HomeMy WebLinkAboutPreliminary Capital Improments Budget FY01-02City of Euless Prcxruingthe past wbile P rcp ai ngifor t lu fu tu re. Preliminary Capital Improvements Program FY2001-2002 .F r a -FI r! :=f CITY OFFICIALS MARY LIB SALEH, MAYOR JOE HENNIG, CITY MANAGER Gary McKamie Deputy City Manager Loretta Getchell, CPA Director of Fiscal & Administrative Services CARL TYSON, COUNCIL MEMBER PLACE ONE AND MAYOR PRO TEM LEON HOGG, COUNCIL MEMBER PLACE TWO BOB EDWARDS, COUNCIL MEMBER PLACE THREE CHARLES MILLER, COUNCIL MEMBER PLACE FOUR GLENN PORTERFIELD, COUNCIL MEMBER PLACE FIVE VEVA LOU MASSEY, COUNCIL MEMBER PLACE SIX E ITY June 20, 2001 Honorable Mayor Mary Lib Saleh City Council: CarlTyson, Place One & Mayor Pro Tem Leon Hogg, Place Two Bob Edwards, Place Three Charles Miller, Place Four Glenn Porterfield, Place Five Veva Lou Massey, Place Six INTRODUCTION The City of Euless Capital lmprovements Program is a comprehensive document detailing all projects that have been identified to date. Emphasis has been placed on organizing this data in a manner that will facilitate decision making processes, assist in long range planning and provide the citizens of Euless with information regarding planned projects. This document meets the requirements of the City Charter. Article Vll, Section 2 (4) requires " A statement proposing any capital expenditures deemed necessary for undertaking during the next budget year and recommended provisions for financing". Section 2 (5) further requires "A list of capital projects which should be undertaken within the five (5) next succeeding years". We extend special appreciation to the directors and the finance staff for their outstanding performance in creating this document. UNDERSTANDING THIS BOOK Although this book contains a large volume of information, the summaries should make it easy to understand at a glance. The book is divided into three sections: Funded Projects, Unfunded Projects, and Completed Projects. Each section begins with a summary and is followed by detailed data for those wishing to research individual projects. The detail provided includes the project's relationship to City master plans, the project description and justification, the effect on future maintenance and operating costs, and the estimated total cost. Within each section, you will find the detailed descriptions sorted by type. There are five basic project types: Drainage, Streets, Water, Wastewater, and Other. Funded projects indicate any City Council authorization and the current status of the project. The current status section recaps all financial information currently reflected on the City's financial reports. Thus, budget amounts in this section only reflect actual dollars available. No budget amounts are added to line items until funding is received. As funds become available, they will be allocated to the appropriate budget line items based on the total estimated cost. 201 N. Ector Drive, Euless, Texas 76039-3595 817 /685-.1.400 . Metro 817 /267-4403 . Fax 8171685- 1416 * Projects have been classified as funded if any portion of the funding is available. For those projects that are not fully funded, clear explanations have been provided as to how the remainder of the projects is expected to be funded. The Unfunded Projects section has been classified into lhree categories of priority. Priority A indicates that the staff anticipates presenting this project to the Council for action during the upcoming budget year. Priority B projects should be presented to Council within two to five years. Projects that will not begin for at least ,ive years have been given a Priority C. This system has been used to allow the Council to evaluate and shift priorities, when necessary, and to provide a means of budgeting capital projects for at least five years. Recommended funding sources have been indicated if known. The Completed Projects section provides a summary indicating total project budget, actual expenditure, and varlance. Funds remaining have been returned to the appropriate fund balance account for reappropriation. A detail of each project has also been provided. FY2OO2 PROPOSED PROJECTS Funding sources have been recommended for all projects that will be presented to the Council during the upcoming budget year. These are listed on the Unfunded Projects Summary as Priority A. These include:. Gateway Boulevard - Southern Portiono CDBG 2002. Line Replacements @ Dunaway, E. Alexander, Paula Lane, Midway Park o Manhole Rehabilitation Program. Disinfection ModificationMell Rehabilitation. Effluent Water Maino Building D Remodel. Midway Recreation Center Upgrade . The City also has approximately $5.9 million of funding pending for existing projects. This includes $3.2 million of general obligation bonds for Pipeline Road. This also includes anticipated reimbursement due on Pipeline Road. CLOSING COMMENTS Staff is presenting this book for the Council to review and comment. We understand that this document is a work in progress and requires regular updates. We hope this document will serve as a great tool to aid in your future decisions. Sin ager Joe Hen City Funded Projects !l I j i .s,,{ I ! i ! j.;r:l' "'rti I l'' )) H CAPITAL IMPROVEMENTS PROGRAM FUNDED PROJECTS SUMMARY BUDGET AMOUNT AS OF Mav 31. 2001 ProJoct Numher Dralnage Wat€r & Sewer CIP lmpact Fee Half Cent Sales Tax Pollco Facllity General CIP Fund E3crow Funds Unfundod/ Fundlng Oth€r Fund Prolsct Cost DRAINAGE PROJECTS DR9903 Misc Orainaoe lmDrovemenls s51.609 $51.60s oR9904 Hud€ne Creek s2s7.500 $257.500 S t rh-l: di, I Dr2ln 2 de Prdtek $309,109 $309,1 09 STREET PROJECTS PS9901 Norlh Main Street s7 413.732 s430.000 $1 7.276 $s.0s3 $7.866.061 P59902 Mid Cities Blvd.ss00 000 $60.650 s1.000.000 $20.146 (1)$1 -580.796 P59903 l-lwv ,l83 SeMce R@d $1 52,825 $45.132 91s7.957 PS9SO4 HaNmd RGd $s.462.162 s602 2s0 s16 S19 (2)36.081.3r 1 PS9905 TEffic Studies $27.198 s27 1C8 PS9906 Tafnc Safetv s12A.O27 $128,O27 PS9908 Siqnilialion $167,285 $'167.285 PSSOO9 FM'157 North. SH183 to SH121 (Lrndseoino & Liohtinol $239.820 s23q 820 PS9910 Sidewalk Proiects $200.000 $200.000 PS9912 Hamood - Main Stret lntemection $'1.126.935 $1.126.935 PS0001 FM157 - S PiDeline-SH10 (Ull Relc)$322.037 $322.037 PS0002 West Pioeline - Raider/Hwv 10 $182.336 s497.019 s4.61 1.395 (3)s5.2m.750 PS0003 Glade - Heritaoe/SH '121 $1.421.494 s1 38.750 s1.560.244 PS0004 Glade - SH 121lchamDaone $1.s73.394 s98.368 s1.671.762 $1 8.91 7.245 $430.000 $1,414,293 $5,656,s27 $42,1 18 $26,460,183 WASTEWATER PROJECTS w\M)00'l coBG 899-UC-48-0001 s1 50.000 sl 50,000 wwo002 $87 013 $65.000 s1s2.013 wwo003 TFIA Oebt Pavments sa22.o37 s822,037 wwo101 FY 2OO1 COBG $457,000 $457.000 w1/i/0102 Manhole Rehab. PrcoGm $1s0.000 s200.000 s350.000 ww)r03 $500.000 s500.000 $1,344,013 s822.O37 $265,000 $2.431.050 WATER PROJECTS WT9SO2 Wal6. Tank Paintino $200.000 s200.000 WTSNA Mid Citier t2'Line $31 1.6S2 $31 1.692 wT9909 2MG Water Tank s2.295.496 $90.000 32.385.4S6 wT9910 Waler Line lor Elevated Tank s, o37 187 ssl s.300 $1,552,487 wT0001 Utilitv Rehab - Wale. Prm€m 9)06?s1 s206 2s1 wT0003 $12,057 $1 2,057 wT000s water Line Milam - Oenton/Midwav $19.31 1 $19,31 I wTo103 Fire Hv.rmnl Rcolacement Proomm s50.000 ss0,000 Sub-lotet Weter Prcl*ts $3,820,302 $916,992 $4.737.294 OTHER ACq00 1 Athletic Comolex Phase ll (4)$1rs230 $1 19,230 ov9901 EDC lnentire Funds $1 9.994 $1 9,994 ) 9rd..t n..^d6tl^h CirLT^b, aha Dhrrr. \rie^ qfu.. Pah.h S Pimlinr HarlhartdVina S.'L7^trt Wr.bsrhr Pr6let. CAPITAL IMPROVEMENTS PROGRAM FUNDED PROJECTS SUMMARY BUDGET AMOUNT AS OF Mav 31. 2001 Prdoct Numbar Prolact Oascrlgllon Dralnago Wat€r & Sew.r CIP lmpacl Fe. Half Cont Sal6s Tax Pollce Facillty General CIP Fund Escrow Funds unfundsd, Fundlng Other Proioct Cost EDo10'l Villaoes Masler Pan $'100.000 (8)$100.000 EDo't02 Bell Ranch Temcs 9200.000 (sl s200.000 PD990'l Polics and Municiml Courts Facilitv $'t1.789.614 s450.000 (5)$'!2.239.6't4 PR9901 Hike and Bike TBil $237 ,714 $237.7',14 PR9902 Senid Cilizens Remodel $16.130 s16'r30 PR9003. PF!O91 8 Various EOC Park Pmjects $269.565 s26q 566 PR9922 $t 50.000 $280,000 (6)s430,000 PR9927 Paft lmffoverent - Texas Star s1.036.s00 51.036.500 PR0016 WlshiG Park lmoaovements $150.000 $1 50.000 PR01 10 Slm Pmteciiodsmenino wall 51.250.000 (7r s1.250.000 ssoo'i0 Fie Statim *t2 $5se.600 s59S 600 ssol 1 3 Park Buildind S1.492,283 (s)$1,492,283 Sub-loa.l Ohar Prcle.s $2,598,734 $1 1,789.6't4 s3.772.283 s18,160.631 TOIAL FUNDED PROJECIS $1 8,91 7,245 $309,1 09 $5,164,31 5 s1,739,029 $3,028,734 $11,789,614 $0 $1,414,293 $5,921.s27 $3.81 4,401 $52,098,267 N) - General Fund - 33,200,000 from Bond Sale, 5497,019 from Escrow, & 1,41 1,395 ftom other sources. - The s@p€ and total cost of this prcject is yet lo be detemined. This representrs funding that has been provided lo date from the Half Cent OpeEting Fund. - 450,000 from OEA Task Force - water & Ssw6r Op€Bting Fund FY 200'l Budget - $280,000 Pending. - Loan hom Car Rsntals to Golf Course ClP. - Bond sale lo bo repaid from Car Rental Fund. (1) (2) (3) (4) (5) (6) (7) (6) ((( roiac R"ildind Pemdd )) Partially U nfunded Projects Anticip Project Number Project Description Unfunded Portion PROPOSED METHOD OF FINANCING Operating Funds Fund Balance General Obligation Bond Sale Certificates of Obligation Revenue Bond Sale Other Funding Sources To 8e Oetermined STREET PROJECTS PS9902 Mid Cities Blvd.$1.000.000 s1.000.000 (2) PS9903 Hwy 183 Service Road $45,1 32 $45,1 32 PS0002 West Pioeline - Raider to HwY 10 $4,611,395 $3.200.000 $ l .908.414 (l ) Sub. Iota, Stree( Proiects $s,656,527 $0 $o $3.200.000 $0 $0 $2.908.414 $45.132 WASTEWATER PROJECTS ww0002 Misc Sewer Rehabiliation $65.000 $65.000 ww0102 Manhole Rehabiliation $200,000 $200,000 Sub lofa, Street Proiecfs $265,000 s265.000 $o $o $o $o $o $0 TOTAL $5,921,527 $265,000 $o $3,200,000 $o $o $2,908,414 $45,1 32 (i) $497,019 anticipated escrow & $'1,41 1 ,395 from other sources. (2) Car Rental Fund L^) ) -.- .D srcf roud fcvNtvuo ofoNnJ III ))) CAPITAL IMPROVEMENTS PROGRAM FUNOED PROJECTS SUMMARY BUDGET AMOUNT AS OF Mav 31. 2001 Prolect Number Proiect Doscrlption Dralnago Walor & Sewer CIP lmpact Foo Half Cont Salss Tax Fund Pollco Faclllty Gonoral Escrow U ntunded/ Fundlng Othor Proiect Cost DRAINAGE PROJECTS DR9903 Misc Orainaoe lmorovements $51.609 $51.609 DR9904 Huriene Creek s257.500 $257.500 Sub-fotzt Dntn.@ Prctqts $309,109 s30s,109 s Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-23-99 Project Title: Project Type: Project No.: MISC DRAINAGE IMPROVEMENTS PROGRAM DRAINAGE Sub-Type: DR9903 Priority: A COUNCIL AUTHORIZATION: PROJECT DESCRIPTION: This project includes funds for various small projects that are identified throughout the year. Often correction of these problems requires design services and the installation of improvements. Large pro1ects that occur will be tracked separately and assigned a different project number. JUSTIFICATION: Failure to correct these problems can often cause damage to existing infrastructure. 5 RELATIONSHIP TO OTHER PROJECTS ANO/OR MASTER PLAN: Gity of Euless Gapital Project Request PROJECT TITLE: MISC DRAINAGE IMPROVEMENTS PROGRAM PROJECT #: DR9903 NET EFFECTS ON OPERATING AND MAINTENANCE GOST (+ OR .) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal:$o Maintenance Costs Subtotal $0 Total Estimated Annual Cost $o TOTAL ESTIMATED CAPITAL COST: Fence Storm Sewers 559 51,050 Total Estimated Capital Cost $s1,609 CURRENTSTATUS PHASE/FUNDING SOURCE Fence Storm Sewers Meters & Setting BUDGET EXPENDED 559 10,605 195 OVER/UNDER BUDGET G +) 0 (40,250) 0 % EXPENDED 100Yo 21o/o 1000/" 559 50,855 '195 ' - This project provided an inter-project transfer of $5,904 to DR9901 $51,609TOTAL PROJECT $11,359 ($40,250) 6 City of Euless Capita! Project Request Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-22-99 Project Title: Project Type: Project No.: HURRICANE CREEK DRAINAGE DR9904 Sub-Type: Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The Unified Development Code (Article 12) permits developers to request reimbursement for a portion ol oversized drainage improvements. PROJECT DESCRIPTION: The Hurricane Creek project involves reimbursement for oversized drainage improvements along a tributary of Hurricane Creek south of SH 183. JUSTIFICATION: A significant watershed drains from SH 183 to the south city limit line. Oversized drainage improvements are required to meet the public improvement requirements established for development. Should it be determined that these funds are not required, they can be reallocated. 7 PROJECT TITLE: HURRICANE CREEK PROJECT#: DR9904 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR.) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal $o Maintenance Costs Subtotal Total Estimated Annual Cost $o TOTAL ESTIMATED CAPITAL COST: Storm Sewers 257 ,500 Total Estimated Capital Cost $257,500 CURRET\TSIATUS PHASE/FUNDING SOURCE Storm Sewers BUDGET 257 ,500 EXPENDED 69,906 OVERiUNDER BUDGET G +) (187,5e4) % EXPENDED 27Yo $257,500TOTAL PROJECT $69,906 ($187,594)270/ 8 $0 FUNDED STREET PROJEGTS f\.-. ) CAPITAL IMPROVEMENTS PROGRAM FUNDED PROJECTS SUMMARY BUDGET AMOUNT AS OF Mav 31. 2001 Prcjecl Numb€r Proict Descrlotlon Wator & Sewer CIP Half Cont Sales TaxDnlnagelmpact Fee Unfunded/ Pollce Faclllty Gsneral Escrow Fundlng Othor Prole.l C6(l STREET PROJECTS PSS90'l Nonh Main St@t s7.413.732 $430,000 $17,276 $s.053 $7.866.061 P59902 Mid Cities Blvd.$500.000 $60.650 $1.000.000 $20.'146 (1)s1.580.796 P59903 Hwy 183 Seruice Rcd $152.825 $45.'t32 s197.957 P59904 HaMood Road s5 462 162 s602.230 316 0'ts (2)s6 081 31 I PSS905 TEffic Studies $27,1 98 $27.198 P59906 TBffic SafetY $128,O27 $128.O27 P59908 Sionilization s167.285 $167.285 PS9C09 FM157 North, SH183 to SH121 (Landseoino & Liohlino)$239.820 $239.820 PS9910 Sid*alk Pmiects $200.000 $200.000 PS9912 HaMmd - Main Street lntecection $1,1 26,935 s1.125 S3s PS0001 FM157 - S Pireline-SH10 (Ull Relc)$322.037 $322.037 PS0002 werl Pi@line - Raider/Hw 10 $1 82.336 $497.01 I $4,61 1.395 (3)$5.290.750 PS0003 Glade - Heritaqe/SH 121 s1.421.494 $1 38.750 $1.560.244 PS0004 clade - SH 121lchamDaqne s1 573.394 s98.368 $1.671.762 $18.917.245 $430.000 $1,414,293 $5,656.527 $42,1 18 s26,460.183 \o )) <'tLf^b, <h@l9r^t4k Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 5-24-99 NORTH MAIN STREET STREET PS9901Proect No.: Sub-Type: Prio CONSTRUCTION A Project Title: Project Type: April 14, 1998 - Authorized bond election for the purpose of funding construction. November 24, 1998 - Approved contract with cummings & Prewitt, lnc. for paving and drainage design. February 8, 20OO - Authorized the acquisition of r-o-w to allow for widening and paving improvements. August 22, 20oo - Ratified the expenditure of $30,000 of EDc funds for r-o-w acquisition along Main St' August 22, 2OOO - Ratified EDC Resolution 1 1-00 authorizing a project involving facility improvements along North Main Street. November 14,2000 - Authorized Resolution #00-1083 declaring public necessity for acquisition of row. February 27,2OOl - Authorized publication of notice of intent to issue certificates of obligation. April 9, 2001 - Approved Ord. 1467 authorizing issuance of Certificates of Obligation, Series 2001 . April 9,2001 - Approved Ord. 1468 authorizing issuance of General Obligation Bonds, Series 2001 in the amount of $6,000,000 COUNCIL AUTHORIZATION: This project is a part of the $13.5 million bond package approved by the voters in October 1998 RELATIONSHIP TO OTHER PROJE CTS AND/OR MASTER PLAN: The project consists of reconstruction and widening of North Main Street from SH10 to Harwood Road. project also consists of relocating overhead utilities to underground, the addition of a subsurface draina system, and the addition of street lights and landscaping improvements. PROJECT DESCRIPTION: 1 . lmprovement of traffic flow and traffic safety. 2. lmprove aesthetics with relocation of overhead utilities and addition of landscaping. 3. Subsurface drainage system needed. 4. Reduction of maintenance requirements. JUSTIFICATION: City of Euless Capital Project Request l0 PROJECT TITLE: NORTH MAIN STREET PROJECT #: PS990'1 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR.) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Nlaterials & Supplies Utilities $0 Subtotal:$0 Subtotal $o Other Average Annual Debt Service $4'12,567 Total Estimated Annual Cost $412,567 TOTAL ESTIMATED CAPITAL COST: *Engineering Right of Way Utility Relocation (City) Appraisal Services Street Lights Landscaping Construction Signs & Markings Midway Sewer Rehab lssuance Cost 641 ,500 1,550,000 722,200 60,000 125,000 350,000 3,822,000 430,000 100,000 65,361 . Added $70,000 for work related to medians. Total Estimated Capital Cost $7,866,061 PHASE/FUNDING SOURCE Engineering Right of Way Utility Relocation (City) Appraisal Services Surveying Services Other Professional Services Special Services Landscaping Signs & Markings Construction Lighting Sewer Main lssuance Cost BUDGET 641,500 1,478,851 722,200 101 ,495 5,170 2,155 5,053 350,000 430,000 3,839,276 '125,000 100,000 65,361 EXPENDED 556,033 1,196,676 0 101 ,495 5,170 2,155 5,053 OVER/UNDER BUDGET (- +) (85,467) (282,175) (722,200) 0 0 0 0 (3s0,000) (411 ,111) (3,839,276) (125,000) (100,000) (3,100) % EXPENDED 87o/o 81o/o 0% 100% 100% 1000/ 100o/o OYo 4% lYo iYo OYo 95% 1 8 0 889 0 0 0 261oz $7,866,061 $1,947,732 ($5,918,329)TOTAL PROJECT 25v, Maintenance Costs CURRE'VTSIATUS 11 City of Euless Capital Project Request Date Prepared: Date Completed: 7-17-99 Project Title: Project Type: Project No.: MID CITIES BLVD STREET PS9902 Sub-Type: Priority: CONSTRUCTION A COUNCIL AUTHORIZATION: November 10, 1998 - Authorized right-of-way acquisition. November 28,2000 - Authorized $17,254 for Citgo utility relocation/protection on an 8" Citgo Pipeline that crosses Mid Cities Boulevard. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLA N: The City's 1999 Master Thoroughfare Plan calls for this roadway to be a six-lane boulevard section. This project was approved a number of years ago as a 100% federally funded construction project through Texas Department of Transportation (TXDOT). TXDOT has bid the project and it is currently under construction. PROJEGT DESCRIPTION: Project consists of reconstruction of Mid-Cities Blvd. from HW 121 to Hwy 360 by Texas Department Transportation (TXDOT). The City of Euless is required to purchase the right-of-way required for the TXDO construction project. The City also proposes to add certain amenities to enhance the aesthetics along the corridor. Another related project is the installation of a new 12-inch water main. (Project # WT9908) This project is currently under construction. JUSTIFICATION: 1 . Frequent flooding which often necessitates closing of this section of the street. 2. Street and roadbed have deteriorated to the point that frequent repairs are required 3. The street does not adequately convey the existing and future traffic volumes. L2 Department: Submitted By: PUBLIC WORKS RANDY BYERS PROJECT TITLE: MID CITIES BLVD PROJECT#: PS9902 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR I ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 $o Maintenance Costs $o Total Estimated Annual Cost $0 TOTAL ESTIMATED CAPITAL COST: Right of Way Appraisal Services Legal Services Engineering Services Overlay 1,461,834 52,700 42,838 23,345 79 Total Estimated Capital Cost $1,580,796 CURREA/TSTATUS PHASE/FUNDING SOURCE Appraisal Services Engineering Services Legal Services Right of Way Overlay Contingency BUDGET 52,700 26,545 61,020 440,452 79 0 EXPENDED 23,870 44,287 '154,409 501,629 79 17 ,254 OVER/UNDER BUDGET G +) (28,830) 17,742 93,389 61 ,177 0 17,254 % EXPENDED 45Yo 167o/o 253Yo 114% 1O0o/" OYo Subtotal:$ 580,796 $7 41 ,528 $160,732 128o/o Funding Pending To be determined $ 1,000,000 $ 1,580,796TOTAL PROJEGT (Funded) 13 Subtotal: Subtotal: Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-26-99 Project Title: Project Type: Project No.: HWY 183 SERVICE ROAD STREET P59903 Sub-Type: Priority: CONSTRUCTION A COUNCIL AUTHORIZATION: September 8, 1998 - Approved as part of Certificates of Obligation, Series 1995 RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: This prolect consists of building a connection from the Hwy 183 frontage road east of Wendy's on Main Street, to the exit ramp of HVVY 183 at North Main Street. This will bring the frontage road traffic to a signalized intersection. JUSTIFICATION: This would allow the traffic east of Wendy's to turn left (south) onto North Main Street. Currently no left turn is allowed from East Fuller to South Bound Main Street. Staff is currently reevaluating the need for this project. The reconstruction of Main Street and future widening of SH 183 may cause this project to be unwarranted. City of Euless Capital Project Request t4 PROJECTTITLE: HWY 183 SERVICE ROAD PROJECT#; PS9903 NET EFFECTS ON OPERATING ANO MAINTENANCE GOST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal $o Maintenance Costs Subtotal $o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Construction 197,957 Total Estimated Capital Cost CURRENTSIATUS PHASE/FUNDING SOURCE BUDGET EXPENOED OVER/UNDER BUDGET G +)% EXPENDED Construction 0 (152,825\0% TOTAL PROJECT (Funded):15?,825 0 (1s2,82s)0% Funding Pending: To Be Determined 45,132 '- This project provided an inter-project transfer of $45,132 to PS0004. $197,957TOTAL PROJEGT 15 $197,957 Department: Submitted By: Date Prepared: Date Completed: 7 -29-99 Project Title: Project Type: Project No.: HARWOOD ROAD, N. MAIN TO 360 STREET Sub-Type: PS9904 Priority: CONSTRUCTION A COUNCIL AUTHORIZATION: April 14, 1998 - Authorized bond election for the purpose of funding conslruction. November 24, 1998 - Authorized contract for appraisal services for parcels necessary to project. May 24, 1999 - Approved resolution determining the necessity for and ordering the improvement. May 24, 1999 - Authorized the acquisition of the necessary right-of-way. June 22,1999 - Approved rightof-way acquisition. December 14, 1999 - Authorized City Manager to negotiate for and acquire additional righlof-ways February 8, 2000 - Awarded construction contract to Larry H. Jackson Construction March 28, 2000 - Authorized issuance of G.O. bonds for Harwood, Main, and West Pipeline. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project is part of the $13.5 million bond program approved by the voters in October 1998. Project identified in the 1999 Master Thoroughfare Plan. PROJECT OESCRIPTION: Reconstruction of Harwood Road from a point approximately 350 feet west of N. Main Street to SH 360. New roadway will be a six-lane boulevard with sidewalks, landscaping and lighting. Signals will be added at Fuller- Wiser and Bear Creek Parkway. JUSTIFICATION: Existing roadway (two-lane) does not meet existing and future needs City of Euless Capital Project Request l6 PUBLIC WORKS RANDY BYERS PROJECT TITLE: HARWOOD ROAD, N. MAIN TO360 PROJECT#: PS9904 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR.) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal $o Maintenance Costs Other Average Annual Debt Service 465,722 Subtotal:$465,722 Total Estimated Annual Cost $465,722 TOTAL ESTIMATED CAPITAL COST: Appraisal Services Acquisition Agent Acquisition Engineering Construction Misc lssuance Cost 54,250 20,150 879,010 413,000 4,342,497 727 371 ,677 Total Estimated Capital Cost $6,081,311 PHASE/FUNDING SOURCE BUDGET OVEFYUNDER BUDGET G +)% EXPENDED Engineering Construction Right of Way Appraisal Services lssuance Cost Contingencies Other Professional Services 413,000 4,342,497 879,010 54,250 371 ,677 550 20,327 400,010 1 ,007 ,281 748,611 53,750 70,000 1,668 6,664 (12,990) (3,335,216) (130,399) (500) (301,677) 1,118 (13,663) 97Yo 85o/o 99o/o 19Yo 303% 33% $6,081,31 1 $2,287,984 ($3,793,327)TOTAL PROJECT 38o/o L7 CURRENISIATUS EXPENDED Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7 -17 -99 Project Title: Project Type: Project No.: TRAFFIC STUDIES STREET PS9905 Sub-Type: Priority: STUDY A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS ANDiOR MASTER PLAN: These funds are utilized with projects PS9906 (Traffic Safety) and PS 9908 (Signalization) to address traffic needs throughout the City. PROJECT DESCRIPTION: Staff utilizes these funds to investigate concerns related to traffic movements and volumes JUSTIFICATION: Traffic patterns and volumes change causing problems on our streets. Funds are needed to compensate consultants for professional services rendered in the investigation work. City of Euless Gapital Project Request 18 PROJECTTITLE: TRAFFICSTUDIES PROJECT#: PS9905 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR .) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal $o Maintenance Costs Subtotal:$o Total Estimated Annual Cost $o TOTAL ESTIMATED CAPITAL COST: Engineering Other Professional Services Traffic Signals 26,352 /o 770 Total Estimated Capital Cost $27,198 CURRENTSIAIUS PHASE/FUNDING SOURCE Engineering Services Other Professional Services Traffic Signals BUDGET 26,352 76 770 EXPENDED 1,081 76 770 OVEFYUNDER BUDGET G +) (25,271]. 0 0 % EXPENDED 4o/. l0OYo 100% * - This project received a transferof S20,000 from Fund 501-Water & Sewer 198TOTAL PROJECT $27 $1,927 ($25,271)7o/o i9 Gity of Euless Capital Project Request Department: Submitted By: Date Prepared: Date Gompleted: 7-15-99 Project Title: Project Type: Project No.: TRAFFIC SAFEry STREETS PS9906 Sub-Type: Priority: STUDY A COUNCIL AUTHORIZATION: February 24, 1998- Approved as part of Certificates of Obligation, Series 1998. May 22,2001- Authorized construction of a temporary right turn lane on southbound N. Main Street @ SH183 Service Road. Construction to be performed by City Forces, RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: These funds are utilized with projects PS9905 (Traffic Studies) and PS9908 (Signalization) to address traffic needs throughout the City. PROJECT DESCRIPTION: Staff utilizes these funds to investigate traffic safety concerns. Maintenance activities are paid from the facilities operating budget. JUSTIFICATION: Trafflc patterns and volumes change, causing safety problems on our streets. Funds are needed to compensate consultants for professional services rendered in the investigation work. PUBLIC WORKS RANDY BYERS 20 PROJECTTITLE: TRAFFICSAFETY PROJECT #: PS9906 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal $0 Maintenance Costs $o Total Estimated Annual Cost $0 TOTAL ESTIMATED CAPITAL COST: Professional Services Equipment Rental Signalization Systems Traffic Signals 5,000 1,000 9,780 112,247 Total Estimated Capital Cost $128,027 CURREA/TSIATUS PHASE/FUNDING SOURCE Professional Services Equipment Rental Signalization Systems Traffic Signals BUDGET 5,000 1 ,000 9,780 '112,247 EXPENDED 4,128 1,000 19,223 31,751 OVER/UNDER BUDGET (. +) (872) 0 9,443 (80,496) % EXPENDED 83Yo 100yo 197Vo 28Yo $128,027TOTAL PROJECT $s6,102 ($71,925)44% 2t Subtotal: Department: Submitted By: Date Prepared: Date Completed: 7 -22-99PUBLIC WORKS RANDY BYERS SIGNALIZATION STREET P59908Proect No.: Sub-Type: Priori SIGNALIZATION A Project Title: Project Type: February 24,.1998 - Approved as part of Tax and Waterworks and Sewer System Revenue Certificates of Obligation, Series 1998. COUNCIL AUTHORIZATION : These funds are utitized with Projects PS9905 (Traffic Studies) and PS9906 (Trafiic Safety) to address traffi needs throughout the City. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: 1. Replace or upgrade controllers 2. Upgrade signals. 3. lnstall Opticom. Signal improvements are often needed to improve traffic safety and vehicular movements through intersections J USTIFICATION: City of Euless Gapital Project Request 22 PROJECTTITLE: SIGNALIZATION PROJECT #: PS9908 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal $0 Maintenance Costs Subtotal: Total Estimated Annual Cost $o TOTAL ESTIMATED CAPITAL COST: Signal System Traffic Signals 20,000 147 ,285 Total Estimated Capital Cost $167,285 CURRENTSIATUS PHASE/FUNDING SOURCE Signal Systems Traffic Signals BUDGET 20,000 147,285 EXPENDED 17,179 19,774 OVERYUNDER BUoGET G +) (2,821\ (127,511) % EXPENDED 860k 13o/o $167,285TOTAL PROJECT $36,9s3 ($130,332)22o/o 23 $o City of Euless Gapital Project Request Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-17-99 Project Title: Project Type: Proiect No.: FM157 NORTH, SH183 TO SH121 (Landscaping & Lighting) STREET Sub-Type: CONSTRUCTION PS9909 Priority: A COUNCIL AUTHORIZATION : RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The Texas Department of Transportation (TXDOT) widened FM157 between SH183 and SH121 to a seven-lane (5+2) undivided roadway section. PROJECT DESCRIPTION: The addition of landscape and irrigation improvements and street lights along the new street. 24 JUSTIFICATION: lmproved visibility and enhanced aesthetics. PROJECT TITLE: FM157 SH 183 and SH121 PROJECT#: PS9909 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR .) ANNUAL: Direcl Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal $o Maintenance Costs Subtotal: Total Estimated Annual Cost $o TOTAL ESTIMATED CAPITAL COST: Landscaping/Lighting 239,820 Total Estimated Capital Cost $239,820 CURRENTSIATUS PHASE/FUNDING SOURCE Landscaping BUDGET 239,820 EXPENDED 693 OVER/UNDER BUDGET (. +) (239,128) % EXPENDED Oo/o Escrow Available $66,916 (Expenses prior to FY99 not reflected) $239,820TOTAL PROJECT $693 ($239,128)0% $o City of Euless Capital Project Request Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7 -17 -99 Project Title: Project Type: Project No.: SIDEWALK PROJECTS STREETS PS99'10 Sub-Type: Priority: SIDEWALKS A COUNCIL AUTHORIZATION: February 24, 1998 - Approved as part of Tax and WateMorks and Sewer System Revenue Certificates of Obligation, Series '1998. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Sidewalks and barrier-free ramps are needed lhroughout the City. The construction of sidewalks and barrier- free ramps has been an ongoing program for a number of years. PROJECT DESCRIPTION: This project includes funds to install new sidewalks and barrier free curb ramps throughout the City as well as improvement on municipal property. Although the City has identified areas that need sidewalks and barrier free curb ramps, federal guidelines require public hearings and other public input to prioritize construction. JUSTIFICATION: 1 . Access and the accessibility of goods and services to pedestrians including those with disabilities is an important need in our city. 2. The federai government has established rules governing the implementation of a program to eliminate barriers within each city. 26 PROJECTTITLE: SIDEWALKPROJECTS PROJECT #: PS9910 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR .) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal $o Maintenance Costs Subtotal:$o Total Estimated Annual Cost $o TOTAL ESTIMATED CAPITAL COST: Sidewalks & Curbs 200,000 Total Estimated Capital Cost $200,000 CURRENTSIATUS PHASE/FUNDING SOURCE Sidewalks & Curbs EXPENDED 179,329 OVEFYUNDER BUDGET G +) (20,671) % EXPENDED 90o/o $200,000TOTAL PROJECT $179,329 ($20,671)90% 27 BUDGET 200,000 Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-17-99 Project Title: Project Type: Proiect No.: HARWOOD-MAIN INTERSECTION STREETS Sub-Type: PS9912 Priority: CONSTRUCTION A COUNCIL AUTHORIZATION : April 14, 1998 - Authorized bond election for the purpose of funding construclion. April 13, 1999 - Bid No. 99-03 awarded for improvements at the North Main and Harwood intersection RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project is the overlap point on Harwood Road and North Main Street projects that were approved in the '1998 bond election. This project involves the relocation of City water and waslewater mains and the installation of slorm drainage improvements to permit the relocation of franchise utility facilities in the intersection of North Main Street and Harwood Road. Reconstruction of the paved intersection will occur at the beginning of the HaMood Road project. JUSTIFICATION: The work included in this project must be complete before the franchise utility companies can perform the relocation of their facilities. City of Euless Capital Project Request 28 PROJECT DESCRIPTION: PROJECTTITLE: HARWOOD-MAIN INTERSECTION PROJECT#: PS9912 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal $o Maintenance Costs Subtotal $o Total Estimated Annual Cost $0 TOTAL ESTIMATED CAPITAL COST: Utility lnstallation 1,126,935 Total Estimated Capital Cost $1, r26,935 CURRENTSIAIUS PHASE/FUNDING SOURCE BUDGET EXPENDED OVER/UNDER BUDGET G +)% EXPENDED Utility lnstallation '1 ,126,935 1,077,303 (49,632)96% ,126,935 $ r,077,303TOTAL PROJECT $1 ($49,632)96% 29 City of Euless Capital Project Request Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-26-99 Project Title: Project Type: Project No.: FM 157-S PIPELINE To SH1o-(Utility Relocation) STREETS Sub-Type: UTlLlw RELOCATION PS0001 Priority: A COUNCIL ACTION: May 24,2000 - Approved Resolution authorizing Tarrant County Commissioners to acquire r-o-w. February 8, 2000 - Authorized professional services contract for engineering design ofwater and sewer mains. April 11, 2000 - Authorize Mayor to execute a drainage easement in conjunction with this project. February 27,2001 - Awarded contract to TGR Constructors lnc for $296,537 and provided for change orders not to exceed $29,654. February 27,2001 - Authorized TRA debt payment of $171 ,537 from waste water impact fees to free operating funds for this project. