HomeMy WebLinkAboutFY 2022 Capital Improvements ProgramCity ofEu(ess Capitafimprovements Program Fiscal wear Ending September 30, 2002 EuCess, Teas About the cover... . The J-fimes Log Cabin, constructed in the 1850's by Andrew Jackson Nimes, was donated to the City by his descendent, Shirley Nimes. The cabin was restored to its original state by Bill Marquis, who is known throughout the State of Texas for the quality of his restoration work, The cabin is now located in the City's Heritage Park along with the first brickhouse built in the City of Euless, as we strive to preserve the past while preparing for the future. Capital Improvements Program Fiscal Year Ending September 30, 2002 City of Euless, Texas 201 N. Ector Drive Euless, TX 76039 CITY OFFICIALS MARY LIB SALEH, MAYOR CARL TYSON, COUNCIL MEMBER PLACE ONE AND MAYOR PRO TEM LEON HOGG, COUNCIL MEMBER PLACE TWO BOB EDWARDS, COUNCIL MEMBER PLACE THREE CHARLES MILLER, COUNCIL MEMBER PLACE FOUR GLENN PORTERFIELD, COUNCIL MEMBER PLACE FIVE VEVA LOU MASSEY, COUNCIL MEMBER PLACE SIX Gary McKamie Deputy City Manager JOE HENNIG, CITY MANAGER Loretta Getchell, CPA Director of Fiscal & Administrative Services TABLE OF CONTENTS CAPITAL IMPROVEMENTS PROGRAM City Officials Table of Contents Letter FUNDED PROJECTS Budget Summary 1 Anticipated Funding Sources 3 Drainage Projects Summary of Funded Drainage Projects 4 DR9903 Misc. Drainage Improvements 5 DR9904 Hurricane Creek 7 Streets Proiects Summary of Funded Street Projects 9 PS9901 North Main Street 10 PS9902 Mid Cities Blvd 12 PS9903 Highway 183 Service Road 14 PS9904 Harwood Road — N. Main to SH 360 16 PS9905 Traffic Studies 18 PS9906 Traffic Safety 20 PS9908 Signalization 22 PS9909 FM 157 North, SH 183 to SH 121 (Landscaping & Lighting) 24 PS9910 Sidewalk Projects 26 PS9912 Harwood -Main Intersection 28 PS0001 FM157-S Pipeline to SH 10 (Utility Relocation) 30 PS0002 West Pipeline — Raider/Hwy 10 32 PS0003 Glade Road — Heritage to SH 121 34 PS0004 Glade Road (East) — SH 121 to Champagne 36 Wastewater Proiects Summary of Funded Wastewater Projects 38 WW0001 CDBG B99-UC-48-0001 39 WW0002 Misc. Sewer Rehab 41 WW0003 TRA Debt Payments 43 WW0101 FY2001 CDBG 45 WW0102 Manhole Rehab Program 47 WW0103 South Pipeline, Heather to Vine 49 Water Projects Summary of Funded Water Projects 51 WT9902 Water Tank Painting 52 WT9908 Mid Cities 12" Line 54 WT9909 2 MG Water Tank 56 FUNDED PROJECTS, CONTINUED Water Projects, Continued WT9910 Lines for Elevated Tank 58 WT0001 Utility Rehab — Water Program 60 WT0003 Water Line Replacement — Aransas 62 WT0005 Line Replacement — Milam - Denton/Midway 64 WT0103 Fire Hydrant Replacement Program 66 Other Projects Summary of Other Funded Projects 68 AC9901 Athletic Complex, Phase II 69 DV9901 Euless Development Corporation Incentive Funds 71 ED0101 Villages Master Plan 73 ED0102 Bell Ranch Terrace 75 PD9901 Police and Municipal Court Facility 77 PR9901 Hike and Bike Trail 79 PR9902 Senior Citizens Remodel 81 PR9903 - PR9918 Various EDC Park Projects 83 PR9922 Tejas Remodel 85 PR9927 Park Improvements — Texas Star 87 PR0016 Wilshire Park Improvements 89 PR0110 Slope Protection/Screening Wall 91 SS0010 Fire Station #2 93 SS0113 Parks and Greenhouse 95 UNFUNDED PROJECTS Summary of Unfunded Projects - Sorted by Type 97 - 101 Drainage Projects Summary of Unfunded Drainage Projects 102 Bear Creek Park 103 Bell Hi Addition 105 Blessing Branch, Main to SH 360 107 Bob Eden Park 109 Boyd Branch 111 Boyd Branch (FEMA) 113 Denton Drive at Midway Park 115 Diversion Line — Oak Lane 117 Hurricane Creek at Airport Business Park 119 Hurricane Creek, Bridge at Marlene 121 Hurricane Creek, North of SH 10 123 Kynette Drive Culvert Modifications 125 Oak Lane Channel 127 Priest Drive Culvert at Woodbury Forest 129 Royal Oaks Addition 131 Trailwood Addition (Summit Ridge) 133 UNFUNDED PROJECTS, CONTINUED Street Projects Summary of Unfunded Street Projects 135 Gateway Boulevard — Southern Portion 136 Fuller Wiser Connector 138 Town Crossing Bridge 140 Glade Road Right of Way Acquisition 142 West Pipeline Road Gas Pipeline Relocation 144 Raider Drive — SH 10 to South Pipeline Road 146 West Pipeline — Raider to City Limits 148 Ash Lane — Aransas to N. Main 150 Baze Road — Glade to Mid Cities 152 Gateway Boulevard — Northern Portion 154 Harwood Road — Main to FM 157 156 Heather and S. Pipeline 158 Highway Ingress — Egress 160 Hwy 10 Sidewalks and Lighting 162 South Ector Drive 164 South Main — SH 10 to Pipeline 166 Vine Street — SH 183 to SH 10 168 Wastewater Projects Summary of Unfunded Wastewater Projects 170 FY2002 CDBG Program 172 Line Replacement — Dunaway 174 Line Replacement — E. Alexander 176 Line Replacement — Paula Lane 178 Manhole Rehab Program 180 Midway Park Mains 182 FY2003 CDBG 184 FY2004 CDBG 186 FY2005 CDBG 188 FY2006 CDBG 190 Line Replacement — Canyon Ridge 192 Line Replacement — Ector Drive 194 Line Replacement — Fayette Drive 196 Line Replacement — Martin Lane 198 Line Replacement — McCormick 200 Line Replacement — Sagebrush 202 Line Replacement — Short Street 204 Little Bear Creek Collection Line 206 FY2007 CDBG 208 Line Replacement — E. Fuller 210 Line Replacement — Jean Lane 212 Line Replacement — Koen 214 Line Replacement — Pebble Creek 216 UNFUNDED PROJECTS, CONTINUED Wastewater Projects, Continued Line Replacement — Ridgecrest 218 Line Replacement — S. Sheppard 220 Line Replacement — W. Fuller 222 Line Replacement — Windward Way 224 Line Replacement — Woodridge 226 SH 183 — Utility Relocation 228 Water Projects Summary of Unfunded Water Projects 230 Disinfection Modification 231 Effluent Water Main 233 SH 360 Water Crossing 235 Rehab Central Dr. Water Storage Tank 237 Rehab/Rebuild Fuller Dr. Ground Storage Tank 239 W. Pipeline Water Main Replacement 241 SH 183 Water Crossing 243 Other Projects Summary of Other Unfunded Projects 245 Building D Remodel 246 Midway Recreation Center Upgrade 248 Aquatic Center / Recreation Center Expansion 250 Building A Remodel 252 Building B Remodel 254 City -Wide Trail Enhancements 256 Fire Station #3 Reconstruction 258 Parks at Texas Star, Phase III 260 Public Works Facility 262 Community Golf Course at Bob Eden 264 Convert & Expand Ruth Millican 266 Expansion & Upgrade of Bob Eden Park 268 Fire Training Facility 270 Library Build -Out 272 Parks at Texas Star, Phase IV 274 Redevelopment of Westpark 276 SH 10 Land Acquisition 278 Softball World 280 Texas Star Conference Centre, Phase II 282 COMPLETED PROJECTS Summary of Completed Projects - Sorted by Type 284 Drainage Projects Summary of Completed Drainage Projects 285 DR9901 Sulphur Branch — Phase II 286 DR9902 Windlea & Westcliff 288 COMPLETED PROJECTS, CONTINUED Street Projects Summary of Completed Street Projects 290 PS9907 Westpark — SH10 to SH183 291 PS9911 Overlay Projects 293 Wastewater Proiects Summary of Completed Wastewater Projects 295 WW9901 CDBG B/98-UC-48-0001/B95-22-50 296 WW9902 WW Impact Fee Study 298 WW9903 Misc. Sewer Rehab FY99 300 WW9904 Hydraulic Analysis 302 Water Proiects Summary of Completed Water Projects 304 WT9901 Meter Change Out 305 WT9903 Master Plan 307 WT9904 Well Repair 309 WT9905 FY99 Misc. Water Rehab 311 WT9906 Hwy 10 Water Line 313 WT9907 Impact Fee Study 315 WT9911 Water Dist. — Master Plan 317 WT0002 Emergency Repair — Hwy 10 319 WT0004 Line Replacement — Milam - Ector/Midway 321 WT0006 Central Drive Water Mains 323 WT0102 SCADA Upgrade 325 Other Projects Summary of Completed Other Projects 327 PR0015 Purchase Stars Center 328 SS9901 Fire Station II — 1515 Westpark Way 330 SS9902 Library Books 332 SS9919 Fire Station #3 — Structural/Cosmetic Repairs 334 THE CITY OF EULESS June 20, 2001 Honorable Mayor Mary Lib Saleh City Council: Carl Tyson, Place One & Mayor Pro Tem Leon Hogg, Place Two Bob Edwards, Place Three Charles Miller, Place Four Glenn Porterfield, Place Five Veva Lou Massey, Place Six INTRODUCTION The City of Euless Capital Improvements Program is a comprehensive document detailing all projects that have been identified to date. Emphasis has been placed on organizing this data in a manner that will facilitate decision making processes, assist in long range planning and provide the citizens of Euless with information regarding planned projects. This document meets the requirements of the City Charter. Article VII, Section 2 (4) requires " A statement proposing any capital expenditures deemed necessary for undertaking during the next budget year and recommended provisions for financing". Section 2 (5) further requires "A list of capital projects which should be undertaken within the five (5) next succeeding years". We extend special appreciation to the directors and the finance staff for their outstanding performance in creating this document. UNDERSTANDING THIS BOOK Although this book contains a large volume of information, the summaries should make it easy to understand at a glance. The book is divided into three sections: Funded Projects, Unfunded Projects, and Completed Projects. Each section begins with a summary and is followed by detailed data for those wishing to research individual projects. The detail provided includes the project's relationship to City master plans, the project description and justification, the effect on future maintenance and operating costs, and the estimated total cost. Within each section, you will find the detailed descriptions sorted by type. There are five basic project types: Drainage, Streets, Water, Wastewater, and Other. Funded projects indicate any City Council authorization and the current status of the project. The current status section recaps all financial information currently reflected on the City's financial reports. Thus, budget amounts in this section only reflect actual dollars available. No budget amounts are added to line items until funding is received. As funds become available, they will be allocated to the appropriate budget line items based on the total estimated cost. 201 N. Ector Drive, Euless, Texas 76039-3595 817/685-1400 • Metro 817/267-4403 • Fax 817/685-1416 www.ci.euless.tx.us Projects have been classified as funded if any portion of the funding is available. For those projects that are not fully funded, clear explanations have been provided as to how the remainder of the projects is expected to be funded. The Unfunded Projects section has been classified into three categories of priority. Priority A indicates that the staff anticipates presenting this project to the Council for action during the upcoming budget year. Priority B projects should be presented to Council within two to five years. Projects that will not begin for at least five years have been given a Priority C. This system has been used to allow the Council to evaluate and shift priorities, when necessary, and to provide a means of budgeting capital projects for at least five years. Recommended funding sources have been indicated if known. The Completed Projects section rovides a summary indicating total project budget, actual expenditure, and variance. Funds remaining have been returned to the appropriate fund balance account for reappropriation. A detail of each project has also been provided. FY2002 PROPOSED PROJECTS Funding sources have been recommended for all projects that will be presented to the Council during the upcoming budget year. These are listed on the Unfunded Projects Summary as Priority A. These include: • Gateway Boulevard — Southern Portion • CDBG 2002 • Line Replacements @ Dunaway, E. Alexander, Paula Lane, Midway Park • Manhole Rehabilitation Program • Disinfection Modification/Well Rehabilitation • Effluent Water Main • Building D Remodel • Midway Recreation Center Upgrade The City also has approximately $5.9 million of funding pending for existing projects. This includes $3.2 million of general obligation bonds for Pipeline Road. This also includes anticipated reimbursement due on Pipeline Road. CLOSING COMMENTS Staff is presenting this book for the Council to review and comment. We understand that this document is a work in progress and requires regular updates. We hope this document will serve as a great tool to aid in your future decisions. Funded Proj ects Project Number Project Description DRAINAGE PROJECTS 0R9903 Misc Drainage Improvements DR9904 Humcane Creek Sub -Total Drainaoe Protects STREET PROJECTS PS9901 North Main Street PS9902 Mid Cities Blvd PS9903 Hwy 183 Service Road PS9904 Harwood Road PS9905 Traffic Studies PS9906 Traffic Safety PS9908 S)gntilization F6A157 North. SH183 to SH121 PS9909 (Landscaping & Lighting) PS9910 Sidewalk Projects PS9912 Harwood - Main Street Intersection PS0001 FM157 - 5 Pipeline-SH 10 (UN Retc) PS0002 West Pipeline - Raider/Hwy 10 P50003 Glade • HentagelSH 121 P50004 Glade-SH 121/Champagne Sub -Total Street Protects WASTEWATER PROJECTS WW0001 WW0002 WW0003 WW0101 WW0102 WW0103 COBG B99-UC•48-0001 Misc Sewer Rehab TRA Debt Payments FY 2001 COBG Manhole Rehab. Program S. Pipeline. Heather to Vine Sub -Total Wastewater Protects WATER PROJECTS WT9902 Water Tank Painting WT9908 Mid Cities 12" Line WT9909 2MG Water Tank W79910 Water Line for Elevated Tank WT0001 Utility Rehab - Water Program WT0003 Water Line Replacement, Aransas WT0005 Water Line Milam - Denton/Midway WT0103 Fire Hydrant Replacement Program OTHER AC9901 DV9901 Sub -Total Water Projects Athletic Comptex Phase fl (4) EDC Incentive Funds Street Fund S7.413.732 S500,000 S152,825 55,462.162 527,198 S128,027 S167.285 $239,8 S200.0 $1,126,9 $322,0: S182,3: 51.421.4! 51.573,3! $18.917.2 Water 8, Drainage Sewer CIP Fund Fund S51.609 S257,500 S309,109 CAPITAL IMPHUvtM1,KI I s f;ti'OGRXM FUNDED PROJECTS SUMMARY BUDGET AMOUNT AS OF Mav 31, 2001 ayurces Impact Fee Fund Half Cent Sales Tax Police Facility General Escrow Fund CIP Fund CIP Fund Funds $430,000 L S17.276 S60,650 S602.230 20 00 35 37 36 34 I S497.019 S 138.750 34 S98.368 (5 5430,000 $1,414,293 5150.000 $87,013 S822,037 S457,000 S150,000 S500,000 51,344.013 S822.037 S200.000 - _ _ S311,692 S2,295,496 S90.000 S1,037,187 S515,300 5206.251 512.057 S19,311 550.000 53.820,302 _ S916,992 1 S119,230 S19,994 Unfunded/ Funding Pending S1.000.000 S45.132 54.611.395 (31 55.656.527 S65,000 S200.000 S265,000 Other Funding Protect Cost 55.053 S20.146 n) 516.919 (2) S51.609 S257.500 $309,109 S7.866.061 51.580.796 S197.957 56.081.311 S27.198 S128.027 S167.285 5239.820 5200.000 S1,126.935 $322.037 S5.290.750 S1.560,244 51.671.762 842,118 1 526,460,183 5150.000 5152.013 S822.037 S457.000 $350.000 S500.000 S2.431.050 $200,000 $311,692 52.385.496 51.552,487 $206,251 S12.057 519.311 $50.000 54,737.294 S119.230 $19.994 Project Number Protect Description ED0101 Villages Master Pan ED0102 Bell Ranch Terrace PD9901 Police and Municipal Courts Facility PR9901 Hike and Bike Trail PR9902 Senior Citizens Remodel PR9903- various EDC Park Projects PR9918 PR9922 Teias Buildlnn RPmnrlel PR9927 Park improvement-TPxas Star PR0016 Wi(hire Park Imnrnvempntc PR0110 Slrthe Pmterenn/Srrppninn Wail SS0010 Fire Statinn 1,9 Street Fund CAPITAL IMPROVEMENTS PROGRAM FUNDED PROJECTS SUMMARY BUDGET AMOUNT AS OF Mav 31. 2001 >ources Water & Half Cent Drainage Sewer CIP Impact Fee Sales Tax Police Facility General Escrow Fund Fund Fund Fund CIP Fund CIP Fund Funds S11.789.614 5237.714 516,130 5269.566 SS011a Park nwldinn drh-Tnnl ether. Pnyxts Tr1T41l F'f IIVr1Fr1 ORr i 1Ff.Te 51 A 917 245 S150.000 51.036.500 S150.000 5599,600 52.598,734 511.789,614 9309.1(9 S5,164.315 51.739.029 53.028,734 Unfunded/ Funding Pending 911,789.614 SO S1,414,293 1 55.921,527 (1I - General Fund (2) - Water & Sewer Fund (2) - 53,200,000 from Bond Sale, 5497,019 from Escrow, & 1,411,395 from other sources. (4) - The scope and total cost of this project is yet to be determined This represents funding that has been provided to date from the Half Cent Operating Fund. (5) - 450.000 from DEA Task Force Is) - Water & Sewer Operating Fund FY 2001 Budget - 5280,000 Pending. (7) - Loan from Car Rentals to Golf Course CIP. (e) - Bond sale to be repaid from Car Rental Fund. Other Funding S100.000 5200.000 5a50,000 PmiiSt Cost (8)I 5100.000 Ohl 5200.000 (5) 512.239.614 S237.714 516.130 5269.566 5280,000 (6) 5430,000 51.036,500 5150.000 51.250.000 (7) S1,250.000 S599.600 51.492.283 (e) 51.492,283 53.772,283 518.160.631 53,814,401 552,098.267 Project Number Project Description STREET PROJECTS PS9902 PS9903 PS0002 Mid Cities Blvd. Partially Unfunded Projects Anticipated Funding Sources Unfunded Portion Operating Fund Funds Balance $1,000,000 PROPOSED METHOD OF FINANCING General Obligation Bond Sale Certificates of Revenue Bond Other Obligation Sale Funding Sources Hwy 183 Service Road $45,132 West Pipeline -Raider to Hwy 10 $4,611,395 Sub -Total Street Projects WASTEWATER PROJECTS WW0002 Misc Sewer Rehabiliation WW0102 Manhole Rehabiliation Sub -Total Street Projects TOTAL $3,200,000 $5,656,527 $0 $0 $3,200,000 $65,000 $200,000 $65,000 $200,000 $1,000,000 (2) $1,908.414 (1) $0 $0 $2,908,414 $265,000 $5,921,527 $265,000 $0 $0 $0 $0 (1) $497,019 anticipated escrow & $1,411,395 from other sources. (2) Car Rental Fund $265,000 $0 $3,200,000 $0 $0 $0 $2,908,414 To Be Determined $45.132 $45.132 $0 $45,132 Fi iiided Drainage Pioj (CtS i Project Number Project Description DRAINAGE PROJECTS DR9903 Misc Drainage imorovements DR9904 Humcane Creek Sub -Total Drainaoe Projects Street Fund CAPITAL IMPROVEMENTS PROGRAM FUNDED PROJECTS SUMMARY BUDGET AMOUNT AS OF Mav 31. 2001 purces Police Facility General Escrow Funding CI P Fund Fund Fund Fund CIP Fund Funds Pending S51.609 S257.500 S309,109 Other Funding Project Cost S51,609 5257.500 S309.109 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: MISC DRAINAGE IMPROVEMENTS PROGRAM Project Type: DRAINAGE Sub -Type: Project No.: DR9903 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Date Prepared: 7-23-99 Date Completed: This project includes funds for various small projects that are identified throughout the year. Often correction of these problems requires design services and the installation of improvements. Large projects that occur will be tracked separately and assigned a different project number. JUSTIFICATION: Failure to correct these problems can often cause damage to existing infrastructure, 5 PROJECT TITLE: MISC DRAINAGE IMPROVEMENTS PROGRAM PROJECT #: DR9903 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Di ct Operatingost Fence Personnel: Full Time Storm Sewers Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs Subtotal: $0 Total Estimated Annual Cost 559 51,050 $0 Total Estimated Capital Cost $51,609 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Fence 559 559 0 100%. Storm Sewers 50,855 10,605 (40,250) 21 % Meters & Setting 195 195 0 100% * - This project provided an inter -project transfer of $5,904 to DR9901. TOTAL PROJECT $51,609 $11,359 ($40,250) 22% 6 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: HURRICANE CREEK Project Type: DRAINAGE Sub -Type: Project No.: DR9904 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-22-99 Date Completed: The Unified Development Code (Article 12) permits developers to request reimbursement for a portion of oversized drainage improvements. PROJECT DESCRIPTION: The Hurricane Creek project involves reimbursement for oversized drainage improvements along a tributary of Hurricane Creek south of SH 183. JUSTIFICATION: A significant watershed drains from SH 183 to the south city limit line. Oversized drainage improvements are required to meet the public improvement requirements established for development. Should it be determined that these funds are not required, they can be reallocated. 7 PROJECT TITLE: HURRICANE CREEK PROJECT #: DR9904 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Qperatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Cow Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Storm Sewers Storm Sewers 257,500 $0 Total Estimated Capital Cost $257,500 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 257,500 69,906 (187,594) 27% TOTAL PROJECT $257,500 $69,906 ($187,594) 27% 8 i i Funded Streef Pio,j (lc ' I J 1 i Project Number Project Description Street Fund STREET PROJECTS PS9901 North Main Street 57,413.732 PS9902 Mid Cities Blvd- 5500.000 PS9903 Hwy 183 Service Road 5152.825 PS9904 Harwood Road 55,462.162 PS9905 Traffic Studies 527,198 PS9906 Traffic Safety 5128,027 PS9908 Signil¢ation 5167.285 FM157 North. SH183 to SH121 PS9909 (Landscaping & Lighting) 5239,820 PS9910 Sidewalk Projects 5200.000 PS9912 Harwood - Main Street Intersection 51,126,935 PS0001 FM157 - S Pipeline-SH10 (Utl Relc) 5322,037 PS0002 West Pipeline - Raider/Hwy 10 5182.336 PS0003 Glade - Heritage/SH 121 51.421,494 PS0004 Glade - SH 121/Champagne 51.573.394 Sub -Total Street Proiects 518.917,245 Drainage Fund Water & Sewer CIP Fund CHNYI'AL IMPROVEMENTS PROGRAM FUNDED PROJECTS SUMMARY BUDGET AMOUNT AS OF Mav 31. 2001 ,ources Half Cent Unfunded/ Impact Fee Sales Tax Police Facility General Escrow Funding Other Fund Fund CIP Fund CIP Fund Funds Pending Funding 5430,000 517.276 55.053 560,650 S1,000,000 520,146 (+) 545.132 5602.230 516.919 (2) 5497,019 5138,750 598.368 5430,000 51,414,293 54,611,395 (3) 55.656,527 542.118 Project Cost 57,866.061 51.580.796 5197,957 56.081.311 527.198 5128.027 5167.285 5239.820 5200,000 51.126.935 5322.037 55.290.750 51.560.244 51.671.762 526.460.183 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: NORTH MAIN STREET Project Type: STREET Project No.: PS9901 COUNCIL AUTHORIZATION: Date Prepared: 5-24-99 Date Completed: Sub -Type: CONSTRUCTION Priority: A April 14, 1998 - Authorized bond election for the purpose of funding construction. November 24, 1998 - Approved contract with Cummings & Prewitt, Inc. for paving and drainage design. February 8, 2000 - Authorized the acquisition of r-o-w to allow for widening and paving improvements. .August 22, 2000 - Ratified the expenditure of $30,000 of EDC funds for r-o-w acquisition along Main St. .August 22, 2000 - Ratified EDC Resolution 11-00 authorizing a project involving facility improvements ;along North Main Street. November 14, 2000 - Authorized Resolution #00-1083 declaring public necessity for acquisition of row. ebruary 27, 2001 - Authorized publication of notice of intent to issue certificates of obligation. April 9, 2001 - Approved Ord. 1467 authorizing issuance of Certificates of Obligation, Series 2001. April 9, 2001 - Approved Ord. 1468 authorizing issuance of General Obligation Bonds, Series 2001 in the amount of $6,000,000 RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project is a part of the $13.5 million bond package approved by the voters in October 1998. PROJECT DESCRIPTION: The project consists of reconstruction and widening of North Main Street from SH10 to Harwood Road. The project also consists of relocating overhead utilities to underground, the addition of a subsurface drainage system, and the addition of street lights and landscaping improvements. JUSTIFICATION: 1. Improvement of traffic flow and traffic safety. 2. Improve aesthetics with relocation of overhead utilities and addition of landscaping. 3. Subsurface drainage system needed. 4. Reduction of maintenance requirements. 10 PROJECT TITLE: NORTH MAIN STREET PROJECT #: PS9901 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Coj Subtotal: Other Average Annual Debt Service Total Estimated Annual Cost PHASE/FUNDING SOURCE Engineering Right of Way Utility Relocation (City) Appraisal Services Surveying Services Other Professional Services Special Services Landscaping Signs & Markings Construction Lighting Sewer Main Issuance Cost TOTAL ESTIMATED CAPITAL COST: *Engineering Right of Way Utility Relocation (City) $0 Appraisal Services Street Lights Landscaping Construction Signs & Markings Midway Sewer Rehab $0 Issuance Cost 641,500 1,550,000 722,200 60,000 125,000 350,000 3,822,000 430,000 100,000 65,361 * Added $70,000 for work related to medians. $0 $412,567 $412,567 Total Estimated Capital Cost CURRENT STATUS BUDGET 641,500 1,478,851 722,200 101,495 5,170 2,155 5,053 350,000 430,000 3,839,276 125,000 100,000 65,361 TOTAL PROJECT $7,866,061 EXPENDED 556,033 1,196,676 0 101,495 5,170 2,155 5,053 0 18,889 0 0 0 62,261 $1,947,732 OVER/UNDER BUDGET (- +) (85,467) (282,175) (722,200) 0 0 0 0 (350,000) (411,111) (3,839,276) (125,000) (100,000) (3,100) $7,866,061 % EXPENDED 87% 81% 0% 100% 100% 100% 100% 0% 4% 0% 0% 0% 95% ($5,918,329) 25% 11 Department: Submitted By: Project Title: Project Type: Project No.: City of Euless Capital Project Request PUBLIC WORKS RANDY BYERS MID CITIES BLVD. STREET PS9902 COUNCIL AUTHORIZATION: Date Prepared: 7-17-99 Date Completed: Sub -Type: CONSTRUCTION Priority: A November 10, 1998 - Authorized right-of-way acquisition. November 28, 2000 - Authorized $17,254 for Citgo utility relocation/protection on an 8" Citgo Pipeline that crosses Mid Cities Boulevard. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The City's 1999 Master Thoroughfare Plan calls for this roadway to be a six -lane boulevard section. This project was approved a number of years ago as a 100% federally funded construction project through Texas Department of Transportation (TxDOT). TxDOT has bid the project and it is currently under construction. PROJECT DESCRIPTION: Project consists of reconstruction of Mid -Cities Blvd. from Hwy 121 to Hwy 360 by Texas Department of Transportation (TxDOT). The City of Euless is required to purchase the right-of-way required for the TxDOT construction project. The City also proposes to add certain amenities to enhance the aesthetics along the corridor. Another related project is the installation of a new 12-inch water main. (Project # WT9908) This project is .3urrently under construction. JUSTIFICATION: 1. Frequent flooding which often necessitates closing of this section of the street. 2. Street and roadbed have deteriorated to the point that frequent repairs are required. 3. The street does not adequately convey the existing and future traffic volumes. 12 PROJECT TITLE: MID CITIES BLVD. PROJECT #: PS9902 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct ODeratina Co.t Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: (Maintenance Costs Subtotal: 'Total Estimated Annual Cost PHASE/FUNDING SOURCE Appraisal Services Engineering Services Legal Services Right of Way Overlay Contingency Subtotal: Funding Pending To be determined TOTAL ESTIMATED CAPITAL COST: Right of Way $0 Appraisal Services Legal Services Engineering Services Overlay $0 $0 1,461,834 52,700 42,838 23,345 79 $0 Total Estimated Capital Cost $1,580,796 CURRENT STATUS BUDGET 52,700 26,545 61,020 440,452 79 0 EXPENDED 23,870 44,287 154,409 501,629 79 17,254 580,796 $741,528 1,000,000 TOTAL PROJECT (Funded) $ 1,580,796 OVER/UNDER BUDGET (-+) (28,830) 17,742 93,389 61,177 0 17,254 % EXPENDED 45% 167% 253% 114% 100% 0% $160,732 128% 13 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Date Prepared: 7-26-99 Date Completed: Project Title: HWY 183 SERVICE ROAD Project Type: STREET Sub -Type: CONSTRUCTION Project No.: PS9903 Priority: A COUNCIL AUTHORIZATION: September 8, 1998 - Approved as part of Certificates of Obligation, Series 1995, RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: This project consists of building a connection from the Hwy 183 frontage road east of Wendy's on Main Street, to the exit ramp of HWY 183 at North Main Street. This will bring the frontage road traffic to a signalized intersection. JUSTIFICATION: This would allow the traffic east of Wendy's to turn left (south) onto North Main Street. Currently no left turn is allowed from East Fuller to South Bound Main Street. Staff is currently reevaluating the need for this project. The reconstruction of Main Street and future widening of SH 183 may cause this project to be unwarranted. 14 PROJECT TITLE: HWY 183 SERVICE ROAD PROJECT #: PS9903 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: TOTAL ESTIMATED CAPITAL COST: Qic Qperatina Cost Construction 197,957 Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE $0 Total Estimated Capital Cost $197,957 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED Construction 152,825 0 (152,825) 0% TOTAL PROJECT (Funded): 152,825 0 (152,825) 0% Etindin Nadi To Be Determined 45,132 * - This project provided an inter -project transfer of $45,132 to PS0004. TOTAL PROJECT $197,957 15 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Date Prepared: 7-29-99 Date Completed: Project Title: HARWOOD ROAD, N. MAIN TO 360 Project Type: STREET Sub -Type: CONSTRUCTION Project No.: PS9904 Priority: A COUNCIL AUTHORIZATION: April 14, 1998 - Authorized bond election for the purpose of funding construction. November 24, 1998 - Authorized contract for appraisal services for parcels necessary to project. May 24, 1999 - Approved resolution determining the necessity for and ordering the improvement. May 24, 1999 - Authorized the acquisition of the necessary right-of-way. .June 22, 1999 - Approved right-of-way acquisition. December 14, 1999 - Authorized City Manager to negotiate for and acquire additional right-of-ways. February 8, 2000 - Awarded construction contract to Larry H. Jackson Construction March 28, 2000 - Authorized issuance of G.O. bonds for Harwood, Main, and West Pipeline. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project is part of the $13.5 million bond program approved by the voters in October 1998. Project identified in the 1999 Master Thoroughfare Plan. PROJECT DESCRIPTION: Reconstruction of Harwood Road from a point approximately 350 feet west of N. Main Street to SH 360. New roadway will be a six -lane boulevard with sidewalks, landscaping and lighting. Signals will be added at Fuller - Wiser and Bear Creek Parkway. JUSTIFICATION: Existing roadway (two-lane) does not meet existing and future needs. 