HomeMy WebLinkAboutCity of Euless Capital Improvements Program FY2010CITY OF EULESSCITY OF EULESS CAPITAL IMPROVEMENTS PROGRAM CAPITAL IMPROVEMENTS PROGRAM CAPITAL IMPROVEMENTS PROGRAM CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR ENDING FISCAL YEAR ENDING SEPTEMBER 30,2010SEPTEMBER 30,2010 201 N. ECTOR DRIVE201 N. ECTOR DRIVE EULESS, TEXAS 76039EULESS, TEXAS 76039 PHONE (817) 685PHONE (817) 685 16261626PHONE (817) 685PHONE (817) 685--16261626 FAX (817) 685FAX (817) 685--14591459 www.eulesstx.govwww.eulesstx.gov CITY OFFICIALS MARY LIB SALEH, MAYOR Tim Stinneford, Council Member — Place One, Mayor Pro Tem Leon Hogg, Council Member — Place Two Linda Martin, Council Member — Place Three Donna Mickan, Council Member — Place Four Glenn Porterfield, Council Member — Place Five Perry Bynum, Council Member — Place Six Gary McKamie, City Manager Loretta Getchell, Deputy City Manager FY2009-2010 i TABLE OF CONTENTS CAPITAL IMPROVEMENTS PROGRAM City Officials Table of Contents ................................................................................................................ i-v Letter ................................................................................................................................... i-vi – i-vii CIP Fund Balance .............................................................................................................. i-viii – i-x FUNDED PROJECTS Summary of Funded Projects .............................................................................................. 01-02 FY09 Amendments .............................................................................................................. 03 Drainage Projects Summary of Funded Drainage Projects ........................................................................... 05 DR9903 Misc. Drainage Improvements Program .................................................... 06-07 DR0701 Eastcliff Drive/Greenbriar Drive Improvements ......................................... 08-09 DR0801 Rockwall Drive/Lamar Drive Improvements .............................................. 10-11 DR0802 Hurricane Creek & Bridge at Marlene Drive Design .................................. 12-13 DR0901 Bear Creek Parkway Erosion Repair ......................................................... 14-15 Street Projects Summary of Funded Street Projects ................................................................................ 17 PS9901 North Main Street ....................................................................................... 18-19 PS9904 Harwood Road ........................................................................................... 20-21 PS9909 FM157 North – SH183 to SH121 ............................................................... 22-23 PS0304 Glade Road ................................................................................................ 24-25 PS0605 South Pipeline Road Bridge Replacement ................................................ 26-27 PS0802 Fuller-Wiser Road Connector .................................................................... 28-29 PS0901 Ash Lane/Denton Drive/Fair Oaks Boulevard Overlay .............................. 30-31 PS0902 Vine Street Design ..................................................................................... 32-33 PS0903 Traffic Signals Mid Cities Boulevard @ Gateway Boulevard and Mid Cities Boulevard @ Baze Road ............................................................ 34-35 Wastewater Projects Summary of Funded Wastewater Projects ....................................................................... 37 WW0002 Misc. Wastewater Rehabilitation .............................................................. 38-39 WW0605 TRA Wastewater Payments – Impact ...................................................... 40-41 WW0801 Line Replacement – Fayette Drive .......................................................... 42-43 WW0802 Line Replacement – South Mills CDBG-R. .............................................. 44-45 WW0901 Line Replacement – Woodridge Circle/Koen Lane .................................. 46-47 WW0902 Line Replacement – West Mills Drive-34th CDBG .................................... 48-49 Water Projects Summary of Funded Water Projects ................................................................................ 51 WT0001 Misc. Water Utility Rehabilitation .............................................................. 52-53 WT0101 Water Tank Debt Payment ........................................................................ 54-55 WT0104 Well Repairs .............................................................................................. 56-57 WT0201 Well Rehabilitation/Disinfection ................................................................ 58-59 WT0202 Effluent Water Main .................................................................................. 60-61 ii Other Projects Summary of Other Funded Projects ................................................................................. 67 AC0901 Texas Star Sports Complex Study/Fencing ............................................... 68-69 CM0304 Entry Monument Sign Program ................................................................. 70-71 CM0804 Redevelopment ......................................................................................... 72-73 DV9901 EDC Incentive Funds ................................................................................ 74-75 ED0101 Planning Consultants ................................................................................ 76-77 ED0801 Redi-Mix Regional Headquarters .............................................................. 78-79 PD9901 Police and Municipal Court Facility ............................................................ 80-81 PR0601 Park Amenities Upgrade ............................................................................ 82-83 PR0720 Misc. Park Structures ................................................................................ 84-85 PR0804 Park Irrigation ............................................................................................ 86-87 PR0901 Trail Enhancement – Bob Eden Park ........................................................ 88-89 PR0902 Senior Citizen Center at Midway Park ....................................................... 90-91 PR0907 Midway Park Family Life Center Phase I ................................................... 92-93 PROPOSED & UNFUNDED PROJECTS Summary of FY10 Proposed & Unfunded Projects – Sorted by Type ................................. 95-98 Drainage Projects Summary of FY10 Proposed & Unfunded Drainage Projects .......................................... 99 Hurricane Creek & Bridge at Marlene Drive – ROW ............................................... 100-101 Boyd Branch Improvements .................................................................................... 102-103 Hurricane Creek & Bridge at Marlene Drive – Construction .................................... 104-105 Hollow Oak Drive Erosion ........................................................................................ 106-107 Marlene Drive Culvert Replacement ........................................................................ 108-109 Flooding Mitigation ................................................................................................. 110-111 Kynette Drive Culvert Modifications ......................................................................... 112-113 Bell Hi Addition ........................................................................................................ 114-115 Blessing Branch – Main Street to SH 360 ............................................................... 116-117 Little Bear Creek Land Acquisition .......................................................................... 118-119 Little Bear Creek Improvements .............................................................................. 120-121 Simmons Culvert Improvements ............................................................................. 122-123 Street Projects Summary of FY10 Proposed & Unfunded Street Projects ............................................... 125 Baze Road – Glade Road to Mid Cities Design/ROW. ............................................ 126-127 Wilshire Drive/Marlene Drive Overlay. ..................................................................... 128-129 Ash Lane – Aransas Drive to N Main Street Design/ROW ...................................... 130-131 Baze Road – Glade Road to Mid Cities Construction. ............................................. 132-133 Ash Lane – Aransas Drive to N Main Street ........................................................... 134-135 Vine Street – SH 183 to SH 10 ................................................................................ 136-137 Traffic Signal – Harwood Road at Bear Creek Parkway .......................................... 138-139 Cullum Drive/Alexander Lane .................................................................................. 140-141 Bear Creek Parkway ................................................................................................ 142-143 Ross Avenue ........................................................................................................... 144-145 Cresthaven Drive. .................................................................................................... 146-147 Highland Drive ......................................................................................................... 148-149 iii South Pipeline Road. ............................................................................................... 150-151 Fuller-Wiser Road – SH 183 to Harwood Road ....................................................... 152-153 Fuller-Wiser Road – Harwood Road to Mid Cities Boulevard .................................. 154-155 Wastewater Projects Summary of FY10 Proposed & Unfunded Wastewater Projects ...................................... 157 Line Replacement – West Alexander Lane/Franklin Drive/Norman Drive ............... 158-159 Line Replacement – Arnett Drive ............................................................................. 160-161 Line Replacement – Pauline Street ......................................................................... 162-163 Line Replacement – Alexander Lane/Ascot Outfall ................................................. 164-165 Line Replacement – Whitener Road/Ascot Outfall .................................................. 166-167 Line Replacement – Collin Drive ............................................................................. 168-169 Line Replacement – Blanco Drive/Aransas Drive/Crane Drive ............................... 170-171 Line Replacement – Slaughter Lane/E Huitt Lane .................................................. 172-173 Line Replacement – Ross Avenue .......................................................................... 174-175 Line Replacement – Oakwood Terrace Phase I ...................................................... 176-177 Line Replacement – Oakwood Terrace Phase II ..................................................... 178-179 SH 183 Utility Relocation ......................................................................................... 180-181 Line Replacement – N Midway Park ....................................................................... 182-183 Line Replacement – S Main Street. ......................................................................... 184-185 Line Replacement – Aransas Drive ......................................................................... 186-187 Line Replacement – Glenn Drive/Crane Drive ........................................................ 188-189 Line Replacement – Boyd Branch ........................................................................... 190-191 Line Replacement – Cedar Hills Estates/Hollywood Boulevard .............................. 192-193 Line Replacement – Cedar Hills Estates/Sunset Drive ........................................... 194-195 Line Replacement – Eastcfliff Drive/Windlea/Signet ............................................... 196-197 Line Replacement – Huntington/Koen/Atkerson/E Huitt/Slaughter/Martin .............. 198-199 Line Replacement – Ector Drive/Fayette Drive ....................................................... 200-201 Line Replacement – Donley Drive/Shelmar Drive ................................................... 202-203 Line Replacement – Denton Drive ........................................................................... 204-205 Line Replacement – Collin Drive/Harris Drive/Irion Drive ........................................ 206-207 Line Replacement – Ector Drive/Donley Drive/Crane Drive .................................... 208-209 Line Replacement – Evans Drive/Canyon Ridge/N Kynette Drive .......................... 210-211 Line Replacement – Janann Street/Brownstone Drive/Shelmar Drive .................... 212-213 Line Replacement – Kynette Drive/ Wilshire Drive/Sierra Drive .............................. 214-215 Line Replacement – Lakewood Boulevard/ Dogwood Circle ................................... 216-217 Line Replacement – Mary Drive/Marlene Drive/Commerce Street .......................... 218-219 Line Replacement – NW Midway/Rusk/Parker ........................................................ 220-221 Line Replacement – Northcliff/Toplea/Winlea ......................................................... 222-223 Line Replacement – Sagebrush/Toplea/Wilshire .................................................... 224-225 Line Replacement – W Midway Drive/Victoria Drive/Delta Drive ............................ 226-227 Line Replacement – W Donley Drive/ Private Drive/Mimosa Lane ......................... 228-229 Water Projects Summary of FY10 Proposed & Unfunded Water Projects ............................................... 231 Line Replacement – Live Oak Ct/Live Oak Drive/Marlene Drive ............................. 232-233 Line Replacement – S Pipeline Road West ............................................................. 234-235 Water & Wastewater Impact Fee Update ................................................................ 236-237 Line Replacement – S Pipeline Road East .............................................................. 238-239 Water System Security Camera Installation ............................................................ 240-241 Line Replacement – Westwood Drive ..................................................................... 242-243 Line Replacement – Collin Drive/Dallas Drive/Harwood Road ................................ 244-245 Line Replacement – Collin Drive/Denton Drive/Dallas Drive ................................... 246-247 iv Line Replacement – Fuller Drive ............................................................................. 248-249 Line Replacement – Springwood Court ................................................................... 250-251 SH 183 Water Crossing ........................................................................................... 252-253 SH 360 Water Crossing .......................................................................................... 254-255 Line Replacement – Kynette Drive .......................................................................... 256-257 Line Replacement – Midcreek Drive/ Rock Creek Drive/Stony Creek Drive ........... 258-259 Line Replacement – Blessing Creek and Little Creek ............................................. 260-261 Line Replacement – Eastcliff Drive .......................................................................... 262-263 Line Replacement – Ector Drive .............................................................................. 264-265 Line Replacement – Hollow Oak Drive .................................................................... 266-267 Line Replacement – Midway Drive East .................................................................. 268-269 Line Replacement – Midway Drive West ................................................................. 270-271 Line Replacement – Dickey Drive South ................................................................. 272-273 Line Replacement – Dickey Drive North .................................................................. 274-275 Line Replacement – Paula Lane ............................................................................. 276-277 Line Replacement – Denton Drive ........................................................................... 278-279 Line Replacement – S Main Street (North) .............................................................. 280-281 Line Replacement – S Main Street (South) ............................................................. 282-283 Line Replacement – Sunset Drive ........................................................................... 284-285 Line Replacement – Wildwood Street ..................................................................... 286-287 Line Replacement – Woodvine Drive (East) ............................................................ 288-289 Line Replacement – Woodvine Drive (West) ........................................................... 290-291 Line Replacement – Shady Creek Drive and Cliffwood Road ................................. 292-293 Line Replacement – Dunaway Drive ....................................................................... 294-295 Line Replacement – E Huitt Lane ............................................................................ 296-297 Line Replacement – Needles Street ........................................................................ 298-299 Water System Security Land Acquisition ................................................................. 300-301 Other Projects Summary of Other FY10 Proposed & Unfunded Projects ................................................ 303 Texas Star Sports Complex Lighting Improvements ............................................... 304-305 Glade Parks Trail Connection .................................................................................. 306-307 Park Amenities Upgrade .......................................................................................... 308-309 Trail Lighting – Phase I ............................................................................................ 310-311 Midway Park FLC – Phase II Outdoor Aquatics Design .......................................... 312-313 Midway Park FLC – Phase III Indoor Aquatics Design ............................................ 314-315 Midway Park FLC – Phase II Outdoor Aquatics Construction ................................. 316-317 Midway Park FLC – Phase III Indoor Aquatics Construction ................................... 318-319 Fire Training Facility and Tower .............................................................................. 320-321 Animal Shelter ......................................................................................................... 322-323 Development/Engineering Building ......................................................................... 324-325 Blessing Branch Park Improvements ...................................................................... 326-327 Texas Star Sports Complex Parking Lot Improvements .......................................... 328-329 South Euless Water Feature ................................................................................... 330-331 Wilshire Park Water Feature ................................................................................... 332-333 Texas Star Sports Complex Improvements ............................................................. 334-335 Trail Connection S Euless ....................................................................................... 336-337 Texas Star Sports Complex – Softball World Turf ................................................... 338-339 Trail Lighting – Phase II ........................................................................................... 340-341 Texas Star Sports Complex – PATS, Phase IV ....................................................... 342-343 Trail Enhancements – Villages Bear Creek ............................................................. 344-345 Trail Enhancements – Phase I ................................................................................ 346-347 Trail Enhancements – Phase II ............................................................................... 348-349 v Trailwood Park Improvements ................................................................................. 350-351 Community Center for South Euless ....................................................................... 352-353 Emergency Call Boxes ............................................................................................ 354-355 Kiddie Carr Park Improvements ............................................................................. 356-357 COMPLETED PROJECTS Summary of Completed Projects .................................................................................... 359-363 Drainage Projects Summary of Completed Drainage Projects ....................................................................... 365 Street Projects Summary of Completed Street Projects ........................................................................... 367 PS0002 West Pipeline Road – Raider Drive to Hwy10 ........................................... 368-369 PS0704 Disability Access Study .............................................................................. 370-371 PS0705 Signal Gateway Blvd @ Glade Road ......................................................... 372-373 PS0801 Overlay North Main Street/Cullum Drive .................................................... 374-375 PS9905 Traffic Studies ............................................................................................ 376-377 Wastewater Projects Summary of Wastewater Projects .................................................................................... 379 WW0701 Line Replacement – McCormick Court & Copher Court .......................... 380-381 WW0702 Line Replacement – Arnett Addition ........................................................ 382-383 WW0703 Line Replacement – Jean Lane ............................................................... 384-385 WW0704 Line Replacement – W Fuller Drive ......................................................... 386-387 Water Projects Summary of Water Projects ............................................................................................. 389 WT0402 Water & Wastewater Impact Fee Update ................................................. 390-391 WT0801 Line Replacement – Signet Drive/Mesa Drive .......................................... 392-393 WT0802 CDBG 33rd Oakwood Terrace (Simmons Drive) ....................................... 394-395 Other Projects Summary of Other Completed Projects ............................................................................ 397 FM0504 Building “B” Remodel ................................................................................ 398-399 FM0801 Texas Star Golf Course & Conference Center Expansion ........................ 400-401 FM0802 Senior Citizen Center Design .................................................................... 402-403 FM0803 Midway Recreation Improvements ............................................................ 404-405 FM0804 Library Shell Expansion ............................................................................. 406-407 PR0602 Mid Cities Landscaping ............................................................................. 408-409 PR0719 Midway Park Trail ...................................................................................... 410-411 vi i-vii Fund Balance Summary - Capital Estimated FY08-09 and Budgeted FY09-10 Capital Improvement Projects Streets Half-Cent Parks General CIP CIP CIP CIP Beg. Working Capital FY09 $2,277,164 $5,022,706 $125 $1,233,651 FY09 Estimated Revenues 363,235 728,931 0 4,529,810 Total Available: 2,640,399 5,751,637 125 5,763,461 FY09 Estimated Project Expenditures (616,326) (3,073,249) 0 (109,410) Total Expenses: (616,326) (3,073,249) 0 (109,410) Estimated Working Capital FY09 $2,024,073 $2,678,388 $125 $5,654,051 FY10 Budgeted Revenues 603,000 55,000 0 1,305,000 Total Available: 2,627,073 2,733,388 125 6,959,051 FY10 Project Expenditures (908,000) (50,000) 0 0 Budgeted Carryover (1,133,578)(2,172,001)0 (6,858,148) Total Expenses: (2,041,578)(2,222,001)0 (6,858,148) Estimated Working Capital FY10 $585,495 $511,387 $125 $100,903 FY2010 Projects FY 2010 County Overlay Projects (Wilshire/Marlene) 288,000 Baze Road - Design and Right-of-Way acquisition 290,000 Ash Lane - Design and Right-of-Way acquisition 330,000 Irrigation Projects 25,000 Incentives 25,000 Total FY2010 Projects $908,000 $50,000 $0 $0 i-viii Fund Balance Summary - Capital Estimated FY08-09 and Budgeted FY09-10 Capital Improvement Projects Police Car Rental Redevelopment Facility Tax TSSC CIP CIP CIP CIP Beg. Working Capital FY09 $523,821 $107,845 $1,730,340 $838,554 FY09 Estimated Revenues 12,126 337 14,425 14,720 Total Available: 535,947 108,182 1,744,765 853,274 FY09 Estimated Project Expenditures (221,939) 0 (1,650,044) (85,204) Total Expenses: (221,939) 0 (1,650,044) (85,204) Estimated Working Capital FY09 $314,008 $108,182 $94,721 $768,070 FY10 Budgeted Revenues 5,000 0 105,000 5,000 Total Available: 319,008 108,182 199,721 773,070 FY10 Project Expenditures 0 0 (100,000) 0 Budgeted Carryover (312,731)(108,182)(22,755)0 Total Expenses: (312,731)(108,182)(122,755)0 Estimated Working Capital FY10 $6,277 $0 $76,966 $773,070 FY2010 Projects Planning Consultants 100,000 Total FY2010 Projects $0 $0 $100,000 $0 i-ix Fund Balance Summary - Capital Estimated FY08-09 and Budgeted FY09-10 Capital Improvement Projects Water Wastewater W&S Impact Impact Drainage CIP Fee Fee CIP Beg. Working Capital FY09 $2,553,953 $2,740,073 $710,634 $1,300,211 FY09 Estimated Revenues 1,403,158 248,197 21,876 747,856 Total Available: 3,957,111 2,988,270 732,510 2,048,067 FY09 Estimated Project Expenditures (1,213,646) (357,000) (60,000) (598,041) Total Expenses: (1,213,646) (357,000) (60,000) (598,041) Estimated Working Capital FY09 $2,743,465 $2,631,270 $672,510 $1,450,026 FY10 Budgeted Revenues 1,393,000 180,000 17,500 215,000 Total Available: 4,136,465 2,811,270 690,010 1,665,026 FY10 Project Expenditures (1,918,000) (410,792) (60,000) (300,000) Budgeted Carryover (2,123,973)0 0 (1,340,149) Total Expenses: (4,041,973)(410,792)(60,000)(1,640,149) Estimated Working Capital FY10 $94,492 $2,400,478 $630,010 $24,877 FY2010 Projects Wastewater Line Replacement 510,000 Effluent Water Line 1,250,000 Meters/Transponders 158,000 Debt Payments, Refunding Bonds Series 260,792 TRA Payments 150,000 60,000 Hurricane Creek right-of-way acquisition 300,000 Total FY2010 Projects $1,918,000 $410,792 $60,000 $300,000 i-x CAPITAL IMPROVEMENTS PROGRAMFUNDED PROJECTS SUMMARYProject Number Project DescriptionBudget as of 5/31/08Appropriation/ AmendmentBudget as of 5/31/09Expended as of 05/31/09Remaining Funds to Complete BudgetEstimated Project CostsUnfunded/ (Excess Funding) DRAINAGE PROJECTSDR9903Misc Drainage Improvements (min bal $150,000) $162,833 $200,000 $362,833 $12,833 $350,000 $362,833 $0DR0701Eastcliff Drive-Greenbriar Drainage Improvements$340,000$0$340,000$31,890 $308,110 $340,000$0DR0801Rockwall Drive-Lamar Drainage Improvements$430,000 $0 $430,000 $30,913 $399,087 $430,000 $0DR0802Hurricane Creek & Bridge at Marlene Drive Design$335,000$0$335,000$42,679 $292,321 $335,000$0DR0901Bear Creek Parkway Erosion Repair$0 $530,000 $530,000 $0 $530,000 $530,000 $0FB9902Fund Balance - Drainage CIP$0 $0 $0 $0 $0 $0 ($104,461)$1,267,833 $730,000 $1,997,833 $118,315 $1,879,518 $1,997,833 ($104,461)STREET PROJECTSPS9901 North Main Street$6,820,047$0 $6,820,047 $6,697,130 $122,917 $6,820,047$0PS9904 Harwood Road$5,695,211$0 $5,695,211 $5,662,473$32,738 $5,695,211$0PS9909FM157 North-SH183 to SH121$129,215$0$129,215$88,930$40,285 $129,215$0PS0304Glade Road$3,077,976$0 $3,077,976 $2,895,573 $182,403 $3,077,976$0PS0605South Pipeline Road Bridge Replacement$157,000$0$157,000$0$157,000 $157,000$0PS0802Fuller-Wiser Road Connector$495,000$0$495,000$33,030 $461,970 $495,000$0PS0901Ash Lane/Denton Drive/Fair Oaks Boulevard Overlay$0$320,000 $320,000 $216,659 $103,341 $320,000$0PS0902Vine Street Design$0$100,000 $100,000$0$100,000 $100,000$0PS0903Traffic Signals Mid Cities Blvd. @ Gateway Blvd. and @ Baze Road$0$320,000 $320,000$2,168$317,832 $320,000$0FB9907Fund Balance - Street CIP$0$0$0$0$0$0 ($775,082)$16,374,449$740,000 $17,114,449 $15,595,963 $1,518,486 $17,114,449 ($775,082)WASTEWATER PROJECTSWW0002Misc Wastewater Rehab (min bal $100,000)$259,169 $56,917 $316,086 $216,086 $100,000 $316,086 $0WW0605 TRA Wastewater Payments - Impact$180,000$60,000 $240,000 $180,000$60,000 $240,000$0WW0801 Line Replacement Fayette Drive$750,000($262,000) $488,000$30,176 $457,824 $488,000$0WW0802 Line Replacement South Mills Drive CDBG-R$0$262,000 $262,000$0$262,000 $262,000$0WW0901 Line Replacement Woodridge Circle/Koen Lane$0$795,000 $795,000$0$795,000 $795,000$0WW0902 Line Replacement West Mills Drive-34th CDBG$0$46,855$46,855$0$46,855 $46,855$0FB9911 FB - Wastewater Impact (Restricted)$0$0$0$0$0$0 ($661,141)$1,189,169$958,772 $2,147,941 $426,262 $1,721,679 $2,147,941 ($661,141)Total Street ProjectsSub-Total Drainage ProjectsSub-Total Wastewater Projects1 CAPITAL IMPROVEMENTS PROGRAMFUNDED PROJECTS SUMMARYProject Number Project DescriptionBudget as of 5/31/08Appropriation/ AmendmentBudget as of 5/31/09Expended as of 05/31/09Remaining Funds to Complete BudgetEstimated Project CostsUnfunded/ (Excess Funding) WATER PROJECTSWT0001Misc Utility Rehab - Water (min bal $150,000)$253,511 $0 $253,511 $103,775 $149,736 $253,511 $0WT0101 Water Tank Debt Payment$2,175,514$257,000 $2,432,514 $2,346,848$85,666 $2,432,514$0WT0104Well Repairs (min bal $75,000)$513,617$0$513,617 $438,617$75,000 $513,617$0WT0201 Well Rehabilitation/Disinfection$600,000$0$600,000 $522,285$77,715 $600,000$0WT0202 Effluent Water Main$250,000$0$250,000$0$250,000 $1,500,000 $1,250,000WT0803Transponders/Meters (annual transfer $158,000)$331,875$331,875 $663,750 $555,247 $108,503 $663,750$0WT0901 TRA Water Payments-Impact$0$100,000 $100,000$0$100,000 $100,000$0FB9910 FB- Water Impact (Restricted)$0$0$0$0$0$0 ($2,534,906)FB9901 FB - Water & Sewer CIP$0$0$0$0$0$0 ($574,280)Sub-Total Water Projects$4,124,517$688,875 $4,813,392 $3,966,772 $846,620 $6,063,392 ($1,859,186)OTHERAC0901 Texas Star Sports Complex Study/Fence$0$100,000 $100,000$85,204$14,796 $100,000$0CM0304 Entry Monument Sign Program$115,782$0$115,782$93,027$22,755 $115,782$0CM0804 Redevelopment$951,947$15,525 $967,472 $659,642 $307,830 $967,472$0DV9901 EDC Incentive Funds$325,854$25,000 $350,854 $300,854$50,000 $350,854$0ED0101 Planning Consultants$100,000$0$100,000$0$100,000 $200,000 $100,000ED0801 Redi-Mix Regional Headquarters$5,450,000($250,000) $5,200,000 $1,175,036 $4,024,964 $5,200,000$0PD9901 Police and Municipal Courts Facility$11,717,134$462 $11,717,596 $11,609,560 $108,036 $11,717,596$0PR0601 Park Amenities Upgrade$150,000$0$150,000 $145,316$4,684 $150,000$0PR0720 Misc. Park Structures$225,000$0$225,000 $131,275$93,725 $225,000$0PR0804 Park Irrigation$25,000$25,000$50,000$770$49,230 $50,000$0PR0901 Trail Enhancement - Bob Eden Park$0$135,000 $135,000$0$135,000 $135,000$0PR0902 Senior Citizen Center at Midway Park$0 $4,856,821 $4,856,821$0 $4,856,821 $4,856,821$0PR0907 Midway Park Family Life Center Phase I$0 $1,330,000 $1,330,000$66,644 $1,263,356 $2,105,000 $775,000FB9906 FB-EDC CIP$0$0$0$0$0$0 ($958,496)FB9908 FB-Athletic Complex CIP$0$0$0$0$0$0 ($740,639)FB9909 FB-General CIP$0$0$0$0$0$0 ($34,342)FB9913 FB-Car Rental CIP$0$0$0$0$0$0 ($74,674)Sub-Total Other Projects$19,060,717 $6,237,808 $25,298,525 $14,267,328 $11,031,197 $26,173,525 ($933,151)$42,016,685 $9,355,455 $51,372,140 $34,374,639 $16,997,501 $53,497,140 ($4,333,020)TOTAL FUNDED PROJECTS2 CITY OF EULESS CAPITAL IMPROVEMENT PROGRAM AMENDMENTS - FUNDED PROJECT BUDGETS Project #Project Description Amendment AC0901 TX Star Sports Complex Feasibility Study Approved in the FY2008-09 budget. CM0804 Redevelopment Interest earnings for $15,525. DR9903 Misc Drainage Improvements Approved in the FY2008-09 budget. DR0901 Bear Creek Erosion Approved in the FY2008-09 budget. DV9901 EDC Incentive Funds Approved in the FY2008-09 budget. ED0801 Redi-Mix Regional Headquarters Approved in the FY2008-09 budget. Project decrease $800,000. Transfer to FB9906. FM0504 Building "B" Remodeling Project complete. Transfer balance to FB9913. FM0801 TX Star Conference Center Expansion Project complete. FM0802 Senior Citizens Center - Land Acquisition Project cancelled. Transfer $250,000 to PR0907. FM0803 Midway Recreation Improvements Project cancelled. Transfer $271,524 to PR0907. FM0804 Library-Shell Expansion Project complete. Transfer balance to FB9909. PD9901 Police and Municipal Court Facility Interest earnings for $462. PR0602 Mid Cities Landscaping Project complete. Transfer balance to FB9913. PR0719 Midway Park Trail Enhancements Project complete. Transfer balance to FB9906. PR0804 Park Irrigation Approved in the FY2008-09 budget. PR0901 Bob Eden Park Trail Enhancements Approved in the FY2008-09 budget. PR0902 Senior Citizens Center at Midway Park. Approved in the FY2008-09 budget. Project reduction. Transfer $726,138 to PR0907. PR0907 Family Life Center at Midway Park-Phase I Approved in the FY2008-09 budget. Transfer from PR0902 $726,138, FM0802 $250,000 and FM0803 $271,524. PS0002 West Pipeline-Raider-Hwy 10 Project complete. Transfer balance to FB9907. PS0704 Disability Access Study Project complete. Transfer balance to FB9907. PS0705 Signal Gateway Blvd. @ Glade Project complete. PS0801 Overlay-North Main/Cullum Drive Project complete. Transfer balance to FB9907. PS0901 FY'2009 County Overlay Projects Approved in the FY2008-09 budget. PS0902 Vine Street Design Approved in the FY2008-09 budget. PS0903 Traffic Signal Mid Cities @ Gateway/Baze Approved in the FY2008-09 budget. Project increase. Transfer $18,155 from FB9907 and $161,845 from escrow. PS9905 Traffic Studies Project complete. Transfer balance to FB9907. WT0101 Water Tank Debt Payment Approved in the FY2008-09 budget. WT0402 Water & Wastewater Impact Fee Study Project complete. Transfer balance to FB9911. WT0801 Line Replacement, Signa/Mesa Project complete. Transfer balance to FB9901. WT0802 CDBG FY'08-33rd Oakwood Terrace(Simmons Dr.) Project complete. Transfer balance to FB9901. WT0803 Transponders/Meters Approved in the FY2008-09 budget. WT0901 TRA Water Payments-Impact Approved in the FY2008-09 budget. WW0002 Miscellaneous Sewer Rehabilitaion Approved in the FY2008-09 budget. WW0402 Line Replacement, Carr Park/SH10 Project Complete. Project deficit $3,547. Transfer from FB9901 WW0603 Little Bear Creek Collection Line Project Complete. Project deficit $8,657. Transfer from FB9911 WW0605 TRA Sewer Payments - Impact Approved in the FY2008-09 budget. WW0701 Line Replacement, McCormick & Copher Project Complete. Transfer balance to FB9901. WW0702 Line Replacement, Arnett Addition Project Complete. Transfer balance to FB9901. WW0703 Line Replacement, Jean Lane Project Complete. Transfer balance to FB9901 WW0704 Line Replacement, W. Fuller Project Complete. Transfer balance to FB9901 WW0801 Line Replacement, Fayette Transfer $162,000 to WW0802. Transfer excess funding $100,000 to FB9901. WW0802 Line Replacement, South Mills CDBG-ARRA $100,000. Transfer $162,000 from WW0801 WW0901 Line Replacement, Woodridge Circle/Koen Approved in the FY2008-09 budget. WW0902 Line Replacement, West Mills Drive Approved in the FY2008-09 budget as part of 34th CDBG. 3 4 CAPITAL IMPROVEMENTS PROGRAMFUNDED PROJECTS SUMMARYProject Number Project DescriptionBudget as of 5/31/08Appropriation/ AmendmentBudget as of 5/31/09Expended as of 05/31/09Remaining Funds to Complete BudgetEstimated Project CostsUnfunded/ (Excess Funding) DRAINAGE PROJECTSDR9903Misc Drainage Improvements (min bal $150,000) $162,833$200,000 $362,833$12,833 $350,000 $362,833$0DR0701Eastcliff Drive-Greenbriar Drainage Improvements$340,000$0$340,000$31,890 $308,110 $340,000$0DR0801Rockwall Drive-Lamar Drainage Improvements$430,000$0$430,000$30,913 $399,087 $430,000$0DR0802Hurricane Creek & Bridge at Marlene Drive Design$335,000$0$335,000$42,679 $292,321 $335,000$0DR0901Bear Creek Parkway Erosion Repair$0$530,000 $530,000$0$530,000 $530,000$0FB9902Fund Balance - Drainage CIP$0$0$0$0$0$0 ($104,461)$1,267,833$730,000 $1,997,833 $118,315 $1,879,518 $1,997,833 ($104,461)Sub-Total Drainage Projects5 Department:Date Prepared:July 23, 1999 Submitted By:Date Completed: Project Title: Project Type:DRAINAGE Sub-Type: Project No.:DR9903 Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: City of Euless Capital Project Request PUBLIC WORKS RON YOUNG COUNCIL AUTHORIZATION: MISCELLANEOUS DRAINAGE IMPROVEMENTS PROGRAM IMPROVEMENTS This project includes funds for various small projects or emergency repairs that are identified throughout the Failure to correct these problems can often cause damage to existing infrastructure. year. Often corrections of these problems require design services and the installation of improvements. As large projects are identified, they will be tracked separately and assigned a different project number. 6 PROJECT TITLE:PROJECT #:DR9903 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time (Minimum balance recommended $150,000) $0 Total Estimated Capital Cost Subtotal:$0 Maintenance Costs $51,609 Drainage Operating Fund - FY02 $50,000 Drainage Operating Fund - FY03 $50,000 Drainage CIP Fund Balance - FY08 $11,224 Drainage Operating Fund - FY09 $200,000 $0 Total Estimated Annual Cost $0 Total Funding $362,833 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $559 $559 $0 100% $362,079 $12,079 $350,000 3% $195 $195 $0 100% $362,833 $12,833 $350,000 4% FUNDING SOURCE: Subtotal: Drainage Operating Fund - FY99 CURRENT STATUS TOTAL PROJECT Fence Storm Drain MISCELLANEOUS DRAINAGE IMPROVEMENTS Meters & Setting Total Salary Transfer From: Purchase of Services Materials & Supplies Storm Drain Utilities 7 Department:Date Prepared:April 15, 2005 Submitted By:Date Completed: Project Title: Project Type:DRAINAGE Sub-Type: Project No.:DR0701 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: IMPROVEMENTS City of Euless Capital Project Request PUBLIC WORKS RON YOUNG EASTCLIFF-GREENBRIAR DRAINAGE IMPROVEMENTS amount of $240,105 for drainage improvements. November 28, 2006:Authorized the city manager to execute a design contract with Freese and Nichols, March 10, 2009:Authorized the city manager to execute a contract with 2L Construction, LLC, in the construction of this project will help prevent the flooding of those homes. In 2005 the city commissioned and received a drainage plan from Freese and Nichols, Inc. Additional inlets and pipe systems will be constructed to contain the flows within the city drainage systems. In moderate storms the drainage capacity in the streets is exceeded causing flooding of several homes. The Inc. in the amount of $32,550. The system will extend from the low point on Eastcliff Drive up Greenbriar Drive several hundred feet. Award Engineering Contract: November 2006 Award Construction Contract: March 2009 Begin Construction: May 2009 Complete Construction: August 2009 8 PROJECT TITLE:EASTCLIFF-GREENBRIAR DRAINAGE IMPRV.PROJECT #: DR0701 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Engineering $40,000 Personnel:Full Time Construction $300,000 Part Time Total Salary $0 Purchase of Services Materials & Supplies Utilities Total Estimated Capital Cost $340,000 Subtotal:$0 FUNDING SOURCE: Maintenance Costs Transfers From: Drainage Operating Fund $320,000 Drainage CIP Fund Balance $20,000 Subtotal:$0 Total Estimated Annual Cost $0 Total Funding $340,000 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Engineering $40,000 $28,060 $11,940 70% Storm Drain $300,000 $3,830 $296,170 1% TOTAL PROJECT $340,000 $31,890 $308,110 9% CURRENT STATUS 9 Department:Date Prepared:April 15, 2005 Submitted By:Date Completed: Project Title: Project Type:DRAINAGE Sub-Type: Project No.:DR0801 Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: City of Euless Capital Project Request PUBLIC WORKS RON YOUNG ROCKWALL-LAMAR DRAINAGE IMPROVEMENTS IMPROVEMENTS COUNCIL AUTHORIZATION: April 30, 2008: Design contract awarded to Halff Associates for $38,000. May 26, 2009:Authorized City Manager to execute a contract with N.A.E. Enterprises, Inc. for drainage improvements in an amount of $269,359.75. In 2005, the city commissioned and received a drainage plan from Freese and Nichols, Inc. A flume is to be reconstructed and additional inlets and pipe systems are to be built from Midway Drive up Lamar Drive to the intersection of Rockwall Drive. Award Design Contract: April 2008 Plans Complete: March 2009 Right Of Way Complete : March 2009 Award Construction Contract: May 2009 Anticipate Construction Complete: January 2010 In moderate storms the drainage capacity in a flume and the streets is exceeded, causing flooding of several homes. The construction of the project will help prevent the flooding of those homes. 