Loading...
HomeMy WebLinkAboutCity of Euless Capital Improvements Program FY2011CITY OF EULESS CAPITAL IMPROVEMENTS PROGRAM FISCAL YEAR ENDING SEPTEMBER 30, 2011 201 N. Ector Drive Euless Texas 76039Euless, Texas  76039 Phone (817) 685‐1626 Fax (817) 685‐1459 www.eulesstx.gov CITY OFFICIALS MARY LIB SALEH, MAYOR Tim Stinneford, Council Member — Place One, Leon Hogg, Council Member — Place Two Linda Martin, Council Member — Place Three Mayor Pro Tem Donna Mickan, Council Member — Place Four Glenn Porterfield, Council Member — Place Five Perry Bynum, Council Member — Place Six Gary McKamie, City Manager Loretta Getchell, Deputy City Manager FY2010-2011 i TABLE OF CONTENTS CAPITAL IMPROVEMENTS PROGRAM City Officials Table of Contents ................................................................................................................ i-v Letter ................................................................................................................................... vii-viii CIP Fund Balance .............................................................................................................. ix-xi FUNDED PROJECTS Summary of Funded Projects .............................................................................................. 01-02 FY10 Amendments .............................................................................................................. 03-04 Drainage Projects Summary of Funded Drainage Projects ........................................................................... 05 DR9903 Misc. Drainage Improvements Program .................................................... 06-07 DR0802 Hurricane Creek & Bridge at Marlene Improvements ................................ 08-09 DR0901 Bear Creek Parkway Erosion Repair ......................................................... 10-11 Street Projects Summary of Funded Street Projects ................................................................................ 13 PS9901 North Main Street ....................................................................................... 14-15 PS9904 Harwood Road ........................................................................................... 16-17 PS0605 South Pipeline Road Bridge Replacement ................................................ 18-19 PS0802 Fuller-Wiser Road Connector .................................................................... 20-21 PS1001 Baze Road Design & ROW Acquisition ..................................................... 22-23 PS1002 FY10 County Overlay – Wilshire/Marlene .................................................. 24-25 PS1003 Ash Lane – Aransas to N Main Design & ROW & Acquisition ................... 26-27 Wastewater Projects Summary of Funded Wastewater Projects ....................................................................... 29 WW0002 Misc. Wastewater Rehabilitation .............................................................. 30-31 WW0605 TRA Wastewater Payments – Impact ...................................................... 32-33 WW0801 Line Replacement – Fayette Drive .......................................................... 34-35 WW0802 Line Replacement – South Mills Drive (CDBG-R) ................................... 36-37 WW0901 Line Replacement – Woodridge Circle/Koen Lane .................................. 38-39 WW1001 Line Replacement – W Alexander Ln/Norman Dr/Franklin Dr ................. 40-41 Water Projects Summary of Funded Water Projects ................................................................................ 43 WT0001 Misc. Water Utility Rehabilitation .............................................................. 44-45 WT0101 Water Tank Debt Payment – Impact ........................................................ 46-47 WT0104 Well Repairs .............................................................................................. 48-49 WT0202 Effluent Water Main .................................................................................. 50-51 WT0803 Transponders/Meters ................................................................................ 52-53 WT0901 TRA Water Payments – Impact ................................................................ 54-55 Other Projects Summary of Other Funded Projects ................................................................................. 57 AC1001 Texas Star Sports Complex Lighting Improvements ................................. 58-59 CM0304 Entry Monument Sign Program ................................................................. 60-61 ii CM0804 Redevelopment ......................................................................................... 62-63 DV9901 EDC Incentive Funds ................................................................................ 64-65 ED0101 Planning Consultants ................................................................................ 66-67 PD9901 Police and Municipal Court Facility ............................................................ 68-69 PR0720 Misc. Park Structures ................................................................................ 70-71 PR0804 Park Irrigation ............................................................................................ 72-73 PR0902 Senior Citizen Center at Midway Park ....................................................... 74-75 PR0907 Midway Park Family Life Center Phase I ................................................... 76-77 PROPOSED & UNFUNDED PROJECTS Summary of FY11 Proposed & Unfunded Projects – Sorted by Type ................................. 79-82 Drainage Projects Summary of FY11 Proposed & Unfunded Drainage Projects .......................................... 83 Boyd Branch Improvements .................................................................................... 84-85 Flooding Mitigation .................................................................................................. 86-87 Hollow Oak Channel Erosion ................................................................................... 88-89 Bell Hi Addition ........................................................................................................ 90-91 Blessing Branch – Main Street to SH360 ................................................................ 92-93 Kynette Drive Culvert Modifications ......................................................................... 94-95 Little Bear Creek Drainage Improvements .............................................................. 96-97 Little Bear Creek Land Acquisition .......................................................................... 98-99 Marlene Drive Culvert Replacement ........................................................................ 100-101 Simmons Culvert Improvements ............................................................................. 102-103 Street Projects Summary of FY11 Proposed & Unfunded Street Projects ............................................... 105 Ash Lane – Aransas Drive to N Main Street Construction ....................................... 106-107 Baze Road – Glade Road to Priest Blvd Construction. ........................................... 108-109 Rio Grande Boulevard ............................................................................................. 110-111 FY2011 County Overlay – Bear Creek Dr/Lakewood Blvd/Ash Lane ...................... 112-113 FY2012 County Overlay – Aransas Drive/Westpark Way ....................................... 114-115 Traffic Signal – Harwood Road at Bear Creek Parkway .......................................... 116-117 FY2013 County Overlay – Trailwood Dr/Trojan Trail ............................................... 118-119 FY2014 County Overlay – Raider/Monterrey/Soto Grande/El Camino Real ........... 120-121 FY2015 County Overlay – Baze Road/Kynette Drive/Signet Drive ........................ 122-123 Bear Creek Parkway ................................................................................................ 124-125 Cresthaven Drive Reconstruction ............................................................................ 126-127 Cullum Drive & Alexander Lane Reconstruction ..................................................... 128-129 Fuller-Wiser Road – Harwood Road to Mid Cities Boulevard .................................. 130-131 Fuller-Wiser Road – SH183 to Harwood Rd ............................................................ 132-133 Highland Drive Reconstruction ................................................................................ 134-135 Ross Avenue Extension .......................................................................................... 136-137 S Pipeline Road ....................................................................................................... 138-139 Vine Street – SH183 to SH10 .................................................................................. 140-141 Wastewater Projects Summary of FY11 Proposed & Unfunded Wastewater Projects ...................................... 143 Line Replacement – Bayless/Pauline/Jones (36th CDBG) ....................................... 144-145 Line Replacement – E Huitt/Ascot/Dunaway ........................................................... 146-147 Line Replacement – Blanco Drive/Aransas Drive/Crane Drive ............................... 148-149 iii Line Replacement – Collin Drive ............................................................................. 150-151 Line Replacement – North Tarrant Express (SH183) Phase I ................................ 152-153 Line Replacement – Ross Avenue ......................................................................... 154-155 Line Replacement – Slaughter Lane/E Huitt Lane .................................................. 156-157 Line Replacement – W Huitt .................................................................................... 158-159 Line Replacement – Oakwood Terrace Addition Phase I ........................................ 160-161 Line Replacement – Oakwood Terrace Addition Phase II ....................................... 162-163 Line Replacement – Denton Drive ........................................................................... 164-165 Line Replacement – Milam Drive ............................................................................. 166-167 Line Replacement – North Tarrant Express (SH183) Phase II ............................... 168-169 Line Replacement – Aransas Drive ......................................................................... 170-171 Line Replacement – Boyd Branch ........................................................................... 172-173 Line Replacement – Cedar Hills Estates/Hollywood Boulevard .............................. 174-175 Line Replacement – Cedar Hills Estates/Sunset Drive ........................................... 176-177 Line Replacement – Collin Drive/Harris Drive/Irion Drive ........................................ 178-179 Line Replacement – Donley Drive/Shelmar Drive ................................................... 180-181 Line Replacement – Eastcliff Drive/Windlea Drive/Signet Drive .............................. 182-183 Line Replacement – Ector Drive/Donley Drive/Crane Drive .................................... 184-185 Line Replacement – Ector Drive/Fayette Drive ....................................................... 186-187 Line Replacement – Evans Drive/Canyon Ridge Drive/N Kynette Drive ................. 188-189 Line Replacement – Glenn Drive/Crane Drive ........................................................ 190-191 Line Replacement – Huntington/Koen/Atkerson/E Huitt/Slaughter/Martin .............. 192-193 Line Replacement – Janann Street/Brownstone Drive/Shelmar Drive .................... 194-195 Line Replacement – Kynette Drive/Wilshire Drive/Sierra Drive/Eastcliff Drive ........ 196-197 Line Replacement – Lakewood Boulevard/Dogwood Circle/Bocowood Circle ........ 198-199 Line Replacement – Mary/Marlene/Commerce/Wilshire/Greenbriar ....................... 200-201 Line Replacement – N Midway Park ....................................................................... 202-203 Line Replacement – Northcliff/Toplea/Windlea/Signet/Kynette/Westcliff................. 204-205 Line Replacement – NW Midway/Rusk/Parker/Rockwall ........................................ 206-207 Line Replacement – S Main Street .......................................................................... 208-209 Line Replacement – Sagebrush/Toplea/Wilshire/Yorkshire/Sagebrush/Tyler ......... 210-211 Line Replacement – W Donley/Private/Mimosa/Magnolia/Redbud ......................... 212-213 Line Replacement – W Midway/Victoria/Delta/Lamar/Rockwall .............................. 214-215 Water Projects Summary of FY11 Proposed & Unfunded Water Projects ............................................... 217 Water & Wastewater Impact Fee Update ................................................................ 218-219 Water System Security Camera Installation ............................................................ 220-221 Line Replacement – S Pipeline Road West ............................................................. 222-223 Line Replacement – North Tarrant Express (SH183) Phase II ................................ 224-225 Line Replacement – Blessing Creek and Little Creek ............................................. 226-227 Line Replacement – Collin Drive, Dallas Drive to Harwood Road ........................... 228-229 Line Replacement – Collin Drive, Denton Drive to Dallas Drive .............................. 230-231 Line Replacement – Denton Drive, Tarrant Drive to Harwood Road ....................... 232-233 Line Replacement – Dickey Drive North, SH10 to E Huitt Lane .............................. 234-235 Line Replacement – Dickey Drive South, E Huitt Lane to Hilton Drive .................... 236-237 Line Replacement – Dunaway Drive, E Alexander Lane to E Ascot Drive .............. 238-239 Line Replacement – E Huitt Lane, S Main Street to Dunaway Drive ....................... 240-241 Line Replacement – Eastcliff Drive, Eastcliff Drive to Del Prado Apts .................... 242-243 Line Replacement – Ector Drive, Trojan Trail to Midway Drive ............................... 244-245 Line Replacement – Fuller Drive, Salem Drive to Carter Drive ............................... 246-247 Line Replacement – Hollow Oak Drive .................................................................... 248-249 Line Replacement – Kynette Drive, Cyclone Creek to Wilshire Drive ..................... 250-251 iv Line Replacement – Live Oak Ct/Live Oak Drive/Marlene Drive ............................. 252-253 Line Replacement – Midcreek Drive/ Rock Creek Drive/Stony Creek Drive ........... 254-255 Line Replacement – Midway Drive East, N Main Street to Freestone Drive ........... 256-257 Line Replacement – Midway Drive West, Freestone Drive to Ector Drive .............. 258-259 Line Replacement – Needles Street, Paula Lane to Raider Drive ........................... 260-261 Line Replacement – Paula Lane, Needles Street to S Pipeline Road ..................... 262-263 Line Replacement – S Main Street (North), E Huitt Lane to SH10 .......................... 264-265 Line Replacement – S Main Street (South) Landover Drive to E Huitt Lane ........... 266-267 Line Replacement – S Pipeline Road East, Vine Street to S Main Street ............... 268-269 Line Replacement – Shady Creek Drive, Cliffwood Road ....................................... 270-271 Line Replacement – Springwood Court ................................................................... 272-273 Line Replacement – Sunset Drive, S Pipeline Road to S Main Street .................... 274-275 Line Replacement – Westwood Drive, Fuller Drive to Carter Drive ......................... 276-277 Line Replacement – Wildwood Street ..................................................................... 278-279 Line Replacement – Woodvine Drive (East), Cliffwood Road to El Camino Real ... 280-281 Line Replacement – Woodvine Drive (West), Pebble Creek to Cliffwood Road...... 282-283 SH360 Water Crossing ............................................................................................ 284-285 Standpipe Storage Tank & Building Demolition ....................................................... 286-287 Water System Security Land Acquisition ................................................................. 288-289 Other Projects Summary of Other FY11 Proposed & Unfunded Projects ................................................ 291 Glade Parks Trail Connection .................................................................................. 292-293 Texas Star Sports Complex Phase IV ..................................................................... 294-295 Trail Lighting – Phase I ............................................................................................ 296-297 Park Amenities Upgrade .......................................................................................... 