HomeMy WebLinkAboutPreliminary Capital Improvements Program FY25-26City of
Euless
Preliminary Capital
Improvements Program
Fiscal Year Ending September 30, 2026
201 N. Ector Drive, Euless, TX 76039 www.eulesstx.gov
City of Euless
FISCAL YEAR 2025-26
Council Members
LINDA MARTIN, MAYOR
Tim Stinneford, Mayor Pro Tem, Place One
Jeremy Tompkins, Place Two
Eddie Price, Place Three
Perry Bynum, Place Four
Annabel Eads, Place Five
Tika Paudel, Place Six
Chris Barker, City Manager
Steven Viera, Assistant City Manager
Lawrence Bryant, Assistant City Manager
TABLE OF CONTENTS
CAPITAL IMPROVEMENTS PROGRAM
City Officials
Table of Contents
Letter
i-iv
vi-vii
FUNDED PROJECTS
Summary of Funded Projects 1
FY2024-25 Amendments 3
Drainage Proiects
Summary of Funded Drainage Projects 5
DR9903 Miscellaneous Drainage Improvements 6
DR1101 Flooding Mitigation 8
DR1201 Miscellaneous Creek Maintenance 10
DR2501 Carr Park Creek Erosion Protection 12
DR2503 South Mills Drive Outfall Restoration 14
Street Proiects
Summary of Funded Street Projects 17
PS1203 Miscellaneous Street Repairs 18
PS 1601 East Harwood Road Extension 20
PS1902 FY2018-19 Street Reconstruction — Pipeline/Highland/Harwood 24
PS1903 Miscellaneous Screening Wall Repair 28
PS2302 Heritage Avenue — Cheek-Sparger Road to Guadalupe Trail 30
PS2501 Fuller -Wiser Road/Bear Creek Parkway Roadway Rehabilitation 34
PS2502 FY2024-25 Street Improvements 36
Wastewater Proiects
Summary of Funded Wastewater Projects 39
WW0002 Miscellaneous Wastewater Rehabilitation 40
WW0605 TRA Wastewater Payments — Impact 42
WW2301 Line Replacement — Cedar Hill Estates South Phase I 44
WW2302 Line Replacement — Cedar Hill Estates South Phase II 48
WW2304 Line Replacement — Trailwood Addition 52
WW2401 FY2023-24 50th CDBG LR: Fair Oaks Blvd./Shelmar Dr./Kensinger Ct. 56
WW2501 FY2024-25 51 st CDBG LR: Milam Drive 60
WW2502 Line Replacement — Oakwood Terrace North Phases I, II, & III — Engineering 64
Water Proiects
Summary of Funded Water Projects 69
WT0001 Miscellaneous Water Rehabilitation 70
WT0104 Well Repairs 72
WT0803 Meters/Transponders/Leak Detection 74
WT1403 Reclaimed Water Line Extension Debt Payment — Impact 76
WT1603 Miscellaneous Valve Replacement 78
WT1604 Reclaimed Water Line Extension Phase III 80
WT1802 Well Replacement — Fuller/Far North 84
WT2301 Line Replacement — Midway Park 1st Addition 88
WT2302 Line Replacement — Oakwood Terrace 92
WT2303 Line Replacement — South Main Street 96
WT2401 Line Replacement — Huntington Drive Phase II 100
WT2402 Line Replacement — Sotogrande Boulevard Phase I 104
WT2501 Line Replacement — Sotogrande Boulevard Phase II 108
Other Proiects
Summary of Funded Other Projects 113
AC1901 Texas Star Sports Complex Phase VII 114
CM0304 Entry Monument Sign Program 116
CM0804 Redevelopment 118
CM1701 Municipal Plaza Improvements Phase II 120
DV9901 EDC Incentive Funds 122
ED1002 EDC Contingency 124
ED 1601 Midtown Development 126
FM1201 ADA/TAS Facility Improvements 128
FM2207 Miscellaneous Roof Repairs & Preventative Maintenance 130
FM2311 Fire Station #2 132
FM2312 Police & Courts Building Remodel 134
FM2409 Animal Shelter Expansion/Renovation 136
FM2508 Facility Renovations at 1400 South Pipeline Road 138
GC 1801 TSGC Miscellaneous Improvements 140
GC2501 Golf Course Upgrades 142
PR0720 Miscellaneous Park Improvements 144
PR0804 Park Irrigation 146
PR2508 Parks at Texas Star South Improvements 148
PR2510 Playground Shade Structures 150
PROPOSED & UNFUNDED PROJECTS
Summary of FY2025-26 Proposed & Unfunded Projects — Sorted by Type 153
Drainage Proiects
Summary of FY2025-26 Proposed & Unfunded Drainage Projects 155
FY2025-26 Drainage Curb & Gutter Improvements 156
FY2026-27 Drainage Curb & Gutter Improvements 158
FY2027-28 Drainage Curb & Gutter Improvements 160
FY2028-29 Drainage Curb & Gutter Improvements 162
FY2029-30 Drainage Curb & Gutter Improvements 164
Valley Gutter Replacement — Crane Drive 166
Street Proiects
Summary of FY2025-26 Proposed & Unfunded Street Projects 167
FY2025-26 Street Improvements 168
Traffic Signal — SH 10 & Dickey Drive 170
Traffic Signal Intersection Improvements — FM 157 & Signet Drive 174
FY2026-27 Street Improvements 178
FY2027-28 Street Improvements 180
FY2028-29 Street Improvements 182
ii
Cresthaven Drive Reconstruction 184
FY2029-30 Street Improvements 186
East Alexander Lane Reconstruction 188
Midway Drive Reconstruction Phase I 189
Midway Drive Reconstruction Phase II 190
Midway Drive Reconstruction Phase III 191
Ross Avenue Extension 192
Sheppard Drive Reconstruction 193
Vine Street Reconstruction — SH 183 to SH 10 194
Wastewater Proiects
Summary of FY2025-26 Proposed & Unfunded Wastewater Projects 195
FY2025-26 52nd CDBG LR: Martin/Slaughter/E Huitt 196
Line Replacement — Oakwood Terrace North Phases I & II Construction 200
Line Replacement — Vine Street Engineering 204
FY2026-27 53rd CDBG LR: Fair Oaks Drive/Lone Oak Circle 208
Line Replacement — Oakwood Terrace North Phase III — Construction 210
Line Replacement — Vine Street Construction 212
FY2027-28 54th CDBG LR: Twin Oaks Court/Shady Hollow 214
Line Replacement — Woodvine Drive Engineering 216
Line Replacement — Cliffwood Road/Shady Creek Drive Engineering 218
Line Replacement — Euless Junior High School/Himes Drive/N Byers Street Engineering 220
FY2028-29 55th CDBG LR: Douglas Street 222
Line Replacement — Woodvine Drive Construction 224
Line Replacement — Cliffwood Road/Shady Creek Drive Construction 226
Line Replacement — Euless Junior High School/Himes Drive/N Byers Street Construction 228
FY2029-30 56th CDBG LR: Fair Oaks Drive/Roundtree Drive 230
Line Replacement — Knob Hill 232
Water Proiects
Summary of FY2025-26 Proposed & Unfunded Water Projects 233
Line Replacement — Sagebrush Trail 234
Line Replacement — Bell -Hi Addition Phases I & II Engineering 238
Line Replacement — West Euless Boulevard Engineering 240
Line Replacement — Bell -Hi Addition Phases I & II Construction 242
Line Replacement — Donley Drive/Donley Court Engineering 244
Line Replacement — West Euless Boulevard Construction 246
Line Replacement — Donley Drive/Donley Court Construction 248
Line Replacement — Fuller -Wiser Road Engineering 250
Line Replacement — Fuller -Wiser Road Construction 252
1 Mil Well Replacement 254
Line Replacement — Dunaway Drive 255
Line Replacement — Knob Hill 256
Line Replacement — Midway Park 3rd Addition 257
Line Replacement — Midway Drive 258
Line Replacement — Westpark Way 259
iii
Other Projects
Summary of FY2025-26 Proposed & Unfunded Other Projects 261
Euless Family Life Center Expansion Feasibility/Programming Study 262
Kiddie Carr Park Improvements 264
Parks at Texas Star South Batting Cage Redevelopment 266
South Euless Park Improvements 268
J.A. Carr Park Expansion 270
Parks at Texas Star South Turf Replacement 272
Euless Family Life Center Expansion Design/Development 274
Parks at Texas Star Phase VIII 276
Euless Family Life Center Expansion Construction Document Development 278
Euless Family Life Center Expansion Construction 280
Parks at Texas Star North Turf Replacement 281
Parks at Texas Star South Entrance Improvements 282
Trail Enhancements Phase I 283
Trail Enhancements Phase II 284
Trail/Park Enhancements Villages of Bear Creek 285
Trailwood Park Improvements 286
West Park Improvements 287
COMPLETED PROJECTS
Drainage Projects
Summary of Completed Drainage Projects 289
FY2024-25 Drainage Curb & Gutter Improvements 290
Street Proiects
Summary of Completed Street Projects 293
PS2202 Mid-Cities/Cheek-Sparger & SH 121 Intersection/ADA Improvements Design 296
PS2401 FY2023-24 Street Improvements 298
Wastewater Proiects
Summary of Completed Wastewater Projects 301
Water Proiects
Summary of Completed Water Projects 305
Other Proiects
Summary of Completed Other Projects 309
PR2011 Wilshire Park Upgrades 312
PR2203 Blessing Branch Park Improvements 314
PR2404 Parks at Texas Star Lighting Upgrade 316
PR2509 Parks at Texas Star South Turf— Fenway/Shea/Jacobs Fields 318
iv
THE CITY OF
EULESS
THE CITY OF
EUL€SS
July 18, 2025
Honorable Mayor Linda Martin
Honorable City Councilmembers:
Tim Stinneford, Mayor Pro Tem, Place One
Jeremy Tompkins, Place Two
Eddie Price, Place Three
Perry Bynum, Place Four
Annabel Eads, Place Five
Tika Paudel, Place Six
INTRODUCTION
The City of Euless' Capital Improvements Program is a comprehensive document detailing all projects
that have been identified to date. Emphasis has been placed on organizing this data in a manner that
will facilitate decision -making processes, assist in long-range planning, and provide the citizens of
Euless with information regarding planned projects. This document meets the requirements of the
City Charter. Article VII, Section 2 (5) requires, "A statement proposing any capital expenditures
deemed necessary for undertaking during the next budget year and recommended provisions for
financing." Section 2 (6) further requires, "A list of capital projects which should be undertaken within
the five (5) next succeeding years."
We extend special appreciation to the directors and the finance staff for their outstanding performance
in creating this document.
UNDERSTANDING THIS BOOK
Although this book contains a large volume of information, the summaries should make it easy to
understand at a glance. The book is divided into three sections: Funded Projects, FY2026 Proposed
and Unfunded Projects, and Completed Projects. Each section begins with a summary and is followed
by detailed data for those wishing to research individual projects.
The detail provided includes the project's relationship to City master plans, the project description and
justification, the effect on future maintenance and operating costs, and the estimated total cost. Within
each section, you will find the detailed descriptions sorted by type. There are five basic project types:
Drainage, Streets, Wastewater, Water, and Other.
The Funded Projects section includes all projects that the City Council has previously authorized.
Many of these projects are on -going and require additional funding from time to time. For each project,
a detailed description has been provided that includes any City Council authorization, the current
status of the project, and a financial summary detailing funding sources and total project budget. Any
amendments or additional appropriations requested are also identified.
201 N. Ector Drive, Euless, Texas 76039-3595
817/685-1400 • Fax 817/685-1416
www.eulcsstx.gov
vi
Any project that has been authorized by the City Council that is not fully funded will include a clear
explanation as to how the remainder of the project is expected to be funded.
The FY2026 budget includes additional funding for impact fee payments, Trailwood Addition, water
line replacements, municipal plaza improvements, generator for Animal Shelter, and replenishing
ongoing miscellaneous improvement projects.
The FY2026 Proposed and Unfunded Projects section has been classified into three categories of
priority. PriorityA indicates the item is recommended and funding has been identified in the proposed
FY2026 budget. Staff recommends City Council authorization for these projects. Priority B projects
should be presented to Council within two to five years for consideration. Projects that will not begin
for at least five years have been assigned a Priority C. This system has been used to allow the
Council to evaluate and shift priorities, when necessary, and to provide a means of budgeting capital
projects for at least five years. Recommended funding sources have been indicated if known.
The Completed Projects section provides a summary for each project type indicating total project
budget, actual expenditure, and variance. Funds remaining have been returned to the appropriate
fund balance account for re -appropriation. Details of projects closed during the prior year have also
been included.
FY2026 PROJECTS:
Funding has been identified for all proposed FY2026 projects which are reflected on the FY2026
Proposed and Unfunded Projects Summary as Priority A. These include:
• FY2025-26 Drainage Curb & Gutter Improvements
• FY2025-26 Street Improvements
• Traffic Signal — SH 10 & Dickey Drive
• Traffic Signal Intersection Improvements — FM 157 & Signet Drive
• FY2025-26 52nd CDBG Wastewater Line Replacement — Martin/Slaughter/E Huitt
• Wastewater Line Replacement — Oakwood Terrace North Phases I & II Construction
• Wastewater Line Replacement — Vine Street Engineering
• Water Line Replacement — Sagebrush Trail
• Euless Family Life Center Expansion Feasibility/Programming Study
• Kiddie Carr Park Improvements
• Parks at Texas Star South Batting Cage Redevelopment
• South Euless Park Improvements
CLOSING COMMENTS
This document is prepared as a comprehensive summary of capital needs that have been identified
throughout the City of Euless. This document will be updated annually to aid the City Council in
allocating resources and determining priorities.
S. ria,reIy
--Chris Barker
City Manager
201 N. Ector Drive, Euless, Texas 76039-3595
817/685-1400 • Fax 817/685-1416
www.eulesstx.gov
vii
THE CITY OF
EULESS
viii
Project
Number
Project Description
CAPITAL IMPROVEMENTS PROGRAM
FUNDED PROJECTS SUMMARY
Unfunded/
Budget as of Appropriation/ Budget as of Expended as of Remaining Revised Project (Excess
5/31/24 Amendment 5/31/25 5/31/25 Funds Cost Estimates Funding)
DRAINAGE PROJECTS
DR9903 Misc. Drainage Improvements $ 1,240,777 $ $ 1,240,777 $ 1,107,106 $ 133,671 $ 1,306,777 $ 66,000
DR1101 Flooding Mitigation $ 501,265 $ (160,000) $ 341,265 $ 122,334 $ 218,931 $ 341,265 $
DR1201 Misc. Creek Maintenance (min bal $100,000) $ 270,000 $ $ 270,000 $ 175,293 $ 94,707 $ 276,000 $ 6,000
DR2501 Carr Park Creek Erosion Protection $ - $ 105,000 $ 105,000 $ $ 105,000 $ 105,000 $
DR2503 South Mills Drive Outfall Restoration $ $ 55,000 $ 55,000 $ - $ 55,000 $ 55,000 $
FB9902 Fund Balance - Drainage CIP $ $ $ $ $ $ $ (212,572)
Sub -Total Drainage Projects $ 2,012,042 $ - $ 2,012,042 $ 1,404,733 $ 607,309 $ 2,084,042 $ (140,572)
STREET PROJECTS
PS1203 Misc. Street Repairs (min bal $150,000) $ 993,150 $ - $ 993,150 $ 837,746 $ 155,404 $ 1,143,150 $ 150,000
PS1601 East Harwood Road Extension $ 100,000 $ $ 100,000 $ $ 100,000 $ 100,000 $
PS1902 FY2018-19 Street Reconstruction - Pipeline/Highland/Harwood $ 20,666,636 $ 1,290,083 $ 21,956,719 $ 14,937,659 $ 7,019,060 $ 21,956,719 $
PS1903 Misc. Screening Wall Repair (annual transfer $25,000) $ 125,000 $ 25,000 $ 150,000 $ 32,000 $ 118,000 $ 175,000 $ 25,000
PS2302 Heritage Avenue - Cheek-Sparger Road to Guadalupe Trail $ 500,000 $ $ 500,000 $ $ 500,000 $ 500,000 $
PS2501 Fuller -Wiser Road/Bear Creek Parkway Roadway Rehabilitation $ - $ 165,000 $ 165,000 $ $ 165,000 $ 165,000 $
PS2502 FY2024-25 Street Improvements $ - $ 1,125,000 $ 1,125,000 $ 328,397 $ 796,603 $ 1,125,000 $ -
FB9907 Fund Balance - Street CIP $ - $ $ $ $ - $ - $ (356,586)
Sub -Total Street Projects $ 22,384,786 $ 2,605,083 $ 24,989,869 $ 16,135,802 $ 8,854,067 $ 25,164,869 $ (181,586)
WASTEWATER PROJECTS
WW0002 Misc. Wastewater Rehab (min bal $100,000) $ 881,086 $ 100,000 $ 981,086 $ 845,180 $ 135,906 $ 1,081,086 $ 100,000
WW0605 TRAWastewaterPayments- Impact $ 1,580,000 $ 50,000 $ 1,630,000 $ 1,580,000 $ 50,000 $ 1,680,000 $ 50,000
WW2301 Line Replacement - Cedar Hill Estates South Phase I $ 622,867 $ $ 622,867 $ 360,725 $ 262,142 $ 622,867 $
WW2302 Line Replacement - Cedar Hill Estates South Phase II $ 534,713 $ - $ 534,713 $ 358,045 $ 176,668 $ 534,713 $
WW2304 Line Replacement-Trailwood Addition $ 3,190,549 $ $ 3,190,549 $ 2,197,949 $ 992,600 $ 3,360,549 $ 170,000
WW2401 FY2023-24 50th CDBG LR: Fair Oaks Blvd./Shelmar Dr./Kensinger Ct. $ 633,972 $ $ 633,972 $ 59,214 $ 574,758 $ 633,972 $
WW2501 FY2024-25 51st CDBG LR: Milani Drive $ - $ 300,750 $ 300,750 $ $ 300,750 $ 300,750 $
WW2502 Line Replacement -Oakwood Terrace North Phases I, II, & III - Engineering $ - $ 309,000 $ 309,000 $ 35,414 $ 273,586 $ 109,000 $ (200,000)
FB9911 Fund Balance - Wastewater Impact (Restricted)
Sub -Total Wastewater Projects
$ $ $ $ $ - $ - $ (697,007)
$ 7,443,187 $ 759,750 $ 8,202,937 $ 5,436,527 $ 2,766,410 $ 8,322,937 $ (577,007)
WATER PROJECTS
WT0001 Misc. Water Rehab (min bal $150,000) $ 1,128,511 $ $ 1,128,511 $ 964,439 $ 164,072 $ 1,128,511 $
WT0104 Well Repairs (annual transfer $50,000) $ 1,763,992 $ 50,000 $ 1,813,992 $ 1,720,935 $ 93,057 $ 1,863,992 $ 50,000
WT0803 Meters/Transponders/Leak Detection (annual transfer $158,000) $ 2,992,944 $ 158,000 $ 3,150,944 $ 1,595,066 $ 1,555,878 $ 3,308,944 $ 158,000
WT1403 Reclaimed Water Line Extension Debt Payment - Impact $ 1,316,652 $ 120,050 $ 1,436,702 $ 1,396,684 $ 40,018 $ 1,553,552 $ 116,850
WT1603 Misc. Valve Replacement (min bal $150,000) $ 515,000 $ 50,000 $ 565,000 $ 414,051 $ 150,949 $ 565,000 $
WT1604 Reclaimed Water Line Extension Phase III $ 6,124,803 $ $ 6,124,803 $ 4,624,803 $ 1,500,000 $ 6,124,803 $ -
WT1802 Well Replacement- Fuller/Far North $ 11,110,110 $ (3,754) $ 11,106,356 $ 11,086,994 $ 19,362 $ 11,106,356 $
WT2301 Line Replacement - Midway Park 1st Addition $ 649,203 $ $ 649,203 $ 607,604 $ 41,599 $ 649,203 $ -
WT2302 Line Replacement - Oakwood Terrace $ 1,986,005 $ $ 1,986,005 $ 1,926,011 $ 59,994 $ 1,986,005 $
WT2303 Line Replacement - South Main Street $ 2,081,008 $ $ 2,081,008 $ 1,826,752 $ 254,256 $ 2,081,008 $
1
Project
Number
Project Description
CAPITAL IMPROVEMENTS PROGRAM
FUNDED PROJECTS SUMMARY
Unfunded/
Budget as of Appropriation/ Budget as of Expended as of Remaining Revised Project (Excess
5/31/24 Amendment 5/31/25 5/31/25 Funds Cost Estimates Funding)
WATER PROJECTS - CONTINUED
WT2401 Line Replacement- Huntington Drive Phase II $ 520,000 $ $ 520,000 $ $ 520,000 $ 520,000 $
WT2402 Line Replacement-Sotogrande Boulevard Phase I $ 365,000 $ - $ 365,000 $ 39,200 $ 325,800 $ 635,000 $ 270,000
WT2501 Line Replacement-Sotogrande Boulevard Phase II $ - $ 365,000 $ 365,000 $ 30,400 $ 334,600 $ 713,000 $ 348,000
FB9910 Fund Balance - Water Impact (Restricted) $ $ $ $ $ $ $ (2,988,230)
FB9901 Fund Balance - Water & Wastewater CIP $ - $ - $ - $ - $ - $ - $ (3,438,026)
Sub -Total Water Projects $ 30,553,228 $ 739,296 $ 31,292,524 $ 26,232,939 $ 5,059,585 $ 32,235,374 $ (5,483,406)
OTHER
AC1901 Texas Star Sports Complex Phase Vll $ 5,127,307 $ (7,811) $ 5,119,496 $ 5,071,726 $ 47,770 $ 5,119,496 $
CM0304 Entry Monument Sign Program $ 145,782 $ - $ 145,782 $ 121,427 $ 24,355 $ 145,782 $ -
CM0804 Redevelopment $ 12,785,298 $ 1,079,417 $ 13,864,715 $ 11,785,003 $ 2,079,712 $ 13,864,715 $
CM1701 Municipal Plaza Improvements Phase II $ 446,733 $ - $ 446,733 $ 216,445 $ 230,288 $ 516,733 $ 70,000
DV9901 EDC Incentive Funds (annual transfer $25,000) $ 1,775,854 $ 25,000 $ 1,800,854 $ 1,351,148 $ 449,706 $ 1,825,854 $ 25,000
ED1002 EDC Contingency $ 325,000 $ - $ 325,000 $ 68,772 $ 256,228 $ 325,000 $ -
ED1601 Midtown Development $ 16,417,980 $ $ 16,417,980 $ 16,356,989 $ 60,991 $ 16,417,980 $
FM1201 ADA/TAS Facility Improvements (min bal $75,000) $ 200,000 $ 15,000 $ 215,000 $ 138,950 $ 76,050 $ 245,000 $ 30,000
FM2207 Misc. Roof Repairs & Preventative Maintenance (min bal $100,000) $ 94,000 $ $ 94,000 $ $ 94,000 $ 160,000 $ 66,000
FM2311 Fire Station #2 $ 10,974,845 $ 162,379 $ 11,137,224 $ 9,810,498 $ 1,326,726 $ 11,137,224 $ -
FM2312 Police & Courts Building Remodel $ 26,903,205 $ 1,161,555 $ 28,064,760 $ 8,528,930 $ 19,535,830 $ 28,064,760 $
FM2409 Animal Shelter Expansion/Renovation $ 6,125,000 $ 150,000 $ 6,275,000 $ 1,902,464 $ 4,372,536 $ 6,525,000 $ 250,000
FM2508 Facility Renovations at 1400 South Pipeline Road $ - $ 3,200,000 $ 3,200,000 $ $ 3,200,000 $ 3,200,000 $
GC1801 TSGC Misc. Improvements (min bal $150,000) $ 637,180 $ 75,000 $ 712,180 $ 627,513 $ 84,667 $ 777,180 $ 65,000
GC2501 Golf Course Upgrades $ - $ 2,240,000 $ 2,240,000 $ 565,173 $ 1,674,827 $ 2,240,000 $
PR0720 Misc. Park Improvements (min bal $200,000) $ 1,818,253 $ 200,000 $ 2,018,253 $ 1,735,729 $ 282,524 $ 2,118,253 $ 100,000
PR0804 Park Irrigation (annual transfer $25,000) $ 425,000 $ 25,000 $ 450,000 $ 313,621 $ 136,379 $ 475,000 $ 25,000
PR2508 Parks at Texas Star South Improvements $ - $ 750,000 $ 750,000 $ 77,068 $ 672,932 $ 750,000 $
PR2510 Playground Shade Structures $ $ 950,000 $ 950,000 $ 61,774 $ 888,226 $ 950,000 $
FB9906 Fund Balance - EDC CIP $ - $ - $ - $ - $ - $ - $ (3,946,342)
FB9908 Fund Balance - Parks at Texas Star CIP $ $ $ $ $ $ $ (171,689)
FB9909 Fund Balance -General CIP $ - $ - $ - $ - $ - $ - $ (8,436,236)
FB9913 Fund Balance - Car Rental CIP $ $ $ $ $ - $ - $ (2,827,430)
FB9916 Fund Balance - TSGCCIP $ - $ - $ - $ - $ - $ - $ (114,773)
Sub -Total Other Projects $ 84,201,437 $ 10,025,540 $ 94,226,977 $ 58,733,230 $ 35,493,747 $ 94,857,977 $ (14,865,470)
TOTAL FUNDED PROJECTS $ 146,594,680 $ 14,129,669 $ 160,724,349 $ 107,943,231 $ 52,781,118 $ 162,665,199 $ (21,248,041)
2
CITY OF EULESS
CAPITAL IMPROVEMENT PROGRAM
AMENDMENTS --FUNDED PROJECTS
PROJECT*
PROJECT DESCRIPTION
AC1901 Texas Star Sports Complex Phase VII
CM0804 Redevelopment
CM0804 Redevelopment
DR1101 Flooding Mitigation
DR2501 Carr Park Creek Erosion Protection
DR2502 FY2025 Drainage Curb & Gutter Improvements
DR2502 FY2025 Drainage Curb & Gutter Improvements
DR2503 South Mills Drive Outfall Restoration
DV9901 EDC Incentive Funds
FM1201 ADA/TAS Facility Improvements
FM2311
FM2312
FM2409
Fire Station #2
Police & Courts Building Remodel
Animal Shelter Expansion/Renovation
FM2508 Facility Renovations at 1400 South Pipeline Road
FM2508 Facility Renovations at 1400 South Pipeline Road
GC1801 TSGC Miscellaneous Improvements
GC2501 Golf Course Upgrades
GC2501
Golf Course Upgrades
PR0720 Miscellaneous Park Improvements
PR0804 Park Irrigation
PR2011 Wilshire Park Upgrades
PR2203 Blessing Branch Park Improvements
PR2404 Parks at Texas Star Lighting Upgrade
PR2508 Parks at Texas Star South Improvements
PR2509 Parks at Texas Star South Turf— Fenway/Shea/Jacobs Fields
PR2509 Parks at Texas Star South Turf— Fenway/Shea/Jacobs Fields
PR2510 Playground Shade Structures
P51902 FY2019 Street Reconstruction — Pipeline/Highland/Harwood
PS1902 FY2019 Street Reconstruction — Pipeline/Highland/Harwood
PS1903 Miscellaneous Screening Wall Repair
PS2202 Mid-Cities/Cheek-Sparger & SH 121 Intersection/ADA Imp.
Design
PS2401 FY2024 Street Improvements
PS2501 Fuller -Wiser Road/Bear Creek Parkway Roadway
Rehabilitation
PS2502 FY2025 Street Improvements
WT0104 Well Repairs
WT0803 Meters/Transponders/Leak Detection
DATE
05/31/2025
10/01/2024
05/31/2025
10/01/2024
10/01/2024
ENDENTS & ACTIONS
To decrease budget by 7MM
,811 for arbitrage payment.
To provide additional funding per FY2025 Approved CIP Plan — $1,000,000
from Car Rental Fund.
To increase funding for earned interest of $79,417.
To transfer excess funding per FY2025 Approved CIP Plan — $160,000 to
Drainage CIP Fund Balance.
To provide funding per FY2025 Approved CIP Plan — $105,000 from
Drainage CIP Fund Balance.
10/01/2024 To provide funding per FY2025 Approved CIP Plan — $265,000 from
Drainage Operating Fund.
05/31/2025 To close project.
10/01/2024 To provide funding per FY2025 Approved CIP Plan — $55,000 from
Drainage CIP Fund Balance.
To provide additional funding per FY2025 Approved CIP Plan — $25,000
from EDC Operating Fund.
To provide additional funding per FY2025 Approved CIP Plan — $15,000
from Car Rental CIP Fund Balance.
To increase funding for earned interest of $162,379.
To increase funding for earned interest of $1,161,555.
To provide additional funding per FY2025 Approved CIP Plan — $150,000
from Car Rental Fund.
To provide funding per FY2025 Approved CIP Plan — $1,500,000 from Car
Rental Fund and $1,500,000 from Dallas Stars Contribution.
To provide additional funding per City Council Authorization — $100,000
from Car Rental Fund and $100,000 from Dallas Stars Contribution.
To provide additional funding per FY2025 Approved CIP Plan — $75,000
from TSGC Reserve Fund.
To provide funding per FY2025 Approved CIP Plan — $2,140,000 from Car
Rental Fund.
To provide additional funding per City Council Authorization — $50,000
from Hotel/Motel Fund and $50,000 from Car Rental Fund.
To provide additional funding per FY2025 Approved CIP Plan — $200,000
from EDC Operating Fund.
To provide additional funding per FY2025 Approved CIP Plan — $25,000
from EDC Operating Fund.
To close project and transfer excess funding of $703 to EDC CIP Fund
Balance.
05/31/2025 To close project and transfer excess funding of $32,054 to EDC CIP Fund
Balance.
05/31/2025 To close project.
10/01/2024 To provide funding per FY2025 Approved CIP Plan
Operating Fund.
10/01/2024 To provide funding per FY2025 Approved CIP Plan
Operating Fund.
05/31/2025 To close project.
10/01/2024 To provide funding per FY2025 Approved CIP Plan
Operating Fund.
To provide additional funding per FY2025 Approved CIP Plan — $1,000,000
from Federal Appropriations Grant.
To increase funding for earned interest of $290,083.
To provide additional funding per FY2025 Approved CIP Plan — $25,000
from General Fund.
To close project.
10/01/2024
10/01/2024
05/31/2025
05/31/2025
10/01/2024
10/01/2024
06/10/2025
10/01/2024
10/01/2024
06/24/2025
10/01/2024
10/01/2024
05/31/2025
10/01/2024
05/31/2025
10/01/2024
05/31/2025
— $750,000 from EDC
— $258,200 from EDC
— $950,000 from EDC
05/31/2025 To close project.
10/01/2024 To provide funding per FY2025 Approved CIP Plan — $165,000 from Street
CIP Fund Balance.
10/01/2024 To provide funding per FY2025 Approved CIP Plan — $1,125,000 from
General Fund.
10/01/2024 To provide additional funding per FY2025 Approved CIP Plan — $50,000
from W/WW Operating Fund.
10/01/2024 To provide additional funding per FY2025 Approved CIP Plan — $158,000
from W/WW Operating Fund.
3
CITY OF EULESS
CAPITAL IMPROVEMENT PROGRAM
AMENDMENTS -- FUNDED PROJECTS
PROJECT# PROJECT DESCRIPTION
WT1403 Reclaimed Water Line Extension Debt Payment — Impact
WT1603 Miscellaneous Valve Replacement
WT1802 Well Replacement— Fuller/Far North
WT2501 Line Replacement—Sotogrande Boulevard Phase II
WW0002 Miscellaneous Wastewater Rehabilitation
WW0605 TRA Wastewater Payments — Impact
WW2501 FY2025 51st CDBG LR: Fair Oaks Boulevard/Lone Oak Circle
WW2501 FY2025 51st CDBG LR: Milam Drive
WW2502 Line Replacement —Oakwood Terrace North Phases I, II, & III
— Engineering
DATE AMENDMENTS & ACTIONS
10/01/2024 To provide additional funding per FY2025 Approved CIP Plan — $120,050
from Water Impact Fee Fund Balance.
10/01/2024 To provide additional funding per FY2025 Approved CIP Plan — $50,000
from W/WW CIP Fund Balance.
05/31/2025 To decrease budget by $3,754 for arbitrage payment.
10/01/2024 To provide funding per FY2025 Approved CIP Plan — $365,000 from
W/WW Operating Fund.
10/01/2024 To provide additional funding per FY2025 Approved CIP Plan — $100,000
from W/WW CIP Fund Balance.
10/01/2024 To provide additional funding per FY2025 Approved CIP Plan — $50,000
from WW Impact Fee Fund Balance.
10/01/2024 To provide funding per FY2025 Approved CIP Plan — $292,000 from
Community Development Block Grant.
02/25/2025 To provide additional funding of $8,750 from Community Development
Block Grant. Project selection switched from Fair Oaks Boulevard/Lone
Oak Circle to Milam Drive due to map eligibility changes.
10/01/2024 To provide funding per FY2025 Approved CIP Plan — $309,000 from
W/WW Operating Fund.
4
Project
Number
Project Description
CAPITAL IMPROVEMENTS PROGRAM
FUNDED PROJECTS SUMMARY
Revised Unfunded/
Budget as of Appropriation/ Budget as of Expended as Remaining Project Cost (Excess
5/31/24 Amendment 5/31/25 of 5/31/25 Funds Estimates Funding)
DRAINAGE PROJECTS
DR9903 Misc. Drainage Improvements $ 1,240,777 $ $ 1,240,777 $ 1,107,106 $ 133,671 $ 1,306,777 $ 66,000
DR1101 Flooding Mitigation $ 501,265 $ (160,000) $ 341,265 $ 122,334 $ 218,931 $ 341,265 $ -
DR1201 Misc. Creek Maintenance (min bal $100,000) $ 270,000 $ $ 270,000 $ 175,293 $ 94,707 $ 276,000 $ 6,000
DR2501 Carr Park Creek Erosion Protection $ $ 105,000 $ 105,000 $ - $ 105,000 $ 105,000 $ -
DR2503 South Mills Drive Outfall Restoration $ $ 55,000 $ 55,000 $ $ 55,000 $ 55,000 $
FB9902 Fund Balance— Drainage CIP $ $ $ $ $ $ $ (212,572)
Total Drainage Projects $ 2,012,042 $ $ 2,012,042 $ 1,404,733 $ 607,309 $ 2,084,042 $ (140,572)
5
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared:
Submitted By: RON YOUNG Date Completed:
Project Title: MISCELLANEOUS DRAINAGE IMPROVEMENTS
Project Type: DRAINAGE Sub -Type: IMPROVEMENTS
July 23,1999
Project Code: DR9903 Priority: A
COUNCIL AUTHORIZATION:
May 27, 2014: Awarded Bid No. 007-14 to Knight Erosion Control, Inc. for Drainage Channel Improvements
along Hurricane Creek and authorized the City Manager to enter into a contract with Knight Erosion Control, Inc.
The estimated expenditure is $135,487.82.
June 23, 2015: Ratified City Manager action to proceed with emergency repairs to City property located along
Hurricane Creek. The estimated expenditure is $74,602.
February 26, 2019: Authorized the City Manager to execute a construction contract with Knight Erosion Control,
Inc. for channel improvements at the Texas Star Golf Course. The estimated expenditure is $121,440.
January 12, 2021: Authorized the City Manager to enter into a contract with Knight Erosion Control Retaining
Walls and Construction, to proceed with emergency repairs related to the City's Sanitary Sewer Collection
System, finding that the procurement is necessary due to unforeseen damage to an eight inch aerial sanitary
sewer crossing located along Hurricane Creek near 350 Westpark Way, and finding that the repair is necessary
to preserve the public health and protect the safety of the City's residents. The estimated expenditure is
$121,000.
April 11, 2023: Awarded Bid No. 011-23 for channel improvements at the Texas Star Golf Course to R.C.
Retaining Walls, Inc. The estimated expenditure is $130,751.36 with an owner -controlled contingency of five
percent of the contractual amount and will be paid from GC2003 and DR9903.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project provides funding for various drainage projects or emergency repairs identified throughout the year.
Often correction of these problems requires design services and other improvements such as bank stabilization.
As major projects are identified, they will be tracked separately and assigned a different project number.
PROJECT SCHEDULE:
JUSTIFICATION:
Failure to correct these problems often causes damage to existing infrastructure.
6
PROJECT TITLE: MISCELLANEOUS DRAINAGE IMPROVEMENTS PROJECT CODE: DR9903
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
$0
Improvements $1,306,777
$0
Subtotal: $0 Total Estimated Capital Cost
Maintenance Costs Funding Source:
Transfer from:
Drainage Operating/CIP Fund
FEMA Reimbursement
$0 Transfer to DR2201
Subtotal: $0 Additional Funding Needed:
Annual expense $51,243 Transfer from:
Drainage Operating Fund
Total Estimated Annual Cost $51,243 Total Funding
CURRENT STATUS
$1,306,777
$1,382,833
$84,178
($226,234)
$66,000
$1,306,777
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Engineering $16,000 $16,000 $0 100%
Fence $559 $559 $0 100%
Storm Sewers $1,273,223 $1,073,552 $199,671 84%
Meters & Setting $195 $195 $0 100%
Land -Right -of -Way $16,800 $16,800 $0 100%
TOTAL PROJECT $1,306,777 $1,107,106 $199,671 85%
7
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared:
Submitted By: RON YOUNG Date Completed:
Project Title: FLOODING MITIGATION
Project Type: DRAINAGE Sub -Type: IMPROVEMENTS
Project Code: DR1101
COUNCIL AUTHORIZATION:
Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
June 30,2010
PROJECT DESCRIPTION:
This project consists of identifying chronic flooding locations within the City of Euless and determining the
cost/benefit of property acquisition and protection compared to extensive drainage relief projects. Property
acquisition will be recommended after consideration of flooding history, appraisals, and feasible alternative
drainage solutions have been evaluated. It is recommended that this be established as an ongoing project.
PROJECT SCHEDULE:
JUSTIFICATION:
Properties throughout the City of Euless situated adjacent to creeks have experienced drainage problems for
several years. The cost for implementing drainage improvement projects to mitigate flooding at isolated locations
may be much greater than the cost of property acquisition. Chronic flooding lowers the property values and this
program will offer a means of relief for affected property owners.
8
PROJECT TITLE: FLOODING MITIGATION PROJECT CODE: DR1101
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel:
Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
$0
Flooding Mitigation $341,265
$0
Subtotal: $0 Total Estimated Capital Cost
$341,265
Maintenance Costs Funding Source:
Transfer from:
Drainage CIP Fund Balance $350,000
Drainage Operating Fund $150,000
$0 Miscellaneous Income $1,265
Subtotal: $0
Transfer to:
Drainage CIP Fund Balance ($160,000)
Total Estimated Annual Cost $0 Total Funding $341,265
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Storm Sewers $341,265 $122,334 $218,931 36%
TOTAL PROJECT
$341,265 $122,334 $218,931 36%
9
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared:
Submitted By: RON YOUNG Date Completed:
Project Title: MISCELLANEOUS CREEK MAINTENANCE
Project Type: DRAINAGE Sub -Type: CREEK MAINTENANCE
Project Code: DR1201
COUNCIL AUTHORIZATION:
Priority: A
March 22,2011
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The City of Euless completed drainage master plan studies for the major creeks that traverse the City. They
include Little Bear Creek, Hurricane Creek, Boyd Branch and Blessing Branch.