10 PROJECT TITLE:PROJECT #: DR0801 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost $50,000 Personnel:Full Time Construction $380,000 Part Time Total Salary $0 Purchase of Services Materials & Supplies Utilities Total Estimated Capital Cost $430,000 Subtotal:$0 FUNDING SOURCE: Maintenance Costs $300,000 Drainage CIP Fund Balance $130,000 Subtotal:$0 Total Estimated Annual Cost $0 Total Funding $430,000 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $50,000 $30,913 $19,087 62% $380,000 $380,000 0% TOTAL PROJECT $430,000 $30,913 $399,087 7% Engineering Storm Drain CURRENT STATUS ROCKWALL-LAMAR DRAINAGE IMPRV. Transfers From: Drainage Operating Fund Engineering 11 Department:Date Prepared:July 26, 1999 Submitted By:Date Completed: Project Title: Project Type:DRAINAGE Sub-Type: Project No.:DR0802 Priority: A RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: In 1996, the City received the storm drainage master plan for Hurricane Creek. The culvert and concrete channel may require rebuilding to prevent structural flooding of a number of homes This project includes the design of a bridge at Marlene Drive, for the improved concrete channel lining that will extend approximately to the confluence of Cyclone Branch and to Hurricane Creek south of SH10. The Flood Study Complete: May 2009 City of Euless Capital Project Request PUBLIC WORKS RON YOUNG HURRICANE CREEK & BRIDGE AT MARLENE DRIVE DESIGN DESIGN COUNCIL AUTHORIZATION: Additional Engineering Design: Pending fees, coordination with Federal Emergency Management Agency and the Army Corps of Engineers, and in a 100-year flood event. These improvements will also help prevent erosion. engineering includes hydraulic studies, modeling, field surveying for plant preparation, easements, permit Award Study Contract: August 2008 preparation of construction plans and bid documents. 12 PROJECT TITLE:PROJECT #:DR0802 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost $335,000 Personnel: Full Time Part Time $0 $335,000 Subtotal:$0 Maintenance Costs $335,000 $0 Total Estimated Annual Cost $0 Total Funding $335,000 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $335,000 $42,679 $292,321 13% $335,000 $42,679 $292,321 13%TOTAL PROJECT FUNDING SOURCE: Transfer from Car Rental CURRENT STATUS Engineering Purchase of Services Materials & Supplies Utilities Subtotal: HURRICANE CREEK & BRIDGE @ MARLENE DESIGN Engineering Total Estimated Capital Cost Total Salary 13 Department:Date Prepared:March 15, 2007 Submitted By:Date Completed: Project Title: Project Type:DRAINAGE Sub-Type: Project No.:DR0901 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: Begin Design: May 2009 Anticipate Begin Construction: 3rd Quarter 2010 Anticipate Construction Complete: 4th Quarter 2010 JUSTIFICATION: City of Euless Capital Project Request PUBLIC WORKS RON YOUNG BEAR CREEK PARKWAY EROSION REPAIR IMPROVEMENTS May 26, 2009:Authorize City Manager to execute a design contract with Jerry Parche for bank stabilization design in an amount of $54,500. Construct erosion control for the eastern embankment of Little Bear Creek just downstream of Bear Creek In 2007, the City received an erosion study for Little Bear Creek from Halff Associates. Continued erosion of the banks will cause the loss of a portion of the trail system and trees adjacent to the Parkway. banks. 14 PROJECT TITLE:PROJECT #:DR0901 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost $70,000 Personnel: Full Time $460,000 Part Time $0 $530,000 Subtotal:$0 Maintenance Costs $530,000 $0 Total Estimated Annual Cost $0 Total Funding $530,000 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $70,000 $0 $70,000 0% $460,000 $0 $460,000 0% $530,000 $0 $530,000 0% BEAR CREEK PARKWAY EROSION REPAIR Engineering Construction Total Salary Purchase of Services Materials & Supplies Utilities Total Estimated Capital Cost FUNDING SOURCE: Transfer from Car Rental Subtotal: CURRENT STATUS Engineering Storm Drain TOTAL PROJECT 15 16 CAPITAL IMPROVEMENTS PROGRAMFUNDED PROJECTS SUMMARYProject Number Project DescriptionBudget as of 5/31/08Appropriation/ AmendmentBudget as of 5/31/09Expended as of 05/31/09Remaining Funds to Complete BudgetEstimated Project CostsUnfunded/ (Excess Funding) STREET PROJECTSPS9901 North Main Street$6,820,047$0 $6,820,047 $6,697,130 $122,917 $6,820,047$0PS9904 Harwood Road$5,695,211$0 $5,695,211 $5,662,473$32,738 $5,695,211$0PS9909FM157 North-SH183 to SH121$129,215$0$129,215$88,930$40,285 $129,215$0PS0304Glade Road$3,077,976$0 $3,077,976 $2,895,573 $182,403 $3,077,976$0PS0605South Pipeline Road Bridge Replacement$157,000$0$157,000$0$157,000 $157,000$0PS0802Fuller-Wiser Road Connector$495,000$0$495,000$33,030 $461,970 $495,000$0PS0901Ash Lane/Denton Drive/Fair Oaks Boulevard Overlay$0$320,000 $320,000 $216,659 $103,341 $320,000$0PS0902Vine Street Design$0$100,000 $100,000$0$100,000 $100,000$0PS0903Traffic Signals Mid Cities Blvd. @ Gateway Blvd. and @ Baze Road$0$320,000 $320,000$2,168$317,832 $320,000$0FB9907Fund Balance - Street CIP$0$0$0$0$0$0 ($775,082)$16,374,449$740,000 $17,114,449 $15,595,963 $1,518,486 $17,114,449 ($775,082)Total Street Projects17 Department:Date Prepared:May 24, 1999 Submitted By:Date Completed: Project Title:NORTH MAIN STREET Project Type:STREET Sub-Type: Project No.:PS9901 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: 2. Improve aesthetics with relocation of overhead utilities and addition of landscaping. 3. Subsurface drainage system needed. 4. Reduction of maintenance requirements. Construction Complete: October 2005 Landscaping and compliance of Americans with Disabilities Act for sidewalks: FY 2010 March 11, 2003: Authorized City Manager to seek competitive bids for paving & drainage construction. April 8, 2003:Awarded contract to McClendon Construction Co. for construction of street, utility, and September 28, 2004: Award bid contract to Whitmore and Sons for landscaping/irrigation for $83,275. drainage for North Main Street for $3,370,035.15, provided for a $180,000 contingency. 1. Improvement of traffic flow and traffic safety. April 9, 2001:Approved Ord. 1468 authorizing issuance of General Obligation Bonds, Series 2001 in the amount of $6,000,000. September 11, 2001:Authorized city manager to negotiate and execute a contract with TXU Electric for the relocation of utilities along North Main Street at an estimated cost of $550,000. December 11, 2001:Awarded Bid # 004-02 to Southlake Construction for the demolition and removal of single-family houses along North Main Street. also consists of relocating overhead utilities, the addition of a subsurface drainage system, and the addition of street lights and landscaping improvements. This project is a part of the $13.5 million bond package approved by the voters in October 1998. April 26, 2005: Award bid to Durable Specialties, Inc., for traffic signalization in the amount of $68,780. The project consists of reconstruction and widening of North Main Street from SH10 to Harwood Road. It April 14, 1998: Authorized bond election for the purpose of funding construction. November 24, 1998: Approved contract with Cummings & Prewitt, Inc. for paving and drainage design. February 8, 2000: Authorized the acquisition of ROW to allow for widening and paving improvements. August 22, 2000: Ratified the expenditure of $30,000 of EDC funds for ROW acquisition along Main Street. November 14, 2000: Authorized Resolution #00-1083 declaring public necessity for acquisition of ROW. February 27, 2001: Authorized publication of notice of intent to issue Certificates of Obligation. City of Euless Capital Project Request PUBLIC WORKS RON YOUNG August 22, 2000:Ratified EDC Resolution 11-00 authorizing a project involving facility improvements along North Main Street. CONSTRUCTION 18 PROJECT TITLE:PROJECT #:PS9901 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: *Engineering $698,156 Direct Operating Cost Right of Way (ROW)$1,447,814 Personnel:Full Time Utility Relocation (City)$290,878 Part Time Appraisal Services $114,673 $0 Street Lights $102,443 Landscaping $115,808 Construction $3,386,609 Signs & Markings $497,419 Contingency $824 Issuance Cost $62,261 $0 Contract Labor $103,162 * Added $70,000 for work related to medians. Total Estimated Capital Cost $6,820,047 Maintenance Costs FUNDING SOURCE: Transfer from: Street CIP Fund Balance FY99 $1,416,185 $0 Developer's Escrow $17,276 EDC Operating Fund $430,000 W/S Operating Fund $5,053 C.O. Bond Proceeds FY01 $1,012,961 G.O. Bond Proceeds FY01 $4,820,919 $412,567 Interest Income $163,667 Miscellaneous $450 Less Transfer To: Streets CIP Fund Balance ($1,046,464) Total Estimated Annual Cost $412,567 Total Funding $6,820,047 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $698,156 $698,156 $0 100% Right of Way $1,447,814 $1,447,814 $0 100% Utility Relocation (City)$290,878 $290,878 $0 100% Appraisal Services $101,495 $101,495 $0 100% Surveying Services $5,170 $5,170 $0 100% $2,955 $2,955 $0 100% $5,053 $5,053 $0 100% Landscaping $115,808 $115,808 $0 100% Signs & Markings $497,419 $466,321 $31,098 94% Construction $3,386,609 $3,386,609 $0 100% Lighting $102,443 $10,624 $91,819 10% $824 $824 $0 0% $62,261 $62,261 $0 100% Contract Labor $103,162 $103,162 $0 100% $6,820,047 $6,697,130 $122,917 98% Subtotal: Issuance Cost NORTH MAIN STREET Total Salary Purchase of Services Other Subtotal: Materials & Supplies Utilities TOTAL PROJECT Average Annual Debt Service CURRENT STATUS Engineering Other Professional Services Contingency Special Services 19 Department:Date Prepared:July 29, 1999 Submitted By:Date Completed: Project Title: Project Type:STREET Sub-Type: Project No.:PS9904 Priority: A COUNCIL AUTHORIZATION: April 14, 1998: Authorized bond election for the purpose of funding construction. November 24, 1998: Authorized contract for appraisal services for parcels necessary to project. May 24, 1999: Approved resolution determining the necessity for and ordering the improvement. May 24, 1999: Authorized the acquisition of the necessary right-of-way. June 22, 1999: Approved right-of-way acquisition. December 14, 1999: Authorized City Manager to negotiate for and acquire additional rights-of-way. February 8, 2000: Awarded construction contract to Larry H. Jackson Construction. March 28, 2000: Authorized issuance of G.O. bonds for Harwood, Main, and West Pipeline. April 8, 2003: Awarded contract to J&J Sprinkler & Landscaping for median pavers for $151,836.30. in the amount of $74,627. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: Construction Complete: June 2002 Landscaping Improvements: FY2010 JUSTIFICATION: The existing two lane roadway does not meet current and future needs. City of Euless Capital Project Request PUBLIC WORKS RON YOUNG HARWOOD ROAD, N. MAIN STREET TO SH360 New roadway will be a six lane boulevard with sidewalks, landscaping, and lighting. Signals will be February 10, 2004:Approved bid 009-04 to Whitmore and Sons, Inc for median irrigation and landscaping added at Fuller-Wiser Road and Bear Creek Parkway. CONSTRUCTION identified in the 1999 Master Thoroughfare Plan. This project is part of the $13.5 million bond program approved by the voters in October 1998. Project is Reconstruction of Harwood Road from a point approximately 350 feet west of North Main Street to SH360. 20 PROJECT TITLE:PROJECT #:PS9904 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Appraisal Services $54,036 Personnel:Full Time Professional Services-Soil Test $52,123 Part Time Acquisition $800,637 $0 Engineering $415,597 $4,021,668 $3,150 $278,000 $70,000 Total Estimated Capital Cost $5,695,211 $0 Maintenance Costs $301,677 $283,634 $465,722 $16,919 $5,392,302 $465,722 Less Inter-Project Transfer to: ($299,321) Total Estimated Annual Cost $465,722 Total Funding $5,695,211 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $415,597 $415,597 $0 100% $4,021,668 $4,013,177 $8,491 100% $800,637 $800,637 $0 100% $54,036 $53,750 $286 99% $70,000 $70,000 $0 100% Contingencies $3,150 $3,092 $58 98% $52,123 $52,123 $0 100% $278,000 $254,097 $23,903 91% $5,695,211 $5,662,473 $32,738 99% Developer's Escrow FUNDING SOURCE: Transfer from: G.O. Bond Proceeds W/S Operating Fund TOTAL PROJECT Construction Contingency Landscaping Right of Way Landscaping Other Professional Services Issuance Cost Appraisal Services Pipeline Road - PS0002 Construction CURRENT STATUS Engineering Materials & Supplies Utilities Subtotal: Other Average Annual Debt Service HARWOOD ROAD, N. MAIN STREET TO SH360 Issuance Cost Street CIP Fund Balance Subtotal: Total Salary Purchase of Services 21 Department:Date Prepared:July 17, 1999 Submitted By:Date Completed: Project Title: Project Type:STREET Sub-Type: Project No.:PS9909 Priority: A COUNCIL AUTHORIZATION: February 2003: Signed an agreement with Oncor for street light installation. medians. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: March 2003:Began negotiations with the Texas Department of Transportation for landscape projects in the pavement under the SH183 bridge. Improved visibility and enhanced aesthetics. Intersection Improvements: FY2008-09 Landscaping Completed: FY2007-08 Construction Complete: July 2009 FM157 NORTH, SH183 TO SH121 City of Euless Capital Project Request PUBLIC WORKS RON YOUNG This project includes the addition of landscaping in the FM157 medians and improvements to the existing lane (5+2) undivided roadway section. CONSTRUCTION The Texas Department of Transportation (TXDOT) widened FM157 between SH183 and SH121 to a seven 22 PROJECT TITLE:PROJECT #:PS9909 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost $129,215 Personnel:Full Time Part Time $0 Total Estimated Capital Cost $129,215 Subtotal:$0 Maintenance Costs $239,820 Escrow Funds $54,215 Less Interproject Transfers to: FM 157 Utility Relocation PS0001 ($26,516) $0 Streets CIP Fund Balance ($138,304) Total Estimated Annual Cost $0 Total Funding $129,215 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $129,215 $88,930 $40,285 69% $129,215 $88,930 $40,285 69% Streets/Highways Transfers from: TOTAL PROJECT FUNDING SOURCE: CURRENT STATUS Streets/Highways Subtotal: Streets CIP Fund Balance FM157, SH183 TO SH121 Total Salary Purchase of Services Materials & Supplies Utilities 23 Department:Date Prepared:July 31, 1999 Submitted By:Date Completed: Project Title: Project Type:STREET Sub-Type: Project No.:PS0304 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: Construction Complete: June 2008 JUSTIFICATION: construction improvements began in May 2006. roadway, including a median and protected turn lanes. Signalization will be provided at Baze Road and at North Main Street. The southern half of the project lies within the City of Euless. Adjustment or relocation of the City of Euless water main along the south side of Glade Road from approximately Roxboro Road to SH360 in advance of the road construction is also required. Glade Road is identified as a minor arterial in the 1999 Master Thoroughfare Plan. This is a continuation of the March 28, 2006:Approved recommending the City of Grapevine to award construction contract to JLB Contracting, LP in the amount of $5,228,709.56 with the City of Euless portion of the cost for paving, drainage and relocation of water mains to be $2,753,458.53. future debt. June 22, 2004: Approval of Res #04-1181 authorizing the interlocal agreement with the City of Grapevine. City of Euless Capital Project Request PUBLIC WORKS RON YOUNG GLADE ROAD December 9, 2003:Approval of Res # 03-1162 declaring intent to reimburse expenditures with proceeds of CONSTRUCTION The City of Grapevine had scheduled design for Glade Road in 2002-2003 and assumed the entire cost for roadway improvements on Glade Road from SH121 to Champagne Drive completed in 2001. The City of Grapevine awarded a design contract in April 2003. The utility relocation began in January 2006. The street that portion of construction costs lies with the City of Euless. The roadway project consists of replacing the existing two-lane asphalt pavement with a four-lane concrete plan preparation. Since the southern half of the proposed roadway construction lies within the City of Euless, 24 PROJECT TITLE:PROJECT #:PS0304 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost $90,000 Personnel:Full Time $20,000 Part Time $2,302,871 $0 $326,000 $25,000 $314,105 $3,077,976 Subtotal:$0 Maintenance Costs $144,105 $206,000 $2,725,000 $2,871 $0 Total Estimated Annual Cost $0 Total Funding $3,077,976 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $90,000 $39,816 $50,184 44% $20,000 $17,604 $2,396 88% Streets and Highways $2,302,871 $2,302,871 $0 100% Utility Relocation $326,000 $326,000 $0 100% Contingency $314,105 $184,282 $129,823 59% Issuance Cost $25,000 $25,000 $0 100% $3,077,976 $2,895,573 $182,403 94% Issuance Cost Contingency Contract Labor Utility Relocation Construction TOTAL PROJECT Total Estimated Capital Cost FUNDING SOURCE: Developer's Escrow Street CIP Fund Balance (Street Fund Balance $140,349) Certificates of Obligation Developer's Escrow: (ES0287 $938, ES0290 $1,933) Contract Labor CURRENT STATUS Right of Way Purchase of Services Materials & Supplies Utilities Subtotal: GLADE ROAD Right of Way (PS0004 Transfer $65,651) Total Salary 25 Department:Date Prepared:April 15, 2005 Submitted By:Date Completed: Project Title:SOUTH PIPELINE ROAD BRIDGE REPLACEMENT(Fuller Branch/Post Oak Channel) Project Type:STREET Sub-Type: Project No.:PS0605 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: BRIDGE City of Euless Capital Project Request PUBLIC WORKS RON YOUNG The City of Euless estimated cost is $157,000. June 26, 2007:Approved an interlocal agreement between the City of Euless and the City of Fort Worth. County and jointly funded by the City of Euless and the City of Fort Worth. This project is related to the proposed asphalt overlay of South Pipeline Road to be accomplished by Tarrant Pending: Delayed due to City of Fort Worth water main conflict. Fort Worth is working on a new bridge existing structure is to be replaced because of structural and geometric deficiencies, as well as load Bridge and related channel improvements are planned at South Pipeline Road over Post Oak Channel. The South Pipeline Road is an important east-west thoroughfare providing access to the southeast portion of the City of Euless. This project will correct structural and geometric deficiencies as well as alleviate load restrictions. The City of Fort Worth will manage the project and the City of Euless will pay for 25 percent of the construction cost representing the area which falls within the City of Euless city limits. restrictions. design. 26 PROJECT TITLE:PROJECT #:PS0605 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost $157,000 Personnel: Full Time Part Time $0 $157,000 Subtotal:$0 Maintenance Costs $157,000 $0 Total Estimated Annual Cost $0 Total Funding $157,000 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $157,000 $0 $157,000 0% $157,000 $0 $157,000 0%TOTAL PROJECT Total Estimated Capital Cost FUNDING SOURCE: Transfer from: Street CIP Fund Balance CURRENT STATUS Streets/Highways Purchase of Services Materials & Supplies Utilities Subtotal: SOUTH PIPELINE ROAD BRIDGE REPLACE Streets/Highways Total Salary 27 Department:Date Prepared:July 23, 1999 Submitted By:Date Completed: Project Title: Project Type:STREET Sub-Type: Project No.:PS0802 Priority: A COUNCIL AUTHORIZATION: for the reconstruction of Fuller-Wiser Road. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: This street is presently constructed to a design standard of four lanes undivided in a 70-foot right-of-way from This project is identified in the 1999 Master Thoroughfare Plan. Fuller-Wiser Road is a minor local arterial connection between SH360 on the north and SH183 on the south. SH183 to north of Mid Cities Boulevard. From the north of Mid Cities Boulevard to SH360, the road will transition from a four lane undivided to a three lane undivided to tie into the existing Texas Department of FULLER-WISER ROAD CONNECTOR City of Euless Capital Project Request PUBLIC WORKS RON YOUNG CONSTRUCTION Award Design: April 2008 Transportation connection at SH360. open drainage to a standard curb and gutter street section with underground drainage systems. Completing this connector will upgrade this portion of the roadway from a two-lane county road section with Right of Way Complete: March 2009 Anticipate Construction Complete: October 2010 May 26, 2009:Authorized the City Manager to award a contract to McClendon Construction for $390,810.10 28 PROJECT TITLE:PROJECT #:PS0802 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost $45,000 Personnel:Full Time $410,000 Part Time $40,000 $0 $495,000 Subtotal:$0 Maintenance Costs $495,000 $0 Total Estimated Annual Cost $0 Total Funding $495,000 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $45,000 $33,030 $11,970 73% $410,000 $0 $410,000 0% $40,000 $0 $40,000 0% $495,000 $33,030 $461,970 7% Right-of-Way FULLER-WISER ROAD CONNECTOR Engineering Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Streets/Highways CURRENT STATUS Engineering TOTAL PROJECT Total Estimated Capital Cost FUNDING SOURCE: Transfer from: Streets CIP Fund Balance Streets/Highways Right-of-Way 29 Department:Date Prepared:April 11, 2008 Submitted By:Date Completed: Project Title: Project Type:STREET Sub-Type: Project No.:PS0901 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: ASH LANE/DENTON DRIVE/FAIR OAKS BOULEVARD OVERLAY FM157, on Fair Oaks Boulevard from North Main Street to Ash Lane, and on Denton Drive from North Main Street to Fuller-Wiser Road. overlay in a cooperative project with Tarrant County. the street. will provide an improved riding surface, will extend the life of the roadway, and will enhance the appearance of Begin Construction: April 2009 City of Euless Capital Project Request PUBLIC WORKS RON YOUNG Construction Complete: June 2009 Euless and Tarrant County for asphalt overlay improvements. OVERLAY January 13, 2009: Authorized the city manager to execute an interlocal agreement between the City of Ash Lane, Denton Drive, and Fair Oaks Boulevard are collector streets that the City of Euless plans to The project consists of edge milling, asphalt overlay, and restriping on Ash Lane from Aransas Drive to The existing asphalt pavement is deteriorating and is becoming a maintenance problem. The asphalt overlay 30 PROJECT TITLE:PROJECT #:PS0901 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time $320,000 Part Time $0 $320,000 Subtotal:$0 Maintenance Costs $320,000 $0 Total Estimated Annual Cost $0 Total Funding $320,000 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $320,000 $216,659 $103,341 68% $320,000 $216,659 $103,341 68% ASH LANE/DENTON DR/FAIR OAKS OVERLAY Construction Total Salary Purchase of Services Materials & Supplies Utilities Total Estimated Capital Cost FUNDING SOURCE: Transfer from: Streets CIP Fund Balance Subtotal: CURRENT STATUS Overlay TOTAL PROJECT 31 Department:Date Prepared:July 23, 1999 Submitted By:Date Completed: Project Title: Project Type:STREET Sub-Type: Project No.:PS0902 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: Street escrow funds are being deposited for use in reconstruction. Vine Street is not identified in the 1999 Master Thoroughfare Plan. Pending: Completion of development is complete, it would be appropriate for the City to reconstruct the existing roadway. DESIGN The City has received street escrow funds from several developments along Vine Street. When development VINE STREET, SH183 TO SH10 DESIGN City of Euless Capital Project Request PUBLIC WORKS RON YOUNG 32 PROJECT TITLE:VINE STREET, SH183 TO SH10 DESIGN PROJECT #:PS0902 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost $80,000 Personnel:Full Time $20,000 Part Time $0 $100,000 Subtotal:$0 Maintenance Costs $100,000 $0 Total Estimated Annual Cost $0 Total Funding $100,000 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $80,000 $0 $80,000 0% $20,000 $0 $20,000 0% $100,000 $0 $100,000 0%TOTAL PROJECT CURRENT STATUS Engineering Right of Way Subtotal: FUNDING SOURCE: Transfer from: Street CIP Fund Balance Total Estimated Capital Cost Purchase of Services Materials & Supplies Utilities Engineering Right of way Total Salary 33 Department:Date Prepared:April 12, 2004 Submitted By:Date Completed: Project Title: Project Type:STREET Sub-Type: Project No.:PS0903 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: Euless Master Thoroughfare Plan adopted in 1999. underground conduit, vehicle detection, and signal controllers for the intersection of Mid Cities Boulevard and determine the justification for signal installation. These intersections require a traffic signal. The project consists of the installation of traffic signal poles, mast arms, signal heads, pedestrian indicators, City of Euless Capital Project Request PUBLIC WORKS RON YOUNG SIGNALIZATION TRAFFIC SIGNALS - MID CITIES BLVD AT GATEWAY BLVD AND AT BAZE ROAD Traffic signals are located at the intersections of arterial and collector thoroughfares identified in the City of Award Design: March 2009 Anticipate Award Construction: September 2009 Anticipate Plans Complete: July 2009 Traffic volumes at these intersections have been monitored and signal warrant studies performed to Gateway Boulevard and for the intersection of Mid Cities Boulevard and Baze Road. 34 PROJECT TITLE:PROJECT #:PS0903 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost $40,000 Personnel:Full Time $280,000 Part Time $0 $320,000 Subtotal:$0 Maintenance Costs $140,000 $18,155 $161,845 $0 Total Estimated Annual Cost $0 Total Funding $320,000 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $40,000 $2,168 $37,832 5% $280,000 $0 $280,000 0% $320,000 $2,168 $317,832 1% SIGNALS - MID CITIES @ GATEWAY & BAZE Engineering Traffic Signals Total Salary Purchase of Services Materials & Supplies Utilities Total Estimated Capital Cost ES0249-ES0254, ES0290 FUNDING SOURCE: Transfer from: Car Rental Operating Fund Subtotal: Street CIP Fund Balance Escrow Funds CURRENT STATUS Engineering Traffic Signals TOTAL PROJECT 35 36 CAPITAL IMPROVEMENTS PROGRAMFUNDED PROJECTS SUMMARYProject Number Project DescriptionBudget as of 5/31/08Appropriation/ AmendmentBudget as of 5/31/09Expended as of 05/31/09Remaining Funds to Complete BudgetEstimated Project CostsUnfunded/ (Excess Funding) WASTEWATER PROJECTSWW0002Misc Wastewater Rehab (min bal $100,000)$259,169 $56,917 $316,086 $216,086 $100,000 $316,086 $0WW0605 TRA Wastewater Payments - Impact$180,000$60,000 $240,000 $180,000$60,000 $240,000$0WW0801 Line Replacement Fayette Drive$750,000($262,000) $488,000$30,176 $457,824 $488,000$0WW0802 Line Replacement South Mills Drive CDBG-R$0$262,000 $262,000$0$262,000 $262,000$0WW0901 Line Replacement Woodridge Circle/Koen Lane$0$795,000 $795,000$0$795,000 $795,000$0WW0902 Line Replacement West Mills Drive-34th CDBG$0$46,855$46,855$0$46,855 $46,855$0FB9911 FB - Wastewater Impact (Restricted)$0$0$0$0$0$0 ($661,141)$1,189,169$958,772 $2,147,941 $426,262 $1,721,679 $2,147,941 ($661,141)Sub-Total Wastewater Projects37 Department:Date Prepared:July 26, 1999 Submitted By:Date Completed: Project Title: Project Type:WASTEWATER Sub-Type: Project No.:WW0002 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: This project is for small unidentified wastewater main problems that may be identified during the fiscal year. City of Euless Capital Project Request PUBLIC WORKS RON YOUNG MISCELLANEOUS WASTEWATER REHABILITATION MAINS March 28, 2006:Authorized the City Manager to proceed with emergency repair by GRA-TEX Utilities to Most of these lines are clay tile and are seriously deteriorated. Large projects will be identified on an "as needed" basis and presented for funding under a new project number. the aerial wastewater main crossing Hurricane Creek at a cost of $55,000. 38 PROJECT TITLE:PROJECT #:WW0002 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time $0 Subtotal:$0 Maintenance Costs $165,000 Inter-project Transfer from: $37,013 $114,073 $0 Total Estimated Annual Cost $0 Total Funding $316,086 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $283,567 $183,567 $100,000 65% $1,939 $1,939 $0 100% $30,580 $30,580 $0 100% $316,086 $216,086 $100,000 68% Total Estimated Capital Cost Contingency MISCELLANEOUS WASTEWATER REHAB Wastewater Mains Misc Wastewater Rehab (WW9903) Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Engineering CURRENT STATUS Wastewater Mains TOTAL PROJECT FUNDING SOURCE: Transfer from W/S Operating Fund W/S CIP Fund Balance (FB9901) (Minimum balance recommended $100,000) 39 Department:Date Prepared:March 3, 2006 Submitted By:Date Completed: Project Title: Project Type:WASTEWATER Sub-Type: Project No.:WW0605 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: systematic drawdown over a ten year period has been developed. PROJECT SCHEDULE: JUSTIFICATION: systematic drawdown that would not impact the annual budget. PAYMENTS City of Euless Capital Project Request PUBLIC WORKS RON YOUNG TRINITY RIVER AUTHORITY WASTEWATER PAYMENT Based on a review by Birkoff, Hendricks, and Conway of the water and wastewater impact fees, it was determined that a substantial portion of the wastewater impact fee is attributed to Trinity River Authority ("TRA") capital projects. Therefore, these fees should be used to pay a portion of the annual TRA expense, as these funds are directly attributed to the expansion of TRA. Based on the available fund balance, a Annual payments of $60,000 over a ten year period from FY2006-FY2015. The expansion at TRA provides additional capacity and it was determined through the wastewater impact fee study that these funds could be used to pay a portion of TRA wastewater payments. It was determined a ten year drawdown would approximate the Capital Improvement Plan Review time frame, as well as provide for a 40 PROJECT TITLE:PROJECT #:WW0605 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost $240,000 Personnel:Full Time Part Time $0 ($60,000) $240,000 Subtotal:($60,000) $60,000 Maintenance Costs $60,000 $60,000 $60,000 $0 Total Estimated Annual Cost ($60,000)Total Funding $240,000 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $240,000 $180,000 $60,000 75% $240,000 $180,000 $60,000 75% TRA WASTEWATER PAYMENT TRA Wastewater Payments FB9911: FY 2009 Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: CURRENT STATUS Wastewater - TRA Service TOTAL PROJECT Total Estimated Capital Cost FUNDING SOURCE: FB9911: FY 2006 FB9911: FY 2007 FB9911: FY 2008 41 Department:Date Prepared:April 30, 2007 Submitted By:Date Completed: Project Title: Type:WASTEWATER Sub-Type: Project No.:WW0801 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: MAINS The wastewater main included in this project is part of the City of Euless Wastewater System Master gas and other chemicals. Many are substandard in size and have inflow/infiltration problems. Systematic Anticipate Award Construction Contract: August 2009 Replace wastewater lines on the west side of Fayette Drive from Harwood Road to Ector Drive. Many wastewater lines throughout the city are 40 plus years old. Most of the lines are vitrified clay tile and are susceptible to ground movement, pulled joints, root infiltration and deterioration from hydrogen sulfide Design Complete: June 2009 replacement will prevent a mandatory widespread replacement. Award Design Contract: August 2008 Anticipate Construction Complete: February 2010 City of Euless Capital Project Request PUBLIC WORKS RON YOUNG LINE REPLACEMENT- FAYETTE DRIVE Inc. in an amount not to exceed $70,544 for projects WW0801 and WW0802. August 12, 2008:Authorized city manager to execute an engineering design contract with Elliott & Hughes, Plan. This project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains. 42 PROJECT TITLE:PROJECT #:WW0801 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost $47,000 Personnel:Full Time $441,000 Part Time $0 $488,000 Subtotal:$0 Maintenance Costs $750,000 ($162,000) ($100,000) $0 Total Estimated Annual Cost $0 Total Funding $488,000 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $47,000 $30,176 $16,824 64% $441,000 $0 $441,000 0% $488,000 $30,176 $457,824 6% Wastewater Line Replacement TOTAL PROJECT Total Estimated Capital Cost FUNDING SOURCE: Transfer from W/S Operating Fund S. Mills Wastewater Line (WW0802) W/WW CIP Fund Balance Wastewater Mains CURRENT STATUS Engineering Purchase of Services Materials & Supplies Utilities Subtotal: LINE REPLACEMENT- FAYETTE DRIVE Engineering Less Interproject Transfers to: Total Salary 43 Department:Date Prepared:April 30, 2007 Submitted By:Date Completed: Project Title: Type:WASTEWATER Sub-Type: Project No.:WW0802 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: MAINS The wastewater main included in this project is part of the City of Euless Wastewater System Master gas and other chemicals. Many are substandard in size and have inflow/infiltration problems. Systematic Anticipate Award Construction Contract: August 2009 Anticipate Construction Complete: February 2010 Replace wastewater lines on the west side of South Mills Drive from Pipeline Road to the south side of Many wastewater lines throughout the city are 40 plus years old. Most of the lines are vitrified clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide Design Complete: June 2009 LINE REPLACEMENT- SOUTH MILLS DRIVE (CDBG-R) Inc. in an amount not to exceed $70,544 for projects WW0801 and WW0802. August 12, 2008:Authorized city manager to execute an engineering design contract with Elliott & Hughes, Plan. This project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains. replacement will reduce maintenance cost and customer problems. Award Design Contract: August 2008 SH10. City of Euless Capital Project Request PUBLIC WORKS RON YOUNG 44 PROJECT TITLE:PROJECT #:WW0802 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost $23,500 Personnel:Full Time $238,500 Part Time $0 $262,000 Subtotal:$0 Maintenance Costs $162,000 $100,000 $0 Total Estimated Annual Cost $0 Total Funding $262,000 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $23,500 $0 $23,500 0% $238,500 $0 $238,500 0% $262,000 $0 $262,000 0% Wastewater Line Replacement TOTAL PROJECT Total Estimated Capital Cost FUNDING SOURCE: Transfer from W/S CIP Fund CDBG-R Funding Wastewater Mains CURRENT STATUS Engineering Purchase of Services Materials & Supplies Utilities Subtotal: LINE REPLACEMENT- SOUTH MILLS Engineering Total Salary 45 Department:Date Prepared:July 10, 2000 Submitted By:Date Completed: Project Title: Type:WASTEWATER Sub-Type: Project No.:WW0901 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. Many wastewater lines throughout the city are 40 plus years old. Most of the lines are clay tile and are Systematic replacement will prevent a mandatory wide spread replacement. subject to ground movement, grease, root infestation and deterioration due to hydrogen sulfide gas and other Anticipate Plans Complete: 1st Quarter 2010 Anticipate Begin Construction: 2nd Quarter 2010 Anticipate Construction Complete: 4th Quarter 2010 MAINS April 14, 2009:Authorized City Manager to execute a design contract with Elliot and Hughes, Inc. for the 3. Briarwood Court and Penoak Court, and design of replacing wastewater mains in an amount not to exceed $61,000. Award Design: March 2009 Replace the following wastewater lines on Wood Ridge Circle: 1. West side of Driftwood Drive from Tanglewood Trail to Pipeline Road 2. East side of Driftwood Drive from Woodridge Circle to Pipeline Road 4. West end of Koen Lane to South Pipeline Road. Systematic replacement of wastewater lines in drainage basin areas using a worst first approach. City of Euless Capital Project Request PUBLIC WORKS RON YOUNG LINE REPLACEMENT-WOODRIDGE CIRCLE/KOEN LANE 46 PROJECT TITLE:PROJECT #:WW0901 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost $87,000 Personnel:Full Time $708,000 Part Time $0 $795,000 Subtotal:$0 Maintenance Costs $795,000 $0 Total Estimated Annual Cost $0 Total Funding $795,000 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $87,000 $0 $87,000 0% $708,000 $0 $708,000 0% $795,000 $0 $795,000 0%TOTAL PROJECT CURRENT STATUS Engineering Wastewater Mains Subtotal: FUNDING SOURCE: Transfer from W/S Operating Fund Total Estimated Capital Cost Purchase of Services Materials & Supplies Utilities LINE REPLACEMENT-WOODRIDGE/KOEN Engineering Wastewater Line Replacement Total Salary 47 Department:Date Prepared:April 15, 2005 Submitted By:Date Completed: Project Title: Project Type:WASTEWATER Sub-Type: Project No.:WW0902 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: replacement is based on the worst first approach. Many wastewater mains throughout the city are 40 plus years old. Most of these lines are clay tile and are Construction Complete: April 2009 LINE REPLACEMENT-WEST MILLS DRIVE The West Mills Drive wastewater main is part of the City of Euless Wastewater System Master Plan. Systematic costs and customer problems. Grant project for wastewater main line replacement. February 26, 2008: Approved the recommended project selection for the 34th year Community Development Block MAINS Replace wastewater mains along West Mills Drive between South Mills Drive and Simmons Drive. susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many Company in the amount of $46,855.05 representing the total amount of the project. are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance City of Euless Capital Project Request PUBLIC WORKS RON YOUNG Begin Construction: March 2009 February 10, 2009:Recommended Tarrant County award construction contract to Hall Albert Construction 48 PROJECT TITLE:PROJECT #:WW0902 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost $46,855 Personnel:Full Time Part Time $0 $46,855 Subtotal:$0 Maintenance Costs $46,855 $0 Total Estimated Annual Cost $0 Total Funding $46,855 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $46,855 $0 $46,855 0% $46,855 $0 $46,855 0% LINE REPLACEMENT-WEST MILLS DRIVE Wastewater Line Replacement Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: CURRENT STATUS Wastewater Mains TOTAL PROJECT Total Estimated Capital Cost FUNDING SOURCE: 34th CDBG FY 2009 49 50 CAPITAL IMPROVEMENTS PROGRAMFUNDED PROJECTS SUMMARYProject Number Project DescriptionBudget as of 5/31/08Appropriation/ AmendmentBudget as of 5/31/09Expended as of 05/31/09Remaining Funds to Complete BudgetEstimated Project CostsUnfunded/ (Excess Funding) WATER PROJECTSWT0001Misc Utility Rehab - Water (min bal $150,000)$253,511 $0 $253,511 $103,775 $149,736 $253,511 $0WT0101 Water Tank Debt Payment$2,175,514$257,000 $2,432,514 $2,346,848$85,666 $2,432,514$0WT0104Well Repairs (min bal $75,000)$513,617$0$513,617 $438,617$75,000 $513,617$0WT0201 Well Rehabilitation/Disinfection$600,000$0$600,000 $522,285$77,715 $600,000$0WT0202 Effluent Water Main$250,000$0$250,000$0$250,000 $1,500,000 $1,250,000WT0803Transponders/Meters (annual transfer $158,000)$331,875$331,875 $663,750 $555,247 $108,503 $663,750$0WT0901 TRA Water Payments-Impact$0$100,000 $100,000$0$100,000 $100,000$0FB9910 FB- Water Impact (Restricted)$0$0$0$0$0$0 ($2,534,906)FB9901 FB - Water & Sewer CIP$0$0$0$0$0$0 ($489,964)Sub-Total Water Projects$4,124,517$688,875 $4,813,392 $3,966,772 $846,620 $6,063,392 ($1,774,870) 51 Department:Date Prepared:July 26, 1999 Submitted By:Date Completed: Project Title: Project Type:WATER Sub-type:MAINS Project No.:WT0001 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: This project is for the correction of small unidentified water main problems that may arise throughout the Some of the City's older water mains have deteriorated and need replacement or repair. Staff requests that MISCELLANEOUS WATER UTILITY REHABILITATION this project be funded on an annual basis. City of Euless Capital Project Request PUBLIC WORKS RON YOUNG fiscal year. Large projects that are identified will be prepared on an "as needed" basis and funded under a new project number. 