Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
97-979 08-12-1997
RESOLUTION NO. 97 -979 A RESOLUTION APPROVING AND ADOPTING THE PLANS AND SPECIFICATIONS, AUTHORIZING THE BIDDING AND APPROVING THE ENGINEER'S COST ESTIMATE FOR PAVING IMPROVEMENTS TO U. S. HIGHWAY 157 FROM HIGHWAY 183 TO HIGHWAY 121. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF EULESS, TEXAS: Section 1 The City Council of the City of Euless, Texas, has previously determined the necessity for improving U. S. State Highway 157, from State Highway 183 to State Highway 121, and has agreed to participate with Texas Department of Transportation and has announced its intention to assess for the improvements. Section 2 Texas Department of Transportation has developed the plans and specifications for this project. Texas Department of Transportation will advertise, bid and award the contract for these paving costs. Section 3 Texas Depai tment of Transportation has prepared a cost estimate for this project. The estimated total constriction cost for this project is $7,670,055.00. The estimated cost of the project to the City of Euless is $1,386, 961.00. Section 4 The City Engineer has prepared an assessment roll from the information provided by Texas Department of Transportation setting forth the names of all property owners of property abutting that portion of Highway 157 which is to be improved and whose property may be subject to assessment. A true and correct copy of the assessment roll is attached to this resolution. Section 5 This resolution shall be effective immediately upon adoption. ADOPTED this 12th day of August 1997, at a regular meeting of the Euless City Council, by a vote of 7 ayes, 0 nays, and 0 abstentions. APPROVED: O/LL Mary Libtaleh, Mayor ATTEST: WPwin\ccc\97-979.res ENGINEER'S COST ESTIMATE FM 157 IMPROVEMENTS NOTE: TOTALS include Engineering and Contingencies. Engineering Dept. 8/12/97 STATE / FEDERAL CITY OF EULESS TOTAL PROJECT CURB & GUTTER: Curb & gutter $15,370.00 $0.00 $15,370.00 Mono curb $7,275.00 $50,067.50 $57,342.50 subtotal $22,645.00 $50,067.50 $72,712.50 SIDEWALK: Sidewalk $19,340.00 $0.00 $19,340.00 Wheelchair ramps $4,950.00 $0.00 $4,950.00 Wall / sidewalk $17,800.00 $0.00 $17,800.00 subtotal $42,090.00 $0.00 $42,090.00 ROADWAY: Lime $119,520.00 $5,328.00 $124,848.00 Lime treated subgrade $124,360.00 $5,562.50 $129,922.50 HMAC underlayment $653,184.00 $27,412.00 $680,596.00 Concrete paving $2,058,056.00 $97,900.00 $2,155,956.00 subtotal $2,955,120.00 $136,202.50 $3,091,322.50 DRAINAGE: Storm pipe $1,716.00 $318,494.00 $320,210.00 Inlets / MH / JB $18,750.00 $160,300.00 $179,050.00 Box culverts $787,654.75 $537,825.00 $1,325,479.75 Wing walls $16,200.00 $0.00 $16,200.00 Rip rap $14,153.00 $4,070.00 $18,223.00 subtotal $838,473.75 $1,020,689.00 $1,859,162.75 OTHER: subtotal $2,961,669.40 $180,00_ $3:141,671.69 TOTALS $6,819,998.15 $1,386,961.29 $8,206,959.44 NOTE: TOTALS include Engineering and Contingencies. Engineering Dept. 8/12/97 TOTAL ESTIMATED PROJECT COST: $8,206,959.44 TOTAL LENGTH OF PROJECT: 10,280.00 feet CITY'S ESTIMATED COST: $1,386,961.00 CITY'S TOTAL FRONTAGE: 9750.71 feet ENGINEER'S ROLL FM 157 IMPROVEMENTS FROM: S.H.121 to S.H.183 PAGE 1of1 PROPERTY OWNER DESCRIPTION OF PROPERTY COST of 1/2 ST. /FR. FT. © $399.17 /FR. FT. ASSESSMENT $ /FR. FT. TOTAL ASSESSMENT C &G(100 %) © $5.13 /FR. FT. SDWLK(100 %) © $0.00 /FR. FT. RDWY(90 %) @ $13.97 /FR. FT. DRNG(90 %) © $104.68 /FR. FT. LOT/ ABST. BLK/ TR. _ ADDITION OR SURV. & ZON. FRONTAGE FEET 1. Texas Power & Light 2. Mazie Nell Eden, etal 939 939 George Linney Survey 517.98 $206,762.69 $2,659.70 $0.00 $6,511.85 $48,799.20 $57,970.75 George Linney Survey 805.10 $321,372.72 $4,133.99 $0.00 $10,121.41 $75,848.94 $90,104.35 6. Joel Taxman 1 3 Lakewood 328.31 $131,051.89 _ $1,685.79 $0.00 $4,127.39 $30,930.28 $36,743.46 7A. Lyons Equities, Inc. Trustees A Lakewood 199.95 $79,814.28 $1,026.69 $0.00 $2,513.70 $18,837.41 $22,377.80 7B. Anchor Investments Pro.ert , Inc. Trustees Lakewood 2nd Addition 174.52 $69,663.35 $896.12 $0.00 $2,194.00 $16,441.63 $19,531.75 7C. Quanset Corp. B -R -1 Lakewood 2nd Addition 348.00 $138,911.57 $1,786.89 $0.00 $4,374.92 $32,785.28 $38,947.10 8. 627 - 868 Euless J.V. 302 J.M. Cummings Survey 845.90 $337,658.90 $4,343.49 $0.00 $10,634.34 $79,692.73 $94,670.56 10. 607 - 766 Euless J.V. 302 J.M. Cummings Survey 430.00 $171,643.61 $2,207.94 $0.00 $5,405.80 $40,510.55 $48,124.29 14B. John Freese & Assoc., Inc. 302 J.M. Cummings Survey 567.50 $226,529.64 $2,913.97 _ $0.00 $7,134.40 $53,464.51 $63,512.88 14C. 801 - 819 Joint Venture 302 J.M. Cummings Survey 440.16 $175,699.19 $2,260.11 $0.00 $5,533.53 $41,467.73 $49,261.37 14A. 620 - 991 Euless J.V. 302 I J.M. Cummings Survey 235.10 $93,845.14 $1,207.18 $0.00 $2,955.59 $22,148.91 $26,311.68 17. Chevron USA, Inc. 1 Harwood Plaza 180.00 $71,850.81 $924.26 $0.00 $2,262.89 $16,957.91 $20,145.05 18. Russell F. Coonley, etux Bonnie M. 6 Harwood Plaza 100.00 $39,917.12 $513.48 $0.00 $1,257.16 $9,421.06 $11,191.70 19. Southerland Lumber & Home Center, Inc. 4 -R -2 1 Harwood Plaza 305.37 $121,894.90 $1,568.00 $0.00 $3,839.00 $28,769.09 $34,176.08 23. Lyons Equities, Inc. Trustees 7 &8 Harwood Plaza 198.24 $79,131.69 $1,017.91 $0.00 $2,492.20 $18,676.31 $22,186.42 24. Lyons Equities, Inc. Trustees 711 J.P. Halford Survey 357.21 $142,587.94 $1,834.19 $0.00 $4,490.71 $33,652.96 $39,977.86 25. William E. Wyatt 711 J.P. Halford Survey 200.00 $79,834.24 $1,026.95 $0.00 $2,514.32 $18,842.12 $22,383.39 28B. W.R. Rose Investments Inc. Trustee 711 J.P. Halford Survey 566.47 $226,118.50 $2,908.68 $0.00 _ $7,121.45 $53,367.47 $63,397.60 28A. W.R. Rose Investments Inc. Trustee 771 J.P. Halford Survey 446.25 $178,130.14 $2,291.38 $0.00 $5,610.09 $42,041.47 $49,942.94 ? ?? ?(Race Trac) 2 A Race Trac 200.00 $79,834.24 $1,026.95 $0.00 $2,514.32 $18,842.12 $22,383.39 30. George Nikolopoulos 1 1 Flory 99.77 $39,825.31 $512.29 $0.00 $1,254.27 $9,399.39 $11,165.96 31. Glenn Gatlin 3/A Park 90.00 $35,925.41 $462.13 $0.00 $1,131.45 $8,478.95 $10,072.53 $115,274.47 34PT1. HEB Independent School District 711 J.P. Halford Survey 1030.00 $411,146.31 $5,288.80 $0.00 $12,948.77 $97,036.90 35. Trustees of / for First Baptist Church of Euless 711 J.P. Halford Survey 863.91 $344,847.97 $4,435.97 $0.00 $10,860.75 $81,389.47 $96,686.18 ? ?? ?(Mobile gas staion) 711 J.P. Halford Survey 220.97 $88,204.86 $1,134.63 $0.00 $2,777.95 $20,817.71 $24,730.29 TOTALS 9750.71 $3,892,202.41 _ $50,067.50 $0.00 $122,582.25 $918,620.10 $1,091,269.85 Engineering Dept 8/12/97