PROJECT DESCRIPTION:
The project provides for maintenance in the creeks described above including removal of fallen trees that impede
the flow of creek water in the natural creek channels, clearing brush and debris at major bridge crossings, and
preventative maintenance. This project does not address items that are deemed cosmetic enhancements.
PROJECT SCHEDULE:
JUSTIFICATION:
Natural creek erosion undermines the root systems of trees adjacent to creek banks which results in trees falling
into or across creek channels. These fallen trees together with accumulated brush and debris can impede the
flow of storm water in the natural creek channels resulting in a rise in the normal water surface elevation. Fallen
trees that are conveyed down stream in the natural creek channels may cause damage to the substructure of
bridges spanning the creek channels.
10
PROJECT TITLE: MISCELLANEOUS CREEK MAINTENANCE PROJECT CODE: DR1201
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost Improvements
Personnel:
Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
$0
(Minimum balance $100,000)
$0
Subtotal: $0 Total Estimated Capital Cost
Maintenance Costs
Subtotal:
Annual expense
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Storm Sewers
TOTAL PROJECT
Funding Source:
Transfer from:
Drainage CIP Fund Balance
Drainage Operating Fund
$0
$0 Additional Funding Needed:
$27,901 Transfer from:
Drainage CIP Fund Balance
$27,901 Total Funding
CURRENT STATUS
$105,000
$165,000
$6,000
$276,000
OVER/UNDER
BUDGET EXPENDED BUDGET (- +) % EXPENDED
$276,000 $175,293 $100,707 64%
$276,000 $175,293 $100,707 64%
11
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared:
Submitted By: MAJOR JONES Date Completed:
Project Title: CARR PARK CREEK EROSION PROTECTION
Project Type: DRAINAGE Sub -Type: IMPROVEMENTS
Project Code: DR2501
COUNCIL AUTHORIZATION:
Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The drainage issues included in this project are part of the City's CIP plan.
April 01,2024
PROJECT DESCRIPTION:
The businesses at both 605 and 607 West Euless Boulevard are located on the north side of a creek that runs
through Carr Park. Erosion of the creek has threatened to undermine these properties. This is a natural earthen
channel and there is no current protection from future erosion.
The proposed solution is to extend the existing concrete lining on the north side of the channel from 603 West
Euless Boulevard approximately 250 linear feet to just beyond 607 West Euless Boulevard.
PROJECT SCHEDULE:
Anticipate Begin Construction: June 2025
Anticipate Construction Complete: September 2025
JUSTIFICATION:
The creek within Carr Park has continued to erode banks over time and may undermine the adjacent properties
to the north.
12
PROJECT TITLE: CARR PARK CREEK EROSION PROTECTION PROJECT CODE: DR2501
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel:
Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Engineering
Construction
$0
$0
$15,000
$90,000
$0
$0 Total Estimated Capital Cost $105,000
$0
Subtotal: $0
Funding Source:
Transfer from:
Drainage CIP Fund Balance
$105,000
Total Estimated Annual Cost $0 Total Funding $105,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Engineering $15,000 $0 $15,000 0%
Construction $90,000 $0 $90,000 0%
TOTAL PROJECT $105,000 $0 $105,000 0%
13
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared:
Submitted By: MAJOR JONES Date Completed:
Project Title: SOUTH MILLS DRIVE OUTFALL RESTORATION
Project Type: DRAINAGE Sub -Type: IMPROVEMENTS
Project Code: DR2503
COUNCIL AUTHORIZATION:
Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
April 01,2024
PROJECT DESCRIPTION:
The existing homes at both 914 South Mills Drive and 711 West Mills Drive have outfalls located at the western
edge of their backyards. Both outfalls show significant erosion underneath their chutes. This erosion has led to
concrete fractures that will eventually fail.
The proposed solution is to remove the large concrete rock located below each outfall and provide two (2) - 20
linear foot gabion walls below each chute and restore the bank and establish erosion control. Finally, detailing the
outfalls to remove the failed portions and provide stability for the structure to remain.
PROJECT SCHEDULE:
Anticipate Begin Construction: June 2025
Anticipate Construction Complete: September 2025
JUSTIFICATION:
The evaluation of the channel by City Staff indicates that this problem has existed for multiple years. Due to the
location, a clear inspection of the outfalls has been difficult.
14
PROJECT TITLE: SOUTH MILLS DRIVE OUTFALL RESTORATION PROJECT CODE: DR2503
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel:
Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Construction $55,000
$0
$0
$0
$0 Total Estimated Capital Cost $55,000
$0
Subtotal: $0
Funding Source:
Transfer from:
Drainage CIP Fund Balance
$55,000
Total Estimated Annual Cost $0 Total Funding $55,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Construction $55,000 $0 $55,000 0%
TOTAL PROJECT $55,000 $0 $55,000 0%
15
THE CITY OF
EULESS
Project
Number
Project Description
CAPITAL IMPROVEMENTS PROGRAM
FUNDED PROJECTS SUMMARY
Revised Unfunded/
Budget as of Appropriation/ Budget as of Expended as Remaining Project Cost (Excess
5/31/24 Amendment 5/31/25 of 5/31/25 Funds Estimates Funding)
STREET PROJECTS
PS1203 Misc. Street Repairs (min bal $150,000) $ 993,150 $ $ 993,150 $ 837,746 $ 155,404 $ 1,143,150 $ 150,000
PS1601 East Harwood Road Extension $ 100,000 $ $ 100,000 $ - $ 100,000 $ 100,000 $
PS1902 FY2018-19Street Reconstruction —Pipeline/Highland/Harwood $ 20,666,636 $ 1,290,083 $ 21,956,719 $ 14,937,659 $ 7,019,060 $ 21,956,719 $ -
PS1903 Misc. Screening Wall Repair (annual transfer $25,000) $ 125,000 $ 25,000 $ 150,000 $ 32,000 $ 118,000 $ 175,000 $ 25,000
PS2302 Heritage Avenue — Cheek-Sparger Road to Guadalupe Trail $ 500,000 $ $ 500,000 $ $ 500,000 $ 500,000 $
PS2501 Fuller -Wiser Road/Bear Creek Parkway Roadway Rehabilitation $ $ 165,000 $ 165,000 $ $ 165,000 $ 165,000 $
PS2502 FY2024-25 Street Improvements $ $ 1,125,000 $ 1,125,000 $ 328,397 $ 796,603 $ 1,125,000 $
FB9907 Fund Balance — Street CIP
$ $ $ $ $ - $ $ (356,586)
Total Street Projects $ 22,384,786 $ 2,605,083 $ 24,989,869 $ 16,135,802 $ 8,854,067 $ 25,164,869 $ (181,586)
17
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared:
Submitted By: HAL CRANOR Date Completed:
Project Title: MISCELLANEOUS STREET REPAIRS
Project Type: STREET Sub -Type: IMPROVEMENTS
March 27,2014
Project Code: PS1203 Priority: A
COUNCIL AUTHORIZATION:
April 24, 2012: Authorized the City Manager to enter into a contract with Estrada Concrete Co. LLC for concrete
road repairs at various locations on North Main Street, Fuller -Wiser Road, and Bear Creek Parkway in the
amount of $93,390.
March 11, 2014: Authorized the City Manager to negotiate and execute a contract for a citywide pavement
management analysis and asset management inventory with Infrastructure Management Services (IMS). The
estimated expenditure is $82,155.
February 26, 2019: Authorized the City Manager to execute an Interlocal Agreement between the City of Euless,
the City of Bedford, the City of Colleyville, and Tarrant County, Texas for the design and construction of a traffic
signal at the intersection of Heritage Avenue and Cheek-Sparger Road. Design costs were paid from this project.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The Master Thoroughfare Plan identifies the various street types within the City of Euless. These street types
include residential streets through regional arterial streets.
PROJECT DESCRIPTION:
This project includes the removal and replacement of deteriorated sections of pavement along identified
roadways.
PROJECT SCHEDULE:
JUSTIFICATION:
Continuing repair of the existing street pavement will maintain safe driving conditions and will extend the overall
life of the City streets.
18
PROJECT TITLE: MISCELLANEOUS STREET REPAIRS PROJECT CODE: PS1203
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Annual expense
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Other Professional Services
Engineering
Construction
TOTAL PROJECT
TOTAL ESTIMATED CAPITAL COST:
Engineering/Construction
(Minimum balance $150,000)
$0
$0
$0
$0 Total Estimated Capital Cost
Funding Source:
Transfer from:
Street CIP Fund Balance
Car Rental & General Fund
$0 2018 Certificates of Obligation
$0 Reimbursement -Other Entities
$0 Additional Funding Needed:
Transfer from: Street CIP FB
$0 Total Funding
CURRENT STATUS
BUDGET
$83,156
$47,150
$1,012,844
OVER/UNDER
EXPENDED BUDGET (- +)
$82,331 $825
$45,500 $1,650
$709,915 $302,929
$1,143,150 $837,746 $305,404
$511,125
$300,000
$150,000
$32,025
$150,000
$1,143,150
EXPENDED
99%
97%
70%
73%
19
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared:
Submitted By: HAL CRANOR Date Completed:
Project Title: EAST HARWOOD ROAD EXTENSION
Project Type: STREET Sub -Type: CONSTRUCTION
Project Code: PS1601
COUNCIL AUTHORIZATION:
Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
June 20,2014
PROJECT DESCRIPTION:
The Texas Department of Transportation and DFW Airport are combining efforts to extend East Harwood Road
through the airport to Rental Car Drive to provide additional access to airport properties. Euless has committed to
share in the cost of the extension in an amount not to exceed $100,000.
PROJECT SCHEDULE:
Design Complete: May 2022
Began Construction: March 2024
Anticipate Construction Complete: FY2026
JUSTIFICATION:
Participation in the project will provide Euless residents with an additional route to and through the airport
properties.
20
PROJECT TITLE: EAST HARWOOD ROAD EXTENSION PROJECT CODE: PS1601
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel:
Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Construction $100,000
$0
$0
$0
$0 Total Estimated Capital Cost $100,000
$0
Subtotal: $0
Funding Source:
Transfer from:
Car Rental Fund
$100,000
Total Estimated Annual Cost $0 Total Funding $100,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Construction $100,000 $0 $100,000 0%
TOTAL PROJECT $100,000 $0 $100,000 0%
21
THE CITY OF
EULESS
EAST HARWOOD ROAD EXTENSION
A
0 700 1,400
2,800
Feet
MON CARTER BLVD
T H E•C I T Y O F
EULESS
IJFAELDD (L'r
INTERNATIONAL PKWY
Legend
Road Extension
23
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 25, 2018
Submitted By: HAL CRANOR Date Completed:
Project Title:
Project Type:
Project CODE:
FY2018-19 ST RECON—PIPELINE/HIGHLAND/HARWOOD
STREET Sub -Type: IMPROVEMENTS
PS1902 Priority: A
COUNCIL AUTHORIZATION:
December 11, 2018: Approved Resolution No. 18-1539 authorizing the City Secretary to publish a notice declaring intention
to issue certificates of obligation.
January 22, 2019: Approved the first and final reading of Ordinance No. 2212, authorizing issuance of "City of Euless,
Texas, Tax and Waterworks and Sewer System (Limited Pledge) Revenue Certificates of Obligation, Series 2019."
December 17, 2019: Authorized the City Manager to negotiate and execute an Engineering Design Contract with Halff
Associates, Inc. for the design of the FY2019 Street Reconstruction project. The estimated expenditure is $1,553,600.
January 12, 2021: Approved Resolution No. 21-1597 authorizing the City Secretary to publish a notice declaring intention to
issue certificates of obligation.
January 12, 2021: Awarded Bid No. 001-21 to McMahon Contracting, LP. for the FY2019 Street Reconstruction Phase I
project in the amount of $10,078,330.84, authorized an owner -controlled contingency not to exceed 5%, and authorized the
City Manager to enter into a contract with McMahon Contracting, LP.
March 9, 2021: Approved first and final reading of Ordinance No. 2270 authorizing the issuance of "City of Euless, Texas,
Tax and Waterworks and Sewer System (Limited Pledge) Revenue Certificates of Obligation, Series 2021."
March 8, 2022: Authorized an increase of owner -controlled contingency for the FY2019 Street Reconstruction Phase I
project from five percent to six percent of the contractual amount.
February 14, 2023: Authorized an increase of owner -controlled contingency for the FY2019 Street Reconstruction Phase I
project in the amount of $27,133.62 above the previously approved six percent.
June 25, 2024: Awarded Bid No. 009-24 for the FY2019 Street Reconstruction Phase II, along West Pipeline Road in the
amount of $6,699,000, authorized an owner controlled contingency not to exceed 7 percent of the contractual amount
($468,930), and authorized the City Manager to enter into a construction contract with Reliable Paving, Inc.
October 8, 2024: Authorized the City Manager to amend the engineering services contract dated January 6, 2020 with Halff
Associates, Inc. to include construction inspection services on an as needed basis for the duration of Phase II of the FY2019
Street Reconstruction Project. The estimated expenditure is $218,600.
November 26, 2024: Authorized the City Manager to execute a construction contract with Fonroche Lighting America for the
purchase and installation of solar street lighting along South Pipeline Road. The estimated expenditure is $59,037.
April 8, 2025: Authorized the City Manager to enter into an Interlocal Agreement with the City of Bedford, related to roadway
improvements on West Pipeline Road.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project scope includes the removal and replacement of asphalt roadway with concrete pavement at the following
locations:
West Pipeline Road between Arwine Court and Raider Drive; South Pipeline Road between Royal Parkway and Highland
Drive; Highland Drive; and Harwood Road between Industrial Boulevard and Main Street. Each reconstructed street will
maintain the same width and lane configuration with the exception of Highland Drive, which will become a standard 31 foot
wide street from back of curb to back of curb; and South Pipeline Road, which will become a standard 31 foot wide street.
The Highland Drive project will include new sidewalk, water, sewer, and storm drain utilities; and the South Pipeline Road
project will include new sidewalk and a rehabilitated 16" waterline.
PROJECT SCHEDULE:
Phase I - South Pipeline/Highland/Harwood
Began Design: September 2019
Design Complete: November 2020
Began Construction: March 2021
Construction Complete: February 2023
Phase II - West Pipeline
Began Design: September 2019
Design Complete: August 2022
Began Construction: July 2024
Anticipate Construction Complete: February 2026
JUSTIFICATION:
The existing asphalt pavement of these streets is deteriorating. The new concrete streets will increase safety, reduce
maintenance costs, provide an improved riding surface, and will enhance the appearance of the streets.
24
PROJECT TITLE: FY2018-19 ST RECON—PIPELINE/HIGHLAND/HARWOOD PROJECT CODE: PS1902
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Ooeratina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
2019 COs Avg. Annual Debt Service
2021 COs Avg. Annual Debt Service
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Engineering
Construction
Contingency
TOTAL ESTIMATED CAPITAL COST:
Engineering
Paving
Drainage
Water/Wastewater Rehab
$0 Contingency
$860,000
$333,000
$1,193,000 Total Estimated Capital Cost
FUNDING SOURCE:
Transfer from:
General Fund
Escrow Fund - ES0296 & ES0292
2019 Certificates of Obligation
2021 Certificates of Obligation
$0 Interest Earnings
$0 Federal Appropriations Grant
$1,193,000 Total Funding
CURRENT STATUS
BUDGET
$1,670,497
$18, 567,189
$1,719,033
TOTAL PROJECT $21,956,719
EXPENDED
$1,654,104
$13,283,555
$0
$14,937,659
OVER/UNDER
BUDGET (- +)
$16,393
$5,283,634
$1,719,033
$1,670,497
$15,701,811
$1,076,691
$1,788,687
$1,719,033
$21,956,719
$1,936,540
$28,700
$12,423,813
$5,500,000
$1,067,666
$1,000,000
$21,956,719
% EXPENDED
99%
72%
0%
$7,019,060 68%
25
THE CITY OF
EULESS
A
0 1,500 3,000
FY 2018-19 STREET RECONSTRUCTION
6,000
Feet
T H E•C I T Y O F
EULESS
Legend
Street Reconstruction
27
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared:
Submitted By: HAL CRANOR Date Completed:
Project Title: MISCELLANEOUS SCREENING WALL REPAIR
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: PS1903
COUNCIL AUTHORIZATION:
Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
April 26,2018
PROJECT DESCRIPTION:
The project consists of maintenance and repair of publicly -owned screening walls throughout the City.
PROJECT SCHEDULE:
JUSTIFICATION:
Screening walls that were constructed at locations including, but not limited to, Harwood Road, West Pipeline
Road, Gateway Boulevard, Main Street etc. are in need of periodic maintenance and repair.
28
PROJECT TITLE: MISCELLANEOUS SCREENING WALL REPAIR PROJECT CODE: PS1903
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel:
Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
$0
Construction $175,000
$0
Subtotal: $0 Total Estimated Capital Cost
Maintenance Costs
Funding Source:
Transfer from:
General Fund
Street CIP Fund Balance
$0
Subtotal: $0 Additional Funding Needed:
Annual expense $25,334 Transfer from:
General Fund
Total Estimated Annual Cost $25,334 Total Funding
CURRENT STATUS
PHASE/FUNDING SOURCE
Construction
TOTAL PROJECT
$175,000
$100,000
$50,000
$25,000
$175,000
OVER/UNDER
BUDGET EXPENDED BUDGET(-+) % EXPENDED
$175,000 $32,000 $143,000 18%
$175,000 $32,000 $143,000 18%
29
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared:
Submitted By: HAL CRANOR Date Completed:
Project Title: HERITAGE AVE — CHEEK-SPARGER RD TO GUADALUPE TR
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: PS2302
COUNCIL AUTHORIZATION:
Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
April 1, 2021
PROJECT DESCRIPTION:
Heritage Avenue is currently a 2-lane asphalt road. The project scope includes concrete roadway reconstruction
of Heritage Avenue, turn lane extensions on Heritage Avenue at Cheek-Sparger, additional street lighting, culvert
replacement, introduction of concrete curb and gutter, drainage system improvements, sidewalks, and bike paths.
The City of Colleyville and City of Euless have each committed $500,000 to the project. The remainder of the
project will be funded by Tarrant County ($500,000) and the FY2024 Federal Appropriations project ($2,250,000),
if approved.
PROJECT SCHEDULE:
Anticipate Begin Design: FY2024-25
Anticipate Design Complete: FY2025-26
Anticipate Begin Construction: FY2025-26
Anticipate Construction Complete: FY2026-27
JUSTIFICATION:
The existing asphalt pavement is deteriorating and the new concrete street will increase safety, regional mobility,
and connectivity.
30
PROJECT TITLE: HERITAGE AVE — CHEEK-SPARGER RD TO GUADALUPE TR PROJECT CODE: PS2302
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel:
Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
City of Euless Participation $500,000
$0
$0
$0
$0 Total Estimated Capital Cost $500,000
Funding Source:
Transfer from:
General Fund
Escrow Fund-ES1403&ES1501
$487,712
$141,071
Subtotal:
Transfer to:
Street CIP Fund Balance ($128,783)
Total Estimated Annual Cost $0 Total Funding $500,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Construction $500,000 $0 $500,000 0%
TOTAL PROJECT $500,000 $0 $500,000 0%
31
THE CITY OF
EULESS
Street Improvement - Heritage Avenue: Cheek-Sparger
Road to Guadalupe Trail
Street Improvement
-Heritage Ave.
0 260 520
1,040
CHEEK (�
SPARGER =
- � RDA 1
1,560
Ro
01410
40,44/
-co�4/G/
'0F
O
DRIVE -
CI m
0
CHEE-K=SPARGER -RD
T H CITY Y OF
ETT'?SS
2,080
Feet
None
N
Legend
Street Reconstruction
33
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared:
Submitted By: MAJOR JONES Date Completed:
Project Title: FULLER WISER RD/BEAR CREEK PKWY ROADWAY REHAB.
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: PS2501
COUNCIL AUTHORIZATION:
Priority: A
April 01,2024
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The Master Thoroughfare Plan identifies the various street types within the City of Euless. These street types
include residential streets through regional arterials. Our pavement management plan through condition
assessment provides statistical data and guidance for cost effective maintenance and project planning.
PROJECT DESCRIPTION:
The project consists of sawcutting, concrete pouring, and restriping on Fuller Wiser Road and Bear Creek
Parkway prioritized by visual inspection, pavement condition index of the roadways, and citizen feedback.
PROJECT SCHEDULE:
Anticipate Begin Construction: June 2025
Anticipate Construction Complete: September 2025
JUSTIFICATION:
The existing concrete pavement is deteriorating in 140 panels. The concrete reconstruction will provide an
improved riding surface, extend the life of the roadway, and enhance the appearance of the streets.
34
PROJECT TITLE: FULLER WISER RD/BEAR CREEK PKWY ROADWAY REHAB. PROJECT CODE: PS2501
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel:
Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Construction $165,000
$0
$0
$0
$0 Total Estimated Capital Cost $165,000
$0
Subtotal: $0
Funding Source:
Transfer from:
Street CIP Fund Balance
$165,000
Total Estimated Annual Cost $0 Total Funding $165,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Construction $165,000 $0 $165,000 0%
TOTAL PROJECT $165,000 $0 $165,000 0%
35
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared:
Submitted By: HAL CRANOR Date Completed:
Project Title: FY2024-25 STREET IMPROVEMENTS
Project Type: STREET Sub -Type: IMPROVEMENTS
May 31,2020
Project Code: PS2502 Priority: A
COUNCIL AUTHORIZATION:
February 11, 2025: Authorized the City Manager to execute an interlocal agreement with Tarrant County for
asphalt overlay improvements.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by pavement
condition index of the roadways.
PROJECT SCHEDULE:
Began Construction: October 2024
Anticipate Construction Complete: September 2025
JUSTIFICATION:
The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface,
extend the life of the roadway, and enhance the appearance of the streets.
36
PROJECT TITLE: FY2024-25 STREET IMPROVEMENTS PROJECT CODE: PS2502
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel:
Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
$0
Construction $1,125,000
$0
Subtotal: $0 Total Estimated Capital Cost
Maintenance Costs
$0
Subtotal: $0
Funding Source:
Transfer from:
General Fund
$1,125,000
$1,125,000
Total Estimated Annual Cost $0 Total Funding $1,125,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Construction $1,125,000 $328,397 $796,603 29%
TOTAL PROJECT
$1,125,000 $328,397 $796,603 29%
37
THE CITY OF
EULESS
Project
Number
WASTEWATER PROJECTS
WW0002 Misc. Wastewater Rehab (min bal $100,000)
W W 0605 TRA Wastewater Payments - Impact
W W 2301 Line Replacement - Cedar Hill Estates South Phase I
W W 2302 Line Replacement - Cedar Hill Estates South Phase II
W W 2304 Line Replacement - Trailwood Addition
W W 2401 FY2023-24 50th CDBG LR: Fair Oaks Blvd./Shelmar Dr./Kensinger Ct.
WW2501 FY2024-25 51st CDBG LR: Milam Drive
W W 2502 Line Replacement - Oakwood Terrace North Phases I, II, & III - Engineering
Project Description
FB9911 Fund Balance - Wastewater Impact (Restricted)
Total Wastewater Projects
CAPITAL IMPROVEMENTS PROGRAM
FUNDED PROJECTS SUMMARY
Budget as of
5/31/24
Appropriation/
Amendment
$ 881,086 $
$ 1,580,000 $
$ 622,867 $
$ 534,713 $
$ 3,190,549 $
$ 633,972 $
$ - $
$ $
$ $
$ 7,443,187 $
Budget as of Expended as
5/31/25 of 5/31/25
Remaining
Funds
Revised
Project Cost
Estimates
Unfunded/
(Excess
Funding)
100,000 $ 981,086 $ 845,180 $ 135,906 $ 1,081,086 $ 100,000
50,000 $ 1,630,000 $ 1,580,000 $ 50,000 $ 1,680,000 $ 50,000
- $ 622,867 $ 360,725 $ 262,142 $ 622,867 $
$ 534,713 $ 358,045 $ 176,668 $ 534,713 $
$ 3,190,549 $ 2,197,949 $ 992,600 $ 3,360,549 $ 170,000
- $ 633,972 $ 59,214 $ 574,758 $ 633,972 $
300,750 $ 300,750 $ $ 300,750 $ 300,750 $
309,000 $ 309,000 $ 35,414 $ 273,586 $ 109,000 $ (200,000)
$ $ $ - $ - $ (697,007)
759,750 $ 8,202,937 $ 5,436,527 $ 2,766,410 $ 8,322,937 $ (577,007)
39
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared:
Submitted By: RON YOUNG Date Completed:
Project Title: MISCELLANEOUS WASTEWATER REHABILITATION
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
July 26,1999
Project Code: WW0002 Priority: A
COUNCIL AUTHORIZATION:
March 8, 2005: Awarded contract to Hall -Albert Construction Company for the replacement of various
wastewater lines in the amount of $977,857.50. (This award was only partially for the WW0002 project.)
March 28, 2006: Authorized the City Manager to proceed with emergency repair by GRA-TEX Utilities to the
aerial wastewater main crossing Hurricane Creek at a cost of $55,000.
November 10, 2015: Awarded Bid No. 008-15, a construction contract to William J. Schultz, Inc. dba Circle C
Construction, for the replacement of sanitary sewer mains in portions of the Westwood Village Addition and the
Green Hills Park Addition and authorized the City Manager to enter into a contract including add alternate #1 if
required. The estimated expenditure is $577,357 and will be paid from WW1501, WW1502, and WW0002.
March 10, 2020: Authorized the City Manager to negotiate and execute an Engineering Services Contract with
Wier & Associates, Inc. for the design of the El Camino Real sanitary sewer rehabilitation project. The estimated
expenditure is $55,000.
May 14, 2024: Ratified City Manager action to proceed with emergency repairs related to the City's sanitary
sewer distribution system on Main Street from Alexander Lane to Huitt Lane. Excel 4 Construction performed the
work and the estimated expenditure was $101,585.46.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project is for funding of small wastewater main projects identified throughout the fiscal year. As larger
projects are identified, they will be presented for funding as separate projects.
PROJECT SCHEDULE:
JUSTIFICATION:
Most of these lines are clay tile and are seriously deteriorated.
40
PROJECT TITLE: MISCELLANEOUS WASTEWATER REHABILITATION PROJECT CODE: WW0002
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Annual expense
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Engineering
Contingency
Wastewater Mains
TOTAL ESTIMATED CAPITAL COST:
Wastewater Mains
(Minimum balance $100,000)
$0
$0
$0
$0 Total Estimated Capital Cost
Funding Source:
Transfer from:
W/WW Operating Fund
WW9903
$0 W/WW CIP Fund Balance
$0 Additional Funding Needed:
$83,256 Transfer from:
W/WW CIP Fund Balance
$83,256 Total Funding
CURRENT STATUS
OVER/UNDER
BUDGET EXPENDED BUDGET(-+)
$72,939 $66,217 $6,722
$30,580 $30,580 $0
$977,567 $748,383 $229,184
$240,000
$37,013
$704,073
$100,000
$1,081,086
% EXPENDED
91%
100%
77%
TOTAL PROJECT $1,081,086 $845,180 $235,906 78%
41
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared:
Submitted By: RON YOUNG Date Completed:
Project Title: TRINITY RIVER AUTHORITY WASTEWATER PAYMENT
Project Type: WASTEWATER Sub -Type: IMPACT FEE
Project Code: WW0605
COUNCIL AUTHORIZATION:
Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
March 03,2006
PROJECT DESCRIPTION:
Based on a review by Birkhoff, Hendricks, and Conway of the water and wastewater impact fees, it was
determined that a substantial portion of the wastewater impact fee is attributed to Trinity River Authority ("TRA")
capital projects. Therefore, these fees should be used to pay a portion of the annual TRA expense, as these
funds are directly attributed to the expansion of TRA.
PROJECT SCHEDULE:
JUSTIFICATION:
The expansion at TRA provides additional capacity and it was determined through the wastewater impact fee
study that these funds could be used to pay a portion of TRA wastewater payments.
42
PROJECT TITLE: TRINITY RIVER AUTHORITY WASTEWATER PAYMENT PROJECT CODE: WW0605
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time $0
Total Salary $0
Purchase of Services ($50,000)
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
TRA Wastewater Payments $1,680,000
($50,000) Total Estimated Capital Cost
Funding Source:
Transfer from:
WW Impact Fee Fund Balance
$1,680,000
$1,630,000
$0
Subtotal: $0 Additional Funding Needed:
Transfer from:
WW Impact Fee Fund Balance $50,000
Total Estimated Annual Cost ($50,000) Total Funding $1,680,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Wastewater - TRA Service $1,680,000 $1,580,000 $100,000 94%
TOTAL PROJECT $1,680,000 $1,580,000 $100,000 94%
43
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared:
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REP — CEDAR HILL ESTATES SOUTH PHASE I
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
March 16,2022
Project Code: WW2301 Priority: A
COUNCIL AUTHORIZATION:
November 22, 2022: Authorized the City Manager to negotiate and execute an engineering services contract
with Plummer Associates, Inc. for the design of the FY2023 Sanitary Sewer Rehabilitation Project.
May 14, 2024: Awarded Bid No. 018-23 for the FY2023 Sanitary Sewer Rehabilitation Project to Douglas Dailey
Construction, LLC for the replacement of sanitary sewer mains located in Cedar Hill Estates South and
authorized the City Manager to enter into a contract with Douglas Dailey Construction, LLC.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Along Sunset Drive between Vine Street and South Main Street and
2. Along Henslee Drive between Whitener Road and Sunset Drive.
PROJECT SCHEDULE:
Began Design: December 2022
Design Complete: March 2024
Began Construction: July 2024
Anticipate Construction Complete: July 2025
JUSTIFICATION:
Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst -first approach to reduce maintenance costs and customer
problems.
44
PROJECT TITLE: LINE REP — CEDAR HILL ESTATES SOUTH PHASE I PROJECT CODE: WW2301
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost Engineering $67,000
Personnel: Full Time Construction $519,502
Part Time $0 Contingency $36,365
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal: $0 Total Estimated Capital Cost
$622,867
Maintenance Costs Funding Source:
Transfer from:
W/WW Operating Fund $67,000
American Rescue Plan Act $335,000
$0 W/WW CIP Fund Balance $220,867
Subtotal: $0
Total Estimated Annual Cost $0 Total Funding $622,867
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Engineering $67,000 $60,850 $6,150 91%
Construction $519,502 $299,875 $219,627 58%
Contingency $36,365 $0 $36,365 0%
TOTAL PROJECT $622,867
$360,725 $262,142
58%
45
THE CITY OF
EULESS
Line Replacement - Cedar Hill Estates South Phase I
—5
Y
HO=LYWOOD:
WHIT'NER
>- I
g 0'
Z
QZ
C
ci
Wastewater Line Replacement
-Sunset Dr.
-Henslee Dr.
0 120 240
480
720
1
`—'5UNSET�
PIPE
T H E CITY OF
EULESS
960
Feet
L
L
N.
w
= LAN DCVER�
MIT
G =ORGE
WHITENER
°
N1
d
CQu
- TRIGG`
if
z44.
-
None
N
A
Legend
Wastewater
47
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared:
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEMENT — CEDAR HILL ESTATES SOUTH PH II
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
March 16,2022
Project Code: WW2302 Priority: A
COUNCIL AUTHORIZATION:
November 22, 2022: Authorized the City Manager to negotiate and execute an engineering services contract
with Plummer Associates, Inc. for the design of the FY2023 Sanitary Sewer Rehabilitation Project.
May 14, 2024: Awarded Bid No. 018-23 for the FY2023 Sanitary Sewer Rehabilitation Project to Douglas Dailey
Construction, LLC for the replacement of sanitary sewer mains located in Cedar Hill Estates South and
authorized the City Manager to enter into a contract with Douglas Dailey Construction, LLC.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Along South Main Street from Whitener Road to South Pipeline Road and
2. Along South Pipeline Road from west of Cannon Drive to South Main Street.
PROJECT SCHEDULE:
Began Design: December 2022
Design Complete: March 2024
Began Construction: July 2024
Anticipate Construction Complete: July 2025
JUSTIFICATION:
Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst -first approach to reduce maintenance costs and customer
problems.
48
PROJECT TITLE: LINE REPLACEMENT — CEDAR HILL ESTATES SOUTH PH II PROJECT CODE: WW2302
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost Engineering $68,000
Personnel: Full Time Construction $436,180
Part Time $0 Contingency $30,533
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal: $0 Total Estimated Capital Cost
Maintenance Costs
Funding Source:
Transfer from:
W/WW Operating Fund
American Rescue Plan Act
$0 W/WW CIP Fund Balance
Subtotal: $0
$534,713
$68,000
$340,000
$126,713
Total Estimated Annual Cost $0 Total Funding $534,713
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Engineering $68,000 $60,850 $7,150 89%
Construction $436,180 $297,195 $138,985 68%
Contingency $30,533 $0 $30,533 0%
TOTAL PROJECT $534,713 $358,045 $176,668 67%
49
THE CITY OF
EULESS
Line Replacement - Cedar Hill Estates South Phase II
0
Wastewater Line Replacement
-S. Main St.
-S. Pipeline Rd.
0 120 240
480
rHOLLYWOQD
720
WHIT NER I
i iPELIN
THE CITY OF
EULESS
960
Feet
LANDOV'
SAINT �Y))
GEORGE
i N'--' WHITENE
L'7/
�TRIGG`
'O, J
H Q
11—
Legend
Wastewater
None
N
A
51
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared:
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEMENT — TRAILWOOD ADDITION
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
April 29,2022
Project Code: WW2304 Priority: A
COUNCIL AUTHORIZATION:
November 22, 2022: Authorized the City Manager to negotiate and execute an engineering services contract
with Plummer Associates, Inc. for the design of the FY2023 Sanitary Sewer Rehabilitation Project.
May 14, 2024: Awarded Bid No. 018-23 for the FY2023 Sanitary Sewer Rehabilitation Project to Douglas Dailey
Construction, LLC for the replacement of sanitary sewer mains located in the Trailwood Addition and authorized
the City Manager to enter into a contract with Douglas Dailey Construction, LLC.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of wastewater mains in the Trailwood Addition including those along
Trailwood Drive, Cripple Creek Drive, Shenandoah Drive, Timberlane Terrace, Summit Ridge Drive, and Shadow
Lane. See project map for additional details on specific line locations.
PROJECT SCHEDULE:
Began Design: December 2022
Design Complete: March 2024
Began Construction: July 2024
Anticipate Construction Complete: July 2025
JUSTIFICATION:
Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst -first approach to reduce maintenance costs and customer
problems.
52
PROJECT TITLE: LINE REPLACEMENT — TRAILWOOD ADDITION PROJECT CODE: WW2304
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel:
Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Engineering
Construction
Contingency
Street Improvements
TOTAL ESTIMATED CAPITAL COST:
Engineering
Construction
$0 Contingency
$0 Street Improvements
$0
$0 Total Estimated Capital Cost
Funding Source:
Transfer from:
W/WW Operating Fund
American Rescue Plan Act
$0 W/WW CIP Fund Balance
$0 Additional Funding Needed:
Transfer from:
Street CIP Fund Balance
$0 Total Funding
CURRENT STATUS
BUDGET
$607,000
$2,414,532
$169,017
$170,000
EXPENDED
$517,223
$1,680,726
$0
$0
OVER/UNDER
BUDGET (- +)
$89,777
$733,806
$169,017
$170,000
$607,000
$2,414,532
$169,017
$170,000
$3,360,549
$607,000
$2,539,634
$43,915
$170,000
$3,360,549
% EXPENDED
85%
70%
0%
0%
TOTAL PROJECT $3,360,549 $2,197,949 $1,162,600 65%
53
THE CITY OF
EULESS
Line Replacement - Trailwood Addition
m i-
-o=z- SU;MMI=T=RID,GE
c"_ku
=BOC:OWO: YD
CYPRESS
Wastewater Line Replacement
-Trailwood Subdivision
0 190 380
760
1,140
T H EEC I T Y OF
ELESS
1,520
Feet
N
Legend
Wastewater
55
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared:
Submitted By: MAJOR JONES Date Completed:
Project Title: 50TH CDBG LINE REP— FAIR OAKS/SHELMAR/KENSINGER
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
March 21,2024
Project Code: WW2401 Priority: A
COUNCIL AUTHORIZATION:
February 13, 2024: Conducted a Public Hearing for the proposed 50th year CDBG project and approved the
recommendation.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Along Fair Oaks Boulevard from Lone Oak Circle to Ash Lane,
2. 302-413 Shelmar Drive, and
3. Kensinger Court.
(50th year CDBG project)
PROJECT SCHEDULE:
Began Design: October 2024
Design Complete: May 2025
Anticipate Begin Construction: August 2025
Anticipate Construction Complete: December 2025
JUSTIFICATION:
Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst -first approach to reduce maintenance costs and customer
problems.
56
PROJECT TITLE: 50TH CDBG LINE REP— FAIR OAKS/SHELMAR/KENSINGER PROJECT CODE: WW2401
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost Engineering $99,252
Personnel: Full Time Construction $534,720
Part Time $0
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
$0
Subtotal: $0 Total Estimated Capital Cost $633,972
Maintenance Costs Funding Source:
50th CDBG Award $633,972
$0
Subtotal: $0
Total Estimated Annual Cost $0 Total Funding $633,972
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Engineering $99,252 $59,214 $40,038 60%
Construction $534,720 $0 $534,720 0%
TOTAL PROJECT $633,972
$59,214 $574,758
9%
57
THE CITY OF
EULESS
Line Replacement - Fair Oaks/Shelmar/Kensinger
O
Wastewater Line Replacement
- Fair Oaks Boulevard
- Shelmar Drive
- Kensinger Court
0 65 130
260
390
ASH L1(W)
KENSINGER111111111J
L
Y. SHELMAR c
ao
w
P10
LONE:OAK 0
THE CITY OF
EULESS
520
Feet
Legend
Wastewater
59
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared:
Submitted By: MAJOR JONES Date Completed:
Project Title: 51ST CDBG LINE REPLACEMENT — MILAM DRIVE
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
March 27,2024
Project Code: WW2501 Priority: A
COUNCIL AUTHORIZATION:
February 25, 2025: Conducted a Public Hearing for the proposed 51 st year CDBG project and approved the
recommendation.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. 770' from 902 Milam Drive, South along Milam Drive to 750 Milam Drive, and
2. 220' from 804 Milam Drive, West along 805 Milam Drive to the end of 805 Milam Drive.