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Project consists of widening FM 157 from Hwy 10 to South Pipeline. Road construction will be performed by TxDOT. The City's only responsibility will be the relocation of water and wastewater mains. The City may choose to provide funds for landscaping the medians as well. JUSTIFICATION: Utility relocation is required by TXDOT at the City's expense 30 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR .) ANNUAL: Total Estimated Annual Cost $o Subtotal: Subtotal $0 Maintenance Costs $o $o Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Direct Operating Cost Personnel: TOTAL ESTIMATED CAPITAL COST: Total Estimated Capital Cost $322,037 25,500 296,537 Engineering Services Utility Relocation CURRENTSIATUS BUDGET EXPENDED % EXPENDEOPHASE/FUNDING SOURCE $322,037TOTAL PROJECT $189,02s ($133,012)59o/o 96% 55o/o 25,500 296,537 24,596 164,429 Engineering Services Relocation OVER/UNDER BUDGET G +) (s04) (1 32,108) PROJECT TITLE: FM 157-S PIPELINE TO SH1 urit Relocation PROJECT#: PS0001 31 City of Euless Capital Project Request Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-26-99 Project Title: Project Type: Proiect No.: WEST PIPELINE - RAIDER/HWY 1O STREET Sub-Type: PS0002 Priority: CONSTRUCTION A COUNCIL AUTHORIZATION : April 14, 1998 - Authorized bond election for the purpose offunding construction. January 1, 2000 - Authorized the City Manager to execute an engineering contract for design June 12,2001 - Declared intent to reimburse expenditures from proceeds of future debt. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLA N: This project was approved as part of the 1998 bond election along with Main Street and Harwood Road PROJECT DESCRIPTION: Project consists of widening West Pipeline Road from 2 lanes to a proposed 4 lane boulevard street. This project will encompass the seclion of W. Pipeline from Hwy 10 to Raider Drive. The City has requested financial participation from Bedford. JUSTIFICATION: The street exists in an expanded condition on either end of this proposed widening. The traffic greatly overloads the existing roadway. 32 PROJECT TITLE: WEST PIPELINE - RAIDERyHWY 10 PROJECT#: PS0002 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR ' ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal $o Maintenance Costs Subtotal $o Other Average Annual Debt Service 9279,745 Total Estimated Annual Cost $279,745 TOTAL ESTIMATED CAPITAL COST: Engineering ROW Appraisal ROW Acquisition Utility Relocation Construction Lighting lssuance Cost 365,000 20,000 550,000 866,550 3,294,200 160,000 35,000 Total Estimated Capital Cost $5,290,750 CURRE'VI STATUS PHASE/FUNDING SOURCE Engineering BUDGET 182,336 EXPENDED 7 5,771 OVER/UNDER BUDGET G +) (106,565) % EXPENDED 42% TOTAL PROJECT (Funded):$182,336 $75,771 ($106,s65)42o/o Funding Pending: Bond Sale Escrow Funds Other 3,200,000 497,0'19 '1 ,41 1 ,395 $5,290,750TOTAL PROJECT .1J City of Euless Capital Project Request Department: Submitted By: PUBLIC WORKS RON YOUNG Date Prepared: Date Completed: 7 -7-00 Project Title: Project Type: Project No.: GLADE FROM HERITAGE TO SH121 STREET Sub-Type: CONSTRUCTION PS0003 Priority: COUNCIL AUTHORIZATION : June 13, 2000 - Authorized execution of Engineering Design Contract not to exceed $138,750. January 9, 2001 - Approved Resolution 01-1089 declaring public necessity for the acquisition of r-o-w. February 27,2001 - Authorized publication of notice of intent to issue certificates of obligation. April 9, 2001 - Approved Ord. 1467 authorizing the issuance of Certificates of Obligation, Series 200'1 . May 22,200'l - Awarded Bid No.045-01 for construction to Texas Sterling Construction for $1,445,600 and provided $68,340 for contingencies. Colleyville will reimburse $78,775. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Construction of Glade from Heritage to S.H. 121 by adding two (2) lanes to the existing three (3) lanes to create a s-lane roadway (2 eastbound lanes, 2 westbound lanes and a cenler continued turn lane). Construct the east half (2 northbound lanes) of Heritage from Glade Road to the south limit of the Target project. Construct a four (4) lane divided north/south roadway from Glade to the south Iimit of the Target project approximately in the center of the Target project. Traffic signals and associated water and drainage facilities will be included. JUSTIFICATION: lncreased ad valorem and sales tax generated by development of this area. 34 PROJECTTITLE: GLADE FROM HERITAGE TO SH121 PROJECT #: PS0003 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR .) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal:$0 Maintenance Costs Subtotal:$o Other Average Annual Debt Service $1 16,509 Total Estimated Annual Cost $1 16,509 TOTAL ESTIMATED CAPITAL COST: Engineering Geo{echnical Services Construction Costs lssuance Cost 138,750 25,000 1,383,000 13,494 Total Estimated Capital Cost $1,560,244 CURRENTSTATUS PHASE/FUNDING SOURCE Engineering & Design Geotech Services Construction lssuance Cost BUDGET 138,750 25,000 1,383,000 13,494 EXPENDED 127 ,970 0 0 13,494 OVER/UNDER BUDGET (- +) (10,780) (25,000) (1,383,000) 0 % EXPENDED 92Yo Oo/o lYo 100% . - This project received a transfer from escrow of $138,750.. - This project received bond proceeds from Series 2001 CO's of $1,421,494 $1 ,560,244TOTAL PROJECT $141,464 ($1 ,418,780)9% 35 Department: Submitted By: PUBLIC WORKS RON YOUNG Date Prepared: Date Gompleted: 7 -7 -O0 GLADE RD (EAST)-SH 121 TO CHAMPAGNE STREET Sub-Type: CONSTRUCTION Pro No PS0004 Priori Project Title: Project Type: June 13, 2OOO - Authorized execution of Engineering Design Contract in the amount of $143'500. February 27,2OOl - Authorized publication of notice of intent to issue certificates of obligation. April 9, 2OOl - Approved Ord. 1467 authorizing the issuance of Certificates of Obligation, Series 2001 May 22,2001 - Awarded Bid # 047-01 for construction to l/'lcMahon Contracting for $874,578.75 and provided for a $52,500 contingency for change orders. COU NCIL AUTHORIZATION : RELATIONSHIP TO OTHER PROJECTS ANDiOR MASTER PLAN: Construct the eastbound lanes of Glade Road under S.H. 121 and construct the south lanes (2 eastbound lanes) of Glade Road from SH. 121 to Champagne Drive. Traffic signals, asphalt transitions and associated water and drainage facilities will be included. PROJECT DESCRIPTION: JUSTIFICATION: lncreased ad valorem and sales tax generated by development of this area. City of Euless Capital Project Request 36 PROJECTTITLE: GLADE RD EAS H121 TO CHAMPAGNE PROJECT#: PS0004 TOTAL ESTIMATED GAPITAL GOST: Total Estimated Capital Cost $1,671,762 143,500 50,000 25,000 1,436,'135 17 ,127 Engineering Righrof-Way Geo-technical Services Construction lssuance Cost NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR .) ANNUAL: Total Estimated Annual Cost $oSubtotal $0 $o Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities 125,212 $125,212 Direct Operating Cost Personnel: CURRENTSIAIUS PHASE/FUNDING SOURCE Engineering & Design Right of Way Construction Geotech Services lssuance Cost OVER/UNDER EXPENDED BUDGET G +) 135,097 (8,403) 0 (50,000) 0 (1,436,135) 0 (25,000) 17 ,127 0 % EXPENDED 94o/o 00k 0o/o 0% 100% * - This project received bond proceeds from Series 2001 CO's of $1,528,262 ' - This project received a transfer from escrow of $98,368. * - This project received a lransfer from PS9903 of $45,132. $1 ,671 ,762TOTAL PROJECT $152,224 ($1 ,sl9,s38)9To Subtotal: Maintenance Costs Other Average Annual Debt Service BUDGET 143,500 50,000 1,436,135 25,000 17 ,127 FUNDED WASTEWATER PROJEGTS tl L _., )) FUNDED PROJECTS SUMMARY General Escrow Unfundod/ Funding Othot Half Cent Sales Tax Wator & Sorer CIP lmpact FeeProloct 13 (, @ ) RllnGFT AMOIINT AS OF Mrv 31 2OOl Pr^la.l Oe<crlolion Strc.t F '6d Dralnago Fund Pollce Facllity WASTEWATER PROJECTS lnBG Pqqt tcJ84001 sts0 000 ql 5n ooo MaG. tuer Pehih sa7 013 s65 000 q15' 013 rPA naht P2rfront.aa22 037 (R?? O?7 /)aa (467 nnn s457 000 (1 qo onn q?no nnn 33s0 000 S Pimlinp Hcrlher lo Vine ss00 000 ss00 000 sg22 037 *26s O00 $2.431.050 Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 10-1-99 Project Title: Project Type: Project No.: cDBG 899-UC-48-0001 WASTEWATER ww0001 Sub-Type: Priority: MAINS A COUNCIL ACTION: April 11,2000 - Recommended Tarrant County reject bids for CDBG and re-advertise. May 23,2000 - Recommended Tarrant County award a contract to Henderson Construction. PROJECT DESCRIPTION: Replace sanitary sewer line on Vine St. from Bayless Dr. south to Sunset Dr. then west on Sunset to S. Pipeline. Replace sanitary sewer line behind the 900 & 1000 Blocks of Oakwood Dr. JUSTIFICATION: Mains in the South Euless area have deteriorated as they have aged. Gity of Euless Gapital Project Request 39 PROJECTTITLE: CDBGB99.UC.48.OOO1 PROJECT#: WW0001 Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal:$o Maintenance Costs Subtotal:$o $o TOTAL ESTIMATED CAPITAL COST: Sewer Mains 150,000 Total Estimated Capital Cost $1s0,000 CURRENTSIAIUS PHASE/FUNDING SOURCE BUDGET EXPENDED OVER/UNDER BUDGET G +)% EXPENDED Sewer Mains 150,000 0 (1s0,000)0o/o $150,000TOTAL PROJECT $o ($150,000)0o/o 40 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Total Estimated Annual Cost Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-26-99 Project Title: Project Type: Project No,: MISC. SEWER REHAB WASTEWATER wwo002 Sub-Type: Priority: MAINS A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: This project is for small unidentifled sewer main problems that may be found during the fiscal year. Large projects will be determined on an "as needed" basis and presented for funding under a new project number. JUSTIFICATION: Most of these lines are clay tile and are seriously deteriorated Gity of Euless Capital Project Request 4l PROJECT TITLE: MISC. SEWER REHAB PROJECT#: WW0002 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal: Maintenance Costs $o Subtotal:$0 $0Total Estimated Annual cost TOTAL ESTIMATED CAPITAL COST: Sewer Mains 1 50,000 (Annual minimum balance to be maintained) Total Estimated Capital Cost $150,000 CURRENTSIATUS PHASE/FUNDING SOURCE BUDGET EXPENDED OVER/UNDER BUDGET G +)% EXPENDED Sewer Mains 87,013 0 (87,013)0!o TOTAL PROJEGT (Funded):87,013 0 (87,013)0v. Funding Pending: Transfer from W/S operations 65,000 ' - This project received an inter-project transfer of $37,013.14 from WW9903 $152,013TOTAL PROJECT Oepartment: Submitted By: FINANCE LORETTA GETCHELL Date Prepared: Date Completed: 7-26-99 Project Title: Project Type: Project No.: TRA DEBT PAYMENTS DEBT SERVICE wwo003 Sub-Type: Priority:A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: A portion of the monthly payment to TRA is attributed to debt service for additional capacity covered by impact fees. Therefore, these funds are being applied to this debt payment. JUSTIFICATION: lmpact fees must be used within 10 years of identified projects. Gity of Euless Capita! Project Request 43 PROJECT TITLE: TRA DEBT PAYMENTS PROJECT#: WW0003 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR .) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: Maintenance Costs $0 Subtotal $o Total Estimated Annual Cost $0 TOTAL ESTIMATED CAPITAL COST: 822,037 Total Estimated Capital Cost $822,037 CURRENTSIATUS PHASE/FUNDING SOURCE BUDGET EXPENDED OVER/UNOER BUDGET G +)% EXPENDED TRA Debt Payments 822,037 822,037 0 100% TOTAL PROJECT $822 037 $822 037 $o 100o/o 44 Debt Payments Depa rtment: Submitted By: Date Prepared: Date Completed: 7-26-99 Project Title: Project Type: Project No.: FY 2OO1 CDBG WASTEWATER wwo101 Sub-Type: Priority: MAINS A COUNCIL AUTHORIZATION : May 22,2001 - Recommended to Tarrant County to award a contract to Horseshoe Construction, lnc. for $348,586 of which Tarrant County will pay $104,001. Change orders were authorized up to $6,900. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: tu This funding is he"fith year project administered by Tarrant County. This is the sixth (6) wastewater proiect in South Euless and is by far the largest undertaken to upgrade wastewater mains. JUSTIFICATION: Wastewater mains in South Euless area have deteriorated as they have aged and they need to be replaced. Gity of Euless Capital Project Request 45 PUBLIC WORKS RANDY BYERS PROJECT DESCRIPTION: Design and conslruction of wastewater mains in the Oakwood Terrance Addition. PROJECTTITLE: FY 2001 CDBG PROJECT#: WWol01 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR I ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal:$o N,4aintenance Costs Subtotal: Total Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Engineering Construction 16,000 541,000 Tarrant County CDBG Contribution (Estimated) (100,000) Total Estimated Capital Cost $457,000 CURRENTSIATUS PHASE/FUNDING SOURCE BUDGET EXPENDED OVER/UNDER BUDGET G +)% EXPENOED Engineering Construction 16,000 441,000 0 0 (16,000) (441,000) lYo 0o/o TOTAL PROJECT $457,000 $o ($4s7,000) jYo 46 So $o City of Euless Capital Project Request Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 6t21t00 Project Title: Project Type: Project No.: MANHOLE REHAB PROGRAM WASTEWATER ww0102 Sub-Type:MANHOLES A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS ANDiOR MASTER PLAN: Rehabilitation of all City wastewater manholes that are in need Line has deteriorated and needs to be replaced JUSTIFICATION: Manholes need to be replaced to avoid inflow and inflltration into the system. 47 Priority: PROJECT DESCRIPTION: PROJECT TITLE: MANHOLE REHAB PROGRAM PROJECT#: WW0102 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR .} ANNUAL: Oirect Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal $0 Maintenance Costs Subtotal:$0 Total Estimated Annual Cost $o TOTAL ESTIMATED CAPITAL COST: Manhole Rehab Program 350,000 Total Estimated Gapital Cost $350,000 CURRENTSTATUS PHASE/FUNDING SOURCE BUDGET EXPENDED OVER/UNDER BUDGET G +)% EXPENDED Manhole Replacement 150,000 0 (1s0,000)0% TOTAL PROJECT (Funded) :150,000 0 (150,000)0v. Funding Pending: Transfer from W/S Operating - FY02 Transfer from WS Operating - FY03 Transfer from WS Operating - FY04 100,000 50,000 50,000 $350,000TOTAL PROJECT 48 Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7126199 Project Title: Project Type: Project No.: S, PIPELINE, HEATHER TO VINE WASTEWATER Sub-Type: WW0103 Priority: MAINS A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The existing wastewater main in South Pipeline has aged and deteriorated. The main needs to be replaced and enlarged from Heather to Vine Street. PROJECT DESCRIPTION: The EPA regulates contamination of soil from wastewater mains. lt is necessary to correct deterioration found in our system. JUSTIFICATION: Line has deteriorated and needs to be replaced. City of Euless Capital Project Request 49 PROJECT TITLE: S. PIPELINE HEATHER TO VINE NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR .) ANNUAL: Direct Operatino Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: Maintenance Costs $o Subtotal:$o Total Estimated Annual Cost $0 TOTAL ESTIMATEO CAPITAL COST: Engineering Sewer Main 50,000 450,000 Total Estimated Capital Cost $500,000 CURREIVTSIATUS PHASE/FUNDING SOURCE BUDGET EXPENDED OVER/UNDER BUDGET (. +)% EXPENDEO Engineering Sewer Mains 50,000 450,000 0 0 (50,000) (4s0,000) 0% 0% 'lmpact fees paid TRA debt service lo free operating funds for this project TOTAL PROJECT $500,000 $0 ($500,000)0% 50 PROJECT#: WW0103 FUNDED WATER PROJEGTS L _,/ CAPITAL IMPROVEMENTS PROGRAM FUNDEO PROJECTS SUMMARY BUDGET AMOUNT AS OF Mav 31. 2001 Project Number Prolecl Descrlotldn Drainage Watsr & Sowor CIP lmpacl F6e Half Cent Salos Tax Pollco Facility Genoral Escrow Funds Unfunded/ Fundlng Olh€r Fund Prolecl Cost WATER PROJECTS wT9902 $200.000 s200 000 wT9908 Mid Cities 12' Line $31 1,692 $31 1.692 wT9909 2MG Waler Tank $2.295.496 $90,000 $2,38s,4e6 vw9910 Water Line for Elevated Tank $1.037.1 87 s515.300 $1,552,487 wT000'l Utilitv Rehab - Water PrcoEm $206.251 $206,251 wT0003 Waler Line Reolecement- A6nsas 7 s12.057 $'r2,057 wT000s Waler Line Milam - Denton/Nridwav s19 31 1 $19,311 wTo103 Fi6 Hvdhnt Reolacement Pmo6m sso 000 $s0,000 S ub-f ole I WaEr Prol ects $3.820.302 $91 6,992 $4,737,254 t/l H ))) d.far Trnk P.intin^ Department: Submitted By: Date Prepared: Date Completed: Project Title: Project Type: Project No.: WATER TANK PAINTING WATER wTg902 Sub-Type: Priority: TANK A COUNCIL AUTHORIZATION : August 27, 1996- lncluded in Fiscal '1996-97 Budget RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: This project includes the preparation of bid documents to paint both elevated water storage facilities. Depending on the type of paint presently on the tanks, this account may be under funded. lf the present paint is lead-based, EPA requires an expensive removal and disposal process. JUSTIFIGATION: As time passes, the appearance and protective qualities of paint diminish. To prevent corrosive damage, the elevated storage tanks must be repainted. City of Euless Capital Project Request 52 PUBLIC WORKS RANDY BYERS 7-26-99 PROJECT TITLE: WATER TANK PAINTING PROJECT#: WT9902 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR.) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal:$0 Maintenance Costs Subtotal $o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Water Tank Painting Total Estimated Capital Gost s200,000 CURRENTSIAIUS PHASE/FUNDING SOURCE Water Tank Painting EXPENDED OVER/UNDER BUDGET (- +) (200,000) % EXPENOED 0%0 $200,000 (TOTAL PROJECT $o $200,000)0o/o 53 200,000 BUDGET 200,000 PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-17-99 Project Title: Project Type: Project No.: MID CITIES 12" LINE WATER wTg908 Sub-Type: Priority: IMPACT FEE PROJECTS A COUNCIL AUTHORIZATION : November 24, 1998 - Authorized professional services contract with Shimek, Jacobs, & Finklea. May 11, 1999 - Awarded Bid No. 99-11 for the construction of a waterline. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The City's Water Master Plan has identifled this water line as being necessary. PROJECT DESCRIPTION: Design and installation of a 12" water llne along Mid Cities Blvd. from SH121 to North Main Street. City Council has authorized both the design and construction contracts. JUSTIFICATION: Needed to provide adequate water service and pressure City of Euless Gapital Project Request 54 Department: Submitted By: PROJECT TITLE: MID CITIES 12' LINE PROJECT#: WT9908 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal: Maintenance Costs $o Subtotal $o Total Estimated Annual Cost $o TOTAL ESTIMATED CAPITAL COST: Engineering Water Mains 52,080 259,612 Total Estimated Capital Cost $31 1,692 CURRENT STATUS PHASE/FUNDING SOURGE Engineering Services Water Mains BUDGET 52,080 259,612 EXPENDED 47 ,724 252,630 OVER/UNDER BUDGET G +) (4,356) (6,982) % EXPENDED 92o/o 97Yo . - This project received an inter-project transfer of $31 1 ,692 from project F89910. $311,692 $300,354TOTAL PROJECT ($1 1,338)96% 55 Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-26-99 Project Title: Project Type: Project No.: 2MG WATER TANK WATER wrg909 Sub-Type: Priority: TANK A COUNCIL AUTHORIZATION: May 24, 1999 - Authorized the contract for professional services with Shimek, Jacobs, & Finklea March 28, 2000 - Authorized the issuance of Revenue Bonds. May 22,2000 - Awarded construction contract to Landmark Structures. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The City's water master plan has identified the need for a 2 million gallon water tank PROJECT DESCRIPTION: Project includes the design and construction of the elevated water tank. Design and construction has been authorized. JUSTIFICATION: 1.) Fire flow pressure needs during peak hours. 2.) System is deficient in elevated storage to meet the demands determined from actual records 3.) Additional capacity is needed to meet the predicted maximum hourly demand. Gity of Euless Capital Project Request 56 PROJECT TITLE: 2MG WATER TANK PROJECT#: WT9909 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR .) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal:$o Maintenance Costs Subtotal:$0 Other Average Annual Debt Service $194,892 Total Estimated Annual Cost $194,892 TOTAL ESTIMATED CAPITAL COST: Engineering Construction lssuance Cost 90,000 2,190,000 60,000 Total Estimated Capital Cost $2,340,000 CURRENTSIATUS PHASE/FUNDING SOURCE Engineering Services Water Tower Construction lssuance Cost Contingency (lnterest Earnings) BUDGET 90,000 2,190,000 60,000 45,496 EXPENDED 83,025 1,766,360 60,000 0 OVERUUNDER BUDGET C +) (6,975) (423,6401 0 (45,496) % EXPENDED 92Yo 811o 100% ov. * - This project received and inter-project transfer of $90,000 from F89910. $2,385,496 $1,909,385TOTAL PROJECT ($476,111)80% 57 Department: Submitted By: 7 -26-99 Project Title: Project Type: Project No.: LINES FOR ELEVATED TANK WATER wT9910 Sub-Type: Priority: MAINS A COU NCIL AUTHORIZATION: May 24, 1999 - Authorized the contract for professional services with Shimek, Jacobs, & Finklea. March 28, 2000 - Authorized the issuance of Revenue Bonds. May 9, 2000 - Authorized utilization of $420,000 in impact fee money for extend this project. May 9, 2000 - Authorized City Engineer to proceed with design of a 16" water supply line. January 23, 2001 - Awarded contract to Mid-State Utilities on installing a 16" water line for $1,072,639. January 23, 2001 - Authorized City Manager to execute the contract. RELATIONSHIP TO OTHER PROJECTS ANDiOR MASTER PLAN: The City's Water Master Plan has identified the need for a 2 million gallon elevated storage tank. Additional water mains are required to connect the new tank with the existing water distribution system. 1.) Design water mains required to connect tank to system. This portion of the project has been funded. 2.) Construction of the water mains required to connect the proposed 2 million gallon tank to the water distribution system. JUSTIFICATION: 1.) Fire flow pressure needs in peak hours. 2.) System is deficient in elevated storage to meet the demands determined from actual records 3.) Additional capacity is needed to meet the predicted maximum hourly demand. City of Euless Gapital Project Request 58 PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: PROJECT DESGRIPTION: PROJEGT TITLE: LINES FOR ELEVATED TANK PROJECT #wT9910 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR.) ANNUAL: Direct Operatino Cost Personnel: Total Salary Purchase of Services Materials & Supplies Utilities 0 Maintenance Costs Other Average Annual Debt Service $87,560 Total Estimated Annual Cost $87,560 TOTAL ESTIMATED CAPITAL COST: Engineering & Design Water Mains $95,300 $1 ,430,000 Total Estimated Gapital Cost $1,525,300 PHASE/FUNDING SOURCE Engineering Services Water Mains Contingency (lnterest Earnings) BUOGET 131 ,300 1,394,000 27 ,187 EXPENDED 1 15,460 296,914 0 OVER/UNDER BUDGET G +) (1s,840) (1,097,086) (27,187) % EXPENDED 88o/o 21Yo 0% ' - This project received an inter-project transfer of $51 5,300 from FB9910. $1,552,487TOTAL PROJECT $412,374 ($1,140,113)27o/o 59 Full Time Part Time $o Subtotal: Subtotal: CURRENISIAIUS Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: oate Completed: 7-26-99 UTILITY REHAB - WATER PROGRAN,I WATER Sub-type: Pro No.wT000'1 Prio MAINS A Project Title: Project Type: COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR M ASTER PLAN: This project is for connection of small unidentified water main problems that may arise throughout the fiscal year Large projects that are identifled will be prepared on an "as needed" bases and funded under a new project number. PROJECT DESCRIPTION: Some of the City's older water mains have deteriorated and need replacement or repair. Staff requests that this project be funded on an annual basis. JUSTIFICATION: City of Euless Capital Project Request 60 PROJECT TITLE: UTlLlry REHAB - WATER PROGRAM PROJEGT#: WT0001 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR.) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal:$o Maintenance Costs Subtotal:$o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Water Mains 150,000 (Annual Minimum Fundlng - $150,000) Total Estimated Capital Cost $1s0,000 PHASE/FUNDING SOURCE Contingencies Water Mains BUDGET 56,251 150,000 EXPENDED 18,4'18 0 OVEFUUNDER BUDGET G +) (37,833) (150,000) % Exponded 33% 0% '- This project received an inter-project transfer of $6,25'l from WT9905. $206,251TOTAL PROJECT $18,418 ($187,833)9v, 6l CURRENTSIATUS Department: Submitted By: Date Prepared: Date Completed: 7 -26-99PUBLIC WORKS RANDY BYERS WATERLINE REPLACEMENT, ARANSAS WATER Sub-Type: ect No.:wTO003 Prio MAINS A Project Title: Project Type: COUNCIL ACTION: March 28,2000 - Approved pro.lect to be funded from existing Water CIP Fund Balance RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Project consists of replacing water lines along Aransas - Ector to Midway. JUSTIFICATION: This line has deteriorated to the point of needing to be replaced City of Euless Gapital Project Request 62 PROJECTTITLE: WATERLINEREPLACEMENT ARANSAS PROJECT#: WT0003 NET EFFEGTS ON OPERATING AND MAINTENANCE COST (+ OR .) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal: Maintenance Costs $o Subtotal:$o Total Estimated Annual Gost $o TOTAL ESTIMATED CAPITAL COST: Water Mains 12,057 Total Estimated Capital Cost $12,0s7 CURRE'\TSTATUS PHASE/FUNDING SOURCE Water Mains BUDGET 12,057 EXPENDED 7 ,043 OVERYUNDER BUDGET G +) (s,014) % EXPENDED 58o/o '- This project received an inter-project transfer of $12,057 from F89901 TOTAL PROJECT $12,057 $7,043 $5 o14 58o/o 63 City of Euless Capital Project Request Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-26-99 Project Title: Project Type: Project No.: LINE REPLACEMENT, MILAM.DENTON/M IDWAY WATER Sub-Type: MAINS WT0005 Priority: A GOUNCIL ACTION: April 8,2000 - Approved project to be funded from existing Water CIP Fund Balance. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Project consists of replacing water lines along Milam Street from Midway to Denton Drive. JUSTIFICATION: This line has deteriorated to the point of needing to be replaced 64 PROJECTTITLE: LINEREPLACEMENT MILAM-DENTON/MIDWAY PROJECT#: WT0005 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal:$o Maintenance Costs Subtotal $0 $0Total Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Water Malns 19,31 1 Total Estimated Capital Cost $19,31 1 CURRENT STATUS PHASE/FUNDING SOURCE Water Mains BUDGET 19,311 EXPENDED OVEFYUNDER BUOGET C +) (19,31 1 ) % EXPENDED 0o/o0 '- This project received an inter-project transfer of $14,806 from F89901 '- This project received an inter-project transfer of $4,505 from WT0004. $19,31 1TOTAL PROJECT $o ($19,31 1 )0o/o 65 City of Euless Capital Project Request Department: Submitted By: WATER DISTRIBUTION RANDY BYERS Date Prepared: Date Completed: 6-1 5-00 Project Title: Project Type: Project No.: FIRE HYDRANT REPLACEMENT PROGRAM WATER wT0103 Sub-Type: Priority: INSTALLATION A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Systematic annual replacement of old, deteriorated or malfunctioning fire hydrants as determined by Fire and/or Public Works personnel. JUSTIFICATION: Fire hydrants are necessary for many functions, the major one being fire flghting. Several hydrants in our distribution system are old, deteriorated and are found to malfunction during annual inspections. These hydrants need to be replaced. 66 PROJECT TITLE: FIRE HYDRANT REPLACEMENT PROGRAM PROJECT #: WT0103 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR.) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal:0 Maintenance Costs Subtotal Other Average Annual Debt Service $87,560 Total Estimated Annual Cost $87,560 TOTAL ESTIMATED CAPITAL COST: Hydrant Replacement $50,000 Total Estimated Capital Gost $50,000 CURRENTSIATUS PHASE/FUNDING SOURCE Hydrant Replacement BUDGET 50,000 EXPENDED OVER/UNDER BUDGET G +) (50,ooo) % EXPENDED 1Yo0 $50,000TOTAL PROJECT $o ($s0,000)00k 67 OTHER FUNDED PROJECTS IIIIII ) CAPITAL IMPROVEMENTS PROGRAM FUNDED PROJECTS SUMMARY BUOGET AMOUNT AS OF Mav 31. 2001 ProJect Number Prolect DescrlDtlon Drainago Fund Wel6r & Sewer CIP Fund lmpact Fee Half Cont Salea Tax Pollce Faclllty General CIP Fund Escril Funds Unfundod, Fundlng Othor Fund Proloct Cost OTHER AC990t Athlelic Comolex PhasalLi6 sl 1 9.230 s1 19.230 Dvqqo I FD(: lnentive Fun.ls s19-994 s'19.994 EDo101 s100 000 /at st00 000 EDo102 Bell Ranch Temce $200.000 (s)$200.000 PD9S01 Poli@ and Municiml Courts Facilitv $1 1.789.614 $450.000 (s)$12.239.614 PRCSO 1 $237.714 $237.714 PR9902 SeniorCitizeos Remodel s16.130 $16.1 30 PR9903- PR9918 Various EDC Park Pmjects $269.566 $269,566 PR9922 Teias Buildino Remodel $150.000 $280.000 (6)$430,000 PR9927 Park lmprovement - Texas Star s't.036.500 $1.036.500 PR0016 WilshiE Park lmDrovements s150 000 s1 50.000 PRo1't0 SloDe Proteclion/Screenino Wall s1 250 000 t7'sl 250 000 ss0010 Fire Station #2 $599.600 $599,600 ssot 1 3 Park Buildino $1.492.283 {8r $ 1,4S2,283 S u b-f ota t Oth er Proiects $4,091,017 $'t 1,78S.614 $2,280.000 $'18.160.631 o\ @ )) \/ill.^ac Mrctar P.n Hiko ,nd Riko Tail Department: Submitted By: COMMUNITY SERVICES RICK HEROLD Date Prepared: Date Completed: 8-2-99 Project Title: Project Type: Project No.: ATHLETIC COMPLEX PHASE II LAND/PROPERTY Sub-Type: AC9901 Priority: IMPROVEMENT A COUNCIL AUTHORIZATION: November 25, 1997 - Approval of recertification of park grant for Phase ll September 9, 1997 - lncluded in Fiscal Year 1997-98 Budget. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project includes $20,000 for the continued revision of the Euless Parks and Community Services Master Plan. The Master Plan revision will update our current l\4aster Plan which will allow the City to qualify for additional grant points for future Texas Parks and Wildlife Department grants. PROJECT DESCRIPTION: These funds will be used for engineering and preliminary plans for Phase lll at the Parks at Texas Star as well as update of the Master Plan. Construction of the additional phases is pending until further funding is available. JUSTIFICATION: Phase ll plans continue to be reevaluated based on future opportunities. Master Plan revision is necessary to receive needed points and potentially $500,000 per project in grant funds. Gity of Euless Capital Project Request 69 PROJECT TITLE: ATHLETIC COMPLEX PHASE ll PROJECT#: AC9901 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR ' ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal $o Maintenance Costs Subtotal:$o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL GOST: Total cost is yet to be determined and depends on the scope of the project. Total Estimated Capital cost $0 CURRENTSTATUS PHASE/FUNDING SOURCE BUDGET EXPENDED OVER/UNDER BUDGET G +)% EXPENDED Engineering Services Land Betterment 29,200 90,030 29,200 34,520 0 (ss,510) 100% 38Yo TOTAL PROJECT $1 19 230 $63 720 ($s5,510) 10 Department: Submitted By: ECONOI\4IC DEVELOPMENT BILL RIDGEWAY Date Prepared: Date Completed: 7 -26-99 Project Title: Project Type: Project No.: EDC INCENTIVE FUNDS HALF-CENT SALES TAX DV9901 Sub-Type: Priority: DEVELOPMENT PROJECT A COU NCIL AUTHORIZATION : Approved in Sales Tax Revenue Bonds, Series 1994. March 27, 2001 - Approved transfer of $325,000 to N. Main Street for r-o-w to free up funds for a sign program. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Euless Development Corporation funds that have been set aside to aid the City of Euless in attracting development opportunities. JUSTIFICATION: City of Euless Capital Project Request 7I PROJECT TITLE: EDC INCENTIVE FUNDS PROJECT #: DV9901 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal: Maintenance Costs $o Subtotal:$o $o TOTAL ESTIMATED CAPITAL COST: Economic Development lncentives 19,994 Total Estimated Capital Cost $19,994 CURRENISTATUS PHASE/FUNDING SOURCE Economic Development lncentives' BUDGET 19,994 EXPENDED 853 OVER/UNDER BUDGET (- +) (19,141) % EXPENDED 4o/o - - This project provided an inter-project transfer of $432,600 to SS0010. "* - This project received an inter-project transfer of $25,000 from 1/2 Cent Operations..t. - This project provided an inter-project transfer of $355,000 to PS9901 $19,994TOTAL PROJECT $853 ($1e,141)4% 72 Total Estimated Annual Cost City of Euless Capital Project Request Department: Submitted By: ECONOMIC DEVELOPMENT BILL RIDGEWAY Date Prepared: Date Completed: 7-7 -00 Project Title: Project Type: Project No.: VILLAGES MASTER PLAN ECONOMIC DEVELOPMENT EDo101 Sub-Type: Priority: DEVELOPMENT PROJECT A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project involves the preliminary development of a Master Plan for the land bounded by 360 on the east, Harwood on the north, existing development on the west, and 183 on south (old mall site plus Van Riet, Ardinger and DFW properties). JUSTIFICATION: Poor planning can result in lower than desired tax revenue, hodge podge development activity, and less than optimal development quality. City needs to be proactive to guide the development of these vital tracts. 13 PROJECT DESCRIPTION: Commission a study to determine the highest and best use of this valuable commerical land. PROJECT TITLE: VILLAGES MASTER PLAN PROJECT#: EDol01 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR.) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o $o Subtotal $o $oTotal Estimated Annual Cost TOTAL ESTIMATED GAPITAL COST: Planning Study '100,000 Total Estimated Capital Cost $100,000 CURRENTSTATUS PHASE/FUNDING SOURCE Planning Study BUDGET 100,000 EXPENDED OVERYUNDER BUDGET G +) (100,000) % EXPENDED Oo/o0 $ 100,000TOTAL PROJECT $o ($100,000)o% 74 Subtotal: Maintenance Costs City of Euless Capital Project Request Department: Submitted By: ECONOMIC DEVELOPMENT BILL RIDGEWAY Date Prepared: Date Completed: 7-7-00 Project Title: Project Type: Project No.: BELL RANCH TERRACE ECONOMIC DEVELOPMENT ED0102 Sub-Type: Priority: DEVELOPMENT PROJECT A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER P LAN: This project would facilitate the development of the remaining phase of Bell Ranch Terrace in accordance with the City's Land Use Plan. PROJECT DESCRIPTION; Assist in infrastructure installation or other type of incentive or assistance, as negotiated through a City Developer Agreement. JUSTIFICATION: Land is vacant (45+ acres) and currently has over 60 property owners. Land should be consolidated and developed to increase the number of residential units in Euless and increase tax base. 75 PROJECT TITLE: BELL RANCH TERRACE PROJECT#: ED0102 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal:$o Maintenance Costs Subtotal:$0 $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Construction 200,000 Total Estimated Capital Cost $200,000 CURRE'VTSIATUS PHASE/FUNDING SOURCE Construction BUDGET 200,000 OVER/UNDER EXPENDED BUDGET (- +) 0 (200,000) % EXPENDED o% $200,000TOTAL PROJECT $o ($200,000)0Yo lh Department: Submitted By: POLICE DEPARTMENT GARY MoKAMIE Project Title: Project Type: Project No.: POLICE & COURTS FACILITY BUILDINGS/FACILITIES PD9901 Sub-Type: Priority: CONSTRUCTION A COUNCIL AUTHORIZATION : January 13, 1998 - Authorized contract with Phillips Swager for architectural services. April 14, 1998 - Authorized the acquisition of the Western Hills lnn and Western Hills Annex. June 9, 1998 - Awarded Bid No. 98-13 for demolition services. October 9, 1998 - Awarded change order to West Excavation for abatement of asbestos. February 23, 1999 - Authorized additional funds for demolition. June 22, 1999 - Declared expectation to reimburse expenditures with proceeds of future debt. June22,1999 - Authorized City Manager to request qualifications for construction management service. February 22,2000 - Public Hearing and approval of Special Use Permit. February 22,2000 - Approval of request for site plan. May 9, 20OO - Approval of Ordinance No. 1426 authorizing sale of Cert. Of Obligation Series 2000,4. May 9, 2000 - Awarded bid for construclion to Ratcliff Construction. November 14, 2000 - Authorized execution of contract for Project Management Services January 9, 20Ol - cranted City Manager approval to authorize change orders not to exceed $25,000. January 23, 2001 - Ratified contract for inspection services to increase limit to $65,000 January 23, 2001 - Approved Change Order #1 to credit contract $'152,391 . January 23, 2001 - Approved Change Order #3 for payment of $48,372.79 on new piers & removal. March 27, 2OO1 - Approved Change Order #4 to credit contract $42,871.41. May 22,2001- Awarded bid #044-01 for furniture in the amount of $332,400.7 0. June 12,2001- Authorize City Manager to execute contract with DataTex not to exceed $74,257.86. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: This 53,000 square foot facility will accommodate police, jail and courts. JUSTIFICATION: Current facility space is grossly inadequate for these areas 77 City of Euless Capital Project Request Date Prepared: 7-15-99 Date Gompleted: PROJECT TITLE: POLICE & COURTS FACILITY PROJEGT#: PD9901 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL. Direct Operating Cost Personnel:Full Time Part Time 128,000 Utilities 73,500 Subtotal:$201,500 Maintenance Costs Maintenance Janitorial Services Other 4,320 34,020 4,800 Subtotal:$43,140 Other Average Annual Debt Service $750,815 $99s,455Total Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Bond lssuance Cost Construction Contingency Demolition Engineering & Architectural Other Professional Services Equipment Furnishings Land Purchase Off-Site Utilities Owner Equipment 76,000 9,085,968 530,532 606,400 637 ,174 71,000 100,000 532,540 43,600 21 ,400 s3s,000 Total Estimated Capital Cost $12,239,614 PHASE/FUNDING SOURCE Bond lssuance Cost Construction Contingency Demolition Architectural Services Surveying Services Geo-Technical Services Other Professional Services Equipment Furnishings Land Purchase off-Site Utilities Owner Equipment Planning Services BUOGET 76,000 9,390,926 88,439 606,709 739,000 10,000 65,000 3'1,000 100,000 532,540 43,600 21,400 485,000 50,000 EXPENDED 76,000 5,649,741 143 606,709 660,530 5,571 69,119 '10,456 0 66,924 43,591 0 49 24,348 OVERiUNDER BUDGET G +) 0 (3,741 ,185) (88,296) (0) (78,470) (4,42e) 4,119 (20,544) (100,000) (465,616) (e) (21,400) (484,951) (25,6s2) % EXPENDED 100% 60% 0% 100% 89% 56% 106Yo 34Yo 0% 13Yo 100Yo o% Oo/o 49Yo ,614 $7,213,181 ($5,026,433)TOTAL PROJECT $12 23q 59Yo CURRENTSIATUS 78 Department: Submitted By: COMMUNITY SERVICES RICK HEROLD Project Title: Project Type: Project No.: HIKE AND BIKE TRAIL HALF-CENT SALES TAX PR990'l Sub-Type: Priority: PARK PROJECT A COUNCIL AUTHORIZATION : FY 1993 - ISTEA Application Approved for submission. FY 1994 - Engineering contract awarded. November 7,1994 - Approved Resolution 94-880 authorizing an agreement with TxDot for design and construction of the Trails of Euless, Phase l. September 8, 1999 - Approved additional funding in the Fiscal Year 1998-99 Budget. November 14, 2000 - Authorized $108,504 for the construction of the Trails of Euless. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Linkage of Bob Eden, Trailwood, and Mcoormick Parks. Future linkage to Villages of Bear Creek Park. PROJECT DESCRIPTION: This long-awaited and necessary project is primarily funded through ISTEA funding. lt provides almost two miles of concrete trails, linking many of our major parks in the northern quadrant of Euless. With the recent land acquisition, the proiect is ready for implementation. Project start date will be determined by TXDOT. JUSTIFICATION: This will allow Euless to take advantage of grant funds that were awarded to Euless over five years ago. Project was delayed due to TXDOT delays and cost overruns on statewide trail projects. The scope of this project was cut to flt within the proposed budget. City of Euless Gapital Project Request 70 Date Prepared: 8-2-99 oate Completed: PROJEGT TITLE: HIKE AND BIKE TRAIL PROJECT#: PR9901 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR.) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal $o Maintenance Costs Subtotal $o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Hike and Bike Trail Engineering Services Planning Services 226,489 7,600 3,625 Total Estimated Capital Cost $237,714 CURRENT STATUS PHASE/FUNDING SOURCE Hike and Bike Trail Engineering Services Planning Services Advertising BUDGET 224,071 7,600 3,625 2,418 OVER/UNDER EXPENDED BUDGET G +) 108,504 (115,567) 7,600 0 3,625 02,593 175 % EXPENDED 48% ,t00yo 100% 107o/o $237,714TOTAL PROJECT $122,322 ($11s,392)51Yo 80 Oepartment: Submitted By: COMMUNITY SERVICES RICK HEROLD Date Prepared: Date Completed: 8-2-99 Project Title: Project Type: Project No.: SENIOR CITIZENS REMODEL HALF-CENT SALES TAX PR9902 Sub-Type: Priority: PARK PROJECT A COUNCIL AUTHORIZATION: September 9, 1997 - lncluded in Fiscal Year 1997-98 Budget e'-/4 J RELATIONSHIP TO OTHER PROJECTS ANDiOR MASTER PLAN: PROJECT DESCRIPTION: This project includes continued remodel of the Simmons Center due to the needs of Euless'aging population. This project includes structural and cosmetic needs as well as purchasing new kitchen equipment and other furniture per request of the senior citizens. JUSTIFICATION: To better serve the expanding Euless senior citizen population. lmprovements in previous years has lead to greater utilization of the facility. City of Euless Capital Project Request 81 PROJECT TITLE: SENIOR CITIZENS REMODEL PROJECT#: PR9902 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal:$o Maintenance Costs $o $0Total Estimated Annual Cost TOTAL ESTIMATED CAPITAL GOST: Remodel 16,130 Total Estimated Capital Cost $16,130 CURRENISIATUS PHASE/FUNDING SOURCE Senior Citizens - Lighting Senior Citizens - Remodel BUDGET 8,618 7 ,512 EXPENDED 8,618 0 OVER/UNDER BUDGET G +) (0) (7,512) % EXPENDED 100% 0% $16,130TOTAL PROJECT $8,618 ($7,512)53Yo aa Subtotal: City of Euless Capital Project Request Department: Submitted By: COMMUNITY SERVICES RICK HEROLD Date Prepared: 8-2-99 Date Completed: Project Title: Project Type: Project No.: VARIOUS EDC PARK PROJECTS HALF-CENT SALES TAX Sub-Type: PR9903 - PR99l8 Priority: PARK PROJECT A COUNCIL AUTHORIZATION : Approved as part Sales Tax Revenue Bonds, Series 1994. December 5,2000 - Awarded bid of playground to Game Time Modlim Rec. Equip. for McCormick Park in the amount of $18,948. December 5, 2000 - Awarded bid of playground to Little Tikes Commercial PIay Sys. for West Park in the amount of $24,212. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: The funds remaining in the Park CIP fund are to be spent for various improvement including the following: 1.) Marquee signs and installation at Midway Recreation Center 2.) Basketball goal installation at South Euless Park 3.) Bench upgrades, table upgrades and trash receptacles throughout the park system. 4.) Portable restroom enclosures at Midway, Villages of Bear Creek and Bob Eden parks. 5.) Nine-hole disc golf course at Trailwood Park. 6.) New playgrounds at westpark, Wilshire Park and Mccormick parks. 7.) South Euless Trail (Engineering and conceptual plans are still under study) 8.) Adopt a Spot Signs and Marketing as well as marketing assislance and beautification projects. 9.) Various other upgrades as needed throughout the park JUSTIFICATION: These are various upgrades that would enhance the park system throughout the City of Euless 83 PROJECT TITLE: VARIOUS EDC PARK PROJECTS PROJECT#: PR9903-PR9918 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -} ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: Maintenance Costs $o Subtotal:$0 $oTotal Estimated Annual Cost TOTAL ESTIMATEO CAPITAL COST: Park Furnishings 269,566 Total Estimated Capital Cost $269,566 CURRE'VTSIATUS PHASE/FUNDING SOURCE EDC Marquee Sign BB Goal - S. Euless Playground lmprovements Bench Upgrades Table Upgrades Trash Receptacles Port RR Enclosures System Upgrades Disc Golf Course Playgrounds S. Euless Trails EDC Adopt A Spot Signs Mkt AssUBeautification Floor - Midway Recreation Special Event Tables Misc. Pro.iect BUDGET 15,000 20,000 10,000 10,000 15,000 15,000 '15,000 10,598 15,000 75,000 5,000 3,000 7,500 10,000 9,000 34,468 EXPENDED 2,927 6,2s6 3,979 8,384 9,764 9,910 12,645 10,598 0 68,329 0 0 6,747 600 2,104 22,298 OVER/UNDER BUDGET G +) (12,073) (13,744) (6,021) (1,616) (5,236) (s,090) (2,355) 0 (15,000) (6,671) (5,000) (3,000) (753) (e,400) (6,8s6) \12,170) o/o EXPENDED 2OYo 31Yo 40o/o 84o/o 65Yo 66% 84o/o 100o/o 0o/o 91o/o Oo/o 0o/o 900/o 6lo zc-/o 65o/o $269,566 $164,s41TOTAL PROJECT ($105,025)61% 84 Department: Submitted By: Date Prepared: Date Completed: 6-27 -OOSUPPORT SERVICES RICK HEROLD TEJAS REMODEL BUILDING/FACILITIES PR9922ProNo.: Sub-Type: Prio REMODEL A Project Title: Project Type: September 9, 1997 - lncluded in Fiscal Year 1997-98 Budget. October 24, 2OOO - Authorized City Manager to contract for architectual services with Byron Folse lnc January 9,2001 - Awarded bid #026-00 for renovation to Stillwell Building for $403,485. January 9, 2001 - Authorized City Manager to execute the contract. COUNCIL AUTHORIZATION : RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER Community Services Department will be the first of six master plan projects. Construction is to begin in January 2001 and scheduled to be completed by June 200'1. PLAN: Community Service Department will be relocated to the Tejas Building located on Royal Parkway adjacent to the existing Fleet & Facility Service Center Building. The Tejas Building will be renovated to accommodate the expansion of the Community Services offices and storage. PROJECT DESCRIPTION: Relocating Community Services offlces to another facility from Building B will allow for present and future expansion plans to accommodate the Finance, Water Department, lnsurance and Human Resources Department. JUSTIFICATION: Gity of Euless Capital Project Request 85 PROJECTTITLE: TEJASREMODEL PROJECT#: PR9922 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal $o Maintenance Costs Utilities Cleaning lnsurance 4,800 2,800 500 Subtotal: Total Estimated Annual Cost $8,100 TOTAL ESTIMATED CAPITAL COST: Remodel 430,000 Total Estimated Capital Cost $430,000 CURRENISTATUS PHASE/FUNDING SOURCE Tejas Building Remodel Other Professional Services Contingency BUDGET 383,48s 26,515 20,000 EXPENDED 359,001 20,531 0 OVER/UNDER BUDGET G +) (24,484) (5,s84) (20,000) % EXPENDED 94% 77o/o 004 $430,000TOTAL PROJECT $379,532 ($50,468)887o $8,100 86 Department: Submitted By: Date Prepared: Date Completed: 2-7-00 Project Title: Project Type: Project No.: PARK IMPROVEMENT. TEXAS STAR HALF-CENT SALES TAX Sub-Type:PARK PROJECT APR9927 COUNCIL AUTHORIZATION : October 26, 1999 - Council authorized the issuance of $1 million in revenue bonds. October 26, 1999 - EDC authorized design services contract. November 30, 1999 - EDC authorized execution of construction agreements. February 7, 2000 - EDC authorized execution of construction agreements. February 7, 2000 - EDC authorized the expenditure of funds for additional park improvements. February 8, 2000 - Council ratified the EDC approval ilems relaled to Texas Star park improvements RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project was basically Phase llof The Parks at Texas Star. The improvements installed within the project are consistent with the City's Master Plan. PROJECT DESCRIPTION: This project involved the construction of a parking lot, installation of lighting and landscaping, and other park improvements associated with the City's portion of the Dr. Pepper Staroenter. JUSTIFICATION: This project was needed to facilitate the Dr. Pepper Starcenter project and to begin build out of the Texas Star Sports Center. City of Euless Gapital Project Request 87 COMMUNITY SERVICES RICK HEROLD Priority: PROJECTTITLE: PARK IMPROVEMENT - TEXAS STAR PROJECT#: PR9927 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal:$o Maintenance Costs Subtotal:$0 Total Estimated Annual Cost $o TOTAL ESTIMATED CAPITAL COST: Bank Charges lssuance Cost Architectural Services Engineering Services Land Betterment Park lmprovement 400 36,100 26,500 35,500 447 ,982 490,018 Total Estimated Capital Cost $1 ,036,500 CURRENT STATUS PHASE/FUNDING SOURCE Bank Charges lssuance Cost Architectural Services Engineering Services Land Betterment Park lmprovement BUDGET 400 36,100 46,830 29,750 447 ,401 476,019 EXPENDED 400 36,100 50,400 29,750 446,264 451 ,097 OVER/UNDER BUDGET G +) 0 0 3,570 t, (1,137) (24,9221 % EXPENDED 100% 100Yo 108yo 1000/" 10OYo 9SYo $1,036,s00 $1,014,011TOTAL PROJECT ($22,48e)98Yo 88 City of Euless Capital Project Request COMMUNITY SERVICES RICK HEROLD Date Prepared: 6-29-01 Date Completed: Project Title: Project Type: Project No.: WILSHIRE PARK IMPROVEMENTS LAND Sub-Type: PR0016 Priority: IMPROVEMENT A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Land and equipment improvement of park facility to remain consistent with forward{ooking park infrastructure for the citizens of Euless. PROJECT DESCRIPTION: Multi-faceted park enhancements to include a trail system, lighting, flshing pier, pond, playgrounds and picnic areas. JUSTIFICATION: A the request of Wilshire Neighborhood Association, the multFfaceted improvements to Wilshire Park will provide park enhancements consistent wilh improvements throughout the city's park infrastructure. 89 Department: Submifted By: PROJECT TITLE: WILSHIRE PARK IMPROVEMENTS PROJECT#: PR0016 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: Maintenance Costs Landscaping/Pond Materials $o '12,500 Subtotal $12,500 Total Estimated Annual Cost $12,500 TOTAL ESTIMATED CAPITAL COST: Engineering & Design Construction 150,000 Total Estimated Capital Cost $150,000 CURRENTSTATUS PHASEiFUNDING SOURCE BUDGET EXPENDED OVER/UNDER BUDGET G +)% EXPENDED Land Betterment 150,000 (100,e06)33Yo TOTAL PROJECT $150,000 $49,094 ($100,906)33Yo 90 49,094 COMMUNIry SERVICES RICK HEROLD Date Prepared: Date Completed: 6-29-00 Project Title: Project Type: SLOPE PROTECTION/SCREENING WALL LAND Sub-Type:IMPROVEMENT AProect No.:PR01 10 Prio COUNCIL AUTHORIZATION: June 'l,2,2001 - Awarded bid #048-01 for construction to Knight Erosion Control for $1 ,033,937.50. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER P LAN: lnitial Slope Protection Project revised from $708,900 to $1,165,000. Revision of project required as erosion has accelerated to levels that require consolidation of initial phase and partial of Phase ll. Project is anticipated to begin July 2001. The screening wall is being recessitated by Ft. Worth's Trinity Blvd road construction project. PROJECT DESCRIPTION: Slope protection from #18 creek damn at tee to damn by #18 green on west side of creek of approximately 1,185 linearfeet and l2feethigh. #18 Bridge to #18 green side damn of 485 linear feet at approximately 12 feet high. From gabion behind #9 green to the gabion at #9 fairway bridge on the northwest side of the creek. From gabion at #9 fairway bridge back to bend at #1 fairway for 900 linear feet at approximately '12 feet high. The screening wall will mitigate some of the negative influences created by the construction of the six lane boulevard street section. JUSTIFICATION: Stop erosion of the creek back on #18 faiMay and prevent the possible future loss of#18 bridge and parts of ,t9 green and fairway. The screening wall is needed to maintain the existing environment and setting of the Texas Star Golf Course, Gity of Euless Capital Project Request 9I Department: Submitted By: PROJECTTITLE: SLOPEPROTECTION/SCREENINGWALL PROJECT #: PR0110 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal:$o Maintenance Costs Utilities lnsurance Subtotal: Average Annual Debt Service Total Estimated Annual Cost $o $98,993 $o TOTAL ESTIMATED CAPITAL GOST: Creek Slope Protection Trinity Screening Wall 1,165,000 85,000 Total Estimated Capital Cost $1 ,250,000 CURRENTSTATUS PHASE/FUNDING SOURGE Land Betterment BUDGET 1,250,000 EXPENDED OVER/UNDER BUDGET G +) (1 ,250,000) % EXPENDED 0%0 Funding provided by a loan from the car rental fund 1 ,250,000TOTAL PROJECT $$o ($1,250,000)0Yo 92 Gity of Euless Gapital Project Request Department: Submitted By: SUPPORT SERVICES TOM COX Date Prepared: Date Completed: 7 -12-00 Project Title: Project Type: Project No.: FORMER FIRE STATION #2 BUILDING/FACILITY ss0010 Sub-Type: Priority: REMODEL A COUNCIL AUTHORIZATION : February 7,2000 - EDC authorized project, acquired Station #2 and adjacent land and proposed lease. February 8,2000 - Council ratifled the EDC approval of items related to Fire Station #2. February 8, 2000 - Council authorized the sale of Fire Station #2 to the EDC for $167,000. June 27,2000 - EDC approved a lease with Beall Concrete Enterprises. June 27,2000 - EDC approved the expenditure of funds for remodel. RELATIONSHIP TO OTHER PROJECTS ANO/OR MASTER PLAN: PROJECT DESCRIPTION: Economic Development Corporation authorized funding to remodel Fire Station #2. The renovated facility will be rented to a business that will pay rent unless certain sales tax revenue goals are achieved. JUSTIFICATION: The City will receive signiflcant sales tax revenue from this venture. 93 PROJECT TITLE: FORMER FIRE STATION #2 PROJECT#: SS0010 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR .) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal $0 Maintenance Costs Subtotal $o Total Estimated Annual Cost $o TOTAL ESTIMATED CAPITAL COST: Other Professional Services Contingencies Land Purchase Acquisition Land Betterment Remodel/lmprovement Parking lmprovement Asbestos Remediation 38,100 12,000 30,000 167,000 12,500 315,000 15,000 '10,000 Total Estimated Capital Cost $599,600 CURRENTSIATUS PHASE/FUNDING SOURCE Other Professional Services Contingencies Land Purchase Acquisition Land Betterment Remodel/lmprovement Asbestos Remediation BUDGET 38,100 7 ,524 31 ,135 167,000 12,500 335,8'15 I ,AZO EXPENDED 41 ,283 U 31,135 167,000 12,501 335,812 7 ,526 OVER/UNDER BUDGET G +) 3,183 (7,524) (0) 0 1 (3) (1) % EXPENDED 108% o% 1000/" 100% 1007o 100% 1O0o/o * - This project received an inter-project transfer of $432,600 from DVg90'1. $599,600 $595,257TOTAL PROJEGT ($4,343)99Yo 94 Oepartment: Submitted By: COMMUNIry SERVICES RICK HEROLD Date Prepared: Date Completed: 6-27 -00 Pro,iect Title: Project Type: Project No.: PARKS & GREENHOUSE BUILDING sso1 'r 3 Sub-Type: Priority: NEW CONSTRUCTION A COUNCIL AUTHORIZATION : October 24, 20OO - Authorized contract with Byron Folse Associates, lnc. for architectural serviecs. January 9, 2001 - Approved Resolution #01-1087 declaring intent to reimburse expenditures February 27,20Ol - Authorized publication of notice of intent to issue certificates of obligation. April 10, 2OOl - Approved masonry exception No. 01-04 to Parks Maintenance Building. April 10, 2OOl - Approved Ord. 1467 authorizing issuance of Certficates of Obligation, Series 2001. April 10,2001 - Approved site plan for a Parks Maintenance Building. June 12, 2001 - Awarded bid #046-01 for construction to T.W. Foster in the amount of $1,325,445.72- The parks and Greenhouse Departement will be the second project ofthe master plan. Construction is to begin in May 200'1 and scheduled to be complete by December 2001. PROJECT DESCRIPTION: Two new buildings and site improvements will be constructed to accommodate the Parks Department and the proposed Greenhouse. The buildings will be located on South Pipeline adjacent to the existing Golf Course Management Building. JUSTIFICATION: Relocating the Parks/Greenhouse Department to a new facility from Midway Drive and Pauline Drive to meet the expanding needs of the department. 95 Gity of Euless Gapital Project Request RELATTONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT TITLE: PARKS & GREENHOUSE PROJECT #: SS01 13 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR I ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal $o Mainlenance Costs Utilities lnsurance 4,800 750 Subtotal:$5,550 Total Estimated Annual Cost $s,550 TOTAL ESTIMATED CAPITAL COST; Planning, Design & Construction Special Services lssuance Cost 1,325,446 155,419 1't ,418 Total Estimated Capital Cost $1 ,492,283 CURRENTSIATUS PHASE/FUNDING SOURCE Construction Special Services lssuance Cost BUDGET 1,325,446 155,419 11,418 EXPENDED OVERiUNDER BUDGET C +) (1,325,446) (53,oee) 0 % EXPENDEO o% 66% 100Yo 0 102,320 11,418 TOTAL PROJECT s1,492,283 $113,738 ($1,378 8% 96 g }J slca[o.r6 papunlun r I It iE \t \/ Ji I I t_ ) \.1 )) CAPITAL IMPROVEMENT PROGRAMS UNFUNDED PROJECTS . SORTED BY TYPE PROPOSED METHOD OF FINANCING Priority Estimated Cost Operating Fund CIP Fund Balance Bond Sale County, State, Federal Funds lmpact Fees Escrow Funds Car Rental Tax Proiect Description EDC To Be Determined DRAINAGE PROJECTS Bear Creek Park 2,200,000$XX Bell Hi Addition 440,000$xx Blessing Branch, Main io SH 360 C 5,285,000$XX Bob Eden Park C 550,000$XX c $500,000 xxBoyd Branch c 880,000$XXBoyd Branch (FEirA) c $55,000 XXOenton Orive at Midway Park c 45,000$Diversion Line - Oak Lane c 1,'100,000$Hurricane Creek at Akport Business Park xx c 220,000$Hurricane Creek, Bridge at Marlene xx c $590,000 XXHunicane Creek, North of SH 10 c 100,000$xxKynette Orive Culvert Modifications C $450,000 xxOak Lane Channel c 121,OOO$xxPriest Drive Culvert & Woodbury Forest TBDRoyal Oaks Addition XX Trailwood Addition (Summit Ridge)C '185,000$XX Sub-Toral Dnlnage Prioriv C $ 16,721,000 DRAINAGE PROJEGTS - TOTAL $ 16,721,000 STREET PROJECTS Gateway Blvd. - Southern Portion 425,000$ Sub-Total Street Prio tyA 425,000$ B $450,000 XXFuller Wiser Connector (') B 775,000$XXTown crossing Bridge (') B 698,476$xxGlade Road Right-of-Way Acquisition {4} B 1,000,000$XXPipeline Road Gas Line (') IIIIIIIIIIIIIII IIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIII II A - Polects that will be pr€seflled lo Council durlng the upcoming year B - Pojects that will be presented to Council Mhin t$o to live yea6. C - Plojecls lhal will bo presented to Council beyond tive years. Hotel / Motel C c xx c xx tt tt I I I --l- t+trl ltt \o @ A - Proiocrs ihat will b€ presented lo Council dudng lhe upcoming yoar. B - Projocls lhal will be presenled lo Councll wthin lwo lo five years. C - Pmjects that willbe prcsented to Councilbeyond live yeals. ( CAPITAL IMPROVEMENT PROGRAMS UNFUNDED PROJECTS . SORTED BY TYPE PROPOSED METHOD OF FINANCING Operating Fund CIP Fund Balancs Car Rental Tax Hotel / Motel EDC To Be DeterminedPriorityEstimated Cost Bond Sale County, Slate, Federal Funds lmpact Fees Escrow FundsProject Description XXB450,000$Raider Drive - SH10 to South Pipeline(1) xxB525,000$west Pipeline - Raider to city Limits (31 3,898,476Sub-fotal Street Priority B $ XXTBDAsh Lane - Aransas to N. Main xxcTBDBaze Road - Glade to Mid-Cities XX1,000,000$Gateway Boulevard - Norlhern Portion XXTBDHarwood Road - Main to SH 157 XX1,500,000sHeather and S. Pipeline XXcTBDHighway lngress-Egress XX$450,000Hwy 10 Sidewalks and Lighting xx1,068,000$S. Ector Drive xxC4,770,420$South Main - Hwy 10 to Pipeline C TBDVine St. - SH 183 to SH 10 8,784,420SuEIota, Streea c $ STREET PROJECTS . TOTAL $ 13,111,896 WASTEWATER PROJECTS XX XX XX237,086$FY 2OO2 CDBG XX140,000$Line Replacement, Dunaway XX20,000$Line Replacement, E. Alexander xx79,000$Line Replacement, Paula Lane 100,000$XX XXManhole Rehab Program 366,000$XXMidway Park Main Replacement 942,086Sub-Total Wastewater Pdority A $ 252,000$XX XXBFY 2OO3 CDBG XX XX211,000$FY 2OO4 CDBG xx XX272,OOO$FY 2OO5 CDBG II IIIIIIIIIIIIII IIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIITIIII IIII II-IIIIIIIIIIII IIII IIIIII (( XX B B -------r----- m= I ll -----T-----T-T- -----T----r ))) CAPITAL IMPROVEMENT PROGRAMS UNFUNDED PROJECTS . SORTED BY TYPE PROPOSED METHOD OF FINANCING Operating Fund CIP Fund BalanceProject Description Priority Bond Sale County, State, Federal Funds lmpact Fees Escrow Funds Car Rental Tax Hotell Motel EDC To 86 Determined xxFY 2006 CDBG 157,000$XX Line Replacement, Canyon Ridge '162,000$ Line Replacement, Ector Drive 200,000$XX B 292,000$xxLine Replacement, Fayette 65,000$Line Replacement, Martin Lane XX Line Replacement, Mccormick & Copher Courts 66,000$XX 195,000$XXLine Replacement, Sagebrush B 80,000o XXLine Replac€ment, Short St. to Copher Ct. B 425,000$XXLitlle Bear Creek collection Line(1) 2,177,000$Sub-Total Waslewatet Priority B XXFY 2OO7 CDBG c 319,000$XX c 156,000$Line Replacement, E. Fuller XX C 52,000$Line Replacement, Jean Lane C 225,OOO$XXLine Replacement, Koen c 95,000$xxLine Replacement, Pebble Creek Line Replacement, Ridgecrest Drive c 90,000$XX Line Replacement, S. Sheppard Drive 90,000$XX Line Replacement, W. Fuller c 70,000$XX c 80,000$Line Replacement, Windward Way XX c 135,000$XXLine Replacement, Wood Ridge Circle TBD XXSH 183 Utility Relocation Sub-Total Wastewatet Priority C '1,312,000$ WASTEWATER PROJECTS . TOTAL 4,631,086$ WATER PROJECTS 600.000$xxOisinfeclion Modification /well Rehabilitation 250,000s XXEffuent Water Main IIIIIIII A - Proiecls lhal e,lll be presented to Council during lh€ upcoming year B - ProiecG lhat will be presented to council wthin lwo lo five yeals. C - Pmjects that will be pGsented to Council beyond l5ve years. \o!o Estimated Cost B B XX B B B B xx r-r---ttf- tt m I ffitt I ttttt rrrrtlttt I -tt m r---r----r A - PloJecG tha w b€ preseflled lo Council dudng the upcoming yeat B - Poj€.ts lhat will b€ pr€sented io Council \tthin two !o ive years. C - Proj6cls thrt $/ill b€ presented to Council b€yond fve years. (( CAPITAL IMPROVEMENT PROGRAMS UNFUNDED PROJECTS . SORTED BY TYPE PROPOSED METHOD OF FINANCING Escrow Funds Car Renlal Tax Hotel/ Motel EDC To Bs DeterminodPriorityEstimated Cost Operatlng Fund CIP Fund Balance Bond Sale County, State, Federal Funds lmpacl FeesProject Description 850,000Sub-Total Water Priority A $ 300,000$XXHwy 360 Water Crossing i') XX500,000$Rehab Central Dr. water Storage {3) 200,000$XXRehab/Rebuild Fuller Dr. Ground Storage Tank ( XX1,000,000$W. Pipeline Water Main Replacement (') 2,000,000$ xxCTBDHwy '183 Water Crossing Sub-Total Water tulo ty C 2,850,000WATER PROJECTS . TOTAL OTHER PROJECTS XX922,020$Building D Remodel XX422,OOO$Midway Reseation Center Upgrade Sub-Total Other Pioity A $1 344,020 s,500,000$XXBAquatics Center/Recreation Center Expansion F) B 978,550Building A Remodel F) XXB837,390$Building B Remodel(') xx XXB1,750,000$city Wide Trail Enhancement r') xxB1,500,000$Fire Station #3 Reconstruction (4) XX XX XXB4,400,000$Parks at Texas Star, Phase lll (') B 2,510,408$xxPublic works Facility (3) 2',t,476,348Sub-Total Olhet Priority B $ XX4,000,000$Community Golf Course at Bob Eden Park xxc1,000,000$Conversion & Expansion of Ruth Millican Cntr xxc2,000,000$Expansion & Upgrade of 8ob Eden Park XX1,200,000$Fire Training Facility IIIIII - I IIIIII - II IIIIIIIIII II IIIIIIIIT IIIII IIIIIIITIIIIIIIIIIIIIIIIIIIIII ( B B B B Sub-Tota, Water Piority B $ XX xx ffi m Illl tt [--r---]-T- t --+-r ))) Ho H (t)- Prolected FY 2oo3 (o)- Proiected FY 2oo4 A - Proiects that will be presented to Council during the upcoming year B - Projecis that will be presented to Council tvthin two to five years. C - Projects that will be presented to Council beyond five years. CAPITAL IMPROVEMENT PROGRAMS UNFUNDED PROJECTS . SORTED BY TYPE Project Description Priority Estimated Cost PROPOSED METHOD OF FINANCING Operating Fund GIP Fund Balance Bond Sale County, State, Federal Funds lmpact Fees Escrow Funds Car Rental Tax Hotel / Motel EDC To Be Determined Library Build Out c $2,120,000 XX Parks at Texas Star, Phase lV c $10,000,000 XX Redevelopment of Westpark c $2,500,000 XX SH 10 Land Acquisition c $3,000,000 XX Softball World c TBD XX Texas Star Conference Cntr, Phase ll c $3,350,000 XX Sub-Total Other Priority C $ 29,170,000 OTHER PROJECTS . TOTAL $ 51,990,368 *.