HomeMy WebLinkAboutFY 2001 Capital Improvents Project1??9'(e-;w
g/ki"
4.6itX,,firaee,/idd %.�
dacam%/% %Wwe
'
1c%'
re IQ, (fe,
cyO, 200/
0;:de.61i,9;7d 760cW
�8/7)685- /826
CITY OFFICIALS
MARY LIB SALEH, MAYOR
CARL TYSON, COUNCIL MEMBER PLACE ONE
LEON HOGG, COUNCIL MEMBER PLACE TWO
BOBBY BAKER, COUNCIL MEMBER PLACE THREE
CHARLES MILLER, COUNCIL MEMBER PLACE FOUR
AND MAYOR PRO TEM
GLENN PORTERFIELD, COUNCIL MEMBER PLACE FIVE
KATIE EDWARDS, COUNCIL MEMBER PLACE SIX
SPECIAL THANKS TO:
VICKI RODRIQUEZ, BUDGET AND TREAURY MANAGER
BETTY THOMAS, ADMINISTRATIVE SECRETARY
JOE HENNIG, CITY MANAGER
Gary McKamie Loretta Getchell, CPA
Deputy City Manager Director of Finance
TABLE OF CONTENTS
CAPITAL IMPROVEMENTS PROGRAM
City Officials
Table of Contents
Letter
FUNDED PROJECTS
Budget Summary 1
Anticipated Funding Sources 3
Drainage Projects
Summary of Funded Drainage Projects 5
DR9903 Misc. Drainage Improvements 6
DR9904 Hurricane Creek 8
Streets Projects
Summary of Funded Street Projects 11
PS9901 North Main Street 12
PS9902 Mid Cities Blvd. 14
PS9903 Highway 183 Service Road 16
PS9904 Harwood Road — N. Main to SH 360 18
PS9905 Traffic Studies 20
PS9906 Traffic Safety 22
PS9907 Westpark, SH 10 to SH 183 24
PS9908 Signalization 26
PS9909 FM 157 North, SH 183 to SH 121 (Landscaping & Lighting) 28
PS9910 Sidewalk Projects 30
PS9912 Harwood -Main Intersection 32
PS0001 FM157-S Pipeline to SH 10 (Utility Relocation) 34
PS0002 West Pipeline — Raider/Hwy 10 36
PS0003 Glade Road — Heritage to SH 121 38
PS0004 Glade Road (East) — SH 121 to Champagne 40
Wastewater Projects
Summary of Funded Wastewater Projects 43
WW0001 CDBG B99-UC-48-0001 44
WW0002 Misc. Sewer Rehab 46
WW0003 TRA Debt Payments 48
Water Projects
Summary of Funded Water Projects 51
WT9902 Water Tank Painting 52
WT9908 Mid Cities 12" Line 54
WT9909 2 MG Water Tank 56
WT9910 Lines for Elevated Tank 58
FUNDED PROJECTS, CONTINUED
Water Projects, Continued
WT0001 Utility Rehab — Water Program 60
WT0003 Water Line Replacement — Aransas 62
WT0005 Line Replacement — Milam - Denton/Midway 64
Other Projects
Summary of Other Funded Projects 67
AC9901 Athletic Complex, Phase II 68
DV9901 Euless Development Corporation Incentive Funds 70
PD9901 Police and Municipal Court Facility 72
PR9901 Hike and Bike Trail 74
PR9902 Senior Citizens Remodel 76
PR9903 - PR9918 Various EDC Park Projects 78
1111f1 r��f1 T
PR9922 i ejas Rernodei 80
PR9927 Park Improvements — Texas Star 82
SS9902 Library Books 84
SS0010 Fire Station #2 86
UNFUNDED PROJECTS
Summary of Unfunded Projects - Sorted by Type 89
Drainaae Proiects
Summary of Unfunded Drainage Projects 95
Golf Course Creek Slope Protection 96
Creek Slope Protection — Phase II 98
Bear Creek Park 100
Bell Hi Addition 102
Blessing Branch, Main to SH 360 104
Bob Eden Park 106
Boyd Branch 108
Boyd Branch (FEMA) 110
Denton Drive at Midway Park 112
Diversion Line — Oak Lane 114
Hurricane Creek at Airport Business Park 116
Hurricane Creek, Bridge at Marlene 118
Hurricane Creek, North of SH 10 120
Kynette Drive Culvert Modifications 122
Oak Lane Channel 124
Priest Drive Culvert at Woodbury Forest 126
Royal Oaks Addition 128
Trailwood Addition (Summit Ridge) 130
Street Projects
Summary of Unfunded Street Projects 133
121 Gateway Bridge (West) 134
UNFUNDED PROJECTS, CONTINUED
Street Projects, Continued
Gateway Boulevard (East) 136
Glade Road Right of Way Acquisition 138
Ash Lane — Aransas to N. Main 140
Baze Road — Glade to Mid Cities 142
Fuller Wiser Connector 144
Harwood Road — Main to FM 157 146
Heather and S. Pipeline 148
Highway Ingress — Egress 150
Hwy 10 Sidewalks and Lighting 152
Hwy 10 — West of Westpark Way 154
South Ector Drive 156
South Main — SH 10 to Pipeline 158
Raider Drive — SH 10 to South Pipeline Road 160
Vine Street — SH 183 to SH 10 162
Wastewater Projects
Summary of Unfunded Wastewater Projects
FY2001 CDBG Program
Manhole Rehab Program
Midway Park Sewer Rehab
S. Pipeline, Heather to Vine
Euless Junior High Wastewater Mains
Line Replacement — Dunaway
Line Replacement — Sagebrush
Line Replacement — Vine to S. Pipeline
Little Bear Creek Collection Line
Line Replacement — Arnett Drive
Line Replacement — Bell Drive
Line Replacement — Broadway
Line Replacement — Canyon Ridge
Line Replacement — Collins Drive
Line Replacement — Dallas
Line Replacement — E. Alexander
Line Replacement — E. Fuller
Line Replacement — Ector Drive
Line Replacement — Fayette Drive
Line Replacement — Harris Drive
Line Replacement — Nimes Drive
Line Replacement — Irion Drive
Line Replacement — Jean Lane
Line Replacement — Koen
Line Replacement —
Line Replacement —
Line Replacement —
Line Replacement —
Line Replacement —
Line Replacement —
Linda Lane
McCormick
Martin Lane
Midway
Paula Lane
Pebble Creek
165
168
170
172
174
176
178
180
182
184
186
188
190
192
194
196
198
200
202
204
206
208
210
212
214
216
218
220
222
224
226
UNFUNDED PROJECTS, CONTINUED
Wastewater Projects, Continued
Line Replacement — Ridgecrest 228
Line Replacement — Ross Ave, 230
Line Replacement — Short St. 232
Line Replacement — S. Sheppard 234
Line Replacement — W. Alexander 236
Line Replacement — W. Fuller 238
Line Replacement — Windward Way 240
Line Replacement — Woodridge 242
SH 183 — Utility Relocation 244
Water Projects
Summary of Unfunded Water Projects 24/
Fire Hydrant Replacement Program 248
FY2001 Utility Rehab 250
Scada Upgrade 252
Disinfection Modification 254
Effluent Water Main 256
SH 360 Water Crossing 258
Rehab Central Dr. Water Storage Tank 260
Rehab/Rebuild Fuller Dr. Ground Storage Tank 262
W. Pipeline Water Main Replacement 264
SH 183 Water Crossing 266
Well Rehabilitaion 268
Other Projects
Summary of Other Unfunded Projects 271
Bell Ranch Terrace 272
Parks & Greenhouse 274
Villages Master Plan 276
Building A Remodel 278
Building B Remodel 280
Building D Remodel 282
Four New Playgrounds 284
Infrastructure Management Software 286
Texas Star Conference Center, Phase II 288
Trinity Screen Wall 290
Aquatic Center 292
Community Golf Course at Bob Eden 294
Convert & Expand Ruth Millican 296
Expansion & Upgrade of Bob Eden Park 298
Expansion of Recreation Center 300
Fire Station #3 Reconstruction 302
Fire Training Facility 304
Public Works Facility 306
Parks at Texas Star, Phase III 308
UNFUNDED PROJECTS, CONTINUED
Other Projects, Continued
Parks at Texas Star, Phase IV 310
Redevelopment of Westpark 312
SH 10 Land Acquisition 314
Softball World 316
COMPLETED PROJECTS
Summary of Completed Projects - Sorted by Type 319
Drainage Projects
Summary of Completed Drainage Projects 321
DR9901 Sulphur Branch — Phase II 322
DR9902 Windlea & Westcliff 324
Street Projects
Summary of Completed Street Projects 327
PS9911 Overlay Projects 328
Wastewater Projects
Summary of Completed Wastewater Projects 331
WW9901 CDBG B/98-UC-48-0001/B95-22-50 332
WW9902 WW Impact Fee Study 334
WW9903 Misc. Sewer Rehab FY99 336
WW9904 Hydraulic Analysis 338
Water Proiects
Summary of Completed Water Projects 341
WT9901 Meter Change Out 342
WT9903 Master Plan 344
WT9904 Well Repair 346
WT9905 FY99 Misc. Water Rehab 348
WT9906 Hwy 10 Water Line 350
WT9907 Impact Fee Study 352
WT9911 Water Dist. — Master Plan 354
WT0002 Emergency Repair — Hwy 10 356
WT0004 Line Replacement — Milam - Ector/Midway 358
WT0006 Central Drive Water Mains 360
Other Projects
Summary of Completed Other Projects 363
PR0015 Purchase Stars Center 364
SS9901 Fire Station II — 1515 Westpark Way 366
SS9919 Fire Station #3 — Structural/Cosmetic Repairs 368
T H E
July 28, 2000
Honorable Mayor Mary Lib Saleh
City Council:
Carl Tyson, Place One
Leon Hogg, Place Two & Mayor Pro Tem
Bobby Baker, Place Three
Charles Miller, Place Four
Glenn Porterfield, Place Five
Veva Lou Massey, Place Six
INTRODUCTION
CITY
O F
The City of Euless Capital Improvements Program is a comprehensive document detailing all projects that
have been identified to date. Emphasis has been placed on organizing this data in a manner that will facilitate
decision making processes, assist in long range planning and provide the citizens of Euless with information
regarding planned projects. This document meets the requirements of the City Charter. Article VII, Section 2
(4) requires " A statement proposing any capital expenditures deemed necessary for undertaking during the
next budget year and recommended provisions for financing". Section 2 (5) further requires "A list of capital
projects which should be undertaken within the five (5) next succeeding years".
We extend special appreciation to the directors and the finance staff for their outstanding performance in
creating this document.
UNDERSTANDING THIS BOOK
Although this book contains a large volume of information, the summaries should make it easy to understand at
a glance. The book is divided into three sections: Funded Projects, Unfunded Projects, and Completed
Projects. Each section begins with a summary and is followed by detailed data for those wishing to research
individual projects.
The detail provided includes the project's relationship to City master plans, the project description and
justification, the effect on future maintenance and operating costs, and the estimated total cost. Within each
section, you will find the detailed descriptions sorted by type. There are five basic project types: Drainage,
Streets, Water, Wastewater, and Other.
Funded projects indicate any City Council authorization and the current status of the project. The current
status section recaps all financial information currently reflected on the City's financial reports. Thus, budget
amounts in this section only reflect actual dollars available. No budget amounts are added to line items until
funding is received. As funds become available, they will be allocated to the appropriate budget line items
based on the total estimated cost.
201 N. Ector Drive, Euless, Texas 76039-3595
817/685-1400 Metro 817/267-4403 c, Fax 817/685-1416
Projects have been classified as funded if any portion of the funding is available. For those projects that are
not fully funded, clear explanations have been provided as to how the remainder of the projects is expected to
be funded.
The Unfunded Projects section has been classified into three categories of priority. Priority A indicates that
the staff anticipates presenting this project to the Council for action during the upcoming budget year. Priority
B projects should be presented to Council within two to five years. Projects that will not begin for at least five
years have been given a Priority C. This system has been used to allow the Council to evaluate and shift
priorities, when necessary, and to provide a means of budgeting capital projects for at least five years.
Recommended funding sources have been indicated if known.
The Completed Projects section provides a summary indicating total project budget, actual expenditure, and
variance. Funds remaining have been returned to the appropriate fund balance account for reappropriation. A
detail of each project has also been provided.
FY2001 PROPOSED PROJECTS
Funding sources have been recommended for all projects that will be presented to the Council during the
upcoming budget year. These are listed on the Unfunded Projects Summary as Priority A. These include:
® Slope protection for the golf course
® Wastewater CDBG program
® Manhole rehabilitation
® Midway Park sewer rehabilitation
® Sewer rehabilitation on S. Pipeline from Heather to Vine
® Fire hydrant replacement program
® Water main rehabilitation program
® Upgrade of SCADA system
® Parks & greenhouse building
® Villages master plan
® Bell Ranch Terrace development assistance
The City also has approximately $14.2 million of funding pending for existing projects. This includes $9.2
million of general obligation bonds for Main Street and Pipeline Road and approximately $3 million of
certificates of obligation for Glade Road.
CLOSING COMMENTS
Staff is presenting this book for the Council to review and comment. We understand that this document is a
work in progress and requires regular updates. We hope this document will serve as a great tool to aid in your
future decisions.
,..,,M1,7g4MM,7sTrDZEZEWH:WMFEZINW,T'FBLMEREMEE,Mffe,EW..TrS.TraM,-.72:,r,WML,,VzzfgtxVmVgrg,2RVM=.,MEfg-fzg?s'zs,,,t:5gzgAgat-jasmzrf.,,:,gLmsgmtmwmgjNm.z.,-m,,
Project
Number Protect Description
I DRAINAGE PROJECTS
DR9903 I Misc Drainage Improvements
DR9904 'Hurricane Creek
Street Fund
CAPITAL IMPROVEMENTS PROGRAM
FUNDED PROJECTS SUMMARY
BUDGET AMOUNT AS OF JUNE 30, 2000
jpurces
Water & Half Cent
Drainage Sewer CIP Impact Fee Sales Tax
Fund Fund Fund Fund
$51.609
$257,500
Sub -Total Drainane Proiects $309,109
STREET PROJECTS
PS9901 North Main Street $1,421,236
PS9902 Mid Cities Blvd. $500.000
PS9903 Hwy 183 Service Road $152.285
PS9904 Harwood Road $4.283,081
PS9905 Traffic Studies $27.198
PS9906 Traffic Safety $128,027
PS9907 Westoark - SH10 to SH183 $605,542
PS9908 Signilization $167,285
FM157 North, SH183 to SH121
PS9909 (Landscaping & Lighting) $239.820
IPS9910 Sidewalk Proiects $200,000
I PS9912 Harwood - Main Street Intersection $1,126,935
IPS0001 FM157 - S Pipeline-SH10 (Utl Relc) $25.500
I PS0002 West Pipeline - Raider/Hwy 10
(PS0003 Glade - Heritage/SH 121
PS0004 Glade - SH 121/Champagne $45,132
$uh-Tnwl Street Prnierlc
WASTEWATER PROJECTS
WW0001 ICDBG B99-UC-48-0001
WW0002 I Misc Sewer Rehab
WW0003 ITRA Debt Payments
Sub -Total Wastewater Proiects
WATER PROJECTS
WT9902 Water Tank Painting
IVVT9908 Mid Cities 12" Line
WT9909 2MG Water Tank
WT9910 Water Line for Elevated Tank
WT0001 Utility Rehab - Water Program
WT0003 Water Line Replacement. Aransas
IWT0005 Water Line Milam - Denton/Midway
Sub -Total Wafer Proiects
$8.922.041
$150,000
$87,013
$25,500
$125.000
$262,513 $125,000
$200,000
$2,250,000
$1.010,000
$56,251
$12.057
$19,311
$311,692
$90.000
$515.300
53.547..619 $916,992
Police Facility General Escrow
CIP Fund CIP Fund Funds
$17.276
$60.650
Unfunded/
Funding
Pending
$4,762,188
$45,672
$602.230 $1,179,081
$138,750
$98,368
$917,274
$5,255,750 (3)
$1,408,000
$1,582,000
$14,232,691
Other Total Project
Funding Cost
$51,609
$257,500
$309,109
$6,200,700
$20,146 (I) $580,796
$197,957
$16,919 (2) $6,081,311
$27,198
$128,027 I
$605,542
$167,285
$239,820 I
$200,000
$1,126,935
$125,000 (2) $150,500
$5,255,750
$1,546,750 I
$1,725,500
$162,065 $24,234,071
$150,000 1
$87,013
$150,500 1
$387,513 1
$200,000
$311,692
$2,340,000
$1,525,300
$56,251
$12,057
$19,311
$4,464,611
Project
Number
CAPITAL IMPROVEMENTS PROGRAM
FUNDED PROJECTS SUMMARY
BUDGET AMOUNT AS OF JUNE 30, 2000
Sources
Water & Half Cent Unfunded/
Drainage Sewer CIP Impact Fee Sales Tax Police Facility General Escrow Funding Other Total Project
Project Description Street Fund Fund Fund Fund Fund CIP Fund CIP Fund Funds Pending Funding Cost
OTHER
AC9901 Athletic Complex Phase II (41 $111,411 $111,411
DV9901 EDC Incentive Funds $324,994 ( $324,994
PD9901 Police and Municipal Courts Facility $11,789,614 $450,000 (5) $12,239,614
PR9901 Hike and Bike Trail $237,714 1 $237.714
PR9902 Senior Citizens Remodel $16,130 $16,130
PR9903-
PR9918
PR9922 Teias Buildino Remodel
PR9927 Park Improvement - Texas Star
SS9902 Library Books
SS0010 Fire Station #2
Various EDC Park Projects
Sub -Total Other Projects
$269,566
$150,000
$1,036,500
$3,302
$599.600
$2,749,217
TOTAL FUNDED PROJECTS $8,922,041 $309.109 $3,810,132 $1,041,992 $2,749,217
(1) - General Fund
(2) - Water & Sewer Fund
(3) - $3,258,731 from Bond Sale, $497,019 from Escrow, & 1,500,000 from other sources.
(4) - The scope and total cost of this project is yet to be determined. This represents funding that has been provided to date from the Half Cent Operating Fund.
$11,789,614 60
(5) - 450,000 from DEA Task Force
(6) - Water & Sewer Operating Fund FY 2001 Budget - $280,000 Pending.
$269.566
$280,000 (6) $430,000
$1,036,500
$3,302
$599,600
5730 000 $15.268.831
$11,789.614 •50 5917, 74 $14„232691 5892,,065 $44.664.135
Project
Number
Project Description
'STREET PROJECTS
IPS9901 North Main Street
IPS9903 Hwy 183 Service Road
PS9904 Harwood Road
IPS0002 West Pipeline - Raider to Hwy 10
IPS0003 Glade - Heritage to SH121
IPS0004 Glade (East) - SH121 to Champagne
Sub -Total Street Proiects
'OTHER
IAC9901 (Athletic Complex Phase II (2)
' Sub -Total Other Proiects
'TOTAL
Unfunded
Portion
$4,762,188
$45,672
$1,179,081
$5,255,750
$1.408,000
$1,582,000
$14,232,691
Operating
Funds
Partially Unfunded Projects
Anticipated Funding Sources
PROPOSED METHOD OF FINANCING
Fund
Balance
General
Obligation Bond
Sale
$4,762,188
$1,179,081
$3,258,731
$9.200.000
Certificates of
Obligation
$1,408,000
$1,582,000
Revenue Bond
Sale
Other
Funding
Sources
$1,997,019 (1)
$1,997,019
$14,232,691 $0 1 $0 $9,200,000 $2,990,000 $0 $1,997,019
(1) $497,019 anticipated escrow & $1,500,000 from other sources.
(2) Scope of this project and related cost is yet to be determined.
To Be
Determined
$45,672
XX
$45,672
M/xer Inte,r6 auth,
4
CV
Project
Number Project Description
DRAINAGE PROJECTS
DR9903 I Misc Drainage Improvements
DR9904 I Hurricane Creek
Sub -Total Drainage Projects
Ln
Street Fund
CAPITAL IMPROVEMENTS PROGRAM
FUNDED PROJECTS SUMMARY
BUDGET AMOUNT AS OF JUNE 30, 2000
Sources
Water & Half Cent Unfunded/
Drainage Sewer CIP Impact Fee Sales Tax Police Facility General Escrow Funding Other Total Project
Fund Fund Fund Fund CIP Fund CIP Fund Funds Pending Funding Cost
$51,609
$51,609
$257,500 $257.500
$309,109 $309,109
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: MISC DRAINAGE IMPROVEMENTS PROGRAM
Project Type: DRAINAGE Sub -Type:
Project No.: DR9903 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Date Prepared: 7-23-99
Date Completed:
This project includes funds for various small projects that are identified throughout the year. Often correction of
these problems requires design services and the installation of improvements. Large projects that occur will be
tracked separately and assigned a different project number.
JUSTIFICATION:
Failure to correct these problems can often cause damage to existing infrastructure.
6
PROJECT TITLE: MISC DRAINAGE IMPROVEMENTS PROGRAM PROJECT #: DR9903
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Fence
Storm Sewers
Meters & Setting
TOTAL ESTIMATED CAPITAL COST:
Fence
Storm Sewers
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS
BUDGET
559
51,050
0
EXPENDED
559
10,605
195
* - This project provided an inter -project transfer of $5,904 to DR9901.
559
51,050
$51,609
OVER/UNDER
BUDGET (- +) % EXPENDED
0 100%
(40,445) 21%
195 0%
TOTAL PROJECT $51,609 $11,359 ($40,250) 22%
7
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: HURRICANE CREEK
Project Type: DRAINAGE Sub -Type:
Project No.: DR9904 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-22-99
Date Completed:
The Unified Development Code (Article 12) permits developers to request reimbursement for a portion of
oversized drainage improvements.
PROJECT DESCRIPTION:
The Hurricane Creek project involves reimbursement for oversized drainage improvements along a tributary of
Hurricane Creek south of SH 183.
JUSTIFICATION:
A significant watershed drains from SH 183 to the south city limit line. Oversized drainage improvements are
required to meet the public improvement requirements established for development. Should it be determined
that these funds are not required, they can be reallocated.
8
PROJECT TITLE: HURRICANE CREEK PROJECT #: DR9904
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time Storm Sewers 257,500
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal: $0
Maintenance Costs
Subtotal: $0
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Storm Sewers
$0 Total Estimated Capital Cost $257,500
CURRENT STATUS
OVER/UNDER
BUDGET EXPENDED BUDGET (-+) % EXPENDED
257,500 69,906 (187,594) 27%
TOTAL PROJECT $257,500 $69,906 ($187,594) 27%
9
Yky)a
v
10
?undgd trRt ProiRct6
Project
Number
CAPITAL IMPROVEMENTS PROGRAM
FUNDED PROJECTS SUMMARY
BUDGET AMOUNT AS OF JUNE 30, 2000
Sources
Water & Half Cent
Drainage Sewer CIP Impact Fee Sales Tax Police Facility General
Proiect Description Street Fund Fund Fund Fund Fund CIP Fund CIP Fund
STREET PROJECTS
PS9901 North Main Street
PS9902 Mid Cities Blvd.
PS9903 Hwv 183 Service Road
PS9904 Harwood Road
PS9905 Traffic Studies
PS9906 Traffic Safety
PS9907 Westpark - SH10 to SH183
PS9908 Signilization
FM157 North, SH183 to SH121
PS9909 (Landscaping & Lighting)
PS9910 Sidewalk Projects
PS9912 Harwood - Main Street Intersection
PS0001 FM157 - S Pipeline-SH10 (Utl Relc)
PS0002 West Pipeline - Raider/Hwv 10
PS0003 Glade - Heritage/SH 121
PS0004 Glade - SH 121/Champagne
Sub -Total Street Proiects
$1,421.236
$500,000
$152.285
$4.283,081
$27,198
$128,027
$605,542
$167,285
$239,820
$200.000
$1.126.935
$25.500
$45,132
$8,922,041
(1) - General Fund
(2) - Water & Sewer Fund
(3) - $3,258,731 from Bond Sale, $497,019 from Escrow, & 1,500,000 from other sources.
Unfunded/
Escrow Funding Other
Funds Pending Funding
$17.276 $4,762,188
$60.650 $20,146
$45,672
$602,230 $1,179,081 $16,919 (2)
$138.750
$98,368
$5,255,750 (3)
$1.408,000
$1,582,000
(1)
$125,000 (2)
Total Project
Cost
$6,200,700
$580,796
$197,957
$6,081,311
$27,198
$128,027
$605,542
$167,285
$239,820
$200,000
$1,126,935
$150,500
$5,255,750
$1,546,750
$1,725,500
$917,274 $14,232,691 $162,065 $24,234,071
Department:
Submitted By:
Project Title:
Project Type:
Project No.:
City of Euless
Capital Project Request
PUBLIC WORKS
RANDY BYERS
NORTH MAIN STREET
STREET
PS9901
COUNCIL AUTHORIZATION:
Date Prepared: 5-24-99
Date Completed:
Sub -Type: CONSTRUCTION
Priority: A
Apr ii 14, 1998 - dull iur iLed bond election for the purpose of funding construction.
November 24, 1998 - Approved contract with Cummings & Prewitt, Inc. for paving and drainage design.
January 31, 2000 - Authorize the acquisition of right-of-ways to allow for widening and paving improvements.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project is a part of the $13.5 million bond package approved by the voters in October 1998.
PROJECT DESCRIPTION:
The project consists of reconstruction and widening of North Main Street from SH10 to Harwood Road. The
project also consists of relocating overhead utilities to underground, the addition of a subsurface drainage
system, and the addition of street lights and landscaping improvements.
JUSTIFICATION:
1. Improvement of traffic flow and traffic safety.
2. Improve aesthetics with relocation of overhead utilities and addition of landscaping.
3. Subsurface drainage system needed.
4. Reduction of maintenance requirements.
12
PROJECT TITLE: NORTH MAIN STREET PROJECT #: PS9901
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Ooeratino Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Other
Average Annual Debt Service
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Engineering
Right of Way
Utility Relocation (City)
Appraisal Services
Surveying Services
Other Professional Services
Special Services
Landscaping
TOTAL PROJECT (Funded):
Fundina Pendina:
Bond Sale
TOTAL ESTIMATED CAPITAL COST:
Engineering
Right of Way
Utility Relocation (City)
$0 Appraisal Services
Street Lights
Landscaping
Construction
$0
$0
$412,567
$412,567 Total Estimated Capital Cost
CURRENT STATUS
BUDGET
673,813
550,000
118,447
69,000
2,770
2,155
5,053
17,276
1,438,514
4,762,186
TOTAL PROJECT $6,200,700
EXPENDED
532,540
332,475
0
101,495
5,170
2,155
5,053
0
978,888
OVER/UNDER
BUDGET (- +)
(141,273)
(217,525)
(118,447)
32,495
2,400
0
0
(17,276)
(459,626)
$571,500
$550,000
$722,200
$60,000
$125,000
$350,000
$3, 822, 000
$6,200,700
% EXPENDED
79%
60%
0%
147%
187%
100%
100%
0%
68%
13
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: MID CITIES BLVD.
Project Type: STREET
Project No.: PS9902
COUNCIL AUTHORIZATION:
Date Prepared: 7-17-99
Date Completed:
Sub -Type: CONSTRUCTION
Priority: A
IYUVGIIIueI 16, 199oo - ALAI lui acquisition.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The City's 1999 Master Thoroughfare Plan calls for this roadway to be a six -lane boulevard section. This
project was approved a number of years ago as a 100% federally funded construction project through Texas
Department of Transportation (TxDOT). TxDOT has bid the project and it is currently under construction.
PROJECT DESCRIPTION:
Project consists of reconstruction of Mid -Cities Blvd. from Hwy 121 to Hwy 360 by Texas Department of
Transportation (TxDOT). The City of Euless is required to purchase the right-of-way required for the TxDOT
construction project. The City also proposes to add certain amenities to enhance the aesthetics along the
corridor.
Another related project is the installation of a new 12-inch water main which was funded from Impact Fees.
(Project # WT9908) This project is currently under construction.
JUSTIFICATION:
1. Frequent flooding which often necessitates closing of this section of the street.
2. Street and roadbed have deteriorated to the point that frequent repairs are required.
3. The street does not adequately convey the existing and future traffic volumes.
14
PROJECT TITLE: MID CITIES BLVD. PROJECT #: PS9902
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Ooeratina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Appraisal Services
Engineering Services
Legal Services
Right of Way
Overlay
TOTAL ESTIMATED CAPITAL COST:
Right of Way
$0 Appraisal Services
Legal Services
Engineering Services
Overlay
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS
BUDGET
52,700
23,345
42,838
461,834
79
EXPENDED
21,370
26,545
44,091
401,379
79
OVER/UNDER
BUDGET (- +)
(31,330)
3,200
1,253
(60,455)
0
461,834
52,700
42,838
23,345
79
$580,796
% EXPENDED
41%
114%
103%
87%
100%
TOTAL PROJECT (Funded) $580,796
15
$493,464
($87,332) 85%
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Date Prepared: 7-26-99
Date Completed:
Project Title: HWY 183 SERVICE ROAD
Project Type: STREET Sub -Type: CONSTRUCTION
Project No.: PS9903 Priority: A
COUNCIL AUTHORIZATION:
5epteiiiibei v, i aao - Appl uved ds par or Certificates of Obligation, series 199b.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project consists of building a connection from the Hwy 183 frontage road east of Wendy's on Main Street, to
the exit ramp of HWY 183 at North Main Street. This will bring the frontage road traffic to a signalized
intersection.