PROJECT SCHEDULE:
Anticipate Begin Design: October 2025
Anticipate Design Complete: April 2026
Anticipate Begin Construction: July 2026
Anticipate Construction Complete: November 2026
JUSTIFICATION:
Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst -first approach to reduce maintenance costs and customer
problems.
60
PROJECT TITLE: 51ST CDBG LINE REPLACEMENT — MILAM DRIVE PROJECT CODE: WW2501
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost Engineering $47,000
Personnel: Full Time Construction $235,500
Part Time $0 Contingency $18,250
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal: $0 Total Estimated Capital Cost
Maintenance Costs
$0
Subtotal: $0
Funding Source:
51 st CDBG Award
$300,750
$300,750
Total Estimated Annual Cost $0 Total Funding $300,750
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Engineering $47,000 $0 $47,000 0%
Construction $235,500 $0 $235,500 0%
Contingency $18,250 $0 $18,250 0%
TOTAL PROJECT $300,750 $0 $300,750 0%
61
THE CITY OF
EULESS
Line Replacement - Milam Drive
SFr z
Fero/
o Z�
U
HARWOOD=RD (W)=
1
BLANCO
MIDWAY,DR
c
er
iCt; co et
� ct vc o
W //
Wastewater Line Replacement
-Milam Dr
THE C I T Y OF
EULESS
0 125 250 500 750 1,000
Feet
0
1-
W
Legend
Wastewater
N
J
63
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared:
Submitted By: MAJOR JONES Date Completed:
Project Title: LR — OAKWOOD TERRACE N PHASES 1,11, & III ENGINEERING
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
March 27,2024
Project Code: WW2502 Priority: A
COUNCIL AUTHORIZATION:
November 12, 2024: Authorized the City Manager to execute an engineering design contract with Wier &
Associates, Inc. The estimated expenditure is $98,850.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan.
PROJECT DESCRIPTION:
The project consists of the engineering design for the replacement of wastewater mains in the following areas:
Phase I — Between Mary Drive and Marlene Drive from Eastcliff Drive to Marlene Drive,
Phase II — 1. Along Eastcliff Drive from Mary Drive to Tyler Avenue and
2. 607-805 Commerce Street, and
Phase III — Between Tyler Avenue and Marlene Drive from Eastcliff Drive to Commerce Street.
PROJECT SCHEDULE:
Began Design: December 2024
Anticipate Design Complete: September 2025
JUSTIFICATION:
Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst -first approach to reduce maintenance costs and customer
problems.
64
PROJECT TITLE: LR — OAKWOOD TERRACE N PHASES 1,11, & III ENGINEERINGPROJECT CODE: WW2502
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel:
Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Engineering $109,000
$0
$0
$0
$0 Total Estimated Capital Cost $109,000
Funding Source:
Transfer from:
W/WW Operating Fund
$309,000
$0
Subtotal: $0
Transfer to:
W/WW CIP Fund Balance ($200,000)
Total Estimated Annual Cost $0 Total Funding $109,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Engineering $109,000 $35,414 $73,586 32%
TOTAL PROJECT $109,000 $35,414 $73,586 32%
65
THE CITY OF
EULESS
Line Replacement - Oakwood Terrace North Phases
I, II, & III Engineering
w
U-
J
Ci
N
co
a.
GREENBRIArc
'44RY
w
0
JI
( DOUBLE:BARREL
cONGBpY�
Wastewater Line Replacement
- Between Mary Dr and Marlene Dr
- Eastcliff Drive -Commerce Street
- Between Tyler Ave and Marlene Dr
0 105 210
420
630
0AGEBRUSH
TYLER
THE CITY OF
EULESS
840
Feet
N
Legend
mWastewater
Cr)
HEATHER=DR
N
67
THE CITY OF
EULESS
Project
Number
Project Description
CAPITAL IMPROVEMENTS PROGRAM
FUNDED PROJECTS SUMMARY
Revised Unfunded/
Budget as of Appropriation/ Budget as of Expended as Remaining Project Cost (Excess
5/31/24 Amendment 5/31/25 of 5/31/25 Funds Estimates Funding)
WATER PROJECTS
WT0001 Misc. Water Rehab (min bal $150,000) $ 1,128,511 $ $ 1,128,511 $ 964,439 $ 164,072 $ 1,128,511 $
WT0104 Well Repairs (annual transfer $50,000) $ 1,763,992 $ 50,000 $ 1,813,992 $ 1,720,935 $ 93,057 $ 1,863,992 $ 50,000
WT0803 Meters/Transponders/Leak Detection (annual transfer $158,000) $ 2,992,944 $ 158,000 $ 3,150,944 $ 1,595,066 $ 1,555,878 $ 3,308,944 $ 158,000
WT1403 Reclaimed Water Line Extension Debt Payment - Impact $ 1,316,652 $ 120,050 $ 1,436,702 $ 1,396,684 $ 40,018 $ 1,553,552 $ 116,850
WT1603 Misc. Valve Replacement (min bal $150,000) $ 515,000 $ 50,000 $ 565,000 $ 414,051 $ 150,949 $ 565,000 $
WT1604 Reclaimed Water Line Extension Phase III $ 6,124,803 $ $ 6,124,803 $ 4,624,803 $ 1,500,000 $ 6,124,803 $
WT1802 Well Replacement - Fuller/Far North $ 11,110,110 $ (3,754) $ 11,106,356 $ 11,086,994 $ 19,362 $ 11,106,356 $
WT2301 Line Replacement - Midway Park 1st Addition $ 649,203 $ $ 649,203 $ 607,604 $ 41,599 $ 649,203 $
WT2302 Line Replacement- Oakwood Terrace $ 1,986,005 $ $ 1,986,005 $ 1,926,011 $ 59,994 $ 1,986,005 $
WT2303 Line Replacement - South Main Street $ 2,081,008 $ $ 2,081,008 $ 1,826,752 $ 254,256 $ 2,081,008 $
WT2401 Line Replacement -Huntington Drive Phase II $ 520,000 $ $ 520,000 $ $ 520,000 $ 520,000 $
WT2402 Line Replacement - Sotogrande Boulevard Phase I $ 365,000 $ $ 365,000 $ 39,200 $ 325,800 $ 635,000 $ 270,000
WT2501 Line Replacement - Sotogrande Boulevard Phase II $ $ 365,000 $ 365,000 $ 30,400 $ 334,600 $ 713,000 $ 348,000
FB9910 Fund Balance - Water Impact (Restricted) $ $ $ $ $ - $ - $ (2,988,230)
FB9901 Fund Balance -Water & Wastewater CIP $ $ $ $ $ - $ - $ (3,438,026)
Total Water Projects $ 30,553,228 $ 739,296 $ 31,292,524 $ 26,232,939 $ 5,059,585 $ 32,235,374 $ (5,483,406)
69
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared:
Submitted By: HAL CRANOR Date Completed:
Project Title: MISCELLANEOUS WATER REHABILITATION
Project Type: WATER Sub -Type: MAIN REPLACEMENT
April 10,2014
Project Code: WT0001 Priority: A
COUNCIL AUTHORIZATION:
June 14, 2022: Ratified City Manager action to proceed with emergency repairs to a 24" water main adjacent to
the northeast traffic signal pole at the intersection of East Harwood Road and Fuller Wiser Road. The estimated
expenditure is $125,000.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project provides funding for small water main projects identified throughout the fiscal year. Large projects
that are identified will be presented for funding under a new project name.
PROJECT SCHEDULE:
JUSTIFICATION:
Some of the City's older water mains have deteriorated and need replacement or repair.
70
PROJECT TITLE: MISCELLANEOUS WATER REHABILITATION PROJECT CODE: WT0001
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost Water Mains
Personnel:
Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
$0
(Minimum balance $150,000)
$0
Subtotal: $0 Total Estimated Capital Cost
Maintenance Costs Funding Source:
Transfers from:
W/WW CIP Fund Balance
W/WW Operating Fund
$0 Project Transfers
Subtotal: $0
Annual expense $0
Total Estimated Annual Cost
$565,000
$710,000
($146,489)
$0 Total Funding $1,128,511
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Contingency $49,231 $45,234 $3,997 92%
Water Mains $1,079,280 $919,205 $160,075 85%
TOTAL PROJECT $1,128,511 $964,439 $164,072 85%
71
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: HAL CRANOR
Project Title: WELL REPAIRS
Project Type: WATER
Date Prepared:
Date Completed:
Sub -Type: WELL REPAIR
March 27,2014
Project Code: WT0104 Priority: A
COUNCIL AUTHORIZATION:
April 22, 2003: Awarded bid 018-03 for Far North Well pump repair to Layne -Texas for $32,790.
February 14, 2006: Awarded bid 011-06 to Millican Well Service, LLC for rehabilitation and installation of the new
Centrilift submersible motor and pump for the Far North Well in the amount of $250,035.
January 25, 2011: Authorized Millican Well Service, LLC to repair Fuller Well in an amount not to exceed
$117,000, budget increase and additional funding of $117,000 required.
July 20, 2011: Transferred $95,000 from FB9901 to WT0104 for emergency well repairs.
August 9, 2011: Ratified City Manager action to proceed with emergency repairs to the Far North Well site, by
Millican Well Service, LLC in an amount not to exceed $95,000.
June 26, 2012: Ratified City Manager action to proceed with emergency repairs to the well located at 1400 North
Main Street, by Millican Well Service, LLC for an estimated amount of $64,950.
May 14, 2013: Authorized well repairs to the well located at 118 W. Fuller Drive (Fuller Well Site) by Millican Well
Service, LLC for an estimated amount of $120,000.
August 13, 2013: Ratified the City Manager action to proceed with emergency repairs to the City owned and
operated water well located at 1400 North Main Street, by Millican Well Service, LLC. The estimated expenditure
is $75,178.02.
October 27, 2015: Ratified City Manager action to proceed with emergency repairs to the well located at 2591
North Main Street, by Millican Well Service, LLC. The estimated expenditure is $54,128.23.
August 16, 2016: Authorized well repairs to the City owned and operated water wells located at 118 W. Fuller
Drive (Fuller Well Site) and 2404 N. Main St. (Far North Well Site) by Millican Well Service, LLC, for an estimated
amount of $170,426.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The funding is being utilized to repair well pumps and for other unexpected well repairs.
PROJECT SCHEDULE:
JUSTIFICATION:
Maintaining the City's wells results in the ability to produce water at a substantial reduction in cost.
72
PROJECT TITLE: WELL REPAIRS PROJECT CODE: WT0104
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Annual expense
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Well Rehabilitation
TOTAL PROJECT
Well Rehabilitation
$0
$0
$0
$0 Total Estimated Capital Cost
Funding Source:
Transfer from:
WT0001 - Misc Water Rehab
W/WW CIP Fund Balance
$0 W/WW Operating Fund
$0 Additional Funding Needed:
$7,500 Transfer from:
W/WW Operating Fund
$7,500 Total Funding
CURRENT STATUS
$145,720
$968,272
$700,000
$50,000
$1,863,992
OVER/UNDER
BUDGET EXPENDED BUDGET (- +) % EXPENDED
$1,863,992 $1,720,935 $143,057 92%
$1,863,992 $1,720,935 $143,057 92%
73
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared:
Submitted By: HAL CRANOR Date Completed:
Project Title: METERS/TRANSPONDERS/LEAK DETECTION
Project Type: WATER Sub -Type: METERS/TRANSPONDERS
April 10,2014
Project Code: WT0803 Priority: A
COUNCIL AUTHORIZATION:
November 13, 2007: Awarded the annual contract for the purchase of water meters and transponders, and
authorized the City Manager to enter into an agreement with Atlas Utility Supply Company in the amount of
$383,875. Amount for project not to exceed $331,875.
November 11, 2008: Awarded the annual contract for the purchase of water meters and transponders, and
authorized the City Manager to enter into an agreement with Atlas Utility Supply Company in the amount of
$356,875. Amount for project not to exceed $331,875.
February 14, 2012: Awarded the annual contract for the purchase of water meters and transponders, and
authorized the City Manager to enter into an agreement with Atlas Utility Company in the amount of $200,000.
January 14, 2014: Authorized the City Manager to execute an Engineering Services Contract with Alan Plummer
and Associates, Inc. for services in assisting the City with the Texas Water Development Board State Revolving
Fund loan applications and the United States Bureau of Reclamation WaterSMART grant application. The
estimated amount is $78,000 and a portion of this amount is also authorized for project WT1201-Reclaimed
Water Line Extension.
February 10, 2015: Awarded the annual contract for the purchase of water meters and transponders, and
authorized the City Manager to enter into an agreement with Atlas Utility Supply Company.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project provides funding for the systematic replacement of meters, transponders, and leak detection on an
as needed basis as well as the accumulation of funds for future system -wide replacements.
PROJECT SCHEDULE:
On -going
JUSTIFICATION:
This project provides funding for the systematic replacement of meters and transponders on a regular schedule at
or near end of asset life.
74
PROJECT TITLE: METERS/TRANSPONDERS/LEAK DETECTION PROJECT CODE: WT0803
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
(Annual Funding $158,000)
Meters/Transponders
$0 FY2008-25
$0 FY2025-26
Debt Issuance Cost
$0
$0 Total Estimated Capital Cost
Funding Source:
Transfer from:
W/WW CIP Fund Balance
W/WW Operating Fund
$0 Proceeds from Sale of Meters
$0 Additional Funding Needed:
Transfer from:
W/WW Operating Fund
$0 Total Funding
CURRENT STATUS
$2,988,787
$158,000
$162,157
$3,308,944
$247,750
$2,844,000
$59,194
$158,000
$3,308,944
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Meters/Transponders $3,146,787 $1,543,466 $1,603,321 49%
Debt Issuance Cost $162,157 $51,600 $110,557 32%
TOTAL PROJECT $3,308,944 $1,595,066 $1,713,878 48%
75
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared:
Submitted By: CHRIS BARKER Date Completed:
Project Title: RECLAIMED WATER LINE EXTENSION DEBT PAYMENT
Project Type: WATER Sub -Type: IMPACT FEE
Project Code: WT1403
COUNCIL AUTHORIZATION:
Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The reclaimed water system extension was included in the impact fee study.
May 31,2013
PROJECT DESCRIPTION:
This project includes the transfer of funds from the water impact fee to pay debt service (W/S System Revenue
Bonds, Series 2013) related to the extension of the reclaimed water system.
PROJECT SCHEDULE:
Last debt payment is scheduled for July 15, 2033.
JUSTIFICATION:
The project provides a non -potable water source for irrigation which will offset future potable water purchases by
the City and will serve to responsibly conserve potable water resources for the City and the region.
76
PROJECT TITLE: RECLAIMED WATER LINE EXTENSION DEBT PAYMENT PROJECT CODE: WT1403
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel:
Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
$0
Annual debt payment - water impact fee $120,000
Subtotal:
Maintenance Costs
Debt Service FY2014-25
Debt Service FY2025-26
$0
$120,000 Total Estimated Capital Cost
Funding Source:
Transfer from:
WT Impact Fee Fund Balance
$1,436,702
$116,850
$1,553,552
$1,436,702
$0
Subtotal: $0 Additional Funding Needed:
Transfer from:
WT Impact Fee Fund Balance $116,850
Total Estimated Annual Cost $120,000 Total Funding $1,553,552
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Transfer to Debt Service $1,553,552 $1,396,684 $156,868 90%
TOTAL PROJECT $1,553,552 $1,396,684 $156,868 90%
77
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared:
Submitted By: HAL CRANOR Date Completed:
Project Title: MISCELLANEOUS VALVE REPLACEMENT
Project Type: WATER Sub -Type: VALVE REPLACEMENT
March 11,2015
Project Code: WT1603 Priority: A
COUNCIL AUTHORIZATION:
November 22, 2016: Authorized the City Manager to execute a contract for the replacement of a 24-inch water
valve, located near the intersection of SH 183 and Sheppard Drive, with Atkins Brothers Equipment Company,
Inc. The estimated expenditure is $53,780.
August 21, 2023: Ratified City Manager action to proceed with emergency repairs to the Westpark Way City
water main. Acadia Services, LLC is performing the work and the estimated expenditure is not expected to
exceed $180,000.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project will allow for the systematic replacement of valves on an as needed basis.
PROJECT SCHEDULE:
On -going
JUSTIFICATION:
Old and deteriorated water valves prevent water lines from being isolated in the event of a line break. The
inability to isolate the smallest segment possible during a line break increases the labor required to isolate the
line, as well as the number of residents and fire hydrants that would be affected by a line break. Systematic
annual replacement of old deteriorated water valves will increase efficiency, reduce maintenance costs, and
ensure maximum fire protection and water service availability.
78
PROJECT TITLE: MISCELLANEOUS VALVE REPLACEMENT PROJECT CODE: WT1603
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost Water Valves
Personnel:
Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
$0
(Minimum balance $150,000)
$0
Subtotal: $0 Total Estimated Capital Cost
Maintenance Costs Funding Source:
Transfer from:
W/WW Operating Fund
W/WW CIP Fund Balance
$0
Subtotal: $0 Additional Funding Needed:
Annual expense $0 Transfer from:
W/WW CIP Fund Balance
Total Estimated Annual Cost $0 Total Funding
CURRENT STATUS
$285,000
$230,000
$50,000
$565,000
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Engineering $10,000 $1,305 $8,695 13%
Contingency $10,000 $0 $10,000 0%
Construction $545,000 $412,746 $132,254 76%
TOTAL PROJECT $565,000
$414,051 $150,949
73%
79
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: June 15, 2015
Submitted By: CHRIS BARKER Date Completed:
Project Title: RECLAIMED WATER LINE EXT. PHASE III
Project Type: WATER Sub -Type: RECLAIMED WATER SYSTEM
Project CODE: WT1604 Priority: A
COUNCIL AUTHORIZATION:
March 14, 2017: Authorized the City Manager to negotiate and execute an Engineering Services Contract with Alan
Plummer Associates, Inc. for design of the reclaimed water system extension project. Funding is to be provided using
remaining unused funds from the Reclaimed Water Line Extension Phase II Project (WT1212) provided through the Texas
Water Development Board's Clean Water State Revolving Fund Program.
August 29, 2017: Approved Resolution No. 17-1513, requesting financial assistance by authorizing an application to be
filed with the Texas Water Development Board.
January 9, 2018: Approved Resolution No. 18-1523, requesting financial assistance by authorizing an application to be
filed with the Texas Water Development Board (TWDB). The TWDB has requested the City issue a new Resolution
authorizing an application to be filed with the TWDB seeking financial assistance in an amount not to exceed $3,260,000
which includes the cost of construction and the TWDB issuance costs.
March 13, 2018: Approved the first and final reading of Ordinance No. 2185, authorizing the issuance of City of Euless,
Texas, Waterworks and Sewer System Revenue Bonds, Series 2018.
March 13, 2018: Approved Resolution No. 18-1528, approving and authorizing the execution of a principal forgiveness
agreement with the Texas Water Development Board and an escrow agreement related thereto associated with the
City of Euless, Texas, Waterworks and Sewer System Revenue Bonds, Series 2018.
December 11, 2018: Awarded Bid No. 008-18, for the construction of the Reclaimed Water Line Extension, Phase III to
Joe Funk Construction in the amount of $3,914,798.50.
February 28, 2023: Approved a Chapter 380 Agreement by and between MM Euless 66 LLC, the City of Euless, and the
Euless Development Corporation (EDC) in connection with the Watercolor Planned Development.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The reclaimed water line extension is a continuation of the City's Reclaimed Water Utility System. The feasibility study
completed in FY2012 initially contemplated six phases; however, due to remaining funds from Phase II and estimated
construction costs the project has been reduced to three phases with this being the final phase.
PROJECT DESCRIPTION:
The project will extend the City's Reclaimed Water Utility System from a point along Bear Creek Parkway north of Little Bear
Creek to a point just south of Glade Road. This portion of the project will supply approximately 17 MG annually to 11
additional properties. The project scope also includes additional expansion of holding capacity and connectivity of the
reclaimed system.
PROJECT SCHEDULE:
Began Design: May 2017
Design Complete: August 2018
Began Construction: March 2019
Construction Complete (Bear Creek Parkway etc.): December 2020
Anticipate Begin Design for Additional Expansion & Connectivity: FY2027
Anticipate Begin Construction for Additional Expansion & Connectivity: FY2028
JUSTIFICATION:
Construction of the project will provide a non -potable water source for irrigation which will offset future potable water
purchases by the City and will serve to responsibly conserve potable water resources for the City and the region.
80
PROJECT TITLE: RECLAIMED WATER LINE EXT. PHASE III PROJECT CODE: WT1604
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Ooeratina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
2018 Rev Bond Avg. Annual DS
2015E Rev Bond Avg. Annual DS (50%)
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Engineering
Construction
Loan Origination Fee
TOTAL ESTIMATED CAPITAL COST:
Engineering
Construction
Loan Origination Fee
$0
$160,000
$70,000
$230,000 Total Estimated Capital Cost
FUNDING SOURCE:
Transfer from WT1212:
2015E Revenue Bond Issue
W/WW CIP Fund Balance
2018 Revenue Bond Issue
Loan Forgiveness
$0 Interest Earnings
$0 W/WW Operating Fund
Rate Stabilization
Transfer to:
W/WW CIP Fund Balance
$230,000 Total Funding
CURRENT STATUS
BUDGET
$662,232
$5,414,672
$47,899
TOTAL PROJECT $6,124,803
EXPENDED
$662,232
$3,914,672
$47,899
$4,624,803
OVER/UNDER
BUDGET (- +)
($0)
$1,500,000
$0
$662,232
$5,414,672
$47,899
$6,124,803
$1,192,103
$75,093
$2,785,000
$473,300
$124,709
$1,000,000
$500,000
($25,402)
$6,124,803
% EXPENDED
100%
72%
100%
$1,500,000 76%
81
THE CITY OF
EULESS
F1l.fi UrC
A
0 437.5 875
RECLAIMED WATER LINE
EXTENSION PHASE III
1,750
Feet
T H EMIC I T Y OF
EULESS
Legend
Reclaimed WL Extension
83
City of Euless
Capital Project Request
Department: PUBLIC WORKS
Submitted By: HAL CRANOR
Project Title: WELL REPLACEMENT — FULLER/FAR NORTH
Project Type: WATER Sub -Type: WELL
Project CODE: WT1802 Priority: A
Date Prepared: April 5, 2017
Date Completed:
COUNCIL AUTHORIZATION:
November 28, 2017: Authorized the City Manager to negotiate and execute an Engineering Design Contract with Alan
Plummer Associates, Inc. for the design of two water wells to replace the existing Fuller Well and Far North Well. The scope
of work for this portion of the project includes the design of the above ground well facilities including booster pumps, electrical
service, and facilities required to operate the new wells.
November 28, 2017: Authorized the City Manager to execute an Engineering Design Contract with RW Harden and
Associates, Inc. for the design of two water wells to replace the existing Fuller Well and Far North Well. The scope of work for
this portion of the project includes all below ground and associated work at the well facilities, the casing, screen, well head,
and pump equipment.
September 25, 2018: Approved Resolution 18-1537, requesting financial assistance by authorizing an application to be filed
with the Texas Water Development Board for a Drinking Water State Revolving Fund Loan.
March 26, 2019: Approved the first and final reading of Ordinance No. 2216, authorizing the issuance of City of Euless,
Texas, Waterworks and Sewer System Revenue Bonds, Series 2019.
June 25, 2019: Authorized award of Bid No. 003-19, for a construction contract to Weisinger Incorporated for well
construction and plugging of the Far North and Fuller Wells in the amount of $6,426,500, less Change Order No. 1, a
deduction of $577,400, for a total net amount of $5,849,100.
April 14, 2020: Approved award of Bid No. 002-20 for a construction contract to Felix Construction Company for the
construction of the Fuller and Far North Well project in the amount of $2,631,000.
May 12, 2020: Authorized the City Manager to negotiate and execute an Engineering Construction Management Agreement
with Alan Plummer Associates. The estimated expenditure is $121,875 for basic services and a budget allowance of up to
$40,000 for additional services.
August 3, 2020: Authorized the City Manager to purchase and contract for the installation of two water well pumps, motors,
and associated appurtenances at the Far North and Fuller Wells, in the amount of $542,060, through Weisinger, Incorporated.
August 11, 2020: Authorized the City Manager to execute a professional services agreement with Signature Automation, LLC
for Engineering Services at the Far North and Fuller Well sites. The scope of services include: Program Logic Control (PLC)
and Human Machine Interface (HMI) programming, submittal review for proposed equipment, SCADA System testing,
operations manuals and training. The estimated expenditure is $73,540.
October 12, 2021: Authorized a change order to the construction contract with Felix Construction Company for the above
ground infrastructure and appurtenances portion of the Fuller and Far North Well project in the amount of $214,074.62. The
change order provides for additional work including electrical modifications, piping, painting, concrete flat work, and fencing.
August 9, 2022: Ratified City Manager action to proceed with emergency repairs to the City's water wells at Fuller and Far
North Well lots. In order to maintain the existing warranty of the new wells, Weisinger Incorporated will perform the work at an
estimated expenditure of $417,810.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
RW Harden & Associates completed a Preliminary Well Design Study in FY2017 in preparation for the replacement of the
Fuller Well, Far North Well, and the eventual replacement of the 1400 North Main Well.
PROJECT DESCRIPTION:
The project consists of the engineering design and complete replacement of the Fuller and Far North Wells with new 1,800
foot deep wells.
PROJECT SCHEDULE:
Began Design: January 2018
Design Complete: May 2019
Began Construction: July 2019
Construction Complete: May 2023
JUSTIFICATION:
RW Harden & Associates completed a Preliminary Well Design Study in FY2017 in preparation for the replacement of the
Fuller Well, Far North Well, and the eventual replacement of the 1400 North Main Well. The Fuller and Far North Well are in
need of immediate replacement. New wells will enable the City to provide high quality water to citizens while reducing
maintenance and operational costs.
84
PROJECT TITLE: WELL REPLACEMENT— FULLER/FAR NORTH PROJECT CODE: WT1802
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Average Debt Service
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Engineering
Construction
Loan Origination Fee
Construction Administration
TOTAL ESTIMATED CAPITAL COST:
Engineering
Construction
Loan Origination Fee
$0 Construction Administration
$0
$381,000
$381,000 Total Estimated Capital Cost
FUNDING SOURCE:
Transfer from:
W/WW Operating Fund
W/WW CIP Fund Balance
Rate Stabilization
2019 Revenue Bond Issue
$0 Interest Earnings
$0 Insurance Proceeds
Transfer to:
WT2201-1 Mil Well Rep. Design
$381,000 Total Funding
CURRENT STATUS
BUDGET
$886,480
$9,821,786
$195,215
$202,875
TOTAL PROJECT $11,106,356
EXPENDED
$885,340
$9,810,385
$195,215
$196,054
$11,086,994
OVER/UNDER
BUDGET (- +)
$1,140
$11,401
$0
$6,821
$886,480
$9,821,786
$195,215
$202,875
$11,106,356
$723,000
$60,480
$900,000
$9,275,000
$150,295
$50,658
($53,077)
$11,106,356
% EXPENDED
100%
100%
100%
97%
$19,362 100%
85
THE CITY OF
EULESS
WELL REPLACEMENT - FULLER & FAR NORTH
co
0
co
NIVVFDL
CITIES BLVD
BOB-�PNB
A
0 875 1,750
3,500
Feet
141
BEY RD
cri
kit' •••••.,11ilim
RA
NA
DR
Q__
E.
HOR
jmr
1C,
T H E•C I T Y OF
EULESS
HI
ig
INEVIEW DR
P
Legend
Well Replacement
0
0
87
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared:
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEMENT — MIDWAY PARK 1ST ADDITION
Project Type: WATER Sub -Type: MAIN REPLACEMENT
March 18,2022
Project Code: WT2301 Priority: A
COUNCIL AUTHORIZATION:
November 22, 2022: Authorized the City Manager to negotiate and execute an engineering services contract
with Plummer Associates, Inc. for the design of the FY2023 Water Rehabilitation Project.
October 24, 2023: Awarded Bid No. 015-23 for the FY2023 Water Rehabilitation Project to A&B Construction,
LLC for the replacement of water mains located in Midway Park 1st Addition and authorized the City Manager to
enter into a contract with A&B Construction, LLC.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are part of the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of an existing 6 inch cast iron water line located along Collin Drive from
Denton Drive to Harwood Road.
PROJECT SCHEDULE:
Began Design: December 2022
Design Complete: August 2023
Began Construction: March 2024
Construction Complete: May 2025
JUSTIFICATION:
Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are
susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic
replacement of water mains using a worst -first approach to reduce maintenance costs and customer problems.
88
PROJECT TITLE: LINE REPLACEMENT — MIDWAY PARK 1ST ADDITION PROJECT CODE: WT2301
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost Engineering $52,000
Personnel: Full Time Construction $585,493
Part Time $0 Contingency $11,710
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
$0
$0 Total Estimated Capital Cost $649,203
$0
Subtotal: $0
Funding Source:
Transfer from:
W/WW Operating Fund
American Rescue Plan Act
$52,000
$597,203
Total Estimated Annual Cost $0 Total Funding $649,203
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Engineering $52,000 $40,567 $11,433 78%
Construction $585,493 $567,037 $18,456 97%
Contingency $11,710 $0 $11,710 0%
TOTAL PROJECT $649,203 $607,604 $41,599 94%
89
THE CITY OF
EULESS
Line Replacement - Midway Park 1st Addition
HARVVO.GDRD4W)
Water Line Replacement
-Collin Dr.
0 120 240
480
***ct)
WALLAS
N •
fts*Is TARRANT
FA 1 Ls
FAN J N' ),
TRAVIS lrU I
1111
if
720
T H E CI T Y OF
HJLESS
960
Feet
- -
111
Legend
Water
91
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared:
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEMENT — OAKWOOD TERRACE
Project Type: WATER Sub -Type: MAIN REPLACEMENT
May 18,2022
Project Code: WT2302 Priority: A
COUNCIL AUTHORIZATION:
November 22, 2022: Authorized the City Manager to negotiate and execute an engineering services contract
with Plummer Associates, Inc. for the design of the FY2023 Water Rehabilitation Project.
October 24, 2023: Awarded Bid No. 015-23 for the FY2023 Water Rehabilitation Project to A&B Construction,
LLC for the replacement of water mains located in Oakwood Terrace and authorized the City Manager to enter
into a contract with A&B Construction, LLC.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are part of the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of the water mains along South Main Street to include E. Whitener Road,
Jean Lane, Reaves Court, and Henslee Drive. Mains along the Southern border of Spring Valley Apartment
Complex's open space are also included in the project scope. See project map for details about specific line
replacements.
PROJECT SCHEDULE:
Began Design: December 2022
Design Complete: August 2023
Began Construction: March 2024
Construction Complete: May 2025
JUSTIFICATION:
Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are
susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic
replacement of water mains using a worst -first approach to reduce maintenance costs and customer problems.
92
PROJECT TITLE: LINE REPLACEMENT — OAKWOOD TERRACE PROJECT CODE: WT2302
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost Engineering $179,781
Personnel: Full Time Construction $1,770,808
Part Time $0 Contingency $35,416
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
$0
$0 Total Estimated Capital Cost $1,986,005
$0
Subtotal: $0
Funding Source:
Transfer from:
W/WW Operating Fund
American Rescue Plan Act
$179,781
$1,806,224
Total Estimated Annual Cost $0 Total Funding $1,986,005
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Engineering $179,781 $152,125 $27,656 85%
Construction $1,770,808 $1,773,886 ($3,078) 100%
Contingency $35,416 $0 $35,416 0%
TOTAL PROJECT
$1,986,005 $1,926,011 $59,994
97%
93
THE CITY OF
EULESS
Line Replacement - Oakwood Terrace
-
4 1
A CE$ �
IIIIIIII
HU TT-
; FFLY 4
REAVES
[C;W
It
cc
:I, ■
YELLOW
ROSE
_WHIT;fIEI u
z z
}
SUI•,;ET
Water Line Replacement
-S. Main St. -E. Whitener Rd.
-South of Spring Valley Apts.
-Jean Ln. -Reaves Ct.
-Henslee Dr.
0 190 380
760
i
I—)
1,140
aI I
PIPELINE-'
T H E CITY OF
EULESS
1,520
Feet
!SLALIGI-(TER
oc�L
Da
I ONBRIl �Q ,E
l l�
IIIIII
At (ERSQN
I_
=AY -RIM
RION
__
//
KENNETH
III \\
Legend
Water
None
A
95
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared:
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEMENT — SOUTH MAIN STREET
Project Type: WATER Sub -Type: MAIN REPLACEMENT
May 18,2022
Project Code: WT2303 Priority: A
COUNCIL AUTHORIZATION:
November 22, 2022: Authorized the City Manager to negotiate and execute an engineering services contract
with Plummer Associates, Inc. for the design of the FY2023 Water Rehabilitation Project.
October 24, 2023: Awarded Bid No. 015-23 for the FY2023 Water Rehabilitation Project to A&B Construction,
LLC for the replacement of water mains located along South Main Street and authorized the City Manager to
enter into a contract with A&B Construction, LLC.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are part of the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of the water mains along South Main Street, Gaye Court, Jefflyn Court,
West Huitt Lane, Linda Lane, Arnett Drive, West Alexander Lane, and Ross Avenue. See project map for details
about specific line replacements.
PROJECT SCHEDULE:
Began Design: December 2022
Design Complete: August 2023
Began Construction: March 2024
Construction Complete: May 2025
JUSTIFICATION:
Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are
susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic
replacement of water mains using a worst -first approach to reduce maintenance costs and customer problems.
96
PROJECT TITLE: LINE REPLACEMENT — SOUTH MAIN STREET PROJECT CODE: WT2303
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost Engineering $210,210
Personnel: Full Time Construction $1,834,114
Part Time $0 Contingency $36,684
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
$0
$0 Total Estimated Capital Cost $2,081,008
Maintenance Costs Funding Source:
Transfer from:
W/WW Operating Fund $101,219
W/WW CIP Fund Balance $108,991
$0 American Rescue Plan Act $1,870,798
Subtotal: $0
Total Estimated Annual Cost $0 Total Funding $2,081,008
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Engineering $210,210 $183,597 $26,613 87%
Construction $1,834,114 $1,643,155 $190,959 90%
Contingency $36,684 $0 $36,684 0%
TOTAL PROJECT $2,081,008 $1,826,752 $254,256 88%
97
THE CITY OF
EULESS
Line Replacement - South Main Street
Water Line Replacement
-Ross Ave. -W. Alexander Ln.
-Arnett Dr. -Linda Ln.
-Gaye Ct. -W. Huitt Ln.
-Jefflyn Ct. -S. Main St.
0 120 240 480
720
THE CITY OF
EULESS
960
Feet
l l
JERNIGAN
criR_ EVOLUTION
R VaLUTION
i 'J
REP_U.BLIC.
ALEXANDEF
(
,HUITET=LN=(E)
Legend
Water
N
A
99
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared:
Submitted By: MAJOR JONES Date Completed:
Project Title: LINE REPLACEMENT — HUNTINGTON DRIVE PHASE II
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: WT2401
COUNCIL AUTHORIZATION:
Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are part of the City's Water System Master Plan.
June 08,2023
PROJECT DESCRIPTION:
The project consists of the replacement of an existing 6 inch AC water line located along Huntington Drive
between East Huitt Lane and Koen Lane. Additionally, replacement of lateral tie-ins located on North Atkerson
Lane and Koen Lane are included.
PROJECT SCHEDULE:
Began Design: January 2022
Design Complete: October 2024
Anticipate Begin Construction: September 2025
Anticipate Construction Complete: December 2025
JUSTIFICATION:
Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are
susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic
replacement of water mains using a worst -first approach to reduce maintenance costs and customer problems.
100
PROJECT TITLE: LINE REPLACEMENT — HUNTINGTON DRIVE PHASE II PROJECT CODE: WT2401
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost Engineering $15,000
Personnel: Full Time Construction $505,000
Part Time $0
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
$0
$0
$0 Total Estimated Capital Cost $520,000
$0
Subtotal: $0
Funding Source:
Transfer from:
W/WW Operating Fund
$520,000
Total Estimated Annual Cost $0 Total Funding $520,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Engineering $15,000 $0 $15,000 0%
Construction $505,000 $0 $505,000 0%
TOTAL PROJECT $520,000 $0 $520,000 0%
101
THE CITY OF
EULESS
LINE REPLACEMENT — HUNTINGTON DRIVE PHASE II
Water Line Replacement
- Huntington Dr. -E. Huitt Ln.
- N. Atkerson Ln. -Koen Ln.
0 75 150
300
450
THE C I T Y OF
EULESS
600
Feet
Legend
• Water
N
A
103
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared:
Submitted By: MAJOR JONES Date Completed:
Project Title: LINE REPLACEMENT — SOTOGRANDE BLVD PHASE I
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: WT2402
COUNCIL AUTHORIZATION:
Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are part of the City's Water System Master Plan.
March 31,2023
PROJECT DESCRIPTION:
The project consists of the replacement of three existing 6 inch AC water line laterals located along Sotogrande
Boulevard between El Camino Real and Monterrey Boulevard.
PROJECT SCHEDULE:
Began Design: February 2024
Design Complete: July 2024
Anticipate Begin Construction: October 2025
Anticipate Construction Complete: April 2026
JUSTIFICATION:
Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are
susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic
replacement of water mains using a worst -first approach to reduce maintenance costs and customer problems.
104
PROJECT TITLE: LINE REPLACEMENT — SOTOGRANDE BLVD PHASE I PROJECT CODE: WT2402
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost Engineering $47,200
Personnel: Full Time Construction $587,800
Part Time $0
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
$0
$0
$0 Total Estimated Capital Cost $635,000
Funding Source:
Transfer from:
W/WW Operating Fund
$365,000
$0
Subtotal: $0 Additional Funding Needed:
Transfer from:
W/WW CIP Fund Balance $270,000
Total Estimated Annual Cost $0 Total Funding $635,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Engineering $47,200 $39,200 $8,000 83%
Construction $587,800 $0 $587,800 0%
TOTAL PROJECT $635,000 $39,200 $595,800 6%
105
THE CITY OF
EULESS
LINE REPLACEMENT — SOTOGRANDE BLVD PHASE I
PIPE[INERD1W)Im
Water Line Replacement
-Sotogrande Blvd.
0 75 150
300
450
THE CITY OF
EULESS
600
Feet
- -
4 1 1 1
ct
Legend
• Water
N
107
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared:
Submitted By: MAJOR JONES Date Completed:
Project Title: LINE REPLACEMENT — SOTOGRANDE BOULEVARD PHASE II
Project Type: WATER Sub -Type: MAIN REPLACEMENT
March 18,2022
Project Code: WT2501 Priority: A
COUNCIL AUTHORIZATION:
November 26, 2024: Authorized the City Manager to amend an engineering services contract dated February 1,
2024 with Parkhill to include the design of the water line replacement for Sotogrande Boulevard Phase II.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are part of the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of an existing 10 inch AC water line located along Sotogrande Boulevard
from El Camino Real to Monterrey Boulevard.
