HomeMy WebLinkAboutPreliminary Capital Improvements Program FY24-25City of Euless Preliminary Capital Improvements Program Fiscal Year Ending September 30, 2025 201 N. Ector Drive, Euless, TX 76039 www.eulesstx.gov CITY OF EULESS FISCAL YEAR 2024-2025 LINDA MARTIN, MAYOR Tim Stinneford, Council Member – Place One Jeremy Tompkins, Council Member – Place Two Eddie Price, Council Member – Place Three Perry Bynum, Council Member – Place Four Annabel Eads, Council Member – Place Five Tika Paudel, Council Member – Mayor Pro Tem, Place Six Loretta Getchell, City Manager Chris Barker, Deputy City Manager Wes Rhodes, Assistant City Manager TABLE OF CONTENTS CAPITAL IMPROVEMENTS PROGRAM City Officials Table of Contents i-iv Letter vi-vii FUNDED PROJECTS Summary of Funded Projects 1 FY2024 Amendments 3 Drainage Projects Summary of Funded Drainage Projects 5 DR9903 Miscellaneous Drainage Improvements 6 DR1101 Flooding Mitigation 8 DR1201 Miscellaneous Creek Maintenance 10 Street Projects Summary of Funded Street Projects 13 PS1203 Miscellaneous Street Repairs 14 PS1601 East Harwood Road Extension 16 PS1902 FY2019 Street Reconstruction – Pipeline/Highland/Harwood 20 PS1903 Miscellaneous Screening Wall Repair 24 PS2202 Mid-Cities/Cheek-Sparger & SH 121 Intersection/ADA Imp. Design 26 PS2302 Heritage Avenue – Cheek-Sparger Road to Guadalupe Trail 30 PS2401 FY2024 Street Improvements 34 Wastewater Projects Summary of Funded Wastewater Projects 37 WW0002 Miscellaneous Wastewater Rehabilitation 38 WW0605 TRA Wastewater Payments – Impact 40 WW2301 Line Replacement – Cedar Hill Estates South Phase I 42 WW2302 Line Replacement – Cedar Hill Estates South Phase II 46 WW2304 Line Replacement – Trailwood Addition 50 WW2401 FY2024 50th CDBG LR: Fair Oaks Boulevard/Shelmar Drive/Kensinger Court 54 Water Projects Summary of Funded Water Projects 59 WT0001 Miscellaneous Water Rehabilitation 60 WT0104 Well Repairs 62 WT0803 Meters/Transponders/Leak Detection 64 WT1403 Reclaimed Water Line Extension Debt Payment – Impact 66 WT1603 Miscellaneous Valve Replacement 68 WT1604 Reclaimed Water Line Extension Phase III 70 WT1802 Well Replacement – Fuller/Far North 74 WT2301 Line Replacement – Midway Park 1st Addition 78 WT2302 Line Replacement – Oakwood Terrace 82 WT2303 Line Replacement – South Main Street 86 i WT2401 Line Replacement – Huntington Drive Phase II 90 WT2402 Line Replacement – Sotogrande Boulevard Phase I 94 Other Projects Summary of Funded Other Projects 99 AC1901 Texas Star Sports Complex Phase VII 100 CM0304 Entry Monument Sign Program 102 CM0804 Redevelopment 104 CM1701 Municipal Plaza Improvements Phase II 106 DV9901 EDC Incentive Funds 108 ED1002 EDC Contingency 110 ED1601 Midtown Development 112 FM1201 ADA/TAS Facility Improvements 114 FM2207 FY2022 Roof Repairs & Preventative Maintenance 116 FM2311 Fire Station #2 118 FM2312 Police & Courts Building Remodel 120 FM2409 Animal Shelter Expansion/Renovation 122 GC1801 TSGC Miscellaneous Improvements 124 PR0720 Miscellaneous Park Improvements 126 PR0804 Park Irrigation 128 PR2011 Wilshire Park Upgrades 130 PR2203 Blessing Branch Park Improvements 132 PR2404 Parks at Texas Star Lighting Upgrade 134 PROPOSED & UNFUNDED PROJECTS Summary of FY2025 Proposed & Unfunded Projects – Sorted by Type 137 Drainage Projects Summary of FY2025 Proposed & Unfunded Drainage Projects 139 Carr Park Creek Erosion Protection 140 FY2025 Drainage Curb & Gutter Improvements 142 South Mills Drive Outfall Restoration 144 FY2026 Drainage Curb & Gutter Improvements 146 FY2027 Drainage Curb & Gutter Improvements 148 FY2028 Drainage Curb & Gutter Improvements 150 FY2029 Drainage Curb & Gutter Improvements 152 Street Projects Summary of FY2025 Proposed & Unfunded Street Projects 155 Fuller-Wiser Road/Bear Creek Parkway Roadway Rehabilitation 156 FY2025 Street Improvements 158 FY2026 Street Improvements 160 FY2027 Street Improvements 162 FY2028 Street Improvements 164 Cresthaven Drive Reconstruction 166 FY2029 Street Improvements 168 East Alexander Lane Reconstruction 170 Ross Avenue Extension 171 ii Sheppard Drive Reconstruction 172 Vine Street Reconstruction – SH 183 to SH 10 173 Wastewater Projects Summary of FY2025 Proposed & Unfunded Wastewater Projects 175 FY2025 51st CDBG LR: Fair Oaks Boulevard/Lone Oak Circle 176 Line Replacement – Oakwood Terrace North Phases I, II, & III – Engineering 180 FY2026 52nd CDBG LR: Twin Oaks Court/Shady Hollow 184 Line Replacement – Oakwood Terrace North Phase I – Construction 186 FY2027 53rd CDBG LR: Douglas Street 188 Line Replacement – Oakwood Terrace North Phase II – Construction 190 Line Replacement – Oakwood Terrace North Phase III – Construction 192 FY2028 54th CDBG LR: Fair Oaks Drive/Roundtree Drive 194 Line Replacement – Woodvine Drive 196 Line Replacement – Cliffwood Road/Shady Creek Drive 198 FY2029 55th CDBG LR: Roundtree Drive 200 Line Replacement – Knob Hill 202 Water Projects Summary of FY2025 Proposed & Unfunded Water Projects 203 Line Replacement – Sotogrande Boulevard Phase II 204 Line Replacement – Sagebrush Trail 208 Line Replacement – Bell-Hi Addition Phases I & II 210 Line Replacement – Donley Drive/Donley Court 212 Line Replacement – West Euless Boulevard 214 1 Mil Well Replacement 216 Line Replacement – Dunaway Drive 217 Line Replacement – Knob Hill 218 Line Replacement – Midway Park 3rd Addition 219 Line Replacement – Westpark Way 220 Other Projects Summary of FY2025 Proposed & Unfunded Other Projects 221 Golf Course Upgrades 222 Facility Renovations at 1400 South Pipeline Road 224 Parks at Texas Star South Improvements 226 Parks at Texas Star South Turf – Fenway, Shea, and Jacobs Field 228 Playground Shade Structures 230 Carr Park Trail Connection 232 Kiddie Carr Park Improvements 234 Parks at Texas Star Phase VIII 236 Parks at Texas Star South Turf Replacement 238 South Euless Park Upgrades 240 Trail Enhancements Phase I 241 Trail Enhancements Phase II 242 Trail Enhancements Villages of Bear Creek 243 Trailwood Park Improvements 244 iii COMPLETED PROJECTS Drainage Projects Summary of Completed Drainage Projects 245 Street Projects Summary of Completed Street Projects 247 PS2301 FY2023 Street Improvements 250 Wastewater Projects Summary of Completed Wastewater Projects 253 WW2303 FY2023 48th/49th CDBG LR: Euless Square/Aransas Drive 256 Water Projects Summary of Completed Water Projects 259 WT2202 Line Replacement – Huntington Drive Phase I 262 Other Projects Summary of Completed Other Projects 265 FM2006 Fire Station #1 268 GC2003 Texas Star Slope Wall Protection Phase I 270 PR2305 Aquatic Park Facility Upgrades 272 PR2308 Midway Park Pickleball Courts 274 PR2311 Trail Lighting – Mid-Cities 276 iv v vi vii viii CAPITAL IMPROVEMENTS PROGRAM FUNDED PROJECTS SUMMARY Project Number Project Description Budget as of 5/31/23 Appropriation/ Amendment Budget as of 5/31/24 Expended as of 5/31/24 Remaining Funds Revised Project Cost Estimates Unfunded/ (Excess Funding) DRAINAGE PROJECTS DR9903 Misc. Drainage Improvements 1,170,777$ 70,000$ 1,240,777$ 1,055,863$ 184,914$ 1,240,777$ -$ DR1101 Flooding Mitigation 501,265$ -$ 501,265$ 18,334$ 482,931$ 341,265$ (160,000)$ DR1201 Misc. Creek Maintenance (min bal $100,000)270,000$ -$ 270,000$ 147,392$ 122,608$ 270,000$ -$ FB9902 Fund Balance – Drainage CIP -$ -$ -$ -$-$-$ (169,625)$ 1,942,042$ 70,000$ 2,012,042$ 1,221,589$ 790,453$ 1,852,042$ (329,625)$ STREET PROJECTS PS1203 Misc. Street Repairs (min bal $150,000)993,150$ -$ 993,150$ 837,746$ 155,404$ 993,150$ -$ PS1601 East Harwood Road Extension 100,000$ -$ 100,000$ -$100,000$ 100,000$ -$ PS1902 FY2019 Street Reconstruction – Pipeline/Highland/Harwood 18,388,501$ 2,278,135$ 20,666,636$ 12,367,601$ 8,299,035$ 21,666,636$ 1,000,000$ PS1903 Misc. Screening Wall Repair (annual transfer $25,000)100,000$ 25,000$ 125,000$ 6,666$ 118,334$ 150,000$ 25,000$ PS2202 Mid-Cities/Cheek-Sparger & SH 121 Intersection/ADA Improvements Design 410,000$ -$ 410,000$ 409,218$ 782$410,000$ -$ PS2302 Heritage Avenue – Cheek-Sparger Road to Guadalupe Trail 260,275$ 239,725$ 500,000$ -$500,000$ 500,000$ -$ PS2401 FY2024 Street Improvements -$ 1,100,000$ 1,100,000$ 1,068,542$ 31,458$ 1,100,000$ -$ FB9907 Fund Balance – Street CIP -$ -$ -$ -$-$-$ (214,027)$ 20,251,926$ 3,642,860$ 23,894,786$ 14,689,773$ 9,205,013$ 24,919,786$ 810,973$ WASTEWATER PROJECTS WW0002 Misc. Wastewater Rehab (min bal $100,000)881,086$ -$ 881,086$ 761,924$ 119,162$ 981,086$ 100,000$ WW0605 TRA Wastewater Payments – Impact 1,480,000$ 100,000$ 1,580,000$ 1,480,000$ 100,000$ 1,630,000$ 50,000$ WW2301 Line Replacement – Cedar Hill Estates South Phase I 402,000$ 220,867$ 622,867$ 57,606$ 565,261$ 622,867$ -$ WW2302 Line Replacement – Cedar Hill Estates South Phase II 408,000$ 126,713$ 534,713$ 57,606$ 477,107$ 534,713$ -$ WW2304 Line Replacement – Trailwood Addition 3,036,000$ 154,549$ 3,190,549$ 489,655$ 2,700,894$ 3,190,549$ -$ WW2401 FY2024 50th CDBG LR: Fair Oaks Boulevard/Shelmar Drive/Kensinger Court -$ 633,972$ 633,972$ -$633,972$ 633,972$ -$ FB9911 Fund Balance – Wastewater Impact (Restricted)-$ -$ -$ -$-$-$ (663,834)$ 6,207,086$ 1,236,101$ 7,443,187$ 2,846,791$ 4,596,396$ 7,593,187$ (513,834)$ WATER PROJECTS WT0001 Misc. Water Rehab (min bal $150,000)1,128,511$ -$ 1,128,511$ 964,439$ 164,072$ 1,128,511$ -$ WT0104 Well Repairs (annual transfer $50,000)1,763,992$ -$ 1,763,992$ 1,713,435$ 50,557$ 1,813,992$ 50,000$ WT0803 Meters/Transponders/Leak Detection (annual transfer $158,000)2,834,944$ 158,000$ 2,992,944$ 1,482,796$ 1,510,148$ 3,150,944$ 158,000$ WT1403 Reclaimed Water Line Extension Debt Payment - Impact 1,198,602$ 118,050$ 1,316,652$ 1,277,306$ 39,346$ 1,436,702$ 120,050$ WT1603 Misc. Valve Replacement (min bal $150,000)515,000$ -$ 515,000$ 414,051$ 100,949$ 565,000$ 50,000$ WT1604 Reclaimed Water Line Extension Phase III 6,124,803$ -$ 6,124,803$ 4,624,803$ 1,500,000$ 6,124,803$ -$ WT1802 Well Replacement – Fuller/Far North 11,110,110$ -$ 11,110,110$ 11,075,518$ 34,592$ 11,110,110$ -$ WT2301 Line Replacement – Midway Park 1st Addition 574,000$ 75,203$ 649,203$ 323,558$ 325,645$ 649,203$ -$ WT2302 Line Replacement – Oakwood Terrace 1,797,812$ 188,193$ 1,986,005$ 261,628$ 1,724,377$ 1,986,005$ -$ WT2303 Line Replacement – South Main Street 2,102,104$ (21,096)$ 2,081,008$ 220,603$ 1,860,405$ 2,081,008$ -$ WT2401 Line Replacement – Huntington Drive Phase II -$ 520,000$ 520,000$ -$520,000$ 520,000$ -$ WT2402 Line Replacement – Sotogrande Boulevard Phase I -$ 365,000$ 365,000$ 34,000$ 331,000$ 365,000$ -$ FB9910 Fund Balance – Water Impact (Restricted)-$ -$ -$ -$-$-$ (2,769,418)$ FB9901 Fund Balance – Water & Wastewater CIP -$ -$ -$ -$-$-$ (2,131,739)$ 29,149,878$ 1,403,350$ 30,553,228$ 22,392,137$ 8,161,091$ 30,931,278$ (4,523,107)$ Sub-Total Street Projects Sub-Total Drainage Projects Sub-Total Wastewater Projects Sub-Total Water Projects 1 CAPITAL IMPROVEMENTS PROGRAM FUNDED PROJECTS SUMMARY Project Number Project Description Budget as of 5/31/23 Appropriation/ Amendment Budget as of 5/31/24 Expended as of 5/31/24 Remaining Funds Revised Project Cost Estimates Unfunded/ (Excess Funding) OTHER AC1901 Texas Star Sports Complex Phase VII 5,102,552$ 24,755$ 5,127,307$ 4,916,380$ 210,927$ 5,127,307$ -$ CM0304 Entry Monument Sign Program 145,782$ -$ 145,782$ 121,427$ 24,355$ 145,782$ -$ CM0804 Redevelopment 11,154,172$ 1,631,126$ 12,785,298$ 11,646,951$ 1,138,347$ 13,785,298$ 1,000,000$ CM1701 Municipal Plaza Improvements Phase II 446,733$ -$ 446,733$ 216,445$ 230,288$ 446,733$ -$ DV9901 EDC Incentive Funds (annual transfer $25,000)1,750,854$ 25,000$ 1,775,854$ 1,351,148$ 424,706$ 1,800,854$ 25,000$ ED1002 EDC Contingency 325,000$ -$ 325,000$ 68,772$ 256,228$ 325,000$ -$ ED1601 Midtown Development 16,417,980$ -$ 16,417,980$ 16,348,505$ 69,475$ 16,417,980$ -$ FM1201 ADA/TAS Facility Improvements (min bal $75,000)200,000$ -$ 200,000$ 138,295$ 61,705$ 215,000$ 15,000$ FM2207 FY2022 Roof Repairs & Preventative Maintenance 94,000$ -$ 94,000$ -$ 94,000$ 94,000$ -$ FM2311 Fire Station #2 10,349,150$ 625,695$ 10,974,845$ 4,863,709$ 6,111,136$ 10,974,845$ -$ FM2312 Police & Courts Building Remodel 960,000$ 25,943,205$ 26,903,205$ 743,096$ 26,160,109$ 26,903,205$ -$ FM2409 Animal Shelter Expansion/Renovation -$ 6,125,000$ 6,125,000$ 88,857$ 6,036,143$ 6,275,000$ 150,000$ GC1801 TSGC Misc. Improvements (min bal $150,000)587,180$ 50,000$ 637,180$ 550,937$ 86,243$ 712,180$ 75,000$ PR0720 Misc. Park Improvements (min bal $200,000)1,618,253$ 200,000$ 1,818,253$ 1,638,163$ 180,090$ 2,018,253$ 200,000$ PR0804 Park Irrigation (annual transfer $25,000)400,000$ 25,000$ 425,000$ 259,800$ 165,200$ 450,000$ 25,000$ PR2011 Wilshire Park Upgrades 2,222,864$ -$ 2,222,864$ 1,961,465$ 261,399$ 2,222,864$ -$ PR2203 Blessing Branch Park Improvements 365,064$ -$ 365,064$ 267,870$ 97,194$ 365,064$ -$ PR2404 Parks at Texas Star Lighting Upgrade -$ 703,350$ 703,350$ 703,350$ -$ 703,350$ -$ FB9906 Fund Balance – EDC CIP -$ -$ -$ -$ -$ -$ (1,710,922)$ FB9908 Fund Balance – Parks at Texas Star CIP -$ -$ -$ -$ -$ -$ (156,392)$ FB9909 Fund Balance – General CIP -$ -$ -$ -$ -$ -$ (4,233,875)$ FB9913 Fund Balance – Car Rental CIP -$ -$ -$ -$ -$ -$ (91,834)$ FB9916 Fund Balance – TSGC CIP -$ -$ -$ -$ -$ -$ (28,591)$ 52,139,584$ 35,353,131$ 87,492,715$ 45,885,170$ 41,607,545$ 88,982,715$ (4,731,614)$ 109,690,516$ 41,705,442$ 151,395,958$ 87,035,460$ 64,360,498$ 154,279,008$ (9,287,207)$ TOTAL FUNDED PROJECTS Sub-Total Other Projects 2 CITY OF EULESS CAPITAL IMPROVEMENT PROGRAM AMENDMENTS -- FUNDED PROJECTS PROJECT#PROJECT DESCRIPTION DATE AMENDMENTS & ACTIONS AC1901 Texas Star Sports Complex Phase VII 05/31/2024 To increase funding for earned interest of $24,755. CM0804 Redevelopment 10/01/2023 To provide additional funding per FY2024 Approved CIP Plan – $1,500,000 from Car Rental Fund.   CM0804 Redevelopment 05/31/2024 To increase funding for earned interest of $71,831 and an exchange of property of $59,295. DR9903 Miscellaneous Drainage Improvements 10/01/2023 To provide additional funding per FY2024 Approved CIP Plan – $70,000 from Drainage Operating Fund.     DV9901 EDC Incentive Funds 10/01/2023 To provide additional funding per FY2024 Approved CIP Plan – $25,000 from EDC Operating Fund. FM2006 Fire Station #1 05/31/2024 To increase funding for earned interest of $94,671.   FM2006 Fire Station #1 05/31/2024 To close project and transfer excess funding of $360,058 to project FM2311 – Fire Station #2. FM2311 Fire Station #2 05/31/2024 To increase funding for earned interest of $265,637 and a transfer of $360,058 from project FM2006 – Fire Station #1. FM2312 Police & Courts Building  Remodel 10/01/2023 To provide funding per FY2024 Approved CIP Plan – $1,250,000 from Crime Control & Prevention District Fund,$22,000,000 from Certificates of Obligation, and $1,834,236 from Equipment Replacement Fund. FM2312 Police & Courts Building Remodel 05/31/2024 To increase funding for earned interest of $858,969. FM2409 Animal Shelter Expansion/Renovation 10/01/2023 To provide funding per FY2024 Approved CIP Plan – $6,125,000 from Car Rental Fund. GC1801 TSGC Miscellaneous Improvements 10/01/2023 To provide additional funding per FY2024 Approved CIP Plan – $50,000 from TSGC Reserve Fund. GC2003 Texas Star Slope Wall Protection Phase I 05/31/2024 To close project. PR0720 Miscellaneous Park Improvements 10/01/2023 To provide additional funding per FY2024 Approved CIP Plan – $200,000 from EDC Operating Fund. PR0804 Park Irrigation 10/01/2023 To provide additional funding per FY2024 Approved CIP Plan – $25,000 from EDC Operating Fund. PR2305 Aquatic Park Facility Upgrades 05/31/2024 To close project and transfer excess funding of $1,959 to EDC CIP Fund Balance. PR2308 Midway Park Pickleball Courts 05/31/2024 To close project. PR2311 Trail Lighting – Mid‐Cities 05/31/2024 To close project and transfer excess funding of $67,696 to EDC CIP Fund Balance. PR2404 Parks at Texas Star Lighting Upgrade 10/01/2023 To provide funding per FY2024 Approved CIP Plan – $632,700 from EDC Operating Fund. PR2404 Parks at Texas Star Lighting Upgrade 05/31/2024 To provide additional funding of $117,300 from an Energy Efficiency and Conservation Block Grant. PR2404 Parks at Texas Star Lighting Upgrade 05/31/2024 To transfer excess funding of $46,650 to EDC CIP Fund Balance. PS1902 FY2019 Street Reconstruction –  Pipeline/Highland/Harwood 10/01/2023 To provide additional funding per FY2024 Approved CIP Plan – $1,936,540 from General Fund. PS1902 FY2019 Street Reconstruction –  Pipeline/Highland/Harwood 05/31/2024 To increase funding for earned interest of $312,895. PS1902 FY2019 Street Reconstruction –  Pipeline/Highland/Harwood 05/31/2024 To increase funding for transfer of $19,602 from ES0292 – Sidewalks at South Pipeline. PS1902 FY2019 Street Reconstruction –  Pipeline/Highland/Harwood 05/31/2024 To increase funding for transfer of $9,098 from ES0296 – Sidewalks at West Pipeline. PS1903 Miscellaneous Screening Wall Repair 10/01/2023 To provide additional funding per FY2024 Approved CIP Plan – $25,000 from General Fund. PS2301 FY2023 Street Improvements 05/31/2024 To close project. PS2302 Heritage Avenue – Cheek‐Sparger Road to Guadalupe  Trail  10/01/2023 To provide additional funding per FY2024 Approved CIP Plan – $239,725 from General Fund. PS2302 Heritage Avenue – Cheek‐Sparger Road to Guadalupe  Trail  05/31/2024 To replace City funding of $128,783 with escrow funds from ES1501‐ Creekwood Glade Parks. City funding will be transferred to Street CIP Fund Balance. PS2401 FY2024 Street Improvements 10/01/2023 To provide funding per FY2024 Approved CIP Plan – $1,100,000 from General Fund. WT1402 Fixed Base Meter Reading and Water Meter  Changeout 09/30/2023 Per the Texas Water Development Board, unexpended bond proceeds of $15,050 were transferred to the W/WW Debt Service Fund. WT1402 Fixed Base Meter Reading and Water Meter  Changeout 09/30/2023 Transferred $13,787 from W/WW CIP Fund Balance to cover end of project expenses. WT0803 Meters/Transponders/Leak Detection 10/01/2023 To provide additional funding per FY2024 Approved CIP Plan – $158,000 from W/WW Operating Fund. 3 CITY OF EULESS CAPITAL IMPROVEMENT PROGRAM AMENDMENTS -- FUNDED PROJECTS PROJECT#PROJECT DESCRIPTION DATE AMENDMENTS & ACTIONS WT1403 Reclaimed Water Line Extension Debt Payment –  Impact 10/01/2023 To provide additional funding per FY2024 Approved CIP Plan – $118,050 from Water Impact Fee Fund Balance. WT2202 Line Replacement – Huntington Drive Phase I 05/31/2024 To close project and transfer excess funding of $46,515 to W/WW CIP Fund Balance. WT2301 Line Replacement – Midway Park 1st Addition 10/24/2023 To increase ARPA funding for transfer of $75,203 from project WW2304 – Trailwood Addition Wastewater Line Replacement. WT2302 Line Replacement – Oakwood Terrace 10/24/2023 To increase ARPA funding for transfer of $167,097 from project WW2304 – Trailwood Addition Wastewater Line Replacement. WT2302 Line Replacement – Oakwood Terrace 10/24/2023 To increase ARPA funding for transfer of $21,096 from project WT2303 – South Main Street Water Line Replacement. WT2303 Line Replacement – South Main Street 10/24/2023 To decrease ARPA funding for transfer of $21,096 to project WT2302 – Oakwood Terrace Water Line Replacement. WT2401 Line Replacement – Huntington Drive Phase II 10/01/2023 To provide funding per FY2024 Approved CIP Plan – $520,000 from W/WW Operating Fund. WT2402 Line Replacement – Sotogrande Boulevard Phase I 10/01/2023 To provide funding per FY2024 Approved CIP Plan – $365,000 from W/WW Operating Fund. WW0605 TRA Wastewater Payments – Impact 10/01/2023 To provide additional funding per FY2024 Approved CIP Plan – $100,000 from WW Impact Fee Fund Balance. WW2301 Line Replacement – Cedar Hill Estates South Phase I 05/14/2024 To provide additional funding per City Council Authorization –$149,195 from W/WW CIP Fund Balance. WW2301 Line Replacement – Cedar Hill Estates South Phase I 05/31/2024 To provide additional funding of $71,672 from W/WW CIP Fund Balance. WW2302 Line Replacement – Cedar Hill Estates South Phase II 05/31/2024 To provide additional funding of $126,713 from W/WW CIP Fund Balance. WW2303 FY2023 48th/49th CDBG LR:  Euless Square/Aransas  Drive 05/31/2024 To close project. Any unused CDBG funds will be allocated to future Community Development Block Grant projects. WW2304 Line Replacement – Trailwood Addition 10/01/2023 To provide additional funding per FY2024 Approved CIP Plan – $352,934 from American Rescue Plan Act Fund. WW2304 Line Replacement – Trailwood Addition 10/24/2023 To reallocate ARPA funds of $242,300 to WT2301–$75,203 and WT2302‐ $167,097 per City Council Authorization. WW2304 Line Replacement – Trailwood Addition 05/31/2024 To provide additional funding of $43,915 from W/WW CIP Fund Balance. WW2401 FY2024 50th CDBG LR:  Fair Oaks Boulevard/Shelmar  Drive/Kensinger Court 05/31/2024 To provide funding of $633,972 from Community Development Block Grant. 4 CAPITAL IMPROVEMENTS PROGRAM FUNDED PROJECTS SUMMARY Project Number Project Description Budget as of 5/31/23 Appropriation/ Amendment Budget as of 5/31/24 Expended as of 5/31/24 Remaining Funds Revised Project Cost Estimates Unfunded/ (Excess Funding) DRAINAGE PROJECTS DR9903 Misc. Drainage Improvements 1,170,777$ 70,000$ 1,240,777$ 1,055,863$ 184,914$ 1,240,777$ -$ DR1101 Flooding Mitigation 501,265$ -$ 501,265$ 18,334$ 482,931$ 341,265$ (160,000)$ DR1201 Misc. Creek Maintenance (min bal $100,000)270,000$ -$ 270,000$ 147,392$ 122,608$ 270,000$ -$ FB9902 Fund Balance – Drainage CIP -$ -$ -$ -$ -$ -$ (169,625)$ Total Drainage Projects 1,942,042$ 70,000$ 2,012,042$ 1,221,589$ 790,453$ 1,852,042$ (329,625)$ 5 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 23,1999 RON YOUNG MISCELLANEOUS DRAINAGE IMPROVEMENTS DRAINAGE IMPROVEMENTS DR9903 May 27, 2014: Awarded Bid No. 007-14 to Knight Erosion Control, Inc. for Drainage Channel Improvements along Hurricane Creek and authorized the City Manager to enter into a contract with Knight Erosion Control, Inc. The estimated expenditure is $135,487.82. June 23, 2015: Ratified City Manager action to proceed with emergency repairs to City property located along Hurricane Creek. The estimated expenditure is $74,602. February 26, 2019: Authorized the City Manager to execute a construction contract with Knight Erosion Control, Inc. for channel improvements at the Texas Star Golf Course. The estimated expenditure is $121,440. January 12, 2021: Authorized the City Manager to enter into a contract with Knight Erosion Control Retaining Walls and Construction, to proceed with emergency repairs related to the City’s Sanitary Sewer Collection System, finding that the procurement is necessary due to unforeseen damage to an eight inch aerial sanitary sewer crossing located along Hurricane Creek near 350 Westpark Way, and finding that the repair is necessary to preserve the public health and protect the safety of the City’s residents. The estimated expenditure is $121,000. April 11, 2023: Awarded Bid No. 011-23 for channel improvements at the Texas Star Golf Course to R.C. Retaining Walls, Inc. The estimated expenditure is $130,751.36 with an owner-controlled contingency of five percent of the contractual amount and will be paid from GC2003 and DR9903. The project provides funding for various drainage projects or emergency repairs identified throughout the year. Often correction of these problems requires design services and other improvements such as bank stabilization. As major projects are identified, they will be tracked separately and assigned a different project number. Failure to correct these problems often causes damage to existing infrastructure. 6 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Improvements $1,240,777 $0 $0 $0 $0 $1,240,777 Transfer from: Drainage Operating/CIP Fund $1,382,833 FEMA Reimbursement $84,178 $0 Transfer to DR2201 ($226,234) $0 Annual expense $105,462 $105,462 $1,240,777 Engineering $16,000 $16,000 $0 100% Fence $559 $559 $0 100% Storm Sewers $1,213,023 $1,028,109 $184,914 85% Meters & Setting $195 $195 $0 100% Land-Right-of-Way $11,000 $11,000 $0 100% $1,240,777 $1,055,863 $184,914 85% MISCELLANEOUS DRAINAGE IMPROVEMENTS DR9903 7 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS June 30,2010 RON YOUNG FLOODING MITIGATION DRAINAGE IMPROVEMENTS DR1101 This project consists of identifying chronic flooding locations within the City of Euless and determining the cost/benefit of property acquisition and protection compared to extensive drainage relief projects. Property acquisition will be recommended after consideration of flooding history, appraisals, and feasible alternative drainage solutions have been evaluated. It is recommended that this be established as an ongoing project. Properties throughout the City of Euless situated adjacent to creeks have experienced drainage problems for several years. The cost for implementing drainage improvement projects to mitigate flooding at isolated locations may be much greater than the cost of property acquisition. Chronic flooding lowers the property values and this program will offer a means of relief for affected property owners. 8 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Flooding Mitigation $341,265 $0 $0 $0 $0 $341,265 Transfer from: Drainage CIP Fund Balance $350,000 Drainage Operating Fund $150,000 $0 Miscellaneous Income $1,265 $0 Transfer to: Drainage CIP Fund Balance ($160,000) $0 $341,265 Storm Sewers $341,265 $18,334 $322,931 5% $341,265 $18,334 $322,931 5% FLOODING MITIGATION DR1101 9 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 22,2011 RON YOUNG MISCELLANEOUS CREEK MAINTENANCE DRAINAGE CREEK MAINTENANCE DR1201 The City of Euless completed drainage master plan studies for the major creeks that traverse the City. They include Little Bear Creek, Hurricane Creek, Boyd Branch and Blessing Branch. The project provides for maintenance in the creeks described above including removal of fallen trees that impede the flow of creek water in the natural creek channels, clearing brush and debris at major bridge crossings, and preventative maintenance. This project does not address items that are deemed cosmetic enhancements. Natural creek erosion undermines the root systems of trees adjacent to creek banks which results in trees falling into or across creek channels. These fallen trees together with accumulated brush and debris can impede the flow of storm water in the natural creek channels resulting in a rise in the normal water surface elevation. Fallen trees that are conveyed down stream in the natural creek channels may cause damage to the substructure of bridges spanning the creek channels. 10 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Improvements (Minimum balance $100,000) $0 $0 $0 $0 Transfer from: Drainage CIP Fund Balance $105,000 Drainage Operating Fund $165,000 $0 $0 Annual expense $0 $0 $270,000 Storm Sewers $270,000 $147,392 $122,608 55% $270,000 $147,392 $122,608 55% MISCELLANEOUS CREEK MAINTENANCE DR1201 11 12 CAPITAL IMPROVEMENTS PROGRAM FUNDED PROJECTS SUMMARY Project Number Project Description Budget as of 5/31/23 Appropriation/ Amendment Budget as of 5/31/24 Expended as of 5/31/24 Remaining Funds Revised Project Cost Estimates Unfunded/ (Excess Funding) STREET PROJECTS PS1203 Misc. Street Repairs (min bal $150,000)993,150$ -$ 993,150$ 837,746$ 155,404$ 993,150$ -$ PS1601 East Harwood Road Extension 100,000$ -$ 100,000$ -$ 100,000$ 100,000$ -$ PS1902 FY2019 Street Reconstruction – Pipeline/Highland/Harwood 18,388,501$ 2,278,135$ 20,666,636$ 12,367,601$ 8,299,035$ 21,666,636$ 1,000,000$ PS1903 Misc. Screening Wall Repair (annual transfer $25,000)100,000$ 25,000$ 125,000$ 6,666$ 118,334$ 150,000$ 25,000$ PS2202 Mid-Cities/Cheek-Sparger & SH 121 Intersection/ADA Improvements Design 410,000$ -$ 410,000$ 409,218$ 782$ 410,000$ -$ PS2302 Heritage Avenue – Cheek-Sparger Road to Guadalupe Trail 260,275$ 239,725$ 500,000$ -$ 500,000$ 500,000$ -$ PS2401 FY2024 Street Improvements -$ 1,100,000$ 1,100,000$ 1,068,542$ 31,458$ 1,100,000$ -$ FB9907 Fund Balance – Street CIP -$ -$ -$ -$ -$ -$ (214,027)$ Total Street Projects 20,251,926$ 3,642,860$ 23,894,786$ 14,689,773$ 9,205,013$ 24,919,786$ 810,973$ 13 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 27,2014 HAL CRANOR MISCELLANEOUS STREET REPAIRS STREET IMPROVEMENTS PS1203 April 24, 2012: Authorized the City Manager to enter into a contract with Estrada Concrete Co. LLC for concrete road repairs at various locations on North Main Street, Fuller-Wiser Road, and Bear Creek Parkway in the amount of $93,390. March 11, 2014: Authorized the City Manager to negotiate and execute a contract for a citywide pavement management analysis and asset management inventory with Infrastructure Management Services (IMS). The estimated expenditure is $82,155. February 26, 2019: Authorized the City Manager to execute an Interlocal Agreement between the City of Euless, the City of Bedford, the City of Colleyville, and Tarrant County, Texas for the design and construction of a traffic signal at the intersection of Heritage Avenue and Cheek-Sparger Road. Design costs were paid from this project. The Master Thoroughfare Plan identifies the various street types within the City of Euless. These street types include residential streets through regional arterial streets. This project includes the removal and replacement of deteriorated sections of pavement along identified roadways. Continuing repair of the existing street pavement will maintain safe driving conditions and will extend the overall life of the City streets. 