298-299 Blessing Branch Park Improvements ...................................................................... 300-301 Midway Park FLC – Phase II Design Outdoor Aquatics .......................................... 302-303 Midway Park FLC – Phase III Design Indoor Aquatics ............................................ 304-305 Development/Engineering Building ......................................................................... 306-307 Midway Park FLC – Phase II Outdoor Aquatics Construction ................................. 308-309 Midway Park FLC – Phase III Indoor Aquatics Construction ................................... 310-311 Texas Star Sports Complex Phase V ...................................................................... 312-313 Animal Shelter Expansion/Renovation .................................................................... 314-315 Community Center for South Euless ....................................................................... 316-317 Emergency Call Boxes ............................................................................................ 318-319 Fire Training Facility and Tower .............................................................................. 320-321 Kiddie Carr Park Improvements ............................................................................. 322-323 South Euless Water Feature ................................................................................... 324-325 Trail Connection S Euless ....................................................................................... 326-327 Trail Enhancements – Phase I ................................................................................ 328-329 Trail Enhancements – Phase II ............................................................................... 330-331 Trail Enhancements – Villages of Bear Creek ......................................................... 332-333 Trail Lighting – Phase II ........................................................................................... 334-335 Trailwood Park Improvements ................................................................................. 336-337 Wilshire Park Water Feature ................................................................................... 338-339 v COMPLETED PROJECTS Drainage Projects Summary of Completed Drainage Projects ....................................................................... 341 DR0701 Eastcliff Drive/Greenbriar Drive Drainage Improvements ......................... 342-343 DR0801 Rockwall Drive/Lamar Drive Drainage Improvements ............................... 344-345 Street Projects Summary of Completed Street Projects ........................................................................... 347 PS9909 FM157 North – SH183 to SH121 ............................................................... 348-349 PS0304 Glade Road ................................................................................................ 350-351 PS0901 Ash/Denton/Fair Oaks Overlay .................................................................. 352-353 PS0903 Mid Cities @ Gateway & Baze Traffic Signals ........................................... 354-355 Wastewater Projects Summary of Completed Wastewater Projects .................................................................. 357 WW0902 Line Replacement, West Mills Drive (34th CDBG) ................................... 358-359 Water Projects Summary of Completed Water Projects ........................................................................... 361 WT0201 Well Rehabilitation/Disinfection ................................................................. 362-363 Other Projects Summary of Completed Other Projects ............................................................................ 365 PR0601 Park Amenities Upgrade ............................................................................ 366-367 AC0901 TSSC Study/Fencing ................................................................................. 368-369 PR0901 Trail Enhancements – Bob Eden Park ...................................................... 370-371 ED0801 Redi-Mix Regional Headquarters .............................................................. 372-373 vi vii July 30, 2010 Honorable Mayor Mary Lib Saleh City Council: Tim Stinneford, Place One Leon Hogg, Place Two Linda Martin, Place Three, Mayor Pro Tem Donna Mickan, Place Four Glenn Porterfield, Place Five Perry Bynum, Place Six INTRODUCTION The City of Euless Capital Improvements Program is a comprehensive document detailing all projects that have been identified to date. Emphasis has been placed on organizing this data in a manner that will facilitate decision-making processes, assist in long-range planning, and provide the citizens of Euless with information regarding planned projects. This document meets the requirements of the City Charter. Article VII, Section 2 (4) requires, “A statement proposing any capital expenditures deemed necessary for undertaking during the next budget year and recommended provisions for financing.” Section 2 (5) further requires, “A list of capital projects which should be undertaken within the five (5) next succeeding years.” We extend special appreciation to the directors and the finance staff for their outstanding performance in creating this document. UNDERSTANDING THIS BOOK Although this book contains a large volume of information, the summaries should make it easy to understand at a glance. The book is divided into three sections: Funded Projects, FY2011 Proposed and Unfunded Projects, and Completed Projects. Each section begins with a summary and is followed by detailed data for those wishing to research individual projects. The detail provided includes the project’s relationship to City master plans, the project description and justification, the effect on future maintenance and operating costs, and the estimated total cost. Within each section, you will find the detailed descriptions sorted by type. There are five basic project types: Drainage, Streets, Wastewater, Water, and Other. Funded projects reflect any City Council authorization and the current status of the project. The current status section recaps all financial information currently reflected on Fund Balance Summary - Capital Estimated FY09-10 and Budgeted FY10-11 Capital Improvement Projects Streets Half-Cent Parks General CIP CIP CIP CIP Beg. Working Capital FY10 $2,024,073 $2,678,388 $125 $5,654,051 FY10 Estimated Revenues 586,888 69,494 0 953,086 Total Available: 2,610,961 2,747,882 125 6,607,137 FY10 Estimated Project Expenditures (823,478) (1,236,995) 0 (4,750,895) Total Expenses: (823,478) (1,236,995)0 (4,750,895) Estimated Working Capital FY10 $1,787,483 $1,510,887 $125 $1,856,242 FY11 Budgeted Revenues 10,685,500 52,500 0 414,950 Total Available: 12,472,983 1,563,387 125 2,271,192 FY11 Project Expenditures (11,110,000) (50,000) 0 (100,000) Budgeted Carryover (846,029)(439,813)0 (1,707,201) Total Expenses: (11,956,029)(489,813)0 (1,807,201) Estimated Working Capital FY11 $516,954 $1,073,574 $125 $463,991 FY2011 Projects FY 2011 County Overlay Projects 300,000 Baze Road - Construction 1,590,000 Ash Lane - Construction 1,920,000 Rio Grande Boulevard 7,300,000 Irrigation Projects 25,000 Incentives 25,000 G&A Charge 100,000 Total FY2011 Projects $11,110,000 $50,000 $0 $100,000 Fund Balance Summary - Capital Estimated FY09-10 and Budgeted FY10-11 Capital Improvement Projects Police Car Rental Redevelopment Facility Tax TSSC CIP CIP CIP CIP Beg. Working Capital FY10 $314,008 $108,182 $94,721 $768,070 FY10 Estimated Revenues 952 188 100,218 7,008 Total Available: 314,960 108,370 194,939 775,078 FY10 Estimated Project Expenditures (25,108) 0 0 (3,900) Total Expenses: (25,108) 0 0 (3,900) Estimated Working Capital FY10 $289,852 $108,370 $194,939 $771,178 FY11 Budgeted Revenues 2,500 0 2,500 5,000 Total Available: 292,352 108,370 197,439 776,178 FY11 Project Expenditures 0 0 0 (50,000) Budgeted Carryover (287,623)(108,370)(122,755)0 Total Expenses: (287,623)(108,370)(122,755)(50,000) Estimated Working Capital FY11 $4,729 $0 $74,684 $726,178 FY2011 Projects TSSC Lighting Project 50,000 Total FY2011 Projects $0 $0 $0 $50,000 Fund Balance Summary - Capital Estimated FY09-10 and Budgeted FY10-11 Capital Improvement Projects Water Wastewater W&S Impact Impact Drainage CIP Fee Fee CIP Beg. Working Capital FY10 $2,743,465 $2,631,270 $672,510 $1,450,026 FY10 Estimated Revenues 1,148,303 160,281 10,469 208,303 Total Available: 3,891,768 2,791,551 682,979 1,658,329 FY10 Estimated Project Expenditures (1,429,186) (410,792) (60,000) (731,853) Total Expenses: (1,429,186) (410,792) (60,000) (731,853) Estimated Working Capital FY10 $2,462,582 $2,380,759 $622,979 $926,476 FY11 Budgeted Revenues 1,065,500 180,000 11,000 156,500 Total Available: 3,528,082 2,560,759 633,979 1,082,976 FY11 Project Expenditures (1,128,000) (414,196) (60,000) (500,000) Budgeted Carryover (1,957,595)0 0 (400,932) Total Expenses: (3,085,595)(414,196)(60,000)(900,932) Estimated Working Capital FY11 $442,487 $2,146,563 $573,979 $182,044 FY2011 Projects Wastewater Line Replacement 920,000 Well Repairs 50,000 Meters/Transponders 158,000 Debt Payments, Refunding Bonds Series 264,196 TRA Payments 150,000 60,000 Flooding Mittigation 500,000 Total FY2011 Projects $1,128,000 $414,196 $60,000 $500,000 FUNDED PROJECTS CAPITAL IMPROVEMENTS PROGRAMFUNDED PROJECTS SUMMARYProject Number Project DescriptionBudget as of 5/31/09Appropriation/ AmendmentBudget as of 5/31/10Expended as of 05/31/10Remaining FundsRevised Project Cost EstimatesUnfunded/ (Excess Funding) DRAINAGE PROJECTSDR9903Misc Drainage Improvements (min bal $150,000) $362,833$0$362,833$61,359 $301,474 $362,833$0DR0802Hurricane Creek & Bridge at Marlene Improvements$335,000$200,000 $535,000 $302,994 $232,006 $378,500 ($156,500)DR0901Bear Creek Parkway Erosion Repair$530,000$0$530,000 $363,544 $166,456 $430,000 ($100,000)FB9902Fund Balance - Drainage CIP$0$0$0$0$0$0 ($367,027)$1,227,833$200,000 $1,427,833 $727,897 $699,936 $1,171,333 ($623,527)STREET PROJECTSPS9901 North Main Street$6,820,047$0 $6,820,047 $6,697,130 $122,917 $6,820,047$0PS9904 Harwood Road$5,695,211$0 $5,695,211 $5,662,473$32,738 $5,695,211$0PS0605South Pipeline Road Bridge Replacement$157,000$0$157,000$0$157,000 $157,000$0PS0802 Fuller-Wiser Connector$495,000$0$495,000 $428,506$66,494 $495,000$0PS1001Baze Road Design & ROW Acquisition$290,000$0$290,000$91,540 $198,460 $240,000 ($50,000) *PS1002FY10 County Overlay - Wilshire/Marlene$288,000$0$288,000$15,023 $272,977 $288,000$0PS1003Ash Lane Design & ROW Acquisition$330,000$0$330,000$63,009 $266,991 $250,000 ($80,000) *FB9907Fund Balance - Street CIP$0$0$0$0$0$0 ($808,595)$14,075,258$0 $14,075,258 $12,957,681 $1,117,577 $13,945,258 ($938,595)WASTEWATER PROJECTSWW0002Misc Wastewater Rehab (min bal $100,000)$316,086 $0 $316,086 $236,666 $79,420 $316,086 $0WW0605 TRA Wastewater Payments - Impact$240,000$60,000 $300,000 $240,000$60,000 $360,000 $60,000WW0801 Line Replacement Fayette Drive$488,000$0$488,000 $287,280 $200,720 $357,000 ($131,000)WW0802 Line Replacement South Mills Drive CDBG-R$262,000$0$262,000$74,157 $187,843 $203,500 ($58,500) **WW0901 Line Replacement Woodridge Circle/Koen Lane$795,000$0$795,000 $237,705 $557,295 $407,000 ($388,000)WW1001 Line Rep - W Alexander Ln/Norman Dr/Franklin Dr$510,000$0$510,000$47,526 $462,474 $570,000 $60,000FB9911 FB - Wastewater Impact (Restricted)$0$0$0$0$0$0 ($620,070)$2,611,086$60,000 $2,671,086 $1,123,334 $1,547,752 $2,213,586 ($1,077,570)* Excess funding will be applied to construction phase** Excess funding moved to project contingency accountSub-Total Street ProjectsSub-Total Drainage ProjectsSub-Total Wastewater Projects1 CAPITAL IMPROVEMENTS PROGRAMFUNDED PROJECTS SUMMARYProject Number Project DescriptionBudget as of 5/31/09Appropriation/ AmendmentBudget as of 5/31/10Expended as of 05/31/10Remaining FundsRevised Project Cost EstimatesUnfunded/ (Excess Funding) WATER PROJECTSWT0001Misc Water Rehab (min bal $150,000)$253,511 $0 $253,511 $120,067 $133,444 $253,511 $0WT0101 Water Tank Debt Payment-Impact$2,432,514$260,792 $2,693,306 $2,606,375$86,931 $2,957,502 $264,196WT0104Well Repairs (min bal $75,000)$513,617$0$513,617 $493,833$19,784 $563,617 $50,000WT0202 Effluent Water Main$250,000 $1,250,000 $1,500,000 $107,678 $1,392,322 $1,500,000$0WT0803Transponders/Meters (annual transfer $158,000)$663,750$158,000 $821,750 $659,630 $162,120 $979,750 $158,000WT0901 TRA Water Payments-Impact$100,000$150,000 $250,000 $100,000 $150,000 $400,000 $150,000FB9910 FB- Water Impact (Restricted)$0$0$0$0$0$0 ($2,320,374)FB9901 FB - Water & Wastewater CIP$0$0$0$0$0$0 ($252,955)Sub-Total Water Projects$4,213,392 $1,818,792 $6,032,184 $4,087,583 $1,944,601 $6,654,380 ($1,951,133)OTHERAC1001 Texas Star Sports Complex Lighting Improvements$0$454,200 $454,200$0$454,200 $504,200 $50,000CM0304 Entry Monument Sign Program$115,782$0$115,782$93,027$22,755 $115,782$0CM0804 Redevelopment$967,472$5,802$973,274 $673,248 $300,026 $973,274$0DV9901 EDC Incentive Funds$350,854$25,000 $375,854 $300,854$75,000 $400,854 $25,000ED0101 Planning Consultants$104,869$100,000 $204,869 $104,869 $100,000 $204,869$0PD9901 Police and Courts Facility$11,717,596$267 $11,717,863 $11,609,560 $108,303 $11,717,863$0PR0720 Misc. Park Structures$225,000$0$225,000 $175,900$49,100 $225,000$0PR0804 Park Irrigation$50,000$25,000$75,000$1,008$73,992 $100,000 $25,000PR0902 Senior Citizen Center at Midway Park$4,856,821$0 $4,856,821 $711,921 $4,144,900 $4,856,821$0PR0907 Euless Family Life Center Phase I$1,330,000$775,000 $2,105,000 $1,304,515 $800,485 $2,105,000$0FB9906 FB-EDC CIP$0$0$0$0$0$0 ($1,060,033)FB9908 FB-Athletic Complex CIP$0$0$0$0$0$0 ($771,092)FB9909 FB-General CIP$0$0$0$0$0$0 ($111,852)FB9913 FB-Car Rental CIP$0$0$0$0$0$0 ($72,088)Sub-Total Other Projects$19,718,394 $1,385,269 $21,103,663 $14,974,902 $6,128,761 $21,203,663 ($1,915,065)$41,845,963 $3,464,061 $45,310,024 $33,871,397 $11,438,627 $45,188,220 ($6,505,890)TOTAL FUNDED PROJECTS2 CITY OF EULESS CAPITAL IMPROVEMENT PROGRAM AMENDMENTS AND ACTIONS -- FUNDED PROJECTS PROJECT#PROJECT DESCRIPTION DATE AMENDMENTS & ACTIONS AC0901 TSSC Study/Fencing 09/30/2009 Project complete, transfer excess funding of $14,796 to FB9908. AC1001 TSSC Lighting Improvements 10/01/2009 Approved in FY2010 Capital Budget. DR0701 Eastcliff/Greenbriar Drainage  Improvements 04/01/2010 Project complete, transfer excess funding of $93,416 to FB9902. DR0801 Rockwall/Lamar Drainage  Improvements 04/01/2010 Project complete, transfer excess funding of $157,446 to FB9902. DR0802 Hurricane Creek 10/01/2009 Approved in FY2010 Capital Budget. DR0901 Bear Creek Parkway Erosion 05/26/2009 Authorized the city manager to execute an engineering design contract with Jerry Parche' Consulting Engineers in an amount not to exceed $54,500 for the design of bank stabilization for portions of Little Bear Creek.   DR0901 Bear Creek Parkway Erosion 01/12/2010 Awarded Bid No. 003‐10 to Ark Contracting Services for the bank stabilization project along Little Bear Creek at Bear Creek Parkway in the amount of $363,031. ED0101 Planning Consultants Additional funding of $100,000 approved in FY2010 Capital Budget. ED0801 RediMix Regional  Headquarters 12/31/2009 Project complete, transfer excess funding of $271,678 to EDC Operations. PR0601 Park Amenities Upgrade 06/24/2010 Project complete, transfer excess funding of $4,684 to FB9906. PR0901 Trails at Bob Eden Park 06/09/2009 Approved award of Bid No. 008‐09 for a construction contract to Ratliff Hardscape, Ltd. for the Bob Eden Park Connector Trail in the amount of $92,664.48. PR0901 Trails at Bob Eden Park 06/24/2010 Project complete, transfer excess funding of $33,327 to FB9906. PR0902 Senior Center at Midway Park 11/24/2009 Authorized the city manager to seek competitive sealed proposals for construction of a senior center in conjunction with Tarrant County. The total project cost is estimated at $4,856,821with $3,630,685 allocated for construction. PR0902 Senior Center at Midway Park 01/12/2010 Approved Site Plan No. 09‐05‐SP for the proposed senior center to be located at Midway City Park Addition, Block A, Lot 1, 300 Midway Drive. PR0902 Senior Center at Midway Park 01/12/2010 Approved award of RFP No. 004‐10 for the construction of a senior center to Ratcliff Constructors, LP and authorizing the city manager to execute construction contract in the amount of $2,936,750 with completion in 300 days. PR0907 Midway Park Family Life  Center ‐ Phase I 10/01/2009 Additional funding of $750,000 approved in FY2010 Capital Budget. PR0907 Midway Park Family Life  Center ‐ Phase I 05/26/2009 Authorized the city manager to negotiate and execute a contract with Byron Folse and Associates, Euless, Texas for architectural services for the expansion of the Midway Recreation Center. PR0907 Midway Park Family Life  Center ‐ Phase I 11/24/2009 Authorized the city manager to seek competitive sealed proposals for construction of the expansion and remodel of Midway Recreation Center. The total project cost is estimated at $2,105,000 with $1,700,000 allocated for construction. PR0907 Midway Park Family Life  Center ‐ Phase I 01/12/2010 Approved award of RFP No. 005‐10 for the construction of additions and renovations to the Midway Recreation Center construction to Ratcliff Constructors, LP and authorize city manager to execute construction contract for a price of $1,658,252. PS0304 Glade Road 06/24/2010 Project complete, transfer excess funding of $172,772 to FB9907. PS0901 Ash/Denton/Fair Oaks Overlay 09/30/2009 Project complete, transfer excess funding of $88,016 to FB9907. PS0903 Mid Cities @ Gateway & Baze  Traffic Signals 06/24/2010 Project complete, transfer excess funding of $69,298 to FB9907. PS1001 Baze Road Design/ROW 10/01/2009 Approved in FY2010 Capital Budget. PS1001 Baze Road Design/ROW 11/10/2009 Authorized the city manager to execute an engineering design contract in an amount not to exceed $128,600 with Neel‐Schaffer, Inc. for the design of Baze Road from Priest Lane to Glade Road. PS1002 Wilshire/Marlene Overlay 10/01/2009 Approved in FY2010 Capital Budget. PS1002 01/12/2010 Authorized city manager to execute an interlocal agreement between Tarrant County and the City of Euless for asphalt overlay improvements to Marlene Drive and Wilshire Drive. PS1003 Ash Lane Design 10/01/2009 Approved in FY2010 Capital Budget. PS1003 Ash Lane Design 11/10/2009 Authorized the city manager to execute an engineering design contract in an amount not to exceed $132,200with Freese and Nichols, Inc. for design of Ash Lane from Aransas Drive to Main Street.   