PROJECT SCHEDULE:
Began Design: October 2024
Anticipate Design Complete: July 2025
Anticipate Begin Construction: October 2025
Anticipate Construction Complete: April 2026
JUSTIFICATION:
Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are
susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic
replacement of water mains using a worst -first approach to reduce maintenance costs and customer problems.
108
PROJECT TITLE: LINE REPLACEMENT — SOTOGRANDE BOULEVARD PHASE IIPROJECT CODE: WT2501
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost Engineering $55,800
Personnel: Full Time Construction $657,200
Part Time $0
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
$0
$0
$0 Total Estimated Capital Cost $713,000
Funding Source:
Transfer from:
W/WW Operating Fund
$365,000
$0
Subtotal: $0 Additonal Funding Needed:
Transfer from:
W/WW CIP Fund Balance $348,000
Total Estimated Annual Cost $0 Total Funding $713,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Engineering $55,800 $30,400 $25,400 54%
Construction $657,200 $0 $657,200 0%
TOTAL PROJECT $713,000 $30,400 $682,600 4%
109
THE CITY OF
EULESS
Line Replacement — Sotogrande Boulevard Phase II
Z Z
Lu m L- PIPELINE RD (W)
co
Water Line Replacement
-Sotogrande Blvd.
0 112.5 225
450
675
SO
43
THE CITY OF
EULESS
900
Feet
Legend
•Water
N
111
THE CITY OF
EULESS
Project
Number
Project Description
CAPITAL IMPROVEMENTS PROGRAM
FUNDED PROJECTS SUMMARY
Revised Unfunded/
Budget as of Appropriation/ Budget as of Expended as Remaining Project Cost (Excess
5/31/24 Amendment 5/31/25 of 5/31/25 Funds Estimates Funding)
OTHER
AC1901 Texas Star Sports Complex Phase VII $ 5,127,307 $ (7,811) $ 5,119,496 $ 5,071,726 $ 47,770 $ 5,119,496 $
CM0304 Entry Monument Sign Program $ 145,782 $ $ 145,782 $ 121,427 $ 24,355 $ 145,782 $
CM0804 Redevelopment $ 12,785,298 $ 1,079,417 $ 13,864,715 $ 11,785,003 $ 2,079,712 $ 13,864,715 $
CM1701 Municipal Plaza Improvements Phase II $ 446,733 $ $ 446,733 $ 216,445 $ 230,288 $ 516,733 $ 70,000
DV9901 EDC Incentive Funds (annual transfer $25,000) $ 1,775,854 $ 25,000 $ 1,800,854 $ 1,351,148 $ 449,706 $ 1,825,854 $ 25,000
ED1002 EDC Contingency $ 325,000 $ $ 325,000 $ 68,772 $ 256,228 $ 325,000 $
ED1601 Midtown Development $ 16,417,980 $ $ 16,417,980 $ 16,356,989 $ 60,991 $ 16,417,980 $
FM1201 ADA/TAS Facility Improvements (min bal $75,000) $ 200,000 $ 15,000 $ 215,000 $ 138,950 $ 76,050 $ 245,000 $ 30,000
FM2207 Misc. Roof Repairs & Preventative Maintenance (min bal $100,000) $ 94,000 $ $ 94,000 $ $ 94,000 $ 160,000 $ 66,000
FM2311 Fire Station #2 $ 10,974,845 $ 162,379 $ 11,137,224 $ 9,810,498 $ 1,326,726 $ 11,137,224 $
FM2312 Police & Courts Building Remodel $ 26,903,205 $ 1,161,555 $ 28,064,760 $ 8,528,930 $ 19,535,830 $ 28,064,760 $
FM2409 Animal Shelter Expansion/Renovation $ 6,125,000 $ 150,000 $ 6,275,000 $ 1,902,464 $ 4,372,536 $ 6,525,000 $ 250,000
FM2508 Facility Renovations at 1400 South Pipeline Road $ $ 3,200,000 $ 3,200,000 $ $ 3,200,000 $ 3,200,000 $
GC1801 TSGC Misc. Improvements (min bal $150,000) $ 637,180 $ 75,000 $ 712,180 $ 627,513 $ 84,667 $ 777,180 $ 65,000
GC2501 Golf Course Upgrades $ $ 2,240,000 $ 2,240,000 $ 565,173 $ 1,674,827 $ 2,240,000 $
PR0720 Misc. Park Improvements (min bal $200,000) $ 1,818,253 $ 200,000 $ 2,018,253 $ 1,735,729 $ 282,524 $ 2,118,253 $ 100,000
PR0804 Park Irrigation (annual transfer $25,000) $ 425,000 $ 25,000 $ 450,000 $ 313,621 $ 136,379 $ 475,000 $ 25,000
PR2508 Parks at Texas Star South Improvements $ $ 750,000 $ 750,000 $ 77,068 $ 672,932 $ 750,000 $
PR2510 Playground Shade Structures $ - $ 950,000 $ 950,000 $ 61,774 $ 888,226 $ 950,000 $
FB9906 Fund Balance - EDC CIP $ - $ $ $ $ $ - $ (3,946,342)
FB9908 Fund Balance - Parks at Texas Star CIP $ - $ $ $ $ $ - $ (171,689)
FB9909 Fund Balance - General CIP $ - $ $ - $ $ $ - $ (8,436,236)
FB9913 Fund Balance - Car Rental CIP $ $ $ $ $ - $ $ (2,827,430)
FB9916 Fund Balance -TSGC CIP $ $ $ $ $ $ $ (114,773)
Total Other Projects $ 84,201,437 $ 10,025,540 $94,226,977 $58,733,230 $ 35,493,747 $94,857,977 $ (14,865,470)
113
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES
Submitted By: RAY MCDONALD
Date Prepared: April 24, 2018
Date Completed:
Project Title: TEXAS STAR SPORTS COMPLEX PHASE VII
Project Type: PARKS/RECREATION Sub -Type: TSSC IMPROVEMENTS
Project CODE: AC1901 Priority: A
COUNCIL AUTHORIZATION:
August 14, 2018: Ratified the Euless Development Corporation (EDC) action taken on August 13, 2018, approving EDC
Resolution No. 21-18, declaring a project for improvements at the Parks at Texas Star including Softball Facilities.
October 23, 2018: Ratified the Euless Development Corporation action taken on October 23, 2018, authorizing the Euless
Development Corporation President to negotiate and execute an Architectural Services Contract with Oxley Williams Tharp
Architects for the planning and design of Texas Star Sports Complex Phase VII (Softball World).
November 12, 2019: Approved all matters incident and related to the issuance and sale of "Euless Development Corporation
Sales Tax Revenue Bonds, Series 2019," including the adoption of Resolution No. 19-1559.
March 24, 2020: Authorized the purchase and installation of sports turf at the Parks at Texas Star Phase VII from
GeoSurfaces, Inc. through the TIPS Interlocal Purchasing System (TIPS #170205) in the amount of $681,200, as well as the
purchase and installation of an LED Retrofit lighting system from GeoSport Lighting Systems, LLC. through the TIPS Interlocal
Purchasing System (TIPS #18120601) in the amount of $434,700.
April 28, 2020: Awarded Bid No. 007-20 for the purchase and installation of outfield fence and backstop wall padding for the
Parks at Texas Star Phase VII to Sports Graphics, Inc. The estimated expenditure is $188,000.
June 9, 2020: Awarded Bid No. 009-20 for the Parks at Texas Star Phase VII renovation to Henthorn Commercial
Construction, LLC and authorized the City Manager to enter into a contract with Henthorn Commercial Construction, LLC. The
total estimated expenditure is $2,228,500.
August 24, 2020: Authorized the purchase, delivery, and installation of 292,000 square feet of TifTuf Bermuda sod from Tri-
Tex Grass, for the Parks at Texas Star Phase VII through the BuyBoard Cooperative Purchasing Program No. 611-20. The
estimated expenditure is $137,240.
January 24, 2023: Awarded Bid No. 002-23 for design/build services including construction administration and general
contracting services for the Texas Star Athletic Staff Offices and authorized the City Manager to enter into a design/build
contract with Gomez Floor Covering, Inc, dba GFC Contracting. The estimated expenditure is $411,914.
May 28, 2024: Awarded Bid No. 006-24 for the construction of the Parks at Texas Star North archway entry sign to Mello
Signs. The estimated expenditure is $148,232.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN
The Texas Star Sports Complex Phase VII includes renovating the existing infields with synthetic turf, renovating the existing
concession/restroom building, building new offices for staff, and upgrading the existing lighting from metal -halide to LED. With
the growing number of participants in youth baseball, renovating the existing infields with synthetic turf will allow staff the
opportunity to expand existing leagues as well as programming for additional leagues in adult softball. Synthetic turf infields
will also substantially reduce the number of rain outs which results in lost revenue. The addition of this phase will ensure that
the Texas Star Sports Complex remains the premier sports facility for amateur athletics for many years to come.
PROJECT DESCRIPTION:
The planning, design, and construction for Texas Star Sports Complex Phase VII. The project scope includes renovating the
existing infields with synthetic turf, renovating the existing facility to meet current ADA standards, renovating the existing
restroom/concession building, creating new office space for staff, upgrading the lighting system to LED, new entry signs, and
demolition of driveway.
PROJECT SCHEDULE:
Began Design: January 2019
Design Complete: May 2020
Began Construction: July 2020
Construction Complete: April 2021
Office Building Complete: December 2023
Archway Entry Sign Construction Complete: February 2025
JUSTIFICATION:
With the completion of Phase VII, the new infields will increase programming opportunities as well as substantially reduce the
number of rain outs.
114
PROJECT TITLE: TEXAS STAR SPORTS COMPLEX PHASE VII PROJECT CODE: AC1901
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct ODeratina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Average Annual Debt Service
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Planning and Design
Construction
Contingency
Parking Lot
Debt Issuance Cost
TOTAL PROJECT
TOTAL ESTIMATED CAPITAL COST:
Planning and Design
Construction
Contingency
$0 Parking Lot
$0 Debt Issuance Cost
$279,000
$279,000 Total Estimated Capital Cost
FUNDING SOURCE:
Transfer from:
EDC Operating Fund
PR2309 - PATS N Parking Lot
$0 2019 EDC Revenue Bonds
$0 Interest Earnings
$279,000 Total Funding
CURRENT STATUS
BUDGET EXPENDED
$196,000 $196,000
$4,666,748 $4,647,717
$76,635 $47,944
$51,708 $51,660
$128,405 $128,405
$5,119,496 $5,071,726
OVER/UNDER
BUDGET (- +)
$0
$19,031
$28,691
$48
$0
$47,770
$196,000
$4,666,748
$76,635
$51,708
$128,405
$5,119,496
$655,000
$49,908
$4,358,215
$56,373
$5,119,496
EXPENDED
100%
100%
63%
100%
100%
99%
115
City of Euless
Capital Project Request
Department: CITY MANAGER Date Prepared:
Submitted By: JOE HENNIG Date Completed:
Project Title: ENTRY MONUMENT SIGN PROGRAM
Project Type: MISCELLANEOUS Sub -Type: IMPROVEMENTS
Project Code: CM0304
COUNCIL AUTHORIZATION:
Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Continuation of the original City of Euless Entry Monument Sign Program.
July 11,2006
PROJECT DESCRIPTION:
Continued construction of City of Euless entry monument signs at key visibility points throughout the City
extending Euless beautification and branding efforts.
PROJECT SCHEDULE:
JUSTIFICATION:
To enable continuous efforts to identify, beautify, and brand the City of Euless.
116
PROJECT TITLE: ENTRY MONUMENT SIGN PROGRAM PROJECT CODE: CM0304
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel:
Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
$0
Land Betterments $145,782
$0
Subtotal: $0 Total Estimated Capital Cost
Maintenance Costs
$0
Subtotal: $0
Funding Source:
Transfer from:
Car Rental Fund
Car Rental CIP Fund Balance
$145,782
$135,782
$10,000
Total Estimated Annual Cost $0 Total Funding $145,782
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Land Betterments $145,782 $121,427 24,355 83%
TOTAL PROJECT
$145,782 $121,427 $24,355 83%
117
Department: CITY MANAGER
Submitted By: GARY MCKAMIE
Project Title: REDEVELOPMENT
Project Type: MISCELLANEOUS
City of Euless
Capital Project Request
Date Prepared: July 11, 2006
Date Completed:
Sub -Type: DEVELOPMENT
Project CODE: CM0804 Priority: A
COUNCIL AUTHORIZATION:
FY2008 Property Acquisitions: 1010 Highland Drive, 1010 Cresthaven Drive, and 710 South Main.
FY2009 Property Acquisitions: 1007 Cresthaven Drive, 912 Cresthaven Drive, 1005 Cresthaven Drive, and 1002 Highland
Drive.
FY2013 Property Acquisitions: North Sheppard Drive (10 lots), 908 Cresthaven Drive, and 910 Cresthaven Drive.
FY2015 Property Acquisitions: 903 Cresthaven Drive, 1447 West Euless Boulevard, 901 Highland Drive, 904 Highland Drive,
and 215 East Ash Lane.
November 10, 2015: Authorized the City Manager to execute an agreement to accept contributions from Gardner Capital
Texas, LLC and Bloomfield Homes Fund, LP to a Community Revitalization Fund in the amount of $100,000.
November 10, 2015: Authorized the Mayor to negotiate and execute conveyance documents for the sale of City owned
property located at 203, 204, and 205 Dickey Drive.
FY2016 Property Acquisitions: 905 Cresthaven Drive.
FY2017 Property Acquisitions: 909 Highland Drive, 911 Highland Drive, 1000 Highland Drive, and 1011 Cresthaven Drive.
October 10, 2017: Authorized the sale of City owned property and structure located at 911 Highland Drive.
FY2018 Property Acquisitions: 906 Highland Drive, 917 Highland Drive, 1005 Highland Drive, 902 Cresthaven Drive, and a
portion of Block 1, Lot 5 in the S.W. Mills Subdivision.
FY2019 Property Acquisitions: 913 Cresthaven Dr., 1001 Cresthaven Dr., 908 Highland Dr., 1001 Highland Dr., 1003
Highland Dr., 109 Ross Ave., and property located at SH183 at Main Street, Tract 16 and 17.
FY2020 Property Acquisitions: 909 Cresthaven Drive, 910 Highland Drive, and 913 Highland Drive.
FY2021 Sale of Property: 906 Cresthaven Drive and Solomon Huitt Survey, No. 705, Tarrant County TX (N Main Street).
FY2021 Property Acquisitions: 901 Cresthaven Drive, 907 Cresthaven Drive, 902 Highland Drive, 1009 Highland Drive, 1011
Highland Drive, and 1451 W Euless Boulevard.
FY2022 Property Acquisitions: 903 Highland Drive, 905 Highland Drive, 907 Highland Drive, 912 Highland Drive, 915
Highland Drive, 916 Highland Drive, 1007 Highland Drive, and 2214 W. Euless Boulevard.
FY2022 Sale of Property: 908 Cresthaven Drive, 910 Cresthaven Drive, and 912 Cresthaven Drive.
FY2023 Property Acquisitions: 914 Highland Drive and 109 Ross Avenue.
FY2024 Property Acquisitions: 911 Cresthaven Drive, 1009 Cresthaven Drive, and 108 West Midway Drive.
June 25, 2024: Awarded Bid No. 011-24 to Pace Construction for landscape and irrigation system installation at the Parks at
Texas Star North, along Highland Drive.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project provides funding to allow the City to participate in redevelopment projects and other community improvements or
make acquisitions of property that will be of economic benefit to the City of Euless.
PROJECT DESCRIPTION:
Project includes City participation in community redevelopment projects and property acquisitions that will be of economic
benefit to the City.
PROJECT SCHEDULE:
Long-term on -going project for continuous improvement of the community.
JUSTIFICATION:
As the City ages, it is imperative that the economic vitality of the City remain strong. Reinvestment into the community will
protect property values from deterioration and keep commercial properties occupied and vibrant.
118
PROJECT TITLE: REDEVELOPMENT PROJECT CODE: CM0804
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct ODeratina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Land Acquisition
Demolition
Minor Apparatus
Incentives
Professional Services
Improvements
Landscaping
TOTAL ESTIMATED CAPITAL COST:
Land Acquisition
Demolition
Minor Apparatus
$0 Incentives
$0 Revitalization Target Area #1
Other Professional Services
Improvements
Landscaping
$0 Total Estimated Capital Cost
FUNDING SOURCE:
Transfer from:
General Fund
Car Rental Operating/CIP Fund
Miscellaneous Other
$0
$0
$0 Total Funding
CURRENT STATUS
BUDGET EXPENDED
$11,330,411 $10,330,265
$625,194 $616,115
$197 $167
$1,160,000 $160,000
$523,913 $511,427
$100,000 $94,273
$125,000 $72,756
TOTAL PROJECT $13,864,715
$11,785,003
OVER/UNDER
BUDGET (- +)
$1, 000,146
$9,079
$30
$1, 000,000
$12,486
$5,727
$52,244
$11,330,411
$625,194
$197
$1,010,000
$150,000
$523,913
$100,000
$125,000
$13,864,715
$3,755,000
$9,200,000
$909,715
$13,864,715
EXPENDED
91%
99%
85%
14%
98%
94%
58%
$2,079,712 85%
119
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared:
Submitted By: HAL CRANOR Date Completed:
Project Title: MUNICIPAL PLAZA IMPROVEMENTS PHASE II
Project Type: FACILITIES Sub -Type: IMPROVEMENTS
June 03, 2014
Project Code: CM1701 Priority: A
COUNCIL AUTHORIZATION:
May 12, 2020: Awarded Bid No. 010-20 for the purchase and installation of an operable louvered canopy for the
Mary Lib Saleh Euless Public Library, to Equinox Louvered Roof. The estimated expenditure is $83,960.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project includes the landscaping and irrigation related to the 40th CDBG ADA accessibility and infrastructure
improvements.
PROJECT DESCRIPTION:
Landscaping and irrigation for the Municipal Plaza following the 40th CDBG ADA accessibility and infrastructure
improvements project. Enhancements will extend to the Library entrance from the courtyard and includes an
operable louvered canopy for the Library's west -side patio. The project scope also consists of improvements to
the City Hall entrance which include: removing the non-functioning water feature and replacing with a cascading
stairway; removing all exposed aggregate concrete and replacing with a colored concrete to match the courtyard;
re-routing roof drains under the patio to drain into the parking lot; removing south side stairs and carrying over the
stone wall to the north to wrap around the new staircase; conforming the north ramp entrance to meet ADA
requirements; installing handrails and lighting on staircase; replacing bollard lighting; and landscaping.
PROJECT SCHEDULE:
Anticipate Construction Compete: FY2026
JUSTIFICATION:
Beautification of the municipal plaza following the hardscape improvements.
120
PROJECT TITLE: MUNICIPAL PLAZA IMPROVEMENTS PHASE II PROJECT CODE: CM1701
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Landscaping/Improvements $509,532
Personnel: Full Time Equipment $7,201
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities $0
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
$0 Total Estimated Capital Cost $516,733
Funding Source:
Transfer from:
General Fund
Car Rental Fund (Phase I)
$0 General CIP Fund Balance
$0 Additional Funding Needed:
Transfer from:
General CIP Fund Balance
$0 Total Funding
CURRENT STATUS
$280,000
$116,733
$50,000
$70,000
$516,733
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Landscaping/Improvements $509,532 $209,244 $300,288 41 %
Equipment $7,201 $7,201 $0 100%
TOTAL PROJECT
$516,733 $216,445 $300,288 42%
121
City of Euless
Capital Project Request
Department: ECONOMIC DEVELOPMENT Date Prepared:
Submitted By: BILL RIDGWAY Date Completed:
Project Title: EULESS DEVELOPMENT CORPORATION INCENTIVE
Project Type: EDC Sub -Type: DEVELOPMENT
July 26,1999
Project Code: DV9901 Priority: A
COUNCIL AUTHORIZATION:
March 27, 2001: Approved transfer of $325,000 to North Main Street for right-of-way to free up funds for a sign
program.
May 30, 2006: Approved payment to Professional Turf Products, Inc. in the amount of $300,000 per agreement.
April 24, 2012: Ratified Euless Development Corporation (EDC) action taken on April 23, 2012, to approve the
first amendment to the lease and incentive agreement by and between the EDC, the City of Euless and U.S.
Concrete, Inc. and its subsidiary Redi-Mix, L.L.C., and authorizing the President to make the modification and
execute such amendment. The agreement called for a $150,000 incentive payment upon the successful
relocation of the US Concrete corporate headquarters to Euless.
December 12, 2017: Approved the EDC projects and actions taken by the EDC Board of Directors on December
12, 2017 which included authorizing the President to negotiate and execute conveyance documents for the
purchase of property located at 411 North Main Street.
February 28, 2023: Approved a Chapter 380 Agreement by and between MM Euless 66 LLC, the City of Euless,
and the Euless Development Corporation (EDC) in connection with the Watercolor Planned Development.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
Euless Development Corporation funds that have been set aside to aid the City of Euless in attracting
development opportunities.
PROJECT SCHEDULE:
JUSTIFICATION:
Funding this project enables the City to act quickly on development opportunities that arise throughout the year.
122
PROJECT TITLE: EULESS DEVELOPMENT CORPORATION INCENTIVE PROJECT CODE: DV9901
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Will be based on the merits of
each opportunity.
$0
$0
$0
Subtotal: $0 Total Estimated Capital Cost
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Economic Development Incentives
Irrigation Supplies
TOTAL PROJECT
Funding Source:
Transfer from:
EDC CIP Fund Balance
EDC Operating Fund
$0 ED1002 - EDC Contingency
$0 Transfer to FS#2 & N Main
Additional Funding Needed:
EDC Operating Fund
$0 Total Funding
CURRENT STATUS
$1,338,454
$1,000,000
$250,000
($787,600)
$25,000
$1,825,854
OVER/UNDER
BUDGET EXPENDED BUDGET (- +) % EXPENDED
$1,825,000 $1,350,295 $474,705 74%
$854 $853 $1 100%
$1,825,854 $1,351,148 $474,706 74%
123
City of Euless
Capital Project Request
Department: ECONOMIC DEVELOPMENT Date Prepared:
Submitted By: GARY MCKAMIE Date Completed:
Project Title: EULESS DEVELOPMENT CORPORATION CONTINGENCY
Project Type: EDC Sub -Type: MISCELLANEOUS
Sept 30,2010
Project Code: ED1002 Priority: A
COUNCIL AUTHORIZATION:
May 14,2019: Ratified the Euless Development Corporation (EDC) action taken on May 13, 2019, authorizing the
expenditure of funds for the demolition of Wilshire Pool.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
To provide funding for emergencies or unforeseen projects that arise throughout the year.
PROJECT SCHEDULE:
On -going
JUSTIFICATION:
This funding enables the City to act quickly on emergency or unforeseen projects. Without funding, these types
of projects would have to wait until the next budget cycle which could increase costs or impede economic
development opportunities.
124
PROJECT TITLE: EULESS DEVELOPMENT CORPORATION CONTINGENCY PROJECT CODE: ED1002
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel:
Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
$0
Contingency $325,000
$0
Subtotal: $0 Total Estimated Capital Cost
$325,000
Maintenance Costs Funding Source:
Transfer from:
EDC Operating/CIP Fund $357,493
AC1601 - TSSC Phase V $64,586
$0 ED1401 - Planning Consultants $152,921
Subtotal: $0 DV9901 - EDC Incentive Funds ($250,000)
Total Estimated Annual Cost $0 Total Funding $325,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Contingency $325,000 $68,772 $256,228 21%
TOTAL PROJECT
$325,000 $68,772 $256,228 21
125
City of Euless
Capital Project Request
Department: CITY MANAGER Date Prepared:
Submitted By: LORETTA GETCHELL Date Completed:
Project Title: MIDTOWN DEVELOPMENT
Project Type: MISCELLANEOUS Sub -Type: DEVELOPMENT
June 16,2015
Project Code: ED1601 Priority: A
COUNCIL AUTHORIZATION:
June 23, 2015: Conducted a Public Hearing and approved Planned Development.
August 25, 2015: Approved Resolution No. 15-1471 creating, authorizing, and establishing the Euless Midtown
Public Improvement District.
December 8, 2015: Approved Resolution No. 15-1479 authorizing publication of notice of intention to issue
certificates of obligation to fund public infrastructure improvements including streets, drainage, and water and
wastewater in the Euless Midtown Reinvestment Zone.
December 8, 2015: Approved Ordinance No. 2096 approving the Project and Financing Plan for Tax Increment
Reinvestment Zone Number Four.
January 12, 2016: Approved Ordinance No. 2098 authorizing the issuance and sale of City of Euless, Texas, Tax
and Waterworks and Sewer System (Limited Pledge) Revenue Certificates of Obligation, Series 2016.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project provides funding for City participation in a public/private development opportunity.
PROJECT DESCRIPTION:
Project includes City participation in a public/private community development project of approximately 56 acres
located in the A.J. Huitt Survey, Abstract 684. Project costs will include land, right-of-way, remediation, paving,
storm drainage, water, wastewater, landscaping, hardscaping, amenities, design, and administrative costs.
PROJECT SCHEDULE:
Began Demolition: Spring 2016
Construction Complete: FY2019
JUSTIFICATION:
This is a significant development opportunity within the heart of Euless. The development is projected to include
residential development including villas, townhomes and rowhouses, cluster housing, and urban lofts; commercial
development including retail and restaurant development; and landscaped bioswales and water detention areas
for stormwater management.
126
PROJECT TITLE: MIDTOWN DEVELOPMENT PROJECT CODE: ED1601
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
$0
Average annual debt service $915,000
Subtotal:
Public Improvements $16,417,980
$0
$915,000 Total Estimated Capital Cost
Maintenance Costs Funding Source:
Certificates of Obligation
$0
Subtotal: $0
$16,417,980
$16,417,980
Total Estimated Annual Cost $915,000 Total Funding $16,417,980
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Public Improvements $16,417,980 $16,356,989 $60,991 100%
TOTAL PROJECT
$16,417,980 $16,356,989 $60,991 100%
127
City of Euless
Capital Project Request
Department: FACILITIES Date Prepared:
Submitted By: KYLE MCADAMS Date Completed:
Project Title: ADA/TAS FACILITY IMPROVEMENTS
Project Type: FACILITIES Sub -Type: IMPROVEMENTS
Project Code: FM1201
COUNCIL AUTHORIZATION:
Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
April 11,2011
PROJECT DESCRIPTION:
This project provides for the continued improvements to various City facilities as required by Federal and State
mandated Americans with Disabilities Act/Texas Accessibility Standards ("ADA/TAS"). City facilities, entrances,
lifts, signage, speech and hearing aided devices, and other areas covered under both ADA and TAS
requirements will be part of these improvements. Project funds will be managed by the City Manager's Office and
will be allocated as identified projects are brought forth and approved.
PROJECT SCHEDULE:
On -going
JUSTIFICATION:
Some City facilities do not meet current ADA/TAS standards. Updating accessibility on a continuing basis will
help keep the City in compliance with government standards and will address the growing needs of citizens with
accessibility issues.
128
PROJECT TITLE: ADA/TAS FACILITY IMPROVEMENTS PROJECT CODE: FM1201
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost Improvements
Personnel:
Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
$0
(Minimum balance $75,000)
$0
Subtotal: $0 Total Estimated Capital Cost
Maintenance Costs
Subtotal:
Annual expense
Total Estimated Annual Cost
Funding Source:
Transfer from:
Car Rental Fund
General Operating/CIP Fund
$0 Risk Operating Fund
$0 Additional Funding Needed:
$655 Transfer from:
General CIP Fund Balance
$655 Total Funding
CURRENT STATUS
$80,000
$110,000
$25,000
$30,000
$245,000
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Structural Maintenance $239,000 $134,314 $104,686 56%
Training $6,000 $4,636 $1,364 77%
TOTAL PROJECT
$245,000
$138,950 $106,050
57%
129
City of Euless
Capital Project Request
Department: FLEET & FACILITY OPERATIONS Date Prepared:
Submitted By: KYLE MCADAMS Date Completed:
Project Title: MISC. ROOF REPAIRS & PREVENTATIVE MAINTENANCE
Project Type: FACILITIES Sub -Type: IMPROVEMENTS
June 22,2022
Project Code: FM2207 Priority: A
COUNCIL AUTHORIZATION:
December 14, 2021: Awarded RFP No. 003-22 for roof inspection and assessment services to Bluefin, LLC a
division of Mantis Innovation.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Facility Maintenance, in conjunction with Mantis/Blue Innovation, conducted a full roof assessment on city -owned
facilities to determine the condition of existing roof structures. The study established a Roof Assessment
Maintenance Program (RAMP) for each building. The assessment identified at what point in the future the roof
would likely need repairs, restoration, or full replacement.
PROJECT DESCRIPTION:
This project provides funding for roof preventative maintenance and repairs to various roofs throughout the City.
PROJECT SCHEDULE:
On -going
JUSTIFICATION:
Roof preventative maintenance and repairs will extend the useful life until a complete replacement is necessary.
130
PROJECT TITLE: MISC. ROOF REPAIRS & PREVENTATIVE MAINTENANCE PROJECT CODE: FM2207
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost Roof PM & Repairs
Personnel:
Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
$0
(Minimum balance $100,000)
$0
Subtotal: $0 Total Estimated Capital Cost
Maintenance Costs Funding Source:
Transfer from:
General Fund $373,000
Transfer to:
$0 General CIP Fund Balance ($279,000)
Subtotal: $0 Additional Funding Needed:
Annual expense $0 Transfer from:
General CIP Fund Balance $66,000
Total Estimated Annual Cost $0 Total Funding $160,000
CURRENT STATUS
PHASE/FUNDING SOURCE
Construction
OVER/UNDER
BUDGET EXPENDED BUDGET (- +) % EXPENDED
$160,000 $0 $160,000 0%
TOTAL PROJECT $160,000 $0 $160,000 0%
131
City of Euless
Capital Project Request
Department: FLEET & FACILITY OPERATIONS Date Prepared: May 17, 2022
Submitted By: KYLE MCADAMS Date Completed:
Project Title: FIRE STATION #2
Project Type: FACILITIES Sub -Type: BUILDING
Project CODE: FM2311 Priority: A
COUNCIL AUTHORIZATION:
August 22, 2022: Authorized the City Manager to negotiate and execute an Architectural Services Contract with Oxley
Williams Tharp Architects. The estimated expenditure is $525,000.
August 22, 2022: Approved the first and final reading of Ordinance No. 2318, authorizing the issuance of City Of Euless,
Texas, Tax Notes, Series 2022.
June 27, 2023: Awarded Request For Competitive Sealed Proposal (RFCSP) No. 013-23 for the construction of Fire Station
No. 2 in the amount of $8,669,150, authorized an owner -controlled contingency not to exceed 5%, and authorized the City
Manager to enter into a construction contract with Modern Contractors.
May 28, 2024: Authorized the purchase of a fire station alerting system for Fire Station No. 2 from US Digital Designs, Inc.
using HGAC Contract No. EC07-23. The estimated expenditure is $133,821.01.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The public safety needs assessment conducted in FY2022 identified Fire Station #2 as a candidate for relocation and
replacement in order to accommodate fire service operations and to meet the growing needs of the community.
PROJECT DESCRIPTION:
Project scope includes the design and construction of a new Fire Station #2 to be located at 2214 West Euless Boulevard. The
proposed project calls for a station of approximately 18,000-19,000 sq. ft. to include four (4) double deep bays to
accommodate various sizes of apparatus along with additional bay space for housing of reserve units and other equipment.
Living quarters and office space for staff are also included in the project. A three-story fire training tower with an internal
stairway and exterior window ports for various forms of ladder training, repelling exercises, and window rescues is also a
possibility for this site.
PROJECT SCHEDULE:
Began Design: October 2022
Design Complete: April 2023
Began Construction: August 2023
Construction Substantially Completed: February 2025
JUSTIFICATION:
The current station located at 1515 Westpark Way can no longer meet the needs of a full -service fire station. This station was
constructed in 1998 from the former Fleet Service Center (built 1978). The facility was remodeled to accommodate the fire
staff and apparatus bays were constructed on the west side of the building for equipment and vehicles. Minor cosmetic
upgrades were performed in 2015 with paint and appliance updates being the primary focus. The needs assessment
performed in FY2022 has determined that the current station would not be a candidate for a remodel and the site would not
accommodate the size of structure needed to support fire operations.
132
PROJECT TITLE: FIRE STATION #2 PROJECT CODE: FM2311
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct ODeratina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Avg. Annual Debt Service
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Professional Services
Construction
Furniture, Fixtures & Equipment
Testing & Material Services
Contingency
TOTAL ESTIMATED CAPITAL COST:
Professional Services
Construction
Furniture, Fixtures & Equipment
$0 Testing & Material Services
$0 Contingency
$1,197,000
$1,197,000 Total Estimated Capital Cost
FUNDING SOURCE:
Transfer from:
General Operating/CIP Fund
Car Rental Fund
FM2006 - Fire Station #1
$0 2022 Tax Notes
$0 Interest Earnings
Interest Earnings (FM2006)
$1,197,000 Total Funding
CURRENT STATUS
BUDGET
$580,000
$9,097,166
$1, 000, 000
$100,000
$360,058
TOTAL PROJECT $11,137,224
EXPENDED
$510,608
$8,596,019
$603,971
$99,900
$0
$9,810,498
OVER/UNDER
BUDGET (- +)
$69,392
$501,147
$396,029
$100
$360,058
$580,000
$9,097,166
$1, 000,000
$100,000
$360,058
$11,137,224
$1,330,000
$878,474
$459,924
$7,600,000
$668,692
$200,134
$11,137,224
% EXPENDED
88%
94%
60%
100%
0%
$1,326,726 88%
133
City of Euless
Capital Project Request
Department: FLEET & FACILITY OPERATIONS Date Prepared: May 17, 2022
Submitted By: KYLE MCADAMS Date Completed:
Project Title: POLICE & COURTS BUILDING REMODEL
Project Type: FACILITIES Sub -Type: REMODEL
Project CODE: FM2312 Priority: A
COUNCIL AUTHORIZATION:
August 22, 2022: Authorized the City Manager to negotiate and execute an Architectural Services Contract with Oxley
Williams Tharp Architects. The estimated expenditure is $960,000.
June 13, 2023: Approved Resolution No. 23-1644 authorizing the City Secretary to publish a notice declaring the intention to
issue certificates of obligation in an amount not to exceed $22 million for public improvements to the City Police and Court
buildings.
August 8, 2023: Approved the first and final reading of Ordinance No. 2349, authorizing the issuance of "City of Euless,
Texas, Tax and Waterworks and Sewer System (Limited Pledge) Revenue Certificates of Obligation, Series 2023".
June 11, 2024: Awarded Request for Competitive Sealed Proposal (RFCSP) No. 003-24 for the construction of the Euless
Police Department and Courts Addition and Alterations in the amount of $18,472,000, authorized an owner -controlled
contingency not to exceed $1,729,000, and authorized the City Manager to enter into a construction contract with Modern
Contractors.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project pertains to the City's continued efforts to meet the needs of citizens related to the delivery of increased public
safety services and to reconfigure the facility to better provide for those and future needs.
PROJECT DESCRIPTION:
This project consists of the design and construction for the remodel of the current Police & Courts Building located at 1102
West Euless Boulevard. The project scope will focus on better utilization of the building by positioning divisions that function
together as a team in close proximity, to provide adequate office space for staff, and to provide security improvements,
meeting room improvements, and general upgrade of fixtures and furnishings. Operations will see minimal impact during the
remodel.
PROJECT SCHEDULE:
Began Design: October 2022
Design Complete: April 2024
Began Construction: July 2024
Anticipate Construction Complete: December 2026
JUSTIFICATION:
Since the building was constructed in the 1999-2000 time frame, the department has realized increased staffing levels, the
addition of the Code Enforcement division, and requirements for long-term storage for evidence and additional equipment
provided to protect officers. The needs assessment performed in FY2022 determined that the current facility is a good
candidate for a remodel and the site can accommodate the structural additions necessary to make such improvements.
134
PROJECT TITLE: POLICE & COURTS BUILDING REMODEL
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Avg. Annual Debt Service
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Professional Services
Construction
Furniture, Fixtures & Equipment
Testing & Material Services
Contingency
PROJECT CODE: FM2312
TOTAL ESTIMATED CAPITAL COST:
Professional Services
Construction
Furniture, Fixtures & Equipment
$0 Testing & Material Services
$0 Contingency
$1,889,000
$1,889,000 Total Estimated Capital Cost
FUNDING SOURCE:
Transfer from:
CCPD Operating Fund
Equipment Replacement Fund
2023 Certificates of Obligation
$0 Interest Earnings
$0
$1,889,000 Total Funding
CURRENT STATUS
BUDGET
$1,210,000
$21,971,524
$3,131,800
$250,000
$1,501,436
EXPENDED
$901,903
$7,476,658
$150,369
$0
$0
OVER/UNDER
BUDGET (- +)
$308,097
$14,494,866
$2,981,431
$250,000
$1,501,436
$1,210,000
$21,971,524
$3,131, 800
$250,000
$1,501,436
$28,064,760
$2,210,000
$1,834,236
$22,000,000
$2,020,524
$28,064,760
EXPENDED
75%
34%
5%
0%
0%
TOTAL PROJECT $28,064,760 $8,528,930 $19,535,830 30%
135
City of Euless
Capital Project Request
Department: FLEET & FACILITY OPERATIONS Date Prepared:
Submitted By: KYLE MCADAMS Date Completed:
Project Title: ANIMAL SHELTER — EXPANSION/RENOVATION
Project Type: FACILITIES Sub -Type: REMODEL
May 07,2007
Project Code: FM2409 Priority: A
COUNCIL AUTHORIZATION:
October 10, 2023: Authorized the City Manager to negotiate and execute an Architectural Services Contract with
Oxley Williams Tharp Architects for the design, renovation, and construction of the Animal Services facility. The
estimated expenditure is $405,000.
November 26, 2024: Awarded Request for Competitive Sealed Proposal (RFCSP) No. 001-25 for the
construction and remodel of the Animal Shelter in the amount of $4,641,000, authorized an owner -controlled
contingency not to exceed 10 percent, and authorized the City Manager to enter into a construction contract with
Modern Contractors.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of a remodel of the former fire station #2 building and animal shelter facility to better
accommodate animal containment, visitors, adoptions, and animal services. The project scope includes the
addition of multiple enclosed dog runs, quarantine runs, an adoption room, additional room for cat containment,
and an area for animal examination and washing. Office space expansion will be included in the renovation as
well as updates to the public/employee restrooms. Additional space within the facility will also be designed for
potential public works storage.
PROJECT SCHEDULE:
Began Design: January 2024
Design Complete: July 2024
Began Construction: January 2025
Anticipate Construction Complete: February 2026
JUSTIFICATION:
The current animal shelter facility was opened in 1978 and has surpassed its capacity to meet current and future
demands.
