINE REPLACEMENT, FAYETTE DRIVE Type: WASTEWATER Sub -Type: Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-10-00 Date Completed: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Replace sanitary sewer lines on east and west sides of Fayette Drive. PROJECT SCHEDULE: JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. 221 PROJECT TITLE: LINE REPLACEMENT, FAYETTE DRIVE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Sewer Line Replacement $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 25,000 300,000 $325,000 222 City of Euless Capital Project Request - Unfunded Department: PUBLIC WORKS Submitted By: RON YOUNG Project Title: LINE REPLACEMENT, JEAN LANE Type: WASTEWATER Sub -Type: Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-10-00 Date Completed: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Replace sanitary sewer lines on Jean Lane. PROJECT SCHEDULE: JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. 223 PROJECT TITLE: LINE REPLACEMENT, JEAN LANE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Sewer Line Replacement $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 5,000 60,000 $65,000 224 Department: Submitted By: Project Title: Project Type: Project No.: City of Euless Capital Project Request PUBLIC WORKS RON YOUNG LINE REPLACEMENT - CEDAR HILL ESTATES WASTEWATER Sub -Type: MAINS Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN Date Prepared: 3/27/2003 Date Completed: Systematic replacement of wastewater lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Design and construction of wastewater mains in the Cedar Hill Estates Addition. Existing deteriorated wastewater mains will be replaced. PROJECT SCHEDULE: JUSTIFICATION: Wastewater mains in the Cedar Hill Estates Addition area have deteriorated as they have aged and they need to be replaced. 225 PROJECT TITLE: LINE REPLACEMENT - CEDAR HILL ESTATE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Ooeratina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund County, State, Federal Funding General Obligation Bonds Revenue bonds Certificate of Obligation Donations Supplemental Sales Tax ADDITIONAL COMMENTS: XX Lines to be replaced: 1.) Between Oakwood and Vine north of Whitner 2.) Broadway from Sunset to Hollywood 3.) Hollywood from Broadway to South Main 4.) Henslee from Sunset to Hollywood 5.) Sunset from Broadway to South Main TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications Construction % 35,000 284,000 $319,000 100% 226 City of Euless Capital Project Request - Unfunded Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: LINE REPLACEMENT, W. FULLER Type: WASTEWATER Sub -Type: Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-10-00 Date Completed: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Replace sanitary sewer lines on W. Fuller Drive. PROJECT SCHEDULE: JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. 227 PROJECT TITLE: LINE REPLACEMENT, W. FULLER PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Sewer Line Replacement $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 5,000 75,000 $80,000 228 City of Euless Capital Project Request - Unfunded Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: LINE REPLACEMENT, WOODRIDGE Type: WASTEWATER Sub -Type: Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-10-00 Date Completed: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Replace sanitary sewer lines on Wood Ridge Circle. PROJECT SCHEDULE: JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. 229 PROJECT TITLE: LINE REPLACEMENT, WOODRIDGE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations Supplemental Sales Tax To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Sewer Line Replacement $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 15,000 150,000 $165,000 230 City of Euless Capital Project Request - Unfunded Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: LINE REPLACEMENT, KOEN Type: WASTEWATER Sub -Type: Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-10-00 Date Completed: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Replace sanitary sewer line 12" from Koen to S. Pipeline. PROJECT SCHEDULE: JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. 231 PROJECT TITLE: LINE REPLACEMENT, KOEN PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Sewer Line Replacement $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 25,000 250,000 $275,000 232 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, FAUN DRIVE Project Type: WASTEWATER Sub -Type: MAIN Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: 5/30/2003 The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. This project is part of the systematic replacement of wastewater mains using a worst first approach. PROJECT DESCRIPTION: Replace wastewater mains: Between Faun Drive and Hodges Drive East of S. Mills Drive from Whitener to North of Hodges PROJECT SCHEDULE: JUSTIFICATION: Many wastewater mains throughout the city are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, real infiltration and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 233 PROJECT TITLE: LINE REPLACEMENT, FAUN DRIVE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 11,000 99,000 $110,000 0% 0% 0% 0% 0% 234 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, HODGES DRIVE Project Type: WASTEWATER Sub -Type: MAIN Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: 5/30/2003 The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. This project is part of the systematic replacement of wastewater mains using a worst first approach. PROJECT DESCRIPTION: Replace wastewater mains: Between Hodges Dr. and West Mills Dr. East of S. Mills Drive from North of Hodges to North of S. Mills Outfall from east of S. Mills to west of S. Mills PROJECT SCHEDULE: JUSTIFICATION: Many wastewater mains throughout the city are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, real infiltration and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 235 PROJECT TITLE: LINE REPLACEMENT, HODGES DRIVE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 13,000 117,000 $130,000 0% 0% 0% 0% 0% 236 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, ARNETT DRIVE Project Type: WASTEWATER Sub -Type: MAIN Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: 5/30/2003 The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. This project is part of the systematic replacement of wastewater mains using a worst first approach. PROJECT DESCRIPTION: Replace wastewater mains: Between West Alexander and Arnett Drive Outfall to Arnett Drive Between Linda Lane and W. Huitt PROJECT SCHEDULE: JUSTIFICATION: Many wastewater mains throughout the city are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, real infiltration and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 237 PROJECT TITLE: LINE REPLACEMENT, ARNETT DRIVE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 14,000 126,000 $140,000 0% 0% 0% 0% 0% 238 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, LINDA LANE Project Type: WASTEWATER Sub -Type: MAIN Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: 5/30/2003 The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. This project is part of the systematic replacement of wastewater mains using a worst first approach. PROJECT DESCRIPTION: Replace wastewater mains: Between Linda Lane and Arnett Drive Linda Lane from S. Main St. west Between Linda Lane and W. Huitt PROJECT SCHEDULE: JUSTIFICATION: Many wastewater mains throughout the city are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, real infiltration and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 239 PROJECT TITLE: LINE REPLACEMENT, LINDA LANE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 20,000 180,000 $200,000 0% 0% 0% 0% 0% 240 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: 7-21-00 Submitted By: RON YOUNG Date Completed: Project Title: SH 183 UTILITY RELOCATION Project Type: WASTEWATER Sub -Type: RELOCATION Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: TxDOT plans to widen SH183 within the next ten years. PROJECT DESCRIPTION: The City has a number of wastewater mains that might require relocation. The scope of the work is unknown at this time. PROJECT SCHEDULE: JUSTIFICATION: Required where conflicts will occur with TxDOT's highway project. 241 PROJECT TITLE: SH 183 UTILITY RELOCATION PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Cost yet to be determined $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % The scope of work will be determined as TxDOT completes the highway reconstruction plans. 0% 0% 0% 0% 0% 242 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, WEST ALEXANDER Project Type: WASTEWATER Sub -Type: MAIN Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: 5/30/2003 The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. This project is part of the systematic replacement of wastewater mains using a worst first approach. PROJECT DESCRIPTION: Replace wastewater mains: Between Ross Ave and West Alexander Lines east of Martha St. north of West Alexander PROJECT SCHEDULE: JUSTIFICATION: Many wastewater mains throughout the city are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, real infiltration and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 243 PROJECT TITLE: LINE REPLACEMENT, WEST ALEXANDER PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 16,000 144,000 $160,000 0% 0% 0% 0% 0% 244 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, NORMAN DRIVE Project Type: WASTEWATER Sub -Type: MAIN Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: 5/30/2003 The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. This project is part of the systematic replacement of wastewater mains using a worst first approach. PROJECT DESCRIPTION: Replace wastewater mains on: Norman Drive north and south from Franklin Dr. PROJECT SCHEDULE: JUSTIFICATION: Many wastewater mains throughout the city are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, real infiltration and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 245 PROJECT TITLE: LINE REPLACEMENT, NORMAN DRIVE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 10,000 90,000 $100,000 0% 0% 0% 0% 0% 246 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, FRANKLIN DRIVE Project Type: WASTEWATER Sub -Type: MAIN Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: 5/30/2003 The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. This project is part of the systematic replacement of wastewater mains using a worst first approach. PROJECT DESCRIPTION: Replace wastewater mains : Between Franklin Drive and S.H. 10 west of Norman Between Franklin Drive and Simmons Drive north of Bayless Drive PROJECT SCHEDULE: JUSTIFICATION: Many wastewater mains throughout the city are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, real infiltration and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 247 PROJECT TITLE: LINE REPLACEMENT, FRANKLIN DRIVE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 16,000 144,000 $160,000 0% 0% 0% 0% 0% 248 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, SOUTH MILLS DRIVE Project Type: WASTEWATER Sub -Type: MAIN Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: 5/30/2003 The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. This project is part of the systematic replacement of wastewater mains using a worst first approach. PROJECT DESCRIPTION: Replace wastewater mains : West of South Mills Drive from S. Pipeline to near south side of S.H. 10 PROJECT SCHEDULE: JUSTIFICATION: Many wastewater mains throughout the city are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, real infiltration and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 249 PROJECT TITLE: LINE REPLACEMENT, SOUTH MILLS DRIVE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 28,000 280,000 $308,000 0% 0% 0% 0% 0% 250 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, WHITENER/ASCOT OUTFALL Project Type: WASTEWATER Sub -Type: MAIN Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: 5/30/2003 The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. This project is part of the systematic replacement of wastewater mains using a worst first approach. PROJECT DESCRIPTION: Replace wastewater mains on: E. Whitener, Cliffdate, and Ascot to north Ascot bend PROJECT SCHEDULE: JUSTIFICATION: Many wastewater mains throughout the city are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, real infiltration and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 251 PROJECT TITLE: WHITENER/ASCOT OUTFALL PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 16,000 160,000 $176,000 0% 0% 0% 0% 0% 252 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, ALEXANDER/ASCOT OUTFALL Project Type: WASTEWATER Sub -Type: MAIN Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: 5/30/2003 The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. This project is part of the systematic replacement of wastewater mains using a worst first approach. PROJECT DESCRIPTION: Replace wastewater mains: From Ascot Lane to creek, north along creek crossing E. Huitt to East Alexander Lane PROJECT SCHEDULE: JUSTIFICATION: Many wastewater mains throughout the city are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, real infiltration and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 253 PROJECT TITLE: ALEXANDER/ASCOT OUTFALL PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 22,000 220,000 $242,000 0% 0% 0% 0% 0% 254 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, ROSS AVENUE Project Type: WASTEWATER Sub -Type: MAIN Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: 5/30/2003 The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. This project is part of the systematic replacement of wastewater mains using a worst first approach. PROJECT DESCRIPTION: Replace wastewater mains on: Ross Avenue and outfall to West Alexander PROJECT SCHEDULE: JUSTIFICATION: Many wastewater mains throughout the city are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, real infiltration and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 255 PROJECT TITLE: LINE REPLACEMENT, ROSS AVENUE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 15,000 135,000 $150,000 0% 0% 0% 0% 0% 255 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, BLANCO, ARANSAS, CRANE Project Type: WASTEWATER Sub -Type: MAIN Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: 4/12/2004 The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. PROJECT DESCRIPTION: Replace wastewater mains on: 1.) Between Blanco and Aransas from Harwood to south 2.) Between Blanco and Crane from Harwood to Aransas. PROJECT SCHEDULE: JUSTIFICATION: Many wastewater mains throughout the city are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacment of wastewater mains using a "worst first" approach to reduce maintenance costs and customer problems. 257 PROJECT TITLE: LINE REPL, BLANCO, ARANSAS, CRANE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction TBD 0% 0% 0% 0% 0% 258 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, DENTON, IRION, BELL Project Type: WASTEWATER Sub -Type: MAIN Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: 4/12/2004 The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. PROJECT DESCRIPTION: Replace wastewater mains on: 1.) Between Denton and Ilion from Harwood to Dallas 2.) Between Dallas and Bell from Denton to Collin PROJECT SCHEDULE: JUSTIFICATION: Many wastewater mains throughout the city are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacment of wastewater mains using a "worst first" approach to reduce maintenance costs and customer problems. 259 PROJECT TITLE: LINE REPL, DENTON, IRION, BELL PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction TBD 0% 0% 0% 0% 0% 260 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, HARRIS, BELL, COLLIN Project Type: WASTEWATER Sub -Type: MAIN Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: 4/12/2004 The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. PROJECT DESCRIPTION: Replace wastewater mains on: 1.) Between Harris and Collins from Harwood to Dallas 2.) Between Bell and Collin from Dallas to Blessing Branch PROJECT SCHEDULE: JUSTIFICATION: Many wastewater mains throughout the city are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacment of wastewater mains using a "worst first" approach to reduce maintenance costs and customer problems. 261 PROJECT TITLE: LINE REPL, HARRIS, BELL, COLLIN PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction TBD 0% 0% 0% 0% 0% 262 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, IRION, HARRIS Project Type: WASTEWATER Sub -Type: MAIN Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: 4/12/2004 The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. PROJECT DESCRIPTION: Replace wastewater mains on: 1.) Between Irion and Harris from Harwood to Dallas 2.) Along Dallas from Irion to Collin PROJECT SCHEDULE: JUSTIFICATION: Many wastewater mains throughout the city are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacment of wastewater mains using a "worst first" approach to reduce maintenance costs and customer problems. 263 PROJECT TITLE: LINE REPLACEMENT - IRION, HARRIS PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction TBD 0% 0% 0% 0% 0% 264 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, COLLIN DRIVE Project Type: WASTEWATER Sub -Type: MAIN Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: 4/12/2004 The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. PROJECT DESCRIPTION: Replace wastewater mains: 1.) Along Collin Dr. from Falls to Dallas 2.) Between Falls and Fannin east of Collin 3.) Between Fannin and Travis east of Collin 4.) Between Travis and Dallas east of Collin 5.) Between Dallas and Tarrant east of Collin PROJECT SCHEDULE: JUSTIFICATION: Many wastewater mains throughout the city are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacment of wastewater mains using a "worst first" approach to reduce maintenance costs and customer problems. 265 PROJECT TITLE: LINE REPLACEMENT - COLLIN DRIVE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction TBD 0% 0% 0% 0% 0% 266 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, SLAUGHTER/E. HUITT Project Type: WASTEWATER Sub -Type: MAIN Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: 4/12/2004 The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. PROJECT DESCRIPTION: Replace wastewater mains: 1.) Between John Vernon and Slaughter east of Dunaway 2.) East of Dunaway from Slaughter to E. Huitt 3.) Along E. Huitt from S. Main to Dunaway PROJECT SCHEDULE: JUSTIFICATION: Many wastewater mains throughout the city are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacment of wastewater mains using a "worst first" approach to reduce maintenance costs and customer problems. 267 PROJECT TITLE: LINE REPLACEMENT - SLAUGHTER/E. HUITT PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction TBD 0% 0% 0% 0% 0% 268 Project Description WATER PROJECTS PrImity Estimated Coat Operating CIP Fund Fund Balance CAPITAL IMPROVEMENT PROGRAMS UNFUNDED PROJECTS . SORTED BY TYPE PROPOSE METHOD OF FINANCING Bond Sale Grants' Impact Escrow Car Rental Contrib FOOS Funds Tax Water System General Security Updates A $ 40.000 XX FY2005 CDBG A $ 164.300 $ 69.300 $ 915,000 Lino Replacement, SotAh Atkers on Lone A $ 70.000 XX Line Replacement, Blanco Orke A $ 08.000 XX Line Replacement, Henslee A $ 183,000 XX Line Rpplacemerrt. John VernortSIou ter A $ 161,000 XX Sub -Total Water Priority A $ 723,300 Water Sys Security Perimeter Fencing Upgrade 6 $ 75,000 XX Hwy 380 W oter Crossing ^ B $ 305.000 XX XX Line Replacement. Cannon Drive o> B $ 248,000 XX Line Replacement, Canyon Ridge n1 B $ 84.000 XX Line Replacement. Hodges Drive to B $ 101,000 XX Line Replacement, Live Onk CVLive Oak Dr Pt 8 $ 77.000 XX N Line Replacement, Signet Driver'' B $ 80.000 XX rT Llne Replacement. Mesa Driven' a $ 55,000 XX cp — I Line Replacement. Arlene Drive(') B $ 73,000 XX Line Replacement. S. Pipeline Road W est {" B $ 122.000 XX Water System Secutlty Comers Mrstallabooi r�1 B $ 70,000 XX Line Replacement. S. Pipeline Road East ur 8 $ 125,000 XX Line Replacement. Collins, Dallas to Harwood C4 8 $ 132.000 XX Line Replacement, Collins, Denton to Dallas lea B $ 118,000 XX Line Replacement, S. kills Drive Nt 8 $ 161.000 XX Line Replacement. Westwood Dew M 8 $ 154,000 XX Sub. Total Willer Priority B $ 2.070,000 Line Replacement. Futter Drive C $ 142,000 Hew 183 Water Creasing C TBO Line Retuaccntert, Ector Drivo C TBD Line Replacement. (.4dw'y Dr East C TBO Line Reptacemertl. Midway Dr W eat C TBD Line Replacement. Simmons Drive North C TBD Lire Replacement. Simmons Drive South C TBD Line Replacement, Dickey Drive South C TBD — Line Replacement. Dickey Drive North C TBD Line Rept"cement. Paula Lane C TBD Line Replacement. Hollow Oak C TBD Line Replacement, Denton Dirve C TBD Lino Replacement. S. Main Street (North) C TBD A. Prokot] 1 rnt.11 M presorted b Council d uneg Rs epoo rrlrp year 8 • Prd1Co1] 1 t a prase read to C oLmt 1..1hLn Mo Iowa yo]us C • Proms "et ue be promti ad b COuxl beyor 1 aw year] Hotol Tax EOC To Be Determined XX XX XX XX XX XX XX XX XX XX XX XX XX Project Description CAPITAL IMPROVEMENT PROGRAMS UNFUNDED PROJECTS -SORTED BY TYPE PROPOSED METHOD OF FINANCING Priority Estimated Cost Operating Fund Line Replacemeni. S. Rhein Street (South) C TBD Line Revlaccmer4. Sunset Dr C TBD Line Replacement, Wildweod C TBD Line Replacement. Woodvine (East) C TBD Line Replacement Woodvino (West) C TBD Line Replacement Springyrood Ct C TBD Line Replacement Shady Creek & CGfferood C TBD Water System Security Land Acquistion C TBD Sub -Total WaterPrioNry C $ 142.000 WATER PROJECTS - TOTAL $ 2,944,300 A- Protect fla t vat be pre :muted to Con/nal game the rgeorrirqy9ar - Privets pat vat be pre 'melted to Coud Pe, two (ooa nary C - Projacl a that wi I be prose, tad to Cowin beyond rtn¢ ya oro CIP Fund Balance Bond Salo Grants, Impact Escrow Car Rental Hotel Contrib Foes Funds Tax Tax EDC To Bo Dotormlnod XX XX XX XX XX XX XX XX City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Project Title: WATER SYSTEM GENERAL SECURITY UPDATES Project Type: WATER Sub -Type: Project No.: Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 4/12/2004 Date Completed: 2004 Water System Vulnerability Assessment of the City of Euless Water System Master Plan PROJECT DESCRIPTION: Project would provide intrusion locks/alarms on SCADA and all building entrances, flood lights with motion sensors, burglar bars on all windows, chlorine leak detection on all injection devices, nightime area light evaluation, replace all gate and entry locks, trim trees and other growth, and install an anti -climbing device on one GST ladder to the following water production and storage sites: Fuller GST, Heritage 2MG, North Main 1 MG, Far North GST, and North Main 2MG. PROJECT SCHEDULE: JUSTIFICATION: Increased water system security by addressing vital elements recommended in the 2004 Water System Vulnerability Assessment as identified by Lockwood, Andrews, and Newman, Inc. and submitted to the EPA. 271 PROJECT TITLE: WATER SYS GENERAL SECURITY UPDATES PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations Supplemental Sales Tax To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 40,000 $40,000 272 Department: Submitted By: Project Title: Project Type: Project No.: City of Euless Capital Project Request PUBLIC WORKS Date Prepared: 4/12/2004 RON YOUNG Date Completed: FY 2005 CDBG WATER Sub -Type: MAIN Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: These water mains are included in the City's Water Master Plan. This is the 30th year CDBG funding by Tarrant County. PROJECT DESCRIPTION: Design and construction of water mains in the Park Crestmore Addition. Water mains in Windward Way and Sheppard Drive will be replaced. PROJECT SCHEDULE: Design services contracted by Tarrant County Estimated design completion - January, 2005 Estimated construction advertising - February, 2005 Estimated contract award - April, 2005 Anticipated start of construction - June, 2005 Anticipated completion - September, 2005 JUSTIFICATION: Existing water mains are substandard in size and require more maintenance than newer mains. 