Loading...
HomeMy WebLinkAboutPreliminary Capital Improvements Program FY26-27Preliminary Capital Improvements Program Fiscal Year Ending September 30, 2027 201 N. Ector Drive, Euless, TX 76039 www.eulesstx.gov City of Euless City of Euless FISCAL YEAR 2026-27 Council Members TIM STINNEFORD, MAYOR Zariyan Stark, Place One Jeremy Tompkins, Place Two Eddie Price, Place Three Perry Bynum, Mayor Pro Tem, Place Four Annabel Eads, Place Five Tika Paudel, Place Six Chris Barker, City Manager Steven Viera, Assistant City Manager Lawrence Bryant, Assistant City Manager TABLE OF CONTENTS CAPITAL IMPROVEMENTS PROGRAM City Officials Table of Contents i-iv Letter vi-vii FUNDED PROJECTS Summary of Funded Projects 1 FY2025-26 Amendments 3 Drainage Projects Summary of Funded Drainage Projects 5 DR9903 Miscellaneous Drainage Improvements 6 DR1101 Flooding Mitigation 8 DR1201 Miscellaneous Creek Maintenance 10 DR2501 Carr Park Creek Erosion Protection 12 DR2503 South Mills Drive Outfall Restoration 14 DR2601 FY2025-26 Drainage Curb & Gutter Improvements 16 Street Projects Summary of Funded Street Projects 19 PS1203 Miscellaneous Street Repairs 20 PS1601 East Harwood Road Extension 22 PS1902 FY2018-19 Street Reconstruction – Pipeline/Highland/Harwood 26 PS1903 Miscellaneous Screening Wall Repair 30 PS2302 Heritage Avenue – Cheek-Sparger Road to Guadalupe Trail 32 PS2601 FY2025-26 Street Improvements 36 PS2602 Traffic Signal – SH 10 & Dickey Drive 38 PS2603 Traffic Signal Intersection Improvements – FM 157 & Signet Drive 42 Wastewater Projects Summary of Funded Wastewater Projects 47 WW0002 Miscellaneous Wastewater Rehabilitation 48 WW0605 TRA Wastewater Payments – Impact 50 WW2301 Line Replacement – Cedar Hill Estates South Phase I 52 WW2302 Line Replacement – Cedar Hill Estates South Phase II 56 WW2304 Line Replacement – Trailwood Addition 60 WW2501 FY2024-25 51st CDBG LR: Milam Drive 64 WW2502 Line Replacement – Oakwood Terrace North Phases I, II, & III – Engineering 68 WW2601 FY2025-26 52nd CDBG LR: Martin/Slaughter 72 WW2602 Line Replacement – Oakwood Terrace North Phases I & II Construction 76 WW2603 Line Replacement – Vine Street Engineering 80 Water Projects Summary of Funded Water Projects 85 WT0001 Miscellaneous Water Rehabilitation 86 WT0104 Well Repairs 88 WT0803 Meters/Transponders/Leak Detection 90 i WT1403 Reclaimed Water Line Extension Debt Payment – Impact 92 WT1603 Miscellaneous Valve Replacement 94 WT1604 Reclaimed Water Line Extension Phase III 96 WT1802 Well Replacement – Fuller/Far North 100 WT2301 Line Replacement – Midway Park 1st Addition 104 WT2302 Line Replacement – Oakwood Terrace 108 WT2303 Line Replacement – South Main Street 112 WT2401 Line Replacement – Huntington Drive Phase II 116 WT2402 Line Replacement – Sotogrande Boulevard Phase I 120 WT2501 Line Replacement – Sotogrande Boulevard Phase II 124 WT2601 Line Replacement – Sagebrush Trail 128 Other Projects Summary of Funded Other Projects 133 AC1901 Texas Star Sports Complex Phase VII 134 CM0304 Entry Monument Sign Program 136 CM0804 Redevelopment 138 CM1701 Municipal Plaza Improvements Phase II 140 DV9901 EDC Incentive Funds 142 ED1002 EDC Contingency 144 ED1601 Midtown Development 146 FM1201 ADA/TAS Facility Improvements 148 FM2207 Miscellaneous Roof Repairs & Preventative Maintenance 150 FM2311 Fire Station #2 152 FM2312 Police & Court Building Remodel 154 FM2508 Facility Renovations at 1400 South Pipeline Road 156 GC1801 TSGC Miscellaneous Improvements 158 GC2501 Golf Course Upgrades 160 PR0720 Miscellaneous Park Improvements 162 PR0804 Park Irrigation 164 PR2508 Parks at Texas Star South Improvements 166 PR2604 Euless Family Life Center Expansion Feasibility/Programming Study 168 PR2605 Kiddie Carr Park Improvements 170 PR2606 Parks at Texas Star South Batting Cage Area Redevelopment 172 PR2607 South Euless Park Improvements 174 PROPOSED & UNFUNDED PROJECTS Summary of FY2026-27 Proposed & Unfunded Projects – Sorted by Type 177 Drainage Projects Summary of FY2026-27 Proposed & Unfunded Drainage Projects 179 FY2026-27 Drainage Curb & Gutter Improvements 180 FY2027-28 Drainage Curb & Gutter Improvements 182 FY2028-29 Drainage Curb & Gutter Improvements 184 FY2029-30 Drainage Curb & Gutter Improvements 186 FY2030-31 Drainage Curb & Gutter Improvements 188 Valley Gutter Replacement – Crane Drive 190 ii Street Projects Summary of FY2026-27 Proposed & Unfunded Street Projects 191 FY2026-27 Street Improvements 192 Traffic Signal Intersection Improvements – Mid-Cities Blvd & North Main Street 194 FY2027-28 Street Improvements 198 Cresthaven Drive Reconstruction 200 FY2028-29 Street Improvements 202 FY2029-30 Street Improvements 204 FY2030-31 Street Improvements 206 East Alexander Lane Reconstruction 208 Midway Drive Reconstruction Phase I 209 Midway Drive Reconstruction Phase II 210 Midway Drive Reconstruction Phase III 211 Ross Avenue Extension 212 Sheppard Drive Reconstruction 213 Vine Street Reconstruction – SH 183 to SH 10 214 Wastewater Projects Summary of FY2026-27 Proposed & Unfunded Wastewater Projects 215 FY2026-27 53rd CDBG LR: Skyway Drive/Ridgecrest Drive/S Ector Drive 216 Line Replacement – Oakwood Terrace North Phase III – Construction 220 Line Replacement – Vine Street Construction 224 FY2027-28 54th CDBG LR: Limestone Drive/Himes Drive 228 Line Replacement – Woodvine Drive Engineering 230 Line Replacement – Cliffwood Road/Shady Creek Drive Engineering 232 Line Replacement – Euless Junior High School/Himes Drive/N Byers Street Engineering 234 FY2028-29 55th CDBG LR: Pecos Drive/N Ector Drive/Midway Drive 236 Line Replacement – Woodvine Drive Construction 238 Line Replacement – Cliffwood Road/Shady Creek Drive Construction 240 Line Replacement – Euless Junior High School/Himes Drive/N Byers Street Construction 242 FY2029-30 56th CDBG LR: Westpark Way Circle Phase I 244 FY2030-31 57th CDBG LR: Westpark Way Circle Phase II 246 Line Replacement – Huntington Place/Stone Meadow Engineering 248 Line Replacement – Huntington Place/Stone Meadow Construction 250 Line Replacement – Knob Hill 251 Water Projects Summary of FY2026-27 Proposed & Unfunded Water Projects 253 Line Replacement – Bell-Hi Addition Phases I & II Engineering 254 Line Replacement – West Euless Boulevard Engineering 258 Line Replacement – Bell-Hi Addition Phases I & II Construction 262 Line Replacement – Donley Drive/Donley Court Engineering 264 Line Replacement – West Euless Boulevard Construction 266 Line Replacement – Donley Drive/Donley Court Construction 268 Line Replacement – Fuller-Wiser Road Engineering 270 Well Water Treatment Feasibility Study 272 Line Replacement – Fuller-Wiser Road Construction 274 Line Replacement – Midway Drive Phases I & II Engineering 276 iii Line Replacement – Midway Drive Phase I Construction 278 1 Mil Well Replacement 280 Line Replacement – Dunaway Drive 281 Groundwater Treatment 282 Line Replacement – Knob Hill 283 Line Replacement – Midway Park 3rd Addition 284 Line Replacement – Midway Drive Phase II Construction 285 Line Replacement – North Main Street 286 Line Replacement – Westpark Way 287 Other Projects Summary of FY2026-27 Proposed & Unfunded Other Projects 289 Euless Family Life Center Expansion Schematic Design 290 J.A. Carr Park Expansion Phase I 292 Parks at Texas Star South Turf Replacement 294 Euless Family Life Center Expansion Design Development 296 Euless Family Life Center Expansion Construction Document Development 298 J.A. Carr Park Expansion Phase II 300 Parks at Texas Star Phase VIII 302 Euless Family Life Center Expansion Construction 304 Parks at Texas Star North Turf Replacement 306 Parks at Texas Star South Entrance Improvements 308 Trail Enhancements Phase I 309 Trail Enhancements Phase II 310 Trail/Park Enhancements Villages of Bear Creek 311 Trailwood Park Improvements 312 West Park Improvements 313 COMPLETED PROJECTS Drainage Projects Summary of Completed Drainage Projects 315 Street Projects Summary of Completed Street Projects 317 PS2501 Fuller-Wiser Road/Bear Creek Parkway Roadway Rehabilitation 320 PS2502 FY2024-25 Street Improvements 322 Wastewater Projects Summary of Completed Wastewater Projects 325 WW2401 FY2023-24 50th CDBG LR: Fair Oaks Blvd./Shelmar Dr./Kensinger Ct. 328 Water Projects Summary of Completed Water Projects 331 Other Projects Summary of Completed Other Projects 335 FM2409 Animal Shelter Expansion/Renovation 338 PR2510 Playground Shade Structures 340 iv v 201 N. Ector Drive, Euless, Texas 76039-3595 817/685-1400  Fax 817/685-1416 www.eulesstx.gov July 30, 2026 Honorable Mayor Tim Stinneford Honorable City Councilmembers: Zariyan Stark, Place One Jeremy Tompkins, Place Two Eddie Price, Place Three Perry Bynum, Mayor Pro Tem, Place Four Annabel Eads, Place Five Tika Paudel, Place Six INTRODUCTION The City of Euless’ Capital Improvements Program is a comprehensive document detailing all projects that have been identified to date. Emphasis has been placed on organizing this data in a manner that will facilitate decision-making processes, assist in long-range planning, and provide the citizens of Euless with information regarding planned projects. This document meets the requirements of the City Charter. We extend special appreciation to the directors and the finance staff for their outstanding performance in creating this document. UNDERSTANDING THIS BOOK Although this book contains a large volume of information, the summaries should make it easy to understand at a glance. The book is divided into three sections: Funded Projects, FY2027 Proposed and Unfunded Projects, and Completed Projects. Each section begins with a summary and is followed by detailed data for those wishing to research individual projects. The detail provided includes the project’s relationship to City master plans, the project description and justification, the effect on future maintenance and operating costs, and the estimated total cost. Within each section, you will find the detailed descriptions sorted by type. There are five basic project types: Drainage, Streets, Wastewater, Water, and Other. The Funded Projects section includes all projects that the City Council has previously authorized. Many of these projects are on-going and require additional funding from time to time. For each project, a detailed description has been provided that includes any City Council authorization, the current status of the project, and a financial summary detailing funding sources and total project budget. Any amendments or additional appropriations requested are also identified. Any project that has been authorized by the City Council that is not fully funded will include a clear explanation as to how the remainder of the project is expected to be funded. YL 201 N. Ector Drive, Euless, Texas 76039-3595 817/685-1400  Fax 817/685-1416 www.eulesstx.gov The FY2027 budget includes additional funding for Well Repairs, the Entry Monument Sign Program, Redevelopment, Municipal Plaza Improvements Phase II, the South Mills Drive Outfall Restoration project, impact fee payments, the Police and Court Building Remodel project, replenishment of ongoing miscellaneous improvement projects, and projects supported through annual transfers. The FY2027 Proposed and Unfunded Projects section has been classified into three categories of priority. Priority A indicates the item is recommended and funding has been identified in the proposed FY2027 budget. Staff recommends City Council authorization for these projects. Priority B projects should be presented to Council within two to five years for consideration. Projects that will not begin for at least five years have been assigned a Priority C. This system has been used to allow the Council to evaluate and shift priorities, when necessary, and to provide a means of budgeting capital projects for at least five years. Recommended funding sources have been indicated if known. The Completed Projects section provides a summary for each project type indicating total project budget, actual expenditure, and variance. Funds remaining have been returned to the appropriate fund balance account for re-appropriation. Details of projects closed during the prior year have also been included. FY2027 PROJECTS: Funding has been identified for all proposed FY2027 projects which are reflected on the FY2027 Proposed and Unfunded Projects Summary as Priority A. These include: FY2026-27 Drainage Curb & Gutter Improvements FY2026-27 Street Improvements Traffic Signal Intersection Improvements – Mid-Cities Blvd & North Main Street FY2026-27 53rd CDBG Wastewater Line Replacement – Skyway Dr/Ridgecrest Dr/S Ector Dr Wastewater Line Replacement – Oakwood Terrace North Phase III Construction Wastewater Line Replacement – Vine Street Construction Water Line Replacement – Bell-Hi Addition Phases I & II Engineering Water Line Replacement – West Euless Boulevard Engineering Euless Family Life Center Expansion Schematic Design J.A. Carr Park Expansion Phase I Parks at Texas Star South Turf Replacement CLOSING COMMENTS This document is prepared as a comprehensive summary of capital needs that have been identified throughout the City of Euless. This document will be updated annually to aid the City Council in allocating resources and determining priorities. Sincerely, Chris Barker City Manager YLL viii CAPITAL IMPROVEMENTS PROGRAM FUNDED PROJECTS SUMMARY Project Number Project Description Budget as of 5/31/25 Appropriation/ Amendment Budget as of 5/31/26 Expended as of 5/31/26 Remaining Funds Revised Project Cost Estimates Unfunded/ (Excess Funding) DRAINAGE PROJECTS DR9903 Misc. Drainage Improvements 1,240,777$ 66,000$ 1,306,777$ 1,293,896$ 12,881$ 1,521,777$ 215,000$ DR1101 Flooding Mitigation 341,265$ -$ 341,265$ 122,334$ 218,931$ 341,265$ -$ DR1201 Misc. Creek Maintenance (min bal $100,000)270,000$ 6,000$ 276,000$ 175,293$ 100,707$ 291,000$ 15,000$ DR2501 Carr Park Creek Erosion Protection 105,000$ -$ 105,000$ 162$ 104,838$ 105,000$ -$ DR2503 South Mills Drive Outfall Restoration 55,000$ -$ 55,000$ 54$ 54,946$ 75,000$ 20,000$ DR2601 FY2025-26 Drainage Curb & Gutter Improvements -$ 350,000$ 350,000$ 260,753$ 89,247$ 350,000$ -$ FB9902 Fund Balance – Drainage CIP -$ -$ -$ -$ -$ -$ (245,024)$ 2,012,042$ 422,000$ 2,434,042$ 1,852,492$ 581,550$ 2,684,042$ 4,976$ STREET PROJECTS PS1203 Misc. Street Repairs (min bal $150,000)993,150$ 150,000$ 1,143,150$ 895,669$ 247,481$ 1,143,150$ -$ PS1601 East Harwood Road Extension 100,000$ -$ 100,000$ -$ 100,000$ 100,000$ -$ PS1902 FY2018-19 Street Reconstruction – Pipeline/Highland/Harwood 21,956,719$ -$ 21,956,719$ 19,340,560$ 2,616,159$ 21,956,719$ -$ PS1903 Misc. Screening Wall Repair (annual transfer $50,000)150,000$ 25,000$ 175,000$ 32,000$ 143,000$ 225,000$ 50,000$ PS2302 Heritage Avenue – Cheek-Sparger Road to Guadalupe Trail 500,000$ -$ 500,000$ -$ 500,000$ 500,000$ -$ PS2601 FY2025-26 Street Improvements 1,200,000$ 1,200,000$ 222,557$ 977,443$ 1,200,000$ -$ PS2602 Traffic Signal – SH 10 & Dickey Drive 811,000$ 811,000$ -$ 811,000$ 811,000$ -$ PS2603 Traffic Signal Intersection Improvements – FM 157 & Signet Drive 1,019,000$ 1,019,000$ -$ 1,019,000$ 1,019,000$ -$ FB9907 Fund Balance – Street CIP -$ -$ -$ -$ -$ -$ (2,552,305)$ 23,699,869$ 3,205,000$ 26,904,869$ 20,490,786$ 6,414,083$ 26,954,869$ (2,502,305)$ WASTEWATER PROJECTS WW0002 Misc. Wastewater Rehab (min bal $100,000)981,086$ 100,000$ 1,081,086$ 845,180$ 235,906$ 1,081,086$ -$ W W0605 TRA Wastewater Payments – Impact 1,630,000$ 50,000$ 1,680,000$ 1,630,000$ 50,000$ 1,730,000$ 50,000$ WW2301 Line Replacement – Cedar Hill Estates South Phase I 622,867$ -$ 622,867$ 436,721$ 186,146$ 622,867$ -$ W W2302 Line Replacement – Cedar Hill Estates South Phase II 534,713$ -$ 534,713$ 397,035$ 137,678$ 534,713$ -$ W W2304 Line Replacement – Trailwood Addition 3,190,549$ 170,000$ 3,360,549$ 2,987,263$ 373,286$ 3,360,549$ -$ W W2501 FY2024-25 51st CDBG LR: Milam Drive 300,750$ -$ 300,750$ 37,308$ 263,442$ 300,750$ -$ W W2502 Line Replacement – Oakwood Terrace North Phases I, II, & III – Engineering 309,000$ (200,000)$ 109,000$ 73,859$ 35,141$ 109,000$ -$ W W2601 FY2025-26 52nd CDBG LR: Martin/Slaughter -$ 310,000$ 310,000$ -$ 310,000$ 310,000$ -$ W W2602 Line Replacement – Oakwood Terrace North Phases I & II Construction -$ 614,000$ 614,000$ -$ 614,000$ 614,000$ -$ W W2603 Line Replacement – Vine Street Engineering -$ 75,000$ 75,000$ 10,503$ 64,497$ 75,000$ -$ FB9911 Fund Balance – Wastewater Impact (Restricted)-$ -$ -$ -$ -$ -$ (800,734)$ 7,568,965$ 1,119,000$ 8,687,965$ 6,417,869$ 2,270,096$ 8,737,965$ (750,734)$ WATER PROJECTS WT0001 Misc. Water Rehab (min bal $150,000)1,128,511$ -$ 1,128,511$ 964,439$ 164,072$ 1,128,511$ -$ W T0104 Well Repairs (annual transfer $75,000)1,813,992$ 50,000$ 1,863,992$ 1,852,791$ 11,201$ 2,413,992$ 550,000$ WT0803 Meters/Transponders/Leak Detection (annual transfer $158,000)3,150,944$ 158,000$ 3,308,944$ 1,759,423$ 1,549,521$ 3,466,944$ 158,000$ WT1403 Reclaimed Water Line Extension Debt Payment - Impact 1,436,702$ 116,850$ 1,553,552$ 1,514,598$ 38,954$ 1,672,202$ 118,650$ WT1603 Misc. Valve Replacement (min bal $150,000)565,000$ -$ 565,000$ 414,051$ 150,949$ 565,000$ -$ W T1604 Reclaimed Water Line Extension Phase III 6,124,803$ -$ 6,124,803$ 4,624,803$ 1,500,000$ 6,124,803$ -$ W T1802 Well Replacement – Fuller/Far North 11,106,356$ -$ 11,106,356$ 11,086,994$ 19,362$ 11,106,356$ -$ Sub-Total Street Projects Sub-Total Drainage Projects Sub-Total Wastewater Projects 1 CAPITAL IMPROVEMENTS PROGRAM FUNDED PROJECTS SUMMARY Project Number Project Description Budget as of 5/31/25 Appropriation/ Amendment Budget as of 5/31/26 Expended as of 5/31/26 Remaining Funds Revised Project Cost Estimates Unfunded/ (Excess Funding) WATER PROJECTS – CONTINUED WT2301 Line Replacement – Midway Park 1st Addition 649,203$ -$ 649,203$ 616,471$ 32,732$ 649,203$ -$ WT2302 Line Replacement – Oakwood Terrace 1,986,005$ 5,500$ 1,991,505$ 1,991,280$ 225$ 1,991,505$ -$ WT2303 Line Replacement – South Main Street 2,081,008$ (5,500)$ 2,075,508$ 1,930,384$ 145,124$ 2,075,508$ -$ WT2401 Line Replacement – Huntington Drive Phase II 520,000$ -$ 520,000$ -$ 520,000$ 520,000$ -$ WT2402 Line Replacement – Sotogrande Boulevard Phase I 365,000$ 270,000$ 635,000$ 39,200$ 595,800$ 635,000$ -$ WT2501 Line Replacement – Sotogrande Boulevard Phase II 365,000$ 348,000$ 713,000$ 57,472$ 655,528$ 713,000$ -$ WT2601 Line Replacement – Sagebrush Trail -$ 620,000$ 620,000$ 52,100$ 567,900$ 620,000$ -$ FB9910 Fund Balance – Water Impact (Restricted)-$ -$ -$ -$ -$ -$ (3,425,453)$ FB9901 Fund Balance – Water & Wastewater CIP -$ -$ -$ -$ -$ -$ (2,924,974)$ 31,292,524$ 1,562,850$ 32,855,374$ 26,904,006$ 5,951,368$ 33,682,024$ (5,523,777)$ OTHER AC1901 Texas Star Sports Complex Phase VII 5,119,496$ -$ 5,119,496$ 5,071,726$ 47,770$ 5,119,496$ -$ CM0304 Entry Monument Sign Program 145,782$ -$ 145,782$ 121,427$ 24,355$ 245,782$ 100,000$ CM0804 Redevelopment 13,864,715$ 81,641$ 13,946,356$ 11,863,768$ 2,082,588$ 14,363,768$ 417,412$ CM1701 Municipal Plaza Improvements Phase II 446,733$ 70,000$ 516,733$ 226,716$ 290,017$ 566,733$ 50,000$ DV9901 EDC Incentive Funds (annual transfer $25,000)1,800,854$ 25,000$ 1,825,854$ 1,351,148$ 474,706$ 1,850,854$ 25,000$ ED1002 EDC Contingency 325,000$ -$ 325,000$ 68,772$ 256,228$ 325,000$ -$ ED1601 Midtown Development 16,417,980$ -$ 16,417,980$ 16,359,955$ 58,025$ 16,417,980$ -$ FM1201 ADA/TAS Facility Improvements (min bal $100,000)215,000$ 30,000$ 245,000$ 230,487$ 14,513$ 330,000$ 85,000$ FM2207 Misc. Roof Repairs & Preventative Maintenance (min bal $100,000)94,000$ 66,000$ 160,000$ 25,080$ 134,920$ 160,000$ -$ FM2311 Fire Station #2 11,137,224$ 29,103$ 11,166,327$ 10,185,199$ 981,128$ 11,166,327$ -$ FM2312 Police & Court Building Remodel 28,064,760$ 723,122$ 28,787,882$ 20,930,460$ 7,857,422$ 28,882,882$ 95,000$ FM2508 Facility Renovations at 1400 South Pipeline Road 3,200,000$ -$ 3,200,000$ 172,603$ 3,027,397$ 3,200,000$ -$ GC1801 TSGC Misc. Improvements (min bal $150,000)712,180$ 65,000$ 777,180$ 699,397$ 77,783$ 857,180$ 80,000$ GC2501 Golf Course Upgrades 2,240,000$ -$ 2,240,000$ 2,197,481$ 42,519$ 2,240,000$ -$ PR0720 Misc. Park Improvements (min bal $200,000)2,018,253$ 100,000$ 2,118,253$ 1,844,877$ 273,376$ 2,118,253$ -$ PR0804 Park Irrigation (annual transfer $25,000)450,000$ 25,000$ 475,000$ 318,296$ 156,704$ 500,000$ 25,000$ PR2508 Parks at Texas Star South Improvements 750,000$ -$ 750,000$ 415,475$ 334,525$ 750,000$ -$ PR2604 Euless Family Life Center Expansion Feasibility/Programming Study -$ 100,000$ 100,000$ 8,000$ 92,000$ 100,000$ -$ PR2605 Kiddie Carr Park Improvements -$ 2,000,000$ 2,000,000$ 64,753$ 1,935,247$ 2,000,000$ -$ PR2606 Parks at Texas Star South Batting Cage Area Redevelopment -$ 1,750,000$ 1,750,000$ 74,824$ 1,675,176$ 1,750,000$ -$ PR2607 South Euless Park Improvements -$ 3,000,000$ 3,000,000$ 225,086$ 2,774,914$ 3,000,000$ -$ FB9906 Fund Balance – EDC CIP -$ -$ -$ -$ -$ -$ (2,586,795)$ FB9908 Fund Balance – Parks at Texas Star CIP -$ -$ -$ -$ -$ -$ (669,445)$ FB9909 Fund Balance – General CIP -$ -$ -$ -$ -$ -$ (11,117,463)$ FB9913 Fund Balance – Car Rental CIP -$ -$ -$ -$ -$ -$ (4,974,519)$ FB9916 Fund Balance – TSGC CIP -$ -$ -$ -$ -$ -$ (123,413)$ 87,001,977$ 8,064,866$ 95,066,843$ 72,455,530$ 22,611,313$ 95,944,255$ (18,594,223)$ 151,575,377$ 14,373,716$ 165,949,093$ 128,120,683$ 37,828,410$ 168,003,155$ (27,366,063)$ TOTAL FUNDED PROJECTS Sub-Total Water Projects Sub-Total Other Projects 2 CITY OF EULESS CAPITAL IMPROVEMENT PROGRAM AMENDMENTS -- FUNDED PROJECTS PROJECT#PROJECT DESCRIPTION DATE AMENDMENTS & ACTIONS CM0804 Redevelopment 05/31/2026 To increase funding for earned interest of $81,641. CM1701 Municipal Plaza Improvements Phase II 10/01/2025 To provide additional funding per FY2026 Approved CIP Plan – $70,000 from General CIP Fund Balance. DR9903 Miscellaneous Drainage Improvements 10/01/2025 To provide additional funding per FY2026 Approved CIP Plan – $66,000 from Drainage Operating Fund. DR1201 Miscellaneous Creek Maintenance 10/01/2025 To provide additional funding per FY2026 Approved CIP Plan – $6,000 from Drainage CIP Fund Balance. DR2601 FY2025-26 Drainage Curb & Gutter Improvements 10/01/2025 To provide funding per FY2026 Approved CIP Plan – $350,000 from Drainage Operating Fund. DV9901 EDC Incentive Funds 10/01/2025 To provide additional funding per FY2026 Approved CIP Plan – $25,000 from EDC Operating Fund. FM1201 ADA/TAS Facility Improvements 10/01/2025 To provide additional funding per FY2026 Approved CIP Plan – $30,000 from General CIP Fund Balance. FM2207 Miscellaneous Roof Repairs & Preventative Maintenance 10/01/2025 To provide additional funding per FY2026 Approved CIP Plan – $66,000 from General CIP Fund Balance. FM2311 Fire Station #2 05/31/2026 To increase funding for earned interest of $29,103. FM2312 Police & Court Building Remodel 05/31/2026 To increase funding for earned interest of $723,122. FM2409 Animal Shelter Expansion/Renovation 10/01/2025 To provide additional funding per FY2026 Approved CIP Plan – $250,000 from General CIP Fund Balance. FM2409 Animal Shelter Expansion/Renovation 05/31/2026 To close project. GC1801 TSGC Miscellaneous Improvements 10/01/2025 To provide additional funding per FY2026 Approved CIP Plan – $65,000 from TSGC CIP Fund Balance. PR0720 Miscellaneous Park Improvements 10/01/2025 To provide additional funding per FY2026 Approved CIP Plan – $100,000 from EDC Operating Fund. PR0804 Park Irrigation 10/01/2025 To provide additional funding per FY2026 Approved CIP Plan – $25,000 from EDC Operating Fund. PR2510 Playground Shade Structures 05/31/2026 To close project and transfer excess funding of $360,585 to EDC CIP Fund Balance. PR2604 Euless Family Life Center Expansion Feasibility/Programming Study 10/01/2025 To provide funding per FY2026 Approved CIP Plan – $100,000 from Car Rental CIP Fund Balance. PR2605 Kiddie Carr Park Improvements 10/01/2025 To provide funding per FY2026 Approved CIP Plan – $2,000,000 from Car Rental CIP Fund Balance. PR2606 Parks at Texas Star South Batting Cage Area Redevelopment 10/01/2025 To provide funding per FY2026 Approved CIP Plan – $1,750,000 from EDC CIP Fund Balance. PR2607 South Euless Park Improvements 10/01/2025 To provide funding per FY2026 Approved CIP Plan – $3,000,000 from EDC CIP Fund Balance. PS1203 Miscellaneous Street Repairs 10/01/2025 To provide additional funding per FY2026 Approved CIP Plan – $150,000 from Street CIP Fund Balance. PS1903 Miscellaneous Screening Wall Repair 10/01/2025 To provide additional funding per FY2026 Approved CIP Plan – $25,000 from General Fund. PS2501 Fuller-Wiser Road/Bear Creek Parkway Roadway Rehabilitation 05/31/2026 To close project and transfer excess funding of $2,068 to Street CIP Fund Balance. PS2502 FY2024-25 Street Improvements 05/31/2026 To close project. PS2601 FY2025-26 Street Improvements 10/01/2025 To provide funding per FY2026 Approved CIP Plan – $1,200,000 from General Fund. PS2602 Traffic Signal – SH 10 & Dickey Drive 10/01/2025 To provide funding per FY2026 Approved CIP Plan – $182,346 from General Fund and $628,654 from TxDOT/HSIP Funding. PS2603 Traffic Signal Intersection Improvements – FM 157 & Signet Drive 10/01/2025 To provide funding per FY2026 Approved CIP Plan – $223,649 from General Fund and $795,351 from TxDOT/HSIP Funding. WT0104 Well Repairs 10/01/2025 To provide additional funding per FY2026 Approved CIP Plan – $50,000 from W/WW Operating Fund. WT0803 Meters/Transponders/Leak Detection 10/01/2025 To provide additional funding per FY2026 Approved CIP Plan – $158,000 from W/WW Operating Fund. WT1403 Reclaimed Water Line Extension Debt Payment – Impact 10/01/2025 To provide additional funding per FY2026 Approved CIP Plan – $116,850 from Water Impact Fee Fund Balance. WT2302 Line Replacement – Oakwood Terrace 05/31/2026 To provide additional funding of $5,500 from WT2303 – South Main Street. WT2303 Line Replacement – South Main Street 05/31/2026 To transfer excess funding of $5,500 to WT2302 – Oakwood Terrace. WT2402 Line Replacement – Sotogrande Boulevard Phase I 10/01/2025 To provide additional funding per FY2026 Approved CIP Plan – $270,000 from W/WW CIP Fund Balance. WT2501 Line Replacement – Sotogrande Boulevard Phase II 10/01/2025 To provide additional funding per FY2026 Approved CIP Plan – $348,000 from W/WW CIP Fund Balance. WT2601 Line Replacement – Sagebrush Trail 10/01/2025 To provide funding per FY2026 Approved CIP Plan – $620,000 from W/WW Operating Fund. 3 CITY OF EULESS CAPITAL IMPROVEMENT PROGRAM AMENDMENTS -- FUNDED PROJECTS PROJECT#PROJECT DESCRIPTION DATE AMENDMENTS & ACTIONS WW0002 Miscellaneous Wastewater Rehabilitation 10/01/2025 To provide additional funding per FY2026 Approved CIP Plan – $100,000 from W/WW CIP Fund Balance. WW0605 TRA Wastewater Payments – Impact 10/01/2025 To provide additional funding per FY2026 Approved CIP Plan – $50,000 from WW Impact Fee Fund Balance. WW2304 Line Replacement – Trailwood Addition 10/01/2025 To provide additional funding per FY2026 Approved CIP Plan – $170,000 from Street CIP Fund Balance. WW2401 FY2023-24 50th CDBG LR: Fair Oaks Blvd./Shelmar Dr./Kensinger Ct. 08/12/2025 To provide additional funding per City Council Authorization – $3,813 from Community Development Block Grant. WW2401 FY2023-24 50th CDBG LR: Fair Oaks Blvd./Shelmar Dr./Kensinger Ct. 05/31/2026 To close project. WW2502 Line Replacement – Oakwood Terrace North Phases I, II, & III – Engineering 10/01/2025 To transfer excess funding per FY2026 Approved CIP Plan – $200,000 to W/WW CIP Fund Balance. WW2601 FY2025-26 52nd CDBG LR: Martin/Slaughter/E Huitt 10/01/2025 To provide funding per FY2026 Approved CIP Plan – $310,000 from Community Development Block Grant. WW2601 FY2025-26 52nd CDBG LR: Martin/Slaughter/E Huitt 05/31/2026 Reduce Community Development Block Grant funding by $21,000 and replace with City funding from W/WW CIP Fund Balance. WW2602 Line Replacement – Oakwood Terrace North Phases I & II Construction 10/01/2025 To provide funding per FY2026 Approved CIP Plan – $614,000 from W/WW Operating Fund. WW2603 Line Replacement – Vine Street Engineering 10/01/2025 To provide funding per FY2026 Approved CIP Plan – $75,000 from W/WW Operating Fund. 4 CAPITAL IMPROVEMENTS PROGRAM FUNDED PROJECTS SUMMARY Project Number Project Description Budget as of 5/31/25 Appropriation/ Amendment Budget as of 5/31/26 Expended as of 5/31/26 Remaining Funds Revised Project Cost Estimates Unfunded/ (Excess Funding) DRAINAGE PROJECTS DR9903 Misc. Drainage Improvements 1,240,777$ 66,000$ 1,306,777$ 1,293,896$ 12,881$ 1,521,777$ 215,000$ DR1101 Flooding Mitigation 341,265$ -$ 341,265$ 122,334$ 218,931$ 341,265$ -$ DR1201 Misc. Creek Maintenance (min bal $100,000)270,000$ 6,000$ 276,000$ 175,293$ 100,707$ 291,000$ 15,000$ DR2501 Carr Park Creek Erosion Protection 105,000$ -$ 105,000$ 162$ 104,838$ 105,000$ -$ DR2503 South Mills Drive Outfall Restoration 55,000$ -$ 55,000$ 54$ 54,946$ 75,000$ 20,000$ DR2601 FY2025-26 Drainage Curb & Gutter Improvements -$ 350,000$ 350,000$ 260,753$ 89,247$ 350,000$ -$ FB9902 Fund Balance – Drainage CIP -$ -$ -$ -$ -$ -$ (245,024)$ Total Drainage Projects 2,012,042$ 422,000$ 2,434,042$ 1,852,492$ 581,550$ 2,684,042$ 4,976$ 5 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 23,1999 MAJOR JONES MISCELLANEOUS DRAINAGE IMPROVEMENTS DRAINAGE IMPROVEMENTS DR9903 May 27, 2014: Awarded Bid No. 007-14 to Knight Erosion Control, Inc. for Drainage Channel Improvements along Hurricane Creek and authorized the City Manager to enter into a contract with Knight Erosion Control, Inc. The estimated expenditure is $135,487.82. June 23, 2015: Ratified City Manager action to proceed with emergency repairs to City property located along Hurricane Creek. The estimated expenditure is $74,602. February 26, 2019: Authorized the City Manager to execute a construction contract with Knight Erosion Control, Inc. for channel improvements at the Texas Star Golf Course. The estimated expenditure is $121,440. January 12, 2021: Authorized the City Manager to enter into a contract with Knight Erosion Control Retaining Walls and Construction, to proceed with emergency repairs related to the City’s Sanitary Sewer Collection System, finding that the procurement is necessary due to unforeseen damage to an eight inch aerial sanitary sewer crossing located along Hurricane Creek near 350 Westpark Way, and finding that the repair is necessary to preserve the public health and protect the safety of the City’s residents. The estimated expenditure is $121,000. April 11, 2023: Awarded Bid No. 011-23 for channel improvements at the Texas Star Golf Course to R.C. Retaining Walls, Inc. The estimated expenditure is $130,751.36 with an owner-controlled contingency of five percent of the contractual amount and will be paid from GC2003 and DR9903. The project provides funding for various drainage projects or emergency repairs identified throughout the year. Often correction of these problems requires design services and other improvements such as bank stabilization. As major projects are identified, they will be tracked separately and assigned a different project number. Failure to correct these problems often causes damage to existing infrastructure. 6 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Improvements $1,521,777 $0 $0 $0 $0 $1,521,777 Transfer from: Drainage Operating/CIP Fund $1,448,833 FEMA Reimbursement $84,178 $0 Transfer to DR2201 ($226,234) $0 Additional Funding Needed: Annual expense $186,790 Transfer from: Drainage Operating Fund $215,000 $186,790 $1,521,777 Engineering $16,000 $16,000 $0 100% Fence $559 $559 $0 100% Storm Sewers $1,488,223 $1,260,342 $227,881 85% Meters & Setting $195 $195 $0 100% Land-Right-of-Way $16,800 $16,800 $0 100% $1,521,777 $1,293,896 $227,881 85% MISCELLANEOUS DRAINAGE IMPROVEMENTS DR9903 7 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS June 30,2010 MAJOR JONES FLOODING MITIGATION DRAINAGE IMPROVEMENTS DR1101 This project consists of identifying chronic flooding locations within the City of Euless and determining the cost/benefit of property acquisition and protection compared to extensive drainage relief projects. Property acquisition will be recommended after consideration of flooding history, appraisals, and feasible alternative drainage solutions have been evaluated. It is recommended that this be established as an ongoing project. Properties throughout the City of Euless situated adjacent to creeks have experienced drainage problems for several years. The cost for implementing drainage improvement projects to mitigate flooding at isolated locations may be much greater than the cost of property acquisition. Chronic flooding lowers the property values and this program will offer a means of relief for affected property owners. 8 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Flooding Mitigation $341,265 $0 $0 $0 $0 $341,265 Transfer from: Drainage CIP Fund Balance $350,000 Drainage Operating Fund $150,000 $0 Miscellaneous Income $1,265 $0 Transfer to: Drainage CIP Fund Balance ($160,000) $0 $341,265 Storm Sewers $341,265 $122,334 $218,931 36% $341,265 $122,334 $218,931 36% FLOODING MITIGATION DR1101 9 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 22,2011 MAJOR JONES MISCELLANEOUS CREEK MAINTENANCE DRAINAGE CREEK MAINTENANCE DR1201 The City of Euless completed drainage master plan studies for the major creeks that traverse the City. They include Little Bear Creek, Hurricane Creek, Boyd Branch and Blessing Branch. The project provides for maintenance in the creeks described above including removal of fallen trees that impede the flow of creek water in the natural creek channels, clearing brush and debris at major bridge crossings, and preventative maintenance. This project does not address items that are deemed cosmetic enhancements. Natural creek erosion undermines the root systems of trees adjacent to creek banks which results in trees falling into or across creek channels. These fallen trees together with accumulated brush and debris can impede the flow of storm water in the natural creek channels resulting in a rise in the normal water surface elevation. Fallen trees that are conveyed down stream in the natural creek channels may cause damage to the substructure of bridges spanning the creek channels. 