136
PROJECT TITLE: ANIMAL SHELTER — EXPANSION/RENOVATION PROJECT CODE: FM2409
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Professional Services $450,000
Personnel: Full Time Construction $4,750,000
Part Time $0 Testing & Material Services $125,000
Total Salary $0 Furniture, Fixtures & Equip. $600,000
Purchase of Services Contingency $450,000
Materials & Supplies Temporary Animal Shelter $150,000
Utilities
Subtotal:
Maintenance Costs
$0
$0 Total Estimated Capital Cost $6,525,000
Funding Source:
Transfer from:
Car Rental Fund
$0
Subtotal: $0 Additional Funding Needed:
Transfer from:
General CIP Fund Balance
Total Estimated Annual Cost $0 Total Funding
CURRENT STATUS
$6,275,000
$250,000
$6,525,000
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Professional Services $450,000 $363,772 $86,228 81%
Construction $4,750,000 $1,375,069 $3,374,931 29%
Testing & Material Services $125,000 $31,144 $93,856 25%
Furniture, Fixtures & Equipment $600,000 $10,542 $589,458 2%
Contingency $450,000 $0 $450,000 0%
Temporary Animal Shelter $150,000 $121,937 $28,063 81%
TOTAL PROJECT $6,525,000 $1,902,464 $4,622,536 29%
137
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared:
Submitted By: DUANE STRAWN Date Completed:
Project Title: FACILITY RENOVATIONS AT 1400 SOUTH PIPELINE ROAD
Project Type: FACILITIES Sub -Type: IMPROVEMENTS
Project Code: FM2508
COUNCIL AUTHORIZATION:
Priority: A
July 16, 2024
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The City of Euless owns a facility located at 1400 South Pipeline Road which is leased to the Dallas Stars. The
original lease agreement was entered into in 1999 and the facility is in need of renovations and improvements.
PROJECT DESCRIPTION:
The project scope includes renovating the restrooms, locker rooms, outdoor patio area, lobby, and office space.
Additionally, an upgrade to the HVAC system, redesign and update of the second floor, improvements to the
ceiling tile and lighting, and installation of new roll up door doors throughout the facility is included in the project
as well.
PROJECT SCHEDULE:
Anticipate Begin Construction: Summer 2025
Anticipate Construction Complete: Fall 2026
JUSTIFICATION:
The building is approximately 25 years old and is in need of renovations and improvements.
138
PROJECT TITLE: FACILITY RENOVATIONS AT 1400 SOUTH PIPELINE ROAD PROJECT CODE: FM2508
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel:
Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Remodel/Improvements $3,200,000
$0
$0
$0
$0 Total Estimated Capital Cost $3,200,000
Funding Source:
Transfer from:
Car Rental Fund $1,600,000
$0 Dallas Stars Contribution $1,600,000
Subtotal: $0
Total Estimated Annual Cost $0 Total Funding $3,200,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Remodel/Improvements $3,200,000 $0 $3,200,000 0%
TOTAL PROJECT $3,200,000 $0 $3,200,000 0%
139
City of Euless
Capital Project Request
Department: TEXAS STAR GOLF COURSE Date Prepared:
Submitted By: GLENDA HARTSELL Date Completed:
Project Title: TSGC MISCELLANEOUS IMPROVEMENTS
Project Type: PARKS/RECREATION Sub -Type: TSGC IMPROVEMENTS
Project Code: GC1801
COUNCIL AUTHORIZATION:
Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
May 17,2011
PROJECT DESCRIPTION:
To provide funding to address small capital projects that arise throughout the year at Texas Star Golf Course.
PROJECT SCHEDULE:
JUSTIFICATION:
Without funding for this project, the smaller items identified throughout the year could not be addressed in a
timely manner and would have to be postponed until the next budget cycle for funding consideration. Timely
response preserves the City's investment in a high -profile asset and maintains the quality service levels expected
by patrons.
140
PROJECT TITLE: TSGC MISCELLANEOUS IMPROVEMENTS PROJECT CODE: GC1801
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:
Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Annual expense
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Improvements
Equipment
Botanical
TOTAL PROJECT
TOTAL ESTIMATED CAPITAL COST:
Improvements
(Minimum balance $150,000)
$0
$0
$0
$0 Total Estimated Capital Cost
Funding Source:
Transfer from:
TSGC Reserve Fund
Hotel/Motel Fund
$0 Car Rental Fund
$0 Miscellaneous Other
$76,576 Additional Funding Needed:
Transfer from: TSGC CIP FB
$76,576 Total Funding
CURRENT STATUS
BUDGET
$453,110
$322,070
$2,000
EXPENDED
$382,663
$242,850
$2,000
OVER/UNDER
BUDGET (- +)
$70,447
$79,220
$0
$515,000
$120,000
$50,000
$27,180
$65,000
$777,180
% EXPENDED
84%
75%
100%
$777,180 $627,513 $149,667 81%
141
City of Euless
Capital Project Request
Department: GOLF COURSE Date Prepared:
Submitted By: GLENDA HARTSELL Date Completed:
Project Title: GOLF COURSE UPGRADES
Project Type: PARKS/RECREATION Sub -Type: TSGC IMPROVEMENTS
Project Code: GC2501
COUNCIL AUTHORIZATION:
Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
May 15,2024
PROJECT DESCRIPTION:
Resurface the existing 'MiniVerde' Ultradwarf Bermuda greens at Texas Star Golf Course by removing the thatch
layer near the surface, replacing with a suitable rootzone mix and re -sprigging the greens with TifEagle
Bermudagrass. Collars will be re -sodded with 419 Bermudagrass. After removal, the existing sand will be used
for agronomic practices around the course and practice areas. Additional improvement projects, such as leveling
and expansion of various Tee boxes, capping sand in bunkers, cart path and parking improvements, and other
small miscellaneous enhancements are included in the project scope.
PROJECT SCHEDULE:
May 15 - Sept 15, 2025 is the appropriate time to schedule the replacement and reconstruction of the greens.
The optimum growing period for TifEagle Bermuda is June through September. The other projects will be
scheduled simultaneously during the growing in period.
JUSTIFICATION:
Texas Star is a championship daily fee golf facility known for its high level of service and excellent course
conditions. At this point in the life of the greens, it has become increasingly more difficult to maintain the existing
'MiniVerde' Ultradwarf Bermuda greens in an acceptable condition year round. TifEagle Bermudagrass is more
genetically stable, as well as having a more robust tolerance to cold weather and shade as opposed to other
Ultradwarf Bermudagrasses. Additionally, improvements on the Tee Boxes, bunkers, cart paths and other small
projects would result in not only an aesthetically pleasing look, but optimal playing conditions as well adding to
the total Texas Star experience.
142
PROJECT TITLE: GOLF COURSE UPGRADES PROJECT CODE: GC2501
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost Greens Replacement $600,000
Personnel: Full Time Capping Bunkers $70,000
Part Time $0 Tee Improvements $85,000
Total Salary $0 Cart Path Improvements $75,000
Purchase of Services Native Area Control $10,000
Materials & Supplies Contingency $100,000
Utilities Transfer to Golf Ops(Rev Loss) $1,200,000
Parking Lot Improvements $100,000
Subtotal:
Maintenance Costs
$0
$0 Total Estimated Capital Cost $2,240,000
$0
Subtotal: $0
Total Estimated Annual Cost
Funding Source:
Transfer from:
Car Rental Fund
Hotel/Motel Fund
$2,190,000
$50,000
$0 Total Funding $2,240,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Design $42,000 $37,922 $4,078 90%
Improvements $840,000 $103,805 $736,195 12%
Contingency $58,000 $0 $58,000 0%
Transfer to Golf Ops (Revenue Loss) $1,200,000 $423,446 $776,554 35%
Parking Lot Improvements $100,000 $0 $100,000 0%
TOTAL PROJECT $2,240,000 $565,173 $1,674,827 25%
143
City of Euless
Capital Project Request
Department: PARKS AND COMMUNITY SERVICES Date Prepared:
Submitted By: RAY MCDONALD Date Completed:
Project Title: MISCELLANEOUS PARK IMPROVEMENTS
Project Type: PARKS/RECREATION Sub -Type: PARKS
March 23,2004
Project Code: PR0720 Priority: A
COUNCIL AUTHORIZATION:
June 9, 2020: Authorized the purchase and installation of sod and irrigation at the Villages of Bear Creek Park,
from Tri-Tex Grass, through the BuyBoard Cooperative Purchasing Program. The estimated expenditure is
$46,500.
May 23, 2023: Authorized the purchase and installation of an LED lighting system for the pickeball courts. The
estimated expenditure is $54,999 and will be paid from PR2308 and PR0720.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The adopted Parks Master Plan recommends funding for system -wide park facilities and amenities upgrades.
PROJECT DESCRIPTION:
The project provides funding for the upgrade and modernization of City parks to include replacement of aged
structures such as pavilions, picnic tables, gazebos, signs, safety components, and other park amenities
including the addition of a gazebo on Main Street. Park infrastructure and structure painting are included in the
scope of the project. Additionally, the project encompasses the installation of trail lighting along the Trails of
Euless similar to the lighting installed along the trail through Midway Park. Trailwood Park, Bob Eden Trail, The
Preserve at McCormick Park, The Villages of Bear Creek Park, and Heritage Park would also benefit from trail
lighting.
PROJECT SCHEDULE:
On -going
JUSTIFICATION:
Pursuant to the recommendations in the Parks Master Plan, park accessibility should be in compliance with the
Americans with Disabilities Act. The existing equipment in many park areas is becoming aged and will require
refurbishment or replacement in the near term. Additionally, park infrastructure should be maintained at a level
that meets citizen expectations.
144
PROJECT TITLE: MISCELLANEOUS PARK IMPROVEMENTS PROJECT CODE: PR0720
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost
Personnel:
Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Fixtures, landscaping, lighting,
& other park and infrastructure
$0 improvements
$0
(Minimum balance $200,000)
$0
Subtotal: $0 Total Estimated Capital Cost
Maintenance Costs Funding Source:
Transfer from:
EDC Operating Fund
Developer Contribution (TRA)
$0 ES0283 & ES1901
Subtotal: $0 Additional Funding Needed:
Annual expense $97,566 Transfer from:
EDC CIP Fund Balance
Total Estimated Annual Cost $97,566 Total Funding
CURRENT STATUS
$1,975,000
$10,500
$32,753
$100,000
$2,118,253
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Park Furnishings $1,545,119 $1,241,836 303,283 80%
Landscaping $52,521 $42,021 10,500 80%
Contingency $57,702 $57,702 0 100%
Park Lighting $166,924 $164,978 1,946 99%
Equipment $3,170 $3,170 0 100%
Trail/Sidewalk Improvements $55,795 $50,305 5,490 90%
Professional Services $60,202 $31,680 28,522 53%
Improvements $129,067 $129,067 0 100%
Demolition $15,000 $14,970 30 100%
Improvements (ES0283-Bear Creek Park) $27,753 $0 27,753 0%
Botanical (ES1901-Barfield Foundation) $5,000 $0 5,000 0%
TOTAL PROJECT $2,118,253 $1,735,729 $382,524 82%
145
City of Euless
Capital Project Request
Department: PARKS AND COMMUNITY SERVICES Date Prepared: October 01,2007
Submitted By: RAY MCDONALD Date Completed:
Project Title: PARK IRRIGATION
Project Type: PARKS/RECREATION Sub -Type: PARKS
Project Code: PR0804 Priority: A
COUNCIL AUTHORIZATION:
June 25, 2024: Awarded Bid No. 011-24 to Pace Construction for landscape and irrigation system installation at
the Parks at Texas Star North, along Highland Drive.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project provides annual funding to continue efforts to meet irrigation needs throughout the City's park
system.
PROJECT SCHEDULE:
Projects will be identified and completed on an as -needed basis.
JUSTIFICATION:
This project allows for maintenance and expansion of the irrigation systems throughout the parks system to
enhance the overall condition of the landscape and green space.
146
PROJECT TITLE: PARK IRRIGATION PROJECT CODE: PR0804
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel:
Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Irrigation
$0
$0
$0
Subtotal: $0 Total Estimated Capital Cost
Maintenance Costs
Funding Source:
Transfer from:
EDC Operating Fund
$475,000
$475,000
$450,000
$0
Subtotal: $0 Additional Funding Needed:
Transfer from:
EDC Operating Fund $25,000
Total Estimated Annual Cost $0 Total Funding $475,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Irrigation $475,000 $313,621 161,379 66%
TOTAL PROJECT
$475,000 $313,621 $161,379 66%
147
City of Euless
Capital Project Request
Department: PARKS AND COMMUNITY SERVICES Date Prepared:
Submitted By: DUANE STRAWN Date Completed:
Project Title: PARKS AT TEXAS STAR SOUTH IMPROVEMENTS
Project Type: PARKS/RECREATION Sub -Type: PARK IMPROVEMENTS
April 4, 2024
Project Code: PR2508 Priority: A
COUNCIL AUTHORIZATION:
November 12, 2024: Authorized the City Manager to execute an architectural services contract with Williams
Tharp Architects for the design of the new restroom facility at the Parks at Texas Star South. The estimated
expenditure is $57,500.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Since the construction of Legends Field in 2017, we have received numerous requests for a restroom facility to
serve that portion of the Parks at Texas Star facility. In addition, the removal of the batting cages has created a
large open space that can be redesigned to better meet the needs of the Parks at Texas Star facility as well as
participants in league and tournament ballgames.
PROJECT DESCRIPTION:
The project scope includes an additional restroom facility to service the east end of the Parks at Texas Star South
Sports Complex and design services to redevelop the former batting cage area at Parks at Texas South with
recreational and/or passive activities.
PROJECT SCHEDULE:
Began Design: January 2025
Anticipate Design Complete: June 2025
Anticipate Begin Restroom Construction: July 2025
Anticipate Restroom Construction Complete: October 2025
JUSTIFICATION:
There is a lack of restroom facilities on the east end of a very busy athletic complex and the installation of a
restroom facility would be a major benefit to customers. Also, since the batting cages at Parks at Texas Star
South were removed, this project will allow for re -purposing of this area with recreational activities.
148
PROJECT TITLE: PARKS AT TEXAS STAR SOUTH IMPROVEMENTS PROJECT CODE: PR2508
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel:
Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Design
Building
Sidewalks
Remodel/Improvements
TOTAL PROJECT
TOTAL ESTIMATED CAPITAL COST:
Restroom Building / Sidewalks
to the Restroom Bld / Batting
$0 Cage Area Redesign
$0
$0
$0 Total Estimated Capital Cost
Funding Source:
Transfer from:
EDC Operating Fund
$0
$0
$0 Total Funding
CURRENT STATUS
BUDGET
$53,000
$325,000
$122,000
$250,000
EXPENDED
$27,229
$42,227
$0
$7,612
OVER/UNDER
BUDGET (- +)
$25,771
$282,773
$122,000
$242,388
$750,000
$750,000
$750,000
$750,000
% EXPENDED
51%
13%
0%
3%
$750,000 $77,068 $672,932 10%
149
City of Euless
Capital Project Request
Department: PARKS AND COMMUNITY SERVICES Date Prepared:
Submitted By: DUANE STRAWN Date Completed:
Project Title: PLAYGROUND SHADE STRUCTURES
Project Type: PARKS/RECREATION Sub -Type: PARK IMPROVEMENTS
July 17,2024
Project Code: PR2510 Priority: A
COUNCIL AUTHORIZATION:
November 26, 2024: Awarded Bid No. 012-24 for the purchase and installation of playground and shade
structures.
March 11, 2025: Authorized the purchase and installation of playground shade structures through the Buyboard
Purchasing Cooperative.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Shade structures for new and existing playgrounds are identified in the 2025 Parks, Recreation, and Open Space
Master Plan .
PROJECT DESCRIPTION:
The project scope includes shade structures over play features at the following parks: Wilshire Park, J.A. Carr
Park, Midway Park, McCormick Park, and the Parks at Texas Star South.
PROJECT SCHEDULE:
Began Construction: April 2025
Anticipate Construction Complete: August 2025
JUSTIFICATION:
The park system lacks shade structures over the existing play features to prevent them from becoming extremely
hot to the touch. In order for Euless residents to utilize and enjoy the playgrounds available to them, shade
structures are necessary to alleviate some of the effects of the Texas heat. A large number of park playgrounds
are protected from the sun by tree canopies, but the five parks listed have no protection from the heat. Providing
shade over the play features throughout the park system will immediately address needs that have been
identified in the Parks Master Plan through public engagement and survey results.
150
PROJECT TITLE: PLAYGROUND SHADE STRUCTURES PROJECT CODE: PR2510
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel:
Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PHASE/FUNDING SOURCE
Park Furnishings
Wilshire Park
J.A. Carr Park
$0 Midway Park
$0 McCormick Park
Parks at Texas Star South
$150,000
$300,000
$200,000
$100,000
$200,000
$0
$0 Total Estimated Capital Cost $950,000
Funding Source:
Transfer from:
EDC Operating Fund
$0
$0
$950,000
$0 Total Funding $950,000
CURRENT STATUS
OVER/UNDER
BUDGET EXPENDED BUDGET(-+)
$950,000 $61,774 $888,226
TOTAL PROJECT $950,000
$61,774 $888,226
% EXPENDED
7%
7%
151
THE CITY OF
EULESS
Project Description
DRAINAGE PROJECTS
CAPITAL IMPROVEMENT PROGRAMS
FY2025-26 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE
PROPOSED METHOD OF FINANCING
Operating CIP Fund Bond/Tax Grants/ Impact Escrow Car Rental To Be
Priority Estimated Cost Other EDC
Fund Balance Note Contributions Fees Funds Tax Determined
FY2025-26 Drainage Curb & Gutter Improvements A $ 350,000 XX
Sub -Total Drainage Priority A -Proposed FY2025-26 $ 350,000
FY2026-27 Drainage Curb & Gutter Improvements (27) B $ 250,000 XX
FY2027-28 Drainage Curb & Gutter Improvements (28) B $ 250,000 XX
FY2028-29 Drainage Curb & Gutter Improvements (29) B $ 250,000 XX
FY2029-30 Drainage Curb & Gutter Improvements (3°) B $ 250,000 XX
Sub -Total Drainage Priority B-Unfunded $ 1,000,000
Valley Gutter Replacement — Crane Drive 1 C $ - 1 I I I 1 1 1 1 1 XX
Sub -Total Drainage Priority C-Unfunded $ -
DRAINAGE PROJECTS - TOTAL $ 1,350,000
STREET PROJECTS
FY2025-26 Street Improvements A $ 1,150,000 XX
Traffic Signal — SH 10 & Dickey Drive A $ 811,000 $182,346 $628,654
Traffic Signal Intersection Improvements — FM 157 & Signet Drive A $ 1,019,000 $223,649 $795,351
Sub -Total Street Priority A -Proposed FY2025-26 $ 2,980,000
FY2026-27 Street Improvements (27) B $ 1,175,000 XX
FY2027-28 Street Improvements (28) B $ 1,200,000 XX
FY2028-29 Street Improvements (2°) B $ 1,225,000 XX
Cresthaven Drive Reconstruction (2°) B $ 3,550,000 XX
FY2029-30 Street Improvements (3°) B $ 1,250,000 XX
Sub -Total Street Priority 6-Unfunded $ 8,400,000
East Alexander Lane Reconstruction C TBD XX
Midway Drive Reconstruction Phase I C TBD XX
Midway Drive Reconstruction Phase II C TBD XX
Midway Drive Reconstruction Phase 11I C TBD XX
Ross Avenue Extension C TBD XX
Sheppard Drive Reconstruction C TBD XX
Vine Street Reconstruction — SH 183 to SH 10 C TBD XX
Sub -Total Street Priority C-Unfunded $
STREET PROJECTS - TOTAL $ 11,380,000
WASTEWATER PROJECTS
FY2025-26 52nd CDBG LR: Martin/Slaughter/E Huitt A $ 310,000
LR: Oakwood Terrace North Phases I & 11 Construction A $ 614,000 XX
LR: Vine Street Engineering A $ 75,000 XX
Sub -Total Wastewater Priority A -Proposed FY2025-26 $ 999,000
FY2026-27 53rd CDBG LR: Fair Oaks Drive/Lone Oak Circle (27' B $ 292,000
LR: Oakwood Terrace North Phase III — Construction (27) B $ 474,000 XX
LR: Vine Street Construction (27) B $ 300,000 XX
FY2027-28 54th CDBG LR: Twin Oaks Court/Shady Hollow (28) B $ 287,000
LR: Woodvine Drive Engineering (28) B $ 98,000 XX
LR: Cliffwood Road/Shady Creek Drive Engineering (29) B $ 119,000 XX
LR: Euless Junior High School/Himes Drive/N Byers Street Engineering (29) B $ 110,000 XX
FY2028-29 55th CDBG LR: Douglas Street (29' B $ 324,000
LR: Woodvine Drive Construction (2°) B $ 491,000 XX
LR: Cliffwood Road/Shady Creek Drive Construction (3°) B $ 596,000 XX
LR: Euless Junior High School/Himes Drive/N Byers Street Construction (3°) B $ 550,000 XX
FY2029-30 56th CDBG LR: Fair Oaks Drive/Roundtree Drive (3°) B $ 323,000
Sub -Total Wastewater Priority B-Unfunded $ 3,964,000
LR: Knob Hill C TBD
XX
Sub -Total Wastewater Priority C-Unfunded
WASTEWATER PROJECTS - TOTAL
LR = Line Replacement
$
$ 4,963,000
153
Project Description
WATER PROJECTS
CAPITAL IMPROVEMENT PROGRAMS
FY2025-26 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE
PROPOSED METHOD OF FINANCING
Operating CIP Fund Bond/Tax Grants/ Impact Escrow Car Rental To Be
Priority Estimated Cost Other EDC
Fund Balance Note Contributions Fees Funds Tax Determined
LR: Sagebrush Trail A $ 620,000 XX
Sub -Total Water Priority A -Proposed FY2025-26 $ 620,000
LR: Bell -Hi Addition Phases I & II Engineering (27) B $ 88,000 XX
LR: West Euless Boulevard Engineering (27) B $ 111,000 XX
LR: Bell -Hi Addition Phases I & II Construction (28) B $ 585,000 XX
LR: Donley Drive/Donley Court Engineering (28) B $ 75,000 XX
LR: West Euless Boulevard Construction (28) B $ 742,000 XX
LR: Donley Drive/Donley Court Construction (29) B $ 497,000 XX
LR: Fuller -Wiser Road Engineering (29) B $ 75,000 XX
LR: Fuller -Wiser Road Construction (3°) B $ 497,000 XX
Sub -Total Water Priority B-Unfunded $ 2,670,000
1 Mil Well Replacement C TBD XX
LR: Dunaway Drive C TBD XX
LR: Knob Hill C TBD XX
LR: Midway Park 3rd Addition C TBD XX
LR: Midway Drive C TBD XX
LR: Westpark Way C TBD XX
Sub -Total Water Priority C-Unfunded $ -
WATER PROJECTS - TOTAL $ 3,290,000
OTHER PROJECTS
Euless Family Life Center Expansion Feasibility/Programming Study A $ 100,000 XX
Kiddie Carr Park Improvements A $ 2,000,000 XX
Parks at Texas Star South Batting Cage Area Redevelopment A $ 1,750,000 XX
South Euless Park Improvements A $ 3,000,000 XX
Sub -Total Other Priority A -Proposed FY2025-26 $ 6,850,000
J.A. Carr Park Expansion (27) B TBD XX
Parks at Texas Star South Turf Replacement (27) B $ 875,000 XX
Euless Family Life Center Expansion Design/Development (28) B TBD XX
Parks at Texas Star Phase VIII (29) B $ 10,000,000 XX
Euless Family Life Center Expansion Construction Document Development (30) B TBD XX
Sub -Total Other Priority B-Unfunded $ 10,875,000
Euless Family Life Center Expansion Construction C TBD XX
Parks at Texas Star North Turf Replacement C TBD XX
Parks at Texas Star South Entrance Improvements C TBD XX
Trail Enhancements Phase I C TBD XX
Trail Enhancements Phase II C TBD XX
Trail/Park Enhancements Villages of Bear Creek C TBD XX
Trailwood Park Improvements C TBD XX
West Park Improvements C TBD XX
Sub -Total Other Priority C-Unfunded $ -
OTHER PROJECTS - TOTAL $ 17,725,000
LR = Line Replacement
154
Project Description
DRAINAGE PROJECTS
FY2025-26 Drainage Curb & Gutter Improvements
Sub -Total Drainage Priority A -Proposed FY2025-26
FY2026-27 Drainage Curb & Gutter Improvements (27)
FY2027-28 Drainage Curb & Gutter Improvements (28)
FY2028-29 Drainage Curb & Gutter Improvements (29)
FY2029-30 Drainage Curb & Gutter Improvements (30)
Sub -Total Drainage Priority B-Unfunded
Valley Gutter Replacement — Crane Drive
Sub -Total Drainage Priority C-Unfunded
DRAINAGE PROJECTS - TOTAL
CAPITAL IMPROVEMENT PROGRAMS
FY2025-26 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE
PROPOSED METHOD OF FINANCING
Estimated Operating CIP Fund Bond/Tax Grants/ Impact Escrow Car Rental To Be
Priority Other EDC
Cost Fund Balance Note Contributions Fees Funds Tax Determined
A $ 350,000 XX
$ 350,000
B $ 250,000 XX
B $ 250,000 XX
B $ 250,000 XX
B $ 250,000 XX
$ 1,000,000
I C $ 1 1 1 I I I 1 I I XX
$ 1,350,000
155
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: July 09,2024
Submitted By: MAJOR JONES Date Completed:
Project Title: FY2025-26 DRAINAGE CURB & GUTTER IMPROVEMENTS
Project Type: DRAINAGE Sub -Type: IMPROVEMENTS
Project Code: Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of the removal and replacement of damaged curb and gutter throughout the City.
PROJECT SCHEDULE:
FY2025-26
JUSTIFICATION:
The existing curb and gutter along many City streets has aged, failed, or been damaged. The curb and gutter
serves as part of the City's storm water collection system. The new curb and gutter will improve drainage
performance while also enhancing the appearance of City streets.
156
PROJECT TITLE: FY2025-26 DRAINAGE CURB & GUTTER IMPROVEMENTS
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
XX
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from Drainage Operating Fund.
TOTAL ESTIMATED CAPITAL COST:
Construction $350,000
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction
$350,000
157
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: July 09,2024
Submitted By: MAJOR JONES Date Completed:
Project Title: FY2026-27 DRAINAGE CURB & GUTTER IMPROVEMENTS
Project Type: DRAINAGE Sub -Type: IMPROVEMENTS
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of the removal and replacement of damaged curb and gutter throughout the City.
PROJECT SCHEDULE:
FY2026-27
JUSTIFICATION:
The existing curb and gutter along many City streets has aged, failed, or been damaged. The curb and gutter
serves as part of the City's storm water collection system. The new curb and gutter will improve drainage
performance while also enhancing the appearance of City streets.
158
PROJECT TITLE: FY2026-27 DRAINAGE CURB & GUTTER IMPROVEMENTS
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
XX
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from Drainage Operating Fund.
TOTAL ESTIMATED CAPITAL COST:
Construction $250,000
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction
$250,000
159
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: July 09,2024
Submitted By: MAJOR JONES Date Completed:
Project Title: FY2027-28 DRAINAGE CURB & GUTTER IMPROVEMENTS
Project Type: DRAINAGE Sub -Type: IMPROVEMENTS
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of the removal and replacement of damaged curb and gutter throughout the City.
PROJECT SCHEDULE:
FY2027-28
JUSTIFICATION:
The existing curb and gutter along many City streets has aged, failed, or been damaged. The curb and gutter
serves as part of the City's storm water collection system. The new curb and gutter will improve drainage
performance while also enhancing the appearance of City streets.
160
PROJECT TITLE: FY2027-28 DRAINAGE CURB & GUTTER IMPROVEMENTS
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
XX
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from Drainage Operating Fund.
TOTAL ESTIMATED CAPITAL COST:
Construction $250,000
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction
$250,000
161
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: July 09,2024
Submitted By: MAJOR JONES Date Completed:
Project Title: FY2028-29 DRAINAGE CURB & GUTTER IMPROVEMENTS
Project Type: DRAINAGE Sub -Type: IMPROVEMENTS
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of the removal and replacement of damaged curb and gutter throughout the City.
PROJECT SCHEDULE:
FY2028-29
JUSTIFICATION:
The existing curb and gutter along many City streets has aged, failed, or been damaged. The curb and gutter
serves as part of the City's storm water collection system. The new curb and gutter will improve drainage
performance while also enhancing the appearance of City streets.
162
PROJECT TITLE: FY2028-29 DRAINAGE CURB & GUTTER IMPROVEMENTS
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
XX
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from Drainage Operating Fund.
TOTAL ESTIMATED CAPITAL COST:
Construction $250,000
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction
$250,000
163
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: July 09,2024
Submitted By: MAJOR JONES Date Completed:
Project Title: FY2029-30 DRAINAGE CURB & GUTTER IMPROVEMENTS
Project Type: DRAINAGE Sub -Type: IMPROVEMENTS
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of the removal and replacement of damaged curb and gutter throughout the City.
PROJECT SCHEDULE:
FY2029-30
JUSTIFICATION:
The existing curb and gutter along many City streets has aged, failed, or been damaged. The curb and gutter
serves as part of the City's storm water collection system. The new curb and gutter will improve drainage
performance while also enhancing the appearance of City streets.
164
PROJECT TITLE: FY2029-30 DRAINAGE CURB & GUTTER IMPROVEMENTS
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
XX
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from Drainage Operating Fund.
TOTAL ESTIMATED CAPITAL COST:
Construction $250,000
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction
$250,000
165
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 04,2025
Submitted By: MAJOR JONES Date Completed:
Project Title: VALLEY GUTTER REPLACEMENT — CRANE DRIVE
Project Type: DRAINAGE Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of the removal and replacement of damaged valley gutter located at 1202 Crane Drive.
Also, regrading and resurfacing each side of the valley gutter is included in the project scope.
PROJECT SCHEDULE:
JUSTIFICATION:
The gutter serves as part of the City's storm water collection system. This gutter has collected water for
extended periods of time causing deterioration. A new gutter will improve drainage performance while also
enhancing the appearance of this area.
166
Project Description
CAPITAL IMPROVEMENT PROGRAMS
FY2025-26 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE
Priority Estimated Cost
PROPOSED METHOD OF FINANCING
Operating CIP Fund Bond/Tax Grants/ Impact Escrow Car Rental
Fund Balance Note Contributions Fees Funds Tax
To Be
Other EDC Determine
d
STREET PROJECTS
FY2025-26 Street Improvements A $ 1,150,000 XX
Traffic Signal — SH 10 & Dickey Drive A $ 811,000 $182,346 $628,654
Traffic Signal Intersection Improvements — FM 157 & Signet Drive A $ 1,019,000 $223,649 $795,351
Sub -Total Street Priority A -Proposed FY2025-26 $ 2,980,000
FY2026-27 Street Improvements (27) B $ 1,175,000 XX
FY2027-28 Street Improvements (28) B $ 1,200,000 XX
FY2028-29 Street Improvements (29) B $ 1,225,000 XX
Cresthaven Drive Reconstruction (29) B $ 3,550,000 XX
FY2029-30 Street Improvements (3°) B $ 1,250,000 XX
Sub -Total Street Priority B-Unfunded $ 8,400,000
East Alexander Lane Reconstruction C TBD XX
Midway Drive Reconstruction Phase I C TBD XX
Midway Drive Reconstruction Phase II C TBD XX
Midway Drive Reconstruction Phase III C TBD XX
Ross Avenue Extension C TBD XX
Sheppard Drive Reconstruction C TBD XX
Vine Street Reconstruction — SH 183 to SH 10 C TBD XX
Sub -Total Street Priority C-Unfunded $
STREET PROJECTS - TOTAL $ 11,380,000
167
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 31,2020
Submitted By: MAJOR JONES Date Completed:
Project Title: FY2025-26 STREET IMPROVEMENTS
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by pavement
condition index of the roadways.
PROJECT SCHEDULE:
FY2025-26
JUSTIFICATION:
The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, extend
the life of the roadway, and enhance the appearance of the streets.
168
PROJECT TITLE: FY2025-26 STREET IMPROVEMENTS
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from General Fund.
XX
TOTAL ESTIMATED CAPITAL COST:
Construction $1,150,000
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction
$1,150,000
0%
0%
0%
0%
0%
169
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 14,2025
Submitted By: MAJOR JONES Date Completed:
Project Title: TRAFFIC SIGNAL — SH 10 & DICKEY DRIVE
Project Type: STREET Sub -Type: SIGNALIZATION
Project Code: Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of the engineering design and installation of a traffic signal with safety lighting at the intersection
of State Highway 10 and Dickey Drive. The project scope also includes updating pavement markings and signage.
PROJECT SCHEDULE:
FY2025-26
JUSTIFICATION:
TxDOT utilizes HSIP funding to achieve significant reductions in traffic fatalities and serious injuries on all public
roads. This intersection has experienced multiple fatal and serious crashes due to the lack of a traffic signal.
This project was submitted by the City of Euless to the Texas Department of Transportation (TxDOT) and approved as
part of the Highway Safety Improvement Program (HSIP). The City will be responsible for engineering design costs
and TxDOT will pay for installation.
170
PROJECT TITLE: TRAFFIC SIGNAL — SH 10 & DICKEY DRIVE
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is as follows:
$182,346 — General Fund (City)
$628,654 — HSIP/TxDOT
TOTAL ESTIMATED CAPITAL COST:
Engineering $125,705
Environmental $25,000
$0 Traffic Signal $628,654
$0 Contingency $31,641
$0
$0
$0
$0
$0 Total Estimated Capital Cost
$182,346
$628,654
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
$811,000
0%
0%
0%
0%
0%
171
THE CITY OF
EULESS
Traffic Signal - SH10 & Dickey
PRIMROSE HILL PRIMROSE ,/ J li
cc
�� \\ w
o \\4=MIDPARK__i
w
:11 o RIVER
re -TOWN:CREEK ` 1 I :=BIRCH_,
�� ce
m ri
._,
cc
ci) 0 U w I�
w w W
Q I-- N
Z PORT ROYALE WAY =
w
Lai n
�"ce
W
O Jul
0 `
0
m
-EVITA J
o
AIRPORT
-REVOLU.IIi N—
L' C
—REPUBLIC
—ALEXANDER=g
CP-
FULLER
WESTWOO
AIRP_ORT
0916
T F
AIRppR
WY-S- p—AIR11%/:-F ,NLIE
—EUL=ESS=BLVD_IE))
IERNIGAN
J
REVOLUTION_ ) 1
Street Improvement
-Intersection of SH10 and Dickey Dr
0 175 350
700
1,050
T H EEC I T Y
OF
ELESS
1,400
Feet
Legend
L I
v
( DUCKET.T1 ,
N
173
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 14,2025
Submitted By: MAJOR JONES Date Completed:
Project Title: TRAFFIC SIGNAL INTERSECTION IMPROVEMENTS — FM 157 & SIGNET DR
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of the engineering design and construction for traffic signal intersection improvements at FM 157
and Signet Drive. The project scope includes updating the curb ramps to be compliant with the Americans with
Disabilities Act, adding a pedestrian signal, updating pavement markings and high visibility crosswalks, and installing
additional sidewalks.
PROJECT SCHEDULE:
FY2025-26
JUSTIFICATION:
TxDOT utilizes HSIP funding to achieve significant reductions in traffic fatalities and serious injuries on all public
roads. This intersection has experienced multiple fatal and serious crashes due to the need for updated equipment
and pavement markings.
This project was submitted by the City of Euless to the Texas Department of Transportation (TxDOT) and approved as
part of the Highway Safety Improvement Program (HSIP). The City will be responsible for engineering design costs
and TxDOT will pay for construction improvements.
174
PROJECT TITLE: TRAFFIC SIGNAL INTERSECTION IMPROVEMENTS — FM 157 & SIGNET DR
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is as follows:
$223,649 — General Fund (City)
$795,351 — HSIP/TxDOT
TOTAL ESTIMATED CAPITAL COST:
Engineering $158,937
Environmental $25,000
$0 Improvements $795,351
$0 Contingency $39,712
$0
$0
$0
$0
$0 Total Estimated Capital Cost
$223,649
$795,351
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
$1,019,000
0%
0%
0%
0%
0%
175
THE CITY OF
EULESS
Traffic Signal Intersection Improvements - FM 157 & Signet
CALAIS .1LLANTE
K" JETTE KYNETTC_,
z
J
'r >-
r
J
cr
co
—ALLEY=
BELL IF
-RANCH-z
—TOPLEA�
SAGEBRUSH=
9
LL
W
Z
W
ce
SIGNET=DR-7;
Cl)ce
cm
z
1 W
ccm
LnAKRIDGE
Street Improvement
-Intersection of FM 157 and Signet Dr
0 175 350
700
1,050
co
0
J
g\RON
0
VILLA.DR
BOYD
O
*,RS�
O>#c
FOUNDERSJ
44 LL �P-ONDS:EDGE^D
PKWY ,
�
0 TOWN -VIEW
m J I
(ESTELLE�
NI
J
TOPLEA. JQ
0)
z
i'
WHITENEF
�y'w DANNY m
E2i2 CREEK m'nv I FAUN
rn m II
THE CITY OF
EULESS
1,400
Feet
Legend
N
177
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 31,2022
Submitted By: MAJOR JONES Date Completed:
Project Title: FY2026-27 STREET IMPROVEMENTS
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by pavement
condition index of the roadways.
PROJECT SCHEDULE:
FY2026-27
JUSTIFICATION:
The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, extend
the life of the roadway, and enhance the appearance of the streets.
178
PROJECT TITLE: FY2026-27 STREET IMPROVEMENTS
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from General Fund.
XX
TOTAL ESTIMATED CAPITAL COST:
Construction $1,175,000
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction
$1,175,000
0%
0%
0%
0%
0%
179
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 31,2023
Submitted By: MAJOR JONES Date Completed:
Project Title: FY2027-28 STREET IMPROVEMENTS
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by pavement
condition index of the roadways.
PROJECT SCHEDULE:
FY2027-28
JUSTIFICATION:
The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, extend
the life of the roadway, and enhance the appearance of the streets.
180
PROJECT TITLE: FY2027-28 STREET IMPROVEMENTS
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from General Fund.
XX
TOTAL ESTIMATED CAPITAL COST:
Construction $1,200,000
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction
$1,200,000
0%
0%
0%
0%
0%
181
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 31,2023
Submitted By: MAJOR JONES Date Completed:
Project Title: FY2028-29 STREET IMPROVEMENTS
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by pavement
condition index of the roadways.
PROJECT SCHEDULE:
FY2028-29
JUSTIFICATION:
The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, extend
the life of the roadway, and enhance the appearance of the streets.
182
PROJECT TITLE: FY2028-29 STREET IMPROVEMENTS
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from General Fund.