PS9909 FM157 North ‐ SH183 to SH121 04/16/2010 Project complete, previously transferred excess funding of $138,304 to FB9907.  3 CITY OF EULESS CAPITAL IMPROVEMENT PROGRAM AMENDMENTS AND ACTIONS -- FUNDED PROJECTS PROJECT#PROJECT DESCRIPTION DATE AMENDMENTS & ACTIONS WT0201 Well Rehabilitation &  Disinfection 06/24/2010 Project complete, transfer excess funding of $77,692 to FB9901. WT0202 Effluent Water Main 10/01/2009 Additional funding of $1,250,000 approved in FY2010 Capital Budget. WT0202 Effluent Water Main 10/13/2009 Authorized the city manager to execute an engineering design contract in an amount not to exceed $127,600 with Alan Plummer, Inc. for the design of an effluent water main.  WT0202 Effluent Water Main 05/25/2010 Approved award of Bid No. 007‐10 for a construction contract with William J. Schultz, Inc., dba Circle C Construction for the effluent water main project in the amount for the base bid of $1,095,925 plus the alternate of $61,700 for a total contract amount of $1,157,625. WW0801 Fayette Line Replacement 02/09/2010 Authorized the city manager to execute a contract in the amount of $301,902.75 with PM Construction and Rehab LP to rehabilitate the Fayette Drive sanitary sewer line. WW0802 S. Mills Line Replacement 10/13/2009 Approved recommendation of bid award to Tarrant County for Community Development Block Grant (CDBG‐R) project no. B09‐us‐48‐0001‐22‐50. to Hall Albert Construction Company in the amount of $171,574.40 for the replacement of sanitary sewer main in the Oakwood Terrace West Addition. The City of Euless monetary participation required is in the amount of $79,864.40. Authorized participation up to $88,443to allow for change orders of up to 5% of the base contract. WW0901 Woodridge/Koen Line  Replacement 02/09/2010 Approved award of Bid No. 002‐10 and authorize the city manager to execute a construction contract with PM Construction and Rehab, LP for the replacement of sanitary sewer mains included in the Woodridge/Koen Line Replacement project. The contract was awarded to the second lowest bidder in the amount of $613,035.15 with a completion time of 120 calendar days. WW0902 West Mills Line Replacement 04/16/2010 Project complete. WW1001 Alexander/Norman/Franklin  Line Replacement 10/01/2009 Approved in FY2010 Capital Budget. WW1001 Alexander/Norman/Franklin  Line Replacement 11/24/2009 Authorized the city manager to execute an engineering design contract with Elliot and Hughes, Inc. in an amount not to exceed $66,300 for the Alexander/Norman/Franklin line replacement project. 4 FUNDED DRAINAGE PROJECTSDRAINAGE PROJECTS CAPITAL IMPROVEMENTS PROGRAMFUNDED PROJECTS SUMMARYProject Number Project DescriptionBudget as of 5/31/09Appropriation/ AmendmentBudget as of 5/31/10Expended as of 05/31/09Remaining FundsRevised Project Cost EstimatesUnfunded/ (Excess Funding) DRAINAGE PROJECTSDR9903Misc Drainage Improvements (min bal $150,000) $362,833$0$362,833$61,359 $301,474 $362,833$0DR0802Hurricane Creek & Bridge at Marlene Improvements$335,000$200,000 $535,000 $302,994 $232,006 $378,500 ($156,500)DR0901Bear Creek Parkway Erosion Repair$530,000$0$530,000 $363,544 $166,456 $430,000 ($100,000)FB9902Fund Balance - Drainage CIP$0$0$0$0$0$0 ($367,027)$1,227,833$200,000 $1,427,833 $727,897 $699,936 $1,171,333 ($623,527)Total Drainage Projects5 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 23,1999 RON YOUNG MISCELLANEOUS DRAINAGE IMPROVEMENTS PROGRAM DRAINAGE IMPROVEMENTS DR9903 This project includes funds for various small projects or emergency repairs identified throughout the year. Often correction of these problems requires design services and other minor improvements. As larger projects are identified, they will be tracked separately and assigned a different project number. Failure to correct these problems often causes damage to existing infrastructure. 6 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Storm Drain (minimum balance $150,000) $0 $0 $0 $0 Transfers from: Drainage Operating Fund FY99 $51,609 Drainage Operating Fund FY02 $50,000 $0 Drainage Operating Fund FY03 $50,000 $0 Drainage CIP Fund FY08 $11,224 Drainage Operating Fund FY09 $200,000 $0 $362,833 Fence $559 $559 0 100% Storm Drain $362,079 $60,605 301,474 17% Meters & Setting $195 $195 0 100% $362,833 $61,359 $301,474 17% MISCELLANEOUS DRAINAGE IMPROVEMENTS PROGRAM DR9903 7 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 15,2005 RON YOUNG HURRICANE CREEK & BRIDGE AT MARLENE IMPROVEMENTS DRAINAGE IMPROVEMENTS DR0802 In 1996, the City received the storm drainage master plan for Hurricane Creek. This project includes the removal of the house at 2103 Marlene Drive, and the design and construction of a maintenance ramp/flume from Marlene Drive to the existing concrete channel. Award Study Contract: August 2008 Flood Study Complete: May 2009 Begin Construction: April 2010 Construction Complete: June 2010 The construction of the maintenance ramp/flume will increase accessibility and maintenance of the channel, as well as provide an additional pathway for conveyance of excess flows to minimize the flooding potential. 8 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering $80,000 Right-of-Way $220,000 Construction $60,000 Demolition $18,500 $378,500 Transfers from: Car Rental $335,000 Drainage Operations $200,000 Transfers to: Drainage CIP Fund Balance ($156,500) $378,500 Engineering $80,000 $61,200 $18,800 77% Demolition $18,500 $21,706 ($3,206)117% Right-of-Way $220,000 $220,088 ($88)100% Construction $60,000 $0 $60,000 0% $378,500 $302,994 $75,506 80% HURRICANE CREEK & BRIDGE AT MARLENE IMPROVEMENT DR0802 9 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 15,2007 RON YOUNG BEAR CREEK PARKWAY EROSION REPAIR DRAINAGE IMPROVEMENTS DR0901 May 26,2009: Authorized the City Manager to execute a design contract with Jerry Parché for bank stabilization design in an amount of $54,000. January 12, 2010: Authorized the City Manager to execute a contract with Ark Contracting Services for $363,031 for the construction of the bank stabilization project. In 2007, the city received an erosion study for Little Bear Creek from Halff Associates. Construct erosion control for the eastern embankment of Little Bear Creek just downstream of Bear Creek Parkway. Begin Design: May 2009 Begin Construction: January 2010 Construction Complete: July 2010 Continued erosion of the banks will cause the loss of a portion of the trail system and trees adjacent to the banks. 10 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering $60,000 Construction $370,000 $430,000 Transfer from Car Rental $530,000 Transfer to: Drainage CIP Fund Balance ($100,000) $430,000 Engineering $60,000 $50,328 $9,672 84% Storm Drain $370,000 $313,216 $56,784 85% $430,000 $363,544 $66,456 85% BEAR CREEK PARKWAY EROSION REPAIR DR0901 11 12 FUNDED STREET PROJECTSSTREET PROJECTS CAPITAL IMPROVEMENTS PROGRAMFUNDED PROJECTS SUMMARYProject Number Project DescriptionBudget as of 5/31/09Appropriation/ AmendmentBudget as of 5/31/10Expended as of 05/31/09Remaining FundsRevised Project Cost EstimatesUnfunded/ (Excess Funding) STREET PROJECTSPS9901 North Main Street$6,820,047$0 $6,820,047 $6,697,130 $122,917 $6,820,047$0PS9904 Harwood Road$5,695,211$0 $5,695,211 $5,662,473$32,738 $5,695,211$0PS0605South Pipeline Road Bridge Replacement$157,000$0$157,000$0$157,000 $157,000$0PS0802 Fuller-Wiser Connector$495,000$0$495,000 $428,506$66,494 $495,000$0PS1001Baze Road Design & ROW Acquisition$290,000$0$290,000$91,540 $198,460 $240,000 ($50,000) *PS1002FY10 County Overlay - Wilshire/Marlene$288,000$0$288,000$15,023 $272,977 $288,000$0PS1003Ash Lane Design & ROW Acquisition$330,000$0$330,000$63,009 $266,991 $250,000 ($80,000) *FB9907Fund Balance - Street CIP$0$0$0$0$0$0 ($808,595)$14,075,258$0 $14,075,258 $12,957,681 $1,117,577 $13,945,258 ($938,595)* excess funding will be applied to construction phase of projectTotal Street Projects13 Department:Date Prepared:5/24/1999 Submitted By:Date Completed: Project Title:NORTH MAIN STREET Project Type:STREET Sub-Type: Project Code:PS9901 Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: City of Euless Capital Project Request PUBLIC WORKS RON YOUNG August 22, 2000:Ratified EDC Resolution 11-00 authorizing a project involving facility improvements along North Main Street. CONSTRUCTION This project is a part of the $13.5 million bond package approved by the voters in October 1998. April 26, 2005: Award bid to Durable Specialties, Inc., for traffic signalization in the amount of $68,780. The project consists of reconstruction and widening of North Main Street from SH10 to Harwood Road. It April 14, 1998: Authorized bond election for the purpose of funding construction. November 24, 1998: Approved contract with Cummings & Prewitt, Inc. for paving and drainage design. February 8, 2000: Authorized the acquisition of ROW to allow for widening and paving improvements. August 22, 2000: Ratified the expenditure of $30,000 of EDC funds for ROW acquisition along Main Street. November 14, 2000: Authorized Resolution #00-1083 declaring public necessity for acquisition of ROW. February 27, 2001: Authorized publication of notice of intent to issue certificates of obligation. 1. Improvement of traffic flow and traffic safety. April 9, 2001:Approved Ord. 1468 authorizing issuance of General Obligation Bonds, Series 2001 in the amount of $6,000,000. September 11, 2001:Authorized city manager to negotiate and execute a contract with TXU Electric for the relocation of utilities along North Main Street at an estimated cost of $550,000. December 11, 2001:Awarded Bid # 004-02 to Southlake Construction for the demolition and removal of single-family houses along North Main Street. also consists of relocating overhead utilities, the addition of a subsurface drainage system, and the addition of street lights and landscaping improvements. 2. Improve aesthetics with relocation of overhead utilities and addition of landscaping. 3. Subsurface drainage system needed. 4. Reduction of maintenance requirements. Construction complete: October 2005 Landscaping and compliance of Americans with Disabilities Act for sidewalks: FY 2010 March 11, 2003: Authorized City Manager to seek competitive bids for paving & drainage construction. April 8, 2003:Awarded contract to McClendon Construction Co. for construction of street, utility, and September 28, 2004: Award bid contract to Whitmore and Sons for landscaping/irrigation for $83,275. drainage for North Main Street for $3,370,035.15, provided for a $180,000 contingency. 14 PROJECT TITLE:PROJECT CODE:PS9901 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: *Engineering $698,156 Direct Operating Cost Right-of-Way $1,447,814 Personnel:Full Time Utility Relocation (City)$290,878 Part Time Appraisal Services $114,673 $0 Street Lights $102,443 Landscaping $115,808 Construction $3,386,609 Signs & Markings $497,419 Contingency $824 Issuance Cost $62,261 $0 Contract Labor $103,162 * Added $70,000 for work related to medians. Total Estimated Capital Cost $6,820,047 Maintenance Costs FUNDING SOURCE: Transfer from: Street CIP Fund Balance FY99 $1,416,185 $0 Developer's Escrow $17,276 EDC Operating Fund $430,000 W/S Operating Fund $5,053 C.O. Bond Proceeds FY01 $1,012,961 G.O. Bond Proceeds FY01 $4,820,919 $412,567 Interest Income $163,667 Miscellaneous $450 Less Transfer To: Streets CIP Fund Balance ($1,046,464) Total Estimated Annual Cost $412,567 Total Funding $6,820,047 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $698,156 $698,156 $0 100% Right-of-Way $1,017,814 $1,017,814 $0 100% Utility Relocation (City)$290,878 $290,878 $0 100% Appraisal Services $101,495 $101,495 $0 100% Surveying Services $5,170 $5,170 $0 100% $2,955 $2,955 $0 100% $5,053 $5,053 $0 100% Landscaping $115,808 $115,808 $0 100% Signs & Markings $497,419 $466,321 $31,098 94% Construction $3,386,609 $3,386,609 $0 100% Lighting $102,443 $10,624 $91,819 10% $824 $824 $0 0% $62,261 $62,261 $0 100% Contract Labor $103,162 $103,162 $0 100% Other Expenditures $430,000 $430,000 $0 100% $6,820,047 $6,697,130 $122,917 98% Subtotal: TOTAL PROJECT Average Annual Debt Service CURRENT STATUS Engineering Subtotal: Other Professional Services Contingency Issuance Cost NORTH MAIN STREET Total Salary Purchase of Services Other Materials & Supplies Utilities Special Services 15 Department:Date Prepared:7/29/1999 Submitted By:Date Completed: Project Title: Project Type:STREET Sub-Type: Project CODE:PS9904 Priority: A COUNCIL AUTHORIZATION: April 14, 1998: Authorized bond election for the purpose of funding construction. November 24, 1998: Authorized contract for appraisal services for parcels necessary to project. May 24, 1999: Approved resolution determining the necessity for and ordering the improvement. May 24, 1999: Authorized the acquisition of the necessary right-of-way. June 22, 1999: Approved right of way acquisition. December 14, 1999: Authorized City Manager to negotiate for and acquire additional rights-of-way. February 8, 2000: Awarded construction contract to Larry H. Jackson Construction. March 28, 2000: Authorized issuance of G.O. bonds for Harwood, Main, and West Pipeline. April 8, 2003: Awarded contract to J&J Sprinkler & Landscaping for median pavers for $151,836.30. in the amount of $74,627. RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: Construction complete: June 2002 Landscaping Improvements: FY2010 JUSTIFICATION: The existing two lane roadway does not meet current and future needs. added at Fuller-Wiser Road and Bear Creek Parkway. CONSTRUCTION identified in the 1999 Master Thoroughfare Plan. This project is part of the $13.5 million bond program approved by the voters in October 1998. Project is Reconstruction of Harwood Road from a point approximately 350 feet west of North Main Street to SH360. City of Euless Capital Project Request PUBLIC WORKS RON YOUNG HARWOOD ROAD, N. MAIN STREET TO SH360 New roadway will be a six lane boulevard with sidewalks, landscaping, and lighting. Signals will be February 10, 2004:Approved bid 009-04 to Whitmore and Sons, Inc. for median irrigation and landscaping 16 PROJECT TITLE:PROJECT CODE:PS9904 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Appraisal Services $53,750 Personnel:Full Time Professional Services-Soil Test $52,123 Part Time Acquisition $800,637 $0 Engineering $415,597 $4,004,091 $3,150 $295,863 $70,000 Total Estimated Capital Cost $5,695,211 $0 Maintenance Costs $301,677 $283,634 465,722 $16,919 $5,392,302 $465,722 Less Inter-Project Transfer to: ($299,321) Total Estimated Annual Cost $465,722 Total Funding $5,695,211 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $415,597 $415,597 $0 100% $4,021,668 $4,013,177 $8,491 100% $800,637 $800,637 $0 100% $54,036 $53,750 $286 99% $70,000 $70,000 $0 100% Contingencies $3,150 $3,092 $58 98% $52,123 $52,123 $0 100% $278,000 $254,097 $23,903 91% $5,695,211 $5,662,473 $32,738 99% HARWOOD ROAD, N. MAIN STREET TO SH360 Issuance Cost Street CIP Fund Balance Subtotal: Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Other Average Annual Debt Service Pipeline Road - PS0002 Construction CURRENT STATUS Engineering Other Professional Services Issuance Cost Appraisal Services TOTAL PROJECT Construction Contingency Landscaping Right-of-Way Landscaping Developer's Escrow FUNDING SOURCE: Transfer from: G.O. Bond Proceeds W/S Operating Fund 17 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 15,2005 RON YOUNG SOUTH PIPELINE ROAD BRIDGE REPLACEMENT STREET BRIDGE PS0605 June 26, 2007: Approved an inter-local agreement between the City of Euless and the City of Fort Worth. The City of Euless' estimated cost is $157,000. This project is related to the proposed asphalt overlay of South Pipeline Road to be performed by Tarrant County and jointly funded by the City of Euless and the City of Fort Worth. Bridge and related channel improvements are planned at South Pipeline Road over Post Oak Channel. The existing structure is to be replaced because of structural and geometric deficiencies as well as load restrictions. The City of Fort Worth will manage the project and the City of Euless will contribute 25% of the construction costs which represents the portion of the project that falls within the city limits of Euless. Pending: Delayed due to the City of Fort Worth water main conflict. Fort Worth is working on a new bridge design. South Pipeline Road is an important east-west thoroughfare providing access to the southeast portion of the City of Euless. This project will correct structural and geometric deficiencies as well as alleviate load restrictions. 