-IIT srcf roud ICVNIVUO OlIONNJNN r-l ))) o N) CAPITAL IMPROVEMENT PROGRAMS UNFUNDED PROJECTS . SORTED BY TYPE Project Description Priority Estimated Cost PROPOSED METHOD OF FINANCING Operating Fund CIP Fund Balance Bond Sale County, State, Federal Funds lmpact Fees Escrow Funds Car Rental Tax Hotet / Motel EDC To Be Determined DRAINAGE PROJECTS Bear Creek Park c $2,200,000 XX Bell Hi Addition c $440,000 XX Blessinq Branch, Main to SH 360 C $5,285,000 XX Bob Eden Park c $550,000 XX Boyd Branch c $500,000 XX Boyd Branch (FEMA)c $880,000 XX Denton Drive at Midway Park c $55,000 xx Diversion Line - Oak Lane c $45,000 xx Hurricane Creek at Airport Business Park c $1,100,000 xx Hurricane Creek, Bridge at Marlene c $220,000 XX Hurricane Creek, North of SH 10 c $4,590,000 XX Kynette Drive Culvert Modifi cations c $100,000 xx Oak Lane Channel c $450,000 xx Priest Drive Culvert & Woodbury Forest c $121,000 xx Royal Oaks Addition c TBD XX Trailwood Addition (Summit Ridge)c $185,000 XX Sub-Total Drainage Priority C $ 16,721,000 DRAINAGE PROJECTS . TOTAL A - Proiec'ts that will be presented to Council during the uPcoming year. B - Proiects that will be presented to Council wthin two to five years. C - Proiects that will be presented to Council beyond five years. $ 16,721,000 Department: Submitted By: PUBLIC WORKS RANDY BYERS Dato Prepared: Date Completed: 7-2't-99 Project Title: Project Type: Project No.: BEAR CREEK PARK DRAINAGE Sub-Type: Priority:c RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project was identified in the 1990 Knowlton, English & Flowers Drainage Utility System Study of Selected lmprovement Projects. PROJECT DESGRIPTION: The Bear Creek Park drainage project involves erosion control and channelization improvements to Little Bear Creek. lt is a portion of Project No. 11 in the above referenced study. JUSTIFICATION: Continued erosion will eventually undermine the creek and adjacent park. Gity of Euless Capital Project Request r03 PROJECT TITLE: BEAR CREEK PARK PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal $0 Maintenance Costs Subtotal $o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Engineering Construction 200,000 2,000,000 Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certifi cate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Speciflcations % Construction % ADDITIONAL COMMENTS: r04 $2,200,000 Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-26-99 Project Title: Project Type: Project No.: BELL HI ADDITION DRAINAGE Sub-Type: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: ln 1990 the City commissioned and received a report from Knowlton, English & Flowers titled Drainage Utility System Study of Selected lmprovement Projects. This project was the 5th project identified in this study. PROJECT DESCRIPTION: The terrain in this location is very flat, which causes the streets to have a very low capacity to remove storm water without flooding. The proposed project ties in to an existing storm drainage system in Needles Drive. Construction of this project will remove the surface water from the street. A substantial portion of the cost of this project is related to street repair, indicating the need to combine this project with a street reconstruction project. JUSTIFICATION: Excessive ponding in the street Gity of Euless Capital Project Request 105 PROJECT TITLE: BELL HI ADDITION PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR.) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal:$o Maintenance Costs Subtotal:$o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: 55,000 385,000 Total Estimated Capital Cost xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications o/o Construction Yo 105 $440,000 Engineering Construction PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined ADOITIONAL GOMMENTS: Department: Submitted By: Date Prepared: Date Completed: 7-26-99 Project Title: Project Type: Project No.: BLESSING BRANCH, MAIN TO SH 360 DRAINAGE Sub-Type: Priority:c RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The Blessing Branch Drainage Master Plan included a conceptual plan to convey stormwater through the creek more efficiently. PROJECT DESCRIPTION: This project involves the channeling and lining of Blessing Branch in accordance with the Blessing Branch Master Plan. The project costs shown on the report break the project into engineering and construction cost. JUSTIFICATION: The City expects to receive significant developer contributions toward this project. However, the City may be required to fund a portion of this project. City of Euless Capital Project Request 107 PUBLIC WORKS RANDY BYERS PROJECTTITLE: BLESSINGBRANCH MAIN TO SH 360 PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR.) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal $o Maintenance Costs Subtotal $o Total Estimated Annual Cost $o TOTAL ESTIMATED CAPITAL COST: Engineering Construction 385,000 4,900,000 Total Estimated Capital Cost $s,28s,000 PROPOSED METHOO OF FINANCE: Operating Fund Fund Balance Certiflcate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx CURRENT STATUS: Conceptual Design o/o Preliminary Design % Final Plans % Specifications o/o Construction o/o AODITIONAL COMMENTS: 108 Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-21-99 Project Title: Project Type: Project No.: Sub-Type: Priority:c RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The improvements proposed are identified in the Little Bear Creek Watershed Master Plan PROJECT DESCRIPTION: This proiect involves erosion control and channelization improvements to Little Bear Creek. This project ties to the Bear Creek Park Project. JUSTIFICATION: Continued erosion will eventually cause damage to existing City facilities. City of Euless Gapital Project Request i09 BOB EDEN PARK DRAINAGE PROJECT TITLE: BOB EDEN PARK PROJECT #; NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Ooerating Cost Personnel:Full Time Part Time Total Salary Purchase of Services $o Utilities Subtotal $o Maintenance Costs Subtotal $o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Engineering ConstruGtion 50,000 500,000 Total Estimated Capital Cost $550,000 PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx CURRENT STATUS: Conceptual Design o/o Preliminary Design % Final Plans o/o Specifications % Construction % ADDITIONAL COMMENTS: 110 City of Euless Gapital Project Request Department: Submitted By; PUBLIC WORKS RANDY BYERS oate Prepared: Date Completed: Project Title: Project Type: Project No.: BOYD BRANCH DRAINAGE Sub-Type: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Channel improvements are shown as being necessary for development in the City's Master Drainage PIan for Boyd Branch. PROJECT DESCRIPTION: The Boyd Branch drainage watershed will require significant improvement between S.H. 10 and S. Pipeline Road as the vacant tracts are developed. Staff believes assistance will be required for reimbursement to developers for the cost of oversize improvements or for construction of channel improvements. Development may not be financially feasible without City assistance. J USTIFICATION: Oversize reimbursement is permitted in the Uniform Development Code. Other types of assistance will al permit growth in tax revenues and employment. 111 7-7-00 PROJECTTITLE: BOYDBRANCH PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: Maintenance Costs $o Subtotal:$0 $oTotal Estimatcd Annual Cost TOTAL ESTIMATED CAPITAL COST: Construction 500,000 Total Estimated Capital Cost $500,000 PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction 7o 0 0lo 0% o% 0% ADDITIONAL COMMENTS: tl2 Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-21-99 Project Title: Project Type: Project No.: BOYD BRANCH (FEMA) DRAINAGE Sub-Type: Priority:c RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The reconstruction of FM 157 south of SH 183 by TXDOT did not include drainage improvements of a sufflcient size to accommodate the 100-year storm evenl. This has created problems with the 100-year flood plain elevation. PROJECT DESCRIPTION: This proiect involves the installation of storm drainage improvements in Boyd Branch and SH 157 to correct the problems associated with the TxDOT construction. JUSTIFICATION: This is an item of work that may be required by FEMA. Gity of Euless Gapital Project Request 113 PROJECTTITLE: BOYDBRANCH FE PROJECT #: TOTAL ESTIMATED CAPITAL COST: Total Estimated Capital Cost $880,000 80,000 800,000 Engineering Construction NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR.) ANNUAL: Total Estimated Annual Cost Subtotal: $0 $o $o Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Direct Operating Cost Personnel: Conceptual Design % Preliminary Design o/o Final Plans % Specifications % Construction % CURRENT STATUS:PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx ADDITIONAL COMMENTS: Staff is reevaluating cost estimates LL4 $o Department: Submitted By: PUBLIC WORKS RANDY BYERS 7-22-99 Project Title: Project Type: Project No.: DENTON DRIVE AT MIDWAY PARK DRAINAGE Sub-Type: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: ln 1990 the City commissioned and received a report from Knowlton, English & Flowers titled Drainage Utility System Study of Selected lmprovement Projects. PROJECT DESCRIPTION: This project involves the installation of two curb inlets on the south side of Bell Drive to eliminate excessive storm water from draining into Denton Drive. (This Project is No.7 in the 1990 Knowlton, English & Flowers Study). JUSTIFICATION: Excessive ponding of stormwater in the street. Gity of Euless Capital Project Request 115 Date Prepared: Date Completed: PROJECT TITLE: DENTON DRIVE AT MIDWAY PARK PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal $o Maintenance Costs Subtotal $o Total Estimated Annual Cost $o TOTAL ESTIMATED CAPITAL COST: Engineering Construction 5,000 50,000 Total Estimated Capital Cost $55,000 PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx CURRENT STATUS: Conceptual Design % Preliminary Design o/" Final Plans o/o Specifications % Construction 7o 7 5o/o ADDITIONAL COMMENTS: 116 City of Euless Capital Project Request Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-22-99 Project Title: Project Type: Project No.: DIVERSION LINE . OAK LANE DRAINAGE Sub-Type: Priority:c RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project was identified in the 1990 Knowlton, English & Flowers study. PROJECT DESCRIPTION: This is identified as Project No. 15 in the study. The homes along the west side of Oak Lane receive a considerable amount of storm water from the Lakewood Park Addition. This project involves grading and the installation of a small drainage system to reduce the problems associated with this lolto-lot drainage. JUSTIFIGATION: Lot to lot drainage continues to be one of the most prolific problems in the City. The cost of the solution is often too expensive for homeowners to afford. tt7 PROJECT TITLE: DIVERSION LINE . OAK LANE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR .) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal:$o Maintenance Costs Subtotal $o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Construction 45,000 Total Estimated Capital Cost $4s,000 PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx CURRENT STATUS: Conceptual Design 7o Preliminary Design % Final Plans % Specifications o/o Construction o/o ADDITIONAL COMMENTS: 118 Departmont: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-22-99 Project Title: Project Type: Project No.: HURRICANE CREEK AT AIRPORT BUSINESS PARK DRAINAGE Sub-Type: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: ln 1990 the City commissioned and received a report from Knowlton, English & Flowers titled Drainage lltility System Study of Selected lmprovement Proiects. PROJEGT DESCRIPTION: This project, Project No. 12 in the above referenced study, involves the installation of erosion conlrol and channel lining improvements along Hurricane Creek south of SH 10. The 1996 Hurricane Creek Storm Drainage Master Plan also identified the need for improvements and a conceptual design. JUSTIFICATION: The 1990 report identified the erosion problems through the Airport Business Park. This property now includes the Texas Star Golf Course. " A portion of the improvements could become necessary within 2 to 5 years Gity of Euless Capital Project Request 119 PROJECTTITLE: HURRICANECREEK AIRPORT BUS PARK PROJECT #: TOTAL ESTIMATED CAPITAL COST: Total Estimated Capital Cost $1,100,000 100,000 1,000,000 Engineering Construction NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR.) ANNUAL: Subtotal: Maintenance Costs Decreased maintenance costs. Total Estimated Annual Cost $0 Subtotal: $o $0 $o Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Direct Operating Cost Personnel: Conceptual Design % Preliminary Design % Final Plans o/o Specifications % Construction % CURRENT STATUS:PROPOSED METHOD OF FINANGE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx ADDITIONAL COMMENTS: 120 Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-26-99 Project Title: Project Type: Project No.: HURRICANE CREEK, BRIDGE AT MARLENE DRAINAGE Sub-Type: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: ln 1990 the City commissioned and received a report from Knowlton, English & Flowers titled Drainage Utility System Study of Selected Improvement Projects. PROJECT DESCRIPTION: This project involves the replacement of the culvert. It is Project No. 17 in the 1990 Knowlton, English, Flowers study. JUSTIFICATION: Culvert does not convey 100 year storm. Gity of Euless Capital Project Request t2t PROJECTTITLE: HURRICANECREEK BRIDGE AT MARLENE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal: Maintenance Costs $o Subtotal:$o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Engineering Construction 35,000 185,000 Total Estimated Capital Cost $220,000 PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % ADDITIONAL COMMENTS: t22 City of Euless Capital Project Request Department: Submitted By: PUBLIC WORKS RANDY BYERS 7-26-99 Project Title: Project Type: Project No.: HURRICANE CREEK, NORTH OF SH 1O DRAINAGE Sub-Type: Priority:c RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: ln 1990 the City commissioned and received a report from Knowlton, English & Flowers titled Drainage altility System Study of Selected Improvement Proiects. Conceptually shown on lhe Hurricane Creek Watershed Master Plan - PROJECT DESCRIPTION: This project involves channelizing and lining Hurricane Creek from the convergence of two tributaries to SH 1O and construction ofa detention pond. The project costs are broken into engineering and construction costs. JUSTIFICATION: SH 10 bridge and culvert does not convey the '100 year storm. Detention is needed and channel lining is needed to control erosion. 123 Date Prepared: Date Completed: PROJECTTITLE: HURRICANECREEK NORTH OF SH 1O PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR.) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Subtotal:$0 Maintenance Costs Subtotal:$o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Engineering Conslruction Total Estimated Capital Gost $4,590,000 PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx CURRENT STATUS: Conceptual Design % Preliminary Design o/o Final Plans % Specifications 7o Construction Yo ADDITIONAL COMMENTS: t24 220,000 4,370,000 Total Salary Purchase of Services Materials & Supplies Utilities $o Department: Submifted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7 -21-99 Project Title: Project Type: Project No.: KYN ETTE DRIVE CULVERT MODIFICATIONS DRAINAGE Sub-Type: Priority:c RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Wilshire Village Addition was constructed prior to the adoption of the City's Uniform Development Code. The requirements prior to the UDC were lower than what the City now requires. This causes more water to remain above ground. The drainage system in the Woodlands Addition needs to be upgraded to meet current requirements. PROJECT DESCRIPTION: A large amount of storm water drains to an existing culvert on Kynette between East Cliff and West Cliff drives. The existing drainage facilities collecting this storm water are inadequate. This project involves the installation of a small drainage system in Kynette up to Sierra. lt is Project No. 17 in the 1990 Knowlton, English & Flowers study. JUSTIFICATION: Excessive surface water flow and ponding. City of Euless Gapital Project Request t25 PROJECT TITLE: KYNETTE DRIVE CULVERT MODIFICATIONS PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR .) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal:$o Maintenance Costs Subtotal:$o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Engineering Construction 15,000 85,000 Total Estimated Capital Cost $100,000 PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications o/o Construction o/o ADDITIONAL COMMENTS: t26 Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Oate Completed: 7-21-99 Project Title: Project Type: Proiect No.: OAK LANE CHANNEL DRAINAGE Sub-Type: Priority:c RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Oakland Estates Addition was constructed prior to the adoption of the City's Uniform Development Code. The requirements prior to the UDC were lower than what the City now requires. PROJECT DESCRIPTION: This project includes significant drainage improvements in the Oakland Estates Addition. The project was also included in the 1990 Knowlton, English, Flowers study but has been expanded to include a concrete lined channel instead of an earthen channel. JUSTIFICATION: Excessive surface water flow and ponding City of Euless Gapital Project Request t27 PROJECT TITLE: OAK LANE CHANNEL PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Tame Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal: Maintenance Costs $o Subtotal $o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Engineering Construction s0,000 400,000 Total Estimated Capital Cost $450,000 PROPOSED METHOD OF FINANCE: xx CURRENT STATUS: Conceptual Design o/o Preliminary Design % Final Plans % Specifications o/o Construction o/o ADDITIONAL COMMENTS: 128 Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-21-99 Project Title: Project Type: Project No.: PRIEST DRIVE CULVERT AT WOODBURY FOREST DRAINAGE Sub-Type: Prlority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: This project involves the installation of a culvert under the extension of Priest Lane west from Tallow Drive to SH 12'1. This project can be reduced in scope or eliminated if Priest Lane does not get extended. There is a possibility the City would be required to perform some channelization work. " This pro.iect could be eliminated due to private development on Baze Property JUSTIFICATION: Excessive surface water flow and ponding. City of Euless Capital Project Request This project is No. 13 in the 1990 Knowlton, English & Flowers study. t29 PROJECT TITLE: PRIEST DRIVE CULVERT AT WOODBURY PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -} ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: Maintenance Costs $o Subtotal $o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Engineering Construction 21,000 100,000 Total Estimated Capital Cost $121 ,000 PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications o/o Construction % ADDITIONAL COMMENTS: 130 Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-26-99 Project Title: Project Type: Proiect No.: ROYAL OAKS ADDITION DRAINAGE Sub-Type: Priority:c RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The City's awareness of the need for this project came with the water seepage problems on Walnut Way west of North Main Street. PROJECT DESCRIPTION: This project involves the installation of a storm drainage system in the backyards of lots in the Royal Oaks Addition to alleviate problems associated with excessive lolto-lot drainage. JUSTIFICATION: Lot to lot drainage solutions often cost much more than individual homeowners can afford. City of Euless Gapital Project Request 131 PROJECT TITLE: ROYAL OAKS ADDITION PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR .) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services lvlaterials & Supplies Utilities Subtotal:$o Maintenance Costs Subtotal:$o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL GOST: Cost is yet to be determined Total Estimated Capital Cost So PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % ADDITIONAL COMMENTS; The cost of this project need to be reevaluated. t32 $o Gity of Euless Capita! Project Request Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-26-99 Project Title: Project Type: Project No,: TRAILWOOD ADDITION (SUMMIT RIDGE) DRAINAGE Sub-Type: Priority:c RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: This project involves the correction of a number of drainage problems and expansion of the existing drainage system. JUSTIFICATION: Drainage system does not meet current standards 133 ln 1990 the City commissioned and received a report from Knowlton, English & Flowers titled Drainage altility System Study of Selected lmprovement Projecrs. This project is the 6th project identified in this study PROJECT TITLE: TRAILWOOD ADDITION UMMIT RIDGE PROJECT #: TOTAL ESTIMATED CAPITAL GOST: Total Estimated Capital Cost $185,000 25,000 160,000 Engineering Construction NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Total Estimated Annual cost Subtotal $o $0 $o $o Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Direct Operating Cost Personnel: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % CURRENT STATUS: Operating Fund Fund Balance Certiflcate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx ADDITIONAL COMMENTS: t34 PROPOSED METHOD OF FINANCE: lLllLtssI llil Tf u srcf roud Ifllurs ofoNnJNn C ))) CAPITAL IMPROVEMENT PROGRAMS UNFUNDED PROJECTS - SORTED BY TYPE PROPOSED METHOD OF FINANCING lmpact Fees Escrow Funds Car Rental Tax Hotel / Motel EDC To Be DeterminedEstimated Cost Operating Fund CIP Fund Balance Bond Sale County, State, Federal Funds PriorityProiect Descriptlon STREET PROJECTS XX425,000$Gateway Blvd. - Southern Portion Sub-Total Street Prio tyA $425,000 XXB450,000$Fulle. wiser Connector o, xxB775,000$Town Crossing Bridge (a) XXB698.476$Glade Road Right-of-Way Acquisition (') XXB1,000,000$Pipeline Road Gas Line (3) XXB450,000$ XXB525.000$West Pipeline - Raider to City Limits Fr 3,898,476Sub-Total Steet Prioity B $ XXTBDcAsh Lane - Aransas to N. Main XXTBDcBaze Road - Glade to Mid-Cities XX1,000,000$Gateway Boulevard - Northern Portion xxTBDcHarwmd Road - Main to SH 157 XX1,500,000$cHeather and S. Pipeline XXTBDcHighway lngress-Egress XXc$450,000Hwy 10 Sidewalks and Lighting XXc1,068,000$S. Ector Drive xxc4,770,420$South Main - Hwy '10 to Pipeline XXcTBDVine St. - SH 183 to SH 10 a,744,420Sub-Total Street Prlorfiy C $ STREET PROJECTS - TOTAL $ 13,111,896 IIIII IIIIIIIIIIIIIIIITIII III II IIIIIIIIIIIIIIIIIIIIIIIIIIITIIIII IIIIII III II -IIIIIII A - Ftojecls that will be presented to Council dudng the upcoming year 8 - Proiecls that will be presented to Cruncll Mhin two to ive years. C - Proiodi thel will be pre3enled lo Council b€yond fv€ y6aG. Raider Drive - SH10 to South Pipeline{a) ttt = i-t-T------T----= I -rl Department: Submitted By: PUBLIC WORKS RON YOUNG Date Prepared: Date Completed: 5/31/0'l Project Title: Project Type: Project No.: GATEWAY BLVD .SOUTHERN PORTION STREET Sub-Type: CONSTRUCTION Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Gateway Blvd is identified in the Master Thoroughfare Plan as a four lane arterial roadway. Two private development projects (Centurion Apartments and Lakes of Little Bear) will install Gateway Blvd along their frontages from Mid-Cities Blvd to Centurion Way leaving approximately 1500 linear feet of the southbound 2 lanes not constructed. PROJECT DESCRIPTION: Construction of the west lanes (south bound) of Gateway Blvd from Mid-Cities Blvd north approximately '1500 feet. The roadway material will be concrete. Storm drainage is included. JUSTIFICATION: This will provide for the full pavement section on Gateway Blvd from Mid-Cities Blvd north to Centurion Way. Completion of this roadway will provide incentive for additional private development in the SH 12llGateway zoning district. City of Euless Capital Project Request L36 PROJECT TITLE: GATEWAY BLVD . SOUTHERN PORTION PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal $0 Maintenance Costs Subtotal:$o Total Estimated Annual Cost $o TOTAL ESTIMATED CAPITAL COST: Engineering Construction Right of Way (easement) Surveying 15,000 375,000 25,000 1 0,000 Total Estimated Capital Cost $425,000 PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund County, State, Federal Funding General Obligation Bonds Revenue bonds Certificate of Obligation Donations Supplemental Sales Tax Car Rental xxx CURRENT STATUS: 100Yo loooh 80% 8OYo ADDITIONAL COMMENTS: 137 Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-23-99 FULLER WISER CONNECTOR STREET BProNo.: Sub-Type: Pri Project Title: Project Type: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project is identified in the 1999 Master Thoroughfare Plan. Fuller-Wiser Road - Type DA and Type DC. Fuller-Wiser is a minor local arterial connection between SH 360 on the north and SH 183 on the south. This facility is presently constructed to a design standard of four la undivided in a 70 ft. right-of-way. The recommended ultimate design standard should be a four lane divid roadway in an 85 ft. right-of-way for the sections that are north of Mid-Cities Blvd. and south of Harwood Road PROJECT DESCRIPTION: JUSTIFICATION: Staff hopes to receive street escrow funds to assist in the construction of this project. City of Euless Gapital Project Request 138 PROJECT TITLE: FULLER WISER CONNECTOR PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR .) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal: Maintenance Costs $o Subtotal:$o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Construction 450,000 Total Estimated Capital Cost $450,000 PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligatioh County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined Car Rental Fund xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % ADDITIONAL COMMENTS: Staff is in the process of reevaluting the cost and schedule for this project. 139 City of Euless Capital Project Request Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-7-00 Project Title: Project Type: Project No.: TOWN CROSSING BRIDGE STREETS Sub-Type: Priority: CONSTRUCTION B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The bridge over Little Bear Creek is required in the City's Master Thoroughfare PIan PROJECT DESCRIPTION: lnfrastructure assistance through the construction of a four (4) lane bridge north of Cheek-Sparger Road (crossing Little Bear Creek). JUSTIFICATION: Financial assistance will be required for development of the portion of 121 Gateway district west of S.H. 121. Development will increase the City's ad valorem and sales tax revenues. 140 PROJECT #: NET EFFEGTS ON OPERATING AND MATNTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal:$0 Maintenance Costs $0 $0Total Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Engineering Construction 75,000 700,000 Total Estimated Capital Cost $775,000 PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx CURRENT STATUS: 0% 0% 0% 0Yo 0% ADDITIONAL COMMENTS: r41 PROJECT TITLE: TOWN CROSSING BRIDGE Subtotal: Conceptual Design % Preliminary Design o/" Final Plans % Specifications % Construction % Department: Submitted By: PUBLIC WORKS RANDY BYERS Project Title: Project Type: Project No.: GLADE RD RIGHT OF WAY ACQUISITION STREET Sub-Type: Priority: CONSTRUCTION B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Glade Road is identified as a minor arterial in the 1999 Master Thoroughfare PIan PROJECT DESCRIPTION: Glade Road is planned as an east-west thoroughfare having 4-lanes divided with an 85' right-of-way JUSTIFICATION: The need/priority for this roadway is dependent on development and the City of Grapevine's bond program schedule. Grapevine has requested our participation. The City currently has approximately $200,000 in street escrow funds for Glade Road. City of Euless Gapital Project Request 142 Date Prepared: 7-31-99 Date Completed: PROJECT TITLE: GLADE RD RIGHT OF WAY ACQUISITION NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatino Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal:$o Ivlaintenance Costs Subtotal:$0 Total Estimated Annual Cost $o TOTAL ESTIMATED CAPITAL COST: Right of Way 698,476 Total Estimated Capital Cost $698,476 PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction o/o ADDITIONAL COMMENTS: I43 PROJECT #: Department: Submitted By: PUBLIC WORKS RON YOUNG Date Prepared: 6129101 Date Completed: Project Title: Project Type: Project No.: W. PIPELINE ROAD GAS PIPELINE RELOCATION STREET Sub-Type: UTlLlry RELOCATION Priority:B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: West Pipeline Road is identified as an arterial in the Master Thoroughfare Plan and the portion of this roadway from SH 10 to Raider Drive was approved for construction as a part of the 1998 Bond Election. PROJECT DESGRIPTION: Remove and relocate a 16" gas pipeline (TXU Gas) that currently exists near the south edge of the existing asphalt roadway. The gas pipeline will be relocated by TXU Gas south near the existing south rightof-way line of W. Pipeline Road. JUSTIFICATION: The existing 16" gas pipeline is shallow (approximately 2' to 2 112") and is located approximately 25' north of the south right-of-way line. The proposed roadway cannot be constructed over the gas pipeline which pushes the roadway north causing excessive right-of-way acquisition in the City of Bedford. The relocation will allow the roadway to be positioned within the existing right-of-way in a more normal fashion and minimize the additional righlof way needs. Gity of Euless Capital Proiect Request 144 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal:$o Maintenance Costs Subtotal $o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Engineering Construction 1,000,000 Total Estimated Capital Cost $1 ,000,000 PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations Supplemental Sales Tax xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 01o OYo o% 0o/o 0% ADDITIONAL COMMENTS: 145 PROJECT TITLE: W. PIPELINE ROAD GAS PIPELINE RELOCATI( PROJECT #: Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-22-99 Project Title: Project Type: Project No.: RAIDER DRIVE, SH 1O TO SOUTH PIPELINE ROAD STREET Sub-Type: Priority:B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Raider Drive is identified as a minor arterial in need of upgrade in the 1999 Master Thoroughfare Plan PROJECT DESCRIPTION: Raider Drive - Type DA. Project will consist of widening and repairing Raider Drive from SH 10 to South Pipeline Road. Raider Drive is an important north-south connection between W. Pipeline Road and SH 10. The recommended ultimate design standard is four lanes divided in a right-of-way standard of 85 feet. ln the future, the City of Arlington may realign and extend Green Oaks Blvd. to connect with Raider instead of Westpark Way. Assuming there is mutual concurrence between Euless and Bedford officials with respect to the realigning of Raider and Central Drive, then it is recommended that the ultimate roadway design standard be a six-lane divided within a minimum rightof-way of 120 feet to match the Arlington design standard. JUSTIFICATION: See description. City of Euless Gapital Project Request r46 PROJECT TITLE: RAIDER DRIVE SH 10 TO SOUTH PIPELINE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR I ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal: Maintenance Costs $o Subtotal:$o Total Estimated Annual Cost $o TOTAL ESTIMATED CAPITAL COST: Engineering Construction Right of Way 35,000 315,000 100,000 Total Estimated capital Cost $450,000 PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certilicate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx Conceptual Design % Preliminary Design % Final Plans % Specifications % Construclion % ADDITIONAL COMMENTS: Txoot project to add one (1) roadway lane in each direction is currently scheduled to be awarded in May,2002 and to be completed in May, 2003, t47 CURRENT STATUS: Department: Submitted By: PUBLIC WORKS RON YOUNG Project Title: Project Type: Project No.: WEST PIPELINE - RAIDER TO CITY LIMITS STREET Sub-Type: CONSTRUCTION Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: West Pipeline Road is identified in the Master Thoroughfare Plan as an arterial roadway. This roadway maintenance project is related to the proposed '12" water main replacement project on West Pipeline Road. PROJECT DESCRIPTION: Provide spot repairs on the existing roadway subgrade, remove and replace deteriorated or damaged curb and gutter, mlll the outer edges of the roadway surface, adjust valve covers and manholes, provide asphalt overlay, and restripe centerline and lane lines. JUSTIFICATION: West Pipeline Road has been patched and repaired numerous times over the years. The proposed '12" water main replacement project will further cut the roadway increasing the need for this overlay project. This project will improve the riding surface and the appearance of the roadway. Gity of Euless Capital Project Request 148 Date Prepared: 6129101 Date Completed: PROJECT TITLE: WEST PIPELINE - RAIDER TO CITY LIMITS PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR.} ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: Maintenance Costs $o Subtotal:$o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Engineering Construction 39,000 486,000 Total Estimated Capital Cost $525,000 PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Special Project Fund Certiflcate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations Supplemental Sales Tax xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % Oo/o O%o 0v. OYo ADDITIONAL COMMENTS: r49 OYo City of Euless Gapital Project Request Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-22-99 Project Title: Project Type: Project No.: ASH LANE - ARANSAS TO N. MAIN STREET Sub-Type: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Project identified in 1999 Master Thoroughfare Plan. PROJECT DESCRIPTION: Ash Lane - Type DA and Type DC. Ash Lane is an important east-west connection between SH 360 and FM '157 (lndustrial Blvd.). The section east of Fuller-Wiser Road is presently constructed to its recommended ultimate design of four lanes divided. Recognizing the residential character of the adjacent surroundings, the recommended ultimate design standard for the section west of Fuller-Wiser is a four-lane undivided in a minimum righGof-way width of 76 feet. JUSTIFICATION: Existing roadway does not currently meet the four-lane section r50 I PROJECT TITLE: ASH LANE - ARANSAS TO N. MAIN PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR .) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal:$o Maintenance Costs Subtotal:$0 Total Estimated Annual Cost $0 TOTAL ESTIMATED CAPITAL COST: Cost yet to be determined. Total Estimated Capital Cost $0 PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx CURRENT STATUS: Conceptual Oesign % Preliminary Design % Final Plans % Specifications o/o Construction % ADDITIONAL COMMENTS: Staff needs to reevaluate cost estimate and proposed schedule for this project. 151 Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-22-99 Project Title: Project Type: Project No.: BAZE ROAD - GLADE TO MID CITIES STREET Sub-Type: Priority:c RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Project identified in '1999 Master Thoroughfare Plan. PROJECT DESCRIPTION: Baze Road - Type EC. Baze Road is an important north-south residential collector that is planned to connect Glade Road and Mid-Cities Blvd. This roadway exists as a four-lane divided roadway north of Glade Road in Grapevine. ln Euless, it is constructed partially as a 40 foot undivided roadway and as a 36 feet (two lanes) undivided roadway in a 60 foot right-of-way. The possible extension of Baze south of Anthony Drive to connect with Mid-Cities Blvd. is recommended only if future access to Baze from Mid-Cities is restricted through geometric design measures to prevent neighborhood "cutthrough" traffic. JUSTIFICATION: Vehicular traffic is currently forced to travel on residential streets to access Mid-Cities Gity of Euless Gapita! Project Request 152 PROJECT TITLEi BAZE ROAD - GLADE TO MID CITIES PROJECT #: NET EFFECTS ON OPERATING ANO MAINTENANCE COST (+ OR ' ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal:$o Maintenance Costs Subtotal $o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Cost yet to be determined. Total Estimated Capital Cost $o Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction Yo ADDITIONAL COMMENTS: Staff is in the process of reevaluating all unfunded street projects. City currently has approximately $300,000 in street escrow for this project. 153 PROPOSED METHOD OF FINANCE: Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7 -7-00 Project Title: Project Type: Project No.: GATEWAY BLVD . NORTHERN PORTION STREET sub-Type:CONSTRUCTION CPriority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project is required on the City's Master Thoroughfare Plan. PROJECT OESCRIPTION: Deslgn and construction of portions of Gateway Boulevard between Glade Road and Mid-Cities Boulevard east of S.H. 121 . JUSTIFICATION: There are likely to be portions of this proposed boulevard that will not be constructed with the development in the 121 Gateway district. City of Euless Capital Project Request t54 PROJECT TITLE: GATEWAY BLVD - NORTHERN PORTION PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR .) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time $o Subtotal:$0 Maintenance Costs Subtotal $o Total Estimated Annual Cost $o TOTAL ESTIMATED CAPITAL COST: Construction 1,000,000 Total Estimated Capital Cost $1,000,000 PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx CURRENT STATUS: Conceptual Design o/o Preliminary Oesign % Final Plans % Specifications % Construction Yo 0 ADDITIONAL COMMENTS: 155 Total Salary Purchase of Services Materials & Supplies Utilities City of Euless Gapital Project Request Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-22-99 Project Title: Project Type: ect No.: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: project identified in the 1999 Master Thoroughfare Plan. Project is being upgraded in NCTCOG'S 1999 Regional Thoroughfare Plan. PROJECT DESCRIPTION: Harwood Road - Type B and Type C. Harwood Road is a major east-west arterial roadway connecting Euless, Bedford, and Hurst with DFW Airport. ln Euless, Harwood exists as a four-lane divided roadway between Main Street and lndustrial Blvd., and as a two-lane undivided roadway east of Main Street. lt currently serves substantial commercial development in Bedford and Hurst, and Harwood will serve similar future development in Euless. The long-range impact of planned commercial and industrial development at DFW Airport is presently uncertain. Consequently, the recommended roadway design standard is six lanes divided. The right-of-way standard for the section east of Main Street is 120 feet. ln recognition ofthe limited existing right-of-way corridor available west of Main, the right-of-way for this section may be reduced. At locations approved by the City Engineer, a minimum width of 104 feet may be permitted. Both sections require a 6-lane boulevard streel section. JUSTIFICATION: See Project Description. The upgrade on the NCTCOG'S Regional Thoroughfare Plan may accelerate the need for this reconstruction. t56 HARWOOD ROAD - MAIN TO FM 157 STREET Sub-Type: Priority: C PROJECT TITLE: HARWOOD ROAD - MAIN TO FM 157 PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal $o Maintenance Costs Subtotal $o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Cost yet to be determined. Total Estimated Capital Cost $0 xx CURRENT STATUS: Conceptual Design % Preliminary Design o/o Final Plans % Specifications % Construction % ADDITIONAL COMMENTS: Staff needs to reevaluate the estimate and scheduling of this project. r5l Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined PROPOSED METHOD OF FINANCE: Department: Submitted By: Date Prepared: Date Completed: Project Title: Project Type: Project No.: HEATHER and S. PIPELINE STREET Sub-Type: Priority: CONSTRUCTION c RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Design and construction of roadway, drainage utility and aesthetic improvements south of S.H. 10. JUSTIFICATION: Stimulate redevelopment and beautify primary gateway to the Texas Star Sports Centre. City of Euless Gapital Project Request 158 PUBLIC WORKS RANDY BYERS 7 -7-00 PROJECT TITLE: HEATHER and S, PIPELINE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: Maintenance Costs $0 Subtotal:$o $0Total Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Construction 1,500,000 Total Estimated Capital Cost $1,500,000 PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certiflcate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx GURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 0% 0y" o% o% ADDITIONAL COMMENTS: 159 OYo Dspartment: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-26-99 Project Title: Project Type: Project No.: HIGHWAY INGRESS - EGRESS STREET Subtype: cPriority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Modification of entrance and exit ramps on SH 183 JUSTIFICATION: lmproved traffic flow. City of Euless Capital Project Request 160 PROJECT TITLE: HIGHWAY INGRESS - EGRESS PROJECT #: NET EFFECTS ON OPERATING ANO MAINTENANCE COST (+ OR.) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal: Maintenance Costs $o Subtotal:$o Total Estimated Annual Cost $o TOTAL ESTIMATED CAPITAL COST: Cost is yet to be determined. Total Estimated Capital Cost $o PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % ADDITIONAL COMMENTS: Staff needs to reevaluate the estimates and scheduling of this project. L6L Gity of Euless Capital Project Request Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7,)200 Project Title: Project Type: Project No.: HWY 1O SIDEWALKS AND LIGHTING STREET Sub-Type: Priority:c RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Per Council's request, the Engineering staff created conceptual drawings and preliminary cost estimates for the installation of sidewalks and lighting along SH 10. PROJECT DESCRIPTION: Project will consist of new sidewalks and street lighting along the entire stretch of Hwy 10. JUSTIFICATION: Corridor lighting can be improved. Sidewalks are missing in many areas along SH 10 where pedestrians currently travel. 162 PROJECT TITLE: HWY 10 SIDEWALKS AND LIGHTING PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR .) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time $o Subtotal:$0 Maintenance Costs $o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Hwy 10 Sidewalks & Lighting 450,000 Hwy 10 Sidewalks & Lighting $450,000 PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx CURRENT STATUS: Conceptual Design % Preliminary Design o/o Final Plans % Specifications % Construction % ADDITIONAL COMMENTS: 163 Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Gity of Euless Capital Project Request Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-22-99 Project Title: Project Type: Project No.: S. ECTOR DRIVE STREET Sub-Type: Priority:c RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Project identified in the 1999 Master Plan and was submitted as a TEA-21 project for federal participation in funding. PROJECT DESCRIPTION: South Ector is an important connection between SH 183 and SH 10. The ultimate des;gn standard is a four lane divided thoroughfare. JUSTIFICATION: See description. ' Priority dependant on receipt of Federal TEA-21 funding t64 PROJECTTITLE: S. ECTOR ORIVE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities So Subtotal:$0 Maintenance Costs Subtotal $o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Engineering Construction Right of Way Utility Relocation Landscaping 54,000 384,000 330,000 170,000 130,000 Total Estimated Capital Cost*$1,068,000 PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications o/o Construction % ADDITIONAL COMMENTS: * The estimated cost reflected above represents approximately 42o/o ol lne total cost of this project. The remaining 58% will be funded by TXDOT. 165 Department: Submitted By: Date Prepared: Date Gompleted: 7-22-99PUBLIC WORKS RANDY BYERS SOUTH MAIN - HWY 1O TO PIPELINE STREET Subtype: cProNo.:Prio Project Title: Project Type: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: project identified in 1999 Master Plan and submitted as a TEA-21 project for federal participation in funding. Main Street is a major north-south arterial connecting Euless to Grapevine and Arlington, with important li to SH 360, SH 183, Trinity boulevard and lH 30. The ultimate design standard is recommended to be six divided south of Harwood to the south City Limit. The right-of-way standard for the section south of SH 183 the south City Limit should be 120 feet. PROJECT DESCRIPTION: JUSTIFICATION: See description. ' Priority dependant on receipt of Federal TEA-21 funding. City of Euless Capital Project Request r66 PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR .) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal:$o Maintenance Costs Subtotal:$0 $o TOTAL ESTIMATED CAPITAL COST: Planning, Design and Engineering Construction Right of Way Utility Relocation Landscaping 211,820 2,648,600 510,000 900,000 500,000 Total Estimated Capital Cost*$4,770,420 PROPOSEO METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans 7o Specifications % Construction % ADDITIONAL COMMENTS: This project was discussed at the May 5, 1999 pre-council session. * The estimated cost reflected above represents approximalely 42o/o of the total cost of this project. The remaining 58% will be funded by TxDOT. t67 PROJECT TITLE: SOUTH MAIN - HWY 10 TO PIPELINE Total Estimated Annual Cost Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-23-99 Project Title: Project Type: VINE ST. - SH183 TO SHlO STREET Sub-Type: ect No.:Prio c RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Vine Street is not identifled in the 1999 Master Thoroughfare Plan. PROJECT DESCRIPTION: The City has received street escrow funds from several developments along Vine Street. When development is complete, it would be appropriate for the City to reconstruct the existing roadway' JUSTIFICATION: Street escrow funds are being deposited for use in reconstruction. 168 City of Euless Gapital Project Request PROJECT TITLE: VINE ST. - SH183 TO SHl0 PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatino Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplles Utilities $o Subtotal $o lvlaintenance Costs Subtotal $0 $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Cost yet to be determined Total Estimated Capital Cost s0 PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % ADDITIONAL COMMENTS: Staff will reevaluate the cost of this project. Street escrow will not cover the anticipated cost. r69 lJ srcfroud ufrvt llrsvi,l i II I ofoNnJNn )) {o ) CA.PITAL IMPROVEMENT PROGRAMS UNFUNOED PROJECTS - SORTED BY TYPE To Be Determined lmpact Fees Escrow Funds Ca. Rental Tax Hotel / Motel EDCCIP Fund Balance Bond Sale County, State, Federal Funds Estimated Cost Operating FundPriorityProject Description EWATER PROJECTS XXXX237,086$FY 2OO2 CDBG XX140,000$Line XX$20,000E. AlexanderLine 79,000$Paula LaneLine XX100,000$ramManhole Rehab 366,000$acementPark Main 942,086Sub-Total Wastewater $ xxXX252,000$FY 2OO3 CDBG XXXX211,000$FY 2OO4 CDBG XXXX272,OOO$FY 2OO5 CDBG XX157,000$XXFY 2006 CDBG $RLine Ector DriveLine B $Line B 65,000$l\rartin LaneLine B 66.000$Mccormick &Line Courts B $195 000LineSabrush B 80,000sher Ct.Short St. toLine XX425,000$BLittle Bear creek Collection Line F) 77,000$Sub-fotal Wastewater B XXc319,000$ XX156,000sE. FullerLine XXc52,000$Jean LaneLine XXC$ment, KoenLine XXc95,000$nt, Pebble CreekLine XX90,000$cDriveLinent EEEEEE IIIIrrr III III II r--EiltlrlirIIEI rI II II EIEIEIEIEIII EEEEEE A - Prciecls that will be presenled lo Council during the upcoming year a - Pmi6cts that will be presented to Council Mhin two to fve years. C - Pojecls lhal will be prcsented to Council beyond fivo yeafs. PROPOSED METHOO OF FINANCING XX xx162,000 292,OOO FY 2OO7 CDBG 225,OOO r-r-T--r -r------T----r-I ----r-----r -----T----r I I f----r--- T----r---_ ]----r---T I [---r---__lT---r--T-T l-----l--T--I-T--Tr I TT-r -l -----r--------r-- I t-r- tt f-T I If-T--T---r-r II ))) CAPITAL IMPROVEMENT PROGRAMS UNFUNDED PROJECTS . SORTED BY TYPE Project Description Priority Estimated Cost PROPOSED METHOD OF FINANCING Operating Fund CIP Fund Balance Bond Sale Coungl, State, Federal Funds lmpact Fees Escrow Funds Gar Rental Tax Hotel / Motel EDC To Be Determined Line Replacement, S. Sheppard Drive c $90,000 XX Line Replacement, W. Fuller c $70,000 XX Line Replacement, Windward Way c $80,000 xx Line Replacement, Wood Ridge Circle c $135,000 XX SH 183 Utility Relocation c TBD XX Sub-Total Wastewater Priority C $1,312,000 WASTEWATER PROJECTS . TOTAL $4,631,086 \t H A - Projects that will be presented to Council during the upcoming year B - Projecls that will be presented to Council wthin two to five years. C - Pro.iects that will be presented to Council beyond flve years. l:.i, Department: Submitted By: PUBLIC WORKS RON YOUNG Date Prepared: Date Completed: 5/24101 Project Title: Project Type: Project No.: FY 2OO2 CDBG WASTEWATER Sub-Type: Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: "A1y This funding is lhe p(h year project administered by Tarrant Co deteriorating wastew'ater mains in the Midway Park area. .trrli.I I,,' .ll 1[,\n'r"' \ unty. This project addresses aging and PROJECT DESCRIPTION: Oesign and construction of wastewater mains in the southeast portion of the Midway Park Addition JUSTIFICATION: Wastewater mains in the Midway Park area have deteriorated as they have aged and they need to be replaced. City of Euless Capital Project Request L72 I I I I ! I I I I I PROJECT TITLE: FY 2002 CDBG PROJECT #: NET EFFECTS ON OPERATING AND MATNTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:FullTime Part Time TotalSalary Purchase of Services Materials & Supplies Utilities $0 Subtotal $0 Maintenance Costs Subtotal:$o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL GOST: Engineering Construction 15,000 337,086 Tarrant County CDBG Contribution (estimated) (1 15,000) Total Estimated Capita! Cost $237,086 PROPOSED METHOD OF FINANCE Current Revenue CIP Fund Balance Special Project Fund County, State, Federal Funding General Obligation Bonds Revenue bonds Certificate of Obligation Donations Supplemental Sales Tax xx xx xx CURRENT STATUS: ConceptualDesign % Preliminary Design % Final Plans % Specifications % Construction % 100Yo ADDITIONAL COMMENTS Lines to be replaced: 1. Between Himes and Limestone/Midway Drive from Lee to Midway Drive 2. Midway Drive from Limestone to Himes. 3. Himes Drive along and east rear lot lines. 4. Through Midway Park from Midway Drive north to Blessing Branch. t73 ' ' t. PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed 7-1 0-00Department: ubmitted By: LINE REPLACEMENT, DUNAWAY WASTEWATER Sub-Type: Project Title: No APrio RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. I ! I I t i I I ! : Replace sanitary sewer lines on Dunaway - E. Alexander to Ascot. PROJECT DESCRIPTION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. JUSTIFIGATION: City of Euless Capital Project Request - Unfunded 174 i I 1 l,I i I I I 'l 1 i i i ,j i ; PROJECTTITLE: LINEREPLACEMENT,DUNAWAY PROJECT #; NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal:$o Maintenance Costs Subtotal:$o Total Estimated Annual Cost $o TOTAL ESTIMATED CAPITAL COST Sewer Line Replacement 140,000 I Total Estimated Capital Cost $140,000 xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % ADDITIONAL COMMENTS: 175 PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determine Dspartment: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepar6d: Date Completed: 7-'10-00 Project Title: Type: Project No.: LINE REPLACEMENT, E. ALEXANDER WASTEWATER Sub.Type: Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst flrst approach PROJECT DESCRIPTION: Replace sanitary sewer lines on E. Alexander Dr. from creek to Dunaway Dr JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. Gity of Euless Gapital Project Request - Unfunded t76 i I i I i I ! i i l I I I I I I I I I ! PROJECTTITLE: LINEREPLACEMENT E. ALEXANDER PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR, ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal:$0 lvlaintenance Costs Subtotal:$o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Sewer Line Replacement 20,000 Total Estimated Capital Cost $20,000 PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund Certiflcate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determine xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans o/o Specifications % Construction % ADDITIONAL COMMENTS: L77 Oepartment: Submitted By: PUBLIC WORK RANDY BYERS Date Prepared: Date Completed: 7-'10-00 Project Title: Type: Project No.: LINE REPLACEMENT, PAULA LANE WASTEWATER Sub-Type: Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst flrst approach PROJECT DESCRIPTION: Replace sanitary sewer lines on Paula Lane - Needles to W. Pipeline JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with inflltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. City of Euless Gapital Project Request - Unfunded 178 I I 1 ! I I : ! I t I I I I I l ] l PROJECTTITLE: LINEREPLACEMENT PAULA LANE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal $0 Maintenance Costs Subtotal $o Total Estimated Annual Cost $o TOTAL ESTIMATED CAPITAL COST Sewer Line Replacement 79,000 Total Estimated Capital Cost $79,000 Current Revenue Reserve Fund Special Pro.iect Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % ADDITIONAL COMMENTS: PROPOSED METHOD OF FINANCE: t79 Dopartment: Submifted By: WASTEWATER RANDY BYERS Date Prepared: Date Completed: 6-21-00 Project Title: Project Type: Project No,: MANHOLE REHAB. PROGRAM WASTEWATER Sub-Type: Priority:A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Rehabilitation of all City wastewater manholes that are in need. JUSTIFICATION: Many brick manholes in our wastewater collection are in disrepair and are allowing a great deal of l&1. This program provides for repair of these manholes which in turn reduces l&l and expenses asociated with treating rainwater & groundwater. City of Euless Capital Project Request 180 I I I i I I i I i PROJEGT TITLE: MANHOLE REHAB. PROGRAM PROJECT #: NET EFFECTS ON OPERATING AND MATNTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:FullTime Part Time TotalSalary Purchase of Services Materials & Supplies Utilities $0 Subtotal $0 Maintenance Costs $o $0otal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST Replacement 100,000 Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate. of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % o% a% OYo 0o/o 0% I ADDIT!ONAL COMMENTS: This project is anticipated to be a three year project. lt is anticipated that the project will proceed through FY 2001, FY 2002, FY 2003 and be completed in FY 2004. 181 Subtotal: $1oo,ooo City of Euless Gapital Project Request Department: Submitted By: PUBLIC WORKS RON YOUNG Date Prepared: Date Completed: 5/25101 Project Title: Project Type: Project No.: MTDWAY PARK - MAINS WASTEWATER Sub-Type: Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project is a companion project to the FY 2002 CDBG project and is a continuation of the wastewater main replacements R*o***,il pWW PROJECT DESGRIPTION: Design and construction of wastewater mains in the southeast portion of the Midway Park Addition JUSTIFICATION: Wastewater mains in the Midway Park area have deteriorated as they have aged and they need to be replaced. t82 I I I I I I I ! .i PROJECT TITLE: MIDWAY PARK - MAINS PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANGE COST (+ OR .) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal $o Maintenance Costs Subtotal $0 Total Estimated Annual Cost $o TOTAL ESTIMATED CAPITAL COST: Engineering Construction 16,000 350,000 Total Estimated Capital Cost e 366 00 0 PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund County, State, Federal Funding General Obligation Bonds Revenue bonds Certificate of Obligation Donations Supplemental Sales Tax xx CURRENT STATUS: Conceptual Design % Preliminary Design 7o Final Plans % Specifications % Construction o/o 100% ADDITIONAL COMMENTS: Lines to be replaced: 1 . Limestone Drive along south and east rear lot lines. 2. Between Freestme and Limestone from Midway South. 3. Outfall main from Limestone south. 4. Between Milan and Freestone south of Midway Drive. r83 Dopartment: Submitted By: PUBLIC WORKS RON YOUNG Date Prepared: Date Completed: 6/08/01 Project Title: Project Type: Proiect No.: FY 2OO3 CDBG WASTEWATER Sub-Type: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: ^*pThis funding is the ffi year project administered by Tarrant County. This project addresses the aging and deteriorating wastewater mains in the Midway Park area and is related to the 26th year CDBG project. PROJECT DESCRIPTION: Design and construction of wastewater mains in the central portion of the Midway Park Addition JUSTIFICATION: Wastewater mains in the Midway Park area have deteriorated as they have aged and they need to be replaced. City of Euless Capital Project Request 184 I I i I I I i i I I PROJECT TITLE: FY 2OO3 CDBG PROJECT #: NET EFFECTS ON OPERATING AND MATNTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:FullTime Part Time TotalSalary Purchase of Services Materials & Supplies Utilities $o Subtotal $o Maintenance Costs Subtotal $o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST Engineering Construction 26,000 331,000 Tarrant County CDBG Contribution (estimated)(105,000) Total Estimated Capital Cost $252,000' PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund County, State, Federal Funding General Obligation Bonds Revenue bonds Certificate of Obligation Donations Supplemental Sales Tax xx xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Speciflcations % Construction % 100% 0o/o OYo 0o/o lYo ADDITIONAL COMMENTS Itr Lines to M w N1.) Between 2.) Between Denton Drive sr $b ns Harris from Harwood to Blessing Branch Outfall 3. 4. 5. Between Bell Dallas from Dallas to Main Line lrion from Harwood to DallasBetween Between & Denton from Harwood to Dallas \ 185 , , -.1. Department: Submitted By: PUBLIC WORKS RON YOUNG Date Prepared: Date Completed: 5125101 Project Title: Project Type Project No.: FY 2OO4 CDBG WASTEWATER Sub-Type: Priority: B RELATIONSHIP TO OTHER PROJEGTS AND/OR MASTER PLAN: : This funding is the 28th year project administered by Tarrant County. This project addresses aging and deteriorating wastewater mains along south side of State Highway 10 and adjacent to Carr Park. ! ,l I I I i i I I ns along south side of State Highway 10 from Martha west to Carr PROJECT DESCRIPTION: Design and construction of wastewater mai Park and along the north side of Carr Park. Wastewater mains in the vicinity of State Highway '10 have deteriorated as they have aged and they need to be replaced. ON:JUSTIF City of Euless Gapital Project Request 186 i I I i PROJECT TITLE: FY 2OO4 CDBG PROJEGT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:FullTime Part Time TotalSalary Purchase of Services Materials & Supplies Utilities $o Subtotal:$o Maintenance Costs Subtotal:$o $ootal Estimated Annual Gost TOTAL ESTIMATED CAPITAL COST: Engineering Construction 16,000 300,000 Tarrant County CDBG Contribution (estimated) (105,000) Total Estimated Capital Cost 1 ,000 PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund County, State, Federal Funding General Obligation Bonds Revenue bonds Certifi cate of Obligation Donations Supplemental Sales Tax xx xx Conceptual Design % Preliminary Design % _ Final Plans % Specifications %' Construction % ADDITIONAL COMMENTS: Lines to be replaced: 1. Along south side of State Highway 10 from Martha to Simmons. 2. Simmons Drive from State Highway 10 to the north side of Carr Park 3. Along the north side of Carr Park. t- 187 $21 CURRENT STATUS: 100% Department: Submitted By: PUBLIC WORKS RON YOUNG Date Prepared: Date Completed: 5l25lo1 Project Title: Project Type Project No.: FY 2OO5 CDBG WASTEWATER Sub-Type: Priority: B RELATIONSHTP TO OTHER PROJECTS AND/OR MASTER PLAN This funding is the 29th year project administered by Tarrant County. This project addresses aging and deteriorating wastewater mains in the Arnett Addition. PROJEGT DESCRIPTION: Design and construction of wastewater mains in the northern portion of the Arnett Addition. JUST!FICATION: Wastewater mains in the Arnett Addition have deteriorated as they have aged and they need to be replaced Gity of Euless Gapital Project Request 188 PROJECT TITLE: FY 2005 CDBG PROJEGT #: NET EFFECTS ON OPERATING AND MATNTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:FullTime Part Time TotalSalary Purchase of Services Materials & Supplies Utilities $o Subtotal:$o Maintenance Costs Subtotal $o $0Total Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Engineering Construction 17,000 360,000 Tarrant County CDBG Contribution (estimated) (105,000) Total Estimated Gapital Cost $272,000 PROPOSED METHOD OF FINANGE: Current Revenue Reserve Fund . Special Project Fund County, State, Federal Funding General Obligation Bonds Revenue bonds Certificate of Obligation Donations Supplemental Sales Tax XX xx GURRENT STATUS Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 100Yo ADDITIONAL GOMMENTS: Lines to be replaced: 1. Ross Avenue and north of Ross Avenue. 2. Between Ross and West Alexander. 3. Between Arnett and West Alexander. 4. Between Linda Lane and Arnett. 5. Linda Lane. 189 Gity of Euless Gapital Project Request Department: Submitted By: PUBLIC WORKS RON YOUNG Date Prepared: Date Completed: 5125101 Project Title: Project Type: Project No.: FY 2006 CDBG WASTEWATER Sub-Type: Prig11lyi E RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: I It i I ! is funding is the 30th year project admini wastewater mains in the by Tarrant County. This project addresses aging of Midway Park. PROJECT DESCRIPTION: Design and construction of wastewater mains in the southern portion of Midway Park Wastewater mains in the Midway Park Addition have deteriorated as they have aged and they need to be replaced. JUSTIFICATION: r90 I PROJECTTITLE: FY 2006 CDBG PROJECT #: NET EFFECTS ON OPERATING AND MATNTENANCE COST (+ OR .) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal $o l\4aintenance Costs $o Total Estimated Annual Cost $o TOTAL ESTIMATEO CAPITAL GOST: Engineering Construction 17,000 245,000 Tarrant County CDBG Contribution (estimated) (105,000) Total Estimated Capital Cost $ 157,000 PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund County, State, Federal Funding General Obligation Bonds Revenue bonds Certificate of Obligation Donations Supplemental Sales Tax xx xx CURRENT STATUS: Conceptual Design o/o Preliminary Design % Final Plans % Specifications % Construction % 100vo ADDITIONAL COMMENTS: Lines to be replaced: 1 . Between Ector and Aransas south of Midway Drive. 2. Between Aransas and Stonewall south of Midway Drive 3. Between Stonewall and Milam south of Midway Drive. 191 Subtotal: Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-10-00 Project Title: Type: Project No.: LINE REPLACEMENT, CANYON RIDGE WASTEWATER Sub-Type: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN; Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Replace sanitary sewer line on Canyon Ridge JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with inflltration and inflow. Systematic replacement will prevenl a mandatory wide spread replacement. City of Euless Capital Project Request - Unfunded 192 l ! I I I I I I i i I I I I i PROJECT TITLE: LINE REPLACEMENT CANYON RIDGE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:FullTime Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal $o Maintenance Costs Subtotal $o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST Sewer Line Replacement 162,000 Total Estimated Capital Gost $1 62 ,000 PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund Certifi cate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined xx CURRENT STATUS Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % ADDITIONAL COMMENTS: 193 i i i Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-10-00 Project Title: Tvpe: Project No.: LINE REPLACEMENT, ECTOR DRIVE WASTEWATER Sub-Type: Priority:B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. PROJECT DESCRIPTION: Replace sanitary sewer lines on east and west sides of Ector Drive from Harwood to end of lines. JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. Gity of Euless Capital Project Request - Unfunded t94 i I I PROJECT TITLE: LINE REPLACEMENT, ECTOR DRIVE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL Direct Operating Cost Personnel: Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal:$o Maintenance Costs Subtotal $o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST Sewer Line Replacement 200,000 Total Estimated Capital Cost $200,000 PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund Certifi cate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined CURRENT STATUS: Conceptual Design % Preliminary Oesign % Final Plans % Specifications % Construction % AODITIONAL COMMENTS: 195 i I I I Full Time Part Time xx Department: Submitted By: PUBLIC WORKS RANDY BYERS Dato Prepared: Date Completed: 7-10-00 Project Title: Type: Project No.: LINE REPLACEMENT, FAYETTE DRIVE WASTEWATER Sub-Type: Priority:B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach PROJECT DESCRIPTION: Replace sanitary sewer lines on east and west sides of Fayette Drive JUSTIFICATION: Many sanitary sewer lines lhroughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. City of Euless Capital Project Request - Unfunded t96 I I I I I I I i 161 : slNt ht htoS -IVNotIoov % uollcnrlsuoc o/o suo[ecrJrcads % sueld lBuu % u6!sao IJEurturlaJd % uOrsao lenldaouoC -+- :SNIVIS INSUUNC xx peuturalao a8 01 suolleuoo spuoq enua^ou spuoS uorleorlqo lerouee 6urpun4 laapel 'alels 'r(lunoC uotle6rlqo lo alecutuoc punl lcalord lelcadS punJ aruasou onua^au lualJnc :3CNVNH JO OOHrf 1/\t OSSOdOUd 0 i 00 Z6Z s lso3 tel!deC paleu!ls3 lelol luaueceldeg our"l ra^,\as :J_SO3 tVJ_tdVC O3t-V!1t1S3 "tvl-Ot- 000'z6z 0$ 0$ lsoc lPnuuv polEur!ls3 Ielol :lelolqns slsoar65ueu6fu]trw 0$:telolqns 0$ se[!t!ln sarlddnS I sleualel\ secltuas Jo aseq3Jnd tuelBS lelol aurf l.red ou.lrl llnl :lauuostad I5ot6ullEr6d-oTr6rKI :..IVNNNV (- UO +) -LSOC 33NVN3J-NIVY! oNV eNtlVU3dO NO SlC3llS -Lf N :# rcf roud Snruo frr-f,l.vi '.].Nf yllf c\fldf u =Nt"l :3'IIt1 Icf toud Department: Submltted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-10-00 Project Title: Type: Project No.: LINE REPLACEMENT, MARTIN LANE WASTEWATER Sub-Type: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach I I PROJECT DESCRIPTION: Replace sanitary sewer line on Martin Lane. JUSTIFICATION: Many sanitary sewer Iines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulflde gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. 