273 PROJECT TITLE: FY 2005 CDBG PROJECT #: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Construction 164,300 Personnel: Full Time Part Time Tarrant County Contribution (95,000) Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $69,300 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Grants/Contributions Supplemental Sales Tax ADDITIONAL COMMENTS: $69,300.00 95,000.00 Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % Held public hearing on January 27, 2004 on proposed project. 274 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, SOUTH ATKERSON LANE Project Type: WATER Sub -Type: MAINS Project No.: Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN This water main is included in the City's Water Master Plan. PROJECT DESCRIPTION: Systematic annual replacement of old deteriorated or substandard size water mains. Replace main from Huntington to 822 S. Atkerson. Replace existing 4" CI main with 8" PVC. PROJECT SCHEDULE: Engineer selection - October, 2004 Award engineering contract - Nov, 2004 Design complete - April, 2005 Construction bids - May, 2005 Award contract - June, 2005 Complete construction - Dec, 2005 JUSTIFICATION: 5/28/2003 Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provides inadequate flow of water for fire protection. 275 PROJECT TITLE: SOUTH ATKERSON LANE NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX PROJECT #: TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 8,000 71,000 $79,000 0% 0% 0% 0% 0% This project will be combined with the other FY05 water main projects into one engineering contract and one construction contract. 276 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, BLANCO DR Project Type: WATER Sub -Type: MAINS Project No.: Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This water main is included in the City's Water Master Plan. PROJECT DESCRIPTION: Systematic annual replacement of old deteriorated or substandard size water mains. Replace main from Aransas to Harwood. Replace 4" CI main with 8" PVC. PROJECT SCHEDULE: Engineer selection - October, 2004 Award engineering contract - Nov, 2004 Design complete - April, 2005 Construction bids - May, 2005 Award contract - June, 2005 Complete construction - Dec, 2005 JUSTIFICATION: 5/28/2003 Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provides inadequate flow of water for fire protection. 277 PROJECT TITLE: LINE REPLACEMENT, BLANCO DR NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX PROJECT #: TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 9,000 87,000 $96,000 0% 0% 0% 0% 0% This project will be combined with the other FY05 water main projects into one engineering contract and one construction contract. 278 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, HENSLEE Project Type: WATER Sub -Type: MAINS Project No.: Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This water main is included in the City's Water Master Plan. PROJECT DESCRIPTION: Systematic annual replacement of old deteriorated or substandard size water mains. Replace main from Hollywood to Sunset. Replace 6" AC main with 8" PVC. PROJECT SCHEDULE: Engineer selection - October, 2004 Award engineering contract - Nov, 2004 Design complete - April, 2005 Construction bids - May, 2005 Award contract - June, 2005 Complete construction - Dec, 2005 JUSTIFICATION: 5/28/2003 Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provides inadequate flow of water for fire protection. 279 PROJECT TITLE: LINE REPLACEMENT, HENSLEE NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX PROJECT #: TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 17,000 166,000 $183,000 0% 0% 0% 0% 0% This project will be combined with the other FY05 water main projects into one engineering contract and one construction contract. 280 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, JOHN VERNON/SLAUGHTER Project Type: WATER Sub -Type: MAINS Project No.: Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This water main is included in the City's Water Master Plan. PROJECT DESCRIPTION: Systematic annual replacement of old deteriorated or substandard size water mains. Replace main east of Dunaway. Replace 4" CI main with 8" PVC. PROJECT SCHEDULE: Engineer selection - October, 2004 Award engineering contract - Nov, 2004 Design complete - April, 2005 Construction bids - May, 2005 Award contract - June, 2005 Complete construction - Dec, 2005 JUSTIFICATION: 5/28/2003 Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provides inadequate flow of water for fire protection. 281 PROJECT TITLE: JOHN VERNON/SLAUGHTER NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX PROJECT #: TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 14,600 146,400 $161,000 0% 0% 0% 0% 0% This project will be combined with the other FY05 water main projects into one engineering contract and one construction contract. 282 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Date Prepared: 4/12/2004 Date Completed: Project Title: WATER SYSTEM SECURITY PERIMETER FENCING UPGRADES Project Type: WATER Sub -Type: Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: 2004 Water System Vulnerability Assessment of the City of Euless Water System Master Plan PROJECT DESCRIPTION: Project would provide new perimeter security fencing to the following water production and storage sites; Fuller GST, Heritage 2MG, North Main 1MG, Far North Main GST. PROJECT SCHEDULE: Recommend Funding in FY'06 JUSTIFICATION: Increased water system security by addressing vital elements recommended in the 2004 Water System Vulnerability Assessment as identified by Lockwood, Andrews, and Newman, Inc. and submitted to the EPA. 283 PROJECT TITLE: WATER SYS PERIMETER FENCING PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations Supplemental Sales Tax ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 75,000 $75,000 284 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Project Title: SH 360 WATER CROSSING Project Type: WATER Sub -Type: MAINS Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-21-00 Date Completed: This project is related to the DFW International Airport Master Plan for property in Euless. PROJECT DESCRIPTION: This project consists of the extension of three water mains across SH 360 right-of-way to provide water service to a portion of the DFW Airport property. PROJECT SCHEDULE: JUSTIFICATION: Development on the airport property will increase the City's tax revenues. The mains should be extended prior to construction of the main lanes of SH 360. 285 PROJECT TITLE: SH 360 WATER CROSSING PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Developer Contributions To Be Determined ADDITIONAL COMMENTS: XX XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 35,000 360,000 $395,000 0% 0% 0% 0% 0% 286 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, CANNON DR Project Type: WATER Sub -Type: MAINS Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This water main is included in the City's Water Master Plan. PROJECT DESCRIPTION: Systematic annual replacement of old deteriorated or substandard size water mains. Replace main from S. Pipeline to Hollywood. Replace 4" CI main with 8" PVC. PROJECT SCHEDULE: JUSTIFICATION: 5/28/2003 Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provides inadequate flow of water for fire protection. 287 PROJECT TITLE: LINE REPLACEMENT, CANNON DR PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 23,000 225,000 $248,000 0% 0% 0% 0% 0% 288 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, CANYON RIDGE Project Type: WATER Sub -Type: MAINS Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This water main is included in the City's Water Master Plan. PROJECT DESCRIPTION: Systematic annual replacement of old deteriorated or substandard size water mains. Replace main south of Marlene Drive. Replace 4" CI main with 8" PVC. PROJECT SCHEDULE: JUSTIFICATION: 5/28/2003 Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provides inadequate flow of water for fire protection. 289 PROJECT TITLE: LINE REPLACEMENT, CANYON RIDGE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 8,000 76,000 $84,000 0% 0% 0% 0% 0% 290 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, HODGES DR Project Type: WATER Sub -Type: MAINS Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This water main is included in the City's Water Master Plan. PROJECT DESCRIPTION: Systematic annual replacement of old deteriorated or substandard size water mains. Replace main from S. Mills to Simmons Drive. Replace 4" CI main with 8" PVC. PROJECT SCHEDULE: JUSTIFICATION: 5/28/2003 Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provides inadequate flow of water for fire protection. 291 PROJECT TITLE: LINE REPLACEMENT, HODGES DR PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 9,000 92,000 $101,000 0% 0% 0% 0% 0% 292 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, LIVE OAK CT & LIVE OAK DR Project Type: WATER Sub -Type: MAINS Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This water main is included in the City's Water Master Plan. PROJECT DESCRIPTION: Systematic annual replacement of old deteriorated or substandard size water mains. Replace main from Cedar Court to Marlene and Live Oak Court. Replace 4" CI main with 8" PVC. PROJECT SCHEDULE: JUSTIFICATION: 5/28/2003 Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provides inadequate flow of water for fire protection. 293 PROJECT TITLE: LIVE OAK CT & LIVE OAK DR PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 7,000 70,000 $77,000 0% 0% 0% 0% 0% 294 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, SIGNET DRIVE Project Type: WATER Sub -Type: MAINS Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This water main is included in the City's Water Master Plan. PROJECT DESCRIPTION: Systematic annual replacement of old deteriorated or substandard size water mains. Replace main from Canyon Ridge to Westcliff. Replace 4" CI main with 8" PVC. PROJECT SCHEDULE: JUSTIFICATION: 5/28/2003 Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provides inadequate flow of water for fire protection. 295 PROJECT TITLE: LINE REPLACEMENT, SIGNET DRIVE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 8,000 81,000 $89,000 0% 0% 0% 0% 0% 296 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, MESA DR Project Type: WATER Sub -Type: MAINS Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This water main is included in the City's Water Master Plan. PROJECT DESCRIPTION: Systematic annual replacement of old deteriorated or substandard size water mains. Replace main from Marlene to Northcliff. Replace 4" CI main with 8" PVC. PROJECT SCHEDULE: JUSTIFICATION: 5/28/2003 Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provides inadequate flow of water for fire protection. 297 PROJECT TITLE: LINE REPLACEMENT, MESA DR PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 5,000 50,000 $55,000 0% 0% 0% 0% 0% 298 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, MARLENE DR Project Type: WATER Sub -Type: MAINS Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This water main is included in the City's Water Master Plan. PROJECT DESCRIPTION: Systematic annual replacement of old deteriorated or substandard size water mains. Replace main from Canyon Ridge to Westcliff. Replace existing 6" CI main with 8" PVC to upgrade existing looped system. PROJECT SCHEDULE: JUSTIFICATION: 5/28/2003 Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provides inadequate flow of water for fire protection. 299 PROJECT TITLE: LINE REPLACEMENT, MARLENE DR PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 7,000 66,000 $73,000 0% 0% 0% 0% 0% 300 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, S. PIPELINE ROAD WEST Project Type: WATER Sub -Type: MAINS Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This water main is included in the City's Water Master Plan. PROJECT DESCRIPTION: Systematic annual replacement of old deteriorated or substandard size water mains. Replace main from Simmons to Vine Street. Replace 6" CI main with 8" PVC. PROJECT SCHEDULE: JUSTIFICATION: 5/28/2003 Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provides inadequate flow of water for fire protection. 301 PROJECT TITLE: SOUTH PIPELINE ROAD WEST PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 11,000 111,000 $122,000 0% 0% 0% 0% 0% 302 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Date Prepared: 4/12/2004 Date Completed: Project Title: WATER SYSTEM SECURITY CAMERA INSTALLATION Project Type: WATER Sub -Type: Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: 2004 Water System Vulnerability Assessment of the City of Euless Water System Master Plan PROJECT DESCRIPTION: Project would provide security camera to the following water production and storage sites; Fuller GST, Heritage 2MG, North Main 1 MG, Far North Main GST and North Main 2MG. PROJECT SCHEDULE: Recommend funding in FY'07 JUSTIFICATION: Increased water system security by addressing vital elements recommended in the 2004 Water System Vulnerability Assessment as identified by Lockwood, Andrews, and Newman, Inc. and submitted to the EPA. 303 PROJECT TITLE: WATER SYS SECURITY CAMERA PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations Supplemental Sales Tax ADDITIONAL COMMENTS: Recommended Funding in FY'07 XX TOTAL ESTIMATED CAPITAL COST: Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 70,000 $70,000 304 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, S. PIPELINE ROAD EAST Project Type: WATER Sub -Type: MAINS Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This water main is included in the City's Water Master Plan. PROJECT DESCRIPTION: Systematic annual replacement of old deteriorated or substandard size water mains. Replace main from Vine Street to S. Main Street. Replace 6" CI main with 8" PVC. PROJECT SCHEDULE: JUSTIFICATION: 5/28/2003 Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provides inadequate flow of water for fire protection. 305 PROJECT TITLE: SOUTH PIPELINE ROAD EAST PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 11,000 114,000 $125,000 0% 0% 0% 0% 0% 306 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, COLLINS DR, DALLAS TO HARWOOD Project Type: WATER Sub -Type: MAINS Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This water main is included in the City's Water Master Plan. PROJECT DESCRIPTION: Systematic annual replacement of old deteriorated or substandard size water mains. Replace main from Dallas to Harwood Road. Replace 6" CI main with 8" PVC. PROJECT SCHEDULE: JUSTIFICATION: 5/28/2003 Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provides inadequate flow of water for fire protection. 307 PROJECT TITLE: COLLINS DR, DALLAS TO HARWOOD PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 12,000 120,000 $132,000 0% 0% 0% 0% 0% 308 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, COLLINS DR, DENTON TO DALLAS Project Type: WATER Sub -Type: MAINS Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This water main is included in the City's Water Master Plan. PROJECT DESCRIPTION: Systematic annual replacement of old deteriorated or substandard size water mains. Replace main from Denton to Dallas. Replace 6" CI main with 8" PVC. PROJECT SCHEDULE: JUSTIFICATION: 5/28/2003 Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provides inadequate flow of water for fire protection. 309 PROJECT TITLE: COLLINS DR, DENTON TO DALLAS PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications Construction 11,000 107,000 $118,000 0% 0% 0% 0% 0% 310 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, S. MILLS DR Project Type: WATER Sub -Type: MAINS Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This water main is included in the City's Water Master Plan. PROJECT DESCRIPTION: Systematic annual replacement of old deteriorated or substandard size water mains. Replace main from Bayless to Whitener. Replace existing 6" CI main with 8" PVC. PROJECT SCHEDULE: JUSTIFICATION: 5/28/2003 Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provides inadequate flow of water for fire protection. 311 PROJECT TITLE: LINE REPLACEMENT, S. MILLS DR PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 15,000 146,000 $161,000 0% 0% 0% 0% 0% 312 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, WESTWOOD DR Project Type: WATER Sub -Type: MAINS Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This water main is included in the City's Water Master Plan. PROJECT DESCRIPTION: Systematic annual replacement of old deteriorated or substandard size water mains. Replace main from Fuller to Carter. Replace 6" CI main with 8" PVC. PROJECT SCHEDULE: JUSTIFICATION: 5/28/2003 Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provides inadequate flow of water for fire protection. 313 PROJECT TITLE: LINE REPLACEMENT, WESTWOOD DR PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 14,000 140,000 $154,000 0% 0% 0% 0% 0% 314 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, FULLER DR Project Type: WATER Sub -Type: MAINS Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This water main is included in the City's Water Master Plan. PROJECT DESCRIPTION: Systematic annual replacement of old deteriorated or substandard size water mains. Replace main from Salem to Carter. Replace 6" CI main with 8" PVC. PROJECT SCHEDULE: JUSTIFICATION: 5/28/2003 Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provides inadequate flow of water for fire protection. 315 PROJECT TITLE: LINE REPLACEMENT, FULLER DR PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 13,000 129,000 $142,000 0% 0% 0% 0% 0% 316 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Project Title: SH 183 WATER CROSSING Project Type: WATER Sub -Type: MAINS Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: TxDOT plans to widen SH 183 within the next 10 years. PROJECT DESCRIPTION: Date Prepared: 7-21-00 Date Completed: The City has a 24" water main and many other smaller mains that will have to be relocated. The scope/magnitude of relocation work is unknown at this time. PROJECT SCHEDULE: JUSTIFICATION: Required where conflicts will occur with TxDOT's highway project. 317 PROJECT TITLE: SH 183 WATER CROSSING NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX $0 $0 $0 PROJECT #: TOTAL ESTIMATED CAPITAL COST: The cost of this project is currently unkown. $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction The scope of work will be determined as TxDOT completes the highway reconstruction plans. 0% 0% 0% 0% 0% 318 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, ECTOR DRIVE Project Type: WATER Sub -Type: MAINS Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This water main is included in the City's Water Master Plan. PROJECT DESCRIPTION: Systematic annual replacement of old deteriorated or substandard size water mains. Replace main from Trojan to Midway. Replace 6" CI main with 8" PVC. PROJECT SCHEDULE: JUSTIFICATION: 5/28/2003 Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provides inadequate flow of water for fire protection. 319 PROJECT TITLE: LINE REPLACEMENT, ECTOR DRIVE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: To Be Determined $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 0% 0% 0% 0% 0% 320 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, MIDWAY DR EAST Project Type: WATER Sub -Type: MAINS Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This water main is included in the City's Water Master Plan. PROJECT DESCRIPTION: Systematic annual replacement of old deteriorated or substandard size water mains. Replace main from N. Main Street to Freestone. Replace 6" CI main with 8" PVC. PROJECT SCHEDULE: JUSTIFICATION: 5/28/2003 Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provides inadequate flow of water for fire protection. 321 PROJECT TITLE: LINE REPLACEMENT, MIDWAY DR EAST PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: To Be Determined $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 0% 0% 0% 0% 0% 322 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, MIDWAY DR WEST Project Type: WATER Sub -Type: MAINS Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This water main is included in the City's Water Master Plan. PROJECT DESCRIPTION: Systematic annual replacement of old deteriorated or substandard size water mains. Replace main from Freestone to Ector. Replace 6" CI main with 8" PVC. PROJECT SCHEDULE: JUSTIFICATION: 5/28/2003 Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provides inadequate flow of water for fire protection. 323 PROJECT TITLE: LINE REPLACEMENT, MIDWAY DR WEST PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: To Be Determined $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 0% 0% 0% 0% 0% 324 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, SIMMONS DRIVE NORTH Project Type: WATER Sub -Type: MAINS Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This water main is included in the City's Water Master Plan. PROJECT DESCRIPTION: Systematic annual replacement of old deteriorated or substandard size water mains. Replace main from Bayless to Whitener. Replace 6" CI main with 8" PVC. PROJECT SCHEDULE: JUSTIFICATION: 5/28/2003 Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provides inadequate flow of water for fire protection. 325 PROJECT TITLE: SIMMONS DRIVE NORTH PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: To Be Determined $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 0% 0% 0% 0% 0% 326 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, SIMMONS DRIVE SOUTH Project Type: WATER Sub -Type: MAINS Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This water main is included in the City's Water Master Plan. PROJECT DESCRIPTION: Systematic annual replacement of old deteriorated or substandard size water mains. Replace main from Whitener to S. Pipeline. Replace 6" CI main with 8" PVC. PROJECT SCHEDULE: JUSTIFICATION: 5/28/2003 Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provides inadequate flow of water for fire protection. 327 PROJECT TITLE: SIMMONS DRIVE SOUTH PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: To Be Determined $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 0% 0% 0% 0% 0% 328 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, DICKEY DRIVE SOUTH Project Type: WATER Sub -Type: MAINS Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This water main is included in the City's Water Master Plan. PROJECT DESCRIPTION: Systematic annual replacement of old deteriorated or substandard size water mains. Replace main from E. Huitt to Hilton. Replace 6" AC main with 8" PVC. PROJECT SCHEDULE: JUSTIFICATION: 5/28/2003 Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provides inadequate flow of water for fire protection. 329 PROJECT TITLE: LINE REPLACEMENT, DICKEY DRIVE SOUTH PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: To Be Determined $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 0% 0% 0% 0% 0% 330 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, DICKEY DRIVE NORTH Project Type: WATER Sub -Type: MAINS Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This water main is included in the City's Water Master Plan. PROJECT DESCRIPTION: Systematic annual replacement of old deteriorated or substandard size water mains. Replace main from S.H. 10 to E. Huitt. Replace 6" AC main with 8" PVC. PROJECT SCHEDULE: JUSTIFICATION: 5/28/2003 Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provides inadequate flow of water for fire protection. 331 PROJECT TITLE: LINE REPLACEMENT, DICKEY DRIVE NORTH PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: To Be Determined $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 0% 0% 0% 0% 0% 332 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, PAULA LANE Project Type: WATER Sub -Type: MAINS Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This water main is included in the City's Water Master Plan. PROJECT DESCRIPTION: Systematic annual replacement of old deteriorated or substandard size water mains. Replace main from Needles to S. Pipeline. Replace 6" CI main with 8" PVC. PROJECT SCHEDULE: JUSTIFICATION: 5/28/2003 Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provides inadequate flow of water for fire protection. 