18 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Streets/Highways $157,000 $0 $0 $0 $0 $157,000 Transfer from: Street CIP Fund Balance $157,000 $0 $0 $0 $157,000 Streets/Highways $157,000 $0 157,000 0% $157,000 $0 $157,000 0% SOUTH PIPELINE ROAD BRIDGE REPLACEMENT PS0605 19 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 13,1999 RON YOUNG Apr 16, 2010 FULLER-WISER ROAD CONNECTOR STREET CONSTRUCTION PS0802 May 26, 2009: Authorized the city manager to award contract to McClendon Construction for $390,810.10 for the construction of Fuller-Wiser Road connector. This project is identified in the 1999 Master Thoroughfare Plan. Fuller-Wiser Road is a minor local arterial connection between SH360 on the north and SH183 on the south. The roadway is presently constructed to a design standard of four lanes undivided in a 70-foot right-of-way from SH183 to north of Mid Cities Boulevard. From north of Mid Cities Boulevard to SH360, the road will transition from a four lane undivided to a three lane undivided to tie into the existing Texas Department of Transportation connection at SH360. Award Design: April 2008 Right-of-Way Complete: March 2009 Award Construction Contract: May 2009 Construction Complete: April 2010 Completing this connector will upgrade this portion of the roadway from a two-lane county road section with an open drainage system to a standard curb and gutter street section with an underground drainage system. 20 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering $45,000 Streets/Highways $410,000 $0 Right-of-Way $40,000 $0 $0 $0 $495,000 Transfer from: Street CIP Fund Balance $495,000 $0 $0 $0 $495,000 Engineering $45,000 $42,999 2,001 96% Streets/Highways $410,000 $385,507 24,493 94% Right-of-Way $40,000 $0 40,000 0% $495,000 $428,506 $66,494 87% FULLER-WISER ROAD CONNECTOR PS0802 21 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 22,1999 RON YOUNG BAZE ROAD-GLADE ROAD TO PRIEST LANE DESIGN & ROW ACQUISITION STREET DESIGN PS1001 November 10, 2009: Authorize the City Manager to execute an engineering design contract with Neel-Schaffer, Inc. in an amount not to exceed $128,600. The reconstruction and expansion of Baze Road was identified in the 1999 Master Thoroughfare Plan. This project consists of the detailed engineering design and right-of-way acquisition for the construction of a 31' back-to-back concrete roadway to replace an existing deteriorating two-lane asphalt roadway. The project includes underground drainage, sidewalks, and street lighting. Award Design: December 2009 Anticipate Plans Complete: August 2010 Anticipate right-of-way complete: December 2010 Baze Road is an important north-south residential collector that is planned to connect Glade Road and Mid Cities Boulevard. This roadway exists as a four-lane divided roadway north of Glade Road in Grapevine. In Euless, it is constructed partially as a 40 foot undivided roadway and as a 36 foot (two-lane) undivided roadway from Mid Cities Boulevard to Priest Lane. The portion of Baze Road from Priest Lane to Glade Road is the only portion that is not constructed to City standards. 22 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering $150,000 Right-of-Way $90,000 $0 Construction*$50,000 $0 $0 $0 $290,000 Transfer from Car Rental $164,938 Transfer from Escrow Funds $125,062 $0 $290,000 Engineering $150,000 $91,540 58,460 61% Right-of-Way $90,000 $0 90,000 0% Construction*$50,000 $0 50,000 0% * Excess funding will be applied to construction phase of project. $290,000 $91,540 $198,460 32% BAZE ROAD-GLADE ROAD TO PRIEST LANE DESIGN & ROW PS1001 23 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 11,2008 RON YOUNG FY2010 COUNTY OVERLAY - WILSHIRE DR/MARLENE DR STREET OVERLAY PS1002 January 12, 2010: Authorized the city manager to execute an interlocal agreement with Tarrant County for asphalt overlay improvements to Marlene Drive and Wilshire Drive. Wilshire Drive and Marlene Drive are collector streets that the City of Euless plans to overlay in a cooperative project with Tarrant County. The project consists of edge milling, asphalt overlay, and restriping of: 1. Wilshire Drive from SH10 to SH183 and 2. Marlene Drive from Canyon Ridge Drive to SH10. Anticipate Begin Construction: July/August 2010 Anticipate Construction Complete: September 2010 The existing asphalt pavement is deteriorating and is becoming a maintenance problem. The asphalt overlay will provide an improved riding surface, extend the life of the roadway, and enhance the appearance of the street. 24 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Material $288,000 $288,000 Transfer from Car Rental $288,000 $288,000 Overlay $288,000 $15,023 272,977 5% $288,000 $15,023 $272,977 5% FY2010 COUNTY OVERLAY - WILSHIRE DR/MARLENE DR PS1002 25 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 01,2002 RON YOUNG ASH LANE-ARANSAS TO N MAIN DESIGN & ROW STREET DESIGN PS1003 November 10, 2009: Authorize the City Manager to execute an engineering design contract for Ash Lane with Freese and Nichols, Inc. in an amount not to exceed $132,200. Ash Lane is identified in the Master Thoroughfare Plan as a four-lane minor arterial roadway from Industrial Boulevard to Fuller-Wiser Road. This project consists of the design and right-of-way acquisition necessary to facilitate removal of the existing two lanes of asphalt pavement on Ash Lane from Aransas Drive to N. Main Street which is to be replaced by a four lane concrete roadway. The associated sidewalks and storm drainage are included in the project scope. Award Design: November 2009 Anticipate Plans Complete: September 2010 Anticipate Right-of-Way Complete: January 2011 Anticipate Begin Construction: April 2011 Anticipate Construction Complete: December 2011 The portion of Ash Lane from Aransas Drive to N. Main Street is the only portion that is not constructed to the Master Thoroughfare Plan standards. Completion of this section of Ash Lane will provide an orderly flow of traffic from Industrial Boulevard to Fuller-Wiser Road. 26 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering $150,000 Right-of-Way $100,000 $0 Construction*$80,000 $0 $0 $0 $330,000 Transfer from: Street CIP Fund Balance $330,000 $0 $330,000 Engineering $150,000 $63,009 86,991 42% Right-of-Way $100,000 $0 100,000 0% Construction*$80,000 $0 80,000 0% * Excess funding will be applied to construction portion of project. $330,000 $63,009 $266,991 19% ASH LANE-ARANSAS TO N MAIN DESIGN & ROW PS1003 27 28 FUNDED  WASTEWATER PROJECTSWASTEWATER PROJECTS CAPITAL IMPROVEMENTS PROGRAMFUNDED PROJECTS SUMMARYProject Number Project DescriptionBudget as of 5/31/09Appropriation/ AmendmentBudget as of 5/31/10Expended as of 05/31/09Remaining FundsRevised Project Cost EstimatesUnfunded/ (Excess Funding) WASTEWATER PROJECTSWW0002Misc Wastewater Rehab (min bal $100,000)$316,086 $0 $316,086 $236,666 $79,420 $316,086 $0WW0605 TRA Wastewater Payments - Impact$240,000$60,000 $300,000 $240,000$60,000 $360,000 $60,000WW0801 Line Replacement Fayette Drive$488,000$0$488,000 $287,280 $200,720 $357,000 ($131,000)WW0802 Line Replacement South Mills Drive CDBG-R$262,000$0$262,000$74,157 $187,843 $203,500 ($58,500) **WW0901 Line Replacement Woodridge Circle/Koen Lane$795,000$0$795,000 $237,705 $557,295 $407,000 ($388,000)WW1001 Line Rep - W Alexander Ln/Norman Dr/Franklin Dr$510,000$0$510,000$47,526 $462,474 $570,000 $60,000FB9911 FB - Wastewater Impact (Restricted)$0$0$0$0$0$0 ($620,070)$2,611,086$60,000 $2,671,086 $1,123,334 $1,547,752 $2,213,586 ($1,077,570)* excess funding added to project contingency accountTotal Wastewater Projects29 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 26,1999 RON YOUNG MISCELLANEOUS WASTEWATER REHABILITATION WASTEWATER MAINS WW0002 March 8, 2005: Award contract to Hall-Albert Construction Company for the replacement of various wastewater lines in the amount of $977,857.50. March 28, 2006: Authorized the city manager to proceed with emergency repair by GRA-TEX Utilities to the aerial wastewater main crossing Hurricane Creek at a cost of $55,000. This project is for funding of small wastewater main problems identified throughout the fiscal year. Larger projects will be determined on an "as needed" basis and presented for funding under a new project number. Most of these lines are clay tile and are seriously deteriorated. 30 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Wastewater Mains (minimum balance $100,000) $0 $0 $0 $0 Transfers from: W/W Operating Fund $165,000 WW9903 $37,013 $0 W/W CIP Fund Balance $114,073 $0 $0 $316,086 Wastewater Mains $283,567 $204,147 79,420 72% Engineering $1,939 $1,939 0 100% Contingency $30,580 $30,580 0 100% $316,086 $236,666 $79,420 75% MISCELLANEOUS WASTEWATER REHABILITATION WW0002 31 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 03,2006 RON YOUNG TRINITY RIVER AUTHORITY WASTEWATER PAYMENT WASTEWATER PAYMENTS WW0605 Based on a review by Birkhoff, Hendricks, and Conway of the water and wastewater impact fees, it was determined that a substantial portion of the wastewater impact fee is attributed to Trinity River Authority ("TRA") capital projects. Therefore, these fees should be used to pay a portion of the annual TRA expense, as these funds are directly attributed to the expansion of TRA. Based on the available fund balance, a systematic drawdown over a ten year period has been developed. Annual Payment $60,000: FY2006-FY2015 The expansion at TRA provides additional capacity and it was determined through the wastewater impact fee study that these funds could be used to pay a portion of TRA wastewater payments. It was determined a ten year drawdown would approximate the Capital Improvement Plan Review time frame, as well as provide for a systematic drawdown that would not impact the annual budget. 32 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: TRA Wastewater Payments $360,000 ($60,000) ($60,000) $360,000 Transfer from: WW Impact Fee Fund Balance $300,000 Additional Funding Needed: Transfer from: WW Impact Fee Fund Balance $60,000 ($60,000) $360,000 Wastewater - TRA Service $360,000 $240,000 $120,000 67% $360,000 $240,000 $120,000 67% TRINITY RIVER AUTHORITY WASTEWATER PAYMENT WW0605 33 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 30,2007 RON YOUNG LINE REPLACEMENT, FAYETTE DRIVE WASTEWATER MAINS WW0801 August 12, 2008: Authorized the city manager to execute an engineering design contract with Elliott & Hughes, Inc. in an amount not to exceed $70,544 for projects WW0801 and WW0802. February 9, 2010: Authorized the City Manager to execute a contract with PM Construction and Rehab LP to rehabilitate the Fayette Drive sanitary sewer line in the amount of $301,902.75. The wastewater main included in the project is part of the City of Euless Wastewater System Master Plan and is included in the plan for the systematic replacement of deteriorating vitrified clay tile wastewater mains. Replace wastewater lines on the west side of Fayette Drive from Harwood Road to Ector Drive. Award Design Contract: August 2008 Design Complete: June 2009 Award Construction Contract: March 2010 Anticipate Construction Complete: August 2010 Many wastewater lines throughout the city are 40 plus years old. Most of the lines are vitrified clay tile and are susceptible to ground movement, pulled joints, root infiltration and deterioration from hydrogen sulfide gas and other chemicals. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will prevent a mandatory widespread replacement. 34 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering $47,000 Wastewater main $310,000 $0 $0 $0 $0 $357,000 Transfer from: W/WW Operating Fund $488,000 $0 Transfer to: $0 W/WW CIP Fund Balance ($131,000) $0 $357,000 Engineering $47,000 $48,862 ($1,862)104% Wastewater Mains $310,000 $238,418 $71,582 77% $357,000 $287,280 $69,720 80% LINE REPLACEMENT, FAYETTE DRIVE WW0801 35 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 30,2007 RON YOUNG LINE REPLACEMENT, SOUTH MILLS DRIVE (CDBG-R) WASTEWATER MAINS WW0802 August 12, 2008: Authorized the city manager to execute an engineering design contract with Elliott & Hughes, Inc. in an amount not to exceed $70,544 for projects WW0801 and WW0802. The city's portion of $88,443 includes $8,578.70 for change orders. October 13, 2009: Recommended Tarrant County award a construction contract to Hall Albert Construction Company in the amount of $171,574.40. City portion not to exceed $88,443. The wastewater main included in the project is part of the City of Euless Wastewater System Master Plan and is included in the plan for the systematic replacement of deteriorating vitrified clay tile wastewater mains. Replace wastewater lines west of South Mills Drive from Pipeline Road to the south side of SH10. Awarded Construction Contract: November 2009 Construction Complete: May 2010 Many wastewater lines throughout the city are 40 plus years old. Most of the lines are vitrified clay tile and are susceptible to ground movement, pulled joints, root infiltration and deterioration from hydrogen sulfide gas and other chemicals. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will prevent a mandatory widespread replacement. 36 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering $23,500 Wastewater main $180,000 $203,500 Transfer from: W/WW Operating Fund $162,000 CDBG-R Funding $100,000 Transfer to: W/WW CIP Fund Balance ($58,500) $203,500 Engineering $23,500 $21,923 $1,577 93% Wastewater Mains $180,000 $52,234 $127,766 29% $203,500 $74,157 $129,343 36% LINE REPLACEMENT, SOUTH MILLS DRIVE (CDBG-R)WW0802 37 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 10,2000 RON YOUNG LINE REPLACEMENT-WOODRIDGE CIRCLE/KOEN LANE WASTEWATER MAINS WW0901 April 14, 2009: Authorized the city manager to execute a design contract for replacement of sanitary sewer lines on Woodridge Circle with Elliot and Hughes, Inc. in an amount not to exceed $61,000. February 9, 2010: Authorized the city manager to execute a contract in the amount of $311,132.40 with PM Construction and Rehab LP to rehabilitate the Woodridge Circle/Koen Lane sanitary sewer lines. Systematic replacement of wastewater lines in drainage basin areas using a worst first approach. Replace the following wastewater lines on Woodridge Circle: 1. West side of Driftwood Drive from Tanglewood Trail to Pipeline Road, 2. East side of Driftwood Drive from Woodridge Circle to Pipeline Road, 3. Briarwood Court and Penoak Court, and 4. West end of Koen Lane to South Pipeline Road. Began Construction: March 2010 Anticipate Construction Complete: August 2010 Many wastewater lines throughout the city are 40 plus years old. Most of the lines are clay tile and are subject to ground movement, grease, root infiltration, and deterioration from hydrogen sulfide gas and other chemicals. Many are not functional at an acceptable level and are often inundated with inflow and infiltration problems. Systematic replacement will prevent a mandatory widespread replacement. 