Loading...
HomeMy WebLinkAbout86-625 03-25-1986RESOLUTION NO. 86 -625 WHEREAS, the Trinity River Authority of Texas is presently involved in continuing planning for future expansions of the existing Tarrant County Water Supply Project; and WHEREAS, in order to properly prepare planning documents, the Authority needs to obtain accurate and current population projections; and WHEREAS, in consideration of the very serious need for planning based upon the best available estimates of current population, rate of growth, and probable future saturation population, data has been assembled based upon available census and demographic data and studies with concurrence of the Planning and Engineering Department as to existing and probable future land use in the City of Euless. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Euless, Tarrant County, Texas, that the following population projections be supplied to the Trinity River Authority of Texas. Experienced 1985 Projected 1990 Projected 1995 Projected 2000 Projected 2005 Number of Customer Equivalent Connections or Population Business (Units) (Individual) 15,700 19,500 24,400 27,600 29,500 38,800 47,600 59,600 67,400 72,100 Assumed Future Saturated Growth for Long Range Planning 30,700 to 34,800 75,000 to 85,000 Adopted at a regular meeting of the City Council of the City of Euless on the 25th day of March, 1986, by a vote of S ayes, O nays, and O abstentions. APPROVED: Harold D. Samuels, Mayor ATTEST: Kay Raijhey, City Sg'crfetary