52 PROJECT TITLE:PROJECT #:WT0001 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time $0 Total Estimated Capital Cost $0 Subtotal:$0 Maintenance Costs $265,000 W/S Operating Fund $100,000 $6,251 Milam - Denton/Midway WT0005 ($7,020) $0 Well Repairs WT0104 ($110,720) Total Estimated Annual Cost $0 Total Funding $253,511 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % Expended $49,231 $24,852 $24,379 50% $204,280 $78,923 $125,357 39% $253,511 $103,775 $149,736 41% W/S CIP Fund Balance Subtotal: Transfer from: Misc Water Rehab WT9905 Purchase of Services Materials & Supplies Utilities Less Inter-project Transfer to: Water Mains CURRENT STATUS Contingencies TOTAL PROJECT (Annual minimum funding $150,000) FUNDING SOURCE: MISCELLANEOUS UTILITY REHAB - WATER Water Mains Total Salary 53 Department:Date Prepared:May 1, 2001 Submitted By:Date Completed: Project Title: Project Type:WATER Sub-type: Project No.:WT0101 Priority: A COUNCIL AUTHORIZATION: Approved in the annual budget. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PAYMENTS City of Euless Capital Project Request PUBLIC WORKS RON YOUNG The water tower provides additional capacity and was included in the water impact fee study. WATER TANK DEBT PAYMENT construction of the new water tower. This project includes the transfer of funds from the water impact fee to pay the debt service related to the 54 PROJECT TITLE:PROJECT #:WT0101 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: $249,012 Direct Operating Cost $291,759 Personnel:Full Time $279,671 Part Time $277,921 $0 $280,834 $278,071 $258,314 $259,932 $257,000 Total Estimated Capital Cost $2,432,514 Subtotal:$0 Maintenance Costs $2,432,514 $0 Total Estimated Annual Cost $0 Total Funding $2,432,514 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % Expended $2,432,514 $2,346,848 $85,666 96% $2,432,514 $2,346,848 $85,666 96% FUNDING SOURCE: WATER TANK DEBT PAYMENT Debt Service - FY02 Debt Service - FY01 Debt Service - FY03 Total Salary Debt Service - FY09 TOTAL PROJECT Transfer from: Water Impact CIP Fund Balance CURRENT STATUS Transfer to Debt Service Subtotal: Materials & Supplies Utilities Debt Service - FY04 Debt Service - FY05 Debt Service - FY06Purchase of Services Debt Service - FY08 Debt Service - FY07 55 Department:Date Prepared:June 1, 2001 Submitted By:Date Completed: Project Title: Project Type:WATER Sub-Type: Project No.:WT0104 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: WELL REPAIR Maintaining the City's wells results in the ability to produce water at a substantial reduction in cost. WELL REPAIRS This funding is being utilized to repair well pumps and for unexpected well repairs. City of Euless Capital Project Request PUBLIC WORKS RON YOUNG February 14, 2006:Award bid #011-06 to Millican Well Services, L.L.C., for rehabilitation and installation of April 22, 2003: Awarded Bid # 018-03 for Far North Well Pump Repair to Layne-Texas for $32,790. new Centrilift submersible motor and pump for the Far North Main Well in the amount of $250,035. Rehabilitation/installation of submersible motor and pump for Far North Main Well complete: February 2007 56 PROJECT TITLE:PROJECT #:WT0104 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time $0 Subtotal:$0 Maintenance Costs $110,720 $77,897 $325,000 $0 Total Estimated Annual Cost $0 Total Funding $513,617 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $513,617 $438,617 $75,000 85% $513,617 $438,617 $75,000 85% WELL REPAIRS Well Repairs Purchase of Services Total Salary (Minimum Balance Maintained $75,000) FUNDING SOURCE: TOTAL PROJECT CURRENT STATUS Well Repairs Materials & Supplies Utilities Subtotal: W/S Operating Fund Transfer from: Misc Water Rehab W/S CIP Fund Balance 57 Department:Date Prepared:July 26, 1999 Submitted By:Date Completed: Project Title: Project Type:WATER Sub-Type: Project No.:WT0201 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: facilities at each of our three well sites. PROJECT SCHEDULE: JUSTIFICATION: by inspection. The Environmental Protection Agency, Texas Natural Resources Conservation Commission, and Safe Drinking Water Act mandate disinfection by-product limits. If test results indicate non-compliance, the need to modify the disinfection process or cease well operations will be necessary. October 9, 2001 Bid #054-01 awarded to Millican Well Services, LLC for $55,130 for plugging three water wells at 1100 Central Drive with a contingency of $13,750. October 23, 2001 Authorized city manager to proceed with emergency plugging of Harwood Trinity water well by Layne-Texas in the amount of $29,450. October 23, 2001 Authorized city manager to proceed with emergency rehabilitation of the Far North Trinity water well by Layne-Texas at an estimated expenditure of $92,254. October 8, 2002 Awarded contract to Tank Builders for the Fuller ground storage reservoir in the amount of $222,600 plus a 5% contingency in the amount of $11,180. packing and rehabilitating items that are found to be in need. It also includes adding ammonia injection Fuller Tank Complete City of Euless Capital Project Request PUBLIC WORKS RON YOUNG WELL REHABILITATION/DISINFECTION WATER PRODUCTION This project consists of inspecting deep wells to determine condition of well pipe, casing, screens, and gravel Wells are old and heavily used. All three deep wells need to be rehabilitated according to needs determined Construction Complete: June 2009 Designs Complete: Ammonia/Chlorine Feed Buildings Begin Construction: Fall 2007 58 PROJECT TITLE:PROJECT #:WT0201 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time $600,000 Part Time $0 Total Estimated Capital Cost $600,000 Subtotal:$0 Maintenance Costs $600,000 $0 Total Estimated Annual Cost $0 Total Funding $600,000 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $600,000 $522,285 $77,715 87% 600,000 522,285 77,715 87% WELL REHABILITATION/DISINFECTION Purchase of Services Total Salary Water Rehabilitation Transfer from W/S Operating Fund FUNDING SOURCE: Materials & Supplies Utilities CURRENT STATUS Subtotal: Well Rehabilitation TOTAL PROJECT 59 Department:Date Prepared:June 29, 2000 Submitted By:Date Completed: Project Title:EFFLUENT WATER MAIN Project Type:WATER Sub-Type: Project No.:WT0202 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: May 26,2009:Authorized the city manager to negotiate and execute an agreement with the City of Fort Worth for the purchase of reclaimed water, including the related Memorandum of Understanding for a term of City of Euless Capital Project Request COMMUNITY SERVICES RON YOUNG mandatory water restrictions. Utilization of this source of water would ensure the city could continue irrigation in the event of drought and system. INSTALLATION March 11, 2008:Approved resolution #08-1272 committing to negotiate with the City of Fort Worth Effluent water main from City of Ft. Worth Village Creek Wastewater Treatment Facility to the Texas Star regarding purchase of reclaimed water delivery through Fort Worth's proposed reclaimed water delivery twenty years from the effective date. property. 60 PROJECT TITLE:PROJECT #:WT0202 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time $1,500,000 Part Time $0 Total Estimated Capital Cost $1,500,000 Subtotal:$0 Maintenance Costs $250,000 $130,000 $0 $500,000 W/S CIP Fund Balance $400,000 220,000 Total Estimated Annual Cost $0 Total Funding $1,500,000 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $250,000 $0 $250,000 0% $250,000 $0 $250,000 0% EFFLUENT WATER MAIN Installation Total Salary Purchase of Services Materials & Supplies Transfer from: Utilities Government Funds W/S Excess Reserves Subtotal: FUNDING SOURCE: Transfer from W/S Operating Fund CURRENT STATUS Water Mains ADDITIONAL FUNDING NEEDED: W/S Operating Fund TOTAL PROJECT 61 Department:Date Prepared:May 31, 2007 Submitted By:Date Completed: Project Title:TRANSPONDERS/METERS Project Type:WATER Sub-Type: Project No.:WT0803 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: 15 years of age and requires frequent returns to the factory for repairs. to be replaced. electronic or remote reading of water consumption. These water meters (transponders) are read with an electronic November 13, 2007:Awarded the annual contract for the purchase of water meters and transponders, and $383,875. Amount for project not to exceed $331,875. November 11, 2008:Awarded the annual contract for the purchase of water meters and transponders, and authorized the city manager to enter into an agreement with Atlas Utility Supply Company in the amount of Partial replacement of transponders occurred in FY2006 and FY2007. The balance of the old transponders needs $356,875. Amount for project not to exceed $331,875. developing technology. Trace transponders are failing at a high rate. The reading equipment is also approximately EQUIPMENT REPLACEMENT Purchase and installation of electronic transponders. Transponders are affixed to water meters allowing for The Trace transponders technology is approximately 15 years old. The dependability of the reading equipment, the Purchase and Installation of meters: Annually device located inside of a vehicle which is driven along a predefined route. transponder size, and the battery life expectancy of the Trace automated reading system has not kept pace with City of Euless Capital Project Request PUBLIC WORKS RON YOUNG authorized the city manager to enter into an agreement with Atlas Utility Supply Company in the amount of Purchase and Installation transponders complete: FY2009 62 PROJECT TITLE:PROJECT #:WT0803 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time $331,875 $0 $331,875 $663,750 Subtotal:$0 Maintenance Costs $173,875 W/S Operating Fund - FY08 $158,000 $173,875 W/S Operating Fund - FY09 $158,000 $0 Total Estimated Annual Cost $0 Total Funding $663,750 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $663,750 $555,247 $108,503 84% $663,750 $555,247 $108,503 84% TRANSPONDERS/METERS Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: CURRENT STATUS Meters/Transponders TOTAL PROJECT Total Estimated Capital Cost FUNDING SOURCE: Transfer from: W/S CIP Fund Balance - FY08 W/S CIP Fund Balance - FY09 FY2008-09 Transponders/Meters FY2007-08 Transponders/Meters (Annual Transfer - Operating Funds $158,000) 63 Department:Date Prepared:May 31, 2008 Submitted By:Date Completed: Project Title: Project Type:WATER Sub-Type: Project No.:WT0901 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: Annual payments of $100,000 over a ten year period from FY2009-FY2018. drawdown over a ten year period has been developed. drawdown would approximate the Capital Improvement Plan Review time frame, as well as provide for a PAYMENTS City of Euless Capital Project Request PUBLIC WORKS RON YOUNG TRINITY RIVER AUTHORITY WATER PAYMENT systematic drawdown that would not impact the annual budget. Based on a review by Birkoff, Hendricks, and Conway of the water and wastewater impact fees, it was determined that a substantial portion of the water impact fee is attributed to Trinity River Authority ("TRA") capital projects. Therefore, these fees should be used to pay a portion of the annual TRA expense, as these funds are directly attributed to the expansion of TRA. Based on the available fund balance, a systematic The expansion at TRA provides additional capacity and it was determined through the water impact fee study that these funds could be used to pay a portion of TRA water payments. It was determined a ten year 64 PROJECT TITLE:PROJECT #:WT0901 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost $100,000 Personnel:Full Time Part Time $0 $100,000 Subtotal:$0 Maintenance Costs 100,000 $0 Total Estimated Annual Cost $0 Total Funding $100,000 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $100,000 $0 $100,000 0% $100,000 $0 $100,000 0% TRINITY RIVER AUTHORITY WATER PAYMENT TRA Water Payments FY2009 Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: CURRENT STATUS Water - TRA Service TOTAL PROJECT Total Estimated Capital Cost FUNDING SOURCE: Transfers from: Water Impact Fund Balance - FY09 65 66 CAPITAL IMPROVEMENTS PROGRAMFUNDED PROJECTS SUMMARYProject Number Project DescriptionBudget as of 5/31/08Appropriation/ AmendmentBudget as of 5/31/09Expended as of 05/31/09Remaining Funds to Complete BudgetEstimated Project CostsUnfunded/ (Excess Funding) OTHERAC0901 Texas Star Sports Complex Study/Fence$0$100,000 $100,000$85,204$14,796 $100,000$0CM0304 Entry Monument Sign Program$115,782$0$115,782$93,027$22,755 $115,782$0CM0804 Redevelopment$951,947$15,525 $967,472 $659,642 $307,830 $967,472$0DV9901 EDC Incentive Funds$325,854$25,000 $350,854 $300,854$50,000 $350,854$0ED0101 Planning Consultants$100,000$0$100,000$0$100,000 $200,000 $100,000ED0801 Redi-Mix Regional Headquarters$5,450,000($250,000) $5,200,000 $1,175,036 $4,024,964 $5,200,000$0PD9901 Police and Municipal Courts Facility$11,717,134$462 $11,717,596 $11,609,560 $108,036 $11,717,596$0PR0601 Park Amenities Upgrade$150,000$0$150,000 $145,316$4,684 $150,000$0PR0720 Misc. Park Structures$225,000$0$225,000 $131,275$93,725 $225,000$0PR0804 Park Irrigation$25,000$25,000$50,000$770$49,230 $50,000$0PR0901 Trail Enhancement - Bob Eden Park$0$135,000 $135,000$0$135,000 $135,000$0PR0902 Senior Citizen Center at Midway Park$0 $4,856,821 $4,856,821$0 $4,856,821 $4,856,821$0PR0907 Midway Park Family Life Center Phase I$0 $1,330,000 $1,330,000$66,644 $1,263,356 $2,105,000 $775,000FB9906 FB-EDC CIP$0$0$0$0$0$0 ($958,496)FB9908 FB-Athletic Complex CIP$0$0$0$0$0$0 ($740,639)FB9909 FB-General CIP$0$0$0$0$0$0 ($34,342)FB9913 FB-Car Rental CIP$0$0$0$0$0$0 ($74,674)Sub-Total Other Projects$19,060,717 $6,237,808 $25,298,525 $14,267,328 $11,031,197 $26,173,525 ($933,151) 67 Department:Date Prepared:July 13, 2008 Submitted By:Date Completed: Project Title: Project Type:LAND Sub-Type: Project No.:AC0901 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: Parks at Texas Star and to replace the fencing at Softball World. With the proposed Midway Park Family Life Center project, staff recognizes the project's impact on our athletic programs due to the loss of the existing fields at Midway Park. The fields at Midway Park are TEXAS STAR SPORTS COMPLEX - STUDY/FENCING IMPROVEMENTS allow staff the ability to conduct the necessary research, through a consultant and/or design firm, to make over ten years of positioning the Texas Star Sports Complex as a premier facility that serves the adult softball as well as the opportunity to accommodate a girl's fast pitch league and tournament play. City of Euless Capital Project Request COMMUNITY SERVICES RAY MCDONALD multiple sports/uses as well as to work with staff in determining cost and design of practice fields at the Identified in the recently adopted Parks Master Plan is the need for additional playing fields to accommodate the growing number of participants in the Parks at Texas Star baseball league as well as the need to make the necessary improvements to the aging fields, fencing, and structures at Softball World. It is important that staff remains committed to the vision that the City Council has promoted for athletic needs of the city as well as a facility that spurs economic opportunities. This proposal would currently used as practice fields for teams participating in the Parks at Texas Star Baseball League on an assigned and rental basis. The Midway Park fields are also used as game fields primarily for tournaments, but also in league play for make-up games in the event of rain-outs. Losing the fields entirely would limit staff's ability to register the same number of teams as previously for tournaments and could extend the season by several weeks for make-up games. the necessary renovations to this facility and develop it into a more multi-use facility that could accommodate the Parks at Texas Star Baseball League and tournament play, additional programming for Consultant and/or design firm services to explore the many options available and costs associated with converting Softball World from its current state into a more programmable complex to accommodate 68 PROJECT TITLE:PROJECT #:AC0901 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost $15,000 Personnel:Full Time $85,000 Part Time $0 $100,000 Subtotal:$0 Maintenance Costs 100,000 $0 Total Estimated Annual Cost $0 Total Funding $100,000 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $15,000 $15,000 $0 100% $85,000 $70,204 $14,796 83% $100,000 $85,204 $14,796 85%TOTAL PROJECT CURRENT STATUS Architectural Services Improvements athletic needs of the city as well as a fac FUNDING SOURCE: Transfer from : Texas Star Sports Complex CIP Total Estimated Capital Cost Purchase of Services Materials & Supplies Utilities TX STAR SPORTS COMPLEX - STUDY/FENCE Feasibility Study Improvements/Fencing Total Salary 69 Department:Date Prepared:July 11, 2006 Submitted By:Date Completed: Project Title: Project Type:OTHER IMPROVEMENTS Sub-Type: Project No.:CM0304 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: JUSTIFICATION: Continued construction of City of Euless entry monument signs at key high visibility points throughout the To enable continued efforts to identify, beautify, and brand the City of Euless. IMPROVEMENTS Continuation of the original CM0304 City of Euless Entry Monument Sign Program. City of Euless Capital Project Request CITY MANAGER GARY MCKAMIE ENTRY MONUMENT SIGN PROGRAM city furthering Euless beautification and branding efforts. PROJECT SCHEDULE: Projects will be identified and completed on an as needed basis. 70 PROJECT TITLE:PROJECT #:CM0304 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost $115,782 Personnel:Full Time Part Time $0 $115,782 Subtotal:$0 Maintenance Costs $115,782 $0 Total Estimated Annual Cost $0 Total Funding $115,782 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $115,782 $93,027 $22,755 80% $115,782 $93,027 $22,755 80%TOTAL PROJECT Total Estimated Capital Cost FUNDING SOURCE: Transfer from Car Rental Land Betterments CURRENT STATUS Purchase of Services Materials & Supplies Utilities Subtotal: ENTRY MONUMENT SIGN PROGRAM Land Betterments Total Salary 71 Department:Date Prepared:May 31, 2007 Submitted By:Date Completed: Project Title: Project Type:DEVELOPMENT Sub-Type: Project No.:CM0804 Priority: A PROJECT SCHEDULE: JUSTIFICATION: community. improvements or make acquisitions of property that will be of economic benefit to the City of Euless. community will protect property values from deterioration and keep commercial properties occupied and vibrant. PROJECT DESCRIPTION AND RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: of property on Lot 27, Block 2, Cresthaven Addition, located at 1010 Highland Drive. November 27, 2007:Authorized the mayor to negotiate and execute conveyance documents for the purchase of property on Lot 24, Block 1, Cresthaven Addition, located at 1010 Cresthaven Drive. of property on Lot 3, Block 2, Cresthaven Addition, located at 1007 Cresthaven Drive. January 13, 2009:Authorized the mayor to negotiate and execute conveyance documents for the purchase of property on Lot 18, Block 1, Cresthaven Addition, located at 912 Cresthaven Drive; and Lot 4, Block 2, City of Euless Capital Project Request CITY MANAGER GARY MCKAMIE DEVELOPMENT PROJECT COUNCIL AUTHORIZATION: REDEVELOPMENT This project provides funding to allow the City to participate in redevelopment projects and other community This will be a long-term project that will be on-going for many years in an effort to continuously improve our As the City ages, it is imperative that the economic vitality of the City remain strong. Reinvestment into the October 23, 2007:Authorized the mayor to negotiate and execute conveyance documents for the purchase 1002 Highland Drive. Cresthaven Addition, located at 1005 Cresthaven Drive; and Lot 23, Block 2, Cresthaven Addition, located at December 11, 2007:Authorized the mayor to negotiate and execute conveyance documents for the purchase of property on Lots 17 & 18, Block 8, Cedar Hill Estates Addition, located at 710 S Main Street. October 28, 2008: Authorized the mayor to negotiate and execute conveyance documents for the purchase 72 PROJECT TITLE:PROJECT #:CM0804 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Land Acquisition $932,018 Personnel:Full Time Demolition Svc $35,357 Part Time Minor Apparatus 97 $0 Total Estimated Capital Cost $967,472 Subtotal:$0 Maintenance Costs $930,000 $27,472 $10,000 $0 Total Estimated Annual Cost $0 Total Funding $967,472 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Land Acquisition $932,018 $614,834 $317,184 66% Demolition Svc $35,357 $44,712 ($9,355) 126% Minor Apparatus $97 $96 $1 99% $967,472 $659,642 $307,830 68% Transfer from General Fund Interest CURRENT STATUS Subtotal: Drill Site Surface Damage TOTAL PROJECT FUNDING SOURCE: Purchase of Services Materials & Supplies Utilities REDEVELOPMENT Total Salary 73 Department:Date Prepared:July 26, 1999 Submitted By:Date Completed: Project Title: Project Type:HALF-CENT SALES TAX Sub-Type: Project No.:DV9901 Priority: A COUNCIL AUTHORIZATION: sign program. agreement PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: DEVELOPMENT PROJECT EDC INCENTIVE FUNDS RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: City of Euless Capital Project Request ECONOMIC DEVELOPMENT BILL RIDGWAY March 27, 2001:Approved transfer of $325,000 to North Main Street for right of way to free up funds for a Approved in Sales Tax Revenue Bonds, Series 1994. May 30, 2006:Approved payment to Professional Turf Products, Inc. in the amount of $300,000 per Euless Development Corporation funds that have been set aside to aid the City of Euless in attracting development opportunities. Projects will be identified on an as needed basis. 74 PROJECT TITLE:PROJECT #:DV9901 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time $0 Total Estimated Capital Cost Unknown Subtotal:$0 Maintenance Costs $888,454 EDC Operating Fund $250,000 Less Inter-project Transfer to: Fire Station #2 SS0010 ($432,600) North Main Street PS9901 ($355,000) $0 Total Estimated Annual Cost $0 Total Funding $350,854 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $350,000 $300,000 $50,000 86% $854 $854 $0 100% $350,854 $300,854 $50,000 86% EDC INCENTIVE FUNDS Will be based on the merits of each opportunity. Total Salary (Annual Transfer - Operating Funds $25,000) Purchase of Services Materials & Supplies Utilities TOTAL PROJECT Transfers from: EDC CIP Fund Balance Subtotal: CURRENT STATUS Economic Development Incentives* Irrigation Supplies FUNDING SOURCE: 75 Department:Date Prepared:July 7, 2000 Submitted By:Date Completed: Project Title: Project Type:ECONOMIC DEVELOPMENT Sub-Type: Project No.:ED0101 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: This project involves the funding for evaluating various development opportunities. Commission a study to determine the highest and best use of this valuable commercial land. Poor planning can result in lower than desired tax revenue, hodge podge development activity, and less than PLANNING CONSULTANTS City of Euless Capital Project Request ECONOMIC DEVELOPMENT BILL RIDGWAY DEVELOPMENT PROJECT optimal development quality. City needs to be proactive to guide the development of these vital tracts. 76 PROJECT TITLE:PROJECT #:ED0101 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Planning Study $200,000 Personnel: Full Time Part Time $0 Total Estimated Capital Cost $200,000 Subtotal:$0 Maintenance Costs $100,000 $100,000 $0 Total Estimated Annual Cost $0 Total Funding $200,000 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Planning Study $100,000 $0 $100,000 0% $100,000 $0 $100,000 0% Purchase of Services Materials & Supplies Utilities PLANNING CONSULTANTS Total Salary TOTAL PROJECT FUNDING SOURCE: Transfer from Car Rental CURRENT STATUS Subtotal: ADDITIONAL FUNDING NEEDED: Transfer from Car Rental 77 Department:Date Prepared:May 31, 2007 Submitted By:Date Completed: Project Title:REDI-MIX REGIONAL HEADQUARTERS Project Type:DEVELOPMENT Sub-Type: Project No.:ED0801 Priority: A COUNCIL/EDC AUTHORIZATION: PROJECT DESCRIPTION AND RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT SCHEDULE: JUSTIFICATION: LLC in the amount of $3,333,244.00 for construction of the facility. November 11, 2008: Awarded bid for concrete only to Redi-Mix Concrete in the amount of $303,974.75 provide for job retention within the City and will provide substantial economic benefit to the City of Euless. square feet. This facility will be used as a regional corporate headquarters and training facility and will INCENTIVES February 25, 2008:EDC authorized acquisition of approximately 2 acres in the Main Centre Addition. February 25, 2008:EDC authorized acquisition of approximately 4 acres in the James P. Hallford Survey. February 25, 2008:Authorized architectural contract for design of corporate headquarters and job training facility. April 14, 2009: Authorized the City Manager to enter into a contract with Vratsinas Construction Company, June 24, 2008:Approved resolution #08-1284 approving a lease and incentive agreement by and between City of Euless, EDC, U.S. Concrete, Inc & Redi Mix, LLC and authorize the mayor to modify and execute such October 22, 2007:EDC held public hearing to consider Resolution 15-07 regarding declaration of project. October 23, 2007:Ratified EDC action to amend and modify existing project with Beall Concrete. LLC, and U.S. Concrete, Inc and authorize the mayor to execute such agreement. August 26, 2008:Approved Chapter 380 Construction Agreement between EDC, City of Euless, Redi-Mix, agreement. Anticipate Construction Complete: December 2009 economic growth. Land Acquisition - April 2008 Design - October 2008 This project includes the purchase of land and the construction of building that is approximately 25,936 Providing incentive to current business to attract and retain primary jobs within the city and promote Award Construction Contract: April 2009 City of Euless Capital Project Request ECONOMIC DEVELOPMENT KYLE MCADAMS June 24, 2008: Ratified EDC action regarding lease and incentive agreement. February 26, 2008:Ratified EDC action to purchase property and to authorize architectural contract. June 23, 2008:EDC authorized lease and incentive agreement between EDC, City of Euless, Redi Mix and U.S. Concrete, Inc. 78 PROJECT TITLE:PROJECT #:ED0801 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: $3,333,244 Direct Operating Cost $400,000 Personnel:Full Time $405,000 Part Time Engineering/Survey $57,500 $0 Utility relocation $50,000 Land Acquisition $650,000 Contingency $150,000 Landscape/Irrigation $140,000 $14,256 $5,200,000 Subtotal:$0 Maintenance Costs $3,450,000 EDC Operating Fund $1,750,000 $0 Total Estimated Annual Cost $0 Total Funding $5,200,000 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $3,333,244 $106,585 $3,226,659 3% $405,000 $399,893 $5,107 99% $650,000 $633,453 $16,547 97% $150,000 $128 $149,872 0% $140,000 $0 $140,000 0% Engineering/Survey $57,500 $0 $57,500 0% $14,256 $0 $14,256 0% $50,000 $34,977 $15,023 70% $400,000 $0 $400,000 0% $5,200,000 $1,175,036 $4,024,964 23% Construction Land Acquisition Transfer from: Landscape/Irrigation Contingency Data and Telephone Architect CURRENT STATUS Subtotal: Equipment Concrete Utility relocation TOTAL PROJECT FUNDING SOURCE: Car Rental Fund REDI-MIX REGIONAL HEADQUARTERS Concrete Total Salary Construction Architect Total Estimated Capital Cost Purchase of Services Materials & Supplies Utilities 79 Department:Date Prepared:July 15, 1999 Submitted By:Date Completed: Project Title:POLICE & MUNICIPAL COURTS FACILITY Project Type:BUILDINGS/FACILITIES Sub-Type: Project No.:PD9901 Priority: A COUNCIL AUTHORIZATION: January 13, 1998 - Authorized contract with Phillips Swager for architectural services. April 14, 1998 - Authorized the acquisition of the Western Hills Inn and Western Hills Annex. June 9, 1998 - Awarded Bid No. 98-13 for demolition services. October 9, 1998 - Awarded change order to West Excavation for abatement of asbestos. February 23, 1999 - Authorized additional funds for demolition. June 22, 1999 - Declared expectation to reimburse expenditures with proceeds of future debt. June 22, 1999 - Authorized City Manager to request qualifications for construction management service. February 22, 2000 - Public Hearing and approval of Special Use Permit. February 22, 2000 - Approval of request for site plan. May 9, 2000 - Approval of Ordinance No. 1426 authorizing sale of Cert. Of Obligation Series 2000A. May 9, 2000 - Awarded bid for construction to Ratcliff Construction. November 14, 2000 - Authorized execution of contract for Project Management Services January 9, 2001 - Granted City Manager approval to authorize change orders not to exceed $25,000. January 23, 2001 - Ratified contract for inspection services to increase limit to $65,000 January 23, 2001 - Approved Change Order #1 to credit contract $152,391. January 23, 2001 - Approved Change Order #3 for payment of $48,372.79 on new piers and removal. March 27, 2001 - Approved Change Order #4 to credit contract $42,871.41. May 22, 2001 - Awarded bid #044-01 for furniture in the amount of $332,400.70. June 12, 2001 - Authorize City Manager to execute contract with DataTex not to exceed $74,257.86. installing police and public works radio system. PROJECT DESCRIPTION AND RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT SCHEDULE: JUSTIFICATION: Current facility space is grossly inadequate for these areas. This 53,000 square foot facility will accommodate police, jail and courts. August 28, 2001 - Awarded contract to DFW Communication in the amount of $33,009 for relocating and CONSTRUCTION City of Euless Capital Project Request POLICE DEPARTMENT GARY MCKAMIE 80 PROJECT TITLE:PROJECT #:PD9901 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Bond Issuance Cost $76,000 Direct Operating Cost Construction 9,071,257 Personnel:Full Time $128,000 Contingency 127,575 Part Time Demolition 606,709 Architectural/ Surveying/ Geotech 826,439 Other Professional Services 36,310 106,000 Equipment 67,912 Furnishings 350,000 Land Purchase 43,592 Planning Services 70,428 $234,000 Owner Equipment 441,344 Total Estimated Capital Cost $11,717,566 Maintenance Costs HVAC Maintenance 18,084 FUNDING SOURCE: Maintenance 24,850 Transfers from: Janitorial Services & Supplies 37,500 General Fund $394,890 8,000 W/S Operating Fund 175,000 1,500 CCPD Operating Fund 2,160,000 $89,934 DEA Funds 450,000 Bond Proceeds 8,600,000 Interest Income 576,479 $750,815 Less Interproject Transfer to: Building D FM0101 (638,803) Total Estimated Annual Cost $1,074,749 Total Funding $11,717,566 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Bond Issuance Cost 76,000 76,000 0 100% Construction 9,071,257 9,071,257 0 100% Contingency plus interest earnings 127,605 61,264 66,341 48% Demolition 606,709 606,709 0 100% Architectural Services 745,369 745,369 0 100% Surveying Services 6,070 6,071 (1) 100% Geo-Technical Services 75,000 72,511 2,489 97% Other Professional Services 36,310 36,310 0 100% Equipment 67,912 67,912 0 100% Furnishings 350,000 348,347 1,653 100% Land Purchase 43,592 43,591 1 100% Off-Site Utilities 0 0 0 0% Owner Equipment 441,344 403,791 37,553 91% Planning Services 70,428 70,428 0 100% * - This project transferred $638,803 to FM0101. $11,717,596 $11,609,560 $108,036 99% POLICE & MUNICIPAL COURTS Subtotal: Utilities Elect. Supplies Pest Control Subtotal: TOTAL PROJECT Average Annual Debt Service Other CURRENT STATUS 81 Department:Date Prepared:March 23, 2004 Submitted By:Date Completed: Project Title:PARK AMENITIES UPGRADE Project Type:FIXTURES Sub-Type: Project No.:PR0601 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: and outdated and will require refurbishment or replacement in the near term. This project addresses the upgrade of all city parks to modernize amenities from water fountains to play Projects will be identified and completed on an as needed basis. Miracle Recreation Equipment Company for estimated expenditure of $67,000. components to picnic stations and pavilions. The project provides funding for the replacement of aged playground units that are approaching 10-15 years old; these units will include, but not be limited to, components in AJ Carr Park, Midway Park, Villages of Bear Creek Park, Trailwood Park, and McCormick Park. Additionally, this project will provide contingency funding for minor improvements at all parks with respect to playground surfaces, structures, and minor landscaping features. Pursuant to the recommendations in the Parks Master Plan, parks should be brought into accessibility and City of Euless Capital Project Request COMMUNITY SERVICES RAY MCDONALD Americans with Disabilities Act compliance. The existing equipment in many park areas is becoming aged IMPROVEMENTS December 13, 2005:Approved purchase of playground equipment for Villages of Bear Creek Park from The adopted Master Plan recommends funding for system-wide park facilities and amenities upgrades. 82 PROJECT TITLE:PROJECT #:PR0601 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost $110,070 Personnel: Full Time 28,476 Part Time 11,454 $0 $150,000 Subtotal:$0 Maintenance Costs $150,000 $0 Total Estimated Annual Cost $0 Total Funding $150,000 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $110,070 $110,070 $0 100% $28,476 $28,476 $0 100% $11,454 $6,770 $4,684 59% $150,000 $145,316 $4,684 97% Contingencies PARK AMENITIES UPGRADE Park Furnishings Total Salary Purchase of Services Landscaping CURRENT STATUS Park Furnishings Materials & Supplies Utilities Subtotal: TOTAL PROJECT Total Estimated Capital Cost FUNDING SOURCE: Transfer from: EDC Operating Fund Landscaping Contingencies 83 Department:Date Prepared:March 23, 2004 Submitted By:Date Completed: Project Title: Project Type:FIXTURES Sub-Type: Project No.:PR0720 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: IMPROVEMENTS MISC PARK STRUCTURE IMPROVEMENTS Anticipate project completion: Winter 2009 Americans with Disabilities Act compliance. The existing equipment in many park areas is becoming aged The adopted Master Plan recommends funding for system-wide park facilities and amenities upgrades. This project continues the upgrade of all city parks to modernize amenities from water fountains to play City of Euless Capital Project Request COMMUNITY SERVICES RAY MCDONALD Begin upgrade: March 2007 components to picnic stations and pavilions. This project provides funding for the replacement of aged structures to include pavilions, picnic tables, gazebos, signage, safety components, and other park amenities including the addition of a gazebo on Main Street. Pursuant to the recommendations in the Parks Master Plan, parks should be brought into accessibility and and outdated and will require refurbishment or replacement in the near term. 84 PROJECT TITLE:PROJECT #:PR0720 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost $166,792 Personnel:Full Time $33,338 Part Time $24,870 $0 $225,000 Subtotal:$0 Maintenance Costs 225,000 $0 Total Estimated Annual Cost $0 Total Funding $225,000 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $24,870 $24,870 $0 100% $166,792 $73,067 $93,725 44% Contingencies $33,338 $33,338 $0 100% $225,000 $131,275 $93,725 58% Contingencies Landscaping TOTAL PROJECT FUNDING SOURCE: Transfer from: EDC Operating Fund Park Furnishings CURRENT STATUS Landscaping Purchase of Services Materials & Supplies Utilities Subtotal: MISC PARK STRUCTURES Fixtures Total Estimated Capital Cost Total Salary 85 Department:Date Prepared:October 1, 2007 Submitted By:Date Completed: Project Title:PARK IRRIGATION Project Type:LANDSCAPING Sub-Type: Project No.:PR0804 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: of the landscape and green space. Projects will be identified and completed on an as needed basis. This project provides annual funding to continue the City's efforts to meet irrigation needs throughout the IMPROVEMENTS City's park system. City of Euless Capital Project Request COMMUNITY SERVICES RAY MCDONALD This will allow for expansion of the irrigation systems throughout parks to enhance the overall condition 86 PROJECT TITLE:PROJECT #:PR0804 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time $50,000 $0 $50,000 Subtotal:$0 Maintenance Costs $50,000 $0 Total Estimated Annual Cost $0 Total Funding $50,000 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $50,000 $770 $49,230 2% $50,000 $770 $49,230 2% Irrigation (Annual Transfer - Operating Funds $25,000) TOTAL PROJECT Total Estimated Capital Cost FUNDING SOURCE: Transfer from: CURRENT STATUS Irrigation Subtotal: Materials & Supplies Utilities PARK IRRIGATION EDC Operating Fund Total Salary Purchase of Services 87 Department:Date Prepared:April 29, 2008 Submitted By:Date Completed: Project Title: Project Type:TRAIL Sub-Type: Project No.:PR0901 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: Award construction contract: June 2009 Anticipate construction complete: September 2009 JUSTIFICATION: comprehensive trail enhancement project. This trail connection opportunity will be consistent with the identified need for further trail expansions as identified in the adopted Parks Master Plan. The master plan recommendation will be part of a city-wide City of Euless Capital Project Request COMMUNITY SERVICES RAY MCDONALD TRAIL ENHANCEMENTS-BOB EDEN PARK IMPROVEMENT update to the Trails Master Plan in 2001 and is part of an overall trail expansion project that was identified as a high priority in the adopted Parks Master Plan. This project includes approximately 1525 linear feet of 4" x 10' concrete trail to connect the existing trail June 9, 2009:Award contract to Ratliff Hardscape, Ltd. for the construction of concrete trail in the amount of $92,664.48. Creekwood Addition north of Mid Cities Boulevard. This particular connection was originally identified in the This project will connect the trail of Bob Eden Park with the trail that was recently constructed in the in Bob Eden Park to the recently constructed trail in the Creekwood Addition. Also included is a retaining wall under the Mid Cities bridge, hand rails, and rip rap for bank stabilization. This connection provides safer access to five parks: Trailwood Park, Bob Eden Park, McCormick Park, The Preserve at McCormick Park, and Villages of Bear Creek Park. The ultimate goal is to connect the City of Euless trail system to the trail system in the City of Colleyville at Heritage Road. 88 PROJECT TITLE:PROJECT #:PR0901 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost $110,000 Personnel:Full Time 5,000 Part Time 5,000 $0 15,000 $135,000 Subtotal:$0 Maintenance Costs 135,000 $0 Total Estimated Annual Cost $0 Total Funding $135,000 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $120,000 $0 $120,000 0% $15,000 $0 $15,000 0% $135,000 $0 $135,000 0%TOTAL PROJECT CURRENT STATUS Hike and Bike Trail Contingency Subtotal: FUNDING SOURCE: Transfer from: EDC CIP Fund Balance Total Estimated Capital Cost Purchase of Services Materials & Supplies Utilities TRAIL ENHANCEMENTS-BOB EDEN PARK 1525 LF 4" x 10' concrete trail Retaining wall section Rip rap and hand rails Total Salary Contingency 89 Department:Date Prepared:February 11, 2009 