38 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering $87,000 Wastewater mains $320,000 $407,000 Transfer from: W/WW Operating Fund $795,000 Transfer to: W/WW CIP Fund Balance ($388,000) $407,000 Engineering $87,000 $62,234 $24,766 72% Wastewater Mains $320,000 $175,471 $144,529 55% $407,000 $237,705 $169,295 58% LINE REPLACEMENT-WOODRIDGE CIRCLE/KOEN LANE WW0901 39 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 30,2003 RON YOUNG LINE REPLACEMENT-W ALEXANDER/NORMAN/FRANKLIN WASTEWATER MAINS WW1001 November 24, 2009: Authorized the city manager to execute an engineering design contract with Elliott and Hughes, Inc. in an amount not to exceed $66,300. The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan and are included in the plan for the systematic replacement of wastewater mains using a worst first approach. The project consists of the replacement of the following wastewater mains: 1. Between Ross Avenue and West Alexander Lane, 2. Between Norman Drive and Franklin Drive, and 3. Between Franklin Drive and Simmons Drive, North of Bayless Drive. Design Award: November 2009 Anticipate Construction Award: September 2010 Anticipate Begin Construction: October 2010 Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 40 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering $70,000 Construction $500,000 $0 $0 $0 $0 $570,000 Transfer from: W/WW Operations $510,000 $0 Additional Funding Needed: $0 Transfer from: W/WW CIP Fund Balance $60,000 $0 $570,000 Wastewater Mains $500,000 $0 500,000 0% Engineering $70,000 $47,526 22,474 68% $570,000 $47,526 $522,474 8% LINE REPLACEMENT-W ALEXANDER/NORMAN/FRANKLIN WW1001 41 42 FUNDED WATER PROJECTSWATER PROJECTS CAPITAL IMPROVEMENTS PROGRAMFUNDED PROJECTS SUMMARYProject Number Project DescriptionBudget as of 5/31/09Appropriation/ AmendmentBudget as of 5/31/10Expended as of 05/31/09Remaining FundsRevised Project Cost EstimatesUnfunded/ (Excess Funding) WATER PROJECTSWT0001Misc Water Rehab (min bal $150,000)$253,511 $0 $253,511 $120,067 $133,444 $253,511 $0WT0101 Water Tank Debt Payment-Impact$2,432,514$260,792 $2,693,306 $2,606,375$86,931 $2,957,502 $264,196WT0104Well Repairs (min bal $75,000)$513,617$0$513,617 $493,833$19,784 $563,617 $50,000WT0202 Effluent Water Main$250,000 $1,250,000 $1,500,000 $107,678 $1,392,322 $1,500,000$0WT0803Transponders/Meters (annual transfer $158,000)$663,750$158,000 $821,750 $659,630 $162,120 $979,750 $158,000WT0901 TRA Water Payments-Impact$100,000$150,000 $250,000 $100,000 $150,000 $400,000 $150,000FB9910 FB- Water Impact (Restricted)$0$0$0$0$0$0 ($2,320,374)FB9901 FB - Water & Wastewater CIP$0$0$0$0$0$0 ($252,955)Total Water Projects$4,213,392 $1,818,792 $6,032,184 $4,087,583 $1,944,601 $6,654,380 ($1,951,133)43 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 26,2009 RON YOUNG MISCELLANEOUS UTILITY REHABILITATION-WATER WATER MAINS WT0001 This project is for the correction of small unidentified water main problems that may arise throughout the fiscal year. Large projects that are identified will be presented for funding under a new project number. Some of the city's older water mains have deteriorated and need replacement or repair. Staff requests that this project be funded on an annual basis. 44 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Water Mains (Minimum balance $150,000) Transfers from: W/WW CIP Fund Balance $265,000 W/WW Operations $100,000 Project WT9905 $6,251 Transfer to WT0005 ($7,020) Transfer to WT0104 ($110,720) $253,511 Contingency $49,231 $24,852 $24,379 50% Water Mains $204,280 $95,215 $109,065 47% $253,511 $120,067 $133,444 47% MISCELLANEOUS UTILITY REHABILITATION-WATER WT0001 45 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 01,2001 RON YOUNG WATER TANK DEBT PAYMENT - IMPACT WATER WT0101 Approved in the annual budget. The water tower was included in the water impact fee study. This project includes the transfer of funds from the water impact fee to pay debt service (W/S System Revenue Refunding Bonds, Series 2006) related to the construction of the new water tower (Heritage Park). Last debt payment is scheduled for July 15, 2020. The water tower provides additional capacity and was included in the water impact fee study. 46 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Debt Service - FY2001-FY2010 $2,693,306 $0 Debt Service - FY2011 $264,196 $0 $0 $0 $2,957,502 Water Impact CIP Fund Bal $2,693,306 $0 Additional Funding Needed: $0 Water Impact CIP Fund Bal $264,196 $0 $2,957,502 Transfer to Debt Service $2,957,502 $2,606,375 351,127 88% $2,957,502 $2,606,375 $351,127 88% WATER TANK DEBT PAYMENT - IMPACT WT0101 47 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS June 01,2001 RON YOUNG WELL REPAIRS WATER WELL REPAIR WT0104 April 22, 2003: Awarded bid 018-03 for far north well pump repair to Layne-Texas for $32,790. February 14, 2006: Awarded bid 011-06 to Millican Well Services, LLC for rehabilitation and installation of the new Centrilift submersible motor and pump for the far north main well in the amount of $250,035. The funding is being utilized to repair well pumps and for other unexpected well repairs. Installation of motor and pump for far north well complete: February 2007 Maintaining the city's wells results in the ability to produce water at a substantial reduction in cost. 48 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Well Rehabilitation (minimum balance $75,000) $0 $0 $0 $0 Transfers from: WT0001 - Misc Water Rehab $110,720 W/WW CIP Fund Balance $77,897 $0 W/WW Operating Fund $325,000 $0 Additional Funding Needed: Transfer from W/WW Ops $50,000 $0 $563,617 Well Rehabilitation $563,617 $493,833 69,784 88% $563,617 $493,833 $69,784 88% WELL REPAIRS WT0104 49 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES June 29,2000 RAY MCDONALD EFFLUENT WATER MAIN WATER INSTALLATION WT0202 March 11, 2008: Approved resolution 08-1272 to enter into negotiations with the City of Fort Worth ("FW"). May 26, 2009: Authorized the city manager to negotiate and execute an agreement with FW for the purchase of reclaimed water, including the related Memorandum of Understanding (with 20-year term). October 13, 2009: Authorized the city manager to execute an engineering design contract with Alan Plummer Associates Inc. in an amount not to exceed $127,600 for the design of an effluent water main. May 25, 2010: Award bid #007-10 for construction contract in the amount of $1,157,625 including alternate to William J. Schultz, Inc. dba Circle C Construction for the effluent water main adjacent to Texas Star Golf Course. Effluent water main from the City of Fort Worth Village Creek Wastewater Treatment Facility to the Texas Star property. Award Design Contract: October 2009 Anticipate Plans Complete: May 2010 Anticipate Award Construction Contract: June 2010 Anticipate Construction Completed: January 2011 Utilization of this source of water would ensure the City could continue irrigation in the event of drought and/or activation of mandatory water restrictions. Continued irrigation is required for the protection of the City's capital investment in the Texas Star Golf Course and the athletic complex portion of the Texas Star Sports Complex. 50 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Installation $1,500,000 $0 $0 $0 $0 $1,500,000 Transfers from: W/WW Operating Fund $250,000 City of Fort Worth $130,000 $0 W/WW Operating Fund $720,000 $0 W/WW CIP Fund Balance $400,000 $0 $1,500,000 Water Mains $1,360,000 $0 1,360,000 0% Engineering $140,000 $107,678 32,322 77% $1,500,000 $107,678 $1,392,322 7% EFFLUENT WATER MAIN WT0202 51 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 31,2007 RON YOUNG TRANSPONDERS AND METERS WATER EQUIPMENT REPLACEMENT WT0803 November 13, 2007: Awarded the annual contract for the purchase of water meters and transponders, and authorized the city manager to enter into an agreement with Atlas Utility Supply Company in the amount of $383,875. Amount for project not to exceed $331,875. November 11, 2008: Awarded the annual contract for the purchase of water meters and transponders, and authorized the city manager to enter into an agreement with Atlas Utility Supply Company in the amount of $356,875. Amount for project not to exceed $331,875. Partial replacement of transponders occurred in FY2006 and FY2007. This project proposes to replace the balance of the old transponders. Purchase and installation electronic transponders that are affixed to water meters allowing for electronic or remote reading of customer water consumption. These water meters (transponders) are read with an electronic device located inside a vehicle which is driven along a predefined route. Purchase and Installation Transponders Complete: FY2009 Purchase and Installation of Meters: Annually The Trace transponders technology is approximately 15 years old. The dependability of the reading equipment, the transponder size, and the battery life expectancy of the Trace automated reading system has not kept pace with developing technology. Trace transponders are failing at a high rate. The reading equipment is also approximately 15 years of age and requires frequent returns to the factory for repairs. 52 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: (Annual Funding $158,000) Transponders/Meters FY2008 $331,875 $0 Transponders/Meters FY2009 $331,875 $0 Transponders/Meters FY2010 $158,000 Transponders/Meters FY2011 $158,000 $0 $0 $979,750 Transfers from: W/WW CIP Fund Balance $347,750 W/WW Operating Fund $474,000 $0 $0 Additional Funding Needed: W/WW Operating Fund $158,000 $0 $979,750 Meters/Transponders $979,750 $659,630 320,120 67% $979,750 $659,630 $320,120 67% TRANSPONDERS AND METERS WT0803 53 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 31,2008 RON YOUNG TRINITY RIVER AUTHORITY WATER PAYMENT-IMPACT WATER PAYMENTS WT0901 Based on a review by Birkhoff, Hendricks, and Conway of the water and wastewater impact fees, it was determined that a substantial portion of the water impact fee is attributed to Trinity River Authority ("TRA") capital projects. Therefore, these fees should be used to pay a portion of the annual TRA expense, as these funds are directly attributed to the expansion of TRA. Based on the available fund balance, a systematic drawdown over a ten year period has been developed. Annual payment FY2009: $100,000 Annual payments FY2010-2018: $150,000 The expansion at TRA provides additional capacity and it was determined through the water impact fee study that these funds could be used to pay a portion of TRA water payments. It was determined a ten year drawdown would approximate the Capital Improvement Plan Review time frame, as well as provide for a systematic drawdown that would not impact the annual budget. 54 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Water - TRA Payments FY2009 $100,000 Water - TRA Payments FY2010 $150,000 Water - TRA Payments FY2011 $150,000 ($150,000) ($150,000) $400,000 Transfer from: Water Impact Fund Bal $250,000 Additional Funding Needed: Transfer from: Water Impact Fund Bal $150,000 ($150,000) $400,000 Water - TRA Service $400,000 $100,000 $300,000 25% $400,000 $100,000 $300,000 25% TRINITY RIVER AUTHORITY WATER PAYMENT-IMPACT WT0901 55 56 FUNDED OTHER PROJECTSOTHER PROJECTS CAPITAL IMPROVEMENTS PROGRAMFUNDED PROJECTS SUMMARYProject Number Project DescriptionBudget as of 5/31/09Appropriation/ AmendmentBudget as of 5/31/10Expended as of 05/31/10Remaining FundsRevised Project Cost EstimatesUnfunded/ (Excess Funding) OTHERAC1001 Texas Star Sports Complex Lighting Improvements$0$454,200 $454,200$0$454,200 $504,200 $50,000CM0304 Entry Monument Sign Program$115,782$0$115,782$93,027$22,755 $115,782$0CM0804 Redevelopment$967,472$5,802$973,274 $673,248 $300,026 $973,274$0DV9901 EDC Incentive Funds$350,854$25,000 $375,854 $300,854$75,000 $400,854 $25,000ED0101 Planning Consultants$104,869$100,000 $204,869 $104,869 $100,000 $204,869$0PD9901 Police and Courts Facility$11,717,596$267 $11,717,863 $11,609,560 $108,303 $11,717,863$0PR0720 Misc. Park Structures$225,000$0$225,000 $175,900$49,100 $225,000$0PR0804 Park Irrigation$50,000$25,000$75,000$1,008$73,992 $100,000 $25,000PR0902 Senior Citizen Center at Midway Park$4,856,821$0 $4,856,821 $711,921 $4,144,900 $4,856,821$0PR0907 Euless Family Life Center Phase I$1,330,000$775,000 $2,105,000 $1,304,515 $800,485 $2,105,000$0FB9906 FB-EDC CIP$0$0$0$0$0$0 ($1,060,033)FB9908 FB-Athletic Complex CIP$0$0$0$0$0$0 ($771,092)FB9909 FB-General CIP$0$0$0$0$0$0 ($111,852)FB9913 FB-Car Rental CIP$0$0$0$0$0$0 ($72,088)Total Other Projects$19,718,394 $1,385,269 $21,103,663 $14,974,902 $6,128,761 $21,203,663 ($1,915,065)57 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES April 29,2008 RAY MCDONALD TEXAS STAR SPORTS COMPLEX LIGHTING IMPROVEMENTS FIXTURES IMPROVEMENTS AC1001 Identified in the feasibility study was the recommendation to remove the existing light fixtures, poles, and foundations, and the replacement with new Sports lighting poles and fixtures. The project replaces the existing field lighting fixtures, poles, and foundations with Musco "Light Structure Green" or "LSG" lighting which is the best product on the market for spill/glare control and maintaining constant light levels. The system includes a remote ballast for easy maintenance, constant illumination levels, pre-wired and pre-aimed fixtures from the factory, and a 25-year maintenance free warranty. The "LSG" is considerably more efficient than the existing sport lighting fixtures installed, requires approximately 30% fewer fixtures than the existing system to achieve 50/30 foot-candle levels, and reduces utility costs. Grant Award: November 2009 Award Contract: November 2010 (Grant Deadline 18 months) Project Completion: February 2011 (Grant Deadline 36 months) The existing poles, which were originally installed in 1982, are integral ballasted 1500 watt metal halide sports lighting fixtures that require maintenance approximately two times per year to replace fixtures, lenses and bulbs. There are numerous cracks and erosion points in the light pole foundations and existing poles do not meet current wind load requirements. 58 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Lighting $398,000 Concrete Piers/Bolts $71,000 Design/Engineering $10,000 Contingency $25,200 ($25,000) ($25,000) $504,200 Dept of Energy ARRA Grant $454,200 Additional Funding Needed: TSSC CIP Fund Balance $50,000 (Gas Royalties) ($25,000) $504,200 Equipment - Lighting System $469,000 $0 $469,000 0% Design/Engineering $10,000 $0 $10,000 0% Contingency $25,200 $0 $25,200 0% $504,200 $0 $504,200 0% TEXAS STAR SPORTS COMPLEX LIGHTING IMPROVEMENTS AC1001 59 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: CITY MANAGER July 11,2006 JOE HENNIG ENTRY MONUMENT SIGN PROGRAM OTHER IMPROVEMENTS CM0304 Continuation of the original City of Euless Entry Monument Sign Program. Continued construction of City of Euless entry monument signs at key high visibility points throughout the city extending Euless beautification and branding efforts. To enable continuous efforts to identify, beautify, and brand the City of Euless. 60 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Land Betterments $115,782 $0 $0 $0 $0 $115,782 Transfer from: Car Rental $115,782 $0 $0 $0 $115,782 Land Betterments $115,782 $93,027 22,755 80% $115,782 $93,027 $22,755 80% ENTRY MONUMENT SIGN PROGRAM CM0304 61 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: CITY MANAGER July 11,2006 GARY MCKAMIE REDEVELOPMENT DEVELOPMENT DEVELOPMENT CM0804 Oct 23, 2007: Authorized the purchase of property on Lot 27, Block 2, Cresthaven Addn, 1010 Highland Dr Nov 27, 2007: Authorized the purchase of property on Lot 24, Block 1, Cresthaven Addn, 1010 Cresthaven Dr Dec 11, 2007: Authorized the purchase of property on Lots 17&18, Block 8, Cedar Hill Estates Addn, 710 S Main Oct 28, 2008: Authorized the purchase of property on Lot 3, Block 2, Cresthaven Addn, 1007 Cresthaven Dr Jan 13, 2009: Authorized the purchase of property on Lot 18, Block 1, Cresthaven Addn, 912 Cresthaven Dr; Lot 4, Block 2, Cresthaven Addn, 1005 Cresthaven Dr; and Lot 23, Block 2, Cresthaven Addn, 1002 Highland Dr This project provides funding to allow the City to participate in redevelopment projects and other community improvements or make acquisitions of property that will be of economic benefit to the City of Euless. Project includes city participation in community redevelopment projects and property acquisitions that will be of economic benefit to the City. Long-term on-going project for continuous improvement of the community. As the City ages, it is imperative that the economic vitality of the City remain strong. Reinvestment into the community will protect property values from deterioration and keep commercial properties occupied and vibrant. 62 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Land Acquisition $912,481 Demolition $60,696 $0 Minor Apparatus $97 $0 $0 $0 $973,274 Transfer from General Fund $930,000 Interest Earnings $32,374 Drill Site Surface Damage $10,000 $0 $0 Additional Funding: FY2010 Interest Earnings $900 $0 $973,274 Land Acquisition $912,481 $614,834 297,647 67% Demolition $60,696 $58,317 2,379 96% Minor Apparatus $97 $97 0 100% $973,274 $673,248 $300,026 69% REDEVELOPMENT CM0804 63 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: ECONOMIC DEVELOPMENT July 26,1999 BILL RIDGWAY EULESS DEVELOPMENT CORPORATION INCENTIVE HALF-CENT SALES TAX DEVELOPMENT DV9901 March 27, 2001: Approved transfer of $325,000 to North Main Street for right-of-way to free up funds for a sign program. May 30, 2006: Approved payment to Professional Turf Products, Inc. in the amount of $300,000 per agreement. Euless Development Corporation funds that have been set aside to aid the City of Euless in attracting development opportunities. 