16 PROJECT TITLE: HARWOOD ROAD, N. MAIN TO 360 PROJECT #: PS9904 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating C 1 Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance COBiS Other Average Annual Debt Service Subtotal: Total Estimated Annual Cost PHASE/FUNDING SOURCE Engineering Construction Right of Way Appraisal Services Issuance Cost Contingencies Other Professional Services TOTAL ESTIMATED CAPITAL COST: Appraisal Services Acquisition Agent $0 Acquisition Engineering Construction Misc Issuance Cost $0 465,722 $465,722 $465,722 Total Estimated Capital Cost CURRENT STATUS BUDGET 413,000 4,342,497 879,010 54,250 371,677 550 20,327 EXPENDED 400,010 1,007,281 748,611 53,750 70,000 1,668 6,664 OVER/UNDER BUDGET (- +) (12,990) (3,335,216) (130,399) (500) (301,677) 1,118 (13,663) 54,250 20,150 879,010 413,000 4,342,497 727 371,677 $6,081,311 % EXPENDED 97% 23% 85% 99% 19% 303% 33% TOTAL PROJECT $6,081,311 $2,287,984 ($3,793,327) 38% 17 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Date Prepared: 7-17-99 Date Completed: Project Title: TRAFFIC STUDIES Project Type: STREET Sub -Type: STUDY Project No.: PS9905 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: These funds are utilized with projects PS9906 (Traffic Safety) and PS 9908 (Signalization) to address traffic needs throughout the City. PROJECT DESCRIPTION: Staff utilizes these funds to investigate concerns related to traffic movements and volumes. JUSTIFICATION: Traffic patterns and volumes change causing problems on our streets. Funds are needed to compensate consultants for professional services rendered in the investigation work. 18 PROJECT TITLE: TRAFFIC STUDIES PROJECT #: PS9905 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: DirestOperating GQ 1 Engineering 26,352 Personnel: Full Time Other Professional Services 76 Part Time Traffic Signals 770 Total Salary $0 Purchase of Services Materials & Supplies Utilities :Subtotal: $0 Maintenance Costa Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $27,198 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Engineering Services 26,352 1,081 (25,271) 4% Other Professional Services 76 76 0 100% Traffic Signals 770 770 0 100% * - This project received a transfer of $20,000 from Fund 501-Water & Sewer TOTAL PROJECT $27,198 $1,927 ($25,271) 7% 19 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: 7-15-99 Submitted By: RANDY BYERS Date Completed: Project Title: TRAFFIC SAFETY Project Type: STREETS Sub -Type: STUDY Project No.: PS9906 Priority: A COUNCIL AUTHORIZATION: February 24, 1998 - Approved as part of Certificates of Obligation, Series 1998. May 22, 2001 - Authorized construction of a temporary right turn lane on southbound N. Main Street @ SH183 Service Road. Construction to be performed by City Forces. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: These funds are utilized with projects PS9905 (Traffic Studies) and PS9908 (Signalization) to address traffic needs throughout the City. PROJECT DESCRIPTION: Staff utilizes these funds to investigate traffic safety concerns. Maintenance activities are paid from the facilities operating budget. JUSTIFICATION: Traffic patterns and volumes change, causing safety problems on our streets. Funds are needed to compensate consultants for professional services rendered in the investigation work. 20 PROJECT TITLE: TRAFFIC SAFETY PROJECT #: PS9906 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PHASE/FUNDING SOURCE Professional Services Equipment Rental Signalization Systems Traffic Signals TOTAL ESTIMATED CAPITAL COST: Professional Services Equipment Rental Signalization Systems $0 Traffic Signals $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS BUDGET 5,000 1,000 9,780 112,247 EXPENDED 4,128 1,000 19,223 31,751 OVER/UNDER BUDGET (- +) (872) 0 9,443 (80,496) 5,000 1,000 9,780 112,247 $128,027 % EXPENDED 83% 100% 197% 28% TOTAL PROJECT $128,027 $56,102 ($71,925) 44% 21 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: SIGNALIZATION Project Type: STREET Project No.: PS9908 COUNCIL AUTHORIZATION: Date Prepared: 7-22-99 Date Completed: Sub -Type: SIGNALIZATION Priority: A February 24, 1998 - Approved as part of Tax and Waterworks and Sewer System Revenue Certificates of Obligation, Series 1998. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: These funds are utilized with Projects PS9905 (Traffic Studies) and PS9906 (Traffic Safety) to address traffic needs throughout the City. PROJECT DESCRIPTION: 1. Replace or upgrade controllers. 2. Upgrade signals. 3. Install Opticom. JUSTIFICATION: Signal improvements are often needed to improve traffic safety and vehicular movements through intersections. 22 PROJECT TITLE: SIGNALIZATION PROJECT #: PS9908 i I NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: DifectOparating_Cost Signal System Personnel: Full Time Traffic Signals Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs Subtotal: Total Estimated Annual Cost so 20,000 147,285 $0 Total Estimated Capital Cost $167,285 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Signal Systems 20,000 17,179 (2,821) 86% Traffic Signals 147,285 19,774 (127,511) 13% TOTAL PROJECT $167,285 $36,953 ($130,332) 22% 23 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Date Prepared: 7-17-99 Date Completed: Project Title: FM157 NORTH, SH183 TO SH121 (Landscaping & Lighting) Project Type: STREET Sub -Type: CONSTRUCTION Project No.: PS9909 Priority: A COUNCIL AUTHORIZATION: (RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The Texas Department of Transportation (TxDOT) widened FM157 between SH183 and SH121 to a seven -lane (5+2) undivided roadway section. PROJECT DESCRIPTION: The addition of landscape and irrigation improvements and street lights along the new street. JUSTIFICATION: Improved visibility and enhanced aesthetics. 24 PROJECT TITLE: FM157, SH183 and SH121 PROJECT #: PS9909 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating_GQs1 Landscaping/Lighting 239,820 Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 •Subtotal: $0 Maintenance Costs •Subtotal: $0 'Total Estimated Annual Cost 'PHASE/FUNDING SOURCE ,Landscaping Escrow Available $66,916 (Expenses prior to FY99 not reflected) $0 Total Estimated Capital Cost $239,820 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 239,820 693 (239,128) 0% TOTAL PROJECT $239,820 $693 ($239,128) 0% 25 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: SIDEWALK PROJECTS Project Type: STREETS Project No.: PS9910 COUNCIL AUTHORIZATION: Date Prepared: 7-17-99 Date Completed: Sub -Type: SIDEWALKS Priority: A February 24, 1998 - Approved as part of Tax and Waterworks and Sewer System Revenue Certificates of Obligation, Series 1998. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Sidewalks and barrier -free ramps are needed throughout the City. The construction of sidewalks and barrier - free ramps has been an ongoing program for a number of years. PROJECT DESCRIPTION: This project includes funds to install new sidewalks and barrier free curb ramps throughout the City as well as improvement on municipal property. Although the City has identified areas that need sidewalks and barrier free curb ramps, federal guidelines require public hearings and other public input to prioritize construction. JUSTIFICATION: 1. Access and the accessibility of goods and services to pedestrians including those with disabilities is an important need in our city. 2. The federal government has established rules governing the implementation of a program to eliminate barriers within each city. 26 PROJECT TITLE: SIDEWALK PROJECTS PROJECT #: PS9910 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: D rectOperating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 •Subtotal: $0 .Maintenance Costa Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Sidewalks & Curbs Sidewalks & Curbs 200,000 $0 Total Estimated Capital Cost $200,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (-+) % EXPENDED 200,000 179,329 (20,671) 90% TOTAL PROJECT $200,000 $179,329 ($20,671) 90% 27 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Date Prepared: 7-17-99 Date Completed: Project Title: HARWOOD-MAIN INTERSECTION Project Type: STREETS Sub -Type: CONSTRUCTION Project No.: PS9912 Priority: A COUNCIL AUTHORIZATION: April 14, 1998 - Authorized bond election for the purpose of funding construction. April 13, 1999 - Bid No. 99-03 awarded for improvements at the North Main and Harwood intersection. (RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project is the overlap point on Harwood Road and North Main Street projects that were approved in the 1998 bond election. (PROJECT DESCRIPTION: • This project involves the relocation of City water and wastewater mains and the installation of storm drainage improvements to permit the relocation of franchise utility facilities in the intersection of North Main Street and Harwood Road. Reconstruction of the paved intersection will occur at the beginning of the Harwood Road project. JUSTIFICATION: The work included in this project must be complete before the franchise utility companies can perform the relocation of their facilities. 28 PROJECT TITLE: HARWOOD-MAIN INTERSECTION PROJECT #: PS9912 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Ooeratina Cos( Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Main1enanee Co Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Utility Installation TOTAL PROJECT TOTAL ESTIMATED CAPITAL COST: Utility Installation 1,126,935 $0 Total Estimated Capital Cost $1,126,935 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 1,126,935 1,077,303 (49,632) 96% $1,126,935 29 $1,077,303 ($49,632) 96% City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Date Prepared: 7-26-99 Date Completed: Project Title: FM 157-S PIPELINE TO SH10-(Utility Relocation) Project Type: STREETS Sub -Type: UTILITY RELOCATION Project No.: PS0001 Priority: A COUNCIL ACTION: May 24, 2000 - Approved -Resolution authorizing Tarrant County Commissioners to acquire r-o-w. February 8, 2000 - Authorized professional services contract for engineering design of water and sewer mains. April 11, 2000 - Authorize Mayor to execute a drainage easement in conjunction with this project. February 27, 2001 - Awarded contract to TGR Constructors Inc for $296,537 and provided for change orders not to exceed $29,654. February 27, 2001 - Authorized TRA debt payment of $171,537 from waste water impact fees to free operating funds for this project. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Project consists of widening FM 157 from Hwy 10 to South Pipeline. Road construction will be performed by TxDOT. The City's only responsibility will be the relocation of water and wastewater mains. The City may choose to provide funds for landscaping the medians as well. JUSTIFICATION: Utility relocation is required by TxDOT at the City's expense. 30 PROJECT TITLE: FM 157-S PIPELINE TO SH10-(Utility Relocation) PROJECT #: PS0001 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Engineering Services 25,500 Personnel: Full Time Utility Relocation 296,537 Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs. Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Engineering Services Relocation $0 Total Estimated Capital Cost $322,037 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 25,500 24,596 (904) 96% 296,537 164,429 (132,108) 55% TOTAL PROJECT $322,037 $189,025 ($133,012) 59% 31 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Date Prepared: 7-26-99 Date Completed: Project Title: WEST PIPELINE - RAIDER/HWY 10 Project Type: STREET Sub -Type: CONSTRUCTION Project No.: PS0002 Priority: A COUNCIL AUTHORIZATION: . anrii 14 1 qqg - Ai ithnri7eri hnnri elentinn_fnr_the pa -pose of funding construction. January 1, 2000 - Authorized the City Manager to execute an engineering contract for design. June 12, 2001 - Declared intent to reimburse expenditures from proceeds of future debt. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project was approved as part of the 1998 bond election along with Main Street and Harwood Road. PROJECT DESCRIPTION: Project consists of widening West Pipeline Road from 2 lanes to a proposed 4 lane boulevard street. This project will encompass the section of W. Pipeline from Hwy 10 to Raider Drive. The City has -equested financial participation from Bedford. JUSTIFICATION: The street exists in an expanded condition on either end of this proposed widening. The traffic greatly overloads the existing roadway. 32 PROJECT TITLE: WEST PIPELINE - RAIDER/HWY 10 PROJECT #: PS0002 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating-QQat Engineering 365,000 Personnel: Full Time ROW Appraisal 20,000 Part Time ROW Acquisition 550,000 Total Salary $0 Utility Relocation 866,550 Purchase of Services Construction 3,294,200 Materials & Supplies Lighting 160,000 Utilities Issuance Cost 35,000 Subtotal: $0 Maintenance CQsts Subtotal: Other Average Annual Debt Service Total Estimated Annual Cost PHASE/FUNDING SOURCE Engineering $0 $279,745 $279,745 Total Estimated Capital Cost CURRENT STATUS $5,290,750 OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 182,336 75,771 (106,565) 42% TOTAL PROJECT (Funded): $182,336 $75,771 ($106,565) 42% Etdnding_Pending: Bond Sale 3,200,000 I Escrow Funds 497,019 Other 1,411,395 TOTAL PROJECT $5,290,750 33 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: 7-7-00 Submitted By: RON YOUNG Date Completed: Project Title: GLADE FROM HERITAGE TO SH121 Project Type: STREET Sub -Type: CONSTRUCTION Project No.: PS0003 Priority: COUNCIL AUTHORIZATION: June 13, 2000 - Authorized execution of Engineering Design Contract not to exceed $138,750. January 9, 2001 - Approved Resolution 01-1089 declaring public necessity for the acquisition of r-o-w. February 27, 2001 - Authorized publication of notice of intent to issue certificates of obligation. April 9, 2001 - Approved Ord. 1467 authorizing the issuance of Certificates of Obligation, Series 2001. May 22, 2001 - Awarded Bid No. 045-01 for construction to Texas Sterling Construction for $1,445,600 and provided $68,340 for contingencies. Colleyville will reimburse $78,775. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Construction of Glade from Heritage to S.H. 121 by adding two (2) lanes to the existing three (3) lanes to create a 5-lane roadway (2 eastbound lanes, 2 westbound lanes and a center continued turn lane). Construct the east half (2 northbound lanes) of Heritage from Glade Road to the south limit of the Target project. Construct a four (4) lane divided north/south roadway from Glade to the south limit of the Target project approximately in the center of the Target project. Traffic signals and associated water and drainage facilities will be included. JUSTIFICATION: Increased ad valorem and sales tax generated by development of this area. 34 PROJECT TITLE: GLADE FROM HERITAGE TO SH121 PROJECT #: PS0003 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Other .Average Annual Debt Service 'Total Estimated Annual Cost PHASE/FUNDING SOURCE Engineering & Design Geotech Services Construction Issuance Cost TOTAL ESTIMATED CAPITAL COST: Engineering Geo-technical Services Construction Costs $0 Issuance Cost $0 $0 $116,509 $116,509 Total Estimated Capital Cost CURRENT STATUS BUDGET 138,750 25,000 1,383,000 13,494 EXPENDED 127,970 0 0 13,494 OVER/UNDER BUDGET (- +) (10,780) (25,000) (1,383,000) 0 * - This project received a transfer from escrow of $138,750. * - This project received bond proceeds from Series 2001 CO's of $1,421,494. TOTAL PROJECT $1,560,244 $141,464 ($1,418,780) 138,750 25,000 1,383,000 13,494 $1,560,244 % EXPENDED 92% 0% 0% 100% 9% 35 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Date Prepared: 7-7-00 Date Completed: Project Title: GLADE RD (EAST)-SH 121 TO CHAMPAGNE Project Type: STREET Sub -Type: CONSTRUCTION Project No.: PS0004 Priority: COUNCIL AUTHORIZATION: June 13, 2000 - Authorized execution of Engineering Design Contract in the amount of $143,500. February 27, 2001 - Authorized publication of notice of intent to issue certificates of obligation. .April 9, 2001 - Approved Ord. 1467 authorizing the issuance of Certificates of Obligation, Series 2001. IMay 22, 2001 - Awarded Bid # 047-01 for construction to McMahon Contracting for $874,578.75 and -provided for a $52,500 contingency for change orders. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Construct the eastbound lanes of Glade Road under S.H. 121 and construct the south lanes (2 eastbound lanes) of Glade Road from SH. 121 to Champagne Drive. Traffic signals, asphalt transitions and associated water and drainage facilities will be included. JUSTIFICATION: Increased ad valorem and sales tax generated by development of this area. 36 PROJECT TITLE: GLADE RD (EAST)-SH 121 TO CHAMPAGNE PROJECT #: PS0004 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Coj :Subtotal: Other Average Annual Debt Service Total Estimated Annual Cost PHASE/FUNDING SOURCE Engineering & Design Right of Way Construction Geotech Services Issuance Cost TOTAL ESTIMATED CAPITAL COST: Engineering Right -of -Way Geo-technical Services $0 Construction Issuance Cost $0 $0 125,212 $125,212 Total Estimated Capital Cost CURRENT STATUS BUDGET 143,500 50,000 1,436,135 25,000 17,127 EXPENDED 135,097 0 0 0 17,127 OVER/UNDER BUDGET (- +) (8,403) (50,000) (1,436,135) (25,000) 0 * - This project received bond proceeds from Series 2001 CO's of $1,528,262. * - This project received a transfer from escrow of $98,368. * - This project received a transfer from PS9903 of $45,132. 143,500 50,000 25,000 1,436,135 17,127 $1,671,762 % EXPENDED 94% 0% 0% 0% 100% TOTAL PROJECT $1,671,762 $152,224 ($1,519,538) 9% 37 Funded Wastewater P1Oj ('CtS Project Number Project Description WASTEWATER PROJECTS WW0001 CDBG B99-UC48-0001 WW0002 Misc Sewer Rehab WW0003 ( TRA Debt Payments WW0101 FY 2001 CDBG WW0102 Manhole Rehab. Program WW0103 S. Pipeline. Heather to Vine Sub -Total Wastewater Proiects CO Street Fund CFG AL IMF kUVtMtNIS PROGRAM FUNDED PROJECTS SUMMARY BUDGET AMOUNT AS OF Mav 31. 2001 sources Water & Half Cent Drainage Sewer CIP Impact Fee Sales Tax Fund Fund Fund — Fund Fund S 150.000 Unfunded! Police Facility General Escrow Funding Other CIP Fund CIP Fund Funds Pending Funding S87.013 S822,037 S457,000 S 150.000 S500.000 S1,344,013 S822,037 S65.000 S200.000 S265,000 Proiect Cost S150,000 S152,013 S822.037 S457,000 S350.000 S500,000 S2,431,050 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: CDBG B99-UC-48-0001 Project Type: WASTEWATER Sub -Type: MAINS Project No.: WW0001 Priority: A COUNCIL ACTION: Date Prepared: 10-1-99 Date Completed: April 11, 2000 - Recommended Tarrant County reject bids for CDBG and re -advertise. May 23, 2000 - Recommended Tarrant County award a contract to Henderson Construction. 'PROJECT DESCRIPTION: i Replace sanitary sewer line on Vine St. from Bayless Dr. south to Sunset Dr. then west on Sunset to S. Pipeline. Replace sanitary sewer line behind the 900 & 1000 Blocks of Oakwood Dr. JUSTIFICATION: Mains in the South Euless area have deteriorated as they have aged. 39 PROJECT TITLE: CDBG B99-UC-48-0001 PROJECT #: WW0001 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: DiceS_LQperatino Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Coata Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Sewer Mains Sewer Mains 150,000 $0 Total Estimated Capital Cost $150,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 150,000 0 (150,000) 0% TOTAL PROJECT $150,000 $0 ($150,000) 0% 40 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: MISC. SEWER REHAB Project Type: WASTEWATER Sub -Type: MAINS Project No.: WW0002 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Date Prepared: 7-26-99 Date Completed: This project is for small unidentified sewer main problems that may be found during the fiscal year. Large projects will be determined on an "as needed" basis and presented for funding under a new project number. JUSTIFICATION: Most of these lines are clay tile and are seriously deteriorated. 41 PROJECT TITLE: MISC. SEWER REHAB PROJECT #: WW0002 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Oberating_CasA Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs Subtotal: $0 Total Estimated Annual Cost 'RASE/FUNDING SOURCE :Sewer Mains TOTAL PROJECT (Funded): Funding Pending: Transfer from WIS operations 65,000 * - This project received an inter -project transfer of $37,013.14 from WW9903. TOTAL PROJECT $152,013 Sewer Mains 150,000 (Annual minimum balance to be maintained) $0 Total Estimated Capital Cost $150,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 87,013 0 (87,013) 0% 87,013 0 (87,013) 0% 42 City of Euless Capital Project Request Department: FINANCE Submitted By: LORETTA GETCHELL Project Title: TRA DEBT PAYMENTS Project Type: DEBT SERVICE Sub -Type: Project No.: WW0003 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Date Prepared: 7-26-99 Date Completed: A portion of the monthly payment to TRA is attributed to debt service for additional capacity covered by impac fees. Therefore, these funds are being applied to this debt payment. JUSTIFICATION: Impact fees must be used within 10 years of identified projects, 43 PROJECT TITLE: TRA DEBT PAYMENTS PROJECT #: WW0003 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Oneratina Coat Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs .Subtotal: $0 'Total Estimated Annual Cost PHASE/FUNDING SOURCE TRA Debt Payments Debt Payments 822,037 $0 Total Estimated Capital Cost $822,037 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 822,037 822,037 0 100% TOTAL PROJECT $822,037 $822,037 $0 100% 44 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: FY 2001 CDBG Project Type: WASTEWATER Sub -Type: MAINS Project No.: WW0101 Priority: A COUNCIL AUTHORIZATION: Date Prepared: 7-26-99 Date Completed: May 22, 2001 - Recommended to Tarrant County to award a contract to Horseshoe Construction, Inc. for $348,586 of which Tarrant County will pay $104,001. Change orders were authorized up to $6,900. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This funding is the 25th year project administered by Tarrant County. This is the sixth (6) wastewater project in South Euless and is by far the largest undertaken to upgrade wastewater mains. PROJECT DESCRIPTION: Design and construction of wastewater mains in the Oakwood Terrance Addition. JUSTIFICATION: Wastewater mains in South Euless area have deteriorated as they have aged and they need to be replaced. 45 PROJECT TITLE: FY 2001 CDBG PROJECT #: WW0101 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Oper_ating_Gast Engineering 16,000 Personnel: Full Time Construction 541,000 Part Time Total Salary $0 Purchase of Services Tarrant County CDBG Contribution (100,000) Materials & Supplies (Estimated) Utilities Subtotal: $0 Maintenance_Cvats Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $457,000 CURRENT STATUS OVERJUNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Engineering 16,000 0 (16,000) 0% Construction 441,000 0 (441,000) 0% TOTAL PROJECT $457,000 $0 ($457,000) 0% 46 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RANDY BYERS Date Completed: Project Title: MANHOLE REHAB PROGRAM Project Type: WASTEWATER Sub -Type: MANHOLES Project No.: WW0102 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Rehabilitation of all City wastewater manholes that are in need. PROJECT DESCRIPTION: Line has deteriorated and needs to be replaced. JUSTIFICATION: Manholes need to be replaced to avoid inflow and infiltration into the system. 6/21 /00 47 PROJECT TITLE: MANHOLE REHAB PROGRAM PROJECT #: WW0102 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: TOTAL ESTIMATED CAPITAL COST: DirectQpelating Coat Manhole Rehab Program 350,000 Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Cosh .Subtotal: $0 'Total Estimated Annual Cost PHASE/FUNDING SOURCE Manhole Replacement TOTAL PROJECT (Funded) : Funding Pending: Transfer from W/S Operating - FY02 Transfer from W/S Operating - FY03 Transfer from W/S Operating - FY04 TOTAL PROJECT $0 Total Estimated Capital Cost $350,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 150,000 0 (150,000) 0% 150,000 0 (150,000) 0% 100,000 50,000 50,000 $350,000 48 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RANDY BYERS Date Completed: Project Title: S. PIPELINE, HEATHER TO VINE Project Type: WASTEWATER Sub -Type: MAINS Project No.: WW0103 Priority: A COUNCIL AUTHORIZATION: !RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: 'The existing wastewater main in South Pipeline has aged and deteriorated. The main needs to be -eplaced and enlarged from Heather to Vine Street. PROJECT DESCRIPTION: 7/26/99 The EPA regulates contamination of soil from wastewater mains. It is necessary to correct deterioration found in Jur system. JUSTIFICATION: Line has deteriorated and needs to be replaced. 49 PROJECT TITLE: S. PIPELINE, HEATHER TO VINE PROJECT #: WW0103 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Coats Subtotal: $0 Total Estimated Annual Cost Engineering Sewer Main 50,000 450,000 $0 Total Estimated Capital Cost $500,000 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Engineering 50,000 0 (50,000) 0% Sewer Mains 450,000 0 (450,000) 0% *Impact fees paid TRA debt service to free operating funds for this project. TOTAL PROJECT $500,000 $0 ($500,000) 0% 50 I i ll1 FtE i1(i(1d W T lt('li I[ro,j ('Cts Project Number Project Description WATER PROJECTS WT9902 Water Tank Painting WT9908 Mid Cities 12' Line WT9909 2MG Water Tank WT9910 Water Line for Elevated Tank WT0001 Utility Rehab - Water Program WT0003 Water Line Replacement. Aransas WT0005 Water Line Milam - Denton/Midway WT0103 Fire Hydrant Replacement Program Sub -Total Water Projects Street Fund CAPITAL IMPROVEMENTS PltOt,NAM FUNDED PROJECTS SUMMARY BUDGET AMOUNT AS OF Mav 31. 2001 ources Water & Half Cent Unfunded/ Police Drainage Sewer CIP Impact Fee Sales Tax ice Facility General Escrow Funding Other CIP Fund Fund Fund Fund CIP Fund Funds Pending Funding 5200,000 5311.692 52,295.496 S90.000 51.037,187 5515.300 S206,251 512,057 S19.311 S50.000 S3,820.302 5916,992 Protect Cost 5200.000 5311,692 52.385.496 51.552.487 S206.251 512,057 S19.311 S50.000 54.737.294 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: WATER TANK PAINTING Project Type: WATER Sub -Type: TANK Project No.: WT9902 Priority: A COUNCIL AUTHORIZATION: August 27, 1996 - Included in Fiscal 1996-97 Budget. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Date Prepared: 7-26-99 Date Completed: This project includes the preparation of bid documents to paint both elevated water storage facilities. Depending on the type of paint presently on the tanks, this account may be under funded. If the present paint is lead -based, EPA requires an expensive removal and disposal process. JUSTIFICATION: As time passes, the appearance and protective qualities of paint diminish. To prevent corrosive damage, the elevated storage tanks must be repainted. 52 PROJECT TITLE: WATER TANK PAINTING PROJECT #: WT9902 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct OperatingS 1 Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 MaintenanceSoti Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Water Tank Painting Water Tank Painting 200,000 $0 Total Estimated Capital Cost $200,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (-+) % EXPENDED 200,000 0 (200,000) 0% TOTAL PROJECT $200,000 $0 ($200,000) 0% 53 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: MID CITIES 12" LINE Project Type: WATER Project No.: WT9908 COUNCIL AUTHORIZATION: Date Prepared: 7-17-99 Date Completed: Sub -Type: IMPACT FEE PROJECTS Priority: A November 24, 1998 - Authorized professional services contract with Shimek, Jacobs, & Finklea. May 11, 1999 - Awarded Bid No. 99-11 for the construction of a waterline. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: 'The City's Water Master Plan has identified this water line as being necessary. PROJECT DESCRIPTION: .Design and installation of a 12" water line along Mid Cities Blvd. from SH121 to North Main Street. City Council .has authorized both the design and construction contracts. JUSTIFICATION: Needed to provide adequate water service and pressure. 54 PROJECT TITLE: MID CITIES 12" LINE PROJECT #: WT9908 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct OperatirtgLaat Engineering Personnel: Full Time Water Mains Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maint�.nnce Costs Subtotal: $0 Total Estimated Annual Cost 52,080 259,612 $0 Total Estimated Capital Cost $311,692 CURRENT STATUS OVER/UNDER .PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Engineering Services 52,080 47,724 (4,356) 92% Water Mains 259,612 252,630 (6,982) 97% * - This project received an inter -project transfer of $311,692 from project FB9910. TOTAL PROJECT $311,692 $300,354 ($11,338) 96% 55 Department: Submitted By: Project Title: Project Type: Project No.: City of Euless Capital Project Request PUBLIC WORKS RANDY BYERS 2MG WATER TANK WATER WT9909 COUNCIL AUTHORIZATION: Sub -Type: TANK Priority: A Date Prepared: Date Completed: 7-26-99 May 24, 1999 - Authorized the contract for professional services with Shimek, Jacobs, & Finklea. March 28, 2000 - Authorized the issuance of Revenue Bonds. May 22, 2000 - Awarded construction contract to Landmark Structures. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The City's water master plan has identified the need for a 2 million gallon water tank. PROJECT DESCRIPTION: Project includes the design and construction of the elevated water tank. Design and construction has been authorized. JUSTIFICATION: 1.) Fire flow pressure needs during peak hours. 2.) System is deficient in elevated storage to meet the demands determined from actual records. 3.) Additional capacity is needed to meet the predicted maximum hourly demand. 56 PROJECT TITLE: 2MG WATER TANK PROJECT #: WT9909 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Uct Oneratina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Coates Subtotal: Other .Average Annual Debt Service 'Total Estimated Annual Cost PHASE/FUNDING SOURCE Engineering Services Water Tower Construction Issuance Cost Contingency (Interest Earnings) TOTAL ESTIMATED CAPITAL COST: Engineering Construction Issuance Cost $0 $0 $0 $194,892 $194,892 Total Estimated Capital Cost CURRENT STATUS BUDGET 90,000 2,190,000 60,000 45,496 EXPENDED 83,025 1,766,360 60,000 0 OVER/UNDER BUDGET (- +) (6,975) (423,640) 0 (45,496) 90,000 2,190,000 60,000 $2,340,000 % EXPENDED 92% 81% 100% 0% * - This project received and inter -project transfer of $90,000 from FB9910. TOTAL PROJECT $2,385,496 $1,909,385 ($476,111) 80% 57 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: LINES FOR ELEVATED TANK Project Type: WATER Sub -Type: MAINS Project No.: WT9910 Priority: A COUNCIL AUTHORIZATION: Date Prepared: 7-26-99 Date Completed: May 24, 1999 - Authorized the contract for professional services with Shimek, Jacobs, & Finklea. March 28, 2000 - Authorized the issuance of Revenue Bonds. May 9, 2000 - Authorized utilization of $420,000 in impact fee money for extend this project. May 9, 2000 - Authorized City Engineer to proceed with design of a 16" water supply line. January 23, 2001 - Awarded contract to Mid -State Utilities on installing a 16" water line for $1,072,639. January 23, 2001 - Authorized City Manager to execute the contract. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The City's Water Master Plan has identified the need for a 2 million gallon elevated storage tank. Additional water mains are required to connect the new tank with the existing water distribution system. PROJECT DESCRIPTION: 1.) Design water mains required to connect tank to system. This portion of the project has been funded. 2.) Construction of the water mains required to connect the proposed 2 million gallon tank to the water distribution system. JUSTIFICATION: 1.) Fire flow pressure needs in peak hours. 2.) System is deficient in elevated storage to meet the demands determined from actual records. 3.) Additional capacity is needed to meet the predicted maximum hourly demand. 