Submitted By:Date Completed: Project Title: Project Type:BUILDINGS Sub-Type: Project No.:PR0902 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: several programmable classroom spaces, a fitness component, staff offices, restrooms, kitchen with serving identified as a primary need of the citizens. A new senior center with state-of-the-art support facilities and programmable space for an ever growing senior population will allow the City to serve its elderly population by expanding services and programs for them. open space based on the needs as expressed by the citizens. In the plan development process for the recent update to the Parks Master Plan and as part of the City’s five year master plan, a scientific survey of park, recreation, and open space needs was conducted from a sample of randomly selected citizens of Euless. From this valuable information, a list of priorities was identified. A new senior center was The City of Euless has for many years recognized the importance of planning for parks, recreation, and February 26, 2008:  Approved as part of the 34th year Community Development Block Grant. February 24, 2009: Approved as the 35th year Community Development Block Grant center facility. Construction of a new senior citizen center facility will allow the City to serve the growing elderly population by expanding services and programs for senior citizens. CONSTRUCTION area, game room, lobby, and other areas for accommodating senior activities. approximately 5,000 square feet of multi-use space at Midway Recreation Center. The facility includes The City of Euless has identified, as part of the city's five year master plan, the need for a new senior citizen City of Euless Capital Project Request COMMUNITY SERVICES RAY MCDONALD SENIOR CITIZEN CENTER AT MIDWAY PARK The project encompasses the construction of a new 20,000 square foot senior citizen center to include 90 PROJECT TITLE:PROJECT #:PR0902 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost $500,000 Personnel:Full Time $3,630,685 Part Time $363,068 $0 $363,068 $4,856,821 Subtotal:$0 Maintenance Costs $1,750,000 $3,332,959 *34th year CDBG-FY2009 $186,224 *35th year CDBG-FY2010 $313,776 Less Inter-Project Transfer to: $0 Midway Park FLC - Phase I ($726,138) Total Estimated Annual Cost $0 Total Funding $4,856,821 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $500,000 $0 $500,000 0% $3,630,685 $0 $3,630,685 0% $363,068 $0 $363,068 0% $363,068 $0 $363,068 0% $4,856,821 $0 $4,856,821 0%TOTAL PROJECT Contingency Furnishings/Equipment CURRENT STATUS Engineering Construction Subtotal: Mineral/Gas Lease Bonus Total Estimated Capital Cost FUNDING SOURCE: Transfer from Car Rental Purchase of Services Materials & Supplies Utilities Total Salary Furnishings/Equipment SENIOR CITIZEN CENTER AT MIDWAY PARK *Engineering/Architectural/Testing Construction Contingency 10% 91 Department:Date Prepared:February 11, 2009 Submitted By:Date Completed: Project Title: Project Type:BUILDINGS Sub-Type:CONSTRUCTION/EXPANSION Project No.:PR0907 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: Renovating and expanding the current recreation center received favorable consideration among the residents that responded to the survey. inventories coupled with population projections through 2017 to determine needs over the next ten years. City of Euless Capital Project Request COMMUNITY SERVICES RAY MCDONALD MIDWAY PARK FAMILY LIFE CENTER PHASE I October 14, 2008:Authorized the city manager to negotiate and execute a contract with Kimley-Horn and Associates, Inc for a feasibility study. ability to serve the needs of the citizens becomes more of a challenge with limited space and resources. The City of Euless has for many years recognized the importance of planning for parks, recreation, and open space based on the needs as expressed by the citizens. The Midway Recreation Center is renovate the existing park and recreation facilities for both indoor and outdoor activities. Standards were customized for the City of Euless based on citizen demand, compared with the existing public facility The City of Euless has identified, as part of the city's five year master plan, the need to expand and This project addresses some of the immediate needs identified in the citizen survey by creating additional programmable spaces for youth and adult classes, expanding or constructing a new fitness established as the City's only recreational community center. The role of the facility has grown since it center and aerobics area, creating additional space for pre-school aged children, dedicating space for programming activities for teens, and general upgrades to the facility. Staff proposes connecting the recreation center to the senior center to allow for shared, programmable space as well as resources. opened and is now reaching maximum capacity for many of the programs and services currently offered. Attendance numbers at the Midway Recreation Center continue to rise and with a growing population, the 92 PROJECT TITLE:PROJECT #:PR0907 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Construction $1,700,000 Personnel:Full Time Contingency $100,000 Part Time $150,000 $0 $155,000 $2,105,000 Subtotal:$0 Maintenance Costs FB9909 - Fund Balance $136,338 FM0802 Senior Citizen Design (GF)$250,000 FM0803 Rec Cntr Improvement (GF) $217,524 $726,138 ADDITIONAL FUNDING NEEDED: $0 Car Rental FY 2010 775,000 Total Estimated Annual Cost $0 Total Funding $2,105,000 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $155,000 $66,644 $88,356 43% $925,000 $0 $925,000 0% $100,000 $0 $100,000 0% $150,000 $0 $150,000 0% $1,330,000 $66,644 $1,263,356 5% Total Salary Architectural Fees/Engineering MIDWAY PARK FAMILY LIFE CENTER PHASE I Furnishings/Equipment Purchase of Services Materials & Supplies Utilities Total Estimated Capital Cost FUNDING SOURCE: Transfers from General CIP Fund: Subtotal: PR0902 Senior Citizens Center (CR) CURRENT STATUS Architectural/Engineering Construction TOTAL PROJECT Contingency Furnishings/Equipment 93 94 Project DescriptionPriority Estimated Cost Operating FundCIP Fund BalanceBond SaleGrants/ ContribImpact FeesEscrow FundsCar Rental Tax Other EDCTo Be DeterminedDRAINAGE PROJECTSHurricane Creek & Bridge at Marlene Drive ROW(10)A300,000$ 200,000$ 100,000$ Boyd Branch Improvements(10)A10,000,000$ XXXXXXSub-Total Drainage Priority A-Proposed FY'1010,300,000$ Hurricane Creek & Bridge at Marlene Drive Construction(12)B3,420,000$ XXHollow Oak Channel Erosion(14)BTBDXXSub-Total Drainage Priority B-Unfunded3,420,000$ Marlene Drive Culvert ReplacementCTBDXXFlooding MitigationCTBDXXKynette Drive Culvert Modifications CTBDXXBell Hi Addition CTBDXXBlessing Branch-Main Street to SH 360CTBDXXLittle Bear Creek-Land AcquisitionCTBDXXLittle Bear Creek-ImprovementsCTBDXXSimmons Culvert ImprovementsCTBDXXSub-Total Drainage Priority C-Unfunded-$ DRAINAGE PROJECTS - TOTAL13,720,000$ STREET PROJECTSBaze Road Design/ROWA290,000$ $125,062 $164,938Wilshire Drive/Marlene Drive OverlayA288,000$ XXAsh Lane Design/ROWA330,000$ 330,000$ Sub-Total Street Priority A-Proposed FY10908,000$ Baze Road-Glade Road to Mid Cities Blvd. Construction(11)B1,590,000$ XXAsh Lane-Aransas Drive to N Main Street(11)B1,920,000$ $307,000$885,000$728,000Vine Street-SH183 to SH10(12)B580,000$ $66,000 $514,000Traffic Signal-Harwood Road at Bear Creek Parkway(12)B170,000$ XXCullum Drive/Alexander Lane(14)B1,350,000$ $61,000 $1,289,000Sub-Total Street Priority B-Unfunded5,610,000$ Bear Creek Parkway CTBDXXRoss AvenueCTBDXXCresthaven DriveCTBDXXHighland DriveCTBDXXSouth Pipeline RoadCTBDXXFuller-Wiser Road-SH183 To Harwood RoadCTBDXXFuller-Wiser Road-Harwood Road to Mid Cities Boulevard CTBDXXSub-Total Street Priority C-Unfunded-$ STREET PROJECTS - TOTAL6,518,000$ PROPOSED METHOD OF FINANCINGCAPITAL IMPROVEMENT PROGRAMSFY10 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE95 Project DescriptionPriority Estimated Cost Operating FundCIP Fund BalanceBond SaleGrants/ ContribImpact FeesEscrow FundsCar Rental Tax Other EDCTo Be DeterminedPROPOSED METHOD OF FINANCINGCAPITAL IMPROVEMENT PROGRAMSFY10 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPEWASTEWATER PROJECTSLine Replacement, W Alexander Ln/Norman Dr/Franklin Dr A510,000$ XXSub-Total Wastewater Priority A-Proposed FY10510,000$ Line Replacement, Arnett Drive(11)B351,000$ XXLine Replacement, Pauline Street 36th(11)B405,000$ XXLine Replacement, Alexander/Ascot Outfall(11)B242,000$ XXLine Replacement, Whitener/Ascot Outfall(11)B176,000$ XXLine Replacement, Collin Drive(12)B405,000$ XXLine Replacement, Blanco/Aransas/Crane(12)B327,000$ XXLine Replacement, Slaughter Lane/E Huitt Lane(13)B475,000$ XXLine Replacement, Ross Avenue (13)B150,000$ XXLine Replacement, Oakwood Terrace Phase I(14)B345,000$ XXLine Replacement, Oakwood Terrace Phase II(14)B635,000$ XXSub-Total Wastewater Priority B-Unfunded3,511,000$ SH 183 Utility Relocation CTBDXXLine Replacement, N Midway ParkCTBDXXLine Replacement, S Main StreetCTBDXXLine Replacement, Aransas DriveCTBDXXLine Replacement, Glenn Drive/Crane DriveCTBDXXLine Replacement, Boyd BranchCTBDXXLine Replacement, Cedar Hills Estates/Hollywood Blvd.CTBDXXLine Replacement, Cedar Hills Estates/Sunset DriveCTBDXXLine Replacement, Eastcliff/Windlea/SignetCTBDXXLine Replacement, Huntington/Koen/AtkersonCTBDXXLine Replacement, Ector Drive/Fayette DriveCTBDXXLine Replacement, Donley/Shelmar DriveCTBDXXLine Replacement, Denton DriveCTBDXXLine Replacement, Collin Drive/Harris Drive/Irion DriveCTBDXXLine Replacement, Ector Drive/Donley Drive/Crane Drive CTBDXXLine Replacement, Evans/Canyon Ridge/N KynetteCTBDXXLine Replacement, Janann/Brownstone/Shelmar DriveCTBDXXLine Replacement, Kynette/Wilshire/SierraCTBDXXLine Replacement, Lakewood/Dogwood CircleCTBDXXLine Replacement, Mary/Marlene/CommerceCTBDXXLine Replacement, NW Midway/Rusk/ParkerCTBDXXLine Replacement, Northcliff/Toplea/WinleaCTBDXXLine Replacement, Sagebrush-Toplea/WilshireCTBDXXLine Replacement, W Midway/Victoria/DeltaCTBDXXLine Replacement, W Donley/Private Drive/MimosaCTBDXXSub-Total Wastewater Priority C-Unfunded-$ WASTEWATER PROJECTS - TOTAL4,021,000$ 96 Project DescriptionPriority Estimated Cost Operating FundCIP Fund BalanceBond SaleGrants/ ContribImpact FeesEscrow FundsCar Rental Tax Other EDCTo Be DeterminedPROPOSED METHOD OF FINANCINGCAPITAL IMPROVEMENT PROGRAMSFY10 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPEWATER PROJECTSAN/ASub-Total Water Priority A-Proposed FY10-$ Line Replacement, Live Oak Ct/Live Oak Dr /Marlene Drive(11)B320,000$ XXLine Replacement, S Pipeline Road West (12) B260,000$ XXWater & Wastewater Impact Fee Update (12)B30,000$ XXLine Replacement, S Pipeline Road East (13)B240,000$ XXWater System Security Camera Installation (14)B75,000$ XXSub-Total Water Priority B-Unfunded925,000$ Line Replacement, Westwood DriveCTBDXXLine Replacement, Collin/Dallas Drive/Harwood RoadCTBDXXLine Replacement, Collin/Denton Drive/Dallas DriveCTBDXXLine Replacement, Fuller DriveCTBDXXLine Replacement, Springwood CourtCTBDXXHwy 183 Water CrossingCTBDXXHwy 360 Water Crossing CTBDXXLine Replacement, Kynette Drive CTBDXXLine Replacement, Midcreek/Rock Creek/Stony CreekCTBDXXLine Replacement, Blessing Creek and Little CreekCTBDXXLine Replacement, Eastcliff Drive CTBDXXLine Replacement, Ector DriveCTBDXXLine Replacement, Hollow Oak DriveCTBDXXLine Replacement, Midway Drive East CTBDXXLine Replacement, Midway Drive WestCTBDXXLine Replacement, Dickey Drive SouthCTBDXXLine Replacement, Dickey Drive NorthCTBDXXLine Replacement, Paula Lane CTBDXXLine Replacement, Denton DriveCTBDXXLine Replacement, S Main Street (North)CTBDXXLine Replacement, S Main Street (South)CTBDXXLine Replacement, Sunset DriveCTBDXXLine Replacement, Wildwood StreetCTBDXXLine Replacement, Woodvine (East)CTBDXXLine Replacement, Woodvine (West)CTBDXXLine Replacement, Shady Creek and CliffwoodCTBDXXLine Replacement, Dunaway DriveCTBDXXLine Replacement, E Huitt LaneCTBDXXLine Replacement, Needles StreetCTBDXXWater System Security Land AcquisitionCTBDXXSub-Total Water Priority C-Unfunded-$ WATER PROJECTS - TOTAL925,000$ 97 Project DescriptionPriority Estimated Cost Operating FundCIP Fund BalanceBond SaleGrants/ ContribImpact FeesEscrow FundsCar Rental Tax Other EDCTo Be DeterminedPROPOSED METHOD OF FINANCINGCAPITAL IMPROVEMENT PROGRAMSFY10 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPEOTHER PROJECTSTexas Star Sports Complex Lighting ImprovementsA600,000$ XXGlade Parks Trail ConnectionA2,000,000$ XXSub-Total Other Priority A-Proposed FY102,600,000$ Park Amenities Upgrade (11)B150,000$ XXTrail Lighting-Phase I (11)B50,000$ XXMidway Park FLC Phase-II Design Outdoor Aquatics(11)B468,453$ XXMidway Park FLC Phase-III Design Indoor Aquatics(11)B317,500$ XXMidway Park FLC Phase-II Outdoor Aquatics Construction(12)B5,199,836$ XX $500,000Midway Park FLC Phase-III Indoor Aquatics Construction(13)B3,492,500$ $750,000XXFire Training Facility and Tower (13) B1,793,000$ XXAnimal Shelter (13)B692,900$ XXDevelopment/Engineering Building (13)B1,159,100$ XXBlessing Branch Park Improvements (13)B275,040$ XXTexas Star Sports Complex Parking Lot Improvements (14)B99,550$ XXSouth Euless Water Feature (14)BTBDXXWilshire Park Water Feature (14)BTBD XXSub-Total Other Priority B-Unfunded13,697,879$ Texas Star Sports Complex ImprovementsCTBDXXTrail Connection - S EulessCTBDXXTexas Star Sports Complex-Softball World TurfCTBDXXTrail Lighting-Phase IICTBDXXTexas Star Sports Complex-PATS, Phase IVCTBDXXTrail Enhancements-Villages Bear CreekCTBDXXTrail Enhancements-Phase ICTBDXXTrail Enhancements-Phase IICTBDXXTrailwood Park ImprovementsCTBDXXCommunity Center for South EulessCTBDXXEmergency Call BoxesCTBDXXKiddie Carr Park ImprovementsCTBDXXSub-Total Other Priority C-Unfunded-$ OTHER PROJECTS - TOTAL16,297,879$ 98 Project DescriptionPriority Estimated Cost Operating FundCIP Fund BalanceBond SaleGrants/ ContribImpact FeesEscrow FundsCar Rental TaxOther EDCTo Be DeterminedDRAINAGE PROJECTSHurricane Creek & Bridge at Marlene Drive ROW(10)A300,000$ 200,000$ 100,000$ Boyd Branch Improvements(10)A 10,000,000$ XX XX XXSub-Total Drainage Priority A-Proposed FY'1010,300,000$ Hurricane Creek & Bridge at Marlene Drive ConstructionB 3,420,000$ XXHollow Oak Channel Erosion(14)B TBDXXSub-Total Drainage Priority B-Unfunded3,420,000$ Marlene Drive Culvert ReplacementC TBDXXFlooding MitigationC TBDXXKynette Drive Culvert Modifications C TBDXXBell Hi Addition C TBDXXBlessing Branch-Main Street to SH 360C TBDXXLittle Bear Creek-Land AcquisitionC TBDXXLittle Bear Creek-ImprovementsC TBDXXSimmons Culvert ImprovementsC TBDXXSub-Total Drainage Priority C-Unfunded-$ DRAINAGE PROJECTS - TOTAL13,720,000$ CAPITAL IMPROVEMENT PROGRAMSFY10 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPEPROPOSED METHOD OF FINANCING99 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: DRAINAGE May 28,2003 RON YOUNG HURRICANE CREEK & BRIDGE AT MARLENE DRIVE ROW ACQUISTION DRAINAGE ROW ACQUISITION A In 1996, the City received the storm drainage master plan for Hurricane Creek. This project consists of the property, right-of-way or other acquisition for drainage improvements on Hurricane Creek, north and south of the bridge at Marlene. Anticipate Begin: FY2010 Anticipate Complete: Summer 2011 The culvert and concrete channel may require rebuilding to prevent structural flooding of a number of homes in a 100 year flood event. Easements may be at the back door of east-side properties and properties on cul-de- sac. The City may also need ROW from west side properties. Two homes on Canyon Ridge will remain in the flood plain. Acquisitions may be an alternative consideration. 100 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: HURRICANE CREEK & BRIDGE AT MARLENE DRIVE ROW ACQUISTION Right of Way/Acquisition $300,000 $0 $0 $0 $0 $0 $0 $0 $300,000 XX 0% XX 0% 0% 0% 0% 101 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 17,2009 RON YOUNG BOYD BRANCH IMPROVEMENTS DRAINAGE IMPROVEMENTS Drainage improvements are included in the Boyd Branch Watershed Study. This project includes the portion of Boyd Branch from S Pipeline Road to SH183 and may include structural and non-structural activities to reduce or minimize the effects of large stormwater events. A large portion of this project occurs on a section of Boyd Branch that lies in a platted private drainage easement which also shows the maintenance responsibility to rest on the property owner(s). Since the City of Euless has no easement rights along these sections of Boyd Branch, the city is of the opinion that improving the capacity of Boyd Branch to handle large stormwater events is the responsibility of the property owner(s). The City of Euless may have some utility relocation expenses related to any improvements made to Boyd Branch. FY2010 Large stormwater events result in runoff exceeding the capacity of Boyd Branch. This project is intended to reduce or minimize property losses associated with stormwater runoff exceeding the capacity of Boyd Branch. 102 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Escrow Funds Other Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: BOYD BRANCH IMPROVEMENTS Property Owner(s) Contribution to Construction $6,000,000 City of Euless Construction (Max.)$4,000,000 (See Comments) $10,000,000 XX XX XX It is estimated that the City of Euless related construction items will be limited to $4,000,000 or less depending on the scope of work defined. 103 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 28,2003 RON YOUNG HURRICANE CREEK & BRIDGE AT MARLENE DRIVE CONSTRUCTION DRAINAGE IMPROVEMENTS B In 1996, the City received the storm drainage master plan for Hurricane Creek. This project consists of the construction of a bridge at Marlene Drive and for the improved concrete channel lining that will extend approximately to the confluence of Cyclone Branch and channel improvements south of SH10. Anticipate Begin: FY2012 Anticipate Complete: 4th Quarter 2013 The culvert and concrete channel will be rebuilt to prevent structural flooding of a number of homes in a 100- year flood event. These improvements will also help prevent erosion. 104 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: HURRICANE CREEK & BRIDGE AT MARLENE DRIVE CONSTRUCTION Construction $3,400,000 Project Oversight $20,000 $0 $0 $0 $0 $0 $0 $0 $3,420,000 0% 0% 0% 0% 0% XX 105 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 03,2008 RON YOUNG HOLLOW OAK CHANNEL EROSION DRAINAGE IMPROVEMENTS B In May 2008 the City authorized a drainage study for the creek area that runs at the rear of the lots fronting on Hollow Oak Drive and Linkwood Drive. The completed drainage study was received in July 2008. The creek area along the rear of the lots on Hollow Oak Drive and Linkwood Drive exists in a natural state. The creek bank along the south has experienced some slope failures. The drainage study recommended installation of "bag wall" slope protection. The City has received complaints that fences and other improvements on private property will be threatened if additional slope failures take place. Currently no residences are threatened. 106 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: HOLLOW OAK CHANNEL EROSION Engineering-To Be Determined Construction-To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX The most recent cost for this project is approximately $347,113. If this project moves forward, an updated opinion of probable cost will need to be prepared. Due to the expected impact to the native conditions, this project would require broad support from all impacted neighbors. Alternatives, such as possible assistance with removal or relocation of improvements on affected properties, should also be considered. 107 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 10,2008 RON YOUNG MARLENE DRIVE CULVERT REPLACEMENT DRAINAGE IMPROVEMENTS C Marlene Drive is noted as a collector street on the City's Master Thoroughfare Plan. The scope of the project includes construction of a new culvert at Cyclone Branch to meet current load and drainage capacity standards. A portion of the concrete channel will also need to be reconstructed both upstream and downstream to ensure a smooth transition. The existing culvert is load limited. The new culvert will be designed to convey sufficient drainage to comply with current standards. 108 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: MARLENE DRIVE CULVERT REPLACEMENT Engineering-To Be Determined Construction-To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 109 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 03,2008 RON YOUNG FLOODING MITIGATION DRAINAGE C This project consists of identifying chronic flooding locations within the City of Euless and determining the cost/benefit of property acquisition compared to extensive drainage relief projects. Property acquisition will be recommended after consideration of flooding history, appraisals and feasible alternative drainage solutions have been evaluated. It is recommended that this be established as an ongoing project. Buildings throughout the City of Euless situated adjacent to creeks have experienced drainage problems for several years. The cost for implementing drainage improvement projects to mitigate flooding at isolated locations may be much greater than property acquisition. Chronic flooding lowers the property values and this program will offer a means of relief for affected property owners. 110 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: FLOODING MITIGATION Flooding Mitigation-To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 111 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 21,1999 RON YOUNG KYNETTE DRIVE CULVERT MODIFICATIONS DRAINAGE IMPROVEMENTS C Wilshire Village Addition was constructed prior to the adoption of the City's Uniform Development Code ("UDC"). The requirements prior to the UDC were lower than what the City now requires. The current construction configuration of Wilshire Village causes more water to remain above ground than is acceptable under current standards. The drainage system in the Wilshire Village Addition needs to be upgraded to meet current requirements. The project involves the installation of a small drainage system on Kynette Drive up to Sierra Drive. It is Project No. 16 in the 1990 Knowlton, English, Flowers study. Surface water flow within Kynette Drive exceeds the City's current development standards. A large amount of storm water drains to an existing culvert on Kynette Drive between East Cliff and West Cliff Drives. The existing drainage facilities collecting this storm water are inadequate according to current standards. 112 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: KYNETTE DRIVE CULVERT MODIFICATIONS Engineering-To Be Determined Construction-To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 113 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 26,1999 RON YOUNG BELL HI ADDITION DRAINAGE IMPROVEMENTS C In 2005 the City commissioned and received a drainage plan from Freese and Nichols, Inc. In this plan, the Bell Hi Addition was identified as an area in need of flood relief. The proposed project ties into an existing storm drainage system on Needles Street. A substantial portion of the cost of this project is related to street repair, indicating the need to combine this project with a street reconstruction project. The construction of this project will prevent the flooding of Paula Lane, David Drive, and Needles Street during most intense rainfall events. The terrain in this location is very flat, which causes the streets to have a very low capacity to remove storm water. 114 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: BELL HI ADDITION Engineering-To Be Determined $0 Construction-To Be Determined $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 115 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 26,1999 RON YOUNG BLESSING BRANCH-MAIN STREET TO SH360 DRAINAGE IMPROVEMENTS C The Blessing Branch Drainage Master Plan included a conceptual plan to convey storm water through the creek more efficiently. This project involves the channeling and lining of Blessing Branch in accordance with the Blessing Branch Master Plan. The City expects to receive significant developer contributions toward this project. However, the City may be required to fund a portion of this project. 116 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: BLESSING BRANCH-MAIN STREET TO SH360 Engineering-To Be Determined Construction-To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 117 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 21,1999 RON YOUNG LITTLE BEAR CREEK LAND ACQUISITION DRAINAGE ACQUISITION C In 2007, the City received an erosion study for Little Bear Creek from Halff Associates. Acquire property located adjacent to Little Bear Creek at 2101 N. Main. Erosion of property is a possibility in the future. Acquisition is anticipated to be a voluntary buy-out. 118 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LITTLE BEAR CREEK LAND ACQUISITION Engineering-To Be Determined Construction-To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 119 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 21,1999 RON YOUNG LITTLE BEAR CREEK DRAINAGE IMPROVEMENTS DRAINAGE IMPROVEMENTS C The improvements proposed for Bob Eden Park are identified in the Little Bear Creek Watershed Master Plan. The Little Bear Creek Park portion of this project was identified in the 1990 Knowlton, English and Flowers Drainage Utility System Study of Selected Improvement Projects. Both parts of this drainage project involve erosion control and channelization improvements to Little Bear Creek. The Bear Creek Park part is a portion of Project No. 11 in the above-referenced study. This project will be re- evaluated to determine if the scope and proposed improvements should be modified. This part of the project will be redefined and re-estimated. Continued erosion will eventually undermine the creek in both parks and cause damage to existing City facilities. 120 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LITTLE BEAR CREEK DRAINAGE IMPROVEMENTS Engineering-To Be Determined Construction-To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 121 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: SIMMONS CULVERT IMPROVEMENTS April 15,2005 RON YOUNG SIMMONS CULVERT IMPROVEMENTS DRAINAGE IMROVEMENTS C In 2005 the City commissioned and received a drainage plan from Freese and Nichols, Inc. An additional culvert will extend from the apartment complex on the east side of Simmons Drive and will outfall into the creek area on the north side of Carr Park. In intense storms the capacity of the existing culvert is exceeded. Additional culverts will be required to convey the design storm flows. The construction of this project will enable the safe use of Simmons Drive in intense storm events. 122 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: SIMMONS CULVERT IMPROVEMENTS Cost -To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 123 124 Project DescriptionPriority Estimated Cost Operating FundCIP Fund BalanceBond SaleGrants/ ContribImpact FeesEscrow FundsCar Rental TaxOther EDCTo Be DeterminedSTREET PROJECTSBaze Road Design/ROWA290,000$ $125,062 $164,938Wilshire Drive/Marlene Drive OverlayA288,000$ XXAsh Lane Design/ROWA330,000$ 330,000$ Sub-Total Street Priority A-Proposed FY10908,000$ Baze Road-Glade Road to Mid Cities Blvd. Construction(11)B1,590,000$ XXAsh Lane-Aransas Drive to N Main Street(11)B1,920,000$ $307,000$885,000$728,000Vine Street-SH183 to SH10(12)B580,000$ $66,000 $514,000Traffic Signal-Harwood Road at Bear Creek Parkway(12)B170,000$ XXCullum Drive/Alexander Lane(14)B1,350,000$ $61,000 $1,289,000Sub-Total Street Priority B-Unfunded5,610,000$ Bear Creek Parkway CTBDXXRoss AvenueCTBDXXCresthaven DriveCTBDXXHighland DriveCTBDXXSouth Pipeline RoadCTBDXXFuller-Wiser Road-SH183 To Harwood RoadCTBDXXFuller-Wiser Road-Harwood Road to Mid Cities Boulevard CTBDXXSub-Total Street Priority C-Unfunded-$ STREET PROJECTS - TOTAL6,518,000$ CAPITAL IMPROVEMENT PROGRAMSFY10 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPEPROPOSED METHOD OF FINANCING125 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 22,1999 RON YOUNG BAZE ROAD-GLADE ROAD TO MID CITIES BLVD DESIGN & ROW ACQUISITION STREET DESIGN A The reconstruction and expansion of Baze Road was identified in the 1999 Master Thoroughfare Plan. This project consists of the detailed engineering design and right-of-way acquisition for the construction of a 31' (back to back) concrete roadway to replace an existing deteriorating two-lane asphalt roadway. The project will include underground drainage, sidewalks, and street lighting. Anticipate Award Design: December 2009 Anticipate Plans Complete: August-September 2010 Anticipate right-of-way complete: November-December 2010 Baze Road is an important north-south residential collector that is planned to connect Glade Road and Mid Cities Boulevard. This roadway exists as a four-lane divided roadway north of Glade Road in Grapevine. In Euless, it is constructed partially as a 40 foot undivided roadway and as a 36 foot (two lane) undivided roadway from Mid-Cities Boulevard to Priest Lane. The portion of Baze Road from Priest Lane to Glade Road is the only portion that is not constructed to City standards. 126 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Other Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: BAZE ROAD-GLADE ROAD TO MID CITIES BLVD DESIGN & ROW ACQUISITION Engineering $200,000 Right of Way $90,000 $290,000 XX XX 127 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 11,2008 RON YOUNG WILSHIRE DRIVE/MARLENE DRIVE-OVERLAY STREET OVERLAY A Wilshire Drive and Marlene Drive are collector streets that the City of Euless plans to overlay in a cooperative project with Tarrant County. The project consists of edge milling, asphalt overlay, and restriping of: 1. Wilshire Drive from SH10 to SH183 and 2. Marlene Drive from Canyon Ridge Drive to SH10. Anticipate Begin Construction: April 2010 Anticipate Construction Complete: June 2010 The existing asphalt pavement is deteriorating and is becoming a maintenance problem. The asphalt overlay will provide an improved riding surface, will extend the life of the roadway, and will enhance the appearance of the street. 128 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: WILSHIRE DRIVE/MARLENE DRIVE-OVERLAY Material $288,000 $0 $0 $0 $0 $0 $0 $0 $288,000 0% 0% 0% 0% 0% XX 129 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 01,2002 RON YOUNG ASH LANE-ARANSAS DRIVE TO N MAIN STREET DESIGN & ROW ACQUISTION STREET DESIGN A Ash Lane is identified in the Master Thoroughfare Plan as a four-lane minor arterial roadway from Industrial Boulevard to Fuller-Wiser Road. This project consists of the design and right-of-way acquisition necessary to facilitate removal of the existing two lanes of asphalt pavement from Aransas Drive to N. Main Street which is to be replaced by a four lane concrete roadway. The associated sidewalks and storm drainage are included in the project scope. Anticipate Award Design: December 2009 Anticipate Plans Complete: August-September 2010 Anticipate Right-of-Way Complete: November-December 2010. The portion of Ash Lane from Aransas Drive to N. Main Street is the only portion that is not constructed to the Master Thoroughfare Plan standards. Completion of this section of Ash Lane will provide an orderly flow of traffic from Industrial Boulevard to Fuller-Wiser Road. 130 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: ASH LANE-ARANSAS DRIVE TO N MAIN STREET DESIGN & ROW ACQUISTION Engineering $230,000 Right of Way $100,000 $0 $0 $0 $0 $0 $0 $0 $330,000 0% XX 0% 0% 0% 0% 131 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 22,1999 RON YOUNG BAZE ROAD, GLADE ROAD TO MID CITIES BOULEVARD CONSTRUCTION STREET CONSTRUCTION B The reconstruction and expansion of Baze Road was identified in the 1999 Master Thoroughfare Plan. This project consists of the construction of a 31' (back-to-back) concrete roadway including underground drainage, sidewalks, and street lighting. This project will replace the existing deteriorating two-lane asphalt roadway. Anticipate Begin Construction: February-March 2011 Anticipate Construction Complete: December 2011 Baze Road is an important north-south residential collector that is planned to connect Glade Road and Mid Cities Boulevard. This roadway exists as a four-lane divided roadway north of Glade Road in Grapevine. In Euless, it is constructed partially as a 40 foot undivided roadway and as a 36 foot (two lane) undivided roadway from Mid-Cities Boulevard to Priest Lane. The portion of Baze Road from Priest Lane to Glade Road is the only portion that is not constructed to City standards. 132 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: BAZE ROAD, GLADE ROAD TO MID CITIES BOULEVARD CONSTRUCTION Construction $1,590,000 $0 $0 $0 $0 $0 $0 $0 $1,590,000 0% 0% 0% 0% 0% XX 133 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 01,2002 RON YOUNG ASH LANE-ARANSAS DRIVE TO N MAIN STREET CONSTRUCTION STREET CONSTRUCTION B Ash Lane is identified in the Master Thoroughfare Plan as a four-lane minor arterial roadway from Industrial Boulevard to Fuller-Wiser Road. This project consists of the removal of the existing two lanes of asphalt pavement from Aransas Drive to N Main Street to be replaced by a four lane concrete roadway. The associated sidewalks and storm drainage are included in the project scope. Anticipate Begin Construction: February-March 2011 Anticipate Construction Complete: February 2012 The portion of Ash Lane from Aransas Drive to N Main Street is the only portion that is not constructed to the Master Thoroughfare Plan standards. Completion of this section of Ash Lane will provide an orderly flow of traffic from Industrial Boulevard to Fuller-Wiser Road. 134 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: ASH LANE-ARANSAS DRIVE TO N MAIN STREET CONSTRUCTION Construction $1,920,000 $0 $0 $0 $0 $0 $0 $0 $1,920,000 0% 307,000 0% 0% 0% 885,000 0% 728,000 135 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 23,1999 RON YOUNG VINE STREET-SH 183 TO SH10 STREET B Vine Street is not identified in the 1999 Master Thoroughfare Plan. The projects consists of the reconstruction of Vine Street from SH 183 to SH 10. Anticipate Begin Construction: Summer 2012 Anticipate Complete Construction: Winter 2013 The City has received street escrow funds from several developments along Vine Street. When development is complete, it would be appropriate for the City to reconstruct the existing roadway. 136 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Other Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: VINE STREET-SH 183 TO SH10 Construction $580,000 $0 $0 $0 $0 $0 $0 $0 $580,000 0% 0% 0% 0% 0% XX XX Escrow Funds will also be used to finance a portion of this project. 137 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 12,2004 RON YOUNG TRAFFIC SIGNAL-HARWOOD ROAD @ BEAR CREEK PARKWAY STREET SIGNALIZATION B Traffic signals are located at the intersections of arterial and collector thoroughfares identified in the City of Euless Master Thoroughfare Plan adopted in 1999. The project consists of the installation of traffic signal poles, mast arms, signal heads, pedestrian indicators, underground conduit, vehicle detection, and signal controller for the intersection of Harwood Road and Bear Creek Parkway. Traffic signal warrant studies will be performed to determine the appropriate timing for construction. Traffic volumes at this intersection will be monitored and signal warrant studies will be performed to determine the justification for signal installation. This intersection will ultimately require a traffic signal. 138 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: TRAFFIC SIGNAL-HARWOOD ROAD @ BEAR CREEK PARKWAY Engineering $20,000 Traffic Signals $150,000 $0 $0 $0 $0 $0 $0 $0 $170,000 0% 0% 0% 0% 0% XX 139 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 15,2005 RON YOUNG CULLUM DRIVE AND ALEXANDER LANE RECONSTRUCTION STREET CONSTRUCTION B These two minor streets serve as collector type streets by conveying traffic to major arterials. Cullum Drive will be reconstructed from SH 10 to Huitt Lane and Alexander Lane will be reconstructed from Main Street to Cullum Drive. Both streets will be reconstructed from two lane county type roads to standard 31' wide residential streets with underground drainage. Anticipate Award Design: 2nd Quarter 2013 Anticipate Right-of-Way Complete: 3rd Quarter 2013 Anticipate Plans Complete: 1st Quarter 2014 Anticipate Begin Construction: 3rd Quarter 2014 Anticipate Construction: 3rd Quarter 2015 Reconstruction of the streets will decrease the annual maintenance and provide a standard residential street in compliance with City standards. 140 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: CULLUM DRIVE AND ALEXANDER LANE RECONSTRUCTION Engineering $150,000 Right of Way $20,000 $0 Construction $1,180,000 $0 $0 $0 $0 $0 $0 $1,350,000 0% 0% 0% 0% 0% XX Escrow Funds will also be used to finance a portion of this project. 141 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 03,2008 RON YOUNG BEAR CREEK PARKWAY STREET CONSTRUCTION C Bear Creek Parkway is identified as a local collector thoroughfare in the City of Euless Master Thoroughfare Plan. This project consist of the complete reconstruction of Bear Creek Parkway from Harwood Road to Ash Lane to current City Standards. Bear Creek Parkway is an aging roadway nearing the end of its service life. Portions of the roadway are beginning to deteriorate and require maintenance work. As the pavement deteriorates and fails, maintenance costs increase. 142 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: BEAR CREEK PARKWAY Engineering/Design- To Be Determined Construction- To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 143 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 31,2005 RON YOUNG ROSS AVENUE EXTENSION STREET CONSTRUCTION C This extension of Ross Avenue from the recently completed section adjacent to the fire station will complete the upgrading of this street. The construction of the remainder of Ross Avenue from the fire station to the west limit will be in accordance with City standards which includes concrete pavement. This construction, in accordance with City Standards, will allow the road a long service life and lower the annual maintenance. 144 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: ROSS AVENUE EXTENSION Engineering- To Be Determined Right of Way- To Be Determined $0 Construction- To Be Determined $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 145 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 13,2007 RON YOUNG CRESTHAVEN DRIVE RECONSTRUCTION STREET CONSTRUCTION C Cresthaven Drive is not identified in the 1999 Master Thoroughfare Plan. This project includes the reconstruction of Cresthaven Drive from a two-lane asphalt roadway to 31' wide, curb and guttered concrete street from SH 10 to S Pipeline Road. To upgrade Cresthaven Drive to a standard City concrete curb and gutter section. 146 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: CRESTHAVEN DRIVE RECONSTRUCTION Engineering-To Be Determined Construction- To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 147 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 13,2007 RON YOUNG HIGHLAND DRIVE RECONSTRUCTION STREET CONSTRUCTION C Highland Drive is not identified in the 1999 Master Thoroughfare Plan. The project includes the reconstruction of Highland Drive from SH 10 to S Pipeline Road from a two lane asphalt roadway to a 31' wide curb and guttered concrete street. To upgrade Highland Drive to a standard City concrete curb and gutter section. 148 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: HIGHLAND DRIVE RECONSTRUCTION Engineering- To Be Determined Construction- To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 149 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 13,2007 RON YOUNG S PIPELINE ROAD STREET CONSTRUCTION C South Pipeline Road is not identified in the 1999 Master Thoroughfare Plan. The project consists of reconstruction of South Pipeline Road from a two-lane asphalt roadway to a 31' wide, curb and guttered concrete street from east of Royal Parkway to East of Highland Drive. To upgrade South Pipeline Road to a standard City concrete curb and gutter section. 