JUSTIFICATION:
This would allow the traffic east of Wendy's to turn left (south) onto North Main Street. Currently no left turn
is allowed from East Fuller to South Bound Main Street. Staff is currently reevaluating the need for this
project. The reconstruction of Main Street and future widening of SH 183 may cause this project to be
unwarranted.
16
PROJECT TITLE: HWY 183 SERVICE ROAD PROJECT #: PS9903
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Ooeratina Cost Construction 197,957
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
$0
so
so
$0 Total Estimated Capital Cost $197,957
CURRENT STATUS
OVER/UNDER
BUDGET EXPENDED BUDGET (- +) % EXPENDED
Construction 152,285 0 (152,285) 0%
TOTAL PROJECT (Funded):
152,285 0 (152,285) 0%
Funding Pending:
To Be Determined 45,672
* - This project provided an inter -project transfer of $45,672 to PS0004.
TOTAL PROJECT
$197, 957
17
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: HARWOOD ROAD, N. MAIN TO 360
Project Type: STREET Sub -Type:
Project No.: PS9904 Priority: A
COUNCIL AUTHORIZATION:
Date Prepared: 7-29-99
Date Completed:
April 14, 1yyu - Authorzed bond election tor the purpose of funding construction.
November 24, 1998 - Authorized contract for appraisal services for parcels necessary to project.
May 24, 1999 - Approval of resolution determining the necessity for and ordering the improvement.
May 24, 1999 - Authorize the acquisition of the necessary right-of-way.
June 22, 1999 - Approved right-of-way acquisition.
December 14, 1999 - Authorized City Manager to negotiate for and acquire additional right-of-ways.
February 8, 2000 - Awarded construction contract to Larry H. Jackson Construction
March 28, 2000 - Authorization to issue G.O. bonds for Harwood, Main, and West Pipeline.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project is part of the $13.5 million bond program approved by the voters in October 1998. Project
identified in the 1999 Master Thoroughfare Plan.
PROJECT DESCRIPTION:
Reconstruction of Harwood Road from a point approximately 350 feet west of N. Main Street to SH 360. New
roadway will be a six -lane boulevard with sidewalks, landscaping and lighting. Signals will be added at Fuller -
Wiser and Bear Creek Parkway.
JUSTIFICATION:
Existing roadway (two-lane) does not meet existing and future needs.
18
PROJECT TITLE: HARWOOD ROAD, N. MAIN TO 360 PROJECT #: PS9904
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Dent Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Other
Average Annual Debt Service
Subtotal:
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Engineering
Construction
Right of Way
Appraisal Services
Issuance Cost
Contingencies
Other Professional Services
PROJECT TOTAL (Funded):
Funding Pending:
Bond Sale
TOTAL ESTIMATED CAPITAL COST:
Appraisal Services
Acquisition Agent
$0 Acquisition
Engineering
Construction
Misc
Issuance Cost
$0
465,722
$465,722
$465,722 Total Estimated Capital Cost
CURRENT STATUS
BUDGET EXPENDED
413,000
3,183,757
879,010
54,250
371,677
536
0
373,174
494,721
731,642
50,250
70,000
536
1,841
4,902,230 1,722,165
1,179,081
TOTAL PROJECT $6,081,311
OVER/UNDER
BUDGET (- +)
(39,826)
(2,689,036)
(147,368)
(4,000)
(301,677)
(0)
1,841
(3,180,065)
54,250
20,150
879,010
413,000
4,342,497
727
371,677
$6,081,311
% EXPENDED
90%
16%
83%
93%
19%
100%
35%
19
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: 7-17-99
Submitted By: RANDY BYERS Date Completed:
Project Title: TRAFFIC STUDIES
Project Type: STREET Sub -Type: STUDY
Project No.: PS9905 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
These funds are utilized with projects PS9906 (Traffic Safety) and PS 9908 (Signalization) to address traffic
needs throughout the City.
PROJECT DESCRIPTION:
Staff utilizes these funds to investigate concerns related to traffic movements and volumes.
JUSTIFICATION:
Traffic patterns and volumes change causing problems on our streets. Funds are needed to compensate
consultants for professional services rendered in the investigation work.
20
PROJECT TITLE: TRAFFIC STUDIES PROJECT #: PS9905
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Engineering Services
Other Professional Services
Traffic Signals
TOTAL ESTIMATED CAPITAL COST:
Engineering
Other Professional Services
Traffic Signals
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS
BUDGET
26,352
76
770
EXPENDED
1,081
76
770
* - This project received a transfer of $20,000 from Fund 501-Water & Sewer
TOTAL PROJECT
$27,198
21
$1,927
OVER/UNDER
BUDGET (- +)
(25,271)
0
0
26,352
76
770
$27,198
% EXPENDED
4%
100%
100%
($25,271) 7%
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Date Prepared: 7-15-99
Date Completed:
Project Title: TRAFFIC SAFETY
Project Type: STREETS Sub -Type: STUDY
Project No.: PS9906 Priority: A
COUNCIL AUTHORIZATION:
F0hr.j ry 7d '1QQR - Opproved �c part cf Tax and atcnvcrk. d System Revenue •fic t-
.� -�..p. r.. ......,. .. r.......+ � ... uwi rrv�no and Sewer System Certificates ll:d lCJ or
Obligation, Series 1998.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
These funds are utilized with projects PS9905 (Traffic Studies) and PS9908 (Signalization) to address traffic
needs throughout the City.
PROJECT DESCRIPTION:
Staff utilizes these funds to investigate traffic safety concerns. Maintenance activities are paid from the facilities
operating budget.
JUSTIFICATION:
Traffic patterns and volumes change, causing safety problems on our streets. Funds are needed to compensate
consultants for professional services rendered in the investigation work.
22
PROJECT TITLE: TRAFFIC SAFETY PROJECT #: PS9906
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Professional Services
Equipment Rental
Signalization Systems
Traffic Signals
TOTAL ESTIMATED CAPITAL COST:
Professional Services
Equipment Rental
Signalization Systems
$0 Traffic Signals
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS
BUDGET
5,000
1,000
9,780
112,247
EXPENDED
4,128
1,000
9,724
27,899
OVER/UNDER
BUDGET (- +)
(873)
0
(57)
(84,348)
5,000
1,000
9,780
112,247
$128,027
% EXPENDED
83%
1 0 0 %
99%
25%
TOTAL PROJECT
$128,027
23
$42,750 ($85,277) 33%
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Date Prepared: 7-17-99
Date Completed:
Project Title: WESTPARK - SH10 TO SH183
Project Type: STREET Sub -Type: CONSTRUCTION
Project No.: PS9907 Priority: A
COUNCIL AUTHORIZATION:
April 13, 1999 - Approved Bid No. 99-05 for irrigation and landscape improvements.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The Westpark Way project is nearing completion. The street reconstruction was accomplished through funding
from the City and the Texas Department of Transportation (TxDOT).
PROJECT DESCRIPTION:
Reconstruction of a two-lane asphalt street. TxDOT recently completed the new four -lane and five -lane
concrete street. The work remaining on the project includes completion of the landscaping package and
installation of street lights.
JUSTIFICATION:
1. Two-lane street did not adequately convey existing or future traffic volumes.
2. Ongoing safety concerns made the reconstruction of Westpark Way mandatory.
24
PROJECT TITLE: WESTPARK - SH10 TO SH183 PROJECT #: PS9907
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Engineering Services
Plumbing Services, Outside
Irrigation Repairs
Fence
Equipment Rentals
Streets & Highways
Contingencies
Sidewalks & Curbs
Landscaping
Signal Systems
(Expenses prior to FY99 not reflected)
TOTAL PROJECT
TOTAL ESTIMATED CAPITAL COST:
Balance Remaining @ 10-1-99
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS
BUDGET
9,152
2,291
23,745
10,100
74
2,835
169,682
5,939
377,336
4,388
$605,542
25
EXPENDED
9,152
2,290
24,215
10,099
74
2,835
63,741
6,234
395,797
4,388
OVER/UNDER
BUDGET (- +)
0
(1)
470
(1)
(0)
0
(105,941)
295
18,461
(1)
605,542
$605,542
% EXPENDED
100%
100%
102%
100%
99%
100%
38%
105%
105%
100%
$518,826 ($86,716) 86%
Department:
Submitted By:
Project Title:
Project Type:
Project No.:
City of Euless
Capital Project Request
PUBLIC WORKS
RANDY BYERS
SIGNALIZATION
STREET
PS9908
COUNCIL AUTHORIZATION:
Date Prepared: 7-22-99
Date Completed:
Sub -Type: SIGNALIZATION
Priority: A
Fcbr ua y 24, 19.13 - Approved as part of Tax and Waterwoi-ks SCWCf System Revenue Certificates of
Obligation, Series 1998.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
These funds are utilized with Projects PS9905 (Traffic Studies) and PS9906 (Traffic Safety) to address traffic
needs throughout the City.
PROJECT DESCRIPTION:
1. Replace or upgrade controllers.
2. Upgrade signals.
3. Install Opticom.
JUSTIFICATION:
Signal improvements are often needed to improve traffic safety and vehicular movements through intersections.
26
PROJECT TITLE: SIGNALIZATION PROJECT #: PS9908
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Ooeratina Cost Signal System
Personnel: Full Time Traffic Signals
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal: $0
Maintenance Costs
Subtotal: $0
Total Estimated Annual Cost
20,000
147,285
$0 Total Estimated Capital Cost $167,285
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED
Signal Systems 20,000 17,179 (2,821) 86%
Traffic Signals 147,285 11,134 (136,151) 8%
TOTAL PROJECT $167,285 $28,313 ($138,972) 17%
27
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Date Prepared: 7-17-99
Date Completed:
Project Title: FM157 NORTH, SH183 TO SH121 (Landscaping & Lighting)
Project Type: STREET Sub -Type: CONSTRUCTION
Project No.: PS9909 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The Texas Department of Transportation (TxDOT) widened FM157 between SH183 and SH121 to a seven -
lane (5+2) undivided roadway section.
PROJECT DESCRIPTION:
The addition of landscape and irrigation improvements and street lights along the new street.
JUSTIFICATION:
Improved visibility and enhanced aesthetics.
28
PROJECT TITLE: FM157, SH183 and SH121 PROJECT #: PS9909
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Landscaping/Lighting 239,820
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal: $0
Maintenance Costs
Subtotal: $0
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Landscaping
Escrow Available $66,915.55
(Expenses prior to FY99 not reflected)
$0 Total Estimated Capital Cost $239,820
CURRENT STATUS
OVER/UNDER
BUDGET EXPENDED BUDGET (- +) % EXPENDED
239,820 693 (239,128) 0%
TOTAL PROJECT $239,820 $693 ($239,128) 0%
29
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: SIDEWALK PROJECTS
Project Type: STREETS
Project No.: PS9910
COUNCIL AUTHORIZATION:
Date Prepared: 7-17-99
Date Completed:
Sub -Type: SIDEWALKS
Priority: A
February 24, •i998 - Approved as part of lax and Waterworks and Sewer System Revenue Certificates of
Obligation, Series 1998.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Sidewalks and barrier -free ramps are needed throughout the City. The construction of sidewalks and barrier -
free ramps has been an ongoing program for a number of years.
PROJECT DESCRIPTION:
This project includes funds to install new sidewalks and barrier free curb ramps throughout the City as well as
improvement on municipal property. Although the City has identified areas that need sidewalks and barrier free
curb ramps, federal guidelines require public hearings and other public input to prioritize construction.
JUSTIFICATION:
1. Access and the accessibility of goods and services to pedestrians including those with disabilities
is an important need in our city.
2. The federal government has established rules governing the implementation of a program to eliminate
barriers within each city.
30
PROJECT TITLE: SIDEWALK PROJECTS PROJECT #: PS9910
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Ooeratina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Sidewalks & Curbs 200,000
$0
Subtotal: $0
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Sidewalks & Curbs
TOTAL PROJECT
so
$0 Total Estimated Capital Cost $200,000
CURRENT STATUS
OVER/UNDER
BUDGET EXPENDED BUDGET (- +) % EXPENDED
200,000 106,524 (93,476) 53%
$200,000 $106,524 ($93,476) 53%
31
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Date Prepared: 7-17-99
Date Completed:
Project Title: HARWOOD-MAIN INTERSECTION
Project Type: STREETS Sub -Type: CONSTRUCTION
Project No.: PS9912 Priority: A
COUNCIL AUTHORIZATION:
Aprii i4, i9 8 - Authorized bond election for the purpose of funding construction.
April 13, 1999 - Bid No. 99-03 awarded for improvements at the North Main and Harwood intersection.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project is the overlap point on Harwood Road and North Main Street projects that were approved in the
1998 bond election.
PROJECT DESCRIPTION:
This project involves the relocation of City water and wastewater mains and the installation of storm
drainage improvements to permit the relocation of franchise utility facilities in the intersection of North
Main Street and Harwood Road. Reconstruction of the paved intersection will occur at the beginning
of the Harwood Road project.
JUSTIFICATION:
The work included in this project must be complete before the franchise utility companies can perform
the relocation of their facilities.
32
PROJECT TITLE: HARWOOD-MAIN INTERSECTION PROJECT #: PS9912
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal: $0
Maintenance Costs
Subtotal: $0
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Utility Installation
TOTAL PROJECT
Utility Installation 1,126,935
$0 Total Estimated Capital Cost $1,126,935
CURRENT STATUS
OVER/UNDER
BUDGET EXPENDED BUDGET (- +) % EXPENDED
1,126,935 1,077,247
(49,688) 96%
$1,126,935 $1,077,247 ($49,688)
33
96%
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: FM 157-S PIPELINE TO SH10-(Utility Relocation)
Project Type: UTILITY RELOCATION Sub -Type:
Project No.: PS0001 Priority: A
COUNCIL ACTION:
Date Prepared: 7-26-99
Date Completed:
May z4, 2000 - Approval of Resolution authorizing Tarrant County Commissioners to acquire r-o-w
February 8, 2000 - Authorize Professional Srvcs Contract for engineering design of water and sewer mains
April 11, 2000 - Authorize Mayor to execute a drainage easement in conjunction with this project.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Project consists of widening FM 157 from Hwy 10 to South Pipeline. Road construction will be performed by
TxDOT. The City's only responsibility will be the relocation of water and wastewater mains. The City may
choose to provide funds for landscaping the medians as well.
JUSTIFICATION:
Utility relocation is required by TxDOT at the City's expense.
34
PROJECT TITLE: FM 157-S PIPELINE TO SH10-(Utility Relocation) PROJECT #: PS0001
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
$0
so
Subtotal: $0
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Engineering Services
TOTAL PROJECT (Funded):
Engineering Services 25,500
Estimated Additional Cost 100,000
$0 Total Estimated Capital Cost $125,500
CURRENT STATUS
OVER/UNDER
BUDGET EXPENDED BUDGET (- +) % EXPENDED
25,500 2,309
25,500 2,309
Funding Pending,:
Water & Sewer Operating 125,000
TOTAL PROJECT
$150,500
35
(23,191) 9%
(23,191) 9%
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Date Prepared: 7-26-99
Date Completed:
Project Title: WEST PIPELINE - RAIDER/HWY 10
Project Type: STREET Sub -Type: CONSTRUCTION
Project No.: PS0002 Priority: A
COUNCIL AUTHORIZATION:
April 14, 199t3 - Authorized bond election for the purpose of funding construction.
January 1, 2000 - Authorize the City Manager to execute an engineering contract for design.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project was approved as part of the 1998 bond election along with Main Street and Harwood Road.
PROJECT DESCRIPTION:
Project consists of widening West Pipeline Road from 2 lanes to a proposed 4 lane boulevard street.
This project will encompass the section of W. Pipeline from Hwy 10 to Raider Drive. The City has
requested financial participation from Bedford.
JUSTIFICATION:
The street exists in an expanded condition on either end of this proposed widening. The traffic greatly
overloads the existing roadway.
36
PROJECT TITLE: WEST PIPELINE - RAIDER/HWY 10 PROJECT #: PS0002
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
.Direct Qperatinq Cost Engineering 365,000
Personnel: Full Time ROW Appraisal 20,000
Part Time ROW Acquisition 550,000
Total Salary $0 Utility Relocation 866,550
Purchase of Services Construction 3,294,200
Materials & Supplies Lighting 160,000
Utilities
Subtotal: $0
Maintenance Costs
Subtotal:
Other
Average Annual Debt Service
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Engineering
TOTAL PROJECT (Funded):
$0
$279,745
$279,745 Total Estimated Capital Cost
CURRENT STATUS
$5,255,750
OVER/UNDER
BUDGET EXPENDED BUDGET (-+) % EXPENDED
0 53,889 53,889
$0 $53,889 $53,889
Eucinc_Pendij_
Bond Sale 3,258,731
Escrow Funds 497,019
Other 1,500,000
TOTAL PROJECT
$5,255,750
37
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: 7-7-00
Submitted By: RON YOUNG Date Completed:
Project Title: GLADE FROM HERITAGE TO SH121
Project Type: STREET Sub -Type: CONSTRUCTION
Project No.: PS0003 Priority:
COUNCIL AUTHORIZATION:
Juna 13, 2003 - Authorization toexecute EIr ii ICCI II iy Dt siy. II Coniraci, upon approvai of City Attorney.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Construction of Glade from Heritage to S.H. 121 by adding two (2) lanes to the existing three (3) lanes to create
a 5-lane roadway (2 eastbound lanes, 2 westbound lanes and a center continued turn lane). Construct the east
half (2 northbound lanes) of heritage from Glade Road to the south limit of the Target project. Construct a four
(4) lane divided north/south roadway from Glade to the south limit of the Target project approximately in the
center of the Target project. Traffic signals and associated water and drainage facilities will be included.
JUSTIFICATION:
Increased ad valorem and sales tax generated by development of this area.
38
PROJECT TITLE: GLADE FROM HERITAGE TO SH121 PROJECT #: PS0003
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Ooeratina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Other
Average Annual Debt Service
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Engineering & Design
TOTAL PROJECT (Funded):
Funding Pending:
Bond Sale
TOTAL ESTIMATED CAPITAL COST:
Engineering
Geo-technical Services
Construction Costs
$0
$0
$0
$131,480
$131,480 Total Estimated Capital Cost
CURRENT STATUS
BUDGET
138,750
$138,750
1,408,000
* - This project received a transfer from escrow of $138,750.
TOTAL PROJECT $1,546,750
EXPENDED
0
$0
138,750
25,000
1,383,000
$1,546,750
OVER/UNDER
BUDGET (- +) % EXPENDED
(138,750) 0%
($138,750)
0%
39
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RON YOUNG
Date Prepared: 7-7-00
Date Completed:
Project Title: GLADE RD (EAST)-SH 121 TO CHAMPAGNE
Project Type: STREET Sub -Type: CONSTRUCTION
Project No.: PS0004 Priority:
COUNCIL AUTHORIZATION:
June 13, 2000 - Authvi ILd..UI I iu execute Engineering Design Contract in the amount of $143,500.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Construct the eastbound lanes of Glade Road under S.H. 121 and construct the south lanes (2 eastbound lanes)
of Glade Road from SH. 121 to Champagne Drive. Traffic signals, asphalt transitions and associated water and
drainage facilities will be included.
JUSTIFICATION:
Increased ad valorem and sales tax generated by development of this area.
40
PROJECT TITLE: GLADE RD (EAST)-SH 121 TO CHAMPAGNE PROJECT #: PS0004
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating_
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Other
Average Annual Debt Service
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Engineering & Design
TOTAL PROJECT (Funded):
Funding Pending:
Bond Sale
TOTAL ESTIMATED CAPITAL COST:
Engineering
Right -of -Way
Geo-technical Services
$0 Construction
$0
$0
148,265
$148,265 Total Estimated Capital Cost
CURRENT STATUS
BUDGET
143,500
$143,500
1,582,000
* - This project received a transfer from escrow of $98,368
* - This project received a transfer from PS9903 of $45,132.
TOTAL PROJECT
$1,725,500
41
143,500
50,000
25,000
1,507,000
$1,725,500
OVER/UNDER
EXPENDED BUDGET (-+) % EXPENDED
0 (143,500) 0%
$0
($143,500)
0%
42
Project
Number
CAPITAL IMPROVEMENTS PROGRAM
FUNDED PROJECTS SUMMARY
BUDGET AMOUNT AS OF JUNE 30, 2000
Sources
Water & Half Cent Unfunded/
Drainage Sewer CIP Impact Fee Sales Tax Police Facility General Escrow Funding Other
Project Description Street Fund Fund Fund Fund Fund CIP Fund CIP Fund Funds Pending Funding
WASTEWATER PROJECTS
WW0001 CDBGB99-UC-a8-0001
WW0002 IMisc Sewer Rehab
WW0003 ITRA Debt Payments
Sub -Total Wastewater Proiects
$150,000
$87,013
$25,500 $125,000
$262,513 $125,000
Total Project
Cost
$150,000
$87,013
$150,500
$387,513
Department:
Submitted By:
Project Title:
Project Type:
Project No.:
City of Euless
Capital Project Request
PUBLIC WORKS
RANDY BYERS
CDBG B99-UC-48-0001
WASTEWATER
WW0001
COUNCIL ACTION:
Sub -Type:
Priority: A
Date Prepared: 10-1-99
Date Completed:
April 11, 2000 - Recommend Tarrant County reject bids for CDBG and re -advertise.
May 23, 2000 - Recommend Tarrant County award a contract to Henderson Construction.
PROJECT DESCRIPTION:
Replace sanitary sewer line on Vine St. from Bayless Dr. south to Sunset Dr. then west on Sunset to S.
Pipeline. Replace sanitary sewer line behind the 900 & 1000 Blocks of Oakwood Dr.
JUSTIFICATION:
Mains in the South Euless area have deteriorated as they have aged.
44
PROJECT TITLE: CDBG B99-UC-48-0001 PROJECT #: WW0001
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Water Mains
Sewer Mains 150,000
so
$0
$0
$0 Total Estimated Capital Cost $150,000
CURRENT STATUS
OVER/UNDER
BUDGET EXPENDED BUDGET (- +) % EXPENDED
150,000 0 (150,000) 0%
TOTAL PROJECT $150,000 $0 ($150,000) 0%
45
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: MISC. SEWER REHAB
Project Type: WASTEWATER Sub -Type: MAINS
Project No.: WW0002 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Date Prepared: 7-26-99
Date Completed:
This project is for small unidentified sewer main problems that may be found during the fiscal year. Large
projects will be determined on an "as needed" basis and presented for funding under a new project number.
JUSTIFICATION:
Most of these lines are clay the and are seriously deteriorated.
46
PROJECT TITLE: MISC. SEWER REHAB PROJECT #: WW0002
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Ooeratino Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
so
Subtotal: $0
Maintenance Costs
Subtotal: $0
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Sewer Mains
Sewer Mains 87,013
$0 Total Estimated Capital Cost $87,013
CURRENT STATUS
OVER/UNDER
BUDGET EXPENDED BUDGET(-+) % EXPENDED
87,013 0 (87,013) 0%
* - This project received an inter -project transfer of $37,013.14 from WW9903.
TOTAL PROJECT $87,013 $0 ($87,013) 0%
47
City of Euless
Capital Project Request
Department: FINANCE
Submitted By: LORETTA GETCHELL
Project Title: TRA DEBT PAYMENTS
Project Type: DEBT SERVICE Sub -Type:
Project No.: VWV0003 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Date Prepared: 7-26-99
Date Completed:
A portion of the monthly payment to TRA is attributed to debt service for additional capacity covered by impact
fees. Therefore, these funds are being applied to this debt payment.
JUSTIFICATION:
Impact fees must be used within 10 years of identified projects.
48
PROJECT TITLE: TRA DEBT PAYMENTS PROJECT #: WW0003
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Debt Payments 150,500
so
Subtotal: $0
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
TRA Debt Payments
TOTAL PROJECT (Funded):
so
$0 Total Estimated Capital Cost $150,500
CURRENT STATUS
OVER/UNDER
BUDGET EXPENDED BUDGET (- +) % EXPENDED
25,500 25,500 0 100%
$25,500 $25,500 $0 100%
Funding Pending:
Impact Fees 125,000
TOTAL PROJECT $150,500
49
50
Project
Number
CAPITAL IMPROVEMENTS PROGRAM
FUNDED PROJECTS SUMMARY
BUDGET AMOUNT AS OF JUNE 30, 2000
Sources
Water & Half Cent
Drainage Sewer CIP Impact Fee Sales Tax
ProiectDescriotion Street Fund Fund Fund Fund Fund
WATER PROJECTS
WT9902 (Water Tank Painting
WT9908 'Mid Cities 12" Line
WT9909 I2MG Water Tank
WT9910 I Water Line for Elevated Tank
W r000i !Utility Rehab - Water Program
WT0003 IWater Line Replacement, Aransas
WT0005 I Water Line Milam - Denton/Midway
Sub -Total Water Projects
$200,000
$311,692
$2,250,000 $90,000
$1,010,000 $515,300
$56,251
$12,057
$19,311
$3,547,619 $916,992
Unfunded/
Police Facility General Escrow Funding Other
CIP Fund CIP Fund Funds Pending Funding
$4,
Total Project
Cost
$200,000
$311,692
$2,340,000
$1,525,300
$56,251
$12,057
$19,311
464,611
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: WATER TANK PAINTING
Project Type: WATER Sub -Type: TANK
Project No.: WT9902 Priority: A
COUNCIL AUTHORIZATION:
August 27, I b - inciuded in riscai 1i996-97 Budget.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Date Prepared: 7/26/1999
Date Completed:
This project includes the preparation of bid documents to paint both elevated water storage facilities. Depending
on the type of paint presently on the tanks, this account may be under funded. If the present paint is lead -based,
EPA requires an expensive removal and disposal process.
JUSTIFICATION:
As time passes, the appearance and protective qualities of paint diminish. To prevent corrosive damage, the
elevated storage tanks must be repainted.
52
PROJECT TITLE: WATER TANK PAINTING PROJECT #: WT9902
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Ooeratina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Water Tank Painting
Water Tank Painting 200,000
so
so
so
$0 Total Estimated Capital Cost $200,000
CURRENT STATUS
OVER/UNDER
BUDGET EXPENDED BUDGET (- +) % EXPENDED
200,000 0 (200,000) 0%
TOTAL PROJECT $200,000 $0 ($200,000) 0%
53
City of Euless
Capital Project - equest
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: MID CITIES 12" LINE
Project Type: WATER
Project No.: WT9908
COUNCIL AUTHORIZATION:
Date Prepared: 7-17-99
Date Completed:
Sub -Type: IMPACT FEE PROJECTS
Priority: A
November 24, 1995 - Authorized professionai services contract with Shimek, Jacobs, & Finklea.
May 11, 1999 - Awarded Bid No. 99-11 for the construction of a waterline.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The City's Water Master Plan has identified this water line as being necessary.
PROJECT DESCRIPTION:
Design and installation of a 12" water line along Mid Cities Blvd. from SH121 to North Main Street. City Council
has authorized both the design and construction contracts.
JUSTIFICATION:
Needed to provide adequate water service and pressure.
54
PROJECT TITLE: MID CITIES 12" LINE PROJECT #: WT9908
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Engineering
Personnel: Full Time Water Mains
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
so
Subtotal: $0
Maintenance Costs
Subtotal: $0
Total Estimated Annual Cost
52,080
259,612
$0 Total Estimated Capital Cost $311,692
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (-+) % EXPENDED
Engineering Services 52,080 47,724 (4,356) 92%
Water Mains 259,612 248,086 (11,526) 96%
* - This project received an inter -project transfer of $311,692 from project FB9910.
TOTAL PROJECT $311,692 $295,810 ($15,882) 95%
55
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: 2MG WATER TANK
Project Type: WATER
Project No.: WT9909
COUNCIL AUTHORIZATION:
Date Prepared: 7-26-99
Date Completed:
Sub -Type: IMPACT FEE PROJECTS
Priority: A
May 24, " 999 - Authorized the contract tor protessional services with Shimek, Jacobs, & Finklea.
March 28, 2000 - Authorized the issuance of Revenue Bonds.
May 22, 2000 - Award construction contract to Landmark Structures.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The City's water master plan has identified the need for a 2 million gallon water tank.
PROJECT DESCRIPTION:
Project includes the design and construction of the elevated water tank. Design and construction has been
authorized.
JUSTIFICATION:
1.) Fire flow pressure needs during peak hours.
2.) System is deficient in elevated storage to meet the demands determined from actual records.
3.) Additional capacity is needed to meet the predicted maximum hourly demand.
56
PROJECT TITLE: 2MG WATER TANK PROJECT #: WT9909
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct ODeratina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Other
Average Annual Debt Service
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Engineering Services
Water Tower Construction
Issuance Cost
TOTAL ESTIMATED CAPITAL COST:
Engineering
Construction (Unfunded)
Issuance Cost
$0
so
$0
$194,892
$194,892 Total Estimated Capital Cost
CURRENT STATUS
BUDGET
90,000
2,190, 000
60,000
EXPENDED
67,500
172,730
60,000
* - This project received and inter -project transfer of $90,000 from FB9910.
TOTAL PROJECT $2,340,000
$300,230
OVER/UNDER
BUDGET (- +)
22,500
2,017,270
0
90,000
2,190,000
60,000
$2,340,000
% EXPENDED
75%
8%
100%
$2,039,770 13%
57
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Date Prepared: 7-26-99
Date Completed:
Project Title: LINES FOR ELEVATED TANK
Project Type: WATER Sub -Type: IMPACT FEE PROJECTS
Project No.: WT9910 Priority: A
COUNCIL AUTHORIZATION:
May 24,1999 - Authorized the contract for professional services with Shimek, Jacobs, & Finklea.
March 28, 2000 - Authorized the issuance of Revenue Bonds.