58 PROJECT TITLE: LINES FOR ELEVATED TANK PROJECT #: WT9910 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direet4perating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: 0 MlaintenancQ Costs Subtotal: Other Average Annual Debt Service $87,560 Total Estimated Annual Cost Engineering & Design Water Mains $95,300 $1,430,000 $87,560 Total Estimated Capital Cost $1,525,300 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Engineering Services 131,300 115,460 (15,840) 88% Water Mains 1,394,000 296,914 (1,097,086) 21 Contingency (Interest Earnings) 27,187 0 (27,187) 0% * - This project received an inter -project transfer of $515,300 from FB9910. TOTAL PROJECT $1,552,487 $412,374 ($1,140,113) 27% 59 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: 7-26-99 Submitted By: RANDY BYERS Date Completed: Project Title: UTILITY REHAB - WATER PROGRAM Project Type: WATER Sub -type: MAINS Project No.: WT0001 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: This project is for connection of small unidentified water main problems that may arise throughout the fiscal year, _arge projects that are identified will be prepared on an "as needed" bases and funded under a new project i lumber. JUSTIFICATION: Some of the City's older water mains have deteriorated and need replacement or repair. Staff requests that this project be funded on an annual basis. 60 PROJECT TITLE: UTILITY REHAB - WATER PROGRAM PROJECT #: WT0001 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: 1:2lr ct ODeratina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 MainlenanQsts Subtotal: $0 Total Estimated Annual Cost Water Mains 150,000 (Annual Minimum Funding - $150,000) $0 Total Estimated Capital Cost $150,000 CURRENT STATUS OVER/UNDER 'PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % Expended Contingencies 56,251 18,418 (37,833) 33% Water Mains 150,000 0 (150,000) 0% * - This project received an inter -project transfer of $6,251 from WT9905. TOTAL PROJECT $206,251 $18,418 ($187,833) 9% 61 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: 7-26-99 Submitted By: RANDY BYERS Date Completed: Project Title: WATERLINE REPLACEMENT, ARANSAS Project Type: WATER Sub -Type: MAINS Project No.: WT0003 Priority: A COUNCIL ACTION: March 28, 2000 - Approved project to be funded from existing Water CIP Fund Balance. IRELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: 'roject consists of replacing water lines along Aransas - Ector to Midway. JUSTIFICATION: This line has deteriorated to the point of needing to be replaced. 62 PROJECT TITLE: WATERLINE REPLACEMENT, ARANSAS PROJECT #: WT0003 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct ODeratin9 Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Water Mains TOTAL ESTIMATED CAPITAL COST: Water Mains 12,057 $0 Total Estimated Capital Cost $12,057 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 12,057 7,043 (5,014) 58% * - This project received an inter -project transfer of $12,057 from FB9901. TOTAL PROJECT $12,057 $7,043 ($5,014) 58% 63 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: 7-26-99 Submitted By: RANDY BYERS Date Completed: Project Title: LINE REPLACEMENT, MILAM-DENTON/MIDWAY Project Type: WATER Sub -Type: MAINS Project No.: WT0005 Priority: A COUNCIL ACTION: April 8, 2000 - Approved project to be funded from existing Water CIP Fund Balance. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Project consists of replacing water lines along Milam Street from Midway to Denton Drive. JUSTIFICATION: This line has deteriorated to the point of needing to be replaced. 64 PROJECT TITLE: LINE REPLACEMENT, MILAM-D ENTON/MIDWAY PROJECT #: WT0005 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Mainienanse_Gosta :Subtotal: $0 'Total Estimated Annual Cost PHASE/FUNDING SOURCE Water Mains Water Mains 19,311 $0 Total Estimated Capital Cost $19,311 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (-+) % EXPENDED 19,311 0 (19,311) 0% * - This project received an inter -project transfer of $14,806 from FB9901. * - This project received an inter -project transfer of $4,505 from WT0004. TOTAL PROJECT $19,311 $0 ($19,311) 0% 65 City of Euless Capital Project Request Department: WATER DISTRIBUTION Date Prepared: 6-15-00 Submitted By: RANDY BYERS Date Completed: Project Title: FIRE HYDRANT REPLACEMENT PROGRAM Project Type: WATER Sub -Type: INSTALLATION Project No.: WT0103 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Systematic annual replacement of old, deteriorated or malfunctioning fire hydrants as determined by =ire and/or Public Works personnel. JUSTIFICATION: Fire hydrants are necessary for many functions, the major one being fire fighting. Several hydrants in our distribution system are old, deteriorated and are found to malfunction during annual inspections. These hydrants need to be replaced. 66 PROJECT TITLE: FIRE HYDRANT REPLACEMENT PROGRAM PROJECT #: WT0103 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Omaii g Cosi Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: 0 Maintenance Costa Subtotal: Other Average Annual Debt Service $87,560 Total Estimated Annual Cost PHASE/FUNDING SOURCE Hydrant Replacement TOTAL PROJECT Hydrant Replacement $50,000 $87,560 Total Estimated Capital Cost $50,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (-+) % EXPENDED 50,000 0 (50,000) 0% $50,000 67 $0 ($50,000) 0% Other Funded Proj E'('t1S '1 i 1 Project Number Project Description OTHER AC9901 Athletic Complex Phase II (4) DV9901 EDC Incentive Funds ED0101 Villages Master Pan ED0102 Bell Ranch Terrace P09901 Police and Municipal Courts Facility PR9901 Hike and Bike Trail PR9902 Senior Citizens Remodel PR9903- Vanous EOC Park Projects PR9918 PR9922 Texas Building Remodel PR9927 Park Improvement - Texas Star PR0016 Wilshire Park Improvements PR0110 Slope Protection/Screening Wall SS0010 Fire Station 82 SS0113 Park Building Sub -Total Other Projects 0' CO Street Fund Drainage Fund Water & Sewer CIP Fund CAPITAL IMPROVEMENTS PROGRAM FUNDED PROJECTS SUMMARY BUDGET AMOUNT AS OF Mav 31. 2001 fources Half Cent Impact Fee Sales Tax Fund Fund 5119,230 519,994 Police Facility General CIP Fund CIP Fund 511.789,614 $237,714 516,130 5269,566 5150,000 51.036.500 5150,000 5599,600 51,492,283 (9) 54,091,017 511.789.614 Unfunded/ Escrow Funding Funds Pending Other Funding 5100.000 (e) 5200.000 (s) S450.000 (6) 5280.000 (6) 51.250,000 tri Project Cost 5119.230 519.994 5100,000 5200.000 512.239.614 S237.714 516,130 5269.566 5430.000 51.036.500 5150.000 51.250.000 5599.600 51.492.283 52.280,000 518,160,631 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: 8-2-99 Submitted By: RICK HEROLD Date Completed: Project Title: ATHLETIC COMPLEX PHASE II Project Type: LAND/PROPERTY Sub -Type: IMPROVEMENT Project No.: AC9901 Priority: A COUNCIL AUTHORIZATION: November 25, 1997 - Approval of recertification of park grant for Phase II. September 9, 1997 - Included in Fiscal Year 1997-98 Budget. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project includes $20,000 for the continued revision of the Euless Parks and Community Services Master Plan. The Master Plan revision will update our current Master Plan which will allow the City to qualify for additional grant points for future Texas Parks and Wildlife Department grants. PROJECT DESCRIPTION: These funds will be used for engineering and preliminary plans for Phase III at the Parks at Texas Star as well as update of the Master Plan. Construction of the additional phases is pending until further funding is available. JUSTIFICATION: Phase II plans continue to be reevaluated based on future opportunities. Master Plan revision is necessary to receive needed points and potentially $500,000 per project in grant funds. 69 PROJECT TITLE: ATHLETIC COMPLEX PHASE II PROJECT #: AC9901 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: L ctDperating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 IkaintenenceS to Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Engineering Services Land Betterment Total cost is yet to be determined and depends on the scope of the project. $0 Total Estimated Capital Cost $0 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 29,200 29,200 0 90,030 34,520 (55,510) 100% 38% TOTAL PROJECT $119,230 $63,720 ($55,510) 53% 70 City of Euless Capital Project Request Department: ECONOMIC DEVELOPMENT Date Prepared: 7-26-99 Submitted By: BILL RIDGEWAY Date Completed: Project Title: EDC INCENTIVE FUNDS Project Type: HALF -CENT SALES TAX Sub -Type: DEVELOPMENT PROJECT Project No.: DV9901 Priority: A COUNCIL AUTHORIZATION: Approved in Sales Tax Revenue Bonds, Series 1994. March 27, 2001 - Approved transfer of $325,000 to N. Main Street for r-o-w to free up funds for a sign program. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: !Euless Development Corporation funds that have been set aside to aid the City of Euless in attracting development opportunities. JUSTIFICATION: 71 PROJECT TITLE: EDC INCENTIVE FUNDS PROJECT #: DV9901 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Economic Development Incentives 19,994 Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Economic Development Incentives* $0 Total Estimated Capital Cost $19,994 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 19,994 853 (19,141) 4% * - This project provided an inter -project transfer of $432,600 to SS0010. ** - This project received an inter -project transfer of $25,000 from 1/2 Cent Operations. "` - This project provided an inter -project transfer of $355,000 to PS9901 TOTAL PROJECT $19,994 $853 ($19,141) 4% 72 City of Euless Capital Project Request Department: ECONOMIC DEVELOPMENT Date Prepared: 7-7-00 Submitted By: BILL RIDGEWAY Date Completed: Project Title: VILLAGES MASTER PLAN Project Type: ECONOMIC DEVELOPMENT Sub -Type: DEVELOPMENT PROJECT Project No.: ED0101 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project involves the preliminary development of a Master Plan for the land bounded by 360 on the east, Harwood on the north, existing development on the west, and 183 on south (old mall site plus Van Riet, Ardinger and DFW properties). PROJECT DESCRIPTION: Commission a study to determine the highest and best use of this valuable commerical land. JUSTIFICATION: Poor planning can result in lower than desired tax revenue, hodge podge development activity, and less than optimal development quality. City needs to be proactive to guide the development of these vital tracts. 73 PROJECT TITLE: VILLAGES MASTER PLAN PROJECT #: ED0101 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Planning Study Planning Study 100,000 $0 Total Estimated Capital Cost $100,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 100,000 0 (100,000) 0% TOTAL PROJECT $100,000 $0 ($100,000) 0% 74 City of Euless Capital Project Request Department: ECONOMIC DEVELOPMENT Date Prepared: 7-7-00 Submitted By: BILL RIDGEWAY Date Completed: Project Title: BELL RANCH TERRACE Project Type: ECONOMIC DEVELOPMENT Sub -Type: DEVELOPMENT PROJECT Project No.: ED0102 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project would facilitate the development of the remaining phase of Bell Ranch Terrace in accordance with the City's Land Use Plan. PROJECT DESCRIPTION: Assist in infrastructure installation or other type of incentive or assistance, as negotiated through a City - Developer Agreement. JUSTIFICATION: Land is vacant (45+ acres) and currently has over 60 property owners. Land should be consolidated and developed to increase the number of residential units in Euless and increase tax base. 75 PROJECT TITLE: BELL RANCH TERRACE PROJECT #: ED0102 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct OceratiugCost Construction 200,000 Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost CURRENT STATUS PHASE/FUNDING SOURCE Construction $200,000 OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 200,000 0 (200,000) 0% TOTAL PROJECT $200,000 $0 ($200,000) 0% 76 City of Euless Capital Project Request Department: POLICE DEPARTMENT Submitted By: GARY McKAMIE Date Prepared: 7-15-99 Date Completed: Project Title: POLICE & COURTS FACILITY Project Type: BUILDINGS/FACILITIES Sub -Type: CONSTRUCTION Project No.: PD9901 Priority: A COUNCIL AUTHORIZATION: January 13, 1998 - Authorized contract with Phillips Swager for architectural services. April 14, 1998 - Authorized the acquisition of the Western Hills Inn and Western Hills Annex. June 9, 1998 - Awarded Bid No. 98-13 for demolition services. October 9, 1998 - Awarded change order to West Excavation for abatement of asbestos. February 23, 1999 - Authorized additional funds for demolition. June 22, 1999 - Declared expectation to reimburse expenditures with proceeds of future debt. June 22, 1999 - Authorized City Manager to request qualifications for construction management service. February 22, 2000 - Public Hearing and approval of Special Use Permit. February 22, 2000 - Approval of request for site plan. May 9, 2000 - Approval of Ordinance No. 1426 authorizing sale of Cert. Of Obligation Series 2000A. May 9, 2000 - Awarded bid for construction to Ratcliff Construction. November 14, 2000 - Authorized execution of contract for Project Management Services January 9, 2001 - Granted City Manager approval to authorize change orders not to exceed $25,000. January 23, 2001 - Ratified contract for inspection services to increase limit to $65,000 January 23, 2001 - Approved Change Order #1 to credit contract $152,391. January 23, 2001 - Approved Change Order #3 for payment of $48,372.79 on new piers & removal. March 27, 2001 - Approved Change Order #4 to credit contract $42,871.41. May 22, 2001 - Awarded bid #044-01 for furniture in the amount of $332,400.70. June 12, 2001 - Authorize City Manager to execute contract with DataTex not to exceed $74,257.86. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: IPROJECT DESCRIPTION: This 53,000 square foot facility will accommodate police, jail and courts. JUSTIFICATION: Current facility space is grossly inadequate for these areas. 77 PROJECT TITLE: POLICE & COURTS FACILITY PROJECT #: PD9901 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Utilities Subtotal: .Maintenance Costs Maintenance Janitorial Services Other Subtotal: Other ,Average Annual Debt Service "Total Estimated Annual Cost 1PHASEIFUNDING SOURCE !Bond Issuance Cost 'Construction !Contingency Demolition .Architectural Services Surveying Services Geo-Technical Services Other Professional Services Equipment Furnishings Land Purchase Off -Site Utilities Owner Equipment Planning Services TOTAL ESTIMATED CAPITAL COST: 128,000 Bond Issuance Cost Construction Contingency Demolition 73,500 Engineering & Architectural Other Professional Services Equipment Furnishings $201,500 Land Purchase Off -Site Utilities Owner Equipment 4,320 34,020 4,800 $43,140 $750,815 $995,455 Total Estimated Capital Cost CURRENT STATUS BUDGET 76,000 9,390,926 88,439 606,709 739,000 10,000 65,000 31,000 100,000 532,540 43,600 21,400 485,000 50,000 TOTAL PROJECT $12,239,614 EXPENDED 76,000 5,649,741 143 606,709 660,530 5,571 69,119 10,456 0 66,924 43,591 0 49 24,348 $7,213,181 OVER/UNDER BUDGET (- +) 0 (3,741,185) (88,296) (0) (78,470) (4,429) 4,119 (20,544) (100,000) (465,616) (9) (21,400) (484,951) (25,652) 76,000 9,085,968 530,532 606,400 637,174 71,000 100,000 532,540 43,600 21,400 535,000 $12,239,614 % EXPENDED 100% 60% 0% 100% 89% 56% 106% 34% 0% 13% 100% 0°A) 0% 49% ($5,026,433) 59% 78 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: 8-2-99 Submitted By: RICK HEROLD Date Completed: Project Title: HIKE AND BIKE TRAIL Project Type: HALF -CENT SALES TAX Sub -Type: PARK PROJECT Project No.: PR9901 Priority: A COUNCIL AUTHORIZATION: FY 1993 - ISTEA Application Approved for submission. FY 1994 - Engineering contract awarded. November 7,1994 - Approved Resolution 94-880 authorizing an agreement with TxDot for design and construction of the Trails of Euless, Phase I. September 8, 1999 - Approved additional funding in the Fiscal Year 1998-99 Budget. November 14, 2000 - Authorized $108,504 for the construction of the Trails of Euless. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Linkage of Bob Eden, Trailwood, and McCormick Parks. Future linkage to Villages of Bear Creek Park. PROJECT DESCRIPTION: This long-awaited and necessary project is primarily funded through ISTEA funding. It provides almost two miles of concrete trails, linking many of our major parks in the northern quadrant of Euless. With the recent land acquisition, the project is ready for implementation. Project start date will be determined by TxDOT. JUSTIFICATION: This will allow Euless to take advantage of grant funds that were awarded to Euless over five years ago. Project was delayed due to TxDOT delays and cost overruns on statewide trail projects. The scope of this project was cut to fit within the proposed budget. 79 PROJECT TITLE: HIKE AND BIKE TRAIL PROJECT #: PR9901 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: D_irect_Qperating Cost Personnel: Full Time Hike and Bike Trail 226,489 Part Time Engineering Services 7,600 Total Salary $0 Planning Services 3,625 Purchase of Services Materials & Supplies Utilities Subtotal: $0 Maintenance Costs Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $237,714 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Hike and Bike Trail 224,071 108,504 (115,567) 48% Engineering Services 7,600 7,600 0 100% Planning Services 3,625 3,625 0 100% Advertising 2,418 2,593 175 107% TOTAL PROJECT $237,714 $122,322 ($115,392) 51% 80 City of Euless Capital Project Request Department: COMMUNITY SERVICES Submitted By: RICK HEROLD Date Prepared: 8-2-99 Date Completed: Project Title: SENIOR CITIZENS REMODEL Project Type: HALF -CENT SALES TAX Sub -Type: PARK PROJECT Project No.: PR9902 Priority: A COUNCIL AUTHORIZATION: September 9, 1997 - Included in Fiscal Year 1997-98 Budget. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: This project includes continued remodel of the Simmons Center due to the needs of Euless' aging population. This project includes structural and cosmetic needs as well as purchasing new kitchen equipment and other furniture per request of the senior citizens. JUSTIFICATION: To better serve the expanding Euless senior citizen population. Improvements in previous years has lead to greater utilization of the facility. 81 PROJECT TITLE: SENIOR CITIZENS REMODEL PROJECT #: PR9902 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatjng_cast Personnel: Full Time Remodel 16,130 Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $16,130 CURRENT STATUS OVER/UNDER PHASEIFUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Senior Citizens - Lighting 8,618 8,618 (0) 100% Senior Citizens - Remodel 7,512 0 (7,512) 0% TOTAL PROJECT $16,130 $8,618 ($7,512) 53% 82 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: 8-2-99 Submitted By: RICK HEROLD Date Completed: Project Title: VARIOUS EDC PARK PROJECTS Project Type: HALF -CENT SALES TAX Sub -Type: PARK PROJECT Project No.: PR9903 - PR9918 Priority: A COUNCIL AUTHORIZATION: Approved as part Sales Tax Revenue Bonds, Series 1994. December 5, 2000 - Awarded bid of playground to Game Time Modlim Rec. Equip. for McCormick Park in the amount of $18,948. December 5, 2000 - Awarded bid of playground to Little Tikes Commercial Play Sys. for West Park in the amount of $24,212. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: The funds remaining in the Park CIP fund are to be spent for various improvement including the following: 1.) Marquee signs and installation at Midway Recreation Center 2.) Basketball goal installation at South Euless Park 3.) Bench upgrades, table upgrades and trash receptacles throughout the park system. 4.) Portable restroom enclosures at Midway, Villages of Bear Creek and Bob Eden parks. 5.) Nine -hole disc golf course at Trailwood Park. 6.) New playgrounds at Westpark, Wilshire Park and McCormick parks. 7.) South Euless Trail (Engineering and conceptual plans are still under study) 8.) Adopt a Spot Signs and Marketing as well as marketing assistance and beautification projects. 9.) Various other upgrades as needed throughout the park system. JUSTIFICATION: These are various upgrades that would enhance the park system throughout the City of Euless. 83 PROJECT TITLE: VARIOUS EDC PARK PROJECTS PROJECT #: PR9903-PR9918 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: DirecLQperatingC t Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PHASE/FUNDING SOURCE EDC Marquee Sign BB Goal - S. Euless Playground Improvements Bench Upgrades Table Upgrades Trash Receptacles Port RR Enclosures System Upgrades Disc Golf Course Playgrounds S. Euless Trails EDC Adopt A Spot Signs Mkt Asst/Beautification Floor - Midway Recreation Special Event Tables Misc. Project TOTAL PROJECT TOTAL ESTIMATED CAPITAL COST: Park Furnishings $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS BUDGET 15,000 20,000 10,000 10,000 15,000 15,000 15,000 10,598 15,000 75,000 5,000 3,000 7,500 10,000 9,000 34,468 $269,566 84 EXPENDED 2,927 6,256 3,979 8,384 9,764 9,910 12,645 10,598 0 68,329 0 0 6,747 600 2,104 22,298 OVER/UNDER BUDGET (- +) (12,073) (13,744) (6,021) (1,616) (5,236) (5,090) (2,355) 0 (15,000) (6,671) (5,000) (3,000) (753) (9,400) (6,896) (12,170) 269,566 $269,566 % EXPENDED 20% 31% 40% 84% 65% 66% 84% 100% 0% 91% 0% 0% 90% 6% 23% 65% $164,541 ($105,025) 61% City of Euless Capital Project Request Department: SUPPORT SERVICES Submitted By: RICK HEROLD Date Prepared: 6-27-00 Date Completed: Project Title: TEJAS REMODEL Project Type: BUILDING/FACILITIES Sub -Type: REMODEL Project No.: PR9922 Priority: A COUNCIL AUTHORIZATION: September 9, 1997 - Included in Fiscal Year 1997-98 Budget. October 24, 2000 - Authorized City Manager to contract for architectual services with Byron Folse Inc. .January 9, 2001 - Awarded bid #026-00 for renovation to Stillwell Building for $403,485. •January 9, 2001 - Authorized City Manager to execute the contract. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Community Services Department will be the first of six master plan projects. Construction is to begin in January 2001 and scheduled to be completed by June 2001. PROJECT DESCRIPTION: Community Service Department will be relocated to the Tejas Building located on Royal Parkway adjacent to the existing Fleet & Facility Service Center Building. The Tejas Building will be renovated to accommodate the expansion of the Community Services offices and storage. JUSTIFICATION: Relocating Community Services offices to another facility from Building B will allow for present and future expansion plans to accommodate the Finance, Water Department, Insurance and Human Resources Department. 85 PROJECT TITLE: TEJAS REMODEL PROJECT #: PR9922 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: lair ctOpera1ing.Cos1 Personnel: Full Time Remodel 430,000 Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Qosta Utilities 4,800 Cleaning 2,800 Insurance 500 Subtotal: $8,100 Total Estimated Annual Cost $8,100 Total Estimated Capital Cost $430,000 CURRENT STATUS OVER/UNDER I DHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED :Tejas Building Remodel 383,485 359,001 (24,484) 94% •Other Professional Services 26,515 20,531 (5,984) 77% •Contingency 20,000 0 (20,000) 0% TOTAL PROJECT $430,000 $379,532 ($50,468) 88% 86 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: 2-7-00 Submitted By: RICK HEROLD Date Completed: Project Title: PARK IMPROVEMENT - TEXAS STAR Project Type: HALF -CENT SALES TAX Sub -Type: PARK PROJECT Project No.: PR9927 Priority: A COUNCIL AUTHORIZATION: October 26, 1999 - Council authorized the issuance of $1 million in revenue bonds. October 26, 1999 - EDC authorized design services contract. November 30, 1999 - EDC authorized execution of construction agreements. February 7, 2000 - EDC authorized execution of construction agreements. February 7, 2000 - EDC authorized the expenditure of funds for additional park improvements. February 8, 2000 - Council ratified the EDC approval items related to Texas Star park improvements. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project was basically Phase II of The Parks at Texas Star. The improvements installed within the project are consistent with the City's Master Plan. PROJECT DESCRIPTION: This project involved the construction of a parking lot, installation of lighting and landscaping, and other park improvements associated with the City's portion of the Dr. Pepper StarCenter. JUSTIFICATION: This project was needed to facilitate the Dr. Pepper StarCenter project and to begin build out of the Texas Star Sports Center. 87 PROJECT TITLE: PARK IMPROVEMENT - TEXAS STAR PROJECT #: PR9927 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating, Coat Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costa .Subtotal: Total Estimated Annual Cost PHASE/FUNDING SOURCE Bank Charges Issuance Cost Architectural Services Engineering Services Land Betterment ark Improvement TOTAL ESTIMATED CAPITAL COST: Bank Charges Issuance Cost $0 Architectural Services Engineering Services Land Betterment Park Improvement $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS BUDGET 400 36,100 46,830 29,750 447,401 476,019 TOTAL PROJECT $1,036,500 OVER/UNDER EXPENDED BUDGET (- +) 400 36,100 50,400 29,750 446,264 451,097 $1,014,011 0 0 3,570 0 (1,137) (24,922) 400 36,100 26,500 35,500 447,982 490,018 $1,036,500 % EXPENDED 100% 100% 108% 100% 100% 95% ($22,489) 98% 88 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: 6-29-01 Submitted By: RICK HEROLD Date Completed: Project Title: WILSHIRE PARK IMPROVEMENTS Project Type: LAND Sub -Type: IMPROVEMENT Project No.: PR0016 Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Land and equipment improvement of park facility to remain consistent with forward -looking park infrastructure for the citizens of Euless. PROJECT DESCRIPTION: Multi -faceted park enhancements to include a trail system, lighting, fishing pier, pond, playgrounds and picnic areas. JUSTIFICATION: A the request of Wilshire Neighborhood Association, the multi -faceted improvements to Wilshire Park will provide park enhancements consistent with improvements throughout the city's park infrastructure. 89 PROJECT TITLE: WILSHIRE PARK IMPROVEMENTS PROJECT #: PR0016 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Died Ope[ating Cost Engineering & Design Personnel: Full Time Construction 150,000 Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Landscaping/Pond Materials $0 $0 12,500 -Subtotal: $12,500 'Total Estimated Annual Cost IPHASE/FUNDING SOURCE $12,500 Total Estimated Capital Cost $150,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED Land Betterment 150,000 49,094 (100,906) 33% TOTAL PROJECT $150,000 $49,094 ($100,906) 33% 90 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: 6-29-00 Submitted By: RICK HEROLD Date Completed: Project Title: SLOPE PROTECTION/SCREENING WALL Project Type: LAND Sub -Type: IMPROVEMENT Project No.: PR0110 Priority: A COUNCIL AUTHORIZATION: June 12, 2001 - Awarded bid #048-01 for construction to Knight Erosion Control for $1,033,937.50. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Initial Slope Protection Project revised from $708,900 to $1,165,000. Revision of project required as erosion ihas accelerated to levels that require consolidation of initial phase and partial of Phase II. Project is anticipated to begin July 2001. The screening wall is being recessitated by Ft. Worth's Trinity Blvd road construction project. PROJECT DESCRIPTION: Slope protection from #18 creek damn at tee to damn by #18 green on west side of creek of approximately 1,185 linear feet and 12 feet high. #18 Bridge to #18 green side damn of 485 linear feet at approximately 12 feet high. From gabion behind #9 green to the gabion at #9 fairway bridge on the northwest side of the creek. From gabion at #9 fairway bridge back to bend at #1 fairway for 900 linear feet at approximately 12 feet high. The screening wall will mitigate some of the negative influences created by the construction of the six lane boulevard street section. JUSTIFICATION: Stop erosion of the creek back on #18 fairway and prevent the possible future loss of #18 bridge and parts of #9 green and fairway. The screening wall is needed to maintain the existing environment and setting of the Texas Star Golf Course. 91 PROJECT TITLE: SLOPE PROTECTION/SCREENI VG WALL PROJECT #: PRO110 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Pirect Oneratina Cos( Personnel: Full Time Creek Slope Protection 1,165,000 Part Time Trinity Screening Wall 85,000 Total Salary $0 Purchase of Services Materials & Supplies Utilities Subtotal: $0 Maintenance Gig Utilities Insurance Subtotal: $0 :Average Annual Debt Service $98,993 'Total Estimated Annual Cost $0 Total Estimated Capital Cost CURRENT STATUS PHASE/FUNDING SOURCE Land Betterment $1,250,000 OVER/UNDER BUDGET EXPENDED BUDGET (-+) % EXPENDED 1,250,000 0 (1,250,000) 0% Funding provided by a loan from the car rental fund. TOTAL PROJECT $1,250,000 $0 ($1,250,000) 0% 92 City of Euless Capital Project Request Department: SUPPORT SERVICES Date Prepared: 7-12-00 Submitted By: TOM COX Date Completed: Project Title: FORMER FIRE STATION #2 Project Type: BUILDING/FACILITY Sub -Type: REMODEL Project No.: SS0010 Priority: A COUNCIL AUTHORIZATION: February 7, 2000 - EDC authorized project, acquired Station #2 and adjacent land and proposed lease. February 8, 2000 - Council ratified the EDC approval of items related to Fire Station #2. February 8, 2000 - Council authorized the sale of Fire Station #2 to the EDC for $167,000. June 27, 2000 - EDC approved a lease with Beall Concrete Enterprises. June 27, 2000 - EDC approved the expenditure of funds for remodel. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Economic Development Corporation authorized funding to remodel Fire Station #2. The renovated facility will be rented to a business that will pay rent unless certain sales tax revenue goals are achieved. JUSTIFICATION: The City will receive significant sales tax revenue from this venture. 93 PROJECT TITLE: FORMER FIRE STATION #2 PROJECT #: SS0010 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Coal Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance CQsts Subtotal: Total Estimated Annual Cost PHASE/FUNDING SOURCE Other Professional Services • Contingencies •Land Purchase .Acquisition 'Land Betterment Remodel/Improvement Asbestos Remediation TOTAL ESTIMATED CAPITAL COST: Other Professional Services Contingencies Land Purchase $0 Acquisition Land Betterment Remodel/Improvement Parking Improvement Asbestos Remediation $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS BUDGET 38,100 7,524 31,135 167,000 12,500 335,815 7,526 EXPENDED 41,283 0 31,135 167,000 12,501 335,812 7,526 * - This project received an inter -project transfer of $432,600 from DV9901. OVER/UNDER BUDGET (- +) 3,183 (7,524) (0) 0 1 (3) (1) 38,100 12,000 30,000 167,000 12,500 315,000 15,000 10,000 $599,600 % EXPENDED 108% 0% 100% 100% 100% 100% 100% TOTAL PROJECT $599,600 $595,257 ($4,343) 99% 94 City of Euless Capital Project Request Department: COMMUNITY SERVICES Submitted By: RICK HEROLD Date Prepared: 6-27-00 Date Completed: Project Title: PARKS & GREENHOUSE Project Type: BUILDING Sub -Type: NEW CONSTRUCTION Project No.: SS0113 Priority: A COUNCIL AUTHORIZATION: October 24, 2000 - Authorized contract with Byron Folse Associates, Inc. for architectural serviecs. January 9, 2001 - Approved Resolution #01-1087 declaring intent to reimburse expenditures. February 27, 2001 - Authorized publication of notice of intent to issue certificates of obligation. April 10, 2001 - Approved masonry exception No. 01-04 to Parks Maintenance Building. April 10, 2001 - Approved Ord. 1467 authorizing issuance of Certficates of Obligation, Series 2001. April 10, 2001 - Approved site plan for a Parks Maintenance Building. June 12, 2001 - Awarded bid #046-01 for construction to T.W. Foster in the amount of $1,325,445.72. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The Parks and Greenhouse Departement will be the second project of the master plan. Construction is to begin in May 2001 and scheduled to be complete by December 2001. PROJECT DESCRIPTION: Two new buildings and site improvements will be constructed to accommodate the Parks Department and the proposed Greenhouse. The buildings will be located on South Pipeline adjacent to the existing Golf Course Management Building. JUSTIFICATION: Relocating the Parks/Greenhouse Department to a new facility from Midway Drive and Pauline Drive to meet the expanding needs of the department. 95 PROJECT TITLE: PARKS & GREENHOUSE PROJECT #: SS0113 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: 12irect Qperatina Cas Personnel: Full Time Planning, Design & Construction 1,325,446 Part Time Special Services 155,419 Total Salary $0 Issuance Cost 11,418 Purchase of Services Materials & Supplies Utilities Subtotal: $0 Mointenanc _c_Qsts Utilities Insurance 4,800 750 Subtotal: $5,550 Total Estimated Annual Cost $5,550ITotal Estimated Capital Cost $1,492,283 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED Construction 1,325,446 0 (1,325,446) 0% Special Services 155,419 102,320 (53,099) 66% Issuance Cost 11,418 11,418 0 100% TOTAL PROJECT $1,492,283 $113,738 ($1,378,545) 8% 96 Uiifuwled Proj ects Project Description Priority Estimated Cost DRAINAGE PROJECTS CAPITAL IMPROVEMENT PROGRAMS UNFUNDED PROJECTS - SORTED BY TYPE PROPOSED METHOD OF FINANCING County, Operating CIP Fund Bond State, Impact Escrow Fund Balance Sale Federal Fees Funds Funds Car Rental Hotel / EDC To Be Tax Motel Determined Bear Creek Park C $ 2,200,000 Bell Hi Addition C $ 440,000 Blessing Branch, Main to SH 360 C $ 5,285,000 Bob Eden Park C $ 550,000 Boyd Branch C $ 500,000 Boyd Branch (FEMA) C $ 880,000 Denton Drive at Midway Park C $ 55,000 Diversion Line - Oak Lane C $ 45,000 Hurricane Creek at Airport Business Park C $ 1,100,000 Hurricane Creek, Bridge at Marlene C $ 220,000 Hurricane Creek, North of SH 10 C $- 4,590,000 Kynette Drive Culvert Modifications C $ 100,000 Oak Lane Channel 1 C $ 450,000 Priest Drive Culvert & Woodbury Forest C $ 121,000 Royal Oaks Addition C TBD Trailwood Addition (Summit Ridge) C $ 185,000 Sub -Total Drainage Priority C $ 16,721,000 DRAINAGE PROJECTS - TOTAL STREET PROJECTS Gateway Blvd. - Southern Portion $ 16,721,000 A $ 425,000 Sub -Total Street Priority A $ 425,000 Fuller Wiser Connector (3) B $ 450,000 Town Crossing Bridge (") B _$ 775,000 1 Glade Road Right -of -Way Acquisition (") B $ 698,476 Pipeline Road Gas Line (3) I B $ 1,000,000 A - Projects that will be presented to Council during the upcoming year. B - Projects that will be presented to Council wthin two to five years. C - Projects that will be presented to Council beyond five years. XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX Project Description CAPITAL IMPROVEMENT PROGRAMS UNFUNDED PROJECTS - SORTED BY TYPE PROPOSED METHOD OF FINAN CING County, Priority Estimated Cost Operating CIP Fund Bond State, Impact Escrow Car Hotel Fund Balance Sale Federal Fees Funds Rental Motel Funds Tax Raider Drive - SH10 to South Pipeline (" B $ West Pipeline - Raider to City Limits (3) B $ Sub -Total Street Priority B Ash Lane - Aransas to N Baze Road - Glade to Mi Gateway Boulevard - No Harwood Road - Main to Heather and S. Pipeline Highway Ingress -Egress Hwy 10 Sidewalks and Li S. Ector Drive South Main - Hwy 10 to Vine St. - SH 183 to SH 450,000 525,000 XX XX 3,898,476 EDC . Main C TBD d-Cities 'them Portion C C TBD $ 1,000,000 SH 157 C TBD C $ 1,500,000 C TBD ghting C $ 450,000 C $ 1,068,000 ipeline C $ 4,770,420 0 C TBD Sub -Total Street Priority C !STREET PROJECTS - TOTAL !WASTEWATER PROJECTS FY 2002 CDBG Line Replacement, Duna Line Replacement, E. Ale Line Replacement, Paula Manhole Rehab Program Midway Park Main Replac $ 8,788,420 $ 13,111,896 A $ 237,086 XX XX XX vay A $ 140,000 XX xander A $ 20,000 XX Lane A $ 79,000 XX A A $ 100,000 XX XX :ement A $ 366,000 XX Sub -Total Wastewater Priority A FY 2003 CDBG FY 2004 CDBG FY 2005 CDBG B B $ 942,086 252,000 211,000 $ 272,000 XX XX XX XX XX XX A - Projects that will be presented to Council during the upcoming year. B - Projects that will be presented to Council wthin two to five years. C - Projects that will be presented to Council beyond five years. To Be Determined XX XX XX XX XX XX XX XX XX XX Project Description FY 2006 CDBG Line Replacement, Canyon Ridge Line Replacement, Ector Drive Line Replacement, Fayette Line Replacement, Martin Lane Line Replacement, McCormick & Copher Courts Line Replacement, Sagebrush Line Replacement, Short St. to Copher Ct. Little Bear Creek Collection Line (4) Sub -Total Wastewater Priority B FY 2007 CDBG Line Replacement, E. Fuller Line Replacement, Jean Lane Line Replacement, Koen Line Replacement, Pebble Creek Line Replacement, Ridgecrest Drive Line Replacement, S. Sheppard Drive Line Replacement, W. Fuller Line Replacement, Windward Way Line Replacement, Wood Ridge Circle SH 183 Utility Relocation Sub -Total Wastewater Priority C WASTEWATER PROJECTS - TOTAL WATER PROJECTS Disinfection Modification /Well Rehabilitation Effluent Water Main CAPI I AL IMPROVEMENT PROGRAMS UNFUNDED PROJECTS - SORTED BY TYPE _ PROPOSED METHOD OF FINANCING County, I Operating CIP Fund Bond State, Impact Escrow Car Hotel / Priority Estimated Cost Fund Balance Sale Federal Fees Funds RTaxal Motel Funds EDC B $ 157,000 XX XX B $ 162,000 XX B $ 200,000 XX B $ 292,000 XX B $ 65,000 XX B $ 66,000 XX B $ 195,000 XX B $ 80,000 XX XX B $ 425,000 $ 2,377,000 C $ 319,000 XX �( C $ 156,000 C $ 52,000 C $ 225,000 C $ 95,000 C $ 90,000 C $ 90,000 C $ 70,000 C $ 80,000 C $ 135,000 C TBD 1,312,000 $ 4,631,086 A A $ 600,000 XX $ 250,000 XX A - Projects that will be presented to Council during the upcoming year. B - Projects that will be presented to Council wthin two to five years. C - Projects that will be presented to Council beyond five years. To Be Determined XX XX XX XX XX XX XX XX XX XX Project Description Sub -Total Water Priority A Hwy 360 Water Crossing (31 Rehab Central Dr. Water Stor Rehab/Rebuild Fuller Dr. Grou W. Pipeline Water Main Repla CAPITAL IMPROVEMENT PROGRAMS UNFUNDED PROJECTS - SORTED BY TYPE Priority Estimated Cost PROPOSED METHOD OF F NANCING County, Operating CIP Fund Bond State, Impact Escrow Car Fund Balance Sale Federal Fees Funds Rental Funds Tax 850,000 Hotel / Motel EDC age B B $ 300,000 XX 01 B $ 500,000 XX nd Storage Tank r B $ 200,000 XX cement (31 B _ $ 1,000,000 XX Sub -Total Water Priority B $ 2,000,000 Hwy 183 Water Crossing TBD Sub -Total Water Priority C WATER PROJECTS - TOTAL OTHER PROJECTS Building D Remodel Midway Recreation Center Upgrade $ 2,850,000 A $ 922,020 XX I A 422,000 Sub -Total Other Priority A Aquatics Center/Recreatio Building A Remodel t31 Building B Remodel (4) City Wide Trail Enhanceme Fire Station #3 Reconstruct Parks at Texas Star, Phase Public Works Facility (6) $ 1,344,020 XX Center Expansion (41 B I $ 9,500,000 XX j B B $ 978,550 , B $ 837,390 XX 'It (3' B $ 1,750,000 XX XX on t�1 B $ 1,500,000 XX 1111'1 B $ 4,400,000 XX XX XX B $ 2,510,408 XX Sub -Total Other Priority B Community Golf Course at Bob Ed Conversion & Expansion of Ruth M Expansion & Upgrade of Bob Eden Fire Training Facility $ 21,476,348 en Park C $ 4,000,000 ...._ illican Cntr C $ 1,000,000 Park C $ 2,000,000 C $ 1,200,000 A - Projects that will be presented to Council during the upcoming year. B - Projects that will be presented to Council wthin two to five years. C - Projects that will be presented to Council beyond five years. To Be Determined XX XX XX XX Project Description I_ihranr Ri''ild Out Parks at Texas Star. Phase IV Redevelopment of Westpark SH 10 Land Acquisition Snfthall World Texas Star Conference Cntr Phace II Soh -Total Other Priority (f OTHER PROJECTS - TOTAL (3) - Projected FY 2003 (u _ Projected FY 2004 CAPITAL IMPROVEMENT PROGRAMS UNFUNDED PROJECTS - SORTED BY TYPE Priority Estimated Cost PROPOSED METHOD OF F NANCING County, Car Operating CIP Fund Bond State, Impact Escrow Rental Hotel / EDC To Be Fund Balance Sale Federal Fees Funds Tax Motel Determined Funds C $ 2,120,000 XX C $ 10,000,000 XX C $ 2,500,000 XX C $ 3,000,000 XX C TBD XX C $ 3,350,000 XX A - Projects that will be presented to Council during the upcoming year. B - Projects that will be presented to Council wthin two to five years. C - Projects that wit be presented to Council beyond five years. $ 29,170,000 $ 51,990,368 Unfunded Drainage Projects CAPITAL IMPROVEMENT PROGRAMS UNFUNDED PROJECTS - SORTED BY TYPE Project Description Priority Estimated Cost PROPOSED METHOD OF FINANCING County, Operating CIP Fund Bond State, Impact Escrow Car Fund Balance Sale Federal Fees Funds Rental Funds Tax DRAINAGE PROJECTS Bear Creek Park _ C $ 2,200,000 BeII Hi Addition C $ 440,000 Blessing Branch, Main to SH 360 C $ 5,285,000 Hotel / To Be Motel EDC Determined Bob Eden Park C $ 550,000 Boyd Branch C $ 500,000 Boyd Branch (FEMA) C $ 880,000 Denton Drive at Midway Park C $ 55,000 Diversion Line - Oak Lane C $ 45,000 Hurricane Creek at Airport Business Park C $ 1,100,000 Hurricane Creek, Bridge at Marlene C $ 220,000 Hurricane Creek, North of SH 10 C $ 4,590,000 Kynette Drive Culvert Modifications C $ 100,000 Oak Lane Channel C $ 450,000 Priest Drive Culvert & Woodbury Forest C $ 121,000 Royal Oaks Addition C TBD Trailwood Addition (Summit Ridge) C $ 185,000 Sub -Total Drainage Priority C DRAINAGE PROJECTS - TOTAL $ 16,721,000 $ 16,721,000 A - Projects that will be presented to Council during the upcoming year. B - Projects that will be presented to Council wthin two to five years. C - Projects that will be presented to Council beyond five years. XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: BEAR CREEK PARK Project Type: DRAINAGE Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-21-99 Date Completed: This project was identified in the 1990 Knowlton, English & Flowers Drainage Utility System Study of Selected Improvement Projects. PROJECT DESCRIPTION: The Bear Creek Park drainage project involves erosion control and channelization improvements to Little Bear Creek. It is a portion of Project No. 11 in the above referenced study. JUSTIFICATION: Continued erosion will eventually undermine the creek and adjacent park. 103 PROJECT TITLE: BEAR CREEK PARK PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Coss Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costa Subtotal: Total Estimated Annual Cost (PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 200,000 2,000,000 $2,200,000 104 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: BELL HI ADDITION Project Type: DRAINAGE Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-26-99 Date Completed: In 1990 the City commissioned and received a report from Knowlton, English & Flowers titled Drainage Utility System Study of Selected Improvement Projects. This project was the 5th project identified in this study. PROJECT DESCRIPTION: The terrain in this location is very flat, which causes the streets to have a very low capacity to remove storm •water without flooding. The proposed project ties in to an existing storm drainage system in Needles Drive. Construction of this project will remove the surface water from the street. A substantial portion of the cost of this !project is related to street repair, indicating the need to combine this project with a street reconstruction project. JUSTIFICATION: Excessive ponding in the street. 105 PROJECT TITLE: BELL HI ADDITION PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Llaintanans to Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $o $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 55,000 385,000 $440,000 106 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: 7-26-99 Submitted By: RANDY BYERS Date Completed: Project Title: BLESSING BRANCH, MAIN TO SH 360 Project Type: DRAINAGE Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The Blessing Branch Drainage Master Plan included a conceptual plan to convey stormwater through the creek more efficiently. PROJECT DESCRIPTION: This project involves the channeling and lining of Blessing Branch in accordance with the Blessing Branch Master Plan. The project costs shown on the report break the project into engineering and construction cost. !JUSTIFICATION: The City expects to receive significant developer contributions toward this project. However, the City may be required to fund a portion of this project. 107 PROJECT TITLE: BLESSING BRANCH, MAIN TO SH 360 PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direst Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications % Construction % 385,000 4,900,000 $5,285,000 108 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: BOB EDEN PARK Project Type: DRAINAGE Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-21-99 Date Completed: The improvements proposed are identified in the Little Bear Creek Watershed Master Plan. PROJECT DESCRIPTION: This project involves erosion control and channelization improvements to Little Bear Creek. This project ties to the Bear Creek Park Project. JUSTIFICATION: Continued erosion will eventually cause damage to existing City facilities. 109 PROJECT TITLE: BOB EDEN PARK PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Dir t.Qperating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Utilities Subtotal: Meintenenste_Q4 Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design Preliminary Design % Final Plans Specifications % Construction % 50,000 500,000 $550,000 110 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: BOYD BRANCH Project Type: DRAINAGE Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-7-00 Date Completed: Channel improvements are shown as being necessary for development in the City's Master Drainage Plan for Boyd Branch. PROJECT DESCRIPTION: The Boyd Branch drainage watershed will require significant improvement between S.H. 10 and S. Pipeline Road as the vacant tracts are developed. Staff believes assistance will be required for reimbursement to developers for the cost of oversize improvements or for construction of channel improvements. Development may not be financially feasible without City assistance. JUSTIFICATION: Oversize reimbursement is permitted in the Uniform Development Code. Other types of assistance will also permit growth in tax revenues and employment. 111 PROJECT TITLE: BOYD BRANCH PROJECT #: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Opel -Wing cast Personnel: Full Time Construction 500,000 Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenanca_CostS Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $500,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % 0% Fund Balance Preliminary Design % 0% Certificate of Obligation Final Plans % 0% County, State, Federal Funding Specifications % 0% General Obligation Bonds Construction % 0% Revenue bonds Impact Fees Escrow Funds To Be Determined XX ADDITIONAL COMMENTS: 112 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: BOYD BRANCH (FEMA) Project Type: DRAINAGE Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-21-99 Date Completed: The reconstruction of FM 157 south of SH 183 by TxDOT did not include drainage improvements of a sufficient size to accommodate the 100-year storm event. This has created problems with the 100-year flood plain elevation. {PROJECT DESCRIPTION: • This project involves the installation of storm drainage improvements in Boyd Branch and SH 157 to correct the problems associated with the TxDOT construction. -,JUSTIFICATION: This is an item of work that may be required by FEMA. 113 PROJECT TITLE: BOYD BRANCH (FEMA) PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: aired Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Coats Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: Staff is reevaluating cost estimates. XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications Construction % 80,000 800,000 $880,000 114 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: 7-22-99 Submitted By: RANDY BYERS Date Completed: Project Title: DENTON DRIVE AT MIDWAY PARK Project Type: DRAINAGE Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: In 1990 the City commissioned and received a report from Knowlton, English & Flowers titled Drainage Utility System Study of Selected Improvement Projects. PROJECT DESCRIPTION: This project involves the installation of two curb inlets on the south side of Bell Drive to eliminate excessive storm water from draining into Denton Drive. (This Project is No. 7 in the 1990 Knowlton, English & Flowers Study). JUSTIFICATION: Excessive ponding of stormwater in the street. 115 PROJECT TITLE: DENTON DRIVE AT MIDWAY PARK PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct_Operating Goat Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: MaintenanceSts Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications % Construction 5,000 50,000 $55,000 75% 116 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: DIVERSION LINE - OAK LANE Project Type: DRAINAGE Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project was identified in the 1990 Knowlton, English & Flowers study. PROJECT DESCRIPTION: Date Prepared: 7-22-99 Date Completed: This is identified as Project No. 15 in the study. The homes along the west side of Oak Lane receive a considerable amount of storm water from the Lakewood Park Addition. This project involves grading and the installation of a small drainage system to reduce the problems associated with this lot -to -lot drainage. JUSTIFICATION: Lot to lot drainage continues to be one of the most prolific problems in the City. The cost of the solution is often too expensive for homeowners to afford. 117 PROJECT TITLE: DIVERSION LINE - OAK LANE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Diract Operating_Co1 Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintonanoe Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design Preliminary Design % Final Plans % Specifications % Construction % 45,000 $45,000 118 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: 7-22-99 Submitted By: RANDY BYERS Date Completed: Project Title: HURRICANE CREEK AT AIRPORT BUSINESS PARK Project Type: DRAINAGE Sub -Type: Project No.: Priority: *C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: In 1990 the City commissioned and received a report from Knowlton, English & Flowers titled Drainage Utility System Study of Selected Improvement Projects. PROJECT DESCRIPTION: This project, Project No. 12 in the above referenced study, involves the installation of erosion control and channel lining improvements along Hurricane Creek south of SH 10. The 1996 Hurricane Creek Storm Drainage Master Plan also identified the need for improvements and a conceptual design. JUSTIFICATION: The 1990 report identified the erosion problems through the Airport Business Park. This property now includes the Texas Star Golf Course. * A portion of the improvements could become necessary within 2 to 5 years. 119 PROJECT TITLE: HURRICANE CREEK a AIRPORT BUS PARK PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct. Q rating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Decreased maintenance costs. Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications % Construction % 100,000 1,000,000 $1,100,000 120 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: 7-26-99 Submitted By: RANDY BYERS Date Completed: Project Title: HURRICANE CREEK, BRIDGE AT MARLENE Project Type: DRAINAGE Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: In 1990 the City commissioned and received a report from Knowlton, English & Flowers titled Drainage Utility System Study of Selected Improvement Projects. PROJECT DESCRIPTION: This project involves the replacement of the culvert. It is Project No. 17 in the 1990 Knowlton, English, Flowers study. _.JUSTIFICATION: Culvert does not convey 100 year storm. 121 PROJECT TITLE: HURRICANE CREEK, BRIDGE AT MARLENE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operetin_g_Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design Preliminary Design % Final Plans % Specifications Construction % 35,000 185,000 $220,000 1 122 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: 7-26-99 Submitted By: RANDY BYERS Date Completed: Project Title: HURRICANE CREEK, NORTH OF SH 10 Project Type: DRAINAGE Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: In 1990 the City commissioned and received a report from Knowlton, English & Flowers titled Drainage Utility System Study of Selected Improvement Projects. Conceptually shown on the Hurricane Creek Watershed Master Plan . PROJECT DESCRIPTION: This project involves channelizing and lining Hurricane Creek from the convergence of two tributaries Ito SH 10 and construction of a detention pond. The project costs are broken into engineering and construction •costs. JUSTIFICATION: SH 10 bridge and culvert does not convey the 100 year storm. Detention is needed and channel lining is needed to control erosion. 123 PROJECT TITLE: HURRICANE CREEK, NORTH OF SH 10 PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Dir_eaQp ing_Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 220,000 4,370,000 $4,590,000 124 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: KYNETTE DRIVE CULVERT MODIFICATIONS Project Type: DRAINAGE Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-21-99 Date Completed: Wilshire Village Addition was constructed prior to the adoption of the City's Uniform Development Code. The requirements prior to the UDC were lower than what the City now requires. This causes more water to remain above ground. The drainage system in the Woodlands Addition needs to be upgraded to meet current requirements. PROJECT DESCRIPTION: A large amount of storm water drains to an existing culvert on Kynette between East Cliff and West Cliff drives. The existing drainage facilities collecting this storm water are inadequate. This project involves the installation of a small drainage system in Kynette up to Sierra. It is Project No. 17 in the 1990 Knowlton, English & Flowers study. JUSTIFICATION: Excessive surface water flow and ponding. 125 PROJECT TITLE: KYNETTE DRIVE CULVERT MODIFICATIONS PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct_Qperatino Coat Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans °A) Specifications % Construction % 15,000 85,000 $100,000 126 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: OAK LANE CHANNEL Project Type: DRAINAGE Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-21-99 Date Completed: Oakland Estates Addition was constructed prior to the adoption of the City's Uniform Development Code. The requirements prior to the UDC were lower than what the City now requires. PROJECT DESCRIPTION: This project includes significant drainage improvements in the Oakland Estates Addition. The project was also included in the 1990 Knowlton, English, Flowers study but has been expanded to include a concrete lined channel instead of an earthen channel. 'JUSTIFICATION: Excessive surface water flow and ponding. 127 PROJECT TITLE: OAK LANE CHANNEL PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Co51 Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications % Construction % 50,000 400,000 $450,000 128 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: 7-21-99 Submitted By: RANDY BYERS Date Completed: Project Title: PRIEST DRIVE CULVERT AT WOODBURY FOREST Project Type: DRAINAGE Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project is No. 13 in the 1990 Knowlton, English & Flowers study. PROJECT DESCRIPTION: 'This project involves the installation of a culvert under the extension of Priest Lane west from Tallow Drive to SH .121. This project can be reduced in scope or eliminated if Priest Lane does not get extended. There is a possibility the City would be required to perform some channelization work. " This project could be eliminated due to private development on Baze Property. JUSTIFICATION: Excessive surface water flow and ponding. 129 PROJECT TITLE: PRIEST DRIVE CULVERT AT WOODBURY PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: laireeLOperetingCost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications Construction % 21,000 100,000 $121,000 130 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: 7-26-99 Submitted By: RANDY BYERS Date Completed: Project Title: ROYAL OAKS ADDITION Project Type: DRAINAGE Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The City's awareness of the need for this project came with the water seepage problems on Walnut Way west of North Main Street. PROJECT DESCRIPTION: This project involves the installation of a storm drainage system in the backyards of lots in the Royal Oaks .Addition to alleviate problems associated with excessive lot -to -lot drainage. JUSTIFICATION: Lot to lot drainage solutions often cost much more than individual homeowners can afford. 131 PROJECT TITLE: ROYAL OAKS ADDITION PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX The cost of this project need to be reevaluated. TOTAL ESTIMATED CAPITAL COST: Cost is yet to be determined $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design Preliminary Design Final Plans Specifications Construction City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: 7-26-99 Submitted By: RANDY BYERS Date Completed: Project Title: TRAILWOOD ADDITION (SUMMIT RIDGE) Project Type: DRAINAGE Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: In 1990 the City commissioned and received a report from Knowlton, English & Flowers titled Drainage Utility System Study of Selected Improvement Projects. This project is the 6th project identified in this study. PROJECT DESCRIPTION: This project involves the correction of a number of drainage problems and expansion of the existing drainage system. .JUSTIFICATION: Drainage system does not meet current standards. 133 PROJECT TITLE: TRAILWOOD ADDITION (SUMMIT RIDGE) PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Uitect Operating Coat Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Main tenance_CsLatS Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 so $o $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design Preliminary Design % Final Plans % Specifications % Construction % 25,000 160,000 $185,000 134 -Unfunded S reet Pioj acts CAPITAL IMPROVEMENT PROGRAMS UNFUNDED PROJECTS - SORTED BY TYPE Project Description Priority Estimated Cost STREET PROJECTS PROPOSED METHOD OF FINANCING County, Operating CIP Fund Bond State, Impact Escrow Hotel / Fund Balance Sale Federal Fees Funds Motel Funds Gateway Blvd. - Southern Portion I A I $ 425,000 I Sub -Total Street Priority A Fuller Wiser Connector (3) Town Crossing Bridge'" Glade Road Right -of -Way Acquisition (4) Pipeline Road Gas Line (3) Raider Drive - SH10 to South Pipeline (4) West Pipeline - Raider to City Limits (3) Sub -Total Street Priority B Ash Lane - Aransas to N. Main Baze Road - Glade to Mid -Cities Gateway Boulevard - Northern Portion Harwood Road - Main to SH 157 Heather and S. Pipeline Highway Ingress -Egress Hwy 10 Sidewalks and Lighting S. Ector Drive South Main - Hwy 10 to Pipeline Vine St. - SH 183 to SH 10 Sub -Total Street Priority C STREET PROJECTS - TOTAL $ 425,000 B I $ 450,000 B 1 $ 775,000 B $ 698,476 B I $ 1,000,000 B $ 450,000 B $ 525,000 $ 3,898,476 C TBD C TBD C $ 1,000,000 XX XX XX XX XX Car Rental Tax XX EDC C TBD C $ 1,500,000 C TBD C $ 450,000 C $ 1,068,000 C $ 4,770,420 C TBD $ 8,788,420 $ 13,111,896 A - Projects that will be presented to Council during the upcoming year. B - Projects that will be presented to Council wthin two to five years. C - Projects that will be presented to Council beyond five years. To Be Determined XX XX XX XX XX XX XX XX XX XX City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: Submitted By: RON YOUNG Date Completed: 5/31/01 Project Title: GATEWAY BLVD -SOUTHERN PORTION Project Type: STREET Sub -Type: CONSTRUCTION Project No.: Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Gateway Blvd is identified in the Master Thoroughfare Plan as a four lane arterial roadway. Two private development projects (Centurion Apartments and Lakes of Little Bear) will install Gateway Blvd along their frontages from Mid -Cities Blvd to Centurion Way leaving approximately 1500 linear feet of the southbound 2 lanes not constructed. PROJECT DESCRIPTION: Construction of the west lanes (south bound) of Gateway Blvd from Mid -Cities Blvd north approximately 1500 -feet. The roadway material will be concrete. Storm drainage is included. JUSTIFICATION: This will provide for the full pavement section on Gateway Blvd from Mid -Cities Blvd north to Centurion Way. Completion of this roadway will provide incentive for additional private development in the SH 121/Gateway zoning district. 136 PROJECT TITLE: GATEWAY BLVD - SOUTHERN PORTION PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: 2irect ODeratinp Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Cods Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund County, State, Federal Funding General Obligation Bonds Revenue bonds Certificate of Obligation Donations Supplemental Sales Tax Car Rental ADDITIONAL COMMENTS: XXX TOTAL ESTIMATED CAPITAL COST: Engineering Construction Right of Way (easement) $0 Surveying $0 $0 $0Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications % Construction % 15,000 375,000 25,000 10,000 $425,000 100% 100% 80% 80% 137 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: FULLER WISER CONNECTOR Project Type: STREET Sub -Type: Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project is identified in the 1999 Master Thoroughfare Plan. PROJECT DESCRIPTION: Date Prepared: 7-23-99 Date Completed: Fuller -Wiser Road - Type DA and Type DC. Fuller -Wiser is a minor local arterial connection between SH 360 on the north and SH 183 on the south. This facility is presently constructed to a design standard of four lanes undivided in a 70 ft. right-of-way. The recommended ultimate design standard should be a four lane divided roadway in an 85 ft. right-of-way for the sections that are north of Mid -Cities Blvd. and south of Harwood Road. ;JUSTIFICATION: Staff hopes to receive street escrow funds to assist in the construction of this project. 138 PROJECT TITLE: FULLER WISER CONNECTOR PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: DirectQpera1ing_Co t Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined Car Rental Fund ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % Staff is in the process of reevaluting the cost and schedule for this project. 