XX
TOTAL ESTIMATED CAPITAL COST:
Construction $1,225,000
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction
$1,225,000
0%
0%
0%
0%
0%
183
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 02,2024
Submitted By: MAJOR JONES Date Completed:
Project Title: CRESTHAVEN DRIVE RECONSTRUCTION
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The Master Thoroughfare Plan identifies the various street types within the City of Euless. These street types include
residential streets through regional arterials. The pavement management plan, through condition assessment,
provides statistical data and guidance for cost effective maintenance and project planning.
PROJECT DESCRIPTION:
This project includes the reconstruction of Cresthaven Drive from a two-lane asphalt roadway to a 31 foot wide curb
and gutter concrete street from SH 10 to South Pipeline Road.
The project scope includes the replacement of an existing 4 inch AC water line and 6 inch PVC water line located
along Cresthaven Drive between West Euless Drive and South Pipeline Road.
PROJECT SCHEDULE:
FY2028-29
JUSTIFICATION:
The existing asphalt pavement is deteriorating and upgrading to a concrete curb and gutter street will provide an
improved riding surface, extend the life of the roadway, and enhance the appearance of the streets.
Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible
to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains
using a worst -first approach to reduce maintenance costs and customer problems.
184
PROJECT TITLE: CRESTHAVEN DRIVE RECONSTRUCTION
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
$0
$0
$0
$0
$0
$0
TOTAL ESTIMATED CAPITAL COST:
Engineering $550,000
Construction $3,000,000
Total Estimated Annual Cost $0 Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding XX Construction %
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from FY2026 Federal Appropriations grant, if approved.
$3,550,000
0%
0%
0%
0%
0%
185
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 31,2023
Submitted By: MAJOR JONES Date Completed:
Project Title: FY2029-30 STREET IMPROVEMENTS
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by pavement
condition index of the roadways.
PROJECT SCHEDULE:
FY2029-30
JUSTIFICATION:
The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, extend
the life of the roadway, and enhance the appearance of the streets.
186
PROJECT TITLE: FY2029-30 STREET IMPROVEMENTS
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from General Fund.
XX
TOTAL ESTIMATED CAPITAL COST:
Construction $1,250,000
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction
$1,250,000
0%
0%
0%
0%
0%
187
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: July 23,1999
Submitted By: RON YOUNG Date Completed:
Project Title: EAST ALEXANDER LANE RECONSTRUCTION
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This minor street serves as a collector type street by conveying traffic to major roadways.
PROJECT DESCRIPTION:
East Alexander Lane will be reconstructed from Main Street to Cullum Drive. It will be reconstructed from a two-
lane county type road to a standard 31 foot wide residential street with underground drainage and sidewalks.
PROJECT SCHEDULE:
JUSTIFICATION:
Reconstruction of this street will decrease the annual maintenance and comply with current City standards.
188
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 04,2025
Submitted By: MAJOR JONES Date Completed:
Project Title: MIDWAY DRIVE RECONSTRUCTION PHASE I
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This minor street serves as a collector type street by conveying traffic to major roadways.
PROJECT DESCRIPTION:
The project consists of the reconstruction of West Midway Drive between FM 157 and North Ector Drive.
PROJECT SCHEDULE:
JUSTIFICATION:
Reconstruction of this street will decrease the annual maintenance and comply with current City standards.
189
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 04,2025
Submitted By: MAJOR JONES Date Completed:
Project Title: MIDWAY RECONSTRUCTION PHASE II
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This minor street serves as a collector type street by conveying traffic to major roadways.
PROJECT DESCRIPTION:
The project consists of the reconstruction of West Midway Drive between North Ector Drive and North Main
Street.
PROJECT SCHEDULE:
JUSTIFICATION:
Reconstruction of this street will decrease the annual maintenance and comply with current City standards.
190
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 04,2025
Submitted By: MAJOR JONES Date Completed:
Project Title: MIDWAY RECONSTRUCTION PHASE III
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This minor street serves as a collector type street by conveying traffic to major roadways.
PROJECT DESCRIPTION:
The project consists of the reconstruction of West Midway Drive between North Main Street and 510 Arbor
Creek.
PROJECT SCHEDULE:
JUSTIFICATION:
Reconstruction of this street will decrease the annual maintenance and comply with current City standards.
191
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 31,2005
Submitted By: RON YOUNG Date Completed:
Project Title: ROSS AVENUE EXTENSION
Project Type: STREET Sub -Type: CONSTRUCTION
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The construction of the remainder of Ross Avenue from the fire station to the west limit will be in accordance
with City standards which includes concrete pavement.
PROJECT SCHEDULE:
JUSTIFICATION:
Construction of this street will comply with current City standards. This extension of Ross Avenue from the
completed section adjacent to the fire station will complete the upgrading of this street.
192
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: June 12,2020
Submitted By: HAL CRANOR Date Completed:
Project Title: SHEPPARD DRIVE RECONSTRUCTION
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project includes the reconstruction of Sheppard Drive from the west bound service road of SH 183 to Trojan
Trail. Sheppard Drive is currently an open section asphalt street that includes a small section of concrete curb
and gutter. The road will be reconstructed as a concrete roadway with curb and gutter. No storm drain system
will need to be constructed.
PROJECT SCHEDULE:
JUSTIFICATION:
To upgrade Sheppard Drive to a concrete curb and gutter street.
193
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 28,2015
Submitted By: HAL CRANOR Date Completed:
Project Title: VINE STREET RECONSTRUCTION — SH 183 TO SH 10
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Vine Street is not identified in the City's Master Thoroughfare Plan.
PROJECT DESCRIPTION:
The project consists of the reconstruction of Vine Street from SH 183 to SH 10.
PROJECT SCHEDULE:
JUSTIFICATION:
The City has received street escrow funds from several developments along Vine Street. When development is
complete, it would be appropriate for the City to reconstruct the existing roadway.
194
Project Description
CAPITAL IMPROVEMENT PROGRAMS
FY2025-26 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE
PROPOSED METH )D OF FINANCING
Operating CIP Fund Bond/Tax Grants/ Impact Escrow Car Rental To Be
Priority Estimated Cost Other EDC
Fund Balance Note Contributions Fees Funds Tax Determined
WASTEWATER PROJECTS
FY2025-26 52nd CDBG LR: Martin/Slaughter/E Huitt A $ 310,000 XX
LR: Oakwood Terrace North Phases I & II Construction A $ 614,000 XX
LR: Vine Street Engineering A $ 75,000 XX
Sub -Total Wastewater Priority A -Proposed FY2025-26 $ 999,000
FY2026-27 53rd CDBG LR: Fair Oaks Drive/Lone Oak Circle (27) B $ 292,000 XX
LR: Oakwood Terrace North Phase III — Construction (27) B $ 474,000 XX
LR: Vine Street Construction (27) B $ 300,000 XX
FY2027-28 54th CDBG LR: Twin Oaks Court/Shady Hollow (28) B $ 287,000 XX
LR: Woodvine Drive Engineering (28) B $ 98,000 XX
LR: Cliffwood Road/Shady Creek Drive Engineering (29) B $ 119,000 XX
LR: Euless Junior High School/Himes Drive/N Byers Street Engineering (29) B $ 110,000 XX
FY2028-29 55th CDBG LR: Douglas Street (29) B $ 324,000 XX
LR: Woodvine Drive Construction (29) B $ 491,000 XX
LR: Cliffwood Road/Shady Creek Drive Construction (3°) B $ 596,000 XX
LR: Euless Junior High School/Himes Drive/N Byers Street Construction ('°) B $ 550,000 XX
FY2029-30 56th CDBG LR: Fair Oaks Drive/Roundtree Drive (3°) B $ 323,000 XX
Sub -Total Wastewater Priority B-Unfunded $ 3,964,000
LR: Knob Hill I C TBD I I I I I I I I I XX
Sub -Total Wastewater Priority C-Unfunded $
WASTEWATER PROJECTS -TOTAL
LR = Line Replacement
$ 4,963,000
195
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 20,2025
Submitted By: MAJOR JONES Date Completed:
Project Title: 52ND CDBG LINE REPLACEMENT — MARTIN/SLAUGHTER/E HUITT
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Martin Lane from Huntington Drive to American Boulevard,
2. Slaughter Lane from Huntington Drive to American Boulevard, and
3. East Huitt Lane from Huntington Drive to American Boulevard.
(52nd year CDBG project)
PROJECT SCHEDULE:
FY2025-26
JUSTIFICATION:
Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to
ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard
in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains
using a worst -first approach to reduce maintenance costs and customer problems.
196
PROJECT TITLE: 52ND CDBG LINE REPLACEMENT — MARTIN/SLAUGHTER/E HUITT
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
$0
$0
$0
$0
$0
$0
TOTAL ESTIMATED CAPITAL COST:
Engineering $40,000
Construction $270,000
Total Estimated Annual Cost $0 Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding XX Construction
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Project is contingent upon actual CDBG funding availability.
$310,000
0%
0%
0%
0%
0%
197
THE CITY OF
EULESS
Line Replacement - Martin/Slaughter/E Huitt
:ALEXANDER � J
-144Rmsr,
rn
SUpUGHTER
z
z
0
0
z
I HUITT,=
z
L
•
/i
Wastewater Line Replacement
-Between E Alexander Ln and Martin
Ln and Slaughter Ln and E Huitt Ln
0 80 160
320
z
0
0
480
T H EEC I T Y
0 F
ELESS
640
Feet
Legend
=Wastewater
199
Department:
Submitted By:
Project Title:
Project Type:
Project Code:
City of Euless
Capital Project Request
PUBLIC WORKS Date Prepared: April 04,2025
MAJOR JONES Date Completed:
LINE REPLACEMENT — OAKWOOD TERRACE NORTH PHASES I & II CONSTRUCTION
WASTEWATER Sub -Type: MAIN REPLACEMENT
Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Between Mary Drive and Marlene Drive from Eastcliff Drive to Marlene Drive, and
2. 607-805 Commerce Street.
PROJECT SCHEDULE:
FY2025-26
JUSTIFICATION:
Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to
ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard
in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains
using a worst -first approach to reduce maintenance costs and customer problems.
200
PROJECT TITLE: LINE REPLACEMENT — OAKWOOD TERRACE NORTH PHASES I & II CONSTRUCTION
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from W/WW Operating Fund.
XX
TOTAL ESTIMATED CAPITAL COST:
Construction $614,000
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction
$614,000
0%
0%
0%
0%
0%
201
THE CITY OF
EULESS
Line Replacement - Oakwood Terrace North Phases I & II
co
GREENBRIAR
MARLENE-DR
04RY
m
w
0
)OUBLE BARREL- I
1
./
Wastewater Line Replacement
- Between Mary Dr and Marlene Dr
- Commerce St
0 112.5 225
450
675
TOPLEA
0AGEBRUSH
TYLER
THE CITY OF
EULESS
900
Feet
m
fl
Legend
Wastewater
ce
ce
W
N
203
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 04,2025
Submitted By: MAJOR JONES Date Completed:
Project Title: LINE REPLACEMENT — VINE STREET ENGINEERING
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan.
PROJECT DESCRIPTION:
The project consists of the engineering design for the replacement of wastewater mains from 513 to 603 Vine Street.
PROJECT SCHEDULE:
FY2025-26
JUSTIFICATION:
Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to
ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard
in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains
using a worst -first approach to reduce maintenance costs and customer problems.
The project will resolve issues for the property behind 603 Vine Street at 606 Martha Street.
204
PROJECT TITLE: LINE REPLACEMENT — VINE STREET ENGINEERING
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from W/WW Operating Fund.
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering $75,000
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction
$75,000
0%
0%
0%
0%
0%
205
THE CITY OF
EULESS
Line Replacement — Vine Street
z
0
z
BAYLESS
0
0
0
CLEBUD
Wastewater Line Replacement
-Between Vine St and Martha St
0 65 130
260
390
i EAV=S
HOLLYWOOu
THE C I T Y OF
EULESS
520
Feet
Legend
•Wastewater
207
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 20,2025
Submitted By: MAJOR JONES Date Completed:
Project Title: 53RD CDBG LINE REPLACEMENT — FAIR OAKS/LONE OAK CIRCLE
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Along Fair Oaks Boulevard from Lone Oak Circle to Twin Oaks Court, and
2. Along Lone Oak Circle.
(53rd year CDBG project)
PROJECT SCHEDULE:
FY2026-27
JUSTIFICATION:
Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to
ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard
in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains
using a worst -first approach to reduce maintenance costs and customer problems.
208
PROJECT TITLE: 53RD CDBG LINE REPLACEMENT — FAIR OAKS/LONE OAK CIRCLE
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
$0
$0
$0
$0
$0
$0
TOTAL ESTIMATED CAPITAL COST:
Engineering $38,000
Construction $254,000
Total Estimated Annual Cost $0 Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding XX Construction
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Project is contingent upon actual CDBG funding availability.
$292,000
0%
0%
0%
0%
0%
209
Department:
Submitted By:
Project Title:
Project Type:
Project Code:
City of Euless
Capital Project Request
PUBLIC WORKS Date Prepared: March 27,2024
MAJOR JONES Date Completed:
LINE REPLACEMENT — OAKWOOD TERRACE NORTH PHASE III CONSTRUCTION
WASTEWATER Sub -Type: MAIN REPLACEMENT
Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of wastewater mains in the following areas:
1. Along Eastcliff Drive from Mary Drive to Tyler Avenue and
2. Between Tyler Avenue and Marlene Drive from Eastcliff Drive to Commerce Street.
PROJECT SCHEDULE:
FY2026-27
JUSTIFICATION:
Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to
ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard
in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains
using a worst -first approach to reduce maintenance costs and customer problems.
210
PROJECT TITLE: LINE REPLACEMENT — OAKWOOD TERRACE NORTH PHASE III CONSTRUCTION
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from W/WW Operating Fund.
XX
TOTAL ESTIMATED CAPITAL COST:
Construction $474,000
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction
$474,000
0%
0%
0%
0%
0%
211
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 04,2025
Submitted By: MAJOR JONES Date Completed:
Project Title: LINE REPLACEMENT — VINE STREET CONSTRUCTION
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of wastewater mains from 513 to 603 Vine Street.
PROJECT SCHEDULE:
FY2026-27
JUSTIFICATION:
Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to
ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard
in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains
using a worst -first approach to reduce maintenance costs and customer problems.
The project will resolve issues for the property behind 603 Vine Street at 606 Martha Street.
212
PROJECT TITLE: LINE REPLACEMENT — VINE STREET CONSTRUCTION
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from W/WW Operating Fund.
XX
TOTAL ESTIMATED CAPITAL COST:
Construction $300,000
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction
$300,000
0%
0%
0%
0%
0%
213
Department:
Submitted By:
Project Title:
Project Type:
Project Code:
City of Euless
Capital Project Request
PUBLIC WORKS Date Prepared: March 20,2025
MAJOR JONES Date Completed:
54TH CDBG LINE REPLACEMENT — TWIN OAKS COURT/SHADY HOLLOW
WASTEWATER Sub -Type: MAIN REPLACEMENT
Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Twin Oaks Court and
2. Shady Hollow.
(54th year CDBG project)
PROJECT SCHEDULE:
FY2027-28
JUSTIFICATION:
Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to
ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard
in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains
using a worst -first approach to reduce maintenance costs and customer problems.
214
PROJECT TITLE: 54TH CDBG LINE REPLACEMENT — TWIN OAKS COURT/SHADY HOLLOW
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
$0
$0
$0
$0
$0
$0
TOTAL ESTIMATED CAPITAL COST:
Engineering $38,000
Construction $249,000
Total Estimated Annual Cost $0 Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding XX Construction
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Project is contingent upon actual CDBG funding availability.
$287,000
0%
0%
0%
0%
0%
215
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 04,2025
Submitted By: MAJOR JONES Date Completed:
Project Title: LINE REPLACEMENT — WOODVINE DRIVE ENGINEERING
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan.
PROJECT DESCRIPTION:
The project consists of the engineering design for the replacement of the wastewater mains located at 1306-3803
Woodvine Drive.
PROJECT SCHEDULE:
FY2027-28
JUSTIFICATION:
Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to
ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard
in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains
using a worst -first approach to reduce maintenance costs and customer problems.
216
PROJECT TITLE: LINE REPLACEMENT — WOODVINE DRIVE ENGINEERING
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from W/WW Operating Fund.
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering $98,000
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction
$98,000
0%
0%
0%
0%
0%
217
Department:
Submitted By:
Project Title:
Project Type:
Project Code:
City of Euless
Capital Project Request
PUBLIC WORKS Date Prepared: April 04,2025
MAJOR JONES Date Completed:
LINE REPLACEMENT — CLIFFWOOD ROAD/SHADY CREEK DRIVE ENGINEERING
WASTEWATER Sub -Type: MAIN REPLACEMENT
Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan.
PROJECT DESCRIPTION:
The project consists of the engineering design for the replacement of the following wastewater mains:
1. 1309-1509 Cliffwood Road and
2. 3905-4003 Shady Creek Drive.
PROJECT SCHEDULE:
FY2028-29
JUSTIFICATION:
Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to
ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard
in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains
using a worst -first approach to reduce maintenance costs and customer problems.
218
PROJECT TITLE: LINE REPLACEMENT — CLIFFWOOD ROAD/SHADY CREEK DRIVE ENGINEERING
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from W/WW Operating Fund.
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering $119,000
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction
$119,000
0%
0%
0%
0%
0%
219
Department:
Submitted By:
Project Title:
Project Type:
Project Code:
City of Euless
Capital Project Request
PUBLIC WORKS Date Prepared: April 07,2025
MAJOR JONES Date Completed:
LINE REPLACEMENT — EULESS JUNIOR HS/HIMES DR/N BYERS ST ENGINEERING
WASTEWATER Sub -Type: MAIN REPLACEMENT
Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan.
PROJECT DESCRIPTION:
The project consists of the engineering design for the replacement of the wastewater mains in the following area:
1. Those located within the Euless Junior High School property,
2. Along Himes Drive from a point 90 feet north of the intersection with West Fuller Drive to 250 ft north of the
intersection, and
3. Along North Byers Street from the intersection with West Fuller Drive to 250 feet north of the intersection.
PROJECT SCHEDULE:
FY2028-29
JUSTIFICATION:
Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to
ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard
in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains
using a worst -first approach to reduce maintenance costs and customer problems.
220
PROJECT TITLE: LINE REPLACEMENT — EULESS JUNIOR HS/HIMES DR/N BYERS ST ENGINEERING
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from W/WW Operating Fund.
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering $110,000
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction
$110,000
0%
0%
0%
0%
0%
221
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 20,2025
Submitted By: MAJOR JONES Date Completed:
Project Title: 55TH CDBG LINE REPLACEMENT — DOUGLAS STREET
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of wastewater mains located on Douglas Street from Aransas Drive to Fair
Oaks Boulevard.
(55th year CDBG project)
PROJECT SCHEDULE:
FY2028-29
JUSTIFICATION:
Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to
ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard
in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains
using a worst -first approach to reduce maintenance costs and customer problems.
222
PROJECT TITLE: 55TH CDBG LINE REPLACEMENT — DOUGLAS STREET
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
$0
$0
$0
$0
$0
$0
TOTAL ESTIMATED CAPITAL COST:
Engineering $42,000
Construction $282,000
Total Estimated Annual Cost $0 Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding XX Construction
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Project is contingent upon actual CDBG funding availability.
$324,000
0%
0%
0%
0%
0%
223
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 04,2025
Submitted By: MAJOR JONES Date Completed:
Project Title: LINE REPLACEMENT — WOODVINE DRIVE CONSTRUCTION
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of the wastewater mains located at 1306-3803 Woodvine Drive.
PROJECT SCHEDULE:
FY2028-29
JUSTIFICATION:
Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to
ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard
in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains
using a worst -first approach to reduce maintenance costs and customer problems.
224
PROJECT TITLE: LINE REPLACEMENT — WOODVINE DRIVE CONSTRUCTION
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from W/WW Operating Fund.
XX
TOTAL ESTIMATED CAPITAL COST:
Construction $491,000
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction
$491,000
0%
0%
0%
0%
0%
225
Department:
Submitted By:
Project Title:
Project Type:
Project Code:
City of Euless
Capital Project Request
PUBLIC WORKS Date Prepared: April 04,2025
MAJOR JONES Date Completed:
LINE REPLACEMENT — CLIFFWOOD ROAD/SHADY CREEK DRIVE CONSTRUCTION
WASTEWATER Sub -Type: MAIN REPLACEMENT
Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. 1309-1509 Cliffwood Road and
2. 3905-4003 Shady Creek Drive.
PROJECT SCHEDULE:
FY2029-30
JUSTIFICATION:
Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to
ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard
in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains
using a worst -first approach to reduce maintenance costs and customer problems.
226
PROJECT TITLE: LINE REPLACEMENT — CLIFFWOOD ROAD/SHADY CREEK DRIVE CONSTRUCTION
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from W/WW Operating Fund.
XX
TOTAL ESTIMATED CAPITAL COST:
Construction $596,000
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction
$596,000
0%
0%
0%
0%
0%
227
Department:
Submitted By:
Project Title:
Project Type:
Project Code:
City of Euless
Capital Project Request
PUBLIC WORKS Date Prepared: April 07,2025
MAJOR JONES Date Completed:
LINE REPLACEMENT — EULESS JUNIOR HS/HIMES DR/N BYERS ST CONSTRUCTION
WASTEWATER Sub -Type: MAIN REPLACEMENT
Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of the wastewater mains in the following area:
1. Those located within the Euless Junior High School property,
2. Along Himes Drive from a point 90 feet north of the intersection with West Fuller Drive to 250 ft north of the
intersection, and
3. Along North Byers Street from the intersection with West Fuller Drive to 250 feet north of the intersection.
PROJECT SCHEDULE:
FY2029-30
JUSTIFICATION:
Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to
ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard
in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains
using a worst -first approach to reduce maintenance costs and customer problems.
228
PROJECT TITLE: LINE REPLACEMENT — EULESS JUNIOR HS/HIMES DR/N BYERS ST CONSTRUCTION
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from W/WW Operating Fund.
XX
TOTAL ESTIMATED CAPITAL COST:
Construction $550,000
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction
$550,000
0%
0%
0%
0%
0%
229
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 20,2025
Submitted By: MAJOR JONES Date Completed:
Project Title: 56TH CDBG LINE REPLACEMENT — FAIR OAKS DRIVE/ROUNDTREE DRIVE
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Fair Oaks Drive from Roundtree Drive to Denton Drive and
2. Roundtree Drive from Fair Oaks Drive to Cedar Ridge Terrace.
(56th year CDBG project)
PROJECT SCHEDULE:
FY2029-30
JUSTIFICATION:
Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to
ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard
in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains
using a worst -first approach to reduce maintenance costs and customer problems.
230
PROJECT TITLE: 56TH CDBG LINE REPLACEMENT — FAIR OAKS DRIVE/ROUNDTREE DRIVE
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
$0
$0
$0
$0
$0
$0
TOTAL ESTIMATED CAPITAL COST:
Engineering $42,000
Construction $281,000
Total Estimated Annual Cost $0 Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding XX Construction
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Project is contingent upon actual CDBG funding availability.
$323,000
0%
0%
0%
0%
0%
231
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 11,2022
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REPLACEMENT — KNOB HILL
Project Type: WASTEWATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The wastewater mains included in this project are part of the City's Wastewater System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of all City -maintained wastewater mains located at Knob Hill.
PROJECT SCHEDULE:
JUSTIFICATION:
Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst -first approach to reduce maintenance costs and customer
problems.
232
Project Description
CAPITAL IMPROVEMENT PROGRAMS
FY2025-26 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE
Priority Estimated Cost Operating
Fund
PROPOSED METHOD OF FINANCING
CIP Fund Bond/Tax Grants/ Impact Escrow Car Rental
Balance Note Contributions Fees Funds Tax
Other EDC
To Be
Determined
WATER PROJECTS
LR: Sagebrush Trail A $ 620,000 XX
Sub -Total Water Priority A -Proposed FY2025-26 $ 620,000
LR: Bell -Hi Addition Phases I & II Engineering (27) B $ 88,000 XX
LR: West Euless Boulevard Engineering (27) B $ 111,000 XX
LR: Bell -Hi Addition Phases I & II Construction (28) B $ 585,000 XX
LR: Donley Drive/Donley Court Engineering (28) B $ 75,000 XX
LR: West Euless Boulevard Construction (28) B $ 742,000 XX
LR: Donley Drive/Donley Court Construction (29) B $ 497,000 XX
LR: Fuller -Wiser Road Engineering (29) B $ 75,000 XX
LR: Fuller -Wiser Road Construction (3°) B $ 497,000 XX
Sub -Total Water Priority B-Unfunded $ 2,670,000
1 Mil Well Replacement C TBD XX
LR: Dunaway Drive C TBD XX
LR: Knob Hill C TBD XX
LR: Midway Park 3rd Addition C TBD XX
LR: Midway Drive C TBD XX
LR: Westpark Way C TBD XX
Sub -Total Water Priority C-Unfunded $ -
WATER PROJECTS - TOTAL $ 3,290,000
LR = Line Replacement
233
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 18,2022
Submitted By: MAJOR JONES Date Completed:
Project Title: LINE REPLACEMENT — SAGEBRUSH TRAIL
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are part of the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of an existing 8 inch cast iron water line located along Sagebrush Trail from
Wilshire Drive to the end of Sagebrush Trail.
PROJECT SCHEDULE:
FY2025-26
JUSTIFICATION:
Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible
to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains
using a worst -first approach to reduce maintenance costs and customer problems.
234
PROJECT TITLE: LINE REPLACEMENT — SAGEBRUSH TRAIL
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from W/WW Operating Fund.
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering $81,000
Construction $539,000
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction
$620,000
0%
0%
0%
0%
0%
235
THE CITY OF
EULESS
Line Replacement - Sagebrush Trail
SIGNET
WINDLEA
TOPLEA
aAGEBRUSH
TYLER
MARY RI
Water Line Replacement
-Sagebrush Trl
0 112.5 225
450
675
w D Z
a F —J >- o0
Cl)73
ALLEY H--
o —' Z amxi
SIGNET DR
Et
a x
-BEL[RANCH_z a a
co
0
m
It
cc
cn
cc
O
�TOPLE�•.
SAGEBRUSH
THE EULESSCITY O F
900
Feet
(OAKRID3E
Legend
•Water
N
237
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 18,2022
Submitted By: MAJOR JONES Date Completed:
Project Title: LINE REPLACEMENT — BELL -HI ADDITION PHASES I & II ENGINEERING
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are part of the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the engineering design for the replacement of an existing 6 inch cast iron water line in the
following areas:
1. Along Needles Street from Raider Drive to Paula Lane and
2. Along Paula Lane from Needles Street to West Pipeline Road.
PROJECT SCHEDULE:
FY2026-27
JUSTIFICATION:
Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible
to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains
using a worst -first approach to reduce maintenance costs and customer problems.
238
PROJECT TITLE: LINE REPLACEMENT — BELL -HI ADDITION PHASES I & II ENGINEERING
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from W/WW Operating Fund.
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering $88,000
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction
$88,000
0%
0%
0%
0%
0%
239
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared:
Submitted By: MAJOR JONES Date Completed:
Project Title: LINE REPLACEMENT — WEST EULESS BOULEVARD ENGINEERING
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are part of the City's Water System Master Plan.
March 26,2024
PROJECT DESCRIPTION:
The project consists of the engineering design for the replacement of an existing 8 inch water line located between
2219 and 2603 West Euless Boulevard.
PROJECT SCHEDULE:
FY2026-27
JUSTIFICATION:
Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible
to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains
using a worst -first approach to reduce maintenance costs and customer problems.
240
PROJECT TITLE: LINE REPLACEMENT — WEST EULESS BOULEVARD ENGINEERING
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from W/WW Operating Fund.
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering $111,000
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction
$111,000
0%
0%
0%
0%
0%
241
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 18,2022
Submitted By: MAJOR JONES Date Completed:
Project Title: LINE REPLACEMENT — BELL -HI ADDITION PHASES I & II CONSTRUCTION
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are part of the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of an existing 6 inch cast iron water line in the following areas:
1. Along Needles Street from Raider Drive to Paula Lane and
2. Along Paula Lane from Needles Street to West Pipeline Road.
PROJECT SCHEDULE:
FY2027-28
JUSTIFICATION:
Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible
to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains
using a worst -first approach to reduce maintenance costs and customer problems.
242
PROJECT TITLE: LINE REPLACEMENT — BELL -HI ADDITION PHASES I & II CONSTRUCTION
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from W/WW Operating Fund.
XX
TOTAL ESTIMATED CAPITAL COST:
Construction $585,000
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction %
$585,000
0%
0%
0%
0%
0%
243
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 18,2022
Submitted By: MAJOR JONES Date Completed:
Project Title: LINE REPLACEMENT — DONLEY DRIVE/DONLEY COURT ENGINEERING
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are part of the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the engineering design for the replacement of an existing 6 inch water line located in the
following areas:
1. Along Donley Drive from Glenn Drive to Harwood Road and
2. Along Donley Court.
PROJECT SCHEDULE:
FY2027-28
JUSTIFICATION:
Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible
to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains
using a worst -first approach to reduce maintenance costs and customer problems.
244
PROJECT TITLE: LINE REPLACEMENT — DONLEY DRIVE/DONLEY COURT ENGINEERING
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from W/WW Operating Fund.
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering $75,000
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction
$75,000
0%
0%
0%
0%
0%
245
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 26,2024
Submitted By: MAJOR JONES Date Completed:
Project Title: LINE REPLACEMENT — WEST EULESS BOULEVARD CONSTRUCTION
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are part of the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of an existing 8 inch water line located between 2219 and 2603 West Euless
Boulevard.
PROJECT SCHEDULE:
FY2027-28
JUSTIFICATION:
Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible
to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains
using a worst -first approach to reduce maintenance costs and customer problems.
246
PROJECT TITLE: LINE REPLACEMENT — WEST EULESS BOULEVARD CONSTRUCTION
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from W/WW Operating Fund.
XX
TOTAL ESTIMATED CAPITAL COST:
Construction $742,000
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction
$742,000
0%
0%
0%
0%
0%
247
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 18,2022
Submitted By: MAJOR JONES Date Completed:
Project Title: LINE REPLACEMENT — DONLEY DRIVE/DONLEY COURT CONSTRUCTION
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are part of the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of an existing 6 inch water line located in the following areas:
1. Along Donley Drive from Glenn Drive to Harwood Road and
2. Along Donley Court.
PROJECT SCHEDULE:
FY2028-29
JUSTIFICATION:
Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible
to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains
using a worst -first approach to reduce maintenance costs and customer problems.
248
PROJECT TITLE: LINE REPLACEMENT — DONLEY DRIVE/DONLEY COURT CONSTRUCTION
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from W/WW Operating Fund.
XX
TOTAL ESTIMATED CAPITAL COST:
Construction $497,000
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction
$497,000
0%
0%
0%
0%
0%
249
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared:
Submitted By: MAJOR JONES Date Completed:
Project Title: LINE REPLACEMENT — FULLER -WISER ROAD ENGINEERING
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are part of the City's Water System Master Plan.
April 10,2025
PROJECT DESCRIPTION:
The project consists of the engineering design for the replacement of an existing 8 inch AC water line located along
Fuller -Wiser Road from 1210 Fuller -Wiser Road to East Ash Lane.
PROJECT SCHEDULE:
FY2028-29
JUSTIFICATION:
Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible
to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains
using a worst -first approach to reduce maintenance costs and customer problems.
250
PROJECT TITLE: LINE REPLACEMENT — FULLER -WISER ROAD ENGINEERING
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from W/WW Operating Fund.
XX
TOTAL ESTIMATED CAPITAL COST:
Engineering $75,000
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction
$75,000
0%
0%
0%
0%
0%
251
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared:
Submitted By: MAJOR JONES Date Completed:
Project Title: LINE REPLACEMENT — FULLER -WISER ROAD CONSTRUCTION
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are part of the City's Water System Master Plan.
April 10,2025
PROJECT DESCRIPTION:
The project consists of the replacement of an existing 8 inch AC water line located along Fuller -Wiser Road from 1210
Fuller -Wiser Road to East Ash Lane.
PROJECT SCHEDULE:
FY2029-30
JUSTIFICATION:
Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible
to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains
using a worst -first approach to reduce maintenance costs and customer problems.
252
PROJECT TITLE: LINE REPLACEMENT — FULLER -WISER ROAD CONSTRUCTION
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from W/WW Operating Fund.
XX
TOTAL ESTIMATED CAPITAL COST:
Construction $497,000
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction
$497,000
0%
0%
0%
0%
0%
253
Department:
Submitted By:
Project Title:
Project Type:
Project Code:
City of Euless
Capital Project Request
PUBLIC WORKS
MAJOR JONES
1 MIL WELL REPLACEMENT
WATER
Sub -Type: WELL
Priority: C
Date Prepared: April 15,2019
Date Completed:
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
RW Harden & Associates prepared design and bid documents in FY2022 for the eventual replacement of the 1
Mil Well.
PROJECT DESCRIPTION:
The project consists of the complete replacement of the 1 Mil Well with a new well.
PROJECT SCHEDULE:
JUSTIFICATION:
A new well will enable the City to continue to provide high quality water to citizens while reducing maintenance
and operational costs.
254
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 05,2018
Submitted By: MAJOR JONES Date Completed:
Project Title: LINE REPLACEMENT — DUNAWAY DRIVE
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are part of the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of an existing 6 inch AC water line located along Dunaway Drive
between East Alexander Lane and McCormick Court.
PROJECT SCHEDULE:
JUSTIFICATION:
Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are
susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic
replacement of water mains using a worst -first approach to reduce maintenance costs and customer problems.
255
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: May 11,2022
Submitted By: MAJOR JONES Date Completed:
Project Title: LINE REPLACEMENT — KNOB HILL
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are part of the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of all City -maintained water mains located at Knob Hill.
PROJECT SCHEDULE:
JUSTIFICATION:
Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are
susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic
replacement of water mains using a worst -first approach to reduce maintenance costs and customer problems.
256
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 05,2018
Submitted By: MAJOR JONES Date Completed:
Project Title: LINE REPLACEMENT — MIDWAY PARK 3RD ADDITION
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are part of the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of an existing 6 inch cast iron water line located along Ector Drive
between Fayette Drive and West Harwood Road.
PROJECT SCHEDULE:
JUSTIFICATION:
Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are
susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic
replacement of water mains using a worst -first approach to reduce maintenance costs and customer problems.
257
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: April 04,2025
Submitted By: MAJOR JONES Date Completed:
Project Title: LINE REPLACEMENT — MIDWAY DRIVE
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are part of the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of an existing 6 inch AC water line located along West Midway Drive
between FM 157 and North Main Street.
PROJECT SCHEDULE:
JUSTIFICATION:
Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are
susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic
replacement of water mains using a worst -first approach to reduce maintenance costs and customer problems.
258
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 26,2020
Submitted By: MAJOR JONES Date Completed:
Project Title: LINE REPLACEMENT — WESTPARK WAY
Project Type: WATER Sub -Type: MAIN REPLACEMENT
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The water mains included in this project are part of the City's Water System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of an existing 12 inch AC water line located along Westpark Way
between SH 10 and South Pipeline Road.
PROJECT SCHEDULE:
JUSTIFICATION:
Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are
susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic
replacement of water mains using a worst -first approach to reduce maintenance costs and customer problems.
259
THE CITY OF
EULESS
Project Description
CAPITAL IMPROVEMENT PROGRAMS
FY2025-26 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE
PROPO ;ED METHOD OF FINANCING
Priority Estimated Cost Operating CIP Fund Bond/Tax Grants/ Impact Escrow Car Rental Tax Other EDC To Be
Fund Balance Note Contributions Fees Funds Determined
OTHER PROJECTS
Euless Family Life Center Expansion Feasibility/Programming Study A $ 100,000 XX
Kiddie Carr Park Improvements A $ 2,000,000 XX
Parks at Texas Star South Batting Cage Area Redevelopment A $ 1,750,000 XX
South Euless Park Improvements A $ 3,000,000 XX
Sub -Total Other Priority A -Proposed FY2025-26 $ 6,850,000
J.A. Carr Park Expansion (2') B TBD XX
Parks at Texas Star South Turf Replacement (27) B $ 875,000 XX
Euless Family Life Center Expansion Design/Development (29) B TBD XX
Parks at Texas Star Phase VIII (29) B $ 10,000,000 XX
Euless Family Life Center Expansion Construction Document Development (3°) B TBD XX
Sub -Total Other Priority B-Unfunded $ 10,875,000
Euless Family Life Center Expansion Construction C TBD XX
Parks at Texas Star North Turf Replacement C TBD XX
Parks at Texas Star South Entrance Improvements C TBD XX
Trail Enhancements Phase I C TBD XX
Trail Enhancements Phase II C TBD XX
Trail/Park Enhancements Villages of Bear Creek C TBD XX
Trailwood Park Improvements C TBD XX
West Park Improvements C TBD XX
Sub -Total Other Priority C-Unfunded $ -
OTHER PROJECTS - TOTAL $ 17,725,000
261
Department:
Submitted By:
Project Title:
Project Type:
Project Code:
City of Euless
Capital Project Request
PARKS AND COMMUNITY SERVICES Date Prepared: April 1, 2025
DUANE STRAWN Date Completed:
EULESS FAMILY LIFE CENTER EXPANSION FEASIBILITY/PROGRAMMING STUDY
PARKS/RECREATION Sub -Type: FACILITY IMPROVEMENTS
Priority:
A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The adopted 2025 Parks, Recreation, and Open Space Master Plan identified the expansion of the Euless Family Life
Center (EFLC) as the No. 1 Indoor Need Priority. In order to meet the demands of citizens, the EFLC needs to
expand it's functional footprint to accommodate growing membership, classes, and programs offered.
PROJECT DESCRIPTION:
The project scope includes a feasibility and programming study to determine the appropriate mixture of programming
space and activities for the EFLC expansion project as recommended in the Parks Master Plan update and further
defined with staff recommendations. This project would lead to the Design/Development phase.
PROJECT SCHEDULE:
FY2025-26
JUSTIFICATION:
Built in 1989, the EFLC has served a great need for over 36 years. Renovations and some additions (fitness area)
were completed in 2010. These areas have become overwhelmed with the growth in membership and the number
and size of the classes and programs offered at the EFLC. During the development of the 2025 Parks, Recreation,
and Open Space Master Plan, citizens ranked the expansion, renovation, and redevelopment of the EFLC as their No.
1 priority on the Indoor Needs List. Specific needs include additional gym space, multi -purpose rooms, storage, fitness
area, Child Care, Teen Room, and office space. Restrooms and locker rooms are in need of renovation/expansion
and the facility entrances and exits need to be more customer friendly for members and visitors.
262
PROJECT TITLE: EULESS FAMILY LIFE CENTER EXPANSION FEASIBILITY/PROGRAMMING STUDY
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from Car Rental CIP Fund Balance.
