HomeMy WebLinkAbout86-625 03-25-1986RESOLUTION NO. 86 -625
WHEREAS, the Trinity River Authority of Texas is presently involved in
continuing planning for future expansions of the existing Tarrant County
Water Supply Project; and
WHEREAS, in order to properly prepare planning documents, the Authority
needs to obtain accurate and current population projections; and
WHEREAS, in consideration of the very serious need for planning based upon
the best available estimates of current population, rate of growth, and
probable future saturation population, data has been assembled based upon
available census and demographic data and studies with concurrence of the
Planning and Engineering Department as to existing and probable future land
use in the City of Euless.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Euless,
Tarrant County, Texas, that the following population projections be
supplied to the Trinity River Authority of Texas.
Experienced 1985
Projected 1990
Projected 1995
Projected 2000
Projected 2005
Number of Customer Equivalent
Connections or Population
Business (Units) (Individual)
15,700
19,500
24,400
27,600
29,500
38,800
47,600
59,600
67,400
72,100
Assumed Future
Saturated Growth
for Long Range
Planning 30,700 to 34,800 75,000 to 85,000
Adopted at a regular meeting of the City Council of the City of Euless on
the 25th day of March, 1986, by a vote of S ayes, O nays, and O
abstentions.
APPROVED:
Harold D. Samuels, Mayor
ATTEST:
Kay Raijhey, City Sg'crfetary