333 PROJECT TITLE: LINE REPLACEMENT, PAULA LANE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: To Be Determined $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 0% 0% 0% 0% 0% 334 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, HOLLOW OAK Project Type: WATER Sub -Type: MAINS Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This water main is included in the City's Water Master Plan. PROJECT DESCRIPTION: 5/28/2003 Systematic annual replacement of old deteriorated or substandard size water mains. Replace main from Woodridge to Pebble Creek and Woodridge south of Hollow Oak. Replace 6" CI main with 8" PVC. PROJECT SCHEDULE: JUSTIFICATION: Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provides inadequate flow of water for fire protection. 335 PROJECT TITLE: LINE REPLACEMENT, HOLLOW OAK PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: To Be Determined $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 0% 0% 0% 0% 0% 336 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: Project Title: LINE REPLACEMENT, DENTON DRIVE Project Type: WATER Sub -Type: MAINS Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This water main is included in the City's Water Master Plan. PROJECT DESCRIPTION: Systematic annual replacement of old deteriorated or substandard size water mains. Replace main from Tarrant Drive to Harwood. Replace 6" CI main with 8" PVC. PROJECT SCHEDULE: JUSTIFICATION: 5/28/2003 Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provides inadequate flow of water for fire protection. 337 PROJECT TITLE: LINE REPLACEMENT, DENTON DRIVE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: To Be Determined $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 0% 0% 0% 0% 0% 338 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Project Title: LINE REPLACEMENT - S. MAIN STREET (NORTH) Project Type: WATER Sub -Type: MAIN Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 4/12/2004 Date Completed: The water mains included in this project are part of the City of Euless Water System Master Plan. PROJECT DESCRIPTION: Replace water main: 1.) S. Main Street from E. Huitt to SH 10 (Replace 6" with 8") PROJECT SCHEDULE: JUSTIFICATION: Old and deteriorated water mains increase the City's maintenance cost. Substandard size water mains provide a reduced flow of water. This is part of the systematic annual replacement of deteriorated and substandard size water mains. 339 PROJECT TITLE: LINE REPLACEMENT, S. MAIN ST (NORTH) PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations Supplemental Sales Tax To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Project Title: LINE REPLACEMENT - S. MAIN STREET (SOUTH) Project Type: WATER Sub -Type: MAIN Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 4/12/2004 Date Completed: The water mains included in this project are part of the City of Euless Water System Master Plan. PROJECT DESCRIPTION: Replace water main: 1.) S. Main Street from Landover to E. Huitt (Replace 6" with 8") PROJECT SCHEDULE: JUSTIFICATION: Old and deteriorated water mains increase the City's maintenance cost. Substandard size water mains provide a reduced flow of water. This is part of the systematic annual replacement of deteriorated and substandard size water mains. 341 PROJECT TITLE: LINE REPLACEMENT, S. MAIN ST (SOUTH) PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations Supplemental Sales Tax To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Project Title: LINE REPLACEMENT - SUNSET DR Project Type: WATER Sub -Type: MAIN Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 4/12/2004 Date Completed: The water mains included in this project are part of the City of Euless Water System Master Plan. PROJECT DESCRIPTION: Replace water main: 1.) Sunset Drive from S. Pipeline to S. Main (Replace 6" with 8") PROJECT SCHEDULE: JUSTIFICATION: Old and deteriorated water mains increase the City's maintenance cost. Substandard size water mains provide a reduced flow of water. This is part of the systematic annual replacement of deteriorated and substandard size water mains. 343 PROJECT TITLE: LINE REPLACEMENT, SUNSET DR PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations Supplemental Sales Tax To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Project Title: LINE REPLACEMENT - WILDWOOD Project Type: WATER Sub -Type: MAIN Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 4/12/2004 Date Completed: The water mains included in this project are part of the City of Euless Water System Master Plan. PROJECT DESCRIPTION: Replace water main: 1.) Wildwood Dr. (Replace 6" with 8") PROJECT SCHEDULE: JUSTIFICATION: Old and deteriorated water mains increase the City's maintenance cost. Substandard size water mains provide a reduced flow of water. This is part of the systematic annual replacement of deteriorated and substandard size water mains. 345 PROJECT TITLE: LINE REPLACEMENT, WILDWOOD PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations Supplemental Sales Tax To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Project Title: LINE REPLACEMENT - WOODVINE (EAST) Project Type: WATER Sub -Type: MAIN Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 4/12/2004 Date Completed: The water mains included in this project are part of the City of Euless Water System Master Plan. PROJECT DESCRIPTION: Replace water main: 1.) Woodvine Dr. from Cliffwood to El Camino Real (Replace 6" with 8") PROJECT SCHEDULE: JUSTIFICATION: Old and deteriorated water mains increase the City's maintenance cost. Substandard size water mains provide a reduced flow of water. This is part of the systematic annual replacement of deteriorated and substandard size water mains. 347 PROJECT TITLE: LINE REPLACEMENT, WOODVINE (EAST) PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations Supplemental Sales Tax To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Project Title: LINE REPLACEMENT - WOODVINE (WEST) Project Type: WATER Sub -Type: MAIN Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 4/12/2004 Date Completed: The water mains included in this project are part of the City of Euless Water System Master Plan. PROJECT DESCRIPTION: Replace water main: 1.) Woodvine Dr. from Pebble Creek to Cliffwood (Replace 6" with 8") PROJECT SCHEDULE: JUSTIFICATION: Old and deteriorated water mains increase the City's maintenance cost. Substandard size water mains provide a reduced flow of water. This is part of the systematic annual replacement of deteriorated and substandard size water mains. 349 PROJECT TITLE: LINE REPLACEMENT, WOODVINE (WEST) PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations Supplemental Sales Tax To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Project Title: LINE REPLACEMENT - SPRINGWOOD CT Project Type: WATER Sub -Type: MAIN Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 4/12/2004 Date Completed: The water mains included in this project are part of the City of Euless Water System Master Plan. PROJECT DESCRIPTION: Replace water main: 1.) Springwood Court (Replace 4" with 8") PROJECT SCHEDULE: JUSTIFICATION: Old and deteriorated water mains increase the City's maintenance cost. Substandard size water mains provide a reduced flow of water. This is part of the systematic annual replacement of deteriorated and substandard size water mains. 351 PROJECT TITLE: LINE REPLACEMENT, SPRINGWOOD CT PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations Supplemental Sales Tax To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Date Prepared: 4/12/2004 Date Completed: Project Title: LINE REPLACEMENT - SHADY CREEK & CLIFFWOOD Project Type: WATER Sub -Type: MAIN Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The water mains included in this project are part of the City of Euless Water System Master Plan. PROJECT DESCRIPTION: Replace water main: 1.) Shady Creek Dr. (Replace 6" with 8") 2.) Cliffwood Dr. (Replace 6" with 8") PROJECT SCHEDULE: JUSTIFICATION: Old and deteriorated water mains increase the City's maintenance cost. Substandard size water mains provide a reduced flow of water. This is part of the systematic annual replacement of deteriorated and substandard size water mains. 353 PROJECT TITLE: LINE REPL, SHADY CREEK/CLIFFWOOD PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations Supplemental Sales Tax To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Project Title: WATER SYSTEM SECURITY LAND ACQUISTION Project Type: WATER Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 4/12/2004 Date Completed: 2004 Water System Vulnerability Assessment of the City of Euless Water System Master Plan PROJECT DESCRIPTION: Project would allow us to acquire a small residential property which shields the Fuller GST from public view, remove the residence and provide greater security, access and visibility. PROJECT SCHEDULE: JUSTIFICATION: Increased water system security by addressing vital elements recommended in the 2004 Water System Vulnerability Assessment as identified by Lockwood, Andrews, and Newman, Inc. and submitted to the EPA. 355 PROJECT TITLE: WATER SYS SECURITY LAND ACQ PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations Supplemental Sales Tax To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Land Acquistion $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 9)?,01,ectsi Project Description OTHER PROJECTS Building B Design Slope Protection -Phase 4 Parking -Preserve @ McCormick Park Priority Estimated Cost A $ 100,000 A $ 122,000 A $ 75,000 Sub -Total Other PriorityA $ 297,000 Building B Construction(8) B $ 945,194 Dog Park - Bob Eden Park (8) B $ 75,000 Park Amenities Upgrade (6) B $ 150,000 Pool Renovations - Phase II - Wilshire Pare) B $ 1,000,000 Public Works Facility (7) B $ 1,729,050 Pool Renovations - Phase III - South Eulesslfii B $ 1,000,000 Parks Sign Program (8) B $ 125,000 Pool Renovations - Phase IV - Midway(8) B $ 1,000,000 City Wide Trail Enhancements - Phase It91 B $ 250,000 Misc Park Structure Improvements(8) B $ 150,000 CAPITAL IMPROVEMENT PROGRAMS UNFUNDED PROJECTS - SORTED BY TYPE PROPOSED METHOD OF FINANCING Operating Fund CIP Fund Balance XX Bond Sale Grants/ Impact Escrow Car Rental Contrib Fees Funds Tax XX XX XX XX XX XX XX XX XX XX XX XX Hotel Tax EDC To Be Determined Sub -Total Other Priority B $ 6,424,244 Fire Training Facility C $ 1,315,000 XX Library Build Out C $ 2,202,500 XX Aquatics Center/Rec Center Exp, Phase I C $ 5,500,000 XX Aquatics Center/Rec Center Exp, Phase II C $ 4,400,000 XX City Wide Trail Enhancements - Phase II C $ 350,000 XX City Wide Trail Enhancements - Phase III C $ 200,000 XX City Wide Trail Enhancements - Phase IV C $ 150,000 XX Parks @ Texas Star, Phase IV C $ 2,000,000 XX Simmons Center Expansion C $ 850,000 XX Ruth Millican Expansion C $ 1,150,000 XX Community Golf Course @ Bob Eden C $ 4,000,000 XX Sub -Total Other Priority C $ 22,117,500 OTHER PROJECTS - TOTAL $ 28,838,744 A - Projects that will be presented to Council during the upcoming year. B - Projects that will be presented to Council wthin two to five years. C - Projects that will be presented to Council beyond five years. 357 Department: Submitted By: Project Title: Project Type: Project No.: City of Euless Capital Project Request FACILITES OPERATIONS KYLE MCADAMS BUILDING B-DESIGN BUILDING Sub -Type: DESIGN Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Building B is the fifth project of the master plan. PROJECT DESCRIPTION: Date Prepared: Revised: Date Completed: 6-27-00 5-28-01 To provide the design of a more efficient work space area, Building B will be remodeled to expand the layout for the following departments: Finance, Water Billing Office, Insurance and Human Resources. PROJECT SCHEDULE: JUSTIFICATION: Renovation of Building B will provide more efficient work space area for Finance, Water Department, Insurance, and Human Resource Department offices. Structure will be brought up to the current ADA and TAAS standards during remodel. 358 PROJECT TITLE: BUILDING B-DESIGN PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Maintenance Costs Janitorial Services & Supplies Pest Control Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund County, State, Federal Funding General Obligation Bonds Revenue bonds Certificate of Obligation To Be Determined Car Rental ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Design $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 100,000 $100,000 359 City of Euless Capital Project Request Department: GOLF COURSE Date Prepared: 05/24/2004 Submitted By: GLENDA HARTSELL-SHELTON Date Completed: Project Title: SLOPE PROTECTION -PHASE 4 Project Type: LAND Sub -Type: IMPROVEMENTS Project No.: Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Continuation of the slope wall protection on Hurricane Creek; this will be the 4th phase of the project and is the continued prevention of the embankment on Hurricane Creek that meanders through Texas Star Golf Course. Under phase 4, the wall will tie into the existing slope wall on #3 tee and continue down the #2 fairways. PROJECT DESCRIPTION: Install slope protection at #3 tee at the existing slope protection and continue to #2 fairway on the east side of the creek; this slope wall will be approximately375 linear feet on a wall 10 to 15 feet high. Felton fabric will be placed behind the wall to relieve the hydraulic pressure and keep soil and embankment stable. PROJECT SCHEDULE: JUSTIFICATION: Stop erosion of the creek bank on #3 tee box to the #2 fairway and prevent the possible future loss of cart path and embankment along the fairway. 360 PROJECT TITLE: SLOPE PROTECTION -PHASE 4 PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Maintenance Costs Janitorial Services & Supplies Pest Control Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund County, State, Federal Funding General Obligation Bonds Revenue bonds Certificate of Obligation To Be Determined Car Rental ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Creek Slope Protection $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 122,000 $122,000 361 City of Euless Capital Project Request Department: Community Services Date Prepared: 6/15/2004 Submitted By: Ray McDonald Date Completed: Project Title: Parking -Preserve At McCormick Park Project Type: Land Sub -Type: Improvements Project No.: Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The Parks Master Plan, as adopted in June 2002, contains provision(s) for trail and infrastructure enchancements within the City of Euless parks system. The Outdoor Learning/Nature Center area, known as The Preserve At McCormick Park, was approved in FY04 and will be funded through a matching funds grant from the Texas Parks & Wildlife Department. PROJECT DESCRIPTION: This project will give consideration to additional parking infrastructure for The Preserve At McCormick Park. PROJECT SCHEDULE: JUSTIFICATION: The Parks Master Plan identifies the Outdoor Learning/Nature Center area as a top priority. The Preserve At McCormick Park (currrently funded through both city contributions and a matching funds grant from TPWD) will preserve open space and provide for outdoor nature and preservation educational opportunities. 362 PROJECT TITLE: Parking -Preserve @ McCormick Park PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations Supplemental Sales Tax ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Design Parking $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 2,500 72,500 $75,000 363 Department: Submitted By: Project Title: Project Type: Project No.: City of Euless Capital Project Request FACILITES OPERATIONS KYLE MCADAMS BUILDING B-CONSTRUCTION BUILDING Date Prepared: Revised: Date Completed: Sub -Type: REMODEL Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Building B is the fifth project of the master plan. PROJECT DESCRIPTION: 6-27-00 5-28-01 To provide a more efficient work space area, Building B will be remodeled to expand the layout for the following departments: Finance, Water Billing Office, Insurance and Human Resources. PROJECT SCHEDULE: JUSTIFICATION: Renovation of Building B will provide more efficient work space area for Finance, Water Department, Insurance, and Human Resource Department offices. Structure will be brought up to the current ADA and TAAS standards during remodel. 364 PROJECT TITLE: BUILDING B-CONSTRUCTION PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Maintenance Costs Janitorial Services & Supplies Pest Control Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund County, State, Federal Funding General Obligation Bonds Revenue bonds Certificate of Obligation To Be Determined Car Rental ADDITIONAL COMMENTS: TOTAL ESTIMATED CAPITAL COST: Remodel Architectural fees (7.5%) $0 Telephone/Cabling Furniture (partial) Security System 4,500 Fire Alarm Appliances Landscaping Asbestos Abatement $4,500 Exterior/Drive-up Bill Pymt System Signage 4,000 6,200 500 $10,700 $15,200 Total Estimated Capital Cost XX CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 737,390 62,804 24,000 20,000 10,000 2,500 3,000 5,000 55,000 21,000 4,500 $945,194 50% 365 City of Euless Capital Project Request Department: COMMUNITY SERVICES Submitted By: RAY MCDONALD Date Prepared: 3/23/2004 Date Completed: Project Title: DOG PARK - BOB EDEN PARK Project Type: LAND Sub -Type: IMPROVEMENTS Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The adopted Master Plan recommends funding for the acquisition of open space and subsequent development of park land. PROJECT DESCRIPTION: Taking advantage of Mid -Cities alignment and address increased park land areas, the addition of a dog park to Bob Eden will enhance the opportunities offered within the park. PROJECT SCHEDULE: JUSTIFICATION: This Mid -Cities re -alignment has increased the need to update the Bob Eden park infrastructure. The addition of a dog park within the Bob Eden park boundaries will be the first addition of this amenity throughout the Euless Parks system and will provide a place for residents to bring dogs within a designated park area. 366 PROJECT TITLE: DOG PARK - BOB EDEN PARK PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Janitorial Services Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations Supplemental Sales Tax Car Rental ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Land Betterment Fencing/Structures Contingencies $0 Landscaping Parking $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 35,000 8,750 1,750 4,500 25,000 $75,000 367 City of Euless Capital Project Request Department: COMMUNITY SERVICES Submitted By: RAY MCDONALD Date Prepared: 3/23/2004 Date Completed: Project Title: PARK AMENITIES UPGRADE Project Type: FIXTURES Sub -Type: IMPROVEMENTS Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The adopted Master Plan recommends funding for System -Wide Park Facilities and amenities upgrades. PROJECT DESCRIPTION: This project will address the upgrade of all city parks to modernize amenities from water fountains to play components to picnic stations and pavillions. This project will provide funding for the replacement of aged playground units that are approaching 10-15 years old; these units will include but not be limited to components in AJ Carr Park, Midway Park, Villages of Bear Creek, and Trailwood Park. Additionally, this project will provide contingency funding for minor improvements at all parks with respect to playground surfaces, structures, and minor landscaping features. PROJECT SCHEDULE: JUSTIFICATION: Pursuant to the recommendations in the Parks Master Plan, parks should be brought into accessiblitlity and ADA compliance. Additionally, existing equipment in many park areas is becoming aged and outdated and will require refurbishment/replacement in the near term. 368 PROJECT TITLE: PARK AMENITIES UPGRADE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Janitorial Services Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations Supplemental Sales Tax Car Rental ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Fixtures Landscaping Contingencies $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 100,000 25,000 25,000 $150,000 369 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: 3/23/2004 Submitted By: RAY MCDONALD Date Completed: Project Title: POOL RENOVATION - PHASE II - WILSHIRE PARK Project Type: BUILDING Sub -Type: RENOVATIONS Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Phase I of the pools project (funded in FY04) will address and identify immediate cost with respect to the renovation of S. Euless, Wilshire Park, and Midway Park pools. Phase I of the pools project will also identify areas for either ADA compliance and/or state certification/safety code updates to coincide with a pool renovation. Adopted Parks Master Plan identifies pool redevelopment as a major capital improvement need supported by the age and condition of the present pools. PROJECT DESCRIPTION: Phase II will include funding to redevelop Wilshire Park pool. This redevelopment will include renovations to update surrounding structures and insure both pool and surrounding structures are ADA compliant. Additionally, operating equipment (pumps and piping) will be replaced with new equipment. PROJECT SCHEDULE: Anticipated Funding FY '07 JUSTIFICATION: Three (3) thirty year old pools are outdated and the City should upgrade aquatic offerings for the growing citizen population. 370 PROJECT TITLE: POOLS - PH II WILSHIRE PARK PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Janitorial Services Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations Supplemental Sales Tax Car Rental ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering (7%) Construction Landscaping (5%) $0 Furniture & Fixtures Contingencies (4-5%) $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 59,500 850,000 42,500 15,000 33,000 $1,000,000 371 City of Euless Capital Project Request Department: FACILITY OPERATIONS Date Prepared: 6-27-00 Submitted By: KYLE MCADAMS Revised: 5-28-01 Date Completed: Project Title: PUBLIC WORKS FACILITY Project Type: BUILDING Sub -Type: NEW CONSTRUCTION Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Public Works Facility is the sixth project in the master plan. Construction is proposed to begin in FY2007-08. PROJECT DESCRIPTION: Site planning, topographic surveying and architectural design for a new Public Works Facility to be located on existing city property east of the Fire Station and Animal Control Shelter at 1515 Westpark Way. The scope of work will include office space for supervisors, built-in desk space and storage for foremen, parts, storage, equipment bay for weather sensitive equipment, conference room, training/break room, on -call ready room, locker room, outside construction materials storage bins, sheltered vehicle parking, animal shelter and parking. PROJECT SCHEDULE: Design should be funded in FY'07 and construction in FY'08 JUSTIFICATION: The existing Public Works facility is 50 years old and is a former carrugated metal building that has been modified over time. The building and ancillary structures are not ADA compliant and a constant maintenance problem. The current facility lacks adequate administrative/training space and is deficient in restroom facilities. The current facility is not large enough to adequately house the personnel assigned to Public Works. 372 PROJECT TITLE: PUBLIC WORKS FACILITY PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Utilities Cleaning Insurance Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund County, State, Federal Funding General Obligation Bonds Revenue bonds Certificate of Obligation To Be Determined Car Rental Tax ADDITIONAL COMMENTS: TOTAL ESTIMATED CAPITAL COST: Architect Construction Telephone & Data Cabling $0 Security System Fire Alarm System Appliances Landscaping Irrigation Furniture Signage $0 6,000 4,800 2,500 $13,300 $13,300 Total Estimated Capital Cost XX CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % Design should be funded in FY05 and construction in FY06. 