10 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: (Minimum balance $100,000) $0 $0 $0 $0 Transfer from: Drainage CIP Fund Balance $111,000 Drainage Operating Fund $165,000 $0 $0 Additional Funding Needed: Annual expense $0 Transfer from: Drainage Operating Fund $15,000 $0 $291,000 Storm Sewers $291,000 $175,293 $115,707 60% $291,000 $175,293 $115,707 60% MISCELLANEOUS CREEK MAINTENANCE DR1201 11 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 01,2024 MAJOR JONES CARR PARK CREEK EROSION PROTECTION DRAINAGE IMPROVEMENTS DR2501 The drainage issues included in this project are part of the City's CIP plan. The businesses at both 605 and 607 West Euless Boulevard are located on the north side of a creek that runs through Carr Park. Erosion of the creek has threatened to undermine these properties. This is a natural earthen channel and there is no current protection from future erosion. The proposed solution is to extend the existing concrete lining on the north side of the channel from 603 West Euless Boulevard approximately 250 linear feet to just beyond 607 West Euless Boulevard. Began Construction: May 2026 Anticipate Construction Complete: July 2026 The creek within Carr Park has continued to erode banks over time and may undermine the adjacent properties to the north. 12 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Construction $105,000 $0 $0 $0 $0 $105,000 Transfer from: Drainage CIP Fund Balance $105,000 $0 $0 $0 $105,000 Construction $105,000 $162 $104,838 0% $105,000 $162 $104,838 0% CARR PARK CREEK EROSION PROTECTION DR2501 13 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 01,2024 MAJOR JONES SOUTH MILLS DRIVE OUTFALL RESTORATION DRAINAGE IMPROVEMENTS DR2503 The existing homes at both 914 South Mills Drive and 711 West Mills Drive have outfalls located at the western edge of their backyards. Both outfalls show significant erosion underneath their chutes. This erosion has led to concrete fractures that will eventually fail. The proposed solution is to remove the large concrete rock located below each outfall and provide two (2) - 20 linear foot gabion walls below each chute and restore the bank and establish erosion control. Finally, detailing the outfalls to remove the failed portions and provide stability for the structure to remain. Anticipate Begin Construction: October 2026 Anticipate Construction Complete: January 2027 The evaluation of the channel by City Staff indicates that this problem has existed for multiple years. Due to the location, a clear inspection of the outfalls has been difficult. 14 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Construction $75,000 $0 $0 $0 $0 $75,000 Transfer from: Drainage CIP Fund Balance $55,000 $0 $0 Additional Funding Needed: Transfer from: Drainage Operating Fund $20,000 $0 $75,000 Construction $75,000 $54 $74,946 0% $75,000 $54 $74,946 0% SOUTH MILLS DRIVE OUTFALL RESTORATION DR2503 15 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 09,2024 MAJOR JONES FY2025-26 DRAINAGE CURB & GUTTER IMPROVEMENTS DRAINAGE IMPROVEMENTS DR2601 The project consists of the removal and replacement of damaged curb and gutter throughout the City. Began Construction: October 2025 Anticipate Construction Complete: September 2026 The existing curb and gutter along many City streets has aged, failed, or been damaged. The curb and gutter serves as part of the City's storm water collection system. The new curb and gutter will improve drainage performance while also enhancing the appearance of City streets. 16 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Construction $350,000 $0 $0 $0 $0 $350,000 Transfer from: Drainage Operating Fund $350,000 $0 $0 $0 $350,000 Construction $350,000 $260,753 $89,247 75% $350,000 $260,753 $89,247 75% FY2025-26 DRAINAGE CURB & GUTTER IMPROVEMENTS DR2601 17 18 CAPITAL IMPROVEMENTS PROGRAM FUNDED PROJECTS SUMMARY Project Number Project Description Budget as of 5/31/25 Appropriation/ Amendment Budget as of 5/31/26 Expended as of 5/31/26 Remaining Funds Revised Project Cost Estimates Unfunded/ (Excess Funding) STREET PROJECTS PS1203 Misc. Street Repairs (min bal $150,000)993,150$ 150,000$ 1,143,150$ 895,669$ 247,481$ 1,143,150$ -$ PS1601 East Harwood Road Extension 100,000$ -$ 100,000$ -$ 100,000$ 100,000$ -$ PS1902 FY2018-19 Street Reconstruction – Pipeline/Highland/Harwood 21,956,719$ -$ 21,956,719$ 19,340,560$ 2,616,159$ 21,956,719$ -$ PS1903 Misc. Screening Wall Repair (annual transfer $50,000)150,000$ 25,000$ 175,000$ 32,000$ 143,000$ 225,000$ 50,000$ PS2302 Heritage Avenue – Cheek-Sparger Road to Guadalupe Trail 500,000$ -$ 500,000$ -$ 500,000$ 500,000$ -$ PS2601 FY2025-26 Street Improvements 1,200,000$ 1,200,000$ 222,557$ 977,443$ 1,200,000$ -$ PS2602 Traffic Signal – SH 10 & Dickey Drive 811,000$ 811,000$ -$ 811,000$ 811,000$ -$ PS2603 Traffic Signal Intersection Improvements – FM 157 & Signet Drive 1,019,000$ 1,019,000$ -$ 1,019,000$ 1,019,000$ -$ FB9907 Fund Balance – Street CIP -$ -$ -$ -$ -$ -$ (2,552,305)$ Total Street Projects 23,699,869$ 3,205,000$ 26,904,869$ 20,490,786$ 6,414,083$ 26,954,869$ (2,502,305)$ 19 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 27,2014 MAJOR JONES MISCELLANEOUS STREET REPAIRS STREET IMPROVEMENTS PS1203 April 24, 2012: Authorized the City Manager to enter into a contract with Estrada Concrete Co. LLC for concrete road repairs at various locations on North Main Street, Fuller-Wiser Road, and Bear Creek Parkway in the amount of $93,390. March 11, 2014: Authorized the City Manager to negotiate and execute a contract for a citywide pavement management analysis and asset management inventory with Infrastructure Management Services (IMS). The estimated expenditure is $82,155. February 26, 2019: Authorized the City Manager to execute an Interlocal Agreement between the City of Euless, the City of Bedford, the City of Colleyville, and Tarrant County, Texas for the design and construction of a traffic signal at the intersection of Heritage Avenue and Cheek-Sparger Road. Design costs were paid from this project. The Master Thoroughfare Plan identifies the various street types within the City of Euless. These street types include residential streets through regional arterial streets. This project includes the removal and replacement of deteriorated sections of pavement along identified roadways. Continuing repair of the existing street pavement will maintain safe driving conditions and will extend the overall life of the City streets. 20 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: (Minimum balance $150,000) $0 $0 $0 $0 Transfer from: Street CIP Fund Balance $661,125 Car Rental & General Fund $300,000 $0 2018 Certificates of Obligation $150,000 $0 Reimbursement-Other Entities $32,025 Annual expense $57,923 $57,923 $1,143,150 Other Professional Services $83,156 $82,331 $825 99% Engineering $47,150 $45,500 $1,650 97% Construction $1,012,844 $767,838 $245,006 76% $1,143,150 $895,669 $247,481 78% MISCELLANEOUS STREET REPAIRS PS1203 21 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS June 20,2014 MAJOR JONES EAST HARWOOD ROAD EXTENSION STREET CONSTRUCTION PS1601 The Texas Department of Transportation and DFW Airport are combining efforts to extend East Harwood Road through the airport to Rental Car Drive to provide additional access to airport properties. Euless has committed to share in the cost of the extension in an amount not to exceed $100,000. Design Complete: May 2022 Began Construction: March 2024 Anticipate Construction Complete: FY2025-26 Participation in the project will provide Euless residents with an additional route to and through the airport properties. 22 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Construction $100,000 $0 $0 $0 $0 $100,000 Transfer from: Car Rental Fund $100,000 $0 $0 $0 $100,000 Construction $100,000 $0 $100,000 0% $100,000 $0 $100,000 0% EAST HARWOOD ROAD EXTENSION PS1601 23 24 HW Y 36 0 HW Y 3 6 0 W AIRFIELD DR BE A R C R E E K P K W Y E MIDWAY D R IN T E R N A T I O N A L P K W Y E ASH LN E HARWOOD RD MI N T E R S C H AP E L R D DO V E T R L WH I T E T A I L R D AM O N C A R T E R B L V D RU S T I C L N PILOT HILL DR R E D M A P L E R D MOUNTAIN LAUREL DR GA R D E N A V E H W Y 3 6 0 H W Y 3 6 0 H W Y 3 6 0 H W Y 3 6 0 HW Y 3 6 0 BE A R C R E E K P K W Y IN T E R N A T I O N AL P K WY EAST HARWOOD ROAD EXTENSION Legend Road Extension 01,4002,800700 Feet 25 Department:Date Prepared:May 25, 2018 Submitted By:Date Completed: Project Title: Project Type:STREET Sub-Type: Project CODE:PS1902 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: Phase I - South Pipeline/Highland/Harwood Phase II - West Pipeline JUSTIFICATION: The project scope includes the removal and replacement of asphalt roadway with concrete pavement at the following locations: West Pipeline Road between Arwine Court and Raider Drive; South Pipeline Road between Royal Parkway and Highland Drive; Highland Drive; and Harwood Road between Industrial Boulevard and Main Street. Each reconstructed street will maintain the same width and lane configuration with the exception of Highland Drive, which will become a standard 31 foot wide street from back of curb to back of curb; and South Pipeline Road, which will become a standard 31 foot wide street. The Highland Drive project will include new sidewalk, water, sewer, and storm drain utilities; and the South Pipeline Road project will include new sidewalk and a rehabilitated 16" waterline. The existing asphalt pavement of these streets is deteriorating. The new concrete streets will increase safety, reduce maintenance costs, provide an improved riding surface, and will enhance the appearance of the streets. Design Complete: November 2020 Began Construction: March 2021 Construction Complete: February 2023 Began Design: September 2019 Design Complete: August 2022 Began Construction: July 2024 Anticipate Construction Complete: July 2026 Began Design: September 2019 City of Euless Capital Project Request PUBLIC WORKS MAJOR JONES FY2018-19 ST RECON–PIPELINE/HIGHLAND/HARWOOD IMPROVEMENTS December 11, 2018: Approved Resolution No. 18-1539 authorizing the City Secretary to publish a notice declaring intention to issue certificates of obligation. March 8, 2022: Authorized an increase of owner-controlled contingency for the FY2019 Street Reconstruction Phase I project from five percent to six percent of the contractual amount. January 12, 2021: Awarded Bid No. 001-21 to McMahon Contracting, LP. for the FY2019 Street Reconstruction Phase I project in the amount of $10,078,330.84, authorized an owner-controlled contingency not to exceed 5%, and authorized the City Manager to enter into a contract with McMahon Contracting, LP. January 12, 2021: Approved Resolution No. 21-1597 authorizing the City Secretary to publish a notice declaring intention to issue certificates of obligation. January 22, 2019: Approved the first and final reading of Ordinance No. 2212, authorizing issuance of “City of Euless, Texas, Tax and Waterworks and Sewer System (Limited Pledge) Revenue Certificates of Obligation, Series 2019.” December 17, 2019: Authorized the City Manager to negotiate and execute an Engineering Design Contract with Halff Associates, Inc. for the design of the FY2019 Street Reconstruction project. The estimated expenditure is $1,553,600. March 9, 2021: Approved first and final reading of Ordinance No. 2270 authorizing the issuance of “City of Euless, Texas, Tax and Waterworks and Sewer System (Limited Pledge) Revenue Certificates of Obligation, Series 2021.” February 14, 2023: Authorized an increase of owner-controlled contingency for the FY2019 Street Reconstruction Phase I project in the amount of $27,133.62 above the previously approved six percent. June 25, 2024: Awarded Bid No. 009-24 for the FY2019 Street Reconstruction Phase II, along West Pipeline Road in the amount of $6,699,000, authorized an owner controlled contingency not to exceed 7 percent of the contractual amount ($468,930), and authorized the City Manager to enter into a construction contract with Reliable Paving, Inc. October 8, 2024: Authorized the City Manager to amend the engineering services contract dated January 6, 2020 with Halff Associates, Inc. to include construction inspection services on an as needed basis for the duration of Phase II of the FY2019 Street Reconstruction Project. The estimated expenditure is $218,600. November 26, 2024: Authorized the City Manager to execute a construction contract with Fonroche Lighting America for the purchase and installation of solar street lighting along South Pipeline Road. The estimated expenditure is $59,037. April 8, 2025: Authorized the City Manager to enter into an Interlocal Agreement with the City of Bedford, related to roadway improvements on West Pipeline Road. 26 PROJECT TITLE:PROJECT CODE:PS1902 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Engineering $1,825,000 Direct Operating Cost Paving $15,547,308 Personnel:Full Time Drainage $1,076,691 Part Time Water/Wastewater Rehab $1,788,687 $0 Contingency $1,719,033 2019 COs Avg. Annual Debt Service $860,000 2021 COs Avg. Annual Debt Service $333,000 $1,193,000 Total Estimated Capital Cost $21,956,719 Maintenance Costs General Fund $1,936,540 Escrow Fund - ES0296 & ES0292 $28,700 2019 Certificates of Obligation $12,423,813 2021 Certificates of Obligation $5,500,000 $0 Interest Earnings $1,067,666 $0 Federal Appropriations Grant $1,000,000 Total Estimated Annual Cost $1,193,000 Total Funding $21,956,719 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $1,825,000 $1,801,955 $23,045 99% $18,412,686 $17,538,605 $874,081 95% $1,719,033 $0 $1,719,033 0% $21,956,719 $19,340,560 $2,616,159 88% Subtotal: FUNDING SOURCE: Transfer from: CURRENT STATUS Engineering TOTAL PROJECT Subtotal: Contingency Construction FY2018-19 ST RECON–PIPELINE/HIGHLAND/HARWOOD Total Salary Purchase of Services Materials & Supplies Utilities 27 28 N M A I N S T W EULE S S B L V D W PIPELINE RD N I N D U S T R I A L B L V D W ASH LN S M A I N S T WE S T P A R K W A Y W MID-CITIES BLVD SH 1 21 MIDWAY DR AR A N S A S D R MI L A M D R W AIRPORT FWY W HARWOOD RD NI T A L N SHELMAR DR WI L S H I R E D R SI M M ON S DR MARLENE DR OAK LN GLENN DR OA K W O O D D R S I N D U S T R I A L B L V D DO N L E Y D R RA I D E R D R MA R T H A S T HI M E S D R RO Y A L P K W Y CA N N O N D R LAM A R D R TROJAN TRL CO L L I N D R ALLEN DR EVA LN CL I F F W O O D R D WO O D R I D G E C I R ST A N L E Y D R PA M E LA D R LA K E WOO D B L V D RE N E E D R SHADOW LN PA R K E R D R HI G H L A N D D R V I N E S T IR I O N DR SIGNET ST VI N E S T FY 2018-19 STREET RECONSTRUCTION Legend Street Reconstruction ¯ 03,0006,0001,500 Feet 29 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 26,2018 MAJOR JONES MISCELLANEOUS SCREENING WALL REPAIR STREET IMPROVEMENTS PS1903 The project consists of maintenance and repair of publicly-owned screening walls throughout the City. Screening walls that were constructed at locations including, but not limited to, Harwood Road, West Pipeline Road, Gateway Boulevard, Main Street etc. are in need of periodic maintenance and repair. 30 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: (Annual funding $50,000) $0 $0 $0 $0 Transfer from: General Fund $125,000 Street CIP Fund Balance $50,000 $0 $0 Additional Funding Needed: Annual expense $0 Transfer from: General Fund $50,000 $0 $225,000 Construction $225,000 $32,000 $193,000 14% $225,000 $32,000 $193,000 14% MISCELLANEOUS SCREENING WALL REPAIR PS1903 31 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 1, 2021 MAJOR JONES HERITAGE AVE – CHEEK-SPARGER RD TO GUADALUPE TR STREET IMPROVEMENTS PS2302 March 10, 2026: Authorized the City Manager to negotiate and execute an lnterlocal Agreement with the City of Colleyville relating to roadway improvements on Heritage Avenue. The City of Euless will contribute $50,000 toward the improvements and will also cover costs associated with specific bid items. Heritage Avenue is currently a 2-lane asphalt road. The project scope includes concrete roadway reconstruction of Heritage Avenue, turn lane extensions on Heritage Avenue at Cheek-Sparger, additional street lighting, culvert replacement, introduction of concrete curb and gutter, drainage system improvements, sidewalks, and bike paths. The City of Colleyville and City of Euless have each committed $500,000 to the project. The remainder of the project will be funded by Tarrant County ($500,000) and the FY2024 Federal Appropriations project ($2,250,000), if approved. Began Design: FY2024-25 Anticipate Design Complete: FY2026-27 Anticipate Begin Construction: FY2026-27 Anticipate Construction Complete: FY2027-28 The existing asphalt pavement is deteriorating and the new concrete street will increase safety, regional mobility, and connectivity. 32 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: City of Euless Participation $500,000 $0 $0 $0 $0 $500,000 Transfer from: General Fund $487,712 Escrow Fund-ES1403&ES1501 $141,071 Transfer to: Street CIP Fund Balance ($128,783) $0 $500,000 Construction $500,000 $0 $500,000 0% $500,000 $0 $500,000 0% HERITAGE AVE – CHEEK-SPARGER RD TO GUADALUPE TR PS2302 33 34 Street Improvement - Heritage Avenue: Cheek-Sparger Road to Guadalupe Trail Street Improvement -Heritage Ave. Legend None N A 0 260 520 1,040 1,560 2,080 •Street Reconstruction-==-c:::::Jlll---====:::::::i--• Feet 35 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 31,2020 MAJOR JONES FY2025-26 STREET IMPROVEMENTS STREET IMPROVEMENTS PS2601 February 24, 2026: Approved renewal of Bid No. 006-23 for asphalt street repairs, overlays, materials, and street maintenance services to Austin Asphalt, Reynolds Asphalt, and Viking Construction. April 28, 2026: Authorized the purchase of asphalt milling services from TexOp Construction and Dustrol, Inc. through an interlocal agreement with Tarrant County. May 12, 2026: Authorized the City Manager to execute an interlocal agreement between the City of Euless and Tarrant County for asphalt overlay improvements to Aransas Drive, Newport Court, Newport Way, Norman Drive, Henslee Drive, and Sunset Drive. The estimated expenditure is $564,075. The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by pavement condition index of the roadways. Began Construction: October 2025 Anticipate Construction Complete: September 2026 The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, extend the life of the roadway, and enhance the appearance of the streets. 36 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Construction $1,200,000 $0 $0 $0 $0 $1,200,000 $0 Transfer from: General Fund $1,200,000 $0 $0 $1,200,000 Construction $1,200,000 $222,557 $977,443 19% $1,200,000 $222,557 $977,443 19% FY2025-26 STREET IMPROVEMENTS PS2601 37 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 14,2025 MAJOR JONES TRAFFIC SIGNAL – SH 10 & DICKEY DRIVE STREET SIGNALIZATION PS2602 October 28, 2025: Approved Resolution No. 25-1683, authorizing the City Manager to execute an Advance Funding Agreement with the Texas Department of Transportation for a Highway Safety Improvement Program grant. March 10, 2026: Authorized the City Manager to negotiate and execute an engineering design contract with Kimley-Horn and Associates, Inc. The estimated expenditure is $148,500. The project consists of the engineering design and installation of a traffic signal with safety lighting at the intersection of State Highway 10 and Dickey Drive. The project scope also includes updating pavement markings and signage. Anticipate Begin Design: FY2025-26 Anticipate Design Complete: FY2026-27 Anticipate Begin Construction: FY2027-28 Anticipate Construction Complete: FY2027-28 TxDOT utilizes HSIP funding to achieve significant reductions in traffic fatalities and serious injuries on all public roads. This project was submitted by the City of Euless to the Texas Department of Transportation (TxDOT) and approved as part of the Highway Safety Improvement Program (HSIP). The City will be responsible for engineering design costs and TxDOT will pay for installation. 38 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Environmental $25,000 Engineering $125,705 $0 Contingency $31,641 $0 Traffic Signal $628,654 $0 $0 $811,000 $0 Transfer from: General Fund $182,346 HSIP/TxDOT $628,654 $0 $0 $811,000 Other Professional Services $25,000 $0 $25,000 0% Engineering $125,705 $0 $125,705 0% Contingency $31,641 $0 $31,641 0% Traffic Signal $628,654 $0 $628,654 0% $811,000 $0 $811,000 0% TRAFFIC SIGNAL – SH 10 & DICKEY DRIVE PS2602 39 40 AIRP O RT WESTWOOD RI V E R B I R C H REVOLUTION REPUBLIC SH O R T D I C K E Y NE W P O R T ALEXANDER HU N T I N G T O N WE S T P O R T AIRPORT FULLER TOWN C R EEK SLA U G H T E R CA R T E R PORT ROYALE WAY AS H B U R Y MA L O N E Y ARI E S DUCKETT RIVER BIRCH MAR T IN D U N A W A Y SE R E N A D E EVITA ST E W A R T MO O N L I G H T LI B R A SLA U GHTER ALEXANDER MI L L I C A N JO H N V E R NON CO L O N I A L MARTIN FULLER-WIS E R JERNIGAN REVOLUTION A I RP O RT FULLER -WI S E R R D HUITT LN (E) C U L L U M D R EULESS BLVD (E) AIRPORT F W Y N L ( E ) AIRPORT F W Y S L ( E ) FHHW kStreet Improvement - Intersection of SH 10 & Dickey Dr Legend Street Improvement Traffic Signal - SH 10 & Dickey Drive 41 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 14,2025 MAJOR JONES TRAFFIC SIGNAL INTERSECTION IMP. – FM 157&SIGNET DR STREET IMPROVEMENTS PS2603 October 28, 2025: Approved Resolution No. 25-1683, authorizing the City Manager to execute an Advance Funding Agreement with the Texas Department of Transportation for a Highway Safety Improvement Program grant. March 10, 2026: Authorized the City Manager to negotiate and execute an engineering design contract with Kimley-Horn and Associates, Inc. The estimated expenditure is $165,500. The project consists of the engineering design and construction for traffic signal intersection improvements at FM 157 and Signet Drive. The project scope includes updating the curb ramps to be compliant with the Americans with Disabilities Act, adding a pedestrian signal, updating pavement markings and high visibility crosswalks, and installing additional sidewalks. Anticipate Begin Design: FY2025-26 Anticipate Design Complete: FY2026-27 Anticipate Begin Construction: FY2027-28 Anticipate Construction Complete: FY2027-28 TxDOT utilizes HSIP funding to achieve significant reductions in traffic fatalities and serious injuries on all public roads. This project was submitted by the City of Euless to the Texas Department of Transportation (TxDOT) and approved as part of the Highway Safety Improvement Program (HSIP). The City will be responsible for engineering design costs and TxDOT will pay for construction improvements. 42 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Environmental $25,000 Engineering $158,937 $0 Contingency $39,712 $0 Improvements $795,351 $0 $0 $1,019,000 $0 Transfer from: General Fund $223,649 HSIP/TxDOT $795,351 $0 $0 $1,019,000 Other Professional Services $25,000 $0 $25,000 0% Engineering $158,937 $0 $158,937 0% Contingency $39,712 $0 $39,712 0% Improvements $795,351 $0 $795,351 0% $1,019,000 $0 $1,019,000 0% TRAFFIC SIGNAL INTERSECTION IMP. – FM 157&SIGNET DR PS2603 43 44 SE TTL E R S PONDS EDGE ADAM LO G G E R S TENN E S S E E KYNETTE EDGAR F A R M E R S TOPLEA PA R K SO U T H M I L L S PAULIN E ALLEY P E A C H O R C H A R D KYNETTE TOPLEA FARMERS BOYD SAGEBRUSH CA S S A N D R A WHITENER CALAIS COTTON GIN RE N E E NI T A OAKRIDGE BELL RANCH ALLANTE CA LVA R Y BRASH E R SU M A LO I S OL DI R ON ESTELLE TOWN VIEW BR A S H E R RE N E E JU L I A CA L V A R Y AL L E Y DE L P A S O I N D U S T R I A L B L V D ( S ) SIGNET DR NI T A L N DE L P A S O S T FOUNDERS PKWY EULESS B L V D ( W ) F OU N D E R S P KW Y VILLA DR FHHW kStreet Improvement - Intersection of FM 157 & Signet Dr Legend Street Improvement Traffic Signal Intersection Improvements - FM 157 & Signet Dr 45 46 CAPITAL IMPROVEMENTS PROGRAM FUNDED PROJECTS SUMMARY Project Number Project Description Budget as of 5/31/25 Appropriation/ Amendment Budget as of 5/31/26 Expended as of 5/31/26 Remaining Funds Revised Project Cost Estimates Unfunded/ (Excess Funding) WASTEWATER PROJECTS WW0002 Misc. Wastewater Rehab (min bal $100,000)981,086$ 100,000$ 1,081,086$ 845,180$ 235,906$ 1,081,086$ -$ WW0605 TRA Wastewater Payments – Impact 1,630,000$ 50,000$ 1,680,000$ 1,630,000$ 50,000$ 1,730,000$ 50,000$ WW2301 Line Replacement – Cedar Hill Estates South Phase I 622,867$ -$ 622,867$ 436,721$ 186,146$ 622,867$ -$ WW2302 Line Replacement – Cedar Hill Estates South Phase II 534,713$ -$ 534,713$ 397,035$ 137,678$ 534,713$ -$ WW2304 Line Replacement – Trailwood Addition 3,190,549$ 170,000$ 3,360,549$ 2,987,263$ 373,286$ 3,360,549$ -$ WW2501 FY2024-25 51st CDBG LR: Milam Drive 300,750$ -$ 300,750$ 37,308$ 263,442$ 300,750$ -$ WW2502 Line Replacement – Oakwood Terrace North Phases I, II, & III – Engineering 309,000$ (200,000)$ 109,000$ 73,859$ 35,141$ 109,000$ -$ WW2601 FY2025-26 52nd CDBG LR: Martin/Slaughter -$ 310,000$ 310,000$ -$ 310,000$ 310,000$ -$ WW2602 Line Replacement – Oakwood Terrace North Phases I & II Construction -$ 614,000$ 614,000$ -$ 614,000$ 614,000$ -$ WW2603 Line Replacement – Vine Street Engineering -$ 75,000$ 75,000$ 10,503$ 64,497$ 75,000$ -$ FB9911 Fund Balance – Wastewater Impact (Restricted)-$ -$ -$ -$ -$ -$ (800,734)$ Total Wastewater Projects 7,568,965$ 1,119,000$ 8,687,965$ 6,417,869$ 2,270,096$ 8,737,965$ (750,734)$ 47 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 26,1999 MAJOR JONES MISCELLANEOUS WASTEWATER REHABILITATION WASTEWATER MAIN REPLACEMENT WW0002 March 8, 2005: Awarded contract to Hall-Albert Construction Company for the replacement of various wastewater lines in the amount of $977,857.50. (This award was only partially for the WW0002 project.) March 28, 2006: Authorized the City Manager to proceed with emergency repair by GRA-TEX Utilities to the aerial wastewater main crossing Hurricane Creek at a cost of $55,000. November 10, 2015: Awarded Bid No. 008-15, a construction contract to William J. Schultz, Inc. dba Circle C Construction, for the replacement of sanitary sewer mains in portions of the Westwood Village Addition and the Green Hills Park Addition and authorized the City Manager to enter into a contract including add alternate #1 if required. The estimated expenditure is $577,357 and will be paid from WW1501, WW1502, and WW0002. March 10, 2020: Authorized the City Manager to negotiate and execute an Engineering Services Contract with Wier & Associates, Inc. for the design of the El Camino Real sanitary sewer rehabilitation project. The estimated expenditure is $55,000. May 14, 2024: Ratified City Manager action to proceed with emergency repairs related to the City's sanitary sewer distribution system on Main Street from Alexander Lane to Huitt Lane. Excel 4 Construction performed the work and the estimated expenditure was $101,585.46. This project is for funding of small wastewater main projects identified throughout the fiscal year. As larger projects are identified, they will be presented for funding as separate projects. Most of these lines are clay tile and are seriously deteriorated. 48 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: (Minimum balance $100,000) $0 $0 $0 $0 Transfer from: W/WW Operating Fund $240,000 WW9903 $37,013 $0 W/WW CIP Fund Balance $804,073 $0 Annual expense $0 $0 $1,081,086 Engineering $72,939 $66,217 $6,722 91% Contingency $30,580 $30,580 $0 100% Wastewater Mains $977,567 $748,383 $229,184 77% $1,081,086 $845,180 $235,906 78% MISCELLANEOUS WASTEWATER REHABILITATION WW0002 49 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 03,2006 MAJOR JONES TRINITY RIVER AUTHORITY WASTEWATER PAYMENT WASTEWATER IMPACT FEE WW0605 Based on a review by Birkhoff, Hendricks, and Conway of the water and wastewater impact fees, it was determined that a substantial portion of the wastewater impact fee is attributed to Trinity River Authority ("TRA") capital projects. Therefore, these fees should be used to pay a portion of the annual TRA expense, as these funds are directly attributed to the expansion of TRA. The expansion at TRA provides additional capacity and it was determined through the wastewater impact fee study that these funds could be used to pay a portion of TRA wastewater payments. 50 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: TRA Wastewater Payments $1,730,000 $0 $0 ($50,000) ($50,000) $1,730,000 Transfer from: WW Impact Fee Fund Balance $1,680,000 $0 $0 Additional Funding Needed: Transfer from: WW Impact Fee Fund Balance $50,000 ($50,000) $1,730,000 Wastewater - TRA Service $1,730,000 $1,630,000 $100,000 94% $1,730,000 $1,630,000 $100,000 94% TRINITY RIVER AUTHORITY WASTEWATER PAYMENT WW0605 51 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 16,2022 MAJOR JONES LINE REP – CEDAR HILL ESTATES SOUTH PHASE I WASTEWATER MAIN REPLACEMENT WW2301 November 22, 2022: Authorized the City Manager to negotiate and execute an engineering services contract with Plummer Associates, Inc. for the design of the FY2023 Sanitary Sewer Rehabilitation Project. May 14, 2024: Awarded Bid No. 018-23 for the FY2023 Sanitary Sewer Rehabilitation Project to Douglas Dailey Construction, LLC for the replacement of sanitary sewer mains located in Cedar Hill Estates South and authorized the City Manager to enter into a contract with Douglas Dailey Construction, LLC. The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project consists of the replacement of the following wastewater mains: 1. Along Sunset Drive between Vine Street and South Main Street and 2. Along Henslee Drive between Whitener Road and Sunset Drive. Began Design: December 2022 Design Complete: March 2024 Began Construction: July 2024 Anticipate Construction Complete: June 2026 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 52 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering $67,000 Construction $519,502 $0 Contingency $36,365 $0 $0 $0 $622,867 Transfer from: W/WW Operating Fund $67,000 American Rescue Plan Act $335,000 $0 W/WW CIP Fund Balance $220,867 $0 $0 $622,867 Engineering $67,000 $61,224 $5,776 91% Construction $519,502 $375,497 $144,005 72% Contingency $36,365 $0 $36,365 0% $622,867 $436,721 $186,146 70% LINE REP – CEDAR HILL ESTATES SOUTH PHASE I WW2301 53 54 55 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 16,2022 MAJOR JONES LINE REPLACEMENT – CEDAR HILL ESTATES SOUTH PH II WASTEWATER MAIN REPLACEMENT WW2302 November 22, 2022: Authorized the City Manager to negotiate and execute an engineering services contract with Plummer Associates, Inc. for the design of the FY2023 Sanitary Sewer Rehabilitation Project. May 14, 2024: Awarded Bid No. 018-23 for the FY2023 Sanitary Sewer Rehabilitation Project to Douglas Dailey Construction, LLC for the replacement of sanitary sewer mains located in Cedar Hill Estates South and authorized the City Manager to enter into a contract with Douglas Dailey Construction, LLC. The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project consists of the replacement of the following wastewater mains: 1. Along South Main Street from Whitener Road to South Pipeline Road and 2. Along South Pipeline Road from west of Cannon Drive to South Main Street. Began Design: December 2022 Design Complete: March 2024 Began Construction: July 2024 Anticipate Construction Complete: June 2026 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 56 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering $68,000 Construction $436,180 $0 Contingency $30,533 $0 $0 $0 $534,713 Transfer from: W/WW Operating Fund $68,000 American Rescue Plan Act $340,000 $0 W/WW CIP Fund Balance $126,713 $0 $0 $534,713 Engineering $68,000 $61,224 $6,776 90% Construction $436,180 $335,811 $100,369 77% Contingency $30,533 $0 $30,533 0% $534,713 $397,035 $137,678 74% LINE REPLACEMENT – CEDAR HILL ESTATES SOUTH PH II WW2302 57 58 59 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 29,2022 MAJOR JONES LINE REPLACEMENT – TRAILWOOD ADDITION WASTEWATER MAIN REPLACEMENT WW2304 November 22, 2022: Authorized the City Manager to negotiate and execute an engineering services contract with Plummer Associates, Inc. for the design of the FY2023 Sanitary Sewer Rehabilitation Project. May 14, 2024: Awarded Bid No. 018-23 for the FY2023 Sanitary Sewer Rehabilitation Project to Douglas Dailey Construction, LLC for the replacement of sanitary sewer mains located in the Trailwood Addition and authorized the City Manager to enter into a contract with Douglas Dailey Construction, LLC. The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project consists of the replacement of wastewater mains in the Trailwood Addition including those along Trailwood Drive, Cripple Creek Drive, Shenandoah Drive, Timberlane Terrace, Summit Ridge Drive, and Shadow Lane. See project map for additional details on specific line locations. Began Design: December 2022 Design Complete: March 2024 Began Construction: July 2024 Anticipate Construction Complete: June 2026 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 60 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering $558,000 Construction $2,284,634 $0 Street Improvements $517,915 $0 $0 $0 $3,360,549 Transfer from: W/WW Operating Fund $607,000 American Rescue Plan Act $2,539,634 $0 W/WW CIP Fund Balance $43,915 $0 Street CIP Fund Balance $170,000 $0 $3,360,549 Engineering $558,000 $520,408 $37,592 93% Construction $2,284,634 $1,952,233 $332,401 85% Street Improvements $517,915 $514,622 $3,293 99% $3,360,549 $2,987,263 $373,286 89% LINE REPLACEMENT – TRAILWOOD ADDITION WW2304 61 62 Line Replacement - Trailwood Addition :,L'%R,AR 3AR. +A9(1 LA .