September 7, 1982
CALL TO ORDER
The regular meeting of the Planning & Zoning Commission was called to order at 7:35
p.m. in the Council Chambers of Euless City Hall by Chairman John Deithloff.
MEMBERS & STAFF PRESENT MEMBERS ABSENT
John Deithloff Norma Runyon
Carl Tyson
John Lynch
Bob Williamson
Sam Cotten
Robert McMillan
James Knight - City Engineer
Becky Null - Development Coordinator
VISITORS
Willie Mae McCormick Paul Unzicker
Dee Stevenson Coit Stevenson
George Field Doug Moss
David Bagwell David Farrington
Barry Hudson
INVOCATION
The invocation was given by Mr. Bob Williamson.
APPROVAL OF MINUTES
The minutes of the regular meeting dated August 17, 1982, were approved as written.
Page Two, Regular Meeting, Planning & Zoning Commission, September 7, 1982
I.
CONTINUATION OF PUBLIC HEARING -
ZONING CASE # 372 - REQUEST OF
PAUL UNZICKER FOR GEORGE FIELD
FOR CHANGE OF ZONING FROM R-1
WISP FOR CUD VARIABLE HOUSING (R-
3 DENSITY) TO SPUD (TOWNHOME) ON
A PORTION OF TRACT 1B, R.D. PRICE
SURVEY, A-1206, LOCATED SOUTH OF
MCCORMICK FARM, WEST OF FULLER-
WISER ROAD, EAST OF NORTH MAIN
STREET AND NORTH OF LITTLE BEAR
CREEK
Chairman Deithloff explained that the public hearing is still open, being a continuation
from the meeting on August 17th.
David Bagwell, Vice-President with Crow Development, went over the changes made in
the revised development plan. He addressed James Knight's letter dated September
2nd by item as follows:
1. A perpetual maintenance agreement has not been provided for the
permanent community open space because it is their intention to dedicate
that portion as a City park. There will be an agreement on the drainage
easement running along the eastern boundary.
2. Regarding access to the open space, Mr. Bagwell stated that an access
easement has been provided off of Fuller-Wiser Road along with access
from within this subject property and also the second phase of McCormick
Farms. He considered the park area to be more of a neighborhood park
rather than a regional park.
3. Concerning note #4 on the Development Plan, the plan will have to be
adjusted slightly if the right-of-way for North Main is not abandoned.
4. The large pecan trees are protected by the right-of-way provided in
addition to the building setback lines.
5. The developer explained the question as to the ability of garbage pick-up
trucks to load and unload dumpsters can be worked out at the time of
final submittal of the site plan.
6. Developer will comply with state law requirements for placement of the
fire hydrants.
7. Developer does not intend to set individual water meters for each unit;
only for each building.
C
Page Three, Regular Meeting, Planning & Zoning Commission, September 7, 1982
Mr. Lynch stated his concern about having a perpetual maintenance agreement relative
to the drainage easement running along the eastern boundary. He pointed out that
there has not been a perpetual maintenance agreement approved like that when the
lots do not actually front on the creek. If approved, this would mean the homeowner's
association would be responsible, and not specific individuals. There was also concern
that the homeowner's association could eventually be dissolved.
Mr. Doug Moss with Pulte Homes stated he had conferred with their attorney who
explained that a homeowner's association is a legal entity and whatever restrictions
desired can be placed on the association.
Mr. Tyson inquired if the City knows what is going to happen to North Main Street.
Mr. Knight stated that construction would occur as property along North Main is
developed. There will be two north and south lanes with a free turn lane from Cheek
Sparger north to Glade as is done south of the creek.
A considerable amount of discussion took place regarding establishing the eastern right-
of-way line along this proposed development.
There being no additional proponents or opponents, Chairman Deithloff declared the
public hearing closed.
Mr. Lynch made a motion to approve Zoning Case #372 as submitted subject to James
Knight's letter dated September 2nd with the following conditions:
1. A perpetual maintenance agreement be provided affecting the driveways
and creek area adjacent to the property on the east side. The proposed
permanent community open space is to be included until it has been
accepted as a City park.
2. The commission make no committment at this time as to the exact
location of the horizontal curve or property line location along North Main
Street; that these items be addressed at the time of final platting. The
Commission reserves the right, at that time, to disprove the horizontal
control information. The developer is to stake the horizontal curve
locations prior to going to City Council.