150 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: S PIPELINE ROAD Engineering- To Be Determined Construction- To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 151 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS February 16,2009 ROBERT BARKER FULLER-WISER ROAD-SH 183 TO HARWOOD ROAD STREET CONSTRUCTION C Fuller-Wiser Road is identified as a minor arterial in the City of Euless Master Thoroughfare Plan. The project consists of the complete reconstruction of Fuller-Wiser Road to current standards from SH 183 to Harwood Road. Fuller-Wiser Road is an aging roadway nearing the end of its service life. Portions of the roadway are beginning to deteriorate and require maintenance work. As the pavement deteriorates and fails, maintenance costs increase. 152 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: FULLER-WISER ROAD-SH 183 TO HARWOOD ROAD Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 153 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS February 16,2009 ROBERT BARKER FULLER-WISER ROAD-HARWOOD ROAD TO MID CITIES BLVD STREET CONSTRUCTION C Fuller-Wiser Road is identified as a minor arterial in the City of Euless Master Thoroughfare Plan. This project consist of the complete reconstruction of Fuller-Wiser Road to current City standards from Harwood Road to Mid-Cities Boulevard. Fuller-Wiser Road is an aging roadway nearing the end of its service life. Portions of the roadway are beginning to deteriorate and require maintenance work. As the pavement deteriorates and fails, maintenance costs increase. 154 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: FULLER-WISER ROAD-HARWOOD ROAD TO MID CITIES BLVD Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 155 156 Project DescriptionPriority Estimated Cost Operating FundCIP Fund BalanceBond SaleGrants/ ContribImpact FeesEscrow FundsCar Rental TaxOther EDCTo Be DeterminedWASTEWATER PROJECTSLine Replacement, W Alexander Ln/Norman Dr/Franklin DrA510,000$ XXSub-Total Wastewater Priority A-Proposed FY10510,000$ Line Replacement, Arnett Drive(11)B351,000$ XXLine Replacement, Pauline Street 36th(11)B405,000$ XXLine Replacement, Alexander/Ascot Outfall(11)B242,000$ XXLine Replacement, Whitener/Ascot Outfall(11)B176,000$ XXLine Replacement, Collin Drive(12)B405,000$ XXLine Replacement, Blanco/Aransas/Crane(12)B327,000$ XXLine Replacement, Slaughter Lane/E Huitt Lane(13)B475,000$ XXLine Replacement, Ross Avenue (13)B150,000$ XXLine Replacement, Oakwood Terrace Phase I(14)B345,000$ XXLine Replacement, Oakwood Terrace Phase II(14)B635,000$ XXSub-Total Wastewater Priority B-Unfunded3,511,000$ SH 183 Utility Relocation C TBDXXLine Replacement, N Midway ParkC TBDXXLine Replacement, S Main StreetC TBDXXLine Replacement, Aransas DriveC TBDXXLine Replacement, Glenn Drive/Crane DriveC TBDXXLine Replacement, Boyd BranchC TBDXXLine Replacement, Cedar Hills Estates/Hollywood Blvd.C TBDXXLine Replacement, Cedar Hills Estates/Sunset DriveC TBDXXLine Replacement, Eastcliff/Windlea/SignetC TBDXXLine Replacement, Huntington/Koen/AtkersonC TBDXXLine Replacement, Ector Drive/Fayette DriveC TBDXXLine Replacement, Donley/Shelmar DriveC TBDXXLine Replacement, Denton DriveC TBDXXLine Replacement, Collin Drive/Harris Drive/Irion DriveC TBDXXLine Replacement, Ector Drive/Donley Drive/Crane DriveC TBDXXLine Replacement, Evans/Canyon Ridge/N KynetteC TBDXXLine Replacement, Janann/Brownstone/Shelmar DriveC TBDXXLine Replacement, Kynette/Wilshire/SierraC TBDXXLine Replacement, Lakewood/Dogwood CircleC TBDXXLine Replacement, Mary/Marlene/CommerceC TBDXXLine Replacement, NW Midway/Rusk/ParkerC TBDXXLine Replacement, Northcliff/Toplea/WinleaC TBDXXLine Replacement, Sagebrush-Toplea/WilshireC TBDXXLine Replacement, W Midway/Victoria/DeltaC TBDXXLine Replacement, W Donley/Private Drive/MimosaC TBDXXSub-Total Wastewater Priority C-Unfunded-$ WASTEWATER PROJECTS - TOTAL4,021,000$ CAPITAL IMPROVEMENT PROGRAMSFY10 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPEPROPOSED METHOD OF FINANCING157 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 30,2003 RON YOUNG LINE REPLACEMENT-WEST ALEXANDER LANE/NORMAN DRIVE/FRANKLIN DRIVE WASTEWATER MAINS A The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. The project consists of the replacement of the following wastewater mains: 1. Between Ross Avenue and West Alexander Lane 2. Between Norman Drive and Franklin Drive, and 3. Between Franklin Drive and Simmons Drive, North of Bayless Drive. Anticipate Design Award: 2nd Quarter 2010 Anticipate Design Award: 1st Quarter 2011 Anticipate Begin Construction: 2nd Quarter 2011 Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 158 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-WEST ALEXANDER LANE/NORMAN DRIVE/FRANKLIN DRIVE Engineering $60,000 Construction $450,000 $0 $0 $0 $0 $0 $0 $0 $510,000 XX 0% 0% 0% 0% 0% 159 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 30,2003 RON YOUNG LINE REPLACEMENT-ARNETT DRIVE WASTEWATER MAINS B The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. The project consists of the replacement of the following wastewater mains: 1. Between West Alexander and Arnett Drive 2. Outfall to Arnett Drive, and 3. Between Linda Lane and W Huitt Lane. Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 160 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-ARNETT DRIVE Engineering $40,000 Construction $311,000 $0 $0 $0 $0 $0 $0 $0 $351,000 XX 0% 0% 0% 0% 0% 161 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 15,2005 RON YOUNG LINE REPLACEMENT-PAULINE STREET WASTEWATER MAINS B The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. The project consists of the replacement of the following wastewater mains: 1. Between Pauline Street and Jones Street 2. Between Pauline Street and Bayless Drive, and 3. North of Bayless Drive between South Mills Drive and Simmons Drive. Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 162 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-PAULINE STREET Engineering $45,000 Construction $360,000 $0 $0 $0 $0 $0 $0 $0 $405,000 0% 0% 0% 0% XX 0% This project lies within the current Community Development Block Grant area and will be submitted as the 36th year CDBG Project. 163 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 30,2003 RON YOUNG LINE REPLACEMENT-ALEXANDER LANE/ASCOT DRIVE OUTFALL WASTEWATER MAINS B The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. The project consists of the replacement of wastewater mains from Ascot Drive to the north along Fuller Branch to E Huitt Lane. Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 164 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-ALEXANDER LANE/ASCOT DRIVE OUTFALL Engineering $22,000 Construction $220,000 $0 $0 $0 $0 $0 $0 $0 $242,000 XX 0% 0% 0% 0% 0% 165 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 30,2003 RON YOUNG LINE REPLACEMENT-WHITENER ROAD/ASCOT DRIVE OUTFALL WASTEWATER MAINS B The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. This project consists of the replacement of the following wastewater mains: 1. Ascot Drive 2. Dunaway Court, and 3. Dunaway Drive between Dunaway Court and Ascot Drive. Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 166 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-WHITENER ROAD/ASCOT DRIVE OUTFALL Engineering $16,000 Construction $160,000 $0 $0 $0 $0 $0 $0 $0 $176,000 XX 0% 0% 0% 0% 0% 167 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 12,2004 RON YOUNG LINE REPLACEMENT-COLLIN DRIVE WASTEWATER MAINS B The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. This project consists of the replacement of the following wastewater mains: 1. Along Collin Drive from Falls Drive to Travis Drive 2. Between Falls Drive and Fannin Drive east of Collin Drive 3. Between Fannin Drive and Travis Drive east of Collin Drive 4. Between Travis Drive and Dallas Drive east of Collin Drive, and 5. Between Dallas Drive and Tarrant Drive east of Collin Drive. Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. The project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 168 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-COLLIN DRIVE Engineering $45,000 Construction $360,000 $0 $0 $0 $0 $0 $0 $0 $405,000 XX 0% 0% 0% 0% 0% 169 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 12,2004 RON YOUNG LINE REPLACEMENT-BLANCO DRIVE/ARANSAS DRIVE/CRANE DRIVE WASTEWATER MAINS B The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. This project consists of the replacement of the following wastewater mains: 1. Between Blanco Drive and Aransas Drive from south of Harwood Road and 2. Between Blanco Drive and Crane Drive from Harwood Road to Aransas Drive. Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 170 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-BLANCO DRIVE/ARANSAS DRIVE/CRANE DRIVE Engineering $35,000 Construction $292,000 $0 $0 $0 $0 $0 $0 $0 $327,000 XX 0% 0% 0% 0% 0% 171 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 12,2004 RON YOUNG LINE REPLACEMENT-SLAUGHTER LANE/E HUITT LANE WASTEWATER MAINS B The project is part of the City of Euless Wastewater System Master Plan. The project consists of the replacement of the following wastewater mains: 1. Between John Vernon Lane and Slaughter Lane east of Dunaway Drive 2. East of Dunaway Drive from Slaughter Lane to E Huitt Lane, and 3. Along E Huitt Lane from S Main Street to Dunaway Drive. Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 172 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-SLAUGHTER LANE/E HUITT LANE Engineering $55,000 Construction $420,000 $0 $0 $0 $0 $0 $0 $0 $475,000 XX 0% 0% 0% 0% 0% 173 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 30,2003 RON YOUNG LINE REPLACEMENT-ROSS AVENUE WASTEWATER MAINS B The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. The project consists of the replacement of the wastewater mains located on Ross Avenue and outfall to West Alexander Lane. Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 174 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-ROSS AVENUE Engineering $15,000 Construction $135,000 $0 $0 $0 $0 $0 $0 $0 $150,000 XX 0% 0% 0% 0% 0% 175 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 13,2006 RON YOUNG LINE REPLACEMENT-OAKWOOD TERRACE ADDITION PHASE I WASTEWATER MAINS B The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. This project consists of the replacement of the following wastewater mains: 1. Between Hollywood Boulevard/Reaves Court from Vine Street to the end of Reaves Court and 2. From Hollywood Boulevard to Reaves Court along 306 Hollywood Boulevard. Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 176 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-OAKWOOD TERRACE ADDITION PHASE I Engineering $40,000 Cosntruction $305,000 $0 $0 $0 $0 $0 $0 $0 $345,000 XX 0% 0% 0% 0% 0% 177 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 13,2006 RON YOUNG LINE REPLACEMENT-OAKWOOD TERRACE ADDITION PHASE II WASTEWATER MAINS B The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. The project consists of the replacement of the following wastewater mains: 1. Along 608 and 610 Martha Street 2. Between Martha Street/Cannon Drive from Reaves Court to W Huitt Lane 3. Between Jefflyn Court/W Huitt Lane from Martha Street to S Main Street, and 4. Between Henslee Drive/Cannon Drive from Reaves Court to Jefflyn Court. Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 178 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-OAKWOOD TERRACE ADDITION PHASE II Engineering $75,000 Construction $560,000 $0 $0 $0 $0 $0 $0 $0 $635,000 XX 0% 0% 0% 0% 0% 179 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 21,2000 RON YOUNG SH 183 UTILITY RELOCATION WASTEWATER RELOCATION C Texas Department of Transportation ("TxDOT") plans to widen SH183 within the next ten years. The City has a number of wastewater mains that might require relocation. The scope of the work is unknown at this time. Relocation required where conflicts occur with the TxDOT's highway project. 180 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: SH 183 UTILITY RELOCATION Cost -To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX The scope of work will be determined as TxDOT completes the highway reconstruction plans. 181 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 13,2006 RON YOUNG LINE REPLACEMENT-N MIDWAY PARK WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. The project consists of the replacement of the following wastewater mains: 1. East of Denton Drive between Bell Drive and Dallas Drive 2. Between Denton Drive/Irion Drive from Dallas Drive to Harwood Road 3. Along Denton Drive from Harwood Road to Collin Drive, and 4. Along Milam Drive from Blanco Drive to Midway Park Drive. Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, open joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 182 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-N MIDWAY PARK Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 183 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 13,2006 RON YOUNG LINE REPLACEMENT-S MAIN STREET WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. The project consists of the replacement of the wastewater main along S Main Street from Jean Lane to W Alexander Lane. Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 184 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-S MAIN STREET Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 185 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 05,2007 RON YOUNG LINE REPLACEMENT-ARANSAS DRIVE WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. The project consists of the replacement of the wastewater mains east of Aransas Drive between Harwood Road and Douglas Street. Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 186 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-ARANSAS DRIVE Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 187 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 05,2007 RON YOUNG LINE REPLACEMENT-GLENN DRIVE/CRANE DRIVE WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. The project consists of the replacement of the wastewater mains located west of Glenn Drive from Aransas Drive to Glenn Drive and West of Crane Drive from Harwood Road to upstream of Glenn Drive. Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 188 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-GLENN DRIVE/CRANE DRIVE Construction- To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 189 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 10,2007 RON YOUNG LINE REPLACEMENT-BOYD BRANCH WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. This project consists of replacing the existing 12" clay tile wastewater line west of S Mills Drive extending north of S Pipeline Road to Carr Park. Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 190 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-BOYD BRANCH Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 191 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 15,2005 RON YOUNG LINE REPLACEMENT-CEDAR HILLS ESTATES/HOLLYWOOD BOULEVARD WASTEWATER MAINS C This project is part of the systematic replacement of wastewater mains using a worst first approach. This project consist of the design and construction of wastewater mains in the Cedar Hill Addition along Hollywood Boulevard from Vine Street to the east of Cannon Drive. Wastewater mains in the Cedar Hill Estates Addition area have deteriorated as they have aged and they need to be replaced. 192 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-CEDAR HILLS ESTATES/HOLLYWOOD BOULEVARD Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 193 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 15,2005 RON YOUNG LINE REPLACEMENT-CEDAR HILLS ESTATES/SUNSET DRIVE WASTEWATER MAINS C This project is part of the systematic replacement of wastewater mains using a worst first approach. This project consists of the replacement of the following wastewater mains in the Cedar Hills Estates Addition: 1. Sunset Drive from Vine Street to S. Main Street, 2. Henslee Drive from Sunset Drive to Hollywood Boulevard, and 3. Hollywood Boulevard from Henslee Drive to S Main Street. Wastewater mains in the Cedar Hills Estates Addition area have deteriorated as they have aged and need to be replaced. 194 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-CEDAR HILLS ESTATES/SUNSET DRIVE Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 195 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS February 16,2009 RON YOUNG LINE REPLACEMENT-EASTCLIFF/WINDLEA/SIGNET WASTEWATER MAIN C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains. This project includes the replacement of the following wastewater mains: 1. Eastcliff Drive from Tyler Avenue to Signet Drive 2. Windlea Drive from Eastcliff Drive to Wilshire Drive, and 3. Between Windlea Drive/Signet Drive from Eastcliff Drive to Wilshire Drive. Many wastewater mains throughout the City are 40+ years old. Most of these lines are vitrified clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 196 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-EASTCLIFF/WINDLEA/SIGNET Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 XX 197 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS February 16,2009 RON YOUNG HUNTINGTON/KOEN/ATKERSON/E HUITT/SLAUGHTER/MARTIN WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains. This project consists of the replacement of the following wastewater mains: 1. East of Huntington Drive from S Atkerson Lane to E Alexander Lane, 2. Between Koen Lane/S Atkerson Lane from Huntington Drive to FAA Road, 3. Between S Atkerson Lane/N Atkerson Lane from Huntington Drive to FAA Road, 4. Between N Atkerson Lane/E Huitt Lane from Huntington Drive to FAA Road, 5. Between E Huitt Lane/Slaughter Lane from Huntington Drive to FAA Road, 6. Between Slaughter Lane/Martin Lane from Huntington to FAA Road, and 7. Between Martin Lane/E Alexander Lane from Huntington Drive to FAA Road. Many wastewater mains throughout the city are 40+ years old. Most of these lines are vitrified clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 198 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: HUNTINGTON/KOEN/ATKERSON/E HUITT/SLAUGHTER/MARTIN Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 199 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 15,2005 RON YOUNG LINE REPLACEMENT-ECTOR DRIVE/FAYETTE DRIVE WASTEWATER MAINS C This project is part of the systematic replacement of wastewater mains using a worst first approach. The project consists of the replacement of the wastewater mains between Fayette Drive and Ector Drive from Harwood Road to the end of the line. Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 200 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-ECTOR DRIVE/FAYETTE DRIVE Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 201 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS February 16,2009 RON YOUNG LINE REPLACEMENT-DONLEYDRIVE/SHELMAR DRIVE WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains. This project consists of the replacement of the wastewater lines on: 1. Donley Drive from Shelmar Drive to W Ash Lane 2. Donley Drive from Harwood Road to Shelmar Drive, and 3. Shelmar Drive from Green Hill Street to the end of Shelmar Drive. Many wastewater mains throughout the city are 40+ years old. Most of these lines are vitrified clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 202 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-DONLEYDRIVE/SHELMAR DRIVE Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 203 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 05,2007 RON YOUNG LINE REPLACEMENT-DENTON DRIVE WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. This project consists of the replacement of wastewater mains located on Denton Drive between Collin Drive and Harwood Road to include Bell Drive. Many wastewater mains throughout the city are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 204 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-DENTON DRIVE Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 205 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 05,2007 RON YOUNG LINE REPLACEMENT-COLLIN DRIVE/HARRIS DRIVE/IRION DRIVE WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project consists of the following wastewater main replacements: 1. West of Collin Drive between Denton Drive and Harwood Road 2. West of Harris Drive from Dallas Drive to Harwood Road 3. Dallas Drive from west of Collin Drive to west of Harris Drive 4. South of Dallas Drive from west of Collin Drive to Dallas Drive, and 5. West of Irion Drive from Dallas Drive to Harwood Road Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 206 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-COLLIN DRIVE/HARRIS DRIVE/IRION DRIVE Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 207 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS February 16,2009 RON YOUNG LINE REPLACEMENT-ECTOR DRIVE/DONLEY DRIVE/CRANE DRIVE WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains. The project consists of the replacement of the following wastewater mains: 1. Between Ector Drive and Donley Drive from Aransas Drive to Harwood Road and 2. Between Donley Drive/Crane Drive from Aransas Drive to Harwood Road. Many wastewater mains throughout the city are 40+ years old. Most of these lines are vitrified clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 208 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-ECTOR DRIVE/DONLEY DRIVE/CRANE DRIVE Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 209 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS February 16,2009 RON YOUNG LINE REPLACEMENT-EVANS DRIVE/CANYON RIDGE DRIVE/N KYNETTE DRIVE WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains. The project consists of the replacement of the following wastewater mains: 1. Between Evans Drive/Canyon Ridge Drive from Cyclone Branch to north of Kynette Drive and 2. North of Kynette Drive from Canyon Ridge Drive to Cyclone Branch. Many wastewater mains throughout the city are 40+ years old. Most of these lines are vitrified clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 210 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-EVANS DRIVE/CANYON RIDGE DRIVE/N KYNETTE DRIVE Engineering- To Be Determined Construction- To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 211 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS February 16,2009 RON YOUNG LINE REPLACEMENT-JANANN STREET/BROWNSTONE DRIVE/SHELMAR DRIVE WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains. The project consists of the replacement of the following wastewater mains: 1. Janann Street from Aransas Drive to Donley Drive 2. Brownstone Drive from Aransas Drive to Donley Drive 3. Shelmar Drive from Greenhill Street to Aransas Drive, and 4. Aransas Drive from 500' south of Shelmar Drive to Janann Street. Many wastewater mains throughout the City are 40+ years old. Most of these lines are vitrified clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 212 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-JANANN STREET/BROWNSTONE DRIVE/SHELMAR DRIVE Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 213 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS February 16,2009 RON YOUNG LINE REPLACEMENT-KYNETTE/WILSHIRE/SIERRA/EASTCLIFF, E OF SIERRA WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains. The project consists of the replacement of the following wastewater mains: 1. Kynette Drive from Eastcliff Drive to Wilshire Drive 2. Wilshire Drive from Kynette Drive extending 800' north 3. Between Sierra Drive/Eastcliff Drive from Kynette Drive to Signet Drive, and 4. East of Sierra Drive from Signet Drive to Wilshire Park. Many wastewater mains throughout the City are 40+ years old. Most of these lines are vitrified clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 214 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-KYNETTE/WILSHIRE/SIERRA/EASTCLIFF, E OF SIERRA Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 215 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS February 16,2009 RON YOUNG LINE REPLACEMENT-LAKEWOOD BLVD/DOGWOOD CIRCLE/BOCOWOOD CIRCLE WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains. The project consists of the replacement of the following wastewater mains: 1. Lakewood Boulevard from Dogwood Circle north to Private Drive, and 2. Dogwood Circle, Cypress Circle, Bocowood Circle, and Aspenway Circle. Many wastewater mains throughout the City are 40+ years old. Most of these lines are vitrified clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 216 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-LAKEWOOD BLVD/DOGWOOD CIRCLE/BOCOWOOD CIRCLE Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 217 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS February 16,2009 RON YOUNG LINE REPLACEMENT-MARY/MARLENE/COMMERCE-WILSHIRE/GREENBRIAR WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains. The project consists of the replacement of the following wastewater mains: 1. Between Mary Drive/Marlene Drive from Cyclone Branch to Marlene Drive 2. Between Commerce Street/Wilshire Drive from Marlene Drive to Sagebrush Trail 3. South of Greenbriar Drive from Cyclone Branch to Debra Drive 4. Between Greenbriar Drive/Mary Street from Eastcliff Drive to Debra Drive, and 5. East of Debra Drive and south of Mary Drive. Many wastewater mains throughout the City are 40+ years old. Most of these lines are vitrified clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 218 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-MARY/MARLENE/COMMERCE-WILSHIRE/GREENBRIAR Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 219 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS February 16,2009 RON YOUNG LINE REPLACEMENT-NW MIDWAY/RUSK/PARKER/ROCKWALL DRIVES WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains. The project consists of the replacement of the following wastewater mains: 1. North of West Midway Drive from FM 157 to Parker Drive 2. West Midway Drive from Parker Drive to Rusk Drive 3. Rusk Drive from West Midway Drive to Parker Drive 4. Parker Drive from West Midway Drive to Rockwall Drive, and 5. Rockwall Drive from west of Parker Drive to 400' west of Lamar Drive. Many wastewater mains throughout the City are 40+ years old. Most of these lines are vitrified clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 220 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-NW MIDWAY/RUSK/PARKER/ROCKWALL DRIVES Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 221 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS February 16,2009 RON YOUNG LINE REP-NORTHCLIFF/TOPLEA/WINDLEA/SIGNET/KYNETTE/WESTCLIFF WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains. The project consists of the replacement of the following wastewater mains: 1. Between Northcliff Drive/Toplea Drive from Canyon Ridge to Cyclone Branch 2. Between Toplea Drive/Windlea Drive from Canyon Ridge to Cyclone Branch 3. Between Windlea Drive/Signet Drive from Canyon Ridge to Cyclone Branch 4. Signet Drive/Kynette Drive from the church to Cyclone Branch, and 5. Westcliff Drive from Toplea Drive to north of Windlea Drive. Many wastewater mains throughout the City are 40+ years old. Most of these lines are vitrified clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 222 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REP-NORTHCLIFF/TOPLEA/WINDLEA/SIGNET/KYNETTE/WESTCLIFF Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 223 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS February 16,2009 RON YOUNG LINE REPLACEMENT-SAGEBRUSH-TOPLEA/WILSHIRE-YORKSHIRE/SAGEBRUSH WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains. The project consists of the replacement of the following wastewater mains: 1. Between Sagebrush Trail/Toplea Drive from Cyclone Branch to east of Wilshire Drive 2. Between Wilshire Drive/Yorkshire Drive from Signet Drive to south of Toplea Drive 3. Between Sagebrush Trail/Tyler Avenue from Cyclone Branch to Commerce Street 4. Eastcliff Drive from /Tyler Avenue to the apartments, and 5. Between Marlene Drive/Tyler Avenue from Eastcliff Drive to Commerce Street. Many wastewater mains throughout the City are 40+ years old. Most of these lines are vitrified clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 224 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-SAGEBRUSH-TOPLEA/WILSHIRE-YORKSHIRE/SAGEBRUSH Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 225 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS February 16,2009 RON YOUNG LINE REP-W MIDWAY/VICTORIA/DELTA/LAMAR/ROCKWALL WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains. The project consists of the replacement of the following wastewater mains: 1. West Midway Drive from FM 157 to Victoria Drive 2. Victoria Drive from West Midway Drive north 700' 3. Delta Drive from West Midway Drive north 1000' 4. Lamar Drive from West Midway Drive north to Fayette Drive, and 5. Rockwall Drive from Lamar Drive west and north 800'. Many wastewater mains throughout the City are 40+ years old. Most of these lines are vitrified clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 226 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REP-W MIDWAY/VICTORIA/DELTA/LAMAR/ROCKWALL Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 227 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS February 16,2009 RON YOUNG LINE REPLACEMENT-W DONLEY/PRIVATE DRIVE/MIMOSA/MAGNOLIA/REDBUD WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. The project consists of the replacement of the following wastewater mains: 1. West of Donley Drive from West Ash Lane to Private Drive 2. Private Drive from west of Redbud Drive to Lakewood Boulevard 3. Mimosa Lane from Bocowood Drive to Private Drive 4. Magnolia Lane from Bocowood Drive to Private Drive, and 5. Redbud Drive from Bocowood Drive to Private Drive. Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 228 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-W DONLEY/PRIVATE DRIVE/MIMOSA/MAGNOLIA/REDBUD Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 229 230 Project DescriptionPriority Estimated Cost Operating FundCIP Fund BalanceBond SaleGrants/ ContribImpact FeesEscrow FundsCar Rental Tax Other EDCTo Be DeterminedWATER PROJECTSAN/ASub-Total Water Priority A-Proposed FY10-$ Line Replacement, Live Oak Ct/Live Oak Dr /Marlene Drive(11B320,000$ XXLine Replacement, S Pipeline Road West (12) B260,000$ XXWater & Wastewater Impact Fee Update (12)B30,000$ XXLine Replacement, S Pipeline Road East (13)B240,000$ XXWater System Security Camera Installation (14)B75,000$ XXSub-Total Water Priority B-Unfunded925,000$ Line Replacement, Westwood DriveCTBDXXLine Replacement, Collin/Dallas Drive/Harwood RoadCTBDXXLine Replacement, Collin/Denton Drive/Dallas DriveCTBDXXLine Replacement, Fuller DriveCTBDXXLine Replacement, Springwood CourtCTBDXXHwy 183 Water CrossingCTBDXXHwy 360 Water Crossing CTBDXXLine Replacement, Kynette Drive CTBDXXLine Replacement, Midcreek/Rock Creek/Stony CreekCTBDXXLine Replacement, Blessing Creek and Little CreekCTBDXXLine Replacement, Eastcliff Drive CTBDXXLine Replacement, Ector DriveCTBDXXLine Replacement, Hollow Oak DriveCTBDXXLine Replacement, Midway Drive East CTBDXXLine Replacement, Midway Drive WestCTBDXXLine Replacement, Dickey Drive SouthCTBDXXLine Replacement, Dickey Drive NorthCTBDXXLine Replacement, Paula Lane CTBDXXLine Replacement, Denton DriveCTBDXXLine Replacement, S Main Street (North)CTBDXXLine Replacement, S Main Street (South)CTBDXXLine Replacement, Sunset DriveCTBDXXLine Replacement, Wildwood StreetCTBDXXLine Replacement, Woodvine (East)CTBDXXLine Replacement, Woodvine (West)CTBDXXLine Replacement, Shady Creek and CliffwoodCTBDXXLine Replacement, Dunaway DriveCTBDXXLine Replacement, E Huitt LaneCTBDXXLine Replacement, Needles StreetCTBDXXWater System Security Land AcquisitionCTBDXXSub-Total Water Priority C-Unfunded-$ WATER PROJECTS - TOTAL925,000$ CAPITAL IMPROVEMENT PROGRAMSFY10 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPEPROPOSED METHOD OF FINANCING231 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 28,2003 RON YOUNG LINE REPLACEMENT-LIVE OAK CT/LIVE OAK DRIVE/MARLENE DRIVE WATER MAINS B These water mains are included in the City's Water Master Plan. The project consists of the replacement of the existing 4" cast iron water main with an 8" PVC main along Cedar Court to Marlene Drive and Live Oak Court. Additionally, the replacement of the existing 8" cast iron water main with an 8" PVC water main from Canyon Ridge to West Cliff Drive is also included in the scope of the project. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water main provides inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance costs. 232 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-LIVE OAK CT/LIVE OAK DRIVE/MARLENE DRIVE Engineering $40,000 Construction $280,000 $0 $0 $0 $0 $0 $0 $0 $320,000 XX 233 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 28,2003 RON YOUNG LINE REPLACEMENT-S PIPELINE ROAD WEST WATER MAINS B This water main is included in the City's Water Master Plan. The project consists of the replacement of the existing 6" cast iron water main with an 8" PVC water main along S Pipeline Road west from Simmons Drive to Vine Street. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance costs. 234 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-S PIPELINE ROAD WEST Engineering $30,000 Construction $230,000 $0 $0 $0 $0 $0 $0 $0 $260,000 XX 0% 0% 0% 0% 0% 235 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 31,2009 RON YOUNG WATER AND WASTEWATER IMPACT FEE UPDATE WATER B Water and wastewater impact fee charges were instituted by the City of Euless in 1990 in accordance with applicable state law to generate revenue for funding of capital improvements attributable to new development. Impact fees are related to the items identified by the Capital Improvements Plan and the Water and Wastewater System Master Plan. This project will consist of reviewing the City's Land Use Assumptions, the costs of future infrastructure needs, system capacity available for future growth, the cost of Trinity River Authority service and update the Capital Improvements Plan. Calculations based on state dictated requirements will be made to determine the maximum allowable impact fees. The city council will determine what percentage of the maximum allowable fee to impose. Legislation passed in 2001 provided an automatic five year extension to the 2002 Update. The impact fees were updated in 2007 as required. The next impact fee update will be in 2012 barring any new legislative action. 236 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: WATER AND WASTEWATER IMPACT FEE UPDATE Engineering $30,000 $0 $0 $0 $0 $0 $0 $0 $30,000 0% XX 0% 0% 0% 0% The proposed method of financing is impact fees. 237 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 28,2003 RON YOUNG LINE REPLACEMENT-S PIPELINE ROAD EAST WATER MAINS B This water main is included in the City's Water Master Plan. The project will replace the existing 6" cast iron water main with an 8" PVC water main along S Pipeline Road east from Vine Street to S Main Street. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance costs. 238 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-S PIPELINE ROAD EAST Engineering $30,000 Construction $210,000 $0 $0 $0 $0 $0 $0 $0 $240,000 XX 0% 0% 0% 0% 0% 239 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 12,2004 RON YOUNG WATER SYSTEM SECURITY CAMERA INSTALLATION WATER B 2004 Water System Vulnerability Assessment of the City of Euless Water System Master Plan. The project provides for the installation of security cameras at the water production and storage sites (ground storage tanks and towers) located at West Fuller Drive, Heritage Park, 1400 N Main Street, 2591 N Main Street, and 2700 N Main Street. Increase water system security by addressing vital elements recommended in the 2004 Water System Vulnerability Assessment as identified by Lockwood, Andrews, and Newman, Inc. and submitted to the Environmental Protection Agency (EPA). 240 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: WATER SYSTEM SECURITY CAMERA INSTALLATION Equipment Installation $75,000 $0 $0 $0 $0 $0 $0 $0 $75,000 XX 0% 0% 0% 0% 0% 241 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 28,2003 RON YOUNG LINE REPLACEMENT-WESTWOOD DRIVE WATER MAINS C This water main is included in the City's Water Master Plan. The project will replace a 6" cast iron main with an 8" PVC main along Westwood Drive from Fuller Drive to Carter Drive. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water main provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance costs. 242 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-WESTWOOD DRIVE Engineering- To Be Determined Construction- To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 243 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 28,2003 RON YOUNG LINE REPLACEMENT-COLLIN DR, DALLAS DRIVE TO HARWOOD ROAD WATER MAINS C This water main is included in the City's Water Master Plan. The project will replace a 6" cast iron main with an 8" PVC main along Collin Drive from Dallas Drive to Harwood Road. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance costs. 244 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-COLLIN DR, DALLAS DRIVE TO HARWOOD ROAD Engineering-To Be Determined Construction-To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 245 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 28,2003 RON YOUNG LINE REPLACEMENT-COLLIN DR, DENTON DRIVE TO DALLAS DRIVE WATER MAINS C This water main is included in the City's Water Master Plan. The project will replace a 6" cast iron main to an 8" PVC main along Collin Drive from Denton Drive to Dallas Drive. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance costs. 246 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-COLLIN DR, DENTON DRIVE TO DALLAS DRIVE Engineering-To Be Determined Construction-To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 247 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 28,2003 RON YOUNG LINE REPLACEMENT-FULLER DRIVE WATER MAINS C This water main is included in the City's Water Master Plan. The project consists of replacing a 6" cast iron water main with an 8" PVC water main along Fuller Drive from Salem Drive to Carter Drive. Old and deteriorated water mains increase the City's maintenance costs. substandard size mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance cost. 248 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-FULLER DRIVE Engineering-To Be Determined Construction-To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 249 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 12,2004 RON YOUNG LINE REPLACEMENT-SPRINGWOOD COURT WATER MAINS C The water mains included in this project are part of the City of Euless Water System Master Plan. The project consists of the replacement of 4" water main with an 8" main on Springwood Court. Old and deteriorated water mains increase the City's maintenance cost. Substandard size water mains provide a reduced flow of water. Systematic annual replacement of deteriorated and substandard size water mains will reduce maintenance costs. 250 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-SPRINGWOOD COURT Engineering- To Be Determined Construction- To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 251 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 21,2000 RON YOUNG SH 183 WATER CROSSING WATER MAINS C Texas Department of Transportation ("TxDOT") plans to widen SH 183 within the next 10 years. The City has a 24" water main and many other smaller mains that will have to be relocated when SH 183 is reconstructed. The scope/magnitude of relocation work is unknown at this time. Relocation required where conflicts occur with TxDOT's highway project. 