(:22 ' &R,33 L (&R(( . % (1T T R ( ( %2&2:22' TR A , L : 2 2 ' %( 1 T TR ( ( :,1&+(6T(R 6+( 1 A 1 ' 2 A+ :22''AL( T,0%(RLA1( 2A. % ( A R & R ( ( . R811,1* %(A R 6+A'2: 086. ( * 0A ; : ( L L &<3R(66 A63(1:A< ( A *L( 6 1(6 T *R,)),T+ :A'( A1T+21<6816+,1( A%%(< %2% (' ( 1 0 A , 1 6 T 1 6800,T R , ' * ( 'R %A = ( R ' 0,'-&,T , (6 %L9' ( 0,'-&,T,(6 % L 9 ' : None 0 380 760 1,140 1,520190 Feet Wastewater Line Replacement -Trailwood Subdivision Legend Wastewater 63 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 27,2024 MAJOR JONES 51ST CDBG LINE REPLACEMENT – MILAM DRIVE WASTEWATER MAIN REPLACEMENT WW2501 February 25, 2025: Conducted a Public Hearing for the proposed 51st year CDBG project and approved the recommendation. The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project consists of the replacement of the following wastewater mains: 1. 770’ from 902 Milam Drive, South along Milam Drive to 750 Milam Drive, and 2. 220’ from 804 Milam Drive, West along 805 Milam Drive to the end of 805 Milam Drive. Began Design: October 2025 Design Complete: April 2026 Anticipate Begin Construction: July 2026 Anticipate Construction Complete: November 2026 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 64 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering $47,000 Construction $235,500 $0 Contingency $18,250 $0 $0 $0 $300,750 51st CDBG Award $300,750 $0 $0 $0 $300,750 Engineering $47,000 $37,308 $9,692 79% Construction $235,500 $0 $235,500 0% Contingency $18,250 $0 $18,250 0% $300,750 $37,308 $263,442 12% 51ST CDBG LINE REPLACEMENT – MILAM DRIVE WW2501 65 66 LAM A R DO N L EY DA L L A S MI L A M MIL A M ECT OR CO L L I N BLANCO BE L L ST O N EWALL BL A N C O AR A N S AS FAYETTE PE C O S IR I O N HA R R I S C R A N E DE N T O N AR A N S A S D R MIDWAY DR EC T O R D R (N ) HARWOOD RD (W) FHHW ¯Wastewater Line Replacement -Milam Dr Legend Wastewater Line Replacement - Milam Drive 67 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 27,2024 MAJOR JONES LR – OAKWOOD TERRACE N PHASES I,II,&III ENGINEERING WASTEWATER MAIN REPLACEMENT WW2502 November 12, 2024: Authorized the City Manager to execute an engineering design contract with Wier & Associates, Inc. The estimated expenditure is $98,850. The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project consists of the engineering design for the replacement of wastewater mains in the following areas: Phase I – Between Mary Drive and Marlene Drive from Eastcliff Drive to Marlene Drive, Phase II – 1. Along Eastcliff Drive from Mary Drive to Tyler Avenue and 2. 607-805 Commerce Street, and Phase III – Between Tyler Avenue and Marlene Drive from Eastcliff Drive to Commerce Street. Began Design: December 2024 Design Complete: October 2025 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 68 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering $109,000 $0 $0 $0 $0 $109,000 Transfer from: W/WW Operating Fund $309,000 $0 $0 Transfer to: W/WW CIP Fund Balance ($200,000) $0 $109,000 Engineering $109,000 $73,859 $35,141 68% $109,000 $73,859 $35,141 68% LR – OAKWOOD TERRACE N PHASES I,II,&III ENGINEERING WW2502 69 70 Line Replacement - Oakwood Terrace North Phases I, II, & III Engineering 6T $ N L E < E$6 T& L I ) ) ' E L P R $ ' O LON* % O : 'O8%LE %$RREL 6$*E%R86+ &O00 ER&E 0$R< 'E % R $ E$6T& L I ) ) T<LER P$ 0 E L$ *REEN%RI$R : I L 6 + I R E ' R E8LE6 6 % L 9 ' : 0$RLENE 'R +E $ T + E R ' R 0 210 420 630 840105 Feet ¯Wastewater Line Replacement -Between Mary Dr and Marlene Dr -Eastcliff Drive -Commerce Street -Between Tyler Ave and Marlene Dr Legend Wastewater 71 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 20,2025 MAJOR JONES 52ND CDBG LINE REPLACEMENT – MARTIN/SLAUGHTER WASTEWATER MAIN REPLACEMENT WW2601 February 10, 2026: Conducted a Public Hearing for the proposed 52nd year CDBG project and approved the recommendation. The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project consists of the replacement of the following wastewater mains: 1. Martin Lane from Huntington Drive to American Boulevard and 2. Slaughter Lane from Huntington Drive to American Boulevard. (52nd year CDBG project) Anticipate Begin Design: August 2026 Anticipate Design Complete: November 2026 Anticipate Begin Construction: July 2027 Anticipate Construction Complete: September 2027 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 72 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering $40,000 Construction $270,000 $0 $0 $0 $0 $310,000 $0 Transfer from: 52nd CDBG Award $289,000 W/WW CIP Fund Balance $21,000 $0 $0 $310,000 Engineering $40,000 $0 $40,000 0% Construction $270,000 $0 $270,000 0% $310,000 $0 $310,000 0% 52ND CDBG LINE REPLACEMENT – MARTIN/SLAUGHTER WW2601 73 74 MARTIN ALEXANDER ARI E S SL A UGHTER H U N T I N G T O N D I C K E Y H U N T I N G T O N A TKER S ON DICKEY S L A U G H T E R MARTI N HUIT T L N (E) )HHW ¯Wastewater Line Replacement -Martin Ln from Huntington Dr to American Blvd -Slaughter Ln from Huntington Dr to American Blvd Legend Wastewater Line Replacement - Martin/Slaughter 75 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 04,2025 MAJOR JONES LR – OAKWOOD TERRACE N PHASES I & II CONSTRUCTION WASTEWATER MAIN REPLACEMENT WW2602 March 24, 2026: Awarded Bid No. 002-26 for the Oakwood Terrace North Phases I & II Sanitary Sewer Replacement Project to Capital Underground Utilities, LLC. The estimated expenditure is $424,083 and includes a seven percent owner-controlled contingency of $27,744. The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project consists of the replacement of the following wastewater mains: 1. Between Mary Drive and Marlene Drive from Eastcliff Drive to Marlene Drive, and 2. 607-805 Commerce Street. Anticipate Begin Construction: June 2026 Anticipate Construction Complete: October 2026 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 76 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Construction $614,000 $0 $0 $0 $0 $614,000 $0 Transfer from: W/WW Operating Fund $614,000 $0 $0 $614,000 Construction $614,000 $0 $614,000 0% $614,000 $0 $614,000 0% LR – OAKWOOD TERRACE N PHASES I & II CONSTRUCTION WW2602 77 78 D E L P R A D O LONG B O W EASTC L I F F EAS T C L I F F DOUBLE BARREL SAGEBRUSH COMM ERCE MARY PA ME L A DE B R A TYLER GREENBRIAR ST A N L E Y TOPLEA MARLENE DR WI L S H I R E D R EULESS B L V D ( W ) HE A T H E R D R FHHW ¯Wastewater Line Replacement -Between Mary Dr and Marlene Dr -Commerce St Legend Wastewater Line Replacement - Oakwood Terrace North Phases I & II 79 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 04,2025 MAJOR JONES LINE REPLACEMENT – VINE STREET ENGINEERING WASTEWATER MAIN REPLACEMENT WW2603 The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project consists of the engineering design for the replacement of wastewater mains from 513 to 603 Vine Street. Began Design: January 2026 Design Complete: April 2026 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. The project will resolve issues for the property behind 603 Vine Street at 606 Martha Street. 80 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering $75,000 $0 $0 $0 $0 $75,000 $0 Transfer from: W/WW Operating Fund $75,000 $0 $0 $75,000 Engineering $75,000 $10,503 $64,497 14% $75,000 $10,503 $64,497 14% LINE REPLACEMENT – VINE STREET ENGINEERING WW2603 81 82 C L E B U D N O R M A N HOLLYWOOD V I N E OA K W O O D BAYLESS REAVES M A R T H A CLEBUD )HHW ¯Wastewater Line Replacement -Between Vine St and Martha St Legend Wastewater Line Replacement – Vine Street 83 84 CAPITAL IMPROVEMENTS PROGRAM FUNDED PROJECTS SUMMARY Project Number Project Description Budget as of 5/31/25 Appropriation/ Amendment Budget as of 5/31/26 Expended as of 5/31/26 Remaining Funds Revised Project Cost Estimates Unfunded/ (Excess Funding) WATER PROJECTS WT0001 Misc. Water Rehab (min bal $150,000)1,128,511$ -$ 1,128,511$ 964,439$ 164,072$ 1,128,511$ -$ WT0104 Well Repairs (annual transfer $75,000)1,813,992$ 50,000$ 1,863,992$ 1,852,791$ 11,201$ 2,413,992$ 550,000$ WT0803 Meters/Transponders/Leak Detection (annual transfer $158,000)3,150,944$ 158,000$ 3,308,944$ 1,759,423$ 1,549,521$ 3,466,944$ 158,000$ WT1403 Reclaimed Water Line Extension Debt Payment - Impact 1,436,702$ 116,850$ 1,553,552$ 1,514,598$ 38,954$ 1,672,202$ 118,650$ WT1603 Misc. Valve Replacement (min bal $150,000)565,000$ -$ 565,000$ 414,051$ 150,949$ 565,000$ -$ WT1604 Reclaimed Water Line Extension Phase III 6,124,803$ -$ 6,124,803$ 4,624,803$ 1,500,000$ 6,124,803$ -$ WT1802 Well Replacement – Fuller/Far North 11,106,356$ -$ 11,106,356$ 11,086,994$ 19,362$ 11,106,356$ -$ WT2301 Line Replacement – Midway Park 1st Addition 649,203$ -$ 649,203$ 616,471$ 32,732$ 649,203$ -$ WT2302 Line Replacement – Oakwood Terrace 1,986,005$ 5,500$ 1,991,505$ 1,991,280$ 225$ 1,991,505$ -$ WT2303 Line Replacement – South Main Street 2,081,008$ (5,500)$ 2,075,508$ 1,930,384$ 145,124$ 2,075,508$ -$ WT2401 Line Replacement – Huntington Drive Phase II 520,000$ -$ 520,000$ -$ 520,000$ 520,000$ -$ WT2402 Line Replacement – Sotogrande Boulevard Phase I 365,000$ 270,000$ 635,000$ 39,200$ 595,800$ 635,000$ -$ WT2501 Line Replacement – Sotogrande Boulevard Phase II 365,000$ 348,000$ 713,000$ 57,472$ 655,528$ 713,000$ -$ WT2601 Line Replacement – Sagebrush Trail -$ 620,000$ 620,000$ 52,100$ 567,900$ 620,000$ -$ FB9910 Fund Balance – Water Impact (Restricted)-$ -$ -$ -$ -$ -$ (3,425,453)$ FB9901 Fund Balance – Water & Wastewater CIP -$ -$ -$ -$ -$ -$ (2,924,974)$ Total Water Projects 31,292,524$ 1,562,850$ 32,855,374$ 26,904,006$ 5,951,368$ 33,682,024$ (5,523,777)$ 85 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 10,2014 MAJOR JONES MISCELLANEOUS WATER REHABILITATION WATER MAIN REPLACEMENT WT0001 June 14, 2022: Ratified City Manager action to proceed with emergency repairs to a 24" water main adjacent to the northeast traffic signal pole at the intersection of East Harwood Road and Fuller Wiser Road. The estimated expenditure is $125,000. This project provides funding for small water main projects identified throughout the fiscal year. Large projects that are identified will be presented for funding under a new project name. Some of the City's older water mains have deteriorated and need replacement or repair. 86 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: (Minimum balance $150,000) $0 $0 $0 $0 Transfers from: W/WW CIP Fund Balance $565,000 W/WW Operating Fund $710,000 $0 Project Transfers ($146,489) $0 Annual expense $0 $0 $1,128,511 Contingency $49,231 $45,234 $3,997 92% Water Mains $1,079,280 $919,205 $160,075 85% $1,128,511 $964,439 $164,072 85% MISCELLANEOUS WATER REHABILITATION WT0001 87 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 27,2014 MAJOR JONES WELL REPAIRS WATER WELL REPAIR WT0104 April 22, 2003: Awarded bid 018-03 for Far North Well pump repair to Layne-Texas for $32,790. February 14, 2006: Awarded bid 011-06 to Millican Well Service, LLC for rehabilitation and installation of the new Centrilift submersible motor and pump for the Far North Well in the amount of $250,035. January 25, 2011: Authorized Millican Well Service, LLC to repair Fuller Well in an amount not to exceed $117,000, budget increase and additional funding of $117,000 required. July 20, 2011: Transferred $95,000 from FB9901 to WT0104 for emergency well repairs. August 9, 2011: Ratified City Manager action to proceed with emergency repairs to the Far North Well site, by Millican Well Service, LLC in an amount not to exceed $95,000. June 26, 2012: Ratified City Manager action to proceed with emergency repairs to the well located at 1400 North Main Street, by Millican Well Service, LLC for an estimated amount of $64,950. May 14, 2013: Authorized well repairs to the well located at 118 W. Fuller Drive (Fuller Well Site) by Millican Well Service, LLC for an estimated amount of $120,000. August 13, 2013: Ratified the City Manager action to proceed with emergency repairs to the City owned and operated water well located at 1400 North Main Street, by Millican Well Service, LLC. The estimated expenditure is $75,178.02. October 27, 2015: Ratified City Manager action to proceed with emergency repairs to the well located at 2591 North Main Street, by Millican Well Service, LLC. The estimated expenditure is $54,128.23. August 16, 2016: Authorized well repairs to the City owned and operated water wells located at 118 W. Fuller Drive (Fuller Well Site) and 2404 N. Main St. (Far North Well Site) by Millican Well Service, LLC, for an estimated amount of $170,426. The funding is being utilized to repair well pumps and for other unexpected well repairs. Maintaining the City's wells results in the ability to produce water at a substantial reduction in cost. 88 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: (Annual funding $75,000) $0 $0 $0 $0 Transfer from: WT0001 - Misc Water Rehab $145,720 W/WW $968,272 $0 W/WW Operating Fund $750,000 $0 Additional Funding Needed: Annual expense $131,856 Transfer from: W/WW Operating Fund $550,000 $131,856 $2,413,992 Well Rehabilitation $2,413,992 $1,852,791 $561,201 77% $2,413,992 $1,852,791 $561,201 77% WELL REPAIRS WT0104 89 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 10,2014 MAJOR JONES METERS/TRANSPONDERS/LEAK DETECTION WATER METERS/TRANSPONDERS WT0803 November 13, 2007: Awarded the annual contract for the purchase of water meters and transponders, and authorized the City Manager to enter into an agreement with Atlas Utility Supply Company in the amount of $383,875. Amount for project not to exceed $331,875. November 11, 2008: Awarded the annual contract for the purchase of water meters and transponders, and authorized the City Manager to enter into an agreement with Atlas Utility Supply Company in the amount of $356,875. Amount for project not to exceed $331,875. February 14, 2012: Awarded the annual contract for the purchase of water meters and transponders, and authorized the City Manager to enter into an agreement with Atlas Utility Company in the amount of $200,000. January 14, 2014: Authorized the City Manager to execute an Engineering Services Contract with Alan Plummer and Associates, Inc. for services in assisting the City with the Texas Water Development Board State Revolving Fund loan applications and the United States Bureau of Reclamation WaterSMART grant application. The estimated amount is $78,000 and a portion of this amount is also authorized for project WT1201-Reclaimed Water Line Extension. February 10, 2015: Awarded the annual contract for the purchase of water meters and transponders, and authorized the City Manager to enter into an agreement with Atlas Utility Supply Company. This project provides funding for the systematic replacement of meters, transponders, and leak detection on an as needed basis as well as the accumulation of funds for future system-wide replacements. On-going This project provides funding for the systematic replacement of meters and transponders on a regular schedule at or near end of asset life. 90 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: (Annual funding $158,000) $0 $0 $0 $0 Transfer from: W/WW CIP Fund Balance $247,750 W/WW Operating Fund $3,002,000 $0 Proceeds from Sale of Meters $59,194 $0 Additional Funding Needed: Transfer from: W/WW Operating Fund $158,000 $0 $3,466,944 Meters/Transponders $3,304,787 $1,707,823 $1,596,964 52% Debt Issuance Cost $162,157 $51,600 $110,557 32% $3,466,944 $1,759,423 $1,707,521 51% METERS/TRANSPONDERS/LEAK DETECTION WT0803 91 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 31,2013 CHRIS BARKER RECLAIMED WATER LINE EXTENSION DEBT PAYMENT WATER IMPACT FEE WT1403 The reclaimed water system extension was included in the impact fee study. This project includes the transfer of funds from the water impact fee to pay debt service (W/S System Revenue Bonds, Series 2013) related to the extension of the reclaimed water system. Last debt payment is scheduled for July 15, 2033. The project provides a non-potable water source for irrigation which will offset future potable water purchases by the City and will serve to responsibly conserve potable water resources for the City and the region. 92 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Debt Service FY2014-26 $1,553,552 Debt Service FY2026-27 $118,650 $0 $0 Annual debt payment - water impact fee $120,000 $0 $120,000 $1,672,202 Transfer from: WT Impact Fee Fund Balance $1,553,552 $0 $0 Additional Funding Needed: Transfer from: WT Impact Fee Fund Balance $118,650 $120,000 $1,672,202 Transfer to Debt Service $1,672,202 $1,514,598 $157,604 91% $1,672,202 $1,514,598 $157,604 91% RECLAIMED WATER LINE EXTENSION DEBT PAYMENT WT1403 93 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 11,2015 MAJOR JONES MISCELLANEOUS VALVE REPLACEMENT WATER VALVE REPLACEMENT WT1603 November 22, 2016: Authorized the City Manager to execute a contract for the replacement of a 24-inch water valve, located near the intersection of SH 183 and Sheppard Drive, with Atkins Brothers Equipment Company, Inc. The estimated expenditure is $53,780. August 21, 2023: Ratified City Manager action to proceed with emergency repairs to the Westpark Way City water main. Acadia Services, LLC is performing the work and the estimated expenditure is not expected to exceed $180,000. This project will allow for the systematic replacement of valves on an as needed basis. On-going Old and deteriorated water valves prevent water lines from being isolated in the event of a line break. The inability to isolate the smallest segment possible during a line break increases the labor required to isolate the line, as well as the number of residents and fire hydrants that would be affected by a line break. Systematic annual replacement of old deteriorated water valves will increase efficiency, reduce maintenance costs, and ensure maximum fire protection and water service availability. 94 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: (Minimum balance $150,000) $0 $0 $0 $0 Transfer from: W/WW Operating Fund $285,000 W/WW CIP Fund Balance $280,000 $0 $0 Annual expense $0 $0 $565,000 Engineering $10,000 $1,305 $8,695 13% Contingency $10,000 $0 $10,000 0% Construction $545,000 $412,746 $132,254 76% $565,000 $414,051 $150,949 73% MISCELLANEOUS VALVE REPLACEMENT WT1603 95 Department:Date Prepared:June 15, 2015 Submitted By:Date Completed: Project Title: Project Type:WATER Sub-Type: Project CODE:WT1604 Priority: A COUNCIL AUTHORIZATION: March 14, 2017: Authorized the City Manager to negotiate and execute an Engineering Services Contract with Alan Plummer Associates, Inc. for design of the reclaimed water system extension project. Funding is to be provided using remaining unused funds from the Reclaimed Water Line Extension Phase II Project (WT1212) provided through the Texas Water Development Board's Clean Water State Revolving Fund Program. August 29, 2017: Approved Resolution No. 17-1513, requesting financial assistance by authorizing an application to be filed with the Texas Water Development Board. January 9, 2018: Approved Resolution No. 18-1523, requesting financial assistance by authorizing an application to be filed with the Texas Water Development Board (TWDB). The TWDB has requested the City issue a new Resolution authorizing an application to be filed with the TWDB seeking financial assistance in an amount not to exceed $3,260,000 which includes the cost of construction and the TWDB issuance costs. March 13, 2018: Approved the first and final reading of Ordinance No. 2185, authorizing the issuance of City of Euless, Texas, Waterworks and Sewer System Revenue Bonds, Series 2018. March 13, 2018: Approved Resolution No. 18-1528, approving and authorizing the execution of a principal forgiveness agreement with the Texas Water Development Board and an escrow agreement related thereto associated with the City of Euless, Texas, Waterworks and Sewer System Revenue Bonds, Series 2018. December 11, 2018: Awarded Bid No. 008-18, for the construction of the Reclaimed Water Line Extension, Phase III to Joe Funk Construction in the amount of $3,914,798.50. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: Anticipate Begin Design for Additional Expansion & Connectivity: FY2026-27 Construction Complete (Bear Creek Parkway etc.): December 2020 Construction of the project will provide a non-potable water source for irrigation which will offset future potable water purchases by the City and will serve to responsibly conserve potable water resources for the City and the region. The project will extend the City's Reclaimed Water Utility System from a point along Bear Creek Parkway north of Little Bear Creek to a point just south of Glade Road. This portion of the project will supply approximately 17 MG annually to 11 additional properties. The project scope also includes additional expansion of holding capacity and connectivity of the reclaimed system. RECLAIMED WATER SYSTEM The reclaimed water line extension is a continuation of the City's Reclaimed Water Utility System. The feasibility study completed in FY2012 initially contemplated six phases; however, due to remaining funds from Phase II and estimated construction costs the project has been reduced to three phases with this being the final phase. Design Complete: August 2018 Began Construction: March 2019 Anticipate Begin Construction for Additional Expansion & Connectivity: FY2027-28 City of Euless Capital Project Request PUBLIC WORKS CHRIS BARKER RECLAIMED WATER LINE EXT. PHASE III Began Design: May 2017 February 28, 2023: Approved a Chapter 380 Agreement by and between MM Euless 66 LLC, the City of Euless, and the Euless Development Corporation (EDC) in connection with the Watercolor Planned Development. 96 PROJECT TITLE:PROJECT CODE:WT1604 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Engineering $662,232 Direct Operating Cost Construction $5,414,672 Personnel:Full Time Loan Origination Fee $47,899 Part Time $0 2018 Rev Bond Avg. Annual DS $160,000 2015B Rev Bond Avg. Annual DS (50%)$70,000 $230,000 Total Estimated Capital Cost $6,124,803 Maintenance Costs 2015B Revenue Bond Issue $1,192,103 W/WW CIP Fund Balance $75,093 2018 Revenue Bond Issue $2,785,000 Loan Forgiveness $473,300 $0 Interest Earnings $124,709 $0 W/WW Operating Fund $1,000,000 Rate Stabilization $500,000 Transfer to: W/WW CIP Fund Balance ($25,402) Total Estimated Annual Cost $230,000 Total Funding $6,124,803 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $662,232 $662,232 ($0)100% $5,414,672 $3,914,672 $1,500,000 72% $47,899 $47,899 $0 100% $6,124,803 $4,624,803 $1,500,000 76% FUNDING SOURCE: Transfer from WT1212: CURRENT STATUS Engineering TOTAL PROJECT Subtotal: Loan Origination Fee Construction Subtotal: Utilities RECLAIMED WATER LINE EXT. PHASE III Total Salary Purchase of Services Materials & Supplies 97 98 FU L L E R - W I S E R R D H W Y 3 6 0 H W Y 3 6 0 BA Y B E R R Y L N ER W I N D R CH I T T A M D R H I L L T R A I L D R HARRINGTON LN CR AN B E R R Y L N H O L L Y D R A L M O N D L N MACK DR PO P P Y LN WILD OAK LN WO O D P A T H D R CECIL LN NE T T L E L N MC D O W E L L D R PAR SLEY LN AC O R N D R HOLIDAY LN BALSAM DR LARK LN HA R R I N G T O N C T GI N G E R L N FOUTAIN PARK DR FOUNTAIN SIDE DR CARAWAY LN ROSEMEAD DR HO L L Y C T PA R K M A N O R C T PA R K G R O V E D R H W Y 3 6 0 H W Y 3 6 0 H W Y 3 6 0 HW Y 3 6 0 H W Y 3 6 0 HWY 3 6 0 H W Y 3 6 0 RECLAIMED WATER LINE EXTENSION PHASE III Legend Reclaimed WL Extension 0 875 1,750437.5 Feet 99 Department:Date Prepared:April 5, 2017 Submitted By:Date Completed: Project Title: Project Type:WATER Sub-Type: Project CODE:WT1802 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: WELL Design Complete: May 2019 Began Construction: July 2019 Construction Complete: May 2023 Began Design: January 2018 August 11, 2020: Authorized the City Manager to execute a professional services agreement with Signature Automation, LLC, for Engineering Services at the Far North and Fuller Well sites. The scope of services include: Program Logic Control (PLC) and Human Machine Interface (HMI) programming, submittal review for proposed equipment, SCADA System testing, operations manuals and training. The estimated expenditure is $73,540. May 12, 2020: Authorized the City Manager to negotiate and execute an Engineering Construction Management Agreement with Alan Plummer Associates. The estimated expenditure is $121,875 for basic services and a budget allowance of up to $40,000 for additional services. RW Harden & Associates completed a Preliminary Well Design Study in FY2017 in preparation for the replacement of the Fuller Well, Far North Well, and the eventual replacement of the 1400 North Main Well. City of Euless Capital Project Request PUBLIC WORKS MAJOR JONES WELL REPLACEMENT – FULLER/FAR NORTH RW Harden & Associates completed a Preliminary Well Design Study in FY2017 in preparation for the replacement of the Fuller Well, Far North Well, and the eventual replacement of the 1400 North Main Well. The Fuller and Far North Well are in need of immediate replacement. New wells will enable the City to provide high quality water to citizens while reducing maintenance and operational costs. August 3, 2020: Authorized the City Manager to purchase and contract for the installation of two water well pumps, motors, and associated appurtenances at the Far North and Fuller Wells, in the amount of $542,060, through Weisinger, Incorporated. November 28, 2017: Authorized the City Manager to negotiate and execute an Engineering Design Contract with Alan Plummer Associates, Inc. for the design of two water wells to replace the existing Fuller Well and Far North Well. The scope of work for this portion of the project includes the design of the above ground well facilities including booster pumps, electrical service, and facilities required to operate the new wells. November 28, 2017: Authorized the City Manager to execute an Engineering Design Contract with RW Harden and Associates, Inc. for the design of two water wells to replace the existing Fuller Well and Far North Well. The scope of work for this portion of the project includes all below ground and associated work at the well facilities, the casing, screen, well head, and pump equipment. September 25, 2018: Approved Resolution 18-1537, requesting financial assistance by authorizing an application to be filed with the Texas Water Development Board for a Drinking Water State Revolving Fund Loan. March 26, 2019: Approved the first and final reading of Ordinance No. 2216, authorizing the issuance of City of Euless, Texas, Waterworks and Sewer System Revenue Bonds, Series 2019. June 25, 2019: Authorized award of Bid No. 003-19, for a construction contract to Weisinger Incorporated for well construction and plugging of the Far North and Fuller Wells in the amount of $6,426,500, less Change Order No. 1, a deduction of $577,400, for a total net amount of $5,849,100. April 14, 2020: Approved award of Bid No. 002-20 for a construction contract to Felix Construction Company for the construction of the Fuller and Far North Well project in the amount of $2,631,000. The project consists of the engineering design and complete replacement of the Fuller and Far North Wells with new 1,800 foot deep wells. October 12, 2021: Authorized a change order to the construction contract with Felix Construction Company for the above ground infrastructure and appurtenances portion of the Fuller and Far North Well project in the amount of $214,074.62. The change order provides for additional work including electrical modifications, piping, painting, concrete flat work, and fencing. August 9, 2022: Ratified City Manager action to proceed with emergency repairs to the City's water wells at Fuller and Far North Well lots. In order to maintain the existing warranty of the new wells, Weisinger Incorporated will perform the work at an estimated expenditure of $417,810. 100 PROJECT TITLE:PROJECT CODE:WT1802 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Engineering $886,480 Direct Operating Cost Construction $9,821,786 Personnel:Full Time Loan Origination Fee $195,215 Part Time $0 Construction Administration $202,875 $0 Average Debt Service $381,000 $381,000 Total Estimated Capital Cost $11,106,356 Maintenance Costs W/WW Operating Fund $723,000 W/WW CIP Fund Balance $60,480 Rate Stabilization $900,000 2019 Revenue Bond Issue $9,275,000 $0 Interest Earnings $150,295 $0 Insurance Proceeds $50,658 Transfer to: WT2201-1 Mil Well Rep. Design ($53,077) Total Estimated Annual Cost $381,000 Total Funding $11,106,356 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $886,480 $885,340 $1,140 100% $9,821,786 $9,810,385 $11,401 100% Loan Origination Fee $195,215 $195,215 $0 100% $202,875 $196,054 $6,821 97% $11,106,356 $11,086,994 $19,362 100% Utilities WELL REPLACEMENT – FULLER/FAR NORTH Total Salary Purchase of Services Materials & Supplies TOTAL PROJECT Subtotal: Construction Subtotal: Construction Administration FUNDING SOURCE: Transfer from: CURRENT STATUS Engineering 101 102 N M A I N S T W ASH LN N I N D U S T R I A L B L V D AR A N S A S D R E MIDWAY D R HW Y 3 6 0 N E C T O R D R E ASH LN W MID-CITIES BLVD SH 1 2 1 E HARWOOD RD H W Y 3 6 0 E MID-CITIES BLVD W HARWOOD RD SHELMAR DR GLENN DR DO N L E Y D R DE N T O N D R CR A N E D R E DENT O N D R RI O G R A N D E B L V D LAM A R D R TROJAN TRL CO L L I N D R HIM E S D R GA T E W A Y B L V D FA Y E T T E D R E FULLER DR ALLEN DR JANANN ST MI N T E R S C H A P E L R D SH 1 2 1 CINNAMON LN LARK LN BEAR CREEK DR BE L L D R LA K E W O O D B L V D BA Y B E R R Y L N ER W I N D R A N G E L A L N SHADOW LN WESTOVER DR CLINIC DR SIXPENCE LN TOWN CREEK DR CH I T T A M D R PI N E V I E W D R LAUREL LN PA R K E R D R MILLA LN OA K T I M B E R D R FR E E S T O NE D R LIM E S T O N E D R R U S K D R HARRIN G T O N L N ST O N E W A L L D R WI N S T O N D R DEL T A D R COUNTRY LN ANICE LN BAZ E R D DA R L E N E T R BOB ED E N L A N E WALNUT WAY BENT TREE DR SA L E M D R MA R S H A L L D R PRIEST LN SPRINGRIDGE LN ABBEY RD RU S T I C L N HIGH HAWK TR OAK FOREST TRL L I T T L E B E A R T R HIGHVIEW DR PILOT HILL DR FALLS DR RAMBLING LN PINION DR RI V E R B I R C H R D PARSLEY LN AC O R N D R HOLIDAY LN DRAKE DR BALSAM DR GA R D E N A V E FOUTAIN PARK DR HORSE SHOE DR FOUNTAIN SIDE DR AS T E R D R KIMBLE DR H W Y 3 6 0 H W Y 3 6 0 SH 1 2 1 H W Y 3 6 0 WELL REPLACEMENT- )8//(5 )$51257+ Legend Well Replacement 01,7503,500875 Feet 103 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 18,2022 MAJOR JONES LINE REPLACEMENT – MIDWAY PARK 1ST ADDITION WATER MAIN REPLACEMENT WT2301 November 22, 2022: Authorized the City Manager to negotiate and execute an engineering services contract with Plummer Associates, Inc. for the design of the FY2023 Water Rehabilitation Project. October 24, 2023: Awarded Bid No. 015-23 for the FY2023 Water Rehabilitation Project to A&B Construction, LLC for the replacement of water mains located in Midway Park 1st Addition and authorized the City Manager to enter into a contract with A&B Construction, LLC. The water mains included in this project are part of the City's Water System Master Plan. The project consists of the replacement of an existing 6 inch cast iron water line located along Collin Drive from Denton Drive to Harwood Road. Began Design: December 2022 Design Complete: August 2023 Began Construction: March 2024 Construction Complete: May 2025 Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 104 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering $52,000 Construction $597,203 $0 $0 $0 $0 $649,203 Transfer from: W/WW Operating Fund $52,000 American Rescue Plan Act $597,203 $0 $0 $0 $649,203 Engineering $52,000 $40,816 $11,184 78% Construction $597,203 $575,655 $21,548 96% $649,203 $616,471 $32,732 95% LINE REPLACEMENT – MIDWAY PARK 1ST ADDITION WT2301 105 106 Line Replacement - Midway Park 1st Addition 7ARRA17 M , L A M %L ( 6 6 , 1 * & R ( ( .'ALLA6 %( L L &2 L L , 1 )ALL6 )A11,1 7RA9,6 ,R , 2 1 +A R R , 6 '( 1 7 2 1 +AR:22' R' : MA , 1 6 7 1 None 0 240 480 720 960120 Feet Legend Water Water Line Replacement -Collin Dr. 107 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 18,2022 MAJOR JONES LINE REPLACEMENT – OAKWOOD TERRACE WATER MAIN REPLACEMENT WT2302 November 22, 2022: Authorized the City Manager to negotiate and execute an engineering services contract with Plummer Associates, Inc. for the design of the FY2023 Water Rehabilitation Project. October 24, 2023: Awarded Bid No. 015-23 for the FY2023 Water Rehabilitation Project to A&B Construction, LLC for the replacement of water mains located in Oakwood Terrace and authorized the City Manager to enter into a contract with A&B Construction, LLC. The water mains included in this project are part of the City's Water System Master Plan. The project consists of the replacement of the water mains along South Main Street to include E. Whitener Road, Jean Lane, Reaves Court, and Henslee Drive. Mains along the Southern border of Spring Valley Apartment Complex's open space are also included in the project scope. See project map for details about specific line replacements. Began Design: December 2022 Design Complete: August 2023 Began Construction: March 2024 Construction Complete: May 2025 Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 108 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering $153,061 Construction $1,837,679 $0 Contingency $765 $0 $0 $0 $1,991,505 Transfer from: W/WW Operating Fund $179,781 American Rescue Plan Act $1,811,724 $0 $0 $0 $1,991,505 Engineering $153,061 $153,061 $0 100% Construction $1,837,679 $1,837,454 $225 100% Contingency $765 $765 $0 100% $1,991,505 $1,991,280 $225 100% LINE REPLACEMENT – OAKWOOD TERRACE WT2302 109 110 111 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 18,2022 MAJOR JONES LINE REPLACEMENT – SOUTH MAIN STREET WATER MAIN REPLACEMENT WT2303 November 22, 2022: Authorized the City Manager to negotiate and execute an engineering services contract with Plummer Associates, Inc. for the design of the FY2023 Water Rehabilitation Project. October 24, 2023: Awarded Bid No. 015-23 for the FY2023 Water Rehabilitation Project to A&B Construction, LLC for the replacement of water mains located along South Main Street and authorized the City Manager to enter into a contract with A&B Construction, LLC. The water mains included in this project are part of the City's Water System Master Plan. The project consists of the replacement of the water mains along South Main Street, Gaye Court, Jefflyn Court, West Huitt Lane, Linda Lane, Arnett Drive, West Alexander Lane, and Ross Avenue. See project map for details about specific line replacements. Began Design: December 2022 Design Complete: August 2023 Began Construction: March 2024 Construction Complete: May 2025 Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 112 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering $199,210 Construction $1,847,584 $0 Contingency $28,714 $0 $0 $0 $2,075,508 Transfer from: W/WW Operating Fund $101,219 W/WW CIP Fund Balance $108,991 $0 American Rescue Plan Act $1,865,298 $0 $0 $2,075,508 Engineering $199,210 $184,720 $14,490 93% Construction $1,847,584 $1,716,950 $130,634 93% Contingency $28,714 $28,714 $0 100% $2,075,508 $1,930,384 $145,124 93% LINE REPLACEMENT – SOUTH MAIN STREET WT2303 113 114 115 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS June 08,2023 MAJOR JONES LINE REPLACEMENT – HUNTINGTON DRIVE PHASE II WATER MAIN REPLACEMENT WT2401 The water mains included in this project are part of the City's Water System Master Plan. The project consists of the replacement of an existing 6 inch AC water line located along Huntington Drive between East Huitt Lane and Koen Lane. Additionally, replacement of lateral tie-ins located on North Atkerson Lane and Koen Lane are included. Began Design: January 2022 Design Complete: October 2024 Anticipate Begin Construction: October 2026 Anticipate Construction Complete: January 2027 Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 116 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering $15,000 Construction $505,000 $0 $0 $0 $0 $520,000 Transfer from: W/WW Operating Fund $520,000 $0 $0 $0 $520,000 Engineering $15,000 $0 $15,000 0% Construction $505,000 $0 $505,000 0% $520,000 $0 $520,000 0% LINE REPLACEMENT – HUNTINGTON DRIVE PHASE II WT2401 117 118 LINE REPLACEMENT – HUNTINGTON DRIVE PHASE II .OEN S LA U G HTER H U N T I N G T O N D I C . E < - O H N V E R N O N D I C . E < H U N T I N G T O N S L A U G H T E R COPHER AT.ERSON A T .E R S ON HUITT L N E 0 150 300 450 60075 Feet ¯Legend Water Water Line Replacement -Huntington Dr. -E. Huitt Ln. -N. Atkerson Ln. -Koen Ln. 119 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 31,2023 MAJOR JONES LINE REPLACEMENT – SOTOGRANDE BLVD PHASE I WATER MAIN REPLACEMENT WT2402 The water mains included in this project are part of the City's Water System Master Plan. The project consists of the replacement of three existing 6 inch AC water line laterals located along Sotogrande Boulevard between El Camino Real and Monterrey Boulevard. Began Design: February 2024 Design Complete: July 2024 Anticipate Begin Construction: September 2026 Anticipate Construction Complete: February 2027 Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 120 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering $47,200 Construction $587,800 $0 $0 $0 $0 $635,000 Transfer from: W/WW Operating Fund $365,000 W/WW CIP Fund Balance $270,000 $0 $0 $0 $635,000 Engineering $47,200 $39,200 $8,000 83% Construction $587,800 $0 $587,800 0% $635,000 $39,200 $595,800 6% LINE REPLACEMENT – SOTOGRANDE BLVD PHASE I WT2402 121 122 LINE REPLACEMENT – SOTOGRANDE BLVD PHASE I B R < A N D E E EL C A M I N OREAL PIPELINE RD : SO T O G R A N D E B L V D 0 150 300 450 60075 Feet ¯Legend Water Water Line Replacement -Sotogrande Blvd. 123 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 18,2022 MAJOR JONES LINE REPLACEMENT – SOTOGRANDE BLVD PHASE II WATER MAIN REPLACEMENT WT2501 November 26, 2024: Authorized the City Manager to amend an engineering services contract dated February 1, 2024 with Parkhill to include the design of the water line replacement for Sotogrande Boulevard Phase II. The water mains included in this project are part of the City's Water System Master Plan. The project consists of the replacement of an existing 10 inch AC water line located along Sotogrande Boulevard from El Camino Real to Monterrey Boulevard. Began Design: October 2024 Anticipate Design Complete: June 2026 Anticipate Begin Construction: September 2026 Anticipate Construction Complete: February 2027 Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 124 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering $50,000 Construction $663,000 $0 $0 $0 $0 $713,000 Transfer from: W/WW Operating Fund $365,000 W/WW CIP Fund Balance $348,000 $0 $0 $0 $713,000 Engineering $50,000 $49,972 $28 100% Construction $663,000 $7,500 $655,500 1% $713,000 $57,472 $655,528 8% LINE REPLACEMENT – SOTOGRANDE BLVD PHASE II WT2501 125 126 Line Replacement – Sotogrande Boulevard Phase II B R < $ 1 ' ( ( +( L ( 1 PIP(LI1( R' : 0 2 1 7 ( R R ( < B L9 ' S2 7 2 * R $ 1 ' ( B L 9 ' (L &$0I 1 2 R ( $ L 0 225 450 675 900112.5 Feet ¯ Legend Water Water Line Replacement -Sotogrande Blvd. 127 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 18,2022 MAJOR JONES LINE REPLACEMENT – SAGEBRUSH TRAIL WATER MAIN REPLACEMENT WT2601 The water mains included in this project are part of the City's Water System Master Plan. The project consists of the replacement of an existing 8 inch cast iron water line located along Sagebrush Trail from Wilshire Drive to the end of Sagebrush Trail. Began Design: December 2025 Anticipate Design Complete: June 2026 Anticipate Begin Construction: October 2026 Anticipate Construction Complete: January 2027 Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 128 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering $81,000 Construction $539,000 $0 $0 $0 $0 $620,000 $0 Transfer from: W/WW Operating Fund $620,000 $0 $0 $620,000 Engineering $81,000 $52,100 $28,900 64% Construction $539,000 $0 $539,000 0% $620,000 $52,100 $567,900 8% LINE REPLACEMENT – SAGEBRUSH TRAIL WT2601 129 130 Line Replacement – Sagebrush Trail T<L(R S,*1(T :,1'L($ S$*(%R8S+ T23L($T23L($2$.R,'*( $LL(< $ L L ( < S$*(%R8S+ &200 ( R & ( 0$R< 1, T $ & $ L 9 $ R < < 2 R . S + , R ( % R $ S + ( R %R $ S + ( R <2 R . S + , R ( &$ L 9 $ R < %(LL R$1&+ 0 $ R L ( 1( 'R : , L S + , R ( ' R (8L(S S % L 9 ' : S,*1(T'R 1 , T $ L 1 0 225 450 675 900112.5 Feet ¯ Legend Water Water Line Replacement -Sagebrush Trl 131 132 CAPITAL IMPROVEMENTS PROGRAM FUNDED PROJECTS SUMMARY Project Number Project Description Budget as of 5/31/25 Appropriation/ Amendment Budget as of 5/31/26 Expended as of 5/31/26 Remaining Funds Revised Project Cost Estimates Unfunded/ (Excess Funding) OTHER AC1901 Texas Star Sports Complex Phase VII 5,119,496$ -$ 5,119,496$ 5,071,726$ 47,770$ 5,119,496$ -$ CM0304 Entry Monument Sign Program 145,782$ -$ 145,782$ 121,427$ 24,355$ 245,782$ 100,000$ CM0804 Redevelopment 13,864,715$ 81,641$ 13,946,356$ 11,863,768$ 2,082,588$ 14,363,768$ 417,412$ CM1701 Municipal Plaza Improvements Phase II 446,733$ 70,000$ 516,733$ 226,716$ 290,017$ 566,733$ 50,000$ DV9901 EDC Incentive Funds (annual transfer $25,000)1,800,854$ 25,000$ 1,825,854$ 1,351,148$ 474,706$ 1,850,854$ 25,000$ ED1002 EDC Contingency 325,000$ -$ 325,000$ 68,772$ 256,228$ 325,000$ -$ ED1601 Midtown Development 16,417,980$ -$ 16,417,980$ 16,359,955$ 58,025$ 16,417,980$ -$ FM1201 ADA/TAS Facility Improvements (min bal $100,000)215,000$ 30,000$ 245,000$ 230,487$ 14,513$ 330,000$ 85,000$ FM2207 Misc. Roof Repairs & Preventative Maintenance (min bal $100,000)94,000$ 66,000$ 160,000$ 25,080$ 134,920$ 160,000$ -$ FM2311 Fire Station #2 11,137,224$ 29,103$ 11,166,327$ 10,185,199$ 981,128$ 11,166,327$ -$ FM2312 Police & Court Building Remodel 28,064,760$ 723,122$ 28,787,882$ 20,930,460$ 7,857,422$ 28,882,882$ 95,000$ FM2508 Facility Renovations at 1400 South Pipeline Road 3,200,000$ -$ 3,200,000$ 172,603$ 3,027,397$ 3,200,000$ -$ GC1801 TSGC Misc. Improvements (min bal $150,000)712,180$ 65,000$ 777,180$ 699,397$ 77,783$ 857,180$ 80,000$ GC2501 Golf Course Upgrades 2,240,000$ -$ 2,240,000$ 2,197,481$ 42,519$ 2,240,000$ -$ PR0720 Misc. Park Improvements (min bal $200,000)2,018,253$ 100,000$ 2,118,253$ 1,844,877$ 273,376$ 2,118,253$ -$ PR0804 Park Irrigation (annual transfer $25,000)450,000$ 25,000$ 475,000$ 318,296$ 156,704$ 500,000$ 25,000$ PR2508 Parks at Texas Star South Improvements 750,000$ -$ 750,000$ 415,475$ 334,525$ 750,000$ -$ PR2604 Euless Family Life Center Expansion Feasibility/Programming Study -$ 100,000$ 100,000$ 8,000$ 92,000$ 100,000$ -$ PR2605 Kiddie Carr Park Improvements -$ 2,000,000$ 2,000,000$ 64,753$ 1,935,247$ 2,000,000$ -$ PR2606 Parks at Texas Star South Batting Cage Area Redevelopment -$ 1,750,000$ 1,750,000$ 74,824$ 1,675,176$ 1,750,000$ -$ PR2607 South Euless Park Improvements -$ 3,000,000$ 3,000,000$ 225,086$ 2,774,914$ 3,000,000$ -$ FB9906 Fund Balance – EDC CIP -$ -$ -$ -$ -$ -$ (2,586,795)$ FB9908 Fund Balance – Parks at Texas Star CIP -$ -$ -$ -$ -$ -$ (669,445)$ FB9909 Fund Balance – General CIP -$ -$ -$ -$ -$ -$ (11,117,463)$ FB9913 Fund Balance – Car Rental CIP -$ -$ -$ -$ -$ -$ (4,974,519)$ FB9916 Fund Balance – TSGC CIP -$ -$ -$ -$ -$ -$ (123,413)$ Total Other Projects 87,001,977$ 8,064,866$ $95,066,843 $72,455,530 22,611,313$ $95,944,255 (18,594,223)$ 133 Department:Date Prepared:April 24, 2018 Submitted By:Date Completed: Project Title: Project Type:PARKS/RECREATION Sub-Type: Project CODE:AC1901 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN PROJECT DESCRIPTION: PROJECT SCHEDULE: Design Complete: May 2020 Archway Entry Sign Construction Complete: February 2025 Construction Complete: April 2021 JUSTIFICATION: May 28, 2024: Awarded Bid No. 006-24 for the construction of the Parks at Texas Star North archway entry sign to Mello Signs. The estimated expenditure is $148,232. October 23, 2018: Ratified the Euless Development Corporation action taken on October 23, 2018, authorizing the Euless Development Corporation President to negotiate and execute an Architectural Services Contract with Oxley Williams Tharp Architects for the planning and design of Texas Star Sports Complex Phase VII (Softball World). March 24, 2020: Authorized the purchase and installation of sports turf at the Parks at Texas Star Phase VII from GeoSurfaces, Inc. through the TIPS Interlocal Purchasing System (TIPS #170205) in the amount of $681,200, as well as the purchase and installation of an LED Retrofit lighting system from GeoSport Lighting Systems, LLC. through the TIPS Interlocal Purchasing System (TIPS #18120601) in the amount of $434,700. April 28, 2020: Awarded Bid No. 007-20 for the purchase and installation of outfield fence and backstop wall padding for the Parks at Texas Star Phase VII to Sports Graphics, Inc. The estimated expenditure is $188,000. June 9, 2020: Awarded Bid No. 009-20 for the Parks at Texas Star Phase VII renovation to Henthorn Commercial Construction, LLC and authorized the City Manager to enter into a contract with Henthorn Commercial Construction, LLC. The total estimated expenditure is $2,228,500. January 24, 2023: Awarded Bid No. 002-23 for design/build services including construction administration and general contracting services for the Texas Star Athletic Staff Offices and authorized the City Manager to enter into a design/build contract with Gomez Floor Covering, Inc, dba GFC Contracting. The estimated expenditure is $411,914. With the completion of Phase VII, the new infields will increase programming opportunities as well as substantially reduce the number of rainouts. The planning, design, and construction for Texas Star Sports Complex Phase VII. The project scope includes renovating the existing infields with synthetic turf, renovating the existing facility to meet current ADA standards, renovating the existing restroom/concession building, creating new office space for staff, upgrading the lighting system to LED, new entry signs, and demolition of driveway. Office Building Complete: December 2023 City of Euless Capital Project Request COMMUNITY SERVICES DUANE STRAWN TEXAS STAR SPORTS COMPLEX PHASE VII TSSC IMPROVEMENTS The Texas Star Sports Complex Phase VII includes renovating the existing infields with synthetic turf, renovating the existing concession/restroom building, building new offices for staff, and upgrading the existing lighting from metal-halide to LED. With the growing number of participants in youth baseball, renovating the existing infields with synthetic turf will allow staff the opportunity to expand existing leagues as well as programming for additional leagues in adult softball. Synthetic turf infields will also substantially reduce the number of rain outs which results in lost revenue. The addition of this phase will ensure that the Texas Star Sports Complex remains the premier sports facility for amateur athletics for many years to come. Began Construction: July 2020 November 12, 2019: Approved all matters incident and related to the issuance and sale of "Euless Development Corporation Sales Tax Revenue Bonds, Series 2019," including the adoption of Resolution No. 19-1559. Began Design: January 2019 August 14, 2018: Ratified the Euless Development Corporation (EDC) action taken on August 13, 2018, approving EDC Resolution No. 21-18, declaring a project for improvements at the Parks at Texas Star including Softball Facilities. August 24, 2020: Authorized the purchase, delivery, and installation of 292,000 square feet of TifTuf Bermuda sod from Tri- Tex Grass, for the Parks at Texas Star Phase VII through the BuyBoard Cooperative Purchasing Program No. 611-20. The estimated expenditure is $137,240. 134 PROJECT TITLE:PROJECT CODE:AC1901 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Planning and Design $196,000 Direct Operating Cost Construction $4,666,748 Personnel:Full Time Contingency $76,635 Part Time $0 Parking Lot $51,708 $0 Debt Issuance Cost $128,405 Average Annual Debt Service $279,000 $279,000 Total Estimated Capital Cost $5,119,496 Maintenance Costs EDC Operating Fund $655,000 PR2309 - PATS N Parking Lot $49,908 $0 2019 EDC Revenue Bonds $4,358,215 $0 Interest Earnings $56,373 Total Estimated Annual Cost $279,000 Total Funding $5,119,496 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $196,000 $196,000 $0 100% $4,666,748 $4,647,717 $19,031 100% $76,635 $47,944 $28,691 63% Parking Lot $51,708 $51,660 $48 100% Debt Issuance Cost $128,405 $128,405 $0 100% $5,119,496 $5,071,726 $47,770 99% Subtotal: FUNDING SOURCE: Transfer from: CURRENT STATUS Planning and Design TOTAL PROJECT Subtotal: Contingency Construction TEXAS STAR SPORTS COMPLEX PHASE VII Total Salary Purchase of Services Materials & Supplies Utilities 135 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: CITY MANAGER July 11,2006 CHRIS BARKER ENTRY MONUMENT SIGN PROGRAM MISCELLANEOUS IMPROVEMENTS CM0304 Continuation of the original City of Euless Entry Monument Sign Program. Continued construction of City of Euless entry monument signs at key visibility points throughout the City extending Euless beautification and branding efforts. To enable continuous efforts to identify, beautify, and brand the City of Euless. 136 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Land Betterments $245,782 $0 $0 $0 $0 $245,782 Transfer from: Car Rental Fund $135,782 Car Rental CIP Fund Balance $10,000 $0 $0 Additional Funding Needed: Transfer from: Car Rental Fund $100,000 $0 $245,782 Land Betterments $245,782 $121,427 124,355 49% $245,782 $121,427 $124,355 49% ENTRY MONUMENT SIGN PROGRAM CM0304 137 Department:Date Prepared:July 11, 2006 Submitted By:Date Completed: Project Title: Project Type:MISCELLANEOUS Sub-Type: Project CODE:CM0804 Priority:A COUNCIL AUTHORIZATION: October 10, 2017: Authorized the sale of City owned property and structure located at 911 Highland Drive. FY2023 Property Acquisitions: 914 Highland Drive and 109 Ross Avenue. FY2024 Property Acquisitions: 911 Cresthaven Drive, 1009 Cresthaven Drive, and 108 West Midway Drive. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: As the City ages, it is imperative that the economic vitality of the City remain strong. Reinvestment into the community will protect property values from deterioration and keep commercial properties occupied and vibrant. November 10, 2015: Authorized the Mayor to negotiate and execute conveyance documents for the sale of City owned property located at 203, 204, and 205 Dickey Drive. FY2016 Property Acquisitions: 905 Cresthaven Drive. FY2017 Property Acquisitions: 909 Highland Drive, 911 Highland Drive, 1000 Highland Drive, and 1011 Cresthaven Drive. FY2019 Property Acquisitions: 913 Cresthaven Dr., 1001 Cresthaven Dr., 908 Highland Dr., 1001 Highland Dr., 1003 Highland Dr., 109 Ross Ave., and property located at SH183 at Main Street, Tract 16 and 17. FY2020 Property Acquisitions: 909 Cresthaven Drive, 910 Highland Drive, and 913 Highland Drive. This project provides funding to allow the City to participate in redevelopment projects and other community improvements or make acquisitions of property that will be of economic benefit to the City of Euless. Project includes City participation in community redevelopment projects and property acquisitions that will be of economic benefit to the City. Long-term on-going project for continuous improvement of the community. FY2021 Property Acquisitions: 901 Cresthaven Drive, 907 Cresthaven Drive, 902 Highland Drive, 1009 Highland Drive, 1011 Highland Drive, and 1451 W Euless Boulevard. FY2018 Property Acquisitions: 906 Highland Drive, 917 Highland Drive, 1005 Highland Drive, 902 Cresthaven Drive, and a portion of Block 1, Lot 5 in the S.W. Mills Subdivision. FY2021 Sale of Property: 906 Cresthaven Drive and Solomon Huitt Survey, No. 705, Tarrant County TX (N Main Street). FY2022 Property Acquisitions: 903 Highland Drive, 905 Highland Drive, 907 Highland Drive, 912 Highland Drive, 915 Highland Drive, 916 Highland Drive, 1007 Highland Drive, and 2214 W. Euless Boulevard. FY2022 Sale of Property: 908 Cresthaven Drive, 910 Cresthaven Drive, and 912 Cresthaven Drive. June 25, 2024: Awarded Bid No. 011-24 to Pace Construction for landscape and irrigation system installation at the Parks at Texas Star North, along Highland Drive. November 10, 2015: Authorized the City Manager to execute an agreement to accept contributions from Gardner Capital Texas, LLC and Bloomfield Homes Fund, LP to a Community Revitalization Fund in the amount of $100,000. City of Euless Capital Project Request CITY MANAGER CHRIS BARKER REDEVELOPMENT DEVELOPMENT FY2015 Property Acquisitions: 903 Cresthaven Drive, 1447 West Euless Boulevard, 901 Highland Drive, 904 Highland Drive, and 215 East Ash Lane. FY2008 Property Acquisitions: 1010 Highland Drive, 1010 Cresthaven Drive, and 710 South Main. FY2013 Property Acquisitions: North Sheppard Drive (10 lots), 908 Cresthaven Drive, and 910 Cresthaven Drive. FY2009 Property Acquisitions: 1007 Cresthaven Drive, 912 Cresthaven Drive, 1005 Cresthaven Drive, and 1002 Highland Drive. 138 PROJECT TITLE:PROJECT CODE:CM0804 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Land Acquisition $11,829,464 Direct Operating Cost Demolition $625,194 Personnel:Full Time Minor Apparatus $197 Part Time $0 Incentives $1,010,000 $0 Revitalization Target Area #1 $150,000 Other Professional Services $523,913 $100,000 $125,000 $0 Total Estimated Capital Cost $14,363,768 Maintenance Costs $3,755,000 Car Rental Operating/CIP Fund $9,200,000 Miscellaneous Other $991,356 $0 $0 Additional Funding Needed: Transfer from: General Fund $417,412 Total Estimated Annual Cost $0 Total Funding $14,363,768 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED $11,704,464 $10,330,265 $1,374,199 88% $675,194 $643,755 $31,439 95% $197 $167 $30 85% Incentives $1,160,000 $160,000 $1,000,000 14% $598,913 $562,552 $36,361 94% Improvements $100,000 $94,273 $5,727 94% Landscaping $125,000 $72,756 $52,244 58% $14,363,768 $11,863,768 $2,500,000 83% Utilities Landscaping REDEVELOPMENT Total Salary Purchase of Services Materials & Supplies Improvements TOTAL PROJECT Subtotal: Minor Apparatus Demolition Subtotal: Professional Services FUNDING SOURCE: Transfer from: General Fund CURRENT STATUS Land Acquisition 139 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS June 03, 2014 SCOTT PETERSON MUNICIPAL PLAZA IMPROVEMENTS PHASE II FACILITIES IMPROVEMENTS CM1701 May 12, 2020: Awarded Bid No. 010-20 for the purchase and installation of an operable louvered canopy for the Mary Lib Saleh Euless Public Library, to Equinox Louvered Roof. The estimated expenditure is $83,960. This project includes the landscaping and irrigation related to the 40th CDBG ADA accessibility and infrastructure improvements. Landscaping and irrigation for the Municipal Plaza following the 40th CDBG ADA accessibility and infrastructure improvements project. Enhancements will extend to the Library entrance from the courtyard and includes an operable louvered canopy for the Library's west-side patio. The project scope also consists of improvements to the City Hall entrance which include: removing the non-functioning water feature and replacing with a cascading stairway; removing all exposed aggregate concrete and replacing with a colored concrete to match the courtyard; re-routing roof drains under the patio to drain into the parking lot; removing south side stairs and carrying over the stone wall to the north to wrap around the new staircase; conforming the north ramp entrance to meet ADA requirements; installing handrails and lighting on staircase; replacing bollard lighting; and landscaping. Anticipate Begin Construction City Hall Entrance: July 2026 Anticipate Construction Complete City Hall Entrance: September 2026 Beautification of the municipal plaza following the hardscape improvements. 140 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Landscaping/Improvements $559,532 Equipment $7,201 $0 $0 $0 $0 $566,733 Transfer from: General Fund $280,000 Car Rental Fund (Phase I) $116,733 $0 General CIP Fund Balance $120,000 $0 Additional Funding Needed: Transfer from: General Fund $50,000 $0 $566,733 Landscaping/Improvements $559,532 $219,515 $340,017 39% Equipment $7,201 $7,201 $0 100% $566,733 $226,716 $340,017 40% MUNICIPAL PLAZA IMPROVEMENTS PHASE II CM1701 141 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: ECONOMIC DEVELOPMENT July 26,1999 REAGAN ROTHENBERGER EULESS DEVELOPMENT CORPORATION INCENTIVE EDC DEVELOPMENT DV9901 March 27, 2001: Approved transfer of $325,000 to North Main Street for right-of-way to free up funds for a sign program. May 30, 2006: Approved payment to Professional Turf Products, Inc. in the amount of $300,000 per agreement. April 24, 2012: Ratified Euless Development Corporation (EDC) action taken on April 23, 2012, to approve the first amendment to the lease and incentive agreement by and between the EDC, the City of Euless and U.S. Concrete, Inc. and its subsidiary Redi-Mix, L.L.C., and authorizing the President to make the modification and execute such amendment. The agreement called for a $150,000 incentive payment upon the successful relocation of the US Concrete corporate headquarters to Euless. December 12, 2017: Approved the EDC projects and actions taken by the EDC Board of Directors on December 12, 2017 which included authorizing the President to negotiate and execute conveyance documents for the purchase of property located at 411 North Main Street. February 28, 2023: Approved a Chapter 380 Agreement by and between MM Euless 66 LLC, the City of Euless, and the Euless Development Corporation (EDC) in connection with the Watercolor Planned Development. Euless Development Corporation funds that have been set aside to aid the City of Euless in attracting development opportunities. Funding this project enables the City to act quickly on development opportunities that arise throughout the year. 142 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: (Annual funding $25,000) $0 $0 $0 $0 Transfer from: EDC CIP Fund Balance $1,338,454 EDC Operating Fund $1,025,000 $0 ED1002 - EDC Contingency $250,000 $0 Transfer to FS#2 & N Main ($787,600) Additional Funding Needed: EDC Operating Fund $25,000 $0 $1,850,854 Economic Development Incentives $1,850,000 $1,350,295 $499,705 73% Irrigation Supplies $854 $853 $1 100% $1,850,854 $1,351,148 $499,706 73% EULESS DEVELOPMENT CORPORATION INCENTIVE DV9901 143 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: ECONOMIC DEVELOPMENT Sept 30,2010 CHRIS BARKER EULESS DEVELOPMENT CORPORATION CONTINGENCY EDC MISCELLANEOUS ED1002 May 14,2019: Ratified the Euless Development Corporation (EDC) action taken on May 13, 2019, authorizing the expenditure of funds for the demolition of Wilshire Pool. To provide funding for emergencies or unforeseen projects that arise throughout the year. On-going This funding enables the City to act quickly on emergency or unforeseen projects. Without funding, these types of projects would have to wait until the next budget cycle which could increase costs or impede economic development opportunities. 144 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Contingency $325,000 $0 $0 $0 $0 $325,000 Transfer from: EDC Operating/CIP Fund $357,493 AC1601 - TSSC Phase V $64,586 $0 ED1401 - Planning Consultants $152,921 $0 DV9901 - EDC Incentive Funds ($250,000) $0 $325,000 Contingency $325,000 $68,772 $256,228 21% $325,000 $68,772 $256,228 21% EULESS DEVELOPMENT CORPORATION CONTINGENCY ED1002 145 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: CITY MANAGER June 16,2015 CHRIS BARKER MIDTOWN DEVELOPMENT MISCELLANEOUS DEVELOPMENT ED1601 June 23, 2015: Conducted a Public Hearing and approved Planned Development. August 25, 2015: Approved Resolution No. 15-1471 creating, authorizing, and establishing the Euless Midtown Public Improvement District. December 8, 2015: Approved Resolution No. 15-1479 authorizing publication of notice of intention to issue certificates of obligation to fund public infrastructure improvements including streets, drainage, and water and wastewater in the Euless Midtown Reinvestment Zone. December 8, 2015: Approved Ordinance No. 2096 approving the Project and Financing Plan for Tax Increment Reinvestment Zone Number Four. January 12, 2016: Approved Ordinance No. 2098 authorizing the issuance and sale of City of Euless, Texas, Tax and Waterworks and Sewer System (Limited Pledge) Revenue Certificates of Obligation, Series 2016. This project provides funding for City participation in a public/private development opportunity. Project includes City participation in a public/private community development project of approximately 56 acres located in the A.J. Huitt Survey, Abstract 684. Project costs will include land, right-of-way, remediation, paving, storm drainage, water, wastewater, landscaping, hardscaping, amenities, design, and administrative costs. Began Demolition: Spring 2016 Construction Complete: FY2019 This is a significant development opportunity within the heart of Euless. The development is projected to include residential development including villas, townhomes and rowhouses, cluster housing, and urban lofts; commercial development including retail and restaurant development; and landscaped bioswales and water detention areas for stormwater management. 146 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Public Improvements $16,417,980 $0 $0 Average annual debt service $915,000 $0 $915,000 $16,417,980 Certificates of Obligation $16,417,980 $0 $0 $915,000 $16,417,980 Public Improvements $16,417,980 $16,359,955 $58,025 100% $16,417,980 $16,359,955 $58,025 100% MIDTOWN DEVELOPMENT ED1601 147 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: FACILITIES April 11,2011 SCOTT PETERSON ADA/TAS FACILITY IMPROVEMENTS FACILITIES IMPROVEMENTS FM1201 This project provides for the continued improvements to various City facilities as required by Federal and State mandated Americans with Disabilities Act/Texas Accessibility Standards ("ADA/TAS"). City facilities, entrances, lifts, signage, speech and hearing aided devices, and other areas covered under both ADA and TAS requirements will be part of these improvements. Project funds will be managed by the City Manager's Office and will be allocated as identified projects are brought forth and approved. On-going Some City facilities do not meet current ADA/TAS standards. Updating accessibility on a continuing basis will help keep the City in compliance with government standards and will address the growing needs of citizens with accessibility issues. 148 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: (Minimum balance $100,000) $0 $0 $0 $0 Transfer from: Car Rental Fund $65,000 General Operating/CIP Fund $155,000 $0 Risk Operating Fund $25,000 $0 Additional Funding Needed: Annual expense $91,537 Transfer from: General CIP Fund Balance $85,000 $91,537 $330,000 Structural Maintenance $318,525 $223,636 $94,889 70% Training $11,475 $6,851 $4,624 60% $330,000 $230,487 $99,513 70% ADA/TAS FACILITY IMPROVEMENTS FM1201 149 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: FLEET & FACILITY OPERATIONS June 22,2022 SCOTT PETERSON MISC. ROOF REPAIRS & PREVENTATIVE MAINTENANCE FACILITIES IMPROVEMENTS FM2207 December 14, 2021: Awarded RFP No. 003-22 for roof inspection and assessment services to Bluefin, LLC a division of Mantis Innovation. Facility Maintenance, in conjunction with Mantis/Blue Innovation, conducted a full roof assessment on city-owned facilities to determine the condition of existing roof structures. The study established a Roof Assessment Maintenance Program (RAMP) for each building. The assessment identified at what point in the future the roof would likely need repairs, restoration, or full replacement. This project provides funding for roof preventative maintenance and repairs to various roofs throughout the City. On-going Roof preventative maintenance and repairs will extend the useful life until a complete replacement is necessary. 150 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: (Minimum balance $100,000) $0 $0 $0 $0 Transfer from: General Fund $373,000 General CIP Fund Balance $66,000 $0 $0 Annual expense $25,080 Transfer to: General CIP Fund Balance ($279,000) $25,080 $160,000 Construction $160,000 $25,080 $134,920 16% $160,000 $25,080 $134,920 16% MISC. ROOF REPAIRS & PREVENTATIVE MAINTENANCE FM2207 151 Department:Date Prepared:May 17, 2022 Submitted By:Date Completed: Project Title: Project Type:FACILITIES Sub-Type: Project CODE:FM2311 Priority:A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: The current station located at 1515 Westpark Way can no longer meet the needs of a full-service fire station. This station was constructed in 1998 from the former Fleet Service Center (built 1978). The facility was remodeled to accommodate the fire staff and apparatus bays were constructed on the west side of the building for equipment and vehicles. Minor cosmetic upgrades were performed in 2015 with paint and appliance updates being the primary focus. The needs assessment performed in FY2022 has determined that the current station would not be a candidate for a remodel and the site would not accommodate the size of structure needed to support fire operations. Project scope includes the design and construction of a new Fire Station #2 to be located at 2214 West Euless Boulevard. The proposed project calls for a station of approximately 18,000-19,000 sq. ft. to include four (4) double deep bays to accommodate various sizes of apparatus along with additional bay space for housing of reserve units and other equipment. Living quarters and office space for staff are also included in the project. A three-story fire training tower with an internal stairway and exterior window ports for various forms of ladder training, repelling exercises, and window rescues is also a possibility for this site. Began Construction: August 2023 Construction Completed: August 2025 City of Euless Capital Project Request FLEET & FACILITY OPERATIONS SCOTT PETERSON FIRE STATION #2 BUILDING The public safety needs assessment conducted in FY2022 identified Fire Station #2 as a candidate for relocation and replacement in order to accommodate fire service operations and to meet the growing needs of the community. Design Complete: April 2023 Began Design: October 2022 August 22, 2022: Authorized the City Manager to negotiate and execute an Architectural Services Contract with Oxley Williams Tharp Architects. The estimated expenditure is $525,000. August 22, 2022: Approved the first and final reading of Ordinance No. 2318, authorizing the issuance of City Of Euless, Texas, Tax Notes, Series 2022. June 27, 2023: Awarded Request For Competitive Sealed Proposal (RFCSP) No. 013-23 for the construction of Fire Station No. 2 in the amount of $8,669,150, authorized an owner-controlled contingency not to exceed 5%, and authorized the City Manager to enter into a construction contract with Modern Contractors. May 28, 2024: Authorized the purchase of a fire station alerting system for Fire Station No. 2 from US Digital Designs, Inc. using HGAC Contract No. EC07-23. The estimated expenditure is $133,821.01. 