450,000 $450,000 139 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Date Prepared: 7-7-00 Date Completed: Project Title: TOWN CROSSING BRIDGE Project Type: STREETS Sub -Type: CONSTRUCTION Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: -The bridge over Little Bear Creek is required in the City's Master Thoroughfare Plan. PROJECT DESCRIPTION: Infrastructure assistance through the construction of a four (4) lane bridge north of Cheek-Sparger Road (crossing Little Bear Creek). JUSTIFICATION: Financial assistance will be required for development of the portion of 121 Gateway district west of S.H. 121 Development will increase the City's ad valorem and sales tax revenues. 140 PROJECT TITLE: TOWN CROSSING BRIDGE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Coat Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: ttlaintenenceS is Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 so so $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 75,000 700,000 $775,000 0% 0% 0% 0% 0% 141 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: 7-31-99 Submitted By: RANDY BYERS Date Completed: Project Title: GLADE RD RIGHT OF WAY ACQUISITION Project Type: STREET Sub -Type: CONSTRUCTION Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Glade Road is identified as a minor arterial in the 1999 Master Thoroughfare Plan. PROJECT DESCRIPTION: Glade Road is planned as an east -west thoroughfare having 4-lanes divided with an 85' right-of-way. JUSTIFICATION: The need/priority for this roadway is dependent on development and the City of Grapevine's bond program schedule. Grapevine has requested our participation. The City currently has approximately $200,000 in street escrow funds for Glade Road. 142 PROJECT TITLE: GLADE RD RIGHT OF WAY ACQUISITION PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Qir LQoeratino Cosi Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: MaintenancQ Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: TOTAL ESTIMATED CAPITAL COST: Right of Way $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design Preliminary Design % XX Final Plans % Specifications % Construction % XX 698,476 $698,476 143 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Date Prepared: 6/29/01 Date Completed: Project Title: W. PIPELINE ROAD GAS PIPELINE RELOCATION Project Type: STREET Sub -Type: UTILITY RELOCATION Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: West Pipeline Road is identified as an arterial in the Master Thoroughfare Plan and the portion of this roadway from SH 10 to Raider Drive was approved for construction as a part of the 1998 Bond Election. PROJECT DESCRIPTION: Remove and relocate a 16" gas pipeline (TXU Gas) that currently exists near the south edge of the existing asphalt roadway. The gas pipeline will be relocated by TXU Gas south near the existing south right-of-way line of W. Pipeline Road. JUSTIFICATION: The existing 16" gas pipeline is shallow (approximately 2' to 2 1/2") and is located approximately 25' north of the south right-of-way line. The proposed roadway cannot be constructed over the gas pipeline which pushes the roadway north causing excessive right-of-way acquisition in the City of Bedford. The relocation will allow the roadway to be positioned within the existing right-of-way in a more normal fashion and minimize the additional right -of way needs. 144 PROJECT TITLE: W. PIPELINE ROAD GAS PIPELINE RELOCATIC PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Onereting_C2st Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Cost. Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations Supplemental Sales Tax ADDITIONAL COMMENTS: TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % XX Specifications Construction % 1,000,000 $1,000,000 0% 0% 0% 0% 0% 145 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Date Prepared: 7-22-99 Date Completed: Project Title: RAIDER DRIVE, SH 10 TO SOUTH PIPELINE ROAD Project Type: STREET Sub -Type: Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Raider Drive is identified as a minor arterial in need of upgrade in the 1999 Master Thoroughfare Plan. PROJECT DESCRIPTION: Raider Drive - Type DA. Project will consist of widening and repairing Raider Drive from SH 10 to South Pipeline Road. Raider Drive is an important north -south connection between W. Pipeline Road and SH 10. The recommended ultimate design standard is four lanes divided in a right-of-way standard of 85 feet. In the future, the City of Arlington may realign and extend Green Oaks Blvd. to connect with Raider instead of Westpark Way. Assuming there is mutual concurrence between Euless and Bedford officials with respect to the realigning of Raider and Central Drive, then it is recommended that the ultimate roadway design standard be a six -lane divided within a minimum right-of-way of 120 feet to match the Arlington design standard. ,JUSTIFICATION: See description. 146 PROJECT TITLE: RAIDER DRIVE, SH 10 TO SOUTH PIPELINE NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: direct Operrti 9 Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: .Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: PROJECT #: TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 Right of Way $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design °A) Preliminary Design % XX Final Plans % Specifications % Construction % 35,000 315,000 100,000 $450,000 TxDot project to add one (1) roadway lane in each direction is currently scheduled to be awarded in May, 2002 and to be completed in May, 2003. 147 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Date Prepared: 6/29/01 Date Completed: Project Title: WEST PIPELINE - RAIDER TO CITY LIMITS Project Type: STREET Sub -Type: CONSTRUCTION Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: West Pipeline Road is identified in the Master Thoroughfare Plan as an arterial roadway. This roadway maintenance project is related to the proposed 12" water main replacement project on West Pipeline Road. PROJECT DESCRIPTION: Provide spot repairs on the existing roadway subgrade, remove and replace deteriorated or damaged curb and gutter, mill the outer edges of the roadway surface, adjust valve covers and manholes, provide asphalt overlay, -and restripe centerline and lane lines. JUSTIFICATION: West Pipeline Road has been patched and repaired numerous times over the years. The proposed 12" water main replacement project will further cut the roadway increasing the need for this overlay project. This project will improve the riding surface and the appearance of the roadway. 148 PROJECT TITLE: WEST PIPELINE - RAIDER TO CITY LIMITS PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (4- OR -) ANNUAL: Uitact_4patating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities x Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations Supplemental Sales Tax ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design Preliminary Design % Final Plans Specifications % Construction % 39,000 486,000 $525,000 0% 0% 0% 0% 0% 149 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: ASH LANE - ARANSAS TO N. MAIN Project Type: STREET Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Project identified in 1999 Master Thoroughfare Plan. PROJECT DESCRIPTION: Date Prepared: 7-22-99 Date Completed: Ash Lane - Type DA and Type DC. Ash Lane is an important east -west connection between SH 360 and FM 157 (Industrial Blvd.). The section east of Fuller -Wiser Road is presently constructed to its recommended ultimate design of four lanes divided. Recognizing the residential character of the adjacent surroundings, the recommended ultimate design standard for the section west of Fuller -Wiser is a four -lane undivided in a minimum right-of-way width of 76 feet. JUSTIFICATION: Existing roadway does not currently meet the four -lane section. 150 PROJECT TITLE: ASH LANE - ARANSAS TO N. MAIN PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating_ t Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenancata Subtotal: 'Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: 0 TOTAL ESTIMATED CAPITAL COST: Cost yet to be determined. $0 $0 $o $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design Preliminary Design % Final Plans % Specifications Construction % Staff needs to reevaluate cost estimate and proposed schedule for this project. City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: BAZE ROAD - GLADE TO MID CITIES Project Type: STREET Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Project identified in 1999 Master Thoroughfare Plan. PROJECT DESCRIPTION: Date Prepared: 7-22-99 Date Completed: Baze Road - Type EC. Baze Road is an important north -south residential collector that is planned to connect Glade Road and Mid -Cities Blvd. This roadway exists as a four -lane divided roadway north of Glade Road in Grapevine. In Euless, it is constructed partially as a 40 foot undivided roadway and as a 36 feet (two lanes) undivided roadway in a 60 foot right-of-way. The possible extension of Baze south of Anthony Drive to connect with Mid -Cities Blvd. is recommended only if future access to Baze from Mid -Cities is restricted through geometric design measures to prevent neighborhood "cut -through" traffic. .JUSTIFICATION: Vehicular traffic is currently forced to travel on residential streets to access Mid -Cities. 152 PROJECT TITLE: BAZE ROAD - GLADE TO MID CITIES NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX $0 $0 $0 PROJECT #: TOTAL ESTIMATED CAPITAL COST: Cost yet to be determined. $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction $0 Staff is in the process of reevaluating all unfunded street projects. City currently has approximately $300,000 in street escrow for this project. 153 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Date Prepared: 7-7-00 Date Completed: Project Title: GATEWAY BLVD - NORTHERN PORTION Project Type: STREET Sub -Type: CONSTRUCTION Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project is required on the City's Master Thoroughfare Plan. PROJECT DESCRIPTION: !Design and construction of portions of Gateway Boulevard between Glade Road and Mid -Cities Boulevard east iof S.H. 121. JUSTIFICATION: There are likely to be portions of this proposed boulevard that will not be constructed with the development in the 121 Gateway district. 154 PROJECT TITLE: GATEWAY BLVD - NORTHERN PORTION PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: QirectQperatina Coat Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost 'PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction 1,000,000 $1,000,000 0 155 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: 7-22-99 Submitted By: RANDY BYERS Date Completed: Project Title: HARWOOD ROAD - MAIN TO FM 157 Project Type: STREET Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Project identified in the 1999 Master Thoroughfare Plan. Project is being upgraded in NCTCOG's 1999 Regional Thoroughfare Plan. PROJECT DESCRIPTION: Harwood Road - Type B and Type C. Harwood Road is a major east -west arterial roadway connecting Euless, Bedford, and Hurst with DFW Airport. In Euless, Harwood exists as a four -lane divided roadway between Main Street and Industrial Blvd., and as a two-lane undivided roadway east of Main Street. It currently serves substantial commercial development in Bedford and Hurst, and Harwood will serve similar future development in Euless. The long-range impact of planned commercial and industrial development at DFW Airport is presently uncertain. Consequently, the recommended roadway design standard is six lanes divided. The right-of-way standard for the section east of Main Street is 120 feet. In recognition of the limited existing right-of-way corridor available west of Main, the right-of-way for this section may be reduced. At locations approved by the City Engineer, a minimum width of 104 feet may be permitted. Both sections require a 6-lane boulevard street section. JUSTIFICATION: See Project Description. The upgrade on the NCTCOG's Regional Thoroughfare Plan may accelerate the need for this reconstruction. 156 PROJECT TITLE: HARWOOD ROAD - MAIN TO FM 157 PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: nirecLOperatir 1 Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Cost yet to be determined. $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % Staff needs to reevaluate the estimate and scheduling of this project. City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Date Prepared: 7-7-00 Date Completed: Project Title: HEATHER and S. PIPELINE Project Type: STREET Sub -Type: CONSTRUCTION Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Design and construction of roadway, drainage utility and aesthetic improvements south of S.H. 10. JUSTIFICATION: Stimulate redevelopment and beautify primary gateway to the Texas Star Sports Centre. 158 PROJECT TITLE: HEATHER and S. PIPELINE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Jir<ct Operatina Gost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design Preliminary Design Final Plans % Specifications % Construction 1,500,000 $1,500,000 0% 0% 0% 0% 0% 159 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: 7-26-99 Submitted By: RANDY BYERS Date Completed: Project Title: HIGHWAY INGRESS - EGRESS Project Type: STREET Subtype: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: loROJECT DESCRIPTION: Modification of entrance and exit ramps on SH 183. JUSTIFICATION: Improved traffic flow. 160 PROJECT TITLE: HIGHWAY INGRESS - EGRESS PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance C 11 Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Cost is yet to be determined. $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % Staff needs to reevaluate the estimates and scheduling of this project. City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: HWY 10 SIDEWALKS AND LIGHTING Project Type: STREET Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-23-99 Date Completed: Per Council's request, the Engineering staff created conceptual drawings and preliminary cost estimates for the installation of sidewalks and lighting along SH 10. PROJECT DESCRIPTION: Project will consist of new sidewalks and street lighting along the entire stretch of Hwy 10. JUSTIFICATION: Corridor lighting can be improved. Sidewalks are missing in many areas along SH 10 where pedestrians currently travel. 162 PROJECT TITLE: HWY 10 SIDEWALKS AND LIGHTING PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Qi[ect Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance G is Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Hwy 10 Sidewalks & Lighting $0 $0 so $0 Hwy 10 Sidewalks & Lighting CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 450,000 $450,000 163 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: S. ECTOR DRIVE Project Type: STREET Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-22-99 Date Completed: Project identified in the 1999 Master Plan and was submitted as a TEA-21 project for federal participation in funding. PROJECT DESCRIPTION: :South Ector is an important connection between SH 183 and SH 10. The ultimate design standard is a four lane idivided thoroughfare. JUSTIFICATION: See description. * Priority dependant on receipt of Federal TEA-21 funding. 164 PROJECT TITLE: S. ECTOR DRIVE NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenanceosts Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX PROJECT #: TOTAL ESTIMATED CAPITAL COST: Engineering $0 Construction Right of Way Utility Relocation Landscaping $0 $0 $0 Total Estimated Capital Cost* CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 54,000 384,000 330,000 170,000 130,000 $1,068,000 * The estimated cost reflected above represents approximately 42% of the total cost of this project. The remaining 58% will be funded by TxDOT. 165 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: SOUTH MAIN - HWY 10 TO PIPELINE Project Type: STREET Subtype: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-22-99 Date Completed: Project identified in 1999 Master Plan and submitted as a TEA-21 project for federal participation in funding. PROJECT DESCRIPTION: Main Street is a major north -south arterial connecting Euless to Grapevine and Arlington, with important linkages to SH 360, SH 183, Trinity boulevard and IH 30. The ultimate design standard is recommended to be six lanes divided south of Harwood to the south City Limit. The right-of-way standard for the section south of SH 183 to the south City Limit should be 120 feet. JUSTIFICATION: See description. * Priority dependant on receipt of Federal TEA-21 funding. 166 PROJECT TITLE: SOUTH MAIN - HWY 10 TO PIPELINE NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance_Cora Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX PROJECT #: TOTAL ESTIMATED CAPITAL COST: Planning, Design and Engineering $0 Construction Right of Way Utility Relocation Landscaping $0 $0 $0 Total Estimated Capital Cost* CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction % This project was discussed at the May 5, 1999 pre -council session. 211,820 2,648,600 510,000 900,000 500,000 $4,770,420 * The estimated cost reflected above represents approximately 42% of the total cost of this project. The remaining 58% will be funded by TxDOT. 167 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: VINE ST. - SH183 TO SH10 Project Type: STREET Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Vine Street is nQt identified in the 1999 Master Thoroughfare Plan. PROJECT DESCRIPTION: Date Prepared: 7-23-99 Date Completed: -The City has received street escrow funds from several developments along Vine Street. When development is complete, it would be appropriate for the City to reconstruct the existing roadway. JUSTIFICATION: Street escrow funds are being deposited for use in reconstruction. 168 PROJECT TITLE: VINE ST. - SH183 TO SH10 PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Uitect Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Cost yet to be determined. $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications % Construction % Staff will reevaluate the cost of this project. Street escrow will not cover the anticipated cost. Unfi iiided. Wastewater Projects CAPITAL IMPROVEMENT PROGRAMS UNFUNDED PROJECTS - SORTED BY TYPE Project Description Priority Estimated Cost WASTEWATER PROJECTS FY 2002 CDBG Line Replacement, Dunaway Line Replacement, E. Alexander Line Replacement, Paula Lane Manhole Rehab Program Midway Park Main Replacement Sub -Total Wastewater Priority A FY 2003 CDBG FY 2004 CDBG FY 2005 CDBG FY 2006 CDBG Line Replacement, Canyon Ridge Line Replacement, Ector Drive Line Replacement, Fayette Line Replacement, Martin Lane Line Replacement, McCormick & Copher Courts Line Replacement, Sagebrush Line Replacement, Short St. to Copher Ct. Little Bear Creek Collection Line (4) Sub -Total Wastewater Priority B FY 2007 CDBG Line Replacement, E. Fuller Line Replacement, Jean Lane Line Replacement, Koen Line Replacement, Pebble Creek Line Replacement, Ridgecrest Drive A A PROPOSED METHOD OF F NANCING County, Car Operating CIP Fund Bond State, Impact Escrow Rental Hotel / EDC To Be Fund Balance Sale Federal Fees Funds Tax Motel Determined Funds $ 237,086 xx xx XX $ 140,000 XX A $ 20,000 XX A $ 79,000 XX A $ 100,000 XX XX A $ 366,000 XX B B $ 942,086 $ 252,000 $ 211,000 B $ 272,000 B $ 157,000 B $ 162,000 B $ 200,000 B $ 292,000 B $ 65,000 B $ 66,000 B $ 195,000 B 80,000 B $ 425,000 $ 2,377,000 C $ 319,000 C $ 156,000 C $ 52,000 C $ 225,000 C $ 95,000 C $ 90,000 A - Projects that will be presented to Council during the upcoming year. B - Projects that will be presented to Council wthin two to five years. C - Projects that will be presented to Council beyond five years. XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX CAPITAL IMPROVEMENT PROGRAMS UNFUNDED PROJECTS - SORTED BY TYPE Project Description Priority Estimated Cost Line Replacement, S. Sheppard Drive C $ 90,000 Line Replacement, W. Fuller C $ 70,000 Line Replacement, Windward Way C $ 80,000 Line Replacement, Wood Ridge Circle C $ 135,000 SH 183 Utility Relocation C TBD Sub -Total Wastewater Priority C $ 1,312,000 WASTEWATER PROJECTS - TOTAL A - Projects that will be presented to Council during the upcoming year. B - Projects that will be presented to Council wthin two to five years. C - Projects that will be presented to Council beyond five years. $ 4,631,086 PROPOSED METI- OD OF FINANCING County, Operating CIP Fund Bond State, Impact Escrow Fund Balance Sale Federal Fees Funds Funds Car Rental Hotel / EDC To Be Tax Motel Determined XX XX XX XX XX Department: Submitted By: Project Title: Project Type: Project No.: City of Euless Capital Project Request PUBLIC WORKS RON YOUNG FY 2002 CDBG WASTEWATER Sub -Type: Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: Date Completed: 5/24/01 This funding is the 26th year project administered by Tarrant County. This project addresses aging and deteriorating wastewater mains in the Midway Park area. PROJECT DESCRIPTION: Design and construction of wastewater mains in the southeast portion of the Midway Park Addition. JUSTIFICATION: Wastewater mains in the Midway Park area have deteriorated as they have aged and they need to be replaced. 172 PROJECT TITLE: FY 2002 CDBG PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: 'Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Current Revenue CIP Fund Balance Special Project Fund County, State, Federal Funding General Obligation Bonds Revenue bonds Certificate of Obligation Donations Supplemental Sales Tax ADDITIONAL COMMENTS: XX XX XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 Tarrant County CDBG Contribution (estimated) $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % Lines to be replaced: 1. Between Himes and LimestonelMidway Drive from Lee to Midway Drive. 2. Midway Drive from Limestone to Himes. 3. Himes Drive along and east rear lot lines. 4. Through Midway Park from Midway Drive north to Blessing Branch. 15,000 337,086 (115,000) $237,086 100% 173 City of Euless Capital Project Request - Unfunded Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: LINE REPLACEMENT, DUNAWAY Type: WASTEWATER Sub -Type: Project No.: Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-10-00 Date Completed: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Replace sanitary sewer lines on Dunaway - E. Alexander to Ascot. JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. PROJECT TITLE: LINE REPLACEMENT, DUNAWAY PROJECT #: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct_Qperating_CQat Personnel: Full Time Sewer Line Replacement 140,000 Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Cmt Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $140,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Current Revenue XX Conceptual Design % Reserve Fund Preliminary Design % Special Project Fund Final Plans °A) Certificate of Obligation Specifications % County, State, Federal Funding Construction General Obligation Bonds Revenue bonds Donations To Be Determine ADDITIONAL COMMENTS: 175 City of Euless Capital Project Request - Unfunded Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: LINE REPLACEMENT, E. ALEXANDER Type: WASTEWATER Sub -Type: Project No.: Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-10-00 Date Completed: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Replace sanitary sewer lines on E. Alexander Dr. from creek to Dunaway Dr. JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. 176 PROJECT TITLE: LINE REPLACEMENT, E. ALEXANDER PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Ooeratigg_Goat Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: 'Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determine ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Sewer Line Replacement $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design Preliminary Design % Final Plans % Specifications % Construction % 20,000 $20,000 177 City of Euless Capital Project Request - Unfunded Department: PUBLIC WORK Submitted By: RANDY BYERS Project Title: LINE REPLACEMENT, PAULA LANE Type: WASTEWATER Sub -Type: Project No.: Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-10-00 Date Completed: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Replace sanitary sewer lines on Paula Lane - Needles to W. Pipeline. JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. 178 PROJECT TITLE: LINE REPLACEMENT, PAULA LANE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Dir_ect_Qpatating Coat Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance CQata Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined 'ADDITIONAL COMMENTS: TOTAL ESTIMATED CAPITAL COST: Sewer Line Replacement $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: XX Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 79,000 $79,000 179 City of Euless Capital Project Request Department: WASTEWATER Submitted By: RANDY BYERS Project Title: MANHOLE REHAB. PROGRAM Project Type: WASTEWATER Sub -Type: Project No.: Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Rehabilitation of all City wastewater manholes that are in need. JUSTIFICATION: Date Prepared: 6-21-00 Date Completed: Many brick manholes in our wastewater collection are in disrepair and are allowing a great deal of I&I. This program provides for repair of these manholes which in turn reduces I&I and expenses asociated with treating rainwater & groundwater. 180 PROJECT TITLE: MANHOLE REHAB. PROGRAM NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Cosh :Subtotal: 'Total Estimated Annual Cost !PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX XX $0 $0 $0 PROJECT #: TOTAL ESTIMATED CAPITAL COST: Replacement $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design Preliminary Design % Final Plans % Specifications Construction % 100,000 $100,000 0% 0% 0% 0% 0% This project is anticipated to be a three year project. It is anticipated that the project will proceed through FY 2001, FY 2002, FY 2003 and be completed in FY 2004. 181 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Project Title: MIDWAY PARK - MAINS Project Type: WASTEWATER Sub -Type: Project No.: Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: Date Completed: 5/25/01 This project is a companion project to the FY 2002 CDBG project and is a continuation of the wastewater main replacements. PROJECT DESCRIPTION: Design and construction of wastewater mains in the southeast portion of the Midway Park Addition. JUSTIFICATION: Wastewater mains in the Midway Park area have deteriorated as they have aged and they need to be replaced. 182 PROJECT TITLE: MIDWAY PARK - MAINS PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Ooeratina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance_GQsts Subtotal: Total Estimated Annual Cost (PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund County, State, Federal Funding General Obligation Bonds Revenue bonds Certificate of Obligation Donations Supplemental Sales Tax ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 $O Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % Lines to be replaced: 1. Limestone Drive along south and east rear lot lines. 2. Between Freestme and Limestone from Midway South. 3. Outfall main from Limestone south. 4. Between Milan and Freestone south of Midway Drive. 16,000 350,000 $366,000 100% 183 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Project Title: FY 2003 CDBG Project Type: WASTEWATER Sub -Type: Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: Date Completed: 6/08/01 This funding is the 27th year project administered by Tarrant County. This project addresses the aging and deteriorating wastewater mains in the Midway Park area and is related to the 26th year CDBG project. PROJECT DESCRIPTION: Design and construction of wastewater mains in the central portion of the Midway Park Addition. JUSTIFICATION: Wastewater mains in the Midway Park area have deteriorated as they have aged and they need to be replaced. 184 PROJECT TITLE: FY 2003 CDBG PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct optlati gCost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: . Current Revenue Reserve Fund Special Project Fund County, State, Federal Funding General Obligation Bonds Revenue bonds Certificate of Obligation Donations Supplemental Sales Tax ADDITIONAL COMMENTS: TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 Tarrant County CDBG Contribution (estimated) $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: XX Conceptual Design % Preliminary Design % Final Plans % XX Specifications % Construction % Lines to be replaced: 1.) Between Bell Drive and Denton Drive 2.) Between Collins and Harris from Harwood to Blessing Branch Outfall 3.) Between Bell and Dallas from Dallas to Main Line 4.) Between Harris & Irion from Harwood to Dallas 5.) Between Irion & Denton from Harwood to Dallas 26,000 331,000 (105,000) $252,000 100% 0% 0% 0% 0% 185 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Project Title: FY 2004 CDBG Project Type: WASTEWATER Sub -Type: Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: Date Completed: 5/25/01 This funding is the 28th year project administered by Tarrant County. This project addresses aging and deteriorating wastewater mains along south side of State Highway 10 and adjacent to Carr Park. PROJECT DESCRIPTION: Design and construction of wastewater mains along south side of State Highway 10 from Martha west to Carr Park and along the north side of Carr Park. JUSTIFICATION: Wastewater mains in the vicinity of State Highway 10 have deteriorated as they have aged and they need to be replaced. 186 PROJECT TITLE: FY 2004 CDBG PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cosf Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund County, State, Federal Funding General Obligation Bonds Revenue bonds Certificate of Obligation Donations Supplemental Sales Tax ADDITIONAL COMMENTS: XX XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 Tarrant County CDBG Contribution (estimated) $0 so $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction Lines to be replaced: 1. Along south side of State Highway 10 from Martha to Simmons. 2. Simmons Drive from State Highway 10 to the north side of Carr Park. 3. Along the north side of Carr Park. 16,000 300,000 (105,000) $211,000 100% 187 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Project Title: FY 2005 CDBG Project Type: WASTEWATER Sub -Type: Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: Date Completed: 5/25/01 This funding is the 29th year project administered by Tarrant County. This project addresses aging and deteriorating wastewater mains in the Arnett Addition. PROJECT DESCRIPTION: Design and construction of wastewater mains in the northern portion of the Arnett Addition. JUSTIFICATION: Wastewater mains in the Arnett Addition have deteriorated as they have aged and they need to be replaced. 