May 9, 2000 - Authorization to utilize $420,000 in impact fee money for extend this project.
May 9, 2000 - Authorize City Engineer to proceed with design of a 16" water supply line.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The City's Water Master Plan has identified the need for a 2 million gallon elevated storage tank. Additional
water mains are required to connect the new tank with the existing water distribution system.
PROJECT DESCRIPTION:
1.) Design water mains required to connect tank to system. This portion of the project has been funded.
2.) Construction of the water mains required to connect the proposed 2 million gallon tank to the water
distribution system.
JUSTIFICATION:
1.) Fire flow pressure needs in peak hours.
2.) System is deficient in elevated storage to meet the demands determined from actual records.
3.) Additional capacity is needed to meet the predicted maximum hourly demand.
58
PROJECT TITLE: LINES FOR ELEVATED TANK PROJECT #: WT9910
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
so
Subtotal: 0
Maintenance Costs
Subtotal:
Other
Average Annual Debt Service $87,560
Total Estimated Annual Cost
Engineering & Design
Water Mains
$95,300
$1,430,000
$87,560 Total Estimated Capital Cost $1,525,300
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Engineering Services 95,300 8,079 (87,221) 8%
Water Mains 1,430,000 0 (1,430,000) 0%
* - This project received an inter -project transfer of $515,300 from FB9910.
TOTAL PROJECT
$1,525,300
59
$8,079 ($1,517,221)
1%
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: 7-26-99
Submitted By: RANDY BYERS Date Completed:
Project Title: UTILITY REHAB - WATER PROGRAM
Project Type: WATER Sub -type: MAINS
Project No.: WT0001 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project is for connection of small unidentified water main problems that may arise throughout the fiscal
year. Large projects that are identified will be prepared on an "as needed" bases and funded under a new
project number.
JUSTIFICATION:
Some of the City's older water mains have deteriorated and need replacement or repair. Staff requests that
this project be funded on an annual basis.
60
PROJECT TITLE: UTILITY REHAB - WATER PROGRAM PROJECT #: WT0001
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time Water Mains 56,251
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Water Mains
so
(Minimum Funding - $50,000)
so
so
$0 Total Estimated Capital Cost $56,251
CURRENT STATUS
OVER/UNDER
BUDGET EXPENDED BUDGET (- +) % Expended
56,251 18,418 (37,833) 33%
* - This project received an inter -project transfer of $6,251 from WT9905.
TOTAL PROJECT
$56,251 $18,418 ($37,833) 33%
61
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: 7-26-99
Submitted By: RANDY BYERS Date Completed:
Project Title: WATERLINE REPLACEMENT, ARANSAS
Project Type: WATER Sub -Type: WATER LINE
Project No.: WT0003 Priority: A
COUNCIL ACTION:
March 28, 2000 - Project to be funded trom existing Water CIP Fund Balance.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Project consists of replacing water lines along Aransas - Ector to Midway.
JUSTIFICATION:
This line has deteriorated to the point of needing to be replaced.
62
PROJECT TITLE: WATERLINE REPLACEMENT, ARANSAS PROJECT #: WT0003
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Dir Op ing_Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal: $0
Maintenance Costa
Subtotal: $0
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Water Mains
Water Mains 12,057
$0 Total Estimated Capital Cost $12,057
CURRENT STATUS
OVER/UNDER
BUDGET EXPENDED BUDGET (- +) % EXPENDED
12,057 0 (12,057) 0%
* - This project received an inter -project transfer of $12,057 from FB9901.
TOTAL PROJECT
$12,057 $0 ($12,057) 0%I
63
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: 7-26-99
Submitted By: RANDY BYERS Date Completed:
Project Title: LINE REPLACEMENT, MILAM-DENTON/MIDWAY
Project Type: WATER Sub -Type: WATER LINE
Project No.: WT0005 Priority: A
COUNCIL ACTION:
Apiii 6, 2000 - Approved project to be funded from existing vvater UIN Fund Balance.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Project consists of replacing water lines along Milam Street from Midway to Denton Drive.
JUSTIFICATION:
This line has deteriorated to the point of needing to be replaced.
64
PROJECT TITLE: LINE REPLACEMENT, MILAM-DENTON/MIDWAY PROJECT #: WT0005
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct ODeratina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Water Mains
Water Mains
so
so
so
19,311
$0 Total Estimated Capital Cost $19,311
CURRENT STATUS
OVER/UNDER
BUDGET EXPENDED BUDGET (-+) % EXPENDED
19,311 0 (19,311) 0%
* - This project received an inter -project transfer of $14,806 from FB9901.
* - This project received an inter -project transfer of $4,505 from WT0004.
TOTAL PROJECT $19,311 $0 ($19,311) 0%
65
66
hr Fundzd Projct5
Project
Number
OTHER
AC9901
DV9901
PD9901
PR9901
PR9902
CAPITAL IMPROVEMENTS PROGRAM
FUNDED PROJECTS SUMMARY
BUDGET AMOUNT AS OF JUNE 30, 2000
Sources
Water & Half Cent Unfunded/
Drainage Sewer CIP Impact Fee Sales Tax Police Facility General Escrow Funding Other
Protect Description Street Fund Fund Fund Fund Fund CIP Fund CIP Fund Funds Pending Funding
Athletic Complex Phase II (1) 1 5111,411
EDC Incentive Funds 1 $324,994 1
Police and Municipal Courts Facility ( $11.789.614
Hike and Bike Trail 1 $237,714 I
Senior Citizens Remodel 1 $16,130 1
PR9903- Various EDC Park Projects
PR9918
PR9922 Teias Building Remodel
PR9927 Park Improvement - Texas Star
SS9902 Library Books
SS0010 Fire Station #2
0
v
$269.566
$150.000
$1,036,500
$3.302
$599,600
Sub -Total Other Protects 1 $2,749,217
$11.789,614 50
(1) - The scope and total cost of this project is yet to be determined. This represents funding that has been provided to dale from the Half Cent Operating Fund.
(2) - 450,000 from DEA Task Force
(3) - Water & Sewer Operating Fund FY 2001 Budget - $280,000 Pending.
Total Project
Cost
$111.411
$324,994 I
$450,000 (2) $12,239.614 I
$237.714 I
$16,130 I
$269,566
$280,000 (3) $430,000
$1,036,500
53,302
$599,600
$730,000 515,268.831
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES
Submitted By: RICK HEROLD
Date Prepared: 8-2-99
Date Completed:
Project Title: ATHLETIC COMPLEX PHASE II
Project Type: LAND/PROPERTY Sub -Type: IMPROVEMENT
Project No.: AC9901 Priority: A
COUNCIL AUTHORIZATION:
NnvPmhpr 25, 1947 - Approval of rPrertifiratinn of nark grant for Phoco II
September 9, 1997 - Included in Fiscal Year 1997-98 Budget.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project includes $20,000 for revision of the Euless Parks and Community Services Master Plan. The
Master Plan revision will update our current Master Plan which will allow the City to qualify for additional grant
points for future Texas Parks and Wildlife Department grants.
PROJECT DESCRIPTION:
These funds will be used for engineering and preliminary plans for Phase II at the Parks at Texas Star as well
as update of the Master Plan. Construction of the additional phases is pending until further funding is available.
JUSTIFICATION:
Phase II plans continue to be reevaluated based on future opportunities. Master Plan revision is necessary to
receive needed points and potentially $500,000 per project in grant funds.
68
PROJECT TITLE: ATHLETIC COMPLEX PHASE II PROJECT #: AC9901
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cog,
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal: $0
Maintenance Costs
Subtotal: $0
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Athletic Complex Phase II
Total cost is yet to be determined and depends on the
scope of the project.
$0 Total Estimated Capital Cost $0
CURRENT STATUS
OVER/UNDER
BUDGET EXPENDED BUDGET (- +) % EXPENDED
111,411 56,743 (54,668) 51%
TOTAL PROJECT $111,411 $56,743 ($54,668) 51%
69
City of Euless
Capital Project Request
Department: PLANNING & DEVELOPMENT Date Prepared: 7-26-99
Submitted By: JOE HENNIG Date Completed:
Project Title: EDC INCENTIVE FUNDS
Project Type: HALF -CENT SALES TAX Sub -Type: DEVELOPMENT PROJECT
Project No.: DV9901 Priority: A
COUNCIL AUTHORIZATION:
f1 fl pl V VGU in Sales Tax Revenue UVI IUJ, JCI ICJ 100'1.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Euless Development Corporation funds that have been set aside to aid the City of Euless in attracting
development opportunities.
JUSTIFICATION:
70
PROJECT TITLE: EDC INCENTIVE FUNDS PROJECT #: DV9901
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time Economic Development Incentives 324,994
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
so
Subtotal: $0
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Economic Development Incentives*
so
$0 Total Estimated Capital Cost $324,994
CURRENT STATUS
OVER/UNDER
BUDGET EXPENDED BUDGET (- +) % EXPENDED
324,994 853 (324,141) 0%
* - This project provided an inter -project transfer of $432,600 to SS0010.
** - This project received an inter -project transfer of $25,000 from 1/2 Cent Operations.
TOTAL PROJECT
$324,994 $853 ($324,141) 0%
71
City of Euless
Capital Project Request
Department: POLICE DEPARTMENT
Submitted By: GARY McKAMIE
Date Prepared: 7-15-99
Date Completed:
Project Title: POLICE & COURTS FACILITY
Project Type: BUILDINGS/FACILITIES Sub -Type: CONSTRUCTION
Project No.: PD9901 Priority: A
COUNCIL AUTHORIZATION:
Ianu 13 199! A,1+hnrizcd contract ,+h Phillips S . for architectural vu..uu�� .v, .vvv , ♦u.11v11�%u contract VV1111 1 111111 �./J VVYay VI IVI Q1\,I IIIGI.IUI QI services.
April 14, 1998 - Authorized the acquisition of the Western Hills Inn and Western Hills Annex.
June 9, 1998 - Awarded Bid No. 98-13 for demolition services.
October 9, 1998 - Awarded change order to West Excavation for abatement of asbestos.
February 23, 1999 - Authorized additional funds for demolition.
June 22, 1999 - Declared expectation to reimburse expenditures with proceeds of future debt.
June 22, 1999 - Authorized City Manager to request qualifications for construction management services.
February 22, 2000 - Public Hearing and approval of Special Use Permit.
February 22, 2000 - Approval of request for site plan.
May 9, 2000 - Approval of Ordinance No. 1426 authorizing sale of Revenue Cert. Of Obligation Series 2000A.
May 9, 2000 - Awarded bid for construction to Ratcliff Construction.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This 53,000 square foot facility will accommodate police, jail and courts.
JUSTIFICATION:
Current facility space is grossly inadequate for these areas.
72
PROJECT TITLE: POLICE & COURTS FACILITY PROJECT #: PD9901
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Utilities
Subtotal:
Maintenance Costs
Maintenance
Janitorial Services
Other
Subtotal:
Other
Average Annual Debt Service
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Bond Issuance Cost
Construction
Contingency
Demolition
Architectural Services
Surveying Services
Geo-Technical Services
Engineering Services
Other Professional Services
Equipment
Furnishings
Land Purchase
Off -Site Utilities
Owner Direct
TOTAL PROJECT
TOTAL ESTIMATED CAPITAL COST:
128,000 Bond Issuance Cost
Construction
Contingency
Demolition
Engineering & Architectural
117,936 Other Professional Services
Equipment
Furnishings
$245,936 Land Purchase
Off -Site Utilities
Owner Direct
4,320
34,020
4,800
$43,140
$750,815
$1,039,891 Total Estimated Capital Cost
CURRENT STATUS
BUDGET
76,000
9,085,968
530,532
606,400
627,174
10,000
40,000
0
31,000
100,000
532,540
43,600
21,400
535,000
$12,239,614
73
EXPENDED
76,000
0
0
606,709
510,688
5,571
7,170
14,608
2,313
0
0
43,591
0
0
OVER/UNDER
BUDGET (- +)
0
(9,085,968)
(530,532)
309
(116,486)
(4,429)
(32,830)
14,608
(28,687)
(100,000)
(532,540)
(9)
(21,400)
(535,000)
76,000
9,085,968
530,532
606,400
637,174
71,000
100,000
532,540
43,600
21,400
535,000
$12,239,614
% EXPENDED
100%
0%
0%
100%
81%
56%
18%
7%
0%
0%
100%
0%
0%
$1,266,650 ($10,972,964) 10%
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: 8-2-99
Submitted By: RICK HEROLD Date Completed:
Project Title: HIKE AND BIKE TRAIL
Project Type: HALF -CENT SALES TAX Sub -Type: PARK PROJECT
Project No.: PR9901 Priority: A
COUNCIL AUTHORIZATION:
ennn inTr n n
r 1 iaaa - IS i Er% 1ppliudtiuii Appiuvtu fuf 5uuinia�iun.
FY 1994 - Engineering contract awarded.
September 8, 1999 - Approved additional funding in the Fiscal Year 1998-99 Budget.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Linkage of Bob Eden, Trailwood, and McCormick Parks. Future linkage to Villages of Bear Creek Park.
PROJECT DESCRIPTION:
This long-awaited and necessary project is primarily funded through ISTEA funding. It provides almost two
miles of concrete trails, linking many of our major parks in the northern quadrant of Euless. The City Attorney
is endeavoring to acquire the Brodsky parcel for this project. Staff is waiting on a final cost estimate from
TxDOT.
JUSTIFICATION:
This will allow Euless to take advantage of grant funds that were awarded to Euless over five years ago.
Project was delayed due to TxDOT delays and cost overruns on statewide trail projects. The scope of this
project was cut to fit within the proposed budget.
74
PROJECT TITLE: HIKE AND BIKE TRAIL PROJECT #: PR9901
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Ooeratina Cost
Personnel: Full Time Hike and Bike Trail 226,489
Part Time Engineering Services 7,600
Total Salary $0 Planning Services 3,625
Purchase of Services
Materials & Supplies
Utilities
Subtotal: $0
Maintenance Costs
Subtotal: $0
Total Estimated Annual Cost
$0 Total Estimated Capital Cost $237,714
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Hike and Bike Trail 226,489 0 (226,489) 0%
Engineering Services 7,600 7,600 0 100%
Planning Services 3,625 3,625 0 100%
Advertising 0 2,268 2,268
TOTAL PROJECT
$237,714
75
$13,493
($224,221) 6°/0
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: 8-2-99
Submitted By: RICK HEROLD Date Completed:
Project Title: SENIOR CITIZENS REMODEL
Project Type: HALF -CENT SALES TAX Sub -Type: PARK PROJECT
Project No.: PR9902 Priority: A
COUNCIL AUTHORIZATION:
Cn n+r.rr.hnr. 0 .nr rr7 007 Inn!, irlrl in Mr, nrl Vnn�f Q 1 irinrs+
....M.......,....., ...... uP f.,..,. I,.., „.,u I JI 1 ..u, Q
,� ...,..y...
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project includes continued remodel of the Simmons Center due to the needs of Euless' aging population.
This project includes structural and cosmetic needs as well as purchasing new kitchen equipment and other
furniture per request of the senior citizens.
JUSTIFICATION:
To better serve the expanding Euless senior citizen population. Improvements in previous years has lead to
greater utilization of the facility.
76
PROJECT TITLE: SENIOR CITIZENS REMODEL PROJECT #: PR9902
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time Remodel 16,130
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal: $0
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
so
$0 Total Estimated Capital Cost $16,130
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Senior Citizens - Lighting 8,618 8,618 (0) 100%
Senior Citizens - Remodel 7,512 0 (7,512) 0%
TOTAL PROJECT $16,130 $8,618 ($7,512) 53%
77
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES
Submitted By: RICK HEROLD
Date Prepared: 8-2-99
Date Completed:
Project Title: VARIOUS EDC PARK PROJECTS
Project Type: HALF -CENT SALES TAX Sub -Type: PARK PROJECT
Project No.: PR9903 - PR9918 Priority: A
COUNCIL AUTHORIZATION:
AnnrnvPrl AS part RalPs Tax Ravani is Rnnrlc Sariac 1 QQd
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The funds remaining in the Park CIP fund are to be spent for various improvement including the following:
1.) Marquee signs and installation at Midway Recreation Center
2.) Basketball goal installation at South Euless Park
3.) Bench upgrades, table upgrades and trash receptacles throughout the park system.
4.) Portable restroom enclosures at Midway, Villages of Bear Creek and Bob Eden parks.
5.) Nine -hole disc golf course at Trailwood Park.
6.) New playgrounds at Westpark, Wilshire Park and McCormick parks.
7.) South Euless Trail (Engineering and conceptual plans are still under study)
8.) Adopt a Spot Signs and Marketing as well as marketing assistance and beautification projects.
9.) Various other upgrades as needed throughout the park system.
JUSTIFICATION:
These are various upgrades that would enhance the park system throughout the City of Euless.
78
PROJECT TITLE: VARIOUS EDC PARK PROJECTS PROJECT #: PR9903-PR9918
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time Park Furnishings 269,566
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal: $0
Maintenance Costs
Subtotal: $0
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Various EDC Projects
$0 Total Estimated Capital Cost $269,566
CURRENT STATUS
OVER/UNDER
BUDGET EXPENDED BUDGET (-+) % EXPENDED
269,566 86,328 (183,238) 32%
TOTAL PROJECT $269,566 $86,328 ($183,238) 32%
79
City of Euless
Capital Project Request
Department: SUPPORT SERVICES
Submitted By: RICK HEROLD
Date Prepared: 6-27-00
Date Completed:
Project Title: TEJAS REMODEL
Project Type: BUILDING/FACILITIES Sub -Type: REMODEL
Project No.: PR9922 Priority: A
COUNCIL AUTHORIZATION:
en•-...irral,,%r 0 1007 _ Ir.nhtrinrl in Cin -- I Vnnr 1007 08 D ,rlr,r,4
...,r.,.........r.. ..... I. 1 I ,...,uI I .,wI I ..., I ., , .1.41.40,..
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Community Services Department will be the first of six master plan projects. Construction is to begin in
January 2001 and scheduled to be completed by June 2001.
PROJECT DESCRIPTION:
Community Service Department will be relocated to the Tejas Building located on Royal Parkway adjacent to
the existing Fleet & Facility Service Center Building. The Tejas Building will be renovated to accommodate
the expansion of the Community Services offices and storage.
JUSTIFICATION:
Relocating Community Services offices to another facility from Building B will allow for present and future
expansion plans to accommodate the Finance, Water Department, Insurance and Human Resources
Department.
80
PROJECT TITLE: TEJAS REMODEL PROJECT #: PR9922
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time Remodel 430,000
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal: $0
Maintenance Costs
Utilities 4,800
Cleaning 2,800
Insurance 500
Subtotal: $8,100
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Tejas Building Remodel
$8,100 Total Estimated Capital Cost $430,000
CURRENT STATUS
OVER/UNDER
BUDGET EXPENDED BUDGET (- +) % EXPENDED
150,000 0 (150,000) 0%
TOTAL PROJECT (Funded): $150,000 $0 ($150,000) 0%
Funding Pending:
Water & Sewer Operting Fund 280,000
(FY 2001 Budget)
TOTAL PROJECT
$430,000
81
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: 2-7-00
Submitted By: RICK HEROLD Date Completed:
Project Title: PARK IMPROVEMENT - TEXAS STAR
Project Type: HALF -CENT SALES TAX Sub -Type: PARK PROJECT
Project No.: PR9927 Priority: A
COUNCIL AUTHORIZATION:
V IaUIar GU, A220 - Council authorized the issuance of $1 million :_ revenue LUU_UJ.
October 26, 1999 - EDC authorized design services contract.
November 30, 1999 - EDC authorized execution of construction agreements.
February 7, 2000 - EDC authorized execution of construction agreements.
February 7, 2000 - EDC authorized the expenditure of funds for additional park improvements.
February 8, 2000 - Council ratified the EDC approval items related to Texas Star park improvements.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project was basically Phase II of The Parks at Texas Star. The improvements installed within the project
are consistent with the City's Master Plan.
PROJECT DESCRIPTION:
This project involved the construction of a parking lot, installation of lighting and landscaping, and other park
improvements associated with the City's portion of the Dr. Pepper StarCenter.
JUSTIFICATION:
This project was needed to facilitate the Dr. Pepper StarCenter project and to begin build out of the Texas
Star Sports Center.
82
PROJECT TITLE: PARK IMPROVEMENT - TEXAS STAR PROJECT #: PR9927
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Bank Charges
Issuance Cost
Architectural Services
Engineering Services
Land Betterment
Park Improvement
TOTAL PROJECT
TOTAL ESTIMATED CAPITAL COST:
Bank Charges
Issuance Cost
$0 Architectural Services
Engineering Services
Land Betterment
Park Improvement
$0
$0
$0
Total Estimated Capital Cost
CURRENT STATUS
BUDGET
400
36,100
26,500
35,500
447,982
490,018
$1,036,500
83
EXPENDED
400
36,100
32,830
29,750
433,449
456,096
$988,626
OVER/UNDER
BUDGET (- +)
0
0
6,330
(5,750)
(14,533)
(33,922)
400
36,100
26,500
35,500
447,982
490,018
$1,036,500
% EXPENDED
100%
100%
124%
84%
97%
93%
($47,874) 95%
City of Euless
Capital Project Request
Department: SUPPORT SERVICES
Submitted By: TOM COX
Date Prepared: 8-2-99
Date Completed:
Project Title: LIBRARY BOOKS
Project Type: HALF -CENT SALES TAX Sub -Type: LIBRARY
Project No.: SS9902 Priority: A
COUNCIL AUTHORIZATION:
Aooroved as Dart of Sales Tax RPVPniiP Rnnrls SPriPs 1AA4
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Funds remaining from bond sale related to new library facility and amenities.
JUSTIFICATION:
This item was one of the projects stated in the initial approval for the Half Cent Sales Tax.
PROJECT TITLE: LIBRARY BOOKS PROJECT #: SS9902
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time Library Book Purchase 3,302
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Library Books
(Expenses prior to FY99 not reflected)
so
so
so
$0 Total Estimated Capital Cost $3,302
CURRENT STATUS
OVER/UNDER
BUDGET EXPENDED BUDGET (- +) % EXPENDED
3,302 3,255 (47) 99%
TOTAL PROJECT $3,302 $3,255 ($47)
85
99%
City of Euless
Capital Project Request
Department: SUPPORT SERVICES
Submitted By: TOM COX
Date Prepared: 7-12-00
Date Completed:
Project Title: FIRE STATION #2
Project Type: BUILDING/FACILITY Sub -Type: REMODEL
Project No.: SS0010 Priority: A
COUNCIL AUTHORIZATION:
L'.. M.. ...... 7 onnn mnr+ n��a�,.-..:-....4 .. • ..F ..-1 04..47..., 44') .....� ...�7.....-...a �.....4 ...,..I .. ...� I........
GNI mum i . , a.vvv - L V V Oull IVI ILOu'.lrVjGl.L, GILA-WU cu Vlauul 1 1TL al lu a AJCIOGl R :arid arid pi opoadu
February 8, 2000 - Council ratified the EDC approval of items related to Fire Station #2.
February 8, 2000 - Council authorized the sale of Fire Station #2 to the EDC for $167,000.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Economic Development Corporation authorized funding to remodel Fire Station #2. The renovated facility will
be rented to a business that will pay rent unless certain sales tax revenue goals are achieved.
JUSTIFICATION:
The City will receive significant sales tax revenue from this venture.
86
PROJECT TITLE: FIRE STATION #2 PROJECT #: SS0010
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Other Professional Services
Contingencies
Land Purchase
Acquisition
Land Betterment
Remodel/Improvement
Parking Improvement
Asbestos Remediation
TOTAL PROJECT
TOTAL ESTIMATED CAPITAL COST:
Other Professional Services
Contingencies
Land Purchase
$0 Acquisition
Land Betterment
Remodel/Improvement
Parking Improvement
Asbestos Remediation
so
so
$0 Total Estimated Capital Cost
CURRENT STATUS
BUDGET
38,100
12,000
30,000
167,000
12,500
315,000
15,000
10,000
$599,600
87
EXPENDED
13,913
0
600
167,000
12,501
1,300
0
7,526
$202,840
OVER/UNDER
BUDGET (- +)
(24,187)
(12,000)
(29,400)
0
1
(313,700)
(15, 000)
(2,475)
38,100
12,000
30,000
167,000
12,500
315,000
15,000
10,000
$599,600
% EXPENDED
37%
0%
2%
100%
100%
0%
0%
75%
($396,760) 34%
88
=7.Z4474%,,:1M2P4,2:42,7,
3
o,
CAPITAL IMPROVEMENT PROGRAMS
UNFUNDED PROJECTS - SORTED BY TYPE
PROPOSED METHOD OF FINANCING
County,
Operating CIP Fund Bond State, Impact Escrow Car Hotel /
Project Description Priority Estimated Cost Fund Balance Sale Federal Fees Funds RTaxal Motel
Funds
DRAINAGE PROJECTS
Golf Course Creek Slope Protection (')
Sub -Total Drainage Priority A
Creek Slope Protection Phase II cm
Sub -Total Drainage Priority B
Bear Creek Park
Bell Hi Addition
Blessing Branch, Main to SH 360
Bob Eden Park
Boyd Branch
Boyd Branch (FEMA)
Denton Drive at Midway Park
Diversion Line - Oak Lane
Hurricane Creek at Airport Business Park
Hurricane Creek, Bridge at Marlene
Hurricane Creek, North of SH 10
Kynette Drive Culvert Modifications
Oak Lane Channel
Priest Drive Culvert & Woodbury Forest
Royal Oaks Addition
Trailwood Addition (Summit Ridge)
Sub -Total Drainage Priority C
'DRAINAGE PROJECTS - TOTAL
STREET PROJECTS
121 Gateway Bridge (West) (4)
Gateway Boulevard (East) o'
I Glade Road Right -of -Way Acquisition (4)
Sub -Total Street Priority B
A - Projects that will be presented to Council during the upcoming year.
B - Projects that will be presented to Council wthin two to five years.
C - Projects that will be presented to Council beyond five yews.
A I$
B I$
708,900
708,900
800,000 I
$ 800,000
C $ 2,200,000
C $ 440,000
C $ 5,285,000
C $ 550,000
C $ 500,000
C $ 880,000
C $ 55,000
C $ 45,000
C $ 1,100,000
C $ 220,000
C $ 4,590,000
C $ 100,000
C $ 450,000
C $ 121,000
C TBD
C $ 185,000
$ 16,721,000
$ 18,229,900
B $ 775,000
B $ 1,000,000
B $ 698,476
$ 2,473,476
I I I I 1 1 xx 1
I 1 I I xx
1 I xx 1 I
I xx I xx
EDC
To Be
Determined
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
Project Description
'WATER PROJECTS
Fire Hydrant Replacement Program
FY 2001 Utility Rehab - Water Program
SCADA Upgrade
Sub -Total Water Priority A
Disinfection Modification'27
Effluent Water Main m
Hwy 360 Water Crossing (2)
Rehab Central Dr. Water Storage'°'
Rehab/Rebuild Fuller Dr. Ground Storage Tank
W. Pipeline Water Main Replacement rn
Sub -Total Water Priority B
Hwy 183 Water Crossing
Well Rehabilitation
Sub -Total Water Priority C
WATER PROJECTS - TOTAL
OTHER PROJECTS
Bell Ranch Terrace
Parks & Greenhouse (')
Villages Master Plan ("
CAPITAL IMPROVEMENT PROGRAMS
UNFUNDED PROJECTS - SORTED BY TYPE
PROPOSED METHOD OF FINANCING
County,
Operating CIP Fund Bond State, Impa:t Escrow Car Hotel /
Priority Estimated Cost Fund Balance Sale Federal Fee;; Funds RT al Motel
ax
Funds
A 1 $ 50,000 I
A I $ 150,000 I
A I $ 93,400 I
$ 293,400
B $ 250,000 I
B $ 1,500,000I
B $ 300,000 I
B $ 500,000
B $ 200,000
B $ 1,000,000
$ 3,750,000
C 1 TBD
C I $ 750,000
$ 750,000
$ 4,793,400
A
A
A
$ 200,000
$ 1,200,000
$ 100,000
xx I 1 1 1 I I 1
xx l 1 1 I I I I
x 1 1 1 1 I I I
XX
XX
XX
XX
XX
XX
XX
XX
XX
Sub -Total Other Priority A $ 1,500,000
Building A Remodel B $ 892,000 XX
Building B Remodel'°' B $ 738,750 XX
Building D Remodel'2' B $ 805,600 XX
Four New Playgrounds (2) B $ 400,000 XX
Infrastructure Management Software rn B $ 500,000 XX
Texas Star Conference Cntr, Phase II'3) B $ 3,350,000 XX
Trinity Screen Wall a' B $ 250,000 XX
Sub -Total Other Priority B
A - Projects that will be presented to Council during the upcoming year.
B - Projects that will be presented to Council wthin two to five years.
C - Projects that will be presented to Council beyond five years.
- Projec will be F led to Cc beyond t ars.
$ 6,936,350
EDC
To Be
Determined
XX
XX
CAPITAL IMPROVEMENT PROGRAMS
UNFUNDED PROJECTS - SORTED BY TYPE
Project Description Priority Estimated Cost
Aquatic Center
Community Golf Course at Bob Eden Park
Conversion & Expansion of Ruth Millican Cntr
Expansion & Upgrade of Bob Eden Park
Expansion of Recreation Center
Fire Station #3 Reconstruction
Fire Training Facility
New Public Works Facility
Parks at Texas Star, Phase III
Parks at Texas Star, Phase IV
Redevelopment of Westpark
SH 10 Land Acquisition
Softball World
C $ 4,000,000
C $ 4,000,000
C $ 600,000
C $ 2,000,000
C $ 2,500,000
C $ 1,500,000
C $ 1,200,000
C $ 2,253,250
C $ 4,400,000
C $ 10,000,000
C $ 2,500,000
C $ 3,000,000
C TB D
Sub -Total Other Priority C $ 37,953,250
'OTHER PROJECTS - TOTAL $ 46,389,600
- Projected FY 2001
ai - Projected FY 2002
(3) - Projected FY 2003
(4) - Projected FY 2004
(5) - To be paid from interest earned on Main Street bond proceeds.