152 PROJECT TITLE:PROJECT CODE:FM2311 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Professional Services $580,000 Direct Operating Cost Construction $9,126,269 Personnel:Full Time Furniture, Fixtures & Equipment $1,000,000 Part Time $0 Testing & Material Services $105,000 $0 Contingency $355,058 Avg. Annual Debt Service $1,197,000 $1,197,000 Total Estimated Capital Cost $11,166,327 Maintenance Costs General Operating/CIP Fund $1,330,000 Car Rental Fund $878,474 FM2006 - Fire Station #1 $459,924 $0 2022 Tax Notes $7,600,000 $0 Interest Earnings $697,795 Interest Earnings (FM2006)$200,134 Total Estimated Annual Cost $1,197,000 Total Funding $11,166,327 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED $580,000 $510,608 $69,392 88% $9,126,269 $8,865,089 $261,180 97% $1,000,000 $707,444 $292,556 71% Testing & Material Services $105,000 $102,058 $2,942 97% Contingency $355,058 $0 $355,058 0% $11,166,327 $10,185,199 $981,128 91% Subtotal: FUNDING SOURCE: Transfer from: CURRENT STATUS Professional Services TOTAL PROJECT Subtotal: Furniture, Fixtures & Equipment Construction FIRE STATION #2 Total Salary Purchase of Services Materials & Supplies Utilities 153 Department:Date Prepared:May 17, 2022 Submitted By:Date Completed: Project Title: Project Type:FACILITIES Sub-Type: Project CODE:FM2312 Priority:A COUNCIL AUTHORIZATION: March 10, 2026: Authorized the purchase of dispatch furniture from Miller at Work. The estimated expenditure is $133,018. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: March 10, 2026: Authorized the purchase and installation of audio/visual equipment from TodoVerde Consulting Ventures LLC. The estimated expenditure is $599,287. April 14, 2026: Authorized the purchase of office furniture from Workplace Solutions. The estimated expenditure is $1,076,789. REMODEL This project pertains to the City's continued efforts to meet the needs of citizens related to the delivery of increased public safety services and to reconfigure the facility to better provide for those and future needs. September 9, 2025: Authorized the purchase of construction material testing services from CMJ Engineering. August 12, 2025: Authorized the purchase of an emergency standby generator from Cantwell Power Systems. The estimated expenditure is $551,600. November 25, 2025: Authorized the City Manager to negotiate and execute a Change Order to the existing contract with Modern Contractors to provide for jail facility improvements. December 9, 2025: Authorized the City Manager to execute a contract with CML Security for the building control system. The estimated expenditure is $675,750. December 9, 2025: Authorized the City Manager to execute a contract with McKinney Security Systems, LLC for a security camera system. The estimated expenditure is $149,684. December 9, 2025: Authorized the City Manager to execute a contract with Secured Access Systems, LLC for access control systems hardware, software, supplies, installation, integration, and maintenance services. The estimated expenditure is $269,894. August 22, 2022: Authorized the City Manager to negotiate and execute an Architectural Services Contract with Oxley Williams Tharp Architects. The estimated expenditure is $960,000. June 13, 2023: Approved Resolution No. 23-1644 authorizing the City Secretary to publish a notice declaring the intention to issue certificates of obligation in an amount not to exceed $22 million for public improvements to the City Police and Court building. August 8, 2023: Approved the first and final reading of Ordinance No. 2349, authorizing the issuance of “City of Euless, Texas, Tax and Waterworks and Sewer System (Limited Pledge) Revenue Certificates of Obligation, Series 2023". June 11, 2024: Awarded Request for Competitive Sealed Proposal (RFCSP) No. 003-24 for the construction of the Euless Police Department and Court Addition and Alterations in the amount of $18,472,000, authorized an owner-controlled contingency not to exceed $1,729,000, and authorized the City Manager to enter into a construction contract with Modern Contractors. June 24, 2025: Authorized the purchase of an automatic transfer switch from Cantwell Power Systems. The estimated expenditure is $72,450. City of Euless Capital Project Request FLEET & FACILITY OPERATIONS SCOTT PETERSON POLICE & COURT BUILDING REMODEL Since the building was constructed in the 1999-2000 time frame, the department has realized increased staffing levels, the addition of the Code Enforcement division, and requirements for long-term storage for evidence and additional equipment provided to protect officers. The needs assessment performed in FY2022 determined that the current facility is a good candidate for a remodel and the site can accommodate the structural additions necessary to make such improvements. This project consists of the design and construction for the remodel of the current Police & Court Building located at 1102 West Euless Boulevard. The project scope will focus on better utilization of the building by positioning divisions that function together as a team in close proximity, to provide adequate office space for staff, and to provide security improvements, meeting room improvements, and general upgrade of fixtures and furnishings. Operations will see minimal impact during the remodel. Began Construction: July 2024 Anticipate Construction Complete: November 2026 Design Complete: April 2024 Began Design: October 2022 154 PROJECT TITLE:PROJECT CODE:FM2312 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Professional Svcs & Material Testing $1,210,000 Direct Operating Cost Construction $22,944,646 Personnel:Full Time Furniture, Fixtures & Equipment $3,226,800 Part Time $0 Contingency $1,501,436 $0 Avg. Annual Debt Service $1,889,000 $1,889,000 Total Estimated Capital Cost $28,882,882 Maintenance Costs CCPD Operating Fund $2,210,000 Equipment Replacement Fund $1,834,236 2023 Certificates of Obligation $22,000,000 $0 Interest Earnings $2,743,646 $0 Additional Funding Needed: Transfer from: Equipment Replacement Fund $95,000 Total Estimated Annual Cost $1,889,000 Total Funding $28,882,882 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED $1,210,000 $1,057,709 $152,291 87% $22,944,646 $18,483,936 $4,460,710 81% $3,226,800 $1,388,815 $1,837,985 43% Contingency $1,501,436 $0 $1,501,436 0% $28,882,882 $20,930,460 $7,952,422 72% Utilities POLICE & COURT BUILDING REMODEL Total Salary Purchase of Services Materials & Supplies CURRENT STATUS Professional Svcs & Material Testing TOTAL PROJECT Subtotal: Furniture, Fixtures & Equipment Construction Subtotal: FUNDING SOURCE: Transfer from: 155 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PARKS AND COMMUNITY SERVICES July 16, 2024 DUANE STRAWN FACILITY RENOVATIONS AT 1400 SOUTH PIPELINE ROAD FACILITIES IMPROVEMENTS FM2508 June 10, 2025: Authorized the City Manager to execute a Fifth Amendment to the Purchase and Lease Agreement between the City and DSE Hockey Center, L.P. ("Lessee"). Lessee/City will participate in building renovations. October 28, 2025: Authorized the City Manager to execute a contract with Schindler Elevator Corporation for the modernization and refurbishment of the elevator and control systems. The estimated expenditure is $151,007. January 27, 2026: Authorized the City Manager to execute a contract with Dallas Mechanical Group for repairs and replacement of various heating and ventilation equipment. The estimated expenditure is $128,746. February 24, 2026: Authorized the City Manager to execute a contract with Thermal Care for the replacement of the rink ice manufacturing plant and ancillary chilling equipment. The estimated expenditure is $924,754. May 12, 2026: Authorized the City Manager to execute a contract with Athletica Sport Systems Inc.,for the replacement of the rink perimeter glass, framework, and impact boards. The estimated expenditure is $495,140. The City of Euless owns a facility located at 1400 South Pipeline Road which is leased to the Dallas Stars. The original lease agreement was entered into in 1999 and the facility is in need of renovations and improvements. The project scope includes renovating the restrooms, locker rooms, outdoor patio area, lobby, and office space. Additionally, an upgrade to the HVAC system, redesign and update of the second floor, improvements to the ceiling tile and lighting, and installation of new roll up door doors throughout the facility is included in the project as well. Began Construction: Summer 2025 Anticipate Construction Complete: Fall 2026 The building is approximately 25 years old and is in need of renovations and improvements. 156 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Remodel/Improvements $3,200,000 $0 $0 $0 $0 $3,200,000 Transfer from: Car Rental Fund $1,600,000 $0 Dallas Stars Contribution $1,600,000 $0 $0 $3,200,000 Remodel/Improvements $3,200,000 $172,603 $3,027,397 5% $3,200,000 $172,603 $3,027,397 5% FACILITY RENOVATIONS AT 1400 SOUTH PIPELINE ROAD FM2508 157 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: TEXAS STAR GOLF COURSE May 17,2011 GLENDA HARTSELL TSGC MISCELLANEOUS IMPROVEMENTS PARKS/RECREATION TSGC IMPROVEMENTS GC1801 To provide funding to address small capital projects that arise throughout the year at Texas Star Golf Course. Without funding for this project, the smaller items identified throughout the year could not be addressed in a timely manner and would have to be postponed until the next budget cycle for funding consideration. Timely response preserves the City's investment in a high-profile asset and maintains the quality service levels expected by patrons. 158 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: (Minimum balance $150,000) $0 $0 $0 $0 Transfer from: TSGC Reserve Fund/CIP FB $580,000 Hotel/Motel Fund $120,000 $0 Car Rental Fund $50,000 $0 Miscellaneous Other $27,180 Annual expense $71,884 Additional Funding Needed: Transfer from: TSGC CIP FB $80,000 $71,884 $857,180 Improvements $548,110 $399,248 $148,862 73% Equipment $307,070 $298,149 $8,921 97% Botanical $2,000 $2,000 $0 100% $857,180 $699,397 $157,783 82% TSGC MISCELLANEOUS IMPROVEMENTS GC1801 159 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: GOLF COURSE May 15,2024 GLENDA HARTSELL GOLF COURSE UPGRADES PARKS/RECREATION TSGC IMPROVEMENTS GC2501 April 8, 2025: Awarded Bid No. 009-25 to Fleetwood Services, LLC for the construction of course improvements. The estimated expenditure is $385,228.75 with an owner controlled contingency not to exceed $96,300. June 24, 2025: Authorized the City Manager to execute a contract for repairs to the parking lot to Cam-Crete Contracting. Resurface the existing 'MiniVerde' Ultradwarf Bermuda greens at Texas Star Golf Course by removing the thatch layer near the surface, replacing with a suitable rootzone mix and re-sprigging the greens with TifEagle Bermudagrass. Collars will be re-sodded with 419 Bermudagrass. After removal, the existing sand will be used for agronomic practices around the course and practice areas. Additional improvement projects, such as leveling and expansion of various Tee boxes, capping sand in bunkers, cart path and parking improvements, and other small miscellaneous enhancements are included in the project scope. Began Construction: May 2025 Construction Complete: September 2025 Texas Star is a championship daily fee golf facility known for its high level of service and excellent course conditions. At this point in the life of the greens, it has become increasingly more difficult to maintain the existing 'MiniVerde' Ultradwarf Bermuda greens in an acceptable condition year round. TifEagle Bermudagrass is more genetically stable, as well as having a more robust tolerance to cold weather and shade as opposed to other Ultradwarf Bermudagrasses. Additionally, improvements on the Tee Boxes, bunkers, cart paths and other small projects would result in not only an aesthetically pleasing look, but optimal playing conditions as well adding to the total Texas Star experience. 160 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Greens Replacement $475,000 Capping Bunkers $70,000 $0 Tee Improvements $79,000 $0 Cart Path Improvements $75,000 Native Area Control $10,000 Contingency $130,000 Transfer to Golf Ops(Rev Loss) $1,079,500 Parking Lot Improvements $279,000 Design $42,500 $0 $0 $2,240,000 Transfer from: Car Rental Fund $2,190,000 Hotel/Motel Fund $50,000 $0 $0 $0 $2,240,000 Design $42,500 $42,122 $378 99% Improvements $709,000 $706,685 $2,315 100% Contingency $130,000 $129,515 $485 100% Transfer to Golf Ops (Revenue Loss)$1,079,500 $1,041,090 $38,410 96% Parking Lot Improvements $279,000 $278,069 $931 100% $2,240,000 $2,197,481 $42,519 98% GOLF COURSE UPGRADES GC2501 161 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PARKS AND COMMUNITY SERVICES March 23,2004 DUANE STRAWN MISCELLANEOUS PARK IMPROVEMENTS PARKS/RECREATION PARKS PR0720 June 9, 2020: Authorized the purchase and installation of sod and irrigation at the Villages of Bear Creek Park, from Tri-Tex Grass, through the BuyBoard Cooperative Purchasing Program. The estimated expenditure is $46,500. May 23, 2023: Authorized the purchase and installation of an LED lighting system for the pickeball courts. The estimated expenditure is $54,999 and will be paid from PR2308 and PR0720. The adopted Parks Master Plan recommends funding for system-wide park facilities and amenities upgrades. The project provides funding for the upgrade and modernization of City parks to include replacement of aged structures such as pavilions, picnic tables, gazebos, signs, safety components, and other park amenities including the addition of a gazebo on Main Street. Park infrastructure and structure painting are included in the scope of the project. Additionally, the project encompasses the installation of trail lighting along the Trails of Euless similar to the lighting installed along the trail through Midway Park. Trailwood Park, Bob Eden Trail, The Preserve at McCormick Park, The Villages of Bear Creek Park, and Heritage Park would also benefit from trail lighting. On-going Pursuant to the recommendations in the Parks Master Plan, park accessibility should be in compliance with the Americans with Disabilities Act. The existing equipment in many park areas is becoming aged and will require refurbishment or replacement in the near term. Additionally, park infrastructure should be maintained at a level that meets citizen expectations. 162 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: (Minimum balance $200,000) $0 $0 $0 $0 Transfer from: EDC Operating Fund $2,075,000 Developer Contribution (TRA)$10,500 $0 ES0283 & ES1901 $32,753 $0 Annual expense $109,148 $109,148 $2,118,253 Park Furnishings $1,511,119 $1,282,879 228,240 85% Landscaping $53,021 $42,038 10,983 79% Contingency $57,702 $57,702 0 100% Park Lighting $167,924 $167,558 366 100% Equipment $3,170 $3,170 0 100% Trail/Sidewalk Improvements $57,295 $57,105 190 100% Professional Services $91,202 $90,388 814 99% Improvements $129,067 $129,067 0 100% Demolition $15,000 $14,970 30 100% Improvements (ES0283-Bear Creek Park)$27,753 $0 27,753 0% Botanical (ES1901-Barfield Foundation)$5,000 $0 5,000 0% $2,118,253 $1,844,877 $273,376 87% MISCELLANEOUS PARK IMPROVEMENTS PR0720 163 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PARKS AND COMMUNITY SERVICES October 01,2007 DUANE STRAWN PARK IRRIGATION PARKS/RECREATION PARKS PR0804 June 25, 2024: Awarded Bid No. 011-24 to Pace Construction for landscape and irrigation system installation at the Parks at Texas Star North, along Highland Drive. This project provides annual funding to continue efforts to meet irrigation needs throughout the City's park system. Projects will be identified and completed on an as-needed basis. This project allows for maintenance and expansion of the irrigation systems throughout the parks system to enhance the overall condition of the landscape and green space. 164 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: (Annual funding $25,000) $0 $0 $0 $0 Transfer from: EDC Operating Fund $475,000 $0 $0 Additional Funding Needed: Transfer from: EDC Operating Fund $25,000 $0 $500,000 Irrigation $500,000 $318,296 181,704 64% $500,000 $318,296 $181,704 64% PARK IRRIGATION PR0804 165 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PARKS AND COMMUNITY SERVICES April 4, 2024 DUANE STRAWN PARKS AT TEXAS STAR SOUTH IMPROVEMENTS PARKS/RECREATION PARK IMPROVEMENTS PR2508 November 12, 2024: Authorized the City Manager to execute an architectural services contract with Williams Tharp Architects for the design of the new restroom facility at the Parks at Texas Star South. The estimated expenditure is $57,500. September 23, 2025: Awarded Bid No. 018-25 to First Construction, LLC for the construction of a restroom facility at the Parks at Texas Star South. The estimated expenditure is $502,250. Since the construction of Legends Field in 2017, we have received numerous requests for a restroom facility to serve that portion of the Parks at Texas Star facility. In addition, the removal of the batting cages has created a large open space that can be redesigned to better meet the needs of the Parks at Texas Star facility as well as participants in league and tournament ballgames. The project scope includes an additional restroom facility to service the east end of the Parks at Texas Star South Sports Complex and design services to redevelop the former batting cage area at Parks at Texas South with recreational and/or passive activities. Began Design: January 2025 Design Complete: June 2025 Began Restroom Construction: October 2025 Anticipate Restroom Construction Complete: July 2026 There is a lack of restroom facilities on the east end of a very busy athletic complex and the installation of a restroom facility would be a major benefit to customers. Also, since the batting cages at Parks at Texas Star South were removed, this project will allow for re-purposing of this area with recreational activities. 166 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Restroom Building / Sidewalks to the Restroom Bld / Batting $0 Cage Area Redesign $750,000 $0 $0 $0 $750,000 Transfer from: EDC Operating Fund $750,000 $0 $0 $0 $750,000 Design $53,000 $45,514 $7,486 86% Building $365,000 $362,349 $2,651 99% Sidewalks $122,000 $0 $122,000 0% Remodel/Improvements $210,000 $7,612 $202,388 4% $750,000 $415,475 $334,525 55% PARKS AT TEXAS STAR SOUTH IMPROVEMENTS PR2508 167 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PARKS AND COMMUNITY SERVICES April 1, 2025 DUANE STRAWN EFLC EXPANSION FEASIBILITY/PROGRAMMING STUDY PARKS/RECREATION FACILITY IMPROVEMENTS PR2604 The adopted 2025 Parks, Recreation, and Open Space Master Plan identified the expansion of the Euless Family Life Center (EFLC) as the No. 1 Indoor Need Priority. In order to meet the demands of citizens, the EFLC needs to expand it's functional footprint to accommodate growing membership, classes, and programs offered. The project scope includes a feasibility and programming study to determine the appropriate mixture of programming space and activities for the EFLC expansion project as recommended in the Parks Master Plan update and further defined with staff recommendations. This project would lead to the design phase. Began Feasibility/Programming Study: February 2026 Anticipate Feasibility/Programming Study Complete: December 2026 Built in 1989, the EFLC has served a great need for over 36 years. Renovations and some additions (fitness area) were completed in 2010. These areas have become overwhelmed with growth in membership and number and size of classes and programs offered at the EFLC. During development of the 2025 Parks, Recreation, and Open Space Master Plan, citizens ranked the expansion, renovation, and redevelopment of the EFLC as their No. 1 priority on the Indoor Needs List. Specifics additional gym space, multi-purpose rooms, storage, fitness area, Child Care, Teen Room, and office space. Restrooms and locker rooms are in need of renovation/ expansion and the facility entrances and exits need to be more customer friendly for members and visitors. 168 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Feasibility/Programming Study $100,000 $0 $0 $0 $0 $100,000 $0 Transfer from: Car Rental CIP Fund Balance $100,000 $0 $0 $100,000 Feasibility/Programming Study $100,000 $8,000 $92,000 8% $100,000 $8,000 $92,000 8% EFLC EXPANSION FEASIBILITY/PROGRAMMING STUDY PR2604 169 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PARKS AND COMMUNITY SERVICES April 1, 2025 DUANE STRAWN KIDDIE CARR PARK IMPROVEMENTS PARKS/RECREATION PARK IMPROVEMENTS PR2605 November 11, 2025: Authorized the City Manager to negotiate and execute an engineering/architectural services contract with Dunaway & Associates, Inc. for the design, bidding, and construction administration phase for Kiddie Carr Park. The estimated expenditure is $200,000. The adopted 2025 Parks, Recreation, and Open Space Master Plan recommends funding for system-wide park facilities and amenities upgrades. Kiddie Carr Park was identified as a top priority park renovation based on existing conditions, needs list, and anticipated funding. Kiddie Carr Park is a four-acre park located adjacent to Carr Park off Pauline Street. This park includes the department's in-ground tree farm, a greenhouse, and an outdoor basketball court. This project is comprised of the necessary demolition and site work to complete a renovated park that includes additional parking, sidewalks, and landscaping. Project scope consists of amenities such as benches, picnic tables, general park lighting, a sport court, drinking fountain, trash cans, barbecue grills, bicycle racks, signage, and a trail connection to J.A. Carr Park. Began Design: November 2025 Anticipate Design Complete: July 2026 Anticipate Begin Construction: September 2026 Anticipate Construction Complete: March 2027 As identified in the adopted 2025 Parks, Recreation, and Open Space Master Plan, the municipal park is the foundation of any solid parks and recreation system. Euless' parks and recreation system provides residents and visitors with significant personal, social, environmental, and economic benefits. The revitalization efforts Council focused on over the years have increased citizens' sense of community pride. The proposed project will continue the Council's revitalization efforts by creating an area that will serve both the passive and active leisure pursuits of residents in this area. 170 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Professional Services $200,000 Construction $1,800,000 $0 $0 $0 $0 $2,000,000 $0 Transfer from: Car Rental CIP Fund Balance $2,000,000 $0 $0 $2,000,000 Professional Services $200,000 $64,753 $135,247 32% Construction $1,800,000 $0 $1,800,000 0% $2,000,000 $64,753 $1,935,247 3% KIDDIE CARR PARK IMPROVEMENTS PR2605 171 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PARKS AND COMMUNITY SERVICES May 30, 2025 DUANE STRAWN PATS SOUTH BATTING CAGE AREA REDEVELOPMENT PARKS/RECREATION PARK IMPROVEMENTS PR2606 November 11, 2025: Authorized the City Manager to negotiate and execute an engineering/architectural services contract with the Broussard Group, Inc. for the design, bidding, and construction administration phase for the renovation of the batting cage area at Parks at Texas Star Sports Plaza. The estimated expenditure is $175,000. The adopted 2025 Parks, Recreation, and Open Space Master Plan identified the need for additional seating, playgrounds, pickleball courts, and sport courts. This project includes these items and helps meet the needs of citizens. The removal of the batting cages at the Parks at Texas Star South facility created a large open space available for redesign to better meet the needs of the complex as well as citizens. The project scope includes three lighted pickleball courts, a lighted half-court basketball court, park seating, a natural climbing playground, and a connection to the Parks at Texas Star South Pavilion. Began Design: November 2025 Anticipate Design Complete: June 2026 Anticipate Begin Construction: August 2026 Anticipate Construction Complete: March 2027 This project gives this available area a new purpose and provides citizens numerous new recreational and passive park amenities to enjoy while at the complex. 172 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Batting Cage Area Redev. $1,750,000 $0 $0 $0 $0 $1,750,000 $0 Transfer from: EDC CIP Fund Balance $1,750,000 $0 $0 $1,750,000 Construction $1,750,000 $74,824 $1,675,176 4% $1,750,000 $74,824 $1,675,176 4% PATS SOUTH BATTING CAGE AREA REDEVELOPMENT PR2606 173 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PARKS AND COMMUNITY SERVICES April 1, 2025 DUANE STRAWN SOUTH EULESS PARK IMPROVEMENTS PARKS/RECREATION PARK IMPROVEMENTS PR2607 September 23, 2025: Authorized the City Manager to negotiate and execute a contract with LJA Engineering for the design, bidding, and construction administration phase for the South Euless Park renovation. The estimated expenditure is $275,000. April 28, 2026: Awarded a contract to Tegrity Contractors, Inc. for the renovation of South Euless Park in the amount of $2,670,777 and authorized an owner-controlled contingency not to exceed eight percent. The adopted 2025 Parks, Recreation, and Open Space Master Plan identified general upgrades and improvements in the overall quality of City parks to provide activities for all ages and interest groups and enhance the adjoining neighborhoods. South Euless Park was identified as a top priority park renovation based on existing conditions, needs list, and anticipated funding. Overall park enhancements and improvements include amenities such as new playground equipment, park redevelopment, improved lighting, new sport courts, new group pavilion and restroom, and additional picnic areas. Begin Design: October 2025 Design Complete: April 2026 Begin Construction: May 2026 Anticipate Construction Complete: December 2026 As identified in the adopted 2025 Parks, Recreation, and Open Space Master Plan, the municipal park is the foundation of any solid parks and recreation system. Euless' parks and recreation system provides residents and visitors with significant personal, social, environmental, and economic benefits. The revitalization efforts Council focused on over the years have increased citizens' sense of community pride. The proposed project continues the Council's revitalization efforts by creating an area that will serve both the passive and active leisure pursuits of residents in this area. 174 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Professional Services $275,000 Construction $2,725,000 $0 $0 $0 $0 $3,000,000 $0 Transfer from: EDC CIP Fund Balance $3,000,000 $0 $0 $3,000,000 Professional Services $275,000 $225,086 $49,914 82% Construction $2,725,000 $0 $2,725,000 0% $3,000,000 $225,086 $2,774,914 8% SOUTH EULESS PARK IMPROVEMENTS PR2607 175 176 Project Description Priority Estimated Cost Operating Fund CIP Fund Balance Bond/Tax Note Grants/ Contributions Impact Fees Escrow Funds Car Rental Tax Other EDC To Be Determined DRAINAGE PROJECTS FY2026-27 Drainage Curb & Gutter Improvements A $ 250,000 XX Sub-Total Drainage Priority A-Proposed FY2026-27 $ 250,000 FY2027-28 Drainage Curb & Gutter Improvements (28)B $ 250,000 XX FY2028-29 Drainage Curb & Gutter Improvements (29)B $ 250,000 XX FY2029-30 Drainage Curb & Gutter Improvements (30)B $ 250,000 XX FY2030-31 Drainage Curb & Gutter Improvements (31)B $ 250,000 XX Sub-Total Drainage Priority B-Unfunded $ 1,000,000 Valley Gutter Replacement – Crane Drive C $ - XX Sub-Total Drainage Priority C-Unfunded $ - DRAINAGE PROJECTS - TOTAL $ 1,250,000 STREET PROJECTS FY2026-27 Street Improvements A $ 1,275,000 XX Traffic Signal Intersection Improvements – Mid-Cities Blvd & North Main Street A $ 1,295,183 $ 184,949 $ 1,110,234 Sub-Total Street Priority A-Proposed FY2026-27 $ 2,570,183 FY2027-28 Street Improvements (28)B $ 1,350,000 XX Cresthaven Drive Reconstruction (29)B $ 3,550,000 XX FY2028-29 Street Improvements (29)B $ 1,425,000 XX FY2029-30 Street Improvements (30)B $ 1,500,000 XX FY2030-31 Street Improvements (31)B $ 1,575,000 XX Sub-Total Street Priority B-Unfunded $ 9,400,000 East Alexander Lane Reconstruction C TBD XX Midway Drive Reconstruction Phase I C TBD XX Midway Drive Reconstruction Phase II C TBD XX Midway Drive Reconstruction Phase III C TBD XX Ross Avenue Extension C TBD XX Sheppard Drive Reconstruction C TBD XX Vine Street Reconstruction – SH 183 to SH 10 C TBD XX Sub-Total Street Priority C-Unfunded $ - STREET PROJECTS - TOTAL $ 11,970,183 WASTEWATER PROJECTS FY2026-27 53rd CDBG LR: Skyway Drive/Ridgecrest Drive/S Ector Drive A $ 286,000 XX LR: Oakwood Terrace North Phase III – Construction A $ 474,000 XX LR: Vine Street Construction A $ 300,000 XX Sub-Total Wastewater Priority A-Proposed FY2026-27 $ 1,060,000 FY2027-28 54th CDBG LR: Limestone Drive/Himes Drive (28)B $ 254,000 XX LR: Woodvine Drive Engineering (28)B $ 98,000 XX LR: Cliffwood Road/Shady Creek Drive Engineering (29)B $ 119,000 XX LR: Euless Junior High School/Himes Drive/N Byers Street Engineering (29)B $ 110,000 XX FY2028-29 55th CDBG LR: Pecos Drive/N Ector Drive/Midway Drive (29)B $ 310,000 XX LR: Woodvine Drive Construction (29)B $ 491,000 XX LR: Cliffwood Road/Shady Creek Drive Construction (30)B $ 596,000 XX LR: Euless Junior High School/Himes Drive/N Byers Street Construction (30)B $ 550,000 XX FY2029-30 56th CDBG LR: Westpark Way Circle Phase I (30)B $ 296,000 XX FY2030-31 57th CDBG LR: Westpark Way Circle Phase II (31)B $ 292,000 XX LR: Huntington Place/Stone Meadow Engineering (31)B $ 121,000 XX Sub-Total Wastewater Priority B-Unfunded $ 3,237,000 LR: Huntington Place/Stone Meadow Construction C TBD XX LR: Knob Hill C TBD XX Sub-Total Wastewater Priority C-Unfunded $ - WASTEWATER PROJECTS - TOTAL $ 4,297,000 LR = Line Replacement PROPOSED METHOD OF FINANCING CAPITAL IMPROVEMENT PROGRAMS FY2026-27 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE 177 Project Description Priority Estimated Cost Operating Fund CIP Fund Balance Bond/Tax Note Grants/ Contributions Impact Fees Escrow Funds Car Rental Tax Other EDC To Be Determined PROPOSED METHOD OF FINANCING CAPITAL IMPROVEMENT PROGRAMS FY2026-27 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE WATER PROJECTS LR: Bell-Hi Addition Phases I & II Engineering A $ 88,000 XX LR: West Euless Boulevard Engineering A $ 111,000 XX Sub-Total Water Priority A-Proposed FY2026-27 $ 199,000 LR: Bell-Hi Addition Phases I & II Construction (28)B $ 585,000 XX LR: Donley Drive/Donley Court Engineering (28)B $ 75,000 XX LR: West Euless Boulevard Construction (28)B $ 742,000 XX LR: Donley Drive/Donley Court Construction (29)B $ 497,000 XX LR: Fuller-Wiser Road Engineering (29)B $ 75,000 XX Well Water Treatment Feasibility Study (29)B $ 100,000 XX LR: Fuller-Wiser Road Construction (30)B $ 497,000 XX LR: Midway Drive Phases I & II Engineering (31)B $ 247,000 XX LR: Midway Drive Phase I Construction (31)B $ 722,000 XX Sub-Total Water Priority B-Unfunded $ 3,540,000 1 Mil Well Replacement C TBD XX LR: Dunaway Drive C TBD XX Groundwater Treatment C TBD XX LR: Knob Hill C TBD XX LR: Midway Park 3rd Addition C TBD XX LR: Midway Drive Phase II Construction C TBD XX LR: North Main Street C TBD XX LR: Westpark Way C TBD XX Sub-Total Water Priority C-Unfunded $ - WATER PROJECTS - TOTAL $ 3,739,000 OTHER PROJECTS Euless Family Life Center Expansion Schematic Design A $ 430,000 XX J.A. Carr Park Expansion Phase I A $ 600,000 XX Parks at Texas Star South Turf Replacement A $ 900,000 XX Sub-Total Other Priority A-Proposed FY2026-27 $ 1,930,000 Euless Family Life Center Expansion Design Development (28)B $ 1,290,000 XX Euless Family Life Center Expansion Construction Document Development (29)B $ 2,300,000 XX J.A. Carr Park Expansion Phase II (29)B $ 6,000,000 XX Parks at Texas Star Phase VIII (29)B $ 10,000,000 XX Euless Family Life Center Expansion Construction (30)B TBD XX Parks at Texas Star North Turf Replacement (31)B $ 850,000 XX Sub-Total Other Priority B-Unfunded $ 20,440,000 Parks at Texas Star South Entrance Improvements C TBD XX Trail Enhancements Phase I C TBD XX Trail Enhancements Phase II C TBD XX Trail/Park Enhancements Villages of Bear Creek C TBD XX Trailwood Park Improvements C TBD XX West Park Improvements C TBD XX Sub-Total Other Priority C-Unfunded $ - OTHER PROJECTS - TOTAL $ 22,370,000 LR = Line Replacement 178 Project Description Priority Estimated Cost Operating Fund CIP Fund Balance Bond/Tax Note Grants/ Contributions Impact Fees Escrow Funds Car Rental Tax Other EDC To Be Determined DRAINAGE PROJECTS FY2026-27 Drainage Curb & Gutter Improvements A $ 250,000 XX Sub-Total Drainage Priority A-Proposed FY2026-27 $ 250,000 FY2027-28 Drainage Curb & Gutter Improvements (28)B $ 250,000 XX FY2028-29 Drainage Curb & Gutter Improvements (29)B $ 250,000 XX FY2029-30 Drainage Curb & Gutter Improvements (30)B $ 250,000 XX FY2030-31 Drainage Curb & Gutter Improvements (31)B $ 250,000 XX Sub-Total Drainage Priority B-Unfunded $ 1,000,000 Valley Gutter Replacement – Crane Drive C $ - XX Sub-Total Drainage Priority C-Unfunded $ - DRAINAGE PROJECTS - TOTAL $ 1,250,000 CAPITAL IMPROVEMENT PROGRAMS FY2026-27 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE PROPOSED METHOD OF FINANCING 179 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 09,2024 MAJOR JONES FY2026-27 DRAINAGE CURB & GUTTER IMPROVEMENTS DRAINAGE IMPROVEMENTS A The project consists of the removal and replacement of damaged curb and gutter throughout the City. FY2026-27 The existing curb and gutter along many City streets has aged, failed, or been damaged. The curb and gutter serves as part of the City's storm water collection system. The new curb and gutter will improve drainage performance while also enhancing the appearance of City streets. 