130,000 1,550,000 9,800 7,000 2,500 4,000 6,500 5,500 10,000 3750 $1,729,050 20% 373 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: 3/23/2004 Submitted By: RAY MCDONALD Date Completed: Project Title: POOL RENOVATION - PHASE III - SOUTH EULESS Project Type: BUILDING Sub -Type: RENOVATIONS Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Phase I of the pools project (funded in FY04) will address and identify immediate cost with respect to the renovation of S. Euless, Wilshire Park, and Midway Park pools. Phase I of the pools project will also identify areas for either ADA compliance and/or state certification/safety code updates to coincide with a pool renovation. Adopted Parks Master Plan identifies pool redevelopment as a major capital improvement need supported by the age and condition of the present pools. PROJECT DESCRIPTION: Phase III will include funding to redevelop South Euless Park pool. This redevelopment will include renovations to update surrounding structures and insure both pool and surrounding structures are ADA compliant. Additionally, operating equipment (pumps and piping) will be replaced with new equipment. PROJECT SCHEDULE: Anticipated Funding FY '08 JUSTIFICATION: Three (3) thirty year old pools are outdated and the City should upgrade aquatic offerings for the growing citizen population. 374 PROJECT TITLE: POOLS - PH III SOUTH EULESS PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Janitorial Services Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations Supplemental Sales Tax Car Rental ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering (7%) Construction Landscaping (5%) $0 Furniture & Fixtures Contingencies (4-5%) $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 59,500 850,000 42,500 15,000 33,000 $1,000,000 375 Department: Submitted By: Project Title: Project Type: Project No.: City of Euless Capital Project Request COMMUNITY SERVICES RAY MCDONALD PARK SIGN PROGRAM FIXTURES Date Prepared: 3/23/2004 Date Completed: Sub -Type: IMPROVEMENTS Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The adopted Master Plan recommends funding for System -Wide unified sign program for all city parks. PROJECT DESCRIPTION: This Project will address the upgrade of all city parks signage to the unified "Green Archway" design. Additionally, signage throughout parks will be updated with a standardized appearance throughout the system. PROJECT SCHEDULE: Anticipated Funding FY '08 JUSTIFICATION: Pursuant to the recommendation in the Parks Master Plan, parks signage should be unified and updated throughout the parks system. 376 PROJECT TITLE: PARK SIGN PROGRAM PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Janitorial Services Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations Supplemental Sales Tax Car Rental ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Fixtures Contingencies $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 120,000 5,000 $125,000 377 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: 3/23/2004 Submitted By: RAY MCDONALD Date Completed: Project Title: POOL RENOVATION - PHASE IV- MIDWAY Project Type: BUILDING Sub -Type: RENOVATIONS Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Phase I of the pools project (funded in FY04) will address and identify immediate cost with respect to the renovation of S. Euless, Wilshire Park, and Midway Park pools. Phase I of the pools project will also identify areas for either ADA compliance and/or state certification/safety code updates to coincide with a pool renovation. Adopted Parks Master Plan identifies pool redevelopment as a major capital improvement need supported by the age and condition of the present pools. PROJECT DESCRIPTION: Phase IV will include funding to redevelop the Midway Park pool. This redevelopment will include renovations to update surrounding structures and insure both pool and surrounding structures are ADA compliant. Additionally, operating equipment (pumps and piping) will be replaced with new equipment. PROJECT SCHEDULE: Anticipated Funding FY '09 JUSTIFICATION: Three (3) thirty year old pools are outdated and the City should upgrade aquatic offerings for the growing citizen population. 378 PROJECT TITLE: POOLS - PH IV MIDWAY PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Janitorial Services Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations Supplemental Sales Tax Car Rental ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering (7%) Construction Landscaping (5%) $0 Furniture & Fixtures Contingencies (4-5%) $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 59,500 850,000 42,500 15,000 33,000 $1,000,000 379 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: 3/23/2004 Submitted By: RAY McDONALD Date Completed: Project Title: CITY WIDE TRAIL ENHANCEMENTS - PHASE I Project Type: LAND Sub -Type: IMPROVEMENTS Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Phase I of the proposed four -phase project will include a soft surface trail development and/or re -development at West Park, Heritage Park, and JA Carr Park. This project includes the infrastructure improvements as recommended as a high priority in the adopted Parks Master Plan. PROJECT DESCRIPTION: Redevelop/Redesign existing trails and create a comprehensive trail system with multiple uses for the citizens of Euless. Trails will be incorporated and/or redeveloped at West Park 21 acre park tract, Heritage Park 4.1 acre park tract and JA Carr Park 8.2 acre park tract. PROJECT SCHEDULE: JUSTIFICATION: Trail development and enhancement opportunities will be consistent with available land, funding and time variables. This Master Plan recommendation will be part of a city-wide comprehensive trail enhancement project. 380 PROJECT TITLE: CITY WIDE TRAIL ENHANCEMENT - PH I PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations Supplemental Sales Tax Car Rental ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering (7% Const. Cost) Construction Landscaping (10% Const. Cost) $0 Contingency (4-5% Variable Cost) $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 14,350 205,000 20,500 10,150 $250,000 381 City of Euless Capital Project Request Department: COMMUNITY SERVICES Submitted By: RAY MCDONALD Date Prepared: 3/23/2004 Date Completed: Project Title: MISC PARK STRUCTURE IMPROVEMENTS Project Type: FIXTURES Sub -Type: IMPROVEMENTS Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The adopted Master Plan recommends funding for System -Wide Park Facility and amenities upgrades. PROJECT DESCRIPTION: This Project will address the upgrade of all city parks to modernize amenities from water fountains to play components to picnic stations and pavillions. This project will provide funding for the replacement of aged structures to include pavillions, picnic tables, and other park amenity components. PROJECT SCHEDULE: Anticipated Funding FY '09 JUSTIFICATION: Pursuant to the recommendation in the Parks Master Plan, parks should be brought into accessibility and ADA compliance. Additionally, existing equipment in many park areas is becoming aged and outdated and will require refurbishment/replacement in the near term. 382 PROJECT TITLE: MISC PARK STRUCTURE IMPROVEMENTS PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Janitorial Services Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations Supplemental Sales Tax Car Rental ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Fixtures Contingencies Landscaping $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 100,000 25,000 25,000 $150,000 383 City of Euless Capital Project Request Department: FIRE/FACILITY OPERATIONS Date Prepared: 7-19-00 Submitted By: LEE KOONTZ/KYLE MCADAMS Date Completed: Project Title: FIRE TRAINING FACILITY Project Type: BUILDING Sub -Type: NEW CONSTRUCTION Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The site of the training facility will be behind fire station #2 on Westpark Way and will share land with the proposec future Public Works and Warehouse facility. PROJECT DESCRIPTION: This project will be the construction of a fire training facility that will consist of a four-story fire training tower, burn building and pad site for apparatus operation. PROJECT SCHEDULE: JUSTIFICATION: This facility is needed to provide training for fire department personnel. Currently it is necessary to send our people out of the City to receive training and often it requires the payment of substantial amounts of overtime. The facility would also give us additional credit towards our insurance rating by ISO. 384 PROJECT TITLE: FIRE TRAINING FACILITY PROJECT #: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Construction 1,200,000 Part Time Architectural Fees (7.5%) 90,000 Total Salary $0 Surveying Services 5,000 Purchase of Services Specialized Services 20,000 Materials & Supplies Utilities 5,000 Subtotal: $5,000 Maintenance Costs Maintenance Costs 7,500 Subtotal: $7,500 Total Estimated Annual Cost $12,500 Total Estimated Capital Cost $1,315,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX Conceptual Design % Preliminary Design % Final Plans Specifications Construction 385 City of Euless Capital Project Request Department: FACILITY OPERATIONS Submitted By: KYLE MCADAMS Date Prepared: 7-10-00 Date Completed: Project Title: LIBRARY BUILD OUT Project Type: BUILDING Sub -Type: IMPROVEMENTS Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Shelled area provided in initial plan, design, and construction of the Euless Public Library. The proposed project will provide for completion of the shelled areas as designed with initial construction of the facility. PROJECT DESCRIPTION: Complete shelled areas of Library facility. Build out of shelled areas, once completed will be made available for use by citizens, guests, and employees of the City of Euless. PROJECT SCHEDULE: JUSTIFICATION: Initial construction provided for a shelled area for further expansion as consistent with user/collection growth. Shelled area is available in existing structure for expansion. -386- PROJECT TITLE: LIBRARY BUILD OUT PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Maintenance/Cleaning Janitorial Services & Supplies Pest Control Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Revenue Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To be determined ADDITIONAL COMMENTS: $150, 000 $150,000 $60,000 $10, 000 $220,000 5,000 8,500 500 $14, 000 TOTAL ESTIMATED CAPITAL COST: Construction Architectural Services (8.0%) Telephone & Data Cabling Security System Fire Alarm System Specialized Services $234,000 Total Estimated Capital Cost XX CURRENT STATUS: Conceptual Design % Preliminary Design Final Plans Specifications % Construction % 2,000,000 160,000 30,000 2,000 500 10,000 $2,202,500 387 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: 7/10/2000 Submitted By: RAY MCDONALD Date Revised: 3/12/2003 Date Completed: Project Title: AQUATIC CENTER/RECREATION CENTER EXPANSION - PHASE I Project Type: BUILDING Sub -Type: NEW CONSTRUCTION Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The Parks Master Plan in the approved form includes provision(s)/recommendations to construct an Aquatic Center in conjunction with Recreation Center expansion. PROJECT DESCRIPTION: Develop an indoor aquatic center at Midway Park with emphasis on recreational play of citizens. This component has drawn strong community support and along with the Parks at Texas Star is a top priority of the Parks & Leisure Services Board and staff. PROJECT SCHEDULE: Anticipated Funding FY '09 JUSTIFICATION: Three (3), thirty year old pools are outdated and the City should upgrade aquatic offerings for growing citizen population. 388 PROJECT TITLE: AQUATIC CENTER/REC CENTE - PHASE I PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Full Time Part Time Total Salary Utilities Subtotal: Maintenance Costs Pool & Building Maintenance Total Costs Less: Anticipated Revenue Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Revenue Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To be determined ADDITIONAL COMMENTS: TOTAL ESTIMATED CAPITAL COST: $150,000 Engineering $50,000 Construction $200,000 $60,000 $260,000 100,000 $360,000 (180,000) $180,000 Total Estimated Capital Cost XX CURRENT STATUS: Conceptual Design % Preliminary Design Final Plans Specifications % Construction % 500,000 5,000,000 $5,500,000 389 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: 7/10/2000 Submitted By: RAY MCDONALD Date Revised: 3/12/2003 Date Completed: Project Title: AQUATIC CENTER/RECREATION CENTER EXPANSION - PHASE II Project Type: BUILDING Sub -Type: NEW CONSTRUCTION Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The Parks Master Plan in the approved form includes provision(s)/recommendations to construct an Aquatic Center in conjunction with Recreation Center expansion. PROJECT DESCRIPTION: Expand the current Midway Recreation Center to accomodate growing popularity of recreational programming and facility needs. PROJECT SCHEDULE: Anticipated Funding FY '09 JUSTIFICATION: As usage of current recreation facilities continues to increase, expansion will be required to accommodate citizen demand. 390 PROJECT TITLE: AQUATIC/RECREATION CENTER - PHASE II PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Full Time Part Time Total Salary Utilities Subtotal: Maintenance Costs Building Maintenance Total Costs Less: Anticipated Revenue Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Revenue Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To be determined ADDITIONAL COMMENTS: TOTAL ESTIMATED CAPITAL COST: $75,000 Engineering $25,000 Construction $100,000 $35,000 $135,000 45,000 $180,000 (180,000) $0 Total Estimated Capital Cost XX CURRENT STATUS: Conceptual Design % Preliminary Design Final Plans Specifications % Construction % 400,000 4,000,000 $4,400,000 391 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: 3/23/2004 Submitted By: RAY McDONALD Date Completed: Project Title: CITY WIDE TRAIL ENHANCEMENTS - PHASE II Project Type: LAND Sub -Type: IMPROVEMENTS Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Phase II of the proposed four -phase project will include a soft surface trail development and/or re -development at the Villages of Bear Creek Park. This project includes the infrastructure improvements as recommended as a high priority in the adopted Parks Master Plan. PROJECT DESCRIPTION: Redevelop/redesign and improve the trail system at the Villages of Bear Creek Park that will offer multiple uses for the citizens of Euless. PROJECT SCHEDULE: JUSTIFICATION: Trail development and enhancement opportunities will be consistent with available land, funding and time variables. This Master Plan recommendation will be part of a city-wide comprehensive trail enhancement project. Due to the continual erosion of the existing trail, a redevelopment/redesign of the trail system at Villages of Bear Creek will be a high priority. 392 PROJECT TITLE: CITY WIDE TRAIL ENHANCEMENT - PH II PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations Supplemental Sales Tax To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering (7% Const. Cost) Construction Landscaping (10% Const. Cost) $0 Contingency (4-5% Variable Cost) $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 20,090 287,000 28,700 14,210 $350,000 393 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: 3/23/2004 Submitted By: RAY McDONALD Date Completed: Project Title: CITY WIDE TRAIL ENHANCEMENTS - PHASE III Project Type: LAND Sub -Type: IMPROVEMENTS Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Phase III of the proposed four -phase project will include concrete and/or soft surface trail development at Midway Park and Blessing Branch Park. This project includes the infrastructure improvements as recommended as a high priority in the adopted Parks Master Plan. PROJECT DESCRIPTION: Develop a comprehensive trail system with multiple uses for the citizens of Euless. Trails will be incorporated into the Midway 20.8 acre park tract as well as the Blessing Branch 8.3 acre park tract. Trails in this area will complement the existing trail/sidewalks that are part of the Main Street project. PROJECT SCHEDULE: JUSTIFICATION: Trail development and enhancement opportunities will be consistent with available land, funding and time variables. This Master Plan recommendation will be part of a city-wide comprehensive trail enhancement project. These trails will provide linkeage between apartment communities and residents within the Midway Park community. 394 PROJECT TITLE: CITY WIDE TRAIL ENHANCEMENT - PH III PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations Supplemental Sales Tax To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering (7% Const. Cost) Construction Landscaping (10% Const. Cost) $0 Contingency (4-5% Variable Cost) $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 11,480 164,000 16,400 8,120 $200,000 395 City of Euless Capital Project Request Department: COMMUNITY SERVICES Submitted By: RAY McDONALD Date Prepared: 3/23/2004 Date Completed: Project Title: CITY WIDE TRAIL ENHANCEMENTS - PHASE IV Project Type: LAND Sub -Type: IMPROVEMENTS Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Phase IV of the proposed four -phase project will include concrete and/or soft surface trail development at S. Euless Park and S. Pipeline Road (Heather St. - Parks at Texas Star Entrance). This project includes the infrastructure improvements as recommended as a high priority in the adopted Parks Master Plan. Additionally, this phase of the trails project will link with the Public Works 5-year sidewalk plan with respect to S. Euless sidewalk improvements. PROJECT DESCRIPTION: Develop a comprehensive trail system with multiple uses for the citizens of Euless. Trails will be incorporated into S. Euless 5.5 acre park tract as well as trails along S. Pipeline. These trails will provide the final link to the South Euless Trails System and will be incorporated in the sidewalk Master Plan through the Public Works Department. PROJECT SCHEDULE: JUSTIFICATION: Trail development and enhancement opportunities will be consistent with available land, funding and time variables. This Master Plan recommendation will be part of a city-wide comprehensive trail enhancement project. This trail will link the entire South Euless parks system to include South Euless Park, the Dr. Pepper Stars Center, and the Parks at Texas Star. 396 PROJECT TITLE: CITY WIDE TRAIL ENHANCEMENT - PH IV PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations Supplemental Sales Tax To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering (7% Const. Cost) Construction Landscaping (10% Const. Cost) $0 Contingency (4-5% Variable Cost) $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 8,610 123,000 12,300 6,090 $150,000 397 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: Submitted By: RICK HEROLD Date Revised: Date Completed: Project Title: PARKS AT TEXAS STAR, PHASE IV Project Type: LAND Sub -Type: Improvements Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: 7-10-00 3-12-03 This project includes the design and construction of Phase IV of the Parks @ Texas Star in accordance with the Parks Master Plan as approved in June 2002. Phase III as well as the construction of the Texas Rangers Youth Ball Park are expected to commence during the fiscal year of 2003. PROJECT DESCRIPTION: Phase IV will consist entirely of parking and drainage infrastructure. At the completion of Phase III, we will have consumed the parking capacity available. Additional parking will be necessary and will be installed with related drainage infrastructure during Phase IV. Areas planned for parking are comprised of four sections of parking and park road from west -east along the southern boundary of the site. Parking spaces will total approximately 1,025 spaces. PROJECT SCHEDULE: JUSTIFICATION: A continuation of The Parks At Texas Star Master Plan as committed to citizens with the passage of the 1/2 Cent Sales Tax. 398 PROJECT TITLE: PARKS @ TEXAS STAR, PHASE IV PROJECT # NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Maintenance/Cleaning Subtotal: Total Estimated Annual Cos PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds (EDC) Donations Car Rental Fund Grant(s) ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Design & Construction $0 $0 $0 $0 Total Estimated Capital Cosi CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 2,000,000 $2,000,000 399 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: 3/27/2003 Submitted By: RAY MCDONALD Date Completed: Project Title: SIMMONS CENTER EXPANSION Project Type: BUILDING Sub -Type: EXPANSION Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The Parks Master Plan as approved in June 2002 contains provision(s)/recommendations for the redevelopment/expansion of Senior complex. PROJECT DESCRIPTION: The redeveloped facility will address growing space required from the Senior population and add amenities such as a senior weight area, activity room, arts and crafts area, kitchen, and office space. Additional parking and ground improvements will be included in the complex redevelopment. PROJECT SCHEDULE: Anticipated Funding FY '07 JUSTIFICATION: Address the needs of the aging population and expansion of the existing Simmons Center allows Euless to accomplish these needs with somewhat limited funding. 400 PROJECT TITLE: SIMMONS CENTER EXPANSION PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Janitorial Services Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations Supplemental Sales Tax To Be Determined ADDITIONAL COMMENTS: TOTAL ESTIMATED CAPITAL COST: Design & Engineering $40,000 Construction/Renovation $20,000 Furniture & Fixtures $60,000 Parking & Ground Improvements $15,000 $75,000 15,000 $15,000 $90,000 Total Estimated Capital Cost XX CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 25,000 475,000 150,000 200,000 $850,000 401 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: 7/10/2000 Submitted By: RAY MCDONALD Date Revised: 3/12/2003 Date Completed: Project Title: RUTH MILLICAN EXPANSION Project Type: BUILDING Sub -Type: EXPANSION Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The Parks master Plan as approved in June 2002 contains provision(s)/recommendations for the redevelopment of the Ruth Millican Center. The new facility will be constructed in theme with surroundings of the Heritage Park structures. PROJECT DESCRIPTION: Redevelop Ruth Millican building via demolition and new construction. The new facility will be a programming facility as well as a community rental facility. PROJECT SCHEDULE: Anticipated Funding FY '08 JUSTIFICATION: Address the needs of the aged structure of Ruth Millican. Demolition and reconstruction of the facility to tie in with the facilities of Heritage Park (i.e. Barn Design) 402 PROJECT TITLE: RUTH MILLICAN EXPANSION PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations Supplemental Sales Tax To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Design Construction Furniture & Fixtures $0 Abatement Demolition $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 75,000 825,000 150,000 75,000 25,000 $1,150,000 403 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: 7-10-00 Submitted By: RAY MCDONALD Date Revised: 3/12/2003 Date Completed: Project Title: COMMUNITY GOLF COURSE AT BOB EDEN Project Type: LAND Sub -Type: IMPROVEMENTS Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN This project allows for a low-priced community golf course for beginners, juniors, and seniors; the project is recommended in part within the Parks Master Plan as approved in June 2002. PROJECT DESCRIPTION: Develop 18-hole community golf course, primarily aimed at Euless Citizens, featuring Bermuda greens, limited clubhouse, and ease of play. PROJECT SCHEDULE: Anticipated Funding Beyond FY'09 JUSTIFICATION: Meet community golf needs while taking advantage of scenic areas and preserving necessary green space. Thi facility would be awesome for seniors, ladies, junior and beginning golfers. Increase land value of neighborhooc. 404 PROJECT TITLE: COMMUNITY GOLF COURSE AT BOB EDEN PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Course Maintenance Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Revenue Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined ADDITIONAL COMMENTS: TOTAL ESTIMATED CAPITAL COST: $200,000 Engineering $75,000 Construction $275,000 $40,000 $200,000 $515,000 400,000 $400,000 $915,000 Total Estimated Capital Cost XX CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications Construction % We recommend that all debt and operation costs should be absorbed through the users. 