A - Projects that will be presented to Council during the upcoming year.
B - Projects that will be presented to Council wthin two to five years.
C - Projects that will be presented to Council beyond five years.
PROPOSED METHOD OF FINANCING
County,
Operating CIP Fund Bond State, Impact Escrow Hotel /
Fund Balance Sale Federal Fees Funds Motel
Funds
Car
Rental
Tax
EDC To Be
Determined
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
LeRtatt.t
'�
*
rf-
94
1
(
Project Description
Priority Estimated Cost
CAPITAL IMPROVEMENT PROGRAMS
UNFUNDED PROJECTS - SORTED BY TYPE
PROPOSED METHOD OF FINANCING
County,
Operating CIP Fund Bond State, Impact Escrow Hotel
Fund Balance Sale Federal Fees Funds Motel
Funds
Car
Rental
Tax
EDC
DRAINAGE PROJECTS
1 Golf Course Creek Slope Protection r" 1 A 1$ 708,900 ( 1 1 1 1 1 1 XX I ( 1
Sub -Total Drainage Priority A $ 708,900
Creek Slope Protection Phase II (') 1 B 1$ 800,000 1 1 1 1 1 1 XX 1 1 1
To Be
Determined
Sub -Total Drainage Priority B $ 800,000
Bear Creek Park C $ 2,200,000 XX
Bell Hi Addition C $ 440,000 XX
Blessing Branch, Main to SH 360 C $ 5,285,000 XX
Bob Eden Park C $ 550,000 XX
Boyd Branch C $ 500,000 XX
Boyd Branch (FEMA) C $ 880,000 XX
Denton Drive at Midway Park C $ 55,000 XX
Diversion Line - Oak Lane C $ 45,000 XX
Hurricane Creek at Airport Business Park C $ 1,100,000 XX
Hurricane Creek, Bridge at Marlene C $ 220,000 XX
Hurricane Creek, North of SH 10 C $ 4,590,000 XX
Kynette Drive Culvert Modifications C $ 100,000 XX
Oak Lane Channel C $ 450,000 XX
Priest Drive Culvert & Woodbury Forest C $ 121,000 XX
Royal Oaks Addition C TBD XX
Trailwood Addition (Summit Ridge) C $ 185,000 XX
Sub -Total Drainage Priority C $ 16,721,000
DRAINAGE PROJECTS - TOTAL $ 18,229,900
r'r - Projected FY 2001
(2) - Projected FY 2002
(3) - Projected FY 2003
r4r -Projected FY 2004
(6) - To be paid from interest earned on Main Street bond proceeds.
A - Projects that will be presented to Council during the upcoming year,
B - Projects that will be presented to Council wthin two to five years.
C - Projects that will be presented to Council beyond five years.
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: 6-29-00
Submitted By: RICK HEROLD Date Completed:
Project Title: GOLF COURSE CREEK SLOPE PROTECTION
Project Type: LAND Sub -Type: IMPROVEMENT
Project No.: Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Slope protection from #18 creek damn at tee to damn by #18 green on west side of creek of approximately
1,185 linear feet and 12 feet high. #18 Bridge to #18 green side damn of 485 linear feet at approximately 12 feet
high. From gabion behind #9 green to the gabion at #9 fairway bridge on the northwest side of the creek. From
gabion at #9 fairway bridge back to bend at #1 fairway for 900 linear feet at approximately 12 feet high.
JUSTIFICATION:
Stop erosion of the creek back on #18 fairway and prevent the possible future loss of #18 bridge and parts of #9
green and fairway.
96
PROJECT TITLE: GOLF COURSE CREEK SLOPE PROTECTION PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Revenue
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
Supplemental Sales Tax
Car Rental Tax
ADDITIONAL COMMENTS:
TOTAL ESTIMATED CAPITAL COST:
Creek Slope Protection
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
708,900
$708,900
97
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: 7-10-00
Submitted By: RICK HEROLD Date Completed:
Project Title: CREEK SLOPE PROTECTION - PHASE II
Project Type: LAND Sub -Type: IMPROVEMENT
Project No.: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
1m__UVCmC_IL needed to protect Euless' _UI11-_I_tIl,U_ UU11d_Texas Star 'Sports 1C_Ia_C UCVC1U__C_Is. ;Flu dbC11
rainfall would move part of this request to emergency status.
PROJECT DESCRIPTION:
Additional slope protection along the west side of #9 fairway, along the east side of Hurricane Creek adjacent
to the Golf Course Pavillion, and various other locations throughout the golf course.
JUSTIFICATION:
Prevent erosion that will endanger, in the near future, the golf course pavillion, fairway #9 and various other
locations.
98
PROJECT TITLE: CREEK SLOPE PROTECTION - PHASE II PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Revenue
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
Supplemental Sales Tax
Car Rental Tax
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Construction
so
so
so
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
800,000
$800,000
TBD
99
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Date Prepared: 7-21-99
Date Completed:
Project Title: BEAR CREEK PARK
Project Type: DRAINAGE Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This nrn :int was iriantifiari in tha 19gn Knnwltnn, Fn0lich R, Flnwarc rlrainana IItilifi, S ,ctam Cti irl y of calartarl
Improvement Projects.
PROJECT DESCRIPTION:
The Bear Creek Park drainage project involves erosion control and channelization improvements to Little Bear
Creek. It is a portion of Project No. 11 in the above referenced study.
JUSTIFICATION:
Continued erosion will eventually undermine the creek and adjacent park.
100
PROJECT TITLE: BEAR CREEK PARK PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering
Construction
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
200,000
2,000,000
$2,200,000
101
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: BELL HI ADDITION
Project Type: DRAINAGE Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-26-99
Date Completed:
In 1990 the City commissionerand received nl report from Knowlton, Cunnlninnh Flowers titled a^irai.uyc Utility
System Study of Selected Improvement Projects. This project was the 5th project identified in this study.
PROJECT DESCRIPTION:
The terrain in this location is very flat, which causes the streets to have a very low capacity to remove storm
water without flooding. The proposed project ties in to an existing storm drainage system in Needles Drive.
Construction of this project will remove the surface water from the street. A substantial portion of the cost of this
project is related to street repair, indicating the need to combine this project with a street reconstruction project.
JUSTIFICATION:
Excessive ponding in the street.
102
PROJECT TITLE: BELL HI ADDITION PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering
Construction
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
55,000
385,000
$440,000
103
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: 7-26-99
Submitted By: RANDY BYERS Date Completed:
Project Title: BLESSING BRANCH, MAIN TO SH 360
Project Type: DRAINAGE Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The P!occinn Prnnr.h rlroin.r u Mocter Phn inch triad a rnnrenfi i�l nlan to nnrniov ctnrm�eiatar thrni inh tha rraak
. .. .......�..J ........ ....� ........ .. .... .._.-.-._-.••pt' _.. I-._... -- ...J-......-. -...J.. -..- •..
more efficiently.
PROJECT DESCRIPTION:
This project involves the channeling and lining of Blessing Branch in accordance with the Blessing Branch
Master Plan. The project costs shown on the report break the project into engineering and construction cost.
JUSTIFICATION:
The City expects to receive significant developer contributions toward this project. However, the City may be
required to fund a portion of this project.
104
PROJECT TITLE: BLESSING BRANCH, MAIN TO SH 360 PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering
Construction
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
385,000
4,900,000
$5,285,000
105
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: BOB EDEN PARK
Project Type: DRAINAGE Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-21-99
Date Completed:
The imnrovements nrnnnsed are identified in the I ittle Rear Creek Watershed Master Plan
PROJECT DESCRIPTION:
This project involves erosion control and channelization improvements to Little Bear Creek. This project ties to
the Bear Creek Park Project.
JUSTIFICATION:
Continued erosion will eventually cause damage to existing City facilities.
106
PROJECT TITLE: BOB EDEN PARK PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering
Construction
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
50,000
500,000
$550,000
107
City of Euless
Capital Project Request
Department: ECONOMIC DEVELOPMENT Date Prepared: 7-7-00
Submitted By: ANDREA BAXTER Date Completed:
Project Title: BOYD BRANCH
Project Type: DRAINAGE Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Channel improvements are shown as being necessary for development in the Citv_'s Master Drainaae Plan for
Boyd Branch.
PROJECT DESCRIPTION:
The Boyd Branch drainage watershed will require significant improvement between S.H. 10 and S. Pipeline
Road as the vacant tracts are developed. Staff believes assistance will be required for reimbursement to
developers for the cost of oversize improvements or for construction of channel improvements. Development
may not be financially feasible without City assistance.
JUSTIFICATION:
Oversize reimbursement is permitted in the Uniform Development Code. Other types of assistance will also
permit growth in tax revenues and employment.
108
PROJECT TITLE: BOYD BRANCH PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Ooeratina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Construction
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
500,000
$500,000
0%
0%
0%
0%
0%
109
Department:
Submitted By:
Project Title:
Project Type:
Project No.:
City of Euless
Capital Project Request
PUBLIC WORKS
RANDY BYERS
BOYD BRANCH (FEMA)
DRAINAGE
Sub -Type:
Priority: C
RELATIONSHIP TO OTHER PROJECTS ANDIOR MASTER PLAN:
Date Prepared: 7-21-99
Date Completed:
The, reconstruction of FM 157 south of QLJ 183 by T ,r r' T did not inci .rle drainnne improvements of .., sufficient
size to accommodate the 100-year storm event. This has created problems with the 100-year flood plain
elevation.
PROJECT DESCRIPTION:
This project involves the installation of storm drainage improvements in Boyd Branch and SH 157 to correct the
problems associated with the TxDOT construction.
JUSTIFICATION:
This is an item of work that may be required by FEMA.
110
PROJECT TITLE: BOYD BRANCH (FEMA) PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
Staff is reevaluating cost estimates.
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering
Construction
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
80,000
800,000
$880,000
111
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: 7-22-99
Submitted By: RANDY BYERS Date Completed:
Project Title: DENTON DRIVE AT MIDWAY PARK
Project Type: DRAINAGE Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
In 1990 the Citv commissioned and received a report from Knowlton English R Flowers titled Drainag
Utility System Study of Selected Improvement Projects. v V
PROJECT DESCRIPTION:
This project involves the installation of two curb inlets on the south side of Bell Drive to eliminate excessive
storm water from draining into Denton Drive. (This Project is No. 7 in the 1990 Knowlton, English & Flowers
Study).
JUSTIFICATION:
Excessive ponding of stormwater in the street.
112
PROJECT TITLE: DENTON DRIVE AT MIDWAY PARK PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering
Construction
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans
Specifications
Construction %
5,000
50,000
$55,000
75%
113
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: DIVERSION LINE - OAK LANE
Project Type: DRAINAGE Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This prniRnt waS irIPntifiPrl in the 1 Acn Knnwltnn Fnglish R FInwers sti dy
PROJECT DESCRIPTION:
Date Prepared: 7-22-99
Date Completed:
This is identified as Project No. 15 in the study. The homes along the west side of Oak Lane receive a
considerable amount of storm water from the Lakewood Park Addition. This project involves grading and the
installation of a small drainage system to reduce the problems associated with this lot -to -lot drainage.
JUSTIFICATION:
Lot to lot drainage continues to be one of the most prolific problems in the City. The cost of the solution is often
too expensive for homeowners to afford.
114
PROJECT TITLE: DIVERSION LINE - OAK LANE PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Construction
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
45,000
$45,000
115
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Date Prepared: 7-22-99
Date Completed:
Project Title: HURRICANE CREEK AT AIRPORT BUSINESS PARK
Project Type: DRAINAGE Sub -Type:
Project No.: Priority: *C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
In f1(1!1 44.s.. l'ii., .. ....1 n • r .-..,1 .. n.+ Frnrr, .,..,.Cn,.Ii ,I, 0 Mr, • lesre. 44In.J n...,:.,..,,I..
111 IJUV II IL, ,.JILy UVI IIIIII.. IL/I IIJU GI IU I L.,JL,1 V,..0 G IVr.JVI L 11 VI 11 1 \I IIJVVIIVI I, L—I I,J.IIJ11 LA 1 IVVV,rIJ LI11,.4 ✓I UII Ito i
Utility System Study of Selected Improvement Projects.
PROJECT DESCRIPTION:
This project, Project No. 12 in the above referenced study, involves the installation of erosion control and
channel lining improvements along Hurricane Creek south of SH 10. The 1996 Hurricane Creek Storm Drainage
Master Plan also identified the need for improvements and a conceptual design.
JUSTIFICATION:
The 1990 report identified the erosion problems through the Airport Business Park. This property now includes
the Texas Star Golf Course.
*A portion of the improvements could become necessary within 2 to 5 years.
116
PROJECT TITLE: HURRICANE CREEK AIRPORT BUS PARK PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Decreased maintenance costs.
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering
Construction
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design
Final Plans %
Specifications %
Construction %
100,000
1,000,000
$1,100,000
117
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: 7-26-99
Submitted By: RANDY BYERS Date Completed:
Project Title: HURRICANE CREEK, BRIDGE AT MARLENE
Project Type: DRAINAGE Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
In 1990 the City commissioned and received a report from Knowlton. English & Flowers titled Drainage
Utility System Study of Selected Improvement Projects. v v
PROJECT DESCRIPTION:
This project involves the replacement of the culvert. It is Project No. 17 in the 1990 Knowlton, English, Flowers
study.
JUSTIFICATION:
Culvert does not convey 100 year storm.
118
PROJECT TITLE: HURRICANE CREEK, BRIDGE AT MARLENE PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering
Construction
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
35,000
185,000
$220,000
119
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: 7-26-99
Submitted By: RANDY BYERS Date Completed:
Project Title: HURRICANE CREEK, NORTH OF SH 10
Project Type: DRAI NAGE Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
In 1990 the City commissioned and received a report from Knowlton. Enalish & Flowers titled Drainaae
Utility System Study of Selected Improvement Projects.
Conceptually shown on the Hurricane Creek Watershed Master Plan .
PROJECT DESCRIPTION:
This project involves channelizing and lining Hurricane Creek from the convergence of two tributaries
to SH 10 and construction of a detention pond. The project costs are broken into engineering and construction
costs.
JUSTIFICATION:
SH 10 bridge and culvert does not convey the 100 year storm. Detention is needed and channel lining is needed
to control erosion.
120
PROJECT TITLE: HURRICANE CREEK, NORTH OF SH 10 PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Or eratina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering
Construction
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
220,000
4,370,000
$4,590,000
121
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: KYNETTE DRIVE CULVERT MODIFICATIONS
Project Type: DRAINAGE Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-21-99
Date Completed:
Wilshire Villaae Addition was constructed prior to the adoption of the Citv's Uniform Development Code. The
requirements prior to the UDC were lower than what the City now requires. This causes more water to remain
above ground. The drainage system in the Woodlands Addition needs to be upgraded to meet current
requirements.
PROJECT DESCRIPTION:
A large amount of storm water drains to an existing culvert on Kynette between East Cliff and West Cliff drives.
The existing drainage facilities collecting this storm water are inadequate. This project involves the installation of
a small drainage system in Kynette up to Sierra. It is Project No. 17 in the 1990 Knowlton, English & Flowers
study.
JUSTIFICATION:
Excessive surface water flow and ponding.
122
PROJECT TITLE: KYNETTE DRIVE CULVERT MODIFICATIONS PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering
Construction
$0
$0
$0
$0
Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
15,000
85,000
$100,000
123
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: OAK LANE CHANNEL
Project Type: DRAINAGE Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-21-99
Date Completed:
Oakland Estates Addition was constructed prior to the adoption of the City's Uniform Development Code. The
requirements prior to the UDC were lower than what the City now requires.
PROJECT DESCRIPTION:
This project includes significant drainage improvements in the Oakland Estates Addition. The project was also
included in the 1990 Knowlton, English, Flowers study but has been expanded to include a concrete lined
channel instead of an earthen channel.
JUSTIFICATION:
Excessive surface water flow and ponding.
124
PROJECT TITLE: OAK LANE CHANNEL PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering
Construction
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
50,000
400,000
$450,000
125
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: 7-21-99
Submitted By: RANDY BYERS Date Completed:
Project Title: PRIEST DRIVE CULVERT AT WOODBURY FOREST
Project Type: DRAINAGE Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Tin ic, r,rr,ir,-4 in Alr, 44 in 4k, 4nnn Il.. r,...l4r... C.. r.lir.M O Clr„.....,. ..�, ..d..
,,,IV rl vwvl IV ITV. IV II Li1V IVVV 1 SI IVVVIIVII LIII.11al l u 1 1lJ111/t3I0 aluuy.
PROJECT DESCRIPTION:
This project involves the installation of a culvert under the extension of Priest Lane west from Tallow Drive to SH
121, This project can be reduced in scope or eliminated if Priest Lane does not get extended. There is a
possibility the City would be required to perform some channelization work.
* This project could be eliminated due to private development on Baze Property.
JUSTIFICATION:
Excessive surface water flow and ponding.
126
PROJECT TITLE: PRIEST DRIVE CULVERT AT WOODBURY PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering
Construction
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
21,000
100,000
$121,000
127
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: 7-26-99
Submitted By: RANDY BYERS Date Completed:
Project Title: ROYAL OAKS ADDITION
Project Type: DRAINAGE Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Tha ('.ihi'c awaranacc of tha naarf fnr Chic nrniart rams with tha avatar caanana nrnhlamc nn \A/alni it \A/av watt of
North Main Street.
PROJECT DESCRIPTION:
This project involves the installation of a storm drainage system in the backyards of lots in the Royal Oaks
Addition to alleviate problems associated with excessive lot -to -lot drainage.
JUSTIFICATION:
Lot to lot drainage solutions often cost much more than individual homeowners can afford.
128
PROJECT TITLE: ROYAL OAKS ADDITION PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
The cost of this project is currently being reevaluated.
$0
$0
$0
$0
TOTAL ESTIMATED CAPITAL COST:
Cost is yet to be determined
Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: 7-26-99
Submitted By: RANDY BYERS Date Completed:
Project Title: TRAILWOOD ADDITION (SUMMIT RIDGE)
Project Type: DRAINAGE Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
In 1990 the Citv rnmmissinnerd and rereiverd a report from Knnwltnn, Fnglich R, Flnwerc titter' Drainage
Utility System Study of Selected Improvement Projects. This project is the 6th project identified in this study.
PROJECT DESCRIPTION:
This project involves the correction of a number of drainage problems and expansion of the existing drainage
system.
JUSTIFICATION:
Drainage system does not meet current standards.
130
PROJECT TITLE: TRAILWOOD ADDITION (SUMMIT RIDGE) PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering
Construction
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design
Preliminary Design %
Final Plans %
Specifications %
Construction %
25,000
160,000
$185,000
131
132
:=MTAZIZMr6VIDMM!
nfundRd
)trW roje,
Project Description
STREET PROJECTS
121 Gateway Bridge (West) "'
Gateway Boulevard (East) "'
Glade Road Right -of -Way Acquisition (4'
CAPITAL IMPROVEMENT PROGRAMS
UNFUNDED PROJECTS - SORTED BY TYPE
PROPOSED METHOD OF FINANCING
County,
Car
Priority Estimated Cost Operating CIP Fund Bond State, Impact Escrow Rental Hotel /
Fund Balance Sale Federal Fees Funds Tax Motel
Funds
B $ 775,000
B $ 1,000,000
B $ 698,476
XX
XX
XX
EDC
To Be
Determined
Sub -Total Street Priority B $ 2,473,476
Ash Lane - Aransas to N. Main C TBD XX
Baze Road - Glade to Mid -Cities C TBD XX
Fuller Wiser Connector C $ 450,000 XX
Harwood Road - Main to SH 157 C TBD XX
Heather and S. Pipeline C $ 1,500,000 XX
Highway Ingress -Egress C TBD XX
Hwy 10 Sidewalks and Lighting C $ 450,000 XX
Hwy 10 - West of Westpark Way C $ 1,500,000 XX
S. Ector Drive C $ 1,068,000 XX
South Main - Hwy 10 to Pipeline C $ 4,770,420 XX
Raider Drive - SH 10 to South Pipeline C TBD XX
Vine St.-SH183toSH10 C TBD XX
Sub -Total Street Priority C $ 9,738,420
(STREET PROJECTS - TOTAL $ 12,211,896
r" - Projected FY 2001
a) - Projected FY 2002
(3' - Projected FY 2003
'4) - Projected FY 2004
(5) - To be paid from interest earned on Main Street bond proceeds.
A - Projects that will be presented to Council during the upcoming year.
B - Projects that will be presented to Council wthin two to five years.
C - Projects that will be presented to Council beyond five years.
City of Euless
Capital Project Request
Department: ECONOMIC DEVELOPMENT Date Prepared: 7-7-00
Submitted By: ANDREA BAXTER Date Completed:
Project Title: 121 GATEWAY BRIDGE (WEST)
Project Type: STREETS Sub -Type: CONSTRUCTION
Project No.: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The bridge over Little Bear Creek is required in the City's Master Thoroughfare Plan.
PROJECT DESCRIPTION:
Infrastructure assistance through the construction of a four (4) lane bridge north of Cheek-Sparger Road
(crossing Little Bear Creek).
JUSTIFICATION:
Financial assistance will be required for development of the portion of 121 Gateway district west of S.H. 121.
Development will increase the City's ad valorem and sales tax revenues.
134
PROJECT TITLE: 121 GATEWAY BRIDGE (WEST) PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
Car Rental Tax
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering
Construction
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design
Final Plans %
Specifications %
Construction %
75,000
700,000
$775,000
0%
0%
0%
0%
0%
135
City of Euless
Capital Project Request
Department: ECONOMIC DEVELOPMENT Date Prepared: 7-7-00
Submitted By: ANDREA BAXTER Date Completed:
Project Title: GATEWAY BOULEVARD (EAST)
Project Type: STREET Sub -Type: CONSTRUCTION
Project No.: Priority: B
RELATIONSHIP TO OTHER PROJECTS ANDIOR MASTER PLAN:
This project is required on the City's Master Thoroughfare Plan.
PROJECT DESCRIPTION:
Design and construction of portions of Gateway Boulevard between Glade Road and Mid -Cities Boulevard east
of S.H, 121.
JUSTIFICATION:
There are likely to be portions of this proposed boulevard that will not be constructed with the development in the
121 Gateway district.
136
PROJECT TITLE: GATEWAY BOULEVARD (EAST) PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
$0
$0
$0
$0
TOTAL ESTIMATED CAPITAL COST:
Construction
Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design To
Preliminary Design %
Final Plans %
Specifications %
Construction %
1,000,000
$1,000,000
137
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: 7-31-99
Submitted By: RANDY BYERS Date Completed:
Project Title: GLADE RD RIGHT OF WAY ACQUISITION
Project Type: STREET Sub -Type: CONSTRUCTION
Project No.: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Glade Road is identified as a minor arterial in the 1999 Master Thoroughfare Plan.
PROJECT DESCRIPTION:
Glade Road is planned as an east -west thoroughfare having 4-lanes divided with an 85' right-of-way.
JUSTIFICATION:
The need/priority for this roadway is dependent on development and the City of Grapevine's bond program
schedule. Grapevine has requested our participation. The City currently has approximately $200,000 in street
escrow funds for Glade Road.
138
PROJECT TITLE: GLADE RD RIGHT OF WAY ACQUISITION PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatinu Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
XX
TOTAL ESTIMATED CAPITAL COST:
Right of Way
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
698,476
$698,476
139
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: ASH LANE - ARANSAS TO N. MAIN
Project Type: STREET Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Project identified in 1999 Master Thoroughfare Plan.
PROJECT DESCRIPTION:
Date Prepared: 7-22-99
Date Completed:
Ash Lane - Type DA and Type DC. Ash Lane is an important east -west connection between SH 360 and FM
157 (Industrial Blvd.). The section east of Fuller -Wiser Road is presently constructed to its recommended
ultimate design of four lanes divided. Recognizing the residential character of the adjacent surroundings, the
recommended ultimate design standard for the section west of Fuller -Wiser is a four -lane undivided in a
minimum right-of-way width of 76 feet.
JUSTIFICATION:
Existing roadway does not currently meet the four -lane section.
140
PROJECT TITLE: ASH LANE - ARANSAS TO N. MAIN PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Cost yet to be determined.
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
Staff needs to reevaluate cost estimate and proposed schedule for this project.
141
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: BAZE ROAD - GLADE TO MID CITIES
Project Type: STREET Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Project identified in 1999 Master Thoroughfare Plan.
PROJECT DESCRIPTION:
Date Prepared: 7-22-99
Date Completed:
Baze Road - Type EC. Baze Road is an important north -south residential collector that is planned to connect
Glade Road and Mid -Cities Blvd. This roadway exists as a four -lane divided roadway north of Glade Road in
Grapevine. In Euless, it is constructed partially as a 40 foot undivided roadway and as a 36 feet (two lanes)
undivided roadway in a 60 foot right-of-way. The possible extension of Baze south of Anthony Drive to connect
with Mid -Cities Blvd. is recommended only if future access to Baze from Mid -Cities is restricted through
geometric design measures to prevent neighborhood "cut -through" traffic.
JUSTIFICATION:
Vehicular traffic is currently forced to travel on residential streets to access Mid -Cities.
142
PROJECT TITLE: BAZE ROAD - GLADE TO MID CITIES
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
$0
$0
$0
PROJECT #:
TOTAL ESTIMATED CAPITAL COST:
Cost yet to be determined.
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
$0
Staff is in the process of reevaluating all unfunded street projects. City currently has approximately $300,000
in street escrow for this project.
143
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: FULLER WISER CONNECTOR
Project Type: STREET Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project is identified in the 1999 Master Thoroughfare Plan.
PROJECT DESCRIPTION:
Date Prepared: 7-23-99
Date Completed:
Fuller -Wiser Road - Type DA and Type DC. Fuller -Wiser is a minor local arterial connection between SH 360 on
the north and SH 183 on the south. This facility is presently constructed to a design standard of four lanes
undivided in a 70 ft. right-of-way, The recommended ultimate design standard should be a four lane divided
roadway in an 85 ft. right-of-way for the sections that are north of Mid -Cities Blvd. and south of Harwood Road.
JUSTIFICATION:
Staff hopes to receive street escrow funds to assist in the construction of this project.
144
PROJECT TITLE: FULLER WISER CONNECTOR PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Construction
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
Staff is in the process of reevaluting the cost and schedule for this project.
450,000
$450,000
145
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: HARWOOD ROAD - MAIN TO FM 157
Project Type: STREET Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-22-99
Date Completed:
Proiect identified in the 1999 Master Thoroughfare Plan. Proiect is being upgraded in NCTCOG's 1999
Regional Thoroughfare Plan.
PROJECT DESCRIPTION:
Harwood Road _ Type B and Type C. Harwood Road is a major east -west arterial roadway connecting Euless,
Bedford, and Hurst with DFW Airport. In Euless, Harwood exists as a four -lane divided roadway between Main
Street and Industrial Blvd., and as a two-lane undivided roadway east of Main Street. It currently serves
substantial commercial development in Bedford and Hurst, and Harwood will serve similar future development
in Euless. The long-range impact of planned commercial and industrial development at DFW Airport is
presently uncertain. Consequently, the recommended roadway design standard is six lanes divided. The right-
of-way standard for the section east of Main Street is 120 feet. In recognition of the limited existing right-of-
way corridor available west of Main, the right-of-way for this section may be reduced. At locations approved by
the City Engineer, a minimum width of 104 feet may be permitted. Both sections require a 6-lane boulevard
street section.
JUSTIFICATION:
See Project Description. The upgrade on the NCTCOG's Regional Thoroughfare Plan may accelerate the
need for this reconstruction.
146
PROJECT TITLE: HARWOOD ROAD - MAIN TO FM 157 PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
$0
$0
$0
$0
TOTAL ESTIMATED CAPITAL COST:
Cost yet to be determined.
Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
Staff needs to reevaluate the estimate and scheduling of this project.
Department:
Submitted By:
1
Project Title:
Project Type:
Project No.:
City of Euless
Capital Project Request
ECONOMIC DEVELOPMENT
ANDREA BAXTER
HEATHER and S. PIPELINE
STREET
Date Prepared: 7-7-00
Date Completed:
Sub -Type: CONSTRUCTION
Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Design and construction of roadway, drainage utility and aesthetic improvements south of S.H. 10.
JUSTIFICATION:
Stimulate redevelopment and beautify primary gateway to the Texas Star Sports Centre.
148
PROJECT TITLE: HEATHER and S. PIPELINE PROJECT #:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Ooeratina Cost
Personnel: Full Time Construction 1,500,000
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal: $0
Maintenance Costs
Subtotal: $0
Total Estimated Annual Cost
$0 Total Estimated Capital Cost $1,500,000
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
Conceptual Design % 0%
Preliminary Design % 0%
Final Plans % 0%
Specifications % 0%
Construction % 0%
149
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Date Prepared: 7-26-99
Date Completed:
Project Title: HIGHWAY INGRESS - EGRESS
Project Type: STREET Subtype:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS ANDIOR MASTER PLAN:
PROJECT DESCRIPTION:
Modification of entrance and exit ramps on SH 183.
JUSTIFICATION:
Improved traffic flow.
150
PROJECT TITLE: HIGHWAY INGRESS - EGRESS PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Cost is yet to be determined.