180 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: FY2026-27 DRAINAGE CURB & GUTTER IMPROVEMENTS Construction $250,000 $0 $0 $0 $0 $0 $0 $0 $250,000 XX Proposed funding is from Drainage Operating Fund. 181 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 09,2024 MAJOR JONES FY2027-28 DRAINAGE CURB & GUTTER IMPROVEMENTS DRAINAGE IMPROVEMENTS B The project consists of the removal and replacement of damaged curb and gutter throughout the City. FY2027-28 The existing curb and gutter along many City streets has aged, failed, or been damaged. The curb and gutter serves as part of the City's storm water collection system. The new curb and gutter will improve drainage performance while also enhancing the appearance of City streets. 182 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: FY2027-28 DRAINAGE CURB & GUTTER IMPROVEMENTS Construction $250,000 $0 $0 $0 $0 $0 $0 $0 $250,000 XX Proposed funding is from Drainage Operating Fund. 183 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 09,2024 MAJOR JONES FY2028-29 DRAINAGE CURB & GUTTER IMPROVEMENTS DRAINAGE IMPROVEMENTS B The project consists of the removal and replacement of damaged curb and gutter throughout the City. FY2028-29 The existing curb and gutter along many City streets has aged, failed, or been damaged. The curb and gutter serves as part of the City's storm water collection system. The new curb and gutter will improve drainage performance while also enhancing the appearance of City streets. 184 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: FY2028-29 DRAINAGE CURB & GUTTER IMPROVEMENTS Construction $250,000 $0 $0 $0 $0 $0 $0 $0 $250,000 XX Proposed funding is from Drainage Operating Fund. 185 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 09,2024 MAJOR JONES FY2029-30 DRAINAGE CURB & GUTTER IMPROVEMENTS DRAINAGE IMPROVEMENTS B The project consists of the removal and replacement of damaged curb and gutter throughout the City. FY2029-30 The existing curb and gutter along many City streets has aged, failed, or been damaged. The curb and gutter serves as part of the City's storm water collection system. The new curb and gutter will improve drainage performance while also enhancing the appearance of City streets. 186 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: FY2029-30 DRAINAGE CURB & GUTTER IMPROVEMENTS Construction $250,000 $0 $0 $0 $0 $0 $0 $0 $250,000 XX Proposed funding is from Drainage Operating Fund. 187 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 01,2026 MAJOR JONES FY2030-31 DRAINAGE CURB & GUTTER IMPROVEMENTS DRAINAGE IMPROVEMENTS B The project consists of the removal and replacement of damaged curb and gutter throughout the City. FY2030-31 The existing curb and gutter along many City streets has aged, failed, or been damaged. The curb and gutter serves as part of the City's storm water collection system. The new curb and gutter will improve drainage performance while also enhancing the appearance of City streets. 188 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: FY2030-31 DRAINAGE CURB & GUTTER IMPROVEMENTS Construction $250,000 $0 $0 $0 $0 $0 $0 $0 $250,000 XX Proposed funding is from Drainage Operating Fund. 189 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 04,2025 MAJOR JONES VALLEY GUTTER REPLACEMENT – CRANE DRIVE DRAINAGE MAIN REPLACEMENT C The project consists of the removal and replacement of damaged valley gutter located at 1202 Crane Drive. Also, regrading and resurfacing each side of the valley gutter is included in the project scope. The gutter serves as part of the City's storm water collection system. This gutter has collected water for extended periods of time causing deterioration. A new gutter will improve drainage performance while also enhancing the appearance of this area. 190 Project Description Priority Estimated Cost Operating Fund CIP Fund Balance Bond/Tax Note Grants/ Contributions Impact Fees Escrow Funds Car Rental Tax Other EDC To Be Determined STREET PROJECTS FY2026-27 Street Improvements A $ 1,275,000 XX Traffic Signal Intersection Improvements – Mid-Cities Blvd & North Main Street A $ 1,295,183 $ 184,949 $ 1,110,234 Sub-Total Street Priority A-Proposed FY2026-27 $ 2,570,183 FY2027-28 Street Improvements (28)B $ 1,350,000 XX Cresthaven Drive Reconstruction (29)B $ 3,550,000 XX FY2028-29 Street Improvements (29)B $ 1,425,000 XX FY2029-30 Street Improvements (30)B $ 1,500,000 XX FY2030-31 Street Improvements (31)B $ 1,575,000 XX Sub-Total Street Priority B-Unfunded $ 9,400,000 East Alexander Lane Reconstruction C TBD XX Midway Drive Reconstruction Phase I C TBD XX Midway Drive Reconstruction Phase II C TBD XX Midway Drive Reconstruction Phase III C TBD XX Ross Avenue Extension C TBD XX Sheppard Drive Reconstruction C TBD XX Vine Street Reconstruction – SH 183 to SH 10 C TBD XX Sub-Total Street Priority C-Unfunded $- STREET PROJECTS - TOTAL $ 11,970,183 CAPITAL IMPROVEMENT PROGRAMS FY2026-27 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE PROPOSED METHOD OF FINANCING 191 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 31,2022 MAJOR JONES FY2026-27 STREET IMPROVEMENTS STREET IMPROVEMENTS A The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by pavement condition index of the roadways. FY2026-27 The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, extend the life of the roadway, and enhance the appearance of the streets. 192 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: FY2026-27 STREET IMPROVEMENTS Construction $1,275,000 $0 $0 $0 $0 $0 $0 $0 $1,275,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from General Fund. 193 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 15,2026 MAJOR JONES TRAFFIC SIGNAL INTERSECTION IMPROVEMENTS – MID-CITIES BLVD & N MAIN ST STREET IMPROVEMENTS A The project consists of the engineering design and construction for traffic signal intersection improvements at Mid- Cities Boulevard and North Main Street. The project scope includes updating the curb ramps to be compliant with the Americans with Disabilities Act, adding a pedestrian signal, updating pavement markings and high visibility crosswalks, and installing additional sidewalks. FY2026-27 TxDOT utilizes HSIP funding to achieve significant reductions in traffic fatalities and serious injuries on all public roads. This project was submitted by the City of Euless to the Texas Department of Transportation (TxDOT) and approved as part of the Highway Safety Improvement Program (HSIP). The City will be responsible for engineering design costs and TxDOT will pay for construction improvements. 194 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: TRAFFIC SIGNAL INTERSECTION IMPROVEMENTS – MID-CITIES BLVD & N MAIN ST Engineering $159,949 Environmental $25,000 $0 Improvements $1,110,234 $0 $0 $0 $0 $0 $0 $1,295,183 $184,949 0% 0% 0% 0% $1,110,234 0% To Be Determined Proposed funding is as follows: $184,949 – General Fund (City) $1,110,234 – HSIP/TxDOT 195 196 AM B E R H I L L LAUR E L WINCHESTER T H I S T L E BEAR CREEK PONCIANA RID G E W O OD PINION S U R R E Y ME R L I N BEAR C R EEK BE E C H C O N IF E R LA N T A N A COUNTRY HOLDER SUNSHINE ABBEY M A I N S T (N) MID-CITI E S B L V D ( E ) MI D-C ITIES BLVD ( W ) FHHW kStreet Improvement - Intersection of Mid-Cities Blvd & N Main St Legend Street Improvement Traffic Signal Intersection Imp - Mid-Cities Blvd & N Main St 197 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 31,2023 MAJOR JONES FY2027-28 STREET IMPROVEMENTS STREET IMPROVEMENTS B The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by pavement condition index of the roadways. FY2027-28 The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, extend the life of the roadway, and enhance the appearance of the streets. 198 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: FY2027-28 STREET IMPROVEMENTS Construction $1,350,000 $0 $0 $0 $0 $0 $0 $0 $1,350,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from General Fund. 199 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 02,2024 MAJOR JONES CRESTHAVEN DRIVE RECONSTRUCTION STREET IMPROVEMENTS B The Master Thoroughfare Plan identifies the various street types within the City of Euless. These street types include residential streets through regional arterials. The pavement management plan, through condition assessment, provides statistical data and guidance for cost effective maintenance and project planning. This project includes the reconstruction of Cresthaven Drive from a two-lane asphalt roadway to a 31 foot wide curb and gutter concrete street from SH 10 to South Pipeline Road. The project scope includes the replacement of an existing 4 inch AC water line and 6 inch PVC water line located along Cresthaven Drive between West Euless Drive and South Pipeline Road. FY2028-29 The existing asphalt pavement is deteriorating and upgrading to a concrete curb and gutter street will provide an improved riding surface, extend the life of the roadway, and enhance the appearance of the streets. Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 200 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: CRESTHAVEN DRIVE RECONSTRUCTION Engineering $550,000 Construction $3,000,000 $0 $0 $0 $0 $0 $0 $0 $3,550,000 0% 0% 0% 0% XX 0% To Be Determined Proposed funding is from FY2026 Federal Appropriations grant, if approved. 201 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 31,2023 MAJOR JONES FY2028-29 STREET IMPROVEMENTS STREET IMPROVEMENTS B The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by pavement condition index of the roadways. FY2028-29 The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, extend the life of the roadway, and enhance the appearance of the streets. 202 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: FY2028-29 STREET IMPROVEMENTS Construction $1,425,000 $0 $0 $0 $0 $0 $0 $0 $1,425,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from General Fund. 203 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 31,2023 MAJOR JONES FY2029-30 STREET IMPROVEMENTS STREET IMPROVEMENTS B The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by pavement condition index of the roadways. FY2029-30 The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, extend the life of the roadway, and enhance the appearance of the streets. 204 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: FY2029-30 STREET IMPROVEMENTS Construction $1,500,000 $0 $0 $0 $0 $0 $0 $0 $1,500,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from General Fund. 205 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 01,2026 MAJOR JONES FY2030-31 STREET IMPROVEMENTS STREET IMPROVEMENTS B The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by pavement condition index of the roadways. FY2030-31 The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, extend the life of the roadway, and enhance the appearance of the streets. 206 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: FY2030-31 STREET IMPROVEMENTS Construction $1,575,000 $0 $0 $0 $0 $0 $0 $0 $1,575,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from General Fund. 207 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 23,1999 MAJOR JONES EAST ALEXANDER LANE RECONSTRUCTION STREET IMPROVEMENTS C This minor street serves as a collector type street by conveying traffic to major roadways. East Alexander Lane will be reconstructed from Main Street to Cullum Drive. It will be reconstructed from a two- lane county type road to a standard 31 foot wide residential street with underground drainage and sidewalks. Reconstruction of this street will decrease the annual maintenance and comply with current City standards. 208 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 04,2025 MAJOR JONES MIDWAY DRIVE RECONSTRUCTION PHASE I STREET IMPROVEMENTS C This minor street serves as a collector type street by conveying traffic to major roadways. The project consists of the reconstruction of West Midway Drive between FM 157 and North Ector Drive. Reconstruction of this street will decrease the annual maintenance and comply with current City standards. 209 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 04,2025 MAJOR JONES MIDWAY RECONSTRUCTION PHASE II STREET IMPROVEMENTS C This minor street serves as a collector type street by conveying traffic to major roadways. The project consists of the reconstruction of West Midway Drive between North Ector Drive and North Main Street. Reconstruction of this street will decrease the annual maintenance and comply with current City standards. 210 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 04,2025 MAJOR JONES MIDWAY RECONSTRUCTION PHASE III STREET IMPROVEMENTS C This minor street serves as a collector type street by conveying traffic to major roadways. The project consists of the reconstruction of West Midway Drive between North Main Street and 510 Arbor Creek. Reconstruction of this street will decrease the annual maintenance and comply with current City standards. 211 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 31,2005 MAJOR JONES ROSS AVENUE EXTENSION STREET CONSTRUCTION C The construction of the remainder of Ross Avenue from the fire station to the west limit will be in accordance with City standards which includes concrete pavement. Construction of this street will comply with current City standards. This extension of Ross Avenue from the completed section adjacent to the fire station will complete the upgrading of this street. 212 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS June 12,2020 MAJOR JONES SHEPPARD DRIVE RECONSTRUCTION STREET IMPROVEMENTS C This project includes the reconstruction of Sheppard Drive from the west bound service road of SH 183 to Trojan Trail. Sheppard Drive is currently an open section asphalt street that includes a small section of concrete curb and gutter. The road will be reconstructed as a concrete roadway with curb and gutter. No storm drain system will need to be constructed. To upgrade Sheppard Drive to a concrete curb and gutter street. 213 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 28,2015 MAJOR JONES VINE STREET RECONSTRUCTION – SH 183 TO SH 10 STREET IMPROVEMENTS C Vine Street is not identified in the City's Master Thoroughfare Plan. The project consists of the reconstruction of Vine Street from SH 183 to SH 10. The City has received street escrow funds from several developments along Vine Street. When development is complete, it would be appropriate for the City to reconstruct the existing roadway. 214 Project Description Priority Estimated Cost Operating Fund CIP Fund Balance Bond/Tax Note Grants/ Contributions Impact Fees Escrow Funds Car Rental Tax Other EDC To Be Determined WASTEWATER PROJECTS FY2026-27 53rd CDBG LR: Skyway Drive/Ridgecrest Drive/S Ector Drive A $ 286,000 XX LR: Oakwood Terrace North Phase III – Construction A $ 474,000 XX LR: Vine Street Construction A $ 300,000 XX Sub-Total Wastewater Priority A-Proposed FY2026-27 $ 1,060,000 FY2027-28 54th CDBG LR: Limestone Drive/Himes Drive (28)B $ 254,000 XX LR: Woodvine Drive Engineering (28)B $ 98,000 XX LR: Cliffwood Road/Shady Creek Drive Engineering (29)B $ 119,000 XX LR: Euless Junior High School/Himes Drive/N Byers Street Engineering (29)B $ 110,000 XX FY2028-29 55th CDBG LR: Pecos Drive/N Ector Drive/Midway Drive (29)B $ 310,000 XX LR: Woodvine Drive Construction (29)B $ 491,000 XX LR: Cliffwood Road/Shady Creek Drive Construction (30)B $ 596,000 XX LR: Euless Junior High School/Himes Drive/N Byers Street Construction (30)B $ 550,000 XX FY2029-30 56th CDBG LR: Westpark Way Circle Phase I (30)B $ 296,000 XX FY2030-31 57th CDBG LR: Westpark Way Circle Phase II (31)B $ 292,000 XX LR: Huntington Place/Stone Meadow Engineering (31)B $ 121,000 XX Sub-Total Wastewater Priority B-Unfunded $ 3,237,000 LR: Huntington Place/Stone Meadow Construction C TBD XX LR: Knob Hill C TBD XX Sub-Total Wastewater Priority C-Unfunded $ - WASTEWATER PROJECTS - TOTAL $ 4,297,000 LR = Line Replacement CAPITAL IMPROVEMENT PROGRAMS FY2026-27 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE PROPOSED METHOD OF FINANCING 215 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 09,2026 MAJOR JONES 53RD CDBG LINE REPLACEMENT – SKYWAY DR/RIDGECREST DR/S ECTOR DR WASTEWATER MAIN REPLACEMENT A The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project scope includes the replacement of wastewater mains located in the following areas: 1. Along Skyway Drive from Ridgecrest Drive to Fairlawn Court, 2. Along the east side of Ridgecrest Drive from Skyway Drive to SH 183, and 3. 100-202 South Ector Drive. (53rd year CDBG project) FY2026-27 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 216 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: 53RD CDBG LINE REPLACEMENT – SKYWAY DR/RIDGECREST DR/S ECTOR DR Engineering $37,000 Construction $249,000 $0 $0 $0 $0 $0 $0 $0 $286,000 0% 0% 0% 0% XX 0% To Be Determined Project is contingent upon actual CDBG funding availability. 217 218 HUFFMANAIRPORT V I N E S K Y W A Y S H E P P A R D WIN D W A R D F A IR L A WN RID G E C R E S T AIRPORT N O R M A N AIRPORT FWY NL (W) EULE S S B L V D ( W ) E C T O R D R ( S ) A IRPORT F W Y SL ( W ) FHHW kWastewater Line Replacement - Skyway Dr from Ridgecrest Dr to Fairlawn Ct -Along the east side of Ridgecrest Dr from Skyway Dr to SH 183 - 100-202 S Ector Dr Legend Wastewater Line Replacement - Skyway Dr/Ridgecrest Dr/S Ector Dr 219 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 27,2024 MAJOR JONES LINE REPLACEMENT – OAKWOOD TERRACE NORTH PHASE III CONSTRUCTION WASTEWATER MAIN REPLACEMENT A The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project scope includes the replacement of wastewater mains located in the following areas: 1. Along Eastcliff Drive from Mary Drive to Tyler Avenue and 2. Between Tyler Avenue and Marlene Drive from Eastcliff Drive to Commerce Street. FY2026-27 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 220 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: LINE REPLACEMENT – OAKWOOD TERRACE NORTH PHASE III CONSTRUCTION Construction $474,000 $0 $0 $0 $0 $0 $0 $0 $474,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from W/WW Operating Fund. 221 222 EASTCLI F F SAGEBRUSH E A S T C L I F F DOUBLE BARREL COMM E R C E DE B R A S T A N L E Y MARY TYLER LONG BOW GREENBRIAR TOPLEA EULESS BLVD ( W ) MARLENE DR FHHW kWastewater Line Replacement - Along Eastcliff Dr from Mary Dr to Tyler Ave - Between Tyler Ave and Marlene Dr from Eastcliff Dr to Commerce St Legend Wastewater Line Replacement - Oakwood Terrace North Ph III 223 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 04,2025 MAJOR JONES LINE REPLACEMENT – VINE STREET CONSTRUCTION WASTEWATER MAIN REPLACEMENT A The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project scope includes the replacement of wastewater mains located at 513 to 603 Vine Street. FY2026-27 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. The project will resolve issues for the property behind 603 Vine Street at 606 Martha Street. 224 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: LINE REPLACEMENT – VINE STREET CONSTRUCTION Construction $300,000 $0 $0 $0 $0 $0 $0 $0 $300,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from W/WW Operating Fund. 225 226 C L E B U D N O R M A N HOLLYWOOD V I N E OA K W O O D BAYLESS REAVES M A R T H A CLEBUD )HHW ¯Wastewater Line Replacement -Between Vine St and Martha St Legend Wastewater Line Replacement – Vine Street 227 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 09,2026 MAJOR JONES 54TH CDBG LINE REPLACEMENT – LIMESTONE DRIVE/HIMES DRIVE WASTEWATER MAIN REPLACEMENT B The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project scope includes the replacement of wastewater mains located in the following areas: 1.Along the south and east side of Limestone Drive between Freestone Drive and Lee Drive and 2.321-331 Himes Drive. (54th year CDBG project) FY2027-28 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 228 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: 54TH CDBG LINE REPLACEMENT – LIMESTONE DRIVE/HIMES DRIVE Engineering $34,000 Construction $220,000 $0 $0 $0 $0 $0 $0 $0 $254,000 0% 0% 0% 0% XX 0% To Be Determined Project is contingent upon actual CDBG funding availability. 229 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 04,2025 MAJOR JONES LINE REPLACEMENT – WOODVINE DRIVE ENGINEERING WASTEWATER MAIN REPLACEMENT B The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project scope includes the engineering design for the replacement of wastewater mains located at 1306-3803 Woodvine Drive. FY2027-28 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 230 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: LINE REPLACEMENT – WOODVINE DRIVE ENGINEERING Engineering $98,000 $0 $0 $0 $0 $0 $0 $0 $98,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from W/WW Operating Fund. 231 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 04,2025 MAJOR JONES LINE REPLACEMENT – CLIFFWOOD ROAD/SHADY CREEK DRIVE ENGINEERING WASTEWATER MAIN REPLACEMENT B The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project scope includes the engineering design for the replacement of wastewater mains located in the following areas: 1. 1309-1509 Cliffwood Road and 2. 3905-4003 Shady Creek Drive. FY2028-29 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 232 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: LINE REPLACEMENT – CLIFFWOOD ROAD/SHADY CREEK DRIVE ENGINEERING Engineering $119,000 $0 $0 $0 $0 $0 $0 $0 $119,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from W/WW Operating Fund. 233 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 07,2025 MAJOR JONES LINE REPLACEMENT – EULESS JUNIOR HS/HIMES DR/N BYERS ST ENGINEERING WASTEWATER MAIN REPLACEMENT B The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project scope includes the engineering design for the replacement of wastewater mains located in the following areas: 1. Those located within the Euless Junior High School property, 2. Along Himes Drive from a point 90 feet north of the intersection with West Fuller Drive to 250 ft north of the intersection, and 3. Along North Byers Street from the intersection with West Fuller Drive to 250 feet north of the intersection. FY2028-29 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 234 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: LINE REPLACEMENT – EULESS JUNIOR HS/HIMES DR/N BYERS ST ENGINEERING Engineering $110,000 $0 $0 $0 $0 $0 $0 $0 $110,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from W/WW Operating Fund. 235 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 09,2026 MAJOR JONES 55TH CDBG LINE REPLACEMENT – PECOS DR/NORTH ECTOR DR/MIDWAY DR WASTEWATER MAIN REPLACEMENT B The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project scope includes the replacement of wastewater mains located in the following areas: 1. Along Pecos Drive between North Ector Drive and Midway Drive, 2. Along the south side of Midway Drive between Pecos Drive and North Ector Drive, and 3. Along the west side of North Ector Drive between Pecos Drive and Midway Drive. (55th year CDBG project) FY2028-29 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 236 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: 55TH CDBG LINE REPLACEMENT – PECOS DR/NORTH ECTOR DR/MIDWAY DR Engineering $40,000 Construction $270,000 $0 $0 $0 $0 $0 $0 $0 $310,000 0% 0% 0% 0% XX 0% To Be Determined Project is contingent upon actual CDBG funding availability. 237 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 04,2025 MAJOR JONES LINE REPLACEMENT – WOODVINE DRIVE CONSTRUCTION WASTEWATER MAIN REPLACEMENT B The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project scope includes the replacement of wastewater mains located at 1306-3803 Woodvine Drive. FY2028-29 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 238 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: LINE REPLACEMENT – WOODVINE DRIVE CONSTRUCTION Construction $491,000 $0 $0 $0 $0 $0 $0 $0 $491,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from W/WW Operating Fund. 239 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 04,2025 MAJOR JONES LINE REPLACEMENT – CLIFFWOOD ROAD/SHADY CREEK DRIVE CONSTRUCTION WASTEWATER MAIN REPLACEMENT B The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project scope includes the replacement of wastewater mains located in the following areas: 1. 1309-1509 Cliffwood Road and 2. 3905-4003 Shady Creek Drive. FY2029-30 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 240 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: LINE REPLACEMENT – CLIFFWOOD ROAD/SHADY CREEK DRIVE CONSTRUCTION Construction $596,000 $0 $0 $0 $0 $0 $0 $0 $596,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from W/WW Operating Fund. 241 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 07,2025 MAJOR JONES LINE REPLACEMENT – EULESS JUNIOR HS/HIMES DR/N BYERS ST CONSTRUCTION WASTEWATER MAIN REPLACEMENT B The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project scope includes the replacement of wastewater mains located in the following areas: 1. Those located within the Euless Junior High School property, 2. Along Himes Drive from a point 90 feet north of the intersection with West Fuller Drive to 250 ft north of the intersection, and 3. Along North Byers Street from the intersection with West Fuller Drive to 250 feet north of the intersection. FY2029-30 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 242 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: LINE REPLACEMENT – EULESS JUNIOR HS/HIMES DR/N BYERS ST CONSTRUCTION Construction $550,000 $0 $0 $0 $0 $0 $0 $0 $550,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from W/WW Operating Fund. 243 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 09,2026 MAJOR JONES 56TH CDBG LINE REPLACEMENT – WESTPARK WAY CIRCLE PHASE I WASTEWATER MAIN REPLACEMENT B The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project scope includes the replacement of wastewater mains located in the following areas: 1. 2501-2529 Westpark Way Circle and 2. 2413-2500 Westpark Way Circle. (56th year CDBG project) FY2029-30 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 244 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: 56TH CDBG LINE REPLACEMENT – WESTPARK WAY CIRCLE PHASE I Engineering $38,000 Construction $258,000 $0 $0 $0 $0 $0 $0 $0 $296,000 0% 0% 0% 0% XX 0% To Be Determined Project is contingent upon actual CDBG funding availability. 245 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 09,2026 MAJOR JONES 57TH CDBG LINE REPLACEMENT – WESTPARK WAY CIRCLE PHASE II WASTEWATER MAIN REPLACEMENT B The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project scope includes the replacement of wastewater mains located in the following areas: 1. 2300-2404 Westpark Way Circle and 2. 2301-2401 Westpark Way Circle. (57th year CDBG project) FY2030-31 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 246 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: 57TH CDBG LINE REPLACEMENT – WESTPARK WAY CIRCLE PHASE II Engineering $38,000 Construction $254,000 $0 $0 $0 $0 $0 $0 $0 $292,000 0% 0% 0% 0% XX 0% To Be Determined Project is contingent upon actual CDBG funding availability. 247 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 09,2026 MAJOR JONES LINE REPLACEMENT – HUNTINGTON PLACE/STONE MEADOW ENGINEERING WASTEWATER MAIN REPLACEMENT B The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project scope includes the engineering design for the replacement of wastewater mains located in the following areas: 1. Between Slaughter Lane and East Huitt Lane and between Huntington Drive and FAA Boulevard, 2. Between East Huitt Lane and North Atkerson Lane and between Huntinton Drive and FAA Boulevard, 3. Between North Atkerson Lane and South Atkerson Lane and between Huntington Drive and FAA Boulevard, and 4. Between South Atkerson Lane and Koen Lane and between Huntington Drive and FAA Boulevard. FY2030-31 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 248 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: LINE REPLACEMENT – HUNTINGTON PLACE/STONE MEADOW ENGINEERING Engineering $121,000 $0 $0 $0 $0 $0 $0 $0 $121,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from W/WW Operating Fund. 249 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 09,2026 MAJOR JONES LINE REPLACEMENT – HUNTINGTON PLACE/STONE MEADOW CONSTRUCTION WASTEWATER MAIN REPLACEMENT C The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project scope includes the replacement of wastewater mains located in the following areas: 1. Between Slaughter Lane and East Huitt Lane and between Huntington Drive and FAA Boulevard, 2. Between East Huitt Lane and North Atkerson Lane and between Huntinton Drive and FAA Boulevard, 3. Between North Atkerson Lane and South Atkerson Lane and between Huntington Drive and FAA Blvd, and 4. Between South Atkerson Lane and Koen Lane and between Huntington Drive and FAA Boulevard. Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 250 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 11,2022 MAJOR JONES LINE REPLACEMENT – KNOB HILL WASTEWATER MAIN REPLACEMENT C The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project scope includes the replacement of City-maintained wastewater mains located at Knob Hill. Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 251 252 Project Description Priority Estimated Cost Operating Fund CIP Fund Balance Bond/Tax Note Grants/ Contributions Impact Fees Escrow Funds Car Rental Tax Other EDC To Be Determined WATER PROJECTS LR: Bell-Hi Addition Phases I & II Engineering A $ 88,000 XX LR: West Euless Boulevard Engineering A $ 111,000 XX Sub-Total Water Priority A-Proposed FY2026-27 $ 199,000 LR: Bell-Hi Addition Phases I & II Construction (28)B $ 585,000 XX LR: Donley Drive/Donley Court Engineering (28)B $ 75,000 XX LR: West Euless Boulevard Construction (28)B $ 742,000 XX LR: Donley Drive/Donley Court Construction (29)B $ 497,000 XX LR: Fuller-Wiser Road Engineering (29)B $ 75,000 XX Well Water Treatment Feasibility Study (29)B $ 100,000 XX LR: Fuller-Wiser Road Construction (30)B $ 497,000 XX LR: Midway Drive Phases I & II Engineering (31)B $ 247,000 XX LR: Midway Drive Phase I Construction (31)B $ 722,000 XX Sub-Total Water Priority B-Unfunded $ 3,540,000 1 Mil Well Replacement C TBD XX LR: Dunaway Drive C TBD XX Groundwater Treatment C TBD XX LR: Knob Hill C TBD XX LR: Midway Park 3rd Addition C TBD XX LR: Midway Drive Phase II Construction C TBD XX LR: North Main Street C TBD XX LR: Westpark Way C TBD XX Sub-Total Water Priority C-Unfunded $ - WATER PROJECTS - TOTAL $ 3,739,000 LR = Line Replacement CAPITAL IMPROVEMENT PROGRAMS FY2026-27 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE PROPOSED METHOD OF FINANCING 253 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 18,2022 MAJOR JONES LINE REPLACEMENT – BELL-HI ADDITION PHASES I & II ENGINEERING WATER MAIN REPLACEMENT A The water mains included in this project are part of the City's Water System Master Plan. The project scope includes the engineering design for the replacement of an existing 6 inch cast iron water line located in the following areas: 1. Along Needles Street from Raider Drive to Paula Lane and 2. Along Paula Lane from Needles Street to West Pipeline Road. FY2026-27 Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 254 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: LINE REPLACEMENT – BELL-HI ADDITION PHASES I & II ENGINEERING Engineering $88,000 $0 $0 $0 $0 $0 $0 $0 $88,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from W/WW Operating Fund. 255 256 AMBERTON NEEDLES SY C A M O R E RAIDER SUSAN PA U L A DA V I D SYCAMORE SYCAMORE HA N O V E R PR I N C E T O N WAYDELLE HILL P R E S T W I C K EULESS B L V D ( W ) PIPELINE RD (W) RA I D E R D R )HHW kWater Line Replacement - Along Needles St from Raider Dr to Paula Ln - Along Paula Ln from Needles St to W Pipeline Rd Legend Water Line Replacement - Bell-Hi Addition Ph I & II Engineering 257 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 26,2024 MAJOR JONES LINE REPLACEMENT – WEST EULESS BOULEVARD ENGINEERING WATER MAIN REPLACEMENT A The water mains included in this project are part of the City's Water System Master Plan. The project scope includes the engineering design for the replacement of an existing 8 inch water line located between 2219 and 2603 West Euless Boulevard. FY2026-27 Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 258 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: LINE REPLACEMENT – WEST EULESS BOULEVARD ENGINEERING Engineering $111,000 $0 $0 $0 $0 $0 $0 $0 $111,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from W/WW Operating Fund. 259 260 CHESAPEAKE HO SPI TAL JAME S T O W N REGAL POTOMAC EULESS B L V D ( W ) WE S T P A R K WA Y PIPELINE RD (W) )HHW kWater Line Replacement - 8 inch water line between 2219 and 2603 W Euless Blvd Legend Water Line Replacement - West Euless Blvd Engineering 261 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 18,2022 MAJOR JONES LINE REPLACEMENT – BELL-HI ADDITION PHASES I & II CONSTRUCTION WATER MAIN REPLACEMENT B The water mains included in this project are part of the City's Water System Master Plan. The project scope includes the replacement of an existing 6 inch cast iron water line located in the following areas: 1. Along Needles Street from Raider Drive to Paula Lane and 2. Along Paula Lane from Needles Street to West Pipeline Road. FY2027-28 Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 262 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: LINE REPLACEMENT – BELL-HI ADDITION PHASES I & II CONSTRUCTION Construction $585,000 $0 $0 $0 $0 $0 $0 $0 $585,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from W/WW Operating Fund. 263 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 18,2022 MAJOR JONES LINE REPLACEMENT – DONLEY DRIVE/DONLEY COURT ENGINEERING WATER MAIN REPLACEMENT B The water mains included in this project are part of the City's Water System Master Plan. The project scope includes the engineering design for the replacement of an existing 6 inch water line located in the following areas: 1. Along Donley Drive from Glenn Drive to Harwood Road and 2. Along Donley Court. FY2027-28 Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 264 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: LINE REPLACEMENT – DONLEY DRIVE/DONLEY COURT ENGINEERING Engineering $75,000 $0 $0 $0 $0 $0 $0 $0 $75,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from W/WW Operating Fund. 265 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 26,2024 MAJOR JONES LINE REPLACEMENT – WEST EULESS BOULEVARD CONSTRUCTION WATER MAIN REPLACEMENT B The water mains included in this project are part of the City's Water System Master Plan. The project scope includes the replacement of an existing 8 inch water line located between 2219 and 2603 West Euless Boulevard. FY2027-28 Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 266 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: LINE REPLACEMENT – WEST EULESS BOULEVARD CONSTRUCTION Construction $742,000 $0 $0 $0 $0 $0 $0 $0 $742,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from W/WW Operating Fund. 267 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 18,2022 MAJOR JONES LINE REPLACEMENT – DONLEY DRIVE/DONLEY COURT CONSTRUCTION WATER MAIN REPLACEMENT B The water mains included in this project are part of the City's Water System Master Plan. The project scope includes the replacement of an existing 6 inch water line located in the following areas: 1. Along Donley Drive from Glenn Drive to Harwood Road and 2. Along Donley Court. FY2028-29 Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 268 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: LINE REPLACEMENT – DONLEY DRIVE/DONLEY COURT CONSTRUCTION Construction $497,000 $0 $0 $0 $0 $0 $0 $0 $497,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from W/WW Operating Fund. 269 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 10,2025 MAJOR JONES LINE REPLACEMENT – FULLER-WISER ROAD ENGINEERING WATER MAIN REPLACEMENT B The water mains included in this project are part of the City's Water System Master Plan. The project scope includes the engineering design for the replacement of an existing 8 inch AC water line located along Fuller-Wiser Road from 1210 Fuller-Wiser Road to East Ash Lane. FY2028-29 Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 270 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: LINE REPLACEMENT – FULLER-WISER ROAD ENGINEERING Engineering $75,000 $0 $0 $0 $0 $0 $0 $0 $75,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from W/WW Operating Fund. 271 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS June 01,2026 MAJOR JONES WELL WATER TREATMENT FEASIBILITY STUDY WATER FEASIBILITY STUDY B As part of the ongoing operation of the City's groundwater wells, it is necessary to continuously evaluate current treatment processes to ensure compliance with updated state and federal regulatory requirements. In April 2024, new nationwide regulations were issued under the National Primary Drinking Water Regulation (NPDWR), establishing monitoring and compliance deadlines for all Public Water Systems. The project scope includes a feasibility study to determine if any changes or updates are needed at City-owned and operated groundwater treatment facilities. FY2028-29 A study is necessary to determine if additional treatment options will be needed to meet upcoming regulatory requirements for newly established maximum contaminant levels. 