64 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Will be based on the merits of each opportunity. $0 $0 $0 $0 Transfers from: EDC CIP Fund Balance $888,454 EDC Operating Fund $275,000 $0 Transfer to FS#2 SS0010 ($432,600) $0 Transfer to N Main PS9901 ($355,000) Additional Funding Needed: EDC Operating Fund $25,000 $0 $400,854 Economic Development Incentives $400,000 $300,000 $100,000 75% Irrigation Supplies $854 $854 $0 100% $400,854 $300,854 $100,000 75% EULESS DEVELOPMENT CORPORATION INCENTIVE DV9901 65 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: ECONOMIC DEVELOPMENT July 07,2000 BILL RIDGWAY PLANNING CONSULTANTS ECONOMIC DEVELOPMENT DEVELOPMENT ED0101 This project provides funding for evaluating various development opportunities. Commission a study to determine the highest and best use of valuable undeveloped commercial land. Poor planning can result in lower than desired tax revenue, hodge podge development activity, and less than optimal development quality. The city needs to be proactive to guide the development of these vital tracts. 66 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Planning Study $204,869 $0 $0 $0 $0 $204,869 Transfer from Car Rental $200,000 Transfer from FB9913 $4,869 $0 $0 $0 $204,869 Planning Study $204,869 $104,869 100,000 51% $204,869 $104,869 $100,000 51% PLANNING CONSULTANTS ED0101 67 Department:Date Prepared:7/15/1999 Submitted By:Date Completed: Project Title:POLICE & COURTS FACILITY Project Type:BUILDINGS/FACILITIES Sub-Type: Project No.:PD9901 Priority: A COUNCIL AUTHORIZATION: January 13, 1998 - Authorized contract with Phillips Swager for architectural services. April 14, 1998 - Authorized the acquisition of the Western Hills Inn and Western Hills Annex. June 9, 1998 - Awarded Bid No. 98-13 for demolition services. October 9, 1998 - Awarded change order to West Excavation for abatement of asbestos. February 23, 1999 - Authorized additional funds for demolition. June 22, 1999 - Declared expectation to reimburse expenditures with proceeds of future debt. June 22, 1999 - Authorized City Manager to request qualifications for construction management service. February 22, 2000 - Public Hearing and approval of Special Use Permit. February 22, 2000 - Approval of request for site plan. May 9, 2000 - Approval of Ordinance No. 1426 authorizing sale of Cert. Of Obligation Series 2000A. May 9, 2000 - Awarded bid for construction to Ratcliff Construction. November 14, 2000 - Authorized execution of contract for Project Management Services January 9, 2001 - Granted City Manager approval to authorize change orders not to exceed $25,000. January 23, 2001 - Ratified contract for inspection services to increase limit to $65,000 January 23, 2001 - Approved Change Order #1 to credit contract $152,391. January 23, 2001 - Approved Change Order #3 for payment of $48,372.79 on new piers & removal. March 27, 2001 - Approved Change Order #4 to credit contract $42,871.41. May 22, 2001 - Awarded bid #044-01 for furniture in the amount of $332,400.70. June 12, 2001 - Authorize City Manager to execute contract with DataTex not to exceed $74,257.86. installing police and public works radio system. PROJECT DESCRIPTION AND RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT SCHEDULE: JUSTIFICATION: Current facility space is grossly inadequate for these areas. This 53,000 square foot facility will accommodate police, jail and courts. August 28, 2001 - Awarded contract to DFW Communication in the amount of $33,009 for relocating and CONSTRUCTION City of Euless Capital Project Request POLICE DEPARTMENT GARY MCKAMIE 68 PROJECT TITLE:PROJECT #:PD9901 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Bond Issuance Cost 76,000$ Direct Operating Cost Construction 9,071,257 Personnel:Full Time 128,000 Contingency 127,872 Part Time Demolition 606,709 Architectural/ Surveying/ Geotech 826,439 Other Professional Services 36,310 106,000 Equipment 67,912 Furnishings 350,000 Land Purchase 43,592 Planning Services 70,428 $234,000 Owner Equipment 441,344 Total Estimated Capital Cost $11,717,863 Maintenance Costs HVAC Maintenance 18,084 FUNDING SOURCE: Maintenance 24,850 Transfers from: Janitorial Services & Supplies 37,500 General Fund $394,890 8,000 W/S Operating Fund $175,000 1,500 CCPD Operating Fund 2,160,000 $89,934 DEA Funds 450,000 Bond Proceeds 8,600,000 Interest Income 576,776 $750,815 Less Inter-project Transfer to: Building D FM0101 (638,803) Total Estimated Annual Cost $1,074,749 Total Funding $11,717,863 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED Bond Issuance Cost 76,000 76,000 0 100% Construction 9,071,257 9,071,257 0 100% Contingency plus interest earnings 127,872 61,264 66,608 48% Demolition 606,709 606,709 0 100% Architectural Services 745,369 745,369 0 100% Surveying Services 6,070 6,071 (1) 100% Geo-Technical Services 75,000 72,511 2,489 97% Other Professional Services 36,310 36,310 0 100% Equipment 67,912 67,912 0 100% Furnishings 350,000 348,347 1,653 100% Land Purchase 43,592 43,591 1 100% Off-Site Utilities 0 0 0 0% Owner Equipment 441,344 403,791 37,553 91% Planning Services 70,428 70,428 0 100% * - This project transferred $638,803 to FM0101. $11,717,863 $11,609,560 $108,303 99% POLICE & COURTS FACILITY Subtotal: Utilities Elect. Supplies Pest Control Subtotal: TOTAL PROJECT Average Annual Debt Service Other CURRENT STATUS 69 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES March 23,2004 RAY MCDONALD MISCELLANEOUS PARK STRUCTURE IMPROVEMENTS FIXTURES IMPROVEMENTS PR0720 The adopted Master Plan recommends funding for system-wide park facilities and amenities upgrades. This project continues the upgrade of all city parks to modernize amenities from water fountains to play components to picnic stations and pavilions. This project provides funding for the replacement of aged structures to include pavilions, picnic tables, gazebos, signs, safety components, and other park amenities including the addition of a gazebo on Main Street. Begin Upgrade: March 2007 Anticipate Completion: Pursuant to the recommendations in the Parks Master Plan, parks should provide accessibility pursuant to the Americans with Disabilities Act. The existing equipment in many park areas is becoming aged and will require refurbishment or replacement in the near term. 70 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Fixtures $175,000 Landscaping $16,662 $0 Contingency $33,338 $0 $0 $0 $225,000 Transfer from: EDC Operating Fund $225,000 $0 $0 $0 $225,000 Park Furnishings $166,792 $117,692 49,100 71% Landscaping $24,870 $24,870 0 100% Contingency $33,338 $33,338 0 100% $225,000 $175,900 $49,100 78% MISCELLANEOUS PARK STRUCTURE IMPROVEMENTS PR0720 71 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES October 01,2007 RAY MCDONALD PARK IRRIGATION LANDSCAPING IMPROVEMENTS PR0804 This project provides annual funding to continue efforts to meet irrigation needs throughout the City's park system. Projects will be identified and completed on an as needed basis. This project allows for maintenance and expansion of the irrigation systems throughout the parks system to enhance the overall condition of the landscape and green space. 72 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: (Annual Transfer $25,000) Irrigation $100,000 $0 $0 $0 $0 $100,000 Transfers from EDC Operating $75,000 $0 Additional Funding Needed: $0 2011 Transfer from EDC Op.$25,000 $0 $100,000 Irrigation $100,000 $1,008 98,992 1% $100,000 $1,008 $98,992 1% PARK IRRIGATION PR0804 73 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES February 11,2009 RAY MCDONALD SENIOR CITIZEN CENTER AT MIDWAY PARK BUILDING CONSTRUCTION PR0902 February 26, 2008: Approved as part of the 34th year Community Development Block Grant for $186,224. February 10, 2009: Approved as the 35th year Community Development Block Grant for $313,776. November 24, 2009: Authorized the city manager to seek competitive sealed proposals for construction of the senior center. January 12, 2010: Approval of site plan 09-05SP January 12, 2010: Award RFP#004-10 to Ratcliff Constructors LP for the construction of the Senior Center (including alternate) in the amount of $2,936,750. The City of Euless has identified, as part of the City's five year master plan, the need for a new senior citizen center facility. Construction of a new senior citizen center facility will allow the City to serve the growing elderly population by expanding services and programs for senior citizens. The project consists of the design and construction of a 20,000 square foot new senior citizen center including approximately 5,000 square feet of multi-use space at Midway recreation center. The facility will include several programmable classroom spaces, a fitness component, staff offices, restroom facilities, a kitchen with serving area, a game room, lobby, and other areas for accommodating senior activities. The City of Euless has for many years recognized the importance of planning for parks, recreation, and open space based on the needs as expressed by the citizens. In the plan development process for the recent update to the Parks Master Plan and as part of the City's five year master plan, a scientific survey of park, recreation, and open space needs was conducted from a sample of randomly selected citizens of Euless. From this valuable information, a list of priorities was identified. An new senior center was identified as a primary need of the citizens. A new senior center with state of the art support facilities and programmable space for an ever growing senior population will allow the City to serve its elderly population by expanding services and programs for them. 74 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: *Engineering/Testing $500,000 Construction $2,936,750 Furnishings/Equipment $423,000 Contingency 10% $987,071 $1,000 Landscaping & Irrigation $8,000 $2,500 Utility Construction $2,000 Insurance $500 $4,000 $4,856,821 Janitorial services $1,200 Transfer from Car Rental $1,750,000 Pm & minor repairs $7,900 Mineral/Gas Lease Bonus $3,332,959 Unscheduled maintenance $9,081 *34th year CDBG-FY2009 $186,224 Renewal & replacement $23,879 *35th year CDBG-FY2010 $313,776 $42,060 Transfer to Family Life Center ($726,138) Pest control $750 $46,810 $4,856,821 Architect $500,000 $346,640 $153,360 69% Construction $2,936,750 $359,171 $2,577,579 12% Furnishings/Equipment $363,000 $0 $363,000 0% Contingency 10%$987,071 $2,660 $984,411 0% Irrigation & Landscaping $8,000 $0 $8,000 0% Alarm System $30,000 $0 $30,000 0% Data & Telephone $30,000 $3,450 $26,550 12% Utility Contruction $2,000 $0 $2,000 0% $4,856,821 $711,921 $4,144,900 15% SENIOR CITIZEN CENTER AT MIDWAY PARK PR0902 75 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES February 11,2009 RAY MCDONALD EULESS FAMILY LIFE CENTER PHASE I BUILDINGS CONSTRUCTION/EXPANSION PR0907 October 14, 2008: Authorized the city manager to negotiate and execute a contract with Kimley-Horn and Associates, Inc. for a feasibility study. May 26, 2009: Award architectural contract for design of the Midway Recreation Center remodel and expansion to Byron Folse and Associates. November 24, 2009: Authorized the city manager to seek competitive sealed proposals for the expansion and remodel of the Midway Recreation Center. January 12, 2010: Award RFP#005-10 to Ratcliff Constructors LP for the construction and renovation of the Midway Recreation Center in the amount of $1,658,252 including alternates #1 and #2. The City of Euless has identified, as part of the city's five year master plan, the need to expand and renovate the existing park and recreation facilities for both indoor and outdoor activities. Standards were customized for the City of Euless based on citizen demand, compared with the existing public facility inventories coupled with population projections through 2017 to determine needs over the next ten years. Renovating and expanding the current recreation center received favorable consideration among the residents that responded to the survey. This project addresses some of the immediate needs identified in the citizen survey by remodeling and expanding the Midway Recreation Center to include creation of additional programmable spaces for youth and adult classes, expanding or constructing a new fitness center and aerobics area, creating additional spaces for pre-school aged children, dedicating space for programming activities for teens, and general upgrades to the facility. Staff proposes connecting the recreation center to the senior center to allow for shared, programmable space as well as resources. Project Bid: November 30, 2009 Bids Received: December 22, 2009 Council Approved: January 12, 2010 Begin Construction: January 25, 2010 Estimated Completion: Phase I - Recreation Remodel May 15, 2010 Phase II - Fitness Center August 15, 2010 The City of Euless has for many years recognized the importance of planning for parks, recreation, and open space based on the needs as expressed by the citizens. The Midway recreation center is established as the city's only recreational community center. The role of the facility has grown since it opened and is now reaching maximum capacity for many of the programs and services currently offered. Attendance numbers at the Midway recreation center continue to rise and with a growing population, the ability to serve the needs of the citizens becomes more of a challenge with limited space and resources. 76 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Construction $1,700,000 $0 Contingency $100,000 $0 Furnishings/Equipment $150,000 $0 Architectural/Engineering $155,000 $5,000 $8,500 $0 Insurance $1,500 $15,000 $2,105,000 Janitorial/pest control services $3,800 Transfer from General CIP FB $136,338 Maintenance & minor repairs $13,084 Transfer from FM0802 $250,000 Unscheduled maintenance $14,087 Transfer from FM0803 $217,524 Renewal & replacement $33,504 Transfer from PR0902 $726,138 $64,475 Transfer from Car Rental $775,000 $79,475 $2,105,000 Engineering/Architectural $231,722 $222,927 $8,795 96% Construction $1,658,252 $1,021,863 $636,389 62% Contingency $45,026 $1,432 $43,594 3% Furnishings/Equipment $150,000 $45,776 $104,224 31% Landscaping $5,000 $0 $5,000 0% Utility Installation $0 $525 ($525) Alarm/Data/Telephone $15,000 $11,992 $3,008 80% $2,105,000 $1,304,515 $800,485 62% EULESS FAMILY LIFE CENTER PHASE I PR0907 77 78 PROPOSED AND UNFUNDED  PROJECTSPROJECTS Project DescriptionPriority Estimated Cost Operating FundCIP Fund BalanceBond SaleGrants/ ContribImpact FeesEscrow FundsCar Rental TaxOther EDCTo Be DeterminedDRAINAGE PROJECTSBoyd Branch ImprovementsA $ 10,000,000 $4,000,000 $6,000,000 Flooding MitigationA $ 500,000 $ 150,000 $ 350,000 Sub-Total Drainage Priority A-Proposed FY11 $ 10,500,000 Hollow Oak Channel Erosion(15)B TBD XX Sub-Total Drainage Priority B-Unfunded $ - Bell Hi Addition C TBD XX Blessing Branch-Main Street to SH 360C TBD XX Kynette Drive Culvert Modifications C TBD XX Little Bear Creek-Drainage ImprovementsC TBD XX Little Bear Creek-Land AcquisitionC TBD XX Marlene Drive Culvert ReplacementC TBD XX Simmons Culvert ImprovementsC TBD XX Sub-Total Drainage Priority C-Unfunded $ - DRAINAGE PROJECTS - TOTAL$ 10,500,000 STREET PROJECTSAsh Lane-Aransas Drive to N Main Street Construction A $ 1,920,000 $307,000 $885,000 $648,000 $80,000 * Baze Road-Glade Road to Mid Cities Blvd Construction A $ 1,590,000 $1,540,000 $50,000 ** Rio Grande Boulevard A $ 7,300,000 XX FY2011 County Overlay-Bear Creek Drive/Lakewood Blvd/Ash LaneA $ 300,000 XX Sub-Total Street Priority A-Proposed FY11 $ 11,110,000 FY2012 County Overlay-Aransas Dr/Westpark Way (12)B $ 300,000 XXTraffic Signal-Harwood Rd at Bear Creek Pkwy (12)B $ 185,000 XXFY2013 County Overlay-Trailwood Drive/Trojan Trail (13)B $ 300,000 XXFY2014 County Overlay-Raider/Monterrey/Sotogrande/ El Camino Real (14)B $ 300,000 XXFY2015 County Overlay-Baze Road/Kynette Drive/ Signet Drive (15)B $ 300,000 XXSub-Total Street Priority B-Unfunded $ 1,385,000 Bear Creek Parkway C TBD XX Cresthaven DriveC TBD XX Cullum Drive/Alexander LaneC TBD XX Fuller-Wiser Road-Harwood Road to Mid Cities Blvd C TBD XX Fuller-Wiser Road-SH183 to Harwood RoadC TBD XX Highland DriveC TBD XX Ross AvenueC TBD XX South Pipeline RoadC TBD XX Vine Street-SH183 to SH10C TBD XX Sub-Total Street Priority C-Unfunded $ - STREET PROJECTS - TOTAL$ 12,495,000 * $80,000 excess funding in design project allocated to construction phase.