TOTAL ESTIMATED CAPITAL COST:
Feasibility/Programming Study
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
)O( Preliminary Design %
Final Plans %
Specifications %
Construction
$100,000
$100,000
0%
0%
0%
0%
0%
263
City of Euless
Capital Project Request
Department: PARKS AND COMMUNITY SERVICES Date Prepared: April 1, 2025
Submitted By: DUANE STRAWN Date Completed:
Project Title: KIDDIE CARR PARK IMPROVEMENTS
Project Type: PARKS/RECREATION Sub -Type: PARK IMPROVEMENTS
Project Code: Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The adopted 2025 Parks, Recreation, and Open Space Master Plan recommends funding for system -wide park
facilities and amenities upgrades. Kiddie Carr Park was identified as a top priority park renovation based on existing
conditions, needs list, and anticipated funding. Kiddie Carr Park is a four -acre park located adjacent to Carr Park off
Pauline Street. This park includes the department's in -ground tree farm, a greenhouse, and an outdoor basketball
court.
PROJECT DESCRIPTION:
This project is comprised of the necessary demolition and site work to complete a renovated park that includes
additional parking, sidewalks, and landscaping. Project scope consists of amenities such as benches, picnic tables,
general park lighting, a sport court, drinking fountain, trash cans, barbecue grills, bicycle racks, signage, and a trail
connection to J.A. Carr Park.
PROJECT SCHEDULE:
FY2025-26
JUSTIFICATION:
As identified in the adopted 2025 Parks, Recreation, and Open Space Master Plan, the municipal park is the
foundation of any solid parks and recreation system. Euless' parks and recreation system provides residents and
visitors with significant personal, social, environmental, and economic benefits. The revitalization efforts Council
focused on over the years have increased citizens' sense of community pride. The proposed project will continue the
Council's revitalization efforts by creating an area that will serve both the passive and active leisure pursuits of
residents in this area.
264
PROJECT TITLE: KIDDIE CARR PARK IMPROVEMENTS
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
$0
$0
$0
$0
$0
$0
TOTAL ESTIMATED CAPITAL COST:
Professional Services
Construction
Total Estimated Annual Cost $0 Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance )O( Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from Car Rental CIP Fund Balance.
$200,000
$1,800,000
$2,000,000
0%
0%
0%
0%
0%
265
City of Euless
Capital Project Request
Department: PARKS AND COMMUNITY SERVICES Date Prepared: May 30, 2025
Submitted By: DUANE STRAWN Date Completed:
Project Title: PARKS AT TEXAS STAR SOUTH BATTING CAGE AREA REDEVELOPMENT
Project Type: PARKS/RECREATION Sub -Type: PARK IMPROVEMENTS
Project Code: Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The adopted 2025 Parks, Recreation, and Open Space Master Plan identified the need for additional seating,
playgrounds, pickleball courts, and sport courts. This project includes these items and helps meet the needs of
citizens. The removal of the batting cages at the Parks at Texas Star South facility created a large open space
available for redesign to better meet the needs of the complex as well as citizens.
PROJECT DESCRIPTION:
The project scope includes three lighted pickleball courts, a lighted half -court basketball court, park seating, a natural
climbing playground, and a connection to the Parks at Texas Star South Pavilion.
PROJECT SCHEDULE:
FY2025-26
JUSTIFICATION:
This project gives this available area a new purpose and provides citizens numerous new recreational and passive
park amenities to enjoy while at the complex.
266
PROJECT TITLE: PARKS AT TEXAS STAR SOUTH BATTING CAGE AREA REDEVELOPMENT
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from EDC CIP Fund Balance.
TOTAL ESTIMATED CAPITAL COST:
Batting Cage Area Redevelopment
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
)O( Preliminary Design %
Final Plans %
Specifications %
Construction
$1,750,000
$1,750,000
0%
0%
0%
0%
0%
267
City of Euless
Capital Project Request
Department: PARKS AND COMMUNITY SERVICES Date Prepared: April 1, 2025
Submitted By: DUANE STRAWN Date Completed:
Project Title: SOUTH EULESS PARK IMPROVEMENTS
Project Type: PARKS/RECREATION Sub -Type: PARK IMPROVEMENTS
Project Code:
Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The adopted 2025 Parks, Recreation, and Open Space Master Plan identified general upgrades and improvements in
the overall quality of City parks to provide activities for all ages and interest groups and enhance the adjoining
neighborhoods. South Euless Park was identified as a top priority park renovation based on existing conditions,
needs list, and anticipated funding.
PROJECT DESCRIPTION:
Overall park enhancements and improvements include amenities such as new playground equipment, park
redevelopment, improved lighting, new sport courts, new group pavilion and restroom, and additional picnic areas.
PROJECT SCHEDULE:
FY2025-26
JUSTIFICATION:
As identified in the adopted 2025 Parks, Recreation, and Open Space Master Plan, the municipal park is the
foundation of any solid parks and recreation system. Euless' parks and recreation system provides residents and
visitors with significant personal, social, environmental, and economic benefits. The revitalization efforts Council
focused on over the years have increased citizens' sense of community pride. The proposed project continues the
Council's revitalization efforts by creating an area that will serve both the passive and active leisure pursuits of
residents in this area.
268
PROJECT TITLE: SOUTH EULESS PARK IMPROVEMENTS
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
$0
$0
$0
$0
$0
$0
TOTAL ESTIMATED CAPITAL COST:
Professional Services
Construction
Total Estimated Annual Cost $0 Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance )O( Preliminary Design %
Special Project Fund Final Plans %
Certificate of Obligation Specifications %
County, State, Federal Funding Construction
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from EDC CIP Fund Balance.
$275,000
$2,725,000
$3,000,000
0%
0%
0%
0%
0%
269
City of Euless
Capital Project Request
Department: PARKS AND COMMUNITY SERVICES
Submitted By: DUANE STRAWN
Project Title:
Project Type:
Project Code:
J.A. CARR PARK EXPANSION
PARKS/RECREATION
Date Prepared: April 1, 2025
Date Completed:
Sub -Type: PARK IMPROVEMENTS
Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The adopted 2025 Parks, Recreation, and Open Space Master Plan recommends funding for system -wide trail, park
facilities, and amenities upgrades. The Master Plan identified 6.5 acres of undeveloped land in J.A. Carr Park as a
prime location for many of the high to moderate items reflected on the Priority Needs List.
PROJECT DESCRIPTION:
This project includes the development of approximately 6.5 acres just south of SH 10 in J.A. Carr Park and a future
connection with the neighborhood to the north of SH 10 via a pedestrian tunnel or bridge. The development includes
trails, picnic areas, benches, trail work out stations, and an entrance off of SH 10 with park signage. Multi -use practice
fields and a dog park are also under consideration for this area.
PROJECT SCHEDULE:
FY2026-27
JUSTIFICATION:
As identified in the adopted 2025 Parks, Recreation, and Open Space Master Plan, the municipal park is the
foundation of any solid parks and recreation system. Euless' parks and recreation system provides residents and
visitors with significant personal, social, environmental, and economic benefits. The revitalization efforts Council
focused on over the years have increased citizens' sense of community pride. The proposed project will continue the
Council's revitalization efforts by creating an area that will serve both the passive and active leisure pursuits of
residents in this area.
270
PROJECT TITLE: J.A. CARR PARK EXPANSION
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Prof. Services — To Be Determined
Construction — To Be Determined
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design
Final Plans %
Specifications
Construction
0%
0%
0%
0%
0%
271
City of Euless
Capital Project Request
Department: PARKS AND COMMUNITY SERVICES Date Prepared:
Submitted By: DUANE STRAWN Date Completed:
Project Title: PARKS AT TEXAS STAR SOUTH TURF REPLACEMENT
Project Type: PARKS/RECREATION Sub -Type: PARK IMPROVEMENTS
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
In 2016, the infields of six (6) ballfields at Parks at Texas Star South (Yankee, Royal, Wrigley, Arlington, Legends and
Veterans) were replaced with an artificial sports turf to extend the playability of the fields during heavy use and
inclement weather. This project has been very successful and has increased league and tournament play due to the
fields' durability and ability to run as many games as possible. While some surrounding municipal fields are closed
due to rain, PATS South has been able to complete both league and tournament games.
March 28, 2024
PROJECT DESCRIPTION:
The project scope includes replacing existing synthetic turf at Parks at Texas Star South (Yankee, Royal, Wrigley,
Arlington, Legends and Veterans).
PROJECT SCHEDULE:
FY2026-27
JUSTIFICATION:
The life expectancy of turf is 10 years. Turf was originally installed in 2016 at Parks at Texas Star South (Yankee,
Royal, Wrigley, Arlington, Legends and Veterans), putting the expected replacement year at 2026. With the use of
these fields being exceptional between league and tournament play, the wear and tear on the turf is tremendous. To
avoid the turf becoming unplayable and to continue to program at a high use level, the turf will require replacement at
or around the 10 year mark.
272
PROJECT TITLE: PARKS AT TEXAS STAR SOUTH TURF REPLACEMENT
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
Proposed funding is from EDC Operating Fund.
XX
TOTAL ESTIMATED CAPITAL COST:
Turf Replacement $875,000
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction
$875,000
0%
0%
0%
0%
0%
273
Department:
Submitted By:
Project Title:
City of Euless
Capital Project Request
PARKS AND COMMUNITY SERVICES Date Prepared: April 1, 2025
DUANE STRAWN Date Completed:
EULESS FAMILY LIFE CENTER EXPANSION DESIGN/DEVELOPMENT
Project Type: PARKS/RECREATION Sub -Type: FACILITY IMPROVEMENTS
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The adopted 2025 Parks, Recreation, and Open Space Master Plan identified the expansion of the Euless Family Life
Center (EFLC) as the No. 1 Indoor Need Priority. In order to meet the demands of citizens, the EFLC needs to
expand it's functional footprint to accommodate growing membership, classes, and programs offered.
PROJECT DESCRIPTION:
The project scope includes the design/development portion of the EFLC expansion project and all necessary
architectural and engineering design services. Services include, but are not limited to, existing facility building study,
site visits to other similar projects in the Metroplex, spacial studies, concept drawings, conceptual floor plans, and
development of the Opinion of Probable Costs.
PROJECT SCHEDULE:
FY2027-28
JUSTIFICATION:
Built in 1989, the EFLC has served a great need for over 36 years. Renovations and some additions (fitness area)
were completed in 2010. These areas have become overwhelmed with the growth in membership and the number
and size of the classes and programs offered at the EFLC. During the development of the 2025 Parks, Recreation,
and Open Space Master Plan, citizens ranked the expansion, renovation, and redevelopment of the EFLC as their No.
1 priority on the Indoor Needs List. Specific needs include additional gym space, multi -purpose rooms, storage, fitness
area, Child Care, Teen Room, and office space. Restrooms and locker rooms are in need of renovation/expansion
and the facility entrances and exits need to be more customer friendly for members and visitors.
274
PROJECT TITLE: EULESS FAMILY LIFE CENTER EXPANSION DESIGN/DEVELOPMENT
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
PROPOSED METHOD OF FINANCE:
Operating Fund
Fund Balance
Special Project Fund
Certificate of Obligation
County, State, Federal Funding
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
TOTAL ESTIMATED CAPITAL COST:
Design/Development — To Be Determined
$0
$0
$0
$0
$0
$0
$0 Total Estimated Capital Cost
CURRENT STATUS:
Conceptual Design %
Preliminary Design %
Final Plans %
Specifications %
Construction
0%
0%
0%
0%
0%
275
City of Euless
Capital Project Request
Department: PARKS AND COMMUNITY SERVICES Date Prepared: April 1, 2025
Submitted By: DUANE STRAWN Date Completed:
Project Title: PARKS AT TEXAS STAR PHASE VIII
Project Type: PARKS/RECREATION Sub -Type: PARK IMPROVEMENTS
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The adopted 2025 Parks, Recreation, and Open Space Master Plan identified the need for additional multi -sport
practice fields.
PROJECT DESCRIPTION:
The project includes the design and construction of additional lighted playing surfaces to accommodate multiple
sports. The project scope also includes substantial drainage and utility work, additional parking, and sidewalks.
PROJECT SCHEDULE:
FY2028-29
JUSTIFICATION:
The youth sports leagues continue to expand and grow at a rapid pace. Practice fields have always been a limited
commodity, but this continued growth has revealed a critical need for more practice space. With the addition of
lighted, multi -use fields, staff can accommodate more practices and help alleviate the shortage of practice space.
Creating usable, lighted open space also allows staff the opportunity to expand existing leagues as well as
programming for additional leagues in multiple sports. Completion of this phase will ensure the Texas Star Sports
Complex remains the premier sports facility for amateur athletics for many years to come.
276
PROJECT TITLE: PARKS AT TEXAS STAR PHASE VIII
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
$0
$0
$0
$0
$0
$0
TOTAL ESTIMATED CAPITAL COST:
Professional Services
Construction
Total Estimated Annual Cost $0 Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance )O( Preliminary Design
Special Project Fund Final Plans %
Certificate of Obligation Specifications
County, State, Federal Funding Construction
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
$1,000,000
$9,000,000
$10,000,000
0%
0%
0%
0%
0%
277
Department:
Submitted By:
Project Title:
City of Euless
Capital Project Request
PARKS AND COMMUNITY SERVICES Date Prepared: April 1, 2025
DUANE STRAWN Date Completed:
EULESS FAMILY LIFE CENTER EXPANSION CONSTRUCTION DOCUMENT DEVELOP.
Project Type: PARKS/RECREATION Sub -Type: FACILITY IMPROVEMENTS
Project Code: Priority: B
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The adopted 2025 Parks, Recreation, and Open Space Master Plan identified the expansion of the Euless Family Life
Center (EFLC) as the No. 1 Indoor Need Priority. In order to meet the demands of citizens, the EFLC needs to
expand it's functional footprint to accommodate growing membership, classes, and programs offered.
PROJECT DESCRIPTION:
The project scope includes the construction document development portion of the EFLC expansion project and will
include all necessary Architectural and Engineering design services. Services include, but are not be limited to, final
floor plans, construction documents, bid documents, site inspections, and construction administration.
PROJECT SCHEDULE:
FY2029-30
JUSTIFICATION:
Built in 1989, the Euless Family Life Center has served a great need for over 36 years. Renovations and some
additions (fitness area) were completed in 2010. These areas have become overwhelmed with the growth in
membership and the number and size of the classes and programs offered at the EFLC. During the development of
the 2025 Parks, Recreation, and Open Space Master Plan, citizens ranked the expansion, renovation, and
redevelopment of the EFLC as their No. 1 priority on the Indoor Needs List. Specific needs include additional gym
space, multi -purpose rooms, storage, fitness area, Child Care, Teen Room, and office space. Restrooms and locker
rooms are in need of renovation/expansion and the facility entrances and exits need to be more customer friendly for
members and visitors.
278
PROJECT TITLE: EULESS FAMILY LIFE CENTER EXPANSION CONSTRUCTION DOCUMENT DEVELOP.
NET EFFECTS ON OPERATING AND
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel: Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Subtotal:
$0
$0
$0
$0
$0
$0
TOTAL ESTIMATED CAPITAL COST:
Construction Document Develop. —
To Be Determined
Total Estimated Annual Cost $0 Total Estimated Capital Cost
PROPOSED METHOD OF FINANCE: CURRENT STATUS:
Operating Fund Conceptual Design %
Fund Balance Preliminary Design
Special Project Fund Final Plans %
Certificate of Obligation Specifications
County, State, Federal Funding Construction
General Obligation Bonds
Revenue Bonds
Donations
Supplemental Sales Tax
Car Rental Tax Fund
To Be Determined
ADDITIONAL COMMENTS:
XX
0%
0%
0%
0%
0%
279
City of Euless
Capital Project Request
Department: PARKS AND COMMUNITY SERVICES Date Prepared: April 1, 2025
Submitted By: DUANE STRAWN Date Completed:
Project Title: EULESS FAMILY LIFE CENTER EXPANSION CONSTRUCTION
Project Type: PARKS/RECREATION Sub -Type: FACILITY IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The adopted 2025 Parks, Recreation, and Open Space Master Plan identified the expansion of the Euless
Family Life Center (EFLC) as the No. 1 Indoor Need Priority. In order to meet the demands of citizens, the
EFLC needs to expand it's functional footprint to accommodate growing membership, classes, and programs
offered.
PROJECT DESCRIPTION:
The project scope includes the construction portion of the expansion/renovation of the Recreation Center,
Senior Center, and Natatorium. Construction includes, but is not limited to, a new and separate building to the
west of the existing Recreation Center to include additional gym space, multi -use programmable rooms, walking
track, fitness areas, storage, and office space. Operations will move into the new building once completed so
renovations can begin on the existing Euless Family Life Center building. EFLC renovations include, but are not
limited to, restroom and locker room renovations; updates to customer service operations, lighting, flooring, and
wall coverings; and redesigning the current public spaces.
PROJECT SCHEDULE:
JUSTIFICATION:
Built in 1989, the Euless Family Life Center has served a great need for over 36 years. Renovations and some
additions (fitness area) were completed in 2010. These areas have become overwhelmed with the growth in
membership and the number and size of the classes and programs offered at the EFLC. During the
development of the 2025 Parks, Recreation, and Open Space Master Plan, citizens ranked the expansion,
renovation, and redevelopment of the EFLC as their No. 1 priority on the Indoor Needs List. Specific needs
include additional gym space, multi -purpose rooms, storage, fitness area, Child Care, Teen Room, and office
space. Restrooms and locker rooms are in need of renovation/expansion and the facility entrances and exits
need to be more customer friendly for members and visitors.
280
City of Euless
Capital Project Request
Department: PARKS AND COMMUNITY SERVICES Date Prepared: April 1, 2025
Submitted By: DUANE STRAWN Date Completed:
Project Title: PARKS AT TEXAS STAR NORTH TURF REPLACEMENT
Project Type: PARKS/RECREATION Sub -Type: PARK IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
In 2021, the infields of all four ballfields at the Parks at Texas Star North were replaced with artificial sports turf
to extend the playability of the fields during heavy use and inclement weather.
PROJECT DESCRIPTION:
The project scope includes replacing existing synthetic turf at Parks at Texas Star North with new and improved
product. The concrete base and rubber pellet infill can be reused and only the turf material will be replaced.
PROJECT SCHEDULE:
JUSTIFICATION:
The installation of artificial turf at PATS North has been very successful and increased league and tournament
play due to the field durability and the ability to run as many games as possible. While some surrounding
municipal fields closed due to rain, PATS North was able to complete both league and tournament games. With
the use of these fields being exceptional between league and tournament play, the wear and tear on the turf is
tremendous. The life expectancy of artificial turf is approximately ten years, which puts the expected end of
useful life in 2031. In order to avoid the turf becoming unplayable and to continue to program at high level use,
the turf will need to be replaced at or around the ten year mark.
281
City of Euless
Capital Project Request
Department: PARKS AND COMMUNITY SERVICES Date Prepared: April 1, 2025
Submitted By: DUANE STRAWN Date Completed:
Project Title: PARKS AT TEXAS STAR SOUTH ENTRANCE IMPROVEMENTS
Project Type: PARKS/RECREATION Sub -Type: PARK IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
As the Parks at Texas Star continues to develop and Phase VIII becomes a reality, it is imperative that
customers and visitors utilize the south parking area.
PROJECT DESCRIPTION:
The first 400' of Texas Star Parkway is a concrete divided road with a landscaped median, after the initial 400'
the road transitions into a single lane asphalt road finally ending at a concrete road leading to the south parking
lot. To some, this asphalt section seems to be the end of the road and they feel they should not be there as it
leads to the park maintenance shop. This project would remove the asphalt road and continue the concrete
divided roadway with landscaped median to the rear of the property providing easy access to the south parking
area.
PROJECT SCHEDULE:
JUSTIFICATION:
The south parking area is hard to find and appears to be off limits to the public as it seems to be the entrance to
the parks maintenance area. An enhanced south entrance and upgraded roadway with associated landscaping
will guide participants to the south parking lot and new lighted practice fields. Additionally, enhancing the south
entrance will make it more aesthetically pleasing and much more functional for customers.
282
City of Euless
Capital Project Request
Department: PARKS AND COMMUNITY SERVICES Date Prepared: May 12,2008
Submitted By: RAY MCDONALD Date Completed:
Project Title: TRAIL ENHANCEMENTS PHASE I
Project Type: PARKS/RECREATION Sub -Type: TRAIL SYSTEM
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Trail -related improvements were included in the Needs Assessment and Priority Ranking sections of the
adopted 2025 Parks, Recreation, and Open Space Master Plan.
PROJECT DESCRIPTION:
This project consists of Phase I of trail enhancements identified in the adopted Parks Master Plan which
includes additional water fountains, additional benches, construction of shaded seating areas, addition and/or
installation of new exercise equipment, and picnic stations along the trails as well as construction of additional
pedestrian bridges in high water areas. Also identified, is the need to address various areas in the trails system
that might need to be converted from unpaved to paved trails.
PROJECT SCHEDULE:
JUSTIFICATION:
The City of Euless has experienced significant progress in the last few years in the area of trail development
with an extensive network of paved and unpaved trails. The trails system is a valuable asset to the community
as it provides a safe means for non -vehicular travel, and also provides an opportunity for a variety of
unstructured, low -impact recreational pursuits. The development and maintenance of the trails system
continues to receive significant support from the citizens as indicated in the responses to the needs assessment
survey conducted as a part of the Master Plan update.
283
City of Euless
Capital Project Request
Department: PARKS AND COMMUNITY SERVICES Date Prepared: May 13,2008
Submitted By: RAY MCDONALD Date Completed:
Project Title: TRAIL ENHANCEMENTS PHASE II
Project Type: PARKS/RECREATION Sub -Type: TRAIL SYSTEM
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
Trail -related improvements were included in the Needs Assessment and Priority Ranking sections of the
adopted 2025 Parks, Recreation, and Open Space Master Plan.
PROJECT DESCRIPTION:
This project is Phase II of the trail enhancements that continues implementation of park improvements identified
in the adopted Parks Master Plan which includes additional water fountains, additional benches, construction of
shaded seating, addition and/or installation of new exercise equipment, and picnic stations along the trails as
well as construction of additional pedestrian bridges in high water areas. Also identified, is the need to address
various areas along the trail that need to be converted from unpaved to paved trails.
PROJECT SCHEDULE:
JUSTIFICATION:
The City of Euless has experienced significant progress in the last few years in the area of trail development
with an extensive network of paved and unpaved trails. The trails system is a valuable asset to the community
as it provides a safe means for non -vehicular travel, and also provides an opportunity for a variety of
unstructured, low -impact recreational pursuits. The development and maintenance of the trails system
continues to receive significant support from the citizens as indicated in the responses to the needs assessment
survey conducted as a part of the Master Plan update.
284
City of Euless
Capital Project Request
Department: PARKS AND COMMUNITY SERVICES Date Prepared:
Submitted By: RAY MCDONALD Date Completed:
Project Title: TRAIL/PARKS ENHANCEMENTS VILLAGES OF BEAR CREEK
Project Type: PARKS/RECREATION Sub -Type: TRAIL SYSTEM
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project is a continuation of the overall park improvement plan as identified in the adopted 2025 Parks,
Recreation, and Open Space Master Plan.
March 23,2004
PROJECT DESCRIPTION:
This project includes the redesign/redevelopment of the park and trails at the Villages of Bear Creek Park to
offer multiple outdoor amenities and uses for the citizens of Euless. Heavy bank erosion along the Little Bear
Creek has redefined the trail locations within the Villages of Bear Creek Park resulting in the need to redesign
the park and trail system.
PROJECT SCHEDULE:
JUSTIFICATION:
Trail development and enhancement opportunities will be consistent with available land, funding, and time
variables. This project will follow the adopted 2025 Parks, Recreation, and Open Space Master Plan. Due to
the continual erosion of the existing trail, a redesign/redevelopment of the trail system at the Villages of Bear
Creek is necessary.
285
Department:
Submitted By:
Project Title:
Project Type:
City of Euless
Capital Project Request
PARKS AND COMMUNITY SERVICES
RAY MCDONALD
TRAILWOOD PARK IMPROVEMENTS
PARKS/RECREATION Sub -Type: PARK IMPROVEMENTS
Date Prepared: May 13,2008
Date Completed:
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project is a continuation of the overall park improvement plan as identified in the adopted 2025 Parks,
Recreation, and Open Space Master Plan.
PROJECT DESCRIPTION:
Trailwood Park is an eleven -acre site that currently has a playground and a half -mile hike/bike trail. This project
includes the installation of a new pavilion, a parking lot, park lighting, new park signs, benches along the trail,
and trail lighting.
PROJECT SCHEDULE:
JUSTIFICATION:
As identified in the adopted 2025 Parks, Recreation, and Open Space Master Plan, the municipal park is the
foundation of any solid parks and recreation system. The City of Euless parks and recreation system provides
the residents and visitors with significant personal, social, environmental, and economic benefits. The
revitalization efforts the Council has focused on over the years have increased citizens' sense of community
pride. This proposed project will continue those efforts by creating an area that will serve both the passive and
active leisure needs of the residents in the vicinity.
286
City of Euless
Capital Project Request
Department: PARKS AND COMMUNITY SERVICES Date Prepared: April 1, 2025
Submitted By: DUANE STRAWN Date Completed:
Project Title: WEST PARK IMPROVEMENTS
Project Type: PARKS/RECREATION Sub -Type: PARK IMPROVEMENTS
Project Code: Priority: C
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The adopted 2025 Parks, Recreation, and Open Space Master Plan recommends funding for system -wide park
facilities and amenities upgrades. West Park was identified as a top priority park renovation based on existing
conditions, needs list, and anticipated funding.
PROJECT DESCRIPTION:
This project consists of the necessary demolition and site work to complete a renovated park including
enhanced parking, landscaping, and sidewalks. New amenities such as padded benches, picnic tables, general
park lighting, a sport court, a drinking fountain, trash cans, barbecue grills, bicycle racks, signage, and a trail
connection to the apartment complex across the creek to the north are also included in the project scope.
PROJECT SCHEDULE:
JUSTIFICATION:
As identified in the adopted 2025 Parks, Recreation, and Open Space Master Plan, the municipal park is the
foundation of any solid parks and recreation system. Euless' parks and recreation system provides residents
and visitors with significant personal, social, environmental, and economic benefits. The revitalization efforts the
City Council focused on over the years have increased the citizens' sense of community pride. The proposed
project will continue the Council's revitalization efforts by creating an area that will serve both the passive and
active leisure pursuits of residents in this area.
287
THE CITY OF
EULESS
CAPITAL IMPROVEMENTS PROGRAM
COMPLETED PROJECTS SUMMARY
Project
Number
DRAINAGE PROJECTS
DR9901 Sulphur Branch Phase II
DR9902 Windlea & WestCliff
Project Description
Date Total Project (Over) Under
Completed Total Budget Costs Budget
08/01/99 $ 123,404 $ 120,128 $ 3,276
08/01/99 $ 4,396 $ 1,159 $ 3,237
DR9904 Hurricane Creek 04/30/02 $ 257,500 $ 69,906 $ 187,594
DR0302 Flooding Mitigation Cancelled $ 250,000 $ - $ 250,000
DR0303 Aransas Cod Glenn
DR0304 Live Oak Drainage
12/31/04 $ 250,000 $ 250,000 $
04/15/05 $ 218,000 $ 175,958 $ 42,042
DR0305 Sierra Drive Drainage 04/15/05 $ 40,738 $ 40,738 $ 0
DR0306 Flood Mitigation Plan(FEMA) 04/15/05 $ 32,000 $ 7,750 $ 24,250
DR0307 Simmons Drainage
DR0301 Fuller Branch Channel Stabilization
04/15/05 $ 22,995 $ 22,995 $
05/31/07 $ 279,136 $ 232,176 $ 46,960
DR0401 Channel Stabilization Tributary WFA 05/31/07 $ 437,462 $ 438,070 $ (608)
DR0402 Drainage Project Study 05/31/07 $ 60,000 $ 51,000 $ 9,000
DR0601 Little Bear Creek Study Update
DR0602 McCormick Park
DR0701 Eastcliff Drive/Greenbriar Drive Drainage Imp.
DR0801 Rockwall Drive/Lamar Drive Drainage Imp.
DR0901 Bear Creek Parkway Erosion Repair
DR0802 Hurricane Creek & Bridge at Marlene Improvements
DR0000 Boyd Branch Improvements
DR2201 Bear Creek Elementary Drainage Channel Improvements
Drainage Projects - Prior Years
04/25/08 $ 50,000 $ 49,000 $ 1,000
04/25/08 $ 250,000 $ 247,925 $ 2,075
04/17/10 $ 340,000 $ 246,584 $ 93,416
04/17/10 $ 430,000 $ 272,554 $ 157,446
02/17/11 $ 530,000 $ 464,465 $ 65,535
04/14/11 $ 378,500 $ 344,574 $ 33,926
Cancelled $ 10,000,000 $ - $ 10,000,000
05/31/23 $ 551,366 $ 544,040 $ 7,326
DR2502 IFY2025 Drainage Curb & Gutter Improvements I 05/31/25
Drainage Projects - Current Year
Total Drainage Projects
$ 14,505,497 $ 3,579,022 $ 10,926,475
$ 265,000 $ 265,000 $
$ 265,000 $ 265,000 $
$ 14,770,497 $ 3,844,022 $ 10,926,475
289
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared:
Submitted By: MAJOR JONES Date Completed:
Project Title: FY2025 DRAINAGE CURB & GUTTER IMPROVEMENTS
Project Type: DRAINAGE Sub -Type: IMPROVEMENTS
Project Code: DR2502
COUNCIL AUTHORIZATION:
Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
July 09,2024
May 31, 2025
PROJECT DESCRIPTION:
The project consists of the removal and replacement of damaged curb and gutter throughout the City.
PROJECT SCHEDULE:
Began Construction: October 2024
Construction Complete: May 2025
JUSTIFICATION:
The existing curb and gutter along many City streets has aged, failed, or been damaged. The curb and gutter
serves as part of the City's storm water collection system. The new curb and gutter will improve drainage
performance while also enhancing the appearance of City streets.
290
PROJECT TITLE: FY2025 DRAINAGE CURB & GUTTER IMPROVEMENTS PROJECT CODE: DR2502
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel:
Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
$0
Construction $265,000
$0
Subtotal: $0 Total Estimated Capital Cost
Maintenance Costs
$0
Subtotal: $0
Funding Source:
Transfer from:
Drainage Operating Fund
$265,000
$265,000
Total Estimated Annual Cost $0 Total Funding $265,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Construction $265,000 $265,000 $0 100%
TOTAL PROJECT $265,000 $265,000 $0 100%
291
THE CITY OF
EULESS
Project
Number
CAPITAL IMPROVEMENTS PROGRAM
COMPLETED PROJECTS SUMMARY
Project Description
STREET PROJECTS
PS9911 Overlay Projects
PS9912 Harwood -Main Intersection
PS9907 Westpark Way - SH10 to SH183
PS9902 Mid Cities Blvd.
PS9910 Sidewalks
PS0001 FM 157 S Pipeline to SH10 (Utility Relocation)
PS0003 Glade from Heritage to SH121
PS0004 Glade Rd (East) - SH121 to Champagne
PS0201 Gateway Blvd - Southern Portion
PS0301 Mid Cities Roadway Illumination
PS0302 Driftwood Pipeline Traffic Signal
PS0303 Aransas/Harwood Traffic Signal
PS0402 South Pipeline Road Bridge
PS9908 Signalization
PSO401 West Pipeline - Raider to City Limits
PS0403 Raider Dr - SH10 to South Pipeline
PS0501 Ross Avenue/S.Main 300' W
PS0502 Industrial Signal Timing
PS0503 Overlay -Harwood 157/Main
PS0604 Overlay-S.Main, SH10/S.Pipeline
PS0601 Overlay -East Midway
PS0602 Overlay -Midway, N Main,/FM157
PS0603 Overlay -Fuller Wiser, Midway/Harwood
PS9906 Traffic Safety/Signalization
PS0404 South Pipeline Road Overlay
PS0701 Overlay -Dickey Drive
PS0702 Overlay -East Huitt
PS0703 Overlay -Huntington Drive
PS0706 Gateway Blvd Screening Wall
PS0705 Signal Gateway Blvd @ Glade
PS0002 West Pipeline Road-Raider/Hwy10
PS0801 Overlay -North Main/Cullum Drive
PS9905 Traffic Studies
PS0704 Disability Access Study
PS0901 Ash/Denton/Fair Oaks Overlay
PS0902 Vine Street Design
PS9903 HWY 183 Service Road
PS0304 Glade Road
PS9909 FM157 North - SH183 to SH121
PS0903 Mid Cities @ Gateway & Baze Traffic Signals
PS0802 Fuller -Wiser Connector
PS1002 FY10 County Overlay - Wilshire/Marlene
PS9901 North Main Street
PS9904 Harwood Road
PS1001 Baze Road
PS1101 FY2011 County Overlay -Bear Creek Drive/Lakewood Blvd/Ash Lan€
PS0605 South Pipeline Road Bridge Replacement
PS1003 Ash Lane -Aransas Drive to N. Main Street
PS1201 FY2012 County Overlay -Aransas Drive/Slaughter Lane
PS1301 FY2013 38th CDBG-ADA/TAS Infrastructure Improvements
PS1302 FY2013 County Overlay-Trailwood/Summit Ridge/Westpark/Baze
Date Completed Total Budget
Total Project (Over) Under
Costs Budget
03/30/00 $ 294,687 $ 294,687 $
04/30/00 $ 1,126,935 $ 1,077,303 $ 49,632
09/30/00 $ 605,542 $ 479,915 $ 125,627
05/02/02 $ 1,075,074 $ 963,635 $ 111,439
06/30/03 $ 200,000 $ 200,000 $
04/30/04 $ 378,207 $ 371,318 $ 6,889
04/30/04 $ 1,866,612 $ 1,866,612 $ -
04/30/04 $ 1,210,014 $ 1,162,009 $ 48,005
04/30/04 $ 510,000 $ 473,817 $ 36,183
04/15/05 $ 160,000 $ 148,115 $ 11,885
04/15/05 $ 100,000 $ 68,665 $ 31,335
04/15/05 $ 120,000 $ 89,118 $ 30,882
04/30/05 $ 28,208 $ 28,208 $ -
05/31/06 $ 168,055 $ 168,055 $ -
05/31 /06 $ 223,000 $ 104,859 $ 118,141
05/31/06 $ 330,000 $ 293,435 $ 36,565
05/31/06 $ 95,688 $ 95,638 $ 50
05/31/06 $ 50,000 $ 50,000 $
05/31/06 $ 137,000 $ 119,816 $ 17,184
05/31/06 $ 137,000 $ 140,211 $ (3,211)
05/31/07 $ 83,000 $ 73,550 $ 9,450
05/31/07 $ 105,000 $ 67,632 $ 37,368
05/31/07 $ 40,000 $ 28,695 $ 11,305
05/31/08 $ 128,027 $ 127,939 $ 88
05/31/08 $ 114,750 $ 85,062 $ 29,688
05/31/08 $ 122,200 $ 48,435 $ 73,765
05/31/08 $ 89,000 $ 64,895 $ 24,105
05/31/08 $ 69,500 $ 42,884 $ 26,616
05/31/08 $ 135,800 $ 138,862 $ (3,062)
10/28/08 $ 98,000 $ 98,000 $
12/01/08 $ 6,082,621 $ 6,081,392 $ 1,229
12/31/08 $ 290,000 $ 211,130 $ 78,870
05/30/09 $ 27,286 $ 27,197 $ 89
05/31/09 $ 30,000 $ 13,950 $ 16,050
09/30/09 $ 320,000 $ 231,984 $ 88,016
Cancelled $ 100,000 $ - $ 100,000
Cancelled $ - $ - $
04/16/10 $ 3,077,977 $ 2,905,205 $ 172,772
04/16/10 $ 267,519 $ 129,215 $ 138,304
04/16/10 $ 320,000 $ 250,702 $ 69,298
02/17/11 $ 495,000 $ 441,491 $ 53,509
05/17/11 $ 288,000 $ 200,890 $ 87,110
05/31/12 $ 6,745,047 $ 6,698,149 $ 46,898
05/31/12 $ 5,770,211 $ 5,686,556 $ 83,655
05/31/12 $ 1,830,000 $ 1,558,401 $ 271,599
05/31/12 $ 300,000 $ 265,887 $ 34,113
05/31/13 $ 157,000 $ 157,000 $ -
05/31/13 $ 1,959,230 $ 1,597,270 $ 361,960
05/31/13 $ 300,000 $ 228,759 $ 71,241
05/31/14 $ 450,000 $ 284,581 $ 165,419
05/31/14 $ 280,000 $ 273,995 $ 6,005
293
THE CITY OF
EULESS
CAPITAL IMPROVEMENTS PROGRAM
COMPLETED PROJECTS SUMMARY
Project Total Project (Over) Under
Number Project Description Date Completed Total Budget Costs Budget
STREET PROJECTS - CONTINUED
PS1402 FY2014 County Overlay-Ector Drive/Midway Drive/Trojan Trail 05/31/14 $ 300,000 $ 300,000 $
PS1401 FY2014 39th CDBG-ADA/TAS Infrastructure Improvements 02/28/15 $ 300,000 $ 272,057 $ 27,943
PS1303 Cullum Drive Improvements 03/31/15 $ 1,295,738 $ 1,210,748 $ 84,990
PS1202 ADA/TAS Infrastructure Improvements 05/31/16 $ 463,800 $ 460,996 $ 2,804
PS1502 FY2015 Street Overlay 05/31/16 $ 300,000 $ 217,182 $ 82,818
PS1602 FY2016 Street Overlay 09/30/16 $ 600,000 $ 600,000 $
PS1501 FY2015 40th CDBG-ADA/TAS Infrastructure Improvements 05/31/17 $ 519,600 $ 392,693 $ 126,907
PS1602 FY2016 Street Overlay 05/31/17 $ 600,000 $ 600,000 $
PS1603 FY201641stCDBG-ADA/TAS Infrastructure Improvements 05/31/17 $ 79,301 $ 70,194 $ 9,107
PS1701 FY201742nd CDBG-ADA/TAS Infrastructure Improvements 05/31/18 $ 91,000 $ 65,240 $ 25,760
PS1702 FY2017 Street Improvements 05/31/18 $ 600,000 $ 600,000 $
PS1703 Traffic Signal -Harwood Road at Bear Creek Parkway 05/31/18 $ 180,000 $ 180,000 $
PS1102 Glade Parks Improvements 05/31/19 $ 15,369,514 $ 15,369,514 $
PS1801 FY2018 Street Improvements 05/31/19 $ 425,000 $ 425,000 $
PS1802 FY2018 Street Reconstruction -Fuller Wiser Rd./Bear Creek Pkwy. 05/31/21 $ 6,270,329 $ 6,270,329 $
PS1901 FY2019 Street Improvements 05/31/21 $ 950,000 $ 950,000 $
PS2001 FY2020 Street Improvements 05/31/21 $ 975,000 $ 975,000 $
PS2002 Glade Road Reconstruction -East of Highway 360 05/31/21 $ 150,000 $ 101,643 $ 48,357
PS2003 Traffic Signal-Cheek-Sparger Road at Heritage Avenue 05/31/21 $ 259,800 $ 243,336 $ 16,464
PS2101 FY2021 Street Improvements 05/31/22 $ 1,000,000 $ 1,000,000 $
PS2201 FY2022 Street Improvements 05/31/23 $ 1,025,000 $ 1,025,000 $
PS2301 FY2023 Street Improvements 05/31/24 $ 1,050,000 $ 1,050,000 $
Street Projects - Prior Years $ 71,695,272 $ 68,594,055 $ 3,101,217
PS2202 1 Mid-Cities/Cheek-Sparger & SH 121 Intersection/ADA Imp. Design 05/31/25 $ 410,000 $ 410,000
PS2401 FY2024 Street Improvements 05/31/25 $ 1,100,000 $ 1,100,000 $
Street Projects - Current Year $ 1,510,000 $ 1,510,000 $
Total Street Projects
73,205,272 I $ 70,104,055 I $ 3,101,217
295
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared:
Submitted By: HAL CRANOR Date Completed:
Project Title: MID -CITIES BLVD/CHEEK-SPARGER RD&SH 121 IMP DESIGN
Project Type: STREET Sub -Type: IMPROVEMENTS
May 26,2022
May 31, 2025
Project Code: PS2202 Priority: A
COUNCIL AUTHORIZATION:
June 14, 2022: Authorized the City Manager to enter into an Interlocal Agreement with the City of Bedford,
relating to roadway and ADA improvements at the intersection of Mid -Cities Blvd./Cheek-Sparger Road and State
Highway 121.