272 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: WELL WATER TREATMENT FEASIBILITY STUDY Feasibility Study $100,000 $0 $0 $0 $0 $0 $0 $0 $100,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from W/WW Operating Fund. 273 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 10,2025 MAJOR JONES LINE REPLACEMENT – FULLER-WISER ROAD CONSTRUCTION WATER MAIN REPLACEMENT B The water mains included in this project are part of the City's Water System Master Plan. The project scope includes the replacement of an existing 8 inch AC water line located along Fuller-Wiser Road from 1210 Fuller-Wiser Road to East Ash Lane. FY2029-30 Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 274 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: LINE REPLACEMENT – FULLER-WISER ROAD CONSTRUCTION Construction $497,000 $0 $0 $0 $0 $0 $0 $0 $497,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from W/WW Operating Fund. 275 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 09,2026 MAJOR JONES LINE REPLACEMENT – MIDWAY DRIVE PHASES I & II ENGINEERING WATER MAIN REPLACEMENT B The water mains included in this project are part of the City's Water System Master Plan. The project scope includes the engineering design for the replacement of an existing 6 inch AC water line located in the following areas: 1. Phase I - along West Midway Drive between FM 157 and Ector Drive and 2. Phase II - along West Midway Drive between Ector Drive and North Main Street. FY2030-31 Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 276 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: LINE REPLACEMENT – MIDWAY DRIVE PHASES I & II ENGINEERING Engineering $247,000 $0 $0 $0 $0 $0 $0 $0 $247,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from W/WW Operating Fund. 277 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 19,2026 MAJOR JONES LINE REPLACEMENT – MIDWAY DRIVE PHASE I CONSTRUCTION WATER MAIN REPLACEMENT B The water mains included in this project are part of the City's Water System Master Plan. The project scope includes the replacement of an existing 6 inch AC water line located along West Midway Drive between FM 157 and Ector Drive. FY2030-31 Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 278 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: LINE REPLACEMENT – MIDWAY DRIVE PHASE I CONSTRUCTION Construction $722,000 $0 $0 $0 $0 $0 $0 $0 $722,000 XX 0% 0% 0% 0% 0% To Be Determined Proposed funding is from W/WW Operating Fund. 279 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 15,2019 MAJOR JONES 1 MIL WELL REPLACEMENT WATER WELL C RW Harden & Associates prepared design and bid documents in FY2022 for the eventual replacement of the 1 Mil Well. The project scope includes the complete replacement of the 1 Mil Well with a new well. A new well will enable the City to continue to provide high quality water to citizens while reducing maintenance and operational costs. 280 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 05,2018 MAJOR JONES LINE REPLACEMENT – DUNAWAY DRIVE WATER MAIN REPLACEMENT C The water mains included in this project are part of the City's Water System Master Plan. The project scope includes the replacement of an existing 6 inch AC water line located along Dunaway Drive between East Alexander Lane and McCormick Court. Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 281 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS June 01,2026 MAJOR JONES GROUNDWATER TREATMENT WATER IMPROVEMENTS C Texas Commission on Environmental Quality (TCEQ) - Rule §290.41(a) Water quality. The quality of water to be supplied must meet the quality criteria prescribed by the commission's drinking water standards contained in Subchapter F (relating to Drinking Water Standards Governing Drinking Water Quality and Reporting Requirements for Public Water Systems). This is in accordance with the City's Master plan. The project scope includes funding to address potential unfunded regulatory mandates that may impact the City as emerging studies and rulemaking efforts by the Environmental Protection Agency (EPA) and TCEQ continue to define future groundwater treatment requirements. The specific scope will be determined based on the results and recommendations from the well water treatment feasibility study project. To maintain compliance with TCEQ regulations, applicable American Water Works Association standards, and the EPA's National Primary Drinking Water Regulations. 282 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 11,2022 MAJOR JONES LINE REPLACEMENT – KNOB HILL WATER MAIN REPLACEMENT C The water mains included in this project are part of the City's Water System Master Plan. The project scope includes the replacement of City-maintained water mains located at Knob Hill. Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 283 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 05,2018 MAJOR JONES LINE REPLACEMENT – MIDWAY PARK 3RD ADDITION WATER MAIN REPLACEMENT C The water mains included in this project are part of the City's Water System Master Plan. The project scope includes the replacement of an existing 6 inch cast iron water line located along Ector Drive between Fayette Drive and West Harwood Road. Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 284 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 09,2026 MAJOR JONES LINE REPLACEMENT – MIDWAY DRIVE PHASE II CONSTRUCTION WATER MAIN REPLACEMENT C The water mains included in this project are part of the City's Water System Master Plan. The project scope includes the replacement of an existing 6 inch AC water line located along West Midway Drive between Ector Drive and North Main Street. Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 285 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 09,2026 MAJOR JONES LINE REPLACEMENT – NORTH MAIN STREET WATER MAIN REPLACEMENT C The water mains included in this project are part of the City's Water System Master Plan. The project scope includes the replacement of an existing 16-inch AC water line located along North Main Street from 1400 North Main Street to Ash Lane. Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 286 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 26,2020 MAJOR JONES LINE REPLACEMENT – WESTPARK WAY WATER MAIN REPLACEMENT C The water mains included in this project are part of the City's Water System Master Plan. The project scope includes the replacement of an existing 12 inch AC water line located along Westpark Way between SH 10 and South Pipeline Road. Many water mains throughout the City are 50+ years old. Most of these lines are cast iron or AC and are susceptible to deterioration, leaks, contamination, and damage. This project is part of the systematic replacement of water mains using a worst-first approach to reduce maintenance costs and customer problems. 287 288 Project Description Priority Estimated Cost Operating Fund CIP Fund Balance Bond/Tax Note Grants/ Contributions Impact Fees Escrow Funds Car Rental Tax Other EDC To Be Determined OTHER PROJECTS Euless Family Life Center Expansion Schematic Design A $ 430,000 XX J.A. Carr Park Expansion Phase I A $ 600,000 XX Parks at Texas Star South Turf Replacement A $ 900,000 XX Sub-Total Other Priority A-Proposed FY2026-27 $ 1,930,000 Euless Family Life Center Expansion Design Development (28)B $ 1,290,000 XX Euless Family Life Center Expansion Construction Document Development (29)B $ 2,300,000 XX J.A. Carr Park Expansion Phase II (29)B $ 6,000,000 XX Parks at Texas Star Phase VIII (29)B $ 10,000,000 XX Euless Family Life Center Expansion Construction (30)B TBD XX Parks at Texas Star North Turf Replacement (31)B $ 850,000 XX Sub-Total Other Priority B-Unfunded $ 20,440,000 Parks at Texas Star South Entrance Improvements C TBD XX Trail Enhancements Phase I C TBD XX Trail Enhancements Phase II C TBD XX Trail/Park Enhancements Villages of Bear Creek C TBD XX Trailwood Park Improvements C TBD XX West Park Improvements C TBD XX Sub-Total Other Priority C-Unfunded $- OTHER PROJECTS - TOTAL $ 22,370,000 CAPITAL IMPROVEMENT PROGRAMS FY2026-27 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE PROPOSED METHOD OF FINANCING 289 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PARKS AND COMMUNITY SERVICES April 1, 2026 DUANE STRAWN EULESS FAMILY LIFE CENTER EXPANSION SCHEMATIC DESIGN PARKS/RECREATION FACILITY IMPROVEMENTS A The adopted 2025 Parks, Recreation, and Open Space Master Plan identified the expansion of the Euless Family Life Center (EFLC) as the No. 1 Indoor Need Priority. In order to meet the demands of citizens, the EFLC needs to expand it's functional footprint to accommodate growing membership, classes, and programs offered. The project scope includes the schematic design portion of the EFLC expansion project and all necessary architectural and engineering design services. Services include, but are not limited to, existing facility building study, site visits to other similar projects in the metroplex, spacial studies, concept drawings, conceptual floor plans, and development of the opinion of probable costs. FY2026-27 Built in 1989, the EFLC has served a great need for over 36 years. Renovations and some additions (fitness area) were completed in 2010. These areas have become overwhelmed with the growth in membership and the number and size of the classes and programs offered at the EFLC. During the development of the 2025 Parks, Recreation, and Open Space Master Plan, citizens ranked the expansion, renovation, and redevelopment of the EFLC as their No. 1 priority on the Indoor Needs List. Specific needs include additional gym space, multi-purpose rooms, storage, fitness area, Child Care, Teen Room, and office space. Restrooms and locker rooms are in need of renovation/expansion and the facility entrances and exits need to be more customer friendly for members and visitors. 290 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: EULESS FAMILY LIFE CENTER EXPANSION SCHEMATIC DESIGN Schematic Design $430,000 $0 $0 $0 $0 $0 $0 $0 $430,000 0% XX 0% 0% 0% 0% To Be Determined Proposed funding is from General CIP Fund Balance. 291 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PARKS AND COMMUNITY SERVICES April 1, 2026 DUANE STRAWN J.A. CARR PARK EXPANSION PHASE I PARKS/RECREATION PARK IMPROVEMENTS A The adopted 2025 Parks, Recreation, and Open Space Master Plan recommends funding for system-wide trail, park facilities, and amenities upgrades. The Master Plan identified 6.5 acres of undeveloped land in J.A. Carr Park as a prime location for many of the high to moderate items reflected on the Priority Needs List. The project scope includes the demolition of the existing Simmons Center Building and asphalt parking lot. An expanded concrete parking lot will be constructed in this area to accommodate the growing number of park users and pavilion rentals. In addition, the existing asphalt park entry road will be replaced with concrete. FY2026-27 As identified in the adopted 2025 Parks, Recreation, and Open Space Master Plan, the municipal park is the foundation of any solid parks and recreation system. Euless' parks and recreation system provides residents and visitors with significant personal, social, environmental, and economic benefits. The revitalization efforts Council focused on over the years have increased citizens' sense of community pride. The proposed project will continue the Council's revitalization efforts by creating an area that will serve both the passive and active leisure pursuits of residents in this area. 292 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: J.A. CARR PARK EXPANSION PHASE I Professional Services $40,000 Construction $560,000 $0 Asbestos testing / abatement $0 Building demo Parking lot demo Concrete entrance and parking lot $0 Lighting $0 $0 $0 $0 $600,000 0% XX 0% 0% 0% 0% To Be Determined Proposed funding is from EDC CIP Fund Balance. 293 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PARKS AND COMMUNITY SERVICES April 1, 2026 DUANE STRAWN PARKS AT TEXAS STAR SOUTH TURF REPLACEMENT PARKS/RECREATION PARK IMPROVEMENTS A In 2016, the infields of six (6) ballfields at Parks at Texas Star South (Yankee, Royal, Wrigley, Arlington, Legends and Veterans) were replaced with an artificial sports turf to extend the playability of the fields during heavy use and inclement weather. This project has been very successful and has increased league and tournament play due to the fields' durability and ability to run as many games as possible. While some surrounding municipal fields are closed due to rain, PATS South has been able to complete both league and tournament games. The project scope includes replacing existing synthetic turf at Parks at Texas Star South (Yankee, Royal, Wrigley, Arlington, Legends and Veterans). FY2026-27 The life expectancy of turf is 10 years. Turf was originally installed in 2016 at Parks at Texas Star South (Yankee, Royal, Wrigley, Arlington, Legends and Veterans), putting the expected replacement year at 2026. With the use of these fields being exceptional between league and tournament play, the wear and tear on the turf is tremendous. To avoid the turf becoming unplayable and to continue to program at a high use level, the turf will require replacement at or around the 10 year mark. 294 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: PARKS AT TEXAS STAR SOUTH TURF REPLACEMENT Turf Replacement $900,000 $0 $0 $0 $0 $0 $0 $0 $900,000 0% XX 0% 0% 0% 0% To Be Determined Proposed funding is from EDC CIP Fund Balance. 295 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PARKS AND COMMUNITY SERVICES April 1, 2025 DUANE STRAWN EULESS FAMILY LIFE CENTER EXPANSION DESIGN DEVELOPMENT PARKS/RECREATION FACILITY IMPROVEMENTS B The adopted 2025 Parks, Recreation, and Open Space Master Plan identified the expansion of the Euless Family Life Center (EFLC) as the No. 1 Indoor Need Priority. In order to meet the demands of citizens, the EFLC needs to expand it's functional footprint to accommodate growing membership, classes, and programs offered. The project scope includes the design development portion of the EFLC expansion project and will include all necessary architectural and engineering design services. Services include, but are not limited to, preliminary floor plans, preliminary construction documents, preliminary construction schedule, and updated opinion of probable costs. FY2027-28 Built in 1989, the EFLC has served a great need for over 36 years. Renovations and some additions (fitness area) were completed in 2010. These areas have become overwhelmed with the growth in membership and the number and size of the classes and programs offered at the EFLC. During the development of the 2025 Parks, Recreation, and Open Space Master Plan, citizens ranked the expansion, renovation, and redevelopment of the EFLC as their No. 1 priority on the Indoor Needs List. Specific needs include additional gym space, multi-purpose rooms, storage, fitness area, Child Care, Teen Room, and office space. Restrooms and locker rooms are in need of renovation/expansion and the facility entrances and exits need to be more customer friendly for members and visitors. 296 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: EULESS FAMILY LIFE CENTER EXPANSION DESIGN DEVELOPMENT Design Development $1,290,000 $0 $0 $0 $0 $0 $0 $0 $1,290,000 0% 0% 0% 0% 0% To Be Determined XX 297 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PARKS AND COMMUNITY SERVICES April 1, 2025 DUANE STRAWN EULESS FAMILY LIFE CENTER EXPANSION CONSTRUCTION DOCUMENT DEVELOP. PARKS/RECREATION FACILITY IMPROVEMENTS B The adopted 2025 Parks, Recreation, and Open Space Master Plan identified the expansion of the Euless Family Life Center (EFLC) as the No. 1 Indoor Need Priority. In order to meet the demands of citizens, the EFLC needs to expand it's functional footprint to accommodate growing membership, classes, and programs offered. The project scope includes the construction document development portion of the EFLC expansion project and will include all necessary architectural and engineering design services. Services include, but are not limited to, final floor plans, detailed construction documents, all necessary bid documents, updated opinion of probable costs, site inspections, and construction administration. FY2028-29 Built in 1989, the EFLC has served a great need for over 36 years. Renovations and some additions (fitness area) were completed in 2010. These areas have become overwhelmed with the growth in membership and the number and size of the classes and programs offered at the EFLC. During the development of the 2025 Parks, Recreation, and Open Space Master Plan, citizens ranked the expansion, renovation, and redevelopment of the EFLC as their No. 1 priority on the Indoor Needs List. Specific needs include additional gym space, multi-purpose rooms, storage, fitness area, Child Care, Teen Room, and office space. Restrooms and locker rooms are in need of renovation/expansion and the facility entrances and exits need to be more customer friendly for members and visitors. 298 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: EULESS FAMILY LIFE CENTER EXPANSION CONSTRUCTION DOCUMENT DEVELOP. Construction Document Develop. $2,300,000 $0 $0 $0 $0 $0 $0 $0 $2,300,000 0% 0% 0% 0% 0% To Be Determined XX 299 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PARKS AND COMMUNITY SERVICES April 1, 2026 DUANE STRAWN J.A. CARR PARK EXPANSION PHASE II PARKS/RECREATION PARK IMPROVEMENTS B The adopted 2025 Parks, Recreation, and Open Space Master Plan recommends funding for system-wide trail, park facilities, and amenities upgrades. The Master Plan identified 6.5 acres of undeveloped land in J.A. Carr Park as a prime location for many of the high to moderate items reflected on the Priority Needs List. This project scope includes the development of approximately 6.5 acres just south of SH 10 in J.A. Carr Park and a future connection with the neighborhood to the north of SH 10 via a pedestrian tunnel or bridge. The development includes trails, picnic areas, benches, trail work out stations, and an entrance off of SH 10 with park signage. Multi- use practice fields and a dog park are also under consideration for this area. FY2028-29 As identified in the adopted 2025 Parks, Recreation, and Open Space Master Plan, the municipal park is the foundation of any solid parks and recreation system. Euless' parks and recreation system provides residents and visitors with significant personal, social, environmental, and economic benefits. The revitalization efforts Council focused on over the years have increased citizens' sense of community pride. The proposed project will continue the Council's revitalization efforts by creating an area that will serve both the passive and active leisure pursuits of residents in this area. 300 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: J.A. CARR PARK EXPANSION PHASE II Professional Services $500,000 Construction $5,500,000 $0 $0 $0 $0 $0 $0 $0 $6,000,000 0% XX 0% 0% 0% 0% To Be Determined Proposed funding is from EDC CIP Fund Balance. 301 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION:JUSTIFICATION: PARKS AND COMMUNITY SERVICES April 1, 2025 DUANE STRAWN PARKS AT TEXAS STAR PHASE VIII PARKS/RECREATION PARK IMPROVEMENTS B The adopted 2025 Parks, Recreation, and Open Space Master Plan identified the need for additional multi-sport practice fields. The project includes the design and construction of additional lighted playing surfaces to accommodate multiple sports. The project scope also includes substantial drainage and utility work, additional parking, and sidewalks. FY2028-29 The youth sports leagues continue to expand and grow at a rapid pace. Practice fields have always been a limited commodity, but this continued growth has revealed a critical need for more practice space. With the addition of lighted, multi-use fields, staff can accommodate more practices and help alleviate the shortage of practice space. Creating usable, lighted open space also allows staff the opportunity to expand existing leagues as well as programming for additional leagues in multiple sports. Completion of this phase will ensure the Texas Star Sports Complex remains the premier sports facility for amateur athletics for many years to come. 302 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: PARKS AT TEXAS STAR PHASE VIII Professional Services $1,000,000 Construction $9,000,000 $0 $0 $0 $0 $0 $0 $0 $10,000,000 0% XX 0% 0% 0% 0% To Be Determined 303 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PARKS AND COMMUNITY SERVICES April 1, 2026 DUANE STRAWN EULESS FAMILY LIFE CENTER EXPANSION CONSTRUCTION PARKS/RECREATION FACILITY IMPROVEMENTS B The adopted 2025 Parks, Recreation, and Open Space Master Plan identified the expansion of the Euless Family Life Center (EFLC) as the No. 1 Indoor Need Priority. In order to meet the demands of citizens, the EFLC needs to expand it's functional footprint to accommodate growing membership, classes, and programs offered. The project scope includes the construction portion of the expansion/renovation of the Recreation Center, Senior Center, and Natatorium. Construction includes, but is not limited to, a new and separate building to the west of the existing Recreation Center to include additional gym space, multi-use programmable rooms, walking track, fitness areas, storage, and office space. Operations will move into the new building once completed so renovations can begin on the existing Euless Family Life Center building. EFLC renovations include, but are not limited to, restroom and locker room renovations; updates to customer service operations, lighting, flooring, and wall coverings; and redesigning the current public spaces. FY2029-30 Built in 1989, the EFLC has served a great need for over 36 years. Renovations and some additions (fitness area) were completed in 2010. These areas have become overwhelmed with the growth in membership and the number and size of the classes and programs offered at the EFLC. During the development of the 2025 Parks, Recreation, and Open Space Master Plan, citizens ranked the expansion, renovation, and redevelopment of the EFLC as their No. 1 priority on the Indoor Needs List. Specific needs include additional gym space, multi-purpose rooms, storage, fitness area, Child Care, Teen Room, and office space. Restrooms and locker rooms are in need of renovation/expansion and the facility entrances and exits need to be more customer friendly for members and visitors. 304 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: EULESS FAMILY LIFE CENTER EXPANSION CONSTRUCTION Construction – To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% To Be Determined XX 305 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PARKS AND COMMUNITY SERVICES April 1, 2026 DUANE STRAWN PARKS AT TEXAS STAR NORTH TURF REPLACEMENT PARKS/RECREATION PARK IMPROVEMENTS B In 2021, the infields of all four ballfields at the Parks at Texas Star North were replaced with artificial sports turf to extend the playability of the fields during heavy use and inclement weather. The project scope includes replacing existing synthetic turf at Parks at Texas Star North with new and improved product. The concrete base and rubber pellet infill can be reused and only the turf material will be replaced. FY2030-31 The installation of artificial turf at PATS North has been very successful and increased league and tournament play due to the field durability and the ability to run as many games as possible. While some surrounding municipal fields closed due to rain, PATS North was able to complete both league and tournament games. With the use of these fields being exceptional between league and tournament play, the wear and tear on the turf is tremendous. The life expectancy of artificial turf is approximately ten years, which puts the expected end of useful life in 2031. In order to avoid the turf becoming unplayable and to continue to program at high level use, the turf will need to be replaced at or around the ten year mark. 306 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund ADDITIONAL COMMENTS: PARKS AT TEXAS STAR NORTH TURF REPLACEMENT Turf Replacement $850,000 $0 $0 $0 $0 $0 $0 $0 $850,000 0% XX 0% 0% 0% 0% To Be Determined Proposed funding is from EDC CIP Fund Balance. 307 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PARKS AND COMMUNITY SERVICES April 1, 2025 DUANE STRAWN PARKS AT TEXAS STAR SOUTH ENTRANCE IMPROVEMENTS PARKS/RECREATION PARK IMPROVEMENTS C As the Parks at Texas Star continues to develop and Phase VIII becomes a reality, it is imperative that customers and visitors utilize the south parking area. The first 400' of Texas Star Parkway is a concrete divided road with a landscaped median, after the initial 400' the road transitions into a single lane asphalt road finally ending at a concrete road leading to the south parking lot. To some, this asphalt section seems to be the end of the road and they feel they should not be there as it leads to the park maintenance shop. This project would remove the asphalt road and continue the concrete divided roadway with landscaped median to the rear of the property providing easy access to the south parking area. The south parking area is hard to find and appears to be off limits to the public as it seems to be the entrance to the parks maintenance area. An enhanced south entrance and upgraded roadway with associated landscaping will guide participants to the south parking lot and new lighted practice fields. Additionally, enhancing the south entrance will make it more aesthetically pleasing and much more functional for customers. 308 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PARKS AND COMMUNITY SERVICES June 19,2025 DUANE STRAWN TRAIL ENHANCEMENTS PHASE I PARKS/RECREATION TRAIL SYSTEM C Trail-related improvements were included in the Needs Assessment and Priority Ranking sections of the adopted 2025 Parks, Recreation, and Open Space Master Plan. This project consists of Phase I of trail enhancements identified in the adopted Parks Master Plan which includes additional water fountains, additional benches, construction of shaded seating areas, addition and/or installation of new exercise equipment, and picnic stations along the trails as well as construction of additional pedestrian bridges in high water areas. Also identified, is the need to address various areas in the trails system that might need to be converted from unpaved to paved trails. The trails system is a valuable asset to the community as it provides a safe means for non-vehicular travel and provides an opportunity for a variety of unstructured, low-impact recreational pursuits. The development and maintenance of the trails system continues to receive significant support from the citizens as indicated in the responses to the needs assessment survey conducted as a part of the Master Plan update. 309 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PARKS AND COMMUNITY SERVICES June 19,2025 DUANE STRAWN TRAIL ENHANCEMENTS PHASE II PARKS/RECREATION TRAIL SYSTEM C Trail-related improvements were included in the Needs Assessment and Priority Ranking sections of the adopted 2025 Parks, Recreation, and Open Space Master Plan. This project is Phase II of the trail enhancements that continues implementation of park improvements identified in the adopted Parks Master Plan which includes additional water fountains, additional benches, construction of shaded seating, addition and/or installation of new exercise equipment, and picnic stations along the trails as well as construction of additional pedestrian bridges in high water areas. Also identified, is the need to address various areas along the trail that need to be converted from unpaved to paved trails. The trails system is a valuable asset to the community as it provides a safe means for non-vehicular travel and provides an opportunity for a variety of unstructured, low-impact recreational pursuits. The development and maintenance of the trails system continues to receive significant support from the citizens as indicated in the responses to the needs assessment survey conducted as a part of the Master Plan update. 310 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PARKS AND COMMUNITY SERVICES June 19,2025 DUANE STRAWN TRAIL/PARKS ENHANCEMENTS VILLAGES OF BEAR CREEK PARKS/RECREATION TRAIL SYSTEM C This project is a continuation of the overall park improvement plan as identified in the adopted 2025 Parks, Recreation, and Open Space Master Plan. This project includes the redesign/redevelopment of the park and trails at the Villages of Bear Creek Park to offer multiple outdoor amenities and uses for the citizens of Euless. Heavy bank erosion along the Little Bear Creek has redefined the trail locations within the Villages of Bear Creek Park resulting in the need to redesign the park and trail system. Trail development and enhancement opportunities will be consistent with available land, funding, and time variables. This project will follow the adopted 2025 Parks, Recreation, and Open Space Master Plan. Due to the continual erosion of the existing trail, a redesign/redevelopment of the trail system at the Villages of Bear Creek is necessary. 