14 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering/Construction (Minimum balance $150,000) $0 $0 $0 $0 Transfer from: Street CIP Fund Balance $511,125 Car Rental & General Fund $300,000 $0 2018 Certificates of Obligation $150,000 $0 Reimbursement-Other Entities $32,025 Annual expense $0 $0 $993,150 Other Professional Services $83,156 $82,331 $825 99% Engineering $47,150 $45,500 $1,650 97% Construction $862,844 $709,915 $152,929 82% $993,150 $837,746 $155,404 84% MISCELLANEOUS STREET REPAIRS PS1203 15 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS June 20,2014 HAL CRANOR EAST HARWOOD ROAD EXTENSION STREET CONSTRUCTION PS1601 The Texas Department of Transportation and DFW Airport are combining efforts to extend East Harwood Road through the airport to Rental Car Drive to provide additional access to airport properties. Euless has committed to share in the cost of the extension in an amount not to exceed $100,000. Design Complete: May 2022 Began Construction: March 2024 Anticipate Construction Complete: FY2025 Participation in the project will provide Euless residents with an additional route to and through the airport properties. 16 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Construction $100,000 $0 $0 $0 $0 $100,000 Transfer from: Car Rental Fund $100,000 $0 $0 $0 $100,000 Construction $100,000 $0 $100,000 0% $100,000 $0 $100,000 0% EAST HARWOOD ROAD EXTENSION PS1601 17 18 HW Y 36 0 HW Y 3 6 0 W AIRFIELD DR BE A R C R E E K P K W Y E MIDWAY D R IN T E R N A T I O N A L P K W Y E ASH LN E HARWOOD RD MI N T E R S C H AP E L R D DO V E T R L WH I T E T A I L R D AM O N C A R T E R B L V D RU S T I C L N PILOT HILL DR R E D M A P L E R D MOUNTAIN LAUREL DR GA R D E N A V E H W Y 3 6 0 H W Y 3 6 0 H W Y 3 6 0 H W Y 3 6 0 HW Y 3 6 0 BE A R C R E E K P K W Y IN T E R N A T I O N AL P K WY EAST HARWOOD ROAD EXTENSION Legend Road Extension 01,4002,800700 Feet 19 Department:Date Prepared:May 25, 2018 Submitted By:Date Completed: Project Title: Project Type:STREET Sub-Type: Project CODE:PS1902 Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: Phase I - South Pipeline/Highland/Harwood Phase II - West Pipeline JUSTIFICATION: IMPROVEMENTS COUNCIL AUTHORIZATION: December 11, 2018: Approved Resolution No. 18-1539 authorizing the City Secretary to publish a notice declaring intention to issue certificates of obligation. January 22, 2019: Approved the first and final reading of Ordinance No. 2212, authorizing issuance of “City of Euless, Texas, Tax and Waterworks and Sewer System (Limited Pledge) Revenue Certificates of Obligation, Series 2019.” December 17, 2019: Authorized the City Manager to negotiate and execute an Engineering Design Contract with Halff Associates, Inc. for the design of the FY2019 Street Reconstruction project. The estimated expenditure is $1,553,600. January 12, 2021: Approved Resolution No. 21-1597 authorizing the City Secretary to publish a notice declaring intention to issue certificates of obligation. January 12, 2021: Awarded Bid No. 001-21 to McMahon Contracting, LP. for the FY2019 Street Reconstruction Phase I project in the amount of $10,078,330.84, authorized an owner-controlled contingency not to exceed 5%, and authorized the City Manager to enter into a contract with McMahon Contracting, LP. March 9, 2021: Approved first and final reading of Ordinance No. 2270 authorizing the issuance of “City of Euless, Texas, Tax and Waterworks and Sewer System (Limited Pledge) Revenue Certificates of Obligation, Series 2021.” March 8, 2022: Authorized an increase of owner-controlled contingency for the FY2019 Street Reconstruction Phase I project from five percent to six percent of the contractual amount. February 14, 2023: Authorized an increase of owner-controlled contingency for the FY2019 Street Reconstruction Phase I project in the amount of $27,133.62 above the previously approved six percent. City of Euless Capital Project Request PUBLIC WORKS HAL CRANOR FY2019 ST RECON–PIPELINE/HIGHLAND/HARWOOD The project scope includes the removal and replacement of asphalt roadway with concrete pavement at the following locations: West Pipeline Road between Arwine Court and Raider Drive, South Pipeline Road between Royal Parkway and Highland Drive, Highland Drive, and Harwood Road between Industrial Boulevard and Main Street. Each reconstructed street will maintain the same width and lane configuration with the exception of Highland Drive, which will become a standard 31 foot wide street from back of curb to back of curb; and South Pipeline Road, which will become a standard 31 foot wide street. The Highland Drive project will include new sidewalk, water, sewer, and storm drain utilities; and the South Pipeline Road project will include new sidewalk and a rehabilitated 16" waterline. The existing asphalt pavement of these streets is deteriorating. The new concrete streets will increase safety, reduce maintenance costs, provide an improved riding surface, and will enhance the appearance of the streets. Design Complete: November 2020 Began Construction: March 2021 Construction Complete: February 2023 Began Design: September 2019 Design Complete: August 2022 Anticipate Begin Construction: July 2024 Anticipate Construction Complete: February 2026 Began Design: September 2019 20 PROJECT TITLE:PROJECT CODE:PS1902 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Engineering $1,620,497 Direct Operating Cost Paving $15,461,728 Personnel:Full Time Drainage $1,076,691 Part Time Water/Wastewater Rehab $1,788,687 $0 Contingency $1,719,033 2019 COs Avg. Annual Debt Service $860,000 2021 COs Avg. Annual Debt Service $333,000 $1,193,000 Total Estimated Capital Cost $21,666,636 Maintenance Costs General Fund $1,936,540 Escrow Fund - ES0296 & ES0292 $28,700 2019 Certificates of Obligation $12,423,813 2021 Certificates of Obligation $5,500,000 $0 Interest Earnings $777,583 $0 Additional Funding Needed: Federal Appropriations Grant $1,000,000 Total Estimated Annual Cost $1,193,000 Total Funding $21,666,636 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED $1,620,497 $1,569,973 $50,524 97% $18,327,106 $10,797,628 $7,529,478 59% $1,719,033 $0 $1,719,033 0% $21,666,636 $12,367,601 $9,299,035 57% Utilities FY2019 ST RECON–PIPELINE/HIGHLAND/HARWOOD Total Salary Purchase of Services Materials & Supplies TOTAL PROJECT Subtotal: Contingency Construction Subtotal: FUNDING SOURCE: Transfer from: CURRENT STATUS Engineering 21 22 N M A I N S T W EULE S S B L V D W PIPELINE RD N I N D U S T R I A L B L V D W ASH LN S M A I N S T WE S T P A R K W A Y W MID-CITIES BLVD SH 1 21 MIDWAY DR AR A N S A S D R MI L A M D R W AIRPORT FWY W HARWOOD RD NI T A L N SHELMAR DR WI L S H I R E D R SI M M ON S DR MARLENE DR OAK LN GLENN DR OA K W O O D D R S I N D U S T R I A L B L V D DO N L E Y D R RA I D E R D R MA R T H A S T HI M E S D R RO Y A L P K W Y CA N N O N D R LAM A R D R TROJAN TRL CO L L I N D R ALLEN DR EVA LN CL I F F W O O D R D WO O D R I D G E C I R ST A N L E Y D R PA M E LA D R LA K E WOO D B L V D RE N E E D R SHADOW LN PA R K E R D R HI G H L A N D D R V I N E S T IR I O N DR SIGNET ST VI N E S T FY 2019 STREET RECONSTRUCTION Legend Street Reconstruction ¯ 03,0006,0001,500 Feet 23 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 26,2018 HAL CRANOR MISCELLANEOUS SCREENING WALL REPAIR STREET IMPROVEMENTS PS1903 The project consists of maintenance and repair of publicly-owned screening walls throughout the City. Screening walls that were constructed at locations including, but not limited to, Harwood Road, West Pipeline Road, Gateway Boulevard, Main Street etc. are in need of periodic maintenance and repair. 24 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Construction $150,000 $0 $0 $0 $0 $150,000 Transfer from: General Fund $75,000 Street CIP Fund Balance $50,000 $0 $0 Additional Funding Needed: Annual expense $0 Transfer from: General Fund $25,000 $0 $150,000 Construction $150,000 $6,666 $143,334 4% $150,000 $6,666 $143,334 4% MISCELLANEOUS SCREENING WALL REPAIR PS1903 25 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 26,2022 HAL CRANOR MID-CITIES BLVD/CHEEK-SPARGER RD&SH 121 IMP DESIGN STREET IMPROVEMENTS PS2202 June 14, 2022: Authorized the City Manager to enter into an Interlocal Agreement with the City of Bedford, relating to roadway and ADA improvements at the intersection of Mid-Cities Blvd./Cheek-Sparger Road and State Highway 121. August 9, 2022: Authorized the City Manager to execute an engineering design contract with Kimley-Horn and Associates. The estimated expenditure is $410,000. August 22, 2022: Authorized the City Manager to execute an Advance Funding Agreement (AFA) with the Texas Department of Transportation (TxDOT). The project scope includes the engineering and design of roadway and the Americans with Disabilities Act (ADA) improvements at the intersection of Mid-Cities Boulevard/Cheek-Sparger Road and State Highway 121. The project consists of additions of left turn lanes along Cheek-Sparger, sidewalks, and ADA ramps. The Cities of Bedford and Euless will contribute funding for project costs. Began Design: September 2022 Design Complete: August 2023 Began Construction: February 2024 Anticipate Construction Complete: August 2024 The existing intersection is lacking turn-lane accommodations and ADA support. The improvements will provide more efficient traffic control and ADA pedestrian support. 26 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Euless Participation - Design $205,000 Bedford Participation - Design $205,000 $0 $0 $0 $0 $410,000 Transfer from: General CIP Fund Balance $106,000 Street CIP Fund Balance $99,000 $0 Reimbursement from Bedford $205,000 $0 $0 $410,000 Engineering $410,000 $409,218 $782 100% $410,000 $409,218 $782 100% MID-CITIES BLVD/CHEEK-SPARGER RD&SH 121 IMP DESIGN PS2202 27 28 29 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 1, 2021 HAL CRANOR HERITAGE AVE – CHEEK-SPARGER RD TO GUADALUPE TR STREET IMPROVEMENTS PS2302 Heritage Avenue is currently a 2-lane asphalt road. The project scope includes concrete roadway reconstruction of Heritage Avenue, turn lane extensions on Heritage Avenue at Cheek-Sparger, additional street lighting, culvert replacement, introduction of concrete curb and gutter, drainage system improvements, sidewalks, and bike paths. The City of Colleyville and City of Euless have each committed $500,000 to the project. The remainder of the project will be funded by Tarrant County ($500,000) and the 2024 Federal Appropriations project ($2,250,000) if approved. Anticipate Begin Design: FY2025 Anticipate Design Complete: FY2026 Anticipate Begin Construction: FY2026 Anticipate Construction Complete: FY2027 The existing asphalt pavement is deteriorating and the new concrete street will increase safety, regional mobility, and connectivity. 30 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: City of Euless Participation $500,000 $0 $0 $0 $0 $500,000 Transfer from: General Fund $487,712 Escrow Fund-ES1403&ES1501 $141,071 Transfer to: Street CIP Fund Balance ($128,783) $0 $500,000 Construction $500,000 $0 $500,000 0% $500,000 $0 $500,000 0% HERITAGE AVE – CHEEK-SPARGER RD TO GUADALUPE TR PS2302 31 32 Street Improvement - Heritage Avenue: Cheek-Sparger Road to Guadalupe Trail Street Improvement -Heritage Ave. Legend None N A 0 260 520 1,040 1,560 2,080 •Street Reconstruction-==-c:::::Jlll---====:::::::i--• Feet 33 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 31,2019 HAL CRANOR FY2024 STREET IMPROVEMENTS STREET IMPROVEMENTS PS2401 The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by pavement condition index of the roadways. Began Construction: October 2023 Anticipate Construction Complete: September 2024 The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, extend the life of the roadway, and enhance the appearance of the streets. 34 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Construction $1,100,000 $0 $0 $0 $0 $1,100,000 Transfer from: General Fund $1,100,000 $0 $0 $0 $1,100,000 Construction $1,100,000 $1,068,542 $31,458 97% $1,100,000 $1,068,542 $31,458 97% FY2024 STREET IMPROVEMENTS PS2401 35 36 CAPITAL IMPROVEMENTS PROGRAM FUNDED PROJECTS SUMMARY Project Number Project Description Budget as of 5/31/23 Appropriation/ Amendment Budget as of 5/31/24 Expended as of 5/31/24 Remaining Funds Revised Project Cost Estimates Unfunded/ (Excess Funding) WASTEWATER PROJECTS WW0002 Misc. Wastewater Rehab (min bal $100,000)881,086$ -$ 881,086$ 761,924$ 119,162$ 981,086$ 100,000$ WW0605 TRA Wastewater Payments – Impact 1,480,000$ 100,000$ 1,580,000$ 1,480,000$ 100,000$ 1,630,000$ 50,000$ WW2301 Line Replacement – Cedar Hill Estates South Phase I 402,000$ 220,867$ 622,867$ 57,606$ 565,261$ 622,867$ -$ WW2302 Line Replacement – Cedar Hill Estates South Phase II 408,000$ 126,713$ 534,713$ 57,606$ 477,107$ 534,713$ -$ WW2304 Line Replacement – Trailwood Addition 3,036,000$ 154,549$ 3,190,549$ 489,655$ 2,700,894$ 3,190,549$ -$ WW2401 FY2024 50th CDBG LR: Fair Oaks Boulevard/Shelmar Drive/Kensinger Court -$ 633,972$ 633,972$ -$ 633,972$ 633,972$ -$ FB9911 Fund Balance – Wastewater Impact (Restricted)-$ -$ -$ -$ -$ -$ (663,834)$ Total Wastewater Projects 6,207,086$ 1,236,101$ 7,443,187$ 2,846,791$ 4,596,396$ 7,593,187$ (513,834)$ 37 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 26,1999 RON YOUNG MISCELLANEOUS WASTEWATER REHABILITATION WASTEWATER MAIN REPLACEMENT WW0002 March 8, 2005: Awarded contract to Hall-Albert Construction Company for the replacement of various wastewater lines in the amount of $977,857.50. (This award was only partially for the WW0002 project.) March 28, 2006: Authorized the City Manager to proceed with emergency repair by GRA-TEX Utilities to the aerial wastewater main crossing Hurricane Creek at a cost of $55,000. November 10, 2015: Awarded Bid No. 008-15, a construction contract to William J. Schultz, Inc. dba Circle C Construction, for the replacement of sanitary sewer mains in portions of the Westwood Village Addition and the Green Hills Park Addition and authorized the City Manager to enter into a contract including add alternate #1 if required. The estimated expenditure is $577,357 and will be paid from WW1501, WW1502, and WW0002. March 10, 2020: Authorized the City Manager to negotiate and execute an Engineering Services Contract with Wier & Associates, Inc. for the design of the El Camino Real sanitary sewer rehabilitation project. The estimated expenditure is $55,000. May 14, 2024: Ratified City Manager action to proceed with emergency repairs related to the City's sanitary sewer distribution system on Main Street from Alexander Lane to Huitt Lane. Excel 4 Construction performed the work and the estimated expenditure was $101,585.46. This project is for funding of small wastewater main projects identified throughout the fiscal year. As larger projects are identified, they will be presented for funding as separate projects. Most of these lines are clay tile and are seriously deteriorated. 38 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Wastewater Mains (Minimum balance $100,000) $0 $0 $0 $0 Transfer from: W/WW Operating Fund $240,000 WW9903 $37,013 $0 W/WW CIP Fund Balance $604,073 $0 Additional Funding Needed: Annual expense $0 Transfer from: W/WW CIP Fund Balance $100,000 $0 $981,086 Engineering $72,939 $66,217 $6,722 91% Contingency $30,580 $30,580 $0 100% Wastewater Mains $877,567 $665,127 $212,440 76% $981,086 $761,924 $219,162 78% MISCELLANEOUS WASTEWATER REHABILITATION WW0002 39 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 03,2006 RON YOUNG TRINITY RIVER AUTHORITY WASTEWATER PAYMENT WASTEWATER IMPACT FEE WW0605 Based on a review by Birkhoff, Hendricks, and Conway of the water and wastewater impact fees, it was determined that a substantial portion of the wastewater impact fee is attributed to Trinity River Authority ("TRA") capital projects. Therefore, these fees should be used to pay a portion of the annual TRA expense, as these funds are directly attributed to the expansion of TRA. The expansion at TRA provides additional capacity and it was determined through the wastewater impact fee study that these funds could be used to pay a portion of TRA wastewater payments. 40 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: TRA Wastewater Payments $1,630,000 $0 $0 ($50,000) ($50,000) $1,630,000 Transfer from: WW Impact Fee Fund Balance $1,580,000 $0 $0 Additional Funding Needed: Transfer from: WW Impact Fee Fund Balance $50,000 ($50,000) $1,630,000 Wastewater - TRA Service $1,630,000 $1,480,000 $150,000 91% $1,630,000 $1,480,000 $150,000 91% TRINITY RIVER AUTHORITY WASTEWATER PAYMENT WW0605 41 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 16,2022 HAL CRANOR LINE REP – CEDAR HILL ESTATES SOUTH PHASE I WASTEWATER MAIN REPLACEMENT WW2301 November 22, 2022: Authorized the City Manager to negotiate and execute an engineering services contract with Plummer Associates, Inc. for the design of the FY2023 Sanitary Sewer Rehabilitation Project. May 14, 2024: Awarded Bid No. 018-23 for the FY2023 Sanitary Sewer Rehabilitation Project to Douglas Dailey Construction, LLC for the replacement of sanitary sewer mains located in Cedar Hill Estates South and authorized the City Manager to enter into a contract with Douglas Dailey Construction, LLC. The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project consists of the replacement of the following wastewater mains: 1. Along Sunset Drive between Vine Street and South Main Street and 2. Along Henslee Drive between Whitener Road and Sunset Drive. Began Design: December 2022 Design Complete: March 2024 Anticipate Begin Construction: July 2024 Anticipate Construction Complete: June 2025 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 42 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering $67,000 Construction $519,502 $0 Contingency $36,365 $0 $0 $0 $622,867 Transfer from: W/WW Operating Fund $67,000 American Rescue Plan Act $335,000 $0 W/WW CIP Fund Balance $220,867 $0 $0 $622,867 Engineering $67,000 $57,606 $9,394 86% Construction $519,502 $0 $519,502 0% Contingency $36,365 $0 $36,365 0% $622,867 $57,606 $565,261 9% LINE REP – CEDAR HILL ESTATES SOUTH PHASE I WW2301 43 44 45 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 16,2022 HAL CRANOR LINE REPLACEMENT – CEDAR HILL ESTATES SOUTH PH II WASTEWATER MAIN REPLACEMENT WW2302 November 22, 2022: Authorized the City Manager to negotiate and execute an engineering services contract with Plummer Associates, Inc. for the design of the FY2023 Sanitary Sewer Rehabilitation Project. May 14, 2024: Awarded Bid No. 018-23 for the FY2023 Sanitary Sewer Rehabilitation Project to Douglas Dailey Construction, LLC for the replacement of sanitary sewer mains located in Cedar Hill Estates South and authorized the City Manager to enter into a contract with Douglas Dailey Construction, LLC. The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project consists of the replacement of the following wastewater mains: 1. Along South Main Street from Whitener Road to South Pipeline Road and 2. Along South Pipeline Road from west of Cannon Drive to South Main Street. Began Design: December 2022 Design Complete: March 2024 Anticipate Begin Construction: July 2024 Anticipate Construction Complete: June 2025 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 46 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering $68,000 Construction $436,180 $0 Contingency $30,533 $0 $0 $0 $534,713 Transfer from: W/WW Operating Fund $68,000 American Rescue Plan Act $340,000 $0 W/WW CIP Fund Balance $126,713 $0 $0 $534,713 Engineering $68,000 $57,606 $10,394 85% Construction $436,180 $0 $436,180 0% Contingency $30,533 $0 $30,533 0% $534,713 $57,606 $477,107 11% LINE REPLACEMENT – CEDAR HILL ESTATES SOUTH PH II WW2302 47 48 49 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 29,2022 HAL CRANOR LINE REPLACEMENT – TRAILWOOD ADDITION WASTEWATER MAIN REPLACEMENT WW2304 November 22, 2022: Authorized the City Manager to negotiate and execute an engineering services contract with Plummer Associates, Inc. for the design of the FY2023 Sanitary Sewer Rehabilitation Project. May 14, 2024: Awarded Bid No. 018-23 for the FY2023 Sanitary Sewer Rehabilitation Project to Douglas Dailey Construction, LLC for the replacement of sanitary sewer mains located in the Trailwood Addition and authorized the City Manager to enter into a contract with Douglas Dailey Construction, LLC. The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project consists of the replacement of wastewater mains in the Trailwood Addition including those along Trailwood Drive, Cripple Creek Drive, Shenandoah Drive, Timberlane Terrace, Summit Ridge Drive, and Shadow Lane. See project map for additional details on specific line locations. Began Design: December 2022 Design Complete: March 2024 Anticipate Begin Construction: July 2024 Anticipate Construction Complete: June 2025 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 50 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering $607,000 Construction $2,414,532 $0 Contingency $169,017 $0 $0 $0 $3,190,549 Transfer from: W/WW Operating Fund $607,000 American Rescue Plan Act $2,539,634 $0 W/WW CIP Fund Balance $43,915 $0 $0 $3,190,549 Engineering $607,000 $489,655 $117,345 81% Construction $2,414,532 $0 $2,414,532 0% Contingency $169,017 $0 $169,017 0% $3,190,549 $489,655 $2,700,894 15% LINE REPLACEMENT – TRAILWOOD ADDITION WW2304 51 52 Line Replacement - Trailwood Addition WILDBRIAR PARK HAVEN LA KEWOO D CRIP P L E CREE K B E NT T R E E BOCOWOOD TR A I L W O O D BE N T TR E E WINCHESTER SHE N A N D O AH WOODDALE TIMBERLANE OAK B E A R C R E E K RUNN I NG BE A R SHADOW MUSK E G MA X W E L L CYPRESS ASPENWAY E A GLE S N ES T G RI F FITH WAD E ANTHONY SUNSHINE ABBEY BOB EDE N M A I N S T ( N ) SUMMIT R I D G E D R BA Z E R D MID-CITI E S BLVD(E ) M ID-C ITI E S B L V D (W ) None 0 380 760 1,140 1,520190 Feet Wastewater Line Replacement -Trailwood Subdivision Legend Wastewater 53 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 21,2024 MAJOR JONES 50TH CDBG LINE REP– FAIR OAKS /SHELMAR/KENSINGER WASTEWATER MAIN REPLACEMENT WW2401 February 13, 2024: Conducted a Public Hearing for the proposed 50th year CDBG project and approved the recommendation. The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project consists of the replacement of the following wastewater mains: 1. Along Fair Oaks Boulevard from Lone Oak Circle to Ash Lane, 2. 302-413 Shelmar Drive, and 2. Kensinger Court. (50th year CDBG project) Anticipate Begin Design: August 2024 Anticipate Design Complete: November 2024 Anticipate Begin Construction: January 2025 Anticipate Construction Complete: June 2025 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 54 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering $99,252 Construction $534,720 $0 $0 $0 $0 $633,972 50th CDBG Award $633,972 $0 $0 $0 $633,972 Engineering $99,252 $0 $99,252 0% Construction $534,720 $0 $534,720 0% $633,972 $0 $633,972 0% 50TH CDBG LINE REP– FAIR OAKS /SHELMAR/KENSINGER WW2401 55 56 Line Replacement - Fair Oaks/Shelmar/Kensinger FA I R O A K S SHELMAR R OU N DT R E ETWIN OAKS OA K CE D A R R I D G E K ENSINGER LO N E O A K ASH LN (W) A R A N S A S D R 0 130 260 390 52065 Feet ¯Wastewater Line Replacement -Fair Oaks Boulevard -Shelmar Drive -Kensinger Court Legend Wastewater 57 58 CAPITAL IMPROVEMENTS PROGRAM FUNDED PROJECTS SUMMARY Project Number Project Description Budget as of 5/31/23 Appropriation/ Amendment Budget as of 5/31/24 Expended as of 5/31/24 Remaining Funds Revised Project Cost Estimates Unfunded/ (Excess Funding) WATER PROJECTS WT0001 Misc. Water Rehab (min bal $150,000)1,128,511$ -$ 1,128,511$ 964,439$ 164,072$ 1,128,511$ -$ WT0104 Well Repairs (annual transfer $50,000)1,763,992$ -$ 1,763,992$ 1,713,435$ 50,557$ 1,813,992$ 50,000$ WT0803 Meters/Transponders/Leak Detection (annual transfer $158,000)2,834,944$ 158,000$ 2,992,944$ 1,482,796$ 1,510,148$ 3,150,944$ 158,000$ WT1403 Reclaimed Water Line Extension Debt Payment - Impact 1,198,602$ 118,050$ 1,316,652$ 1,277,306$ 39,346$ 1,436,702$ 120,050$ WT1603 Misc. Valve Replacement (min bal $150,000)515,000$ -$ 515,000$ 414,051$ 100,949$ 565,000$ 50,000$ WT1604 Reclaimed Water Line Extension Phase III 6,124,803$ -$ 6,124,803$ 4,624,803$ 1,500,000$ 6,124,803$ -$ WT1802 Well Replacement – Fuller/Far North 11,110,110$ -$ 11,110,110$ 11,075,518$ 34,592$ 11,110,110$ -$ WT2301 Line Replacement – Midway Park 1st Addition 574,000$ 75,203$ 649,203$ 323,558$ 325,645$ 649,203$ -$ WT2302 Line Replacement – Oakwood Terrace 1,797,812$ 188,193$ 1,986,005$ 261,628$ 1,724,377$ 1,986,005$ -$ WT2303 Line Replacement – South Main Street 2,102,104$ (21,096)$ 2,081,008$ 220,603$ 1,860,405$ 2,081,008$ -$ WT2401 Line Replacement – Huntington Drive Phase II -$ 520,000$ 520,000$ -$ 520,000$ 520,000$ -$ WT2402 Line Replacement – Sotogrande Boulevard Phase I -$ 365,000$ 365,000$ 34,000$ 331,000$ 365,000$ -$ FB9910 Fund Balance – Water Impact (Restricted)-$ -$ -$ -$ -$ -$ (2,769,418)$ FB9901 Fund Balance – Water & Wastewater CIP -$ -$ -$ -$ -$ -$ (2,131,739)$ Total Water Projects 29,149,878$ 1,403,350$ 30,553,228$ 22,392,137$ 8,161,091$ 30,931,278$ (4,523,107)$ 59 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 10,2014 HAL CRANOR MISCELLANEOUS WATER REHABILITATION WATER MAIN REPLACEMENT WT0001 June 14, 2022: Ratified City Manager action to proceed with emergency repairs to a 24" water main adjacent to the northeast traffic signal pole at the intersection of East Harwood Road and Fuller Wiser Road. The estimated expenditure is $125,000. This project provides funding for small water main projects identified throughout the fiscal year. Large projects that are identified will be presented for funding under a new project name. Some of the City's older water mains have deteriorated and need replacement or repair. 