** $50,000 excess funding in design project allocated to construction phase.PROPOSED METHOD OF FINANCINGCAPITAL IMPROVEMENT PROGRAMSFY11 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPE79 Project DescriptionPriority Estimated Cost Operating FundCIP Fund BalanceBond SaleGrants/ ContribImpact FeesEscrow FundsCar Rental TaxOther EDCTo Be DeterminedPROPOSED METHOD OF FINANCINGCAPITAL IMPROVEMENT PROGRAMSFY11 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPEWASTEWATER PROJECTSLR: Bayless/Pauline/Jones-CDBG 36thA $ 350,000 $ 50,000 $ 300,000 LR: E Huitt/Ascot/DunawayA $ 510,000 XX Sub-Total Wastewater Priority A-Proposed FY11 $ 860,000 LR: Blanco/Aransas/Crane (12)B $ 327,000 XX LR: Collin Drive (12)B $ 405,000 XX Line Relocation, N Tarrant Express Phase I (12)B $ 220,000 XX LR: Ross Avenue (13)B $ 215,000 XX LR: Slaughter Lane/E Huitt Lane (13)B $ 475,000 XX LR: W Huitt (13)B $ 180,000 XX LR: Oakwood Terrace Phase I (14)B $ 345,000 XX LR: Oakwood Terrace Phase II (14)B $ 635,000 XX LR: Denton Drive (15)B $ 539,000 XX LR: Milam Drive (15)B $ 253,000 XX Line Relocation, N Tarrant Express Phase II (15)B $ 600,000 XX Sub-Total Wastewater Priority B-Unfunded $ 4,194,000 LR: Aransas DriveC TBD XX LR: Boyd BranchC TBD XX LR: Cedar Hills Estates/Hollywood Blvd.C TBD XX LR: Cedar Hills Estates/Sunset DriveC TBD XX LR: Collin Drive/Harris Drive/Irion DriveC TBD XX LR: Donley/Shelmar DriveC TBD XX LR: Eastcliff/Windlea/SignetC TBD XX LR: Ector Dr/Donley Dr/Crane DrC TBD XX LR: Ector Drive/Fayette DriveC TBD XX LR: Evans/Canyon Ridge/N KynetteC TBD XX LR: Glenn Drive/Crane DriveC TBD XX LR: Huntington/Koen/AtkersonC TBD XX LR: Janann/Brownstone/Shelmar DriveC TBD XX LR: Kynette/Wilshire/SierraC TBD XX LR: Lakewood/Dogwood/BocowoodC TBD XX LR: Mary/Marlene/Commerce/ Wilshire/Greenbriar CTBD XX LR: N Midway ParkC TBD XX LR: Northcliff/Toplea/Winlea/Signet/ Kynette/Westcliff CTBD XX LR: NW Midway/Rusk/Parker/RockwallC TBD XX LR: S Main StreetC TBD XX LR: Sagebrush-Toplea/WilshireC TBD XX LR: W Donley/Private Drive/MimosaC TBD XX LR: W Midway/Victoria/Delta/ Lamar/RockwallCTBD XX Sub-Total Wastewater Priority C-Unfunded $ - WASTEWATER PROJECTS - TOTAL$ 5,054,000 LR = Line Replacement80 Project DescriptionPriority Estimated Cost Operating FundCIP Fund BalanceBond SaleGrants/ ContribImpact FeesEscrow FundsCar Rental TaxOther EDCTo Be DeterminedPROPOSED METHOD OF FINANCINGCAPITAL IMPROVEMENT PROGRAMSFY11 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPEWATER PROJECTSNone for FY2011A $ - Sub-Total Water Priority A-Proposed FY11 $ - Water & Wastewater Impact Fee Update (12)B $ 30,000 XX Water System Security Camera Installation (13)B $ 75,000 XX LR: S Pipeline Road West (15) B $ 300,000 XX Line Relocation, N Tarrant Express Phase II (15)B $ 1,200,000 XX Sub-Total Water Priority B-Unfunded $ 1,605,000 LR: Blessing Creek and Little CreekC TBD XX LR: Collin-Dallas Dr to Harwood RdC TBD XX LR: Collin-Denton Dr to Dallas DrC TBD XX LR: Denton DriveC TBD XX LR: Dickey Drive NorthC TBD XX LR: Dickey Drive SouthC TBD XX LR: Dunaway DriveC TBD XX LR: E Huitt LaneC TBD XX LR: Eastcliff Drive C TBD XX LR: Ector DriveC TBD XX LR: Fuller DriveC TBD XX LR: Hollow Oak DriveC TBD XX LR: Kynette Drive C TBD XX LR: Live Oak Court/Live Oak Drive/Marlene Drive C TBD XX LR: Midcreek/Rock Creek/Stony CreekC TBD XX LR: Midway Drive East C TBD XX LR: Midway Drive WestC TBD XX LR: Needles StreetC TBD XX LR: Paula Lane C TBD XX LR: S Main Street (North)C TBD XX LR: S Main Street (South)C TBD XX LR: S Pipeline Road East C TBD XX LR: Shady Creek Drive/Cliffwood DriveC TBD XX LR: Springwood CourtC TBD XX LR: Sunset DriveC TBD XX LR: Westwood DriveC TBD XX LR: Wildwood StreetC TBD XX LR: Woodvine (East)C TBD XX LR: Woodvine (West)C TBD XX SH360 Water Crossing C TBD XX Standpipe Storage Tank & Bldg DemolitionC TBD XX Water System Security Land AcquisitionC TBD XX Sub-Total Water Priority C-Unfunded $ - WATER PROJECTS - TOTAL$ 1,605,000 LR = Line Replacement81 Project DescriptionPriority Estimated Cost Operating FundCIP Fund BalanceBond SaleGrants/ ContribImpact FeesEscrow FundsCar Rental TaxOther EDCTo Be DeterminedPROPOSED METHOD OF FINANCINGCAPITAL IMPROVEMENT PROGRAMSFY11 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPEOTHER PROJECTSNone for FY2011A $ - Sub-Total Other Priority A-Proposed FY11 $ - Glade Parks Trail Connection (12)B $ 1,211,175 $ 851,550 $ 359,625 Texas Star Sports Complex Phase IV (12)B $ 950,000 XX Trail Lighting-Phase I (12)B $ 50,000 XX Park Amenities Upgrade (13)B $ 150,000 XX Blessing Branch Park Improvements (14)B $ 275,040 XX Euless FLC Phase-II Design Outdoor Aquatics (15)B $ 469,000 XX Euless FLC Phase-III Design Indoor Aquatics (15)B $ 317,500 XX Development/Engineering Building (15)B $ 1,822,500 XX Euless FLC Phase-II Outdoor Aquatics Construction (16)B $ 5,200,000 XX $500,000 Euless FLC Phase-III Indoor Aquatics Construction (16)B $ 3,493,000 $750,000 XXTexas Star Sports Complex Phase V (16)B $ 4,152,000 XX Sub-Total Other Priority B-Unfunded $ 18,090,215 Animal ShelterC TBD XX Community Center for South EulessC TBD XX Emergency Call BoxesC TBD XX Fire Training Facility and TowerC TBD XX Kiddie Carr Park ImprovementsC TBD XX South Euless Water FeatureC TBD XX Trail Connection - S EulessC TBD XX Trail Enhancements-Phase IC TBD XX Trail Enhancements-Phase IIC TBD XX Trail Enhancements-Villages Bear CreekC TBD XX Trail Lighting-Phase IIC TBD XX Trailwood Park ImprovementsC TBD XX Wilshire Park Water FeatureC TBD XX Sub-Total Other Priority C-Unfunded $ - OTHER PROJECTS - TOTAL$ 18,090,215 82 PROPOSED AND UNFUNDED  DRAINAGE PROJECTSDRAINAGE PROJECTS Project DescriptionPriority Estimated Cost Operating FundCIP Fund BalanceBond SaleGrants/ ContribImpact FeesEscrow FundsCar Rental TaxOther EDCTo Be DeterminedDRAINAGE PROJECTSBoyd Branch ImprovementsA $ 10,000,000 $ 4,000,000 $ 6,000,000 Flooding MitigationA $ 500,000 $150,000 $ 350,000 Sub-Total Drainage Priority A-Proposed FY11 $ 10,500,000 Hollow Oak Channel Erosion(15)B TBD XX Sub-Total Drainage Priority B-Unfunded $ - Bell Hi Addition C TBD XX Blessing Branch-Main Street to SH 360C TBD XX Kynette Drive Culvert Modifications C TBD XX Little Bear Creek-Drainage ImprovementsC TBD XX Little Bear Creek-Land AcquisitionC TBD XX Marlene Drive Culvert ReplacementC TBD XX Simmons Culvert ImprovementsC TBD XX Sub-Total Drainage Priority C-Unfunded $ - DRAINAGE PROJECTS - TOTAL$ 10,500,000 CAPITAL IMPROVEMENT PROGRAMSFY11 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPEPROPOSED METHOD OF FINANCING83 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 17,2009 RON YOUNG BOYD BRANCH IMPROVEMENTS DRAINAGE IMPROVEMENTS A Drainage improvements are included in the Boyd Branch Watershed Study. This project includes the portion of Boyd Branch from S Pipeline Road to SH183 and may include structural and non-structural activities to reduce or minimize the effects of large stormwater events. A large portion of this project occurs on a section of Boyd Branch that lies in a platted private drainage easement which also shows the maintenance responsibility to rest on the property owner(s). Since the City of Euless has no easement rights along these sections of Boyd Branch, the city is of the opinion that improving the capacity of Boyd Branch to handle large stormwater events is the responsibility of the property owner(s). The City of Euless may have some utility relocation expenses related to any improvements made to Boyd Branch. FY2011 Large stormwater events result in runoff exceeding the capacity of Boyd Branch. This project is intended to reduce or minimize property losses associated with stormwater runoff exceeding the capacity of Boyd Branch. 84 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Escrow Funds Other Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: BOYD BRANCH IMPROVEMENTS Property Owner(s) Contribution to Construction $6,000,000 $0 $0 City of Euless Construction (Max.) $4,000,000 (See Comments) $0 $0 $0 $10,000,000 0% 0% 0% 0% 0% XX XX It is estimated that the City of Euless related construction items will be limited to $4,000,000 or less depending on the scope of work defined. 85 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS June 30,2010 RON YOUNG FLOODING MITIGATION DRAINAGE CONSTRUCTION A This project consists of identifying chronic flooding locations within the City of Euless and determining the cost/benefit of property acquisition compared to extensive drainage relief projects. Property acquisition will be recommended after consideration of flooding history, appraisals, and feasible alternative drainage solutions have been evaluated. It is recommended that this be established as an ongoing project. Buildings throughout the City of Euless situated adjacent to creeks have experienced drainage problems for several years. The cost for implementing drainage improvement projects to mitigate flooding at isolated locations may be much greater than the cost of property acquisition. Chronic flooding lowers the property values and this program will offer a means of relief for affected property owners. 86 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: FLOODING MITIGATION Flooding Mitigation $500,000 $0 $0 $0 $0 $0 $500,000 $150,000 0% $350,000 0% 0% 0% 0% Proposed funding sources are from Drainage Operations and Drainage CIP Fund Balance. 87 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 03,2008 RON YOUNG HOLLOW OAK CHANNEL EROSION DRAINAGE IMPROVEMENTS B In May 2008, the City authorized a drainage study for the creek area that runs at the rear of the lots fronting on Hollow Oak Drive and Linkwood Drive. The completed drainage study was received in July 2008. The creek area along the rear of the lots on Hollow Oak Drive and Linkwood Drive exists in a natural state. The creek bank along the south has experienced some slope failure. The drainage study recommends installation of "bag wall" slope protection. 2015 The City has received complaints that fences and other improvements on private property will be threatened if additional slope failures take place. Currently no residences are threatened. 88 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: HOLLOW OAK CHANNEL EROSION Engineering $50,000 Construction $300,000 $0 $0 $0 $0 $0 $0 $0 $350,000 0% $250,000 0% 0% 0% 0% $100,000 The most recent cost for this project is approximately $347,113. If this project moves forward, an updated opinion of probable cost will need to be prepared. Due to the expected impact to the native conditions, this project would require broad support from all impacted neighbors. Alternatives, such as possible assistance with removal or relocation of improvements on affected properties, should also be considered. 89 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 26,1999 RON YOUNG BELL HI ADDITION DRAINAGE IMPROVEMENTS C In 2005, the City commissioned and received a drainage plan from Freese and Nichols, Inc. In this plan, the Bell Hi Addition was identified as an area in need of flood relief. The proposed project ties into an existing storm drainage system on Needles Street. A substantial portion of the cost of this project is related to street repair, indicating the need to combine this project with a street reconstruction project. The construction of this project will prevent the flooding of Paula Lane, David Drive, and Needles Street during the most intense rainfall events. The terrain in this location is very flat, which causes the streets to have a very low capacity to remove storm water. 90 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: BELL HI ADDITION Engineering-To Be Determined $0 Construction-To Be Determined $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 91 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 26,1999 RON YOUNG BLESSING BRANCH-MAIN STREET TO SH360 DRAINAGE IMPROVEMENTS C The Blessing Branch Drainage Master Plan included a conceptual plan to convey storm water through the creek more efficiently. This project involves the channeling and lining of Blessing Branch in accordance with the Blessing Branch Master Plan. The City expects to receive significant developer contributions toward this project. However, the City may be required to fund a portion of this project. 92 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: BLESSING BRANCH-MAIN STREET TO SH360 Engineering-To Be Determined Construction-To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 93 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 21,1999 RON YOUNG KYNETTE DRIVE CULVERT MODIFICATIONS DRAINAGE IMPROVEMENTS C Wilshire Village Addition was constructed prior to the adoption of the City's Uniform Development Code ("UDC"). The requirements prior to the UDC were lower than what the City now requires. The current construction configuration of Wilshire Village causes more water to remain above ground than is acceptable under current standards. The drainage system in the Wilshire Village Addition needs to be upgraded to meet the current requirements. The project involves the installation of a small drainage system on Kynette Drive up to Sierra Drive. It is Project No. 16 in the 1990 Knowlton, English, Flowers Drainage Utility System Study of Selected Improvement Projects. Surface water flow within Kynette Drive exceeds the City's current development standards. A large amount of storm water drains to an existing culvert on Kynette Drive between East Cliff and West Cliff Drives. The existing drainage facilities collecting this storm water are inadequate according to current standards. 94 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: KYNETTE DRIVE CULVERT MODIFICATIONS Engineering-To Be Determined Construction-To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 95 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 21,1999 RON YOUNG LITTLE BEAR CREEK DRAINAGE IMPROVEMENTS DRAINAGE IMPROVEMENTS C The improvements proposed for Bob Eden Park are identified in the Little Bear Creek Watershed Master Plan. The Little Bear Creek Park portion of this project was identified in the 1990 Knowlton, English and Flowers Drainage Utility System Study of Selected Improvement Projects. Both parts of this drainage project involve erosion control and channelization improvements to Little Bear Creek. The Bear Creek Park part is a portion of Project No. 11 in the above-referenced study. This project will be re- evaluated to determine if the scope and proposed improvements should be modified. This part of the project will be redefined and re-estimated. Continued erosion will eventually undermine the creek in both parks and cause damage to existing City facilities. 96 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LITTLE BEAR CREEK DRAINAGE IMPROVEMENTS Engineering-To Be Determined Construction-To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 97 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 21,1999 RON YOUNG LITTLE BEAR CREEK LAND ACQUISITION DRAINAGE ACQUISITION C In 2007, the City received an erosion study for Little Bear Creek from Halff Associates. Acquire property located adjacent to Little Bear Creek at 2101 N. Main. Erosion of property is a possibility in the future. Acquisition is anticipated to be a voluntary buy-out. 98 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LITTLE BEAR CREEK LAND ACQUISITION Engineering-To Be Determined Construction-To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 99 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 10,2008 RON YOUNG MARLENE DRIVE CULVERT REPLACEMENT DRAINAGE IMPROVEMENTS C Marlene Drive is noted as a collector street on the City's Master Thoroughfare Plan. The scope of the project includes construction of a new culvert at Cyclone Branch to meet current load and drainage capacity standards. A portion of the concrete channel will also need to be reconstructed both upstream and downstream to ensure a smooth transition. The existing culvert is load limited. The new culvert will be designed to convey sufficient drainage to comply with current standards. 100 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: MARLENE DRIVE CULVERT REPLACEMENT Engineering-To Be Determined Construction-To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 101 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: SIMMONS CULVERT IMPROVEMENTS April 15,2005 RON YOUNG SIMMONS CULVERT IMPROVEMENTS DRAINAGE IMROVEMENTS C In 2005, the City commissioned and received a drainage plan from Freese and Nichols, Inc. An additional culvert will extend from the apartment complex on the east side of Simmons Drive and will outfall into the creek area on the north side of Carr Park. In intense storms the capacity of the existing culvert is exceeded. Additional culverts will be required to convey the design storm flows. The construction of this project will enable the safe use of Simmons Drive in intense storm events. 102 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: SIMMONS CULVERT IMPROVEMENTS Cost -To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 103 104 PROPOSED AND UNFUNDED  STREET PROJECTSSTREET PROJECTS Project DescriptionPriority Estimated Cost Operating FundCIP Fund BalanceBond SaleGrants/ ContribImpact FeesEscrow FundsCar Rental TaxOther EDCTo Be DeterminedSTREET PROJECTSAsh Lane-Aransas Drive to N Main Street ConstructionA $ 1,920,000 $307,000 $885,000 $648,000 $80,000 * Baze Road-Glade Road to Mid Cities Blvd Construction A $ 1,590,000 $1,540,000 $50,000 ** Rio Grande Boulevard A $ 7,300,000 XX FY2011 County Overlay-Bear Creek Drive/Lakewood Blvd/Ash LaneA $ 300,000 XX Sub-Total Street Priority A-Proposed FY11 $ 11,110,000 FY2012 County Overlay-Aransas Dr/Westpark Way (12)B $ 300,000 XXTraffic Signal-Harwood Rd at Bear Creek Pkwy (12)B $ 185,000 XXFY2013 County Overlay-Trailwood Drive/Trojan Trail (13)B $ 300,000 XXFY2014 County Overlay-Raider/Monterrey/Sotogrande/ El Camino Real (14)B $ 300,000 XXFY2015 County Overlay-Baze Road/Kynette Drive/ Signet Drive (15)B $ 300,000 XXSub-Total Street Priority B-Unfunded $ 1,385,000 Bear Creek Parkway C TBD XX Cresthaven DriveC TBD XX Cullum Drive/Alexander Lane C TBD XX Fuller-Wiser Road-Harwood Road to Mid Cities Blvd C TBD XX Fuller-Wiser Road-SH183 to Harwood Road C TBD XX Highland Drive C TBD XX Ross Avenue C TBD XX South Pipeline Road C TBD XX Vine Street-SH183 to SH10 C TBD XX Sub-Total Street Priority C-Unfunded $ - STREET PROJECTS - TOTAL$ 12,495,000 * $80,000 excess funding in design project allocated to construction phase.