3. Enough room be provided on the 20 foot driveway sections to allow the
dumpsters to be picked up and still be screened as required.
4. Parking adjacent to fire hydrants be situated so that there will be no loss
of required parking spaces and overall guest parking spaces.
5. Water meters be located in such manner that they will accommodate the
meters and be protected from vehicular traffic.
6. Streets and drives in the addition will be concrete.
7. The homeowner's agreement is to be reviewed at the time of final
platting. Investigation to be conducted by legal staff to insure that
adequate provisions are included to enforce theer etual maintenance
P P
agreement for both the private streets and the drainage adjacent to the
property.
Page Four, Regular Meeting, Planning & Zoning Commission, September 7, 1982
Mr. Tyson seconded the motion, and the vote is as follows:
Ayes: Messrs. Lynch, Tyson, Cotten, McMillon, and Deithloff
Nays: None
Abstentions: Mr. Williamson
Chairman Deithloff declared the motion carried.
II.
CONSIDER PLATTING - CORRECTED
PLATTING OF LOTS 17 & 18, BLOCK 3,
EULELSS MAIN PLACE ADDITION, LO-
CATED WEST OF FULLER-WISER ROAD,
NORTH OF S.H. 183, EAST OF NORTH
MAIN STREET & SOUTH OF MIDWAY
DRIVE
There being no representative for this item, Mr. James Knight stated that there were
no objections from City Staff. He explained that the reason for this correction is to
move a lot line.
Mr. Cotten made a motion to approve the corrected platting subject to James Knight's
letter dated August 30, 1982.
Mr. Williamson seconded the motion, and the vote is as follows:
Ayes: Messrs. Cotten, Williamson, McMillon, Tyson, Lynch,
and Deithloff
Nays: None
Chairman Deithloff declared the motion carried.
III.
PUBLIC HEARING - ZONING CASE #373
- REQUEST OF BARRY HUDSON FOR
MICHAEL A. BLOCK FOR CHANGE OF
ZONING FROM C-2 TO R-5 W/CUD FOR
CONFORMING HOUSING ON TRACTS
1D1, 1E1 & IEIA, J. GROVES SURVEY, A-
599, LOCATED SOUTH OF WEST PIPE-
LINE ROAD, NORTH OF S.H. 10, EAST
OF RAIDER DRIVE AND WEST OF WEST-
PARK WAY
C
Chairman Deithloff opened the public hearing and explained the rules.
CA':
Page Five, Regular Meeting, Planning & Zoning Commission, September 7, 1982
Mr. David Farrington, President of Farrington & Associates, presented the request for
change of zoning and explained why they feel the requested zoning is appropriate. He
presented a report entitled "The Critical Need For Multi-Family Housing In The
Metroplex" prepared by Moore Diversified Services, Inc.
Mr. Barry Hudson with Farrington & Associates explained that their proposal included
a 250 foot buffer strip south of West Pipeline to be restricted to 16 du/ac with an
overall density for the entire tract of 24 du/ac for a total of 598 units.
Mr. Coit Stevenson, with the proposed developers, presented renderings of similar
apartments they have constructed in Irving. He noted that the development in Irving
was constructed at an overall density of 20 du/ac although the property was zoned for
25 du/ac.
Chairman Deithloff asked for any additional proponents. There being none, he asked
for any opponents of which there were none.
It was the consensus of the Commission that the requested R-5 density was too high.
Mr. Farrington was asked if they would consider limiting the northern 250 feet to a
maximum of 12 du/ac with an overall density of 20 du/ac for a total of 498 units.
Mr. Farrington stated they could accept that.
Mr. McMillon made a motion to recommend approval of the amended zoning request
subject to James Knight's letter dated August 31, 1982, for a maximum of 12 du/ac on
the northern 250 feet with a maximum permissible overall density of 20 du/ac and that
the major parking and access be onto S.H. 10.
Mr. Cotten seconded the motion, and the vote is as follows:
Ayes: Messrs. McMillon, Cotten, Williamson, Lynch, Tyson,
and Deithloff
Nays: None
Chairman Deithloff declared the motion carried.
IV.
ADJOURNMENT
There being no further business to conduct, the meeting adjourned at 9:05 p.m.
Chairman
C