60 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Water Mains (Minimum balance $150,000) $0 $0 $0 $0 Transfers from: W/WW CIP Fund Balance $565,000 W/WW Operating Fund $710,000 $0 Project Transfers ($146,489) $0 Annual expense $0 $0 $1,128,511 Contingency $49,231 $45,234 $3,998 92% Water Mains $1,079,280 $919,205 $160,075 85% $1,128,511 $964,439 $164,072 85% MISCELLANEOUS WATER REHABILITATION WT0001 61 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 27,2014 HAL CRANOR WELL REPAIRS WATER WELL REPAIR WT0104 April 22, 2003: Awarded bid 018-03 for Far North Well pump repair to Layne-Texas for $32,790. February 14, 2006: Awarded bid 011-06 to Millican Well Service, LLC for rehabilitation and installation of the new Centrilift submersible motor and pump for the Far North Well in the amount of $250,035. January 25, 2011: Authorized Millican Well Service, LLC to repair Fuller Well in an amount not to exceed $117,000, budget increase and additional funding of $117,000 required. July 20, 2011: Transferred $95,000 from FB9901 to WT0104 for emergency well repairs. August 9, 2011: Ratified City Manager action to proceed with emergency repairs to the Far North Well site, by Millican Well Service, LLC in an amount not to exceed $95,000. June 26, 2012: Ratified City Manager action to proceed with emergency repairs to the well located at 1400 North Main Street, by Millican Well Service, LLC for an estimated amount of $64,950. May 14, 2013: Authorized well repairs to the well located at 118 W. Fuller Drive (Fuller Well Site) by Millican Well Service, LLC for an estimated amount of $120,000. August 13, 2013: Ratified the City Manager action to proceed with emergency repairs to the City owned and operated water well located at 1400 North Main Street, by Millican Well Service, LLC. The estimated expenditure is $75,178.02. October 27, 2015: Ratified City Manager action to proceed with emergency repairs to the well located at 2591 North Main Street, by Millican Well Service, LLC. The estimated expenditure is $54,128.23. August 16, 2016: Authorized well repairs to the City owned and operated water wells located at 118 W. Fuller Drive (Fuller Well Site) and 2404 N. Main St. (Far North Well Site) by Millican Well Service, LLC, for an estimated amount of $170,426. The funding is being utilized to repair well pumps and for other unexpected well repairs. Maintaining the City's wells results in the ability to produce water at a substantial reduction in cost. 62 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Well Rehabilitation $0 $0 $0 $0 Transfer from: WT0001 - Misc Water Rehab $145,720 W/WW CIP Fund Balance $968,272 $0 W/WW Operating Fund $650,000 $0 Additional Funding Needed: Annual expense $28,435 Transfer from: W/WW Operating Fund $50,000 $28,435 $1,813,992 Well Rehabilitation $1,813,992 $1,713,435 $100,557 94% $1,813,992 $1,713,435 $100,557 94% WELL REPAIRS WT0104 63 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 10,2014 HAL CRANOR METERS/TRANSPONDERS/LEAK DETECTION WATER METERS/TRANSPONDERS WT0803 November 13, 2007: Awarded the annual contract for the purchase of water meters and transponders, and authorized the City Manager to enter into an agreement with Atlas Utility Supply Company in the amount of $383,875. Amount for project not to exceed $331,875. November 11, 2008: Awarded the annual contract for the purchase of water meters and transponders, and authorized the City Manager to enter into an agreement with Atlas Utility Supply Company in the amount of $356,875. Amount for project not to exceed $331,875. February 14, 2012: Awarded the annual contract for the purchase of water meters and transponders, and authorized the City Manager to enter into an agreement with Atlas Utility Company in the amount of $200,000. January 14, 2014: Authorized the City Manager to execute an Engineering Services Contract with Alan Plummer and Associates, Inc. for services in assisting the City with the Texas Water Development Board State Revolving Fund loan applications and the United States Bureau of Reclamation WaterSMART grant application. The estimated amount is $78,000 and a portion of this amount is also authorized for project WT1201-Reclaimed Water Line Extension. February 10, 2015: Awarded the annual contract for the purchase of water meters and transponders, and authorized the City Manager to enter into an agreement with Atlas Utility Supply Company. This project provides funding for the systematic replacement of meters, transponders, and leak detection on an as needed basis as well as the accumulation of funds for future system-wide replacements. On-going This project provides funding for the systematic replacement of meters and transponders on a regular schedule at or near end of asset life. 64 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: (Annual Funding $158,000) Meters/Transponders $0 FY2008 through FY2024 $2,830,787 $0 Meters/Transponders FY2025 $158,000 Debt Issuance Cost $162,157 $0 $0 $3,150,944 Transfer from: W/WW CIP Fund Balance $247,750 W/WW Operating Fund $2,686,000 $0 Proceeds from Sale of Meters $59,194 $0 Additional Funding Needed: Transfer from: W/WW Operating Fund $158,000 $0 $3,150,944 Meters/Transponders $2,988,787 $1,431,196 $1,557,591 48% Debt Issuance Cost $162,157 $51,600 $110,557 32% $3,150,944 $1,482,796 $1,668,148 47% METERS/TRANSPONDERS/LEAK DETECTION WT0803 65 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 31,2013 CHRIS BARKER RECLAIMED WATER LINE EXTENSION DEBT PAYMENT WATER IMPACT FEE WT1403 The reclaimed water system extension was included in the impact fee study. This project includes the transfer of funds from the water impact fee to pay debt service (W/S System Revenue Bonds, Series 2013) related to the extension of the reclaimed water system. Last debt payment is scheduled for July 15, 2033. The project provides a non-potable water source for irrigation which will offset future potable water purchases by the City and will serve to responsibly conserve potable water resources for the City and the region. 66 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Debt Service FY2014-FY2024 $1,316,652 Debt Service FY2025 $120,050 $0 $0 Annual debt payment - water impact fee $120,000 $0 $120,000 $1,436,702 Transfer from: WT Impact Fee Fund Balance $1,316,652 $0 $0 Additional Funding Needed: Transfer from: WT Impact Fee Fund Balance $120,050 $120,000 $1,436,702 Transfer to Debt Service $1,436,702 $1,277,306 $159,396 89% $1,436,702 $1,277,306 $159,396 89% RECLAIMED WATER LINE EXTENSION DEBT PAYMENT WT1403 67 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 11,2015 HAL CRANOR MISCELLANEOUS VALVE REPLACEMENT WATER VALVE REPLACEMENT WT1603 November 22, 2016: Authorized the City Manager to execute a contract for the replacement of a 24-inch water valve, located near the intersection of SH 183 and Sheppard Drive, with Atkins Brothers Equipment Company, Inc. The estimated expenditure is $53,780. August 21, 2023: Ratified City Manager action to proceed with emergency repairs to the Westpark Way City water main. Acadia Services, LLC performed the work and the estimated expenditure is not expected to exceed $180,000. This project will allow for the systematic replacement of valves on an as needed basis. On-going Old and deteriorated water valves prevent water lines from being isolated in the event of a line break. The inability to isolate the smallest segment possible during a line break increases the labor required to isolate the line, as well as the number of residents and fire hydrants that would be affected by a line break. Systematic annual replacement of old deteriorated water valves will increase efficiency, reduce maintenance costs, and ensure maximum fire protection and water service availability. 68 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Water Valves (Minimum balance $150,000) $0 $0 $0 $0 Transfer from: W/WW Operating Fund $285,000 W/WW CIP Fund Balance $230,000 $0 $0 Additional Funding Needed: Annual expense $179,560 Transfer from: W/WW CIP Fund Balance $50,000 $179,560 $565,000 Engineering $10,000 $1,305 $8,695 13% Contingency $10,000 $0 $10,000 0% Construction $545,000 $412,746 $132,254 76% $565,000 $414,051 $150,949 73% MISCELLANEOUS VALVE REPLACEMENT WT1603 69 Department:Date Prepared:June 15, 2015 Submitted By:Date Completed: Project Title: Project Type:WATER Sub-Type: Project CODE:WT1604 Priority: A COUNCIL AUTHORIZATION: March 14, 2017: Authorized the City Manager to negotiate and execute an Engineering Services Contract with Alan Plummer Associates, Inc. for design of the reclaimed water system extension project. Funding is to be provided using remaining unused funds from the Reclaimed Water Line Extension Phase II Project (WT1212) provided through the Texas Water Development Board's Clean Water State Revolving Fund Program. August 29, 2017: Approved Resolution No. 17-1513, requesting financial assistance by authorizing an application to be filed with the Texas Water Development Board. January 9, 2018: Approved Resolution No. 18-1523, requesting financial assistance by authorizing an application to be filed with the Texas Water Development Board (TWDB). The TWDB has requested the City issue a new Resolution authorizing an application to be filed with the TWDB seeking financial assistance in an amount not to exceed $3,260,000 which includes the cost of construction and the TWDB issuance costs. March 13, 2018: Approved the first and final reading of Ordinance No. 2185, authorizing the issuance of City of Euless, Texas, Waterworks and Sewer System Revenue Bonds, Series 2018. March 13, 2018: Approved Resolution No. 18-1528, approving and authorizing the execution of a principle forgiveness agreement with the Texas Water Development Board and an escrow agreement related thereto associated with the City of Euless, Texas, Waterworks and Sewer System Revenue Bonds, Series 2018. December 11, 2018: Awarded Bid No. 008-18, for the construction of the Reclaimed Water Line Extension, Phase III to Joe Funk Construction in the amount of $3,914,798.50. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: City of Euless Capital Project Request PUBLIC WORKS CHRIS BARKER RECLAIMED WATER LINE EXT. PHASE III Began Design: May 2017 February 28, 2023: Approved a Chapter 380 Agreement by and between MM Euless 66 LLC, the City of Euless, and the Euless Development Corporation (EDC) in connection with the Watercolor Planned Development. Anticipate Begin Design for Additional Expansion & Connectivity: FY2026 Construction Complete (Bear Creek Parkway etc.): December 2020 Construction of the project will provide a non-potable water source for irrigation which will offset future potable water purchases by the City and will serve to responsibly conserve potable water resources for the City and the region. The project will extend the City's Reclaimed Water Utility System from a point along Bear Creek Parkway north of Little Bear Creek to a point just south of Glade Road. This portion of the project will supply approximately 17 MG annually to 11 additional properties. The project scope also includes additional expansion of holding capacity and connectivity of the reclaimed system. RECLAIMED WATER SYSTEM The reclaimed water line extension is a continuation of the City's Reclaimed Water Utility System. The feasibility study completed in FY2012 initially contemplated six phases; however, due to remaining funds from Phase II and estimated construction costs the project has been reduced to three phases with this being the final phase. Design Complete: August 2018 Began Construction: March 2019 Anticipate Begin Construction for Additional Expansion & Connectivity: FY2027 70 PROJECT TITLE:PROJECT CODE:WT1604 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Engineering $662,232 Direct Operating Cost Construction $5,414,672 Personnel:Full Time Loan Origination Fee $47,899 Part Time $0 2018 Rev Bond Avg. Annual DS $160,000 2015B Rev Bond Avg. Annual DS (50%) $70,000 $230,000 Total Estimated Capital Cost $6,124,803 Maintenance Costs 2015B Revenue Bond Issue $1,192,103 W/WW CIP Fund Balance $75,093 2018 Revenue Bond Issue $2,785,000 Loan Forgiveness $473,300 $0 Interest Earnings $124,709 $0 W/WW Operating Fund $1,000,000 Rate Stabilization $500,000 Transfer to: W/WW CIP Fund Balance ($25,402) Total Estimated Annual Cost $230,000 Total Funding $6,124,803 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED $662,232 $662,232 ($0)100% $5,414,672 $3,914,672 $1,500,000 72% $47,899 $47,899 $0 100% $6,124,803 $4,624,803 $1,500,000 76% Utilities RECLAIMED WATER LINE EXT. PHASE III Total Salary Purchase of Services Materials & Supplies TOTAL PROJECT Subtotal: Loan Origination Fee Construction Subtotal: FUNDING SOURCE: Transfer from WT1212: CURRENT STATUS Engineering 71 72 FU L L E R - W I S E R R D H W Y 3 6 0 H W Y 3 6 0 BA Y B E R R Y L N ER W I N D R CH I T T A M D R H I L L T R A I L D R HARRINGTON LN CR AN B E R R Y L N H O L L Y D R A L M O N D L N MACK DR PO P P Y LN WILD OAK LN WO O D P A T H D R CECIL LN NE T T L E L N MC D O W E L L D R PAR SLEY LN AC O R N D R HOLIDAY LN BALSAM DR LARK LN HA R R I N G T O N C T GI N G E R L N FOUTAIN PARK DR FOUNTAIN SIDE DR CARAWAY LN ROSEMEAD DR HO L L Y C T PA R K M A N O R C T PA R K G R O V E D R H W Y 3 6 0 H W Y 3 6 0 H W Y 3 6 0 HW Y 3 6 0 H W Y 3 6 0 HWY 3 6 0 H W Y 3 6 0 RECLAIMED WATER LINE EXTENSION PHASE III Legend Reclaimed WL Extension 0 875 1,750437.5 Feet 73 Department:Date Prepared:April 5, 2017 Submitted By:Date Completed: Project Title: Project Type:WATER Sub-Type: Project CODE:WT1802 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: WELL Design Complete: May 2019 Began Construction: July 2019 Construction Complete: May 2023 Began Design: January 2018 August 11, 2020: Authorized the City Manager to execute a professional services agreement with Signature Automation, LLC, for Engineering Services at the Far North and Fuller Well sites. The scope of services include: Program Logic Control (PLC) and Human Machine Interface (HMI) programming, submittal review for proposed equipment, SCADA System testing, operations manuals and training. The estimated expenditure is $73,540. May 12, 2020: Authorized the City Manager to negotiate and execute an Engineering Construction Management Agreement with Alan Plummer Associates. The estimated expenditure is $121,875 for basic services and a budget allowance of up to $40,000 for additional services. RW Harden & Associates completed a Preliminary Well Design Study in FY2017 in preparation for the replacement of the Fuller Well, Far North Well, and the eventual replacement of the 1400 North Main Well. City of Euless Capital Project Request PUBLIC WORKS HAL CRANOR WELL REPLACEMENT – FULLER/FAR NORTH RW Harden & Associates completed a Preliminary Well Design Study in FY2017 in preparation for the replacement of the Fuller Well, Far North Well, and the eventual replacement of the 1400 North Main Well. The Fuller and Far North Well are in need of immediate replacement. New wells will enable the City to provide high quality water to citizens while reducing maintenance and operational costs. August 3, 2020: Authorized the City Manager to purchase and contract for the installation of two water well pumps, motors, and associated appurtenances at the Far North and Fuller Wells, in the amount of $542,060, through Weisinger, Incorporated. November 28, 2017: Authorized the City Manager to negotiate and execute an Engineering Design Contract with Alan Plummer Associates, Inc. for the design of two water wells to replace the existing Fuller Well and Far North Well. The scope of work for this portion of the project includes the design of the above ground well facilities including booster pumps, electrical, and facilities required to operate the new wells. November 28, 2017: Authorized the City Manager to execute an Engineering Design Contract with RW Harden and Associates, Inc. for the design of two water wells to replace the existing Fuller Well and Far North Well. The scope of work for this portion of the project includes all below ground and associated work at the well facilities, the casing, screen, well head, and pump equipment. September 25, 2018: Approved Resolution 18-1537, requesting financial assistance by authorizing an application to be filed with the Texas Water Development Board for a Drinking Water State Revolving Fund Loan. March 26, 2019: Approved the first and final reading of Ordinance No. 2216, authorizing the issuance of City of Euless, Texas, Waterworks and Sewer System Revenue Bonds, Series 2019. June 25, 2019: Authorized award of Bid No. 003-19, for a construction contract to Weisinger Incorporated for well construction and plugging of the Far North and Fuller Wells in the amount of $6,426,500, less Change Order No. 1, a deduction of $577,400, for a total net amount of $5,849,100. April 14, 2020: Approved award of Bid No. 002-20 for a construction contract to Felix Construction Company for the construction of the Fuller and Far North Well project in the amount of $2,631,000. The project consists of the engineering design and complete replacement of the Fuller and Far North Wells with new 1,800 foot deep wells. October 12, 2021: Authorized a change order to the construction contract with Felix Construction Company for the above ground infrastructure and appurtenances portion of the Fuller and Far North Well project in the amount of $214,074.62. The change order provides for additional work including electrical modifications, piping, painting, concrete flat work, and fencing. August 9, 2022: Ratified City Manager action to proceed with emergency repairs to the City's water wells at Fuller and Far North Well lots. In order to maintain the existing warranty of the new wells, Weisinger Incorporated will perform the work at an estimated expenditure of $417,810. 74 PROJECT TITLE:PROJECT CODE:WT1802 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Engineering $886,480 Direct Operating Cost Construction $9,825,540 Personnel:Full Time Loan Origination Fee $195,215 Part Time $0 Construction Administration $202,875 $0 Average Debt Service $381,000 $381,000 Total Estimated Capital Cost $11,110,110 Maintenance Costs W/WW Operating Fund $723,000 W/WW CIP Fund Balance $60,480 Rate Stabilization $900,000 2019 Revenue Bond Issue $9,275,000 $0 Interest Earnings $154,049 $0 Insurance Proceeds $50,658 Transfer to: WT2201-1 Mil Well Rep. Design ($53,077) Total Estimated Annual Cost $381,000 Total Funding $11,110,110 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $886,480 $885,340 $1,140 100% $9,825,540 $9,801,625 $23,915 100% Loan Origination Fee $195,215 $195,215 $0 100% $202,875 $193,338 $9,537 95% $11,110,110 $11,075,518 $34,592 100% Utilities WELL REPLACEMENT – FULLER/FAR NORTH Total Salary Purchase of Services Materials & Supplies TOTAL PROJECT Subtotal: Construction Subtotal: Construction Administration FUNDING SOURCE: Transfer from: CURRENT STATUS Engineering 75 76 N M A I N S T W ASH LN N I N D U S T R I A L B L V D AR A N S A S D R E MIDWAY D R HW Y 3 6 0 N E C T O R D R E ASH LN W MID-CITIES BLVD SH 1 2 1 E HARWOOD RD H W Y 3 6 0 E MID-CITIES BLVD W HARWOOD RD SHELMAR DR GLENN DR DO N L E Y D R DE N T O N D R CR A N E D R E DENT O N D R RI O G R A N D E B L V D LAM A R D R TROJAN TRL CO L L I N D R HIM E S D R GA T E W A Y B L V D FA Y E T T E D R E FULLER DR ALLEN DR JANANN ST MI N T E R S C H A P E L R D SH 1 2 1 CINNAMON LN LARK LN BEAR CREEK DR BE L L D R LA K E W O O D B L V D BA Y B E R R Y L N ER W I N D R A N G E L A L N SHADOW LN WESTOVER DR CLINIC DR SIXPENCE LN TOWN CREEK DR CH I T T A M D R PI N E V I E W D R LAUREL LN PA R K E R D R MILLA LN OA K T I M B E R D R FR E E S T O NE D R LIM E S T O N E D R R U S K D R HARRIN G T O N L N ST O N E W A L L D R WI N S T O N D R DEL T A D R COUNTRY LN ANICE LN BAZ E R D DA R L E N E T R BOB ED E N L A N E WALNUT WAY BENT TREE DR SA L E M D R MA R S H A L L D R PRIEST LN SPRINGRIDGE LN ABBEY RD RU S T I C L N HIGH HAWK TR OAK FOREST TRL L I T T L E B E A R T R HIGHVIEW DR PILOT HILL DR FALLS DR RAMBLING LN PINION DR RI V E R B I R C H R D PARSLEY LN AC O R N D R HOLIDAY LN DRAKE DR BALSAM DR GA R D E N A V E FOUTAIN PARK DR HORSE SHOE DR FOUNTAIN SIDE DR AS T E R D R KIMBLE DR H W Y 3 6 0 H W Y 3 6 0 SH 1 2 1 H W Y 3 6 0 WELL REPLACEMENT- )8//(5 )$51257+ Legend Well Replacement 01,7503,500875 Feet 77 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 18,2022 HAL CRANOR LINE REPLACEMENT – MIDWAY PARK 1ST ADDITION WATER MAIN REPLACEMENT WT2301 November 22, 2022: Authorized the City Manager to negotiate and execute an engineering services contract with Plummer Associates, Inc. for the design of the FY2023 Water Rehabilitation Project. October 24, 2023: Awarded Bid No. 015-23 for the FY2023 Water Rehabilitation Project to A&B Construction, LLC for the replacement of water mains located in Midway Park 1st Addition and authorized the City Manager to enter into a contract with A&B Construction, LLC. The water mains included in this project are part of the City's Water System Master Plan. The project consists of the replacement of an existing 6 inch cast iron water line located along Collin Drive from Denton Drive to Harwood Road. Began Design: December 2022 Design Complete: August 2023 Began Construction: March 2024 Anticipate Construction Complete: February 2025 Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 78 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering $52,000 Construction $585,493 $0 Contingency $11,710 $0 $0 $0 $649,203 Transfer from: W/WW Operating Fund $52,000 American Rescue Plan Act $597,203 $0 $0 $0 $649,203 Engineering $52,000 $38,404 $13,596 74% Construction $585,493 $285,154 $300,339 49% Contingency $11,710 $0 $11,710 0% $649,203 $323,558 $325,645 50% LINE REPLACEMENT – MIDWAY PARK 1ST ADDITION WT2301 79 80 Line Replacement - Midway Park 1st Addition TARRANT M I L A M BL E S S I N G C R E E KDALLAS BE L L CO L L I N FALLS FANNIN TRAVIS IR I O N HA R R I S DE N T O N HARWOOD RD (W) MA I N S T ( N ) None 0 240 480 720 960120 Feet Legend Water Water Line Replacement -Collin Dr. 81 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 18,2022 HAL CRANOR LINE REPLACEMENT – OAKWOOD TERRACE WATER MAIN REPLACEMENT WT2302 November 22, 2022: Authorized the City Manager to negotiate and execute an engineering services contract with Plummer Associates, Inc. for the design of the FY2023 Water Rehabilitation Project. October 24, 2023: Awarded Bid No. 015-23 for the FY2023 Water Rehabilitation Project to A&B Construction, LLC for the replacement of water mains located in Oakwood Terrace and authorized the City Manager to enter into a contract with A&B Construction, LLC. The water mains included in this project are part of the City's Water System Master Plan. The project consists of the replacement of the water mains along South Main Street to include E. Whitener Road, Jean Lane, Reaves Court, and Henslee Drive. Mains along the Southern border of Spring Valley Apartment Complex's open space are also included in the project scope. See project map for details about specific line replacements. Began Design: December 2022 Design Complete: August 2023 Began Construction: March 2024 Anticipate Construction Complete: February 2025 Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 82 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering $179,781 Construction $1,770,808 $0 Contingency $35,416 $0 $0 $0 $1,986,005 Transfer from: W/WW Operating Fund $179,781 American Rescue Plan Act $1,806,224 $0 $0 $0 $1,986,005 Engineering $179,781 $144,016 $35,765 80% Construction $1,770,808 $117,612 $1,653,196 7% Contingency $35,416 $0 $35,416 0% $1,986,005 $261,628 $1,724,377 13% LINE REPLACEMENT – OAKWOOD TERRACE WT2302 83 84 85 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 18,2022 HAL CRANOR LINE REPLACEMENT – SOUTH MAIN STREET WATER MAIN REPLACEMENT WT2303 November 22, 2022: Authorized the City Manager to negotiate and execute an engineering services contract with Plummer Associates, Inc. for the design of the FY2023 Water Rehabilitation Project. October 24, 2023: Awarded Bid No. 015-23 for the FY2023 Water Rehabilitation Project to A&B Construction, LLC for the replacement of water mains located along South Main Street and authorized the City Manager to enter into a contract with A&B Construction, LLC. The water mains included in this project are part of the City's Water System Master Plan. The project consists of the replacement of the water mains along South Main Street, Gaye Court, Jefflyn Court, West Huitt Lane, Linda Lane, Arnett Drive, West Alexander Lane, and Ross Avenue. See project map for details about specific line replacements. Began Design: December 2022 Design Complete: August 2023 Began Construction: March 2024 Anticipate Construction Complete: February 2025 Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 86 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering $210,210 Construction $1,834,114 $0 Contingency $36,684 $0 $0 $0 $2,081,008 Transfer from: W/WW Operating Fund $101,219 W/WW CIP Fund Balance $108,991 $0 American Rescue Plan Act $1,870,798 $0 $0 $2,081,008 Engineering $210,210 $172,819 $37,391 82% Construction $1,834,114 $47,784 $1,786,330 3% Contingency $36,684 $0 $36,684 0% $2,081,008 $220,603 $1,860,405 11% LINE REPLACEMENT – SOUTH MAIN STREET WT2303 87 88 89 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS June 08,2023 MAJOR JONES LINE REPLACEMENT – HUNTINGTON DRIVE PHASE II WATER MAIN REPLACEMENT WT2401 The water mains included in this project are part of the City's Water System Master Plan. The project consists of the replacement of an existing 6 inch AC water line located along Huntington Drive between East Huitt Lane and Koen Lane. Additionally, replacement of lateral tie-ins located on North Atkerson Lane and Koen Lane will be included as well. Began Design: January 2022 Anticipate Design Complete: June 2024 Anticipate Begin Construction: September 2024 Anticipate Construction Complete: December 2024 Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 90 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering $15,000 Construction $505,000 $0 $0 $0 $0 $520,000 Transfer from: W/WW Operating Fund $520,000 $0 $0 $0 $520,000 Engineering $15,000 $0 $15,000 0% Construction $505,000 $0 $505,000 0% $520,000 $0 $520,000 0% LINE REPLACEMENT – HUNTINGTON DRIVE PHASE II WT2401 91 92 LINE REPLACEMENT – HUNTINGTON DRIVE PHASE II K OEN S LA U G H T ER H U N T I N G T O N D I C K E Y J O H N V E R N O N D I C K E Y H U N T I N G T O N S L A U G H T E R COPH ER ATKERSO N A T KE R S ON HUITT L N (E ) 0 150 300 450 60075 Feet ¯Legend Water Water Line Replacement -Huntington Dr. -E. Huitt Ln. -N. Atkerson Ln. -Koen Ln. 93 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 31,2023 MAJOR JONES LINE REPLACEMENT – SOTOGRANDE BLVD PHASE I WATER MAIN REPLACEMENT WT2402 The water mains included in this project are part of the City's Water System Master Plan. The project consists of the replacement of three existing 6 inch AC water line laterals located along Sotogrande Boulevard from El Camino Real to Monterrey Boulevard. Began Design: February 2024 Anticipate Design Complete: June 2024 Anticipate Begin Construction: September 2024 Anticipate Construction Complete: December 2024 Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 94 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering $38,000 Construction $327,000 $0 $0 $0 $0 $365,000 Transfer from: W/WW Operating Fund $365,000 $0 $0 $0 $365,000 Engineering $38,000 $34,000 $4,000 89% Construction $327,000 $0 $327,000 0% $365,000 $34,000 $331,000 9% LINE REPLACEMENT – SOTOGRANDE BLVD PHASE I WT2402 95 96 LINE REPLACEMENT – SOTOGRANDE BLVD PHASE I B R Y A N D E E EL C A M I N OREAL PIPELINE RD (W) SOT O G R A N D E B L V D 0 150 300 450 60075 Feet kLegend Water Water Line Replacement -Sotogrande Blvd. 97 98 CAPITAL IMPROVEMENTS PROGRAM FUNDED PROJECTS SUMMARY Project Number Project Description Budget as of 5/31/23 Appropriation/ Amendment Budget as of 5/31/24 Expended as of 5/31/24 Remaining Funds Revised Project Cost Estimates Unfunded/ (Excess Funding) OTHER AC1901 Texas Star Sports Complex Phase VII 5,102,552$ 24,755$ 5,127,307$ 4,916,380$ 210,927$ 5,127,307$ -$ CM0304 Entry Monument Sign Program 145,782$ -$ 145,782$ 121,427$ 24,355$ 145,782$ -$ CM0804 Redevelopment 11,154,172$ 1,631,126$ 12,785,298$ 11,646,951$ 1,138,347$ 13,785,298$ 1,000,000$ CM1701 Municipal Plaza Improvements Phase II 446,733$ -$ 446,733$ 216,445$ 230,288$ 446,733$ -$ DV9901 EDC Incentive Funds (annual transfer $25,000)1,750,854$ 25,000$ 1,775,854$ 1,351,148$ 424,706$ 1,800,854$ 25,000$ ED1002 EDC Contingency 325,000$ -$ 325,000$ 68,772$ 256,228$ 325,000$ -$ ED1601 Midtown Development 16,417,980$ -$ 16,417,980$ 16,348,505$ 69,475$ 16,417,980$ -$ FM1201 ADA/TAS Facility Improvements (min bal $75,000)200,000$ -$ 200,000$ 138,295$ 61,705$ 215,000$ 15,000$ FM2207 FY2022 Roof Repairs & Preventative Maintenance 94,000$ -$ 94,000$ -$ 94,000$ 94,000$ -$ FM2311 Fire Station #2 10,349,150$ 625,695$ 10,974,845$ 4,863,709$ 6,111,136$ 10,974,845$ -$ FM2312 Police & Courts Building Remodel 960,000$ 25,943,205$ 26,903,205$ 743,096$ 26,160,109$ 26,903,205$ -$ FM2409 Animal Shelter Expansion/Renovation -$ 6,125,000$ 