311 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PARKS AND COMMUNITY SERVICES June 19,2025 DUANE STRAWN TRAILWOOD PARK IMPROVEMENTS PARKS/RECREATION PARK IMPROVEMENTS C This project is a continuation of the overall park improvement plan as identified in the adopted 2025 Parks, Recreation, and Open Space Master Plan. Trailwood Park is an eleven-acre site that currently has a playground and a half-mile hike/bike trail. This project includes the installation of a new pavilion, a parking lot, park lighting, new park signs, benches along the trail, and trail lighting. As identified in the adopted 2025 Parks, Recreation, and Open Space Master Plan, the municipal park is the foundation of any solid parks and recreation system. The City of Euless parks and recreation system provides the residents and visitors with significant personal, social, environmental, and economic benefits. The revitalization efforts the Council has focused on over the years have increased citizens' sense of community pride. This proposed project will continue those efforts by creating an area that will serve both the passive and active leisure needs of the residents in the vicinity. 312 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PARKS AND COMMUNITY SERVICES April 1, 2025 DUANE STRAWN WEST PARK IMPROVEMENTS PARKS/RECREATION PARK IMPROVEMENTS C The adopted 2025 Parks, Recreation, and Open Space Master Plan recommends funding for system-wide park facilities and amenities upgrades. West Park was identified as a top priority park renovation based on existing conditions, needs list, and anticipated funding. This project consists of the necessary demolition and site work to complete a renovated park including enhanced parking, landscaping, and sidewalks. New amenities such as padded benches, picnic tables, general park lighting, a sport court, a drinking fountain, trash cans, barbecue grills, bicycle racks, signage, and a trail connection to the apartment complex across the creek to the north are also included in the project scope. As identified in the adopted 2025 Parks, Recreation, and Open Space Master Plan, the municipal park is the foundation of any solid parks and recreation system. Euless' parks and recreation system provides residents and visitors with significant personal, social, environmental, and economic benefits. The revitalization efforts the City Council focused on over the years have increased the citizens' sense of community pride. The proposed project will continue the Council's revitalization efforts by creating an area that will serve both the passive and active leisure pursuits of residents in this area. 313 314 CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Date Completed Total Budget Total Project Costs (Over) Under Budget DRAINAGE PROJECTS DR9901 Sulphur Branch Phase II 08/01/99 123,404$ 120,128$ 3,276$ DR9902 Windlea & WestCliff 08/01/99 4,396$ 1,159$ 3,237$ DR9904 Hurricane Creek 04/30/02 257,500$ 69,906$ 187,594$ DR0302 Flooding Mitigation Cancelled 250,000$ -$ 250,000$ DR0303 Aransas @ Glenn 12/31/04 250,000$ 250,000$ -$ DR0304 Live Oak Drainage 04/15/05 218,000$ 175,958$ 42,042$ DR0305 Sierra Drive Drainage 04/15/05 40,738$ 40,738$ 0$ DR0306 Flood Mitigation Plan(FEMA)04/15/05 32,000$ 7,750$ 24,250$ DR0307 Simmons Drainage 04/15/05 22,995$ 22,995$ -$ DR0301 Fuller Branch Channel Stabilization 05/31/07 279,136$ 232,176$ 46,960$ DR0401 Channel Stabilization Tributary WFA 05/31/07 437,462$ 438,070$ (608)$ DR0402 Drainage Project Study 05/31/07 60,000$ 51,000$ 9,000$ DR0601 Little Bear Creek Study Update 04/25/08 50,000$ 49,000$ 1,000$ DR0602 McCormick Park 04/25/08 250,000$ 247,925$ 2,075$ DR0701 Eastcliff Drive/Greenbriar Drive Drainage Imp.04/17/10 340,000$ 246,584$ 93,416$ DR0801 Rockwall Drive/Lamar Drive Drainage Imp.04/17/10 430,000$ 272,554$ 157,446$ DR0901 Bear Creek Parkway Erosion Repair 02/17/11 530,000$ 464,465$ 65,535$ DR0802 Hurricane Creek & Bridge at Marlene Improvements 04/14/11 378,500$ 344,574$ 33,926$ DR0000 Boyd Branch Improvements Cancelled 10,000,000$ -$ 10,000,000$ DR2201 Bear Creek Elementary Drainage Channel Improvements 05/31/23 551,366$ 544,040$ 7,326$ DR2502 FY2025 Drainage Curb & Gutter Improvements 05/31/25 265,000$ 265,000$ -$ 14,770,497$ 3,844,022$ 10,926,475$ -$ -$ -$ -$ -$ -$ Total Drainage Projects 14,770,497$ 3,844,022$ 10,926,475$ Drainage Projects - Current Year Project Number Project Description Drainage Projects - Prior Years 315 316 CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Date Completed Total Budget Total Project Costs (Over) Under Budget STREET PROJECTS PS9911 Overlay Projects 03/30/00 294,687$ 294,687$ -$ PS9912 Harwood-Main Intersection 04/30/00 1,126,935$ 1,077,303$ 49,632$ PS9907 Westpark Way - SH10 to SH183 09/30/00 605,542$ 479,915$ 125,627$ PS9902 Mid Cities Blvd.05/02/02 1,075,074$ 963,635$ 111,439$ PS9910 Sidewalks 06/30/03 200,000$ 200,000$ -$ PS0001 FM 157 S Pipeline to SH10 (Utility Relocation)04/30/04 378,207$ 371,318$ 6,889$ PS0003 Glade from Heritage to SH121 04/30/04 1,866,612$ 1,866,612$ -$ PS0004 Glade Rd (East) - SH121 to Champagne 04/30/04 1,210,014$ 1,162,009$ 48,005$ PS0201 Gateway Blvd - Southern Portion 04/30/04 510,000$ 473,817$ 36,183$ PS0301 Mid Cities Roadway Illumination 04/15/05 160,000$ 148,115$ 11,885$ PS0302 Driftwood Pipeline Traffic Signal 04/15/05 100,000$ 68,665$ 31,335$ PS0303 Aransas/Harwood Traffic Signal 04/15/05 120,000$ 89,118$ 30,882$ PS0402 South Pipeline Road Bridge 04/30/05 28,208$ 28,208$ -$ PS9908 Signalization 05/31/06 168,055$ 168,055$ -$ PS0401 West Pipeline - Raider to City Limits 05/31/06 223,000$ 104,859$ 118,141$ PS0403 Raider Dr - SH10 to South Pipeline 05/31/06 330,000$ 293,435$ 36,565$ PS0501 Ross Avenue/S.Main 300' W 05/31/06 95,688$ 95,638$ 50$ PS0502 Industrial Signal Timing 05/31/06 50,000$ 50,000$ -$ PS0503 Overlay-Harwood 157/Main 05/31/06 137,000$ 119,816$ 17,184$ PS0604 Overlay-S.Main, SH10/S.Pipeline 05/31/06 137,000$ 140,211$ (3,211)$ PS0601 Overlay-East Midway 05/31/07 83,000$ 73,550$ 9,450$ PS0602 Overlay-Midway, N Main,/FM157 05/31/07 105,000$ 67,632$ 37,368$ PS0603 Overlay-Fuller Wiser, Midway/Harwood 05/31/07 40,000$ 28,695$ 11,305$ PS9906 Traffic Safety/Signalization 05/31/08 128,027$ 127,939$ 88$ PS0404 South Pipeline Road Overlay 05/31/08 114,750$ 85,062$ 29,688$ PS0701 Overlay-Dickey Drive 05/31/08 122,200$ 48,435$ 73,765$ PS0702 Overlay-East Huitt 05/31/08 89,000$ 64,895$ 24,105$ PS0703 Overlay-Huntington Drive 05/31/08 69,500$ 42,884$ 26,616$ PS0706 Gateway Blvd Screening Wall 05/31/08 135,800$ 138,862$ (3,062)$ PS0705 Signal Gateway Blvd @ Glade 10/28/08 98,000$ 98,000$ -$ PS0002 West Pipeline Road-Raider/Hwy10 12/01/08 6,082,621$ 6,081,392$ 1,229$ PS0801 Overlay-North Main/Cullum Drive 12/31/08 290,000$ 211,130$ 78,870$ PS9905 Traffic Studies 05/30/09 27,286$ 27,197$ 89$ PS0704 Disability Access Study 05/31/09 30,000$ 13,950$ 16,050$ PS0901 Ash/Denton/Fair Oaks Overlay 09/30/09 320,000$ 231,984$ 88,016$ PS0902 Vine Street Design Cancelled 100,000$ -$ 100,000$ PS9903 HWY 183 Service Road Cancelled -$ -$ -$ PS0304 Glade Road 04/16/10 3,077,977$ 2,905,205$ 172,772$ PS9909 FM157 North - SH183 to SH121 04/16/10 267,519$ 129,215$ 138,304$ PS0903 Mid Cities @ Gateway & Baze Traffic Signals 04/16/10 320,000$ 250,702$ 69,298$ PS0802 Fuller-Wiser Connector 02/17/11 495,000$ 441,491$ 53,509$ PS1002 FY10 County Overlay - Wilshire/Marlene 05/17/11 288,000$ 200,890$ 87,110$ PS9901 North Main Street 05/31/12 6,745,047$ 6,698,149$ 46,898$ PS9904 Harwood Road 05/31/12 5,770,211$ 5,686,556$ 83,655$ PS1001 Baze Road 05/31/12 1,830,000$ 1,558,401$ 271,599$ PS1101 FY2011 County Overlay-Bear Creek Drive/Lakewood Blvd/Ash Lane 05/31/12 300,000$ 265,887$ 34,113$ PS0605 South Pipeline Road Bridge Replacement 05/31/13 157,000$ 157,000$ -$ PS1003 Ash Lane-Aransas Drive to N. Main Street 05/31/13 1,959,230$ 1,597,270$ 361,960$ PS1201 FY2012 County Overlay-Aransas Drive/Slaughter Lane 05/31/13 300,000$ 228,759$ 71,241$ PS1301 FY2013 38th CDBG-ADA/TAS Infrastructure Improvements 05/31/14 450,000$ 284,581$ 165,419$ PS1302 FY2013 County Overlay-Trailwood/Summit Ridge/Westpark/Baze 05/31/14 280,000$ 273,995$ 6,005$ Project Number Project Description 317 318 CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Date Completed Total Budget Total Project Costs (Over) Under Budget Project Number Project Description STREET PROJECTS - CONTINUED PS1402 FY2014 County Overlay-Ector Drive/Midway Drive/Trojan Trail 05/31/14 300,000$ 300,000$ -$ PS1401 FY2014 39th CDBG-ADA/TAS Infrastructure Improvements 02/28/15 300,000$ 272,057$ 27,943$ PS1303 Cullum Drive Improvements 03/31/15 1,295,738$ 1,210,748$ 84,990$ PS1202 ADA/TAS Infrastructure Improvements 05/31/16 463,800$ 460,996$ 2,804$ PS1502 FY2015 Street Overlay 05/31/16 300,000$ 217,182$ 82,818$ PS1602 FY2016 Street Overlay 09/30/16 600,000$ 600,000$ -$ PS1501 FY2015 40th CDBG-ADA/TAS Infrastructure Improvements 05/31/17 519,600$ 392,693$ 126,907$ PS1602 FY2016 Street Overlay 05/31/17 600,000$ 600,000$ -$ PS1603 FY2016 41st CDBG-ADA/TAS Infrastructure Improvements 05/31/17 79,301$ 70,194$ 9,107$ PS1701 FY2017 42nd CDBG-ADA/TAS Infrastructure Improvements 05/31/18 91,000$ 65,240$ 25,760$ PS1702 FY2017 Street Improvements 05/31/18 600,000$ 600,000$ -$ PS1703 Traffic Signal-Harwood Road at Bear Creek Parkway 05/31/18 180,000$ 180,000$ -$ PS1102 Glade Parks Improvements 05/31/19 15,369,514$ 15,369,514$ -$ PS1801 FY2018 Street Improvements 05/31/19 425,000$ 425,000$ -$ PS1802 FY2018 Street Reconstruction-Fuller Wiser Rd./Bear Creek Pkwy.05/31/21 6,270,329$ 6,270,329$ -$ PS1901 FY2019 Street Improvements 05/31/21 950,000$ 950,000$ -$ PS2001 FY2020 Street Improvements 05/31/21 975,000$ 975,000$ -$ PS2002 Glade Road Reconstruction-East of Highway 360 05/31/21 150,000$ 101,643$ 48,357$ PS2003 Traffic Signal-Cheek-Sparger Road at Heritage Avenue 05/31/21 259,800$ 243,336$ 16,464$ PS2101 FY2021 Street Improvements 05/31/22 1,000,000$ 1,000,000$ -$ PS2201 FY2022 Street Improvements 05/31/23 1,025,000$ 1,025,000$ -$ PS2301 FY2023 Street Improvements 05/31/24 1,050,000$ 1,050,000$ -$ PS2202 Mid-Cities/Cheek-Sparger & SH 121 Intersection/ADA Imp. Design 05/31/25 410,000$ 410,000$ -$ PS2401 FY2024 Street Improvements 05/31/25 1,100,000$ 1,100,000$ -$ 73,205,272$ 70,104,055$ 3,101,217$ PS2501 Fuller-Wiser Road/Bear Creek Parkway Roadway Rehabilitation 05/31/26 165,000$ 162,932$ 2,068$ PS2502 FY2024-25 Street Improvements 05/31/26 1,125,000$ 1,125,000$ -$ 1,290,000$ 1,287,932$ 2,068$ Total Street Projects 74,495,272$ 71,391,987$ 3,103,285$ Street Projects - Current Year Street Projects - Prior Years 319 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 01,2024 MAJOR JONES May 31, 2026 FULLER WISER RD/BEAR CREEK PKWY ROADWAY REHAB. STREET IMPROVEMENTS PS2501 The Master Thoroughfare Plan identifies the various street types within the City of Euless. These street types include residential streets through regional arterials. Our pavement management plan through condition assessment provides statistical data and guidance for cost effective maintenance and project planning. The project consists of sawcutting, concrete pouring, and restriping on Fuller Wiser Road and Bear Creek Parkway prioritized by visual inspection, pavement condition index of the roadways, and citizen feedback. Began Construction: June 2025 Construction Complete: September 2025 The existing concrete pavement is deteriorating in 140 panels. The concrete reconstruction will provide an improved riding surface, extend the life of the roadway, and enhance the appearance of the streets. 320 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Construction $165,000 $0 $0 $0 $0 $165,000 Transfer from: Street CIP Fund Balance $165,000 $0 $0 Transfer to: Street CIP Fund Balance ($2,068) $0 $162,932 Construction $165,000 $162,932 $2,068 99% $165,000 $162,932 $2,068 99% FULLER WISER RD/BEAR CREEK PKWY ROADWAY REHAB.PS2501 321 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 31,2020 MAJOR JONES May 31, 2026 FY2024-25 STREET IMPROVEMENTS STREET IMPROVEMENTS PS2502 February 11, 2025: Authorized the City Manager to execute an interlocal agreement with Tarrant County for asphalt overlay improvements. The project consists of edge milling, asphalt overlay, and restriping on various streets prioritized by pavement condition index of the roadways. Began Construction: October 2024 Construction Complete: November 2025 The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, extend the life of the roadway, and enhance the appearance of the streets. 322 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Construction $1,125,000 $0 $0 $0 $0 $1,125,000 Transfer from: General Fund $1,125,000 $0 $0 $0 $1,125,000 Construction $1,125,000 $1,125,000 $0 100% $1,125,000 $1,125,000 $0 100% FY2024-25 STREET IMPROVEMENTS PS2502 323 324 CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Date Completed Total Budget Total Project Costs (Over) Under Budget WASTEWATER PROJECTS WW9902 Impact Fee Study 09/30/99 13,000$ 12,238$ 762$ WW9903 Misc Sewer Rehab FY99 09/30/99 50,000$ 12,987$ 37,013$ WW9904 Hydraulic Analysis 06/30/00 27,000$ 27,000$ -$ WW9901 CDBG B/98-UC-48-0001/B95-22-50 08/19/00 150,000$ 72,927$ 77,073$ WW0003 TRA Debt Payment 05/31/01 822,037$ 822,037$ -$ WW0001 CDBG B/99-UC-48-0001 09/30/01 150,000$ 121,682$ 28,318$ WW0101 CDBG B00-UC480001-2250 02/20/02 251,485$ 247,790$ 3,695$ WW0102 Manhole Rehab. Program 03/31/03 250,000$ 184,520$ 65,480$ WW0201 CDBG - B01-UC-48-0001-22-50 03/31/03 237,086$ 172,948$ 64,138$ WW0202 Line Replacement -Dunaway 02/28/05 140,000$ 139,955$ 45$ WW0203 Line Replacement - E. Alexander 02/28/05 20,000$ 20,000$ -$ WW0204 Line Replacement - Paula Lane 02/28/05 79,000$ 79,000$ -$ WW0103 Line replacement-S. Pipeline,Heather-Vine 04/15/05 489,759$ 464,504$ 25,255$ WW0205 Line Replacement - Midway Park 04/30/05 366,000$ 318,149$ 47,851$ WW0401 CDBG B03-UC-48-0001-22-50 04/30/05 217,000$ 161,170$ 55,830$ WW0301 CDBG B02-UC-48-0001-22-50 07/26/05 271,455$ 271,454$ 1$ WW0302 Inflow & Infiltration Cancelled 200,000$ -$ 200,000$ WW0303 Line Replacement, Canyon Ridge 08/31/06 196,200$ 173,516$ 22,684$ WW0304 Line Replacement, Sagebrush 08/31/06 160,900$ 136,470$ 24,430$ WW0305 Line Replacement, Short 08/31/06 251,400$ 219,932$ 31,468$ WW0306 Line Replacement, E. Fuller 08/31/06 231,372$ 180,089$ 51,283$ WW0501 Line Replacement, Pebble Creek 08/31/06 172,600$ 145,655$ 26,945$ WW0604 Line Replacement, CDBG-Oakwood Terrace 05/31/07 293,723$ 232,274$ 61,449$ WW0402 Line Replacement, Carr Park/SH10 05/31/08 588,000$ 528,302$ 59,698$ WW0403 Line Replacement, Ector Drive 05/31/08 373,000$ 328,309$ 44,691$ WW0601 Line Replacement, Cedar Hills Estate 05/31/08 319,000$ 200,201$ 118,799$ WW0602 Line Replacement, Ector Drive 05/31/08 425,000$ 285,758$ 139,242$ WW0603 Little Bear Creek Collection Line 05/31/08 575,000$ 464,293$ 110,707$ WW0701 Line Replacement, McCormick & Copher 02/05/09 243,000$ 194,254$ 48,746$ WW0702 Line Replacement, Arnett Addition 02/05/09 313,322$ 229,006$ 84,316$ WW0703 Line Replacement, Jean Lane 02/05/09 111,000$ 70,603$ 40,397$ WW0704 Line Replacement, W. Fuller 02/05/09 132,000$ 82,708$ 49,292$ WW0902 Line Replacement, West Mills Drive-34th CDBG 04/16/10 46,855$ 46,855$ -$ WW0802 Line Replacement South Mills Drive CDBG-R 11/01/10 253,710$ 165,867$ 87,843$ WW0901 Line Replacement Woodridge Circle/Koen Lane 11/01/10 407,000$ 309,410$ 97,590$ WW0801 Line Replacement Fayette Drive 04/14/11 357,000$ 325,676$ 31,324$ WW1001 Line Rep - W Alexander Ln/Norman Dr/Franklin Dr 05/31/12 420,000$ 331,614$ 88,386$ WW1101 Line Rep - Bayless/Pauline/Jones (CDBG)05/31/12 350,000$ 208,903$ 141,097$ WW1103 Line Rep - Bayless/Pauline/Jones Outfall 05/31/12 57,000$ 37,544$ 19,456$ WW1202 Line Rep - Collin Drive (37th CDBG)05/31/12 300,000$ 231,173$ 68,827$ WW1102 Line Rep - E Huit Lane/Ascot Drive/Dunaway Drive 05/31/13 560,000$ 468,932$ 91,068$ WW1201 Line Rep - Blanco/Aransas/Crane 05/31/13 327,000$ 284,321$ 42,679$ WW1301 Line Rep - Ross/Slaughter/East & West Huitt 05/31/14 670,000$ 566,640$ 103,360$ WW1203 SH183 Phase I Wastewater Relocation 10/31/14 372,243$ 372,243$ -$ WW1401 Line Rep - Denton Drive 06/01/15 629,000$ 506,466$ 122,534$ WW1501 Line Rep - Crane Drive 05/31/16 264,823$ 264,823$ -$ WW1502 Line Rep - Town Creek Drive 05/31/16 440,665$ 395,896$ 44,769$ WW1601 Line Rep - Glenn Drive 05/31/17 293,000$ 264,370$ 28,630$ WW1702 FY2017 42nd CDBG LR: Oakwood Terrace Phase I 05/31/17 242,000$ 190,474$ 51,526$ WW1701 Line Rep - Cedar Hill Estates/Hollywood Boulevard 05/31/18 134,165$ 89,001$ 45,164$ WW1801 SH183 Phase II Wastewater Relocation 05/31/19 700,672$ 681,209$ 19,463$ WW1802 FY2018 43rd CDBG LR: Oakwood Terrace Phase II 05/31/19 223,125$ 183,337$ 39,788$ WW1901 Line Rep - Cedar Hill Estates North 05/31/20 409,903$ 250,838$ 159,065$ WW1902 FY2019 44th CDBG LR: Oakwood Terrace Phases III & IV 05/31/20 377,639$ 248,838$ 128,801$ Project Number Project Description 325 326 CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Date Completed Total Budget Total Project Costs (Over) Under Budget Project Number Project Description WASTEWATER PROJECTS - CONTINUED WW2001 FY2020 45th CDBG LR: Midway Park 2nd Addition Phase I 05/31/21 444,244$ 400,484$ 43,760$ WW2002 Line Rep - Midway Park 3rd Addition Phase I 05/31/22 446,600$ 292,446$ 154,154$ WW2003 Line Rep - North Main Street 05/31/22 189,000$ 115,849$ 73,151$ WW2101 Line Rep - El Camino Real 05/31/22 562,000$ 371,957$ 190,043$ WW2102 FY2021 46th CDBG LR: Del Paso Street Phase I & II 05/31/22 478,652$ 331,867$ 146,785$ WW2103 Line Rep - SH10 @ Main Street 05/31/22 121,000$ 49,293$ 71,707$ WW2201 FY2022 47th CDBG LR: Paula Ln./David Dr./Susan St./Raider Ct. 05/31/23 412,058$ 409,440$ 2,618$ WW2202 Line Rep – Midway Park 3rd Addition Phase II & Green Hills Park 05/31/23 442,400$ 359,914$ 82,486$ WW2203 Line Rep – South Pipeline Road & SH 10 05/31/23 165,340$ 165,340$ -$ WW2303 FY2023 48th/49th CDBG LR: Euless Square/Aransas Drive 05/31/24 769,897$ 467,240$ 302,657$ 19,986,330$ 15,987,991$ 3,998,339$ WW2401 FY2023-24 50th CDBG LR: Fair Oaks Blvd./Shelmar Dr./Kensinger Ct. 05/31/26 637,785$ 637,785$ -$ 637,785$ 637,785$ -$ Total Wastewater Projects 20,624,115$ 16,625,776$ 3,998,339$ Wastewater Projects- Current Year Wastewater Projects - Prior Years 327 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 21,2024 MAJOR JONES May 31, 2026 50TH CDBG LINE REP– FAIR OAKS/SHELMAR/KENSINGER WASTEWATER MAIN REPLACEMENT WW2401 February 13, 2024: Conducted a Public Hearing for the proposed 50th year CDBG project and approved the recommendation. August 12, 2025: Approved Resolution No. 25-1677, awarding a construction contract to Douglas Dailey Construction. The estimated expenditure is $554,900 with an authorized contingency in the amount of $27,745. The wastewater mains included in this project are part of the City's Wastewater System Master Plan. The project consists of the replacement of the following wastewater mains: 1. Along Fair Oaks Boulevard from Lone Oak Circle to Ash Lane, 2. 302-413 Shelmar Drive, and 3. Kensinger Court. (50th year CDBG project) Began Design: October 2024 Design Complete: May 2025 Began Construction: October 2025 Construction Complete: May 2026 Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst-first approach to reduce maintenance costs and customer problems. 328 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering $88,743 Construction $549,042 $0 $0 $0 $0 $637,785 50th CDBG Award $637,785 $0 $0 $0 $637,785 Engineering $88,743 $88,743 $0 100% Construction $549,042 $549,042 $0 100% $637,785 $637,785 $0 100% 50TH CDBG LINE REP– FAIR OAKS/SHELMAR/KENSINGER WW2401 329 330 CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Date Completed Total Budget Total Project Costs (Over) Under Budget WATER PROJECTS WT9903 Master Plan 08/30/99 42,000$ 5,445$ 36,555$ WT9904 Well Repairs 09/30/99 66,921$ 66,921$ -$ WT9907 Impact Fee Study 09/30/99 13,000$ 12,238$ 762$ WT9911 Water Distribution - Master Plan 09/30/99 25,600$ 24,000$ 1,600$ WT9901 Meter Change Out Program 10/30/99 101,917$ 98,365$ 3,552$ WT0002 Emergency Repair - Hwy 10 11/30/99 15,450$ 14,214$ 1,236$ WT9906 Hwy 10 Water Line 01/30/00 150,000$ 138,883$ 11,117$ WT0006 Central Drive Water Mains 03/31/00 92,814$ 90,742$ 2,072$ WT9905 Misc Water Rehab 06/30/00 50,000$ 43,749$ 6,251$ WT0004 Water Line Milam - Ector/Midway 06/30/00 18,248$ 13,743$ 4,505$ WT0102 SCADA Upgrade 04/09/01 93,400$ 93,400$ -$ WT0003 Waterline Replacement - Aransas 06/30/01 12,057$ 7,089$ 4,968$ WT0005 Waterline Replacement - Milam- Denton/Mid 04/30/02 26,988$ 26,988$ -$ WT9910 Water Line for Elevated Tank 05/31/02 1,608,386$ 1,201,698$ 406,688$ WT9909 2MG Water Tank 03/31/03 2,430,881$ 2,289,571$ 141,310$ WT0103 Fire Hydrant Replacement Program 03/31/03 50,000$ 49,626$ 374$ WT9908 Mid Cities Blvd. 12" Line 04/30/04 342,080$ 313,354$ 28,726$ WT0401 Line Replacement, West Pipeline Main 05/31/06 1,215,663$ 1,215,663$ -$ WT0403 Waterline Replacement - Fairlawn Court Cancelled 35,000$ -$ 35,000$ WT0404 Waterline Replacement - Atkerson Lane Cancelled 104,000$ -$ 104,000$ WT0405 Line Replacement, West Ash Lane 08/31/06 30,000$ 11,626$ 18,374$ WT0406 Line Replacement, Westport/Newport/Asbury 08/31/06 67,000$ 9,866$ 57,134$ WT0502 FY'2005 CDBG 08/31/06 69,300$ 29,549$ 39,751$ WT0503 Line Replacement, S. Atkerson Lane 08/31/06 79,000$ 51,294$ 27,706$ WT0504 Line Replacement, Blanco Drive 08/31/06 112,620$ 112,620$ -$ WT0505 Line Replacement, Henslee 08/31/06 183,000$ 123,859$ 59,141$ WT0506 Line Replacement, Vernon/Slaughter 08/31/06 161,000$ 113,052$ 47,948$ WT9902 Tank Painting 05/31/07 1,317,763$ 957,542$ 360,221$ WT0501 System Security Upgrade 05/31/08 40,000$ 28,319$ 11,681$ WT0601 Wtr Sys Security Perimeter Fence Upgrade 05/31/08 75,000$ 49,567$ 25,433$ WT0602 Line Replacement, Cannon Drive 05/31/08 250,000$ 223,055$ 26,945$ WT0701 Line Replacement, Canyon Ridge 05/31/08 116,000$ 78,136$ 37,864$ WT0702 CDBG FY07 - 32nd Oakwood Terrace 05/31/08 334,481$ 296,223$ 38,258$ WT0802 CDBG-33rd Oakwood Terrace-Simmons 12/31/08 451,639$ 384,173$ 67,466$ WT0402 Water & Wastewater Impact Fee Update 05/31/09 30,000$ 17,729$ 12,271$ WT0801 Line Replacement, Signet/Mesa 05/31/09 255,000$ 218,663$ 36,337$ WT0201 Well Rehabilitation/Disinfection 04/17/10 600,000$ 522,308$ 77,692$ WT0202 Reclaimed Water Main 05/31/13 1,750,000$ 1,606,337$ 143,663$ WT1202 Standpipe Storage Tank & Building Demolition 05/31/13 134,640$ 70,089$ 64,551$ WT1203 Water & Wastewater Impact Fee Update 05/31/13 34,575$ 34,575$ -$ WT1401 El Camino Real 02/28/15 460,000$ 420,462$ 39,538$ WT0901 Trinity River Authority Water Payment-Impact 05/31/16 750,000$ 750,000$ -$ WT1201 Reclaimed Water Line Extension Phase I 05/31/16 3,239,452$ 3,239,452$ -$ WT1501 24-Inch Valve Replacement 05/31/16 180,000$ 131,370$ 48,630$ WT1601 Line Rep - Donley Drive/Shelmar Drive 05/31/16 212,000$ 152,990$ 59,010$ WT1602 FY2016 41st CDBG Line Rep - Ector Drive 05/31/17 310,925$ 309,151$ 1,774$ WT1212 Reclaimed Water Line Extension Phase II 05/31/18 2,591,496$ 1,868,473$ 723,023$ WT1402 Fixed Base Meter Reading and Water Meter Changeout 05/31/18 5,503,719$ 5,503,719$ -$ WT1801 SH183 Phase II Water Relocation 05/31/19 780,672$ 703,577$ 77,095$ Project Number Project Description 331 332 CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Date Completed Total Budget Total Project Costs (Over) Under Budget Project Number Project Description WATER PROJECTS - CONTINUED WT1901 Line Rep - Kynette Drive 05/31/20 635,000$ 593,793$ 41,207$ WT0101 Water Tank Debt Payment-Impact 05/31/21 5,240,318$ 5,240,318$ -$ WT2001 Line Replacement – Alexander Lane 05/31/23 347,829$ 326,385$ 21,444$ WT2101 Line Replacement – Dickey Drive 05/31/23 568,171$ 568,171$ -$ WT2201 1 Mil Well Replacement Design 05/31/23 53,077$ 53,077$ -$ WT2202 Line Replacement – Huntington Drive Phase I 05/31/24 515,000$ 468,485$ 46,515$ 33,973,082$ 30,973,694$ 2,999,388$ -$ -$ -$ -$ -$ -$ Total Water Projects 33,973,082$ 30,973,694$ 2,999,388$ Water Projects- Current Year Water Projects - Prior Years 333 334 CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Date Completed Total Budget Total Project Costs (Over) Under Budget OTHER PROJECTS AC0202 Athletic Complex Phase Ill 05/31/06 1,252,221$ 1,251,915$ 306$ AC1001 Texas Star Sports Complex Lighting Improvements 05/31/12 504,200$ 475,246$ 28,954$ AC1201 Texas Star Sports Complex Phase IV 05/31/16 645,687$ 575,653$ 70,034$ AC1601 Texas Star Sports Complex Phase V 05/31/18 2,602,877$ 2,538,291$ 64,586$ AC1702 Texas Star Sports Complex Phase VI 05/31/17 1,258,892$ 1,258,470$ 422$ AC9901 Athletic Complex Phase II 06/30/02 123,654$ 75,047$ 48,607$ CM1508 Car Rental Contingency 05/31/16 700,000$ 700,000$ -$ CM1509 Municipal Plaza Improvements Phase I 05/31/17 158,500$ 41,767$ 116,733$ ED0101 Planning Consultants 05/31/18 204,869$ 104,869$ 100,000$ ED0102 Bell Ranch Terrace Cancelled 200,000$ -$ 200,000$ FM0101 Building D 09/30/02 930,610$ 930,608$ 2$ FM0209 Midway Recreation Upgrade 06/30/02 557,125$ 557,125$ -$ FM0308 Building A Remodel 05/31/07 1,663,238$ 1,651,325$ 11,913$ FM0309 Fire Station #3 05/31/07 2,286,798$ 2,286,229$ 569$ FM0504 Building "B" Remodel 05/31/09 1,322,490$ 1,315,697$ 6,793$ FM0601 Public Works Facility 05/31/08 2,210,956$ 2,213,507$ (2,551)$ FM0801 TX Star Golf Course & Conference Ctr Expand 05/31/09 3,630,079$ 3,630,079$ -$ FM0802 Senior Citizen Center Design cancelled 250,000$ -$ 250,000$ FM0803 Midway Recreation Improvements 03/31/09 293,500$ 75,976$ 217,524$ FM0804 Library-Shell Expansion 12/31/08 307,034$ 305,664$ 1,370$ FM1510 Development/Engineering Building Improvements 05/31/18 2,589,125$ 2,588,793$ 332$ FM1708 Library Remodel 05/31/21 7,546,908$ 7,546,908$ -$ GC1201 TSGC Misc. Improvements 05/31/18 430,000$ 404,820$ 25,180$ GC1701 TSGC Maintenance Building 05/31/18 100,000$ 97,934$ 2,066$ GR1401 Golf Course Upgrades 09/30/14 587,000$ 581,296$ 5,704$ PD9901 Police and Courts Facility 05/31/15 11,718,304$ 11,718,304$ -$ PR0015 Purchase of Dallas Stars Center 05/31/00 10,327,978$ 10,327,978$ -$ PR0016 Wilshire Park Improvements 06/30/02 150,000$ 149,926$ 74$ PR0110 Slope Protection/Screening Wall 03/31/03 1,275,203$ 1,273,923$ 1,280$ PR0302 Bob Eden Parking 04/30/05 75,000$ 74,854$ 146$ PR0303 Youth Ballpark 04/30/05 600,000$ 600,000$ -$ PR0407 Parking Improvements, Midway Cancelled 11,000$ -$ 11,000$ PR0408 Parking Improvements, S. Euless Park 05/31/06 55,000$ 20,991$ 34,009$ PR0409 Parking Improvements, Simmons 07/29/04 6,960$ 6,960$ -$ PR0410 Parking Improvements, Villages Bear Creek 07/29/04 33,666$ 33,666$ -$ PR0411 Preserve at McCormick Park 05/31/06 1,168,427$ 1,168,427$ -$ PR0412 Splash Pool 05/31/06 125,000$ 124,477$ 523$ PR0601 Park Amenities Upgrade 04/17/10 150,000$ 145,316$ 4,684$ PR0602 Mid Cities Landscaping 05/31/09 40,000$ 33,199$ 6,801$ PR0719 Midway Park Trail 05/31/09 210,000$ 190,473$ 19,527$ PR0901 Trail Enhancements - Bob Eden Park 04/17/10 135,000$ 101,673$ 33,327$ PR0902 Senior Citizen Center at Midway Park 05/31/11 4,763,661$ 3,888,892$ 874,769$ PR0907 Euless Family Life Center Phase I 05/31/11 2,105,000$ 2,099,281$ 5,719$ PR1201 Euless Family Life Center Aquatics 09/30/14 7,504,972$ 7,319,299$ 185,673$ PR1401 Glade Parks Trail Connection 05/31/19 1,396,545$ 1,138,772$ 257,773$ PR1917 Carr Park Improvements 05/31/21 1,928,548$ 1,906,504$ 22,044$ PR9901 Hike/Bike Trail 04/30/05 237,714$ 237,714$ -$ PR9902 Senior Citizen Remodel 04/30/05 16,130$ 16,130$ -$ PR9903- PR9918 Various EDC Park Projects 09/30/06 259,566$ 248,891$ 10,675$ PR9922 Tejas Remodel 11/30/01 430,000$ 455,885$ (25,885)$ PR9927 Park Improvements - Texas Star 09/30/01 1,036,500$ 1,025,298$ 11,202$ Project Number Project Description 335 336 CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Date Completed Total Budget Total Project Costs (Over) Under Budget Project Number Project Description OTHER PROJECTS - CONTINUED PW1704 Public Works Yard Improvements 05/31/17 100,000$ 97,686$2,314$ SS0010 Former Fire Station #2 06/30/02 599,600$ 595,257$ 4,343$ SS0113 Park Building 06/30/02 1,492,400$ 1,492,100$ 300$ SS9901 Fire Station II 03/30/00 49,688$49,688$-$ SS9902 Library Books 08/15/00 3,302$3,302$-$ SS9919 Fire Station #3 - Structural Repairs 03/30/00 30,000$17,344$12,656$ PR2102 Senior Center Canopy CDBG-CV 05/31/23 394,544$ 392,980$ 1,564$ PR2306 Carr Park Trail Connection 05/31/23 316,100$ -$ 316,100$ PR2307 Kiddie Carr Park Improvements 05/31/23 893,500$ -$ 893,500$ PR2309 Parks at Texas Star North Additional Parking Lot 05/31/23 499,800$ 449,892$ 49,908$ PR2310 Trail Lighting – Heritage Avenue to Bob Eden Park 05/31/23 150,000$ 150,000$ -$ FM2006 Fire Station #1 05/31/24 7,748,239$ 7,388,181$ 360,058$ GC2003 Texas Star Slope Wall Protection Phase I 05/31/24 415,337$ 415,337$ -$ PR2305 Aquatic Park Facility Upgrades 05/31/24 315,000$ 313,041$ 1,959$ PR2308 Midway Park Pickleball Courts 05/31/24 200,520$ 200,520$ -$ PR2311 Trail Lighting – Mid-Cities 05/31/24 152,000$ 84,304$67,696$ PR2011 Wilshire Park Upgrades 05/31/25 2,222,864$ 2,222,161$ 703$ PR2203 Blessing Branch Park Improvements 05/31/25 365,064$ 333,010$ 32,054$ PR2404 Parks at Texas Star Lighting Upgrade 05/31/25 703,350$ 703,350$ -$ PR2509 Parks at Texas Star South Turf – Fenway/Shea/Jacobs Fields 05/31/25 258,200$ 258,200$ -$ 95,025,445$ 90,680,404$ 4,345,041$ FM2409 Animal Shelter Expansion/Renovation 05/31/26 6,525,000$ 6,525,000$ -$ PR2510 Playground Shade Structures 05/31/26 950,000$ 589,415$ 360,585$ 7,475,000$ 7,114,415$ 360,585$ Total Other Projects 102,500,445$ 97,794,819$ 4,705,626$ Other Projects - Current Year Other Projects - Prior Years 337 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: FLEET & FACILITY OPERATIONS May 07,2007 SCOTT PETERSON May 31, 2026 ANIMAL SHELTER – EXPANSION/RENOVATION FACILITIES REMODEL FM2409 October 10, 2023: Authorized the City Manager to negotiate and execute an Architectural Services Contract with Oxley Williams Tharp Architects for the design, renovation, and construction of the Animal Services facility. The estimated expenditure is $405,000. November 26, 2024: Awarded Request for Competitive Sealed Proposal (RFCSP) No. 001-25 for the construction and remodel of the Animal Shelter in the amount of $4,641,000, authorized an owner-controlled contingency not to exceed 10 percent, and authorized the City Manager to enter into a construction contract with Modern Contractors. June 24, 2025: Authorized the purchase of an emergency standby generator and automatic transfer switch from Cantwell Power Systems. The estimated expenditure is $106,780. August 12, 2025: Authorized the purchase of office and common area furniture from National Business Furniture, LLC. The estimated expenditure is $53,172. September 9, 2025: Authorized the purchase of construction material testing services from CMJ Engineering. October 14, 2025: Awarded Bid No. 022- 25 for the purchase of kennels, cages, and miscellaneous accessories to Direct Animal Products. The estimated expenditure is $352,087. The project consists of a remodel of the former fire station #2 building and animal shelter facility to better accommodate animal containment, visitors, adoptions, and animal services. The project scope includes the addition of multiple enclosed dog runs, quarantine runs, an adoption room, additional room for cat containment, and an area for animal examination and washing. The renovation will also include expanded office space, updates to the public/employee restrooms, and additional space for potential public works storage. Began Design: January 2024 Began Construction: January 2025 Design Complete: July 2024 Construction Complete: May 2026 The current animal shelter facility was opened in 1978 and has surpassed its capacity to meet current and future demands. 338 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Professional Services $411,142 Construction $5,244,017 $0 Testing & Material Services $47,164 $0 Furniture, Fixtures & Equip. $690,745 Temporary Animal Shelter $131,932 $0 $0 $6,525,000 Transfer from: Car Rental Fund $6,275,000 General CIP Fund Balance $250,000 $0 $0 $0 $6,525,000 Professional Services $411,142 $411,142 $0 100% Construction $5,244,017 $5,244,017 $0 100% Testing & Material Services $47,164 $47,164 $0 100% Furniture, Fixtures & Equipment $690,745 $690,745 $0 100% Temporary Animal Shelter $131,932 $131,932 $0 100% $6,525,000 $6,525,000 $0 100% ANIMAL SHELTER – EXPANSION/RENOVATION FM2409 339 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PARKS AND COMMUNITY SERVICES July 17,2024 DUANE STRAWN May 31, 2026 PLAYGROUND SHADE STRUCTURES PARKS/RECREATION PARK IMPROVEMENTS PR2510 November 26, 2024: Awarded Bid No. 012-24 for the purchase and installation of playground and shade structures. March 11, 2025: Authorized the purchase and installation of playground shade structures through the Buyboard Purchasing Cooperative. Shade structures for new and existing playgrounds are identified in the 2025 Parks, Recreation, and Open Space Master Plan . The project scope includes shade structures over play features at the following parks: Wilshire Park, J.A. Carr Park, Midway Park, McCormick Park, and the Parks at Texas Star South. Began Construction: April 2025 Construction Complete: December 2025 The park system lacks shade structures over the existing play features to prevent them from becoming extremely hot to the touch. In order for Euless residents to utilize and enjoy the playgrounds available to them, shade structures are necessary to alleviate some of the effects of the Texas heat. A large number of park playgrounds are protected from the sun by tree canopies, but the five parks listed have no protection from the heat. Providing shade over the play features throughout the park system will immediately address needs that have been identified in the Parks Master Plan through public engagement and survey results. 340 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Wilshire Park $150,000 J.A. Carr Park $300,000 $0 Midway Park $200,000 $0 McCormick Park $100,000 Parks at Texas Star South $200,000 $0 $0 $950,000 Transfer from: EDC Operating Fund $950,000 $0 $0 Transfer to: EDC CIP Fund Balance ($360,585) $0 $589,415 Park Furnishings $950,000 $589,415 $360,585 62% $950,000 $589,415 $360,585 62% PLAYGROUND SHADE STRUCTURES PR2510 341 342