198 I I I I Gity of Euless Gapital Project Request - Unfunded PROJECT TITLE: LINE REPLACEMENT MARTIN LANE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:FullTime Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal:$o Maintenance Costs Subtotal:$o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST Sewer Line Replacement 65,000 Total Estimated Capital Cost $65,000 PROPOSED METHOD OF FINANGE: Current Revenue Reserve Fund Special Project Fund Certificate of Obl igation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined xx CURRENT STATUS Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % ADDITIONAL COMMENTS: 199 t Gity of Euless Gapital Project Request - Unfunded Department: Submitted By: Date Prepared: 7-10-00 Date Completed: Project Title: Type: Project No.: LINE REPLACEMENT, McCORMICK WASTEWATER Sub-Type: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst flrst approach PROJECT DESGRIPTION: Replace sanitary sewer line servicing McCormick and Copher Courts JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subJect to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often innundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. t 200 PUBLIC WORKS RANDY BYERS I I I I i I 1 I 1 PROJECT TITLE: LINE REPLACEMENT McCORMICK PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ oR -)ANNUAL: Direct Operating Cost Personnel:FullTime Part Time TotalSalary Purchase of Services Materials & Supplies Utilities $o Subtotal $0 Maintenance Costs Subtotal $o $0Total Estimated Annual Gost TOTAL ESTIMATED CAPITAL COST: Sewer Line Replacement 66,000 i I Total Estimated Capital Cost $66 ,000 PROPOSED METHOD OF FINANCE Current Revenue Reserve Fund Special Project Fund Certifi cate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined xx I Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % ADDITIONAL GOMMENTS: 20t CURRENT STATUS: Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Gompleted: 7-10-00 Project Title: Type: Project No.: LINE REPLACEMENT, SAGEBRUSH WASTEWATER Sub-Type: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach Replace sanitary sewer lines on the north and south sides of Sagebrush Trail. PROJEGT DESCRIPTION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. JUSTIFICATION Gity of Euless Capital Project Request - Unfunded 202 : l- PROJECT TITLE: LINE REPLACEMENT SAGEBRUSH PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR.) ANNUAL Direct Operating Cost Personnel:FullTime Part Time Total Salary Purchase of Services Materials & SupPlies Utilities $o Subtotal: Maintenance Costs $o Subtotal:$o $ootal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Sewer Line Replacement 195,000 Total Estimated Capital Cost $195,000 PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % ADDITIONAL COMMENTS 203 Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: 7-10-00 Date Gompleted: Project Title: Type: Proiect No.: LINE REPLACEMENT, SHORT ST. WASTEWATER Sub-Type: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach I r I : Replace sanitary sewer lines - 8" outfall - Short St. to Copher Ct. PROJECT DESGRIPTION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. JUSTIFICAT!ON: City of Euless Capital Project Request - Unfunded 204 i i i i I i I i , i II i i : : PROJECTTITLE: LINEREPLACEMENT SHORT ST PROJECT #: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal: Maintenance Costs $0 Subtotal $o $0Total Estimated Annual Cost TOTAL ESTII\4ATED CAPITAL COST Sewer Line Replacement 80,000 Total Estimated capital cost $80 00 0 PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % ADDITIONAL COMMENTS: 205 NET EFFECTS ON OPERATING ANDI MAINTENANCE COST (+ OR .) ANNUAL: Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7 -26-99 Project Title: Project Type: Proiect No.: LITTLE BEAR CREEK COLLECTION LINE WASTEWATER Sub-Type: Priority:B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Project identified as necessary in the Wastewater lmpact Fee Map. PROJECT DESCRIPTION: i Design and construction of the Little Bear Creek Major Collection Line identified in the 1999 Wastewater lmpact Fee Review. JUSTIFICATION: Existing wastewater main does not have adequate capacity to serve future groMh in the basin. lmpact fee funds are currently available to fund this project. Gity of Euless Capital Project Request I I I ' 206 PROJECT TITLE: LITTLE BEAR CREEK COLLECTION LINE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal $o Maintenance Costs Subtotal $o $oTotal Estimated Annual Cost TOTAL ESTIMATED GAPITAL COST: Engineering Construction Right of Way 75,000 300,000 50,000 Total Estimated Capital Cost $425, i : 000 PROPOSED METHOD OF FINANCE: xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % ADDITIONAL COMMENTS: 207 Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined Department: Submitted By: PUBLIC WORKS RON YOUNG Date Prepared: oate Completed: 5/25101 Project Title: Project Type: Project No.: FY 2OO7 CDBG WASTEWATER Sub-Type: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This funding is the 31th year project administered by Tarrant County. This project addresses aging and deteriorating waslewater mains in the Cedar Hill Estates area and is a continuation of previous CDBG projects. I PROJECT DESCRIPTION: Design and construction of wastewater mains in the Cedar Hill Estates Addition. JUSTIFICATION: Wastewater mains in the Cedar Hill Estates Addition area have deteriorated as they have aged and they need to be replaced. Gity of Euless Capital Project Request I I i I l 208 PROJEGT TITLE: FY 2OO7 CDBG PROJECT #: NET EFFECTS ON OPERATING AND MATNTENANCE COST (+ OR ) ANNUAL: Direct Operating Cost Personnel:FullTime Part Time TotalSalary Purchase of Services Materials & SuPPlies Utilities $o Subtotal:$o Subtotal $o $0Total Estimated Annual Gost TOTAL ESTIMATED CAPITAL COST: Engineering Construction 17,000 407,000 Tarrant County CDBG Contribution (estimated) (105,000) Total Estimated Capital Cost $319,000 PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund County, State, Federal Funding General Obligation Bonds Revenue bonds Certificate of Obligation Donations Supplemental Sales Tax xx xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 1O0o/o ADDITIONAL COMMENTS: Lines to be replaced: 1. Between Oakwood and Vine north of Whitener 2. Broadway from Sunset to Hollywood. 3. Hollywood from Broadway to South Main. 4. Henslee from Sunset to Hollywood. 5. Sunset from Broadway to South Main. 209 t, Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-10-00 Project Title: Type: Project No.: LINE REPLACEMENT, E. FULLER WASTEWATER Sub-Type: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Systematic replacement of sanrtary sewer lines in drainage basin areas using a worst flrst approach PROJECT DESCRIPTION: l Replace sanitary sewer line on E. Fuller Dr. - north and south sides. JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. Gity of Euless Gapita! Project Request - Unfunded 210 I I I I I I I I PROJECTTITLE: LINEREPLACEMENT E. FULLER PROJECT #: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal:$o Maintenance Costs Subtotal:$0 $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST Sewer Line Replacement 156,000 Total Estimated Gapital Cost $1 56 000 PROPOSEO METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications o/o Construction o/o ADDITIONAL COMMENTS: 2TI NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR.) ANNUAL: Department: Submltted By: PUBLIC WORKS RANDY BYERS Date Pr€pared: Date Completed: 7-10-00 Project Title: Type: Project No.: LINE REPLACEMENT, JEAN LANE WASTEWATER Sub-Type: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach PROJECT DESCRIPTION: Replace sanitary sewer lines on Jean Lane. JUSTIFICATION: Many sanitary sewer Iines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. 2r2 I I i I I i City of Euless Capital Project Request - Unfunded PROJECTTITLE: LINEREPLACEMENT JEAN LANE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR ) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal $0 Maintenance Costs Subtotal:$o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Sewer Line Replacement Total Estimated Capital Cost $52,000 PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Pro.iect Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined xx Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction o/o ADDITIONAL COMMENTS: 2L3 52,000 CURRENT STATUS: Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-1 0-00 Project Title: Type: Project No.: LINE REPLACEMENT, KOEN WASTEWATER Sub-Type: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst flrst approach PROJECT DESCRIPTION: Replace sanitary sewer line 'l2" from Koen to S. Pipeline. : I I i I I I i ! I I I ! t i I i I : : JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. City of Euless Capital Project Request - Unfunded 214 I t a I I II I I I I ; PROJECTTITLE: LINEREPLACEMENT KOEN PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR .) ANNUAL Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o $0 Subtotal $0 $0Total Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Sewer Line Replacement 225,000 Total Estimated Capital Cost $?2 5,0 : 00 PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Speciflcations % Construction % ...........-.... ADDITIONAL COMMENTS: 2t5 Subtotal: Maintenance Costs PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-10-00 Project Title: Type: Project No.: LINE REPLACEMENT, PEBBLE CREEK WASTEWATER Sub-Type: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach PROJECT DESCRIPTION: Replace sanitary sewer lines on Pebble Creek from Woodvine to Wood Ridge. JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most ofthe lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulflde gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. City of Euless Capital Project Request - Unfunded 216 Department: Submitted By: I : I ll i ! I PROJECTTITLE: LINEREPLACEMENT PEBBLE CREEK PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR.) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal:$0 Maintenance Costs Subtotal $o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST Sewer Line Replacement 95,000 Total Estimated capital Cost $s5 000 PROPOSED METHOD OF FINANCE: Current Revenue Reserve FUM Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % ADDITIONAL COMMENTS: 2t7 I Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-10-00 Project Title: Type: Project No.: LINE REPLACEMENT, RIDGECREST WASTEWATER Sub-Type: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach PROJECT DESCRIPTION: Replace sanitary sewer lines on Ridgecrest Drive. JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. City of Euless Capital Project Request - Unfunded 218 I i Ii I I ! I : PROJECTTITLE: LINEREPLACEMENT RIDGECREST PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal:$o Maintenance Costs Subtotal $o Total Estimated A.nnual Gost $o TOTAL ESTIMATED CAPITAL COST: Sewer Line Replacement 90,000 Total Estimated Capital Cost $90,000 PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction o/o ADDITIONAL COMMENTS: ?t9 D6partment: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-10-00 Project Title: Type: Project No.: LINE REPLACEMENT, S. SHEPPARD WASTEWATER Sub-Type: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Systematic replacement of sanitary sewer Iines in drainage basin areas using a worst first approach PROJECT DESCRIPTION: Replace sanitary sewer lines on S. Sheppard Dr JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulflde gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. City of Euless Gapita! Project Request - Unfunded 220 ! PROJECTTITLE: LINEREPLACEMENT S. SHEPPARD PROJEGT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL Direct Operating Cost Personnel:Full Time Part Time $o Subtotal $0 Maintenance Costs $o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Sewer Line Replacement 90,000 Total Estimated Gapital Cost $90,000 PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Pro,iect Fund Certiflcate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined xx CURRENT STATUS: ADDITIONAL COMMENTS: 22L Subtotal: Total Salary Purchase of Services Materials & Supplies Utilities Conceptual Design o/o Preliminary Design % Final Plans % Specifications % Construction % Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-10-00 Project Title: Tvpe; Project No.: LINE REPLACEMENT, W. FULLER WASTEWATER Sub-Type: Priority: C RELATIONSHIP TO OTHER PROJECTS ANDiOR MASTER PLAN: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst flrst approach PROJECT DESCRIPTION: Replace sanitary sewer lines on W. Fuller Drive JUSTIFICATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. City of Euless Capital Project Request - Unfunded 222 i I l I i ! I ! i PROJECT TITLE: LINE REPLACEMENT W. FULLER PROJECT #: NET EFFECTS ON OPERATING ANDI MAINTENANCE COST (* OR -) ANNUAL: Direct Operating Cost Personnel:FullTime Part Time TotalSalary Purchase of Services Materials & Supplies Utilities $o Subtotal $o Maintenance Costs Subtotal:$o $0Total Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST Sewer Line Replacement 70,000 Total Estimated Capital Cost $70,000 PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined xx CURRENT STATUS Conceptual Design % Preliminary Design % FinalPlans % Specifications % Construction % ADDITIONAL COMMENTS: 223 : t I I I i t I I I Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Gompleted: 7-10-00 Project Title Type: Project No.: LINE REPLACEMENT, WINDWARD WAY Sub-Type: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach PROJECT DESGRIPTION: Replace sanitary sewer lines on Windward Way. JUSTIFIGAT!ON: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. 224 I i I : Gity of Euless Gapital Project Request - Unfunded PROJECTTITLE: LINEREPLACEMENT WINDWARD WAY PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OP -1 4xxgot' Direct Operatino Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal:$o Maintenance Costs Subtotal $o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Sewer Line Replacement 80,000 Total Estimated Gapital Cost $80,000 PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined xx Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction o/o ADDITIONAL COMMENTS: 225 CURRENT STATUS: City of Euless Capital Project Request - Unfunded Department: Submitted By: PUBLIC WORKS RANDY BYERS 7-10-00 Project Title Type: Project No.: LINE REPLACEMENT, WOODRIDGE WASTEWATER Sub-Type: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach PROJECT DESCRIPTION: Replace sanitary sewer lines on Wood Ridge Circle. JUSTIFIGATION: Many sanitary sewer lines throughout the city are 40+ years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to Hydrogen Sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Systematic replacement will prevent a mandatory wide spread replacement. 226 Date Prepared: Date Completed: I I I I I .i I t I I I I i I! I i I I ! : PROJECTTITLE: LINEREPLACEMENT WOODRIDGE PROJEGT #: NET EFFECTS ON OPERATING ANDI MATNTENANCE COST (+ Op -1 4XXg1r' Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal:$0 Maintenance Costs $o $o TOTAL ESTIMATED CAPITAL COST: Sewer Line Replacement 135,000 Total Estimated Capital Cost $135,000 PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations Supplemental Sales Tax To Be Determined xx CURRENT STATUS: l Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % ADDITIONAL COMMENTS: 227 Subtotal: Total Estimated Annual Cost Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7 -21-00 Project Title: Project Type: Proiect No.: SH 183 WASTEWATER Sub-Type: RELOCATION Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: TXDOT plans to widen SH183 within the next ten years PRoJEGT DESGRIPTION: I I The City has a number of wastewater mains that might require relocation. The scope of the work is unknown'at this time. l : I I ii I i I i I I JUSTIFICATION: Required where conflicts will occur with TxDOT's highway project. City of Euless Gapital Project Request 228 .. I I I PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal: Maintensnce Costs $0 Subtotal:$o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL GOST: Cost yet to be determined Total Estimated Capital Cost $o PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans 7o Speciflcations % Construction % 0% 0% 0Yo 0% 0% ADDITIONAL COMMENTS: The scope of work will be determined as TXDOT completes the highway reconstruction plans. 229 PROJECTTITLE: SH 183 Y srcf roud uflvtt oroNnJNn C ))) l.')(,o CAPITAL IMPROVEMENT PROGRAMS UNFUNDED PROJECTS . SORTED BY TYPE Project Description Priority Estimated Cost PROPOSED METHOD OF FINANC]NG Operating Fund CIP Fund Balance Bond Sale County, State, Federal Funds lmpact Fees Escrow Funds Car Rental Tax Hotel / Motel EDC To Be Determined WATER PROJECTS Disinfection Modification llVell Rehabilitation A $600,000 XX Efnuent Water Main A $250,000 XX Sub-Total Water Priority A $850,000 Hwy 360 Water Crossing It B $300,000 XX Rehab Central Dr. Water Storage tr(B $500,000 XX Rehab/f:==::oqoo0 XX W. Pipeline Water Main Replacement(3)B $1,000,000 XX Sub-Iofal Water PrioritY B $ 2,000,000 Hwy 183 Water Crossing c TBD XX Sub-Total Water Priority C WATER PROJECTS.TOTAL $ 2,850,000 A - Proiects that will be presented to Council during the upcoming year. B - Projecls that will be presented to Council Mhin two to five years. C - Proiecls that will be presented to Council beyond five years. iri l li\ Gity of Euless Capital Project Request Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-26-99 Project Title: Project Type: Project No.: DISINFECTION MODIFICATION/vVELL REHABILITATION WATER Sub-Type: WATER PRODUCTION Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: j PROJECT DESGRIPTION: This project consists of inspecting deep wells to determine condition of well pipe, casing, screens packing and rehabilitating items that are found to be in need. lt also includes adding ammonia inject "nd grruLl ion facilitids at each of our four well sites. JUSTIFICATION: Wells are old and heavily used. All four deep wells need to be rehabilitated according to needs determined by inspection. The EPA, TNRCC, and SDWA mandate disinfection by-product limits. lf our test results indicate non compliance, we will need to modify our disinfection process or cease well operations. 23L I ! I 1-l iI : I i i PROJECTTITLE: DISINFECTION MODIFICATION/VVELL REHABILIT,PROJECT#: NET EFFECTS ON OPERATING AND MATNTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:FullTime Part Time TotalSalary Purchase of Services Materials & Supplies Utilities $o Subtotal $o Maintenance Costs Subtotal:$o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Modification 600,000 Tota! Estimated Gapital Cost $600,000 PROPOSED METHOD OF F!NANCE Operating Fund Fund Balance Certificate of Obl igation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx CURRENT STATUS: Conceptual Design % Preliminary Design % FinalPlans % Specifications % Construction % lYo lYo 0% 0o/o 0% ADDITIONAL COMMENTS: 232 Gity of Euless Capital Project Request Department: Submitted By: COMMUNITY SERVICES RICK HEROLD Date Prepared: Date Gompleted: 6-29-00 Project Title: Project Type: Project No.: EFFLUENT WATER MAIN WATER Sub-Type: Priority: INSTALLATION A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION Effluent water main from City of Ft. Worth, Village Creek Wastewater Treatment Facility to the Texas property. i Siar JUSTIF!CATION This source of water would ensure that we could continue water in the event of drought and mandatory water restrictions. 233 I I : I I I i PROJECTTITLE: EFFLUENT WATER MAIN PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o $o Subtotal $o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: lnstallation 250,000 Total Estimated Capital Cost $250 000 PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction 7o 0% 0% 0% AODITIONAL COMMENTS: 234 Subtotal: Maintenance Costs 0o/o 0% Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Oate Completed: 7 -21-00 Project Title: Project Type: Proiect No.: SH 360 WATER CROSSING WATER Sub-Type: Priority: MAINS B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project is related to the DFW lnternational Airport Master Plan for property in Euless PROJECT DESCRIPTION: I This project consists of the extension of three water mains across SH 360 right-of-way to provide water service to a portion of the DFW Airport property. JUSTIFICATION: Development on the airport property will increase the City's tax revenues. The mains should be extended prior to construction of the main lanes of SH 360. Gity of Euless Gapital Project Request 235 l i I I I I PROJECT TITLE: SH 360 WATER CROSSING PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal Maintenance Cosls Subtotal:$0 $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Engineering Construction 30,000 270,000 Total Estimated Capital Cost $300,000 PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certiflcate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx GURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction b/o 0o/o 0v. 0o/o 0% ADDITIONAL COMMENTS: zJo 01o Department: Submitted By: WATER PRODUCTION RANDY BYERS Date Prepared: 6-21-00 Date Completed: Project Title: Project Type: Project No.: REHAB CENTRAL DR. WATER STORAGE TANK WATER Sub-Type: TANK Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: I I PROJEGT DESCRIPTION: lnspect and determine needs and complete rehab of Central Dr. ground storage tank JUSTIFICATION: This facility is nearing 50 years of age. An inspection of structural integrity should be made. Any needed repairs or upgrades, including removal of lead based paint, to bring this tank into compliance with current regualtions. City of Euless Capital Project Request 237 I PROJECT TITLE: REHAB CENTRAL DR. STORAGE TANK PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR .) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal $0 Maintenance Costs Subtotal $o $oTotal Estimated Annual Gost TOTAL ESTIMATED CAPITAL COST: Rehab 500,000 Total Estimated Capital Cost $500,000 PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx CURRENT STATUS: 0%Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 0% 0% iYo 0v. AODITIONAL GOMMENTS: 238 Department: Submitted By: WATER PRODUCTION RANDY BYERS Date Prepared: Date Completed: 6-21-00 Project Title: Project Type: Project No.: REHAB/REBUILD FULLER DR. GROUND STORAGE TANK WATER Sub-Type: TANK Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: lnspect and determine structural condition of Fuller Dr. ground storage tank. Make needed repairs from rehab to JUSTIFICATION: This facility is one of the earliest ground storage tanks. lt is nearing 50 years of age and is in need of repairs. The tank may be found to be structurally unsound and would need to be rebuilt. City of Euless Gapita! Project Request 239 PROJECT TITLE: REHAB/REBUILD FULLER GROUND TANK PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR.) ANNUAL Direct Operating Cost Personnel:FullTime Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal $o Maintenance Costs Subtotal $o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Rehab/Rebuild 200,000 Total Estimated Capital Cost $200 ,000 PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certifi cate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 0%! 0% lYo OYo 0% ADDITIONAL COMMENTS 240 City of Euless Capital Project Request Department: Submitted By: WATER DISTRIBUTION RANDY BYERS Date Prepared: Date Completed: 6-1 5-00 Project Title: Project Type: Project No.: W. PIPELINE WATERMAIN REPLACEMENT WATERLINE REPLACEMENT Sub-Type: Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Needs to be completed prior to maintenance of roadway o PROJECT DESCRIPTION Replace approximately two (2) miles of 12" water main on W. Pipeline Road from Central Drive to West Limits. i ; City ! I i i ! I i I i j i JUSTIFICATION: This waterline is large and deep. lt suffers from deterioration and many leaks have had to be repaired. Needed roadway maintenance is being delayed until this line is replaced. 24r PROJECT TITLE: W. PIPELINE WATERMAIN REPLACEMENT PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR .) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal $o Maintenance Costs Subtotal: Total Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Water Main Replacement Total Estimated Capital Cost $1,000,000 PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation Couhty, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction o/o 0% 'lYo o% lYo 0o/o ADDITIONAL COMMENTS: 242 1 ,000,000 $o $o City of Euless Gapital Project Request Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-21-00 Project Title: Project Type: Project No.: SH 183 WATER CROSSING WATER Sub-Type: Priority: MAINS c RELATIONSHIP TO OTHER PROJECTS ANDiOR MASTER PLAN: TxDOT plans to widen SH 183 within the next 10 years. PROJECT DESCRIPTION: The City has a 24" water main and many other smaller mains that will have to be relocated. The scope/magnitude of relocation work is unknown at this time. JUSTIFIGATION: Required where conflicts will occur with TxDOT's highway project 243 : i ,t 1 I I I I I I I i PROJECTTITLE: SH 183 WATER CROSSING PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR .) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal:$o Maintenance Costs Subtotal:$o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: The cost of this project is currently unkown Total Estimated Gapital Cost $o Operating Fund Fund Balance Certiflcate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans 70 Speciflcations % Construction % 0% lYo 0o/o 0v" 0o/o ADDITIONAL COMMENTS: The scope of work will be determined as TXDOT completes the highway reconstruction plans 244 PROPOSED METHOD OF FINANCE: t"L l- I ! II, !oE IIII srcfroud ofoNnJNn UfHIO o )) tJs CAPITAL IMPROVEMENT PROGRAMS UNFUNDED PROJECTS . SORTEO BY TYPE PROPOSED METHOD OF FINANCING Priority Estimated Cost Operating Fund CIP Fund Balance Bond Sale County, State, Federal Funds lmpact Fees Escrow Funds Car Rental Tax Hotel / Motel EDC To Be OeterminedProject Description OTHER PROJECTS 618.803 )t7 7/7 922,020$XX XXBuilding O Remodel 422,000$XXMidway Recreation Center Upgrade Sub-Total Other Priorlty A 1,344,020$ B s,500,000 xxAquatics Center/Recreation Center Expansion F) B 978,550$XXBuilding A Remodel p) B 837,390$XXBuilding B Remodel Io) 1,750,000$XX XXCity Wide Trail Enhancement(3) B 1,500,000$XX B 4,400,000$XX XX XXParks at Texas Star, Phase lll (') B 2,510,408$XXPublic Works Facility (6) Sub-Total Other Priority B $ 21476,348 Community Golf Course al Bob Eden Park 4,000,000$xx '1,000,000$XXConversion & Expansion of Ruth Millican Cntr C 2,000,000$XXExpansion & Upgrade of Bob Eden Park C 1,200,000$XXFire Training Facility c 2,120,O00$XXLibrary Build Out $ 10,000,000 XXParks at Texas Star, Phase lV 2,500,000$XXRedevelopment of Westpark 3,000,000$XXSH 10 Land Acquisition c TBD XXSofrball World 3,350,000$XXTexas Star Conference Cntr, Phase ll Sub-Totat Other Pdorlty C $ 29,170,000 $ 51,s90,368 IIIIIIr I A - Proiects that will be p.esented to Council dudng the upcoming year B - Prcjec-ts lhat wlll be presented to Council Mhin two to five years. C - Prcl€cls that will be prcsented io Council beyond five yeals- ) Fire Station #3 Reconstruction (4) OTHER PROJECTS . TOTAL m I-ltI II I rf---r---T-----r---- I tt t--+--F- ttttttttrtttrtt m City of Euless Gapital Project Request BUILDING D BUILDING RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Building D will be the third project of the master plan. Construction is to begin in January 2002 and scheduled for completion in July 2002. Building D, which now houses the Police Oepartment, will be renovated to accommodate the future office expansion of Fire Administration, lnformation Services, and Purchasing, with a storage and receiving area. Construction cost will be $922,020 (construction cost based on current cost). PROJECT DESCRIPTION: Relocating the Police Department to a new facility on Hwy 10 in October 2001, freeing space lo renovat Building D to accommodate the expansion needs of the Fire Administration, lnformation Services, and Purchasing Departments. JUSTIFICATION: 246 Date Prepared: 6-27-00 Revised: 5-28-01 Date Completed: PUBLIC WORKS RANDY BYERS Department: Submitted By: Project Title: Project Type: Proiect No.: Sub-Type: RENOVATION Priority: A PROJECT TITLE: BUILDING D PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE GOST (+ OR.) ANNUAL: Direct Ooerating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal:$o Mainlenance Costs Subtotal: Total Estimated Annual Cost $o TOTAL ESTIMATED CAPITAL COST: Remodel lncludes: Architectural fees (7.5%) Telephone/Cabling Plumbing Test Slab Test Furniture Misc. fees 922,020 S-.,JS'*'"--f),]l*"-*o -fool $ 7o'ooo 1::::::,: :;,rill ; t:;';? (r I*) Total Estimated Capital Cost $922,O20 PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund County, State, Federal Funding General Obligation Bonds Revenue bonds Certificate of Obligation Car Rental CIP Fund Balance xx xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % ADDITIONAL COMMENTS: 247 $0 Department: Submitted By: COMMUNIry SERVICES RICK HEROLD Date Prepared: Date Completed: 6/13/01 Project Title: Project Type: MIDWAY RECREATION CENTER UPGRADE BUILDING Sub-Type:REMODEL AProect No.:Priori RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Expansion project requested in response to increased user load of recreation center PROJECT DESCRIPTION: Remodel will involve providing additional space and equipment for the Fitness Center and Weight Room areas. Additionally, two administrative offices located on the lower level of the facility will be constructed for administrative responsibility and visibility in redesigned areas. New tables and chairs will be purchased and the chilled water HVAC system wlll be replaced. JUSTIFICATION: Users and citizens of the current facility are required to wait for machines and endure crowds during peak periods. The proposed expansion will provide additional cardiovascular machines and fitness space for the increasing user demand of the recreation facility. lt will also take care of general upgrades that are needed. 248 City of Euless Capital Project Request PROJECT TITLE: MIDWAY RECREATION CENTER UPGRADE PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time $o Total Salary Purchase of Services Materials & Supplies Utilities $o 1,000 $1,000 Maintenance Costs Maintenance/Cleaning 200 Subtotal:$2oo Total Estimated Annual Cost $1,200 TOTAL ESTIMATED CAPITAL COST: Planning, Design and Construction 422,000 Total Estimated Capital Cost $422,000 PROPOSED METHOD OF FINANGE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds Car Rental Fund xx Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % 0Yo 0o/o 0Yo 0% 0Yo ADDITIONAL COMMENTS: 249 Subtotal: CURRENT STATUS: City of Euless Capital Project Request Department: Submitted By: COMMUNITY SERVICES RICK HEROLD Date Prepared: Date Completed: Project Title: Project Type: Project No.: AQUATIC CENTER/RECREATION CENTER EXPANSION BUILoING Sub-Type: NEW CONSTRUCTION Priority:B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The completion of Master Plan is anticipated for August 2001. Master Plan will include a proposal to construct an Aquatic Center in conjunction with the Recreation Center expansion. PROJECT DESCRIPTION: Develop an aquatic center at Midway Park with emphasis on recreational play of citizens. This component has drawn strong community support and along with the Parks at Texas Star is a top priority of the Parks & Leisure Services Board and staff. JUSTIFICATION: Three (3) thirty year old pools which are outdated and the City totally needs to upgrade our aquatic offerings to our citizens. Additionally, as usage of current recreation facility continues to increase, expansion will be required to accommodate citizen demands. 