6,125,000$ 88,857$ 6,036,143$ 6,275,000$ 150,000$ GC1801 TSGC Misc. Improvements (min bal $150,000)587,180$ 50,000$ 637,180$ 550,937$ 86,243$ 712,180$ 75,000$ PR0720 Misc. Park Improvements (min bal $200,000)1,618,253$ 200,000$ 1,818,253$ 1,638,163$ 180,090$ 2,018,253$ 200,000$ PR0804 Park Irrigation (annual transfer $25,000)400,000$ 25,000$ 425,000$ 259,800$ 165,200$ 450,000$ 25,000$ PR2011 Wilshire Park Upgrades 2,222,864$ -$ 2,222,864$ 1,961,465$ 261,399$ 2,222,864$ -$ PR2203 Blessing Branch Park Improvements 365,064$ -$ 365,064$ 267,870$ 97,194$ 365,064$ -$ PR2404 Parks at Texas Star Lighting Upgrade -$ 703,350$ 703,350$ 703,350$ -$ 703,350$ -$ FB9906 Fund Balance – EDC CIP -$ -$ -$ -$ -$ -$ (1,710,922)$ FB9908 Fund Balance – Parks at Texas Star CIP -$ -$ -$ -$ -$ -$ (156,392)$ FB9909 Fund Balance – General CIP -$ -$ -$ -$ -$ -$ (4,233,875)$ FB9913 Fund Balance – Car Rental CIP -$ -$ -$ -$ -$ -$ (91,834)$ FB9916 Fund Balance – TSGC CIP -$ -$ -$ -$ -$ -$ (28,591)$ Total Other Projects 52,139,584$ 35,353,131$ $87,492,715 $45,885,170 41,607,545$ $88,982,715 (4,731,614)$ 99 Department:Date Prepared:April 24, 2018 Submitted By:Date Completed: Project Title: Project Type:PARK/RECREATION Sub-Type: Project CODE:AC1901 Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: Design Complete: May 2020 Anticipate Construction Complete for Archway Entry Sign: October 2024 Construction Complete: April 2021 JUSTIFICATION: With the completion of Phase VII, the new infields will increase programming opportunities as well as substantially reduce the number of rain outs. The planning, design, and construction for Texas Star Sports Complex Phase VII. The project scope includes renovating the existing infields with synthetic turf, renovating the existing facility to meet current ADA standards, renovating the existing restroom/concession building, creating new office space for staff, upgrading the lighting system to LED, new entry signs, and demolition of driveway. Office Building Complete: December 2023 City of Euless Capital Project Request COMMUNITY SERVICES RAY MCDONALD TEXAS STAR SPORTS COMPLEX PHASE VII TSSC IMPROVEMENTS The Texas Star Sports Complex Phase VII includes renovating the existing infields with synthetic turf, renovating the existing concession/restroom building, building new offices for staff, and upgrading the existing lighting from metal-halide to LED. With the growing number of participants in youth baseball, renovating the existing infields with synthetic turf will allow staff the opportunity to expand existing leagues as well as programming for additional leagues in adult softball. Synthetic turf infields will also substantially reduce the number of rain outs which results in lost revenue. The addition of this phase will ensure that the Texas Star Sports Complex remains the premier sports facility for amateur athletics for many years to come. Began Construction: July 2020 Began Design: January 2019 COUNCIL AUTHORIZATION: August 14, 2018: Ratified the Euless Development Corporation (EDC) action taken on August 13, 2018, approving EDC Resolution No. 21-18, declaring a project for improvements at the Parks at Texas Star including Softball Facilities. October 23, 2018: Ratified the Euless Development Corporation action taken on October 23, 2018, authorizing the Euless Development Corporation President to negotiate and execute an Architectural Services Contract with Oxley W illiams Tharp Architects for the planning and design of Texas Star Sports Complex Phase VII (Softball World). November 12, 2019: Approved all matters incident and related to the issuance and sale of "Euless Development Corporation Sales Tax Revenue Bonds, Series 2019," including the adoption of Resolution No. 19-1559. March 24, 2020: Authorized the purchase and installation of sports turf at the Parks at Texas Star Phase VII from GeoSurfaces, Inc. through the TIPS Interlocal Purchasing System (TIPS #170205) in the amount of $681,200, as well as the purchase and installation of an LED Retrofit lighting system from GeoSport Lighting Systems, LLC. through the TIPS Interlocal Purchasing System (TIPS #18120601) in the amount of $434,700. April 28, 2020: Awarded Bid No. 007-20 for the purchase and installation of outfield fence and backstop wall padding for the Parks at Texas Star Phase VII to Sports Graphics, Inc. The estimated expenditure is $188,000. June 9, 2020: Awarded Bid No. 009-20 for the Parks at Texas Star Phase VII renovation to Henthorn Commercial Construction, LLC and authorized the City Manager to enter into a contract with Henthorn Commercial Construction, LLC. The total estimated expenditure is $2,228,500. August 24, 2020: Authorized the purchase, delivery, and installation of 292,000 square feet of TifTuf Bermuda sod from Tri- Tex Grass, for the Parks at Texas Star Phase VII through the BuyBoard Cooperative Purchasing Program No. 611-20. The estimated expenditure is $137,240. January 24, 2023: Awarded Bid No. 002-23 for design/build services including construction administration and general contracting services for the Texas Star Athletic Staff Offices and authorized the City Manager to enter into a design/build contract with Gomez Floor Covering, Inc, dba GFC Contracting. The estimated expenditure is $411,914. May 28, 2024: Awarded Bid No. 006-24 for the construction of the Parks at Texas Star North archway entry sign to Mello Signs. The estimated expenditure is $148,232. 100 PROJECT TITLE:PROJECT CODE:AC1901 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Planning and Design $196,000 Direct Operating Cost Construction $4,674,559 Personnel:Full Time Contingency $76,635 Part Time $0 Parking Lot $51,708 $0 Debt Issuance Cost $128,405 Average Annual Debt Service $279,000 $279,000 Total Estimated Capital Cost $5,127,307 Maintenance Costs EDC Operating Fund $655,000 PR2309 - PATS N Parking Lot $49,908 $0 2019 EDC Revenue Bonds $4,358,215 $0 Interest Earnings $64,184 Total Estimated Annual Cost $279,000 Total Funding $5,127,307 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED $196,000 $196,000 $0 100% $4,674,559 $4,492,371 $182,188 96% $76,635 $47,944 $28,691 63% Parking Lot $51,708 $51,660 $48 100% Debt Issuance Cost $128,405 $128,405 $0 100% $5,127,307 $4,916,380 $210,927 96% Utilities TEXAS STAR SPORTS COMPLEX PHASE VII Total Salary Purchase of Services Materials & Supplies TOTAL PROJECT Subtotal: Contingency Construction Subtotal: FUNDING SOURCE: Transfer from: CURRENT STATUS Planning and Design 101 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: CITY MANAGER July 11,2006 JOE HENNIG ENTRY MONUMENT SIGN PROGRAM MISCELLANEOUS IMPROVEMENTS CM0304 Continuation of the original City of Euless Entry Monument Sign Program. Continued construction of City of Euless entry monument signs at key visibility points throughout the City extending Euless beautification and branding efforts. To enable continuous efforts to identify, beautify, and brand the City of Euless. 102 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Land Betterments $145,782 $0 $0 $0 $0 $145,782 Transfer from: Car Rental Fund $135,782 Car Rental CIP Fund Balance $10,000 $0 $0 $0 $145,782 Land Betterments $145,782 $121,427 24,355 83% $145,782 $121,427 $24,355 83% ENTRY MONUMENT SIGN PROGRAM CM0304 103 Department:Date Prepared:July 11, 2006 Submitted By:Date Completed: Project Title: Project Type:MISCELLANEOUS Sub-Type: Project CODE:CM0804 Priority: A COUNCIL AUTHORIZATION: October 10, 2017: Authorized the sale of City owned property and structure located at 911 Highland Drive. FY2023 Property Acquisitions: 914 Highland Drive and 109 Ross Avenue. FY2024 Property Acquisitions: 911 Cresthaven Drive, 1009 Cresthaven Drive, and 108 West Midway Drive. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: November 10, 2015: Authorized the City Manager to execute an agreement to accept contributions from Gardner Capital Texas, LLC and Bloomfield Homes Fund, LP to a Community Revitalization Fund in the amount of $100,000. City of Euless Capital Project Request CITY MANAGER GARY MCKAMIE REDEVELOPMENT DEVELOPMENT FY2015 Property Acquisitions: 903 Cresthaven Drive, 1447 West Euless Boulevard, 901 Highland Drive, 904 Highland Drive, and 215 East Ash Lane. FY2008 Property Acquisitions: 1010 Highland Drive, 1010 Cresthaven Drive, and 710 South Main. FY2013 Property Acquisitions: North Sheppard Drive (10 lots), 908 Cresthaven Drive, and 910 Cresthaven Drive. FY2009 Property Acquisitions: 1007 Cresthaven Drive, 912 Cresthaven Drive, 1005 Cresthaven Drive, and 1002 Highland Drive. As the City ages, it is imperative that the economic vitality of the City remain strong. Reinvestment into the community will protect property values from deterioration and keep commercial properties occupied and vibrant. November 10, 2015: Authorized the Mayor to negotiate and execute conveyance documents for the sale of City owned property located at 203, 204, and 205 Dickey Drive. FY2016 Property Acquisitions: 905 Cresthaven Drive. FY2017 Property Acquisitions: 909 Highland Drive, 911 Highland Drive, 1000 Highland Drive, and 1011 Cresthaven Drive. FY2019 Property Acquisitions: 913 Cresthaven Dr., 1001 Cresthaven Dr., 908 Highland Dr., 1001 Highland Dr., 1003 Highland Dr., 109 Ross Ave., and property located at SH183 at Main Street, Tract 16 and 17. FY2020 Property Acquisitions: 909 Cresthaven Drive, 910 Highland Drive, and 913 Highland Drive. This project provides funding to allow the City to participate in redevelopment projects and other community improvements or make acquisitions of property that will be of economic benefit to the City of Euless. Project includes City participation in community redevelopment projects and property acquisitions that will be of economic benefit to the City. Long-term on-going project for continuous improvement of the community. FY2021 Property Acquisitions: 901 Cresthaven Drive, 907 Cresthaven Drive, 902 Highland Drive, 1009 Highland Drive, 1011 Highland Drive, and 1451 W Euless Boulevard. FY2018 Property Acquisitions: 906 Highland Drive, 917 Highland Drive, 1005 Highland Drive, 902 Cresthaven Drive, and a portion of Block 1, Lot 5 in the S.W. Mills Subdivision. FY2021 Sale of Property: 906 Cresthaven Drive and Solomon Huitt Survey, No. 705, Tarrant County TX (N Main Street). FY2022 Property Acquisitions: 903 Highland Drive, 905 Highland Drive, 907 Highland Drive, 912 Highland Drive, 915 Highland Drive, 916 Highland Drive, 1007 Highland Drive, and 2214 W. Euless Boulevard. FY2022 Sale of Property: 908 Cresthaven Drive, 910 Cresthaven Drive, and 912 Cresthaven Drive. 104 PROJECT TITLE:PROJECT CODE:CM0804 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Land Acquisition $11,315,994 Direct Operating Cost Demolition $610,194 Personnel:Full Time Minor Apparatus $197 Part Time $0 Incentives $1,010,000 $0 Revitalization Target Area #1 $150,000 Other Professional Services $473,913 $100,000 $125,000 $0 Total Estimated Capital Cost $13,785,298 Maintenance Costs $3,755,000 Car Rental Operating/CIP Fund $8,200,000 Miscellaneous Other $830,298 $0 $0 Additional Funding Needed: Transfer from: Car Rental Fund $1,000,000 Total Estimated Annual Cost $0 Total Funding $13,785,298 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $11,315,994 $10,330,265 $985,729 91% $610,194 $593,995 $16,199 97% $197 $167 $30 85% Incentives $1,160,000 $160,000 $1,000,000 14% $473,913 $466,928 $6,985 99% Improvements $100,000 $94,273 $5,727 94% Landscaping $125,000 $1,323 $123,677 1% $13,785,298 $11,646,951 $2,138,347 84% Subtotal: Professional Services FUNDING SOURCE: Transfer from: General Fund CURRENT STATUS Land Acquisition TOTAL PROJECT Subtotal: Minor Apparatus Demolition REDEVELOPMENT Total Salary Purchase of Services Materials & Supplies Improvements Utilities Landscaping 105 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS June 03, 2014 HAL CRANOR MUNICIPAL PLAZA IMPROVEMENTS PHASE II FACILITIES IMPROVEMENTS CM1701 May 12, 2020: Awarded Bid No. 010-20 for the purchase and installation of an operable louvered canopy for the Mary Lib Saleh Euless Public Library, to Equinox Louvered Roof. The estimated expenditure is $83,960. This project includes the landscaping and irrigation related to the 40th CDBG ADA accessibility and infrastructure improvements. Landscaping and irrigation improvements to the Municipal Plaza following the 40th CDBG ADA accessibility and infrastructure improvements. Project will extend to the Library entrance from the courtyard and includes an operable louvered canopy for the Library's west-side patio. Anticipate Construction Compete: FY2025 Beautification of the municipal plaza following the hardscape improvements. 106 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Landscaping $439,532 Equipment $7,201 $0 $0 $0 $0 $446,733 Transfer from: General Fund $280,000 Car Rental Fund (Phase I) $116,733 $0 General CIP Fund Balance $50,000 $0 $0 $446,733 Landscaping $439,532 $209,244 $230,288 48% Equipment $7,201 $7,201 $0 100% $446,733 $216,445 $230,288 48% MUNICIPAL PLAZA IMPROVEMENTS PHASE II CM1701 107 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: ECONOMIC DEVELOPMENT July 26,1999 BILL RIDGWAY EULESS DEVELOPMENT CORPORATION INCENTIVE EDC DEVELOPMENT DV9901 March 27, 2001: Approved transfer of $325,000 to North Main Street for right-of-way to free up funds for a sign program. May 30, 2006: Approved payment to Professional Turf Products, Inc. in the amount of $300,000 per agreement. April 24, 2012: Ratified Euless Development Corporation (EDC) action taken on April 23, 2012, to approve the first amendment to the lease and incentive agreement by and between the EDC, the City of Euless and U.S. Concrete, Inc. and its subsidiary Redi-Mix, L.L.C., and authorizing the President to make the modification and execute such amendment. The agreement called for a $150,000 incentive payment upon the successful relocation of the US Concrete corporate headquarters to Euless. December 12, 2017: Approved the EDC projects and actions taken by the EDC Board of Directors on December 12, 2017 which included authorizing the President to negotiate and execute conveyance documents for the purchase of property located at 411 North Main Street. February 28, 2023: Approved a Chapter 380 Agreement by and between MM Euless 66 LLC, the City of Euless, and the Euless Development Corporation (EDC) in connection with the Watercolor Planned Development. Euless Development Corporation funds that have been set aside to aid the City of Euless in attracting development opportunities. Funding this project enables the City to act quickly on development opportunities that arise throughout the year. 108 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Will be based on the merits of each opportunity. $0 $0 $0 $0 Transfer from: EDC CIP Fund Balance $1,338,454 EDC Operating Fund $975,000 $0 ED1002 - EDC Contingency $250,000 $0 Transfer to FS#2 & N Main ($787,600) Additional Funding Needed: EDC Operating Fund $25,000 $0 $1,800,854 Economic Development Incentives $1,800,000 $1,350,295 $449,705 75% Irrigation Supplies $854 $853 $1 100% $1,800,854 $1,351,148 $449,706 75% EULESS DEVELOPMENT CORPORATION INCENTIVE DV9901 109 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: ECONOMIC DEVELOPMENT Sept 30,2010 GARY MCKAMIE EULESS DEVELOPMENT CORPORATION CONTINGENCY EDC MISCELLANEOUS ED1002 May 14,2019: Ratified the Euless Development Corporation (EDC) action taken on May 13, 2019, authorizing the expenditure of funds for the demolition of Wilshire Pool. To provide funding for emergencies or unforeseen projects that arise throughout the year. On-going This would enable the City to act quickly on emergency or unforeseen projects. Without funding, these types of projects would have to wait until the next budget cycle which could increase costs or impede economic development opportunities. 110 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Contingency $325,000 $0 $0 $0 $0 $325,000 Transfer from: EDC Operating/CIP Fund $357,493 AC1601 - TSSC Phase V $64,586 $0 ED1401 - Planning Consultants $152,921 $0 DV9901 - EDC Incentive Funds ($250,000) $0 $325,000 Contingency $325,000 $68,772 $256,228 21% $325,000 $68,772 $256,228 21% EULESS DEVELOPMENT CORPORATION CONTINGENCY ED1002 111 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: CITY MANAGER June 16,2015 LORETTA GETCHELL MIDTOWN DEVELOPMENT MISCELLANEOUS DEVELOPMENT ED1601 June 23, 2015: Conducted a Public Hearing and approved Planned Development. August 25, 2015: Approved Resolution No. 15-1471 creating, authorizing, and establishing the Euless Midtown Public Improvement District. December 8, 2015: Approved Resolution No. 15-1479 authorizing publication of notice of intention to issue certificates of obligation to fund public infrastructure improvements including streets, drainage, and water and wastewater in the Euless Midtown Zone. December 8, 2015: Approved Ordinance No. 2096 approving the Project and Financing Plan for Tax Increment Reinvestment Zone Number Four. January 12, 2016: Approved Ordinance No. 2098 authorizing the issuance and sale of City of Euless, Texas, Tax and Waterworks and Sewer System (Limited Pledge) Revenue Certificates of Obligation, Series 2016. This project provides funding for City participation in a public/private development opportunity. Project includes City participation in a public/private community development project of approximately 56 acres located in the A.J. Huitt Survey, Abstract 684. Project costs will include land, right-of-way, remediation, paving, storm drainage, water, wastewater, landscaping, hardscaping, amenities, design, and administrative costs. Began Demolition: Spring 2016 Construction Complete: FY2019 This is a significant development opportunity within the heart of Euless. The development is projected to include residential development including villas, townhomes and rowhouses, cluster housing, and urban lofts; commercial development including retail and restaurant development; and landscaped bioswales and water detention areas for stormwater management. 112 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Public Improvements $16,417,980 $0 $0 Average annual debt service $915,000 $0 $915,000 $16,417,980 Certificates of Obligation $16,417,980 $0 $0 $915,000 $16,417,980 Public Improvements $16,417,980 $16,348,505 $69,475 100% $16,417,980 $16,348,505 $69,475 100% MIDTOWN DEVELOPMENT ED1601 113 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: FACILITIES April 11,2011 KYLE MCADAMS ADA/TAS FACILITY IMPROVEMENTS FACILITIES IMPROVEMENTS FM1201 This project provides for the continued improvements to various City facilities as required by Federal and State mandated Americans with Disabilities Act/Texas Accessibility Standards ("ADA/TAS"). City facilities, entrances, lifts, signage, speech and hearing aided devices, and other areas covered under both ADA and TAS requirements will be part of these improvements. Project funds will be managed by the City Manager's Office and will be allocated as identified projects are brought forth and approved. On-going Some City facilities do not meet current ADA/TAS standards. Updating accessibility on a continuing basis will help keep the City in compliance with government standards and will address the growing needs of citizens with accessibility issues. 114 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Improvements (Minimum balance $75,000) $0 $0 $0 $0 Transfer from: Car Rental Fund $65,000 General Operating/CIP Fund $110,000 $0 Risk Operating Fund $25,000 $0 Additional Funding Needed: Annual expense $14,184 Transfer from: Car Rental CIP Fund Balance $15,000 $14,184 $215,000 Structural Maintenance $209,000 $133,659 $75,341 64% Training $6,000 $4,636 $1,364 77% $215,000 $138,295 $76,705 64% ADA/TAS FACILITY IMPROVEMENTS FM1201 115 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: FLEET & FACILITY OPERATIONS June 22,2022 KYLE MCADAMS FY2022 ROOF REPAIRS & PREVENTATIVE MAINTENANCE FACILITIES ROOF REPLACEMENT/PM FM2207 December 14, 2021: Awarded RFP No. 003-22 for roof inspection and assessment services to Bluefin, LLC a division of Mantis Innovation. Facility Maintenance, in conjunction with Bluefin, LLC a division of Mantis Innovation, conducted a full roof assessment on 29 city-owned facilities to determine the condition of existing roof structures. The study established a Roof Assessment Maintenance Program (RAMP) for City buildings. The assessment also identified at what point in the future the roofs would likely need repairs, restoration, or full replacement. The facilities previously identified in this project were part of the assessment project. As a result of the assessment, full replacement of the roof on the finance building is no longer necessary and modification of the project scope significantly reduces estimated costs. The assessment determined that implementation of a comprehensive preventative maintenance plan combined with general roof repairs such as drain repairs, removal of accumulated debris, repairs to edge caps, and general resealing of flashings, curb boxes, and gas/electric service entrances were sufficient to extend the useful life of many of the roofs. As such, project funding has been reallocated to address these needs. Summer 2024 The roof assessment conducted in early Spring of 2022 identified structures in need of immediate attention. These structures were categorized as Roof Preventative Maintenance to extend the lives of the roofs or as Roof Repairs to address potential leaks. The proposed preventative maintenance and general repairs suggested for City structures will extend the useful lives of the roofs and defer complete replacement/restoration into the future. 116 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Roof Preventative Maintenance $94,000 $94,000 Transfer from: General Fund $373,000 Transfer to: General CIP Fund Balance ($279,000) $94,000 Construction $94,000 $0 $94,000 0% $94,000 $0 $94,000 0% FY2022 ROOF REPAIRS & PREVENTATIVE MAINTENANCE FM2207 117 Department:Date Prepared:May 17, 2022 Submitted By:Date Completed: Project Title: Project Type:FACILITIES Sub-Type: Project CODE:FM2311 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: BUILDING The public safety needs assessment conducted in FY2022 identified Fire Station #2 as a candidate for relocation and replacement in order to accommodate fire service operations and to meet the growing needs of the community. Design Complete: April 2023 Began Design: October 2022 August 22, 2022: Authorized the City Manager to negotiate and execute an Architectural Services Contract with Oxley Williams Tharp Architects. The estimated expenditure is $525,000. August 22, 2022: Approved the first and final reading of Ordinance No. 2318, authorizing the issuance of "City Of Euless, Texas, Tax Notes, Series 2022". June 27, 2023: Awarded Request For Competitive Sealed Proposal (RFCSP) No. 013-23 for the construction of Fire Station No. 2 in the amount of $8,669,150, authorized an owner-controlled contingency not to exceed 5%, and authorized the City Manager to enter into a construction contract with Modern Contractors. May 28, 2024: Authorized the purchase of a fire station alerting system for Fire Station No. 2 from US Digital Designs, Inc. using HGAC Contract No. EC07-23. The estimated expenditure is $133,821.01. City of Euless Capital Project Request FLEET & FACILITY OPERATIONS KYLE MCADAMS FIRE STATION #2 The current station located at 1515 Westpark Way can no longer meet the needs of a full-service fire station. This station was constructed in 1998 from the former Fleet Service Center (built 1978). The facility was remodeled to accommodate the fire staff and apparatus bays were constructed on the west side of the building for equipment and vehicles. Minor cosmetic upgrades were performed in 2015 with paint and appliance updates being the primary focus. The needs assessment performed in FY2022 has determined that the current station would not be a candidate for a remodel and the site would not accommodate the size of structure needed to support fire operations. Project scope includes the design and construction of a new Fire Station #2 to be located at 2214 West Euless Boulevard. The proposed project calls for a station of approximately 18,000-19,000 sq. ft. to include four (4) double deep bays to accommodate various sizes of apparatus along with additional bay space for housing of reserve units and other equipment. Living quarters and office space for staff are also included in the project. A three-story fire training tower with an internal stairway and exterior window ports for various forms of ladder training, repelling exercises, and window rescues is also a possibility for this site. Began Construction: August 2023 Anticipate Construction Complete: October 2024 118 PROJECT TITLE:PROJECT CODE:FM2311 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Professional Services $580,000 Direct Operating Cost Construction $8,934,787 Personnel:Full Time Furniture, Fixtures & Equipment $600,000 Part Time $0 Testing & Material Services $80,000 $0 Contingency $780,058 Avg. Annual Debt Service $1,197,000 $1,197,000 Total Estimated Capital Cost $10,974,845 Maintenance Costs General Operating/CIP Fund $1,330,000 Car Rental Fund $878,474 FM2006 - Fire Station #1 $459,924 $0 2022 Tax Notes $7,600,000 $0 Interest Earnings $506,313 Interest Earnings (FM2006)$200,134 Total Estimated Annual Cost $1,197,000 Total Funding $10,974,845 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED $580,000 $541,020 $38,980 93% $8,934,787 $4,298,027 $4,636,760 48% $600,000 $24,662 $575,338 4% Testing & Material Services $80,000 $0 $80,000 0% Contingency $780,058 $0 $780,058 0% $10,974,845 $4,863,709 $6,111,136 44% Utilities FIRE STATION #2 Total Salary Purchase of Services Materials & Supplies CURRENT STATUS Professional Services TOTAL PROJECT Subtotal: Furniture, Fixtures & Equipment Construction Subtotal: FUNDING SOURCE: Transfer from: 119 Department:Date Prepared:May 17, 2022 Submitted By:Date Completed: Project Title: Project Type:FACILITIES Sub-Type: Project CODE:FM2312 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: REMODEL This project pertains to the City's continued efforts to meet the needs of citizens related to the delivery of increased public safety services and to reconfigure the facility to better provide for those and future needs. Design Complete: April 2024 Began Design: October 2022 August 22, 2022: Authorized the City Manager to negotiate and execute an Architectural Services Contract with Oxley Williams Tharp Architects. The estimated expenditure is $960,000. June 13, 2023: Approved Resolution No. 23-1644 authorizing the City Secretary to publish a notice declaring the intention to issue certificates of obligation in an amount not to exceed $22 million for public improvements to the City Police and Court buildings. August 8, 2023: Approved the first and final reading of Ordinance No. 2349, authorizing the issuance of “City of Euless, Texas, Tax and Waterworks and Sewer System (Limited Pledge) Revenue Certificates of Obligation, Series 2023". June 11, 2024: Awarded Request for Competitive Sealed Proposal (RFCSP) No. 003-24 for the construction of the Euless Police Department and Courts Addition and Alterations in the amount of $18,472,000, authorized an owner-controlled contingency not to exceed $1,729,000, and authorized the City Manager to enter into a construction contract with Modern Contractors. City of Euless Capital Project Request FLEET & FACILITY OPERATIONS KYLE MCADAMS POLICE & COURTS BUILDING REMODEL Since the building was constructed in the 1999-2000 time frame, the department has realized increased staffing levels, the addition of the Code Enforcement division, and requirements for long-term storage for evidence and additional equipment provided to protect officers. The needs assessment performed in FY2022 determined that the current facility is a good candidate for a remodel and the site can accommodate the structural additions necessary to make such improvements. This project consists of the design and construction for the remodel of the current Police & Courts Building located at 1102 West Euless Boulevard. The project scope will focus on better utilization of the building by positioning divisions that function together as a team in close proximity, to provide adequate office space for staff, and to provide security improvements, meeting room improvements, and general upgrade of fixtures and furnishings. It will be necessary for staff to shift operations within the facility during the remodel. Different phases of the construction will be performed to allow for such accommodations. Operations will see minimal impact during the remodel. Anticipate Begin Construction: August 2024 Anticipate Construction Complete: October 2026 120 PROJECT TITLE:PROJECT CODE:FM2312 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Professional Services $960,000 Direct Operating Cost Construction $21,059,969 Personnel:Full Time Furniture, Fixtures & Equipment $2,931,800 Part Time $0 Testing & Material Services $250,000 $0 Contingency $1,701,436 Avg. Annual Debt Service $1,889,000 $1,889,000 Total Estimated Capital Cost $26,903,205 Maintenance Costs CCPD Operating Fund $2,210,000 Equipment Replacement Fund $1,834,236 2023 Certificates of Obligation $22,000,000 $0 Interest Earnings $858,969 $0 Total Estimated Annual Cost $1,889,000 Total Funding $26,903,205 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED $960,000 $725,320 $234,680 76% $21,059,969 $0 $21,059,969 0% $2,931,800 $17,776 $2,914,024 1% Testing & Material Services $250,000 $0 $250,000 0% Contingency $1,701,436 $0 $1,701,436 0% $26,903,205 $743,096 $26,160,109 3% Utilities POLICE & COURTS BUILDING REMODEL Total Salary Purchase of Services Materials & Supplies CURRENT STATUS Professional Services TOTAL PROJECT Subtotal: Furniture, Fixtures & Equipment Construction Subtotal: FUNDING SOURCE: Transfer from: 121 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: FLEET & FACILITY OPERATIONS May 07,2007 KYLE MCADAMS ANIMAL SHELTER – EXPANSION/RENOVATION FACILITIES REMODEL FM2409 October 10, 2023: Authorized the City Manager to negotiate and execute an Architectural Services Contract with Oxley Williams Tharp Architects for the design, renovation, and construction of the Animal Services facility. The estimated expenditure is $405,000. The project consists of a remodel of the former fire station #2 building and animal shelter facility to better accommodate animal containment, visitors, adoptions, and animal services. The project scope includes the addition of multiple enclosed dog runs, quarantine runs, an adoption room, additional room for cat containment, and an area for animal examination and washing. Office space expansion will be included in the renovation as well as updates to the public/employee restrooms. Additional space within the facility will also be designed for potential public works storage. Began Design: January 2024 Anticipate Design Complete: July 2024 Anticipate Begin Construction: December 2024 Anticipate Construction Complete: February 2026 The current animal shelter facility was opened in 1978 and has surpassed its capacity to meet current and future demands. 