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
Staff needs to reevaluate the estimates and scheduling of this project.
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: HWY 10 SIDEWALKS AND LIGHTING
Project Type: STREET Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS ANDIOR MASTER PLAN:
Date Prepared: 7-23-99
Date Completed:
Per Council's request, the Engineering staff created conceptual drawings and preliminary cost estimates for the
installation of sidewalks and lighting along SH 10.
PROJECT DESCRIPTION:
Project will consist of new sidewalks and street lighting along the entire stretch of Hwy 10.
JUSTIFICATION:
Corridor lighting can be improved. Sidewalks are missing in many areas along SH 10 where pedestrians
currently travel.
152
PROJECT TITLE: HWY 10 SIDEWALKS AND LIGHTING PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Hwy 10 Sidewalks & Lighting
$0
$0
$0
$0 Hwy 10 Sidewalks & Lighting
CURRENT STATUS:
Conceptual Design %
Preliminary Design
Final Plans %
Specifications %
Construction %
450,000
$450,000
153
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: HWY 10 - WEST OF WESTPARK WAY
Project Type: STREET Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-23-99
Date Completed:
1 At....,-, i Niai io ivi vi i i v w lac a oin-iai is 1 vauvvay acL.uui i LI u vu91 ivuL a is vm.y.
PROJECT DESCRIPTION:
The City would likely be required to fund utility relocations when TxDOT reconstructs and widens this section.
Staff is discussing timing of this project with TxDOT and determining whether additional funds will be required
from the City. The City may desire to add funds for landscaping and irrigation.
JUSTIFICATION:
Required by TxDOT.
154
PROJECT TITLE: HWY 10 - WEST OF WESTPARK WAY PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Utility Relocation
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
Staff plans to review the proposed scope of work to provide a breakdown of the costs.
1,500,000
$1,500,000
155
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: S. ECTOR DRIVE
Project Type: STREET Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-22-99
Date Completed:
Project identified in the 1999 Master Plan and was submitted as a TFA-21 prniart fnr forlorn! partir.inatinn in
funding.
PROJECT DESCRIPTION:
South Ector is an important connection between SH 183 and SH 10. The ultimate design standard is a four lane
divided thoroughfare.
JUSTIFICATION:
See description.
* Priority dependant on receipt of Federal TEA-21 funding.
156
PROJECT TITLE: S. ECTOR DRIVE
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
PROJECT #:
TOTAL ESTIMATED CAPITAL COST:
Engineering
$0 Construction
Right of Way
Utility Relocation
Landscaping
$0
$0
$0 Total Estimated Capital Cost*
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
54,000
384,000
330,000
170,000
130,000
$1,068,000
* The estimated cost reflected above represents approximately 42% of the total cost of this project. The
remaining 58% will be funded by TxDOT.
157
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: SOUTH MAIN - HWY 10 TO PIPELINE
Project Type: STREET Subtype:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-22-99
Date Completed:
Protect identified in 1999 Master Plan and submitted as a TEA-21 project for federal participation in funding.
PROJECT DESCRIPTION:
Main Street is a major north -south arterial connecting Euless to Grapevine and Arlington, with important linkages
to SH 360, SH 183, Trinity boulevard and IH 30. The ultimate design standard is recommended to be six lanes
divided south of Harwood to the south City Limit. The right-of-way standard for the section south of SH 183 to
the south City Limit should be 120 feet.
JUSTIFICATION:
See description.
* Priority dependant on receipt of Federal TEA-21 funding.
158
PROJECT TITLE: SOUTH MAIN - HWY 10 TO PIPELINE
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
PROJECT #:
TOTAL ESTIMATED CAPITAL COST:
Planning, Design and
Engineering
$0 Construction
Right of Way
Utility Relocation
Landscaping
$0
$0
$0 Total Estimated Capital Cost*
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
This project was discussed at the May 5, 1999 pre -council session.
211,820
2,648,600
510,000
900,000
500,000
$4,770,420
* The estimated cost reflected above represents approximately 42% of the total cost of this project. The
remaining 58% will be funded by TxDOT.
159
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Date Prepared: 7-22-99
Date Completed:
Project Title: RAIDER DRIVE, SH 10 TO SOUTH PIPELINE ROAD
Project Type: STREET Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Raider Drive is identified as a minor arterial in need of ['parade in the 1999 Master Thnrniighfare Plan
PROJECT DESCRIPTION:
Raider Drive = Type DA. Project will consist of widening and repairing Raider Drive from SH 10 to South
Pipeline Road, Raider Drive is an important north -south connection between W. Pipeline Road and SH 10. The
recommended ultimate design standard is four lanes divided in a right-of-way standard of 85 feet. In the future,
the City of Arlington may realign and extend Green Oaks Blvd. to connect with Raider instead of Westpark Way.
Assuming there is mutual concurrence between Euless and Bedford officials with respect to the realigning of
Raider and Central Drive, then it is recommended that the ultimate roadway design standard be a six -lane
divided within a minimum right-of-way of 120 feet to match the Arlington design standard.
JUSTIFICATION:
See description.
160
PROJECT TITLE: RAIDER DRIVE, SH 10 TO SOUTH PIPELINE PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Cost is yet to be determined.
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
Staff needs to reevaluate the current estimate and property needs.
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Date Prepared: 7-23-99
Submitted By: RANDY BYERS Date Completed:
Project Title: VINE ST. - SH183 TO SH10
Project Type: STREET Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Vine Street is not identified in the 1999 Master Thoroi,nhfarp Plan
PROJECT DESCRIPTION:
The City has received street escrow funds from several developments along Vine Street. When development is
complete, it would be appropriate for the City to reconstruct the existing roadway.
JUSTIFICATION:
Street escrow funds are being deposited for use in reconstruction.
162
PROJECT TITLE: VINE ST. - SH183 TO SH10
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Ooeratina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
PROJECT #:
TOTAL ESTIMATED CAPITAL COST:
Cost yet to be determined.
$0
so
so
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
$0
Staff is in the process of reevaluating the cost of this project. Street escrow will never cover the anticipated
cost.
163
164
CAPITAL IMPROVEMENT PROGRAMS
UNFUNDED PROJECTS - SORTED BY TYPE
Project Description Priority Estimated Cost
(WASTEWATER PROJECTS
FY 2001 CDBG
Manhole Rehab Program
Midway Park Sewer Rehab (Main Street)
S. Pipeline, Heather to Vine
(5)
PROPOSED METHOD OF FINANCING
County,
Operating CIP Fund Bond State, Impact Escrow Hotel /
Fund Balance Sale Federal Fees Funds Motel
Funds
A $ 457,000 XX XX
A $ 150,000 XX
A $ 100,000 XX
A $ 500,000
Sub -Total Wastewater Priority A $ 1,207,000
Euless Junior High Wastewater Main rn B $ 75,000 XX
Line Replacement, Dunaway B $ 140,000 XX
Line Replacement, Sagebrush B $ 195,000 XX
Line Replacement Vine to S. Pipeline (2) B $ 500,000 XX
Little Bear Creek Collection Line (4' B $ 425,000
Sub -Total Wastewater Priority B $ 1,335,000
XX
XX
XX
Car
Rental
Tax
EDC
To Be
Determined
Line Replacement, Arnett C $ 72,000 XX
Line Replacement, Bell C $ 45,000 XX
CS
"' Line Replacement, Broadway C $ 104,000 XX
Line Replacement, Canyon Ridge C $ 162,000 XX
Line Replacement, Collins Drive C $ 130,000 XX
Line Replacement, Dallas C $ 52,000 XX
Line Replacement, E. Alexander C $ 20,000 XX
Line Replacement, E. Fuller C $ 156,000 XX
Line Replacement, Ector Drive C $ 200,000 XX
Line Replacement, Fayette C $ 292,000 XX
Line Replacement, Harris C $ 52,000 XX
Line Replacement, Nimes C $ 150,000 XX
Line Replacement, Irion C $ 52,000 XX
Line Replacement, Jean Lane C $ 52,000 XX
Line Replacement, Koen C $ 225,000 XX
Line Replacement, Linda Lane C $ 72,000 XX
Line Replacement, McCormick & Copher Court C $ 66,000 XX
Line Replacement, Martin Lane C $ 65,000 XX
Line Replacement, Midway Drive C $ 163,000 XX
Line Replacement, Paula Lane C $ 79,000 XX
Line Replacement, Pebble Creek C $ 95,000 XX
Line Replacement, Ridgecrest Drive C $ 90,000 XX
A - Projects that will be presented to Council during the upcoming year.
B - Projects that will be presented to Council wthin two to five years.
C - Projects that will be presented to Council beyond five years.
CAPITAL IMPROVEMENT PROGRAMS
UNFUNDED PROJECTS - SORTED BY TYPE
PROPOS ED METHOD OF FINANCII-G
County,
Operating CIP Fund Bond State, Impa,:t Escrow Car Hotel / To Be
Project Description Priority Estimated Cost Fund Balance Sale Federal Fees, Funds RTaxal EDC
Motel Determined
Funds
Line Replacement, Ross Avenue C $ 90,000 XX
Line Replacement, Short St. to Copher Ct. C $ 80,000 XX
Line Replacement, S. Sheppard Drive C $ 90,000 XX
Line Replacement, W. Alexander C $ 72,000 XX
Line Replacement, W. Fuller C $ 70,000 XX
Line Replacement, Windward Way C $ 80,000 XX
Line Replacement, Wood Ridge Circle C $ 135,000 XX
SH 183 Utility Relocation C TBD XX
Sub -Total Wastewater Priority C $ 3,011,000 XX
WASTEWATER PROJECTS - TOTAL
$ 5,553,000
(1) - Projected FY 2001
rzr - Projected FY 2002
r33 - Projected FY 2003
tar - Projected FY 2004
(5) - To be paid from interest eamed on Main Street bond proceeds.
A - Projects that will be presented to Council during the upcoming year.
B - Projects that will be presented to Council wthin two to five years.
C - Projects that will be presented to Council beyond five years.
THIS PAGE INTENTIONALLY LEFT BLANK
167
Department:
Submitted By:
Project Title:
Project Type:
Project No.:
City of Euless
Capital Project Request
PUBLIC WORKS
RANDY BYERS
FY 2001 CDBG
WASTEWATER
Sub -Type:
Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared:
Date Completed:
7-26-99
This funding is the 2Fth tianr project ndrninictered by Tarrant County. TN. is the sixth (6) wastewater project in
South Euless and is by far the largest undertaken to upgrade wastewater mains.
PROJECT DESCRIPTION:
Design and construction of wastewater mains in the Oakwood Terrance Addition.
JUSTIFICATION:
Wastewater mains in South Euless area have deteriorated as they have aged and they need to be replaced.
168
PROJECT TITLE: FY 2001 CDBG PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
XX
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering
Construction
$0
Tarrant County CDBG Contrib
(Estimate)
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
Line to be replaced:
1) Between Martha and Vine from the north end South to Reaves - ties into FY00 CDBG Project.
2) Between Vine and Oakwood from the north end South to line 1 at Bayless.
3) Between Oakwood and Norman from the north end South to tie in with the FY97 CDBG Project.
4) Cannon Drive, Hollywood to S. Pipeline.
16,000
541,000
(100,000)
$457,000
100%
100%
100%
100%
0%
169
City of Euless
Capital Project Request
Department: WASTEWATER
Submitted By: RANDY BYERS
Project Title: MANHOLE REHAB. PROGRAM
Project Type: WASTEWATER Sub -Type:
Project No.: Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Rehabilitation of all City wastewater manholes that are in need.
JUSTIFICATION:
Date Prepared: 6-21-00
Date Completed:
Many brick manholes in our wastewater collection are in disrepair and are allowing a great deal of I&I. This
program provides for repair of these manholes which in turn reduces I&I and expenses asociated with treating
rainwater & groundwater.
170
PROJECT TITLE: MANHOLE REHAB. PROGRAM
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
$0
so
PROJECT #:
TOTAL ESTIMATED CAPITAL COST:
Replacement
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
XX Preliminary Design %
Final Plans
Specifications
Construction %
150,000
$150, 000
0%
0%
0%
0%
0%
This project is anticipated to be a three year project. It is anticipated that the project will proceed through FY
2001, FY 2002, FY 2003 and be completed in FY 2004.
171
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: 7-26-99
Submitted By: RANDY BYERS Date Completed:
Project Title: MIDWAY PARK SEWER REHAB
Project Type: WASTEWATER Sub -Type: MAINS
Project No.: Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project is tied t/l the evicting N. M2in Street ro cnstruuction prcjcct.
PROJECT DESCRIPTION:
Utility relocation funds were budgeted in the N. Main Street project. Staff has identified wastewater mains (that
connect to the facilities in N. Main) in need of repair or replacement. Staff has asked that the repair and
rehabilitation of these mains be included in the N. Main Street project.
JUSTIFICATION:
Performing this work with N. Main utility relocations will be more cost effective than creating a relatively small
stand-alone project.
172
PROJECT TITLE: MIDWAY PARK SEWER REHAB PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Ooeratina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance - Street
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
TOTAL ESTIMATED CAPITAL COST:
Sewer Mains
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
XX Preliminary Design %
Final Plans %
Specifications
Construction
$100,000
$100, 000
173
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: 7-26-99
Submitted By: RANDY BYERS Date Completed:
Project Title: S. PIPELINE, HEATHER TO VINE
Project Type: WASTEWATER Sub -Type: MAINS
Project No.: Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
No relAtinnships PYrP.pt to f'it! Ire 1 &lit/ ralnration project for south FM1 F7
PROJECT DESCRIPTION:
The existing wastewater main in South Pipeline has aged and deteriorated. The main needs to be replaced and
enlarged from Heather to Vine Street. A cost estimate and schedule have not been created to date.
JUSTIFICATION:
The EPA regulates contamination of soil from wastewater mains. It is necessary to correct deterioration found in
our system.
174
PROJECT TITLE: S. PIPELINE, HEATHER TO VINE PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering
Sewer Main
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
50,000
450,000
$500,000
175
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: 7-26-99
Submitted By: RANDY BYERS Date Completed:
Project Title: EULESS JR. HIGH WASTEWATER MAINS
Project Type: WASTEWATER Sub -Type: MAINS
Project No.: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
As the HEB ISD prepared its plan for the remodeling of Euless Junior High School, it became obvious that a
significant deterioration of the City's existing wastewater mains has occurred on the site. The School District's
contractor is relocating and replacing one segment. The City will be responsible for repairing and rehabilitating
or replacing several other segments. The scope has not yet been finalized.
JUSTIFICATION:
HEB ISD is replacing one of the deteriorated mains. The City needs to replace others to prevent discharge of
wastewater into the ground.
176
PROJECT TITLE: EULESS JR. HIGH WASTEWATER MAINS PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Sewer Mains
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
HEB ISD is saving the City approximately $25,000 by performing some work under its bond program.
$75,000
$75,000
177
City of Euless
Capital Project Request - Unfunded
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: LINE REPLACEMENT, DUNAWAY
Type: WASTEWATER Sub -Type:
Project No.: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-10-00
Date Completed:
Cvofomn+lr. ronlnromon+ of cnni+nn, crn,anr linnc in rlrninnnn kncin n lninn n ..nnrr.+
.,..... I n.,.11v. vl......vv1 I w1n v. v..0 n. 1� uvr. v� u�wv uI u�un�uya, U4J111 CAI 40111.J. CI VVJIl. Iuo1. appri01....
PROJECT DESCRIPTION:
Replace sanitary sewer lines on Dunaway - E. Alexander to Ascot.
JUSTIFICATION:
Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are
subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and
other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration
and inflow. Systematic replacement will prevent a mandatory wide spread replacement.
178
PROJECT TITLE: LINE REPLACEMENT, DUNAWAY PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Current Revenue
Reserve Fund
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
To Be Determine
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Sewer Line Replacement
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans
Specifications %
Construction %
140,000
$140,000
179
City of Euless
Capital Project Request - Unfunded
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: LINE REPLACEMENT, SAGEBRUSH
Type: WASTEWATER Sub -Type:
Project No.: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-10-00
Date Completed:
Systematic replacement of sanitary sewer iines III draii'age basil' areas using a worst first approach.
PROJECT DESCRIPTION:
Replace sanitary sewer lines on the north and south sides of Sagebrush Trail.
JUSTIFICATION:
Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are
subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and
other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration
and inflow. Systematic replacement will prevent a mandatory wide spread replacement.
180
PROJECT TITLE: LINE REPLACEMENT, SAGEBRUSH PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Ooeratina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Current Revenue
Reserve Fund
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Sewer Line Replacement
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
195,000
$195, 000
181
City of Euless
Capital Project Request
Department: WASTEWATER COLLECTION Date Prepared: 6-21-00
Submitted By: RANDY BYERS Date Completed:
Project Title: LINE REPLACEMENT, VINE/S PIPELINE
Project Type: WASTEWATER Sub -Type:
Project No.: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Replacement of the 12" sanitary sewerline from Vine St. to Simmons to S. Pipeline.
JUSTIFICATION:
This transmission line is clay tile and in poor condition. It needs to be replaced utilizing trenchless technology
as soon as possible.
182
PROJECT TITLE: LINE REPLACEMENT, VINE/S PIPELINE PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Replacement
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
500,000
$500,000
0%
0%
0%
0%
0%
183
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: 7-26-99
Submitted By: RANDY BYERS Date Completed:
Project Title: LITTLE BEAR CREEK COLLECTION LINE
Project Type: WASTEWATER Sub -Type: IMPACT FEE PROJECT
Project No.: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PrniPrt iripntifipri ac nPreccani in thn \l\Jactrawatar Import Foo Mon
PROJECT DESCRIPTION:
Design and construction of the Little Bear Creek Major Collection Line identified in the 1999 Wastewater
Impact Fee Review. The year identified for construction was 2002.
JUSTIFICATION:
Existing wastewater main does not have adequate capacity to serve future growth in the basin. Impact fee
funds are currently available to fund this project.
184
PROJECT TITLE: LITTLE BEAR CREEK COLLECTION LINE PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering
Construction
$0 Right of Way
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
75,000
300,000
50,000
$425,000
185
City of Euless
Capital Project Request - Unfunded
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: LINE REPLACEMENT, ARNETT DRIVE
Type: WASTEWATER Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-10-00
Date Completed:
Systematir. rPplaremint of sanitary sower linos in drainage basin ore-s using :a worst first npprocch
PROJECT DESCRIPTION:
Replace sanitary sewer line on Arnett Drive.
JUSTIFICATION:
Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are
subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and
other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration
and inflow. Systematic replacement will prevent a mandatory wide spread replacement.
186
PROJECT TITLE: LINE REPLACEMENT, ARNETT DRIVE PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Ooeratina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Current Revenue
Reserve Fund
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
Supplemental Sales Tax
To Be Determined
ADDITIONAL COMMENTS:
XX
so
$0
$0
so
(TOTAL ESTIMATED CAPITAL COST:
Sewer Line Replacement
Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
72,000
$72,000
187
City of Euless
Capital Project Request - Unfunded
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: LINE REPLACEMENT, BELL DR
Type: WASTEWATER Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-10-00
Date Completed:
Cy ctem3tin replunnmcnt of .c m tui j scry 3 lines in drainage basin areas using a worst first approach.
PROJECT DESCRIPTION:
Replace sanitary sewer lines on Bell Drive.
JUSTIFICATION:
Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are
subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and
other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration
and inflow. Systematic replacement will prevent a mandatory wide spread replacement.
188
PROJECT TITLE: LINE REPLACEMENT, BELL DR PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Ooeratina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Current Revenue
Reserve Fund
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Sewer Line Replacement
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
45,000
$45,000
189
City of Euless
Capital Project Request - Unfunded
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: LINE REPLACEMENT, BROADWAY
Type: WASTEWATER Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-10-00
Date Completed:
Cvctem?tir ronloremont rf conitnni ce � er linos in d�ruinnnnfirst 4
.. p . II MAW., u.rn ai.,ua using a worstrst approach.
PROJECT DESCRIPTION:
Replace sanitary sewer line on Broadway - Hollywood to Sunset.
JUSTIFICATION:
Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are
subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and
other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration
and inflow. Systematic replacement will prevent a mandatory wide spread replacement.
190
PROJECT TITLE: LINE REPLACEMENT, BROADWAY PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Ooeratina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Current Revenue
Reserve Fund
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Sewer Line Replacement
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications
Construction %
104,000
$104,000
191
City of Euless
Capital Project Request - Unfunded
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: LINE REPLACEMENT, CANYON RIDGE
Type: WASTEWATER Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-10-00
Date Completed:
Cvcfomotic replacement of �n.,itnry .. r li.,..s : ....:rage b..s:, t f rst
��•. •...• .. L.••.•vv•• II. lu.wy •��n.. rr 1.1 eel it,. II Ul all ocluC Va0111 OrCOO UJllly O VVVrJI IIIJI approach.
PROJECT DESCRIPTION:
Replace sanitary sewer line on Canyon Ridge.
JUSTIFICATION:
Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are
subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and
other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration
and inflow. Systematic replacement will prevent a mandatory wide spread replacement.
192
PROJECT TITLE: LINE REPLACEMENT, CANYON RIDGE PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct ODeratina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Current Revenue
Reserve Fund
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Sewer Line Replacement
so
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
162,000
$162,000
193
City of Euless
Capital Project Request - Unfunded
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: LINE REPLACEMENT, COLLINS DRIVE
Type: WASTEWATER Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-10-00
Date Completed:
Systematic replacement of sanitary sewer lines in drainana hasin araas !_icing a 1,A'orct first 2pprnarh
PROJECT DESCRIPTION:
Replace sanitary sewer line on Collins Drive.
JUSTIFICATION:
Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are
subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and
other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration
and inflow. Systematic replacement will prevent a mandatory wide spread replacement.
194
PROJECT TITLE: LINE REPLACEMENT, COLLINS DRIVE PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Ooeratina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Current Revenue
Reserve Fund
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Sewer Line Replacement
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design
Final Plans
Specifications %
Construction %
130,000
$130,000
195
City of Euless
Capital Project Request - Unfunded
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: LINE REPLACEMENT, DALLAS
Type: WASTEWATER Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-10-00
Date Completed:
Systematic lacement f sanitary.
t_ry. r_ _- ''_v_
vy.�w���au�, rc F:rla�,clllclll of JailllQly sewer IIIICJ ��I Ul dll l[IyC Udblldl%d5 using a worst first approach.
PROJECT DESCRIPTION:
Replace sanitary sewer line on Dallas - Irion to mid block clean out.
JUSTIFICATION:
Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are
subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and
other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration
and inflow. Systematic replacement will prevent a mandatory wide spread replacement.
196
PROJECT TITLE: LINE REPLACEMENT, DALLAS PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Ooeratina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Current Revenue
Reserve Fund
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Sewer Line Replacement
so
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
52,000
$52,000
197
City of Euless
Capital Project Request - Unfunded
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: LINE REPLACEMENT, E. ALEXANDER
Type: WASTEWATER Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-10-00
Date Completed:
Systematic replacement of sanitary ewe iii ies ii I di dii idCyC basin awas usirig a worst first approach.
PROJECT DESCRIPTION:
Replace sanitary sewer lines on E. Alexander Dr. from creek to Dunaway Dr.
JUSTIFICATION:
Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are day tile and are
subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and
other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration
and inflow. Systematic replacement will prevent a mandatory wide spread replacement.
198
PROJECT TITLE: LINE REPLACEMENT, E. ALEXANDER PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Current Revenue
Reserve Fund
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
To Be Determine
ADDITIONAL COMMENTS:
TOTAL ESTIMATED CAPITAL COST:
Sewer Line Replacement
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
XX Specifications
Construction
20,000
$20, 000
199
City of Euless
Capital Project Request - Unfunded
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: LINE REPLACEMENT, E. FULLER
Type: WASTEWATER Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-10-00
Date Completed:
Syste I atic cpldcei i iciii ur sdrIiiar y sewer lines in drainage basin areas using a worst first approach.
PROJECT DESCRIPTION:
Replace sanitary sewer line on E. Fuller Dr. - north and south sides.
JUSTIFICATION:
Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are
subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and
other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration
and inflow. Systematic replacement will prevent a mandatory wide spread replacement.
200
PROJECT TITLE: LINE REPLACEMENT, E. FULLE PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Current Revenue
Reserve Fund
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Sewer Line Replacement
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans
Specifications %
Construction %
156,000
$156,000
201
City of Euless
Capital Project Request - Unfunded
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: LINE REPLACEMENT, ECTOR DRIVE
Type: WASTEWATER Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-10-00
Date Completed:
Cvctamatir ranlanam: nt of canifani emeanr linnc in rlrninnnn hnoin nrnnn nn n
PROJECT DESCRIPTION:
Replace sanitary sewer lines on east and west sides of Ector Drive from Harwood to end of lines.
JUSTIFICATION:
Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are
subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and
other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration
and inflow. Systematic replacement will prevent a mandatory wide spread replacement.
202
PROJECT TITLE: LINE REPLACEMENT, ECTOR DRIVE PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Current Revenue
Reserve Fund
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Sewer Line Replacement
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction
200,000
$200,000
203
City of Euless
Capital Project Request - Unfunded
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: LINE REPLACEMENT, FAYETTE DRIVE
Type: WASTEWATER Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-10-00
Date Completed:
Systematic atic replacement of sanitary JCWNCI iiu ies it i dl ail Jaye basin areas using a worst first approach.
PROJECT DESCRIPTION:
Replace sanitary sewer lines on east and west sides of Fayette Drive.
JUSTIFICATION:
Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are
subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and
other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration
and inflow. Systematic replacement will prevent a mandatory wide spread replacement.
204
PROJECT TITLE: LINE REPLACEMENT, FAYETTE DRIVE PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Current Revenue
Reserve Fund
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Sewer Line Replacement
$0
so
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design
Preliminary Design %
Final Plans %
Specifications
Construction %
292,000
$292,000
205
City of Euless
Capital Project Request - Unfunded
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: LINE REPLACEMENT, HARRIS DRIVE
Type: WASTEWATER Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-10-00
Date Completed:
Systomatic ronlocomont of conitary sewer linos in
�)•.. .. Ir •..•...+•• •.• ) uJba ina1UJII IIJ. G YVVJIfirst approach.
PROJECT DESCRIPTION:
Replace sanitary sewer line on Harris Drive.
JUSTIFICATION:
Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are
subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and
other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration
and inflow. Systematic replacement will prevent a mandatory wide spread replacement.
206
PROJECT TITLE: LINE REPLACEMENT, HARRIS DRIVE PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Current Revenue
Reserve Fund
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Sewer Line Replacement
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans
Specifications %
Construction
52,000
$52,000
207
City of Euless
Capital Project Request - Unfunded
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: LINE REPLACEMENT, HIMES DRIVE
Type: WASTEWATER Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-10-00
Date Completed:
SyetemUt;c r: p!cc i 6%nt ofsanitary ai vvcr Tunes ii1 .'.haulage bas111 are s usin,. a wo bt IIst app1Uac1 I.
PROJECT DESCRIPTION:
Replace sanitary sewer lines on east and west sides of Nimes Drive.
JUSTIFICATION:
Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are
subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and
other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration
and inflow. Systematic replacement will prevent a mandatory wide spread replacement.
208
PROJECT TITLE: LINE REPLACEMENT, HIMES DRIVE PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct ODeratina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Current Revenue
Reserve Fund
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Sewer Line Replacement
$0
so
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design
Preliminary Design %
Final Plans
Specifications %
Construction %
150,000
$150,000
209
City of Euless
Capital Project Request - Unfunded
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: LINE REPLACEMENT, IRION DRIVE
Type: WASTEWATER Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-10-00
Date Completed:
vyoLGI l lain. I Gplat.GI I !GI IL vI sanitary JCvv CI IIIICJ III UI [III Ic7l,. C VASIII al ea5 usii ig a worst first approach.
PROJECT DESCRIPTION:
Replace sanitary sewer line on Trion Drive.
JUSTIFICATION:
Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are
subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and
other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration
and inflow. Systematic replacement will prevent a mandatory wide spread replacement.
210
PROJECT TITLE: LINE REPLACEMENT, IRION DRIVE PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Current Revenue
Reserve Fund
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Sewer Line Replacement
so
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
52,000
$52,000
211
City of Euless
Capital Project Request - Unfunded
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: LINE REPLACEMENT, JEAN LANE
Type: WASTEWATER Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-10-00
Date Completed:
Syctmm�tin V y�la uuuli rV Filaccmucit. VI J..a1n Huai ..y
JGVV Gi udani died3 uaiiiy a wui5i first approach.
PROJECT DESCRIPTION:
Replace sanitary sewer lines on Jean Lane.
JUSTIFICATION:
Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are
subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and
other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration
and inflow. Systematic replacement will prevent a mandatory wide spread replacement.
212
PROJECT TITLE: LINE REPLACEMENT, JEAN LANE PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Oneratina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Current Revenue
Reserve Fund
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Sewer Line Replacement
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design
Preliminary Design %
Final Plans %
Specifications %
Construction %
52,000
$52,000
213
City of Euless
Capital Project Request - Unfunded
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: LINE REPLACEMENT, KOEN
Type: WASTEWATER Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-10-00
Date Completed:
Qvc+amutin roninnnnrInnt of enniinnl "vrivr i�nnn in drninnnn hnnin n n' {Firm h
vyJ Vrl J UIy J VJ 111 V1 U111GyV ✓GJII I G11 VGJ UJ11 IU G VVVI JI. 11101. Q'.JJI VQVI 1.
PROJECT DESCRIPTION:
Replace sanitary sewer line 1211 from Koen to S. Pipeline.
JUSTIFICATION:
Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are
subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and
other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration
and inflow. Systematic replacement will prevent a mandatory wide spread replacement.