350,000 3,650,000 $4,000,000 TBD 405 Project Numbor CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Profoct Description Date Total Project (Over) Under Completed Total Budget Costs Budget DRAINAGE PROJECTS OR9901 �SrdpherBranchPhase11 08/01f99 5123,404 $120,128 $3.276 DR9902 Wirdlea 8 WestCliff 08/01199 54.396 51.159 $3.237 DR9904 Hurricane Creek 04131/02 5257,500 569,908 5187,594 Sub -Total Drainage Projects 5385,300 $191.193 5194.107 STREET PROJECTS PS9902 hid Cities BM, 05/02102 51.075,074 5963.635 $111,439 PS9903 HWV 183 Service Road Cancelled $0 50 $0 PS9907 Westpark Way •SH 10 to SH183 09/30/00 5605,542 $479,915 $125,627 PS9910 Sidewalks 06/30103 $200.000 $200.000 50 PS9911 Overlay Proiects 03130/00 $294,687 $294,887 $0 PS9912 Harwood -Main Inlersection 04/30/00 $1.128,935 $1.077,303 $49,632 PS0001 FM 157 S Pipeline to SH10 (Utility Relocalion) 04/30/04 $378.207 $371.318 $6.889 PS0003 Glade from Hlenlasz to SH121 04130/04 $1.868,612 $1,868.612 $0 PS0004 Glade Rd (East1 - SH121 to Champagne 04/30/04 $1.210,014 $1 162,000 $48.005 PS0201 Gateway Blvd -Southern Portion 04130/04 $510,000 $473.817 $38,183 Sub -Toter Street Proiects $7,267,071 $8,889.298 $377,776 WASTEWATER PROJECTS WW0001 CDBG B198-UC-48.0001/B95-22.50 08/19/09 $150,000 $72.927 $77.073_ WW9902 Impact Fee Study 091JOt99 $13,000 $12.238 5762 WW9903 Misc Sewer Rehab FY99 09130199 $50000 512,967 537,013 W W 9904 1-tvotraulic Analysis 00/30t00 $27,000 $27.000 SO WV/0001 CDBG B/99.UC.48-0001 09/30/01 $150000 5121,682 528.318 W W0003 TRA Debt Payment 05/31/01 $822.037 5822,037 $0 WWO101 CDBG300-UC480001-2250 02/20/02 5251.485 $247,790 53.895 WW0t02 Manhole Rehab. Pr' -.gram 03/31/03 S250.000 $184,520 $85.480 W W 0201 CDBG - 801-UC-48-0001-22-50 03/31/03 $237,086 5172,948 $84.138 Sub -Total Wastewater Proiects $1,950,808 $1.074.129 $2/6.479 WATER PROJECTS W T9901 Mater ChanneOta Program 10/30/99 $101,917 598.385 _ $3,552 WT9003 Master Plan 08/30199 $42.000 $5.445 $38,555 WT9904 Well Repairs 09/30/99 $68921 566.921 S0 WT9905 Misc Water Rehab 08/30/00 $50.000 543.749 $6.251 WT9900 4wy10WaterLine 01/30/09 $150.000 $138,883 $11,117 WT990/ Impact Fee Study 09/30/00 513000 512.238 $762 WT9908 Mid Cities Blvd. 12" Line D4/30/04 $342 080 $313,354 528.720 WT9909 21.OG Water Tank 03131/03 52430.881 52.289.571 5141.310 WT9910 Water Line ter Elevated Tank 05131/02 $1,608.386 $1.201,098 $408.888 WT9911 Water Distribution -Pfister Plan 09/30/99 S25,600 $24,000 51.600 W T0002 Emergency Repair - liwy 10 1 1130/99 $15.450 514,214 $1.236 WT0003 W aterli ne Replacement - Aransas 06I30/01 $12,057 57.089 54.908 W T0004 Water Line kAlarti - Ector)Mdway 06/30/00 518,248 513.743 54.505 W T0005 Waterline Reolacement - A,4Iani- Denton/P,Ud 04/30102 S26,986 $26.988 $0 WT0000 Central Drive Water Mains 03/31/00 $92 814 $90.742 $2 072 WT0102 SCADA Upgrade 04/09101 $66.400 $93.400 SO WT0103 Fire 1-vdrant Replacement Procram 3131/2003 $50.000 549.626 5374 WT0403 Waterline Replacement - Fairlawn Court Cancelled 365.000 50 535,000 WT0404 Waterline Replacement - Atkerson Lane Cancelled 5104.000 $0 $104.000 Sub -Toter Water Projects $5,278.742 54,490,021 $788,718 -406- CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Project Date Total Project (Over) Under Number Proloct Description Completed Total Budget Costs Budget OTHER AC9901 Athletic Complex Phase II 08f30102 5123.054 S75.047 548.007 ED0102 Bell Ranch Terrace Cancelled 5200.000 $0 5200.000 FM0101 Building 0 9/30/2002 S930.610 5930.608 S2 FIv10209 A,bdwayRoc reationUovrade 06130102 5557.125 5557.125 SO PRt122 Texas Remodel 11130l01 5430.000 5455.885 ($ 25,885t PR9027 Psrk Imerovements • Texas Star 09130101 51.030,500 51,014.011 522.489 PR001S Purchase of Dallas StersCerlter 05131/00 $10,327.978 510,327.978 SO PR0016 Wilshire Park ImDroyements 08(30f02 $150.000 5149.926 574 PR0110 Slop, ProtectioWScreenlnnWall 3/3112003 51.275,203 51,273.923 S1.280 SS9901 Fire Station II 03(30/00 549.688 $49,688 S0 SS9902 Library Books 08/15/00 38,302 53.302 50 SS9919 Fire Station t!3 -Structural Repairs 0373CV00 530.000 517.344 512656 SSO010 Former Fire Station #2 06130102 5599,600 5595.257 54.343 SS0113 Pork Building 0/30/2002 51,492.283 51,491.857 S420 Sub -Total Other Projects S17,205,943 516,941,951 5263,092 TOTAL COMPLETED PROJECTS 3112.087,084 530.186.595 51,901,009 -407- g5zccuuge 9)wi/wf/si CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Project Date Total Project (Over) Under Number Project Description Completed Total Budget Costs Budget DRAINAGE PROJECTS DR9901 Sulpher Branch Phase II 08/01/99 $123,404 $120,128 $3,276 DR9902 Windlea & WestCliff 08/01/99 $4,396 $1,159 $3,237 DR9904 Hurricane Creek 04/31/02 $257,500 $69,906 $187,594 Sub -Total Drainage Projects $385,300 $191,193 $194,107 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: SULPHUR BRANCH PHASE II Project Type: DRAINAGE Sub -Type: Project No.: DR9901 Priority: A COUNCIL AUTHORIZATION: October 13, 1998 - Approved the acquisition of Right -of -Way RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-20-99 Date Completed: 8-01-99 The Sulphur Branch channelization project was the number one needed project identified in the 1990 study prepared by Knowlton, English and Flowers. PROJECT DESCRIPTION: This project includes the drainage work to be performed on Sulphur Branch south of SH 10. The work was performed by the Corps of Engineers. The City's financial participation in this project is complete. JUSTIFICATION: To improve the flow through the original Sulphur Branch project and remove 40 properties from the 100 year floodplain. 409 PROJECT TITLE: SULPHUR BRANCH PHASE II PROJECT #: DR9901 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PHASE/FUNDING SOURCE Appraisal Services Surveying Services Land Purchases Storm Sewers (Expenses prior to FY99 not reflected) TOTAL ESTIMATED CAPITAL COST: Land Purchases Storm Sewers $0 Surveying Appraisal Services $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS BUDGET 600 4,500 89,000 29,304 EXPENDED 600 4,500 89,000 26,028 * - This project received an inter -project transfer of $5,904 from project DR9903. * - Remaining funds transferred to FB9902 TOTAL PROJECT $123,404 410 $120,128 OVER/UNDER BUDGET (- +) 0 0 0 (3,276) 89,000 29,304 4,500 600 $123,404 % EXPENDED 100% 100% 100% 89% ($3,276) 97% City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: WINDLEA & WESTCLIFF Project Type: DRAINAGE Sub -Type: Project No.: DR9902 Priority: A COUNCIL AUTHORIZATION: Date Prepared: 7-20-99 Date Completed: 8-1-99 January 13, 1998 - Awarded Bid No. 97-54 for the construction of drainage improvements. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: In 1990 the City commissioned and received a report from Knowlton, English & Flowers titled Drainage Utility System Study of Selected Improvement Projects. This was Project No. 4 in the referenced study. PROJECT DESCRIPTION: This project includes pipe, inlet and flume improvements that were completed in 1998. JUSTIFICATION: Additional underground capacity required to reduce ponding of storm water in the street intersection. 411 PROJECT TITLE: WINDLEA & WESTCLIFF PROJECT #: DR9902 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST MAINTENANCE COST (+ OR -) ANNUAL Direct ODeratina Cost Fence 274 Personnel: Full Time Landscaping & Irrigation 4,122 Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs Subtotal: $0 Total Estimated Annual Cos $0 Total Estimated Capital Cosi $4,396 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Fence 274 274 0 100% Landscaping & Irrigation 4,122 885 (3,237) 21% (Expenses prior to FY 99 not reflected) Remaining funds transferred to FB9902 TOTAL PROJECT $4,396 $1,159 ($3,237) 26% 412 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: HURRICANE CREEK Project Type: DRAINAGE Sub -Type: Project No.: DR9904 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-22-99 Date Completed: 4-31-02 The Unified Development Code (Article 12) permits developers to request reimbursement for a portion of oversized drainage improvements. PROJECT DESCRIPTION: The Hurricane Creek project involves reimbursement for oversized drainage improvements along a tributary of Hurricane Creek south of SH 183. JUSTIFICATION: A significant watershed drains from SH 183 to the south city limit line. Oversized drainage improvements are required to meet the public improvement requirements established for development. Should it be determined that these funds are not required, they can be reallocated. 413 PROJECT TITLE: HURRICANE CREEK PROJECT #: DR9904 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST MAINTENANCE COST (+ OR -) ANNUAL Direct Operatina Cost Personnel: Full Time Storm Sewers 257,500 Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs Subtotal: $0 Total Estimated Annual Cos PHASE/FUNDING SOURCE Storm Sewers $0 Total Estimated Capital Cosi $257,500 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 257,500 69,906 (187,594) 27% This project transferred $187,594 to FB9902. No additional work is scheduled in this area. TOTAL PROJECT $257,500 $69,906 ($187,594) 27% 414 Sfrtaa 9sWi/eCt/S1 Project Number CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Project Description Date Total Project (Over) Under Completed Total Budget Costs Budget STREET PROJECTS PS9902 Mid Cities Blvd. 05/02/02 $1,075,074 $963,635 $111,439 PS9903 HWY 183 Service Road Cancelled $0 $0 $0 PS9907 Westpark Way -SH10 to SH183 09/30/00 $605,542 $479,915 $125,627 PS9910 Sidewalks 06/30/03 $200,000 $200,000 $0 PS9911 Overlay Protects 03/30/00 $294,687 $294,687 $0 PS9912 Harwood -Main Intersection 04/30/00 $1,126,935 $1,077,303 $49,632 PS0001 FM 157 S Pipeline to SH10 (Utility Relocation) 04/30/04 $378,207 $371,318 $6,889 PS0003 Glade from Heritage to SH121 04/30/04 $1,866,612 $1,866,612 $0 PS0004 Glade Rd (East) - SH121 to Champagne 04/30/04 $1,210,014 $1,162,009 $48,005 PS0201 Gateway Blvd - Southern Portion 04/30/04 $510,000 $473,817 $36,183 Sub -Total Street Projects $7,267,071 $6,889,296 $377,775 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: MID CITIES BLVD. Project Type: STREET Project No.: PS9902 COUNCIL AUTHORIZATION: Date Prepared: 7-17-99 Date Completed: 5-2-02 Sub -Type: CONSTRUCTION Priority: A November 10, 1998 - Authorized right-of-way acquisition. November 28, 2000 - Authorized $17,254 for Citgo utility relocation/protection on an 8" Citgo Pipeline that crosses Mid Cities Boulevard. June 12, 2001 - declared intent to reimburse from bond sales RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The City's 1999 Master Thoroughfare Plan calls for this roadway to be a six -lane boulevard section. This project was approved a number of years ago as a 100% federally funded construction project through Texas Department of Transportation (TxDOT). TxDOT has bid the project and it is virtually complete. PROJECT DESCRIPTION: Project consists of reconstruction of Mid -Cities Blvd. from Hwy 121 to Hwy 360 by Texas Department of Transportation (TxDOT). The City of Euless is required to purchase the right-of-way required for the TxDOT construction project. The City also proposes to add certain amenities to enhance the aesthetics along the corridor. Another related project is the installation of a new 12-inch water main. (Project # WT9908) This project is currently under construction. JUSTIFICATION: 1. Frequent flooding which often necessitates closing of this section of the street. 2. Street and roadbed have deteriorated to the point that frequent repairs are required. 3. The street does not adequately convey the existing and future traffic volumes. 416 PROJECT TITLE: MID CITIES BLVD. PROJECT #: PS9902 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cos PHASE/FUNDING SOURCE Appraisal Services Engineering Services Legal Services Right of Way Overlay Contingency TOTAL ESTIMATED CAPITAL COST Right of Way $0 Appraisal Services Legal Services Engineering Services Overlay Contingency $0 Total Estimated Capital Cosi FUNDING SOURCE: Bond Proceeds Developer's Escrow General Fund $0 Street Fund Balance Inter -project Transfer: Hwy 183 Service Road $0 Total Fundinc CURRENT STATUS BUDGET 83,870 44,511 220,340 709,020 79 17,254 TOTAL PROJECT $ 1,075,074 EXPENDED 23,870 44,511 208,901 669,020 79 17,254 $963,635 OVER/UNDER BUDGET (- +) (60,000) 0 (11,439) (40,000) 0 0 709,020 83,870 220,340 44,511 79 17,254 $1,075,074 500,000 60,651 20,145 341,453 152,825 $1,075,074 % EXPENDED 28% 100% 95% 94% 100% 0% ($111,439) 90% 417 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Date Prepared: 7-26-99 Date Completed: Project Cancelled Project Title: HWY 183 SERVICE ROAD Project Type: STREET Sub -Type: CONSTRUCTION Project No.: PS9903 Priority: A COUNCIL AUTHORIZATION: September 8, 1998 - Approved as part of Certificates of Obligation, Series 1995. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: This project consists of building a connection from the Hwy 183 frontage road east of Wendy's on Main Street, to the exit ramp of HWY 183 at North Main Street. This will bring the frontage road traffic to a signalized intersection. JUSTIFICATION: This would allow the traffic east of Wendy's to turn left (south) onto North Main Street. Currently no left turn is allowed from East Fuller to South Bound Main Street. Staff is currently reevaluating the need for this project. The reconstruction of Main Street and future widening of SH 183 may cause this project to be unwarranted. 418 PROJECT TITLE: HWY 183 SERVICE ROAD PROJECT #: PS9903 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST MAINTENANCE COST (+ OR -) ANNUAL Direct ODeratina Cost Construction 0 Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs $0 Total Estimated Capital Cosi $0 $0 FUNDING SOURCE: Bond Proceeds CO Series 1995 197,957 Subtotal: $0 Total Estimated Annual Cos PHASE/FUNDING SOURCE Inter -project Transfer to: Glade Rd -121/Champagne PS0004 (45,132) Mid Cities Blvd PS9902 (152,825) $0 Total Fundinc $0 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED Construction 0 0 0 TOTAL PROJECT $0 $0 $0 419 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Date Prepared: 7-17-99 Date Completed: 9-30-00 Project Title: WESTPARK - SH10 TO SH183 Project Type: STREET Sub -Type: CONSTRUCTION Project No.: PS9907 Priority: A COUNCIL AUTHORIZATION: April 13, 1999 - Approved Bid No. 99-05 for irrigation and landscape improvements. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The street reconstruction was accomplished through funding from the City and the Texas Department of Transportation (TxDOT). PROJECT DESCRIPTION: Reconstruction of a two-lane asphalt street. TxDOT recently completed the new four -lane and five -lane concrete street. This funding is for the landscaping package and installation of street lights. JUSTIFICATION: 1. Two-lane street did not adequately convey existing or future traffic volumes. 2. Ongoing safety concerns made the reconstruction of Westpark Way mandatory. 420 PROJECT TITLE: WESTPARK - SH10 TO SH183 PROJECT #: PS9907 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cos PHASE/FUNDING SOURCE Engineering Services Plumbing Services, Outside Irrigation Repairs Fence Equipment Rentals Streets & Highways Contingencies Sidewalks & Curbs Landscaping Signal Systems TOTAL ESTIMATED CAPITAL COST Balance Remaining @ 10-1-99 $0 $0 $0 $0 Total Estimated Capital Cosi CURRENT STATUS BUDGET 9,152 2,290 24,778 10,099 74 2,835 149,895 6,234 395,797 4,388 EXPENDED 9,152 2,290 24,778 10,099 74 2,835 63,741 6,234 356,324 4,388 OVER/UNDER BUDGET (- +) 0 0 (0) 0 (0) 0 (86,154) 0 (39,473) (1) 605,542 $605,542 % EXPENDED 100% 100% 100% 100% 99% 100% 43% 100% 90% 100% (Expenses prior to FY99 not reflected) The remaining balance of $125,627 was transferred to FB9907. TOTAL PROJECT $605,542 $479,915 ($125,627) 79% 421 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: SIDEWALK PROJECTS Project Type: STREETS Project No.: PS9910 COUNCIL AUTHORIZATION: Date Prepared: 7-17-99 Date Completed: 6-30-03 Sub -Type: SIDEWALKS Priority: A February 24, 1998 - Approved as part of Tax and Waterworks and Sewer System Revenue Certificates of Obligation, Series 1998. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Sidewalks and barrier -free ramps are needed throughout the City. The construction of sidewalks and barrier - free ramps has been an ongoing program for a number of years. PROJECT DESCRIPTION: This project includes funds to install new sidewalks and barrier free curb ramps throughout the City as well as improvement on municipal property. Although the City has identified areas that need sidewalks and barrier free curb ramps, federal guidelines require public hearings and other public input to prioritize construction. JUSTIFICATION: 1. Access and the accessibility of goods and services to pedestrians including those with disabilities is an important need in our city. 2. The federal government has established rules governing the implementation of a program to eliminate barriers within each city. 422 PROJECT TITLE: SIDEWALK PROJECTS PROJECT #: PS9910 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST MAINTENANCE COST (+ OR -) ANNUAL Direct ODeratina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Sidewalks & Curbs 200,000 $0 Total Estimated Capital Cosi $0 FUNDING SOURCE: Certificates of Obligation, 1998 Subtotal: $0 Total Estimated Annual Cos PHASE/FUNDING SOURCE Sidewalks & Curbs $200,000 200,000 $0 Total Estimated Capital Cosi $200,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 200,000 200,000 0 100% TOTAL PROJECT $200,000 $200,000 $0 100% 423 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Date Prepared: 7-26-99 Date Completed: 3-30-00 Project Title: OVERLAY PROJECTS Project Type: STREETS Sub -Type: OVERLAY Project No.: PS9911 Priority: A COUNCIL AUTHORIZATION: September 8, 1998 - Included in FY98-99 Budget. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: These projects are developed based on information contained in a street condition survey. PROJECT DESCRIPTION: FY99 projects include the following streets: OVERLAY: Kynette, Signet, Toplea, Victoria, and Delta RECONSTRUCT: South Mills, Bayless, Pauline, Lee, Himes, Westcliff, and Douglas. CUT & PATCH: West Pipeline. JUSTIFICATION: Each year we schedule approximately 10% of the lane miles in the City for preventive maintenance, including micro paving, overlay and some total reconstruction. This account provides funding for these activities plus the unforeseen projects that seem to come up each year. The recommended funding level for this account is $350,000 per year. In future years, overlay will be added to the general fund baseline budget as this is considered to be normal maintenance and operating costs. 424 PROJECT TITLE: OVERLAY PROJECTS PROJECT #: PS9911 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST MAINTENANCE COST (+ OR -) ANNUAL Direct Operatina Cost Overlay Personnel: Full Time Part Time Total Salary $0 Purchase of Services Materials & Supplies Utilities Subtotal: $0 Maintenance Costs Subtotal: $0 Total Estimated Annual Cos PHASE/FUNDING SOURCE Overlay 294,687 $0 Total Estimated Capital Cosi $294,687 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 294,687 294,687 0 100% TOTAL PROJECT $294,687 $294,687 $0 100% 425 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Date Prepared: 7-17-99 Date Completed: 4-30-00 Project Title: HARWOOD-MAIN INTERSECTION Project Type: STREETS Sub -Type: CONSTRUCTION Project No.: PS9912 Priority: A COUNCIL AUTHORIZATION: April 14, 1998 - Authorized bond election for the purpose of funding construction. April 13, 1999 - Bid No. 99-03 awarded for improvements at the North Main and Harwood intersection. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project is the overlap point on Harwood Road and North Main Street projects that were approved in the 1998 bond election. PROJECT DESCRIPTION: This project involves the relocation of City water and wastewater mains and the installation of storm drainage improvements to permit the relocation of franchise utility facilities in the intersection of North Main Street and Harwood Road. Reconstruction of the paved intersection will occur at the beginning of the Harwood Road project. JUSTIFICATION: The work included in this project must be complete before the franchise utility companies can perform the relocation of their facilities. 426 PROJECT TITLE: HARWOOD-MAIN INTERSECTION PROJECT #: PS9912 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST MAINTENANCE COST (+ OR -) ANNUAL Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs Subtotal: $0 Total Estimated Annual Cos PHASE/FUNDING SOURCE Utility Installation Utility Installation 1,126,935 $0 Total Estimated Capital Cosi $1,126,935 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 1,126,935 1,077,303 (49,632) 96% This project transferred the remaining balance $49,632 to FB9907. TOTAL PROJECT $1,126,935 $1,077,303 ($49,632) 96% 427 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Date Prepared: 7-26-99 Date Completed: 04-30-04 Project Title: FM 157-S PIPELINE TO SH10-(Utility Relocation) Project Type: STREETS Sub -Type: UTILITY RELOCATION Project No.: PS0001 Priority: A COUNCIL ACTION: May 24, 2000 -Approved Resolution authorizing Tarrant County Commissioners to acquire r-o-w. February 8, 2000 - Authorized professional services contract for engineering design of water and sewer mains. April 11, 2000 - Authorize Mayor to execute a drainage easement in conjunction with this project. February 27, 2001 - Awarded contract to TGR Constructors Inc for $296,537 and provided for change orders not to exceed $29,654. February 27, 2001 - Authorized TRA debt payment of $171,537 from waste water impact fees to free operating funds for this project. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Project consists of widening FM 157 from Hwy 10 to South Pipeline. Road construction will be performed by TxDOT. The City's only responsibility will be the relocation of water and wastewater mains. The City may choose to provide funds for landscaping the medians as well. JUSTIFICATION: Utility relocation is required by TxDOT at the City's expense. 428 PROJECT TITLE: FM 157-S PIPELINE TO SH10-(Utility Relocation) PROJECT #: PS0001 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PHASE/FUNDING SOURCE Engineering Services Relocation Geotech Services TOTAL ESTIMATED CAPITAL COST: Engineering Services Utility Relocation Geo Tech $0 Total Estimated Capital Cost $0 FUNDING SOURCE: W/S Operating Fund Interproject Transfer: FM157 SH183/SH121 (PS9909) Street Fund Balance Street Fund Balance FY'04 $0 $0 Total Estimated Capital Cost CURRENT STATUS BUDGET 25,500 351,939 768 25,500 351,939 768 $378,207 322,037 26,516 29,654 (6,890) $371,317 OVER/UNDER EXPENDED BUDGET (-+) % EXPENDED 24,596 346,721 0 (904) (5,218) (768) 96% 99% 0% TOTAL PROJECT $378,207 $371,317 ($6,890) 98% 429 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Project Title: GLADE FROM HERITAGE TO SH121 Project Type: STREET Project No.: PS0003 COUNCIL AUTHORIZATION: Date Prepared: 7-7-00 Date Completed: 04-30-04 Sub -Type: CONSTRUCTION Priority: June 13, 2000 - Authorized execution of Engineering Design Contract not to exceed $138,750. January 9, 2001 - Approved Resolution 01-1089 declaring public necessity for the acquisition of r-o-w. February 27, 2001 - Authorized publication of notice of intent to issue certificates of obligation. April 9, 2001 - Approved Ord. 1467 authorizing the issuance of Certificates of Obligation, Series 2001. May 22, 2001 - Awarded Bid No. 045-01 for construction to Texas Sterling Construction for $1,445,600 and provided $68,340 for contingencies. Colleyville will reimburse $76,950. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Construction of Glade from Heritage to S.H. 121 by adding two (2) lanes to the existing three (3) lanes to create a 5-lane roadway (2 eastbound lanes, 2 westbound lanes and a center continued turn lane). Construct the east half (2 northbound lanes) of Heritage from Glade Road to the south limit of the Target project. Construct a four (4) lane divided north/south roadway from Glade to the south limit of the Target project approximately in the center of the Target project. Traffic signals and associated water and drainage facilities will be included. JUSTIFICATION: Increased ad valorem and sales tax generated by development of this area. 430 PROJECT TITLE: GLADE FROM HERITAGE TO SH121 PROJECT #: PS0003 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Other Average Annual Debt Service Total Estimated Annual Cost PHASE/FUNDING SOURCE Engineering & Design Geotech Services Construction Issuance Cost Right of Way TOTAL PROJECT TOTAL ESTIMATED CAPITAL COST: Engineering Geo-technical Services Construction Costs $0 Issuance Cost Right of Way Total Estimated Capital Cost $0 FUNDING SOURCE: Developer's Escrow CO Bond Proceeds Series 2001 Inter -project Transfer: $0 Glade/121to Champagne PS0004 Interest Income Due from the City of Colleyville $116,509 $116,509 Total Funding CURRENT STATUS BUDGET EXPENDED 131,481 131,481 12,944 12,944 1,583,665 1,583,665 13,494 13,494 125,028 125,028 $1,866,612 431 $1,866,612 OVER/UNDER BUDGET (- +) 0 0 (0) 0 0 141,000 13,000 1,570,000 13,494 128,508 $1,866,002 138,750 1,421,494 192,908 36,510 76,950 $1,866,612 % EXPENDED 100% 100% 100% 100% 100% ($0) 100% City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Project Title: GLADE RD (EAST)-SH 121 TO CHAMPAGNE Project Type: STREET Project No.: PS0004 COUNCIL AUTHORIZATION: Date Prepared: 7-7-00 Date Completed: 04-30-04 Sub -Type: CONSTRUCTION Priority: June 13, 2000 -Authorized execution of Engineering Design Contract in the amount of $143,500. February 27, 2001 - Authorized publication of notice of intent to issue certificates of obligation. April 9, 2001 - Approved Ord. 1467 authorizing the issuance of Certificates of Obligation, Series 2001. May 22, 2001 - Awarded Bid # 047-01 for construction to McMahon Contracting for $874,578.75 and provided for a $52,500 contingency for change orders. Sept 10, 2002 - Awarded Bid # 022-02 for Glade Road median pavers to Green Scaping Co. in the amount of $29,265. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Construct the eastbound lanes of Glade Road under S.H. 121 and construct the south lanes (2 eastbound lanes) of Glade Road from SH. 121 to Champagne Drive. Traffic signals, asphalt transitions and associated water and drainage facilities will be included. This roadway was substantially complete as of October 2001. Landscaping began in January 2003. JUSTIFICATION: Increased ad valorem and sales tax generated by development of this area. 432 PROJECT TITLE: GLADE RD (EAST)-SH 121 TO CHAMPAGNE PROJECT #: PS0004 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Other Average Annual Debt Service Total Estimated Annual Cos PHASE/FUNDING SOURCE Engineering & Design Right of Way Construction Geotech Services Issuance Cost Landscape TOTAL ESTIMATED CAPITAL COST Engineering Right -of -Way Geo-technical Services $0 Construction Issuance Cost Landscaping Total Estimated Capital Cosi $0 FUNDING SOURCE: Interest Income CO Bond Proceeds Series 2001 Developer's Escrow Inter -project Transfer From: $0 Hwy 183 Service Road Inter -project Transfer To: Glade Rd - Heritage to 121 West Pipeline PS0002 125,212 Glade Road ROW PS0002 $125,212 Total Fundinc CURRENT STATUS BUDGET 153,000 23,500 861,637 6,530 17,127 148,220 TOTAL PROJECT $1,210,014 EXPENDED 152,900 23,437 876,157 6,528 17,127 85,860 $1,162,009 OVER/UNDER BUDGET (- +) (100) (63) 14,520 (2) 0 (62,360) 153,000 23,500 6,530 859,857 17,127 150,000 $1,210,014 46,985 1,528,262 98,368 45,132 (192,908) (250,000) (65,651) (48,180) $1,162,008 % EXPENDED 100% 100% 102% 100% 100% 58% ($48,005) 96% 433 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Date Prepared: 05/31/01 Date Completed: 04-30-04 Project Title: GATEWAY BLVD -SOUTHERN PORTION Project Type: STREET Sub -Type: CONSTRUCTION Project No.: PS0201 Priority: A COUNCIL AUTHORIZATION: August 27, 2002 - Awarded contract to Gilco Contracting Inc. for $426,534.45 and provided for a $25,000 contingency. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Gateway Blvd is identified in the Master Thoroughfare Plan as a four lane arterial roadway. Two private development projects (Centurion Apartments and Lakes of Little Bear) will install Gateway Blvd along their frontages from Mid -Cities Blvd to Centurion Way leaving approximately 1500 linear feet of the southbound 2 lanes not constructed. This project is nearing completion. PROJECT DESCRIPTION: Construction of the west lanes (south bound) of Gateway Blvd from Mid -Cities Blvd north approximately 1500 feet. The roadway material will be concrete. Storm drainage is included. JUSTIFICATION: This will provide for the full pavement section on Gateway Blvd from Mid -Cities Blvd north to Centurion Way. Completion of this roadway will provide incentive for additional private development in the SH 121/Gateway zoning district. 434 PROJECT TITLE: GATEWAY BLVD - SOUTHERN PORTION PROJECT #: PS0201 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PHASE/FUNDING SOURCE Surveying Services Engineering Services Construction TOTAL ESTIMATED CAPITAL COST: Engineering Construction Right of Way (easement) $0 Surveying (Construction changed to include Hyde - Roberts driveway) Total Estimated Capital Cost $0 FUNDING SOURCES: Car Rental Fund Developers Escrow Inter -project Transfer: Street Fund Balance Street Fund Balance FY '04 $0 $0 Total Estimated Capital Cost CURRENT STATUS 15,000 485,000 0 10,000 $510,000 425,000 189,912 (104,912) (36,183) $473,817 OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 10,000 3,368 6,632 15,000 963 14,037 485,000 469,487 15,513 34% 6% 97% TOTAL PROJECT $510,000 $473,817 $36,183 93% 435 `w Project Number CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Project Description Date Total Project (Over) Under Completed Total Budget Costs Budget WASTEWATER PROJECTS WW9901 CDBG B/98-UC-48-0001/B95-22-50 08/19/09 $150,000 $72,927 $77,073 WW9902 Impact Fee Study 09/30/99 $13,000 $12,238 $762 WW9903 Misc Sewer Rehab FY99 09/30/99 $50,000 $12,987 $37,013 WW9904 Hydraulic Analysis 06/30/00 $27,000 $27,000 $0 WW0001 CDBG B/99-UC-48-0001 09/30/01 $150,000 $121,682 $28,318 WW0003 TRA Debt Payment 05/31/01 $822,037 $822,037 $0 WW0101 CDBG B00-U0480001-2250 02/20/02 $251,485 $247,790 $3,695 WW0102 Manhole Rehab. Program 03/31/03 $250,000 $184,520 $65,480 WW0201 CDBG - B01-UC-48-0001-22-50 03/31/03 $237,086 $172,948 $64,138 Sub -Total Wastewater Projects $1,950,608 $1,674,129 $276,479 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: CDBG B/98-UC-48-0001/B95-22-50 Project Type: WASTEWATER Sub -Type: MAINS Project No.: WW9901 Priority: A COUNCIL AUTHORIZATION: Date Prepared: 7-26-99 Date Completed: 8-19-99 January 13, 1998 - Held Public Hearing / Approved CDBG project selection. April 13, 1999 - Recommended Tarrant County award bid to Horseshoe Construction. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This funding is the 24th year project administered through Tarrant County. This is the fifth wastewater project in South Euless. PROJECT DESCRIPTION: Design and construction of wastewater mains in the Oakwood Terrace Addition. JUSTIFICATION: Mains in the South Euless area have deteriorated as they have aged. 437 PROJECT TITLE: CDBG B/98-UC-48-0001/B95-22-50 PROJECT #: WW9901 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs Subtotal: $0 Total Estimated Annual Cost Sewer Mains 150,000 $0 Total Estimated Capital Cost $150,000 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Sewer Mains 150,000 72,927 (77,073) 49% Remaining funds transferred to FB9901 TOTAL PROJECT $150,000 $72,927 ($77,073) 49% 438 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Date Prepared: 7-26-99 Date Completed: 9-30-99 Project Title: WW IMPACT FEE STUDY Project Type: WASTEWATER Sub -Type: IMPACT FEE PROJECTS Project No.: WW9902 Priority: A COUNCIL AUTHORIZATION: January 26, 1999 - Approved contract for study. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The City's Capital Improvement Program and Impact Fee Study must be updated every three years. PROJECT DESCRIPTION: 1.) Establish a static model for the sewer system based on basin development 2.) Develop a 10-year capital improvement plan. 3.) Review existing living unit equivalents. 4.) Calculate maximum impact fee. JUSTIFICATION: Required by state law to justify impact fee charges. 439 PROJECT TITLE: WW IMPACT FEE STUDY PROJECT #: WW9902 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Planning Services Remaining funds transferred to FB9910 Planning Services 13,000 $0 Total Estimated Capital Cost $13,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 13,000 12,238 (762) 94% TOTAL PROJECT $13,000 $12,238 ($762) 94% 440 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: MISC. SEWER REHAB FY99 Project Type: WASTEWATER Sub -Type: MAINS Project No.: WW9903 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Date Prepared: 7-26-99 Date Completed: 9-30-99 This project is for small unidentified sewer main problems that may be found during the fiscal year. Large projects will be determined on an "as needed" basis and presented for funding under a new project number. JUSTIFICATION: Most of these lines are clay tile and are seriously deteriorated. 441 PROJECT TITLE: MISC. SEWER REHAB FY99 PROJECT #: WW9903 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct ODeratina Cost Personnel: Full Time Sewer Mains 50,000 Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Sewer Mains Remaining funds transferred to WW0002 TOTAL PROJECT $0 Total Estimated Capital Cost $50,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 50,000 12,987 (37,013) 26% $50,000 442 $12,987 ($37,013) 26% City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: HYDRAULIC ANALYSIS Project Type: WASTEWATER Project No.: WW9904 COUNCIL AUTHORIZATION: Date Prepared: 7-23-99 Date Completed: 6-30-00 Sub -Type: IMPACT FEE PROJECT Priority: A November 24, 1998 - Authorized contract with Shimek, Jacobs, & Finklea to perform analysis. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The hydraulic analysis is a subset of the City's Wastewater Master Plan. PROJECT DESCRIPTION: Professional services related to the analysis of the City's wastewater system. Pressures, velocities and other items are studied to determine adequacy. JUSTIFICATION: Required to determine adequacy of wastewater system. 443 PROJECT TITLE: HYDRAULIC ANALYSIS PROJECT #: WW9904 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Engineering 27,000 Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Engineering Services (Does not reflect expenses prior to FY99). TOTAL PROJECT $0 Total Estimated Capital Cost $27,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 27,000 27,000 0 100% $27,000 444 $27,000 $0 100% City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: CDBG B99-UC-48-0001 Project Type: WASTEWATER Sub -Type: MAINS Project No.: WW0001 Priority: A COUNCIL ACTION: Date Prepared: 10-1-99 Date Completed: 9-30-01 April 11, 2000 - Recommended Tarrant County reject bids for CDBG and re -advertise. May 23, 2000 - Recommended Tarrant County award a contract to Henderson Construction for $286,304 with Tarrant County paying $145,380 and the City paying $140,924. PROJECT DESCRIPTION: This funding is the 25th year project administered by Tarrant County. This project includes replacing sanitary sewer line on Vine St. from Bayless Dr. south to Sunset Dr. then west on Sunset to S. Pipeline. It also includes replacing sanitary sewer line behind the 900 & 1000 Blocks of Oakwood Dr. JUSTIFICATION: Mains in the South Euless area have deteriorated as they have aged. 445 PROJECT TITLE: CDBG B99-UC-48-0001 PROJECT #: WW0001 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Sewer Mains Sewer Mains 150,000 $0 Total Estimated Capital Cost $150,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 150,000 121,682 (28,318) 81% Note: The remaining balance on this project was transferred to FB9901. TOTAL PROJECT $150,000 $121,682 ($28,318) 81% 446 City of Euless Capital Project Request Department: FINANCE Submitted By: LORETTA GETCHELL Project Title: TRA DEBT PAYMENTS Project Type: DEBT SERVICE Sub -Type: Project No.: WW0003 Priority: A COUNCIL AUTHORIZATION RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN PROJECT DESCRIPTION: Date Prepared: 7-26-99 Date Completed: 5-31-01 A portion of the monthly payment to TRA is attributed to debt service for additional capacity covered by impact fees. Therefore, these funds are being applied to this debt payment. JUSTIFICATION: Impact fees must be used within 10 years of identified projects. 447 PROJECT TITLE: TRA DEBT PAYMENTS PROJECT #: WW0003 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST MAINTENANCE COST (+ OR -) ANNUAL Direct ODeratina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs Subtotal: $0 Total Estimated Annual Cos PHASE/FUNDING SOURCE TRA Debt Payments Debt Payments 822,037 $0 Total Estimated Capital Cosi $822,037 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 822,037 822,037 0 100% TOTAL PROJECT $822,037 $822,037 $0 100% 448 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: CDBG B00-UC480001-2250 Project Type: WASTEWATER Sub -Type: MAINS Project No.: WW0101 Priority: A COUNCIL AUTHORIZATION: Date Prepared: 7-26-99 Date Completed: 2-20-02 May 22, 2001 - Recommended to Tarrant County to award a contract to Horseshoe Construction, Inc. for $348,586 of which Tarrant County will pay $104,001. Change orders were authorized up to $6,900. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This funding is the 26th year project administered by Tarrant County. This is the sixth (6) wastewater project in South Euless and is by far the largest undertaken to upgrade wastewater mains. PROJECT DESCRIPTION: Design and construction of wastewater mains in the Oakwood Terrace Addition. JUSTIFICATION: Wastewater mains in South Euless area have deteriorated as they have aged and they need to be replaced. 449 PROJECT TITLE: CDBG B00-UC480001-2250 PROJECT #: WW0101 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Engineering 16,000 Personnel: Full Time Construction 335,485 Part Time Total Salary $0 Purchase of Services Tarrant County CDBG Contribution (100,000) Materials & Supplies (Estimated) Utilities Total Estimated Capital Cost $251,485 Subtotal: $0 FUNDING SOURCE: Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Sewer Mains W/S Operating Fund Inter -project Transfer to: CDBG - B01-UC-48-0001 WW0201 457,000 (205,515) $0 Total Funding $251,485 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 251,485 247,790 The remaining balance of this project $3,695 transferred to FB9901. TOTAL PROJECT $251,485 450 $247,790 (3,695) 99% ($3,695) 99% City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Date Prepared: 06/21/00 Date Completed: 3/31/03 Project Title: MANHOLE REHAB PROGRAM Project Type: WASTEWATER Sub -Type: MANHOLES Project No.: WW0102 Priority: A COUNCIL AUTHORIZATION: August 14, 2001 Awarded Bid No. 051-01 to Water Dist Maintenance & Repair in the amount of $79,960 for rehabilitation of approximately 1200 feet of sanitary sewer manholes. Sept 10, 2002 - Awarded Bid #021-02 to Southwestern Packing and Seals in the amount of $102,800. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Rehabilitation of all City wastewater manholes that are in need. PROJECT DESCRIPTION: Line has deteriorated and needs to be replaced. JUSTIFICATION: Manholes need to be replaced to avoid inflow and infiltration into the system. 451 PROJECT TITLE: MANHOLE REHAB PROGRAM PROJECT #: WW0102 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Manhole Rehab Program 250,000 Total Estimated Capital Cost $250,000 Subtotal: $0 FUNDING SOURCE: Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Manhole Replacement W/S Operating Fund FY01 150,000 W/S Operating Fund FY02 100,000 $0 Total Funding $250,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 250,000 184,520 (65,480) 74% Remaining funds transferred to Water/Sewer CIP Fund Balance. TOTAL PROJECT $250,000 $184,520 ($65,480) 74% 452 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Project Title: CDBG - B01-UC-48-0001-22-50 Project Type: WASTEWATER Sub -Type: Project No.: WW0201 Priority: A Date Prepared: 5/24/01 Date Completed: 3/31/03 COUNCIL AUTHORIZATION: 1-23-01 Hold public hearing and approval of recommended project. 2-12-02 Contract awarded to Horseshoe Construction Inc. in the amount of $270,719. Tarrant County will pay $100,001 and the City of Euless will pay $170,718. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This funding is the 27th year project administered by Tarrant County. This project addresses aging and deteriorating wastewater mains in the Midway Park area. PROJECT DESCRIPTION: Design and construction of wastewater mains in the southeast portion of the Midway Park Addition. JUSTIFICATION: Wastewater mains in the Midway Park area have deteriorated as they have aged and they need to be replaced. 453 PROJECT TITLE: CDBG - B01-UC-48-0001-22-50 PROJECT #: WW0201 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Engineering 15,000 Personnel: Full Time Construction 337,086 Part Time Total Salary $0 Tarrant County CDBG Contribution (115,000) Purchase of Services (estimated) Materials & Supplies Utilities Total Estimated Capital Cost $237,086 Subtotal: $0 FUNDING SOURCE: Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Engineer Service Sewer Main W/S Operating Fund Inter -project Transfer from: CDBG BOO-UC480001 WW0101 31,571 205,515 $0 Total Funding $237,086 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 15,000 14,920 (80) 99% 222,086 158,028 (64,058) 71% Remaining balance transferred to Water/Sewer CIP Fund Balance. TOTAL PROJECT $237,086 $172,948 ($64,138) 73% 454 Wa/te ¶wec2si Project Number CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Protect Description Date Total Project (Over) Under Completed Total Budget Costs Budget WATER PROJECTS WT9901 Meter Change Out Program 10/30/99 $101,917 $98,365 $3,552 WT9903 Master Plan 08/30/99 $42,000 $5,445 $36,555 WT9904 Well Repairs 09/30/99 $66,921 $66,921 $0 WT9905 Misc Water Rehab 06/30/00 $50,000 $43,749 $6,251 WT9906 Hwy 10 Water Line 01/30/00 $150,000 $138,883 $11,117 WT9907 Impact Fee Study 09/30/99 $13,000 $12,238 $762 WT9908 Mid Cities Blvd. 12" Line 04/30/04 $342,080 $313,354 $28,726 WT9909 2MG Water Tank 03/31/03 $2,430,881 $2,289,571 $141,310 WT9910 Water Line for Elevated Tank 05/31/02 $1,608,386 $1,201,698 $406,688 WT9911 Water Distribution - Master Plan 09/30/99 $25,600 $24,000 $1,600 WT0002 Emergency Repair- Hwy 10 11/30/99 $15,450 $14,214 $1,236 WT0003 Waterline Replacement - Aransas 06/30/01 $12,057 $7,089 $4,968 WT0004 Water Line Milam - Ector/Midway 06/30/00 $18,248 $13,743 $4,505 WT0005 Waterline Replacement - Milam- Denton/Mid 04/30/02 $26,988 $26,988 $0 WT0006 Central Drive Water Mains 03/31/00 $92,814 $90,742 $2,072 WT0102 SCADA Upgrade 04/09/01 $93,400 $93,400 $0 WT0103 Fire Hydrant Replacement Program 3/31/2003 $50,000 $49,626 $374 WT0403 Waterline Replacement - Fairlawn Court Cancelled $35,000 $0 $35,000 WT0404 Waterline Replacement - Atkerson Lane Cancelled $104,000 $0 $104,000 Sub -Total Water Projects $5,278,742 $4,490,026 $788,716 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Date Prepared: 7-15-99 Date Completed: 10-30-99 Project Title: METER CHANGE OUT Project Type: WATER Sub -Type: METERS Project No.: WT9901 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Project consists of replacing old meters with new radio -read meters throughout the City in phases. This program is complete. JUSTIFICATION: 1. Increased accuracy in billing water consumption. 2. Reduction in man-hours for meter reading due to radio -read meters that replaced old style meters. 456 PROJECT TITLE: METER CHANGE OUT PROJECT #: WT9901 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Meters $0 $0 60,000 Subtotal: $60,000 Total Estimated Annual Cost PHASE/FUNDING SOURCE Meters & Settings (Cost prior to FY1999 not reflected) Meters & Settings 101,917 $60,000 Total Estimated Capital Cost $101,917 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 101,917 98,365 (3,552) 97% * - The remaining balance was transferred to FB9901. TOTAL PROJECT $101,917 457 $98,365 ($3,552) 97% City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: MASTER PLAN Project Type: WATER Project No.: WT9903 COUNCIL AUTHORIZATION: Date Prepared: 7-26-99 Date Completed: 8-30-99 Sub -Type: PRELIMINARY STUDIES Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The 1999 Water Distribution System Master Plan presents a comprehensive plan for the development of the water distribution system to serve the City of Euless at build -out conditions. The current service area does not include any property within the D/FW Airport boundary. PROJECT DESCRIPTION: This project encompasses any studies needed to ascertain the adequacy of the system. The only current activity relates to the airport. A computer analysis was performed to aid in the development of an overall system of water mains, elevated storage tanks and supply from the TRA to efficiently serve the City of Euless development (within D/FW airport) that is anticipated. A preliminary Capital Improvement Plan and overall master plan map were created for a portion of the D/FW Airport. No expenditure of additional funds is currently being considered. This master plan work was solely performed for planning/feasibility purposes. JUSTIFICATION: The City and the airport are working on development opportunities. The airport requested that the City determine if the City can provide water service to property within the airport boundary west and south of Bear Creek. Impact fees cannot be used to fund this item as the airport is not currently within the City's service area. 458 PROJECT TITLE: MASTER PLAN PROJECT #: WT9903 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct ODeratina Cost Personnel: Full Time Planning Services 42,000 Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Planning Services Remaining funds transferred to FB9901 TOTAL PROJECT $0 Total Estimated Capital Cost $42,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 42,000 5,445 (36,555) 12.96% $42,000 $5,445 ($36,555) 12.96% 459 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: WELL REPAIRS Project Type: WATER Project No.: WT9904 COUNCIL AUTHORIZATION: Date Prepared: 7-26-99 Date Completed: 9-30-99 Sub -Type: WELL REPAIR Priority: A August 27, 1997 - Included in Fiscal Year 1996-97 Budget. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: This funding carried over from previous years and is being utilized to repair a well pump. This balance is not sufficient to cover the entire cost of the project as discussed in a previous council meeting. Staff expects to request approximately $50,000 from the Water and Sewer CIP fund balance to cover this expenditure. JUSTIFICATION: Maintaining the City's wells results in the ability to produce water at a substantial reduction in cost. This funding will be included in the baseline budget in future years as it is considered normal maintenance and operating costs. 460 PROJECT TITLE: WELL REPAIRS PROJECT #: WT9904 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Equipment Maintenance 3,000 Personnel: Full Time Meters & Setting 63,921 Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $66,921 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Equipment Maintenance 63,921 63,921 0 100% Meters & Setting 3,000 3,000 0 100% This project received $33,396 from FB9901 TOTAL PROJECT $66,921 461 $66,921 $0 100% City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: FY99 MISC WATER REHAB Project Type: WATER Sub -Type: MAINS Project No.: WT9905 Priority: COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Date Prepared: 7-26-99 Date Completed: 6-30-00 This project is for correction of small unidentified water main problems that may arise throughout the fiscal year. Large projects that are identified will be presented on an "as needed" basis and funded under a new project number. JUSTIFICATION: Some of the City's older water mains have deteriorated and need replacement or repair. Staff request that this project be funded on an annual basis at a level not to exceed $50,000. 