122 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Professional Services $450,000 Construction $4,500,000 $0 Testing & Material Services $125,000 $0 Furniture, Fixtures & Equip. $600,000 Contingency $450,000 Temporary Animal Shelter $150,000 $0 $0 $6,275,000 Transfer from: Car Rental Fund $6,125,000 $0 $0 Additional Funding Needed: Transfer from: Car Rental Fund $150,000 $0 $6,275,000 Professional Services $450,000 $78,189 $371,811 17% Construction $4,500,000 $0 $4,500,000 0% Testing & Material Services $125,000 $10,668 $114,332 9% Furniture, Fixtures & Equipment $600,000 $0 $600,000 0% Contingency $450,000 $0 $450,000 0% Temporary Animal Shelter $150,000 $0 $150,000 0% $6,275,000 $88,857 $6,186,143 1% ANIMAL SHELTER – EXPANSION/RENOVATION FM2409 123 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: TEXAS STAR GOLF COURSE May 17,2011 GLENDA HARTSELL TSGC MISCELLANEOUS IMPROVEMENTS PARK/RECREATION TSGC IMPROVEMENTS GC1801 To provide funding to address small capital projects that arise throughout the year at Texas Star Golf Course. Without funding for this project, the smaller items identified throughout the year could not be addressed in a timely manner and would have to be postponed until the next budget cycle for funding consideration. Timely response preserves the City's investment in a high-profile asset and maintains the quality service levels expected by patrons. 124 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Improvements (Minimum balance $150,000) $0 $0 $0 $0 Transfer from: TSGC Reserve Fund $440,000 Hotel/Motel Fund $120,000 $0 Car Rental Fund $50,000 $0 Miscellaneous Other $27,180 Annual expense $73,838 Additional Funding Needed: Transfer from: TSGC Reserves $75,000 $73,838 $712,180 Improvements $463,110 $375,702 $87,408 81% Equipment $247,070 $173,235 $73,835 70% Botanical $2,000 $2,000 $0 100% $712,180 $550,937 $161,243 77% TSGC MISCELLANEOUS IMPROVEMENTS GC1801 125 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES March 23,2004 RAY MCDONALD MISCELLANEOUS PARK IMPROVEMENTS EDC PARKS PR0720 June 9, 2020: Authorized the purchase and installation of sod and irrigation at the Villages of Bear Creek Park, from Tri-Tex Grass, through the BuyBoard Cooperative Purchasing Program. The estimated expenditure is $46,500. May 23, 2023: Authorized the purchase and installation of an LED lighting system for the pickeball courts. The estimated expenditure is $54,999 and will be paid from PR2308 and PR0720. The adopted Parks Master Plan recommends funding for system-wide park facilities and amenities upgrades. The project provides funding for the upgrade and modernization of City parks to include replacement of aged structures such as pavilions, picnic tables, gazebos, signs, safety components, and other park amenities including the addition of a gazebo on Main Street. Park infrastructure and structure painting are included in the scope of the project. Additionally, the project encompasses the installation of trail lighting along the Trails of Euless similar to the lighting installed along the trail through Midway Park. Trailwood Park, Bob Eden Trail, The Preserve at McCormick Park, The Villages of Bear Creek Park, and Heritage Park would also benefit from trail lighting. On-going Pursuant to the recommendations in the Parks Master Plan, park accessibility should be in compliance with the Americans with Disabilities Act. The existing equipment in many park areas is becoming aged and will require refurbishment or replacement in the near term. Additionally, park infrastructure should be maintained at a level that meets citizen expectations. 126 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Fixtures, landscaping, lighting, & other park and infrastructure $0 improvements $0 (Minimum balance $200,000) $0 $0 Transfer from: EDC Operating Fund $1,775,000 Developer Contribution (TRA)$10,500 $0 ES0283 & ES1901 $32,753 $0 Additional Funding Needed: Annual expense $140,967 Transfer from: EDC Operating Fund $200,000 $140,967 $2,018,253 Park Furnishings $1,513,041 $1,179,672 333,369 78% Landscaping $52,521 $42,021 10,500 80% Contingency $57,702 $57,702 0 100% Park Lighting $166,924 $164,978 1,946 99% Equipment $3,170 $3,170 0 100% Trail/Sidewalk Improvements $30,795 $30,795 0 100% Professional Services $17,280 $15,788 1,492 91% Improvements $129,067 $129,067 0 100% Demolition $15,000 $14,970 30 100% Improvements (ES0283-Bear Creek Park)$27,753 $0 27,753 0% Botanical (ES1901-Barfield Foundation)$5,000 $0 5,000 0% $2,018,253 $1,638,163 $380,090 81% MISCELLANEOUS PARK IMPROVEMENTS PR0720 127 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES October 01,2007 RAY MCDONALD PARK IRRIGATION EDC PARKS PR0804 This project provides annual funding to continue efforts to meet irrigation needs throughout the City's park system. Projects will be identified and completed on an as-needed basis. This project allows for maintenance and expansion of the irrigation systems throughout the parks system to enhance the overall condition of the landscape and green space. 128 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Irrigation $450,000 $0 $0 $0 $0 $450,000 Transfer from: EDC Operating Fund $425,000 $0 $0 Additional Funding Needed: Transfer from: EDC Operating Fund $25,000 $0 $450,000 Irrigation $450,000 $259,800 190,200 58% $450,000 $259,800 $190,200 58% PARK IRRIGATION PR0804 129 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES March 02,2017 RAY MCDONALD WILSHIRE PARK UPGRADES PARK/RECREATION PARK IMPROVEMENTS PR2011 August 20, 2021: Authorized the City Manager to negotiate and execute an Architectural Services Contract with GSBS Architects for the renovation of Wilshire Park. The estimated expenditure is $212,000. August 22, 2022: Awarded Bid No. 010-22 for the renovation of Wilshire Park and authorized the City Manager to enter into a contract with C. Green Scaping L.P. The estimated expenditure is $1,704,031. November 14, 2023: Authorized the purchase and installation of playground equipment for Wilshire Park from Child's Play, Inc. through the BuyBoard Purchasing Cooperative. The estimated expenditure is $111,285. The adopted Parks Master Plan calls for general upgrades and improvements in the overall quality of parks in the City and to develop a high-quality parks system that provides activities for all age and interest groups and enhances the adjoining neighborhoods. Overall park enhancements and improvements to include expanding parking lot, additional amenities such as a pavilion, upgrading playground and playground surface, additional trails with connections to adjacent neighborhood, bridge connections for trail, expanding the floating dock, additional sidewalks, and adding park lighting. Began Design: April 2021 Design Complete: July 2022 Began Construction: January 2023 Anticipate Construction Complete: June 2024 As identified in the adopted Parks Master Plan, the municipal park is the foundation of any solid parks and recreation system. The City of Euless parks and recreation system provides residents and visitors with significant personal, social, environmental, and economic benefits. The revitalization efforts that the Euless City Council has focused on over the years has increased the sense of community pride. Wilshire Park is a four-acre park located adjacent to Wilshire Elementary School off Sierra Drive. The current amenities at this park include a playground, .25 mile trail and a fishing pier/pond. The project will continue the City Council's revitalization efforts by creating an area that will serve both the passive and active leisure needs of the residents in this area. 130 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Development/Prof. Services $297,292 Construction $1,720,072 $0 Fixtures/Furnishings $134,685 $0 Landscaping $70,815 $0 $0 $2,222,864 Transfer from: Car Rental Fund $1,953,820 PR1917-Carr Park Imp. $22,044 $0 EDC Operating Fund $475,000 $0 Transfer to: PR1917 - Carr Park Imp.($228,000) $0 $2,222,864 Development/Professional Services $297,292 $292,874 $4,418 99% Construction $1,720,072 $1,473,559 $246,513 86% Fixtures/Furnishings $134,685 $134,684 $1 100% Landscaping $70,815 $60,348 $10,467 85% $2,222,864 $1,961,465 $261,399 88% WILSHIRE PARK UPGRADES PR2011 131 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES April 30,2008 RAY MCDONALD BLESSING BRANCH PARK IMPROVEMENTS PARK/RECREATION PARK IMPROVEMENTS PR2203 November 8, 2022: Awarded Bid No. 001-23 for the construction of the Blessing Branch Park trail connection to Dean Electric, Inc., dba Dean Construction. The estimated expenditure is $182,250. This project is a continuation of the overall trail system expansion and general park improvements as identified in the Parks Master Plan. Blessing Branch Park is a 7.3 acre linear park located on the east side of Main Street across from Midway Park. Currently, the park has only one swing set. This project includes construction of a trail connection from Main Street to the west and Fuller Wiser to the east. Additionally, the project includes a new playground, picnic pads with grills, and some type of shade shelter/pavilion/gazebo. This area currently gets a high volume of foot traffic. Constructing a trail in this linear greenbelt would not only provide a safe, paved access for residents east of Main Street to Midway Park, Midway Park Elementary, and to Trinity High School, but will also help create a renewed sense of quality of life for the residents in that area by enhancing the recreational amenities available. Began Design: March 2022 Design Complete: July 2022 Began Construction: October 2022 Anticipate Construction Complete: September 2024 The number one request from Euless citizens as it relates to trails, based on the responses to the needs assessment survey as identified in the Parks Master Plan, was to construct trail connections between existing and/or future park developments. This project not only satisfies that request, but also provides trail connections to neighborhoods, schools, between major thoroughfares, and potentially to future commercial developments to the southeast. 132 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Approximately 28,000 sq ft of 4"x8' concrete trail $158,480 $0 Playground/Border $60,000 $0 Picnic pads w/grills $20,000 Shade shelter/pavilion/gazebo $30,000 Trail Lighting $50,000 Playground chips $5,400 Design/Survey/Engineering $23,800 Contingency $17,384 $0 $0 $365,064 Transfer from: EDC Operating Fund $365,064 $0 $0 $0 $365,064 Engineering $23,800 $14,550 $9,250 61% Contingency $17,384 $0 $17,384 0% Trail Construction $198,480 $195,467 $3,013 98% Lighting $50,000 $0 $50,000 0% Park Furnishings $75,400 $57,853 $17,547 77% $365,064 $267,870 $97,194 73% BLESSING BRANCH PARK IMPROVEMENTS PR2203 133 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES May 14,2021 RAY MCDONALD PARKS AT TEXAS STAR LIGHTING UPGRADE PARK/RECREATION PARK IMPROVEMENTS PR2404 February 13, 2024: Authorized the purchase and installation of an LED retrofit lighting system at the Parks at Texas Star South from GeoSport Lighting Systems, LLC through The Interlocal Purchasing Systems (TIPS). The estimated expenditure is $699,750. This project would replace the halide lighting with LED lighting fixtures on Wrigley, Royal, Yankee, Arlington, Veterans, and McGrady fields. Begin Construction: March 2024 Construction Complete: March 2024 The recent addition of Legends Field as well as the newly-renovated Parks at Texas Star Phase VII included the addition of LED sports lighting. Upgrading the remaining field lights to LED lighting will not only make the entire sports complex lighting universal, but will reduce the overall energy consumed, reduce maintenance cost, and significantly increase the overall sports lighting performance with state of the art lighting controls. 134 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Lighting $703,350 $0 $0 $0 $0 $703,350 Transfer from: EDC Operating Fund $632,700 $0 Energy Efficiency Block Grant $117,300 $0 Transfer to: EDC CIP Fund Balance ($46,650) $0 $703,350 Lighting $703,350 $703,350 $0 100% $703,350 $703,350 $0 100% PARKS AT TEXAS STAR LIGHTING UPGRADE PR2404 135 136 Project Description Priority Estimated Cost Operating Fund CIP Fund Balance Bond/Tax Note Grants/ Contributions Impact Fees Escrow Funds Car Rental Tax Other EDC To Be Determined DRAINAGE PROJECTS Carr Park Creek Erosion Protection A $ 105,000 XX FY2025 Drainage Curb & Gutter Improvements A $ 200,000 XX South Mills Drive Outfall Restoration A $ 55,000 XX Sub-Total Drainage Priority A-Proposed FY2025 $ 360,000 FY2026 Drainage Curb & Gutter Improvements (26)B $ 200,000 XX FY2027 Drainage Curb & Gutter Improvements (27)B $ 200,000 XX FY2028 Drainage Curb & Gutter Improvements (28)B $ 200,000 XX FY2029 Drainage Curb & Gutter Improvements (29)B $ 200,000 XX Sub-Total Drainage Priority B-Unfunded $ 800,000 None Currently C $ - Sub-Total Drainage Priority C-Unfunded $ - DRAINAGE PROJECTS - TOTAL $ 1,160,000 STREET PROJECTS Fuller-Wiser Road/Bear Creek Parkway Roadway Rehabilitation A $ 165,000 XX FY2025 Street Improvements A $ 1,125,000 XX Sub-Total Street Priority A-Proposed FY2025 $ 1,290,000 FY2026 Street Improvements (26)B $ 1,150,000 XX FY2027 Street Improvements (27)B $ 1,175,000 XX FY2028 Street Improvements (28)B $ 1,200,000 XX Cresthaven Drive Reconstruction (29)B $ 3,550,000 XX FY2029 Street Improvements (29)B $ 1,225,000 XX Sub-Total Street Priority B-Unfunded $ 8,300,000 East Alexander Lane Reconstruction C TBD XX Ross Avenue Extension C TBD XX Sheppard Drive Reconstruction C TBD XX Vine Street Reconstruction – SH 183 to SH 10 C TBD XX Sub-Total Street Priority C-Unfunded $ - STREET PROJECTS - TOTAL $ 9,590,000 WASTEWATER PROJECTS FY2025 51st CDBG LR: Fair Oaks Boulevard/Lone Oak Circle A $ 292,000 XX LR: Oakwood Terrace North Phases I, II, & III – Engineering A $ 309,000 XX Sub-Total Wastewater Priority A-Proposed FY2025 $ 601,000 FY2026 52nd CDBG LR: Twin Oaks Court/Shady Hollow (26)B $ 287,000 XX LR: Oakwood Terrace North Phase I – Construction (26)B $ 536,000 XX FY2027 53rd CDBG LR: Douglas Street (27)B $ 324,000 XX LR: Oakwood Terrace North Phase II – Construction (27)B $ 521,000 XX LR: Oakwood Terrace North Phase III – Construction (27)B $ 489,000 XX FY2028 54th CDBG LR: Fair Oaks Drive/Roundtree Drive (28)B $ 323,000 XX LR: Woodvine Drive (28)B $ 589,000 XX LR: Cliffwood Road/Shady Creek Drive (29)B $ 715,000 XX FY2029 55th CDBG LR: Roundtree Drive (29)B $ 327,000 XX Sub-Total Wastewater Priority B-Unfunded $ 4,111,000 LR: Knob Hill C TBD XX Sub-Total Wastewater Priority C-Unfunded $ - WASTEWATER PROJECTS - TOTAL $ 4,712,000 LR = Line Replacement PROPOSED METHOD OF FINANCING CAPITAL IMPROVEMENT PROGRAMS FY2025 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE 137 Project Description Priority Estimated Cost Operating Fund CIP Fund Balance Bond/Tax Note Grants/ Contributions Impact Fees Escrow Funds Car Rental Tax Other EDC To Be Determined PROPOSED METHOD OF FINANCING CAPITAL IMPROVEMENT PROGRAMS FY2025 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE WATER PROJECTS LR: Sotogrande Boulevard Phase II A $ 365,000 XX Sub-Total Water Priority A-Proposed FY2025 $ 365,000 LR: Sagebrush Trail (26)B $ 539,000 XX LR: Bell-Hi Addition Phases I & II (27)B $ 585,000 XX LR: Donley Drive/Donley Court (28)B $ 497,000 XX LR: West Euless Boulevard (29)B $ 742,000 XX Sub-Total Water Priority B-Unfunded $ 2,363,000 1 Mil Well Replacement C TBD XX LR: Dunaway Drive C TBD XX LR: Knob Hill C TBD XX LR: Midway Park 3rd Addition C TBD XX LR: Westpark Way C TBD XX Sub-Total Water Priority C-Unfunded $- WATER PROJECTS - TOTAL $ 2,728,000 OTHER PROJECTS Golf Course Upgrades A $ 2,140,000 XX Facility Renovations at 1400 South Pipeline Road A $ 3,000,000 $1,500,000 $1,500,000 Parks at Texas Star South Improvements A $ 750,000 XX Parks at Texas Star South Turf – Fenway/Shea/Jacobs Fields A $ 258,200 XX Playground Shade Structures A $ 950,000 XX Sub-Total Other Priority A-Proposed FY2025 $ 7,098,200 Carr Park Trail Connection (26)B TBD XX Kiddie Carr Park Improvements (26)B TBD XX Parks at Texas Star Phase VIII (27)B TBD XX Parks at Texas Star South Turf Replacement (27)B $ 875,000 XX Sub-Total Other Priority B-Unfunded $ 875,000 South Euless Park Upgrades C TBD XX Trail Enhancements Phase I C TBD XX Trail Enhancements Phase II C TBD XX Trail Enhancements Villages of Bear Creek C TBD XX Trailwood Park Improvements C TBD XX Sub-Total Other Priority C-Unfunded $- OTHER PROJECTS - TOTAL $ 7,973,200 LR = Line Replacement 138138 Project Description Priority Estimated Cost Operating Fund CIP Fund Balance Bond/Tax Note Grants/ Contributions Impact Fees Escrow Funds Car Rental Tax Other EDC To Be Determined DRAINAGE PROJECTS Carr Park Creek Erosion Protection A $ 105,000 XX FY2025 Drainage Curb & Gutter Improvements A $ 200,000 XX South Mills Drive Outfall Restoration A $ 55,000 XX Sub-Total Drainage Priority A-Proposed FY2025 $ 360,000 FY2026 Drainage Curb & Gutter Improvements (26)B $ 200,000 XX FY2027 Drainage Curb & Gutter Improvements (27)B $ 200,000 XX FY2028 Drainage Curb & Gutter Improvements (28)B $ 200,000 XX FY2029 Drainage Curb & Gutter Improvements (29)B $ 200,000 XX Sub-Total Drainage Priority B-Unfunded $ 800,000 None Currently C $- Sub-Total Drainage Priority C-Unfunded $- DRAINAGE PROJECTS - TOTAL $ 1,160,000 CAPITAL IMPROVEMENT PROGRAMS FY2025 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE PROPOSED METHOD OF FINANCING 139 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 01,2024 MAJOR JONES CARR PARK CREEK EROSION PROTECTION DRAINAGE IMPROVEMENTS A The drainage issues included in this project are part of the City's CIP plan. The businesses at both 605 and 607 West Euless Boulevard are located on the north side of a creek that runs through Carr Park. Erosion of the creek has threatened to undermine these properties. This is a natural earthen channel and there is no current protection from future erosion. The proposed solution is to extend the existing concrete lining on the north side of the channel from 603 West Euless Boulevard approximately 250 linear feet to just beyond 607 West Euless Boulevard. FY2025 The creek within Carr Park has continued to erode over time and may undermine the adjacent properties to the north. 140 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: CARR PARK CREEK EROSION PROTECTION Engineering $15,000 Construction $90,000 $0 $0 $0 $0 $0 $0 $0 $105,000 0% XX 0% 0% 0% 0% To Be Determined Proposed funding is from Drainage CIP Fund Balance. 141 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 09,2024 MAJOR JONES FY2025 DRAINAGE CURB & GUTTER IMPROVEMENTS DRAINAGE IMPROVEMENTS A The project consists of the removal and replacement of damaged curb and gutter throughout the City. FY2025 The existing curb and gutter along many City streets has aged, failed, or been damaged. The curb and gutter serves as part of the City's storm water collection system. The new curb and gutter will improve drainage performance while also enhancing the appearance of City streets. 142 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: FY2025 DRAINAGE CURB & GUTTER IMPROVEMENTS Construction $200,000 $0 $0 $0 $0 $0 $0 $0 $200,000 XX Proposed funding is from Drainage Operating Fund. 143 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 01,2024 MAJOR JONES SOUTH MILLS DRIVE OUTFALL RESTORATION DRAINAGE IMPROVEMENTS A The drainage issues included in this project are part of the City's CIP plan. The existing homes at both 914 South Mills Drive and 711 West Mills Drive have outfalls located at the western edge of their backyards. Both outfalls show significant erosion underneath their chutes. This erosion has led to concrete fractures and eventual failure. The proposed solution is to remove the large concrete rock located below each outfall and provide two (2) - 20 linear foot gabion walls below each chute and restore the bank and establish erosion control. Finally, detailing the outfalls to remove the failed portions and provide stability for the structure to remain. FY2025 The evaluation of the channel by City Staff indicates that this problem has existed for multiple years. Due to the location, a clear inspection of the outfalls has been difficult. 144 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: SOUTH MILLS DRIVE OUTFALL RESTORATION Construction $55,000 $0 $0 $0 $0 $0 $0 $0 $55,000 0% XX 0% 0% 0% 0% To Be Determined Proposed funding is from Drainage CIP Fund Balance. 145 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 09,2024 MAJOR JONES FY2026 DRAINAGE CURB & GUTTER IMPROVEMENTS DRAINAGE IMPROVEMENTS B The project consists of the removal and replacement of damaged curb and gutter throughout the City. FY2026 The existing curb and gutter along many City streets has aged, failed, or been damaged. The curb and gutter serves as part of the City's storm water collection system. The new curb and gutter will improve drainage performance while also enhancing the appearance of City streets. 146 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: FY2026 DRAINAGE CURB & GUTTER IMPROVEMENTS Construction $200,000 $0 $0 $0 $0 $0 $0 $0 $200,000 XX Proposed funding is from Drainage Operating Fund. 147 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 09,2024 MAJOR JONES FY2027 DRAINAGE CURB & GUTTER IMPROVEMENTS DRAINAGE IMPROVEMENTS B The project consists of the removal and replacement of damaged curb and gutter throughout the City. FY2027 The existing curb and gutter along many City streets has aged, failed, or been damaged. The curb and gutter serves as part of the City's storm water collection system. The new curb and gutter will improve drainage performance while also enhancing the appearance of City streets. 148 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: FY2027 DRAINAGE CURB & GUTTER IMPROVEMENTS Construction $200,000 $0 $0 $0 $0 $0 $0 $0 $200,000 XX Proposed funding is from Drainage Operating Fund. 149 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 09,2024 MAJOR JONES FY2028 DRAINAGE CURB & GUTTER IMPROVEMENTS DRAINAGE IMPROVEMENTS B The project consists of the removal and replacement of damaged curb and gutter throughout the City. FY2028 The existing curb and gutter along many City streets has aged, failed, or been damaged. The curb and gutter serves as part of the City's storm water collection system. The new curb and gutter will improve drainage performance while also enhancing the appearance of City streets. 150 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: FY2028 DRAINAGE CURB & GUTTER IMPROVEMENTS Construction $200,000 $0 $0 $0 $0 $0 $0 $0 $200,000 XX Proposed funding is from Drainage Operating Fund. 151 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 09,2024 MAJOR JONES FY2029 DRAINAGE CURB & GUTTER IMPROVEMENTS DRAINAGE IMPROVEMENTS B The project consists of the removal and replacement of damaged curb and gutter throughout the City. FY2029 The existing curb and gutter along many City streets has aged, failed, or been damaged. The curb and gutter serves as part of the City's storm water collection system. The new curb and gutter will improve drainage performance while also enhancing the appearance of City streets. 152 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: FY2029 DRAINAGE CURB & GUTTER IMPROVEMENTS Construction $200,000 $0 $0 $0 $0 $0 $0 $0 $200,000 XX Proposed funding is from Drainage Operating Fund. 153 154 Project Description Priority Estimated Cost Operating Fund CIP Fund Balance Bond/Tax Note Grants/ Contributions Impact Fees Escrow Funds Car Rental Tax Other EDC To Be Determined STREET PROJECTS Fuller-Wiser Road/Bear Creek Parkway Roadway Rehabilitation A $ 165,000 XX FY2025 Street Improvements A $ 1,125,000 XX Sub-Total Street Priority A-Proposed FY2025 $ 1,290,000 FY2026 Street Improvements (26)B $ 1,150,000 XX FY2027 Street Improvements (27)B $ 1,175,000 XX FY2028 Street Improvements (28)B $ 1,200,000 XX Cresthaven Drive Reconstruction (29)B $ 3,550,000 XX FY2029 Street Improvements (29)B $ 1,225,000 XX Sub-Total Street Priority B-Unfunded $ 8,300,000 East Alexander Lane Reconstruction C TBD XX Ross Avenue Extension C TBD XX Sheppard Drive Reconstruction C TBD XX Vine Street Reconstruction – SH 183 to SH 10 C TBD XX Sub-Total Street Priority C-Unfunded $- STREET PROJECTS - TOTAL $ 9,590,000 CAPITAL IMPROVEMENT PROGRAMS FY2025 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE PROPOSED METHOD OF FINANCING 155 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 01,2024 MAJOR JONES FULLER WISER ROAD/BEAR CREEK PARKWAY ROADWAY REHABILITATION STREET IMPROVEMENTS A The Master Thoroughfare Plan identifies the various street types within the City of Euless. These street types include residential streets through regional arterials. Our pavement management plan through condition assessment provides statistical data and guidance for cost effective maintenance and project planning. The project consists of sawcutting, concrete pouring, and restriping on Fuller Wiser Road and Bear Creek Parkway prioritized by visual inspection, pavement condition index of the roadways, and citizen feedback. FY2025 The existing concrete pavement is deteriorating in 140 panels. The concrete reconstruction will provide an improved riding surface, extend the life of the roadway, and enhance the appearance of the streets. 