August 9, 2022: Authorized the City Manager to execute an engineering design contract with Kimley-Horn and
Associates. The estimated expenditure is $410,000.
August 22, 2022: Authorized the City Manager to execute an Advance Funding Agreement (AFA) with the
Texas Department of Transportation (TxDOT).
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
The project scope includes the engineering and design of roadway and the Americans with Disabilities Act (ADA)
improvements at the intersection of Mid -Cities Boulevard/Cheek-Sparger Road and State Highway 121. The
project consists of additions of left turn lanes along Cheek-Sparger, sidewalks, and ADA ramps. The Cities of
Bedford and Euless will contribute funding for project costs.
PROJECT SCHEDULE:
Began Design: September 2022
Design Complete: August 2023
Began Construction: February 2024
Construction Complete: September 2024
JUSTIFICATION:
The existing intersection is lacking turn -lane accommodations and ADA support. The improvements will provide
more efficient traffic control and ADA pedestrian support.
296
PROJECT TITLE: MID -CITIES BLVD/CHEEK-SPARGER RD&SH 121 IMP DESIGNPROJECT CODE: PS2202
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel:
Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Euless Participation - Design
Bedford Participation - Design
$0
$0
$0
$205,000
$205,000
$0 Total Estimated Capital Cost $410,000
Maintenance Costs Funding Source:
Transfer from:
General CIP Fund Balance $106,000
Street CIP Fund Balance $99,000
$0 Reimbursement from Bedford $205,000
Subtotal: $0
Total Estimated Annual Cost $0 Total Funding $410,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Engineering $410,000 $410,000 $0 100%
TOTAL PROJECT $410,000 $410,000 $0 100%
297
City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared:
Submitted By: HAL CRANOR Date Completed:
Project Title: FY2024 STREET IMPROVEMENTS
Project Type: STREET Sub -Type: IMPROVEMENTS
Project Code: PS2401
COUNCIL AUTHORIZATION:
Priority: A
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
May 31,2019
May 31, 2025
PROJECT DESCRIPTION:
The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by pavement
condition index of the roadways.
PROJECT SCHEDULE:
Began Construction: October 2023
Construction Complete: September 2024
JUSTIFICATION:
The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface,
extend the life of the roadway, and enhance the appearance of the streets.
298
PROJECT TITLE: FY2024 STREET IMPROVEMENTS PROJECT CODE: PS2401
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel:
Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Subtotal:
Maintenance Costs
Construction $1,100,000
$0
$0
$0
$0 Total Estimated Capital Cost $1,100,000
$0
Subtotal: $0
Funding Source:
Transfer from:
General Fund
$1,100,000
Total Estimated Annual Cost $0 Total Funding $1,100,000
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Construction $1,100,000 $1,100,000 $0 100%
TOTAL PROJECT $1,100,000 $1,100,000 $0 100%
299
THE CITY OF
EULESS
CAPITAL IMPROVEMENTS PROGRAM
COMPLETED PROJECTS SUMMARY
Project
Number Project Description
WASTEWATER PROJECTS
WW9902 Impact Fee Study
WW9903 Misc Sewer Rehab FY99
WW9904 Hydraulic Analysis
WW9901 CDBG B/98-UC-48-0001/B95-22-50
WW0003 TRA Debt Payment
WW0001 CDBG B/99-UC-48-0001
WW0101 CDBG B00-UC480001-2250
WW0102 Manhole Rehab. Program
WW0201 CDBG - B01-UC-48-0001-22-50
WW0202 Line Replacement -Dunaway
WW0203 Line Replacement - E. Alexander
WW0204 Line Replacement - Paula Lane
WW0103 Line replacement-S. Pipeline,Heather-Vine
WW0205 Line Replacement - Midway Park
WW0401 CDBG B03-UC-48-0001-22-50
WW0301 CDBG B02-UC-48-0001-22-50
WW0302 Inflow & Infiltration
WW0303 Line Replacement, Canyon Ridge
WW0304 Line Replacement, Sagebrush
WW0305 Line Replacement, Short
WW0306 Line Replacement, E. Fuller
WW0501 Line Replacement, Pebble Creek
WW0604 Line Replacement, CDBG-Oakwood Terrace
WW0402 Line Replacement, Carr Park/SH10
WW0403 Line Replacement, Ector Drive
WW0601 Line Replacement, Cedar Hills Estate
WW0602 Line Replacement, Ector Drive
WW0603 Little Bear Creek Collection Line
WW0701 Line Replacement, McCormick & Copher
WW0702 Line Replacement, Arnett Addition
WW0703 Line Replacement, Jean Lane
WW0704 Line Replacement, W. Fuller
WW0902 Line Replacement, West Mills Drive-34th CDBG
WW0802 Line Replacement South Mills Drive CDBG-R
WW0901 Line Replacement Woodridge Circle/Koen Lane
WW0801 Line Replacement Fayette Drive
WW1001 Line Rep - W Alexander Ln/Norman Dr/Franklin Dr
WW1101 Line Rep - Bayless/Pauline/Jones (CDBG)
WW1103 Line Rep - Bayless/Pauline/Jones Outfall
WW1202 Line Rep - Collin Drive (37th CDBG)
WW1102 Line Rep - E Huit Lane/Ascot Drive/Dunaway Drive
WW1201 Line Rep - Blanco/Aransas/Crane
WW1301 Line Rep - Ross/Slaughter/East & West Huitt
WW1203 SH183 Phase I Wastewater Relocation
WW1401 Line Rep - Denton Drive
WW1501 Line Rep - Crane Drive
WW1502 Line Rep - Town Creek Drive
WW1601 Line Rep - Glenn Drive
WW1702 FY2017 42nd CDBG LR: Oakwood Terrace Phase I
WW1701 Line Rep - Cedar Hill Estates/Hollywood Boulevard
WW1801 SH183 Phase 11 Wastewater Relocation
WW1802 FY2018 43rd CDBG LR: Oakwood Terrace Phase II
WW1901 Line Rep - Cedar Hill Estates North
WW1902 FY2019 44th CDBG LR: Oakwood Terrace Phases III & IV
WW2001 FY2020 45th CDBG LR: Midway Park 2nd Addition Phase I
Date Completed Total Budget
Total Project (Over) Under
Costs Budget
09/30/99 $ 13,000 $ 12,238 $ 762
09/30/99 $ 50,000 $ 12,987 $ 37,013
06/30/00 $ 27,000 $ 27,000 $
08/19/00 $ 150,000 $ 72,927 $ 77,073
05/31/01 $ 822,037 $ 822,037 $
09/30/01 $ 150,000 $ 121,682 $ 28,318
02/20/02 $ 251,485 $ 247,790 $ 3,695
03/31/03 $ 250,000 $ 184,520 $ 65,480
03/31/03 $ 237,086 $ 172,948 $ 64,138
02/28/05 $ 140,000 $ 139,955 $ 45
02/28/05 $ 20,000 $ 20,000 $
02/28/05 $ 79,000 $ 79,000 $
04/15/05 $ 489,759 $ 464,504 $ 25,255
04/30/05 $ 366,000 $ 318,149 $ 47,851
04/30/05 $ 217,000 $ 161,170 $ 55,830
07/26/05 $ 271,455 $ 271,454 $ 1
Cancelled $ 200,000 $ - $ 200,000
08/31/06 $ 196,200 $ 173,516 $ 22,684
08/31/06 $ 160,900 $ 136,470 $ 24,430
08/31/06 $ 251,400 $ 219,932 $ 31,468
08/31/06 $ 231,372 $ 180,089 $ 51,283
08/31/06 $ 172,600 $ 145,655 $ 26,945
05/31/07 $ 293,723 $ 232,274 $ 61,449
05/31/08 $ 588,000 $ 528,302 $ 59,698
05/31/08 $ 373,000 $ 328,309 $ 44,691
05/31/08 $ 319,000 $ 200,201 $ 118,799
05/31/08 $ 425,000 $ 285,758 $ 139,242
05/31/08 $ 575,000 $ 464,293 $ 110,707
02/05/09 $ 243,000 $ 194,254 $ 48,746
02/05/09 $ 313,322 $ 229,006 $ 84,316
02/05/09 $ 111,000 $ 70,603 $ 40,397
02/05/09 $ 132,000 $ 82,708 $ 49,292
04/16/10 $ 46,855 $ 46,855 $
11/01/10 $ 253,710 $ 165,867 $ 87,843
11/01/10 $ 407,000 $ 309,410 $ 97,590
04/14/11 $ 357,000 $ 325,676 $ 31,324
05/31/12 $ 420,000 $ 331,614 $ 88,386
05/31/12 $ 350,000 $ 208,903 $ 141,097
05/31/12 $ 57,000 $ 37,544 $ 19,456
05/31/12 $ 300,000 $ 231,173 $ 68,827
05/31/13 $ 560,000 $ 468,932 $ 91,068
05/31/13 $ 327,000 $ 284,321 $ 42,679
05/31/14 $ 670,000 $ 566,640 $ 103,360
10/31/14 $ 372,243 $ 372,243 $
06/01/15 $ 629,000 $ 506,466 $ 122,534
05/31/16 $ 264,823 $ 264,823 $
05/31/16 $ 440,665 $ 395,896 $
05/31/17 $ 293,000 $ 264,370 $
05/31/17 $ 242,000 $ 190,474 $
05/31/18 $ 134,165 $ 89,001 $
05/31/19 $ 700,672 $ 681,209 $
05/31/19 $ 223,125 $ 183,337 $
05/31/20 $ 409,903 $ 250,838 $
05/31/20 $ 377,639 $ 248,838 $
05/31/21 $ 444,244 $ 400,484 $
44,769
28,630
51,526
45,164
19,463
39,788
159,065
128,801
43,760
301
THE CITY OF
EULESS
CAPITAL IMPROVEMENTS PROGRAM
COMPLETED PROJECTS SUMMARY
Project
Number Project Description
WASTEWATER PROJECTS - CONTINUES
WW2002 Line Rep - Midway Park 3rd Addition Phase I
WW2003 Line Rep - North Main Street
WW2101 Line Rep - El Camino Real
WW2102 FY2021 46th CDBG LR: Del Paso Street Phase I & 11
WW2103 Line Rep - SH10 @ Main Street
WW2201 FY2022 47th CDBG LR: Paula Ln./David Dr./Susan St./Raider Ct.
WW2202 Line Rep — Midway Park 3rd Addition Phase 11 & Green Hills Park
WW2203 Line Rep — South Pipeline Road & SH 10
WW2303 FY2023 48th/49th CDBG LR: Euless Square/Aransas Drive
Wastewater Projects - Prior Years
Wastewater Projects- Current Year
Date Completed Total Budget
Total Project (Over) Under
Costs Budget
05/31/22 $ 446,600 $ 292,446 $ 154,154
05/31/22 $ 189,000 $ 115,849 $ 73,151
05/31/22 $ 562,000 $ 371,957 $ 190,043
05/31/22 $ 478,652 $ 331,867 $ 146,785
05/31/22 $ 121,000 $ 49,293 $ 71,707
05/31/23 $ 412,058 $ 409,440 $ 2,618
05/31/23 $ 442,400 $ 359,914 $ 82,486
05/31/23 $ 165,340 $ 165,340 $
05/31/24 $ 769,897 $ 467,240 $ 302,657
$ 19,986,330 $ 15,987,991 $ 3,998,339
Total Wastewater Projects I $ 19,986,330 I $ 15,987,991 I $
3,998,339
303
THE CITY OF
EULESS
Project
Number
CAPITAL IMPROVEMENTS PROGRAM
COMPLETED PROJECTS SUMMARY
Project Description
Date Total Project (Over) Under
Completed Total Budget Costs Budget
WATER PROJECTS
WT9903 Master Plan 08/30/99 $ 42,000 $ 5,445 $ 36,555
WT9904 Well Repairs 09/30/99 $ 66,921 $ 66,921 $
WT9907 Impact Fee Study 09/30/99 $ 13,000 $ 12,238 $ 762
WT9911 Water Distribution - Master Plan 09/30/99 $ 25,600 $ 24,000 $ 1,600
WT9901 Meter Change Out Program 10/30/99 $ 101,917 $ 98,365 $ 3,552
WT0002 Emergency Repair- Hwy 10 11/30/99 $ 15,450 $ 14,214 $ 1,236
WT9906 Hwy 10 Water Line 01/30/00 $ 150,000 $ 138,883 $ 11,117
WT0006 Central Drive Water Mains 03/31/00 $ 92,814 $ 90,742 $ 2,072
WT9905 Misc Water Rehab 06/30/00 $ 50,000 $ 43,749 $ 6,251
WT0004 Water Line Milam - Ector/Midway 06/30/00 $ 18,248 $ 13,743 $ 4,505
WT0102 SCADA Upgrade 04/09/01 $ 93,400 $ 93,400 $
WT0003 Waterline Replacement - Aransas 06/30/01 $ 12,057 $ 7,089 $ 4,968
WT0005 Waterline Replacement - Milam- Denton/Mid 04/30/02 $ 26,988 $ 26,988 $
WT9910 Water Line for Elevated Tank 05/31/02 $ 1,608,386 $ 1,201,698 $ 406,688
WT9909 2MG Water Tank 03/31/03 $ 2,430,881 $ 2,289,571 $ 141,310
WT0103 Fire Hydrant Replacement Program 03/31/03 $ 50,000 $ 49,626 $ 374
WT9908 Mid Cities Blvd. 12" Line 04/30/04 $ 342,080 $ 313,354 $ 28,726
WT0401 Line Replacement, West Pipeline Main 05/31/06 $ 1,215,663 $ 1,215,663 $
WT0403 Waterline Replacement - Fairlawn Court Cancelled $ 35,000 $ - $ 35,000
WT0404 Waterline Replacement - Atkerson Lane Cancelled $ 104,000 $ - $ 104,000
WT0405 Line Replacement, West Ash Lane 08/31/06 $ 30,000 $ 11,626 $ 18,374
WT0406 Line Replacement, Westport/Newport/Asbury 08/31/06 $ 67,000 $ 9,866 $ 57,134
WT0502 FY'2005 CDBG 08/31/06 $ 69,300 $ 29,549 $ 39,751
WT0503 Line Replacement, S. Atkerson Lane 08/31/06 $ 79,000 $ 51,294 $ 27,706
WT0504 Line Replacement, Blanco Drive 08/31/06 $ 112,620 $ 112,620 $
WT0505 Line Replacement, Henslee 08/31/06 $ 183,000 $ 123,859 $ 59,141
WT0506 Line Replacement, Vernon/Slaughter 08/31/06 $ 161,000 $ 113,052 $ 47,948
WT9902 Tank Painting 05/31/07 $ 1,317,763 $ 957,542 $ 360,221
WT0501 System Security Upgrade 05/31/08 $ 40,000 $ 28,319 $ 11,681
WT0601 Wtr Sys Security Perimeter Fence Upgrade 05/31/08 $ 75,000 $ 49,567 $ 25,433
WT0602 Line Replacement, Cannon Drive 05/31/08 $ 250,000 $ 223,055 $ 26,945
WT0701 Line Replacement, Canyon Ridge 05/31/08 $ 116,000 $ 78,136 $ 37,864
WT0702 CDBG FY07 - 32nd Oakwood Terrace 05/31/08 $ 334,481 $ 296,223 $ 38,258
WT0802 CDBG-33rd Oakwood Terrace -Simmons 12/31/08 $ 451,639 $ 384,173 $ 67,466
WT0402 Water & Wastewater Impact Fee Update 05/31/09 $ 30,000 $ 17,729 $ 12,271
WT0801 Line Replacement, Signet/Mesa 05/31/09 $ 255,000 $ 218,663 $ 36,337
WT0201 Well Rehabilitation/Disinfection 04/17/10 $ 600,000 $ 522,308 $ 77,692
WT0202 Reclaimed Water Main 05/31/13 $ 1,750,000 $ 1,606,337 $ 143,663
WT1202 Standpipe Storage Tank & Building Demolition 05/31/13 $ 134,640 $ 70,089 $ 64,551
WT1203 Water & Wastewater Impact Fee Update 05/31/13 $ 34,575 $ 34,575 $
WT1401 El Camino Real 02/28/15 $ 460,000 $ 420,462 $ 39,538
WT0901 Trinity River Authority Water Payment -Impact 05/31/16 $ 750,000 $ 750,000 $
WT1201 Reclaimed Water Line Extension Phase I 05/31/16 $ 3,239,452 $ 3,239,452 $
WT1501 24-Inch Valve Replacement 05/31/16 $ 180,000 $ 131,370 $ 48,630
WT1601 Line Rep - Donley Drive/Shelmar Drive 05/31/16 $ 212,000 $ 152,990 $ 59,010
WT1602 FY2016 41st CDBG Line Rep - Ector Drive 05/31/17 $ 310,925 $ 309,151 $ 1,774
WT1212 Reclaimed Water Line Extension Phase II 05/31/18 $ 2,591,496 $ 1,868,473 $ 723,023
WT1402 Fixed Base Meter Reading and Water Meter Changeout 05/31/18 $ 5,503,719 $ 5,503,719 $
WT1801 SH183 Phase II Water Relocation 05/31/19 $ 780,672 $ 703,577 $ 77,095
305
THE CITY OF
EULESS
Project
Number
CAPITAL IMPROVEMENTS PROGRAM
COMPLETED PROJECTS SUMMARY
Project Description
Date Total Project (Over) Under
Completed Total Budget Costs Budget
WATER PROJECTS - CONTINUED
WT1901 Line Rep - Kynette Drive 05/31/20 $ 635,000 $ 593,793 $ 41,207
WT0101 Water Tank Debt Payment -Impact 05/31/21 $ 5,240,318 $ 5,240,318 $
WT2001 Line Replacement — Alexander Lane 05/31/23 $ 347,829 $ 326,385 $ 21,444
WT2101 Line Replacement— Dickey Drive 05/31/23 $ 568,171 $ 568,171 $
WT2201 1 Mil Well Replacement Design 05/31/23 $ 53,077 $ 53,077 $
WT2202 Line Replacement — Huntington Drive Phase I 05/31/24 $ 515,000 $ 468,485 $ 46,515
Water Projects - Prior Years $ 33,973,082 $ 30,973,694 $ 2,999,388
Water Projects- Current Year
Total Water Projects
$ 33,973,082 $ 30,973,694 $ 2,999,388
307
THE CITY OF
EULESS
Project
Number
CAPITAL IMPROVEMENTS PROGRAM
COMPLETED PROJECTS SUMMARY
Protect Description
Date Completed Total Budget
Total Project (Over) Under
Costs Budget
OTHER PROJECTS
ACO202 Athletic Complex Phase III 05/31/06 $ 1,252,221 $ 1,251,915 $ 306
AC1001 Texas Star Sports Complex Lighting Improvements 05/31/12 $ 504,200 $ 475,246 $ 28,954
AC1201 Texas Star Sports Complex Phase IV 05/31/16 $ 645,687 $ 575,653 $ 70,034
AC1601 Texas Star Sports Complex Phase V 05/31/18 $ 2,602,877 $ 2,538,291 $ 64,586
AC1702 Texas Star Sports Complex Phase VI 05/31/17 $ 1,258,892 $ 1,258,470 $ 422
AC9901 Athletic Complex Phase II 06/30/02 $ 123,654 $ 75,047 $ 48,607
CM1508 Car Rental Contingency 05/31/16 $ 700,000 $ 700,000 $
CM1509 Municipal Plaza Improvements Phase I 05/31/17 $ 158,500 $ 41,767 $ 116,733
ED0101 Planning Consultants 05/31/18 $ 204,869 $ 104,869 $ 100,000
ED0102 Bell Ranch Terrace Cancelled $ 200,000 $ - $ 200,000
FM0101 Building D 09/30/02 $ 930,610 $ 930,608 $ 2
FM0209 Midway Recreation Upgrade 06/30/02 $ 557,125 $ 557,125 $
FM0308 Building A Remodel 05/31/07 $ 1,663,238 $ 1,651,325 $ 11,913
FM0309 Fire Station #3 05/31/07 $ 2,286,798 $ 2,286,229 $ 569
FM0504 Building "B" Remodel 05/31/09 $ 1,322,490 $ 1,315,697 $ 6,793
FM0601 Public Works Facility 05/31/08 $ 2,210,956 $ 2,213,507 $ (2,551)
FM0801 TX Star Golf Course & Conference Ctr Expand 05/31/09 $ 3,630,079 $ 3,630,079 $
FM0802 Senior Citizen Center Design cancelled $ 250,000 $ - $ 250,000
FM0803 Midway Recreation Improvements 03/31/09 $ 293,500 $ 75,976 $ 217,524
FM0804 Library -Shell Expansion 12/31/08 $ 307,034 $ 305,664 $ 1,370
FM1510 Development/Engineering Building Improvements 05/31/18 $ 2,589,125 $ 2,588,793 $ 332
FM1708 Library Remodel 05/31/21 $ 7,546,908 $ 7,546,908 $
GC1201 TSGC Misc. Improvements 05/31/18 $ 430,000 $ 404,820 $ 25,180
GC1701 TSGC Maintenance Building 05/31/18 $ 100,000 $ 97,934 $ 2,066
GR1401 Golf Course Upgrades 09/30/14 $ 587,000 $ 581,296 $ 5,704
PD9901 Police and Courts Facility 05/31/15 $ 11,718,304 $ 11,718,304 $
PR0015 Purchase of Dallas Stars Center 05/31/00 $ 10,327,978 $ 10,327,978 $
PR0016 Wilshire Park Improvements 06/30/02 $ 150,000 $ 149,926 $ 74
PR0110 Slope Protection/Screening Wall 03/31/03 $ 1,275,203 $ 1,273,923 $ 1,280
PR0302 Bob Eden Parking 04/30/05 $ 75,000 $ 74,854 $ 146
PR0303 Youth Ballpark 04/30/05 $ 600,000 $ 600,000 $
PR0407 Parking Improvements, Midway Cancelled $ 11,000 $ $ 11,000
PR0408 Parking Improvements, S. Euless Park 05/31/06 $ 55,000 $ 20,991 $ 34,009
PR0409 Parking Improvements, Simmons 07/29/04 $ 6,960 $ 6,960 $
PRO410 Parking Improvements, Villages Bear Creek 07/29/04 $ 33,666 $ 33,666 $
PRO411 Preserve at McCormick Park 05/31/06 $ 1,168,427 $ 1,168,427 $
PR0412 Splash Pool 05/31/06 $ 125,000 $ 124,477 $ 523
PRO601 Park Amenities Upgrade 04/17/10 $ 150,000 $ 145,316 $ 4,684
PR0602 Mid Cities Landscaping 05/31/09 $ 40,000 $ 33,199 $ 6,801
PR0719 Midway Park Trail 05/31/09 $ 210,000 $ 190,473 $ 19,527
PRO901 Trail Enhancements - Bob Eden Park 04/17/10 $ 135,000 $ 101,673 $ 33,327
PR0902 Senior Citizen Center at Midway Park 05/31/11 $ 4,763,661 $ 3,888,892 $ 874,769
PR0907 Euless Family Life Center Phase I 05/31/11 $ 2,105,000 $ 2,099,281 $ 5,719
PR1201 Euless Family Life Center Aquatics 09/30/14 $ 7,504,972 $ 7,319,299 $ 185,673
PR1401 Glade Parks Trail Connection 05/31/19 $ 1,396,545 $ 1,138,772 $ 257,773
PR1917 Carr Park Improvements 05/31/21 $ 1,928,548 $ 1,906,504 $ 22,044
PR9901 Hike/Bike Trail 04/30/05 $ 237,714 $ 237,714 $
PR9902 Senior Citizen Remodel 04/30/05 $ 16,130 $ 16,130 $
PR9903- Various EDC Park Projects
PR9918 09/30/06 $ 259,566 $ 248,891 $ 10,675
PR9922 Tejas Remodel 11/30/01 $ 430,000 $ 455,885 $ (25,885)
PR9927 Park Improvements - Texas Star 09/30/01 $ 1,036,500 $ 1,025,298 $ 11,202
309
THE CITY OF
EULESS
CAPITAL IMPROVEMENTS PROGRAM
COMPLETED PROJECTS SUMMARY
Project
Number Project Description
OTHER PROJECTS - CONTINUED
PW1704 Public Works Yard Improvements
SS0010 Former Fire Station #2
SS0113 Park Building
SS9901 Fire Station II
SS9902 Library Books
SS9919 Fire Station #3 - Structural Repairs
PR2102 Senior Center Canopy CDBG-CV
PR2306 Carr Park Trail Connection
PR2307 Kiddie Carr Park Improvements
PR2309 Parks at Texas Star North Additional Parking Lot
PR2310 Trail Lighting - Heritage Avenue to Bob Eden Park
FM2006 Fire Station #1
GC2003 Texas Star Slope Wall Protection Phase I
PR2305 Aquatic Park Facility Upgrades
PR2308 Midway Park Pickleball Courts
PR2311 Trail Lighting - Mid -Cities
Other Projects - Prior Years
PR2011 Wilshire Park Upgrades
PR2203 Blessing Branch Park Improvements
PR2404 Parks at Texas Star Lighting Upgrade
PR2509 Parks at Texas Star South Turf - Fenway/Shea/Jacobs Fields
Other Projects - Current Year
Total Other Projects
Date Completed Total Budget
Total Project (Over) Under
Costs Budget
05/31/17 $ 100,000 $ 97,686 $ 2,314
06/30/02 $ 599,600 $ 595,257 $ 4,343
06/30/02 $ 1,492,400 $ 1,492,100 $ 300
03/30/00 $ 49,688 $ 49,688 $
08/15/00 $ 3,302 $ 3,302 $
03/30/00 $ 30,000 $ 17,344 $ 12,656
05/31/23 $ 394,544 $ 392,980 $ 1,564
05/31/23 $ 316,100 $ - $ 316,100
05/31/23 $ 893,500 $ - $ 893,500
05/31/23 $ 499,800 $ 449,892 $ 49,908
05/31/23 $ 150,000 $ 150,000 $
05/31/24 $ 7,748,239 $ 7,388,181 $ 360,058
05/31/24 $ 415,337 $ 415,337 $
05/31/24 $ 315,000 $ 313,041 $ 1,959
05/31/24 $ 200,520 $ 200,520 $
05/31/24 $ 152,000 $ 84,304 $ 67,696
$ 91,475,967 $ 87,163,683 $ 4,312,284
05/31/25 $ 2,222,864 $ 2,222,161 $ 703
05/31/25 $ 365,064 $ 333,010 $ 32,054
05/31/25 $ 703,350 $ 703,350 $
05/31/25 $ 258,200 $ 258,200 $
$ 3,549,478 $ 3,516,721 $ 32,757
$ 95,025,445 I $ 90,680,404 I $ 4,345,041
311
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared:
Submitted By: RAY MCDONALD Date Completed:
Project Title: WILSHIRE PARK UPGRADES
Project Type: PARKS/RECREATION Sub -Type: PARK IMPROVEMENTS
March 02,2017
May 31, 2025
Project Code: PR2011 Priority: A
COUNCIL AUTHORIZATION:
August 20, 2021: Authorized the City Manager to negotiate and execute an Architectural Services Contract
with GSBS Architects for the renovation of Wilshire Park. The estimated expenditure is $212,000.
August 22, 2022: Awarded Bid No. 010-22 for the renovation of Wilshire Park and authorized the City Manager
to enter into a contract with C. Green Scaping L.P. The estimated expenditure is $1,704,031.
November 14, 2023: Authorized the purchase and installation of playground equipment for Wilshire Park from
Child's Play, Inc. through the BuyBoard Purchasing Cooperative. The estimated expenditure is $111,285.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
The adopted Parks Master Plan calls for general upgrades and improvements in the overall quality of parks in the
City and to develop a high -quality parks system that provides activities for all age and interest groups and
enhances the adjoining neighborhoods.
PROJECT DESCRIPTION:
Overall park enhancements and improvements to include expanding parking lot, additional amenities such as a
pavilion, upgrading playground and playground surface, additional trails with connections to adjacent
neighborhood, bridge connections for trail, expanding the floating dock, additional sidewalks, and adding park
lighting.
PROJECT SCHEDULE:
Began Design: April 2021
Design Complete: July 2022
Began Construction: January 2023
Construction Complete: June 2024
JUSTIFICATION:
As identified in the adopted Parks Master Plan, the municipal park is the foundation of any solid parks and
recreation system. The City of Euless parks and recreation system provides residents and visitors with significant
personal, social, environmental, and economic benefits. The revitalization efforts that the Euless City Council has
focused on over the years has increased the sense of community pride. Wilshire Park is a four -acre park located
adjacent to Wilshire Elementary School off Sierra Drive. The current amenities at this park include a
playground, .25 mile trail and a fishing pier/pond. The project will continue the City Council's revitalization efforts
by creating an area that will serve both the passive and active leisure needs of the residents in this area.
312
PROJECT TITLE: WILSHIRE PARK UPGRADES PROJECT CODE: PR2011
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel:
Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
Development/Prof. Services $297,292
Construction $1,720,072
$0 Fixtures/Furnishings $134,685
$0 Landscaping $70,815
$0
Subtotal: $0 Total Estimated Capital Cost
Maintenance Costs
Subtotal:
Total Estimated Annual Cost
$2,222,864
Funding Source:
Transfer from:
Car Rental Fund $1,953,820
PR1917-Carr Park Imp. $22,044
$0 EDC Operating Fund $475,000
$0 Transfer to:
PR1917 - Carr Park Imp. ($228,000)
EDC CIP Fund Balance ($703)
$0 Total Funding $2,222,161
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Development/Professional Services $294,688 $294,688 $0 100%
Construction $1,718,056 $1,717,354 $702 100%
Fixtures/Furnishings $134,685 $134,684 $1 100%
Landscaping $75,435 $75,435 $0 100%
TOTAL PROJECT $2,222,864 $2,222,161 $703 100%
313
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared:
Submitted By: RAY MCDONALD Date Completed:
Project Title: BLESSING BRANCH PARK IMPROVEMENTS
Project Type: PARKS/RECREATION Sub -Type: PARK IMPROVEMENTS
April 30,2008
May 31, 2025
Project Code: PR2203 Priority: A
COUNCIL AUTHORIZATION:
November 8, 2022: Awarded Bid No. 001-23 for the construction of the Blessing Branch Park trail connection to
Dean Electric, Inc., dba Dean Construction. The estimated expenditure is $182,250.
September 10, 2024: Authorized the purchase and installation of solar LED path and area lighting from Facility
Solutions Group through the BuyBoard Purchasing Cooperative. The estimated expenditure is $65,030.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
This project is a continuation of the overall trail system expansion and general park improvements as identified in
the Parks Master Plan.
PROJECT DESCRIPTION:
Blessing Branch Park is a 7.3 acre linear park located on the east side of Main Street across from Midway Park.
Currently, the park has only one swing set. This project includes construction of a trail connection from Main
Street to the west and Fuller Wiser to the east. Additionally, the project includes a new playground, picnic pads
with grills, and some type of shade shelter/pavilion/gazebo. This area currently gets a high volume of foot traffic.
Constructing a trail in this linear greenbelt would not only provide a safe, paved access for residents east of Main
Street to Midway Park, Midway Park Elementary, and to Trinity High School, but will also help create a renewed
sense of quality of life for the residents in that area by enhancing the recreational amenities available.
PROJECT SCHEDULE:
Began Design: March 2022
Design Complete: July 2022
Began Construction: October 2022
Construction Complete: Janunary 2025
JUSTIFICATION:
The number one request from Euless citizens as it relates to trails, based on the responses to the needs
assessment survey as identified in the Parks Master Plan, was to construct trail connections between existing
and/or future park developments. This project not only satisfies that request, but also provides trail connections
to neighborhoods, schools, between major thoroughfares, and potentially to future commercial developments to
the southeast.
314
PROJECT TITLE: BLESSING BRANCH PARK IMPROVEMENTS PROJECT CODE: PR2203
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operating Cost Approximately 28,000 sq ft of
Personnel: Full Time 4"x8' concrete trail $158,480
Part Time $0 Playground/Border $60,000
Total Salary $0 Picnic pads w/grills $20,000
Purchase of Services Shade shelter/pavilion/gazebo $30,000
Materials & Supplies Trail Lighting $50,000
Utilities Playground chips $5,400
Design/Survey/Engineering $23,800
Contingency $17,384
$0
Subtotal: $0 Total Estimated Capital Cost
Maintenance Costs
Funding Source:
Transfer from:
EDC Operating Fund
$365,064
$365,064
$0
Subtotal: $0
Transfer to:
EDC CIP Fund Balance ($32,054)
Total Estimated Annual Cost $0 Total Funding $333,010
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Engineering $23,800 $14,550 $9,250 61%
Contingency $17,384 $0 $17,384 0%
Trail Construction $198,480 $195,577 $2,903 99%
Lighting $65,030 $65,030 $0 100%
Park Furnishings $60,370 $57,853 $2,517 96%
TOTAL PROJECT $365,064 $333,010 $32,054 91%
315
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared:
Submitted By: RAY MCDONALD Date Completed:
Project Title: PARKS AT TEXAS STAR LIGHTING UPGRADE
Project Type: PARKS/RECREATION Sub -Type: PARK IMPROVEMENTS
May 14,2021
May 31, 2025
Project Code: PR2404 Priority: A
COUNCIL AUTHORIZATION:
February 13, 2024: Authorized the purchase and installation of an LED retrofit lighting system at the Parks at
Texas Star South from GeoSport Lighting Systems, LLC through The Interlocal Purchasing Systems (TIPS). The
estimated expenditure is $699,750.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
PROJECT DESCRIPTION:
This project would replace the halide lighting with LED lighting fixtures on Wrigley, Royal, Yankee, Arlington,
Veterans, and McGrady fields.
PROJECT SCHEDULE:
Begin Construction: March 2024
Construction Complete: March 2024
JUSTIFICATION:
The recent addition of Legends Field as well as the newly -renovated Parks at Texas Star Phase VII included the
addition of LED sports lighting. Upgrading the remaining field lights to LED lighting will not only make the entire
sports complex lighting universal, but will reduce the overall energy consumed, reduce maintenance cost, and
significantly increase the overall sports lighting performance with state of the art lighting controls.
316
PROJECT TITLE: PARKS AT TEXAS STAR LIGHTING UPGRADE PROJECT CODE: PR2404
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost Lighting
Personnel: Full Time
Part Time $0
Total Salary $0
Purchase of Services
Materials & Supplies
Utilities
$0
Subtotal: $0 Total Estimated Capital Cost
Maintenance Costs
$703,350
$703,350
Funding Source:
Transfer from:
EDC Operating Fund $632,700
$0 Energy Efficiency Block Grant $117,300
Subtotal: $0
Transfer to:
EDC CIP Fund Balance ($46,650)
Total Estimated Annual Cost $0 Total Funding $703,350
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Lighting $703,350 $703,350 $0 100%
TOTAL PROJECT $703,350 $703,350 $0 100%
317
City of Euless
Capital Project Request
Department: COMMUNITY SERVICES Date Prepared:
Submitted By: DUANE STRAWN Date Completed:
Project Title: PARKS AT TEXAS STAR SOUTH TURF
Project Type: PARKS/RECREATION Sub -Type: PARK IMPROVEMENTS
April 1, 2024
May 31, 2025
Project Code: PR2509 Priority: A
COUNCIL AUTHORIZATION:
September 24, 2024: Authorized the purchase and installation of artificial turf for Fenway, Shea, and Jacobs
baseball fields at the Parks at Texas Star South from GeoSurfaces through The Interlocal Purchasing System
(TIPS). The estimated expenditure is $258,200.
RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN:
In 2016, the infields of six (6) ballfields at Parks at Texas Star South (Yankee, Royal, Wrigley, Arlington, Legends
and Veterans) were replaced with an artificial sports turf to extend the playability of the fields during heavy use
and inclement weather. This project has been very successful and has increased our league play and
tournament play due to the fields durability and ability to run as many games as possible during league and
tournament play. While some surrounding municipal fields are closed due to rain, Parks at Texas Star South has
been able to complete both league and tournament games.
PROJECT DESCRIPTION:
The project scope includes the installation of turf on the infields of Fenway, Shea and Jacobs fields at Parks at
Texas Star South. These infields are much smaller because they are only used for coach pitch and t-ball.
PROJECT SCHEDULE:
Began Construction: December 2024
Construction Complete: February 2025
JUSTIFICATION:
Going back to 2016, when the first turf infields were installed at Parks at Texas Star South, the number of rain
outs have been significantly reduced. Even after the heaviest rain events, the infields are still playable; any rain
out of games is either due to satellite locations being rained out or the outfields being too wet to play. Currently,
the infields are clay at these locations.
These are the last three baseball fields in the Parks at Texas Star Athletic Complex that do not have artificial turf
and continue to get rained out while the other fields are playable.
318
PROJECT TITLE: PARKS AT TEXAS STAR SOUTH TURF PROJECT CODE: PR2509
NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST:
MAINTENANCE COST (+ OR -) ANNUAL:
Direct Operatina Cost
Personnel:
Full Time
Part Time
Total Salary
Purchase of Services
Materials & Supplies
Utilities
$0
$0
Synthetic Turf $258,200
$0
Subtotal: $0 Total Estimated Capital Cost
Maintenance Costs
$0
Subtotal: $0
Funding Source:
Transfer from:
EDC Operating Fund
$258,200
$258,200
Total Estimated Annual Cost $0 Total Funding $258,200
CURRENT STATUS
OVER/UNDER
PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED
Synthetic Turf $258,200 $258,200 $0 100%
TOTAL PROJECT
$258,200 $258,200 $0 100%
319
THE CITY OF
EULESS