188 PROJECT TITLE: FY 2005 CDBG PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct_Qoeratina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: 'Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund County, State, Federal Funding General Obligation Bonds Revenue bonds Certificate of Obligation Donations Supplemental Sales Tax ADDITIONAL COMMENTS: Lines to be replaced: 1. Ross Avenue and north of Ross Avenue. 2. Between Ross and West Alexander. 3. Between Arnett and West Alexander. 4. Between Linda Lane and Arnett. 5. Linda Lane. TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 Tarrant County CDBG Contribution (estimated) $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: XX Conceptual Design % Preliminary Design % Final Plans % XX Specifications % Construction % 17,000 360,000 (105,000) $272,000 100% 189 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Project Title: FY 2006 CDBG Project Type: WASTEWATER Sub -Type: Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: Date Completed: 5/25/01 This funding is the 30th year project administered by Tarrant County. This project addresses aging and deteriorating wastewater mains in the southern protion of Midway Park. PROJECT DESCRIPTION: Design and construction of wastewater mains in the southern portion of Midway Park. JUSTIFICATION: Wastewater mains in the Midway Park Addition have deteriorated as they have aged and they need to be replaced. 190 PROJECT TITLE: FY 2006 CDBG PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: pirecLODeratina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund County, State, Federal Funding General Obligation Bonds Revenue bonds Certificate of Obligation Donations Supplemental Sales Tax ADDITIONAL COMMENTS: TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 Tarrant County CDBG Contribution (estimated) $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: XX Conceptual Design % Preliminary Design % Final Plans % XX Specifications % Construction % Lines to be replaced: 1. Between Ector and Aransas south of Midway Drive. 2. Between Aransas and Stonewall south of Midway Drive. 3. Between Stonewall and Milam south of Midway Drive. 17,000 245,000 (105,000) $157,000 100% 191 City of Euless Capital Project Request - Unfunded Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: LINE REPLACEMENT, CANYON RIDGE Type: WASTEWATER Sub -Type: Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-10-00 Date Completed: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Replace sanitary sewer line on Canyon Ridge. JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. 192 PROJECT TITLE: LINE REPLACEMENT, CANYON RIDGE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Opere_ting_1 Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costa Subtotal: 'Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Sewer Line Replacement so $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 162,000 $162,000 193 City of Euless Capital Project Request - Unfunded Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: LINE REPLACEMENT, ECTOR DRIVE Type: WASTEWATER Sub -Type: Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-10-00 Date Completed: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Replace sanitary sewer lines on east and west sides of Ector Drive from Harwood to end of lines. .JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. 194 PROJECT TITLE: LINE REPLACEMENT, ECTOR DRIVE PROJECT #: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Ditect Operating Cori Personnel: Full Time Sewer Line Replacement 200,000 Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $200,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Current Revenue Reserve Fund Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined ADDITIONAL COMMENTS: XX Conceptual Design Preliminary Design % Final Plans % Specifications Construction 195 City of Euless Capital Project Request - Unfunded Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: LINE REPLACEMENT, FAYETTE DRIVE Type: WASTEWATER Sub -Type: Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-10-00 Date Completed: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: !Replace sanitary sewer lines on east and west sides of Fayette Drive. JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. 196 PROJECT TITLE: LINE REPLACEMENT, FAYETTE DRIVE PROJECT #: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Ooeratinao Coat Personnel: Full Time Sewer Line Replacement 292,000 Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs. Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $292,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Current Revenue Reserve Fund Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined ADDITIONAL COMMENTS: XX Conceptual Design % Preliminary Design % Final Plans % Specifications Construction % 197 City of Euless Capital Project Request - Unfunded Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: LINE REPLACEMENT, MARTIN LANE Type: WASTEWATER Sub -Type: Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-10-00 Date Completed: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Replace sanitary sewer line on Martin Lane. .JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. 198 PROJECT TITLE: LINE REPLACEMENT, MARTIN LANE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Mpintenance Costs Subtotal: 'Total Estimated Annual Cost 'PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Sewer Line Replacement $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications % Construction % 65,000 $65,000 199 City of Euless Capital Project Request - Unfunded Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: LINE REPLACEMENT, McCORMICK Type: WASTEWATER Sub -Type: Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-10-00 Date Completed: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Replace sanitary sewer line servicing McCormick and Gopher Courts. JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often innundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. 200 PROJECT TITLE: LINE REPLACEMENT, McCORMICK PROJECT #: NET EFFECTS ON OPERHTING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: MaintenancaLg_sts Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Sewer Line Replacement $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 66,000 $66,000 201 City of Euless Capital Project Request - Unfunded Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: Type: Project No.: LINE REPLACEMENT, SAGEBRUSH WASTEWATER Sub -Type: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-10-00 Date Completed: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Replace sanitary sewer lines on the north and south sides of Sagebrush Trail. JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. 202 PROJECT TITLE: LINE REPLACEMENT, SAGEBRUSH PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct ODeratingCt Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Sewer Line Replacement $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications % Construction % 195,000 $195,000 203 City of Euless Capital Project Request - Unfunded Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: LINE REPLACEMENT, SHORT ST. Type: WASTEWATER Sub -Type: Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-10-00 Date Completed: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Replace sanitary sewer lines - 8" outfall - Short St. to Copher Ct. JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. 204 PROJECT TITLE: LINE REPLACEMENT, SHORT ST. PROJECT #: NET EFFECTS ON OPERATING ANDI MAINTENANCE COST (+ OR -) ANNUAL: Direct Ooeratin.g Cot Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: 'Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Sewer Line Replacement $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 80,000 $80,000 205 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: 7-26-99 Submitted By: RANDY BYERS Date Completed: Project Title: LITTLE BEAR CREEK COLLECTION LINE Project Type: WASTEWATER Sub -Type: Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Project identified as necessary in the Wastewater Impact Fee Map. PROJECT DESCRIPTION: Design and construction of the Little Bear Creek Major Collection Line identified in the 1999 Wastewater Impact Fee Review. JUSTIFICATION: Existing wastewater main does not have adequate capacity to serve future growth in the basin. Impact fee funds are currently available to fund this project. 206 PROJECT TITLE: LITTLE BEAR CREEK COLLECTION LINE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Dirt_Operatino Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs. Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 Right of Way $0 so $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design Preliminary Design % Final Plans Specifications % Construction % 75,000 300,000 50,000 $425,000 207 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RON YOUNG Project Title: FY 2007 CDBG Project Type: WASTEWATER Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: Date Completed: 5/25/01 This funding is the 31th year project administered by Tarrant County. This project addresses aging and deteriorating wastewater mains in the Cedar Hill Estates area and is a continuation of previous CDBG projects. PROJECT DESCRIPTION: Design and construction of wastewater mains in the Cedar Hill Estates Addition. .JUSTIFICATION: 'Wastewater mains in the Cedar Hill Estates Addition area have deteriorated as they have aged and they need to be replaced. 208 PROJECT TITLE: FY 2007 CDBG PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: DirectQp__erating Sit Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund County, State, Federal Funding General Obligation Bonds Revenue bonds Certificate of Obligation Donations Supplemental Sales Tax ADDITIONAL COMMENTS: TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 Tarrant County CDBG Contribution (estimated) $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: XX Conceptual Design Preliminary Design % Final Plans % XX Specifications % Construction Lines to be replaced: 1. Between Oakwood and Vine north of Whitener. 2. Broadway from Sunset to Hollywood. 3. Hollywood from Broadway to South Main. 4. Henslee from Sunset to Hollywood. 5. Sunset from Broadway to South Main. 17,000 407,000 (105,000) $319,000 100% 209 City of Euless Capital Project Request - Unfunded Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: LINE REPLACEMENT, E. FULLER Type: WASTEWATER Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-10-00 Date Completed: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Replace sanitary sewer line on E. Fuller Dr. - north and south sides. JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. 210 PROJECT TITLE: LINE REPLACEMENT, E. FULLER PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Jyjpintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Sewer Line Replacement $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 156,000 $156,000 211 City of Euless Capital Project Request - Unfunded Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: LINE REPLACEMENT, JEAN LANE Type: WASTEWATER Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-10-00 Date Completed: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Replace sanitary sewer lines on Jean Lane. JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. 212 PROJECT TITLE: LINE REPLACEMENT, JEAN LANE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating_G1 Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Sewer Line Replacement $0 so $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 52,000 $52,000 213 City of Euless Capital Project Request - Unfunded Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: LINE REPLACEMENT, KOEN Type: WASTEWATER Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-10-00 Date Completed: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Replace sanitary sewer line 12" from Koen to S. Pipeline. JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. 214 PROJECT TITLE: LINE REPLACEMENT, KOEN PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Sewer Line Replacement $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 225,000 $225,000 215 City of Euless Capital Project Request - Unfunded Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: LINE REPLACEMENT, PEBBLE CREEK Type: WASTEWATER Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-10-00 Date Completed: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Replace sanitary sewer lines on Pebble Creek from Woodvine to Wood Ridge. JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. 216 PROJECT TITLE: LINE REPLACEMENT, PEBBLE CREEK PROJECT #: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: D irect_Operating_Cost Personnel: Full Time Sewer Line Replacement 95,000 Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Mzintan.ance Costs Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $95,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Current Revenue Reserve Fund Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined ADDITIONAL COMMENTS: XX Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 217 City of Euless Capital Project Request - Unfunded Department: PUBLIC WORKS Date Prepared: 7-10-00 Submitted By: RANDY BYERS Date Completed: Project Title: LINE REPLACEMENT, RIDGECREST Type: WASTEWATER Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Replace sanitary sewer lines on Ridgecrest Drive. JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. 218 PROJECT TITLE: LINE REPLACEMENT, RIDGECREST PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costq Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Sewer Line Replacement $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 90,000 $90,000 219 City of Euless Capital Project Request - Unfunded Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: LINE REPLACEMENT, S. SHEPPARD Type: WASTEWATER Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-10-00 Date Completed: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Replace sanitary sewer lines on S. Sheppard Dr. JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. 220 PROJECT TITLE: LINE REPLACEMENT, S. SHEPPARD PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Qir_est_Operating_Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Sewer Line Replacement $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction 90,000 $90,000 221 City of Euless Capital Project Request - Unfunded Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: LINE REPLACEMENT, W. FULLER Type: WASTEWATER Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-10-00 Date Completed: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Replace sanitary sewer lines on W. Fuller Drive. JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. 222 PROJECT TITLE: LINE REPLACEMENT, W. FULLER PROJECT #: NET EFFECTS ON OPERATING ANDI MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Coat_S Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Sewer Line Replacement so so so $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans °A Specifications % Construction % 70,000 $70,000 223 City of Euless Capital Project Request - Unfunded Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: LINE REPLACEMENT, WINDWARD WAY Type: Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-10-00 Date Completed: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Replace sanitary sewer lines on Windward Way. JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. 224 PROJECT TITLE: LINE REPLACEMENT, WINDWARD WAY PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Oneretina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance CQ5ta Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Sewer Line Replacement $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications Construction 80,000 $80,000 225 City of Euless Capital Project Request - Unfunded Department: PUBLIC WORKS Date Prepared: 7-10-00 Submitted By: RANDY BYERS Date Completed: Project Title: LINE REPLACEMENT, WOODRIDGE Type: WASTEWATER Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS ANDIOR MASTER PLAN: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Replace sanitary sewer lines on Wood Ridge Circle. JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. 226 PROJECT TITLE: LINE REPLACEMENT, WOODRIDGE PROJECT #: NET EFFECTS ON OPERATING ANDI MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: klaintenance_ceata Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations Supplemental Sales Tax To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Sewer Line Replacement $0 $0 $o $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design Preliminary Design % Final Plans % Specifications % Construction 135,000 $135,000 227 Department: Submitted By: Project Title: Project Type: Project No.: City of Euless Capital Project Request PUBLIC WORKS RANDY BYERS SH 183 WASTEWATER Date Prepared: 7-21-00 Date Completed: Sub -Type: RELOCATION Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: TxDOT plans to widen SH183 within the next ten years. PROJECT DESCRIPTION: The City has a number of wastewater mains that might require relocation. The scope of the work is unknown at this time. JUSTIFICATION: Required where conflicts will occur with TxDOT's highway project. 228 PROJECT TITLE: SH 183 PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Opereting_Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costa Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Cost yet to be determined $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications % Construction % The scope of work will be determined as TxDOT completes the highway reconstruction plans. 0% 0% 0% 0% 0% 229 Unfiiiided Water Proj ('CtS Project Description Priority Estimated Cost CAPITAL IMPROVEMENT PROGRAMS UNFUNDED PROJECTS - SORTED BY TYPE PROPOSED METHOD OF FINANCING County, Operating CIP Fund Bond State, Impact Escrow Fund Balance Sale Federal Fees Funds Funds WATER PROJECTS Disinfection Modification /Well Rehabilitation I A I$ 600,000 I XX I I I I Effluent Water Main I A I$ 250,000 I XX I I I Sub -Total Water Priority A $ 850,000 Hwy 360 Water Crossing 01 I B $ 300,000 XX Rehab Central Dr. Water Storage (') I B $ 500,000 XX Rehab/Rebuild Fuller Dr. Ground Storage Tank (1 B $ 200,000 XX W. Pipeline Water Main Replacement t') I B $ 1,000,000 XX Sub -Total Water Priority B Hwy 183 Water Crossing Sub -Total Water Priority C WATER PROJECTS - TOTAL $ 2,000,000 C I TBD A - Projects that will be presented to Council during the upcoming year. B - Projects that will be presented to Council wthin two to five years. C - Projects that will be presented to Council beyond five years. $ 2,850,000 Car Rental Hotel / EDC To Be Tax Motel Determined I I I I I I I XX City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: 7-26-99 Submitted By: RANDY BYERS Date Completed: Project Title: DISINFECTION MODIFICATION/WELL REHABILITATION Project Type: WATER Sub -Type: WATER PRODUCTION Project No.: Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: This project consists of inspecting deep wells to determine condition of well pipe, casing, screens and gravel packing and rehabilitating items that are found to be in need. It also includes adding ammonia injection facilities at each of our four well sites. JUSTIFICATION: Wells are old and heavily used. All four deep wells need to be rehabilitated according to needs determined by inspection. The EPA, TNRCC, and SDWA mandate disinfection by-product limits. If our test results indicate non compliance, we will need to modify our disinfection process or cease well operations. 231 PROJECT TITLE: DISINFECTION MODIFICATION/WELL REHABILIT, PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating__ Cut Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance QQsls Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Modification $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications % Construction 600,000 $600,000 0% 0% 0% 0% 0% 232 Department: Submitted By: Project Title: Project Type: Project No.: City of Euless Capital Project Request COMMUNITY SERVICES RICK HEROLD EFFLUENT WATER MAIN WATER Date Prepared: 6-29-00 Date Completed: Sub -Type: INSTALLATION Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Effluent water main from City of Ft. Worth, Village Creek Wastewater Treatment Facility to the Texas Star property. JUSTIFICATION: This source of water would ensure that we could continue water in the event of drought and mandatory water restrictions. 233 PROJECT TITLE: EFFLUENT WATER MAIN PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct ODeratina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Installation $0 so $0 $0 !Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 250,000 $250,000 0% 0% 0% 0% 0% 234 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: SH 360 WATER CROSSING Project Type: WATER Sub -Type: MAINS Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-21-00 Date Completed: This project is related to the DFW International Airport Master Plan for property in Euless. PROJECT DESCRIPTION: This project consists of the extension of three water mains across SH 360 right-of-way to provide water service to a portion of the DFW Airport property. JUSTIFICATION: Development on the airport property will increase the City's tax revenues. The mains should be extended prior to construction of the main lanes of SH 360. 235 PROJECT TITLE: SH 360 WATER CROSSING PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatin _Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design Final Plans % Specifications % Construction b/° 30,000 270,000 $300,000 0% 0% 0% 0% 0% 236 City of Euless Capital Project Request Department: WATER PRODUCTION Submitted By: RANDY BYERS Project Title: REHAB CENTRAL DR. WATER STORAGE TANK Project Type: WATER Sub -Type: TANK Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Date Prepared: 6-21-00 Date Completed: Inspect and determine needs and complete rehab of Central Dr. ground storage tank. JUSTIFICATION: This facility is nearing 50 years of age. An inspection of structural integrity should be made. Any needed repairs or upgrades, including removal of lead based paint, to bring this tank into compliance with current regualtions. 237 PROJECT TITLE: REHAB CENTRAL DR. STORAGE TANK PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cclet Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Rehab $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications % Construction % 500,000 $500,000 0% 0% 0% 0% 0% 238 City of Euless Capital Project Request Department: WATER PRODUCTION Submitted By: RANDY BYERS Date Prepared: 6-21-00 Date Completed: Project Title: REHAB/REBUILD FULLER DR. GROUND STORAGE TANK Project Type: WATER Sub -Type: TANK Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Inspect and determine structural condition of Fuller Dr. ground storage tank. Make needed repairs from rehab to rebuild as necessary. JUSTIFICATION: This facility is one of the earliest ground storage tanks. It is nearing 50 years of age and is in need of repairs. The tank may be found to be structurally unsound and would need to be rebuilt. 239 PROJECT TITLE: REHAB/REBUILD FULLER GROUND TANK PROJECT #: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Oneratina Cost Personnel: Full Time Rehab/Rebuild 200,000 Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Coat, Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $200,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX Conceptual Design % 0% Preliminary Design % 0% Final Plans % 0% Specifications % 0% Construction % 0% 240 City of Euless Capital Project Request Department: WATER DISTRIBUTION Submitted By: RANDY BYERS Project Title: W. PIPELINE WATERMAIN REPLACEMENT Project Type: WATERLINE REPLACEMENT Sub -Type: Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Needs to be completed prior to maintenance of roadway. PROJECT DESCRIPTION: Date Prepared: 6-15-00 Date Completed: Replace approximately two (2) miles of 12" water main on W. Pipeline Road from Central Drive to West City Limits. JUSTIFICATION: This waterline is large and deep. It suffers from deterioration and many leaks have had to be repaired. Needed roadway maintenance is being delayed until this line is replaced. 241 PROJECT TITLE: W. PIPELINE WATERMAIN REPLACEMENT PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating_ Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Water Main Replacement $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 1,000,000 $1,000,000 0% 0% 0% 0% 0% 242 Department: Submitted By: Project Title: Project Type: Project No.: City of Euless Capital Project Request PUBLIC WORKS RANDY BYERS SH 183 WATER CROSSING WATER Sub -Type: MAINS Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: TxDOT plans to widen SH 183 within the next 10 years. PROJECT DESCRIPTION: Date Prepared: 7-21-00 Date Completed: The City has a 24" water main and many other smaller mains that will have to be relocated. The scope/magnitude of relocation work is unknown at this time. JUSTIFICATION: Required where conflicts will occur with TxDOT's highway project. 243 PROJECT TITLE: SH 183 WATER CROSSING PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating S2st Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance CQata Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: The cost of this project is currently unkown. $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications Construction % The scope of work will be determined as TxDOT completes the highway reconstruction plans. 0% 0% 0% 0% 0% Oth.er Unfunded Projects Project Description 'OTHER PROJECTS Building D Remodel Midway Recreation Center Upgrade Sub -Total Other Priority A Aquatics Center/Recreation Center Expansion (4) Building A Remodel (3) Building B Remodel (6) City Wide Trail Enhancement (3) Fire Station #3 Reconstruction (`) Parks at Texas Star, Phase III (3) Public Works Facility (6) Sub -Total Other Priority B Community Golf Course at Bob Eden Park Conversion & Expansion of Ruth Millican Cntr Expansion & Upgrade of Bob Eden Park Fire Training Facility Library Build Out Parks at Texas Star, Phase IV Redevelopment of Westpark SH 10 Land Acquisition Softball World Texas Star Conference Cntr, Phase II Sub -Total Other Priority C 'OTHER PROJECTS -TOTAL CAPITAL IMPROVEMENT PROGRAMS UNFUNDED PROJECTS - SORTED BY TYPE PROPOSED METHOD OF FINANCING County, Operating CIP Fund Bond State, Impact Escrow Car Hotel / To Be Priority Estimated Cost Fund Balance Sale Federal Fees Funds RTaxal Motel EDC Determined Funds A I$ A ' $ 422,000 922,020 1 XX $ 1,344,020 B $ 9,500,000 B $ 978,550 B $ 837,390 B $ 1,750,000 B $ 1,500,000 B $ 4,400,000 B $ 2,510,408 $ 21,476,348 C $ 4,000,000 C $ 1,000,000 C $ 2,000,000 C $ 1,200,000 C $ 2,120,000 C $ 10,000,000 C $ 2,500,000 C $ 3,000,000 C TBD C $ 3,350,000 A - Projects that will be presented to Council during the upcoming year. B - Projects that will be presented to Council wthin two to five years. C - Projects that will be presented to Council beyond five years. $ 29,170,000 $ 51,990,368 XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX Department: Submitted By: Project Title: Project Type: Project No.: City of Euless Capital Project Request PUBLIC WORKS RANDY BYERS BUILDING D BUILDING Date Prepared: 6-27-00 Revised: 5-28-01 Date Completed: Sub -Type: RENOVATION Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Building D will be the third project of the master plan. Construction is to begin in January 2002 and scheduled for completion in July 2002. PROJECT DESCRIPTION: Building D, which now houses the Police Department, will be renovated to accommodate the future office expansion of Fire Administration, Information Services, and Purchasing, with a storage and receiving area. Construction cost will be $922,020 (construction cost based on current cost). JUSTIFICATION: Relocating the Police Department to a new facility on Hwy 10 in October 2001, freeing space to renovate Building D to accommodate the expansion needs of the Fire Administration, Information Services, and Purchasing Departments. 246 PROJECT TITLE: BUILDING D PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating CQst Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund County, State, Federal Funding General Obligation Bonds Revenue bonds Certificate of Obligation Car Rental CIP Fund Balance ADDITIONAL COMMENTS: XX XX TOTAL ESTIMATED CAPITAL COST: Remodel Includes: Architectural fees (7.5%) $0 Telephone/Cabling Plumbing Test Slab Test Furniture Misc. fees $0 so $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 922,020 $922,020 247 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: Submitted By: RICK HEROLD Date Completed: Project Title: MIDWAY RECREATION CENTER UPGRADE Project Type: BUILDING Sub -Type: REMODEL Project No.: Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Expansion project requested in response to increased user load of recreation center PROJECT DESCRIPTION: 6/13/01 Remodel will involve providing additional space and equipment for the Fitness Center and Weight Room areas. Additionally, two administrative offices located on the lower level of the facility will be constructed for administrative responsibility and visibility in redesigned areas. New tables and chairs will be purchased and the chilled water HVAC system will be replaced. JUSTIFICATION: Users and citizens of the current facility are required to wait for machines and endure crowds during peak periods. The proposed expansion will provide additional cardiovascular machines and fitness space for the ever- increasing user demand of the recreation facility. It will also take care of general upgrades that are needed. 248 PROJECT TITLE: MIDWAY RECREATION CENTER UPGRADE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatina Cosi Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Maintenance/Cleaning Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds Car Rental Fund ADDITIONAL COMMENTS: TOTAL ESTIMATED CAPITAL COST: Planning, Design and $0 Construction $0 1,000 $1,000 200 $200 $1,200 Total Estimated Capital Cost XX CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 422,000 $422,000 0% 0% 0% 0% 0% 249 City of Euless Capital Project Request Department: COMMUNITY SERVICES Submitted By: RICK HEROLD Date Prepared: 7-10-00 Date Completed: Project Title: AQUATIC CENTER/RECREATION CENTER EXPANSION Project Type: BUILDING Sub -Type: NEW CONSTRUCTION Project No.: Priority: B RFI ATIONSHIP TO OTHFR PRO.IFCTS ANnIOR MASTFR PLAN: The completion of Master Plan is anticipated for August 2001. Master Plan will include a proposal to construct an Aquatic Center in conjunction with the Recreation Center expansion. PROJECT DESCRIPTION: Develop an aquatic center at Midway Park with emphasis on recreational play of citizens. This component has drawn strong community support and along with the Parks at Texas Star is a top priority of the Parks & Leisure Services Board and staff. JUSTIFICATION: Three (3) thirty year old pools which are outdated and the City totally needs to upgrade our aquatic offerings to our citizens. Additionally, as usage of current recreation facility continues to increase, expansion will be required to accommodate citizen demands. 