156 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: FULLER WISER ROAD/BEAR CREEK PARKWAY ROADWAY REHABILITATION Construction $165,000 $0 $0 $0 $0 $0 $0 $0 $165,000 0% XX 0% 0% 0% 0% To Be Determined Proposed funding is from Street CIP Fund Balance. 157 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 31,2020 HAL CRANOR FY2025 STREET IMPROVEMENTS STREET IMPROVEMENTS A The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by pavement condition index of the roadways. FY2025 The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, extend the life of the roadway, and enhance the appearance of the streets. 158 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: FY2025 STREET IMPROVEMENTS Construction $1,125,000 $0 $0 $0 $0 $0 $0 $0 $1,125,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from General Fund. 159 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 31,2020 HAL CRANOR FY2026 STREET IMPROVEMENTS STREET IMPROVEMENTS B The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by pavement condition index of the roadways. FY2026 The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, extend the life of the roadway, and enhance the appearance of the streets. 160 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: FY2026 STREET IMPROVEMENTS Construction $1,150,000 $0 $0 $0 $0 $0 $0 $0 $1,150,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from General Fund. 161 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 31,2022 HAL CRANOR FY2027 STREET IMPROVEMENTS STREET IMPROVEMENTS B The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by pavement condition index of the roadways. FY2027 The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, extend the life of the roadway, and enhance the appearance of the streets. 162 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: FY2027 STREET IMPROVEMENTS Construction $1,175,000 $0 $0 $0 $0 $0 $0 $0 $1,175,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from General Fund. 163 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 31,2023 MAJOR JONES FY2028 STREET IMPROVEMENTS STREET IMPROVEMENTS B The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by pavement condition index of the roadways. FY2028 The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, extend the life of the roadway, and enhance the appearance of the streets. 164 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: FY2028 STREET IMPROVEMENTS Construction $1,200,000 $0 $0 $0 $0 $0 $0 $0 $1,200,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from General Fund. 165 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 02,2024 MAJOR JONES CRESTHAVEN DRIVE RECONSTRUCTION STREET IMPROVEMENTS B The Master Thoroughfare Plan identifies the various street types within the City of Euless. These street types include residential streets through regional arterials. Our pavement management plan through condition assessment provides statistical data and guidance for cost effective maintenance and project planning. This project includes the reconstruction of Cresthaven Drive from a two-lane asphalt roadway to a 31 foot wide curb and gutter concrete street from SH10 to S Pipeline Road. The project scope includes the replacement of an existing 4 inch AC water line and 6 inch PVC water line located along Cresthaven Drive between West Euless Drive and South Pipeline Road. FY2029 To upgrade Cresthaven Drive to a concrete curb and gutter street. Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 166 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: CRESTHAVEN DRIVE RECONSTRUCTION Engineering $550,000 Construction $3,000,000 $0 $0 $0 $0 $0 $0 $0 $3,550,000 0% 0% 0% 0% 0% To Be Determined XX 167 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 31,2023 MAJOR JONES FY2029 STREET IMPROVEMENTS STREET IMPROVEMENTS B The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by pavement condition index of the roadways. FY2029 The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, extend the life of the roadway, and enhance the appearance of the streets. 168 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: FY2029 STREET IMPROVEMENTS Construction $1,225,000 $0 $0 $0 $0 $0 $0 $0 $1,225,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from General Fund. 169 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 23,1999 RON YOUNG EAST ALEXANDER LANE RECONSTRUCTION STREET IMPROVEMENTS C This minor street serves as a collector type street by conveying traffic to major roadways. East Alexander Lane will be reconstructed from Main Street to Cullum Drive. It will be reconstructed from a two- lane county type road to a standard 31 foot wide residential street with underground drainage and sidewalks. Reconstruction of this street will decrease the annual maintenance and provide compliance with current City standards. 170 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 31,2005 RON YOUNG ROSS AVENUE EXTENSION STREET CONSTRUCTION C The construction of the remainder of Ross Avenue from the fire station to the west limit will be in accordance with City standards which includes concrete pavement. Construction of this street will provide compliance with current City standards. This extension of Ross Avenue from the completed section adjacent to the fire station will complete the upgrading of this street. 171 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS June 12,2020 HAL CRANOR SHEPPARD DRIVE RECONSTRUCTION STREET IMPROVEMENTS C This project includes the reconstruction of Sheppard Drive from the west bound service road of SH 183 to Trojan Trail. Sheppard Drive is currently an open section asphalt street that includes a small section of concrete curb and gutter. The road will be reconstructed as a concrete roadway with curb and gutter. No storm drain system will need to be constructed. To upgrade Sheppard Drive to a concrete curb and gutter street. 172 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 28,2015 HAL CRANOR VINE STREET RECONSTRUCTION – SH 183 TO SH 10 STREET IMPROVEMENTS C Vine Street is not identified in the City's Master Thoroughfare Plan. The project consists of the reconstruction of Vine Street from SH 183 to SH 10. The City has received street escrow funds from several developments along Vine Street. When development is complete, it would be appropriate for the City to reconstruct the existing roadway. 173 174 Project Description Priority Estimated Cost Operating Fund CIP Fund Balance Bond/Tax Note Grants/ Contributions Impact Fees Escrow Funds Car Rental Tax Other EDC To Be Determined WASTEWATER PROJECTS FY2025 51st CDBG LR: Fair Oaks Boulevard/Lone Oak Circle A $ 292,000 XX LR: Oakwood Terrace North Phases I, II, & III – Engineering A $ 309,000 XX Sub-Total Wastewater Priority A-Proposed FY2025 $ 601,000 FY2026 52nd CDBG LR: Twin Oaks Court/Shady Hollow (26)B $ 287,000 XX LR: Oakwood Terrace North Phase I – Construction (26)B $ 536,000 XX FY2027 53rd CDBG LR: Douglas Street (27)B $ 324,000 XX LR: Oakwood Terrace North Phase II – Construction (27)B $ 521,000 XX LR: Oakwood Terrace North Phase III – Construction (27)B $ 489,000 XX FY2028 54th CDBG LR: Fair Oaks Drive/Roundtree Drive (28)B $ 323,000 XX LR: Woodvine Drive (28)B $ 589,000 XX LR: Cliffwood Road/Shady Creek Drive (29)B $ 715,000 XX FY2029 55th CDBG LR: Roundtree Drive (29)B $ 327,000 XX Sub-Total Wastewater Priority B-Unfunded $ 4,111,000 LR: Knob Hill C TBD XX Sub-Total Wastewater Priority C-Unfunded $- WASTEWATER PROJECTS - TOTAL $ 4,712,000 LR = Line Replacement CAPITAL IMPROVEMENT PROGRAMS FY2025 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE PROPOSED METHOD OF FINANCING 175 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 27,2024 MAJOR JONES 51ST CDBG LINE REPLACEMENT – FAIR OAKS BOULEVARD/LONE OAK CIRCLE WASTEWATER MAIN REPLACEMENT A The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project consists of the replacement of the following wastewater mains: 1. Along Fair Oaks Boulevard from Lone Oak Circle to Twin Oaks Court and 2. Lone Oak Circle. (51st year CDBG project) FY2025 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 176 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: 51ST CDBG LINE REPLACEMENT – FAIR OAKS BOULEVARD/LONE OAK CIRCLE Engineering $38,000 Construction $254,000 $0 $0 $0 $0 $0 $0 $0 $292,000 0% 0% 0% 0% XX 0% To Be Determined Project is contingent upon actual CDBG funding availability. 177 178 Line Replacement - Fair Oaks Boulevard/Lone Oak Circle S H A D Y H O L L O W CE D A R R I D G E F A I R O A K S ROU N DTR E ETWIN OAKS SH A D Y HO L L O W DE N T O N K ENSINGER LO N E O A K DOUG LAS S H E LMAR A R A N S A S D R 0 130 260 390 52065 Feet ¯Wastewater Line Replacement -Fair Oaks Boulevard -Lone Oak Circle Legend Wastewater 179 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 27,2024 MAJOR JONES LINE REPLACEMENT – OAKWOOD TERRACE NORTH PHASES I,II, & III ENGINEERING WASTEWATER MAIN REPLACEMENT A The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project consists of the engineering design for the replacement of wastewater mains in the following areas: Phase I - Between Mary Drive and Marlene Drive from Eastcliff Drive to Marlene Drive, Phase II - 1. Along Eastcliff Drive from Mary Drive to Tyler Avenue and 2. 607-805 Commerce Street, and Phase III - Between Tyler Avenue and Marlene Drive from Eastcliff Drive to Commerce Street. FY2025 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 180 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: LINE REPLACEMENT – OAKWOOD TERRACE NORTH PHASES I,II, & III ENGINEERING Engineering $309,000 $0 $0 $0 $0 $0 $0 $0 $309,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from W/WW Operating Fund. 181 182 Line Replacement - Oakwood Terrace North Phases I, II, & III Engineering ST A N L E Y EAS T C L I F F D E L P R A D O LONG B O W DOUBLE BARREL SAGEBRUSH COMM ERCE MARY DE B R A EASTC L I F F TYLER PA M E L A GREENBRIAR WI L S H I R E D R EULESS B L V D ( W ) MARLENE DR HE A T H E R D R 0 210 420 630 840105 Feet ¯Wastewater Line Replacement -Between Mary Dr and Marlene Dr -Eastcliff Drive -Commerce Street -Between Tyler Ave and Marlene Dr Legend Wastewater 183 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 27,2024 MAJOR JONES 52ND CDBG LINE REPLACEMENT – TWIN OAKS COURT/SHADY HOLLOW WASTEWATER MAIN REPLACEMENT B The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project consists of the replacement of the following wastewater mains: 1. Twin Oaks Court and 2. Shady Hollow. (52nd year CDBG project) FY2026 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 184 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: 52ND CDBG LINE REPLACEMENT – TWIN OAKS COURT/SHADY HOLLOW Engineering $38,000 Construction $249,000 $0 $0 $0 $0 $0 $0 $0 $287,000 0% 0% 0% 0% XX 0% To Be Determined Project is contingent upon actual CDBG funding availability. 185 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 27,2024 MAJOR JONES LINE REPLACEMENT – OAKWOOD TERRACE NORTH PHASE I CONSTRUCTION WASTEWATER MAIN REPLACEMENT B The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project consists of the replacement of wastewater mains between Mary Drive and Marlene Drive from Eastcliff Drive to Marlene Drive. FY2026 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 186 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: LINE REPLACEMENT – OAKWOOD TERRACE NORTH PHASE I CONSTRUCTION Construction $536,000 $0 $0 $0 $0 $0 $0 $0 $536,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from W/WW Operating Fund. 187 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 27,2024 MAJOR JONES 53RD CDBG LINE REPLACEMENT – DOUGLAS STREET WASTEWATER MAIN REPLACEMENT B The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project consists of the replacement of wastewater mains located on Douglas Street from Aransas Drive to Fair Oaks Boulevard. (53rd year CDBG project) FY2027 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 188 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: 53RD CDBG LINE REPLACEMENT – DOUGLAS STREET Engineering $42,000 Construction $282,000 $0 $0 $0 $0 $0 $0 $0 $324,000 0% 0% 0% 0% XX 0% To Be Determined Project is contingent upon actual CDBG funding availability. 189 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 27,2024 MAJOR JONES LINE REPLACEMENT – OAKWOOD TERRACE NORTH PHASE II CONSTRUCTION WASTEWATER MAIN REPLACEMENT B The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project consists of the replacement of the following wastewater mains: 1. Along Eastcliff Drive from Mary Drive to Tyler Avenue and 2. 607-805 Commerce Street. FY2027 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 190 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: LINE REPLACEMENT – OAKWOOD TERRACE NORTH PHASE II CONSTRUCTION Construction $521,000 $0 $0 $0 $0 $0 $0 $0 $521,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from W/WW Operating Fund. 191 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 27,2024 MAJOR JONES LINE REPLACEMENT – OAKWOOD TERRACE NORTH PHASE III CONSTRUCTION WASTEWATER MAIN REPLACEMENT B The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project consists of the replacement of the wastewater mains between Tyler Avenue and Marlene Drive from Eastcliff Drive to Commerce Street. FY2027 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 192 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: LINE REPLACEMENT – OAKWOOD TERRACE NORTH PHASE III CONSTRUCTION Construction $489,000 $0 $0 $0 $0 $0 $0 $0 $489,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from W/WW Operating Fund. 193 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 27,2024 MAJOR JONES 54TH CDBG LINE REPLACEMENT – FAIR OAKS DRIVE/ROUNDTREE DRIVE WASTEWATER MAIN REPLACEMENT B The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project consists of the replacement of the following wastewater mains: 1. Fair Oaks Drive from Roundtree Drive to Denton Drive and 2. Roundtree Drive from Fair Oaks Drive to Cedar Ridge Terrace. (54th year CDBG project) FY2028 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 194 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: 54TH CDBG LINE REPLACEMENT – FAIR OAKS DRIVE/ROUNDTREE DRIVE Engineering $42,000 Construction $281,000 $0 $0 $0 $0 $0 $0 $0 $323,000 0% 0% 0% 0% XX 0% To Be Determined Project is contingent upon actual CDBG funding availability. 195 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 05,2024 MAJOR JONES LINE REPLACEMENT – WOODVINE DRIVE WASTEWATER MAIN REPLACEMENT B The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project consists of the replacement of the wastewater mains located at 1306-3803 Woodvine Drive. FY2028 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 196 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: LINE REPLACEMENT – WOODVINE DRIVE Engineering $98,000 Construction $491,000 $0 $0 $0 $0 $0 $0 $0 $589,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from W/WW Operating Fund. 197 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 27,2024 MAJOR JONES LINE REPLACEMENT – CLIFFWOOD ROAD/SHADY CREEK DRIVE WASTEWATER MAIN REPLACEMENT B The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project consists of the replacement of the following wastewater mains: 1. 1309-1509 Cliffwood Road and 2. 3905-4003 Shady Creek Drive. FY2029 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 198 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: LINE REPLACEMENT – CLIFFWOOD ROAD/SHADY CREEK DRIVE Engineering $119,000 Construction $596,000 $0 $0 $0 $0 $0 $0 $0 $715,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from W/WW Operating Fund. 199 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 28,2024 MAJOR JONES 55TH CDBG LINE REPLACEMENT – ROUNDTREE DRIVE WASTEWATER MAIN REPLACEMENT B The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project consists of the replacement of the following wastewater mains: 1. 206-214 Roundtree Drive and 2. 1300-1314 Roundtree Drive. (55th year CDBG project) FY2029 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 200 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: 55TH CDBG LINE REPLACEMENT – ROUNDTREE DRIVE Engineering $42,000 Construction $285,000 $0 $0 $0 $0 $0 $0 $0 $327,000 0% 0% 0% 0% XX 0% To Be Determined Project is contingent upon actual CDBG funding availability. 201 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 11,2022 HAL CRANOR LINE REPLACEMENT – KNOB HILL WASTEWATER MAIN REPLACEMENT C The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project consists of the replacement of all City-maintained wastewater mains located at Knob Hill. Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 202 Project Description Priority Estimated Cost Operating Fund CIP Fund Balance Bond/Tax Note Grants/ Contributions Impact Fees Escrow Funds Car Rental Tax Other EDC To Be Determined WATER PROJECTS LR: Sotogrande Boulevard Phase II A $ 365,000 XX Sub-Total Water Priority A-Proposed FY2025 $ 365,000 LR: Sagebrush Trail (26)B $ 539,000 XX LR: Bell-Hi Addition Phases I & II (27)B $ 585,000 XX LR: Donley Drive/Donley Court (28)B $ 497,000 XX LR: West Euless Boulevard (29)B $ 742,000 XX Sub-Total Water Priority B-Unfunded $ 2,363,000 1 Mil Well Replacement C TBD XX LR: Dunaway Drive C TBD XX LR: Knob Hill C TBD XX LR: Midway Park 3rd Addition C TBD XX LR: Westpark Way C TBD XX Sub-Total Water Priority C-Unfunded $- WATER PROJECTS - TOTAL $ 2,728,000 LR = Line Replacement CAPITAL IMPROVEMENT PROGRAMS FY2025 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE PROPOSED METHOD OF FINANCING 203 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 18,2022 MAJOR JONES LINE REPLACEMENT – SOTOGRANDE BOULEVARD PHASE II WATER MAIN REPLACEMENT A The water mains included in this project are part of the City's Water System Master Plan. The project consists of the replacement of an existing 10 inch AC water line located along Sotogrande Boulevard from El Camino Real to Monterrey Boulevard. FY2025 Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 204 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: LINE REPLACEMENT – SOTOGRANDE BOULEVARD PHASE II Engineering $33,000 Construction $332,000 $0 $0 $0 $0 $0 $0 $0 $365,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from W/WW Operating Fund. 205 206 Line Replacement – Sotogrande Boulevard Phase II B R Y A N D E E HE L E N PIPELINE RD (W) M O N T E R R E Y B LV D SOT O G R A N D E B L V D E L C AMIN O R E A L 0 225 450 675 900112.5 Feet ¯ Legend Water Water Line Replacement -Sotogrande Blvd. 207 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 18,2022 MAJOR JONES LINE REPLACEMENT – SAGEBRUSH TRAIL WATER MAIN REPLACEMENT B The water mains included in this project are part of the City's Water System Master Plan. The project consists of the replacement of an existing 8 inch cast iron water line located along Sagebrush Trail from Wilshire Drive to the end of Sagebrush Trail. FY2026 Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 208 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: LINE REPLACEMENT – SAGEBRUSH TRAIL Engineering $70,000 Construction $469,000 $0 $0 $0 $0 $0 $0 $0 $539,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from W/WW Operating Fund. 209 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 18,2022 MAJOR JONES LINE REPLACEMENT – BELL-HI ADDITION PHASES I & II WATER MAIN REPLACEMENT B The water mains included in this project are part of the City's Water System Master Plan. The project consists of the replacement of an existing 6 inch cast iron water line in the following areas: 1. Along Needles Street from Raider Drive to Paula Lane and 2. Along Paula Lane from Needles Street to West Pipeline Road. FY2027 Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 210 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: LINE REPLACEMENT – BELL-HI ADDITION PHASES I & II Engineering $76,000 Construction $509,000 $0 $0 $0 $0 $0 $0 $0 $585,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from W/WW Operating Fund. 211 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 18,2022 MAJOR JONES LINE REPLACEMENT – DONLEY DRIVE/DONLEY COURT WATER MAIN REPLACEMENT B The water mains included in this project are part of the City's Water System Master Plan. The project consists of the replacement of an existing 6 inch water line located in the following areas: 1. Along Donley Drive from Glenn Drive to Harwood Road and 2. Along Donley Court. FY2028 Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 212 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: LINE REPLACEMENT – DONLEY DRIVE/DONLEY COURT Engineering $65,000 Construction $432,000 $0 $0 $0 $0 $0 $0 $0 $497,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from W/WW Operating Fund. 213 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 26,2024 MAJOR JONES LINE REPLACEMENT – WEST EULESS BOULEVARD WATER MAIN REPLACEMENT B The water mains included in this project are part of the City's Water System Master Plan. The project consists of the replacement of an existing 8 inch water line located between 2219 and 2603 West Euless Boulevard. FY2029 Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 214 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: LINE REPLACEMENT – WEST EULESS BOULEVARD Engineering $97,000 Construction $645,000 $0 $0 $0 $0 $0 $0 $0 $742,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from W/WW Operating Fund. 215 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 15,2019 MAJOR JONES 1 MIL WELL REPLACEMENT WATER WELL C RW Harden & Associates prepared design and bid documents in FY2022 for the eventual replacement of the 1 Mil Well. The project consists of the complete replacement of the 1 Mil Well with a new well. A new well will enable the City to continue to provide high quality water to citizens while reducing maintenance and operational costs. 216 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 05,2018 MAJOR JONES LINE REPLACEMENT – DUNAWAY DRIVE WATER MAIN REPLACEMENT C The water mains included in this project are part of the City's Water System Master Plan. The project consists of the replacement of an existing 6 inch AC water line located along Dunaway Drive between East Alexander Lane and McCormick Court. Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 217 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 11,2022 MAJOR JONES LINE REPLACEMENT – KNOB HILL WATER MAIN REPLACEMENT C The water mains included in this project are part of the City's Water System Master Plan. The project consists of the replacement of all City-maintained water mains located at Knob Hill. Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 218 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 05,2018 MAJOR JONES LINE REPLACEMENT – MIDWAY PARK 3RD ADDITION WATER MAIN REPLACEMENT C The water mains included in this project are part of the City's Water System Master Plan. The project consists of the replacement of an existing 6 inch cast iron water line located along Ector Drive between Fayette Drive and West Harwood Road. Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 219 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 26,2020 MAJOR JONES LINE REPLACEMENT – WESTPARK WAY WATER MAIN REPLACEMENT C The water mains included in this project are part of the City's Water System Master Plan. The project consists of the replacement of an existing 12 inch AC water line located along Westpark Way between SH 10 and South Pipeline Road. Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 220 Project Description Priority Estimated Cost Operating Fund CIP Fund Balance Bond/Tax Note Grants/ Contributions Impact Fees Escrow Funds Car Rental Tax Other EDC To Be Determined OTHER PROJECTS Golf Course Upgrades A $ 2,140,000 XX Facility Renovations at 1400 South Pipeline Road A $ 3,000,000 $1,500,000 $1,500,000 Parks at Texas Star South Improvements A $ 750,000 XX Parks at Texas Star South Turf – Fenway/Shea/Jacobs Fields A $ 258,200 XX Playground Shade Structures A $ 950,000 XX Sub-Total Other Priority A-Proposed FY2025 $ 7,098,200 Carr Park Trail Connection (26)B TBD XX Kiddie Carr Park Improvements (26)B TBD XX Parks at Texas Star Phase VIII (27)B TBD XX Parks at Texas Star South Turf Replacement (27)B $ 875,000 XX Sub-Total Other Priority B-Unfunded $ 875,000 South Euless Park Upgrades C TBD XX Trail Enhancements Phase I C TBD XX Trail Enhancements Phase II C TBD XX Trail Enhancements Villages of Bear Creek C TBD XX Trailwood Park Improvements C TBD XX Sub-Total Other Priority C-Unfunded $ - OTHER PROJECTS - TOTAL $ 7,973,200 CAPITAL IMPROVEMENT PROGRAMS FY2025 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE PROPOSED METHOD OF FINANCING 221 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: GOLF COURSE May 15,2024 GLENDA HARTSELL GOLF COURSE UPGRADES PARK/RECREATION TSGC IMPROVEMENTS A Resurface the existing 'MiniVerde' Ultradwarf Bermuda greens at Texas Star Golf Course by removing the thatch layer near the surface, replacing with a suitable rootzone mix and re-sprigging the greens with TifEagle Bermudagrass. Collars will be re-sodded with 419 Bermudagrass. After removal, the existing sand will be used for agronomic practices around the course and practice areas. Additional course improvement projects, such as the leveling and expansion of various Tee boxes, capping sand in bunkers, cart path improvements and other small miscellaneous improvements are included in the project scope. May 15 - Sept 15 is the appropriate time to schedule the replacement and reconstruction of the greens. The optimum growing period for TifEagle Bermuda is June through September. The other projects will be scheduled simultaneously during the growing in period. Texas Star is a championship daily fee golf facility known for its high level of service and excellent course conditions. At this point in the life of the greens, it has become increasingly more difficult to maintain the existing 'MiniVerde' Ultradwarf Bermuda greens in an acceptable condition year round. TifEagle Bermudagrass is more genetically stable, as well as having a more robust tolerance to cold weather and shade as opposed to other Ultradwarf Bermudagrasses. Additionally, improvements on the Tee Boxes, bunkers, cart paths and other small projects would result in not only an aesthetically pleasing look, but optimal playing conditions as well adding to the total Texas Star experience. 222 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: GOLF COURSE UPGRADES Greens Replacement $600,000 Capping Bunkers $70,000 $0 Tee Improvements $85,000 $0 Cart Path Improvements $75,000 Native Area Control $10,000 Contingency $100,000 $0 Transfer to Golf Ops (Revenue Loss) $1,200,000 $0 $0 $0 $0 $2,140,000 0% 0% 0% 0% 0% XX To Be Determined The additional cost to this project would be the loss of revenue for the duration of the course closure. 223 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: July 16, 2024COMMUNITY SERVICES DUANE STRAWN FACILITY RENOVATIONS AT 1400 SOUTH PIPELINE ROAD FACILITIES IMPROVEMENTS A The City of Euless owns a facility located at 1400 South Pipeline Road which is leased to the Dallas Stars. The original lease agreement was entered into in 1999 and the facility is in need of renovations and improvements. The project scope includes renovating the restrooms, locker rooms, outdoor patio area, lobby, and office space. Additionally, an upgrade to the HVAC system, redesign and update of the second floor, improvements to the ceiling tile and lighting, and installation of new roll up door doors throughout the facility is included in the project as well. Anticipate Begin Construction - Summer 2025 Anticipate Construction Complete - Fall 2026 The building is approximately 25 years old and is in need of renovations and improvements. 