Loading...
HomeMy WebLinkAbout26-1702 08-11-2026RESOLUTION NO. 26-1702 A RESOLUTION RECOMMENDING AWARD OF A CONTRACT FOR COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) PROJECT NO. B25-UC-48-0001-22-50 TO DOUGLAS DAILEY CONSTRUCTION, LLC. LOCATED IN FERRIS, TEXAS, IN THE AMOUNT OF $269,125.50 FOR THE REPLACEMENT OF SANITARY SEWER MAIN ALONG MILAM DRIVE. WHEREAS, the City Council of the City of Euless, Texas does hereby recommend the award of contract for CDBG Project No. B25-UC-48-0001-22-50 to Douglas Dailey Construction, LLC. located in Ferris, Texas, in the amount of $256,310.00 for the replacement of the sanitary sewer main along Milam Drive; and WHEREAS, CDBG Project No. B25-UC-48-0001-22-50 consists of the replacement of approximately 1,190 linear feet of sanitary sewer main located at a distance of 770 feet from 902 Milam Drive, South along Milam Drive to 750 Milam Drive, and 220 feet from 804 Milam Drive, West along 805 Milam Drive to the end of 805 Milam Drive using trenchless technology and open trench methods; and WHEREAS, the City Council recommends including the authorization for the City of Euless staff and Tarrant County to issue change order(s) totaling an amount not to exceed five percent (5%) of the base contract amount ($12,815.50) without requiring formal action by the City Council; and WHEREAS, the construction funds available through Tarrant County for this project are $254,746.96; and WHEREAS, the application process requires that the following statement be included: The City recommends Tarrant County award the bid to Douglas Dailey Construction, LLC. for $256,310.00 and will pay $1,563.04 toward construction. The City also approves a contingency for any costs above this amount up to $12, 815.50. WHEREAS, Staff has reviewed the bid tabulation and based on supporting documentation from Parkhill, Inc. (Exhibit A), recommends that Tarrant County award the contract to the low bidder, Douglas Dailey Construction, LLC located in Ferris, Texas. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF EULESS, TEXAS, THAT: SECTION 1. The City of Euless, Texas City Council recommends award of a contract to Douglas Dailey Construction, LLC located in Ferris, Texas, for the replacement of the sanitary sewer main located at a distance of 770 feet from 902 Milam Drive, South along Milam Drive to 750 Milam Drive, and 220 feet from 804 Milam Drive, West along 805 Milam Drive to the end of 805 Milam Drive in the amount of $269,125.50 of which Tarrant County Community Development will pay $254,746.96. The remaining $14,378.54 will be paid for by the City of Euless. SECTION 2. This Resolution shall become effective immediately upon its passage and approval. APPROVED AND ADOPTED at a regular meeting of the Euless City Council on August 11, 2026, by a vote of 7 ayes, 0 nays, and 0 abstentions. APPROVED: Tim Stinneford, ' ayor ATTEST: Sutter, RM , M y\Secretary/Chief Governance Officer Resolution No. 26-1702, Page Page 2 of 4 Parkhill Exhibit A TARRANT COUNTY TARRANT COUNTY CDBG — EULESS 51ST YEAR MILAM DRIVE WASTEWATER LINE IMPROVEMENTS 2501 Parkview Drive, Suite 420 Fort Worth, Texas 76102 June 03, 2026 — 2:00 PM Parkhill Project No. 