252 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: SH 183 WATER CROSSING Costs- To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 253 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 21,2000 RON YOUNG SH 360 WATER CROSSING WATER MAINS C This project is related to the DFW International Airport Master Plan for property in Euless. This project consists of the extension of three water mains across SH 360 right of way to provide service to a portion of the DFW Airport property. Development on the airport property could potentially increase the City's tax revenues. This development is dependent upon the availability of water service to this area. 254 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: SH 360 WATER CROSSING Costs -To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 255 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 15,2005 RON YOUNG LINE REPLACEMENT-KYNETTE DRIVE WATER MAINS C This water main is included in the City's Water Master Plan. The project consists of the replacement of a 6" cast iron water main with an 8" PVC main along Kynette Drive from Cyclone Creek to Wilshire Drive. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance costs. 256 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-KYNETTE DRIVE Construction- To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 257 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 05,2007 RON YOUNG LINE REPLACEMENT-MIDCREEK/ROCK CREEK/STONY CREEK WATER C The water main is included in the City's Water Master Plan. This project consists of the replacement of a 6" AC main with an 8" PVC main on Midcreek Drive, Rock Creek Drive, and Stony Creek Drive. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. 258 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-MIDCREEK/ROCK CREEK/STONY CREEK Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 259 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 05,2007 RON YOUNG LINE REPLACEMENT-BLESSING CREEK AND LITTLE CREEK WATER MAINS C The water main is included in the City's Water Master Plan. This project will replace the 6" AC main with an 8" PVC main for Blessing Creek and Little Creek. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance costs. 260 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-BLESSING CREEK AND LITTLE CREEK Engineering-To Be Determined Construction-To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 261 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 15,2005 RON YOUNG LINE REPLACEMENT-EASTCLIFF DRIVE WATER MAINS C This water main is included in the City's Water Master Plan. The project consists of the replacement of the 6" AC main to an 8" PVC main along Eastcliff Drive from Toplea Drive to Del Prado Apartments. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance costs and increase water flow. 262 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-EASTCLIFF DRIVE Engineering-To Be Determined Construction-To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 263 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 28,2003 RON YOUNG LINE REPLACEMENT-ECTOR DRIVE WATER MAINS C This water main is included in the City's Water Master Plan. The project consists of the replacement of the 6" cast iron water main with an 8" PVC main on Ector Drive from Trojan Trail to Midway Drive. Old and deteriorated water mains increase the City's maintenance costs. Substandard size mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance costs. 264 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-ECTOR DRIVE Engineering-To Be Determined Construction-To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 265 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 28,2003 RON YOUNG LINE REPLACEMENT-HOLLOW OAK DRIVE WATER MAINS C This water main is included in the City's Water Master Plan. The project consists of the replacement of the 6" cast iron main with an 8" PVC main along Hollow Oak Drive from Woodridge Circle to Pebble Creek Drive and Woodridge Circle south of Hollow Oak Drive. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance costs. 266 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-HOLLOW OAK DRIVE Engineering- To Be Determined Construction- To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 267 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 28,2003 RON YOUNG LINE REPLACEMENT-MIDWAY DRIVE EAST WATER MAINS C This water main is included in the City's Water Master Plan. This project replaces the 6" cast iron water main with an 8" PVC main on Midway Drive east from N Main Street to Freestone Drive. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provided inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance costs. 268 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-MIDWAY DRIVE EAST Engineering -To Be Determined Construction- To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 269 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 28,2003 RON YOUNG LINE REPLACEMENT-MIDWAY DRIVE WEST WATER MAINS C This water main is included in the City's Water Master Plan. This project replaces the 6" cast iron water main with an 8" PVC main along Midway Drive west from Freestone Drive to Ector Drive. Old and deteriorated water mains increase the City's maintenance costs. Substandard size mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance costs. 270 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-MIDWAY DRIVE WEST Engineering -To Be Determined Construction- To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 271 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 28,2003 RON YOUNG LINE REPLACEMENT-DICKEY DRIVE SOUTH WATER MAINS C This water main is included in the City's Water Master Plan. This project consists of the replacement of a 6" cast iron water main with an 8" PVC main along Dickey Drive south from E Huitt Lane to Hilton Drive. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance costs. 272 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-DICKEY DRIVE SOUTH Engineering-To Be Determined Construction-To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 273 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 28,2003 RON YOUNG LINE REPLACEMENT-DICKEY DRIVE NORTH WATER MAINS C This water main is included in the City's Water Master Plan. This project consists of replacing the 6" cast iron water main with an 8" PVC main along Dickey Drive north from SH 10 to E Huitt Lane. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance cost. 274 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-DICKEY DRIVE NORTH Engineering-To Be Determined Construction-To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 275 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 28,2003 RON YOUNG LINE REPLACEMENT-PAULA LANE WATER MAINS C This water main is included in the City's Water Master Plan. The project consists of the replacement of the 6" cast iron water main with an 8" PVC main along Paula Lane from Needles Street to S Pipeline Road. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance costs. 276 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-PAULA LANE Costs-To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 277 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 28,2003 RON YOUNG LINE REPLACEMENT-DENTON DRIVE WATER MAINS C This water main is included in the City's Water Master Plan. The project consists of the replacement of the 6" cast iron water main with an 8" PVC main along Denton Drive from Tarrant Drive to Harwood Road. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance cost. 278 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-DENTON DRIVE Engineering-To Be Determined Construction-To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 279 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 12,2004 RON YOUNG LINE REPLACEMENT-S MAIN STREET (NORTH) WATER MAIN C The water mains included in this project are part of the City of Euless Water System Master Plan. The project will replace and upgrade the water main along S Main Street from E Huitt Lane to SH 10 from a 6" cast iron main to an 8" PVC. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance cost. 280 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-S MAIN STREET (NORTH) Construction-To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 281 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 12,2004 RON YOUNG LINE REPLACEMENT-S MAIN STREET (SOUTH) WATER MAIN C The water mains included in this project are part of the City of Euless Water System Master Plan. This project will replace and upgrade the water main along S Main Street from Landover Drive to E Huitt Lane from a 6" cast iron main to an 8" PVC. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance cost. 282 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-S MAIN STREET (SOUTH) Construction-To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 283 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 12,2004 RON YOUNG LINE REPLACEMENT-SUNSET DRIVE WATER MAINS C The water mains included in this project are part of the City of Euless Water System Master Plan. The project will replace and upgrade the water main along Sunset Drive from S Pipeline Road to S Main Street from a 6" cast iron main to an 8" PVC. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance cost. 284 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-SUNSET DRIVE Construction-To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 285 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 12,2004 RON YOUNG LINE REPLACEMENT-WILDWOOD STREET WATER MAINS C The water mains included in this project are part of the City of Euless Water System Master Plan. This project will replace and upgrade the water main along Wildwood Street from a 6" cast iron main to an 8" PVC. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance cost. 286 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-WILDWOOD STREET Construction- To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 287 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 12,2004 RON YOUNG LINE REPLACEMENT-WOODVINE DRIVE (EAST) WATER MAINS C The water mains included in this project are part of the City of Euless Water System Master Plan. The project will replace and upgrade the water main along Woodvine Drive from Cliffwood Road to El Camino Real from a 6" cast iron main to an 8" PVC main. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance cost. 288 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-WOODVINE DRIVE (EAST) Construction- To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 289 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 12,2004 RON YOUNG LINE REPLACEMENT-WOODVINE DRIVE (WEST) WATER MAINS C The water mains included in this project are part of the City of Euless Water System Master Plan. This project will replace and upgrade the water main along Woodvine Drive form Pebble Creek to Cliffwood Road from a 6" cast iron main to an 8" PVC. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance cost. 290 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-WOODVINE DRIVE (WEST) Construction- To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 291 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 12,2004 RON YOUNG LINE REPLACEMENT-SHADY CREEK DRIVE AND CLIFFWOOD DRIVE WATER MAINS C The water mains included in this project are part of the City of Euless Water System Master Plan. This project will replace and upgrade the water mains along Shady Creek Drive and Cliffwood Drive from the existing 6" cast iron mains to 8" PVC. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance cost. 292 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-SHADY CREEK DRIVE AND CLIFFWOOD DRIVE Construction -To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 293 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 15,2005 RON YOUNG LINE REPLACEMENT-DUNAWAY DRIVE WATER MAINS C This water main is included in the City's Water Master Plan. The project consists of the replacement of the existing 6" AC water main with an 8" PVC water main on Dunaway Drive from E Alexander Lane to E Ascot Drive. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance cost. 294 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-DUNAWAY DRIVE Engineering-To Be Determined Construction-To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 295 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 15,2005 RON YOUNG LINE REPLACEMENT-E HUITT LANE WATER MAINS C This water main is included in the City's Water Master Plan. The project consists of the replacement of the existing 6" PVC water main with an 8" PVC water main along E Huitt Lane from S Main Street to Dunaway Drive. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance cost. 296 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-E HUITT LANE Engineering- To Be Determined Construction- To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 297 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 15,2005 RON YOUNG LINE REPLACEMENT-NEEDLES STREET WATER MAINS C This water main is included in the City's Water Master Plan. The project consists of the replacement of the existing 6" cast iron water main with an 8" PVC water main along Needles Street from Paula Lane to Raider Drive. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance cost. 298 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-NEEDLES STREET Engineering -To Be Determined Construction- To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 299 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 12,2004 RON YOUNG WATER SYSTEM SECURITY LAND ACQUISITION WATER C 2004 Water System Vulnerability Assessment of the City of Euless Water Systems Master Plan. The project consists of the acquisition of a small residential property which shields the Fuller ground storage tank from public view. Removal of the residence in order to provide greater security, access and visibility is also included in the scope of the project. Increase water system security by addressing vital elements recommended in the 2004 Water System Vulnerability Assessment as identified by Lockwood, Andrews and Newman, Inc. and submitted to the Environmental Protection Agency (EPA). 300 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: WATER SYSTEM SECURITY LAND ACQUISITION Land Acquisition-To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 301 302 Project DescriptionPriority Estimated Cost Operating FundCIP Fund BalanceBond SaleGrants/ ContribImpact FeesEscrow FundsCar Rental TaxOther EDCTo Be DeterminedOTHER PROJECTSTexas Star Sports Complex Lighting ImprovementsA600,000$ XXGlade Parks Trail ConnectionA2,000,000$ XXSub-Total Other Priority A-Proposed FY102,600,000$ Park Amenities Upgrade (11)B150,000$ XXTrail Lighting-Phase I (11)B50,000$ XXMidway Park FLC Phase-II Design Outdoor Aquatics(11)B468,453$ XXMidway Park FLC Phase-III Design Indoor Aquatics(11)B317,500$ XXMidway Park FLC Phase-II Outdoor Aquatics Construction(12)B5,199,836$ XX $500,000Midway Park FLC Phase-III Indoor Aquatics Construction(13)B3,492,500$ $750,000XXFire Training Facility and Tower (13) B1,793,000$ XXAnimal Shelter (13)B692,900$ XXDevelopment/Engineering Building (13)B1,159,100$ XXBlessing Branch Park Improvements (13)B275,040$ XXTexas Star Sports Complex Parking Lot Improvements (14)B99,550$ XXSouth Euless Water Feature (14)B TBDXXWilshire Park Water Feature (14)B TBD XXSub-Total Other Priority B-Unfunded13,697,879$ Texas Star Sports Complex ImprovementsC TBDXXTrail Connection - S EulessC TBDXXTexas Star Sports Complex-Softball World TurfC TBDXXTrail Lighting-Phase IIC TBDXXTexas Star Sports Complex-PATS, Phase IVC TBDXXTrail Enhancements-Villages Bear CreekC TBDXXTrail Enhancements-Phase IC TBDXXTrail Enhancements-Phase IIC TBDXXTrailwood Park ImprovementsC TBDXXCommunity Center for South EulessC TBDXXEmergency Call BoxesC TBDXXKiddie Carr Park ImprovementsC TBDXXSub-Total Other Priority C-Unfunded-$ OTHER PROJECTS - TOTAL16,297,879$ CAPITAL IMPROVEMENT PROGRAMSFY10 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPEPROPOSED METHOD OF FINANCING303 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES April 29,2008 RAY MCDONALD TEXAS STAR SPORTS COMPLEX LIGHTING IMPROVEMENTS FIXTURES IMPROVEMENTS A The feasibility study recommended the removal of the existing light fixtures, poles, and foundations, and the replacement with new Sports lighting poles and fixtures. The project replaces the existing field lighting fixtures, poles and foundations with Musco "Light Structure Green" or "LSG" lighting which is the best product on the market for spill/glare control and maintaining constant light levels. The system includes a remote ballast for easy maintenance, constant illumination levels, pre-wired and pre-aimed fixtures from the factory, and a 25-year maintenance free warranty. The "LSG" is considerably more efficient than the existing sport lighting fixtures installed, requires approximately 30% fewer fixtures than the existing system to achieve 50/30 foot-candle levels, and reduces utility costs. The existing poles, which were originally installed in 1982, are integral ballasted 1500 watt metal halide sports lighting fixtures that require maintenance approximately two times per year to replace fixtures, lenses and bulbs. There are numerous cracks and erosion points in the light pole foundations and do not meet current wind load requirements. 304 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: TEXAS STAR SPORTS COMPLEX LIGHTING IMPROVEMENTS Disconnect and remove existing lights $600,000 fixtures, poles and footings and replace $0 with MUSCO LSG and reconnect to $0 existing circuits and switchgear $0 $0 $0 $0 $0 $600,000 0% 0% 0% 0% XX 0% This project is contingent upon the receipt of grant funding. 305 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES May 05,2008 RAY MCDONALD GLADE PARKS TRAIL CONNECTION LAND IMPROVEMENTS A As identified in the Glade Parks development, this project proposes to connect the existing Trails of Euless to the City of Colleyville trails through the Glade Park Development. Very high interest in trails and trail connectivity was identified in the scientific survey conducted for the adopted Parks Master Plan. Eighty-eight percent of those who participated in the survey singled out trail connections between existing and future park developments as their number one priority. Additionally, seventy-six percent identified the need for trail connectivity to other cities as their top priority. This trail would link the Trails of Euless to the City of Colleyville trail system through the Glade Park Development. The trail would tie-in to the existing trail to the east, go under SH 121, and tie-in to the City of Colleyville trail system to the west. The City of Euless has experienced significant progress in the last few years in the area of trail development with an extensive network of paved and unpaved trails. The trails system is a valuable asset to the community as it assists not only in providing a safe means for non-vehicular travel, but also in providing an opportunity for a variety of unstructured, low-impact recreational pursuits. The continued development and maintenance of our trails system received a great deal of support from the citizens as indicated in the responses to the scientific survey and has also been supported by past updates to the Parks Master Plan. 306 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: GLADE PARKS TRAIL CONNECTION Cost $2,000,000 $0 $0 $0 $0 $0 $0 $0 $2,000,000 0% 0% 0% 0% XX 0% This project is contingent upon the receipt of grant funding. 307 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES May 01,2008 RAY MCDONALD PARK AMENITIES UPGRADE FIXTURES IMPROVEMENTS B Identified in the Needs Assessment section of the adopted Parks Master Plan, are projects related to park infrastructure, fixtures, and amenities that are recommended for either renovation, upgrade, or repair. This project addresses park infrastructure needs and/or renovation of current park amenities such as: park structure painting (gazebos, pavilions, etc.), minor trail repairs, playground renovations, installation of shaded "stopping stations" along the Trails of Euless, and other projects identified in the Parks Master Plan. Anticipate Begin: FY2011 Pursuant to the recommendations in the Parks Master Plan, parks and related infrastructure should be maintained at levels that meets the citizens' expectations. The needs have been identified in the Parks Master Plan based on staff and citizen input. This project addresses some of those request. 308 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: PARK AMENITIES UPGRADE Fixtures $100,000 Park Amenities $50,000 $0 $0 $0 $0 $0 $0 $0 $150,000 XX 0% 0% 0% 0% 0% The proposed method of finance is the EDC Fund Balance. 309 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES April 30,2008 RAY MCDONALD TRAIL LIGHTING-PHASE I FIXTURES IMPROVEMENTS B Identified in the Needs Assessment section of the adopted Parks Master Plan is the addition of trail lighting in various parks where trails are located. This request is for the first phase of a project dedicated to satisfying that need. This project includes the installation of trail lighting along the Trails of Euless similar to what was installed along the trail through Midway Park. Additional parks that have been identified as needing trail lighting are: Trailwood Park, The Preserve at McCormick Park, The Villages of Bear Creek Park and Heritage Park. Not all of the parks identified would be included in this phase, but rather in future phases of an overall Trail Lighting project. Trails in the area have become popular and lighting trails could extend hours of usage as well as provide for increased visibility/security for remote trail areas. 310 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: TRAIL LIGHTING-PHASE I Fixtures $50,000 $0 $0 $0 $0 $0 $0 $0 $50,000 XX 0% 0% 0% 0% 0% The proposed method of financing is EDC fund balance. 311 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES February 11,2009 RAY MCDONALD MIDWAY PARK FLC PHASE II- OUTDOOR AQUATICS DESIGN DESIGN IMPROVEMENTS B The City of Euless has for many years recognized the importance of planning for parks, recreation, and open space based on the needs as expressed by the citizens. In the plan development process for the recent update to the Parks Master Plan and as part of the City’s five year master plan, a scientific survey of park, recreation, and open space needs was conducted from a sample of randomly selected citizens in Euless. From this valuable information, a list of priorities was identified. A new Outdoor Aquatic Center was identified as a top priority. The project consists of the design of an outdoor family aquatic center which will include various play components such as a leisure pool, slides, aqua play features, shade structures, a bath house, and all the necessary filtration systems to support the aquatic features. The project also involves redevelopments/ improvements to the entire site such as relocating the tennis courts and the construction of various trails, a group pavilion, an amphitheater, multi-use sport courts, additional picnic stations with grills, a nature area, a botanical garden, and public art display(s). The City population is sufficient to support an outdoor family aquatic center. The City's existing aquatic facilities have aged and maintaining the pools and support facilities has been an ongoing issue and concern. The expenses necessary to maintain and operate the pools each season continue to increase, far exceeding the revenue generated by the pools. Continuing in repair mode is no longer possible at the Wilshire and South Euless Pools and a long-term plan is necessary. Given the fact that two of the neighborhood pools are over thirty years old and the cost to renovate, repair, or replace them is estimated at over one million dollars each, it is recommended that the city concentrate its efforts and resources toward the family aquatic facility to serve the citizens of Euless. Project approval requires revision of the master planning of Midway Park. The FLC project eliminates the current ball fields and requires the relocation of the the existing tennis courts, which will be replaced with the necessary support facilities to serve the project such as parking, lighting, landscaping, and recreational amenities such as pavilions, picnic stations, open space, sand volleyball court(s), and trails. 312 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: MIDWAY PARK FLC PHASE II- OUTDOOR AQUATICS DESIGN Engineering $468,453 $0 $0 $0 $0 $0 $0 $0 $468,453 0% XX 0% 0% 0% 0% The proposed method of finance is EDC CIP Fund Balance. 313 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES February 11,2009 RAY MCDONALD MIDWAY PARK FLC PHASE III- INDOOR AQUATICS DESIGN DESIGN INDOOR AQUATIC CENTER B The City of Euless has identified, as part of the city’s five year master plan, the need for an indoor aquatic center. The design of an indoor aquatic center will allow the City to serve the growing population by expanding services and programs for citizens. The project consist of the design of an indoor aquatic center (approximately 8,600 square feet) that includes a lap / leisure pool, current channel, slide, and therapy pool. This multi-purpose facility would be attached to the senior center and would serve the senior population, as well as the general public and would be used for various aquatic programs including aerobics / wellness classes, swim lessons, rehabilitation opportunities, and would also be used as a rental facility for birthday and private parties. The City of Euless has for many years recognized the importance of planning for parks, recreation, and open space based on the needs as expressed by the citizens. In the plan development process for the recent update to the Parks Master Plan and as part of the City’s five year master plan, a scientific survey of park, recreation and open space needs was conducted from a full sample of randomly selected citizens in Euless. From this valuable information, a list of priorities was identified. An indoor aquatic center was identified as a high priority for aquatic facilities that the city currently lacks. An indoor aquatic center would allow staff the opportunity to serve the growing population by expanding services and programs for all citizens. 314 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: MIDWAY PARK FLC PHASE III- INDOOR AQUATICS DESIGN Engineering $317,500 $0 $0 $0 $0 $0 $0 $0 $317,500 0% 0% 0% 0% 0% XX 315 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES February 11,2009 RAY MCDONALD MIDWAY PARK FLC PHASE II-OUTDOOR AQUATICS CONSTRUCTION CONSTRUCTION PARK IMPROV./OUTDOOR AQUATIC CENTER B The City of Euless has for many years recognized the importance of planning for parks, recreation, and open space based on the needs as expressed by the citizens. In the plan development process for the recent update to the Parks Master Plan and as part of the City’s five year master plan, a scientific survey of park, recreation, and open space needs was conducted from a sample of randomly selected citizens in Euless. From this valuable information, a list of priorities was identified. A new Outdoor Aquatic Center was identified as a top priority. The project consists of the construction of an outdoor family aquatic center which will include various play components such as a leisure pool, slides, aqua play features, shade structures, a bath house, and all the necessary filtration systems to support the aquatic features. The project also involves redevelopments/ improvements to the entire site such as relocating the tennis courts and the construction of various trails, a group pavilion, an amphitheater, multi-use sport courts, additional picnic stations with grills, a nature area, a botanical garden, and public art display(s). The City population is sufficient to support an outdoor family aquatic center. The City's existing aquatic facilities have aged and maintaining the pools and support facilities has been an ongoing issue and concern. The expenses necessary to maintain and operate the pools each season continue to increase, far exceeding the revenue generated by the pools. Continuing in repair mode is no longer possible at the Wilshire and South Euless Pools and a long-term plan is necessary. Given the fact that two of the neighborhood pools are over thirty years old and the cost to renovate, repair, or replace them is estimated at over one million dollars each, it is recommended that the city concentrate its efforts and resources toward the family aquatic facility to serve the citizens of Euless. Project approval requires revision of the master planning of Midway Park. The FLC project eliminates the current ball fields and requires the relocation of the the existing tennis courts, which will be replaced with the necessary support facilities to serve the project such as parking, lighting, landscaping, and recreational amenities such as pavilions, picnic stations, open space, sand volleyball court(s), and trails. 316 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: MIDWAY PARK FLC PHASE II-OUTDOOR AQUATICS CONSTRUCTION Construction $4,684,538 Contingency 5%$257,649 $0 Inflation 5%$257,649 $0 $0 $0 $0 $0 $0 $5,199,836 0% 0% 0% 0% XX 0% XX 317 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES February 11,2009 RAY MCDONALD MIDWAY PARK FLC PHASE III-INDOOR AQUATICS CONSTRUCTION CONSTRUCTION INDOOR AQUATIC CENTER B The City of Euless has identified, as part of the city’s five year master plan, the need for an indoor aquatic center. Construction of an indoor aquatic center will allow the City to serve the growing population by expanding services and programs for citizens. The project consists of the construction of an indoor aquatic center (approximately 8,600 square feet) that includes a lap / leisure pool, current channel, slide, and therapy pool. This multi-purpose facility would be attached to the senior center and would serve the senior population, as well as the general public and would be used for various aquatic programs including aerobics / wellness classes, swim lessons, rehabilitation opportunities, and would also be used as a rental facility for birthday and private parties. The City of Euless has for many years recognized the importance of planning for parks, recreation, and open space based on the needs as expressed by the citizens. In the plan development process for the recent update to the Parks Master Plan and as part of the City’s five year master plan, a scientific survey of park, recreation and open space needs was conducted from a full sample of randomly selected citizens in Euless. From this valuable information, a list of priorities was identified. An indoor aquatic center was identified as a high priority for aquatic facilities that the city currently lacks. An indoor aquatic center would allow staff the opportunity to serve the growing population by expanding services and programs for all citizens. 318 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: MIDWAY PARK FLC PHASE III-INDOOR AQUATICS CONSTRUCTION Grading/Utilities/Electrical $100,000 Indoor Pool Building $3,000,000 $0 Furnishings and Equipment $75,000 $0 Contingency 10% $317,500 $0 $0 $0 $0 $0 $3,492,500 0% 0% 0% 0% XX 0% XX 319 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: FLEET & FACILITY OPERATIONS May 07,2007 KYLE MCADAMS FIRE TRAINING CENTER & TOWER CONSTRUCTION NEW CONSTRUCTION B The site will be located in the area surrounded by the Texas Star Sports Complex softball fields and the Parks Maintenance Facility. The complex will be located on a 236' x 222' concrete slab and will consist of a five story 22' x 33' tower, a two story 22' x 34' training maze room, and a 14' burn room adjacent to the maze room. The facility must allow room for full maneuvering of fire trucks on all sides of the structure. Since the structure will be within the Texas Star Sports Complex the area surrounding the training center can be utilized for additional parking when not in use for training purposes. 320 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: FIRE TRAINING CENTER & TOWER Construction $1,575,000 Architect 8%$126,000 Survey & Testing Fees $8,000 Engineering $15,750 $2,200 Instruments & Apparatus $15,750 $5,800 Contingency $52,500 Insurance $1,000 $9,000 PM & Minor Repairs $3,000 Unscheduled Maintenance $3,250 Renewal & Replacement $5,500 Pest Control $294 $12,044 $21,044 $1,793,000 25% 0% 0% 0% 0% XX 321 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: FLEET & FACILITY OPERATIONS May 07,2007 KYLE MCADAMS ANIMAL SHELTER-EXPANSION/RENOVATION CONSTRUCTION REMODEL/EXPANSION B This project is part of the City's five year master plan and is the fourth of six proposed projects. The project consists of the expansion of the current animal shelter facility to better accommodate visitors, adoptions and animal services. The addition of ten (10) enclosed dog runs, six (6) quarantine runs, an adoption room, additional room for cat containment and an area for animal washing . Office space expansion will be included in the renovation as well as updates to the public / employee restrooms. 322 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: ANIMAL SHELTER-EXPANSION/RENOVATION Construction $550,000 Architect 8%$44,000 Survey & Testing Fees $8,200 Engineering $4,500 $1,000 HVAC Units $21,500 $2,500 Office Furniture $6,500 Instruments & Apparatus $3,300 Insurance $400 Kitchen Appliances $3,300 Data & Telephone $9,100 Alarm & Security Service $3,700 $3,900 Contingency $30,000 Landscaping $5,500 PM& Minor Repairs $5,200 Irrigation $3,300 Unscheduled Maintenance $5,100 Renewal & Replacement $16,800 Pest Control $575 $27,675 $31,575 $692,900 25% 0% 0% XX 0% 0% 323 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: FLEET & FACILITIES OPERATIONS May 07,2007 KYLE MCADAMS DEVELOPMENT/ENGINEERING BUILDING BUILDING REMODEL/EXPANSION B This project is part of the City's five year master plan and is the third of six proposed projects. The development and engineering building received a major remodel in 1996 with renovation of the building's interior. But due to limited funding at that time, certain elements could not be justified as part of the remodel. This upgrade will allow for construction of a new entrance facade to match the other campus structures. Security issues pertaining to controlled access will be addressed as well as renovation of the Fuller Room into a functional conference area. Public restroom facilities will be relocated to meet ADA/Texas Accessibility Standards, the interior will be upgraded, and new carpet will be installed throughout the facility. 324 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: DEVELOPMENT/ENGINEERING BUILDING Construction $775,000 Architect 8%$62,000 Survey & Testing Fees $2,800 Interior Upgrades (Paint & Carpet)$92,000 $2,000 Furniture $26,500 $3,500 Fixtures $21,500 Instruments & Apparatus $1,300 Insurance $750 Data & Telephone $2,750 Alarm & Security Services $2,750 Window Frame Repairs $21,000 $6,250 Sprinkler System $94,000 Interior & Exterior Signage $5,500 Janitorial Service/Pest Control $2,000 HVAC Units $52,000 PM & Minor Repairs $9,100 Unscheduled Maintenance $11,250 Renewal & Replacement $25,000 $47,350 $53,600 $1,159,100 25% 0% 0% XX 0% 0% 325 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES April 30,2008 RAY MCDONALD BLESSING BRANCH PARK IMPROVEMENTS PARK LAND IMPROVEMENTS B This project is a continuation of the overall trails expansion and general park improvements as identified in the Parks Master Plan. Blessing Branch Park is a 7.3 acre linear park located on the east side of Main Street across from Midway Park. Currently, the park has only one swing set. This project includes construction of a trail connection from Main Street to the west and Fuller-Wiser to the east. Additionally, the project includes a new playground, picnic pad (s) with grill(s), and some type of shade shelter/pavilion/gazebo. This area currently gets a high volume of foot traffic. Constructing a trail in this linear greenbelt would not only provide safe, paved access for the residents east of Main Street to Midway Park, Midway Park Elementary, and to Trinity High School, but also help create a renewed sense of quality of life for the residents in that area by enhancing the recreational amenities available. The number one request from our citizens as it relates to trails, based on the responses to the survey as identified in the Parks Master Plan, was to construct trail connections between existing and/or future park developments. This project not only satisfies that request, but also provides trail connections to neighborhoods, schools, between major thoroughfares, and potentially to future commercial developments to the southeast. 326 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: BLESSING BRANCH PARK IMPROVEMENTS Approximately 28,000 square feet of 4"x8' concrete trail @ $6 square foot $168,000 $0 Playground/Border $30,000 $0 Picnic pads w/grills $10,000 Shade shelter/pavilion/gazebo $30,000 Trail Lighting $20,000 $0 Playground chips $5,400 Contingency 10%$11,640 $0 $0 $0 $0 $275,040 0% XX 0% 0% 0% 0% The proposed method of finance is EDC Fund Balance. 327 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES April 29,2008 RAY MCDONALD TEXAS STAR SPORTS COMPLEX PARKING LOT IMPROVEMENTS LAND IMPROVEMENTS B Identified in the feasibility study was the need to provide additional parking at Softball World to accommodate the overflow during certain league and tournament events. The project allows for an additional 24 head-in parking spaces on the east of the existing parking lot and 9 additional head-in parking spaces behind the red field along with additional netting to allow for a substantial amount of additional parking. This project helps satisfy the need for additional parking during certain league and tournament events and allows staff the opportunity to create a recreational area that would include picnic areas, outdoor grills, picnic tables, horseshoe pit, etc. in the unimproved area on the east end of the facility. 