214
PROJECT TITLE: LINE REPLACEMENT, KOEN PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Ooeratinu Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Current Revenue
Reserve Fund
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Sewer Line Replacement
so
$0
so
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans
Specifications %
Construction %
225,000
$225,000
215
City of Euless
Capital Project Request - Unfunded
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: LINE REPLACEMENT, LINDA LANE
Type: WASTEWATER Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-10-00
Date Completed:
Systematic rep!acomerrt of sNr i+.,n, :cr linc3 in droi..a.gr. h..s;. t f rst h
� _..... .. r, ..,........ u i UI G11 tGIJ, li vauu i area i i.i�iiiy a 'v'vvrS� w �� aj�Fii va�.i i.
PROJECT DESCRIPTION:
Replace sanitary sewer line on Linda Lane.
JUSTIFICATION:
Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are
subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and
other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration
and inflow. Systematic replacement will prevent a mandatory wide spread replacement.
216
PROJECT TITLE: LINE REPLACEMENT, LINDA LA 'JE PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Current Revenue
Reserve Fund
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
Supplemental Sales Tax
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Sewer Line Replacement
so
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
72,000
$72,000
217
City of Euless
Capital Project Request - Unfunded
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: LINE REPLACEMENT, McCORMICK
Type: WASTEWATER Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-10-00
Date Completed:
Cvc+omnfin ronlnnomonf of cnnHnn, rn * r.r linen in rlrninnnn
..�.., .... •......v I v..wvv� i ice.. i• v� v�.� ��.u� y ._r �. ♦.i 111i,..a III ui u11161Wi uc u QJ uoII I p vvuroi. III.SI QF.J'.JrUCIO1 I.
PROJECT DESCRIPTION:
Replace sanitary sewer line servicing McCormick and Copher Courts.
JUSTIFICATION:
Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are
subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and
other chemicals. Many are not functional at an acceptable level and are often innundated with infiltration
and inflow. Systematic replacement will prevent a mandatory wide spread replacement.
218
PROJECT TITLE: LINE REPLACEMENT, McCORMICK PROJECT #:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Ooeratina Cost
Personnel: Full Time Sewer Line Replacement 66,000
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
so
so
Subtotal: $0
Total Estimated Annual Cost
$0 Total Estimated Capital Cost $66,000
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Current Revenue
Reserve Fund
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
To Be Determined
ADDITIONAL COMMENTS:
XX
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
219
City of Euless
Capital Project Request - Unfunded
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: LINE REPLACEMENT, MARTIN LANE
Type: WASTEWATER Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-10-00
Date Completed:
Cvctemalic rnnlonoment of vn..iiitnni owor r.,cs ' .d......,....e basi r.--
..�.. ..1.,........�. w. w y :��. yr lil wwa iil ut au lays uaJliI cal GaJ UJII IIUY. cl WUIJI IIIJL dIJIJI Udla I.
PROJECT DESCRIPTION:
Replace sanitary sewer line on Martin Lane.
JUSTIFICATION:
Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are
subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and
other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration
and inflow. Systematic replacement will prevent a mandatory wide spread replacement.
220
PROJECT TITLE: LINE REPLACEMENT, MARTIN LANE PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Ooeratina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Current Revenue
Reserve Fund
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Sewer Line Replacement
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
65,000
$65,000
221
City of Euless
Capital Project Request - Unfunded
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: LINE REPLACEMENT, MIDWAY
Type: WASTEWATER Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-10-00
Date Completed:
Systom2tin ronl2comont of cunitnni seerUr c� in d�ra�3gc hn.-i., .. _ t
i uy., vaaiii arcao i.iuiiiy a wv Vl J1. IIIJ� cI �.I FJIV[I�.I I.
PROJECT DESCRIPTION:
Replace sanitary sewer line on Midway Drive - Ector to Main Street.
JUSTIFICATION:
Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are
subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and
other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration
and inflow, Systematic replacement will prevent a mandatory wide spread replacement.
222
PROJECT TITLE: LINE REPLACEMENT, MIDWAY PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Current Revenue
Reserve Fund
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Sewer Line Replacement
so
$0
so
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans
Specifications %
Construction %
163,000
$163,000
223
Department:
Submitted By:
Project Title:
Type:
Project No.:
City of Euless
Capital Project Request - Unfunded
PUBLIC WORK Date Prepared: 7-10-00
RANDY BYERS Date Completed:
LINE REPLACEMENT, PAULA LANE
WASTEWATER Sub -Type:
Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Syst ,rnat, coplace l o t of sanitary' y sewer lines in uI ai aye udau l di CdJ obit i d MASI Iirsi approach.
PROJECT DESCRIPTION:
Replace sanitary sewer lines on Paula Lane - Needles to W. Pipeline.
JUSTIFICATION:
Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are
subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and
other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration
and inflow. Systematic replacement will prevent a mandatory wide spread replacement.
224
PROJECT TITLE: LINE REPLACEMENT, PAULA LANE PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Current Revenue
Reserve Fund
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
To Be Determined
ADDITIONAL COMMENTS:
XX
$0
$0
$0
$0
TOTAL ESTIMATED CAPITAL COST:
Sewer Line Replacement
Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design cio
Final Plans %
Specifications %
Construction %
79,000
$79,000
225
City of Euless
Capital Project Request - Unfunded
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: LINE REPLACEMENT, PEBBLE CREEK
Type: WASTEWATER Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-10-00
Date Completed:
Systciiiintic r.:Nln...n..:.i iicnt of s m taffy ocvvcr iii ics iii uraii iaye uaaiiI areas iisi� g d wort iist appI Odd I.
PROJECT DESCRIPTION:
Replace sanitary sewer lines on Pebble Creek from Woodvine to Wood Ridge.
JUSTIFICATION:
Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are
subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and
other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration
and inflow. Systematic replacement will prevent a mandatory wide spread replacement.
226
PROJECT TITLE: LINE REPLACEMENT, PEBBLE CREEK PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Current Revenue
Reserve Fund
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Sewer Line Replacement
so
so
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design
Preliminary Design %
Final Plans %
Specifications
Construction
95,000
$95,000
227
City of Euless
Capital Project Request - Unfunded
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: LINE REPLACEMENT, RIDGECREST
Type: WASTEWATER Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-10-00
Date Completed:
S ystem3t c rcp!a V\..rl l\cr1 It of san tal ' sewe Imes III drainage
are s uair1 a wort fir t a fti h.
,� V1114.I� N Y a y pp
PROJECT DESCRIPTION:
Replace sanitary sewer lines on Ridgecrest Drive.
JUSTIFICATION:
Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are
subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and
other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration
and inflow. Systematic replacement will prevent a mandatory wide spread replacement.
228
PROJECT TITLE: LINE REPLACEMENT, RIDGECREST PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Ooeratina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Current Revenue
Reserve Fund
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Sewer Line Replacement
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans
Specifications %
Construction
90,000
$90,000
229
City of Euless
Capital Project :- equest - Unfunded
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: LINE REPLACEMENT, ROSS AVE
Type: WASTEWATER Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-10-00
Date Completed:
Vy JlV111GlIV 1 VI,/IGIiVI 11,1 II v1 JQ1114QIy ocvvcr IIII 111 UI auldl c IJ II1 cI c* UJII It,. d VVUI Jt 111 Jt dP IJIUcRa 1.
PROJECT DESCRIPTION:
Replace sanitary sewer line on Ross Ave. including feeder lines servicing 100 & 200 Blocks of W. Euless
Blvd. South side.
JUSTIFICATION:
Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are
subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and
other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration
and inflow. Systematic replacement will prevent a mandatory wide spread replacement.
230
PROJECT TITLE: LINE REPLACEMENT, ROSS AVE PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Current Revenue
Reserve Fund
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
Supplemental Sales Tax
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Sewer Line Replacement
so
$0
so
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
90,000
$90,000
231
Department:
Submitted By:
Project Title:
Type:
Project No.:
City of Euless
Capital Project Request - Unfunded
PUBLIC WORKS
RANDY BYERS
LINE REPLACEMENT, SHORT ST.
WASTEWATER Sub -Type:
Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-10-00
Date Completed:
SystP.matir renlanamPnt of sanitary cower lines in drainage b sin areas using a worst first approach.
,__... _.._ _. __.. .., �.� .. .. cower !Ines ... drainage ....y., vuv��� areas u.�ll ly a worst first QN�.JIVdI.I I
PROJECT DESCRIPTION:
Replace sanitary sewer lines - 811 outfall - Short St. to Copher Ct.
JUSTIFICATION:
Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are
subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and
other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration
and inflow. Systematic replacement will prevent a mandatory wide spread replacement.
PROJECT TITLE: LINE REPLACEMENT, SHORT ST. PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Current Revenue
Reserve Fund
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Sewer Line Replacement
so
so
so
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
80,000
$80,000
233
City of Euless
Capital Project Request - Unfunded
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: LINE REPLACEMENT, S. SHEPPARD
Type: WASTEWATER Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-10-00
Date Completed:
S_ys_tom?tic ro,. pla...c..e...ment of sewer lines in drainage bw.si• areas using a worst first approach.
.
PROJECT DESCRIPTION:
Replace sanitary sewer lines on S. Sheppard Dr.
JUSTIFICATION:
Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are
subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and
other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration
and inflow. Systematic replacement will prevent a mandatory wide spread replacement.
234
PROJECT TITLE: LINE REPLACEMENT, S. SHEPPARD PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct ODeratina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Current Revenue
Reserve Fund
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Sewer Line Replacement
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design
Preliminary Design %
Final Plans
Specifications
Construction %
90,000
$90,000
235
City of Euless
Capital Project Request - Unfunded
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: LINE REPLACEMENT, W. ALEXANDER
Type: WASTEWATER Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-10-00
Date Completed:
Systematic replacement sanitary' sewer lines drainage
'
..�.,............ replacement w of uai oval y sewer lines ii i ui Au IAyC basin I areas U511 Ili d mist first approach.
PROJECT DESCRIPTION:
Replace sanitary sewer line on W. Alexander Lane.
JUSTIFICATION:
Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are
subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and
other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration
and inflow. Systematic replacement will prevent a mandatory wide spread replacement.
236
PROJECT TITLE: LINE REPLACEMENT, W. ALEXANDER PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Ooeratina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Current Revenue
Reserve Fund
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
To Be Determine
ADDITIONAL COMMENTS:
TOTAL ESTIMATED CAPITAL COST:
Sewer Line Replacement
$0
$o
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
72,000
$72,000
237
City of Euless
Capital Project Request - Unfunded
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: LINE REPLACEMENT, W. FULLER
Type: WASTEWATER Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-10-00
Date Completed:
Cvctvmu n rnnlnnymnnt F n '4nn, linn.. .1.-..:........ h....l..
vyv ., �..� ..el v. Qui mu, y s�,vvit ni ico II I ui au iayc uaou i areas usiiiy a VVUI Jl Ill.. l Opp! Udl.l I.
PROJECT DESCRIPTION:
Replace sanitary sewer lines on W. Fuller Drive.
JUSTIFICATION:
Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are
subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and
other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration
and inflow. Systematic replacement will prevent a mandatory wide spread replacement.
238
PROJECT TITLE: LINE REPLACEMENT, W. FULLER PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Current Revenue
Reserve Fund
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
To Be Determined
ADDITIONAL COMMENTS:
TOTAL ESTIMATED CAPITAL COST:
Sewer Line Replacement
so
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans
Specifications %
Construction %
70,000
$70,000
239
City of Euless
Capital Project Request - Unfunded
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: LINE REPLACEMENT, WINDWARD WAY
Type: Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-10-00
Date Completed:
Systematic replacement of .c_runitu y so),vor linos in drainage basin areas using a worst first approach.
PROJECT DESCRIPTION:
Replace sanitary sewer lines on Windward Way.
JUSTIFICATION:
Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are
subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and
other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration
and inflow. Systematic replacement will prevent a mandatory wide spread replacement.
240
PROJECT TITLE: LINE REPLACEMENT, WINDWARD WAY PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Ooeratina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Current Revenue
Reserve Fund
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Sewer Line Replacement
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans
Specifications
Construction %
80,000
$80,000
241
City of Euless
Capital Project Request - Unfunded
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: LINE REPLACEMENT, WOODRIDGE
Type: WASTEWATER Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-10-00
Date Completed:
Systematic sanitarylacement..._...--I:.-__ . J__'__
.�y�wu�au�, replacement of JCVVCI IIIICJ III UIdI1!aye UHJIII HICHS USllly cl wursi first approach.
PROJECT DESCRIPTION:
Replace sanitary sewer lines on Wood Ridge Circle.
JUSTIFICATION:
Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are
subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and
other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration
and inflow. Systematic replacement will prevent a mandatory wide spread replacement.
242
PROJECT TITLE: LINE REPLACEMENT, WOODRIDGE PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct ODeratina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Current Revenue
Reserve Fund
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
Supplemental Sales Tax
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Sewer Line Replacement
so
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design
Final Plans %
Specifications
Construction
135,000
$135,000
243
Department:
Submitted By:
Project Title:
Project Type:
Project No.:
City of Euless
Capital Project Request
PUBLIC WORKS
ANDREA BAXTER
SH 183
WASTEWATER
Date Prepared: 7-21-00
Date Completed:
Sub -Type: RELOCATION
Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
T..fl /lT ...1.. _... a.. ...:J.._ t I IA n11 ...:4.L:_ tL_ ___.� i__ .._ _
I nvv I pia' la tU VVIUCI I JI I I UJ VVII.11111 U IC next tel I yedr s.
PROJECT DESCRIPTION:
The City has a number of wastewater mains that might require relocation. The scope of the work is unknown
at this time.
JUSTIFICATION:
Required where conflicts will occur with TxDOT's highway project.
244
PROJECT TITLE: SH 183 PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Cost yet to be determined
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans
Specifications 13/0
Construction %
The scope of work will be determined as TxDOT completes the highway reconstruction plans.
0%
0%
0%
0%
0%
245
g/v mom# V aink.
246
l'11r1,111,1'1111,1N-111,111111,11dmik
a
Project Description
WATER PROJECTS
Fire Hydrant Replacement Program
FY 2001 Utility Rehab - Water Program
SCADA Upgrade
Sub -Total Water Priority A
Disinfection Modification (2)
Effluent Water Main (2)
Hwy 360 Water Crossing (2)
Rehab Central Dr. Water Storage (4)
Rehab/Rebuild Fuller Dr. Ground Storage Tan
W. Pipeline Water Main Replacement rn
Sub -Total Water Priority B
Hwy 183 Water Crossing
Well Rehabilitation
Sub -Total Water Priority C
WATER PROJECTS - TOTAL
CAPITAL IMPROVEMENT PROGRAMS
UNFUNDED PROJECTS - SORTED BY TYPE
PROPOSED METHOD OF FINANCING
County,
Operating CIP Fund Bond State, Impact Escrow Car Hotel /
Priority Estimated Cost Rental
Fund Balance Sale Federal Fees Funds TaxMotel
Funds
A 1 $ 50,000
A 1 $ 150,000
A 1 $ 93,400
$ 293,400
B $ 250,000
B $ 1,500,000
B $ 300,000
B $ 500,000
B $ 200,000
B $ 1,000,000
$ 3,750,000
C TBD 1
C 1 $ 750,000 J
$ 750,000
$ 4,793,400
(') - Projected FY 2001
(2) - Projected FY 2002
r3' - Projected FY 2003
° - Projected FY 2004
(5) - To be paid from interest eamed on Main Street bond proceeds.
A - Projects that will be presented to Council during the upcoming year
B - Projects that will be presented to Council wthin two to five years.
C -Projects that will be presented to Council beyond five years.
XX
XX
XX
XX
XX
XX
XX
XX
XX
EDC
To Be
Determined
XX
XX
City of Euless
Capital Project Request
Department: WATER DISTRIBUTION Date Prepared: 6-15-00
Submitted By: RANDY BYERS Date Completed:
Project Title: FIRE HYDRANT REPLACEMENT PROGRAM
Project Type: WATER Sub -Type: INSTALLATION
Project No.: Priority: A
RELATIONSHIP TO OTHER PROJECTS ANDIOR MASTER PLAN:
PROJECT DESCRIPTION:
Systematic annual replacement of old, deteriorated or malfunctioning fire hydrants as determined by Fire and/or
Public Works personnel.
JUSTIFICATION:
Fire hydrants are necessary for many functions, the major one being fire fighting. Several hydrants in our
distribution system are old, deteriorated and are found to malfunction during annual inspections. These hydrants
need to be replaced.
248
PROJECT TITLE: FIRE HYDRANT REPLACEMENT PROGRAM PROJECT #:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time Hydrant Replacement 50,000
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal: $0
Maintenance Costs
Subtotal: $0
Total Estimated Annual Cost
$0 Total Estimated Capital Cost $50,000
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design % 0%
Fund Balance XX Preliminary Design % 0%
Certificate of Obligation Final Plans % 0%
County, State, Federal Funding Specifications % 100%
General Obligation Bonds 1 Construction % 0%
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
Car Rental Tax
ADDITIONAL COMMENTS:
249
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: FY 2001 UTILITY REHAB - WATER PROGRAM
Project Type: WATER Sub -type: MAINS
Project No.: Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Replacement of water mains including the following:
Hodges
Slaughter
John Vernon
JUSTIFICATION:
Date Prepared:
Date Completed:
These water mains have deteriorated to the point of needing replacement.
7-26-99
PROJECT TITLE: FY 2001 UTILITY REHAB - WATER PROGRAM PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Water Mains
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
$150,000
$150, 000
251
City of Euless
Capital Project Request - Unfunded
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: SCADA UPGRADE
Type: WATER Sub -Type:
Project No.: Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Date Prepared: 7-24-00
Date Completed:
Upgrade Supervisory Control and Data Acquisition (SCADA) System Hardware and Software.
JUSTIFICATION:
The SCADA System in use today is not Y2K Compliant. Specifications for upgrade could not be completed
prior to 12/31/99. The time on the computer was set back to a previous date. Since the installation was
completed new/improved technology has evolved. The upgrade will entail all new equipment. Failure to
upgrade will result in an approximate 100% increase in the cost of producing water from our wells.
252
PROJECT TITLE: SCADA UPGRADE PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Current Revenue
Fund Balance - W/S Fund
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
Supplemental Sales Tax
ADDITIONAL COMMENTS:
TOTAL ESTIMATED CAPITAL COST:
12,000 SCADA Upgrade
$12,000
85,000
$97, 000
$0
$97,000 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design
XX Preliminary Design %
Final Plans
Specifications %
Construction %
93,400
$93,400
0%
0%
0%
0%
0%
253
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: 7-26-99
Submitted By: RANDY BYERS Date Completed:
Project Title: DISINFECTION MODIFICATION
Project Type: WATER Sub -Type: WATER PRODUCTION
Project No.: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Project consists of adding ammonia injection facilities at each of our five well sites.
JUSTIFICATION:
The EPA, TNRCC, and SDWA mandate disinfection by-product limits. If our test results indicate non-
compliance, we will need to modify our disinfection process or cease well operations.
* The need for this may never happen; however it could happen within the year.
254
PROJECT TITLE: DISINFECTION MODIFICATION PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Modification
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
250,000
$250,000
0%
0%
0%
0%
0%
255
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: 6-29-00
Submitted By: RICK HEROLD Date Completed:
Project Title: EFFLUENT WATER MAIN
Project Type: WATER Sub -Type: INSTALLATION
Project No.: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Effluent water main from City of Ft. Worth, Village Creek Wastewater Treatment Facility to the Texas Star
property.
JUSTIFICATION:
This source of water would ensure that we could continue water in the event of drought and mandatory water
restrictions,
256
PROJECT TITLE: EFFLUENT WATER MAIN PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
Car Rental Tax
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Installation
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
1,500,000
$1,500,000
0%
0%
0%
0%
0%
257
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: 7-21-00
Submitted By: ANDREA BAXTER Date Completed:
Project Title: SH 360 WATER CROSSING
Project Type: WATER Sub -Type: MAINS
Project No.: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project is related to the DFW International Airport Master Plan for property in Euless.
PROJECT DESCRIPTION:
This project consists of the extension of three water mains across SH 360 right-of-way to provide water service
to a portion of the DFW Airport property.
JUSTIFICATION:
Development on the airport property will increase the City's tax revenues. The mains should be extended prior
to construction of the main lanes of SH 360.
258
PROJECT TITLE: SH 360 WATER CROSSING PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering
Construction
$0
$0
$0
Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design
Preliminary Design
Final Plans
Specifications %
Construction %
30,000
270,000
$300,000
0%
0%
0%
0%
0%
259
City of Euless
Capital Project Request
Department: WATER PRODUCTION
Submitted By: RANDY BYERS
Project Title: REHAB CENTRAL DR. WATER STORAGE TANK
Project Type: WATER Sub -Type: TANK
Project No.: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Date Prepared: 6-21-00
Date Completed:
Inspect and determine needs and complete rehab of Central Dr. ground storage tank.
JUSTIFICATION:
This facility is nearing 50 years of age. An inspection of structural integrity should be made. Any needed repairs
or upgrades, including removal of lead based paint, to bring this tank into compliance with current regualtions.
260
PROJECT TITLE: REHAB CENTRAL DR. STORAGE TANK PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Rehab
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design °A°
Final Plans %
Specifications %
Construction %
500,000
$500,000
0%
0%
0%
0%
0%
261
City of Euless
Capital Project Request
Department: WATER PRODUCTION Date Prepared: 6-21-00
Submitted By: RANDY BYERS Date Completed:
Project Title: REHAB/REBUILD FULLER DR. GROUND STORAGE TANK
Project Type: WATER Sub -Type: TANK
Project No.: Priority: B
RELATIONSHIP TO OTHER PROJECTS ANDIOR MASTER PLAN:
PROJECT DESCRIPTION:
Inspect and determine structural condition of Fuller Dr. ground storage tank. Make needed repairs from rehab to
rebuild as necessary.
JUSTIFICATION:
This facility is one of the earliest ground storage tanks. It is nearing 50 years of age and is in need of repairs.
The tank may be found to be structurally unsound and would need to be rebuilt.
262
PROJECT TITLE: REHAB/REBUILD FULLER GROUND TANK PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Rehab/Rebuild
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
200,000
$200,000
0%
0%
0%
0%
0%
263
City of Euless
Capital Project Request
Department: WATER DISTRIBUTION
Submitted By: RANDY BYERS
Project Title: W. PIPELINE WATERMAIN REPLACEMENT
Project Type: WATERLINE REPLACEMENT Sub -Type:
Project No.: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Needs to be completed prior to maintenance to roadway.
PROJECT DESCRIPTION:
Date Prepared: 6-15-00
Date Completed:
Replace approximately two (2) miles of 12" water main on W. Pipeline Road from Central Drive to West Cit;!
Limits,
JUSTIFICATION:
This waterline is large and deep. It suffers from deterioration and many leaks have had to be repaired. Needecl
roadway maintenance is being delayed until this line is replaced.
264
PROJECT TITLE: W. PIPELINE WATERMAIN REPLACEMENT PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Water Main Replacement
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
1,000,000
$1,000,000
0%
0%
0 °/a
0°/a
0%
265
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: ANDREA BAXTER
Project Title: SH 183 WATER CROSSING
Project Type: WATER Sub -Type: MAINS
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
TxfOT plans to wirian SH 1RR within the naxt 1n vaarc
PROJECT DESCRIPTION:
Date Prepared: 7-21-00
Date Completed:
The City has a 24" water main and many other smaller mains that will have to be relocated. The
scope/magnitude of relocation work is unknown at this time.
JUSTIFICATION:
Required where conflicts will occur with TxDOT's highway project.
266
PROJECT TITLE: SH 183 WATER CROSSING PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Ooeratina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
xX
TOTAL ESTIMATED CAPITAL COST:
The cost of this project is currently unkown.
so
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design
Final Plans %
Specifications %
Construction %
The scope of work will be determined as TxDOT completes the highway reconstruction plans.
0%
0%
0%
0%
0%
267
City of Euless
Capital Project Request
Department: WATER PRODUCTION
Submitted By: RANDY BYERS
Project Title: WELL REHABILITATION
Project Type: WATER Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Date Prepared: 6-21-00
Date Completed:
Inspect all deep wells to determine condition of well pipe, casing, screens and gravel packing and rehabilitate all
that are found to be in need.
JUSTIFICATION:
Wells are old and heavily used. All five deep wells need to be rehabilitated according to needs determined by
inspection.
268
PROJECT TITLE: WELL REHABILITATION PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
xx
TOTAL ESTIMATED CAPITAL COST:
Well Rehabilitation
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
750,000
$750,000
0%
0%
0%
0%
0%
269
270
OthRr UnfundRd ProJRct6
Project Description
OTHER PROJECTS
Bell Ranch Terrace
Parks & Greenhouse r"
Villages Master Plan "'
Sub -Total Other Priority A
Building A Remodel
Building B Remodel (4)
Building D Remodel (2)
Four New Playgrounds (2)
Infrastructure Management Software rn
Texas Star Conference Cntr, Phase II rn
Trinity Screen Wall (2)
Sub -Total Other Priority B
Aquatic Center
Community Golf Course at Bob Eden Park
Conversion & Expansion of Ruth Millican Cntr
Expansion & Upgrade of Bob Eden Park
Expansion of Recreation Center
Fire Station #3 Reconstruction
Fire Training Facility
New Public Works Facility
Parks at Texas Star, Phase III
Parks at Texas Star, Phase IV
Redevelopment of Westpark
SH 10 Land Acquisition
Softball World
Priority Estimated Cost
CAPITAL IMPROVEMENT PROGRAMS
UNFUNDED PROJECTS - SORTED BY TYPE
PROPOSED METHOD OF FINANCING
County,
Operating CIP Fund Bond State, Impact Escrow Hotel /
Fund Balance Sale Federal Fees Funds Motel
Funds
A I $ 200,000
A I $ 1,200,000I I
A I $ 100,000 I I
$ 1,500,000
B $ 892,000
B $ 738,750
B $ 805,600
B $ 400,000
B $ 500,000
B $ 3,350,000
B $ 250,000
$ 6,936,350
C $ 4,000,000
C $ 4,000,000
C $ 600,000
C $ 2,000,000
C $ 2,500,000
C $ 1,500,000
C $ 1,200,000
C $ 2,253,250
C $ 4,400,000
C $ 10,000,000
C $ 2,500,000
C $ 3,000,000
C TBD
Sub -Total Other Priority C $ 37,953,250
OTHER PROJECTS - TOTAL $ 46,389,600
"r - Projected FY 2001
(2) - Projected FY 2002
rn - Projected FY 2003
(4) - Projected FY 2004
(5) - To be paid from interest eamed on Main Street bond proceeds.
A - Projects that will be presented to Council during the upcoming year.
B - Projects that will be presented to Council wthin two to five years.
C - Projects that will be presented to Council beyond five years.
XX
XX
XX
XX
Car
Rental
Tax
XX
XX
XX
XX
XX
XX
EDC
To Be
Determined
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
City of Euless
Capital Project Request
Department: ECONOMIC DEVELOPMENT Date Prepared: 7-7-00
Submitted By: ANDREA BAXTER Date Completed:
Project Title: BELL RANCH TERRACE
Project Type: MISC Sub -Type:
Project No.: Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project would facilitate the development of the remaining phase of Bell Ranch Terrance in accordance
with the City's Land Use Plan.
PROJECT DESCRIPTION:
Assist in infrastructure installation or other type of incentive or assistance, as negotiated through a City -
Developer Agreement.
JUSTIFICATION:
Land is vacant (45+ acres) and currently has over 60 property owners. Land should be consolidated and
developed to increase the number of residential units in Euless and increase tax base.
272
PROJECT TITLE: BELL RANCH TERRACE PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
Car Rental Tax
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Construction
so
so
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans °A.
Specifications %
Construction %
200,000
$200,000
273
City of Euless
Capital Project Request
Department: SUPPORT SERVICES
Submitted By: TOM COX
Project Title: PARKS & GREENHOUSE
Project Type: NEW CONSTRUCTION
Project No.:
Sub -Type:
Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 6-27-00
Date Completed:
The Parks and Greenhouse Department will be the second project of the master plan Construction is to begin
in May 2001 and scheduled to be complete by December 2001.
PROJECT DESCRIPTION:
Two new buildings and site improvements will be constructed to accommodate the Parks Department and the
proposed Greenhouse. The buildings will be located on S. Pipeline adjacent to the existing Golf Course
Management Building. The total proposed cost of this project is $1,200,000 (construction cost based on current
cost).
JUSTIFICATION:
Relocating the Parks/Greenhouse Department to a new facility from Midway Drive and Pauline Drive to meet the
expanding needs of the department.
274
PROJECT TITLE: PARKS & GREENHOUSE PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Utilities
Insurance
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
Car Rental Tax
ADDITIONAL COMMENTS:
TOTAL ESTIMATED CAPITAL COST:
Planning, Design and
Engineering
Construction
$0 Right -of -Way
Utility Relocation
Landscaping
Appraisal Services
Surveying
$0
4,800
750
$5,550
$5,550 Total Estimated Capital Cost
XX
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
1,200,000
$1,200,000
275
City of Euless
Capital Project Request
Department: ECONOMIC DEVELOPMENT Date Prepared: 7-7-00
Submitted By: ANDREA BAXTER Date Completed:
Project Title: VILLAGES MASTER PLAN
Project Type: PLANNING STUDY Sub -Type:
Project No.: Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project involves the preliminary development of a Master Plan for the land bounded by 360 on the east,
Harwood on the north, existing development on the west, and 183 on south (old mall site plus Van Riet, Ardinger
and DFW properties).
PROJECT DESCRIPTION:
Commission a study to determine the highest and best use of this valuable commercial land.