462 PROJECT TITLE: FY99 MISC WATER REHAB PROJECT #: WT9905 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PHASE/FUNDING SOURCE Engineering Services Sanitation Services Equipment Rentals Other Supplies Plumbing Supplies Sand Sewer Mains Fire Hydrants Equipment Rentals TOTAL ESTIMATED CAPITAL COST: Water Mains $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS BUDGET 1,000 1,000 1,500 5,047 25,000 426 27 8,000 8,000 * - Remaining balance transferred to WT0001. TOTAL PROJECT $50,000 463 EXPENDED 587 827 1,140 2,908 19,084 426 27 12,075 6,675 $43,749 OVER/UNDER BUDGET (- +) (414) (173) (360) (2,139) (5,916) 0 4,075 (1,325) 50,000 $50,000 % Expended 59% 83% 76% 58% 76% 100% 151% 83% ($6,251) 87% City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: HWY 10 WATER LINE Project Type: WATER Sub -Type: MAINS Project No.: WT9906 Priority: A COUNCIL AUTHORIZATION: Date Prepared: 7-17-99 Date Completed: 1-30-00 November 24, 1998 - Authorized project expenditure. June 22, 1999 - Awarded Bid No. 99-12 for the installation of 8" water line improvements to Gra-Tex. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Water line needed to provide water service to properties along SH10 and improved fire protection coverage. PROJECT DESCRIPTION: Design and installation of an 8" water main along SH10 from Westpark Way to a point east of Raider Drive. JUSTIFICATION: 1. Economic Development 2. Improve ability of adjacent property owners to develop their property. 464 PROJECT TITLE: HWY 10 WATER LINE PROJECT #: WT9906 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PHASE/FUNDING SOURCE Engineering Services Surveying Services Water Mains Right -of -Way Aquisition Contingency TOTAL ESTIMATED CAPITAL COST: Water Mains Engineering $0 Surveying Services Right -of -Way Contingency $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS BUDGET 24,061 12,147 89,933 3,490 20,369 * - Remaining balance transferred to FB9901. TOTAL PROJECT $150,000 465 EXPENDED 25,411 12,146 97,836 3,490 0 OVER/UNDER BUDGET (- +) 1,350 (1) 7,903 0 (20,369) 89,933 24,061 12,147 3,490 20,369 $150,000 % EXPENDED 106% 100% 109% 100% 0% $138,883 ($11,117) 93% City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: IMPACT FEE STUDY Project Type: WATER Project No.: WT9907 COUNCIL AUTHORIZATION: January 26, 1999 - Approved the contract for study. Date Prepared: 7-17-99 Date Completed: 9-30-99 Sub -Type: IMPACT FEE PROJECTS Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The City's Capital Improvements Program and Impact Fee Study must be updated every three years. PROJECT DESCRIPTION: 1.) Review existing living unit equivalents. 2.) Calculate maximum impact fee 3.) Develop 10 year capital improvement plan JUSTIFICATION: Required by law. 466 PROJECT TITLE: IMPACT FEE STUDY PROJECT #: WT9907 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct ODeratina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Planning Services Remaining funds transferred to FB9910 TOTAL PROJECT Planning Services 13,000 $0 Total Estimated Capital Cost $13,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 13,000 12,238 (762) 94% $13,000 467 $12,238 ($762) 94% Department: Submitted By: Project Title: Project Type: Project No.: City of Euless Capital Project Request PUBLIC WORKS RANDY BYERS MID CITIES 12" LINE WATER WT9908 COUNCIL AUTHORIZATION: Date Prepared: 7-17-99 Date Completed: 04-30-04 Sub -Type: IMPACT FEE PROJECTS Priority: A November 24, 1998 - Authorized professional services contract with Shimek, Jacobs, & Finklea. May 11, 1999 - Awarded Bid No. 99-11 for the construction of a waterline. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The City's Water Master Plan has identified this water line as being necessary. PROJECT DESCRIPTION: Design and installation of a 12" water line along Mid Cities Blvd. from SH121 to North Main Street. City Council has authorized both the design and construction contracts. Anticipated completion date is July, 2003. JUSTIFICATION: Needed to provide adequate water service and pressure. 468 PROJECT TITLE: MID CITIES 12" LINE PROJECT #: WT9908 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST MAINTENANCE COST (+ OR -) ANNUAL Direct ODeratina Cost Engineering Personnel: Full Time Water Mains Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs $0 Total Estimated Capital Cosi $0 FUNDING SOURCE: Water Impact Fee Fund Transfer fund Balance Subtotal: $0 Total Estimated Annual Cos 52,080 290,000 $342,080 342,080 (28,726) $0 Total Fundinc $313,354 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Engineering Services 47,724 47,724 0 100% Water Mains 265,630 265,630 0 100% TOTAL PROJECT $313,354 $313,354 $0 100% 469 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: 2MG WATER TANK Project Type: WATER Sub -Type: TANK Project No.: WT9909 Priority: A COUNCIL AUTHORIZATION: Date Prepared: 7-26-99 Date Completed: 3-31-03 May 24, 1999 - Authorized the contract for professional services with Shimek, Jacobs, & Finklea. March 28, 2000 - Authorized the issuance of Revenue Bonds. February 22, 2000 - Awarded construction contract to Landmark Structures. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The City's water master plan has identified the need for a 2 million gallon water tank. PROJECT DESCRIPTION: Project includes the design and construction of the elevated water tank. Design and construction has been authorized. JUSTIFICATION: 1.) Fire flow pressure needs during peak hours. 2.) System is deficient in elevated storage to meet the demands determined from actual records. 3.) Additional capacity is needed to meet the predicted maximum hourly demand. 470 PROJECT TITLE: 2MG WATER TANK PROJECT #: WT9909 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Other Average Annual Debt Service Total Estimated Annual Cost PHASE/FUNDING SOURCE Engineering Services Water Tower Construction Issuance Cost Contingency (Interest & Savings) Geo Tech Services TOTAL ESTIMATED CAPITAL COST: Engineering Construction Issuance Cost $0 Geo Tech Services $0 Total Estimated Capital Cost FUNDING SOURCE: Revenue Bond Proceeds Water Impact Fee Fund $0 Interest Income $194,892 $194,892 Total Funding CURRENT STATUS BUDGET EXPENDED 90,000 86,850 2,117,286 2,114,420 60,000 60,000 138,294 3,000 25,301 25,301 OVER/UNDER BUDGET (- +) (3,150) (2,866) 0 (135,294) 0 90,000 2,117,286 60,000 25,301 $2,292,587 2,250,000 90,000 90,881 $2,430,881 % EXPENDED 97% 100% 100% 2% 100% TOTAL PROJECT $2,430,881 $2,289,571 ($141,310) 94% 471 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: LINES FOR ELEVATED TANK Project Type: WATER Sub -Type: MAINS Project No.: WT9910 Priority: A COUNCIL AUTHORIZATION: Date Prepared: 7-26-99 Date Completed: 5-31-02 May 24, 1999 - Authorized the contract for professional services with Shimek, Jacobs, & Finklea. March 28, 2000 - Authorized the issuance of Revenue Bonds. May 9, 2000 - Authorized utilization of $420,000 in impact fee money for this project. May 9, 2000 - Authorized City Engineer to proceed with design of a 16" water supply line. January 23, 2001 - Awarded contract to Mid -State Utilities on installing a 16" water line for $1,072,639. January 23, 2001 - Authorized City Manager to execute the contract. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The City's Water Master Plan has identified the need for a 2 million gallon elevated storage tank. Additional water mains are required to connect the new tank with the existing water distribution system. PROJECT DESCRIPTION: 1.) Design water mains required to connect tank to system. This portion of the project has been funded. 2.) Construction of the water mains required to connect the proposed 2 million gallon tank to the water distribution system. JUSTIFICATION: 1.) Fire flow pressure needs during peak hours. 2.) System is deficient in elevated storage to meet the demands determined from actual records. 3.) Additional capacity is needed to meet the predicted maximum hourly demand. 472 PROJECT TITLE: LINES FOR ELEVATED TANK PROJECT #: WT9910 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Other Average Annual Debt Service Total Estimated Annual Cost PHASE/FUNDING SOURCE Engineering Services Water Mains Contingency (Interest Earnings) TOTAL PROJECT TOTAL ESTIMATED CAPITAL COST: Engineering & Design Water Mains $0 0 Total Estimated Capital Cost FUNDING SOURCE: Water Impact Fee Fund Revenue Bond Proceeds Interest Income $87,560 $87,560 Total Funding CURRENT STATUS BUDGET 131,300 1,394,000 83,086 $1,608,386 473 EXPENDED 126,964 1,074,734 0 OVER/UNDER BUDGET (- +) (4,336) (319,266) (83,086) $126,964 $1,074,734 $1,201,698 515,300 1,010,000 83,086 $1,608,386 % EXPENDED 97% 77% 0% $1,201,698 ($406,688) 75% City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Date Prepared: 7-26-99 Date Completed: 9-30-99 Project Title: WATER DIST - MASTER PLAN Project Type: WATER Sub -Type: IMPACT FEE PROJECTS Project No.: WT9911 Priority: A COUNCIL AUTHORIZATION: November 24, 1998 - Authorized contract with Shimek, Jacobs, & Finklea to perform analysis. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The water distribution master plan is updated approximately every three years. PROJECT DESCRIPTION: 1.) Analyze water records from the summers of 1996 and 1997. 2.) Develop water model using the Cybernet Hydraulic Water Distribution Model. 3.) Determine line sizes, pressures at junction modes and effectiveness of elevated storage. 4.) Determine if elevated storage can be refilled to replace water from the drawdown during the maximum hourly demand on the day of maximum usage. 5.) Model pump stations 6.) Verify elevated storage capacity meets the TNRCC minimum water system requirements and the State Board of Insurance Key Rate standards. JUSTIFICATION: Determines the City's ability to properly distribute water to consumers and provide adequate water flow for fire protection. 474 PROJECT TITLE: WATER DIST - MASTER PLAN PROJECT #: WT9911 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct ODeratina Cost Engineering $25,600 Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Engineering Services Remaining funds transferred to FB9910 TOTAL PROJECT $0 Total Estimated Capital Cost $25,600 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 25,600 24,000 (1,600) 94% $25,600 475 $24,000 ($1,600) 94% City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Date Prepared: 10-1-99 Date Completed: 11-30-99 Project Title: EMERGENCY REPAIR - HWY 10 Project Type: WATER Sub -Type: WATER LINE Project No.: WT0002 Priority: A COUNCIL ACTION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Trenchless replacement of water line under Hwy 10 at Ector. PROJECT DESCRIPTION: Emergency repair of water line break under Hwy 10 at Ector Dr. JUSTIFICATION: 476 PROJECT TITLE: EMERGENCY REPAIR - HWY 10 PROJECT #: WT0002 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Water Mains Water Mains 15,450 $0 Total Estimated Capital Cost $15,450 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 15,450 14,214 (1,236) 92% Funding for this project received from FB9901 * - Remainder of $1,236 was transferred back to FB9901. TOTAL PROJECT $15,450 477 $14,214 ($1,236) 92% City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: WATERLINE REPLACEMENT, ARANSAS Project Type: WATER Sub -Type: MAINS Project No.: WT0003 Priority: A COUNCIL ACTION: Date Prepared: 7-26-99 Date Completed: 6-30-01 March 28, 2000 - Approved project to be funded from existing Water CIP Fund Balance. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Project consists of replacing water lines along Aransas - Ector to Midway. JUSTIFICATION: This line has deteriorated to the point of needing to be replaced. 478 PROJECT TITLE: WATERLINE REPLACEMENT, ARANSAS PROJECT #: WT0003 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST MAINTENANCE COST (+ OR -) ANNUAL Direct ODeratina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs Subtotal: $0 Total Estimated Annual Cos PHASE/FUNDING SOURCE Water Mains Water Mains 12,057 $0 Total Estimated Capital Cosi $12,057 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 12,057 7,089 (4,968) 59% * - This project received an inter -project transfer of $12,057 from FB9901. *- Remaining funds of $4,968 transferred back to FB9901. TOTAL PROJECT $12,057 $7,089 ($4,968) 59% 479 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Date Prepared: 7-26-99 Date Completed: 6-30-00 Project Title: LINE REPLACEMENT, MILAM - ECTOR/MIDWAY Project Type: WATER Sub -Type: WATER LINE Project No.: WT0004 Priority: A COUNIL ACTION: March 28, 2000 - Project to be funded from existing Water CIP Fund Balance. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Project consists of replacing water lines along Milam Street from Ector Drive to Midway. JUSTIFICATION: This line has many repair clamps due to leak repairs. The line has deteriorated to the point of needing to be replaced. 480 PROJECT TITLE: LINE REPLACEMENT, MILAM - ECTOR/MIDWAY PROJECT #: WT0004 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Water Mains Water Mains 18,248 $0 Total Estimated Capital Cost $18,248 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 18,248 13,743 (4,505) 75% Funding for this project received from FB9901 Remaining funds transferred to WT0005 TOTAL PROJECT $18,248 481 $13,743 ($4,505) 75% City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: LINE REPLACEMENT, MILAM-DENTON/MIDWAY Project Type: WATER Sub -Type: MAINS Project No.: WT0005 Priority: A COUNCIL ACTION: Date Prepared: 7-26-99 Date Completed: 4-30-02 April 8, 2000 - Approved project to be funded from existing Water CIP Fund Balance. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Project consists of replacing water lines along Milam Street from Midway to Denton Drive. JUSTIFICATION: This line has deteriorated to the point of needing to be replaced. 182 PROJECT TITLE: LINE REPLACEMENT, MILAM-DENTON/MIDWAY PROJECT #: WT0005 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PHASE/FUNDING SOURCE Water Mains TOTAL ESTIMATED CAPITAL COST: Water Mains $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS BUDGET EXPENDED 26,988 26,988 * - This project received an inter -project transfer of * - This project received an inter -project transfer of * - This project received an inter -project transfer of * - This project received an inter -project transfer of TOTAL PROJECT $14,806 from FB9901. $4,505 from WT0004. $7,020 from WT0001 $657 from FB9901. $26,988 483 $26,988 26,988 $26,988 OVER/UNDER BUDGET (- +) % EXPENDED 0 100% $0 100% City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Date Prepared: 7-26-99 Date Completed: 3-31-00 Project Title: CENTRAL DRIVE WATER MAINS Project Type: WATER Sub -Type: WATER MAINS Project No.: WT0006 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Joint project with the City of Bedford. PROJECT DESCRIPTION: Replace existing 16" water line in Central Drive. Existing main is approximately 40 years old. JUSTIFICATION: Bedford is reconstructing Central Drive as a concrete street. The cost of repair or replacement of this line after the new pavement is complete would be substantially more expensive. 484 PROJECT TITLE: CENTRAL DRIVE WATER MAINS PROJECT #: WT0006 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Water Mains Water main 92,814 $0 Total Estimated Capital Cost $92,814 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 92,814 90,742 (2,072) 98% Funding for this project received from FB9901 Remaining funds transferred back to FB9901 TOTAL PROJECT $92,814 485 $90,742 ($2,072) 98% City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: SCADA UPGRADE Project Type: WATER Sub -Type: Project No.: WT0102 Priority: A COUNCIL AUTHORIZATION: Date Prepared: 7-24-00 Date Completed: 4-9-01 September 26, 2000 - Awarded contract to I&C Sales for upgrade of system. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Upgrade Supervisory Control and Data Acquisition (SCADA) System Hardware and Software. JUSTIFICATION: The SCADA System in use today is not Y2K Compliant. Specifications for upgrade could not be completed prior to 12/31/99. The time on the computer was set back to a previous date. Since the installation was completed new/improved technology has evolved. The upgrade will entail all new equipment. Failure to upgrade will result in an apporximate 100% increase in the cost of producing water from our wells. 486 PROJECT TITLE: SCADA UPGRADE PROJECT #: WT0102 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost SCADA Upgrade $93,400 Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Other Average Annual Debt Service Total Estimated Annual Cost PHASE/FUNDING SOURCE Equipment $0 Total Estimated Capital Cost $93,400 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 93,400 93,400 0 100% TOTAL PROJECT $93,400 $93,400 $0 100% 487 City of Euless Capital Project Request Department: WATER DISTRIBUTION Submitted By: RANDY BYERS Date Prepared: 6-15-00 Date Completed: 3-31-03 Project Title: FIRE HYDRANT REPLACEMENT PROGRAM Project Type: WATER Sub -Type: INSTALLATION Project No.: WT0103 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Systematic annual replacement of old, deteriorated or malfunctioning fire hydrants as determined by Fire and/or Public Works personnel. JUSTIFICATION: Fire hydrants are necessary for many functions, the major one being fire fighting. Several hydrants in our distribution system are old, deteriorated and are found to malfunction during annual inspections. These hydrants need to be replaced. 488 PROJECT TITLE: FIRE HYDRANT REPLACEMENT PROGRAM PROJECT #: WT0103 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: 0 Maintenance Costs Subtotal: Other Average Annual Debt Service $87,560 Total Estimated Annual Cost PHASE/FUNDING SOURCE Hydrant Replacement Hydrant Replacement $50,000 Total Estimated Capital Cost FUNDING SOURCE: W/S Fund Balance $50,000 50,000 $87,560 Total Funding $50,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 50,000 49,626 (374) 99% Remaining balance transferred to Water/Sewer CIP Fund Balance. TOTAL PROJECT $50,000 489 $49,626 ($374) 99% City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: 5/28/2003 Submitted By: RON YOUNG Date Completed: Cancelled 5/30/04 Project Title: LINE REPLACEMENT, FAIRLAWN CT Project Type: WATER Sub -Type: MAINS Project No.: WT0403 Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This water main is included in the City's Water Master Plan. PROJECT DESCRIPTION: Systematic annual replacement of old deteriorated or substandard size water mains. Replace 4" CI main with 8" PVC. PROJECT SCHEDULE: CANCELLED 5/31/04 Engineer selected Award design contract - June, 2004 Plans complete - Oct, 2004 Advertise for bids - Nov, 2004 Award construction contract - Jan, 2005 Anticipated construction completion - June, 2005 JUSTIFICATION: Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provides inadequate flow of water for fire protection. 490 PROJECT TITLE: LINE REPLACEMENT, FAIRLAWN CT PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 4,000 31,000 $35,000 0% 0% 0% 0% 0% 491 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: 5/28/2003 Submitted By: RON YOUNG Date Completed: Cancelled 5/31/04 Project Title: LINE REPLACEMENT, ATKERSON LANE Project Type: WATER Sub -Type: MAINS Project No.: WT0404 Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This water main is included in the City's Water Master Plan. PROJECT DESCRIPTION: Systematic annual replacement of old deteriorated or substandard size water mains. Replace main from Dunaway to Dickey. Replace 2" GI with 8" PVC. PROJECT SCHEDULE: CANCELLED 5/31/04 Engineer selected Award design contract - June, 2004 Plans complete - Oct, 2004 Advertise for bids - Nov, 2004 Award construction contract - Jan, 2005 Anticipated construction completion - June, 2005 JUSTIFICATION: Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provides inadequate flow of water for fire protection. 492 PROJECT TITLE: LINE REPLACEMENT, ATKERSON LANE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 10,000 94,000 $104,000 0% 0% 0% 0% 0% 493 Project Number CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Project Description Date Total Project (Over) Under Completed Total Budget Costs Budget OTHER AC9901 Athletic Complex Phase II 06/30/02 $123,654 $75,047 $48,607 ED0102 Bell Ranch Terrace Cancelled $200,000 $0 $200,000 FM0101 Building D 9/30/2002 $930,610 $930,608 $2 FM0209 Midway Recreation Upgrade 06/30/02 $557,125 $557,125 $0 PR9922 Telas Remodel 11/30/01 $430,000 $455,885 ($25,885) PR9927 Park Improvements - Texas Star 09/30/01 $1,036,500 $1,014,011 $22,489 PR0015 Purchase of Dallas StarsCenter 05/31/00 $10,327,978 $10,327,978 $0 PR0016 Wilshire Park Improvements 06/30/02 $150,000 $149,926 $74 PR0110 Slope Protection/Screening Wall 3/31/2003 $1,275,203 $1,273,923 $1,280 SS9901 Fire Station II 03/30/00 $49,688 $49,688 $0 SS9902 Library Books 08/15/00 $3,302 $3,302 $0 SS9919 Fire Station #3 - Structural Repairs 03/30/00 $30,000 $17,344 $12,656 SS0010 Former Fire Station #2 06/30/02 $599,600 $595,257 $4,343 SS0113 Park Building 6/30/2002 $1,492,283 $1,491,857 $426 Sub -Total Other Projects $17,205,943 $16,941,951 $263,992 TOTAL COMPLETED PROJECT $32,087,664 $30,186,595 $1,901,069 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: 8-2-99 Submitted By: RICK HEROLD Date Completed: Project Title: ATHLETIC COMPLEX PHASE II Project Type: LAND/PROPERTY Sub -Type: IMPROVEMENT Project No.: AC9901 Priority: A COUNCIL AUTHORIZATION: November 25, 1997 - Approval of recertification of park grant for Phase II. September 9, 1997 - Included in Fiscal Year 1997-98 Budget. April 8, 2002 - Masterplan to be reviewed by Park Board for approval. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project includes $20,000 for the continued revision of the Euless Parks and Community Services Master Plan. The Master Plan revision will update our current Master Plan which will allow the City to qualify for additional grant points for future Texas Parks and Wildlife Department grants. PROJECT DESCRIPTION: These funds will be used for engineering and preliminary plans for additional phases at the Parks at Texas Star as well as update of the Master Plan. JUSTIFICATION: Master Plan revision is necessary to receive needed points and potentially $500,000 per project in grant funds. 495 PROJECT TITLE: ATHLETIC COMPLEX PHASE II PROJECT #: AC9901 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST MAINTENANCE COST (+ OR -) ANNUAL Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cos PHASE/FUNDING SOURCE Engineering Services Land Betterment Engineering & Design 75,047 $0 Total Estimated Capital Cosi $75,047 $0 FUNDING SOURCE: Fund Balance 111,411 Interest Income 12,243 Inter -project Transfer to: ACO201 Athletic Complex III (48,607) $0 $0 Total Fundinc $75,047 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 40,527 40,527 0 100% 34,520 34,520 0 100% TOTAL PROJECT $75,047 $75,047 $0 100% 496 City of Euless Capital Project Request Department: ECONOMIC DEVELOPMENT Date Prepared: 7-7-00 Submitted By: BILL RIDGEWAY Date Completed: Cancelled Project Title: BELL RANCH TERRACE Project Type: ECONOMIC DEVELOPMENT Sub -Type: DEVELOPMENT PROJECT Project No.: ED0102 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project would facilitate the development of the remaining phase of Bell Ranch Terrace in accordance with the City's Land Use Plan. PROJECT DESCRIPTION: Assist in infrastructure installation or other type of incentive or assistance, as negotiated through a City - Developer Agreement. JUSTIFICATION: Land is vacant (45+ acres) and currently has over 60 property owners. Land should be consolidated and developed to increase the number of residential units in Euless and increase tax base. 497 PROJECT TITLE: BELL RANCH TERRACE PROJECT #: ED0102 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Construction 200,000 Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $200,000 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Construction 200,000 0 (200,000) 0% Transfer to Car Rental Operations 0 200,000 200,000 0% This project was deleted and funds were returned to the Car Rental Operating Fund. TOTAL PROJECT $200,000 $200,000 $0 100% 498 City of Euless Capital Project Request Department: FACILITY OPERATIONS Submitted By: KYLE MCADAMS Project Title: BUILDING D Project Type: BUILDING Project No.: FM 0101 COUNCIL AUTHORIZATION: Date Prepared: 6-27-00 Date Completed: 9-30-02 Sub -Type: RENOVATION Priority: A February 26, 2002 Bid No. 008-02 was awarded to T.W. Foster, Inc. for alterations to Building D & reconstruction of surrounding parking lots in the amount of $779,300. September 25, 2001, authorization to execute a contract with Byron Folse Associates, Inc. for architectural services at 7.5% of construction cost. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Building D is the third project of the master plan. Construction began in January 2002 and was completed September 2002. PROJECT DESCRIPTION: Building D, which previously housed the Police Department, was renovated to accommodate office expansion of Fire Administration, Information Services, and Purchasing, with a storage and receiving area. JUSTIFICATION: Relocating the Police Department to a new facility on Hwy 10 in October 2001, freeing space to renovate Building D to accommodate the expansion needs of the Fire Administration, Information Services, and Purchasing Departments. 499 PROJECT TITLE: BUILDING D PROJECT #: FM0101 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Maintenance Costs Janitorial Services & Supplies Pest Control Subtotal: Total Estimated Annual Cost PHASE/FUNDING SOURCE Special Services Remodel/Improvements TOTAL ESTIMATED CAPITAL COST: Remodel Special Services Contingency $0 8,400 Total Estimated Capital Cost $8,400 FUNDING SOURCE: 5,500 Transfer from Police Facility CIP 8,500 Car Rental Tax Fund 1,250 Miscellaneous (Refund) Inter -project Transfer From: $15,250 Fund Balance (FB9909) $23,650 Total Funding CURRENT STATUS 822,020 70,000 30,000 $922,020 638,803 283,217 8,185 405 $930,610 OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 90,162 90,162 840,448 840,446 TOTAL PROJECT 930,610 930,608 0 2 100°/a 100°/a 2 100°/a 500 City of Euless Capital Project Request Department: COMMUNITY SERVICES Submitted By: RICK HEROLD Project Title: MIDWAY REC UPGRADE Project Type: BUILDING Project No.: FM0209 COUNCIL AUTHORIZATION Sub -Type: REMODEL Priority: A November 13, 2001 Authorized city manager to negotiate and execute a replacement in the amount of $49,750. November 13, 2001 Authorized city manager to negotiate and execute a for the removal and replacement of carpet and padding in the amount of November 13, 2001 Authorized city manager to negotiate and execute a for replacement of chilled water HVAC system in the amount of $159,000 November 13, 2001 Authorized city manager to negotiate and execute a replacement in the amount of $59,959. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN Date Prepared: 6/13/01 Date Completed contract with ACME for a roo contract with Morrell Constructio $47,969. contract with Pierce MechanicE contract with FRS for interior drym Expansion project requested in response to increased user load of recreation center, specifically fitness and weight room areas. Additionally, discovery of mold in late FY 2001, required alteration of remodeling plans. Capital funds for HVAC replacement, Wall, General Remodel, Tables/Chairs, and Phase III renovations were combined and scheduled to be completed concurrently with mold removal. PROJECT DESCRIPTION: Remodel will involve providing additional space and equipment for the Fitness Center and Weight Room areas. Additionally, two administrative offices located on the lower level of the facility will be constructed for administrative responsibility and visibility in redesigned areas. JUSTIFICATION: Users and citizens of the current facility are required to wait for machines and endure crowds during peak periods. The proposed expansion will provide additional cardiovascular machines and fitness space for the ever-increasinc user demand of the recreation facility. 501 PROJECT TITLE: Midway Rec Upgrade PROJECT #: FM0209 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Construction/Renovation 267,125 Part Time Mold Remediation 100,000 Total Salary $0 HVAC 190,000 Purchase of Services Materials & Supplies Utilities 1,000 Subtotal: Total Estimated Capital Cost $1,000 FUNDING SOURCE: $557,125 Maintenance Costs Maintenance/Cleaning 200 Car Rental Tax Fund 488,097 W/S Operating Fund 69,028 Subtotal: $200 Total Estimated Annual Cost PHASE/FUNDING SOURCE Remodel/Improvements $1,200 Total Estimated Capital Cost $557,125 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (-+) % EXPENDED 557,125 557,125 0 100% TOTAL PROJECT 557,125 557,125 0 100.00% 502 City of Euless Capital Project Request Department: SUPPORT SERVICES Submitted By: RICK HEROLD Date Prepared: 6-27-00 Date Completed: 8-31-01 Project Title: TEJAS REMODEL Project Type: BUILDING/FACILITIES Sub -Type: REMODEL Project No.: PR9922 Priority: A COUNCIL AUTHORIZATION: September 9, 1997 - Included in Fiscal Year 1997-98 Budget. October 24, 2000 - Authorized City Manager to contract for architectual services with Byron Folse Inc. January 9, 2001 - Awarded bid #026-00 for renovation to Stillwell Building for $403,485. January 9, 2001 - Authorized City Manager to execute the contract. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Community Services Department was the first of six master plan projects. Construction began in January 2001 and was completed August 2001. PROJECT DESCRIPTION: Community Service Department was relocated to the Tejas Building located on Royal Parkway adjacent to the existing Fleet & Facility Service Center Building. The Tejas Building was renovated to accommodate the expansion of the Community Services offices and storage. JUSTIFICATION: Relocating Community Services offices to another facility from Building B will allow for present and future expansion plans to accommodate the Finance, Water Department, Insurance and Human Resources Department. 503 PROJECT TITLE: TEJAS REMODEL PROJECT #: PR9922 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct ODeratina Cost Personnel: Full Time Remodel 430,000 Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs Utilities 5,600 Cleaning 2,800 Insurance 500 Pest Control 500 Subtotal: $9,400 Total Estimated Annual Cost $9,400 Total Estimated Capital Cost $430,000 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Tejas Building Remodel 383,485 389,056 5,571 101% Other Professional Services 26,515 43,939 17,424 166% Contingency 20,000 22,890 2,890 114% TOTAL PROJECT $430,000 504 $455,885 $25,885 106% City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: 2-7-00 Submitted By: RICK HEROLD Date Completed: 9-30-01 Project Title: PARK IMPROVEMENT - TEXAS STAR Project Type: HALF -CENT SALES TAX Sub -Type: PARK PROJECT Project No.: PR9927 Priority: A COUNCIL AUTHORIZATION: October 26, 1999 - Council authorized the issuance of $1 million in revenue bonds. October 26, 1999 - EDC authorized design services contract. November 30, 1999 - EDC authorized execution of construction agreements. February 7, 2000 - EDC authorized execution of construction agreements. February 7, 2000 - EDC authorized the expenditure of funds for additional park improvements. February 8, 2000 - Council ratified the EDC approval items related to Texas Star park improvements. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project was basically Phase II of The Parks at Texas Star. The improvements installed within the project are consistent with the City's Master Plan. PROJECT DESCRIPTION: This project involved the construction of a parking lot, installation of lighting and landscaping, and other park improvements associated with the City's portion of the Dr. Pepper StarCenter. JUSTIFICATION: This project was needed to facilitate the Dr. Pepper StarCenter project and to begin build out of the Texas Star Sports Center. 505 PROJECT TITLE: PARK IMPROVEMENT - TEXAS STAR PROJECT #: PR9927 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PHASE/FUNDING SOURCE Bank Charges Issuance Cost Architectural Services Engineering Services Land Betterment Park Improvement Park Furnishings TOTAL ESTIMATED CAPITAL COST: Bank Charges Issuance Cost $0 Architectural Services Engineering Services Land Betterment Park Improvement Park Furnishings Total Estimated Capital Cost $0 FUNDING SOURCE Revenue Bond Proceeds Interest Income $0 $0 Total Estimated Capital Cost CURRENT STATUS BUDGET 400 36,100 50,400 29,750 446,264 451,097 11,287 EXPENDED 400 36,100 50,400 29,750 446,264 451,097 11,287 OVER/UNDER BUDGET (- +) 0 0 0 0 0 0 400 36,100 50,400 29,750 446,264 451,097 11,287 1,025,298 1,000,000 25,298 $1,025,298 EXPENDED 1 0 0 % 1 0 0 % 1 0 0 % 1 0 0 % 1 0 0 % 1 0 0 % TOTAL PROJECT $1,025,298 $1,025,298 $0 100% 506 City of Euless Capital Project Request Department: COMMUNITY DEVELOPMENT Date Prepared: 4-1-00 Submitted By: RICK HEROLD Date Completed: 5-31-00 Project Title: PURCHASE STARS CENTER Project Type: BUILDING/FACILITY Sub -Type: ACQUISITION Project No.: PR0015 Priority: A COUNCIL AUTHORIZATION: March 23, 1999 - Authorization to execute a letter of intent with the Dallas Stars regarding Texas Star. June 8, 1999 - Direct City Manager to schedule public hearings for the annexation of property. June 8, 1999 - Prepare a City Service Plan for the property being annexed. July 29, 1999 - Hold Public Hearing on the annexation of property from Ft. Worth. July 29, 1999 - Approval of Joint Resolution with Ft. Worth agreeing to disannex 21.3 acres. September 14, 1999 - Approve and authorize City Manager to execute Purchase Lease Agreement. October 12, 1999 - Approve Ordinance 1381 providing for the annexation of 21.3 acres. October 26, 1999 - Public Hearing on SUP that will allow for the construction of the StarsCenter. October 26, 1999 - Approve SUP to allow for the construction of the Dr. Pepper StarsCenter. October 26, 1999 - Public Hearing on zoning change or Dr. Pepper StarsCenter. October 26, 1999 - Approve zoning change for Dr. Pepper StarsCenter. January 11, 2000 - Approve resolution authorizing the publication of notice of intent to issue C.O.'s January 31, 2000 - Authorize issuance of T&W and Sewer Rev. Cert. Of Obligation, Taxable Series 2000 February 8, 2000 - Final Reading and Approval of issuance of Cert. Of Obligation, Taxable Series 2000. February 8, 2000 - Authorize City Manager to execute Tri-Party Agreement between Euless, Stars, & BoA. February 22, 2000 - Authorize modifications to Purchase and Lease Agreement. April 11, 2000 - Authorize issuance of T&W and Sewer Rev. Cert. Of Obligation, Taxable Series 2000 April 11, 2000 - Approved amendment to a Purchase/Lease Agreement to accept cash escrow. June 12, 2000 - Executed the documents to close on the purchase of the facility. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Many of the athletic complex Phase II issues were addressed in conjunction with this project. PROJECT DESCRIPTION: The City purchased a two rink ice facility. This facility will be leased and operated by the Dallas Stars. It is anticipated to accommodate league hockey play and public skate as well as host regional and national skating events. JUSTIFICATION: This will provide an ice skating facility to our community without burden to the Euless tax payers. 507 PROJECT TITLE: PURCHASE STARS CENTER PROJECT #: PR0015 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PHASE/FUNDING SOURCE Building Acquisition Equipment Issuance Cost Star Center Debt TOTAL ESTIMATED CAPITAL COST: Building Acquisition Equipment $0 Issuance Cost Star Center Debt $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS BUDGET EXPENDED 9,391,814 9,391,814 445,223 445,223 146,000 146,000 344,941 344,941 OVER/UNDER BUDGET (- +) 0 0 0 0 9,391,814 445,223 146,000 344,941 $10,327,978 % EXPENDED 100% 100% 100% 100% TOTAL PROJECT $10,327,978 $10,327,978 $0 100% 508 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: 6-29-01 Submitted By: RICK HEROLD Date Completed: 6-30-02 Project Title: WILSHIRE PARK IMPROVEMENTS Project Type: LAND Sub -Type: IMPROVEMENT Project No.: PR0016 Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Land and equipment improvement of park facility to remain consistent with forward -looking park infrastructure for the citizens of Euless. PROJECT DESCRIPTION: Multi -faceted park enhancements to include a trail system, lighting, fishing pier, pond, playgrounds and picnic areas. JUSTIFICATION: A the request of Wilshire Neighborhood Association, the multi -faceted improvements to Wilshire Park will provide park enhancements consistent with improvements throughout the city's park infrastructure. 509 PROJECT TITLE: WILSHIRE PARK IMPROVEMENTS PROJECT #: PR0016 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Engineering & Design Personnel: Full Time Construction 150,000 Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Landscaping/Pond Materials $0 Total Estimated Capital Cost $0 FUNDING SOURCE: Half -Cent Operating Fund 12,500 Subtotal: $12,500 Total Estimated Annual Cost PHASE/FUNDING SOURCE Land Betterment $150,000 150,000 $12,500 Total Funding $150,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 150,000 149,926 (74) 100°/a Remaining funds transferred to EDC Fund Balance TOTAL PROJECT $150,000 $149,926 ($74) 100% 510 City of Euless Capital Project Request Department: COMMUNITY SERVICES Submitted By: RICK HEROLD Date Prepared: 6-29-00 Date Completed: 3-31-03 Project Title: SLOPE PROTECTION/SCREENING WALL Project Type: LAND Sub -Type: IMPROVEMENT Project No.: PR0110 Priority: A COUNCIL AUTHORIZATION June 12, 2001 - Awarded bid #048-01 for construction to Knight Erosion Control for $1,033,937.5( Sept 10, 2002 - Awarded bid # 020-02 for phase II of the slope protection to Knight Erosion Control in the amou of $163,500. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN Initial Slope Protection Project revised from $708,900 to $1,165,000. Revision of project required as erosion accelerated to levels that required consolidation of initial phase and partial of Phase II. Project began in July 201 and is substantially complete. The screening wall is necessitated by Ft. Worth's Trinity Blvd road construction project. PROJECT DESCRIPTION: Slope protection from #18 creek dam at tee to dam by #18 green on west side of creek of approximately 1,185 linear feet and 12 feet high. #18 Bridge to #18 green side dam of 485 linear feet at approximately 12 feet high. From gabion behind #9 green to the gabion at #9 fairway bridge on the northwest side of the creek. From gabio i at #9 fairway bridge back to bend at #1 fairway for 900 linear feet at approximately 12 feet high. The screening wall will mitigate some of the negative influences created by the construction of the six lane boulevard street section. JUSTIFICATION: Stop erosion of the creek back on #18 fairway and prevent the possible future loss of #18 bridge and parts of #9 green and fairway. The screening wall is needed to maintain the existing environment and setting of the Texas Star Golf Course. 511 PROJECT TITLE: SLOPE PROTECTION/SCREENING WALL PROJECT #: PR0110 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Full Time Creek Slope Protection 1,190,203 Part Time Trinity Screening Wall 85,000 Total Salary $0 Purchase of Services Materials & Supplies Utilities Total Estimated Capital Cost Subtotal: $0 FUNDING SOURCE: Maintenance Costs Loan from Car Rental Fund Utilities Interest Income Insurance Subtotal: $0 Average Annual Debt Service $98,993 Total Estimated Annual Cost $0 Total Funding CURRENT STATUS PHASE/FUNDING SOURCE Land Betterment $1,275,203 1,250,000 25,203 $1,275,203 OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 1,275,203 1,273,923 (1,280) 100% Transferred the remaining $1279.47 to car rental fund as payment towards debt service. TOTAL PROJECT $1,275,203 512 $1,273,923 ($1,280) 100% City of Euless Capital Project Request Department: SUPPORT SERVICES Submitted By: TOM COX Date Prepared: 8-2-99 Date Completed: 3-30-00 Project Title: FIRE STATION II - 1515 Westpark Way Project Type: BUILDING/FACILITIES Sub -Type: REMODEL Project No.: SS9901 Priority: A COUNCIL AUTHORIZATION: October 14, 1997 - Award Bid No. 97-37 for project construction. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Replacement of fire station #2 due to major repairs and enlargement of Westpark Way. PROJECT DESCRIPTION: Renovation of old vehicle repair center. Construction of new apparatus bays to the east of the main building. Removal of existing structures within the old service center. Remove and replace interior concrete floor, construct new eight (8) bed dormitory, kitchen and food preparation area, day room, offices, training room, lavatory room and shower area. Exterior drive approaches were reworked to facilitate movement in and out of the apparatus. Building exterior received new paint scheme to match the current City colors. Stucco panels and face brick was repaired and either painted or cleaned. JUSTIFICATION: With construction and widening of Westpark Way, driveway at existing Fire Station #2 would be too short (15') to accommodate fire apparatus. Building was in need of major interior renovation and upgrades. With the move of Fleet Services into a new building, this left the old vehicle repair center available for renovation. The location and the existing structure lent itself as a logical location to relocate Fire Station #2. 513 PROJECT TITLE: FIRE STATION II - 1515 Westpark Way PROJECT #: SS9901 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Full Time Construction 49,688 Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs Maintenance Costs Pest Control 2,500 500 Subtotal: $3,000 Total Estimated Annual Cost PHASE/FUNDING SOURCE Fire Station II (Expenses prior to FY99 not reflected) $3,000 Total Estimated Capital Cost $49,688 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 49,688 49,688 (0) 100% This project received additional funding in the amount of $6,177 from FB9909 TOTAL PROJECT $49,688 514 $49,688 ($0) 100% City of Euless Capital Project Request Department: SUPPORT SERVICES Submitted By: TOM COX Date Prepared: 8-2-99 Date Completed: 8-15-00 Project Title: LIBRARY BOOKS Project Type: HALF -CENT SALES TAX Sub -Type: LIBRARY Project No.: SS9902 Priority: A COUNCIL AUTHORIZATION: Approved as part of Sales Tax Revenue Bonds, Series 1994. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Funds remaining from bond sale related to new library facility and amenities. JUSTIFICATION: This item was one of the projects stated in the initial approval for the Half Cent Sales Tax. 515 PROJECT TITLE: LIBRARY BOOKS PROJECT #: SS9902 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Full Time Library Book Purchase 3,302 Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Library Books (Expenses prior to FY99 not reflected) TOTAL PROJECT $0 Total Estimated Capital Cost $3,302 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 3,302 3,302 0 100% $3,302 516 $3,302 $0 100% Department: Submitted By: Project Title: Project Type: Project No.: City of Euless Capital Project Request SUPPORT SERVICES TOM COX Date Prepared: 8-2-99 Date Completed: 3-30-00 FIRE STATION #3 - STRUCTURAL/COSMETIC REPAIRS BUILDING/FACILITIES Sub -Type: REMODEL SS9919 Priority: A COUNCIL AUTHORIZATION: May 24, 1999 - Council notification. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Replace concrete drive approaches into the north and south sides of the apparatus bays. Replace carpet and floor coverings in the watch office and living areas. Sawcut and sealed cracks in the apparatus bay floors. Repair external cracks in the stucco panels. Repaint interior walls and refinish the cabinets. JUSTIFICATION: 517 PROJECT TITLE: FIRE STATION #3 - STRUCTURAL/COSMETIC REF PROJECT #: SS9919 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Full Time Construction 30,000 Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Fire Station Foundation Repair * - Remaining funds transferred to FB9909. TOTAL PROJECT $0 Total Estimated Capital Cost $30,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 30,000 17,344 (12,656) 58% $30,000 518 $17,344 ($12,656) 58% City of Euless Capital Project Request Department: SUPPORT SERVICES Submitted By: TOM COX Date Prepared: 7-12-00 Date Completed: 6-30-02 Project Title: FORMER FIRE STATION #2 Project Type: BUILDING/FACILITY Sub -Type: REMODEL Project No.: SS0010 Priority: A COUNCIL AUTHORIZATION: February 7, 2000 - EDC authorized project, acquired Station #2 and adjacent land and proposed lease. February 8, 2000 - Council ratified the EDC approval of items related to Fire Station #2. February 8, 2000 - Council authorized the sale of Fire Station #2 to the EDC for $167,000. June 27, 2000 - EDC approved a lease with Beall Concrete Enterprises. June 27, 2000 - EDC approved the expenditure of funds for remodel. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Economic Development Corporation authorized funding to remodel Fire Station #2. The renovated facility will be rented to a business that will pay rent unless certain sales tax revenue goals are achieved. JUSTIFICATION: The City will receive significant sales tax revenue from this venture. 519 PROJECT TITLE: FORMER FIRE STATION #2 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Maintenance Costs Subtotal: Total Estimated Annual Cost PHASE/FUNDING SOURCE Other Professional Services Contingencies Land Purchase Acquisition Land Betterment Remodel/Improvement Asbestos Remediation TOTAL PROJECT PROJECT #: SS0010 TOTAL ESTIMATED CAPITAL COST: Other Professional Services Contingencies Land Purchase $0 Acquisition Land Betterment Remodel/Improvement Parking Improvement Asbestos Remediation Total Estimated Capital Cost $0 FUNDING SOURCE: Half -Cent Operating Fund 500 Inter -project Transfer from: EDC Incentives DV9901 $500 $500 Total Funding CURRENT STATUS BUDGET 38,100 7,524 31,135 167,000 12,500 335,815 7,526 EXPENDED 41,283 0 31,135 167,000 12,501 335,812 7,526 $599,600 $595,257 520 OVER/UNDER BUDGET (- +) 3,183 (7,524) (0) 0 1 (3) (1) 38,100 12,000 30,000 167,000 12,500 315,000 15,000 10,000 $599,600 167,000 432,600 $599,600 % EXPENDED 1 0 8 % 0% 1 0 0 % 1 0 0 % 1 0 0 % 1 0 0 % 1 0 0 % ($4,343) 99% City of Euless Capital Project Request Department: FACILITY OPERATIONS Submitted By: KYLE MCADAMS Date Prepared: 6-27-00 Date Completed: 6-30-02 Project Title: PARKS & GREENHOUSE Project Type: BUILDING Sub -Type: NEW CONSTRUCTION Project No.: SS0113 Priority: A COUNCIL AUTHORIZATION: October 24, 2000 - Authorized contract with Byron Folse Associates, Inc. for architectural services. January 9, 2001 - Approved Resolution #01-1087 declaring intent to reimburse expenditures. February 27, 2001 - Authorized publication of notice of intent to issue certificates of obligation. April 10, 2001 - Approved masonry exception No. 01-04 to Parks Maintenance Building. April 10, 2001 - Approved Ord. 1467 authorizing issuance of Certficates of Obligation, Series 2001. April 10, 2001 - Approved site plan for a Parks Maintenance Building. June 12, 2001 - Awarded bid #046-01 for construction to T.W. Foster in the amount of $1,325,445.72. November, 2002 - Former park building demolished and site cleared. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The Parks and Greenhouse Department is the second project of the master plan. Constructior began in May 2001 and was substantially complete in June 2002 PROJECT DESCRIPTION: Two new buildings and site improvements were constructed to accommodate the Parks Department and the Greenhouse. The buildings are located on South Pipeline adjacent to the existing Golf Course Management Building. JUSTIFICATION: Relocating the Parks/Greenhouse Department to a new facility from Midway Drive and Pauline Drive to meet the expanding needs of the department. 521 PROJECT TITLE: PARKS & GREENHOUSE PROJECT #: SS0113 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Planning, Design & Construction 1,325,446 Part Time Special Services 155,419 Total Salary $0 Issuance Cost 11,418 Purchase of Services Materials & Supplies 14,964 Utilities 4,800 Total Estimated Capital Cost $1,492,283 Subtotal: $19,764 FUNDING SOURCE: Maintenance Costs CO Bond Proceeds Machinery Maintenance 500 Interest Income Pest Control 700 Janitorial Services 5,736 Janitorial Supplies 900 Maintenance Costs 1,500 Subtotal: $9,336 Total Estimated Annual Cost 1,492,283 102 $29,100 Total Funding $1,492,385 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Construction 1,314,737 1,326,216 11,479 101 Special Services 155,419 143,442 (11,977) 92% Issuance Cost 11,418 11,418 0 100°/0 Contingency 10,811 10,781 (30) 100°/a Remaining funds transferred to Car Rental CIP Fund Balance. TOTAL PROJECT $1,492,385 $1,491,857 ($528) 100% 522 cX 141 eJS/S) "Wtachiqf a/ 6,of/te‘v tomwivw4/1)1"