250 7-10-00 lSZ :slN3tflnoc lvNoll.loov % uollcn4suoc % suoIeculcods % sueld leull o/o u6!sa0,QeUru. a.rd % u6!sao lPntdacuoC :SNIVIS INSUUNC paurujalap aq 01 suolleuoo spuoq anuo^au spuoS uo!]E6llqo l?Jauae 6urpunJ lerapal 'alels 'AunoC uoleoltqo ro ole3uluac punJ palold lBlcads ecuele€ punJ enua^au 6ulleJado :3CNVNtJ JO OOHr3n OSSOdOUd 000'009'6$lsoc leudsc palEurlls3 lelol 000'098'8 000'099 uo[snJlsuoc 6uueeurOu3 :ISOC -MtdVC O3IV!\IIS3 lV.t OI lsoc lPnuuv palEu!ls3 lelol anua^a8 palPdrs[uv :ssa'] 000'09e$ESoS lelof 000'00 t acueualu!ey! 6u!plln€ ? lood sIsoSieJuEEJuEn 000'092s Ietolqns 000'09$sallun 000'002$ 000'09$ 000'09 r$ tueteS lelol eu.rf uEd aur!1 llnl :lauuosJad Isoar6ullErsdci-r55[o :lvnNNV G UO +) ISOC fCNVNfrNlvul oNV CNtrvUSdO NO StC3lJ3 rlIN :# J.C3rOUd NotsNVdx3 u31N3C NOll-V]EC3Um3J-Nf 3 CIJ-VnOV :3"Irlr J.C3rOUd xx 000'08 r$ (ooo'os !) Gity of Euless Capital Project Request Department: Submitted By: PUBLIC WORKS/FACILITIES MAINTENANCE RANDY BYERS Date Prepared: Revised: Date Completed: 6-27-00 5-28-01 Project Title: Project Type: Project No.: BUILDING A BUILDING Sub-Type: REMODEL Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Building A will be the fourth proiect of the master plan. Construction is proposed to begin in March 2003 with an estimated completion in October 2003. PROJECT DESCRIPTION: Building A (Downstairs area) will be renovated to accommodate the new City Council Chambers and Pre- Council and conference rooms. Construction costs will be $978,550 (construction cost based on current costs). JUSTIFICATION: Relocating the Fire Administration and Purchasing Departments to the renovated Building D in July 2002. Downstairs offices will be renovated to accommodate the City Council Chambers, which are currently located in Building B. This will allow for office expansion in Building B for Finance, lnsurance, and Human Resources Departments. 252 PROJECT TITLE: BUILDING A PROJECT #: NET EFFECTS ON OPERATING ANO MAINTENANCE COST (+ OR .) ANNUAL: Direct Operating Cost Personnel:Full Time Parl Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal:$o Mainlenance Costs Subtotal:$o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Remodel lncludes: Architectural fees (7.5%) Telephone/Cabling Furniture (partial) Misc. fees 978,550 Total Estimated Capital Cost $978,550 PROPOSED METHOD OF FINANCE: Operating Funds Reserve Fund Special Project Fund County, State, Federal Funding General Obligation Bonds Revenue bonds Certificate of Obligation Car Rental xx CURRENT STATUS: Conceptual Design 7o Preliminary Design o/o Final Plans % Specifications % Construction o/o ADDITIONAL COMMENTS: 2s3 Oepartment: Submitted By: PUBLIC WORKS/FACILITES MAINTENANCE RANDY BYERS Date Prepared: Revised: Date Completed: 6-27 -00 5-28-01 Project Title: Project Type: Project No.: BUILDING B BUILDING Sub-Type: REMODEL Priority: B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Building B will be the fifth project of the master plan. Conslruction is proposed to begin in January 2004 with an estimated completion in June 2004. PROJECT DESCRIPTION: To provide a more efficient work space area, Building B will be remodeled to expand the layout for the following departments: Finance, Water Billing Offlce, lnsurance and Human Resources. Community Services, Municipal Courts, and the City Council Chambers will all be relocated in other buildings. Construction costs will total $837,390 (construction cost based on current cost). JUSTIFIGATION: Municipal Courts Department and Community Services offices will be relocated to other sites before construction commences. Renovation of Building B will provide more efficient work space area for Finance, Water Department, lnsurance, and Human Resource Department offices. 254 City of Euless Capital Project Request PROJECT TITLE: BUILDING B PROJECT #: Direct operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal $o Maintenance Costs Subtotal:$o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL GOST: Remodel lncludes: Architectural fees (7.5%) Telephone/cabling Furniture (partial) Misc. fees 837,390 Total Estimated Capital Cost $837,390 PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund County, State, Federal Funding General Obligation Bonds Revenue bonds Certificate of Obligation To Be Determined Car Rental xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % ADDITIONAL COMMENTS: 255 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Department: Submitted By: COMMUNITY SERVICES RICK HEROLO oate Prepared: Date Completed: 6/13/01 Project Title: Project Type: Project No.: CIry-WIDE TRAIL ENHANCEMENTS LAND Sub-Type:II\4PROVEMENTS BPriori RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Proposed project is a need as identified in initlal Master Plan as under review by the Park Board. The completion of the Parks Master Plan is anticipated in August 200'1 . PROJECT DESGRIPTION: Develop a comprehensive trail system with multiple uses for the citizens of Euless JUSTIFICATION: Trail development and enhancement opportunities will be consistent with available land, funding and time variables. This Master Plan recommendation will be part of a comprehensive trail enhancement project. City of Euless Gapital Project Request 255 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Seedisod/Path Supplies 25,000 $2s,000 Total Estimated Annual Cost $2s,000 PROPOSED METHOD OF FINANCE:CURRENT STATUS: Operating Revenue Fund Balance Special Project Fund Certiricate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations Car Rental xx Conceptual Design o/o Preliminary Design % Final Plans 7o Specifications % Construction % ADDITIONAL COMMENTS: PROJECT TITLE: CITY-WIDE TRAIL ENHANCEMENTS PROJECT #: TOTAL ESTIMATED CAPITAL COST: Planning, Design and Engineering Construction Right of Way Total Estimated Capital Cost 105,000 1,645,000 $1,750,000 257 Subtotal: $0 $o $0 $o $0 xx City of Euless Gapital Project Request Department: Submitted By: 7-19-00 Project Title: Project Type: Project No.: FIRE STATION #3 RECONSTRUCTION BUILDING Sub-Type: Priority: RECONSTRUCTION B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Not related to other projects. PROJECT DESCRIPTION: Fire Station #3, located at 201 W. Euless Blvd. Should be demolished and reconstructed on-site. Apparatus Building will remain intact with new construction consisting of living quarters, office areas, weight room, day room, kitchen, and storage areas. The project is proposed for FY 2004 and should take 12 months to complete. JUSTIFICATION: This fire station was constructed in a remodeled 30 plus year old structure. The building is experiencing foundation problems and is structurally challenged. Additionally, the building is not large enough to adequately house the personnel assigned to this station. 258 FIRE LEE KOONTZ Date Prepared: Date Completed: PROJECT TITLE: FIRE STATION #3 RECONSTRUCTION PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR .) ANNUAL: Direcl Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal $o Maintenance Costs Subtotal:$o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Construction To include: 1) Architect fees & fixtures 2) Furniture needs to be determined Total Estimated Capital Cost $1 ,500,000 PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction % ADDITIONAL COMMENTS: 259 1 ,500,000 Department: Submitted By: COMMUNIry SERVICES RICK HEROLD Date Prepared: Date Completed: 7-7 -00 Project Title: Project Type: Proiect No.: PARKS AT TEXAS STAR, PHASE III LAND Sub-Type: Priority: IMPROVEMENTS B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Completion of Master Plan is anticipated in August 2001. Relationship with other projects is still pending based on the final approved Plan. PROJECT DESCRIPTION: And four plex, inJine hockey, skate park and parking and related infrastructure JUSTIFICATION: Continue Parks at Texas Star Master Plan as committed to citizens with the passage of the 1/2 Cent Sales Tax. City of Euless Gapital Project Request 260 PROJECT TITLE: PARKS AT TEXAS STAR PHASE III PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $30,000 $30,000 1 I ,500 12,000 Subtotal:$53,500 21 ,500Maintenance Costs Subtotal:$21,500 Total Estimated Annual Cost $75,000 TOTAL ESTIMATED CAPITAL COST: Design Construction 400,000 4,000,000 Total Estimated Capital Cost $4,400,000 PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certiflcate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds (EDC) lmpact Fees Escrow Funds Car Rental Grant 1,500,000 xx $500,000 CURRENT STATUS: Conceptual Design 7o Preliminary Design o/o Final Plans o/o Specifications % Construction 7o 0v. o% 0% 0% o% ADDITIONAL COMMENTS: 26L Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Revised: oate Completed: 6-?7-00 5-28-01 Project Title: Project Type: PUBLIC WORKS FACILITY BUILDING sub-Type: NEW CONSTRUCTION ect No.:Prio B RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: public Works Facility will be the sixth project to be completed in the masler plan. Construction is proposed begin in FY2005-06. PROJECT DESCRIPTION: A new building site will be constructed to accommodate the Public Works Facility. The new building will located adjacent to the Fire Station No. 2 and Animal Shelter along Westpark Way and Pipeline Road. T construction cost wilt be $2,5'10,408 (construction cost based on current cost). JUSTIFICATION: Relocating the Public Works Facility to a new building site to allow for present and future expansion needs and plans. 262 City of Euless Gapital Project Request PROJECT TITLE: PUBLIC WORKS FACILITY PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR.) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal:$o Maintenance Costs Utilities Cleaning lnsurance 6,000 4,800 2,500 Subtotal $13,300 Total Estimated Annual Cost $13,300 TOTAL ESTIMATED CAPITAL COST: Planning, Design and Construction 2,510,408 Total Estimated Capital Cost $2,510,408 PROPOSED METHOD OF FINANCE: Current Revenue Reserve Fund Special Project Fund County, State, Federal Funding General Obligation Bonds Revenue bonds Certificate of Obligation To Be Determined xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction 7o ADDITIONAL COMMENTS: 263 City of Euless Gapital Project Request Department: Submitted By: Date Prepared: Date Completed: 7-10-00 Project Title: Project Type: Project No.: COMMUNITY GOLF COURSE AT BOB EDEN LAND Sub-Type: IMPROVEMENTS Priority: C The completion of the Master Plan is anticipated in August 2001 . The relationship with other projects is still pending based on the final approved plan. PROJECT DESGRIPTION: Develop 18-hole community golf course, primarily aimed at Euless Citizens, featuring Bermuda greens, limited clubhouse, and ease of play. JUSTIFIGATION: Meet community golf needs while taking advantage of scenic areas and preserving necessary green space. This facility would be awesome for seniors, ladies, junior and beginning golfers. lncrease land value of neighborhood. 264 COMMUNITY SERVICES RICK HEROLD RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT TITLE: COMMUNIry GoLF COURSE AT BOB EDEN PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR.) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time $200,000 $75,000 $275,000 $40,000 $200,000 Total Salary Purchase of Services Materials & Supplies Utilities Subtotal $515,000 Maintenance Costs Course Maintenance 400,000 Subtotal:$400,000 Total Estimated Annual Cost $915,000 TOTAL ESTIMATED CAPITAL COST: Engineering Construction 350,000 3,650,000 Total Estimated Capital Cost $4,000,000 PROPOSED METHOD OF FINANGE: Operating Revenue Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined xx Conceptual Design 7o Preliminary Design % Final Plans % Specifications % Construction 7o TBD ADDITIONAL COMMENTS: We recommend that all debt and operation costs should be absorbed through the users 265 CURRENT STATUS: Department: Submitted By: COMMUNITY SERVICES RICK HEROLD Date Prepared: Date Completed: 7-10-00 P No.: Project Title: Project Type: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The completion of the Master Plan is anticipated in August 2001 . The relationship with other projects is still pending based on the final approved plan. PROJECT DESCRIPTION: Redevelop Ruth Millican building to Ruth Millican Senior Center through adding seniors weight area, activity room, arts and crafts area, kitchen, and office space. Ties in beautifully with Heritage Park. Need to continue to address the needs of the aging population and RMC allows Euless to do such with extremely limited funding. J USTIFICATION: Gity of Euless Capital Project Request 266 CONVERT & EXPAND RUTH MILLICAN BUILDING/FACILITY Sub-Type: EXPANSION Priority: C PROJECT TITLE: CONVERT & EXPAND RUTH MILLICAN PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time $40,000 $20,000 $60,000Total Salary Purchase of Services Materials & Supplies Utilities Subtotal:$75,000 Maintenance Costs Custodial Services $15,000 $15,000 Total Estimated Annual Cost $90,000 TOTAL ESTIMATED CAPITAL COST: Engineering Construction $85,000 $915,000 Total Estimated Capital Cost $1,000,000 PROPOSED METHOD OF FINANCE: Operating Revenue Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans o/o Specifications % Construction % ADDITIONAL COMMENTS: 267 Subtotal: $15,000 TBD Gity of Euless Capita! Project Request Department: Submltt6d By: COMMUNIry SERVICES RICK HEROLD Date Prepared: Date Completed: 7-10-00 Project Title: Project Type: Project No.: EXPANSION & UPGRADE OF BOB EDEN PARK LAND Sub.TyPE: IMPROVEMENT/EXPANSION Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The completion of Master Plan is anticipated for August 200'l . The relationship with other projects is still pending based on the final approve plan. PROJECT DESCRIPTION: Redevelop Bob Eden Park, taking advantage of new Mid-Cities alignment and address park aesthetic issues caused by such. Additional irrigation, trail system, soccer fields, parking and disc golf course. JUSTIFICATION: Realignment of Mid-Cities has increased the need to update park infrastructure. Taking advantage of new park land, and adding needed improvements at one of Euless' most utilized facilities. 268 PROJECT TITLE:EXPANSION & UPGRADE OF BOB EDEN PARK PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANGE COST (+ OR.) ANNUAL: Direct operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 $10,000 $8,500 Subtotal:$18,500 Maintenance Costs Contract Mowing 25,000 Subtotal:$25,000 Total Estimated Annual Gost TOTAL ESTIMATED CAPITAL COST: Engineering Construction 175,000 2,325,000 Potential Grant Money (500,000) Total Estimated Capital Cost $2,000,000 PROPOSED METHOD OF FINANCE: Operating Revenue Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined Grant xx $500,000 CURRENT STATUS: Conceptual Design % Preliminary Design o/o Final Plans % Specifications % Construction % TBD ADDITIONAL COMMENTS: 269 $43,500 Department: Submitted By: FIRE LEE KOONTZ Date Prepared: Date Completed: 7-19-00 Project Title: Project Type: Project No.: FIRE TRAINING FACILIry BU ILDING Sub-Type: Priority: NEW CONSTRUCTION c RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The site of the training facility will be behind fire station #2 on Westpark Way and will share land with the proposed future Public Works and Warehouse facility. PROJECT DESCRIPTION: This project will be the construction of a fire training facility that will consist of a four-story fire training tower, burn building and pad site for apparatus operation. JUSTIFICATION: This facility is needed to provide training for fire department personnel. Currently it is necessary to send our people out of the City to receive training and often it requires the payment of substantial amounts of overtime. The facility would also give us additional credit towards our insurance rating by lSO. 270 Gity of Euless Gapita! Project Request PROJECT TITLE: FIRE TRAINING FACILITY PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR.) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal $0 I\ilaintenance Costs Subtotal $o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Construction 1 ,200,000 Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx GURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans 7o Specifications % Construction % ADDITIONAL COMMENTS: 27t $1,200,000 Department: Submitted By: COMMUNIry SERVICES RICK HEROLD Date Prepared: Date Completed: 7-10-00 Pro No.: Sub-Type: Prio IMPROVEMENTS c Project Title: Project Type: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Shelled area provided in initial plan, design, and construction of the Euless Public Library. The proposed project will provide for completion of the shelled areas as designed with initial construction of the facility. Complete shelled areas of Library facility. Build out of shelled areas, once completed will be made available for use by citizens, guests, and employees of the City of Euless. PROJECT DESCRIPTION: lnitial construction provided for a shelled area for further expansion as consistent with user/collection groMh Shelled area is available in existing structure for expansion. JUSTIFICATION: 272 LIBRARY BUILD OUT BUILDING City of Euless Capital Project Request PROJECT TITLE: LIBRARY BUILD OUT PROJECT #: NET EFFECTS ON OPERATING AND MATNTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time $150,000 $150,000 $60,000 $40,000 Total Salary Purchase of Services Materials & Supplies Utilities Subtotal:$250,000 Maintenance Costs Maintenance/cleaning 50,000 Subtotal $s0,000 Total Estimated Annual Cost $300,000 TOTAL ESTIMATED CAPITAL COSTr Planning & Design Construction 120,000 2,000,000 Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: xx CURRENT STATUS: Conceptual Design 7o Preliminary Design % Final Plans 7o Specifications % Construction % ADDITIONAL GOMMENTS: 273 $2,120,000 Operating Revenue Fund Balance Special Project Fund Certilicate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To be determined Department: Submitted By: COMMUNITY SERVICES RICK HEROLD Date Prepared: Date Completed: 7-10-00 Project Title: Project Type: Project No.: PARKS AT TEXAS STAR, PHASE IV LAND Sub-Type: Priority: IMPROVEMENT c RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The completion of the Master Plan is anticipated in August 2001. The relationship with other projects is still pending based on the final approved plan. PROJECT DESCRIPTION: Remaining build-out of baseball/softball, soccer, playground, parking and related infrastructure. JUSTIFICATION: Continue Parks at Texas Star Master Plan as committed to citizens with the passage of the 'll2 cent sales tax. Gity of Euless Gapital Project Request 274 PROJECT TITLE: PARKS AT TEXAS STAR PHASE IV PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE GOST (+ OR ' ANNUAL: Direct Operating Cost Personnel:$40,000 $20,000 $60,000Total Salary Purchase of Services Materials & Supplies Utilities $15,000 Subtotal:$75,000 Maintenance Costs Turf Maintenance $15,000 $15,000 Total Estimated Annual Cost $90,000 TOTAL ESTIMATED CAPITAL COST: Engineering Construction s00,000 9,500,000 PROPOSED METHOD OF FINANCE: Operating Revenue Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined Grant xx $'s unknown CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans o/o Specifications % Construction % ADDITIONAL COMMENTS: Total Estimated Capital Cost $10,000,000 Subtotal: Full Time Part Time TBD 275 Department: Submitted By; COMMUNITY SERVICES RICK HEROLD Date Prepared: Date Completed: 7-10-00 Project Title: Project Type: Project No.: REDEVELOPMENT OF WESTPARK LAND Sub-Type: Priority: IMPROVEMENT c RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The completion of the Master Plan is anticipated in August 2001 . The relationship with other projects is still pending based on the final approved plan. PROJECT DESCRIPTION: Redevelop Westpark by creating an outstanding neighborhood park for citizens. Create a new design wilh a gazebo, pavilion, trails, open space, restrooms, land landscaping. Further, to develop the land that is currently unused into trail and green preservation. JUSTIFICATION: Needed updates to a deteriorating park to better facilitate WestparkMilshire neighborhoods. City of Euless Capital Project Request 276 PROJECT TITLE: REDEVELOPMENT OF WESTPARK PROJEGT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR .) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time $0 $12,000 $12,000Total Salary Purchase of Services Materials & Supplies Utilities $10,000 Subtotal:$22,000 Maintenance Costs Mowing 20,000 Subtotal:$20,000 Total Estimated Annual Cost $42,000 TOTAL ESTIMATED CAPITAL COST: Engineering Construction 200,000 2,300,000 Total Estimated Capital Cost $2,500,000 PROPOSED METHOD OF FINANCE: Operating Revenue Fund Balance Special Project Fund Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds Donations To Be Determined xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Specifications % Construction o/o TBD ADDITIONAL COMMENTS: 277 City of Euless Gapital Project Request Department: Submitted By: ECONOMIC DEVELOPMENT BILL RIDGEWAY Date Prepared: Date Completed: Project Title: Project Type: Project No.: S.H. 1O LAND ACOUISITION MISC Sub-Type: Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project is potentially tied to the Texas Star Sport Centre and the 2012 Olympics. PROJECT DESCRIPTION: The purchase is approximately 12 acres. JUSTIFICATION: Required for facilitating redevelopment or for park use. 278 7-7-00 PROJECT TITLE: S.H. 10 LAND ACQUISITION PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR.) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal:$o Maintenance Costs Subtotal:$o Total Estimated Annual Cost $o TOTAL ESTIMATED CAPITAL COST: Land Acquisition 3,000,000 Total Estimated Capital Cost $3,000,000 Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx CURRENT STATUS: Conceptual Design o/o Preliminary Design % Final Plans % Specifications o/o Construction o/o 0% 0% 0% 0Yo AODITIONAL COMMENTS: 279 PROPOSED METHOD OF FINANCE: 50% City of Euless Capital Project Request Department: Submitted By: COMMUNITY SERVICES RICK HEROLD Date Prepared: Date Completed: 7 -21-00 Project Title: Project Type: Project No.: Sub-Type: Priority: REMODEL c RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project is consistent with the City's Parks Master Plan. PROJECT DESCRIPTION: Capital improvements including: 1) the remodeling of existing buildings; 2) field, lighting, parking, entrance, irrigation, etc upgrades and 3) general renovation. JUSTIFICATION: Required to keep Softball World viable 280 SOFTBALL WORLD BUILDING/FACILITIES PROJECTTITLE: SOFTBALLWORLD PROJECT #: NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR .) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal: [/laintenance Costs $o Subtotal:$o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Project cost to be determined. Total Estimated Capital Cost $o PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx CURRENT STATUS: Conceptual Design % Preliminary Design % Final Plans % Speciflcations % Construction % 0% 0Yo OYo o% ADDITIONAL COMMENTS: 281 OYo City of Euless Gapital Project Request Department: Submitted By: COMMUNITY SERVICES RICK HEROLD Date Prepared: Date completed: 7 -7-O0 Project Title: Project Type: Project No.: TEXAS STAR CONFERENCE CENTER, PHASE II BUILDING/FACILITY Sub-Type: REMODEL Priority: C RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Needed to improve overall Texas Star Golf Course and Conference Center operation. This will allow greater flexibility, improve service levels, and provide better working conditions for staff. PROJECT DESCRIPTION: Proposed expansion of Texas Star Clubhouse by increasing overall square footage through a planned expansion program. New construction will be three tier (downstairs stage, current level to improve catering and office support, and upstairs to add meeting rooms and board rooms). ln addition, the kitchen would be enlarged and addition of 'lgth hole to pro-shop to pavilion merits additional study. JUSTIFICATION: Would greatly increase the functionality of the facility and would provide for additional programming opportunities. Would allow Texas Star to be ahead of the competltion while improving conditions for present staff. 282 PROJECT TITLE: TEXAS STAR CONFERENCE CENTE PHASE II PROJECT #: TOTAL ESTIMATED CAPITAL COST: Total Estimated Capital Cost $3,350,000 350,000 3,000,000 Oesign Construction NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Total Estimated Annual Cost $10,000Subtotal $s1,000 Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities 41,000 10,000 Subtotal: Maintenance Costs Direct Ooerating Cost Personnel: $20,000 $20,000 6,000 15,000 Conceptual Design % Preliminary Design % Final Plans o/o Specifications % Construction %0v. 0o/o 0% 0% GURRENT STATUS:PROPOSED METHOD OF FINANCE: Operating Fund Fund Balance Certificate of Obligation County, State, Federal Funding General Obligation Bonds Revenue bonds lmpact Fees Escrow Funds To Be Determined xx ADDITIONAL COMMENTS: 283 0% Completed Projects ! ra;3J TITIII I I I frf,: ::,il ,. ))) NJ @s AL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY AS OF Mav 3'1. 2001 PrcJect Number Pr6lect DescrlDtlon Total Project CostStreet Fund Dralnage Fund Water & Sewer CIP Fund lmpact Fee Fund Half Cent Sales Tax Fund Pollce Facility CIP Fund General CIP Fund Escrow Funds Over (Under) DRAINAGE PROJECTS DR9901 Suloher Branch Phase ll $123,404 ($3.276)s120,128 DR9902 windlea & Westcliff $4.396 ($3,237)$1,159 Sub-Totat Dninege Prciec,s $1 27.800 ($6,51 3)s121.287 STREET PROJECTS $605.542 ($86.1 54)$519.388 PS991 1 a)ver{av Proiects $294,687 $0 $294,687 Sub.Tola, Slrct Prol*ts $294,687 ($86,154)$814,075 WASTEWATER PROJECTS ww9901 cDBG 8/98-UC-48-000 1/895-22-50 $1 50.000 ($77,073) wwg902 lm@c{ Fee Studv s13.000 ($762)$12,238 ww9903 s50.000 ($37.01 3)s1 2.987 wwg904 Hvdraulic Analreis $27,000 $0 $27.000 Sub-Total Wa slew ater Prci ec,s $200.000 $40,000 ($1 14,848)$'125.152 WATER PROJECTS wI9901 Meter Chanae Out Proqram $101,917 ($3.552)$98,365 wT9903 Master Plan $42.000 ($36,555)s5.445 wT9904 FY1999 Well Reoai6 $66,921 $0 $66.921 wT9905 FY1999 Misc s50.000 ($6.251)$43,749 wT9906 Hwy 10 Water Line $150.000 ($11,'117)s1 38.883 wT9907 lmoact Fee Studv $1 3,000 (s762)$12.238 wT9911 Water Distribution - Master Plan $25.600 ($1.600)$24,000 wT0002 Emerqency Repair - Hwy 1 0 $1 5.450 ($1,236)s14.214 wT0006 Central Orive water Mains $92,814 ($2.O72\$90,742 wT0102 SCADA UDqrade $93,400 $0 $93,400 S u b-Total water Prci ects $630,750 s38.600 ($67,650)$601,700 OTHER of Dallas $'10.327.978 $0 ss9901 Fire Station ll $49.688 $0 s49.688 ss9902 LibErv Books $3.302 $0 $3.302 ss9919 #3 - Structural $30,000 ($12.6s6)$1 7,344 S u b-f otal Oth et Pro iecas $3.302 $1 0,407,666 ($1 2,656)$10,398,312 TOTAL FUNDED PROJECTS $294.687 $1 27,800 $830,750 $78.600 $3.302 $0 $1 0,407,666 $o ($287,821 )$12,060,526 Ps99o7 Westoark Wav -SH10 to SH183 iri<. Spwa. Rpheh FY99 /s4 505\sls 743s18.248wTo604 PROOl 5 GOMPLETED DRAINAGE PROJEGTS ->-rD T III ))) COMPLETED PROJECTS SUMMARY CAPITAL Over Total Project Pollco Faclllty CIP Fund Genenl CIP Fund Escrow Funds lmpact Fee Fund Half Cont Sales Tax Fund Dralnage Fund Waler & Sewer GIP FundSlreet FundProlect Phase ll 21 N) @(Jt AS OF Mav 3'l.2OO'l DR9902 tr^dla. ,C Waclcliff s4 396 t*3 237\ su b-f oh I D n i n aoe Prorecls sl 27.800 ($6.513) Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: 7-20-99 Date Completed: 8-01-99 SULPHUR BRANCH PHASE II DRAINAGE DR9901Pect No.: Project Title: Project Type: COUNCIL AUTHORIZATION : October 13, 1998 - Approved the acquisition of Right-otway RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER The Sulphur Branch channelization project was the number one needed project identified in the 1990 study prepared by Knowlton, English and Flowers. PLAN: This pro.iect includes the drainage work to be performed on Sulphur Branch south of SH 10. The work was performed by the corps of Engineers. The city's financial participation in this project is complete. PROJECT DESCRIPTION: To improve the flow through the original Sulphur Branch project and remove 40 properties from the 100 floodplain. JUSTIFICATION: Gity of Euless Capital Project Request 286 Sub-Type: Priority: A PROJECT #: DR9901 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR.) ANNUAL; Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies utilities $o Subtotal $o Maintenance Costs Subtotal:$o $oTotal Estimated Annual Cost TOTAL ESTIMATED GAPITAL COST: Land Purchases Storm Sewers Surveying Appraisal Services 89,000 29,304 4,500 600 Total Estimated Capital Cost $123,404 CURRENTSIATUS PHASE/FUNDING SOURCE Appraisal Services Surveying Services Land Purchases Storm Sewers BUDGET 600 4,500 89,000 29,304 EXPENDED 600 4,500 89,000 26,028 OVER/UNDER BUDGET G +)% EXPENDED 100% 1O0Yo 100o/o 89% 0 0 0 (3,276) (Expenses prior to FY99 not reflected) . - This project received an inter-pro.iect lransfer of $5,904 from project DR9903. ' - Remaining funds transferred to FB9902 $123,404TOTAL PROJECT $120,128 ($3,276)97o/o 287 PROJECT TITLE: SULPHURBRANCH PHASE II Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-20-99 8-1-99 Project Title: Project Type: Project No.: WINDLEA & WESTCLIFF DRAINAGE DR9902 Sub-Type: Priority:A COUNCIL AUTHORIZATION: January 13, 1998 - Awarded Bid No. 97-54 for the construction of drainage improvements. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: ln 1990 the City commissioned and received a report from Knowlton, English & Flowers titled Drainage Utility Sysfem Study of Selected lmprovement Projects . This was Project No. 4 ln the referenced study. PROJECT DESCRIPTION: This project includes pipe, inlet and flume improvements that were completed in 1998 JUSTIFICATION: Additional underground capacity required to reduce ponding of storm water in the street intersection Gity of Euless Capital Project Request 288 PROJECT TITLE: WINDLEA & WESTCLIFF PROJECT#: 0R9902 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR.) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal:$0 Maintenance Costs Subtotal $o $0Total Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Fence Landscaping & lrrigation 274 4,122 Total Estimated Capital Cost $4,396 CURRENTSTATUS PHASE/FUNDING SOURCE Fence Landscaping & lrrigation BUDGET 274 4,122 EXPENDED 274 885 OVER/UNDER BUDGET G +) 0 \otzot ) % EXPENDED 1000/" 21o/o (Expenses prior to FY 99 not reflected) Remaining funds transferred to F89902 $4,396TOTAL PROJECT $1,159 ($3,237)26% 289 STREET PROJEGTS (::=:- GOMPLETED )) CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY AS OF Mav 31.2001 ProJect Number Prolcl Descrlollon Total Project C6stStreet Fund Oralnags Fund Water & Sewer CIP Fund lmpact Fee Fund Half Cent Sales Tax Fund Pollc6 Faclllg CIP Fund Gonerel CIP Fund Escrow Funds Over (Underl STREET PROJECTS PS99O7 Westpark Way -SH10 to SH183 $605.542 ($86.1 54 1 $51 9.388 PS991 1 Overlav Proiects $294,687 $0 $294,687 SuFfola, Stret Projecrs $294,687 ($86,1 54)$81 4,075 N)\oO ) I Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-17-99 9-30-00 Project Title: Project Type: Project No.: WESTPARK - SHl O TO SH 183 STREET PS9907 Sub-Type: Priority: CONSTRUCTION A COUNCIL AUTHORIZATION : April 13, 1999 - Approved Bid No.99-05 for irrigation and landscape improvements RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The street reconstruction was accomplished through funding from the City and the Texas Department of Transportation (TxDOT). PROJECT DESCRIPTION: Reconstruction of a two-lane asphalt street. TXDOT recently completed the new four-lane and five-lane concrete street. This funding is for the Iandscaping package and inslallation of street lights. JUSTIFICATION: 1 . Two-lane street did not adequately convey existing or future traffic volumes. 2. Ongoing safety concerns made the reconstruction of Westpark Way mandatory City of Euless Gapital Project Request 29t PROJECT TITLE: WESTPARK - SH10 TO SH183 PROJECT #: PS9907 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR .) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal:$0 Maintenance Cosls Subtotal $o Total Estimated Annual Cost $o TOTAL ESTIMATED CAPITAL COST: Balance Remaining @ 10-1-99 605,542 Total Estimated Capital Cost $605,542 CURRENTSIATUS PHASE/FUNDING SOURCE Engineering Services Plumbing Services, Outside lrrigation Repairs Fence Equipment Rentals Streets & Highways Contingencies Sidewalks & Curbs Landscaping Signal Systems BUDGET 9,152 2,290 24,778 10,099 74 2,835 149,895 6,234 395,797 4,388 EXPENDED 9,152 2,290 24,778 10,099 74 2,835 63,7 41 6,234 395,797 4,388 OVER/UNDER BUDGET (. +)% EXPENDED 10Oo/o 100% 100yo 100Yo ooo/- 1007o 43Yo 1O0o/o 100% 100yo (86 n U (0) 0 (0) 0 154) 0 n (1) (Expenses prior to FY99 not reflected) The remaining balance of $86,154 was transferred to F89907 $605,542 $519,388TOTAL PROJECT ($86,1s4)86Yo 292 Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-26-99 Project Title: Project Type: Project No.: OVERLAY PROJECTS STREETS PS9911 Sub-Type: Priority: OVERLAY A COUNCIL AUTHORIZATION : September 8, 1998 - lncluded in FY98-99 Budget. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: These projects are developed based on information contained in a street condition survey PROJECT DESCRIPTION: FY99 projects include the following streets: OVERLAY: Kynette, Signet, Toplea, Victoria, and Delta RECONSTRUCT: South Mills, Bayless, Pauline, Lee, Himes, Westcliff, and Douglas CUT & PATCH: West Pipeline. JUSTIFICATION: Each year we schedule approximately 10% of the lane miles in the City for preventive maintenance, including micro paving, overlay and some total reconstruction. This account provides funding for these activities plus the unforeseen prolects that seem to come up each year. The recommended funding level for this account is $350,000 per year. ln future years, overlay will be added to lhe general fund baseline budget as this is considered to be normal maintenance and operating costs. Gity of Euless Capita! Project Request 293 PROJECT TITLE: OVERLAY PROJECTS PROJECT#: PS991 l NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal:$o Maintenance Costs Subtotal $o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Overlay 294,687 Total Estimated Capital Cost $294,687 CURRENTSIATUS PHASE/FUNDING SOURCE BUDGET EXPENDEO OVER/UNOER BUDGET (- +)% EXPENDED Overlay 294,687 294,687 0 100yo 687TOTAL PROJECT $294 $294,687 $o 10Oo/o 294 GOMPLETED WASTEWATER PROJEGTS CAPITAL IMPROVEMEN 1S PROGRAM COMPLETED PROJECTS SUMMARY AS OF Mav 31.2001 ProJcct N0mber Prolect Oescrlotlon Total Project Street Fund Dnlnage Fund Water & Sewer CIP Fund lmpact Fee Fund Half Cent Sales Tax Fund Pollce Faclllty CIP Fund GeneEl CIP Fund Escrow Funds Over (Under, WASTEWATER PROJECTS ww9901 CDBG B/9&UC-48{00 1 /895-22-s0 $150,000 ($77.073) ww9902 lmoacl Fee Study $13.000 ($762)$12.238 ww9903 Misc Seter Rehab FY99 $50.000 r$37.013)$'t2.987 ww9904 HvdEUlic AnalEis $27,000 s0 $27.000 Su ETotal Wa stew ater Prci *ls $200,000 $40,000 ($1 14,848)$'t25,152 N)\o (,l ) Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7 -26-99 8-19-99 Project Title: Project Type: Proiect No.: cDBG B/98-UC-48-0001 /B95-22-50 WASTEWATER Sub-Type: WW9901 Priority: MAINS A COUNCIL AUTHORIZATION: January 13, 1998 - Held Public Hearing / Approved CDBG project selection. April 13, 1999 - Recommended Tarrant County award bid to Horseshoe Construction RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This funding is the 24th year project administered through Tarrant County. This is the fifth wastewater project in South Euless. PROJECT DESCRIPTION: Design and construction of wastewater mains in the Oakwood Terrace Addition. JUSTIFICATION; Mains in the South Euless area have deteriorated as they have aged City of Euless Capital Project Request 296 PROJECTTITLE: CDBGB/98-UC-48-00011895-22-50 PROJECT#: WW9901 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR .) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal $o Maintenance Costs Subtotal:$o $oTotal Estimated Annual Gost TOTAL ESTIMATED CAPITAL COST: Sewer Mains 150,000 Total Estimated Capital Cost $ 1s0,000 CURRENTSTATUS PHASE/FUNDING SOURCE Sewer Mains Remaining funds transferred to FB9901 BUDGET OVER/UNDER BUDGET G +)% EXPENDED 150,000 (77,073)49% $150,000 $72,927 ($77,073)TOTAL PROJECT 49o/o 291 EXPENDED 72,527 Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-26-99 9-30-99 Project Title: Project Type: Proiect No.: WW IMPACT FEE STUDY WASTEWATER wwg902 Sub-Type: Priority: IMPACT FEE PROJECTS A COUNCIL AUTHORIZATION: January 26, 1999 - Approved contract for study RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The City's Capital lmprovement Program and lmpact Fee Study must be updated every three years. PROJECT DESCRIPTION: 1 .) Extablish a static model for the sewer system based on basin development 2.) Develop a lo-year capital improvement plan. 3.) Review existing living unit equivalents. 4.) Calculate maximum impact fee. JUSTIFICATION: Required by state law to justify impact fee charges City of Euless Gapital Project Request 298 PROJECT TITLE: WW IMPACT FEE STUDY PROJECT#: WW9902 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR .) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal:$o Maintenance Costs Subtotal $o $0Total Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Planning Services 1 3,000 Total Estimated capital Cost $13,000 CURRETVTSIATUS PHASE/FUNDING SOURCE Planning Services BUDGET 13,000 EXPENDED 12,238 OVER/UNDER BUDGET G +) (762) % EXPENDED 94o/o Remaining funds transferred to F89910 $13,000TOTAL PROJECT $12,238 ($762)940il 299 Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-26-99 9-30-99 Project Title: Project Type: Project No.: MISC. SEWER REHAB FY99 WASTEWATER wwg903 Sub-Type: Priority: MAINS A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: This project is for small unidentified sewer main problems that may be found during the flscal year. Large projects will be determined on an "as needed" basis and presented for funding under a new project number. JUSTIFICATION: Most of these lines are clay tile and are seriously deteriorated. City of Euless Gapital Project Request 300 PROJECT TITLE: MISC. SEWER REHAB FY99 PROJECT#: WW9903 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR.) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal:$o Maintenance Costs Subtotal $0 $oTotal Estimated Annual Gost TOTAL ESTIMATED CAPITAL COST: Sewer Mains 50,000 Total Estimated Capital Gost $50,000 CURRENTSTATUS PHASE/FUNDING SOURCE BUDGET OVER/UNDER BUDGET G +)% EXPENDED Sewer Mains 50,000 (s7,013)26% Remaining funds transferred to WW0002 $s0,000TOTAL PROJECT $12 987 ($37,013)26Yo 301 EXPENDED 12,987 Gity of Euless Capital Project Request Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-23-99 6-30-00 Project Title: Project Type: Project No.: HYDRAULIC ANALYSIS WASTEWATER wwg904 Sub-Type: Priority: IMPACT FEE PROJECT A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The hydraulic analysis is a subset of the City's Wastewater Master Plan. PROJECT DESCRIPTION: Professional services related to the analysis of the City's wastewater system. Pressures, velocities and other items are studied to determine adequacy. JUSTIFICATION: Required to determine adequacy of wastewater system 302 COUNCIL AUTHORIZATION: November 24, 1998 - Authorized contract with Shimek, Jacobs, & Finklea to perform analysis. PROJECTTITLE: HYDRAULICANALYSIS PROJECT#: WW9904 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal $o Maintenance Costs Subtotal $0 Total Estimated Annual Cost $o TOTAL ESTIMATED CAPITAL COST: Engineering 27 ,000 Total Estimated Capital Cost $27,000 CURRENISIATUS PHASE/FUNDING SOURCE Engineering Services BUDGET 27 ,000 EXPENDED 27 ,000 OVERYUNDER BUDGET (. +) 0 % EXPENDED 100v. (Does not reflect expenses prior to FY99). $27,000 $27,000TOTAL PROJECT $o 100yo 303 GOMPLETED WATER PROJEGTS ) CAPITAL PROGRAM COMPLETED PROJECTS SUMMARY AS OF Mav 3'1. 2001 Prol*t Number Prolct Descrlotlon Total Prorect CostStreet Fund Oralnage Fund Water & Sewer CIP Fund lmpact Fe. Fund Half Cent Sales Tax Fund Pollce Faclllty CIP Fund Genenl CIP Fund Escrow Funds Over (Under) WATER PROJECTS wT9901 Meter Chanoe Out Prooram s101.917 ($3.552)$98.365 wT9903 Master Plan $42,000 (s36,555)s5.445 wT9904 FYl999 Well Repairs $66,921 $0 $66.921 wT9905 FY1999 Misc Water Rehab $50.000 ($6,251)$43,749 wTg906 Hw 10 Water Line $'150.000 ($11,117)s1 38 883 wT9907 lmoact Fee Studv s1 3,000 (s7621 s12.238 wT9911 Water Distribution - Master Plan s25.600 ($1.600)$24,000 wToo02 Emeroend Reoair - Hw 10 s1 5.450 ($1.236)s14.2',14 wTo004 Water Line Milam - Eclor/Midmy $18,248 (s4.505)$13.743 wT0006 C.ntEl Drive Water Mains s92.814 ($2.O72\s90,742 wTo102 SCADA UmEde $93.400 $0 $93,400 S ub-Tota I Waler Proi ects s630.750 $38,600 ($67,650)$601,700 luJo5 )) City of Euless Gapital Project Request Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Comploted: 7-15-99 10-30-99 Project Title: Project Type: Project No.: METER CHANGE OUT WATER wT9901 Sub-Type: Priority: METERS A COUNCIL AUTHORIZATION : RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Proiect consists of replacing old meters with new radio-read meters throughout the City in phases- This program is complete. JUSTIFICATION: 1 . lncreased accuracy in billing water consumption. 2. Reduction in man-hours for meter reading due to radio-read meters that replaced old style meters. 305 PROJECT TITLE: METER CHANGE OUT PROJECT#: WT9901 NET EFFECTS ON OPERATING AND MAINTENANCE GOST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: Maintenance Costs Meters $0 60,000 Subtotal:$60,000 Total Estimated Annual Cost $60,000 TOTAL ESTIMATED CAPITAL COST: [,4eters & Settings 101 ,91 7 Total Estimated Capital Cost $101 ,917 CURRETVISTATUS PHASE/FUNDING SOURCE Meters & Settings BUDGET 101 ,91 7 OVER/UNDER BUDGET G +) (3,552) % EXPENDED 97Yo (Cost prior to FY1999 not reflected) * - The remaining balance was transferred to FB9901 $101,917TOTAL PROJECT $98,365 ($3,552)97o/o 306 EXPENDED 98,365 Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-26-99 8-30-99 Project Title: Project Type: Proiect No.: Sub-Type: Priority: PRELIMINARY STUDIES A COUNCIL AUTHORIZATION : RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The 1999 Water Distribution System Master Plan presents a comprehensive plan for the development of the water distribution system to serve the City of Euless at build-out conditions. The current service area does not include any property within the D/FW Airport boundary. PROJECT DESCRIPTION: This project encompasses any studies needed to ascertain the adequacy of the system. The only current activity relates to the airport. A compuler analysis was performed to aid in the development of an overall system of water mains, elevated storage tanks and supply from the TRA to efficiently serve the City of Euless development (within D/FW airport) that is anticipated. A preliminary Capital lmprovement Plan and overall master plan map were created for a portion of the D/FW Airport. No expenditure of additional funds is currently being considered. This master plan work was solely performed for planning/feasibility purposes. JUSTIFICATION: The City and the airport are working on development opportunities. The airport requested that the City determine if the City can provide water service to property within the airport boundary west and south of Bear Creek. lmpact fees cannot be used to fund this item as the airport is not currently within the City's service area. City of Euless Capital Project Request 307 MASTER PLAN WATER wTg903 PROJECTTITLE: MASTERPLAN PROJECT#: WT9903 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR .) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utililies $0 Subtotal: Maintenance Costs $o Subtotal:$o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Planning Services 42,000 Total Estimated Capital Cost $42,000 CURRENTSTATUS PHASE/FUNOING SOURCE Planning Services BUDGET 42,000 EXPENDED OVER/UNDER BUDGET G +)% EXPENDED 5,445 (36,5s5)12.96Yo Remaining funds transferred to F89901 $42,000TOTAL PROJECT $5,445 ($36,555)12.960k 308 Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-2A-99 9-30-99 Project Title: Project Type: Proiect No.: WELL REPAIRS WATER wTg904 Sub'Type: Priority: WELL REPAIR A COUNCIL AUTHORIZATION: August 27, 1997 - lncluded in Fiscal Year 1996-97 Budget. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: This funding carried over from previous years and is being utilized to repair a well pump. This balance is not sufficient to cover the entire cost of the project as discuss in a previous council meeting. Staff expects to request approximately $50,000 from the Water and Sewer CIP fund balance to cover this expenditure. JUSTIFICATION: Maintaining the City's wells results in the ability to produce water at a substantial reduction in cost. This funding will be included in the baseline budget in future years as it is considered normal maintenance and operating costs. Gity of Euless Gapital Project Request 309 PROJECT TITLE: WELL REPAIRS PROJECT#: WT9904 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR.) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal:$o Maintenance Costs Subtotal:$o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL GOST: Equipment Maintenance Meters & Setting 3,000 63,921 Total Estimated Capital Cost $66,921 CURRENTSIATUS PHASE/FUNDING SOURCE Equipment Maintenance Meters & Setting BUDGET 63,921 3,000 EXPENDED 63,921 3,000 OVER/UNDER BUDGET G +) 0 0 % EXPENDED 1007o 100% This project received $33,396 from F89901 $66,921TOTAL PROJECT $66,921 $o 100o/o 310 Oepartment: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-26-99 6-30-00 Project Title: Project Type: Proiect No.: FY99 MISC WATER REHAB WATER wTg905 Sub-Type: MAINS Priority: COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJEGTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: This project is for correction of small unidentified water main problems that may arise throughout the fiscal year. Large projects that are identified will be presented on an "as needed" basis and funded under a new project number. JUSTIFICATION: Some of the City's older water mains have deteriorated and need replacement or repair. Staff request that this project be funded on an annual basis at a leve! not to exceed $50,000. City of Euless Capital Project Request 311 PROJEGT TITLE: FY99 MISC WATER REHAB PROJECT#: WT9905 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR .) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal:$o Maintenance Costs Subtotal:$o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Water Mains 50,000 Total Estimated Capital Gost $50,000 CURRENTSIATUS PHASE/FUNDING SOURCE Engineering Services Sanitation Services Equipment Rentals Other Supplies Plumbing Supplies Sand Sewer Mains Fire Hydrants Equipment Rentals BUDGET 1 ,000 'I ,000 1,500 5,047 25,000 426 27 8,000 8,000 EXPENDED 587 827 1,140 2,908 19,084 426 27 12,075 6,675 OVER/UNDER BUDGET G +) (414) (173) (360) (2,139) (5,916) 0 % Expended 59% 83Yo 76Yo 58Yo 76Yo 10Oo/o 4,075 (1,325) 151o/o 83Yo . - Remaining balance transferred to WT0001 . $50,000TOTAL PROJECT $43,749 ($6,251)87o/o 3t2 Gity of Euless Capital Project Request Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7 -17 -99 1-30-00 Project Title: Project Type: Project No.: HWY,IO WATER LINE WATER wTg906 Sub-Type: Priority: MAINS A COUNCIL AUTHORIZATION: November 24, 1998 - Authorized project expenditure. June 22,1999 - Awarded Bid No. 99-12 for the installation of 8" water line improvements to Gra-Tex RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Water line needed to provide water service to properties along SH10 and improved fire protection coverage. PROJECT DESCRIPTION: Design and installation of an 8" water main along SH10 from Westpark Way to a point east of Raider Drive JUSTIFICATION: 1 . Economic Development 2. lmprove ability of adjacent property owners to develop their property 313 PROJECT TITLE: HVVY 10 WATER LINE PROJECT#: WT9906 NET EFFECTS ON OPERATING ANO MAINTENANCE COST (+ OR -} ANNUAL: Direct operating Cost Personnel: Total Salary Purchase of Services Materials & Supplies Utilities Subtotal:$o Maintenance Costs Subtotal $0 $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Water Mains Engineering Surveying Services Rightof-Way Contingency 89,933 24,061 12,147 3,490 20,369 Total Estimated Capital Cost $150,000 CURREIVTSIAIUS PHASE/FUNDING SOURCE Engineering Services Surveying Services Water Mains Right-of-Way Aqu isition Contingency BUDGET 24,061 12,147 89,933 3,490 20,369 EXPENDED 25,411 12,146 97,836 3,490 0 OVER/UNDER BUDGET G +) 1,350 (1) 7,903 0 (20,369) % EXPENDED 106Yo 100% 1090 lOOo/o o% * - Remaining balance transferred to F89901 . $150,000 $138TOTAL PROJECT J 11 117 93% 314 Full Time Part Time $o Gity of Euless Gapita! Project Request Department: Submitted By: PUBLIC WORKS RANDY BYERS DatePrepared: 7-'17-99 Date Completed: 9-30-99 Project Title: Project Type: Project No.: IMPACT FEE STUDY WATER wT9907 Sub-Type:IMPACT FEE PROJECTS APriority: COUNCIL AUTHORIZATION : January 26, 1999 - Approved the contract for study RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The City's Capital lmprovements Program and lmpact Fee Study must be updated every three years PROJECT DESCRIPTION: I .) Review existing living unit equivalents. 2.) Calculate maximum impact fee 3.) Develop 10 year capital improvement plan JUSTIFICATION: Required by law 315 PROJECT TITLE: IMPACT FEE STUDY NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal: Maintenance Costs $0 Subtotal $o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Planning Services 13,000 Total Estimated Capital Cost $13,000 CURRENT STATUS PHASE/FUNDING SOURCE Planning Services EXPENDED 12,238 OVER/UNDER BUDGET G +) (762) % EXPENDED 94Yo Remaining funds transferred to F89910 $13,000TOTAL PROJECT $12,238 ($zoz;94o/o 316 PROJECT#: WT9907 BUDGET 13,000 Department: Submitted By: Date Prepared: Date Completed: 7-26-99 9-30-99 Project Title: Project Type: Project No.: WATER DIST . MASTER PLAN WATER wT9911 Sub-Type:IMPACT FEE PROJECTS APriority: COUNCIL AUTHORIZATION : November 24, 1998 - Authorized contract with Shimek, Jacobs, & Finklea to perform analysis. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: The water distribution master plan is updated approximalely every three years PROJECT DESCRIPTION: 1.) Analyze water records from the summers of 1996 and 1997. 2.) Develop water model using the Cybernet Hydraulic Water Distribution Model. 3.) Determine line sizes, pressures atjunction modes and effectiveness of elevated storage. 4.) Determine if elevated storage can be refilled to replace water from the drawdown during the maximum hourly demand on the day of maximum usage. 5.) Model pump stations 6.) Verify elevated storage capacity meets the TNRCC minimum water system requirements and the State Board of lnsurance Key Rate standards. JUSTIFICATION: Determines the City's ability to properly distribute water to consumers and provide adequate water flow for fire protection. City of Euless Gapital Project Request 317 PUBLIC WORKS RANDY BYERS PROJECT TITLE: WATER DIST- MASTER PLAN PROJECT#: WT9911 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal: Maintenance Costs $o Subtotal $o $oTotal Estimated Annual Cost TOTAL ESTIMATED GAPITAL COST: Engineering $25,600 Total Estimated Capital Cost $25,600 CURRENTSTATUS PHASE/FUNDING SOURCE Engineering Services BUDGET 25,600 EXPENDED 24,000 OVER/UNDER BUDGET G +) (1,600) % EXPENDED g4o/o Remaining funds transferred to F89910 $2s,600TOTAL PROJECT $24,000 ($1,600)94o/o 318 Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Oate Completed: '10-1-99 1 1-30-99 Project Title: Project Type: Project No.: EMERGENCY REPAIR - HWY 1O WATER Sub-Type: WT0002 Priority: WATER LINE A COUNCIL ACTION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Trenchless replacement of water line under Hwy 10 at Ector. PROJECT DESCRIPTION: Emergency repair of water line break under Hwy 10 at Ector Dr. JUSTIFICATION: 319 City of Euless Capital Project Request PROJECT TITLE: EMERGENCY REPAIR - HWY 10 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Total Salary Purchase of Services Materials & Supplies utilities $o Subtotal: Maintenance Costs $o Subtotal:$o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Water Mains 1 5,450 Total Estimated Capital Cost $15,4s0 CURRE^TSTAIUS PHASE/FUNDING SOURCE Water Mains BUDGET 1 5,450 EXPENDED 14,214 OVEFUUNDER BUDGET (- +) (1,236) % EXPENDED 92o/o Funding for this project received from FB9901 ' - Remainder of $1 ,236 was transferred back to FB9901. TOTAL PROJECT $15,450 $14,214 ($1,236)92% 320 PROJECT#: WT0002 Full Time Part Time Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-26-99 6-30-00 Project Title: Project Type: Project No,: LINE REPLACEMENT, MILAM - ECTOR/MIDWAY WATER Sub-Type: WATER LINE WT0004 Priority: A COUNIL ACTION: March 28, 2000 - Project to be funded from existing Water CIP Fund Balance. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Project consists of replacing water lines along Milam Street from Ector Drive to Midway. JUSTIFICATION: This line has many repair clamps due to leak repairs. The line has deteriorated to the point of needing to be replaced. City of Euless Capital Project Request 32t PROJECT TITLE: LINE REPLACEMENT, MILAM - ECTORyMIDWAY PROJECT #: WT0004 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR.) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal $o Maintenance Costs Subtotal:$o Total Estimated Annual Cost $o TOTAL ESTIMATED CAPITAL COST: Water Mains 18,248 Total Estimated Capital Cost CURRENTSTATUS PHASE/FUNDING SOURCE Water Mains BUDGET 18,248 EXPENDED 13,7 43 OVER/UNDER BUDGET (. +} (4,50s) % EXPENDED 7 5o/o Funding for this project received from F89901 Remaining funds transferred to WT0005 $'r8,248TOTAL PROJECT $13,743 ($4 ,505)75Yo 11,) $18,248 Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Gompleted: 7 -26-99 3-3'1-00 Project Title: Project Type: Proiect No,: CENTRAL DRIVE WATER MAINS WATER Sub-TyPe:WATER MAINS AwT0006Priority: COUNCIL AUTHORIZATION : RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Joint project with the City of Bedford JUSTIFICATION: Bedford is reconstructing Central Drive as a concrete street. The cost of repair or replacement of this line after the new pavement is complete would be substantially more expensive. City of Euless Capital Project Request 323 PROJECT DESCRIPTION: Replace existing 16" water line in Central Drive. Existing main is approximately 40 years old. PROJECT TITLE: CENTRAL DRIVE WATER MAINS PROJECT#: WT0006 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR .) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal $o Maintenance Costs Subtotal:$o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Water main 92,814 Total Estimated Capital Cost $92,814 CURRENISTATUS PHASE/FUNOING SOURCE Water Mains BUDGET 92,814 % EXPENDED 98V" Funding for this project received from F89901 Remaining funds transferred back to F89901 $92,814TOTAL PROJECT $90,742 ($2,072]'98o/o 324 OVERiUNOER EXPENDED BUDGET (. +} 90,742 (2,072) City of Euless Capital Project Request Department: Submitted By: PUBLIC WORKS RANDY BYERS Date Prepared: Date Completed: 7-24-00 4-9-01 Project Title: Project Type: Project No.: SCADA UPGRADE WATER wTo102 Sub-Type: Priority:A COUNGIL AUTHORIZATION : September 26, 2000 - Awarded contract to l&C Sales for upgrade of system RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Upgrade Supervisory Control and Data Acquisition (SCADA) System Hardware and Software JUSTIFICATION: The SCADA System in use today is not Y2K Compliant. Speciflcations for upgrade could not be completed priorto 12l31/99. The time on the computer was set back to a previous date. Since the installation was completed nedimproved technology has evolved. The upgrade will entail all new equipment. Failure to upgrade will result in an apporximate 100% increase in the cost of producing water from our wells. 325 PROJECTTITLE: SCADAUPGRADE PROJECT#: WT0102 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Other Average Annual Debt Service Total Estimated Annual Cost $o TOTAL ESTIMATED CAPITAL COST: SCADA Upgrade $93,400 Total Estimated Capital Cost $93,400 CURRENT STATUS PHASE/FUNDING SOURCE Equipment BUDGET 93,400 EXPENDED 93,400 OVER'UNDER BUDGET G +) 0 % EXPENDED 100o/o $93,400TOTAL PROJECT $93,400 $o 100% 3ZO OTHER GOMPLETED PROJEGTS ! { t F )) CAPITAL ]MPROVEMENTS PROGRAM COi'PLETED PROJECTS SUMMARY AS OF Mav 31. 2001 ProJect Number Prolel Descrlotion Dnlnage Fund Water & Sewer CIP Fund lmpact Fa. Fund Half C.nt Sales Tax Fund Pollce Faclllty CIP Fund Genenl CIP Fund Escrow Funds Over Street Fund Total Prolect Cost OTHER PR0015 Purchase of Dallas Starscenter $10,327,978 s0 s10 327 978 ssglnl Fire Station ll s49.688 $0 s49.688 ss9902 Lib€rv B@ks s3.302 $0 $3.302 ss9919 Fire Station #3 - Structural Repairs s30,000 ($1 2.656)$1 7.344 Sub-f otal Oth er P roiects $3.302 $1 0.407.666 ($12.656)$'t0,398,312 TOTAL FUNDED PROJECTS $294.687 s'127.800 s830.750 $78.600 $3.302 $0 $1 0.407,666 $0 ($287,821 )s1 2,060,526 (f,) l\) ! Department: Submitted By: COMMUNITY DEVELOPMENT RICK HEROLD Date Prepared: Date Completed: 4-1-00 5-31-00 Project Title: Project Type: Project No,: PURCHASE STARS CENTER BUILDING/FACILITY PR0015 Sub-Type: Priority: ACOUISITION A COUNCIL AUTHORIZATION : March 23, 1999 - Authorization to execute a letter of intent with the Dallas Stars regarding Texas Star. June 8, 1999 - Dkect City Manager to schedule public hearings for the annexation of property. June 8, 1999 - Prepare a City Service Plan for the property being annexed. July 29, 1999 - Hold Public Hearing on the annexation of property from Ft. Worth. July 29, 1999 - Approval of Joint Resolution with Ft. Worth agreeing to disannex 21.3 acres. September 14, 1999 - Approve and authorize City Manager to execute Purchase Lease Agreement. October 12, 1999 - Approve Ordinance 138'l providing for the annexation of 21 .3 acres. October 26, 1999 - Public Hearing on SUP that will allow for the construction of the StarsCenter. October 26, 1999 - Approve SUP to allow for the construction of the Dr. Pepper StarsCenter. October 26, 1999 - Public Hearing on zoning change or Dr. Pepper Starscenter. October 26, '1999 - Approve zoning change for Dr. Pepper StarsCenter. January 11, 2000 - Approve resolution authorizing the publication of notice of intent to issue C.O.'s January 31, 2000 - Authorize issuance of T&W and Sewer Rev. Cert. Of Obligation, Taxable Series 2000 February 8, 2000 - Final Reading and Approval of issuance of Cert. Of Obligation, Taxable Series 2000. February 8,2000 - Authorize City Manager to execute Tri-Party Agreement between Euless, Stars, & BoA. February 22,2000 - Authorize modifications to Purchase and Lease Agreement. April 11, 2000 - Authorize issuance of T&W and Sewer Rev. Cert. Of Obligation, Taxable Series 2000 April 1't,2000 - Approved amendment to a Purchase/Lease Agreement to accept cash escrow. June 12,2000 - Executed the documents to close on the purchase of the facility. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Many of the athletic complex Phase ll issues were addressed in conjunction with this project. PROJECT DESCRIPTION: The City purchased a two rink ice facility. This facility will be leased and operated by the Dallas Stars. lt is anticipated to accommodate league hockey play and public skate as well as host regional and national skating events. JUSTIFICATION: This will provide an ice skating facility to our community without burden to the Euless tax payers City of Euless Gapital Project Request 328 PROJECT TITLE: PURCHASE STARS CENTER PROJECT#: PR0015 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal:$o Maintenance Costs Subtotal:$o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Building Acquisition Equipment lssuance Cost Star Center Debt 9,391,814 445,223 146,000 344,941 Total Estimated Capital Cost $10,327,978 CURRENTSIAIUS PHASE/FUNDING SOURCE Building Acquisition Equipment lssuance Cost Star Center Debt BUDGET 9,391 ,814 445,223 146,000 344,941 EXPENDED 9,391 ,814 445,223 146,000 344,941 OVER/UNDER BUDGET (. +)% EXPENDED 0 100%0 100% 0 100% 0 100% $10,327,978 $10,327,978TOTAL PROJECT $o 100% 329 Department: Submitted By: Date Prepared: Date Completed: 8-2-99 3-30-00 Project Title: Project Type: Pro.iect No.: FIRE STATION ll - 1 5'15 Westpark Way BUILDING/FACILITIES Sub-Type: REMODEL SS9901 Priority: A COUNCIL AUTHORIZATION : October 14, 1997 - Award Bid No. 97-37 for project construction. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Replacement of fire station #2 due to major repairs and enlargement Westpark Way. PROJECT OESCRIPTION: Renovation of old vehicle repair center. Construction of new apparatus bays to the east of the main building. Removal of existing structures within the old service center. Remove and replace interior concrete floor, construct new eight (8) bed dormitory, kitchen and food preparation area, day room, offices, training room, lavatory room and shower area. Exterior drive approaches were reworked to facilitate movement in and out of the apparatus. Building exterior received new paint scheme to match the current City colors. Stucco panels and face brick was repaired and either painted or cleaned. JUSTIFICATION: With construction and widening of Westpark Way, driveway at existing Fire Station #2 would be too short (15') to accommodate fire apparatus. Building was in need of major interior renovation and upgrades. With the move of Fleet Services into a new building, this left the old vehicle repair center available for renovation. The location and the existing structure lent itself as a logical location to relocate Fire Station #2. City of Euless Capital Project Request 330 SUPPORT SERVICES TOM COX PROJECTTITLE: FIRE STATION ll - 1515Wes ark w PROJECT#: SS9901 TOTAL ESTIMATED CAPITAL COST: Total Estimated Gapital Cost 49,688Construction $49,688 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Total Estimated Annual Cost Subtotal: Subtotal $o $o Maintenance Costs $o $o Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Direct Operating Cost Personnel: CURRE'VTSTATUS (Expenses prior to FY99 not reflected) This project received additional funding in the amount of $6,177 from FB9909 (0) $49,688 10oo/o$49,688TOTAL PROJECT ($01 OVER/UNDER BUDGET G +)% EXPENDED '100% EXPENDED 49,688 PHASE/FUNDING SOURCE Fire Station ll 331 BUDGET 49,688 Department: Submitted By: SUPPORT SERVICES TOM COX Oate Prepared: 8-2-99 Date Completed: 8-15-00 Project Title: Project Type: Project No.: LIBRARY BOOKS HALF-CENT SALES TAX ss9902 Sub-Type: Priority: LIBRARY A COUNCIL AUTHORIZATION : Approved as part of Sales Tax Revenue Bonds, Series 1994. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Funds remaining from bond sale related to new library facility and amenities JUSTIFICATION: This item was one of the projects stated in the initial approval for the Half Cent Sales Tax. City of Euless Capital Project Request 332 PROJEGTTITLE: LIBRARYBOOKS PROJEGT #: SS9902 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operatino Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $0 Subtotal: Maintenance Costs $o Subtotal $o Total Estimated Annual Cost $0 TOTAL ESTIMATED CAPITAL COST: Library Book Purchase 3,302 Total Estimated Capital Cost $3,302 CURRENTSTATUS PHASE/FUNDING SOURCE Library Books BUDGET 3,302 EXPENDED 3,302 OVER/UNDER BUDGET (. +)% EXPENDED 10Oo/o0 (Expenses prior to FY99 not reflected) TOTAL PROJECT $3,302 $3 302 $o 100Yo 333 Oepartment: Submitted By: SUPPORT SERVICES TOIV COX Date Prepared: 8-2-99 Date Completed: 3-30-00 Project Title: Project Type: Project No.: FIRE STATION #3 - STRUCTURAUCOSMETIC REPAIRS BUILDING/FACILITIES Sub-Type: REMODEL SS9919 Priority: A COUNCIL AUTHORIZATION : May 24, 1999 - Council notification RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: Replace concrete drive approaches into the north and south sides of the apparatus bays. Replace carpet and floor coverings in the watch office and living areas. Sawcut and sealed cracks in the apparatus bay floors. Repair external cracks in the stucco panels. Repaint interior walls and refinish the cabinets. JUSTIFICATION: City of Euless Capita! Project Request 334 PROJECT TITLE: FIRE STATION #3 - STRUCTURAUCOSMETIC RE PROJECT #: SS9919 NET EFFECTS ON OPERATING AND MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities $o Subtotal $o Maintenance Costs Subtotal $o $oTotal Estimated Annual Cost TOTAL ESTIMATED CAPITAL COST: Construction 30,000 Total Estimated Capital Cost $30,000 CURRENT STATUS PHASE/FUNDING SOURCE Fire Station Foundation Repair BUDGET 30,000 % EXPENDED 58% ' - Remaining funds transferred to F89909 $30,000TOTAL PROJECT 917 ,344 ($12,656)58v. 335 OVER/UNDER EXPENDED BUDGET (- +) 17 ,344 (12,656)