224 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: FACILITY RENOVATIONS AT 1400 SOUTH PIPELINE ROAD Construction $3,000,000 $0 $0 $0 $0 $0 $0 $0 $3,000,000 0% 0% 0% 0% 0% $1,500,000 Dallas Stars Contribution $1,500,000 225 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES April 4, 2024 DUANE STRAWN PARKS AT TEXAS STAR SOUTH IMPROVEMENTS PARK/RECREATION PARK IMPROVEMENTS A Since the construction of Legends Field in 2017, we have received numerous requests for a restroom facility to serve that portion of the Parks at Texas Star facility. In addition, the removal of the batting cages has created a large open space that can be redesigned to better meet the needs of the Parks at Texas Star facility as well as the participants in our league and tournament ballgames. The project scope includes an additional restroom facility to service the east end of the Parks at Texas Star South Sports Complex and re-purposing the former batting cage area at Parks at Texas South with other recreational and or passive activities. FY2025 There is a lack of restroom facilities on the east end of a very busy athletic complex and the installation of a restroom facility would be a major benefit to our customers. Also, since the batting cages at Parks at Texas Star South were removed, this project will allow for re-purposing of this area with recreational activities. 226 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: PARKS AT TEXAS STAR SOUTH IMPROVEMENTS Restroom Building $325,000 Sidewalks to the Restroom Building $175,000 $0 Batting Cage Area Redesign & $0 Concession Building Renovation $250,000 $0 $0 $0 $0 $0 $750,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from EDC Operating Fund. 227 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES April 1, 2024 DUANE STRAWN PARKS AT TEXAS STAR SOUTH TURF – FENWAY/SHEA/JACOBS FIELDS PARK/RECREATION PARK IMPROVEMENTS A In 2016, the infields of six (6) ballfields at Parks at Texas Star South (Yankee, Royal, Wrigley, Arlington, Legends and Veterans) were replaced with an artificial sports turf to extend the playability of the fields during heavy use and inclement weather. This project has been very successful and has increased our league play and tournament play due to the fields durability and ability to run as many games as possible during league and tournament play. While some surrounding municipal fields are closed due to rain, Parks at Texas Star South has been able to complete both league and tournament games. These are the last three baseball fields in the Parks at Texas Star Athletic Complex that do not have artificial turf and continue to get rained out while the other fields are playable. The project scope includes the installation of turf on the infields of Fenway, Shea and Jacobs fields at Parks at Texas Star South. These infields are much smaller because they are only used for coach pitch and t-ball. FY2025 Going back to 2016, when the first turf infields were installed at Parks at Texas Star South, the number of rain outs have been significantly reduced. Even after the heaviest rain events, the infields are still playable; any rain out of games is either due to satellite locations being rained out or the outfields being too wet to play. Currently, the infields are clay at these locations. 228 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: PARKS AT TEXAS STAR SOUTH TURF – FENWAY/SHEA/JACOBS FIELDS Synthetic Turf $258,200 $0 $0 $0 $0 $0 $0 $0 $258,200 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from EDC Operating Fund. 229 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES July 17,2024 DUANE STRAWN PLAYGROUND SHADE STRUCTURES PARKS/RECREATION PARK IMPROVEMENTS A Shade structures for new and existing playgrounds are identified in the previous Parks Master Plan and the ongoing Parks Master Plan update. The project scope includes shade structures over play features at the following parks: Wilshire Park, J.A. Carr Park, Midway Park, McCormick Park, and the Parks at Texas Star South. FY2025 The park system lacks shade structures over the existing play features to prevent them from becoming extremely hot to the touch. In order for Euless residents to utilize and enjoy the playgrounds available to them, shade structures are necessary to alleviate some of the effects of the Texas heat. A large number of park playgrounds are protected from the sun by tree canopies, but the five parks listed have no protection from the heat. Providing shade over the play features throughout the park system will immediately address needs that have been identified in the Parks Master Plan through public engagement and survey results. 230 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: PLAYGROUND SHADE STRUCTURES Wilshire Park $150,000 J.A. Carr Park $300,000 $0 Midway Park $200,000 $0 McCormick Park $100,000 Parks at Texas Star South $200,000 $0 $0 $0 $0 $0 $950,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from EDC Operating Fund. 231 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES March 02,2017 RAY MCDONALD CARR PARK TRAIL CONNECTION PARK/RECREATION PARK IMPROVEMENTS B The adopted Parks Master Plan recommends funding for system-wide trail, park facilities, and amenities upgrades. This project includes the construction of a sidewalk/trail connection from Carr and Kiddie Carr Parks to South Pipeline Road along Mills Drive and through the TRA easement. FY2026 As identified in the adopted Parks Master Plan, the municipal park is the foundation of any solid parks and recreation system. The City of Euless parks and recreation system provides residents and visitors with significant personal, social, environmental, and economic benefits. The revitalization efforts that the Euless City Council has focused on over the years has increased the sense of community pride. The proposed project will continue the City Council's revitalization efforts by creating an area that will serve both the passive and active leisure needs of the residents in this area. 232 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: CARR PARK TRAIL CONNECTION Prof. Services – To Be Determined Construction – To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% To Be Determined XX 233 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES March 02,2017 RAY MCDONALD KIDDIE CARR PARK IMPROVEMENTS PARK/RECREATION PARK IMPROVEMENTS B The adopted Parks Master Plan recommends funding for system-wide park facilities and amenities upgrades. This project includes the necessary demolition and site work to complete a renovated park project that will include additional parking, benches with pads, picnic tables with pads, additional sidewalks, trail projects, general park lighting, a sport court, drinking fountain, trash cans, bbq grills, bicycle racks, signage, and additional landscaping. FY2026 As identified in the adopted Parks Master Plan, the municipal park is the foundation of any solid parks and recreation system. The City of Euless parks and recreation system provides residents and visitors with significant personal, social, environmental, and economic benefits. The revitalization efforts that the Euless City Council has focused on over the years has increased the sense of community pride. Kiddie Carr Park is a four-acre park located adjacent to Carr Park off Pauline Street. This park includes the Parks Department's in-ground tree farm, a greenhouse, and an outdoor basketball court. The proposed project will continue the City Council's revitalization efforts by creating an area that will serve both the passive and active leisure needs of the residents in this area. 234 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: KIDDIE CARR PARK IMPROVEMENTS Prof. Services – To Be Determined Construction – To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% To Be Determined XX 235 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES March 21,2019 RAY MCDONALD PARKS AT TEXAS STAR PHASE VIII PARK/RECREATION PARK IMPROVEMENTS B Parks at Texas Star Phase VIII includes construction of a multi-use, lighted open space that could be programmed for multiple activities. With the growing number of participants in youth sports, creating additional open space will allow staff the opportunity to expand existing leagues as well as programming for additional leagues in multiple sports. The addition of this phase will ensure that the Texas Star Sports Complex remains the premier sports facility for amateur athletics for many years to come. The project includes the design and construction of additional lighted playing surfaces to accommodate multiple sports. Additionally, this project will include substantial drainage and utility work, additional parking, and sidewalks. FY2027 With the completion of Phase VIII, the new infields will increase programming opportunities to accommodate multiple sports. 236 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: PARKS AT TEXAS STAR PHASE VIII Prof. Services – To Be Determined Construction – To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% To Be Determined XX 237 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES March 28, 2024 DUANE STRAWN PARKS AT TEXAS STAR SOUTH TURF REPLACEMENT PARK/RECREATION PARK IMPROVEMENTS B In 2016, the infields of six (6) ballfields at Parks at Texas Star South (Yankee, Royal, Wrigley, Arlington, Legends and Veterans) were replaced with an artificial sports turf to extend the playability of the fields during heavy use and inclement weather. This project has been very successful and has increased our league play and tournament play due to the fields durability and ability to run as many games as possible during league and tournament play. While some surrounding municipal fields are closed due to rain, PATS South has been able to complete both league and tournament games. The Project scope includes replacing existing turf at Parks at Texas Star South (Yankee, Royal, Wrigley, Arlington, Legends and Veterans). FY2027 The life expectancy of turf is 10 years. Turf was originally installed in 2016 at Parks at Texas Star South (Yankee, Royal, Wrigley, Arlington, Legends and Veterans), putting the expected replacement year at 2026. With the use of these fields being exceptional between league and tournament play, the wear and tear on the turf is tremendous. To avoid the turf becoming unplayable and allow the ability to continue to program at a high use level the turf will require replacement at, or around the 10 year mark. 238 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: PARKS AT TEXAS STAR SOUTH TURF REPLACEMENT Turf Replacement $875,000 $0 $0 $0 $0 $0 $0 $0 $875,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from EDC Operating Fund. 239 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES April 02,2013 RAY MCDONALD SOUTH EULESS PARK UPGRADES PARK/RECREATION PARK IMPROVEMENTS C The adopted Parks Master Plan calls for general upgrades and improvements in the overall quality of parks in the City and to develop a high quality parks system that provides activities for all age and interest groups and enhances the adjoining neighborhoods. Overall park enhancements and improvements to include amenities such as new playground equipment, park redevelopment, improved lighting, water features, upgrade and expansion of existing splashpad, and additional landscaping. As identified in the adopted Parks Master Plan, the municipal park is the foundation of any solid parks and recreation system. The City of Euless parks and recreation system provides residents and visitors with significant personal, social, environmental, and economic benefits. The revitalization efforts that the Euless City Council has focused on over the years has increased the sense of community pride. The proposed project will continue the City Council's revitalization efforts by creating an area that will serve both the passive and active leisure needs of the residents in this area. 240 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES May 12,2008 RAY MCDONALD TRAIL ENHANCEMENTS PHASE I PARK/RECREATION TRAIL SYSTEM C Trail-related improvements were included in the Needs Assessment and Identification section of the adopted Parks Master Plan. This project consists of Phase I of trail enhancements identified in the adopted Parks Master Plan which includes additional water fountains, additional benches, construction of shaded seating areas, addition and/or installation of new exercise equipment, and picnic stations along the trails as well as construction of additional pedestrian bridges in high water areas. Also identified, is the need to address various areas in the trails system that might need to be converted from unpaved to paved trails. The City of Euless has experienced significant progress in the last few years in the area of trail development with an extensive network of paved and unpaved trails. The trails system is a valuable asset to the community as it provides a safe means for non-vehicular travel, and also provides an opportunity for a variety of unstructured, low-impact recreational pursuits. The development and maintenance of the trails system continues to receive significant support from the citizens as indicated in the responses to the needs assessment survey conducted as a part of the Parks Master Plan update. 241 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES May 13,2008 RAY MCDONALD TRAIL ENHANCEMENTS PHASE II PARK/RECREATION TRAIL SYSTEM C Trail-related improvements were included in the Needs Assessment and Identification section of the adopted Parks Master Plan. This project is Phase II of the trail enhancements that continues implementation of park improvements identified in the adopted Parks Master Plan which includes additional water fountains, additional benches, construction of shaded seating, addition and/or installation of new exercise equipment, and picnic stations along the trails as well as construction of additional pedestrian bridges in high water areas. Also identified, is the need to address various areas along the trail that need to be converted from unpaved to paved trails. The City of Euless has experienced significant progress in the last few years in the area of trail development with an extensive network of paved and unpaved trails. The trails system is a valuable asset to the community as it provides a safe means for non-vehicular travel, and also provides an opportunity for a variety of unstructured, low-impact recreational pursuits. The development and maintenance of the trails system continues to receive significant support from the citizens as indicated in the responses to the needs assessment survey conducted as a part of the Parks Master Plan update. 242 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES March 23,2004 RAY MCDONALD TRAIL ENHANCEMENTS VILLAGES OF BEAR CREEK PARK/RECREATION TRAIL SYSTEM C This project includes infrastructure improvements which were identified as a high priority in the adopted Parks Master Plan. This project includes the redevelopment/redesign and improvement of the trail at the Villages of Bear Creek Park to offer multiple uses for the citizens of Euless. Trail development and enhancement opportunities will be consistent with available land, funding, and time variables. This Master Plan recommendation will be part of a city-wide comprehensive trail enhancement project. Due to the continual erosion of the existing trail, a redevelopment/redesign of the trail system at Villages of Bear Creek is necessary. 243 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES May 13,2008 RAY MCDONALD TRAILWOOD PARK IMPROVEMENTS PARK/RECREATION PARK IMPROVEMENTS C This project is a continuation of the overall park improvement plan as identified in the Parks Master Plan. Trailwood Park is an eleven-acre site that currently has a playground and a half-mile hike/bike trail. This project includes the installation of a new pavilion, a parking lot, upgraded playground to meet the Americans with Disabilities Act standards, park lighting, new park signs, benches along the trail, and trail lighting. As identified in the adopted Parks Master Plan, the municipal park is the foundation of any solid parks and recreation system. The City of Euless parks and recreation system provides the residents and visitors with significant personal, social, environmental, and economic benefits. The revitalization efforts that the Euless City Council has focused on over the years has increased the sense of community pride. This proposed project will continue those efforts by creating an area that will serve both the passive and active leisure needs of the residents in the vicinity. 244 CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Date Completed Total Budget Total Project Costs (Over) Under Budget DRAINAGE PROJECTS DR9901 Sulphur Branch Phase II 08/01/99 123,404$ 120,128$ 3,276$ DR9902 Windlea & WestCliff 08/01/99 4,396$ 1,159$ 3,237$ DR9904 Hurricane Creek 04/30/02 257,500$ 69,906$ 187,594$ DR0302 Flooding Mitigation Cancelled 250,000$ -$ 250,000$ DR0303 Aransas @ Glenn 12/31/04 250,000$ 250,000$ -$ DR0304 Live Oak Drainage 04/15/05 218,000$ 175,958$ 42,042$ DR0305 Sierra Drive Drainage 04/15/05 40,738$ 40,738$ 0$ DR0306 Flood Mitigation Plan(FEMA)04/15/05 32,000$ 7,750$ 24,250$ DR0307 Simmons Drainage 04/15/05 22,995$ 22,995$ -$ DR0301 Fuller Branch Channel Stabilization 05/31/07 279,136$ 232,176$ 46,960$ DR0401 Channel Stabilization Tributary WFA 05/31/07 437,462$ 438,070$ (608)$ DR0402 Drainage Project Study 05/31/07 60,000$ 51,000$ 9,000$ DR0601 Little Bear Creek Study Update 04/25/08 50,000$ 49,000$ 1,000$ DR0602 McCormick Park 04/25/08 250,000$ 247,925$ 2,075$ DR0701 Eastcliff Drive/Greenbriar Drive Drainage Imp.04/17/10 340,000$ 246,584$ 93,416$ DR0801 Rockwall Drive/Lamar Drive Drainage Imp.04/17/10 430,000$ 272,554$ 157,446$ DR0901 Bear Creek Parkway Erosion Repair 02/17/11 530,000$ 464,465$ 65,535$ DR0802 Hurricane Creek & Bridge at Marlene Improvements 04/14/11 378,500$ 344,574$ 33,926$ DR0000 Boyd Branch Improvements Cancelled 10,000,000$ -$ 10,000,000$ DR2201 Bear Creek Elementary Drainage Channel Improvements 05/31/23 551,366$ 544,040$ 7,326$ 14,505,497$ 3,579,022$ 10,926,475$ -$ -$ -$ -$ -$ -$ Total Drainage Projects 14,505,497$ 3,579,022$ 10,926,475$ Drainage Projects - Current Year Project Number Project Description Drainage Projects - Prior Years 245 246 CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Date Completed Total Budget Total Project Costs (Over) Under Budget STREET PROJECTS PS9911 Overlay Projects 03/30/00 294,687$ 294,687$ -$ PS9912 Harwood-Main Intersection 04/30/00 1,126,935$ 1,077,303$ 49,632$ PS9907 Westpark Way - SH10 to SH183 09/30/00 605,542$ 479,915$ 125,627$ PS9902 Mid Cities Blvd.05/02/02 1,075,074$ 963,635$ 111,439$ PS9910 Sidewalks 06/30/03 200,000$ 200,000$ -$ PS0001 FM 157 S Pipeline to SH10 (Utility Relocation)04/30/04 378,207$ 371,318$ 6,889$ PS0003 Glade from Heritage to SH121 04/30/04 1,866,612$ 1,866,612$ -$ PS0004 Glade Rd (East) - SH121 to Champagne 04/30/04 1,210,014$ 1,162,009$ 48,005$ PS0201 Gateway Blvd - Southern Portion 04/30/04 510,000$ 473,817$ 36,183$ PS0301 Mid Cities Roadway Illumination 04/15/05 160,000$ 148,115$ 11,885$ PS0302 Driftwood Pipeline Traffic Signal 04/15/05 100,000$ 68,665$ 31,335$ PS0303 Aransas/Harwood Traffic Signal 04/15/05 120,000$ 89,118$ 30,882$ PS0402 South Pipeline Road Bridge 04/30/05 28,208$ 28,208$ -$ PS9908 Signalization 05/31/06 168,055$ 168,055$ -$ PS0401 West Pipeline - Raider to City Limits 05/31/06 223,000$ 104,859$ 118,141$ PS0403 Raider Dr - SH10 to South Pipeline 05/31/06 330,000$ 293,435$ 36,565$ PS0501 Ross Avenue/S.Main 300' W 05/31/06 95,688$ 95,638$ 50$ PS0502 Industrial Signal Timing 05/31/06 50,000$ 50,000$ -$ PS0503 Overlay-Harwood 157/Main 05/31/06 137,000$ 119,816$ 17,184$ PS0604 Overlay-S.Main, SH10/S.Pipeline 05/31/06 137,000$ 140,211$ (3,211)$ PS0601 Overlay-East Midway 05/31/07 83,000$ 73,550$ 9,450$ PS0602 Overlay-Midway, N Main,/FM157 05/31/07 105,000$ 67,632$ 37,368$ PS0603 Overlay-Fuller Wiser, Midway/Harwood 05/31/07 40,000$ 28,695$ 11,305$ PS9906 Traffic Safety/Signalization 05/31/08 128,027$ 127,939$ 88$ PS0404 South Pipeline Road Overlay 05/31/08 114,750$ 85,062$ 29,688$ PS0701 Overlay-Dickey Drive 05/31/08 122,200$ 48,435$ 73,765$ PS0702 Overlay-East Huitt 05/31/08 89,000$ 64,895$ 24,105$ PS0703 Overlay-Huntington Drive 05/31/08 69,500$ 42,884$ 26,616$ PS0706 Gateway Blvd Screening Wall 05/31/08 135,800$ 138,862$ (3,062)$ PS0705 Signal Gateway Blvd @ Glade 10/28/08 98,000$ 98,000$ -$ PS0002 West Pipeline Road-Raider/Hwy10 12/01/08 6,082,621$ 6,081,392$ 1,229$ PS0801 Overlay-North Main/Cullum Drive 12/31/08 290,000$ 211,130$ 78,870$ PS9905 Traffic Studies 05/30/09 27,286$ 27,197$ 89$ PS0704 Disability Access Study 05/31/09 30,000$ 13,950$ 16,050$ PS0901 Ash/Denton/Fair Oaks Overlay 09/30/09 320,000$ 231,984$ 88,016$ PS0902 Vine Street Design Cancelled 100,000$ -$ 100,000$ PS9903 HWY 183 Service Road Cancelled -$ -$ -$ PS0304 Glade Road 04/16/10 3,077,977$ 2,905,205$ 172,772$ PS9909 FM157 North - SH183 to SH121 04/16/10 267,519$ 129,215$ 138,304$ PS0903 Mid Cities @ Gateway & Baze Traffic Signals 04/16/10 320,000$ 250,702$ 69,298$ PS0802 Fuller-Wiser Connector 02/17/11 495,000$ 441,491$ 53,509$ PS1002 FY10 County Overlay - Wilshire/Marlene 05/17/11 288,000$ 200,890$ 87,110$ PS9901 North Main Street 05/31/12 6,745,047$ 6,698,149$ 46,898$ PS9904 Harwood Road 05/31/12 5,770,211$ 5,686,556$ 83,655$ PS1001 Baze Road 05/31/12 1,830,000$ 1,558,401$ 271,599$ PS1101 FY2011 County Overlay-Bear Creek Drive/Lakewood Blvd/Ash Lane 05/31/12 300,000$ 265,887$ 34,113$ PS0605 South Pipeline Road Bridge Replacement 05/31/13 157,000$ 157,000$ -$ PS1003 Ash Lane-Aransas Drive to N. Main Street 05/31/13 1,959,230$ 1,597,270$ 361,960$ PS1201 FY2012 County Overlay-Aransas Drive/Slaughter Lane 05/31/13 300,000$ 228,759$ 71,241$ PS1301 FY2013 38th CDBG-ADA/TAS Infrastructure Improvements 05/31/14 450,000$ 284,581$ 165,419$ PS1302 FY2013 County Overlay-Trailwood/Summit Ridge/Westpark/Baze 05/31/14 280,000$ 273,995$ 6,005$ Project Number Project Description 247 248 CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Date Completed Total Budget Total Project Costs (Over) Under Budget Project Number Project Description STREET PROJECTS - CONTINUED PS1402 FY2014 County Overlay-Ector Drive/Midway Drive/Trojan Trail 05/31/14 300,000$ 300,000$ -$ PS1401 FY2014 39th CDBG-ADA/TAS Infrastructure Improvements 02/28/15 300,000$ 272,057$ 27,943$ PS1303 Cullum Drive Improvements 03/31/15 1,295,738$ 1,210,748$ 84,990$ PS1202 ADA/TAS Infrastructure Improvements 05/31/16 463,800$ 460,996$ 2,804$ PS1502 FY2015 Street Overlay 05/31/16 300,000$ 217,182$ 82,818$ PS1602 FY2016 Street Overlay 09/30/16 600,000$ 600,000$ -$ PS1501 FY2015 40th CDBG-ADA/TAS Infrastructure Improvements 05/31/17 519,600$ 392,693$ 126,907$ PS1602 FY2016 Street Overlay 05/31/17 600,000$ 600,000$ -$ PS1603 FY2016 41st CDBG-ADA/TAS Infrastructure Improvements 05/31/17 79,301$ 70,194$ 9,107$ PS1701 FY2017 42nd CDBG-ADA/TAS Infrastructure Improvements 05/31/18 91,000$ 65,240$ 25,760$ PS1702 FY2017 Street Improvements 05/31/18 600,000$ 600,000$ -$ PS1703 Traffic Signal-Harwood Road at Bear Creek Parkway 05/31/18 180,000$ 180,000$ -$ PS1102 Glade Parks Improvements 05/31/19 15,369,514$ 15,369,514$ -$ PS1801 FY2018 Street Improvements 05/31/19 425,000$ 425,000$ -$ PS1802 FY2018 Street Reconstruction-Fuller Wiser Rd./Bear Creek Pkwy.05/31/21 6,270,329$ 6,270,329$ -$ PS1901 FY2019 Street Improvements 05/31/21 950,000$ 950,000$ -$ PS2001 FY2020 Street Improvements 05/31/21 975,000$ 975,000$ -$ PS2002 Glade Road Reconstruction-East of Highway 360 05/31/21 150,000$ 101,643$ 48,357$ PS2003 Traffic Signal-Cheek-Sparger Road at Heritage Avenue 05/31/21 259,800$ 243,336$ 16,464$ PS2101 FY2021 Street Improvements 05/31/22 1,000,000$ 1,000,000$ -$ PS2201 FY2022 Street Improvements 05/31/23 1,025,000$ 1,025,000$ -$ 70,645,272$ 67,544,055$ 3,101,217$ PS2301 FY2023 Street Improvements 05/31/24 1,050,000$ 1,050,000$ -$ 1,050,000$ 1,050,000$ -$ Total Street Projects 71,695,272$ 68,594,055$ 3,101,217$ Street Projects - Current Year Street Projects - Prior Years 249 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 31,2018 HAL CRANOR May 31, 2024 FY2023 STREET IMPROVEMENTS STREET IMPROVEMENTS PS2301 February 14, 2023: Authorized the City Manager to execute an interlocal agreement with Tarrant County for asphalt overlay improvements to Pamela Drive, Himes Drive, Oak Forest Trail, Shelmar Drive, Oakwood Drive, and Limestone Drive. The estimated expenditure is $600,000. The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by pavement condition index of the roadways. Began Construction: October 2022 Construction Complete: September 2023 The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, extend the life of the roadway, and enhance the appearance of the streets. 250 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Construction $1,050,000 $0 $0 $0 $0 $1,050,000 Transfer from: General Fund $1,050,000 $0 $0 $0 $1,050,000 Construction $1,050,000 $1,050,000 $0 100% $1,050,000 $1,050,000 $0 100% FY2023 STREET IMPROVEMENTS PS2301 251 252 CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Date Completed Total Budget Total Project Costs (Over) Under Budget WASTEWATER PROJECTS WW9902 Impact Fee Study 09/30/99 13,000$ 12,238$ 762$ WW9903 Misc Sewer Rehab FY99 09/30/99 50,000$ 12,987$ 37,013$ WW9904 Hydraulic Analysis 06/30/00 27,000$ 27,000$ -$ WW9901 CDBG B/98-UC-48-0001/B95-22-50 08/19/00 150,000$ 72,927$ 77,073$ WW0003 TRA Debt Payment 05/31/01 822,037$ 822,037$ -$ WW0001 CDBG B/99-UC-48-0001 09/30/01 150,000$ 121,682$ 28,318$ WW0101 CDBG B00-UC480001-2250 02/20/02 251,485$ 247,790$ 3,695$ WW0102 Manhole Rehab. Program 03/31/03 250,000$ 184,520$ 65,480$ WW0201 CDBG - B01-UC-48-0001-22-50 03/31/03 237,086$ 172,948$ 64,138$ WW0202 Line Replacement -Dunaway 02/28/05 140,000$ 139,955$ 45$ WW0203 Line Replacement - E. Alexander 02/28/05 20,000$ 20,000$ -$ WW0204 Line Replacement - Paula Lane 02/28/05 79,000$ 79,000$ -$ WW0103 Line replacement-S. Pipeline,Heather-Vine 04/15/05 489,759$ 464,504$ 25,255$ WW0205 Line Replacement - Midway Park 04/30/05 366,000$ 318,149$ 47,851$ WW0401 CDBG B03-UC-48-0001-22-50 04/30/05 217,000$ 161,170$ 55,830$ WW0301 CDBG B02-UC-48-0001-22-50 07/26/05 271,455$ 271,454$ 1$ WW0302 Inflow & Infiltration Cancelled 200,000$ -$ 200,000$ WW0303 Line Replacement, Canyon Ridge 08/31/06 196,200$ 173,516$ 22,684$ WW0304 Line Replacement, Sagebrush 08/31/06 160,900$ 136,470$ 24,430$ WW0305 Line Replacement, Short 08/31/06 251,400$ 219,932$ 31,468$ WW0306 Line Replacement, E. Fuller 08/31/06 231,372$ 180,089$ 51,283$ WW0501 Line Replacement, Pebble Creek 08/31/06 172,600$ 145,655$ 26,945$ WW0604 Line Replacement, CDBG-Oakwood Terrace 05/31/07 293,723$ 232,274$ 61,449$ WW0402 Line Replacement, Carr Park/SH10 05/31/08 588,000$ 528,302$ 59,698$ WW0403 Line Replacement, Ector Drive 05/31/08 373,000$ 328,309$ 44,691$ WW0601 Line Replacement, Cedar Hills Estate 05/31/08 319,000$ 200,201$ 118,799$ WW0602 Line Replacement, Ector Drive 05/31/08 425,000$ 285,758$ 139,242$ WW0603 Little Bear Creek Collection Line 05/31/08 575,000$ 464,293$ 110,707$ WW0701 Line Replacement, McCormick & Copher 02/05/09 243,000$ 194,254$ 48,746$ WW0702 Line Replacement, Arnett Addition 02/05/09 313,322$ 229,006$ 84,316$ WW0703 Line Replacement, Jean Lane 02/05/09 111,000$ 70,603$ 40,397$ WW0704 Line Replacement, W. Fuller 02/05/09 132,000$ 82,708$ 49,292$ WW0902 Line Replacement, West Mills Drive-34th CDBG 04/16/10 46,855$ 46,855$ -$ WW0802 Line Replacement South Mills Drive CDBG-R 11/01/10 253,710$ 165,867$ 87,843$ WW0901 Line Replacement Woodridge Circle/Koen Lane 11/01/10 407,000$ 309,410$ 97,590$ WW0801 Line Replacement Fayette Drive 04/14/11 357,000$ 325,676$ 31,324$ WW1001 Line Rep - W Alexander Ln/Norman Dr/Franklin Dr 05/31/12 420,000$ 331,614$ 88,386$ WW1101 Line Rep - Bayless/Pauline/Jones (CDBG)05/31/12 350,000$ 208,903$ 141,097$ WW1103 Line Rep - Bayless/Pauline/Jones Outfall 05/31/12 57,000$ 37,544$ 19,456$ WW1202 Line Rep - Collin Drive (37th CDBG)05/31/12 300,000$ 231,173$ 68,827$ WW1102 Line Rep - E Huit Lane/Ascot Drive/Dunaway Drive 05/31/13 560,000$ 468,932$ 91,068$ WW1201 Line Rep - Blanco/Aransas/Crane 05/31/13 327,000$ 284,321$ 42,679$ WW1301 Line Rep - Ross/Slaughter/East & West Huitt 05/31/14 670,000$ 566,640$ 103,360$ WW1203 SH183 Phase I Wastewater Relocation 10/31/14 372,243$ 372,243$ -$ WW1401 Line Rep - Denton Drive 06/01/15 629,000$ 506,466$ 122,534$ WW1501 Line Rep - Crane Drive 05/31/16 264,823$ 264,823$ -$ WW1502 Line Rep - Town Creek Drive 05/31/16 440,665$ 395,896$ 44,769$ WW1601 Line Rep - Glenn Drive 05/31/17 293,000$ 264,370$ 28,630$ WW1702 FY2017 42nd CDBG LR: Oakwood Terrace Phase I 05/31/17 242,000$ 190,474$ 51,526$ WW1701 Line Rep - Cedar Hill Estates/Hollywood Boulevard 05/31/18 134,165$ 89,001$ 45,164$ WW1801 SH183 Phase II Wastewater Relocation 05/31/19 700,672$ 681,209$ 19,463$ WW1802 FY2018 43rd CDBG LR: Oakwood Terrace Phase II 05/31/19 223,125$ 183,337$ 39,788$ WW1901 Line Rep - Cedar Hill Estates North 05/31/20 409,903$ 250,838$ 159,065$ WW1902 FY2019 44th CDBG LR: Oakwood Terrace Phases III & IV 05/31/20 377,639$ 248,838$ 128,801$ WW2001 FY2020 45th CDBG LR: Midway Park 2nd Addition Phase I 05/31/21 444,244$ 400,484$ 43,760$ Project Number Project Description 253 254 CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Date Completed Total Budget Total Project Costs (Over) Under Budget Project Number Project Description WASTEWATER PROJECTS - CONTINUED WW2002 Line Rep - Midway Park 3rd Addition Phase I 05/31/22 446,600$ 292,446$ 154,154$ WW2003 Line Rep - North Main Street 05/31/22 189,000$ 115,849$ 73,151$ WW2101 Line Rep - El Camino Real 05/31/22 562,000$ 371,957$ 190,043$ WW2102 FY2021 46th CDBG LR: Del Paso Street Phase I & II 05/31/22 478,652$ 331,867$ 146,785$ WW2103 Line Rep - SH10 @ Main Street 05/31/22 121,000$ 49,293$ 71,707$ WW2201 FY2022 47th CDBG LR: Paula Ln./David Dr./Susan St./Raider Ct. 05/31/23 412,058$ 409,440$ 2,618$ WW2202 Line Rep – Midway Park 3rd Addition Phase II & Green Hills Park 05/31/23 442,400$ 359,914$ 82,486$ WW2203 Line Rep – South Pipeline Road & SH 10 05/31/23 165,340$ 165,340$ -$ 19,216,433$ 15,520,751$ 3,695,682$ WW2303 FY2023 48th/49th CDBG LR: Euless Square/Aransas Drive 05/31/24 769,897$ 467,240$ 302,657$ 769,897$ 467,240$ 302,657$ Total Wastewater Projects 19,986,330$ 15,987,991$ 3,998,339$ Wastewater Projects- Current Year Wastewater Projects - Prior Years 255 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 29,2022 HAL CRANOR May 31, 2024 48TH/49TH CDBG LINE REP – EULESS SQ/ARANSAS DR WASTEWATER MAIN REPLACEMENT WW2303 February 8, 2022: Conducted a Public Hearing for the proposed 48th year CDBG project and approved the recommendation. March 28, 2023: Conducted a Public Hearing and amended the recommended project selection for the 49th year CDBG project. March 28, 2023: Approved Resolution No. 23-1640, amended Resolution No. 23-1633, and awarded a construction contract to Excel 4 Construction in the amount of $371,200 with a contingency of $18,560. March 28, 2023: Approved Resolution No. 23-1641, amended Resolution No. 23-1634, and awarded a construction contract to Excel 4 Construction in the amount of $277,900 with a contingency of $13,895. The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project consists of the replacement of the following wastewater mains: 1. Euless Square at 1300 Raider Drive, and along the west side of Raider Drive from West Euless Boulevard to a point 450 feet north of West Euless Boulevard, and 2. 