328 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Other Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: TEXAS STAR SPORTS COMPLEX PARKING LOT IMPROVEMENTS 6" thick concrete paving for an additional 33 parking spaces at $1,500 each $49,500 160'x40' and 250'x40' of Dupont Nylon barrier netting $27,600 Four post flat carports to cover 20 parking spaces behind red field 20 spaces @ $675 per space $13,500 Contingency 10%$9,050 $99,650 0% 0% 0% 0% 0% XX 329 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES May 05,2008 RAY MCDONALD SOUTH EULESS WATER FEATURE FACILITY IMPROVEMENTS B The adopted Parks Master Plan calls for the renovation of the South Euless Pool. This aquatic facility has not received any major renovations since it opened in 1972. This request will probably be revised and/or withdrawn upon completion of the family aquatic facility. Recommendations made in both the adopted Parks Master Plan and the Swimming Pool Audit addressed major renovations that were needed at South Euless Pool. The estimated cost for these renovations was approximately $1.3 million. Because of limited space as well as parking, this project will need to be carefully thought through and a decision will need to be made to either spend the money to renovate this existing facility or use the funds toward the construction of a family aquatic facility. This has been documented in both the Swimming Pool Audit and the adopted Parks Master Plan. 330 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: SOUTH EULESS WATER FEATURE Cost- To Be Determined $0 $0 $0 $0 $0 $0 $0 XX 331 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES May 05,2008 RAY MCDONALD WILSHIRE PARK WATER FEATURE FACILITY IMPROVEMENTS B The adopted Parks Master Plan calls for the renovation of Wilshire Pool. This aquatic facility has not received any major renovations since it opened in 1972. This request will most probably be revised and/or withdrawn upon completion of the family aquatic facility. Recommendations made in both the adopted Parks Master Plan and the Swimming Pool Audit addressed major renovations that were needed at Wilshire Pool. The estimated cost for these renovations was approximately $1.3 million. Because of limited space as well as parking, this project will need to be carefully thought through and a decision will need to be made to either spend the money to renovate this existing facility or use the funds toward the construction of a family aquatic facility. Documented in both the Swimming Pool Audit and the adopted Parks Master Plan. 332 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: WILSHIRE PARK WATER FEATURE Cost- To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 333 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES July 13,2008 RAY MCDONALD TEXAS STAR SPORTS COMPLEX IMPROVEMENTS OTHER IMPROVEMENTS C Based on the information gathered from the Texas Star Sports Complex Feasibility Study, this project is to make the necessary renovations to this facility to develop it into a multi-use facility that accommodates the Parks at Texas Star Baseball League and tournament play, additional programming for adult softball, and a girl's fast pitch softball league and tournament play. This project makes the necessary renovations to the existing fields at Softball World to convert what is now a dedicated adult softball facility into a multi-use facility, joined with the Parks at Texas Star to be able to accommodate softball (adult and girl's fast pitch), and boys baseball (recreational and select), and to convert an aging facility into a state-of-the-art sports complex which also includes creating an improved area at the Parks at Texas Star for much-needed practice fields. It is important that staff remain committed to the vision the City Council has promoted for over ten years, of positioning the Texas Star Sports Complex as a premier facility that serves the athletic needs of the City as well as a facility that spurs economic opportunities. This project enables staff to program the Texas Star Sports Complex as a multi-use facility that accommodates the Parks at Texas Star Baseball League and tournament play, additional programming for adult softball, a girl's fast pitch softball league, and tournament play. 334 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: TEXAS STAR SPORTS COMPLEX IMPROVEMENTS Costs- To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 335 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES May 12,2008 RAY MCDONALD TRAIL CONNECTION-SOUTH EULESS LAND IMPROVEMENTS C Identified in the adopted Parks Master Plan is the need for additional trail connections from neighborhoods to parks. There is as very high interest in trails and trail connectivity as identified in the scientific survey in the adopted Parks Master Plan. Eighty-eight percent of those participating in the survey identified the need for trail connections between neighborhoods and parks. Additionally, sixty-eight percent identified the need for trail connectivity to schools as a top priority. This project would allow for safe access to South Euless Park from adjacent neighborhoods as well as South Euless Elementary from the adjacent neighborhood to the south. The City of Euless has experienced significant progress in the last few years in the area of trail development with an extensive network of paved and unpaved trails. The trail system is a valuable asset to the community as it assists not only in providing a safe means for non-vehicular travel, but also in providing an opportunity for a variety of unstructured, low-impact recreational pursuits. The continued development and maintenance of the trails system received a great deal of support from the citizens as indicated in the responses to the scientific survey and has also been supported by past updates to the Parks Master Plan. 336 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: TRAIL CONNECTION-SOUTH EULESS Cost- To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 337 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES February 19,2009 RAY MCDONALD TEXAS STAR SPORTS COMPLEX-SOFTBALL WORLD TURF LAND IMPROVEMENTS C This request is identified in the Parks Master Plan as well as in the feasibility study as a needed renovation to improve the playability of the fields as well as to meet the expectations of today's players and bring the quality of the fields up to the same standards of the other facilities within the Texas Star Sports Complex. This project is to remove existing sod, laser level outfields, prepare soil, fertilization, and planting of approximately 28,600 square yards of Tifway 419 Bermuda grass in the outfields. Originally constructed in 1982, Softball World has carved out a unique niche in the softball arena as "the place to play" competitive softball. Twice recognized as the Softball Complex of the year, Softball World is recognized for creating a premier softball experience for both the player and spectator. Many renovations have taken place at this facility over the past several years, keeping focused on the vision of offering a premier product as a member of the Texas Star Sports Complex. This request is a continuation of the needed renovations to bring the facility up to the standards expected by the users, staff and citizens of Euless. 338 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: TEXAS STAR SPORTS COMPLEX-SOFTBALL WORLD TURF Cost- To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 339 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES May 13,2008 RAY MCDONALD TRAIL LIGHTING-PHASE II FIXTURES IMPROVEMENTS B Identified in the Needs Assessment section of the adopted Parks Master Plan is the addition of trail lighting in various parks where trails are located. This request is for the second phase of a project dedicated to satisfying that need. This project continues the installation of trail lighting along the Trails of Euless similar to what was installed along the trail through Midway Park. Parks that have been identified as needing trail lighting are: Trailwood Park. The Preserve at McCormick Park, The Villages of Bear Creek Park, and Heritage Park. Not all of the parks identified are included in this phase, but rather in future phases of an overall Trail Lighting project. Trails in the area have become popular and lighting trails could extend hours of usage as well as provide for increased visibility/security for remote trail areas. 340 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: TRAIL LIGHTING-PHASE II Cost- To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 341 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES May 01,2008 RAY MCDONALD TEXAS STAR SPORTS COMPLEX-PARKS AT TEXAS STAR, PHASE IV LAND IMPROVEMENTS C This project was identified in the adopted Park's Master Plan as a high priority. This project includes the design and construction of additional parking, restroom facilities and an additional concession stand at the Parks at Texas Star that would serve the growing number of participants in youth soccer as well as the growing number of participants in t-ball, coach-pitch, and 10U baseball. The success of the Parks at Texas Star Baseball League, as well as increased participation in youth soccer and hockey, has emphasized the need for additional parking. Since the completion of Phase III improvements at the Parks at Texas Star, the facility has been severely under served in parking, restroom facilities, and concessions. Due to the large volume of foot traffic throughout the facility, the parking situation has become a safety concern. This project addresses current concerns of the parents of the participants by alleviating: parking issues; the lack of restrooms near the t-ball, coach-pitch, soccer, and 10U baseball fields; and the need for additional concessions. 342 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: TEXAS STAR SPORTS COMPLEX-PARKS AT TEXAS STAR, PHASE IV Cost- To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 343 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES March 23,2004 RAY MCDONALD TRAIL ENHANCEMENTS-VILLAGES OF BEAR CREEK OTHER IMPROVEMENTS C This project includes the infrastructure improvements as recommended as high priority in the adopted Parks Master Plan. This project includes the redevelopment/redesign and improvement of the trail at the Villages of Bear Creek Park to offer multiple uses for the citizens of Euless. Trail development and enhancement opportunities will be consistent with available land, funding and time variables. This Master Plan recommendation will be part of a city-wide comprehensive trail enhancement project. Due to the continual erosion of the existing trail, a redevelopment/redesign of the trail system at Villages of Bear Creek will be a high priority. 344 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: TRAIL ENHANCEMENTS-VILLAGES OF BEAR CREEK Cost- To Be Determined $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 345 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES May 12,2008 RAY MCDONALD TRAIL ENHANCEMENTS- PHASE I TRAILS IMPROVEMENTS C Identified in the Needs Assessment and Identification section of the adopted Parks Master Plan are a number of trail related improvements. This project consists of the first phase of implementation of park improvements identified in the adopted Parks Master Plan which includes additional water fountains, additional benches, construction of shaded seating areas along the trail, additional and/or installation of new exercise equipment along the trails, picnic stations, and construction of additional pedestrian bridges in high water areas. Also identified is the need to address various areas along the trail that need to be converted from unpaved to paved trails. The City of Euless has experienced significant progress in the last few years in the area of trail development with an extensive network of paved and unpaved trails. The trails system is a valuable asset to the community as it assists not only in providing a safe means for non-vehicular travel, but also in providing an opportunity for a variety of unstructured, low-impact recreational pursuits. The continued development and maintenance of our trails system received a great deal of support from the citizens as indicated in the responses to the Scientific Survey and has also been supported by past updates to the Parks Master Plan. 346 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: TRAIL ENHANCEMENTS- PHASE I Cost- To Be Determined $0 $0 $0 $0 $0 $0 $0 XX 0% 0% 0% 0% 0% 347 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES May 13,2008 RAY MCDONALD TRAIL ENHANCEMENTS- PHASE II TRAILS IMPROVEMENTS C This enhancement was identified in the Needs Assessment and Identification section of the adopted Parks Master Plan are a number of trail related improvements. This project is phase II of the trail enhancements that continues implementation of park Improvements identified in the adopted Parks Master Plan which includes additional water fountains, additional benches, construction of shaded seating areas along the trail, additional and/or installation of new exercise equipment along the trails, picnic stations, and construction of additional pedestrian bridges in high water areas. Also identified is the need to address various areas along the trail that need to be converted from unpaved to paved trails. The City of Euless has experienced significant progress in the last few years in the area of trail development with an extensive network of paved and unpaved trails. The trails system is a valuable asset to the community as it assists not only in providing a safe means for non-vehicular travel, but also in providing an opportunity for a variety of unstructured, low-impact recreational pursuits. The continued development and maintenance of our trails system received a great deal of support from the citizens as indicated in the responses to the scientific survey and has also been supported by past updates to the Parks Master Plan. 348 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: TRAIL ENHANCEMENTS- PHASE II Cost- To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 349 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES May 13,2008 RAY MCDONALD TRAILWOOD PARK IMPROVEMENTS LAND IMPROVEMENTS C This project is a continuation of the overall park improvement plan as identified in the Parks Master Plan. Trailwood Park is an eleven acre site that currently has a playground and a half-mile hike/bike trail. This project includes the installation of a new pavilion, a parking lot, a non-paved nature trail on the east end of the park, upgrade the playground to meet ADA standards, park lighting, new park signs, benches along the trail, and trail lighting. The project scope also addresses the erosion problems along the retaining wall on the back side of the homes facing the trail. As identified in the adopted Parks Master Plan, the municipal park is the foundation of any solid parks and recreational system. The City of Euless parks and recreation system provides the residents and visitors with significant personal, social, environmental and economic benefits. The revitalization efforts that the Euless City Council has focused on over the years has increased the sense of community pride. This proposed project will continue those efforts by creating an area that will serve both the passive and active leisure needs of the residents in the vicinity. 350 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: TRAILWOOD PARK IMPROVEMENTS Cost- To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 351 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES May 12,2008 RAY MCDONALD COMMUNITY CENTER FOR SOUTH EULESS LAND/FACILITY IMPROVEMENTS C Identified in the adopted Parks Master Plan is the need for an additional recreation center to serve the citizens in South Euless. Constructing a community recreation center in south Euless would satisfy a demand that was clearly identified in the scientific survey of the adopted Parks Master Plan. Presently, the citizens living in south Euless must travel across major thoroughfares in order to participate in any recreational activities and/or programs that necessitate an indoor setting or that are programmed currently at the Midway Recreation Center. Current membership at the Midway Recreation Center would substantiate the claim that the residents in south Euless will not travel north to participate in recreational activities. A computer-generated report proved in 2007 that of the 2,576 members, 1,892 of them lived in the 76039 zip code as compared to 684 in the 76040 zip code. 352 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: COMMUNITY CENTER FOR SOUTH EULESS Cost- To Be Detertmined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 353 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES May 12,2008 RAY MCDONALD EMERGENCY CALL BOXES AMENITY IMPROVEMENTS C Identified in the Needs Assessment and Identification section of the adopted Parks Master Plan is the installation of emergency call boxes in various parks within the park system. As the population grows and participation in park related leisure activities increases, it's important to consider opportunities to make parks safe for citizens. By installing emergency call boxes in various parks and along the trail system, citizens would be able to reach first responders immediately should an emergency situation arise where a person would need critical public safety assistance. This project would provide the citizens the ability to call directly to public safety dispatch should an emergency situation occur in one of the many park facilities located in Euless. 354 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: EMERGENCY CALL BOXES Cost- To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 355 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES May 13,2008 RAY MCDONALD KIDDIE CARR PARK IMPROVEMENTS LAND IMPROVEMENTS C This project includes the construction or installation of a pavilion, a concrete trail connection to Carr Park, bank stabilization along Boyd Branch Creek which runs through the park, a playground, park lighting, picnic stations, an irrigation system, new perimeter fencing, a drinking fountain, benches, and a dedicated parking lot at Kiddie Carr Park. As identified in the adopted Parks Master Plan, the municipal park is the foundation of any solid parks and recreational system. The City of Euless parks and recreation system provides residents and visitors with significant personal, social, environmental, and economic benefits. The revitalization efforts that the Euless City Council has focused on over the years has increased the sense of community pride. Kiddie Carr Park is a 4 acre park located adjacent to Carr Park off Pauline. The current amenities at this park include the Parks Department's in-ground tree farm, a greenhouse, and an outdoor basketball court. The park is located in a section of town that needs something to stimulate community pride. The proposed project will continue the City Council's revitalization efforts by creating an area that will serve both the passive and active leisure needs of the residents in this area. 356 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: KIDDIE CARR PARK IMPROVEMENTS Cost- To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 357 358 CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Date Completed Total Budget Total Project Costs (Over) Under Budget DRAINAGE PROJECTS DR9901 Sulphur Branch Phase II 08/01/99 123,404$ 120,128$ 3,276$ DR9902 Windlea & WestCliff 08/01/99 4,396$ 1,159$ 3,237$ DR9904 Hurricane Creek 04/31/02 257,500$ 69,906$ 187,594$ DR0302 Flooding Mitigation Cancelled 250,000$ -$ 250,000$ DR0303 Aransas @ Glenn 12/31/04 250,000$ 250,000$ -$ DR0304 Live Oak Drainage 04/15/05 218,000$ 175,958$ 42,042$ DR0305 Sierra Drive Drainage 04/15/05 40,738$ 40,738$ 0$ DR0306 Flood Mitigation Plan(FEMA)04/15/05 32,000$ 7,750$ 24,250$ DR0307 Simmons Drainage 04/15/05 22,995$ 22,995$ -$ DR0301 Fuller Branch Channel Stabilization 05/31/07 279,136$ 232,176$ 46,960$ DR0401 Channel Stabilization Tributary WFA 05/31/07 437,462$ 438,070$ (608)$ DR0402 Drainage Project Study 05/31/07 60,000$ 51,000$ 9,000$ DR0601 Little Bear Creek Study Update 04/25/08 50,000$ 49,000$ 1,000$ DR0602 McCormick Park 04/25/08 250,000$ 247,925$ 2,075$ 2,275,631$ 1,706,805$ 568,826$ -$ -$ -$ -$ Sub-Total Drainage Projects 2,275,631$ 1,706,805$ 568,826$ Project Number Project Description Drainage Projects - Prior Years Drainage Projects - Current Year 359 CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Date Completed Total Budget Total Project Costs (Over) Under Budget Project Number Project Description STREET PROJECTS PS9902 Mid Cities Blvd.05/02/02 1,075,074$ 963,635$ 111,439$ PS9903 HWY 183 Service Road Cancelled -$ -$ -$ PS9907 Westpark Way -SH10 to SH183 09/30/00 605,542$ 479,915$ 125,627$ PS9906 Traffic Safety/Signalization 05/31/08 128,027$ 127,939$ 88$ PS9908 Signalization 05/31/06 168,055$ 168,055$ -$ PS9910 Sidewalks 06/30/03 200,000$ 200,000$ -$ PS9911 Overlay Projects 03/30/00 294,687$ 294,687$ -$ PS9912 Harwood-Main Intersection 04/30/00 1,126,935$ 1,077,303$ 49,632$ PS0001 FM 157 S Pipeline to SH10 (Utility Relocation)04/30/04 378,207$ 371,318$ 6,889$ PS0003 Glade from Heritage to SH121 04/30/04 1,866,612$ 1,866,612$ -$ PS0004 Glade Rd (East) - SH121 to Champagne 04/30/04 1,210,014$ 1,162,009$ 48,005$ PS0201 Gateway Blvd - Southern Portion 04/30/04 510,000$ 473,817$ 36,183$ PS0301 Mid Cities Roadway Illumination 04/15/05 160,000$ 148,115$ 11,885$ PS0302 Driftwood Pipeline Traffic Signal 04/15/05 100,000$ 68,665$ 31,335$ PS0303 Aransas/Harwood Traffic Signal 04/15/05 120,000$ 89,118$ 30,882$ PS0401 West Pipeline - Raider to City Limits 05/31/06 223,000$ 104,859$ 118,141$ PS0402 South Pipeline Road Bridge 04/30/05 28,208$ 28,208$ -$ PS0403 Raider Dr -SH10 to South Pipeline 05/31/06 330,000$ 293,435$ 36,565$ PS0404 South Pipeline Road Overlay 05/31/08 114,750$ 85,062$ 29,688$ PS0501 Ross Avenue/S.Main 300' W 05/31/06 95,688$ 95,638$ 50$ PS0502 Industrial Signal Timing 05/31/06 50,000$ 50,000$ -$ PS0503 Overlay-Harwood 157/Main 05/31/06 137,000$ 119,816$ 17,184$ PS0604 Overlay-S.Main, SH10/S.Pipeline 05/31/06 137,000$ 140,211$ (3,211)$ PS0601 Overlay-East Midway 05/31/07 83,000$ 73,550$ 9,450$ PS0602 Overlay-Midway, N Main,/FM157 05/31/07 105,000$ 67,632$ 37,368$ PS0603 Overlay-Fuller Wiser, Midway/Harwood 05/31/07 40,000$ 28,695$ 11,305$ PS0701 Overlay-Dickey Drive 05/31/08 122,200$ 48,435$ 73,765$ PS0702 Overlay-East Huitt 05/31/08 89,000$ 64,895$ 24,105$ PS0703 Overlay-Huntington Drive 05/31/08 69,500$ 42,884$ 26,616$ PS0706 Gateway Blvd Screening Wall 05/31/08 135,800$ 138,862$ (3,062)$ 9,703,299$ 8,873,369$ 829,930$ PS0002 West Pipeline Road-Raider/Hwy10 12/01/08 6,082,621$ 6,081,392$ 1,229$ PS0704 Disability Access Study 05/31/09 30,000$ 13,950$ 16,050$ PS0705 Signal Gateway Blvd @ Glade 10/28/08 98,000$ 98,000$ -$ PS0801 Overlay-North Main/Cullum Drive 12/31/08 290,000$ 211,130$ 78,870$ PS9905 Traffic Studies 05/30/09 27,286$ 27,197$ 89$ 6,527,907$ 6,431,669$ 96,238$ Sub-Total Street Projects 16,231,206$ 15,305,038$ 926,168$ Street Projects - Current Year Street Projects - Prior Years 360 CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Date Completed Total Budget Total Project Costs (Over) Under Budget WASTEWATER PROJECTS WW9901 CDBG B/98-UC-48-0001/B95-22-50 08/19/00 150,000$ 72,927$ 77,073$ WW9902 Impact Fee Study 09/30/99 13,000$ 12,238$ 762$ WW9903 Misc Sewer Rehab FY99 09/30/99 50,000$ 12,987$ 37,013$ WW9904 Hydraulic Analysis 06/30/00 27,000$ 27,000$ -$ WW0001 CDBG B/99-UC-48-0001 09/30/01 150,000$ 121,682$ 28,318$ WW0003 TRA Debt Payment 05/31/01 822,037$ 822,037$ -$ WW0101 CDBG B00-UC480001-2250 02/20/02 251,485$ 247,790$ 3,695$ WW0102 Manhole Rehab. Program 03/31/03 250,000$ 184,520$ 65,480$ WW0201 CDBG - B01-UC-48-0001-22-50 03/31/03 237,086$ 172,948$ 64,138$ WW0103 Line replacement-S. Pipeline,Heather-Vine 04/15/05 489,759$ 464,504$ 25,255$ WW0202 Line Replacement -Dunaway 02/28/05 140,000$ 139,955$ 45$ WW0203 Line Replacement - E. Alexander 02/28/05 20,000$ 20,000$ -$ WW0204 Line Replacement - Paula Lane 02/28/05 79,000$ 79,000$ -$ WW0205 Line Replacement - Midway Park 04/30/05 366,000$ 318,149$ 47,851$ WW0301 CDBG B02-UC-48-0001-22-50 07/26/05 271,455$ 271,454$ 1$ WW0303 Line Replacement, Canyon Ridge 08/31/06 196,200$ 173,516$ 22,684$ WW0304 Line Replacement, Sagebrush 08/31/06 160,900$ 136,470$ 24,430$ WW0305 Line Replacement, Short 08/31/06 251,400$ 219,932$ 31,468$ WW0306 Line Replacement, E. Fuller 08/31/06 231,372$ 180,089$ 51,283$ WW0401 CDBG B03-UC-48-0001-22-50 04/30/05 217,000$ 161,170$ 55,830$ WW0402 Line Replacement, Carr Park/SH10 05/31/08 588,000$ 528,302$ 59,698$ WW0403 Line Replacement, Ector Drive 05/31/08 373,000$ 328,309$ 44,691$ WW0501 Line Replacement, Pebble Creek 08/31/06 172,600$ 145,655$ 26,945$ WW0302 Inflow & Infiltration Cancelled 200,000$ -$ 200,000$ WW0601 Line Replacement, Cedar Hills Estate 05/31/08 319,000$ 200,201$ 118,799$ WW0602 Line Replacement, Ector Drive 05/31/08 425,000$ 285,758$ 139,242$ WW0603 Little Bear Creek Collection Line 05/31/08 575,000$ 464,293$ 110,707$ WW0604 Line Replacement, CDBG-Oakwood Terrace 05/31/07 293,723$ 232,274$ 61,449$ 7,320,017$ 6,023,160$ 1,296,857$ WW0701 Line Replacement, McCormick & Copher 02/05/09 243,000$ 194,254$ 48,746$ WW0702 Line Replacement, Arnett Addition 02/05/09 313,322$ 229,006$ 84,316$ WW0703 Line Replacement, Jean Lane 02/05/09 111,000$ 70,603$ 40,397$ WW0704 Line Replacement, W. Fuller 02/05/09 132,000$ 82,708$ 49,292$ 799,322$ 576,571$ 222,751$ Total Wastewater Projects 8,119,339$ 6,599,731$ 1,519,608$ Project Number Project Description Wastewater Projects - Prior Years Wastewater Projects- Current Year 361 CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Date Completed Total Budget Total Project Costs (Over) Under Budget Project Number Project Description WATER PROJECTS WT9901 Meter Change Out Program 10/30/99 101,917$ 98,365$ 3,552$ WT9903 Master Plan 08/30/99 42,000$ 5,445$ 36,555$ WT9904 Well Repairs 09/30/99 66,921$ 66,921$ -$ WT9905 Misc Water Rehab 06/30/00 50,000$ 43,749$ 6,251$ WT9906 Hwy 10 Water Line 01/30/00 150,000$ 138,883$ 11,117$ WT9907 Impact Fee Study 09/30/99 13,000$ 12,238$ 762$ WT9908 Mid Cities Blvd. 12" Line 04/30/04 342,080$ 313,354$ 28,726$ WT9909 2MG Water Tank 03/31/03 2,430,881$ 2,289,571$ 141,310$ WT9910 Water Line for Elevated Tank 05/31/02 1,608,386$ 1,201,698$ 406,688$ WT9911 Water Distribution - Master Plan 09/30/99 25,600$ 24,000$ 1,600$ WT0002 Emergency Repair - Hwy 10 11/30/99 15,450$ 14,214$ 1,236$ WT0003 Waterline Replacement - Aransas 06/30/01 12,057$ 7,089$ 4,968$ WT0004 Water Line Milam - Ector/Midway 06/30/00 18,248$ 13,743$ 4,505$ WT0005 Waterline Replacement - Milam- Denton/Mid 04/30/02 26,988$ 26,988$ -$ WT0006 Central Drive Water Mains 03/31/00 92,814$ 90,742$ 2,072$ WT0102 SCADA Upgrade 04/09/01 93,400$ 93,400$ -$ WT0103 Fire Hydrant Replacement Program 03/31/03 50,000$ 49,626$ 374$ WT0401 Line Replacement, West Pipeline Main 05/31/06 1,215,663$ 1,215,663$ -$ WT0403 Waterline Replacement - Fairlawn Court Cancelled 35,000$ -$ 35,000$ WT0404 Waterline Replacement - Atkerson Lane Cancelled 104,000$ -$ 104,000$ WT0405 Line Replacement, West Ash Lane 08/31/06 30,000$ 11,626$ 18,374$ WT0406 Line Replacement, Westport/Newport/Asbury 08/31/06 67,000$ 9,866$ 57,134$ WT0501 System Security Upgrade 05/31/08 40,000$ 28,319$ 11,681$ WT0502 FY'2005 CDBG 08/31/06 69,300$ 29,549$ 39,751$ WT0503 Line Replacement, S. Atkerson Lane 08/31/06 79,000$ 51,294$ 27,706$ WT0504 Line Replacement, Blanco Drive 08/31/06 112,620$ 112,620$ -$ WT0505 Line Replacement, Henslee 08/31/06 183,000$ 123,859$ 59,141$ WT0506 Line Replacement, Vernon/Slaughter 08/31/06 161,000$ 113,052$ 47,948$ WT0601 Wtr Sys Security Perimeter Fence Upgrade 05/31/08 75,000$ 49,567$ 25,433$ WT0602 Line Replacement, Cannon Drive 05/31/08 250,000$ 223,055$ 26,945$ WT0701 Line Replacement, Canyon Ridge 05/31/08 116,000$ 78,136$ 37,864$ WT0702 CDBG FY07 - 32nd Oakwood Terrace 05/31/08 334,481$ 296,223$ 38,258$ WT9902 Tank Painting 05/31/07 1,317,763$ 957,542$ 360,221$ 9,329,569$ 7,790,397$ 1,539,172$ WT0402 Water & Wastewater Impact Fee Update 05/31/09 30,000$ 17,729$ 12,271$ WT0801 Line Replacement, Signet/Mesa 05/31/09 255,000$ 218,663$ 36,337$ WT0802 CDBG-33rd Oakwood Terrace-Simmons 12/31/08 451,639$ 384,173$ 67,466$ 736,639$ 620,565$ 116,074$ Sub-Total Water Projects 10,066,208$ 8,410,962$ 1,655,246$ Water Projects- Current Year Water Projects - Prior Years 362 CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Date Completed Total Budget Total Project Costs (Over) Under Budget Project Number Project Description OTHER PROJECTS AC9901 Athletic Complex Phase II 06/30/02 123,654$ 75,047$ 48,607$ AC0202 Athletic Complex Phase Ill 05/31/06 1,252,221$ 1,251,915$ 306$ ED0102 Bell Ranch Terrace Cancelled 200,000$ -$ 200,000$ FM0101 Building D 09/30/02 930,610$ 930,608$ 2$ FM0209 Midway Recreation Upgrade 06/30/02 557,125$ 557,125$ -$ FM0308 Building A Remodel 05/31/07 1,663,238$ 1,651,325$ 11,913$ FM0309 Fire Station #3 05/31/07 2,286,798$ 2,286,229$ 569$ FM0601 Public Works Facility 05/31/08 2,210,956$ 2,213,507$ (2,551)$ PR9901 Hike/Bike Trail 04/30/05 237,714$ 237,714$ -$ PR9902 Senior Citizen Remodel 04/30/05 16,130$ 16,130$ -$ PR9922 Tejas Remodel 11/30/01 430,000$ 455,885$ (25,885)$ PR9927 Park Improvements - Texas Star 09/30/01 1,036,500$ 1,025,298$ 11,202$ PR0015 Purchase of Dallas Stars Center 05/31/00 10,327,978$ 10,327,978$ -$ PR0016 Wilshire Park Improvements 06/30/02 150,000$ 149,926$ 74$ PR0110 Slope Protection/Screening Wall 03/31/03 1,275,203$ 1,273,923$ 1,280$ PR0302 Bob Eden Parking 04/30/05 75,000$ 74,854$ 146$ PR0303 Youth Ballpark 04/30/05 600,000$ 600,000$ -$ PR0407 Parking Improvements, Midway Cancelled 11,000$ -$ 11,000$ PR0408 Parking Improvements, S. Euless Park 05/31/06 55,000$ 20,991$ 34,009$ PR0409 Parking Improvements, Simmons 07/29/04 6,960$ 6,960$ -$ PR0410 Parking Improvements, Villages Bear Creek 07/29/04 33,666$ 33,666$ -$ PR0411 Preserve at McCormick Park 05/31/06 1,168,427$ 1,168,427$ -$ PR0412 Splash Pool 05/31/06 125,000$ 124,477$ 523$ SS9901 Fire Station II 03/30/00 49,688$ 49,688$ -$ SS9902 Library Books 08/15/00 3,302$ 3,302$ -$ SS9919 Fire Station #3 - Structural Repairs 03/30/00 30,000$ 17,344$ 12,656$ SS0010 Former Fire Station #2 06/30/02 599,600$ 595,257$ 4,343$ SS0113 Park Building 06/30/02 1,492,400$ 1,492,100$ 300$ 27,207,736$ 26,888,567$ 319,169$ FM0504 Building "B" Remodel 05/31/09 1,322,490$ 1,315,697$ 6,793$ FM0801 TX Star Golf Course & Conference Ctr Expand 05/31/09 3,630,079$ 3,630,079$ -$ FM0802 Senior Citizen Center Design cancelled 250,000$ -$ 250,000$ FM0803 Midway Recreation Improvements 03/31/09 293,500$ 75,976$ 217,524$ FM0804 Library-Shell Expansion 12/31/08 307,034$ 305,664$ 1,370$ PR0602 Mid Cities Landscaping 05/31/09 40,000$ 33,199$ 6,801$ PR0719 Midway Park Trail 05/31/09 210,000$ 190,473$ 19,527$ 6,053,103$ 5,551,088$ 502,015$ Sub-Total Other Projects 33,260,839$ 32,439,655$ 821,184$ 69,953,223$ 64,462,191$ 5,491,032$ 09/30/06 Other Projects - Prior Years Other Projects- Current Year TOTAL COMPLETED PROJECTS PR9903- PR9918 Various EDC Park Projects 259,566$ 248,891$ 10,675$ 363 364 CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Date Completed Total Budget Total Project Costs (Over) Under Budget DRAINAGE PROJECTS DR9901 Sulphur Branch Phase II 08/01/99 123,404$ 120,128$ 3,276$ DR9902 Windlea & WestCliff 08/01/99 4,396$ 1,159$ 3,237$ DR9904 Hurricane Creek 04/31/02 257,500$ 69,906$ 187,594$ DR0302 Flooding Mitigation Cancelled 250,000$ -$ 250,000$ DR0303 Aransas @ Glenn 12/31/04 250,000$ 250,000$ -$ DR0304 Live Oak Drainage 04/15/05 218,000$ 175,958$ 42,042$ DR0305 Sierra Drive Drainage 04/15/05 40,738$ 40,738$ 0$ DR0306 Flood Mitigation Plan(FEMA)04/15/05 32,000$ 7,750$ 24,250$ DR0307 Simmons Drainage 04/15/05 22,995$ 22,995$ -$ DR0301 Fuller Branch Channel Stabilization 05/31/07 279,136$ 232,176$ 46,960$ DR0401 Channel Stabilization Tributary WFA 05/31/07 437,462$ 438,070$ (608)$ DR0402 Drainage Project Study 05/31/07 60,000$ 51,000$ 9,000$ DR0601 Little Bear Creek Study Update 04/25/08 50,000$ 49,000$ 1,000$ DR0602 McCormick Park 04/25/08 250,000$ 247,925$ 2,075$ 2,275,631$ 1,706,805$ 568,826$ -$ -$ -$ -$ Total Drainage Projects 2,275,631$ 1,706,805$ 568,826$ Project Number Project Description Drainage Projects - Prior Years Drainage Projects - Current Year 365 366 CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Date Completed Total Budget Total Project Costs (Over) Under Budget STREET PROJECTS PS9902 Mid Cities Blvd.05/02/02 1,075,074$ 963,635$ 111,439$ PS9903 HWY 183 Service Road Cancelled -$ -$ -$ PS9907 Westpark Way -SH10 to SH183 09/30/00 605,542$ 479,915$ 125,627$ PS9906 Traffic Safety/Signalization 05/31/08 128,027$ 127,939$ 88$ PS9908 Signalization 05/31/06 168,055$ 168,055$ -$ PS9910 Sidewalks 06/30/03 200,000$ 200,000$ -$ PS9911 Overlay Projects 03/30/00 294,687$ 294,687$ -$ PS9912 Harwood-Main Intersection 04/30/00 1,126,935$ 1,077,303$ 49,632$ PS0001 FM 157 S Pipeline to SH10 (Utility Relocation)04/30/04 378,207$ 371,318$ 6,889$ PS0003 Glade from Heritage to SH121 04/30/04 1,866,612$ 1,866,612$ -$ PS0004 Glade Rd (East) - SH121 to Champagne 04/30/04 1,210,014$ 1,162,009$ 48,005$ PS0201 Gateway Blvd - Southern Portion 04/30/04 510,000$ 473,817$ 36,183$ PS0301 Mid Cities Roadway Illumination 04/15/05 160,000$ 148,115$ 11,885$ PS0302 Driftwood Pipeline Traffic Signal 04/15/05 100,000$ 68,665$ 31,335$ PS0303 Aransas/Harwood Traffic Signal 04/15/05 120,000$ 89,118$ 30,882$ PS0401 West Pipeline - Raider to City Limits 05/31/06 223,000$ 104,859$ 118,141$ PS0402 South Pipeline Road Bridge 04/30/05 28,208$ 28,208$ -$ PS0403 Raider Dr -SH10 to South Pipeline 05/31/06 330,000$ 293,435$ 36,565$ PS0404 South Pipeline Road Overlay 05/31/08 114,750$ 85,062$ 29,688$ PS0501 Ross Avenue/S.Main 300' W 05/31/06 95,688$ 95,638$ 50$ PS0502 Industrial Signal Timing 05/31/06 50,000$ 50,000$ -$ PS0503 Overlay-Harwood 157/Main 05/31/06 137,000$ 119,816$ 17,184$ PS0604 Overlay-S.Main, SH10/S.Pipeline 05/31/06 137,000$ 140,211$ (3,211)$ PS0601 Overlay-East Midway 05/31/07 83,000$ 73,550$ 9,450$ PS0602 Overlay-Midway, N Main,/FM157 05/31/07 105,000$ 67,632$ 37,368$ PS0603 Overlay-Fuller Wiser, Midway/Harwood 05/31/07 40,000$ 28,695$ 11,305$ PS0701 Overlay-Dickey Drive 05/31/08 122,200$ 48,435$ 73,765$ PS0702 Overlay-East Huitt 05/31/08 89,000$ 64,895$ 24,105$ PS0703 Overlay-Huntington Drive 05/31/08 69,500$ 42,884$ 26,616$ PS0706 Gateway Blvd Screening Wall 05/31/08 135,800$ 138,862$ (3,062)$ 9,703,299$ 8,873,369$ 829,930$ PS0002 West Pipeline Road-Raider/Hwy10 12/01/08 6,082,621$ 6,081,392$ 1,229$ PS0704 Disability Access Study 05/31/09 30,000$ 13,950$ 16,050$ PS0705 Signal Gateway Blvd @ Glade 10/28/08 98,000$ 98,000$ -$ PS0801 Overlay-North Main/Cullum Drive 12/31/08 290,000$ 211,130$ 78,870$ PS9905 Traffic Studies 05/30/09 27,286$ 27,197$ 89$ 6,527,907$ 6,431,669$ 96,238$ Total Street Projects 16,231,206$ 15,305,038$ 926,168$ Street Projects - Current Year Project Number Project Description Street Projects - Prior Years 367 Department:Date Prepared:July 26, 1999 Submitted By:Date Completed:December 1, 2008 Project Title:WEST PIPELINE - RAIDER/SH10 Project Type:STREET Sub-Type: Project No.:PS0002 Priority: A COUNCIL AUTHORIZATION: April 14, 1998 - Authorized bond election for the purpose of funding construction. January 1, 2000 - Authorized the City Manager to execute an engineering contract for design. June 12, 2001 - Declared intent to reimburse expenditures from proceeds of future debt. Inc. for engineering design in the amount of $89,875. design widening the road to design gas pipeline adjustments in an additional amount $77,600. in the amount of $249,971 and authorized contingency of $250,000 for potential change orders. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: include modifications to the intersection of Pipeline Road and SH10. PROJECT SCHEDULE: Award construction contract: November 2005 Construction complete : December 2006 SH10/Pipeline Road Intersection: December 2008 JUSTIFICATION: The street exists in an expanded condition on either end of this proposed widening. The traffic greatly overloads the existing roadway. December 14, 2004 - Declared the necessity to acquire land for reconstruction improvements. March 08, 2005 - Authorized the City Manager to execute an amendment with Teague Nall and Perkins, April 12, 2005 - Authorized the City Manager to amend the contract with Teague Nall and Perkins, Inc. for LP, in the amount of $5,823,149.64. Also, authorized execution of Change Order No. 1 for credit to the City This project will encompass the section of West Pipeline from SH10 to Raider Drive. The project will also CONSTRUCTION This project was approved as part of the 1998 bond election along with Main Street and Harwood Road. City of Euless Capital Project Request PUBLIC WORKS RON YOUNG November 8, 2005-Authorized the City Manager to enter into construction contract with JLB Contracting, Project consists of widening West Pipeline Road from two lanes to a proposed four lane boulevard street. 368 PROJECT TITLE:PROJECT #:PS0002 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Engineering $422,243 Personnel:Full Time ROW Appraisal / Geotech Svc $85,936 Part Time ROW Acquisition $299,033 $0 Utility Relocation & Gas Line $107,177 Construction $4,706,077 $360,230 Issuance Cost $55,000 Contract Labor $46,925 Total Estimated Capital Cost $6,082,621 Subtotal:$0 FUNDING SOURCES: Maintenance Costs Interest Income $980,351 City of Bedford Contributions $220,000 Street CIP Fund Balance (Transfer from PS0004)$298,180 $0 (Transfer from PS9904)$299,321 GO Bond Proceeds FY01 $86,779 GO Bond Proceeds $3,200,000 Certificates of Obligations $1,102,000 $279,745 $473,690 ($577,700) $279,745 $6,082,621 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Engineering $422,243 $422,243 $0 100% Utility Relocation $107,177 $107,177 $0 100% Contract Labor $46,925 $46,925 $0 100% Appraisal Services $15,800 $15,800 $0 100% Right of Way $299,061 $299,061 $0 100% Construction $4,705,705 $4,705,705 $0 100% Issuance Cost $55,000 $55,000 $0 100% Contingency $351,574 $349,694 $1,880 99% Geotech Svcs $70,136 $70,136 $0 100% Signs/Markings $9,000 $9,651 ($651) 107% $6,082,621 $6,081,392 $1,229 100%TOTAL PROJECT Total Estimated Annual Cost CURRENT STATUS Total Funding Transfer to FB9907 Other Average Annual Debt Service Transfer from FB9907 Subtotal: WEST PIPELINE - RAIDER/SH10 Total Salary Purchase of Services Contingency/Signs & MarkingsMaterials & Supplies Utilities 369 Department:Date Prepared:4/13/2006 Submitted By:Date Completed:5/31/2009 Project Title: Project Type:STREET Sub-Type: Project No.:PS0704 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: All City facilities including buildings and streets must be Americans with Disabilities Act compliant per federal and state regulations. DISABILITY ACCESSIBILITY STUDY City of Euless Capital Project Request PUBLIC WORKS RON YOUNG Sidewalks are a part of the City of Euless street system. SIDEWALK This will be the initial assessment for Americans with Disabilities Act compliance within the City. A multi- Completed: May 2009 year effort is anticipated. The initial effort will focus on City facilities and arterial thoroughfares. Begin Study: February 2007 370 PROJECT TITLE:PROJECT #:PS0704 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost $30,000 Personnel:Full Time Part Time $0 $30,000 Subtotal:$0 Maintenance Costs $30,000 $0 Total Estimated Annual Cost $0 Total Funding $30,000 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $30,000 $13,950 $16,050 47% $30,000 $13,950 $16,050 47%TOTAL PROJECT CURRENT STATUS Engineering Subtotal: Total Estimated Capital Cost Transfer from FB9907 Materials & Supplies Utilities Purchase of Services FUNDING SOURCE: Total Salary DISABILITY ACCESSIBILITY STUDY Engineering 371 Department:Date Prepared:5/10/2005 Submitted By:Date Completed:10/28/2008 Project Title: Project Type:STREET Sub-Type: Project No.:PS0705 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Road widening project. PROJECT DESCRIPTION: Glade Road. PROJECT SCHEDULE: JUSTIFICATION: be performed to determine the need and justification for the signal installation. Euless Master Thoroughfare Plan adopted in 1999. This signal will be needed in conjunction with the Glade underground conduit, vehicle detection and signal controller for the intersection of Gateway Boulevard and TRAFFIC SIGNAL - GATEWAY BLVD AT GLADE RD City of Euless Capital Project Request PUBLIC WORKS RON YOUNG SIGNALIZATION The extension of north Gateway Boulevard to Glade Road in conjunction with development on the Wilkins Traffic Signals are located at the intersections of arterial and collector thoroughfares identified in the City of This project consists of the installation of traffic signal poles, mast arms, signal heads, pedestrian indicators, Design complete: March 2007 Installation complete: April 2008 property will generate anticipated traffic volumes that will warrant a traffic signal. Signal warrant studies will 372 PROJECT TITLE:PROJECT #:PS0705 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost $20,000 Personnel:Full Time $78,000 Part Time $0 $98,000 Subtotal:$0 Maintenance Costs $98,000 $0 Total Estimated Annual Cost $0 Total Funding $98,000 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $98,000 $98,000 $0 100% $98,000 $98,000 $0 100%TOTAL PROJECT CURRENT STATUS Traffic Signals Subtotal: Total Estimated Capital Cost Transfer from FB9907 Materials & Supplies Utilities Purchase of Services FUNDING SOURCE: Total Salary TRAFFIC SIGNAL-GATEWAY BLVD @ GLADE Engineering Traffic Signals 373 Department:Date Prepared:4/30/2007 Submitted By:Date Completed:9/30/2008 Project Title: Project Type:STREET Sub-Type: Project No.:PS0801 Priority: A COUNCIL AUTHORIZATION: in the amount of $290,000. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: overlay in a cooperative project with Tarrant County. PROJECT DESCRIPTION: Drive approximately 5300 linear feet. It will also include adjusting manholes and water valve covers. PROJECT SCHEDULE: JUSTIFICATION: this street. OVERLAY North Main Street is a minor arterial street and is one of the two streets that the City of Euless plans to City of Euless Capital Project Request PUBLIC WORKS RON YOUNG NORTH MAIN STREET December 11, 2007:Approved an interlocal agreement with Tarrant County for overlay improvements on North Main Street from Harwood Road to Little Bear Creek and Cullum Drive from SH10 to Iron Bridge Place Construction Complete: September 2008 will provide an improved riding surface, will extend the life of the roadway and will enhance the appearance of The existing asphalt pavement is deteriorating and is becoming a maintenance problem. The asphalt overlay This project consists of edge milling, asphalt overlay, and restriping from Harwood Road to Little Bear Creek 374 PROJECT TITLE:PROJECT #:PS0801 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost $290,000 Personnel:Full Time Part Time $0 $290,000 Subtotal:$0 Maintenance Costs $290,000 $0 Total Estimated Annual Cost $0 Total Funding $290,000 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $290,000 $211,130 $78,870 73% $290,000 $211,130 $78,870 73% NORTH MAIN STREET OVERLAY Construction Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: CURRENT STATUS Overlay TOTAL PROJECT Total Estimated Capital Cost FUNDING SOURCE: Transfer from FB9907 375 Department:Date Prepared:7/17/1999 Submitted By:Date Completed:5/30/2009 Project Title: Project Type:STREET Sub-Type: Project No.:PS9905 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: TRAFFIC STUDIES City of Euless Capital Project Request PUBLIC WORKS RON YOUNG needs throughout the City. streets. Funds are needed to compensate consultants in the investigation process. STUDY These funds are utilized with projects PS9906 Traffic Safety and PS9908 Signalization to address traffic Staff utilizes these funds to investigate concerns related to traffic movements and volumes. The change of traffic patterns and the increased volume of traffic are causing problems on the existing 376 PROJECT TITLE:PROJECT #:PS9905 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost $26,352 Personnel:Full Time $164 Part Time $770 $0 Total Estimated Capital Cost $27,286 Subtotal:$0 Maintenance Costs $7,198 $20,000 $88 $0 Total Estimated Annual Cost $0 Total Funding $27,286 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $26,352 $26,351 $1 100% $164 $76 $88 46% $770 $770 $0 100% $27,286 $27,197 $89 100% FUNDING SOURCE: Street Fund Balance W/S Operating Fund Engineering Other Professional Services Traffic Signals TOTAL PROJECT Traffic Signals CURRENT STATUS Engineering Services Other Professional Services Materials & Supplies Utilities Subtotal: TRAFFIC STUDIES Transfer from PS9906 Total Salary Purchase of Services 377 378 CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Date Completed Total Budget Total Project Costs (Over) Under Budget WASTEWATER PROJECTS WW9901 CDBG B/98-UC-48-0001/B95-22-50 08/19/00 150,000$ 72,927$ 77,073$ WW9902 Impact Fee Study 09/30/99 13,000$ 12,238$ 762$ WW9903 Misc Sewer Rehab FY99 09/30/99 50,000$ 12,987$ 37,013$ WW9904 Hydraulic Analysis 06/30/00 27,000$ 27,000$ -$ WW0001 CDBG B/99-UC-48-0001 09/30/01 150,000$ 121,682$ 28,318$ WW0003 TRA Debt Payment 05/31/01 822,037$ 822,037$ -$ WW0101 CDBG B00-UC480001-2250 02/20/02 251,485$ 247,790$ 3,695$ WW0102 Manhole Rehab. Program 03/31/03 250,000$ 184,520$ 65,480$ WW0201 CDBG - B01-UC-48-0001-22-50 03/31/03 237,086$ 172,948$ 64,138$ WW0103 Line replacement-S. Pipeline,Heather-Vine 04/15/05 489,759$ 464,504$ 25,255$ WW0202 Line Replacement -Dunaway 02/28/05 140,000$ 139,955$ 45$ WW0203 Line Replacement - E. Alexander 02/28/05 20,000$ 20,000$ -$ WW0204 Line Replacement - Paula Lane 02/28/05 79,000$ 79,000$ -$ WW0205 Line Replacement - Midway Park 04/30/05 366,000$ 318,149$ 47,851$ WW0301 CDBG B02-UC-48-0001-22-50 07/26/05 271,455$ 271,454$ 1$ WW0303 Line Replacement, Canyon Ridge 08/31/06 196,200$ 173,516$ 22,684$ WW0304 Line Replacement, Sagebrush 08/31/06 160,900$ 136,470$ 24,430$ WW0305 Line Replacement, Short 08/31/06 251,400$ 219,932$ 31,468$ WW0306 Line Replacement, E. Fuller 08/31/06 231,372$ 180,089$ 51,283$ WW0401 CDBG B03-UC-48-0001-22-50 04/30/05 217,000$ 161,170$ 55,830$ WW0402 Line Replacement, Carr Park/SH10 05/31/08 588,000$ 528,302$ 59,698$ WW0403 Line Replacement, Ector Drive 05/31/08 373,000$ 328,309$ 44,691$ WW0501 Line Replacement, Pebble Creek 08/31/06 172,600$ 145,655$ 26,945$ WW0302 Inflow & Infiltration Cancelled 200,000$ -$ 200,000$ WW0601 Line Replacement, Cedar Hills Estate 05/31/08 319,000$ 200,201$ 118,799$ WW0602 Line Replacement, Ector Drive 05/31/08 425,000$ 285,758$ 139,242$ WW0603 Little Bear Creek Collection Line 05/31/08 575,000$ 464,293$ 110,707$ WW0604 Line Replacement, CDBG-Oakwood Terrace 05/31/07 293,723$ 232,274$ 61,449$ 7,320,017$ 6,023,160$ 1,296,857$ WW0701 Line Replacement, McCormick & Copher 02/05/09 243,000$ 194,254$ 48,746$ WW0702 Line Replacement, Arnett Addition 02/05/09 313,322$ 229,006$ 84,316$ WW0703 Line Replacement, Jean Lane 02/05/09 111,000$ 70,603$ 40,397$ WW0704 Line Replacement, W. Fuller 02/05/09 132,000$ 82,708$ 49,292$ 799,322$ 576,571$ 222,751$ Total Wastewater Projects 8,119,339$ 6,599,731$ 1,519,608$ Project Number Project Description Wastewater Projects - Prior Years Wastewater Projects- Current Year 379 Department:Date Prepared:07/10/2000 Submitted By:Date Completed:02/05/2009 Project Title: Type:WASTEWATER Sub-Type: Project No.:WW0701 Priority: A COUNCIL AUTHORIZATION: Estates Additions, in the amount of $559,933 for projects WW0701, WW0702, WW0703, and WW0704. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: Systematic replacement will prevent a mandatory wide spread replacement. Many sanitary sewer lines throughout the city are 40 plus years old. Most of the lines are clay tile and are Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. November 14, 2006:Authorized the city manager to execute an Engineering design contract with Elliot and sewer mains in portions of the Fuller, Arnett, Oakwood Terrace East, Twin Creek Estates and Oak Crest from Hilton Drive to Evergreen. Construction complete: January 2009 City of Euless Capital Project Request PUBLIC WORKS RON YOUNG LINE REPLACEMENT, MCCORMICK & COPHER June 24, 2008:Award Bid #004-08 to Horseshoe Construction Company, Inc. for replacement sanitary Hughes, Inc. not to exceed $89,322 for projects WW0701, WW0702, WW0703, and WW0704. SEWER MAINS Replace sanitary sewer line servicing the south side of McCormick and Copher Courts and Creekside Drive subject to ground movement, grease, root infestation and deterioration due to hydrogen sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with infiltration and inflow. 380 PROJECT TITLE:PROJECT #:WW0701 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost $23,000 Personnel:Full Time $220,000 Part Time $0 $243,000 Subtotal:$0 Maintenance Costs $190,000 $53,000 $0 Total Estimated Annual Cost $0 Total Funding $243,000 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $28,380 $29,214 ($834) 103% $214,620 $165,040 $49,580 77% $243,000 $194,254 $48,746 80% Total Salary LINE REPLACEMENT, MCCORMICK & COPHER Engineering Sewer Line Replacement FUNDING SOURCE: Materials & Supplies Utilities Purchase of Services Total Estimated Capital Cost Transfer from W/S FB9901 Transfer from WW0702 Subtotal: TOTAL PROJECT CURRENT STATUS Engineering Sewer Mains 381 Department:Date Prepared:7/10/2000 Submitted By:Date Completed:2/05/2009 Project Title:LINE REPLACEMENT, JEAN LANE Type:WASTEWATER Sub-Type: Project No.:WW0703 Priority: A COUNCIL AUTHORIZATION: Hughes, Inc. not to exceed $89,322 for projects WW0701, WW0702, WW0703, and WW0704. Estates Additions, in the amount of $559,933 for projects WW0701, WW0702, WW0703, and WW0704. PROJECT DESCRIPTION: east side of Henslee Drive from Jefflyn Court to Jean Lane and on Gayle Court. PROJECT SCHEDULE: JUSTIFICATION: subject to ground movement, grease, root infestation and deterioration due to hydrogen sulfide gas and other chemicals. Systematic replacement will prevent a mandatory wide spread replacement. Construction Complete: January, 2009 RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. Many sanitary sewer lines throughout the city are 40 plus years old. Most of the lines are clay tile and are Replace sanitary sewer lines on the north side of Jean Lane from Henslee Drive to S. Main. Also, on the City of Euless Capital Project Request PUBLIC WORKS RON YOUNG November 14, 2006:Authorized the city manager to execute an Engineering design contract with Elliot and June 24, 2008:Award Bid #004-08 to Horseshoe Construction Company, Inc. for replacement sanitary sewer mains in portions of the Fuller, Arnett, Oakwood Terrace East, Twin Creek Estates and Oak Crest 382 PROJECT TITLE:PROJECT #:WW0703 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost $16,000 Personnel:Full Time $95,000 Part Time $0 $111,000 Subtotal:$0 Maintenance Costs $130,000 ($19,000) $0 Total Estimated Annual Cost $0 Total Funding $111,000 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $16,000 $9,569 $6,431 60% $95,000 $61,034 $33,966 64% $111,000 $70,603 $40,397 64% Total Salary LINE REPLACEMENT - JEAN LANE Engineering Sewer Line Replacement FUNDING SOURCE: Materials & Supplies Utilities Purchase of Services Total Estimated Capital Cost Transfer from W/S Operating Fund Transfer to FB9901 Subtotal: TOTAL PROJECT CURRENT STATUS Engineering Sewer Mains 383 Department:Date Prepared:7/10/2000 Submitted By:Date Completed:2/05/2009 Project Title: Type:WASTEWATER Sub-Type: Project No.:WW0704 Priority: A COUNCIL AUTHORIZATION: November 14, 2006: Authorized the city manager to execute an Engineering design contract with Elliot and Hughes, Inc. not to exceed $89,322 for projects WW0701, WW0702, WW0703, and WW0704. Estates Additions, in the amount of $559,933 for projects WW0701, WW0702, WW0703, and WW0704. PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: Systematic replacement of sanitary sewer lines in drainage basin areas using a worst first approach. chemicals. Systematic replacement will prevent a mandatory wide spread replacement. sewer mains in portions of the Fuller, Arnett, Oakwood Terrace East, Twin Creek Estates and Oak Crest Design contract: November 2006 Plans complete: December 2007 LINE REPLACEMENT, WEST FULLER June 24, 2008:Award Bid #004-08 to Horseshoe Construction Company, Inc. for replacement sanitary Begin construction: August 2008 Construction complete: January 2009 Many sanitary sewer lines throughout the city are 40 plus years old. Most of the lines are clay tile and are subject to ground movement, grease, root infestation and deterioration due to hydrogen sulfide gas and other Construction bid: June 2008 Replace sanitary sewer lines on West Fuller Drive between Byers Street and North Main. City of Euless Capital Project Request PUBLIC WORKS RON YOUNG RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: 384 PROJECT TITLE:PROJECT #:WW0704 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost $12,000 Personnel:Full Time $120,000 Part Time $0 $132,000 Subtotal:$0 Maintenance Costs $105,000 $27,000 $0 Total Estimated Annual Cost $0 Total Funding $132,000 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $14,268 $14,735 ($467) 103% $117,732 $67,973 $49,759 58% $132,000 $82,708 $49,292 63% Sewer Mains TOTAL PROJECT Subtotal: CURRENT STATUS Engineering Total Estimated Capital Cost FUNDING SOURCE: Transfer from W/S Operating Fund Transfer from FB9901 Materials & Supplies Utilities LINE REPLACEMENT, WEST FULLER Engineering Sewer Line Replacement Total Salary Purchase of Services 385 386 CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Date Completed Total Budget Total Project Costs (Over) Under Budget WATER PROJECTS WT9901 Meter Change Out Program 10/30/99 101,917$ 98,365$ 3,552$ WT9903 Master Plan 08/30/99 42,000$ 5,445$ 36,555$ WT9904 Well Repairs 09/30/99 66,921$ 66,921$ -$ WT9905 Misc Water Rehab 06/30/00 50,000$ 43,749$ 6,251$ WT9906 Hwy 10 Water Line 01/30/00 150,000$ 138,883$ 11,117$ WT9907 Impact Fee Study 09/30/99 13,000$ 12,238$ 762$ WT9908 Mid Cities Blvd. 12" Line 04/30/04 342,080$ 313,354$ 28,726$ WT9909 2MG Water Tank 03/31/03 2,430,881$ 2,289,571$ 141,310$ WT9910 Water Line for Elevated Tank 05/31/02 1,608,386$ 1,201,698$ 406,688$ WT9911 Water Distribution - Master Plan 09/30/99 25,600$ 24,000$ 1,600$ WT0002 Emergency Repair - Hwy 10 11/30/99 15,450$ 14,214$ 1,236$ WT0003 Waterline Replacement - Aransas 06/30/01 12,057$ 7,089$ 4,968$ WT0004 Water Line Milam - Ector/Midway 06/30/00 18,248$ 13,743$ 4,505$ WT0005 Waterline Replacement - Milam- Denton/Mid 04/30/02 26,988$ 26,988$ -$ WT0006 Central Drive Water Mains 03/31/00 92,814$ 90,742$ 2,072$ WT0102 SCADA Upgrade 04/09/01 93,400$ 93,400$ -$ WT0103 Fire Hydrant Replacement Program 03/31/03 50,000$ 49,626$ 374$ WT0401 Line Replacement, West Pipeline Main 05/31/06 1,215,663$ 1,215,663$ -$ WT0403 Waterline Replacement - Fairlawn Court Cancelled 35,000$ -$ 35,000$ WT0404 Waterline Replacement - Atkerson Lane Cancelled 104,000$ -$ 104,000$ WT0405 Line Replacement, West Ash Lane 08/31/06 30,000$ 11,626$ 18,374$ WT0406 Line Replacement, Westport/Newport/Asbury 08/31/06 67,000$ 9,866$ 57,134$ WT0501 System Security Upgrade 05/31/08 40,000$ 28,319$ 11,681$ WT0502 FY'2005 CDBG 08/31/06 69,300$ 29,549$ 39,751$ WT0503 Line Replacement, S. Atkerson Lane 08/31/06 79,000$ 51,294$ 27,706$ WT0504 Line Replacement, Blanco Drive 08/31/06 112,620$ 112,620$ -$ WT0505 Line Replacement, Henslee 08/31/06 183,000$ 123,859$ 59,141$ WT0506 Line Replacement, Vernon/Slaughter 08/31/06 161,000$ 113,052$ 47,948$ WT0601 Wtr Sys Security Perimeter Fence Upgrade 05/31/08 75,000$ 49,567$ 25,433$ WT0602 Line Replacement, Cannon Drive 05/31/08 250,000$ 223,055$ 26,945$ WT0701 Line Replacement, Canyon Ridge 05/31/08 116,000$ 78,136$ 37,864$ WT0702 CDBG FY07 - 32nd Oakwood Terrace 05/31/08 334,481$ 296,223$ 38,258$ WT9902 Tank Painting 05/31/07 1,317,763$ 957,542$ 360,221$ 9,329,569$ 7,790,397$ 1,539,172$ WT0402 Water & Wastewater Impact Fee Update 05/31/09 30,000$ 17,729$ 12,271$ WT0801 Line Replacement, Signet/Mesa 05/31/09 255,000$ 218,663$ 36,337$ WT0802 CDBG-33rd Oakwood Terrace-Simmons 12/31/08 451,639$ 384,173$ 67,466$ 736,639$ 620,565$ 116,074$ Total Water Projects 10,066,208$ 8,410,962$ 1,655,246$ Water Projects- Current Year Water Projects - Prior Years Project Number Project Description 387 Department:Date Prepared:3/28/2003 Submitted By:Date Completed:5/31/2009 Project Title: Project Type:WATER Sub-Type: Project No.:WT0402 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: action. Certified compliance of state law: September 2008 were updated in 2007 as required. The next Impact Fee update will be in 2012 barring any new legislative September 25, 2007:Approved resolution #07-1263 affirming that the water and wastewater impact fees for developments in the City of Euless shall continue in effect as adopted by ordinance number 1364. September 23, 2008:Authorized the city mayor to certify to the Attorney General that the impact fees of the City of Euless comply with state law. allowable fees to impose. Wastewater System Master Plan. Water and Wastewater Impact Fee charges were instituted by the City of Euless in 1990 in accordance with applicable State law to generate revenue for funding of capital improvements attributable to new development. City of Euless Capital Project Request PUBLIC WORKS RON YOUNG WATER AND WASTEWATER IMPACT FEE UPDATE Impact fees are related to the items identified by the Capital Improvements Plan and the Water and needs system capacity available for future growth, the cost of Trinity River Authority service and update the Capital Improvements Plan. Calculations based on State dictated requirements will be made to determine the maximum allowable impact fees. The City Council will determine what percentage of the maximum The project will consist of reviewing the City's Land Use Assumptions, the costs of future infrastructure Legislation passed in 2001 provided an automatic five year extension to the 2002 Update. The Impact Fees Updated impact fees: August 2004 Anticipate next study: August 2012 388 PROJECT TITLE:PROJECT #:WT0402 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost $30,000 Personnel:Full Time Part Time $0 $30,000 Subtotal:$0 Maintenance Costs $15,000 Wastewater Impact Fees $15,000 $0 Total Estimated Annual Cost $0 Total Funding $30,000 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $30,000 $17,729 $12,271 59% $30,000 $17,729 $12,271 59% WATER & WASTEWATER IMPACT FEE UPDATE Engineering Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: CURRENT STATUS Engineering TOTAL PROJECT Total Estimated Capital Cost FUNDING SOURCE: Transfers from: Water Impact Fees 389 Department:Date Prepared:4/30/2007 Submitted By:Date Completed:5/31/2009 Project Title:LINE REPLACEMENTS, SIGNET/MESA Project Type:WATER Sub-Type: Project No.:WT0801 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: Award Engineering Design: June 2008 JUSTIFICATION: City of Euless Capital Project Request PUBLIC WORKS RON YOUNG L.P., to replace water mains in an amount of $192,615. This water main is included in the City's Water Master Plan. provide inadequate flow of water. Construction complete: May 2009 March 10, 2009:Award bid and authorize city manager to execute a contract with McMahon Contracting, Marlene to Northcliff and along Signet from Canyon Ridge to Westcliff. MAINS Replace four inch cast iron water main with eight inch poly vinyl chloride water main along Mesa from Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains Award Construction Contract: March 2009 Begin construction: April 2009 390 PROJECT TITLE:PROJECT #:WT0801 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost $30,000 Personnel:Full Time $225,000 Part Time $0 $255,000 Subtotal:$0 Maintenance Costs $255,000 $0 Total Estimated Annual Cost $0 Total Funding $255,000 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $30,000 $23,858 $6,142 80% $225,000 $194,805 $30,195 87% $255,000 $218,663 $36,337 86% Construction TOTAL PROJECT Total Estimated Capital Cost FUNDING SOURCE: Transfer from: W/S CIP Fund Balance Water Mains CURRENT STATUS Engineering Purchase of Services Materials & Supplies Utilities Subtotal: LINE REPLACEMENTS, SIGNET/MESA Engineering Total Salary 391 Department:Date Prepared:04/04/2007 Submitted By:Date Completed:12/16/2008 Project Title: Project Type:WATER Sub-Type: Project No.:WT0802 Priority: A COUNCIL AUTHORIZATION: to be $334,029 with the remaining balance of $117,610 to be funded by the City. additional $16,165.80 to cover change orders. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: year Community Development Block Grant program. PROJECT DESCRIPTION: Pipeline Road. PROJECT SCHEDULE: JUSTIFICATION: require more maintenance than newer mains. Begin construction: June 2008 Design complete: January 2008 City of Euless Capital Project Request PUBLIC WORKS RON YOUNG CDBG-33rd OAKWOOD TERRACE (SIMMONS DRIVE) MAINS Replace the existing 2,800 linear feet of six inch cast iron water main with an eight inch poly vinyl chloride Construction Completed: October 2008 project is part of the systematic replacement of substandard water mains. This project is part of the 33rd water main along Simmons Drive from Bayless Drive to Whitener Road and from Whitener Road to South Existing water mains are old, deteriorated and substandard in size which provides inadequate water flow and February 27, 2007:Approved 33rd CDBG project for fiscal year 2007-08 to replace water main lines in the Oakwood Terrace West Addition. The estimated total cost is $451,639 and the CDBG funding is anticipated March 25, 2008:Recommended to Tarrant County to award construction contract to Bristow Contracting, LLC for the replacement of a water line main in the Oakwood Terrace West Add'n in the amount of $323,311, of which Tarrant County will pay $269,704.80 and the City of Euless will pay $53,606.20 and authorizing an The water mains included in this project are part of the City of Euless Water System Master Plan. This 392 PROJECT TITLE:PROJECT #:WT0802 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost $451,639 Personnel:Full Time Part Time $0 $0 Subtotal:$0 Maintenance Costs $117,610 $334,029 $0 Total Estimated Annual Cost $0 Total Funding $451,639 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $451,639 $384,173 $67,466 85% $451,639 $384,173 $67,466 85%TOTAL PROJECT Total Estimated Capital Cost FUNDING SOURCE: Transfer From FB9901 CDBG Funding Sewer Mains CURRENT STATUS Purchase of Services Materials & Supplies Utilities Subtotal: CDBG-33rd OAKWOOD TERRACE(SIMMONS) Total Estimated Cost Total Salary 393 394 CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Date Completed Total Budget Total Project Costs (Over) Under Budget OTHER PROJECTS AC9901 Athletic Complex Phase II 06/30/02 123,654$ 75,047$ 48,607$ AC0202 Athletic Complex Phase Ill 05/31/06 1,252,221$ 1,251,915$ 306$ ED0102 Bell Ranch Terrace Cancelled 200,000$ -$ 200,000$ FM0101 Building D 09/30/02 930,610$ 930,608$ 2$ FM0209 Midway Recreation Upgrade 06/30/02 557,125$ 557,125$ -$ FM0308 Building A Remodel 05/31/07 1,663,238$ 1,651,325$ 11,913$ FM0309 Fire Station #3 05/31/07 2,286,798$ 2,286,229$ 569$ FM0601 Public Works Facility 05/31/08 2,210,956$ 2,213,507$ (2,551)$ PR9901 Hike/Bike Trail 04/30/05 237,714$ 237,714$ -$ PR9902 Senior Citizen Remodel 04/30/05 16,130$ 16,130$ -$ PR9922 Tejas Remodel 11/30/01 430,000$ 455,885$ (25,885)$ PR9927 Park Improvements - Texas Star 09/30/01 1,036,500$ 1,025,298$ 11,202$ PR0015 Purchase of Dallas Stars Center 05/31/00 10,327,978$ 10,327,978$ -$ PR0016 Wilshire Park Improvements 06/30/02 150,000$ 149,926$ 74$ PR0110 Slope Protection/Screening Wall 03/31/03 1,275,203$ 1,273,923$ 1,280$ PR0302 Bob Eden Parking 04/30/05 75,000$ 74,854$ 146$ PR0303 Youth Ballpark 04/30/05 600,000$ 600,000$ -$ PR0407 Parking Improvements, Midway Cancelled 11,000$ -$ 11,000$ PR0408 Parking Improvements, S. Euless Park 05/31/06 55,000$ 20,991$ 34,009$ PR0409 Parking Improvements, Simmons 07/29/04 6,960$ 6,960$ -$ PR0410 Parking Improvements, Villages Bear Creek 07/29/04 33,666$ 33,666$ -$ PR0411 Preserve at McCormick Park 05/31/06 1,168,427$ 1,168,427$ -$ PR0412 Splash Pool 05/31/06 125,000$ 124,477$ 523$ SS9901 Fire Station II 03/30/00 49,688$ 49,688$ -$ SS9902 Library Books 08/15/00 3,302$ 3,302$ -$ SS9919 Fire Station #3 - Structural Repairs 03/30/00 30,000$ 17,344$ 12,656$ SS0010 Former Fire Station #2 06/30/02 599,600$ 595,257$ 4,343$ SS0113 Park Building 06/30/02 1,492,400$ 1,492,100$ 300$ 27,207,736$ 26,888,567$ 319,169$ FM0504 Building "B" Remodel 05/31/09 1,322,490$ 1,315,697$ 6,793$ FM0801 TX Star Golf Course & Conference Ctr Expand 05/31/09 3,630,079$ 3,630,079$ -$ FM0802 Senior Citizen Center Design cancelled 250,000$ -$ 250,000$ FM0803 Midway Recreation Improvements 03/31/09 293,500$ 75,976$ 217,524$ FM0804 Library-Shell Expansion 12/31/08 307,034$ 305,664$ 1,370$ PR0602 Mid Cities Landscaping 05/31/09 40,000$ 33,199$ 6,801$ PR0719 Midway Park Trail 05/31/09 210,000$ 190,473$ 19,527$ 6,053,103$ 5,551,088$ 502,015$ Total Other Projects 33,260,839$ 32,439,655$ 821,184$ 259,566$ 248,891$ 10,675$ Other Projects- Current Year Project Number Project Description 09/30/06 Other Projects - Prior Years PR9903- PR9918 Various EDC Park Projects 395 Department:Date Prepared:June 27, 2000 Submitted By:Date Completed:May 31, 2009 Project Title:BUILDING "B"-DESIGN & REMODEL Project Type:BUILDING Sub-Type: Project No.:FM0504 Priority: A COUNCIL AUTHORIZATION: Building "B" for $74,000. space during renovation of Building "B". RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: following departments: Finance, Water Billing Office, Insurance and Human Resources. PROJECT SCHEDULE: Start date: September 2005 JUSTIFICATION: Act and Texas Accessibility Standards as a result of remodeling. Construction complete: September 2006 DESIGN & REMODEL Solutions, Inc in the estimated expenditure of $125,000. January 25, 2005:Byron Folse and Associates contract for architectural services for the renovation of Renovation of Building "B" will provide a more efficient work space area for Finance, Water Department, Insurance and Human Resource Department offices. Structure will comply to Americans with Disabilities Building "B" is the fifth project of the master plan. City of Euless Capital Project Request FACILITIES OPERATIONS KYLE MCADAMS To provide a more efficient work space area, Building "B" will be remodeled to expand the layout for the April 26, 2005:Authorize City Manager to negotiate and execute rental agreement for temporary office September 27, 2005: Awarded bid #022-05 to Modern Contractors in the amount of $933,500. March 28, 2006:Approved the purchase of office furniture, cubicles, etc for Building "B" from Tusa Office 396 PROJECT TITLE:PROJECT #:FM0504 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL:Architectural Services/Survey $96,506 Construction $936,915 Direct Operating Cost Contingency $15,000 Personnel:Full Time Furniture $122,835 Part Time Building Rental $36,000 $0 Moving Expenses $18,334 Asbestos Abatement $23,865 Equipment $17,567 Instr. & Apparatus $25,430 Landscaping $4,156 Owner Equipment $25,882 $1,322,490 Subtotal:$0 Maintenance Costs $1,379,360 $4,000 ($56,870) $500 $500 $5,000 Total Estimated Annual Cost $5,000 Total Funding $1,322,490 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $95,711 $95,711 $0 100% $795 $795 $0 100% Building Rental $36,000 $36,000 $0 100% Contingency $15,000 $8,207 $6,793 55% Moving Expense $18,334 $18,334 $0 100% Construction $936,915 $936,915 $0 100% $4,156 $4,156 $0 100% $23,865 $23,865 $0 100% Equipment $17,567 $17,567 $0 100% Instr. & Apparatus $25,430 $25,430 $0 100% Furniture $122,835 $122,835 $0 100% $25,882 $25,882 $0 100% $1,322,490 $1,315,697 $6,793 99%TOTAL PROJECT Owner Equipment FUNDING SOURCE: Landscaping Asbestos Abatement Architectural Services Janitorial Services & Supplies Surveying Service Maintenance Costs BUILDING "B" DESIGN & REMODEL Total Salary Purchase of Services Materials & Supplies Utilities Total Estimated Capital Cost Transfer from Car Rental Transfer to FB9913 CURRENT STATUS Subtotal: Pest Control 397 Department:Date Prepared:5/7/2007 Submitted By:Date Completed:5/31/2009 Project Title: Project Type:CONSTRUCTION Sub-Type: Project No.:FM0801 Priority: A COUNCIL AUTHORIZATION: Bryon Folse and Associates for the expansion of Texas Star Conference Center in the amount of $173,277. PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: undersized, and expansion will be necessary to accommodate the growth of the conference center. The golf operations which the pro shop supports does not have the size to support the daily traffic demand. The need popularity of Raven's Grill, the facility is in dire need of additional kitchen space. In addition, conference centre activity continues to grow and this expansion will give the facility the ability to host larger functions. These improvements are necessary to compete in today's golf market. to expand the kitchen and the Treaty Room has a direct impact on being able to expand the pro shop within the current foot print of the structure. This expansion will allow for a more efficient Golf Club operation for all The additional kitchen space will alleviate some of the pressure on the current kitchen staff and equipment. Award Design Contract: September 2007 Award Construction Contract: February 2008 Construction Complete: March 2009 a fashion consistent with a country club. Due to the number of conference centre functions, and the The Texas Star Golf Course and Conference Centre is an award winning Golf Club. This course operates in February 12, 2008: Awarded Bid No. 003-08 to JC Commercial in the amount of $3,470,777, plus Alternate No. 1 in the amount of $10,000 and authorized a contingency in the amount of $50,000. Authorized the city manager to enter into a contract with JC Commercial. Authorized the city manager to execute change Order TEXAS STAR GOLF COURSE & CONFERENCE CENTRE EXPANSION September 11, 2007:Authorized the city manager to execute a contract for architectural services with RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: City of Euless Capital Project Request FLEET & FACILITIES OPERATIONS KYLE MCADAMS operational areas of the facility. No. 1 that will result in a credit to the City in the amount of $532,776. This project is part of the city's five year master plan and is the first of six proposed projects. Expansion of current facility to allow for additional conference room capacity. The current kitchen is grossly REMODEL/EXPANSION 398 PROJECT TITLE:PROJECT #:FM0801 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST MAINTENANCE COST (+ OR -) ANNUAL $3,098,961 Direct Operating Cost $279,154 Personnel:Full Time $6,014 Part Time $7,416 0 $4,000 $5,000 $32,000 $90,000 $1,000 Furnishings & Decoratives $25,000 $10,000 Fixtures $27,000 Audio Visual Equipment $20,000 Instruments & Apparatus $15,000 Janitorial Services $18,000 Kitchen Appliances Included PM & Minor Repairs $12,159 Kitchen Fixtures Included Unscheduled Maintenance $11,766 Data & Telephone $7,200 $45,480 Alarm & Security Services $4,000 $1,000 Contingency $9,294 $88,405 Revenue Offset $9,040 Total Estimated Capital Cost $3,630,079 $98,405 $3,189,350 $440,729 Total Estimated Annual Cost $98,405 Total Funding $3,630,079 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $6,014 $6,013 $1 100% $279,154 $279,154 $0 100% Engineer Service $7,416 $8,406 ($990)113% Contingencies $18,334 $2,231 $16,103 12% Construction $3,098,961 $3,079,489 $19,472 99% Landscaping $20,000 $23,890 ($3,890)119% $26,200 $26,782 ($582)102% Furniture $174,000 $204,114 ($30,114)117% $3,630,079 $3,630,079 $0 100% Office Furniture Banquet Furniture TX STAR CONFERENCE CENTRE EXPANSION Architect 8% Insurance Total Direct Expenses: Total Salary Utilities Subtotal: Renewal & Replacement Pest Control Purchase of Services Materials & Supplies Architectural Service Total M&R Costs: CURRENT STATUS Transfer from FB9913 Surveying Service Car Rental Operating MEP Additional Work Instr. & Apparatus Equipment Irrigation System TOTAL PROJECT Construction Survey & Testing Fees Acoustical Consultant Engineering FUNDING SOURCE 399 Department:Date Prepared:5/7/2007 Submitted By:Date Completed:3/31/2009 Project Title: Project Type:DESIGN Sub-Type: Project No.:FM0802 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project is part of the city's five year master plan. acquisition of property upon selection of a site. PROJECT SCHEDULE: JUSTIFICATION: Euless to accomplish these needs. Address the needs of the aging population and the construction of a new Senior Citizens Center allows This project includes funding for the design of a new senior citizens center and funding to begin the City of Euless Capital Project Request FLEET & FACILITY OPERATIONS KYLE MCADAMS SENIOR CITIZENS DESIGN/LAND ACQUISITION PROJECT DESCRIPTION: 400 PROJECT TITLE:PROJECT #:FM0802 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost $141,500 Personnel:Full Time $96,000 Part Time $7,500 $0 $5,000 *$250,000 Subtotal:$0 Maintenance Costs $250,000 $0 Total Estimated Annual Cost $0 Total Funding $250,000 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $7,500 $7,500 0% $96,000 $96,000 0% Engineer Service $5,000 $5,000 0% Land Purchase $141,500 $141,500 0% $250,000 $0 $250,000 0% SENIOR CITIZENS CENTER DESIGN Land Purchase (Proposed) Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Architectural Service CURRENT STATUS Surveying Service TOTAL PROJECT Total Estimated Capital Cost FUNDING SOURCE: Operating Fund approval of such project. *Funding will be transferred to the Midway Park Family Life Center project, subject to the City Council's Architect 8% Engineering Survey & Testing Fees 401 Department:Date Prepared:5/7/2007 Submitted By:Date Completed:3/31/2009 Project Title: Project Type:CONSTRUCTION Sub-Type: Project No.:FM0803 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE JUSTIFICATION: Aging facility that is in need of repair. REMODEL/IMPROVEMENTS City of Euless Capital Project Request FLEET AND FACILITIES OPERATIONS KYLE MCADAMS MIDWAY RECREATION CENTER-BUILDING IMPROVEMENTS This improvement project will encompass numerous areas of the facility from cosmetic to building Wallpaper/Racquetball Court/Flooring/Restroom Facilities - Completed February 2008 Lighting - Pending Roof Repairs - Pending preservation. The project will call for the reroof of a portion of the structure, replacement of the existing rubber flooring and exterior repaint. Wallpaper in the hallways will be replaced with an RFP type product for durability as well as general reconditioning of the bathroom tiles and fixtures. This project will also allow for the replacement of the parking lot lighting as well as the fixtures surrounding the building. 402 PROJECT TITLE:PROJECT #:FM0803 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost *$168,500 Personnel:Full Time $54,000 Part Time $50,000 $0 $10,000 $5,000 $11,000 $8,500 $1,500 $15,000 *$293,500 Janitorial Services $3,000 PM & Minor Repairs $13,804 293,500 Unscheduled Maintenance $14,087 $33,504 $1,000 $65,395 Total Estimated Annual Cost $80,395 Total Funding $293,500 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $293,500 $75,976 $217,524 26% $293,500 $75,976 $217,524 26% MIDWAY RECREATION BLDG IMPROVEMENTS Roof Replacement Insurance Total Direct Expenses: Total Salary Purchase of Services Materials & Supplies Utilities Renewal & Replacement Pest Control Total M&R Costs: CURRENT STATUS Remodel/Improvements TOTAL PROJECT Total Estimated Capital Cost FUNDING SOURCE: Transfer Operating Fund approval of such project. *Funding will be transferred to the Midway Park Family Life Center project, subject to the City Council's Racquet Ball Court Wall Repairs Rubberized Flooring General Carpentry Parking Lot & Walk-way Lighting 403 Department:Date Prepared:5/7/2007 Submitted By:Date Completed:12/31/2008 Project Title: Project Type:CONSTRUCTION Sub-Type: Project No.:FM0804 Priority: A COUNCIL AUTHORIZATION: the amount of $95,187.14 RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: This project is part of the city's five year master plan. PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: expanded to accommodate the current staffing levels. City of Euless Capital Project Request FLEET AND FACILITIES OPERATIONS KYLE MCADAMS REMODEL/EXPANSION LIBRARY-PARTIAL EXPANSION OF SHELLED AREA Committee has requested a local historical room to display Euless artifacts and the staff area needs to be Project complete - December 2008 February 26, 2008:Approved purchase and installation of floor carpeting to Gomez Floor Covering, Inc. in Partial expansion into the shelled of the building to allow for additional administration workspace, individual study rooms, local historical/genealogy area and quiet reading room. This project also includes rehabilitating the front entrance doors, installation of a oven in the kitchen area, new wallpaper for the conference room, new carpet in the main library and canopy lighting for the entrance walks. Project start date - January 2008 Patrons have requested the City consider adding additional study rooms. The Historical Preservation 404 PROJECT TITLE:PROJECT #:FM0804 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost $48,534 Personnel:Full Time $10,000 Part Time $20,000 $0 Furnishings & Decoratives $10,000 $3,000.00 $10,000 $5,000.00 Instruments & Apparatus $5,000 Kitchen Appliances $5,000 $1,500.00 Data & Telephone $4,000 Automatic Doors $48,000 Carpet $96,752 Electrical Work $8,378 Subtotal:$9,500.00 Misc. Carpentry Work $2,200 Wallpaper $17,800 Maintenance Costs Contingency $20,000 Janitorial Services $1,800.00 $305,664 PM & Minor Repairs $9,598.00 Unscheduled Maintenance $9,860.00 $38,270.00 $1,100.00 $60,628.00 $307,034 Total Estimated Annual Cost $70,128.00 Total Funding $307,034 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Remodel/Improvements $268,906 $267,658 $1,248 100% Equipment $2,095 $2,095 $0 100% Instr. & Apparatus $5,448 $5,326 $122 98% Furniture $30,585 $30,585 $0 100% $307,034 $305,664 $1,370 100% Subtotal: TOTAL PROJECT FUNDING SOURCE: CURRENT STATUS Transfer from General Fund Office Furniture Pest Control Total Estimated Capital Cost Renewal & Replacement LIBRARY-PARTIAL EXPANSION SHELL AREA Construction Total Salary Fixtures Insurance Purchase of Services Architect 8% Materials & Supplies Utilities 405 Department:Date Prepared:4/15/2005 Submitted By:Date Completed:5/31/2009 Project Title:MID CITIES LANDSCAPING Project Type:IMPROVEMENTS Sub-Type: Project No.:PR0602 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: and other beautification projects. PROJECT DESCRIPTION: Mid Cities Landscape will include a beautification plan for this major road entrance into the city. PROJECT SCHEDULE: JUSTIFICATION: beautification projects. Landscaping of this artery into the city will both beautify the area and could be a catalyst for further future LAND BETTERMENTS City of Euless Capital Project Request COMMUNITY SERVICES RAY MCDONALD The parks Master Plan in the approved form includes provision(s)/recommendation(s) to develop open space 406 PROJECT TITLE:PROJECT #:PR0602 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost $40,000 Personnel:Full Time Part Time $0 $40,000 Subtotal:$0 $40,000 Maintenance Costs $0 Total Estimated Annual Cost $0 Total Funding $40,000 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $40,000 $33,199 $6,801 83% $40,000 $33,199 $6,801 83% MID CITIES LANDSCAPING Landscaping Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: CURRENT STATUS Landscaping TOTAL PROJECT Total Estimated Capital Cost FUNDING SOURCE: Transfer from Car Rental 407 Department:Date Prepared:4/11/2006 Submitted By:Date Completed:5/31/2009 Project Title: Project Type:LAND Sub-Type: Project No.:PR0719 Priority: A COUNCIL AUTHORIZATION: May 29, 2007: Award bid number 021-07 to Humphrey & Morton Construction Co. in the amount of $165,017 for the construction of trails and bridges. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: the infrastructure improvements as recommended as a high priority in the adopted Parks Master Plan. PROJECT DESCRIPTION: bridges to connect Collins Drive and Tarrant Drive and the Midway Recreation Center. PROJECT SCHEDULE: JUSTIFICATION: IMPROVEMENTS Construction Complete: June 2007 This project will include concrete and/or soft surface trail development at Midway Park. This project includes Concrete trail varying from eight feet to twelve feet in width with sidewalk connections to existing streets and new bridges spanning Blessing Branch. Park benches will be provided at random locations with landscaping City of Euless Capital Project Request COMMUNITY SERVICES RAY McDONALD MIDWAY PARK TRAIL provided at the park bench locations. Low intensity, low height lighting will be provided along the Midway Park Trail. The trail will be approximately .4 miles in length plus the length of associated sidewalks and Award Bid: May 2007 Trail development and enhancement opportunities will be consistent with available land, funding and time variables. This Master Plan recommendation will be part of a city-wide comprehensive trail enhancement project. These trails will provide access to the Midway Park Recreation Center, baseball fields, and swimming pool from nearby residential neighborhoods. 408 PROJECT TITLE:PROJECT #:PR0719 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost $5,000 Personnel:Full Time $6,000 Part Time $3,000 $0 $99,750 $90,000 $6,250 $210,000 Subtotal:$0 Maintenance Costs $210,000 $0 Total Estimated Annual Cost $0 Total Funding $210,000 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $210,000 $190,473 $19,527 91% $210,000 $190,473 $19,527 91% MIDWAY PARK TRAIL Mobilization Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: CURRENT STATUS Land/Hike & Bike Trails TOTAL PROJECT Total Estimated Capital Cost FUNDING SOURCE: Transfer from 1/2 Cent Operating Bridges Contingency Excavation Trail Erosion Control 409 410