Loading...
HomeMy WebLinkAboutWilshire Park Improvements Memorandum - Joe Hennig 1999FROM:1 HENNIG DATE: FEBRUARY 19, 1999 In the Fall of 1997, Mr. Al Patel requested the City of Euless participate in a drainage project located along a tributary of Hurricane Creek south of S.H. 183, west of Wilshire Drive, north of Wilshire Park and east of the Farr -Pacific Addition. The drainage project was part of a proposed 27-acre multi -use development that required 1) the installation of a large concrete box culvert and 2) the construction of a detention pond to reduce the downstream drainage impact of the proposed development. The box culvert and pond were estimated to cost in the $858,000 to $941,000 range, including the cost of pond amenities such as docks and walking trails. In March 1998 the Office of Economic Development recommended the City participate in the cost of the drainage project in an amount between $300,000 and $400,000. This recommendation was based upon estimated annual revenue to the City of $320,000 for a fully developed 27-acre site. Mr. Patel's contractor has billed $899,000 to date for the box culvert and detention pond work it has performed. Mr. Patel will realize additional costs to complete the conversion of the detention pond to a retention pond that is adequate to hold fish. The City has informed Mr. Patel it expects Mr. Patel to fulfill his obligation to excavate the pond in accordance with a grading plan approved by the City without financial assistance from the City. The contractor is expecting to begin that work before the first of March. 201 N. Ector Drive, Euless, Texas 76039-3595 817/685-1400 9 Metro 817/267-4403 0 FAX 817/685-1416 A commitment has been made to the Wilshire Homeowners Association to complete the pond with an amenities package that includes a walking trail, lighting, replacement trees, bubbles and aerators, repaved parking areas and irrigation. Staff proposes to fulfill this commitment in the following way. Execute contracts for the installation of electrical and lighting, aerators and bubblers, drainage improvements, slope stabilization, concrete trails and sidewalks and railing and fencing. The cost of these contracts is expected to total approximately $150,000. The proposed funding source is the Euless Development Corporation contingency account. Please see the attached cost projection. 2. Participate in the cost of the box culvert drainage improvements in an amount up to $250,000. The proposed funding source is the Drainage CIP's Hurricane Creek line item, account 39-66-07-5235. 3. Install irrigation, landscape walls and sod and perform Wilshire Park parking lot repair work with City forces. The material cost for these items is estimated at $61,000 to be paid for out of the operating budgets of the Parks and Public Works Departments. Please see the attached cost projection. A final decision on this project is necessary, so we may proceed with construction immediately upon completion of Mr. Patel's final work on the pond. Thank you for your consideration of this important project for our City. Sincerely, xc: Randy J. Byers, Director of Public Works Rick Herold, Director of Community Services Andrea Baxter, Asst. Director of Public Works 1 1 1 1 1 WIILSHME1 February 19, 1999 Aerator and Bubblers $ 8,200 48" Pipe, Wye Inlet & Headwall $ 24,658 Slope Stabilization / Lining $ 32,000 Contracted Pond Work Subtotal Electrical & Lighting $ 20,400 Concrete Trail and Sidewalks $ 42,900 Railing and Fencing $ 22,000 Contracted Amenities Subtotal *Estimated Contract Amount Irrigation $ 15,000 Landscape Walls $ 10,000 HMAC Parking Lot Repair $ 16,000 Sod $ 20,000 City Installed Subtotal (Mat'ls Only) Total Improvement Cost $ 64,858 $ 83,300 $ 148,158 $ 61,000 $ 209,158 * Note: Fishing pier costs of $25,000 have been removed and additional dollars have been added to railing and fencing to address liability concerns.