250 PROJECT TITLE: AQUATIC CENTER/RECREATION CENTER EXPANSION PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: DireCt Operatina Cost Personnel: Full Time Part Time Total Salary Utilities Subtotal: Maintenance Cos Pool & Building Maintenance Total Costs Less: Anticipated Revenue Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Revenue Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To be determined ADDITIONAL COMMENTS: TOTAL ESTIMATED CAPITAL COST: $150,000 Engineering $50,000 Construction $200,000 $60,000 $260,000 100,000 $360,000 (180,000) $180,000 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design Preliminary Design % Final Plans % XX Specifications % Construction % 650,000 8,850,000 $9,500,000 251 City of Euless Capital Project Request Department: PUBLIC WORKS/FACILITIES MAINTENANCE Date Prepared: 6-27-00 Submitted By: RANDY BYERS Revised: 5-28-01 Date Completed: Project Title: BUILDING A Project Type: BUILDING Sub -Type: REMODEL Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Building A will be the fourth project of the master plan. Construction is proposed to begin in March 2003 with an estimated completion in October 2003. PROJECT DESCRIPTION: Building A (Downstairs area) will be renovated to accommodate the new City Council Chambers and Pre - Council and conference rooms. Construction costs will be $978,550 (construction cost based on current costs). JUSTIFICATION: Relocating the Fire Administration and Purchasing Departments to the renovated Building D in July 2002. Downstairs offices will be renovated to accommodate the City Council Chambers, which are currently located in Building B. This will allow for office expansion in Building B for Finance, Insurance, and Human Resources Departments. 252 PROJECT TITLE: BUILDING A PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Funds Reserve Fund Special Project Fund County, State, Federal Funding General Obligation Bonds Revenue bonds Certificate of Obligation Car Rental ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Remodel Includes: Architectural fees (7.5%) $0 Telephone/Cabling Furniture (partial) Misc. fees $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design Preliminary Design % Final Plans % Specifications % Construction 978,550 $978,550 253 City of Euless Capital Project Request Department: PUBLIC WORKS/FACILITES MAINTENANCE Date Prepared: 6-27-00 Submitted By: RANDY BYERS Revised: 5-28-01 Date Completed: Project Title: BUILDING B Project Type: BUILDING Sub -Type: REMODEL Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Building B will be the fifth project of the master plan. Construction is proposed to begin in January 2004 with an estimated completion in June 2004. PROJECT DESCRIPTION: To provide a more efficient work space area, Building B will be remodeled to expand the layout for the following departments: Finance, Water Billing Office, Insurance and Human Resources. Community Services, Municipal Courts, and the City Council Chambers will all be relocated in other buildings. Construction costs will total $837,390 (construction cost based on current cost). JUSTIFICATION: Municipal Courts Department and Community Services offices will be relocated to other sites before construction commences. Renovation of Building B will provide more efficient work space area for Finance, Water Department, Insurance, and Human Resource Department offices. 254 PROJECT TITLE: BUILDING B PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Qirect Operating_Caaf Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund County, State, Federal Funding General Obligation Bonds Revenue bonds Certificate of Obligation To Be Determined Car Rental ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Remodel Includes: Architectural fees (7.5%) $0 Telephone/Cabling Furniture (partial) Misc. fees $0 so $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications Construction % 837,390 $837,390 255 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: Submitted By: RICK HEROLD Date Completed: Project Title: CITY-WIDE TRAIL ENHANCEMENTS Project Type: LAND Sub -Type: IMPROVEMENTS Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: 6/13/01 Proposed project is a need as identified in initial Master Plan as under review by the Park Board. The completion of the Parks Master Plan is anticipated in August 2001. PROJECT DESCRIPTION: Develop a comprehensive trail system with multiple uses for the citizens of Euless. JUSTIFICATION: Trail development and enhancement opportunities will be consistent with available land, funding and time variables. This Master Plan recommendation will be part of a comprehensive trail enhancement project. 256 PROJECT TITLE: CITY-WIDE TRAIL ENHANCEMENTS PROJECT #: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: QireQW_Derating Cost Personnel: Full Time $0 Planning, Design and Part Time $0 Engineering 105,000 Total Salary $0 Construction Right of Way 1,645,000 Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Cote Seed/Sod/Path Supplies 25,000 Subtotal: $25,000 Total Estimated Annual Cost $25,000 Total Estimated Capital Cost $1,750,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Revenue Conceptual Design % Fund Balance Preliminary Design °A) Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding XX Construction °A° General Obligation Bonds Revenue bonds Donations Car Rental XX ADDITIONAL COMMENTS: 257 City of Euless Capital Project Request Department: FIRE Date Prepared: 7-19-00 Submitted By: LEE KOONTZ Date Completed: Project Title: FIRE STATION #3 RECONSTRUCTION Project Type: BUILDING Sub -Type: RECONSTRUCTION Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Not related to other projects. PROJECT DESCRIPTION: Fire Station #3, located at 201 W. Euless Blvd. Should be demolished and reconstructed on -site. Apparatus Building will remain intact with new construction consisting of living quarters, office areas, weight room, day room, kitchen, and storage areas. The project is proposed for FY 2004 and should take 12 months to complete. JUSTIFICATION: This fire station was constructed in a remodeled 30 plus year old structure. The building is experiencing foundation problems and is structurally challenged. Additionally, the building is not large enough to adequately house the personnel assigned to this station. 258 PROJECT TITLE: FIRE STATION #3 RECONSTRUCTION PROJECT #: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Construction 1,500,000 Part Time Total Salary $0 Purchase of Services To include: Materials & Supplies 1) Architect fees & fixtures Utilities 2) Furniture needs to be determined Subtotal: $0 Maintenance Costa Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $1,500,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX Conceptual Design Preliminary Design % Final Plans Specifications % Construction % 259 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: 7-7-00 Submitted By: RICK HEROLD Date Completed: Project Title: PARKS AT TEXAS STAR, PHASE III Project Type: LAND Sub -Type: IMPROVEMENTS Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND!OR MASTER PLAN: Completion of Master Plan is anticipated in August 2001. Relationship with other projects is still pending based on the final approved plan, PROJECT DESCRIPTION: And four plex, in -line hockey, skate park and parking and related infrastructure. JUSTIFICATION: Continue Parks at Texas Star Master Plan as committed to citizens with the passage of the 1/2 Cent Sales Tax. 260 PROJECT TITLE: PARKS AT TEXAS STAR, PHASE III PROJECT #: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Pict Operatina Cost Personnel: Full Time Design 400,000 Part Time $30,000 Construction 4,000,000 Total Salary $30,000 Purchase of Services Materials & Supplies 11,500 Utilities 12,000 Subtotal: $53,500 Maintenance Costs 21,500 Subtotal: $21,500 Total Estimated Annual Cost $75,000 Total Estimated Capital Cost $4,400,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds (EDC) Impact Fees Escrow Funds Car Rental Grant ADDITIONAL COMMENTS: 1,500,000 XX $500,000 Conceptual Design % 0% Preliminary Design % 0% Final Plans % 0% Specifications % 0% Construction % 0% 261 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: 6-27-00 Submitted By: RANDY BYERS Revised: 5-28-01 Date Completed: Project Title: PUBLIC WORKS FACILITY Project Type: BUILDING Sub -Type: NEW CONSTRUCTION Project No.: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Public Works Facility will be the sixth project to be completed in the master plan. Construction is proposed to begin in FY2005-06. PROJECT DESCRIPTION: A new building site will be constructed to accommodate the Public Works Facility. The new building will be located adjacent to the Fire Station No. 2 and Animal Shelter along Westpark Way and Pipeline Road. Total construction cost will be $2,510,408 (construction cost based on current cost). JUSTIFICATION: Relocating the Public Works Facility to a new building site to allow for present and future expansion needs and plans. 262 PROJECT TITLE: PUBLIC WORKS FACILITY PROJECT #: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Op rating_Cost Planning, Design and Personnel: Full Time Construction 2,510,408 Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 ' Subtotal: $0 Maintenance Costs Utilities 6,000 Cleaning 4,800 Insurance 2,500 Subtotal: $13,300 Total Estimated Annual Cost $13,300 Total Estimated Capital Cost $2,510,408 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Current Revenue Reserve Fund Special Project Fund County, State, Federal Funding General Obligation Bonds Revenue bonds Certificate of Obligation To Be Determined ADDITIONAL COMMENTS: XX Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction 263 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: 7-10-00 Submitted By: RICK HEROLD Date Completed: Project Title: COMMUNITY GOLF COURSE AT BOB EDEN Project Type: LAND Sub -Type: IMPROVEMENTS Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The completion of the Master Plan is anticipated in August 2001. The relationship with other projects is still pending based on the final approved plan. PROJECT DESCRIPTION: Develop 18-hole community golf course, primarily aimed at Euless Citizens, featuring Bermuda greens, limited clubhouse, and ease of play. JUSTIFICATION: Meet community golf needs while taking advantage of scenic areas and preserving necessary green space. This facility would be awesome for seniors, ladies, junior and beginning golfers. Increase land value of neighborhood. 264 PROJECT TITLE: COMMUNITY GOLF COURSE AT BOB EDEN PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Co 1 Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Course Maintenance Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Revenue Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined ADDITIONAL COMMENTS: TOTAL ESTIMATED CAPITAL COST: $200,000 Engineering $75,000 Construction $275,000 $40,000 $200,000 $515,000 400,000 $400,000 $915,000 Total Estimated Capital Cost XX CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % We recommend that all debt and operation costs should be absorbed through the users. 350,000 3,650,000 $4,000,000 TBD 265 City of Euless Capital Project Request Department: COMMUNITY SERVICES Submitted By: RICK HEROLD Date Prepared: 7-10-00 Date Completed: Project Title: CONVERT & EXPAND RUTH MILLICAN Project Type: BUILDING/FACILITY Sub -Type: EXPANSION Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN. The completion of the Master Plan is anticipated in August 2001. The relationship with other projects is still pending based on the final approved plan. PROJECT DESCRIPTION: Redevelop Ruth Millican building to Ruth Millican Senior Center through adding seniors weight area, activity room, arts and crafts area, kitchen, and office space. Ties in beautifully with Heritage Park. JUSTIFICATION: Need to continue to address the needs of the aging population and RMC allows Euless to do such with extremely limited funding. 266 PROJECT TITLE: CONVERT & EXPAND RUTH MILLICAN PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Dires,W perating_CQat Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: MaintQnance Costs Custodial Services Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Revenue Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined ADDITIONAL COMMENTS: TOTAL ESTIMATED CAPITAL COST: $40,000 Engineering $20,000 Construction $60,000 $15,000 $75,000 $15,000 $15,000 $90,000 Total Estimated Capital Cost XX CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % $85,000 $915,000 $1 ,000,000 TBD 267 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: 7-10-00 Submitted By: RICK HEROLD Date Completed: Project Title: EXPANSION & UPGRADE OF BOB EDEN PARK Project Type: LAND Sub -Type: IMPROVEMENT/EXPANSION Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The completion of Master Plan is anticipated for August 2001. The relationship with other projects is still pending based on the final approve plan. PROJECT DESCRIPTION: Redevelop Bob Eden Park, taking advantage of new Mid -Cities alignment and address park aesthetic issues caused by such. Additional irrigation, trail system, soccer fields, parking and disc golf course. JUSTIFICATION: Realignment of Mid -Cities has increased the need to update park infrastructure. Taking advantage of new park land, and adding needed improvements at one of Euless' most utilized facilities. 268 PROJECT TITLE: EXPANSION & UPGRADE OF BOB EDEN PARK PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: QireeLOperating t Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Contract Mowing Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Revenue Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined Grant ADDITIONAL COMMENTS: TOTAL ESTIMATED CAPITAL COST: Engineering Construction $0 $10,000 $8,500 Potential Grant Money $18,500 25,000 $25,000 $43,500 Total Estimated Capital Cost XX $500,000 CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 175,000 2,325,000 (500,000) $2,000,000 TBD 269 Department: FIRE Submitted By: LEE KOONTZ City of Euless Capital Project Request Date Prepared: 7-19-00 Date Completed: Project Title: FIRE TRAINING FACILITY Project Type: BUILDING Sub -Type: NEW CONSTRUCTION Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The site of the training facility will be behind fire station #2 on Westpark Way and will share land with the proposed future Public Works and Warehouse facility. PROJECT DESCRIPTION: This project will be the construction of a fire training facility that will consist of a four-story fire training tower, burn building and pad site for apparatus operation. JUSTIFICATION: This facility is needed to provide training for fire department personnel. Currently it is necessary to send our people out of the City to receive training and often it requires the payment of substantial amounts of overtime. The facility would also give us additional credit towards our insurance rating by ISO. 270 PROJECT TITLE: FIRE TRAINING FACILITY PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Dire.aDheratino Cosa Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Cost Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Construction $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design Final Plans % Specifications Construction % 1,200,000 $1,200,000 271 City of Euless Capital Project Request Department: COMMUNITY SERVICES Submitted By: RICK HEROLD Date Prepared: 7-10-00 Date Completed: Project Title: LIBRARY BUILD OUT Project Type: BUILDING Sub -Type: IMPROVEMENTS Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Shelled area provided in initial plan, design, and construction of the Euless Public Library. The proposed project will provide for completion of the shelled areas as designed with initial construction of the facility. PROJECT DESCRIPTION: Complete shelled areas of Library facility. Build out of shelled areas, once completed will be made available for use by citizens, guests, and employees of the City of Euless. JUSTIFICATION: Initial construction provided for a shelled area for further expansion as consistent with user/collection growth. Shelled area is available in existing structure for expansion. 272 PROJECT TITLE: LIBRARY BUILD OUT PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Ooeratirtg Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Maintenance/Cleaning Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Revenue Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To be determined ADDITIONAL COMMENTS: TOTAL ESTIMATED CAPITAL COST: $150,000 Planning & Design Construction $150,000 $60,000 $40,000 $250,000 50,000 $50,000 $300,000 Total Estimated Capital Cost XX CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 120,000 2,000,000 $2,120,000 273 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: 7-10-00 Submitted By: RICK HEROLD Date Completed: Project Title: PARKS AT TEXAS STAR, PHASE IV Project Type: LAND Sub -Type: IMPROVEMENT Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The completion of the Master Plan is anticipated in August 2001. The relationship with other projects is still pending based on the final approved plan. PROJECT DESCRIPTION: Remaining build -out of baseball/softball, soccer, playground, parking and related infrastructure. JUSTIFICATION: Continue Parks at Texas Star Master Plan as committed to citizens with the passage of the 1/2 cent sales tax. 274 PROJECT TITLE: PARKS AT TEXAS STAR, PHASE IV PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Dir_ect OperatingLQa1 Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Cuts Turf Maintenance Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Revenue Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined Grant ADDITIONAL COMMENTS: TOTAL ESTIMATED CAPITAL COST: $40,000 Engineering $20,000 Construction $60,000 $15,000 $75,000 $15,000 $15,000 $90,000 Total Estimated Capital Cost XX $'s unknown CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction 500,000 9,500,000 $10,000,000 TBD 275 City of Euless Capital Project Request Department: COMMUNITY SERVICES Date Prepared: 7-10-00 Submitted By: RICK HEROLD Date Completed: Project Title: REDEVELOPMENT OF WESTPARK Project Type: LAND Sub -Type: IMPROVEMENT Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The completion of the Master Plan is anticipated in August 2001. The relationship with other projects is still pending based on the final approved plan. PROJECT DESCRIPTION: Redevelop Westpark by creating an outstanding neighborhood park for citizens. Create a new design with a gazebo, pavilion, trails, open space, restrooms, land landscaping. Further, to develop the land that is currently unused into trail and green preservation. JUSTIFICATION: Needed updates to a deteriorating park to better facilitate Westpark/Wilshire neighborhoods. 276 PROJECT TITLE: REDEVELOPMENT OF WESTPPRK PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: QireeLQperating_Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Mowing Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Revenue Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined ADDITIONAL COMMENTS: TOTAL ESTIMATED CAPITAL COST: $0 Engineering $12,000 Construction $12,000 $10,000 $22,000 20,000 $20,000 $42,000 (Total Estimated Capital Cost XX CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 200,000 2,300,000 $2,500,000 TBD 277 City of Euless Capital Project Request Department: ECONOMIC DEVELOPMENT Date Prepared: 7-7-00 Submitted By: BILL RIDGEWAY Date Completed: Project Title: S.H. 10 LAND ACQUISITION Project Type: MISC Sub -Type: Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project is potentially tied to the Texas Star Sport Centre and the 2012 Olympics. PROJECT DESCRIPTION: The purchase is approximately 12 acres. JUSTIFICATION: Required for facilitating redevelopment or for park use. 278 PROJECT TITLE: S.H. 10 LAND ACQUISITION PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Qirect Operatina Coat Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Land Acquisition $0 $0 $0 $0 Total Estimated Capital Cost 279 CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction 3,000,000 $3,000,000 50% 0% 0% 0% 0% City of Euless Capital Project Request Department: COMMUNITY SERVICES Submitted By: RICK HEROLD Date Prepared: 7-21-00 Date Completed: Project Title: SOFTBALL WORLD Project Type: BUILDING/FACILITIES Sub -Type: REMODEL Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project is consistent with the City's Parks Master Plan. PROJECT DESCRIPTION: Capital improvements including: 1) the remodeling of existing buildings; 2) field, lighting, parking, entrance, irrigation, etc upgrades and 3) general renovation. JUSTIFICATION: Required to keep Softball World viable. 280 PROJECT TITLE: SOFTBALL WORLD PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Our ating Co t Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs. Subtotal: Total Estimated Annual Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Impact Fees Escrow Funds To Be Determined ADDITIONAL COMMENTS: XX TOTAL ESTIMATED CAPITAL COST: Project cost to be determined. $0 $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans Specifications % Construction % 0% 0% 0% 0% 0% 281 City of Euless Capital Project Request Department: COMMUNITY SERVICES Submitted By: RICK HEROLD Date Prepared: 7-7-00 Date Completed: Project Title: TEXAS STAR CONFERENCE CENTER, PHASE II Project Type: BUILDING/FACILITY Sub -Type: REMODEL Project No.: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Needed to improve overall Texas Star Golf Course and Conference Center operation. This will allow greater flexibility, improve service levels, and provide better working conditions for staff. PROJECT DESCRIPTION: Proposed expansion of Texas Star Clubhouse by increasing overall square footage through a planned expansion program. New construction will be three tier (downstairs stage, current level to improve catering and office support, and upstairs to add meeting rooms and board rooms). In addition, the kitchen would be enlarged and addition of 19th hole to pro -shop to pavilion merits additional study. JUSTIFICATION: Would greatly increase the functionality of the facility and would provide for additional programming opportunities. Would allow Texas Star to be ahead of the competition while improving conditions for present staff. 282 PROJECT TITLE: TEXAS STAR CONFERENCE CENTER, PHASE II PROJECT #: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: t?iredQperatinq Cost Design 350,000 Personnel: Full Time Construction 3,000,000 Total Salary Purchase of Services Materials & Supplies Utilities Part Time $20,000 $20,000 6,000 15,000 Subtotal: 41,000 Maintenance Costs 10,000 Subtotal: $10,000 Total Estimated Annual Cost $51,000 Total Estimated Capital Cost $3,350,000 PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % 0% Fund Balance Preliminary Design % 0% Certificate of Obligation Final Plans % 0% County, State, Federal Funding Specifications % 0% General Obligation Bonds Construction % 0% Revenue bonds Impact Fees Escrow Funds To Be Determined XX ADDITIONAL COMMENTS: 283 Completed Projects Project Number Proiect Description DRAINAGE PROJECTS DR9901 I Sulpher Branch Phase II DR9902 l Windlea & WestCliff Sub -Total Drainage Projects Street Fund Drainage Fund S123,404 $4,396 $127,800 CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY AS OF Mav 31. 2001 Sources Water & Sewer CIP Fund Impact Fee Fund Half Cent Sales Tax Fund Police Facility CIP Fund General CIP Fund Escrow Funds Over Total Project (Under) Cost (53,276) $120,128 (S3,237) 1 $1,159 (S6,513) I $121,287 STREET PROJECTS IPS9907 Westpark Way -SH10 to SH183 1 S605,542 t t 1 1 1 (586,154) J S519,388 IPS9911 'Overlay Projects 1 5294,687 1 1 1 1 ( 1 S0 1 $294,687 Sub -Total Street Projects j S294,687 (S86,154) $814,075 WASTEWATER PROJECTS WW9901 CDBG B/98-UC-48-0001/B95-22-50 WW9902 Impact Fee Study WW9903 I Misc Sewer Rehab FV99 W W9904' Hydraulic Analysis Sub -Total Wastewater Proiects N 0o WATER PROJECTS WT9901 (Meter Change Out Program WT9903 'Master Ran WT9904 IFY1999 Well Repairs WT9905 I FY1999 Misc Water Rehab WT9906 'Hwy 10 Water Line WT9907 I Impact Fee Study WT9911 'Water Distribution - Master Plan WT0002 I Emergency Repair - Hwy 10 WT0004 WT0006 WT0102 Water Line Milam - Ector/Midway Central Drive Water Mains SCADA Upgrade Sub -Total Water Projects OTHER PRO015 'Purchase of Dallas StarsCenter ISS9901 'Fire Station II ISS9902 ( Library Books 'SS9919 !Fire Station #3- Structural Repairs Sub -Total Other Projects TOTAL FUNDED PROJECTS S294,687 S127,800 S150,000 $50,000 S200,000 5101,917 S42,000 $66,921 $50,000 $150,000 S15,450 $18,248 S92,814 $93,400 $13,000 S27,000 $40,000 S13,000 S25, 600 S630,750 1 $38,600 S830,750 $78,600 $3,302 $3,302 $3.302 S10,327,978 $49,688 $30,000 S10,407,666 $0 $10,407,666 (S77,073) $72,927 (S762) 512,238 (S37,013) 512.987 $0 527,000 ($114,848) S125,152 ($3,552) S98.365 (S36,555) $5.445 S0 $66,921 (S6,251) $43,749 (S11,117) $138.883 (S762) $12,238 (S1,600) S24.000 (S1.236) $14,214 (S4.505) S13,743 (52,072) S90,742 $0 S93,400 ($67,650) S601,700 SO _ S10.327.978 $0 S49,688 S0 53,302 ($12,656) 517,344 (S12,656) S10,398,312 00 (S287,821) $12,060,526 Project Number Proiect Descriotion DRAINAGE PROJECTS IDR9901 ISuloher Branch Phase II IDR9902 IWindlea & WestCliff Sub -Total Drainage Projects Street Fund Drainage Fund CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY AS OF Mau 31. 2001 Sources Water & Sewer CIP Fund 5123,404 $4,396 $127,800 Impact Fee Fund Half Cent Police Sales Tax Facility CIP Fund Fund General CIP Fund Escrow Funds Over (Under) (S3.276) (53,237) (S6,513) Total Project Cost $120,128 $1,159 $121,267 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: SULPHUR BRANCH PHASE II Project Type: DRAINAGE Sub -Type: Project No.: DR9901 Priority: A COUNCIL AUTHORIZATION: October 13, 1998 - Approved the acquisition of Right -of -Way RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Date Prepared: 7-20-99 Date Completed: 8-01-99 The Sulphur Branch channelization project was the number one needed project identified in the 1990 study prepared by Knowlton, English and Flowers. PROJECT DESCRIPTION: This project includes the drainage work to be performed on Sulphur Branch south of SH 10. The work was performed by the Corps of Engineers. The City's financial participation in this project is complete. JUSTIFICATION: To improve the flow through the original Sulphur Branch project and remove 40 properties from the 100 year floodplain. 286 PROJECT TITLE: SULPHUR BRANCH PHASE II PROJECT #: DR9901 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Qjrect Operating C4a1 Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PHASE/FUNDING SOURCE Appraisal Services Surveying Services Land Purchases Storm Sewers (Expenses prior to FY99 not reflected) TOTAL ESTIMATED CAPITAL COST: Land Purchases Storm Sewers $0 Surveying Appraisal Services $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS BUDGET 600 4,500 89,000 29,304 EXPENDED 600 4,500 89,000 26,028 OVER/UNDER BUDGET (- +) 0 0 0 (3,276) * - This project received an inter -project transfer of $5,904 from project DR9903. * - Remaining funds transferred to FB9902 TOTAL PROJECT $123,404 $120,128 89,000 29,304 4,500 600 $123,404 % EXPENDED 100% 100% 100% 89% ($3,276) 97% 287 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: WINDLEA & WESTCLIFF Project Type: DRAINAGE Sub -Type: Project No.: DR9902 Priority: A COUNCIL AUTHORIZATION: Date Prepared: 7-20-99 Date Completed: 8-1-99 January 13, 1998 - Awarded Bid No. 97-54 for the construction of drainage improvements. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: In 1990 the City commissioned and received a report from Knowlton, English & Flowers titled Drainage Utility System Study of Selected Improvement Projects . This was Project No. 4 in the referenced study. PROJECT DESCRIPTION: This project includes pipe, inlet and flume improvements that were completed in 1998. JUSTIFICATION: Additional underground capacity required to reduce ponding of storm water in the street intersection. 288 PROJECT TITLE: WINDLEA & WESTCLIFF PROJECT #: DR9902 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Ooeratina Cost Fence 274 Personnel: Full Time Landscaping & Irrigation 4,122 Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $4,396 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Fence 274 274 0 100% Landscaping & Irrigation 4,122 885 (3,237) 21% (Expenses prior to FY 99 not reflected) Remaining funds transferred to FB9902 TOTAL PROJECT $4,396 $1,159 ($3,237) 26% 289 Project Number Proiect Description STREET PROJECTS PS9907 Westoark Way -SH10 to SH183 PS9911 'Overlay Projects Sub -Total Street Projects Street Fund 5605,542 $294,687 $294,687 Drainage Fund CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY AS OF Mav 31. 2001 Sources Water & Sewer CIP Fund Impact Fee Fund Half Cent Sales Tax Fund Police Facility CIP Fund General CIP Fund Escrow Funds Over (Under) (S86,154) S0 (S86,154) Total Project Cost S519.388 S294,687 S814,075 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: 7-17-99 Submitted By: RANDY BYERS Date Completed: 9-30-00 Project Title: WESTPARK - SH10 TO SH183 Project Type: STREET Sub -Type: CONSTRUCTION Project No.: PS9907 Priority: A COUNCIL AUTHORIZATION: April 13, 1999 - Approved Bid No. 99-05 for irrigation and landscape improvements. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The street reconstruction was accomplished through funding from the City and the Texas Department of Transportation (TxDOT). PROJECT DESCRIPTION: Reconstruction of a two-lane asphalt street. TxDOT recently completed the new four -lane and five -lane concrete street. This funding is for the landscaping package and installation of street lights. JUSTIFICATION: 1. Two-lane street did not adequately convey existing or future traffic volumes. 2. Ongoing safety concerns made the reconstruction of Westpark Way mandatory. 