45851.25 Contractor Addendum 001 Bid Bond Base Bid Total Douglas Dailey Construction, LLC ../ 1 $256,310.00 Kings Solution Services, LLC ✓ ✓ $309,392.50 Excel 4 Construction, LLC ✓ ✓ $382,849.00 Horseshoe Construction, Inc. ✓ 1 $429,425.00 Parkhiil.com Resolution No. 26-1702, Page Page 3 of 4 Tarrant County CDBG — Euless 61st Year Milam Drive Wastewater Line Improvements June 3, 2026 2 a 0 0 F Q Q 24w u'Oz ;?,LE O FRS 8$ $8888$8 55 5555555 5aa»gax 8 5 » $ 5 a 888 5 a» $$$$$$8 E R555151 »«»» $8. g5 5 $$ 51 5 5 8 1 888888 5 a $555 52» 8 '88 8888888 $„ 8255515 tnv » » 8 5 » 8 § 8 » 00'25 00'95 888888 5555 »» 000000 0000SS 00 000'SLS 8 88 5 8g « « 8 g 8 5 8 00'000'0LS 00'00LS .w EXCEL 4 CONSTRUCTION, LLC PO BOX 4739 FORT WORTH, TEXAS 79164 8 $$$$$$8 »:.A»'"a 8 » 8 a 8$$ a«a 88$$$$$ .„ »..gala 88 »» 88. ig 8 « 88$$$$ »««« $ 8, 88888$8 1»aa8.i4 8 § $ 8 8$8 Fall 88$$$$8 8mkg§§§ 88 88 n »a 8 § $$$$$ §t§M§ 00'000' lS 00'008`55 KING SOLUTIONSE RVIC ES, LLC 13221 C HRISMAN ROA D HOUSTON, TEXAS 7 039 8 8888888 R 5555555 » asa"Si'"a $ 5 » 8 R » 888 50 « 8$$$888 E5,55555 » 88««»»» 88 55 $F; $$ 55 »» 8 5 « 888888 55R555 »»»a«» $ 5 » 8 8888888 » «»§§§5§ 8 § $ a $ a»a $ $$$$$$8 ag§g§§§ 8$ §J 88. RIB 8 5 8888.8$ 5a4R55.8 DOUGLAS DAILEY CONSTRUCTION, LLC 2005 BLUFF SPRINGS ROAD FERRIS, TEXAS 76126 8 8888888 o 555g555 a»»» 8 8 5 8 » 8 5 8 888 5E5 »»» 8888888 5555555 »»»««»« $8 55 at 88 55 »» 8. g 888.88.8 555555 a»a»»» 4 Z N 8888888 $ 8. $$$ $$$$$8 00000'OS 00005'LS 00'ODO [S 8. $ 8 888888 TMS UTILITY, LLC 27493 HANNA ROAD NT OAK RIDGE NORTH, TEXAS 77385 E a 88 88$$$$$ 55 5555555 « 8 5 8 5 8 m 5 58,000.00 42.500.00 $$$$ 555R $$ §o $$ § $ § 888888 555ggg< 8 000.00 575.00 575.00 8888888 »§§.§§§, $ $ $88 $ » » 51,500.00 $2,500.00 $$$$ pRO $8 §.§ $8 »I SI,000.00 $1,000.00 $$$$88 »§g§§ Y gI LLlW�W>W J � QQ ��I��IQQQQQQ QQ QQ Q W Q W t LL�� t t 2 2 n LL n J n n n t n n n n al R8 rv_ — R Saw fWWWN« « -- R— --- MobHoo5on and Demobilization 8" HOPE DR 17, Sanitary Sewer Main, Pipe Busting j5L11 ,8" HOPE DR-17 Sewer Line (replacement of 6" VC Pipe. '(SEWER LINE21_ 9 a 8 m ,.Wa s, €8 Z K Rsnave and Dspooe Existing Concrete Manholes I 14-Foot Diameter Sewer Manhole (0' fo Si Depth) J N qq & 8 2 F aP Ili e m e� a gw o' u D• W U W l i Funsh and Instal Standard lateral service reinstatement (0'to 8' depth) 2 5 iq $ 8 0-1 4 $zz3 _4 ggyQ n a 1 a y y qy 1 gQ y N O 'as. E e2- Ey 2 g U t l e a a Manhole Teahng (Vacuum) Claanout, Sewer Line 2 at Ste. 1.20.73 Connect Brisling Sewer Line to Proposed Manhole Curb end Gutter Repair, complete in place Sidewalk Repair, complete in place Egaee and Spot Dig Existing Uti6tie0 Temporary Bypass Pumping and Appurtenances Required to Maintain Continuous Sever Service Ding Consbuction and Tens, compete n pace l44ce6neow Project Alowa ice 'Allowance for point repair at existing sanitary sewer fro pre- onstruction, or following completion of HOPE pipe liner [retaliation, complete in psce .2 II E .ern' it gE o .t s lb R Furnish and Instal Bermuda Sod or St Augustine Sod. complete in place p .e D ° S rb ql 9 s H Traffic Control Plan Project Sign, complete in place TOTAL H m<»m.»m .. - VV� 22_T'R21 88 424 8 I NARK»m Resolution No. 26-1702, Page Page 4 of 4