JUSTIFICATION:
Poor planning can result in lower than desired tax revenue, hodge podge development activity, and less than
optimal development quality. City needs to be proactive to guide the development of these vital tracts.
276
PROJECT TITLE: VILLAGES MASTER PLAN PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
Car Rental Tax
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Planning Study
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
100,000
$100,000
0%
0%
0%
0%
0%
277
City of Euless
Capital Project Request
Department: SUPPORT SERVICES
Submitted By: TOM COX
Date Prepared: 6-27-00
Date Completed:
Project Title: BUILDING A
Project Type: BUILDING/FACILITIES Sub -Type: REMODEL
Project No.: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
RiiiUiinn A will ha tha fniirth nrnjart of tha macter plan. (`.nnctnirtinn is to bpnin in Marrh 2nn3 and scheduled
for completion in October 2003.
PROJECT DESCRIPTION:
Building A (Downstairs area) will be renovated to accommodate the new City Council Chambers and Pre -
Council and conference rooms. Construction costs will be $892,000 (construction cost based on current costs).
JUSTIFICATION:
Relocating the Fire Administration and Purchasing Departments to the renovated Building D in July 2002.
Downstairs offices will be renovated to accommodate the City Council Chambers, which are currently located
in Building B. This will allow for office expansion in Building B for Finance, Insurance and Human Resources
Departments.
278
PROJECT TITLE: BUILDING A PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Remodel
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans
Specifications
Construction
892,000
$892,000
279
City of Euless
Capital Project Request
Department: SUPPORT SERVICES
Submitted By: TOM COX
Project Title: BUILDING B
Project Type: RENOVATION Sub -Type:
Project No.: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 6-27-00
Date Completed:
Ri_iilrlinn R will ha the sixth anrd final nrniPr.t to ha r.mmpleterl in the master plan r.nnstriir.tion to hegin in _laniiary
2004 and scheduled to be completed June 2004.
PROJECT DESCRIPTION:
To provide a more efficient work space area, Building B will be remodeled to expand the layout for the following
departments: Finance, Water Billing Office, Insurance and Human Resources. Community Services, Municipal
Courts and the City Council Chambers will all be relocated in other buildings. Construction costs will total
$738,750 (construction cost based on current cost).
JUSTIFICATION:
Municipal Courts Department and Community Services offices will be relocated to other sites before construction
commences. Renovation of Building B will provide more efficient work space area for Finance, Water
Department, Insurance and Human Resource Department offices.
280
PROJECT TITLE: BUILDING B PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Remodel
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans
Specifications %
Construction %
738,750
$738,750
281
Department:
Submitted By:
Project Title:
Project Type:
Project No.:
City of Euless
Capital Project Request
SUPPORT SERVICES
TOM COX
BUILDING D
BUILDING
Date Prepared: 6-27-00
Date Completed:
Sub -Type: RENOVATION
Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Building D will be the third project of the master plan. Construction to begin in January 2002 and scheduled for
completion in July 2002.
PROJECT DESCRIPTION:
Building D, which now houses the Police Department, will be renovated to accommodate the future office
expansion of Fire Administration, Information Services and Purchasing, with a storage and receiving area.
Construction cost will be $805,600 (construction cost based on current cost).
JUSTIFICATION:
Relocating the Police Department to new facility on Hwy 10 in October 2001, freeing space to renovate Building
D to accommodate the expansion needs of the Fire Administration, Information Services and Purchasing
Departments.
282
PROJECT TITLE: BUILDING D PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
TOTAL ESTIMATED CAPITAL COST:
Remodel
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design
Preliminary Design %
XX Final Plans %
Specifications %
Construction %
805,600
$805,600
283
Department:
Submitted By:
Project Title:
Project Type:
Project No.:
City of Euless
Capital Project Request
COMMUNITY SERVICES
RICK HEROLD
FOUR NEW PLAYGROUNDS
LAND
Date Prepared: 7-10-00
Date Completed:
Sub -Type: IMPROVEMENT
Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
These projects have been outlined as needed by staff and the parks board. Parks infrastructure is to be
addressed in the Master Plan.
PROJECT DESCRIPTION:
Add four additional playgrounds across the parks system as a continuance of parks infrastructure upgrade.
JUSTIFICATION:
Demand of users and removal of old and dangerous units facilitates this need. Improved service to Euless
citizens with young families.
284
PROJECT TITLE: FOUR NEW PLAYGROUNDS PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Revenue
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
Supplemental Sales Tax
Car Rental Tax
ADDITIONAL COMMENTS:
TOTAL ESTIMATED CAPITAL COST:
Construction
$0
$2,000
$2,000
so
$2,000 Total Estimated Capital Cost
XX
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications
Construction %
400,000
$400,000
285
City of Euless
Capital Project Request
Department: ECONOMIC DEVELOPMENT Date Prepared: 7-7-00
Submitted By: ANDREA BAXTER Date Completed:
Project Title: INFRASTRUCTURE MANAGEMENT SOFTWARE
Project Type: MISC Sub -Type:
Project No.: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Purchase of infrastructure management software, creation of databases and initiation of analytical method for
monitoring water, wastewater, roadway and drainage infrastructure. This tool is essential as the City's
infrastructure increases in age and quantity. This tool will assist Public Works in scheduling Capital
Improvement needs.
JUSTIFICATION:
The volume of infrastructure dictates an analytical/database/computerized system for tracking and planning.
286
PROJECT TITLE: INFRASTRUCTURE MANAGEMENT SOFTWARE PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
Special Proiect Fund
ADDITIONAL COMMENTS:
TOTAL ESTIMATED CAPITAL COST:
Software/Hardware and
50,000 Database Creation
Training
$50,000
$50,000
$0
$50,000 Total Estimated Capital Cost
XX
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
500,000
$500,000
0%
0%
0%
0%
0%
287
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: 7-7-00
Submitted By: RICK HEROLD Date Completed:
Project Title: TEXAS STAR CONFERENCE CENTER, PHASE II
Project Type: BUILDING/FACILITY Sub -Type: REMODEL
Project No.: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
NPPriPri to imnrovP overall Texas Star Golf Course and Conference Center operation. This will allow areater
flexibility, improve service levels, and provide better working conditions for staff.
PROJECT DESCRIPTION:
Proposed expansion of Texas Star Clubhouse by increasing overall square footage through a planned
expansion program. New construction will be three tier (downstairs stage, current level to improve catering
and office support, and upstairs to add meeting rooms and board rooms). In addition, the kitchen would be
enlarged and addition of 19th hole to pro -shop to pro -shop to pavilion merits additional study.
JUSTIFICATION:
Would greatly increase the functionality of the facility and would provide for additional programming
opportunities. Would allow Texas Star to be ahead of the competition while improving conditions for present
staff.
288
PROJECT TITLE: TEXAS STAR CONFERENCE CENTER, PHASE II PROJECT #:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Design 250,000
Personnel: Full Time Construction 2,250,000
Part Time $20,000
Total Salary $20,000
Purchase of Services
Materials & Supplies 6,000
Utilities 15,000
Subtotal: 41,000
Maintenance Costs 10,000
Subtotal: $10,000
Total Estimated Annual Cost
$51,000 Total Estimated Capital Cost $2,500,000
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design % 0%
Fund Balance Preliminary Design % 0%
Certificate of Obligation Final Plans % 0%
County, State, Federal Funding Specifications % 0%
General Obligation Bonds Construction % 0%
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
Car Rental Tax XX
ADDITIONAL COMMENTS:
289
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES
Date Prepared: 7-19-00
Submitted By: RICK HEROLD Date Completed:
Project Title: TRINITY SCREEN WALL
Project Type: MISC Sub -Type:
Project No.: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Orninn+ is hninn nnnnccifnlnrl h‘i Cf \A/nrfh'c Trinih, Blvd rnnd nnncfru irfinn nrniort
PROJECT DESCRIPTION:
Construction of screening walls along Trinity Blvd to mitigate some of the negative influences created by the
construction of the six lane boulevard street section.
JUSTIFICATION:
Needed to maintain the existing environment and setting of the Texas Star Golf Course.
290
PROJECT TITLE: TRINITY SCREEN WALL PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
Car Rental Tax
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Construction
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications
Construction %
250,000
$250,000
291
Department:
Submitted By:
Project Title:
Project Type:
Project No.:
City of Euless
Capital Project Request
COMMUNITY SERVICES
RICK HEROLD
AQUATIC CENTER
BUILDING
Date Prepared: 7-10-00
Date Completed:
Sub -Type: NEW CONSTRUCTION
Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The completion of Master Plan is anticipated for October 2000. The relationship with other projects is still
pending based on the final approve plan.
PROJECT DESCRIPTION:
Develop an aquatic center at Midway Park with emphasis on recreational play of citizens. Tremendous
opportunity to build in conjunction with the enlargement of the recreation center.
JUSTIFICATION:
Three (3) thirty year old pools which are outdated and the City totally needs to upgrade our aquatic offerings to
our citizens.
292
PROJECT TITLE: AQUATIC CENTER PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Pool & Building Maintenance
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Revenue
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
To be determined
Grant Possible
ADDITIONAL COMMENTS:
TOTAL ESTIMATED CAPITAL COST:
$50,000 Engineering
$0 Construction
$50,000
$35,000
$85,000
65,000
$65,000
$150,000 Total Estimated Capital Cost
XX
CURRENT STATUS:
Conceptual Design %
Preliminary Design
Final Plans %
Specifications %
Construction %
We believe all operating costs would be more than covered from anticipated revenues.
350,000
3,650,000
$4,000,000
293
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: 7-10-00
Submitted By: RICK HEROLD Date Completed:
Project Title: COMMUNITY GOLF COURSE AT BOB EDEN
Project Type: LAND Sub -Type: IMPROVEMENTS
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The completion of the Master Plan is anticipated in October of 2000. The relationship with other protects is still
pending based on the final approved plan.
PROJECT DESCRIPTION:
Develop 18-hole community golf course, primarily aimed at Euless Citizens, featuring Bermuda greens, limited
clubhouse, and ease of play.
JUSTIFICATION:
Meet community golf needs while taking advantage of scenic areas and preserving necessary green space.
This facility would be awesome for seniors, ladies, junior and beginning golfers. Increase land value of
neighborhood.
294
PROJECT TITLE: COMMUNITY GOLF COURSE AT BOB EDEN PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Qoeratina Cost,
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Course Maintenance
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Revenue
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
To Be Determined
ADDITIONAL COMMENTS:
TOTAL ESTIMATED CAPITAL COST:
$200,000 Engineering
$75,000 Construction
$275,000
$40,000
$200,000
$515,000
400,000
$400,000
$915,000 Total Estimated Capital Cost
XX
1
1
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
We recommend that all debt and operation costs should be absorbed through the users.
350,000
3,650,000
$4,000,000
TBD
295
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES
Submitted By: RICK HEROLD
Date Prepared: 7-10-00
Date Completed:
Project Title: CONVERT & EXPAND RUTH MILLICAN
Project Type: BUILDING/FACILITY Sub -Type: EXPANSION
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The completion of the Master Plan is anticipated in October 2000. The relationship with other projects is still
pending based on the final approved plan.
PROJECT DESCRIPTION:
Redevelop Ruth Millican building to Ruth Millican Senior Center through adding seniors weight area, activity
room, arts and crafts area, kitchen, and office space. Ties in beautifully with Heritage Park.
JUSTIFICATION:
Need to continue to address the needs of the aging population and RMC allows Euless to do such with
extremely limited funding.
296
PROJECT TITLE: CONVERT & EXPAND RUTH MILLICAN PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Custodial Services
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Revenue
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
To Be Determined
ADDITIONAL COMMENTS:
TOTAL ESTIMATED CAPITAL COST:
$40,000 Engineering
$20,000 Construction
$60,000
$15,000
$75,000
$15,000
$15,000
$90,000 Total Estimated Capital Cost
XX
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
$70,000
$530,000
$600,000
TBD
297
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: 7-10-00
Submitted By: RICK HEROLD Date Completed:
Project Title: EXPANSION & UPGRADE OF BOB EDEN PARK
Project Type: LAND Sub -Type: IMPROVEMENT/EXPANSION
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The completion of Master Plan is anticipated for October 2000. The relationship with other projects is still
pending based on the final approve plan.
PROJECT DESCRIPTION:
Redevelop Bob Eden Park, taking advantage of new Mid -Cities alignment and address park aesthetic issues
caused by such. Additional irrigation, trail system, soccer fields, parking and disc golf course.
JUSTIFICATION:
Realignment of Mid -Cities has increased the need to update park infrastructure. Taking advantage of new park
land, and adding needed improvements at one of Euless' most utilized facilities.
298
PROJECT TITLE: EXPANSION & UPGRADE OF BOB EDEN PARK PROJECT #:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time Engineering 175,000
Part Time Construction 1,825,000
Total Salary $0
Purchase of Services $10,000
Materials & Supplies $8,500
Utilities
Subtotal: $18,500
Maintenance Costs
Contract Mowing 25,000
Subtotal: $25,000
Total Estimated Annual Cost
$43,500 Total Estimated Capital Cost $2,000,000
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Revenue
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
To Be Determined XX
Grant $500,000
ADDITIONAL COMMENTS:
Conceptual Design %
Preliminary Design %
Final Plans
Specifications
Construction
TBD
299
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: 7-10-00
Submitted By: RICK HEROLD Date Completed:
Project Title: EXPANSION OF RECREATION CENTER
Project Type: BUILDING Sub -Type: EXPANSION
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The completion of the Master Plan is anticipated in October 2000. The relationship with other projects is still
pending based on the final approved plan.
PROJECT DESCRIPTION:
Add a larger weight room, full-size aerobics room, additional classroom space, increase walking track and
additional storage/classroom space to meet the needs of Euless citizens.
JUSTIFICATION:
Demand necessitates increasing the facility while substantially increasing program opportunities.
300
PROJECT TITLE: EXPANSION OF RECREATION CENTER PROJECT #:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time $60,000 Engineering 300,000
Part Time $20,000 Construction 2,200,000
Total Salary $80,000
Purchase of Services
Materials & Supplies
Utilities $12, 000
Subtotal: $92,000
Maintenance Costs
Custodian Service 15,000
Subtotal: $15,000
Total Estimated Annual Cost
$107,000 Total Estimated Capital Cost $2,500,000
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Revenue
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
Supplemental Sales Tax
To Be Determined XX
Grant Possible $600,000
ADDITIONAL COMMENTS:
Conceptual Design %
Preliminary Design
Final Plans %
Specifications
Construction
TBD
301
City of Euless
Capital Project Request
Department: FIRE Date Prepared: 7-19-00
Submitted By: LEE KOONTZ Date Completed:
Project Title: FIRE STATION #3 RECONSTRUCTION
Project Type: BUILDING Sub -Type: RECONSTRUCTION
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Not related to other projects.
PROJECT DESCRIPTION:
Fire Station #3, located at 201 W. Euless Blvd. Should be demolished and reconstructed on -site. The project
should take 12 months to complete.
JUSTIFICATION:
This fire station was constructed in a remodeled 30 plus year old structure. The building is experiencing
foundation problems and is structurally challenged. Additionally, the building is not large enough to adequately
house the personnel assigned to this station.
302
PROJECT TITLE: FIRE STATION #3 RECONSTRUCTION PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Construction
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction
1,500,000
$1,500,000
303
Department: FIRE
Submitted By: LEE KOONTZ
City of Euless
Capital Project Request
Date Prepared: 7-19-00
Date Completed:
Project Title: FIRE TRAINING FACILITY
Project Type: BUILDING Sub -Type: NEW CONSTRUCTION
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The site of the training facility will be behind fire station #2 on Westpark Way and will share land with the -
proposed future Public Works and Warehouse facility.
PROJECT DESCRIPTION:
This project will be the construction of a fire training facility that will consist of a four-story fire training tower, burn
building and pad site for apparatus operation.
JUSTIFICATION:
This facility is needed to provide training for fire department personnel. Currently it is necessary to send our
people out of the City to receive training and often it requires the payment of substantial amounts of overtime.
The facility would also give us additional credit towards our insurance rating by ISO.
304
PROJECT TITLE: FIRE TRAINING FACILITY PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR •) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Construction
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design
Preliminary Design
Final Plans %
Specifications %
Construction %
1,200,000
$1,200,000
305
City of Euless
Capital Project Request
Department: SUPPORT SERVICES Date Prepared: 6-27-00
Submitted By: TOM COX Date Completed:
Project Title: PUBLIC WORKS FACILITY
Project Type: BUILDING/FACILITY Sub -Type: NEW CONSTRUCTION
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
pi ihlir 1A/nrkc pooility mill ha tho fifth nrniort to ho rmmplotort in tho rn3ctor Non.
PROJECT DESCRIPTION:
A new building site will be constructed to accommodate the Public Works Facility. The new building will be
located adjacent to the Fire Station No. 2 and Animal Shelter along Westpark Way and Pipeline Road. Total
construction cost will be $2,253,250 (construction cost based on current cost).
JUSTIFICATION:
Relocating the Public Works Facility to a new building site to allow for present and future expansion needs and
plans.
306
PROJECT TITLE: PUBLIC WORKS FACILITY PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Utilities
Cleaning
Insurance
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
TOTAL ESTIMATED CAPITAL COST:
Planning, Design and
Engineering
$0 Construction
Right -of -Way
Utility Relocation
Landscaping
Appraisal Services
Surveying
$0
6,000
4,800
2,500
$13,300
$13,300 Total Estimated Capital Cost
XX
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans 13/0
Specifications
Construction %
2,253,250
$2,253,250
307
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: 7-7-00
Submitted By: RICK HEROLD Date Completed:
Project Title: PARKS AT TEXAS STAR, PHASE III
Project Type: LAND Sub -Type: IMPROVEMENTS
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
fnmplPtinn of Master Plan is antiripatarl in ()r:tnhar 2000 RPlatinnship with nthar prniPrts is still p ndina
based on the final approved plan.
PROJECT DESCRIPTION:
And four plex, in -line hockey, skate park and parking and related infrastructure.
JUSTIFICATION:
Continue Parks at Texas Star Master Plan as committed to citizens with the passage of the 1/2 Cent Sales
Tax.
308
PROJECT TITLE: PARKS AT TEXAS STAR, PHASE III PROJECT #:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time Design 400,000
Part Time $30,000 Construction 4,000,000
Total Salary $30,000
Purchase of Services
Materials & Supplies 11,500
Utilities 12,000
Subtotal: $53,500
Maintenance Costs 21,500
Subtotal: $21,500
Total Estimated Annual Cost
$75,000 Total Estimated Capital Cost $4,400,000
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design % 0%
Fund Balance Preliminary Design % 0%
Certificate of Obligation Final Plans % 0%
County, State, Federal Funding Specifications % 0%
General Obligation Bonds Construction % 0%
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined XX
Grant Possible $500,000
ADDITIONAL COMMENTS:
309
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: 7-10-00
Submitted By: RICK HEROLD Date Completed:
Project Title: PARKS AT TEXAS STAR, PHASE IV
Project Type: LAND Sub -Type: IMPROVEMENT
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS ANDIOR MASTER PLAN:
The completion of the Master Plan is anticipated in Octnher 2000 The relationship with nther nrn ants is still
pending based on the final approved plan.
PROJECT DESCRIPTION:
Remaining build -out of baseball/softball, soccer, playground, parking and related infrastructure.
JUSTIFICATION:
Continue Parks at Texas Star Master Plan as committed to citizens with the passage of the 1/2 cent sales tax.
310
PROJECT TITLE: PARKS AT TEXAS STAR, PHASE IV PROJECT #:
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time $40,000 Engineering 500,000
Part Time $20,000 Construction 9,500,000
Total Salary $60,000
Purchase of Services
Materials & Supplies
Utilities $15,000
Subtotal: $75,000
Maintenance Costs
Turf Maintenance $15,000
Subtotal: $15,000
Total Estimated Annual Cost
$90,000 Total Estimated Capital Cost $10,000,000
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Revenue
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
To Be Determined XX
Grant $'s unknown
ADDITIONAL COMMENTS:
Conceptual Design %
Preliminary Design %
Final Plans
Specifications %
Construction
TBD
311
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared: 7-10-00
Submitted By: RICK HEROLD Date Completed:
Project Title: REDEVELOPMENT OF WESTPARK
Project Type: LAND Sub -Type: IMPROVEMENT
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The completion of the Master Plan is anticipated in October 2000. The relationship with other projects is still
pending based on the final approved plan.
PROJECT DESCRIPTION:
Redevelop Westpark by creating an outstanding neighborhood park for citizens. Create a new design with a
gazebo, pavilion, trails, open space, restrooms, land landscaping. Further, to develop the land that is currently
unused into trail and green preservation.
JUSTIFICATION:
Needed updates to a deteriorating park to better facilitate Westpark/Wilshire neighborhoods.
312
PROJECT TITLE: REDEVELOPMENT OF WESTPARK PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Mowing
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Revenue
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Donations
To Be Determined
ADDITIONAL COMMENTS:
TOTAL ESTIMATED CAPITAL COST:
$0 Engineering
$12,000 Construction
$12,000
$10,000
$22,000
20,000
$20,000
$42,000 Total Estimated Capital Cost
XX
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
200,000
2,300,000
$2,500,000
TBD
313
City of Euless
Capital Project Request
Department: ECONOMIC DEVELOPMENT Date Prepared: 7-7-00
Submitted By: ANDREA BAXTER Date Completed:
Project Title: S.H. 10 LAND ACQUISITION
Project Type: MISC Sub -Type:
Project No.: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project is potentially tipri to the Texas Star Sport Centre anti the 2fl12 Olympir__g. The nrn ert is r.Prtainly
tied to the City's desire to encourage redevelopment of blighted areas. The project is identified on the.
Strategic Plan for Economic Development.
PROJECT DESCRIPTION:
The purchase is approximately 22 acres.
JUSTIFICATION:
Required for facilitating redevelopment or for park use.
314
PROJECT TITLE: S.H. 10 LAND ACQUISITION PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Land Acquisition
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
Staff desires approximately $1,000,000 per year, for a three period beginning 2000/2001
3,000,000
$3,000,000
50%
0%
0%
0%
0%
315
Department:
Submitted By:
Project Title:
Project Type:
Project No.:
City of Euless
Capital Project Request
COMMUNITY SERVICES
ANDREA BAXTER
SOFTBALL WORLD
BUILDING/FACILITIES
Date Prepared: 7-21-00
Date Completed:
Sub -Type: REMODEL
Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Thic nrniart is rnncictant with tha rity'c Parkc Macter Plan
PROJECT DESCRIPTION:
Capital improvements including: 1) the remodeling of existing buildings; 2) field, lighting, parking, entrance,
irrigation, etc upgrades and 3) general renovation.
JUSTIFICATION:
Required to keep Softball World viable.
316
PROJECT TITLE: SOFTBALL WORLD PROJECT #:
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue bonds
Impact Fees
Escrow Funds
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Project cost to be determined.
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
0%
0%
0%
0%
0%
317
318
Protect
Number
Protect Description
DRAINOI9E PROJECTS
11DR9901 Sulphur Branch Phase II
DR9902 Windlea & WestCliff
Sub -Total Dralnaoo Protects
'STREET PROJECTS
PS9911 'Overlay Proiects
Sub -Total Street Protects
WASTEWATER PROJECTS
W W 9901
W W9902
WW9903
WW9904
Project
Budget
$123.404
$4.396
5127.800
$294.687
$294.687
CDBG B98-UC-48-0001/895-22-50 I $150.000
Impact Fee Study 1 $13.000
Misc Sewer Rehab FY99 I $50000
Hydraulic Analysis i $27.000
Sub -Tate/ Wastewater Protects 1 590,000
WATER?ROJECTS
WT9901 Meter Chanoe Out Proaram
WT9903 Master Plan
WT9904 I FY1999 Well Repairs
WT9905
WT9906
WT9907
WT9911
WT0002
FY1999 Misc Water Rehab
Hwv 10 Water Line
Impact Fee Study
Water Distribution - Master Plan
Emeroencv Repair - Hwv 10
WT0004 'Water Line Milam - Ector/Midwav
WT0006 I Central Drive Water Mains
Sub -Total Water Protects
OTHER
PR0015 I Purchase of Dallas StarsCenter
SS9901 1 Fire Station II
ecom o I cirp Station #3 - Structural Repairs
Sub -Total Other Protects
$101.917
$42.000
$66.921
$50.000
$150.000
$13.000
$25.600
$15.450
$18.248
$92.814
$449,438
$10.327.978
S49.688
S30.000
$10,377.666
TOTAL COMPLETED PROJEC3I $11,339,591
Street Fund
$294.687
$294,687
Drainage
Fund
$120.128
$1.159
$121,287
Water &
Sewer CIP
Fund
$72.927
S12.987
512.987
$98.365
55.445
$66.921
S43.749
$138.884
CAPITAL IMPROVEMENTS PROGRAM
COMPLETED PROJECTS SUMMARY
BUDGET AMOUNT AS OF JUNE 30. 2000
ACTUAL EXPEND TURES
Impact Fee
Fund
$12.238
S27.000
$39,238
$12.238
S24.000
$14.214
$13.743
S90.742
$353.364 $36.238
5294.687 $121,287 $366.351
S75,476
Half Cent
Sales Tax
Fund
Police
Facility CIP
Fund
General CIP
Fund
S10.327.978
$49 688
$17 344
$10.377.666
$10.377,666
Escrow
Funds
Unfunded(
Funding
Pending
Other
Funding
Total Project
Cost
Variance
Expenditures
to Budget
5120.1281 ($3.27611
$1.1591 ($3.23711
$121,287 I ($6.51311
$294.6871 SO I
$294.687 I SO I
572 927 (S77 073\t
$12 238 ($762
$12 987 ($37 0131
$27 000 1 SO
552.225I (037.77511+
$98 365 ($3.5521
$5 445 (536 555',
$66 921 SO
$43 749 (S6.2511
$138884 ($11116.
$12 238 ($7621
$24 000 (51 6001
$14 214 ($1.2361.1
$13 743 (54 5051
$90 742 ($2 0721
5389,602 (559,,836d
S10327 978 S0
$49 688 ($011
$17,344
$10,
320
Project
Number Proiect Description
DRAINA2E PROJECTS
DR9901 (Sulphur Branch Phase II
DR9902 1 Windlea & WesiCliff
Sub-Tots/Ora/nape Profects
Project
Budget
S123.404
Street Fund
Drainage
Fund
Water 8
Sewer CIP
Fund
S120 128 1 1
54.396 1 1 S1.159 1 1
CAPITAL IMPROVEMENTS PROGRAM
COMPLETED PROJECTS SUMMARY
BUDGET AMOUNT AS OF JULY 20. 2000
ACTUAL EXPENDIT,J,RES
Impact Fee
Fund
Half Cent
Sales Tax
Fund
Police
Facility CIP
Fund
Fire
Facility
CIP Fund
Escrow
Funds
Unfunded/
Funding
Pending
Other
Funding
Total Project
Cost
Variance
Expenditures
to Budget
S120.128 (53276)
1 I 1 51.159 (S3.237)
S127,800 S121,287 S121,287 (56,513)
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: SULPHUR BRANCH PHASE II
Project Type: DRAINAGE Sub -Type:
Project No.: DR9901 Priority: A
COUNCIL AUTHORIZATION:
October 13, 1998 - Approved the acquisition of Right -of -Way
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Date Prepared: 7-20-99
Date Completed: 8-01-99
The Sulphur Branch channelization project was the number one needed project identified in the 1990 study
prepared by Knowlton, English and Flowers.
PROJECT DESCRIPTION:
This project includes the drainage work to be performed on Sulphur Branch south of SH 10. The work was
performed by the Corps of Engineers. The City's financial participation in this project is complete.
JUSTIFICATION:
To improve the flow through the original Sulphur Branch project and remove 40 properties from the 100 year
floodplain.
322
PROJECT TITLE: SULPHUR BRANCH PHASE II PROJECT #: DR9901
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct ODeratina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
JUUlU ld1.
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Appraisal Services
Surveying Services
Land Purchases
Storm Sewers
(Expenses prior to FY99 not reflected)
TOTAL ESTIMATED CAPITAL COST:
Land Purchases
Storm Sewers
$0 Surveying
Appraisal Services
$0 T�
$0
$0 Total Estimated Capital Cost
CURRENT STATUS
BUDGET
600
4,500
89,000
29,304
EXPENDED
600
4,500
89,000
26,028
OVER/UNDER
BUDGET (- +)
0
0
0
(3,276)
* - This project received an inter -project transfer of $5,904 from project DR9903,
* - Remaining funds transferred to FB9902
TOTAL PROJECT
$123,404
323
$120,128
($3,276)
89,000
29,304
4,500
600
$123,404
% EXPENDED
100%
100%
100%
89%
97%
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: WINDLEA & WESTCLIFF
Project Type: DRAINAGE Sub -Type:
Project No.: DR9902 Priority: A
COUNCIL AUTHORIZATION:
Date Prepared: 7-20-99
Date Completed: 8-1-99
January 13, 1998 - Awarded Bid No. 97-54 for the construction of drainage improvements.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
In 1990 the City commissioned and received a report from Knowlton, English & Flowers titled Drainage Utility
System Study of Selected Improvement Projects . This was Project No. 4 in the referenced study.
PROJECT DESCRIPTION:
This project includes pipe, inlet and flume improvements that were completed in 1998.
JUSTIFICATION:
Additional underground capacity required to reduce ponding of storm water in the street intersection.