291 PROJECT TITLE: WESTPARK - SH10 TO SH183 PROJECT #: PS9907 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Oneratina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance GostS Subtotal: Total Estimated Annual Cost PHASEIFUNDING SOURCE Engineering Services Plumbing Services, Outside Irrigation Repairs Fence Equipment Rentals Streets & Highways Contingencies Sidewalks & Curbs Landscaping Signal Systems (Expenses prior to FY99 not reflected) TOTAL ESTIMATED CAPITAL COST: Balance Remaining @ 10-1-99 so $0 so $0 Total Estimated Capital Cost CURRENT STATUS BUDGET 9,152 2,290 24,778 10,099 74 2,835 149,895 6,234 395,797 4,388 EXPENDED 9,152 2,290 24,778 10,099 74 2,835 63,741 6,234 395,797 4,388 The remaining balance of $86,154 was transferred to FB9907. OVER/UNDER BUDGET (- +) 0 0 (0) 0 (0) 0 (86,154) 0 0 (1) 605,542 $605,542 % EXPENDED 100% 100% 100% 100% 99% 100% 43% 100% 100% 100% TOTAL PROJECT $605,542 $519,388 292 ($86,154) 86%I Department: Submitted By: Project Title: Project Type: Project No.: City of Euless Capital Project Request PUBLIC WORKS RANDY BYERS OVERLAY PROJECTS STREETS PS9911 COUNCiL AUTHORIZATION: September 8, 1998 - Included in FY98-99 Budget. Date Prepared: 7-26-99 Date Completed: Sub -Type: OVERLAY Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: These projects are developed based on information contained in a street condition survey. PROJECT DESCRIPTION: FY99 projects include the following streets: OVERLAY: Kynette, Signet, Toplea, Victoria, and Delta RECONSTRUCT: South Mills, Bayless, Pauline, Lee, Nimes, Westcliff, and Douglas. CUT & PATCH: West Pipeline. JUSTIFICATION: Each year we schedule approximately 10% of the lane miles in the City for preventive maintenance, including micro paving, overlay and some total reconstruction. This account provides funding for these activities plus the unforeseen projects that seem to come up each year. The recommended funding level for this account is $350,000 per year. In future years, overlay will be added to the general fund baseline budget as this is considered to be normal maintenance and operating costs. 293 PROJECT TITLE: OVERLAY PROJECTS PROJECT #: PS9911 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Dired.Qperating_G4st Overlay Personnel: Full Time Part Time Total Salary $0 Purchase of Services Materials & Supplies Utilities Subtotal: $0 Maintenance_ is Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Overlay 294,687 $0 Total Estimated Capital Cost $294,687 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 294,687 294,687 0 100% TOTAL PROJECT $294,687 $294,687 $0 100% 294 Project Number Proiect Description WASTEWATER PROJECTS WW9901 CDBG B/98-UC-48-0001/895-22-50 WW9902 Impact Fee Study WW9903 lMisc Sewer Rehab FY99 WW9904 (Hydraulic Analysis Sub -Total Wastewater Proiects Street Fund Drainage Fund CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY AS OF Mav 31. 2001 Sources Water 8 Sewer CIP Fund S150,000 S50.000 5200,000 Impact Fee Fund S13,000 527,000 540,000 Half Cent Sales Tax Fund Police Facility CIP Fund General CIP Fund Escrow Funds Over (Under) Total Project I Cost (577.073) 572.927 (5762) S12.238 (537,013) 512,987 SO 527.000 (5114,848) 5125,152 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: CDBG B/98-UC-48-0001/B95-22-50 Project Type: WASTEWATER Sub -Type: MAINS Project No.: WW9901 Priority: A COUNCIL AUTHORIZATION: Date Prepared: 7-26-99 Date Completed: 8-19-99 January 13, 1998 - Held Public Hearing / Approved CDBG project selection. April 13, 1999 - Recommended Tarrant County award bid to Horseshoe Construction. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This funding is the 24th year project administered through Tarrant County. This is the fifth wastewater project in South Euless. PROJECT DESCRIPTION: Design and construction of wastewater mains in the Oakwood Terrace Addition. JUSTIFICATION: Mains in the South Euless area have deteriorated as they have aged. 296 PROJECT TITLE: CDBG B/98-UC-48-0001/B95-22-50 PROJECT #: WW9901 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: .Dirt Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenanr,e Cow Subtotal: $0 Total Estimated Annual Cost Sewer Mains 150,000 $0 Total Estimated Capital Cost $150,000 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Sewer Mains 150,000 72,927 (77,073) 49% Remaining funds transferred to FB9901 TOTAL PROJECT $150,000 $72,927 ($77,073) 49% 297 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Date Prepared: 7-26-99 Date Completed: 9-30-99 Project Title: WW IMPACT FEE STUDY Project Type: WASTEWATER Sub -Type: IMPACT FEE PROJECTS Project No.: WW9902 Priority: A CO ;L. AUTHORIZATION: January 26, 1999 - Approved contract for study. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The City's Capital Improvement Program and Impact Fee Study must be updated every three years. PROJECT DESCRIPTION: 1.) Extablish a static model for the sewer system based on basin development 2.) Develop a 10-year capital improvement plan. 3.) Review existing living unit equivalents. 4.) Calculate maximum impact fee. JUSTIFICATION: Required by state law to justify impact fee charges. 298 PROJECT TITLE: WW IMPACT FEE STUDY PROJECT #: WW9902 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct ODeratina Colt Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Planning Services 13,000 so Subtotal: $0 Maintenance Cots Subtotal: Total Estimated Annual Cost PHASE/FUNDING SOURCE Planning Services Remaining funds transferred to FB9910 so $0 Total Estimated Capital Cost $13,000 CURRENT STATUS OVERIUNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 13,000 12,238 (762) 94% TOTAL PROJECT $13,000 $12,238 ($762) 94% 299 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: MISC. SEWER REHAB FY99 Project Type: WASTEWATER Sub -Type: MAINS Project No.: WW9903 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Date Prepared: 7-26-99 Date Completed: 9-30-99 This project is for small unidentified sewer main problems that may be found during the fiscal year. Large projects will be determined on an "as needed" basis and presented for funding under a new project number. JUSTIFICATION: Most of these lines are clay tile and are seriously deteriorated. 300 PROJECT TITLE: MISC. SEWER REHAB FY99 PROJECT #: WW9903 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Sewer Mains 50,000 Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costs Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Sewer Mains Remaining funds transferred to WW0002 $0 Total Estimated Capital Cost $50,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 50,000 12,987 (37,013) 26% TOTAL PROJECT $50,000 $12,987 ($37,013) 26% 301 Department: Submitted By: Project Title: Project Type: Project No.: City of Euless Capital Project Request PUBLIC WORKS RANDY BYERS HYDRAULIC ANALYSIS WASTEWATER WW9904 COLJNCII AUTHORVATION: Date Prepared: 7-23-99 Date Completed: 6-30-00 Sub -Type: IMPACT FEE PROJECT Priority: A November 24, 1998 - Authorized contract with Shimek, Jacobs, & Finklea to perform analysis. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The hydraulic analysis is a subset of the City's Wastewater Master Plan. PROJECT DESCRIPTION: Professional services related to the analysis of the City's wastewater system. Pressures, velocities and other items are studied to determine adequacy. JUSTIFICATION: Required to determine adequacy of wastewater system. 302 PROJECT TITLE: HYDRAULIC ANALYSIS PROJECT #: WW9904 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: tQirect Qpentina Cost Engineering 27,000 Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs so so Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Engineering Services (Does not reflect expenses prior to FY99). $0 Total Estimated Capital Cost $27,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (-+) % EXPENDED 27,000 27,000 0 100% TOTAL PROJECT $27,000 $27,000 $0 100% 303 Project Number Proiect Descriotion Street Fund Drainage Fund CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY AS OF Mav 31. 2001 Sources Water & Sewer CIP Fund Impact Fee Fund WATER PROJECTS WT9901 Meter Change Out Program S101.917 WT9903 Master Plan $42,000 WT9904 FY1999 Well Repairs $66,921 WT9905 FY1999 Misc Water Rehab $50.000 WT9906 Hwy 10 Water Line S150.000 WT9907 Impact Fee Study $13,000 W79911 Water Distribution - Master Plan S25,600 WT0002 Emergency Repair - Hwy 10 S15.450 W70004 Water Line Milani - Ector/Midway I $18,248 WT0006 Central Drive Water Mains $92,814 W70102 SCADA Upgrade $93,400 Sub -Total Water Projects $630,750 $38,600 Half Cent Sales Tax Fund Police Facility CIP Fund General CIP Fund Escrow Funds Over Total Project (Under) Cost ($3,5521 598,365 ($36,555) $5,445 S0 $66,921 ($6,251) S43,749 ($11.117) S138.883 ($762) $12.238 ($1,600) 524,000 (51.236) S14,214 (S4,505) $13,743 ($2,072) $90.742 S0 $93.400 (S67.650) 5601,700 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Date Prepared: 7-15-99 Date Completed: 10-30-99 Project Title: METER CHANGE OUT Project Type: WATER Sub -Type: METERS Project No.: WT9901 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Project consists of replacing old meters with new radio -read meters throughout the City in phases. This program is complete. JUSTIFICATION: 1. Increased accuracy in billing water consumption. 2. Reduction in man-hours for meter reading due to radio -read meters that replaced old style meters. 305 PROJECT TITLE: METER CHANGE OUT PROJECT #: WT9901 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Ooeratina Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: MaintenanceL to Meters $0 $0 60,000 Subtotal: $60,000 Total Estimated Annual Cost PHASE/FUNDING SOURCE Meters & Settings (Cost prior to FY1999 not reflected) Meters & Settings 101,917 $60,000 Total Estimated Capital Cost $101,917 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 101,917 98,365 (3,552) 97% * - The remaining balance was transferred to FB9901. TOTAL PROJECT $101,917 $98,365 ($3,552) 97% 306 Department: Submitted By: Project Title: Project Type: Project No.: City of Euless Capital Project Request PUBLIC WORKS RANDY BYERS MASTER PLAN WATER WT9903 COl1N( IL Ai ITHQR!7ATION: Date Prepared: 7-26-99 Date Completed: 8-30-99 Sub -Type: PRELIMINARY STUDIES Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The 1999 Water Distribution System Master Plan presents a comprehensive plan for the development of the water distribution system to serve the City of Euless at build -out conditions. The current service area does not include any property within the D/FW Airport boundary. PROJECT DESCRIPTION: This project encompasses any studies needed to ascertain the adequacy of the system. The only current activity relates to the airport. A computer analysis was performed to aid in the development of an overall system of water mains, elevated storage tanks and supply from the TRA to efficiently serve the City of Euless development (within D/FW airport) that is anticipated. A preliminary Capital Improvement Plan and overall master plan map were created for a portion of the D/FW Airport. No expenditure of additional funds is currently being considered. This master plan work was solely performed for planning/feasibility purposes. JUSTIFICATION: The City and the airport are working on development opportunities. The airport requested that the City determine if the City can provide water service to property within the airport boundary west and south of Bear Creek. Impact fees cannot be used to fund this item as the airport is not currently within the City's service area. 307 PROJECT TITLE: MASTER PLAN PROJECT #: WT9903 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Coat Personnel: Full Time Planning Services 42,000 Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Costa Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Planning Services Remaining funds transferred to FB9901 $0 Total Estimated Capital Cost $42,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 42,000 5,445 (36,555) 12.96% TOTAL PROJECT $42,000 $5,445 ($36,555) 12.96% 308 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: WELL REPAIRS Project Type: WATER Project No.: WT9904 COUNCIL AUTHORIZATION: Date Prepared: 7-26-99 Date Completed: 9-30-99 Sub -Type: WELL REPAIR Priority: A August 27, 1997 - Included in Fiscal Year 1996-97 Budget. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: This funding carried over from previous years and is being utilized to repair a well pump. This balance is not sufficient to cover the entire cost of the project as discuss in a previous council meeting. Staff expects to request approximately $50,000 from the Water and Sewer CIP fund balance to cover this expenditure. JUSTIFICATION: Maintaining the City's wells results in the ability to produce water at a substantial reduction in cost. This funding will be included in the baseline budget in future years as it is considered normal maintenance and operating costs. 309 PROJECT TITLE: WELL REPAIRS PROJECT #: WT9904 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Coal Equipment Maintenance 3,000 Personnel: Full Time Meters & Setting 63,921 Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Mattenance Costa Subtotal: $0 Total Estimated Annual Cost $0 Total Estimated Capital Cost $66,921 CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Equipment Maintenance 63,921 63,921 0 100% Meters & Setting 3,000 3,000 0 100% This project received $33,396 from FB9901 TOTAL PROJECT $66,921 $66,921 $0 100% 310 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: 7-26-99 Submitted By: RANDY BYERS Date Completed: 6-30-00 Project Title: FY99 MISC WATER REHAB Project Type: WATER Sub -Type: MAINS Project No.: WT9905 Priority: COUNCIL AIJTHORI7ATInN: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: This project is for correction of small unidentified water main problems that may arise throughout the fiscal year. Large projects that are identified will be presented on an "as needed" basis and funded under a new project number. JUSTIFICATION: Some of the City's older water mains have deteriorated and need replacement or repair. Staff request that this project be funded on an annual basis at a level not to exceed $50,000. 311 PROJECT TITLE: FY99 MISC WATER REHAB PROJECT #: WT9905 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: MaintenaneeS 15 Subtotal: Total Estimated Annual Cost PHASE/FUNDING SOURCE Engineering Services Sanitation Services Equipment Rentals Other Supplies Plumbing Supplies Sand Sewer Mains Fire Hydrants Equipment Rentals TOTAL ESTIMATED CAPITAL COST: Water Mains $0 $0 so $0 Total Estimated Capital Cost CURRENT STATUS BUDGET 1,000 1,000 1,500 5,047 25,000 426 27 8,000 8,000 * - Remaining balance transferred to WT0001. TOTAL PROJECT EXPENDED 587 827 1,140 2,908 19,084 426 27 12,075 6,675 $50,000 $43,749 312 OVER/UNDER BUDGET (- +) (414) (173) (360) (2,139) (5,916) 0 4,075 (1,325) 50,000 $50,000 % Expended 59% 83% 76% 58% 76% 100% 151% 83% ($6,251) 87% Department: Submitted By: Project Title: Project Type: Project No.: City of Euless Capital Project Request PUBLIC WORKS RANDY BYERS HWY 10 WATER LINE WATER WT9906 COUNCIL AUTHORIZATION: Sub -Type: MAINS Priority: A Date Prepared: 7-17-99 Date Completed: 1-30-00 November 24, 1998 - Authorized project expenditure. June 22, 1999 - Awarded Bid No. 99-12 for the installation of 8" water line improvements to Gra-Tex. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Water line needed to provide water service to properties along SH10 and improved fire protection coverage. PROJECT DESCRIPTION: Design and installation of an 8" water main along SH10 from Westpark Way to a point east of Raider Drive. JUSTIFICATION: 1. Economic Development 2. Improve ability of adjacent property owners to develop their property. 313 PROJECT TITLE: HWY 10 WATER LINE PROJECT #: WT9906 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PHASE/FUNDING SOURCE Engineering Services Surveying Services Water Mains Right -of -Way Aquisition Contingency TOTAL ESTIMATED CAPITAL COST: Water Mains Engineering $0 Surveying Services Right -of -Way Contingency so $0 $0 Total Estimated Capital Cost CURRENT STATUS BUDGET 24,061 12,147 89,933 3,490 20,369 * - Remaining balance transferred to FB9901. EXPENDED 25,411 12,146 97,836 3,490 0 OVER/UNDER BUDGET (- +) 1,350 (1) 7,903 0 (20,369) 89,933 24,061 12,147 3,490 20,369 $150,000 % EXPENDED 106% 100% 109% 100% 0% TOTAL PROJECT $150,000 $138,883 ($11,117) 93% 314 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: IMPACT FEE STUDY Project Type: WATER Project No.: WT9907 COUNCIL AUTHORIZATION: January 26, 1999 - Approved the contract for study. Date Prepared: 7-17-99 Date Completed: 9-30-99 Sub -Type: IMPACT FEE PROJECTS Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The City's Capital Improvements Program and Impact Fee Study must be updated every three years. PROJECT DESCRIPTION: 1.) Review existing living unit equivalents. 2.) Calculate maximum impact fee 3.) Develop 10 year capital improvement plan JUSTIFICATION: Required by law. 315 PROJECT TITLE: IMPACT FEE STUDY PROJECT #: WT9907 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Ooeratinq Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs $0 so Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Planning Services Remaining funds transferred to FB9910 Planning Services 13,000 $0 Total Estimated Capital Cost $13,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 13,000 12,238 (762) 94% TOTAL PROJECT $13,000 $12,238 ($762) 94% 316 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Date Prepared: 7-26-99 Date Completed: 9-30-99 Project Title: WATER DIST - MASTER PLAN Project Type: WATER Sub -Type: IMPACT FEE PROJECTS Project No.: WT9911 Priority: A COUNCIL AUTHORIZATION: November 24, 1998 - Authorized contract with Shimek, Jacobs, & Finklea to perform analysis. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The water distribution master plan is updated approximately every three years. PROJECT DESCRIPTION: 1.) Analyze water records from the summers of 1996 and 1997. 2.) Develop water model using the Cybernet Hydraulic Water Distribution Model. 3.) Determine line sizes, pressures at junction modes and effectiveness of elevated storage. 4.) Determine if elevated storage can be refilled to replace water from the drawdown during the maximum hourly demand on the day of maximum usage. 5.) Model pump stations 6.) Verify elevated storage capacity meets the TNRCC minimum water system requirements and the State Board of Insurance Key Rate standards. JUSTIFICATION: Determines the City's ability to properly distribute water to consumers and provide adequate water flow for fire protection. 317 PROJECT TITLE: WATER DIST - MASTER PLAN PROJECT #: WT9911 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Ooeratina Cost Engineering $25,600 Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenanc C sts $0 so Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Engineering Services Remaining funds transferred to FB9910 $0 Total Estimated Capital Cost $25,600 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 25,600 24,000 (1,600) 94% TOTAL PROJECT $25,600 $24,000 ($1,600) 94% 318 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Date Prepared: 10-1-99 Date Completed: 11-30-99 Project Title: EMERGENCY REPAIR - HWY 10 Project Type: WATER Sub -Type: WATER LINE Project No.: WT0002 Priority: A COUNCIL ACTION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Trenchless replacement of water line under Hwy 10 at Ector. PROJECT DESCRIPTION: Emergency repair of water line break under Hwy 10 at Ector Dr. JUSTIFICATION: 319 PROJECT TITLE: EMERGENCY REPAIR - HWY 10 PROJECT #: WT0002 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Dir Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Col Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Water Mains Water Mains 15,450 $0 Total Estimated Capital Cost $15,450 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 15,450 14,214 (1,236) 92% Funding for this project received from FB9901 * - Remainder of $1,236 was transferred back to FB9901. TOTAL PROJECT $15,450 $14,214 ($1,236) 92% 320 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Date Prepared: 7-26-99 Date Completed: 6-30-00 Project Title: LINE REPLACEMENT, MILAM - ECTOR/MIDWAY Project Type: WATER Sub -Type: WATER LINE Project No.: WT0004 Priority: A COUNIL ACTION: March 28, 2000 - Project to be funded from existing Water CIP Fund Balance. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Project consists of replacing water lines along Milam Street from Ector Drive to Midway. JUSTIFICATION: This line has many repair clamps due to leak repairs. The line has deteriorated to the point of needing to be replaced. 321 PROJECT TITLE: LINE REPLACEMENT, MILAM - ECTOR/MIDWAY PROJECT #: WT0004 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Uireci Operating Cosi Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenanca_G4ais. Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Water Mains Water Mains 18,248 $0 Total Estimated Capital Cost $18,248 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 18,248 13,743 (4,505) 75% Funding for this project received from FB9901 Remaining funds transferred to WT0005 ,TOTAL PROJECT $18,248 $13,743 ($4,505) 75% 322 City of Euless Capital Project Request Department: PUBLIC WORKS Date Prepared: 7-26-99 Submitted By: RANDY BYERS Date Completed: 3-31-00 Project Title: CENTRAL DRIVE WATER MAINS Project Type: WATER Sub -Type: WATER MAINS Project No.: WT0006 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Joint project with the City of Bedford. PROJECT DESCRIPTION: Replace existing 16" water line in Central Drive. Existing main is approximately 40 years old. JUSTIFICATION: Bedford is reconstructing Central Drive as a concrete street. The cost of repair or replacement of this line after the new pavement is complete would be substantially more expensive. 323 PROJECT TITLE: CENTRAL DRIVE WATER MAINS PROJECT #: WT0006 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost PHASE/FUNDING SOURCE Water Mains Water main 92,814 $0 so so $0 Total Estimated Capital Cost $92,814 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (-+) % EXPENDED 92,814 90,742 (2,072) 98% Funding for this project received from FB9901 Remaining funds transferred back to FB9901 TOTAL PROJECT $92,814 $90,742 ($2,072) 98% 324 City of Euless Capital Project Request Department: PUBLIC WORKS Submitted By: RANDY BYERS Project Title: SCADA UPGRADE Project Type: WATER Sub -Type: Project No.: WT0102 Priority: A COUNCIL AUTHORIZATION: Date Prepared: 7-24-00 Date Completed: 4-9-01 September 26, 2000 - Awarded contract to I&C Sales for upgrade of system. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Upgrade Supervisory Control and Data Acquisition (SCADA) System Hardware and Software. JUSTIFICATION: The SCADA System in use today is not Y2K Compliant. Specifications for upgrade could not be completed prior to 12/31/99. The time on the computer was set back to a previous date. Since the installation was completed new/improved technology has evolved. The upgrade will entail all new equipment. Failure to upgrade will result in an apporximate 100% increase in the cost of producing water from our wells. 325 PROJECT TITLE: SCADA UPGRADE PROJECT #: WT0102 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cast SCADA Upgrade $93,400 Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Other Average Annual Debt Service Total Estimated Annual Cost PHASE/FUNDING SOURCE Equipment $0 Total Estimated Capital Cost $93,400 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 93,400 93,400 0 100% TOTAL PROJECT $93,400 $93,400 $0 100% 326 Project Number Project Descriotion Street Fund Drainage Fund CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY AS OF May 31. 2001 Sources Water & Sewer CIP Fund Impact Fee Fund Half Cent Sales Tax Fund Police Facility CIP Fund General CIP Fund Escrow Funds Over Total Project (Under) Cost OTHER IPR0015 Purchase of Dallas StarsCenter ( 1 S10,327,978 SO 510,327,978 ISS9901 Fire Station II 549,688 S0 $49,688 ISS9902 LibraryBooks $3,302 S0 53,302 ISS9919 I Fire Station #3 - Structural Repairs $30,000 ($12,656) $17,344 Sub -Total Other Projects 53,302 510,407,666 (512,656) S10,398,312 TOTAL FUNDED PROJECTS 5294,687 5127,800 5830,750 578,600 53,302 50 510,407,666 SO (S287,821) 512,060,526 City of Euless Capital Project Request Department: COMMUNITY DEVELOPMENT Date Prepared: 4-1-00 Submitted By: RICK HEROLD Date Completed: 5-31-00 Project Title: PURCHASE STARS CENTER Project Type: BUILDING/FACILITY Sub -Type: ACQUISITION Project No.: PR0015 Priority: A COUNCIL AUTHORIZATION: March 23, 1999 - Authorization to execute a letter of intent with the Dallas Stars regarding Texas Star. June 8, 1999 - Direct City Manager to schedule public hearings for the annexation of property. June 8, 1999 - Prepare a City Service Plan for the property being annexed. July 29, 1999 - Hold Public Hearing on the annexation of property from Ft. Worth. July 29, 1999 - Approval of Joint Resolution with Ft. Worth agreeing to disannex 21.3 acres. September 14, 1999 - Approve and authorize City Manager to execute Purchase Lease Agreement. October 12, 1999 - Approve Ordinance 1381 providing for the annexation of 21.3 acres. October 26, 1999 - Public Hearing on SUP that will allow for the construction of the StarsCenter. October 26, 1999 - Approve SUP to allow for the construction of the Dr. Pepper StarsCenter. October 26, 1999 - Public Hearing on zoning change or Dr. Pepper StarsCenter. October 26, 1999 - Approve zoning change for Dr. Pepper StarsCenter. January 11, 2000 - Approve resolution authorizing the publication of notice of intent to issue C.O.'s January 31, 2000 - Authorize issuance of T&W and Sewer Rev. Cert. Of Obligation, Taxable Series 2000 February 8, 2000 - Final Reading and Approval of issuance of Cert. Of Obligation, Taxable Series 2000. February 8, 2000 - Authorize City Manager to execute Tri-Party Agreement between Euless, Stars, & BoA. February 22, 2000 - Authorize modifications to Purchase and Lease Agreement. April 11, 2000 - Authorize issuance of T&W and Sewer Rev. Cert. Of Obligation, Taxable Series 2000 April 11, 2000 - Approved amendment to a Purchase/Lease Agreement to accept cash escrow. June 12, 2000 - Executed the documents to close on the purchase of the facility. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Many of the athletic complex Phase II issues were addressed in conjunction with this project. PROJECT DESCRIPTION: The City purchased a two rink ice facility. This facility will be leased and operated by the Dallas Stars. It is anticipated to accommodate league hockey play and public skate as well as host regional and national skating events. JUSTIFICATION: This will provide an ice skating facility to our community without burden to the Euless tax payers. 328 PROJECT TITLE: PURCHASE STARS CENTER PROJECT #: PR0015 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct ODetj _Co 1 Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: IM intenanceCs1 Subtotal: Total Estimated Annual Cost PHASE/FUNDING SOURCE Building Acquisition Equipment Issuance Cost Star Center Debt TOTAL ESTIMATED CAPITAL COST: Building Acquisition Equipment $0 Issuance Cost Star Center Debt $0 $0 $0 Total Estimated Capital Cost CURRENT STATUS BUDGET 9,391,814 445,223 146,000 344,941 TOTAL PROJECT $10,327,978 OVER/UNDER EXPENDED BUDGET (- +) 9,391,814 445,223 146,000 344,941 $10,327,978 9,391,814 445,223 146,000 344,941 $10,327,978 % EXPENDED 0 100% 0 100% 0 100% 0 100% $0 100% 329 City of Euless Capital Project Request Department: SUPPORT SERVICES Submitted By: TOM COX Date Prepared: 8-2-99 Date Completed: 3-30-00 Project Title: FIRE STATION II - 1515 Westpark Way Project Type: BUILDING/FACILITIES Sub -Type: REMODEL Project No.: SS9901 Priority: A COUNCIL AUTHORIZATION: October 14, 1997 - Award Bid No. 97-37 for project construction. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Replacement of fire station #2 due to major repairs and enlargement Westpark Way. PROJECT DESCRIPTION: Renovation of old vehicle repair center. Construction of new apparatus bays to the east of the main building. Removal of existing structures within the old service center. Remove and replace interior concrete floor, construct new eight (8) bed dormitory, kitchen and food preparation area, day room, offices, training room, lavatory room and shower area. Exterior drive approaches were reworked to facilitate movement in and out of the apparatus. Building exterior received new paint scheme to match the current City colors. Stucco panels and face brick was repaired and either painted or cleaned. JUSTIFICATION: With construction and widening of Westpark Way, driveway at existing Fire Station #2 would be too short (15') to accommodate fire apparatus. Building was in need of major interior renovation and upgrades. With the move of Fleet Services into a new building, this left the old vehicle repair center available for renovation. The location and the existing structure lent itself as a logical location to relocate Fire Station #2. 330 PROJECT TITLE: FIRE STATION II - 1515 Westpark Way PROJECT #: SS9901 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct OoeratinQ Cost. Personnel: Full Time Construction 49,688 Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Cuts Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Fire Station II (Expenses prior to FY99 not reflected) $0 Total Estimated Capital Cost $49,688 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 49,688 49,688 (0) 100% This project received additional funding in the amount of $6,177 from FB9909 TOTAL PROJECT $49,688 $49,688 ($0) 100% 331 City of Euless Capital Project Request Department: SUPPORT SERVICES Date Prepared: 8-2-99 Submitted By: TOM COX Date Completed: 8-15-00 Project Title: LIBRARY BOOKS Project Type: HALF -CENT SALES TAX Sub -Type: LIBRARY Project No.: SS9902 Priority: A COUNCIL AUTHORIZATION: Approved as part of Sales Tax Revenue Bonds, Series 1994. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Funds remaining from bond sale related to new library facility and amenities. JUSTIFICATION: This item was one of the projects stated in the initial approval for the Half Cent Sales Tax. PROJECT TITLE: LIBRARY BOOKS PROJECT #: SS9902 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Library Book Purchase 3,302 Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance CQ t Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Library Books (Expenses prior to FY99 not reflected) $0 Total Estimated Capital Cost $3,302 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 3,302 3,302 0 100% TOTAL PROJECT $3,302 $3,302 $0 100% 333 City of Euless Capital Project Request Department: SUPPORT SERVICES Submitted By: TOM COX Date Prepared: 8-2-99 Date Completed: 3-30-00 Project Title: FIRE STATION #3 - STRUCTURAL/COSMETIC REPAIRS Project Type: BUILDING/FACILITIES Sub -Type: REMODEL Project No.: SS9919 Priority: A COUNCIL AUTHORIZATION: May 24, 1999 - Council notification. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Replace concrete drive approaches into the north and south sides of the apparatus bays. Replace carpet and floor coverings in the watch office and living areas. Sawcut and sealed cracks in the apparatus bay floors. Repair external cracks in the stucco panels. Repaint interior walls and refinish the cabinets. JUSTIFICATION: 334 PROJECT TITLE: FIRE STATION #3 - STRUCTURAL/COSMETIC RE PROJECT #: SS9919 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Qperatina Coat Personnel: Full Time Construction 30,000 Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: $0 Maintenance Cost Subtotal: $0 Total Estimated Annual Cost PHASE/FUNDING SOURCE Fire Station Foundation Repair * - Remaining funds transferred to FB9909. $0 Total Estimated Capital Cost $30,000 CURRENT STATUS OVER/UNDER BUDGET EXPENDED BUDGET (- +) % EXPENDED 30,000 17,344 (12,656) 58% TOTAL PROJECT $30,000 $17,344 ($12,656) 58% 335