1104-1304 Aransas Drive. (48th/49th year CDBG project) Began Design: September 2022 Design Complete: December 2022 Began Construction: May 2023 Construction Complete: September 2023 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 256 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering $88,342 Construction $649,100 $0 Contingency $32,455 $0 $0 $0 $769,897 Transfer from: W/WW CIP Fund Balance $56,250 48th CDBG Award $483,750 $0 49th CDBG Award $286,147 $0 Transfer to: W/WW CIP Fund Balance ($56,250) Unused CDBG Funding ($302,657) $0 $467,240 Engineering $88,342 $88,342 $0 100% Construction $649,100 $378,898 $270,202 58% Contingency $32,455 $0 $32,455 0% $769,897 $467,240 $302,657 61% 48TH/49TH CDBG LINE REP – EULESS SQ/ARANSAS DR WW2303 257 258 CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Date Completed Total Budget Total Project Costs (Over) Under Budget WATER PROJECTS WT9903 Master Plan 08/30/99 42,000$5,445$36,555$ WT9904 Well Repairs 09/30/99 66,921$66,921$-$ WT9907 Impact Fee Study 09/30/99 13,000$12,238$762$ WT9911 Water Distribution - Master Plan 09/30/99 25,600$24,000$1,600$ WT9901 Meter Change Out Program 10/30/99 101,917$ 98,365$3,552$ WT0002 Emergency Repair - Hwy 10 11/30/99 15,450$14,214$1,236$ WT9906 Hwy 10 Water Line 01/30/00 150,000$ 138,883$ 11,117$ WT0006 Central Drive Water Mains 03/31/00 92,814$90,742$2,072$ WT9905 Misc Water Rehab 06/30/00 50,000$43,749$6,251$ WT0004 Water Line Milam - Ector/Midway 06/30/00 18,248$13,743$4,505$ WT0102 SCADA Upgrade 04/09/01 93,400$93,400$-$ WT0003 Waterline Replacement - Aransas 06/30/01 12,057$7,089$4,968$ WT0005 Waterline Replacement - Milam- Denton/Mid 04/30/02 26,988$26,988$-$ WT9910 Water Line for Elevated Tank 05/31/02 1,608,386$ 1,201,698$ 406,688$ WT9909 2MG Water Tank 03/31/03 2,430,881$ 2,289,571$ 141,310$ WT0103 Fire Hydrant Replacement Program 03/31/03 50,000$49,626$374$ WT9908 Mid Cities Blvd. 12" Line 04/30/04 342,080$ 313,354$ 28,726$ WT0401 Line Replacement, West Pipeline Main 05/31/06 1,215,663$ 1,215,663$ -$ WT0403 Waterline Replacement - Fairlawn Court Cancelled 35,000$-$ 35,000$ WT0404 Waterline Replacement - Atkerson Lane Cancelled 104,000$ -$ 104,000$ WT0405 Line Replacement, West Ash Lane 08/31/06 30,000$11,626$18,374$ WT0406 Line Replacement, Westport/Newport/Asbury 08/31/06 67,000$9,866$57,134$ WT0502 FY'2005 CDBG 08/31/06 69,300$29,549$39,751$ WT0503 Line Replacement, S. Atkerson Lane 08/31/06 79,000$51,294$27,706$ WT0504 Line Replacement, Blanco Drive 08/31/06 112,620$ 112,620$ -$ W T0505 Line Replacement, Henslee 08/31/06 183,000$ 123,859$ 59,141$ WT0506 Line Replacement, Vernon/Slaughter 08/31/06 161,000$ 113,052$ 47,948$ WT9902 Tank Painting 05/31/07 1,317,763$ 957,542$ 360,221$ WT0501 System Security Upgrade 05/31/08 40,000$28,319$11,681$ WT0601 Wtr Sys Security Perimeter Fence Upgrade 05/31/08 75,000$49,567$25,433$ WT0602 Line Replacement, Cannon Drive 05/31/08 250,000$ 223,055$ 26,945$ WT0701 Line Replacement, Canyon Ridge 05/31/08 116,000$ 78,136$37,864$ WT0702 CDBG FY07 - 32nd Oakwood Terrace 05/31/08 334,481$ 296,223$ 38,258$ WT0802 CDBG-33rd Oakwood Terrace-Simmons 12/31/08 451,639$ 384,173$ 67,466$ WT0402 Water & Wastewater Impact Fee Update 05/31/09 30,000$17,729$12,271$ WT0801 Line Replacement, Signet/Mesa 05/31/09 255,000$ 218,663$ 36,337$ WT0201 Well Rehabilitation/Disinfection 04/17/10 600,000$ 522,308$ 77,692$ WT0202 Reclaimed Water Main 05/31/13 1,750,000$ 1,606,337$ 143,663$ WT1202 Standpipe Storage Tank & Building Demolition 05/31/13 134,640$ 70,089$64,551$ WT1203 Water & Wastewater Impact Fee Update 05/31/13 34,575$34,575$-$ WT1401 El Camino Real 02/28/15 460,000$ 420,462$ 39,538$ WT0901 Trinity River Authority Water Payment-Impact 05/31/16 750,000$ 750,000$ -$ WT1201 Reclaimed Water Line Extension Phase I 05/31/16 3,239,452$ 3,239,452$ -$ WT1501 24-Inch Valve Replacement 05/31/16 180,000$ 131,370$ 48,630$ WT1601 Line Rep - Donley Drive/Shelmar Drive 05/31/16 212,000$ 152,990$ 59,010$ WT1602 FY2016 41st CDBG Line Rep - Ector Drive 05/31/17 310,925$ 309,151$ 1,774$ WT1212 Reclaimed Water Line Extension Phase II 05/31/18 2,591,496$ 1,868,473$ 723,023$ WT1402 Fixed Base Meter Reading and Water Meter Changeout 05/31/18 5,503,719$ 5,503,719$ -$ WT1801 SH183 Phase II Water Relocation 05/31/19 780,672$ 703,577$ 77,095$ Project Number Project Description 259 260 CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Date Completed Total Budget Total Project Costs (Over) Under Budget Project Number Project Description WATER PROJECTS - CONTINUED WT1901 Line Rep - Kynette Drive 05/31/20 635,000$ 593,793$ 41,207$ WT0101 Water Tank Debt Payment-Impact 05/31/21 5,240,318$ 5,240,318$ -$ WT2001 Line Replacement – Alexander Lane 05/31/23 347,829$ 326,385$ 21,444$ WT2101 Line Replacement – Dickey Drive 05/31/23 568,171$ 568,171$ -$ WT2201 1 Mil Well Replacement Design 05/31/23 53,077$ 53,077$ -$ 33,458,082$ 30,505,209$ 2,952,873$ WT2202 Line Replacement – Huntington Drive Phase I 05/31/24 515,000$ 468,485$ 46,515$ 515,000$ 468,485$ 46,515$ Total Water Projects 33,973,082$ 30,973,694$ 2,999,388$ Water Projects- Current Year Water Projects - Prior Years 261 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 25,2020 HAL CRANOR May 31, 2024 LINE REPLACEMENT – HUNTINGTON DRIVE PHASE I WATER MAIN REPLACEMENT WT2202 June 13, 2023: Approved award of Bid No. 003-23 for the FY2022 Water Line Replacement Project located at Huntington Drive and authorized the City Manager to enter into a contract with Excel 4 Construction, Inc. The estimated expenditure is $462,931.35 and includes an owner-controlled contingency of five percent of the contractual amount. The water mains included in this project are part of the City's Water System Master Plan. The project consists of the replacement of an existing 6 inch asbestos concrete water line located along East Alexander Lane from Dickey Drive to Huntington Drive and Huntington Drive between East Alexander Lane and East Huitt Lane. Additionally, replacement of lateral tie-ins located on Martin Lane and Slaughter Lane will be included as well. Began Design: January 2022 Design Complete: April 2023 Began Construction: August 2023 Construction Complete: May 2024 The line has had nine leaks repaired since 2007 and was installed in 1961. 262 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering Phase I & II $67,000 Construction $448,000 $0 $0 $0 $0 $515,000 Transfer from: W/WW Operating Fund $515,000 $0 $0 Transfer to: W/WW CIP Fund Balance ($46,515) $0 $468,485 Engineering $67,000 $33,044 $33,956 49% Construction $448,000 $435,441 $12,559 97% $515,000 $468,485 $46,515 91% LINE REPLACEMENT – HUNTINGTON DRIVE PHASE I WT2202 263 264 CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Date Completed Total Budget Total Project Costs (Over) Under Budget OTHER PROJECTS AC0202 Athletic Complex Phase Ill 05/31/06 1,252,221$ 1,251,915$ 306$ AC1001 Texas Star Sports Complex Lighting Improvements 05/31/12 504,200$ 475,246$ 28,954$ AC1201 Texas Star Sports Complex Phase IV 05/31/16 645,687$ 575,653$ 70,034$ AC1601 Texas Star Sports Complex Phase V 05/31/18 2,602,877$ 2,538,291$ 64,586$ AC1702 Texas Star Sports Complex Phase VI 05/31/17 1,258,892$ 1,258,470$ 422$ AC9901 Athletic Complex Phase II 06/30/02 123,654$ 75,047$ 48,607$ CM1508 Car Rental Contingency 05/31/16 700,000$ 700,000$ -$ CM1509 Municipal Plaza Improvements Phase I 05/31/17 158,500$ 41,767$ 116,733$ ED0101 Planning Consultants 05/31/18 204,869$ 104,869$ 100,000$ ED0102 Bell Ranch Terrace Cancelled 200,000$ -$ 200,000$ FM0101 Building D 09/30/02 930,610$ 930,608$ 2$ FM0209 Midway Recreation Upgrade 06/30/02 557,125$ 557,125$ -$ FM0308 Building A Remodel 05/31/07 1,663,238$ 1,651,325$ 11,913$ FM0309 Fire Station #3 05/31/07 2,286,798$ 2,286,229$ 569$ FM0504 Building "B" Remodel 05/31/09 1,322,490$ 1,315,697$ 6,793$ FM0601 Public Works Facility 05/31/08 2,210,956$ 2,213,507$ (2,551)$ FM0801 TX Star Golf Course & Conference Ctr Expand 05/31/09 3,630,079$ 3,630,079$ -$ FM0802 Senior Citizen Center Design cancelled 250,000$ -$ 250,000$ FM0803 Midway Recreation Improvements 03/31/09 293,500$ 75,976$ 217,524$ FM0804 Library-Shell Expansion 12/31/08 307,034$ 305,664$ 1,370$ FM1510 Development/Engineering Building Improvements 05/31/18 2,589,125$ 2,588,793$ 332$ FM1708 Library Remodel 05/31/21 7,546,908$ 7,546,908$ -$ GC1201 TSGC Misc. Improvements 05/31/18 430,000$ 404,820$ 25,180$ GC1701 TSGC Maintenance Building 05/31/18 100,000$ 97,934$ 2,066$ GR1401 Golf Course Upgrades 09/30/14 587,000$ 581,296$ 5,704$ PD9901 Police and Courts Facility 05/31/15 11,718,304$ 11,718,304$ -$ PR0015 Purchase of Dallas Stars Center 05/31/00 10,327,978$ 10,327,978$ -$ PR0016 Wilshire Park Improvements 06/30/02 150,000$ 149,926$ 74$ PR0110 Slope Protection/Screening Wall 03/31/03 1,275,203$ 1,273,923$ 1,280$ PR0302 Bob Eden Parking 04/30/05 75,000$ 74,854$ 146$ PR0303 Youth Ballpark 04/30/05 600,000$ 600,000$ -$ PR0407 Parking Improvements, Midway Cancelled 11,000$ -$ 11,000$ PR0408 Parking Improvements, S. Euless Park 05/31/06 55,000$ 20,991$ 34,009$ PR0409 Parking Improvements, Simmons 07/29/04 6,960$ 6,960$ -$ PR0410 Parking Improvements, Villages Bear Creek 07/29/04 33,666$ 33,666$ -$ PR0411 Preserve at McCormick Park 05/31/06 1,168,427$ 1,168,427$ -$ PR0412 Splash Pool 05/31/06 125,000$ 124,477$ 523$ PR0601 Park Amenities Upgrade 04/17/10 150,000$ 145,316$ 4,684$ PR0602 Mid Cities Landscaping 05/31/09 40,000$ 33,199$ 6,801$ PR0719 Midway Park Trail 05/31/09 210,000$ 190,473$ 19,527$ PR0901 Trail Enhancements - Bob Eden Park 04/17/10 135,000$ 101,673$ 33,327$ PR0902 Senior Citizen Center at Midway Park 05/31/11 4,763,661$ 3,888,892$ 874,769$ PR0907 Euless Family Life Center Phase I 05/31/11 2,105,000$ 2,099,281$ 5,719$ PR1201 Euless Family Life Center Aquatics 09/30/14 7,504,972$ 7,319,299$ 185,673$ PR1401 Glade Parks Trail Connection 05/31/19 1,396,545$ 1,138,772$ 257,773$ PR1917 Carr Park Improvements 05/31/21 1,928,548$ 1,906,504$ 22,044$ PR9901 Hike/Bike Trail 04/30/05 237,714$ 237,714$ -$ PR9902 Senior Citizen Remodel 04/30/05 16,130$ 16,130$ -$ Project Number Project Description 265 266 CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Date Completed Total Budget Total Project Costs (Over) Under Budget Project Number Project Description OTHER PROJECTS - CONTINUED PR9903- PR9918 Various EDC Park Projects 09/30/06 259,566$ 248,891$ 10,675$ PR9922 Tejas Remodel 11/30/01 430,000$ 455,885$ (25,885)$ PR9927 Park Improvements - Texas Star 09/30/01 1,036,500$ 1,025,298$ 11,202$ PW1704 Public Works Yard Improvements 05/31/17 100,000$ 97,686$ 2,314$ SS0010 Former Fire Station #2 06/30/02 599,600$ 595,257$ 4,343$ SS0113 Park Building 06/30/02 1,492,400$ 1,492,100$ 300$ SS9901 Fire Station II 03/30/00 49,688$ 49,688$ -$ SS9902 Library Books 08/15/00 3,302$ 3,302$ -$ SS9919 Fire Station #3 - Structural Repairs 03/30/00 30,000$ 17,344$ 12,656$ PR2102 Senior Center Canopy CDBG-CV 05/31/23 394,544$ 392,980$ 1,564$ PR2306 Carr Park Trail Connection 05/31/23 316,100$ -$ 316,100$ PR2307 Kiddie Carr Park Improvements 05/31/23 893,500$ -$ 893,500$ PR2309 Parks at Texas Star North Additional Parking Lot 05/31/23 499,800$ 449,892$ 49,908$ PR2310 Trail Lighting – Heritage Avenue to Bob Eden Park 05/31/23 150,000$ 150,000$ -$ 82,644,871$ 78,762,300$ 3,882,571$ FM2006 Fire Station #1 05/31/24 7,748,239$ 7,388,181$ 360,058$ GC2003 Texas Star Slope Wall Protection Phase I 05/31/24 415,337$ 415,337$ -$ PR2305 Aquatic Park Facility Upgrades 05/31/24 315,000$ 313,041$ 1,959$ PR2308 Midway Park Pickleball Courts 05/31/24 200,520$ 200,520$ -$ PR2311 Trail Lighting – Mid-Cities 05/31/24 152,000$ 84,304$ 67,696$ 8,831,096$ 8,401,383$ 429,713$ Total Other Projects 91,475,967$ 87,163,683$ 4,312,284$ Other Projects - Current Year Other Projects - Prior Years 267 Department:Date Prepared:March 14, 2019 Submitted By:Date Completed:May 31, 2024 Project Title: Project Type:FACILITIES Sub-Type: Project CODE:FM2006 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: The current station cannot be upgraded to current codes and standards without incurring significant expenses. The new construction will provide the following: 1. An ADA and construction code compliant building; 2. A facility to support increasing demand in an area of the City experiencing rapid growth; 3. Allow for the deployment of a double company response station: Ladder / Engine / Medic. 4. New facility that is user friendly and meets the needs of station personnel. 5. A building that will meet current energy / ventilation / electrical codes and function more efficiently. The project consists of the demolition of fire station No.1 located at 201 E. Ash lane. The station was originally constructed 30+ years ago and can no longer meet the functional demands of a full service fire station. The building has had small improvements and minor upgrades to the living areas but no major modifications to the overall building structure. The project scope includes professional services and construction of a new 12,000-15,000 sq ft. station to include four (4) double deep bays to accommodate an aerial ladder truck, fire engine, and ambulance; living quarters; and operation offices for staff. The additional bay space planned in the facility allows for the housing of reserve vehicles and equipment. The professional services includes architecture services, engineering, and construction cost estimates. Began Construction: March 2021 Construction Complete: January 2023 City of Euless Capital Project Request FIRE DEPARTMENT WES RHODES FIRE STATION #1 BUILDING Design Complete: August 2020 October 22, 2019: Authorized the City Manager to negotiate and execute an Architectural Services Contract with Oxley Williams Tharp Architects for the construction of Fire Station No. 1. Began Design: December 2019 October 8, 2019: Approved Resolution No. 19-1557, authorizing the City Secretary to publish a notice declaring intention to issue certificates of obligation in an amount not to exceed $7,500,000 for public improvements to fire department facilities. October 8, 2019: Approved Resolution No. 19-1558, declaring expectation to reimburse expenditures with proceeds of future debt. The City expects to expend funds for acquiring, designing, constructing, improving, expanding, and equipping one or more fire stations (including the demolition of existing Fire Station #1). January 14, 2020: Approved the first and final reading of Ordinance No. 2235, authorizing the issuance of “City of Euless, Texas, Tax and Waterworks and Sewer System (Limited Pledge) Revenue Certificates of Obligation, Series 2020". May 12, 2020: Awarded Bid No. 008-20 for the purchase of a double-wide manufactured home to Clayton Homes. This unit will serve as temporary housing for Fire Station No. 1 staff during the renovations of the existing site. The estimated expenditure is $80,350. May 26, 2020: Approved the first and final reading of Ordinance No. 2244 authorizing the issuance of "City of Euless, Texas Tax Notes, Series 2020". May 26, 2020: Approved Resolution No. 20-1577 declaring expectation to reimburse expenditures with proceeds of future debt. August 11, 2020: Approved the full demolition of Fire Station No. 1, 201 East Ash Lane, to GFC Contracting, to include removal of the structure, driveways and approaches, and return the site to rough grade. Demolition services are provided through the BuyBoard Job Ordering Contract (JOC) program #520-16. The estimated expenditure is $65,882. February 9, 2021: Awarded Request For Competitive Sealed Proposal (RFCSP) No. 002-21 for the construction of Fire Station No. 1 in the amount of $5,147,500, authorized an owner controlled contingency not to exceed 10%, and authorized the City Manager to enter into a construction contract with Modern Contractors. April 13, 2021: Authorized the purchase of a fire station alerting system for Fire Station No. 1 from US Digital Designs, Inc. using HGAC Contract No. EC07-20. The estimated expenditure is $150,372.29. 268 PROJECT TITLE:PROJECT CODE:FM2006 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Professional Services $520,000 Direct Operating Cost Construction $5,960,134 Personnel:Full Time Furniture, Fixtures & Equipment $554,411 Part Time $0 Debt Issuance Costs $133,105 $0 Demolition & Temporary $390,000 $190,589 . Average Debt Service $453,000 $453,000 Total Estimated Capital Cost $7,748,239 Maintenance Costs Debt Service Fund $133,105 2020 Certificates of Obligation $7,335,000 2020 Tax Notes $380,000 $0 Interest Earnings $200,134 $0 Transfer to: FM2311 - Fire Station #2 ($660,058) Total Estimated Annual Cost $453,000 Total Funding $7,388,181 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED $520,000 $516,197 $3,803 99% $5,960,134 $5,794,972 $165,162 97% $554,411 $554,411 $0 100% Demolition & Temporary Fire Station $390,000 $389,496 $504 100% Debt Issuance Costs $133,105 $133,105 $0 100% Contingency $190,589 $0 $190,589 0% $7,748,239 $7,388,181 $360,058 95% Subtotal: FUNDING SOURCE: Transfer from: CURRENT STATUS Professional Services TOTAL PROJECT Subtotal: Furniture, Fixtures & Equipment Construction FIRE STATION #1 Total Salary Purchase of Services Materials & Supplies Contingency Fire Station Utilities 269 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: TEXAS STAR GOLF COURSE April 30, 2019 GLENDA HARTSELL-SHELTON May 31, 2024 TEXAS STAR SLOPE WALL PROTECTION PHASE I DRAINAGE IMPROVEMENTS GC2003 August 3, 2020: Awarded Bid No. 013-20 for Channel Improvements at the Texas Star Golf Course (TSGC), Hole No. 9, and authorized the City Manager to execute a construction contract with Knight Erosion Control, Inc. The estimated expenditure is $124,771.28. September 8, 2020: Awarded Bid No. 016-20 for Channel Improvements at the Texas Star Golf Course, Hole No. 9, and authorized the City Manager to execute a construction contract with Knight Erosion Control, Inc. The estimated expenditure is $129,970. June 22, 2021: Ratified City Manager action to proceed with emergency repairs to City property along Hurricane Creek at TSGC. Knight Erosion Control, Inc. performed the work and the estimated expenditure is $74,923. April 11, 2023: Awarded Bid No. 011-23 for channel improvements at the Texas Star Golf Course to R.C. Retaining Walls, Inc. The estimated expenditure is $130,751.36 with an owner-controlled contingency of five percent of the contractual amount and will be paid from DR9903 and GC2003. Project scope includes the materials and labor for the installation of slope wall protection at the pedestrian and cart bridges at Texas Star Golf Course on hole #9, along the banks of Hurricane Creek. Began Construction: September 2020 Construction Completed: December 2023 Continued deterioration of creek embankment could threaten the structural integrity of the bridge structures and the ability to navigate the cart path. 270 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Rip-rap wall $415,337 $0 $0 $0 $0 $415,337 Transfer from: Car Rental CIP Fund Balance $315,000 GC2001- #9 Fairway Gabion $0 Wall $100,337 $0 $0 $415,337 Improvements $415,337 $415,337 $0 100% $415,337 $415,337 $0 100% TEXAS STAR SLOPE WALL PROTECTION PHASE I GC2003 271 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES May 14,2021 RAY MCDONALD May 31, 2024 AQUATIC PARK FACILITY UPGRADES PARK/RECREATION PARK IMPROVEMENTS PR2305 January 24, 2023: Authorized the purchase and installation of a pre-manufactured building from Restroom Council Facilities Ltd. to serve as a breakroom for the aquatic staff at the Euless Family Life Aquatic Park . The estimated expenditure is $198,864. The adopted Parks Master Plan calls for general upgrades and improvements in the overall quality of parks and park amenities in the City and to develop a high quality parks system that provides for all age and interest groups and enhances the adjoining neighborhoods. Overall aquatic park improvements include amenities such as expanding the lifeguard "shack" area, replacing the netting for the lily pad play feature, weatherproofing the pump room, resurfacing the pool deck, and installing an additional ultra violet filtration system. Began Construction: October 2022 Construction Complete: September 2023 As identified in the adopted Parks Master Plan, the municipal park is the foundation of any solid parks and recreation system. The City of Euless parks and recreation system provides residents and visitors with significant personal, social, environmental, and economic benefits. The revitalization efforts that the Euless City Council has focused on over the years has increased the sense of community pride. The aquatic park continues to serve about 40,000 patrons each year since it opened in 2013. The proposed project will continue the City Council's commitment to the citizens to provide safe, high quality park and recreational facilities for years to come. 272 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Lifeguard Area Construction $165,000 Weatherproof Pump Room $75,000 $0 Resurface Pool Deck $35,000 $0 Upgrade Misc. Play Features $20,000 Miscellaneous Texture Repairs $20,000 $0 $0 $315,000 Transfer from: EDC Operating Fund $315,000 $0 $0 Transfer to: EDC CIP Fund Balance ($1,959) $0 $313,041 Improvements $315,000 $313,041 $1,959 99% $315,000 $313,041 $1,959 99% AQUATIC PARK FACILITY UPGRADES PR2305 273 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES March 08,2022 RAY MCDONALD May 31, 2024 MIDWAY PARK PICKLEBALL COURTS PARK/RECREATION PARK IMPROVEMENTS PR2308 September 27, 2022: Authorized the construction of four VersaCourt outdoor pickleball courts by Turf Green Courts through the Sourcewell Cooperative Purchasing Agreement. The estimated expenditure is $182,910. May 23, 2023: Authorized the purchase and installation of a LED lighting system for the pickeball courts. The estimated expenditure is $54,999 and will be paid from PR0720 and PR2308. Additional recreation courts were included in the Needs Assessment and Identification section of the adopted Parks Master Plan. Project scope consists of the installation of four pickleball courts located at Midway Park. Began Construction: October 2022 Construction Complete: May 2023 Lighting Complete: August 2023 Fencing Complete: September 2023 The City of Euless has experienced an overwhelming number of requests for dedicated space to play pickleball. The popular game has gained many followers in recent years and has consumed numerous hours of open gym time. By installing four dedicated pickleball courts, competitive leagues can be offered to interested residents. Additionally, the gym will have more open play time. 274 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Site Preparation $7,500 Concrete Work $70,794 $0 Light System $16,450 $0 Paddle Sets $250 Net Poles, Nets, and Cranks $1,328 Sport Court Surface $57,658 Black Chain Link 8' $22,230 Windscreen 6' $4,514 Labor $7,067 Freight $3,179 $0 5% Contingency $9,550 $0 $200,520 Transfer from: EDC Operating Fund $200,520 $0 $0 $0 $200,520 Construction $200,520 $200,520 $0 100% $200,520 $200,520 $0 100% MIDWAY PARK PICKLEBALL COURTS PR2308 275 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES May 14,2021 RAY MCDONALD May 31, 2024 TRAIL LIGHTING – MID-CITIES PARK/RECREATION PARK IMPROVEMENTS PR2311 October 25, 2022: Authorized the purchase and installation of solar LED path and area lighting for a portion of the Trails of Euless extending from Heritage Avenue to Euless Main Street, as well as within Bob Eden Park from Facility Solutions Group. The estimated expenditure is $222,475 and will be paid from PR2310 and PR2311. Trail-related improvements were included in the Needs Assessment and Identification section of the adopted Parks Master Plan. Project scope consists of the installation of low level lighting along the trail from Bob Eden Park to Euless Main Street. Began Construction: February 2023 Construction Complete: April 2023 The City of Euless has experienced significant progress in the last few years in the area of trail development with an extensive network of paved and unpaved trails. The trails system is a valuable asset to the community as it provides a safe means for non-vehicular travel, and also provides an opportunity for a variety of unstructured, low-impact recreational pursuits. The addition of well-placed trail lighting that is frequently maintained improves visibility, increases trail access, and provides convenience for trail users. The development and maintenance of the trails system continues to receive significant support from the citizens as indicated in the responses to the needs assessment survey conducted as a part of the Parks Master Plan update. 276 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: 51 LED Solar Light (40W) with Motion Sensors $86,000 $0 51 18ft. Direct Bury Poles $33,000 $0 Equipment Rental and Labor $33,000 $0 $0 $152,000 Transfer from EDC Operating Fund $152,000 $0 $0 Transfer to: EDC CIP Fund Balance ($67,696) $0 $84,304 Lighting $152,000 $84,304 $67,696 55% $152,000 $84,304 $67,696 55% TRAIL LIGHTING – MID-CITIES PR2311 277 278