324
PROJECT TITLE: WINDLEA & WESTCLIFF PROJECT #: DR9902
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Fence 274
Personnel: Full Time Landscaping & Irrigation 4,122
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Ciih+n+ol
Maintenance Costs
$0
en
w�
Subtotal: $0
Total Estimated Annual Cost
$0 Total Estimated Capital Cost $4,396
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Fence 274.00 274 0 100%
Landscaping & Irrigation 4,122 885 (3,237) 21%
(Expenses prior to FY 99 not reflected)
TOTAL PROJECT
$4,396
325
$1,159
($3,237) 26%
g Par ccei°
326
Project
Number
Prniect Description
Project
Budget
1 Drainage
Street Fund Fund
Water 8
Sewer CIP
Fund
CAPITAL IMPROVEMENTS PROGRAM
COMPLETED PROJECTS SUMMARY
BUDGET AMOUNT AS OF JULY 20. 2000
ACTUAL EXPENDIT JRES
Half Cent Police
Impact Fee Sales Tax Facility CIP
Fund Fund Fund
Fire
Facility
CIP Fund
Escrow
Funds
Unfunded!
Funding
Pending
Other
Funding
Total Project
Cost
Variance
Expenditures
to Budget
STREET PROJECTS
PS9911 'Overlay Proiects 1 5294.687 I 5294 687 ( ( 1 1 1 1 1 1 5294.687 S0
Sub -Total Slreot Prolocfs
5294,687 5294.687
5294.687 SO
Department:
Submitted By:
Project Title:
Project Type:
Project No.:
City of Euless
Capital Project Request
PUBLIC WORKS Date Prepared: 7-26-99
RANDY BYERS Date Completed: 3-30-00
OVERLAY PROJECTS
STREETS
PS9911
COUNCIL AUTHORIZATION:
September 8, 1998 - Included in FY98-99 Budget.
Sub -Type: OVERLAY
Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
These projects are developed based on information contained in a street condition survey.
PROJECT DESCRIPTION:
FY99 projects include the following streets:
OVERLAY: Kynette, Signet, Toplea, Victoria, and Delta
RECONSTRUCT: South Mills, Bayless, Pauline, Lee, Nimes, Westcliff, and Douglas.
CUT & PATCH: West Pipeline.
JUSTIFICATION:
Each year we schedule approximately 10% of the lane miles in the City for preventive maintenance, including
micro paving, overlay and some total reconstruction. This account provides funding for these activities plus
the unforeseen projects that seem to come up each year. The recommended funding level for this account is
$350,000 per year. In future years, overlay will be added to the general fund baseline budget as this is
considered to be normal maintenance and operating costs.
328
PROJECT TITLE: OVERLAY PROJECTS PROJECT #: PS9911
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Overlay 294,687
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
S i ihtntal•
Maintenance Costs
$0
$n
Subtotal: $0
Total Estimated Annual Cost $0
PHASE/FUNDING SOURCE
Overlay
TOTAL PROJECT
Total Estimated Capital Cost $294,687
CURRENT STATUS
OVER/UNDER
BUDGET EXPENDED BUDGET (-+) % EXPENDED
294,687 294,687 0 100%
$294,687
329
$294,687
$0 100%
groPar
.4;04
330
Project
Number) Prolect Descrlotlon
WASTEWATER PROJECTS
WW9901 I CDBG B98-UC-48-0001/B95-22-50
WW9902 I Impact Fee Study
I W W9903 Misc Sewer Rehab FY99
I W W9904 !Hydraulic Analysis
Sub -Total Wastewater Protects
Project
Budget
5150.000
S13.000
S50.000
S27.000
590,000
Street Fund
Drainage
Fund
Water &
Sewer CIP
Fund
S72.927
512.987
512.987
CAPITAL IMPROVEMENTS PROGRAM
COMPLETED PROJECTS SUMMARY
BUDGET AMOUNT AS OF JUNE 30.2000
ACTUAL EXPEND TURES
Half Cent Police
Impact Fee Sales Tax Facility CIP
Fund Fund Fund
512.238
527.000
S39.238
General CIF
Fund
Escrow
Funds
Unfunded/
Funding
Pending
Other
Funding
Total Project
Cost
Variance
Expenditures
to Budget
S72.927 I (S77.0731
S12.238 I (S7621
S12.987 I (537.0131
S27.000 I 50
552.225 I IS37,775)
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: CDBG B/98-UC-48-0001/B95-22-50
Project Type: WASTEWATER Sub -Type: MAINS
Project No.: WW9901 Priority: A
COUNCIL AUTHORIZATION:
Date Prepared: 7-26-99
Date Completed: 8-19-99
January 13, 1998 - Held Public Hearing / Approved CDBG project selection.
April 13, 1999 - Recommended Tarrant County award bid to Horseshoe Construction.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This funding is the 24th year project administered through Tarrant County. This is the fifth wastewater project
in South Euless.
PROJECT DESCRIPTION:
Design and construction of wastewater mains in the Oakwood Terrace Addition.
JUSTIFICATION:
Mains in the South Euless area have deteriorated as they have aged.
332
PROJECT TITLE: CDBG B/98-UC-48-0001/B95-22-50 PROJECT #: V VV9901
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct ODeratina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
JUULU LcII.
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Sewer Mains
Sewer Mains 150,000
so
•PV
so
$0 Total Estimated Capital Cost $150,000
CURRENT STATUS
OVER/UNDER
BUDGET EXPENDED BUDGET (- +)
% EXPENDED
150,000 72,927
(77,073) 49%
TOTAL PROJECT $150,000 $72,927 ($77,073) 49%
333
Department:
Submitted By:
Project Title:
Project Type:
Project No.:
City of Euless
Capital Project Request
PUBLIC WORKS
RANDY BYERS
WW IMPACT FEE STUDY
WASTEWATER
WW9902
COUNCIL AUTHORIZATION:
January 26, 1999 - Approved contract for study.
Date Prepared: 7-26-99
Date Completed: 9-30-99
Sub -Type: IMPACT FEE PROJECTS
Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The City's Capital Improvement Program and Impact Fee Study must be updated every three years.
PROJECT DESCRIPTION:
1.) Extablish a static model for the sewer system based on basin development
2.) Develop a 10-year capital improvement plan.
3.) Review existing living unit equivalents.
4.) Calculate maximum impact fee.
JUSTIFICATION:
Required by state law to justify impact fee charges.
PROJECT TITLE: VWV IMPACT FEE STUDY PROJECT #: VWV9902
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Siihtntal•
Maintenance Costs
so
sr)
Subtotal: $0
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Planning Services
Planning Services 13,000
$0 Total Estimated Capital Cost $13,000
CURRENT STATUS
OVER/UNDER
BUDGET EXPENDED BUDGET (- +) % EXPENDED
13,000 12,238 (762) 94%
* - This project provided an inter -project transfer of $762.02 to project FB9910.
TOTAL PROJECT $13,000 $12,238 ($762) 94%
335
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: MISC. SEWER REHAB FY99
Project Type: WASTEWATER Sub -Type: MAINS
Project No.: WW9903 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Date Prepared: 7-26-99
Date Completed: 9-30-99
This project is for small unidentified sewer main problems that may be found during the fiscal year. Large
projects will be determined on an "as needed" basis and presented for funding under a new project number.
JUSTIFICATION:
Most of these lines are clay tile and are seriously deteriorated.
336
PROJECT TITLE: MISC. SEWER REHAB FY99 PROJECT #: WW9903
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time Sewer Mains 50,000
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
$0
so
Subtotal: $0
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Sewer Mains
$0 Total Estimated Capital Cost $50,000
CURRENT STATUS
OVER/UNDER
BUDGET EXPENDED BUDGET (- +) % EXPENDED
50,000 12,987
* - This project provided an inter -project transfer of $37,013.14 to WW0002.
(37,013) 26%
TOTAL PROJECT $50,000 $12,987 ($37,013) 26%
337
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: HYDRAULIC ANALYSIS
Project Type: WASTEWATER
Project No.: WW9904
COUNCIL AUTHORIZATION:
Date Prepared: 7-23-99
Date Completed: 6-30-00
Sub -Type: IMPACT FEE PROJECT
Priority: A
November 24, 1998 - Authorized contract with Shimek, Jacobs, & Finklea to perform analysis.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The hydraulic analysis is a subset of the City's Wastewater Master Plan.
PROJECT DESCRIPTION:
Professional services related to the analysis of the City's wastewater system. Pressures, velocities and other
items are studied to determine adequacy.
JUSTIFICATION:
Required to determine adequacy of wastewater system.
338
PROJECT TITLE: HYDRAULIC ANALYSIS PROJECT #: WW9904
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct ODeratina Cost Engineering 27,000
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
J UUIUIdI.
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Engineering Services
(Does not reflect expenses prior to FY99).
TOTAL PROJECT
$0
$0
$0 Total Estimated Capital Cost $27,000
CURRENT STATUS
OVER/UNDER
BUDGET EXPENDED BUDGET (- +) % EXPENDED
27,000 27,000 0 100%
$27,000
339
$27,000
$0 100%
31+0
0.k
k\k$i7§§$$
&®;/§;;/&&
03
CO
69
®G5§kk$K!m
}/k§§2S£/&/
Sub -Total Water Pro/ects
341
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Date Prepared: 7-15-99
Date Completed: 10-30-99
Project Title: METER CHANGE OUT
Project Type: WATER Sub -Type: METERS
Project No.: WT9901 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Project consists of replacing old meters with new radio -read meters throughout the City in phases. This
program is complete.
JUSTIFICATION:
1. Increased accuracy in billing water consumption.
2. Reduction in man-hours for meter reading due to radio -read meters that replaced old style meters.
342
PROJECT TITLE: METER CHANGE OUT PROJECT #: WT9901
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
CiihtntaI•
Maintenance Costs
$0
wn
Meters 60,000
Subtotal: $60,000
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Meters & Settings
(Cost prior to FY1999 not reflected)
Meters & Settings 101,917
$60,000 Total Estimated Capital Cost $101,917
CURRENT STATUS
OVER/UNDER
BUDGET EXPENDED BUDGET (- +) % EXPENDED
101,917 98,365 (3,552) 97%
* - The remaining balance was transferred to FB9901.
TOTAL PROJECT $101,917 $98,365 ($3,552) 97%
343
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: MASTER PLAN
Project Type: WATER
Project No.: WT9903
COUNCIL AUTHORIZATION:
Date Prepared: 7-26-99
Date Completed: 8-30-99
Sub -Type: PRELIMINARY STUDIES
Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The 1999 Water Distribution System Master Plan presents a comprehensive plan for the development of the
water distribution system to serve the City of Euless at build -out conditions. The current service area does not
include any property within the D/FW Airport boundary.
PROJECT DESCRIPTION:
This project encompasses any studies needed to ascertain the adequacy of the system. The only current
activity relates to the airport. A computer analysis was performed to aid in the development of an overall
system of water mains, elevated storage tanks and supply from the TRA to efficiently serve the City of Euless
development (within D/FW airport) that is anticipated. A preliminary Capital Improvement Plan and overall
master plan map were created for a portion of the D/FW Airport. No expenditure of additional funds is
currently being considered. This master plan work was solely performed for planning/feasibility purposes.
JUSTIFICATION:
The City and the airport are working on development opportunities. The airport requested that the City
determine if the City can provide water service to property within the airport boundary west and south of Bear
Creek. Impact fees cannot be used to fund this item as the airport is not currently within the City's service
area.
344
PROJECT TITLE: MASTER PLAN PROJECT #: WT9903
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time Planning Services 42,000
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
�iihtntai
Maintenance Costs
$0
$n
Subtotal: $0
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Planning Services
TOTAL PROJECT
$0 Total Estimated Capital Cost $42,000
CURRENT STATUS
OVER/UNDER
BUDGET EXPENDED BUDGET (- +) % EXPENDED
42,000 5,445 (36,555) 12.96%
$42,000
345
$5,445
($36,555) 12.96%
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: WELL REPAIRS
Project Type: WATER
Project No.: WT9904
COUNCIL AUTHORIZATION:
Date Prepared: 7-26-99
Date Completed: 9-30-99
Sub -Type: WELL REPAIR
Priority: A
August 27, 1997 - Included in Fiscal Year 1996-97 Budget.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This funding carried over from previous years and is being utilized to repair a well pump. This balance is not
sufficient to cover the entire cost of the project as discuss in a previous council meeting. Staff expects to
request approximately $50,000 from the Water and Sewer CIP fund balance to cover this expenditure.
JUSTIFICATION:
Maintaining the City's wells results in the ability to produce water at a substantial reduction in cost. This
funding will be included in the baseline budget in future years as it is considered normal maintenance and
operating costs.
346
PROJECT TITLE: WELL REPAIRS PROJECT #: WT9904
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Equipment Maintenance 3,000
Personnel: Full Time Meters & Setting 63,921
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
3OUULL11.111.
Maintenance Costs
$0
Subtotal: $0
Total Estimated Annual Cost
$0 Total Estimated Capital Cost $66,921
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Equipment Maintenance 63,921 63,921 0 100%
Meters & Setting 3,000 3,000 0 100%
* - This project received an inter -project transfer of $33,396 from FB9901.
TOTAL PROJECT $66,921 $66,921 $0 100%
347
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: 7-26-99
Submitted By: RANDY BYERS Date Completed: 6-30-00
Project Title: FY99 MISC WATER REHAB
Project Type: WATER Sub -Type: MAINS
Project No.: WT9905 Priority:
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project is for correction of small unidentified water main problems that may arise throughout the fiscal
year. Large projects that are identified will be presented on an "as needed" basis and funded under a new
project number.
JUSTIFICATION:
Some of the City's older water mains have deteriorated and need replacement or repair. Staff request that this
project be funded on an annual basis at a level not to exceed $50,000.
348
PROJECT TITLE: FY99 MISC WATER REHAB PROJECT #: WT9905
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
vuvw1.a1.
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Engineering Services
Sanitation Services
Equipment Rentals
Other Supplies
Plumbing Supplies
Sand
Sewer Mains
Fire Hydrants
Equipment Rentals
TOTAL ESTIMATED CAPITAL COST:
Water Mains
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS
BUDGET
1,000
1,000
1,500
5,047
25,000
426
27
8,000
8,000
* - Remaining balance transferred to WT0001.
TOTAL PROJECT
$50,000
349
EXPENDED
587
827
1,140
2,908
19,084
426
27
12,075
6,675
$43,749
OVER/UNDER
BUDGET (- +)
(414)
(173)
(360)
(2,139)
(5,916)
0
4,075
(1,325)
50,000
$50,000
% Expended
59%
83%
76%
58%
76%
100%
151%
83%
($6,251) 87%
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: HWY 10 WATER LINE
Project Type: WATER Sub -Type: MAINS
Project No.: WT9906 Priority: A
COUNCIL AUTHORIZATION:
Date Prepared: 7-17-99
Date Completed: 1-30-00
November 24, 1998 - Authorized project expenditure.
June 22, 1999 - Awarded Bid No. 99-12 for the installation of 8" water line improvements to Gra-Tex.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Water line needed to provide water service to properties along SH10 and improved fire protection coverage.
PROJECT DESCRIPTION:
Design and installation of an 8" water main along SH10 from Westpark Way to a point east of Raider Drive.
JUSTIFICATION:
1. Economic Development
2. Improve ability of adjacent property owners to develop their property.
350
PROJECT TITLE: HWY 10 WATER LINE
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Engineering Services
Surveying Services
Water Mains
Right -of -Way Aquisition
Contingency
PROJECT #: WT9906
TOTAL ESTIMATED CAPITAL COST:
Water Mains
Engineering
$0 Surveying Services
Right -of -Way
Contingency
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS
BUDGET
24,061
12,147
89,933
3,490
20,369
* - Remaining balance transferred to FB9901.
TOTAL PROJECT
$150,000
351
EXPENDED
25,411
12,146
97,836
3,490
0
OVER/UNDER
BUDGET (- +)
1,350
(1)
7,903
0
(20,369)
89,933
24,061
12,147
3,490
20,369
$150,000
% EXPENDED
106%
100%
109%
100%
0%
$138,883 ($11,117) 93%
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: IMPACT FEE STUDY
Project Type: WATER
Project No.: WT9907
COUNCIL AUTHORIZATION:
January 26, 1999 - Approved the contract for study.
Date Prepared: 7-17-99
Date Completed: 9-30-99
Sub -Type: IMPACT FEE PROJECTS
Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The City's Capital Improvements Program and Impact Fee Study must be updated every three years.
PROJECT DESCRIPTION:
1.) Review existing living unit equivalents.
2.) Calculate maximum impact fee
3.) Develop 10 year capital improvement plan
JUSTIFICATION:
Required by law.
PROJECT TITLE: IMPACT FEE STUDY PROJECT #: WT9907
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Coat
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
JU UIUIdI.
Maintenance Costs
so
tr. rt
Wu
Subtotal: $0
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Planning Services
Planning Services 13,000
$0 Total Estimated Capital Cost $13,000
CURRENT STATUS
OVER/UNDER
BUDGET EXPENDED BUDGET (- +) % EXPENDED
13,000 12,238 (762) 94%
* - This project provided an inter -project transfer of $762.02 to FB9910.
TOTAL PROJECT $13,000 $12,238 ($762) 94%
353
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Date Prepared: 7-26-99
Date Completed: 9-30-99
Project Title: WATER DIST - MASTER PLAN
Project Type: WATER Sub -Type: IMPACT FEE PROJECTS
Project No.: WT9911 Priority: A
COUNCIL AUTHORIZATION:
November 24, 1998 - Authorized contract with Shimek, Jacobs, & Finklea to perform analysis.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water distribution master plan is updated approximately every three years.
PROJECT DESCRIPTION:
1.) Analyze water records from the summers of 1996 and 1997.
2.) Develop water model using the Cybernet Hydraulic Water Distribution Model.
3.) Determine line sizes, pressures at junction modes and effectiveness of elevated storage.
4.) Determine if elevated storage can be refilled to replace water from the drawdown during the maximum
hourly demand on the day of maximum usage.
5.) Model pump stations
6.) Verify elevated storage capacity meets the TNRCC minimum water system requirements and the State
Board of Insurance Key Rate standards.
JUSTIFICATION:
Determines the City's ability to properly distribute water to consumers and provide adequate water flow for fire
protection.
354
PROJECT TITLE: WATER DIST - MASTER PLAN PROJECT #: WT9911
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost Engineering $25,600
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
J UULULdI.
Maintenance Costs
$0
Subtotal: $0
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Engineering Services
$0 Total Estimated Capital Cost $25,600
CURRENT STATUS
OVER/UNDER
BUDGET EXPENDED BUDGET (- +) % EXPENDED
25,600 24,000 (1,600) 94%
* - This project provided an inter -project transfer of $1,600 to project FB9910.
TOTAL PROJECT $25,600 $24,000 ($1,600) 94%
355
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Date Prepared: 10-1-99
Date Completed: 11-30-99
Project Title: EMERGENCY REPAIR - HWY 10
Project Type: WATER Sub -Type: WATER LINE
Project No.: WT0002 Priority: A
COUNCIL ACTION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Trenchless replacement of water line under Hwy 10 at Ector.
PROJECT DESCRIPTION:
Emergency repair of water line break under Hwy 10 at Ector Dr.
JUSTIFICATION:
356
PROJECT TITLE: EMERGENCY REPAIR - HWY 10 PROJECT #: WT0002
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Ooeratina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Cuihtnt?I;
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Water Mains
Water Mains 15,450
$0
$n
so
$0 Total Estimated Capital Cost $15,450
CURRENT STATUS
OVER/UNDER
BUDGET EXPENDED BUDGET (-+) % EXPENDED
15,450 14,214 (1,236) 92%
* - This project received an inter -project transfer of $15,450 from FB9901.
* - Remainder of $1,236 was transferred back to FB9901.
TOTAL PROJECT
$15,450
357
$14,214
($1,236) 92%
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Project Title: LINE REPLACEMENT, MILAM - ECTOR/MIDWAY
Project Type: WATER
Project No.: WT0004
COUNIL ACTION:
Date Prepared: 7-26-99
Date Completed: 6-30-00
Sub -Type: WATER LINE
Priority: A
March 28, 2000 - Project to be funded from existing Water CIP Fund Balance.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Project consists of replacing water lines along Milam Street from Ector Drive to Midway.
JUSTIFICATION:
This line has many repair clamps due to leak repairs. The line has deteriorated to the point of needing to be
replaced.
358
PROJECT TITLE: LINE REPLACEMENT, MILAM - ECTOR/MIDWAY PROJECT #: WT0004
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
vuuwaa,.
Maintenance Costs
so
Subtotal: $0
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Water Mains
Water Mains 18,248
$0 Total Estimated Capital Cost $18,248
CURRENT STATUS
OVER/UNDER
BUDGET EXPENDED BUDGET (- +) % EXPENDED
18,248 13,743 (4,505) 75%
* - This project received an inter -project transfer of $18,248 from FB9901.
* - Remainder transferred to WT0005 by inter -project transfer.
TOTAL PROJECT
$18,248
359
$13,743
($4,505) 75%
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: RANDY BYERS
Date Prepared: 7-26-99
Date Completed: 3-31-00
Project Title: CENTRAL DRIVE WATER MAINS
Project Type: WATER Sub -Type: WATER MAINS
Project No.: WT0006 Priority: A
COUNCIL AUTHORIZATION:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Joint project with the City of Bedford.
PROJECT DESCRIPTION:
Replace existing 16" water line in Central Drive. Existing main is approximately 40 years old.
JUSTIFICATION:
Bedford is reconstructing Central Drive as a concrete street. The cost of repair or replacement of this line after
the new pavement is complete would be substantially more expensive.
360
PROJECT TITLE: CENTRAL DRIVE WATER MAINS PROJECT #: WT0006
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtoiai.
Maintenance Costs
$0
rt
Subtotal: $0
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Water Mains
Water main 92,814
$0 Total Estimated Capital Cost $92,814
CURRENT STATUS
OVER/UNDER
BUDGET EXPENDED BUDGET (- +) % EXPENDED
92,814 90,742 (2,072) 98%
* - This project received an inter -project transfer of $92,814 from FB9901.
* - Remaining funds transferred back to FB9901.
TOTAL PROJECT $92,814 $90,742 ($2,072) 98%
361
Urw
%6 Par
r �
362
Project
Number
Protect Descrlotlon
OTHER
PR0015 I Purchase of Dallas StarsCenter
S59901 I Fire Station II
SS9919 1 Fire Station #3 - Structural Repairs
Sub -Total Other Protects
Project
Budget
S10.327.978
S49.688
S30.000
S10.377.666
Street Fund
Drainage
Fund
Water 8
Sewer CIP
Fund
CAPITAL IMPROVEMENTS PROGRAM
COMPLETED PROJECTS SUMMARY
BUDGET AMOUNT AS OF JUNE 30. 2000
ACTUAL EXPENDTURES
Impact Fee
Fund
Half Cent
Sales Tax
Fund
Police
Facility CIP General Cl.
Fund .................... Fund
Escrow
Funds
Unfunded/
Funding
Pending
S10.327.97.3 1 1
S49.688 1
S17.344 1 1
S10.377.666
Other
Funding
Total Protect
Cost
Variance
Expenditures
to Budget
S10.327.978I $0
S49.688 I ($0)
S17.344 I ($12.656)
S10,377.668I (SO)
City of Euless
Capital Project Request
Department: COMMUNITY DEVELOPMENT Date Prepared: 4-1-00
Submitted By: RICK HEROLD Date Completed: 5-31-00
Project Title: PURCHASE STARS CENTER
Project Type: BUILDING/FACILITY Sub -Type: ACQUISITION
Project No.: PR0015 Priority: A
COUNCIL AUTHORIZATION:
March 23, 1999 - Authorization to execute a letter of intent with the Dallas Stars regarding Texas Star.
June 8, 1999 - Direct City Manager to schedule public hearings for the annexation of property.
June 8, 1999 - Prepare a City Service Plan for the property being annexed.
July 29, 1999 - Hold Public Hearing on the annexation of property from Ft. Worth.
July 29, 1999 - Approval of Joint Resolution with Ft. Worth agreeing to disannex 21.3 acres.
September 14, 1999 - Approve and authorize City Manager to execute Purchase Lease Agreement.
October 12, 1999 - Approve Ordinance 1381 providing for the annexation of 21.3 acres.
October 26, 1999 - Public Hearing on SUP that will allow for the construction of the StarsCenter.
October 26, 1999 - Approve SUP to allow for the construction of the Dr. Pepper StarsCenter.
October 26, 1999 - Public Hearing on zoning change or Dr. Pepper StarsCenter.
October 26, 1999 - Approve zoning change for Dr. Pepper StarsCenter.
January 11, 2000 - Approve resolution authorizing the publication of notice of intent to issue C.O.'s
January 31, 2000 - Authorize issuance of T&W and Sewer Rev. Cert. Of Obligation, Taxable Series 2000
February 8, 2000 - Final Reading and Approval of issuance of Cert. Of Obligation, Taxable Series 2000.
February 8, 2000 - Authorize City Manager to execute Tri-Party Agreement between Euless, Stars, & BoA.
February 22, 2000 - Authorize modifications to Purchase and Lease Agreement.
April 11, 2000 - Authorize issuance of T&W and Sewer Rev. Cert. Of Obligation, Taxable Series 2000
April 11, 2000 - Approved amendment to a Purchase/Lease Agreement to accept cash escrow.
June 12, 2000 - Executed the documents to close on the purchase of the facility.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Many of the athletic complex Phase II issues were addressed in conjunction with this project.
PROJECT DESCRIPTION:
The City purchased a two rink ice facility. This facility will be leased and operated by the Dallas Stars. It is
anticipated to accommodate league hockey play and public skate as well as host regional and national skating
events.
JUSTIFICATION:
This will provide an ice skating facility to our community without burden to the Euless tax payers.
364
PROJECT TITLE: PURCHASE STARS CENTER PROJECT #: PR0015
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Ooeratina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Ci,h+n4,I•
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Building Acquisition
Equipment
Issuance Cost
Star Center Debt
TOTAL PROJECT
TOTAL ESTIMATED CAPITAL COST:
Building Acquisition
Equipment
$0 Issuance Cost
Star Center Debt
$0
$0 Total Estimated Capital Cost
CURRENT STATUS
BUDGET
9,391,814
445,223
146,000
344,941
EXPENDED
9,391,814
445,223
146,000
344,941
$10,327,978 $10,327,978
365
OVER/UNDER
BUDGET (- +)
0
0
0
0
9,391,814
445,223
146,000
344,465
$10,327,502
% EXPENDED
100%
100%
100%
100%
$0 100%
City of Euless
Capital Project Request
Department: SUPPORT SERVICES
Submitted By: TOM COX
Date Prepared: 8-2-99
Date Completed: 3-30-00
Project Title: FIRE STATION II - 1515 Westpark Way
Project Type: BUILDING/FACILITIES Sub -Type: REMODEL
Project No.: SS9901 Priority: A
COUNCIL AUTHORIZATION:
October 14, 1997 - Award Bid No. 97-37 for project construction.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Replacement of fire station #2 due to major repairs and enlargement Westpark Way.
PROJECT DESCRIPTION:
Renovation of old vehicle repair center. Construction of new apparatus bays to the east of the main building.
Removal of existing structures within the old service center. Remove and replace interior concrete floor,
construct new eight (8) bed dormitory, kitchen and food preparation area, day room, offices, training room,
lavatory room and shower area. Exterior drive approaches were reworked to facilitate movement in and out
of the apparatus. Building exterior received new paint scheme to match the current City colors. Stucco
panels and face brick was repaired and either painted or cleaned.
JUSTIFICATION:
With construction and widening of Westpark Way, driveway at existing Fire Station #2 would be too short
(15') to accommodate fire apparatus. Building was in need of major interior renovation and upgrades. With
the move of Fleet Services into a new building, this left the old vehicle repair center available for renovation.
The location and the existing structure lent itself as a logical location to relocate Fire Station #2.
366
PROJECT TITLE: FIRE STATION II - 1515 Westpark Way PROJECT #: SS9901
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time Construction 49,688
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal: $0
Maintenance Costs
Subtotal: $0
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Fire Station II
(Expenses prior to FY99 not reflected)
$0 Total Estimated Capital Cost $49,688
CURRENT STATUS
OVER/UNDER
BUDGET EXPENDED BUDGET (- +) % EXPENDED
49,688 49,688 (0) 100%
* - This project received an inter -project transfer of $6,177 from FB9909.
TOTAL PROJECT $49,688 $49,688 ($0) 100%
367
City of Euless
Capital Project Request
Department: SUPPORT SERVICES Date Prepared: 8-2-99
Submitted By: TOM COX Date Completed: 3-30-00
Project Title: FIRE STATION #3 - STRUCTURAUCOSMETIC REPAIRS
Project Type: BUILDING/FACILITIES Sub -Type: REMODEL
Project No.: SS9919 Priority: A
COUNCIL AUTHORIZATION:
May 24, 1999 - Council notification.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Replace concrete drive approaches into the north and south sides of the apparatus bays. Replace carpet and
floor coverings in the watch office and living areas. Sawcut and sealed cracks in the apparatus bay floors.
Repair external cracks in the stucco panels. Repaint interior walls and refinish the cabinets.
JUSTIFICATION:
368
PROJECT TITLE: FIRE STATION #3 - STRUCTURAL/COSMETIC RE PROJECT #: SS9919
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Ooeratina Cost
Personnel: Full Time Construction 30,000
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Si,htntal•
Maintenance Costs
$0
Subtotal: $0
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Fire Station Foundation Repair
* - Remaining funds transferred to FB9909.
TOTAL PROJECT
$0 Total Estimated Capital Cost $30,000
CURRENT STATUS
OVER/UNDER
BUDGET EXPENDED BUDGET (- +) % EXPENDED
30,000 17,344 (12,656) 58%
$30,000 $17,344 ($12,656) 58%
369