** $50,000 excess funding in design project allocated to construction phase.CAPITAL IMPROVEMENT PROGRAMSFY11 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPEPROPOSED METHOD OF FINANCING105 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 01,2002 RON YOUNG ASH LANE-ARANSAS DRIVE TO N MAIN STREET CONSTRUCTION STREET CONSTRUCTION PS1003 A Ash Lane is identified in the Master Thoroughfare Plan as a four-lane minor arterial roadway from Industrial Boulevard to Fuller-Wiser Road. This project consists of the removal of the existing two lanes of asphalt pavement from Aransas Drive to N Main Street to be replaced by a four lane concrete roadway. The associated sidewalks and storm drainage are included in the project scope. Anticipate Begin Construction: April 2011 Anticipate Construction Complete: December 2011 The portion of Ash Lane from Aransas Drive to N Main Street is the only portion that is not constructed to the Master Thoroughfare Plan standards. Completion of this section of Ash Lane will provide an orderly flow of traffic from Industrial Boulevard to Fuller-Wiser Road. 106 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: ASH LANE-ARANSAS DRIVE TO N MAIN STREET CONSTRUCTION Construction $1,920,000 $0 $0 $0 $0 $0 $0 $0 $1,920,000 0% 307,000 0% 0% 0% 885,000 0% 648,000 $80,000 in excess funding in Design/ROW portion of project available for allocation to construction portion of project. 107 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 22,1999 RON YOUNG BAZE ROAD-GLADE ROAD TO PRIEST LANE CONSTRUCTION STREET CONSTRUCTION PS1001 A The reconstruction and expansion of Baze Road was identified in the 1999 Master Thoroughfare Plan. This project consists of the construction of a 31' (back-to-back) concrete roadway including underground drainage, sidewalks, and street lighting. This project will replace the existing deteriorating two-lane asphalt roadway. Anticipate Begin Construction: March 2011 Anticipate Construction Complete: December 2011 Baze Road is an important north-south residential collector that is planned to connect Glade Road and Mid Cities Boulevard. This roadway exists as a four-lane divided roadway north of Glade Road in Grapevine. In Euless, it is constructed partially as a 40 foot undivided roadway and as a 36 foot (two lane) undivided roadway from Mid Cities Boulevard to Priest Lane. The portion of Baze Road from Priest Lane to Glade Road is the only portion that is not constructed to City standards. 108 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: BAZE ROAD-GLADE ROAD TO PRIEST LANE CONSTRUCTION Construction $1,590,000 $0 $0 $0 $0 $0 $0 $0 $1,590,000 0% 0% 0% 0% 0% 1,540,000 $50,000 in excess funding in Design/ROW portion of project available for allocation to construction portion of project. 109 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS 6/08/2010 RON YOUNG RIO GRANDE BOULEVARD STREET CONSTRUCTION A Rio Grande Boulevard is included in the City's Master Thoroughfare Plan. The project consists of the construction of Rio Grande Boulevard from Mid-Cities Boulevard (Cheek-Sparger Road) to 650 feet south of Glade Road (south end of Harrington Gardens Parkway). The project scope includes construction of a four lane concrete pavement with concrete curbs from Mid-Cities Boulevard (Cheek-Sparger Road) to north of Little Bear Creek and a four lane concrete pavement with median and concrete curbs from north of Little Bear Creek to 650 feet south of Glade Road (south end of Harrington Gardens Parkway). The project includes completion of the Little Bear Creek bridge, sidewalks, underground drainage, and associated utility installations. Design: Winter 2010 ROW: Winter 2010 Construction: Spring 2011 The construction of Rio Grande Boulevard will spur economic development in the area and complete an access route to existing Euless businesses. 110 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: RIO GRANDE BOULEVARD Construction, Design, ROW $7,300,000 $0 $0 $0 $0 $0 $7,300,000 0% 0% 0% TIF 0% 0% The project is contingent upon the results of the feasibility study which is anticipated to be completed in August 2010. 111 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS 3/10/2010 RON YOUNG FY2011 COUNTY OVERLAY - BEAR CREEK DR/LAKEWOOD BLVD/ASH LANE STREET OVERLAY A Bear Creek Drive, Lakewood Boulevard, and Ash Lane are collector streets in the City of Euless Master Thoroughfare Plan. The project consists of edge milling, asphalt overlay, and restriping on: 1. Bear Creek Drive from Mid Cities Boulevard to N. Main Street, 2. Lakewood Boulevard from Ash Lane to Bent Tree Drive, and 3. Ash Lane from N. Main Street to Fuller-Wiser Road. Anticipate Construction Beginning: May 2011 Anticipate Construction Complete: July 2011 The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, will extend the life of the roadways, and will enhance the appearance of the streets. 112 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: FY2011 COUNTY OVERLAY - BEAR CREEK DR/LAKEWOOD BLVD/ASH LANE Construction $300,000 $0 $0 $0 $0 $0 $300,000 0% 0% 0% 0% 0% XX 113 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS 5/20/2010 RON YOUNG FY2012 COUNTY OVERLAY - ARANSAS DRIVE/WESTPARK WAY STREET OVERLAY B Aransas Drive and Westpark Way are collector streets in the City of Euless Master Thoroughfare Plan. The project consists of edge milling, asphalt overlay, and restriping on: 1. Aransas Drive from Midway Drive to Harwood Road, 2. Aransas Drive from Harwood Road to Ash Lane, and 3. Westpark Way from S. Pipeline Road to SH10. Anticipate Construction Beginning: May 2012 Anticipate Construction Complete: July 2012 The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, will extend the life of the roadway, and will enhance the appearance of the streets. 114 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: FY2012 COUNTY OVERLAY - ARANSAS DRIVE/WESTPARK WAY Construction $300,000 $0 $0 $0 $0 $0 $300,000 0% 0% 0% 0% 0% XX 115 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 12,2004 RON YOUNG TRAFFIC SIGNAL-HARWOOD ROAD @ BEAR CREEK PARKWAY STREET SIGNALIZATION B Traffic signals are located at the intersections of arterial and collector thoroughfares identified in the City of Euless Master Thoroughfare Plan adopted in 1999. The project consists of the installation of traffic signal poles, mast arms, signal heads, pedestrian indicators, underground conduit, vehicle detection, and signal controller for the intersection of Harwood Road and Bear Creek Parkway. Traffic signal warrant studies will be performed to determine the appropriate timing for construction. Traffic volumes at this intersection will be monitored and signal warrant studies will be performed to justify signal installation. This intersection will ultimately require a traffic signal. 116 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: TRAFFIC SIGNAL-HARWOOD ROAD @ BEAR CREEK PARKWAY Engineering $25,000 Traffic Signals $160,000 $0 $0 $0 $0 $0 $0 $0 $185,000 0% 0% 0% 0% 0% XX 117 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS 5/20/2010 RON YOUNG FY2013 COUNTY OVERLAY - TRAILWOOD DRIVE/TROJAN TRAIL STREET OVERLAY B Trailwood Drive and Trojan Trail are collector streets in the City of Euless Master Thoroughfare Plan. The project consists of edge milling, asphalt overlay, and restriping on: 1. Trailwood Drive from N. Main Street to Summit Drive (west end) and 2. Trojan Trail from FM157 to Ector Drive. Anticipate Construction Beginning: May 2013 Anticipate Construction Complete: July 2013 The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, will extend the life of the roadway, and will enhance the appearance of the streets. 118 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: FY2013 COUNTY OVERLAY - TRAILWOOD DRIVE/TROJAN TRAIL Construction $300,000 $0 $0 $0 $0 $0 $300,000 0% 0% 0% 0% 0% XX 119 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS 5/20/2010 RON YOUNG FY2014 COUNTY OVERLAY-RAIDER/MONTERREY/SOTOGRANDE/EL CAMINO REAL STREET OVERLAY B Raider Drive, Monterrey Boulevard, Sotogrande Boulevard, and El Camino Real are collector streets in the City of Euless Master Thoroughfare Plan. The project consists of edge milling, asphalt overlay, and restriping on: 1. Raider Drive from SH10 to W. Pipeline Road, 2. Monterrey Boulevard from Sotogrande Boulevard to W. Pipeline Road, 3. Sotogrande Boulevard from El Camino Real to Monterrey Boulevard, and 4. El Camino Real from W. Pipeline Road to south city limits. Anticipate Construction Beginning: May 2014 Anticipate Construction Complete: July 2014 The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, will extend the life of the roadway, and will enhance the appearance of the streets. 120 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: FY2014 COUNTY OVERLAY-RAIDER/MONTERREY/SOTOGRANDE/EL CAMINO REAL Construction $300,000 $0 $0 $0 $0 $0 $300,000 0% 0% 0% 0% 0% XX 121 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS 5/20/2010 RON YOUNG FY2015 COUNTY OVERLAY-BAZE ROAD/KYNETTE DRIVE/SIGNET DRIVE STREET OVERLAY B Baze Road, Kynette Drive, and Signet Drive are collector streets in the City of Euless Master Thoroughfare Plan. The project consists of edge milling, asphalt overlay, and restriping on: 1. Baze Road from Mid Cities Boulevard to Priest Lane, 2. Kynette Drive from Evans Drive to Wilshire Drive, and 3. Signet Drive from Eastcliff Drive to Yorkshire Drive. Anticipate Construction Beginning: May 2015 Anticipate Construction Complete: July 2015 The existing asphalt pavement is deteriorating. The asphalt overlay will provide an improved riding surface, will extend the life of the roadways, and will enhance the appearance of the streets. 122 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: FY2015 COUNTY OVERLAY-BAZE ROAD/KYNETTE DRIVE/SIGNET DRIVE Construction $300,000 $0 $0 $0 $0 $0 $300,000 0% 0% 0% 0% 0% XX 123 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 03,2008 RON YOUNG BEAR CREEK PARKWAY STREET CONSTRUCTION C Bear Creek Parkway is identified as a local collector thoroughfare in the City of Euless Master Thoroughfare Plan. This project consists of the complete reconstruction of Bear Creek Parkway from Harwood Road to Ash Lane to meet current City standards. Bear Creek Parkway is an aging roadway nearing the end of its service life. Portions of the roadway are beginning to deteriorate and require additional maintenance. As the pavement deteriorates and fails, maintenance costs increase. 124 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: BEAR CREEK PARKWAY Engineering/Design- To Be Determined Construction- To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 125 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 13,2007 RON YOUNG CRESTHAVEN DRIVE RECONSTRUCTION STREET CONSTRUCTION C Cresthaven Drive is not identified in the 1999 Master Thoroughfare Plan. This project includes the reconstruction of Cresthaven Drive from a two-lane asphalt roadway to a 31' wide curb and guttered concrete street from SH 10 to S Pipeline Road. To upgrade Cresthaven Drive to a standard City concrete curb and gutter street. 126 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: CRESTHAVEN DRIVE RECONSTRUCTION Engineering-To Be Determined Construction- To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 127 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 23,1999 RON YOUNG CULLUM DRIVE & ALEXANDER LANE RECONSTRUCTION STREET C These two minor streets serve as collector type streets by conveying traffic to major arterials. Cullum Drive will be reconstructed from SH10 to Huitt Lane and Alexander Lane will be reconstructed from Main Street to Cullum Drive. Both streets will be reconstructed from two-lane county type roads to standard 31' wide residential streets with underground drainage. TBD Reconstruction of the streets will decrease the annual maintenance and provide a standard residential street in compliance with current City standards. 128 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Other Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: CULLUM DRIVE & ALEXANDER LANE RECONSTRUCTION To be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX XX Escrow Funds will be used to finance a portion of this project. 129 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS February 16,2009 ROBERT BARKER FULLER-WISER ROAD-HARWOOD ROAD TO MID CITIES BLVD STREET CONSTRUCTION C Fuller-Wiser Road is identified as a minor arterial in the City of Euless Master Thoroughfare Plan. This project consist of the complete reconstruction of Fuller-Wiser Road to current City standards from Harwood Road to Mid Cities Boulevard. Fuller-Wiser Road is an aging roadway nearing the end of its service life. Portions of the roadway are beginning to deteriorate and require additional maintenance. As the pavement deteriorates and fails, maintenance costs increase. 130 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: FULLER-WISER ROAD-HARWOOD ROAD TO MID CITIES BLVD Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 131 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS February 16,2009 ROBERT BARKER FULLER-WISER ROAD-SH183 TO HARWOOD ROAD STREET CONSTRUCTION C Fuller-Wiser Road is identified as a minor arterial in the City of Euless Master Thoroughfare Plan. The project consists of the complete reconstruction of Fuller-Wiser Road to current standards from SH183 to Harwood Road. Fuller-Wiser Road is an aging roadway nearing the end of its service life. Portions of the roadway are beginning to deteriorate and require additional maintenance. As the pavement deteriorates and fails, maintenance costs increase. 132 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: FULLER-WISER ROAD-SH183 TO HARWOOD ROAD Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 133 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 13,2007 RON YOUNG HIGHLAND DRIVE RECONSTRUCTION STREET CONSTRUCTION C Highland Drive is not identified in the 1999 Master Thoroughfare Plan. The project includes the reconstruction of Highland Drive from SH10 to S Pipeline Road from a two lane asphalt roadway to a 31' wide curb and guttered concrete street. To upgrade Highland Drive to a standard City concrete curb and gutter street. 134 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: HIGHLAND DRIVE RECONSTRUCTION Engineering- To Be Determined Construction- To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 135 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 31,2005 RON YOUNG ROSS AVENUE EXTENSION STREET CONSTRUCTION C This extension of Ross Avenue from the recently completed section adjacent to the fire station will complete the upgrading of this street. The construction of the remainder of Ross Avenue from the fire station to the west limit will be in accordance with City standards which includes concrete pavement. This construction, in accordance with City standards, will allow the road a long service life and lower the annual maintenance costs. 136 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: ROSS AVENUE EXTENSION Engineering- To Be Determined Right-of-Way- To Be Determined $0 Construction- To Be Determined $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 137 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 13,2007 RON YOUNG S PIPELINE ROAD STREET CONSTRUCTION C South Pipeline Road is not identified in the 1999 Master Thoroughfare Plan. The project consists of reconstruction of South Pipeline Road from a two-lane asphalt roadway to a 31' wide, curb and guttered concrete street from east of Royal Parkway to east of Highland Drive. To upgrade South Pipeline Road to a standard City concrete curb and gutter street. 138 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: S PIPELINE ROAD Engineering- To Be Determined Construction- To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 139 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 23,1999 RON YOUNG VINE STREET-SH183 TO SH10 STREET C Vine Street is not identified in the 1999 Master Thoroughfare Plan. The project consists of the reconstruction of Vine Street from SH183 to SH10. TBD The City has received street escrow funds from several developments along Vine Street. When development is complete, it would be appropriate for the City to reconstruct the existing roadway. 140 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Other Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: VINE STREET-SH183 TO SH10 To be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX Escrow Funds will be used to finance a portion of this project. 141 142 PROPOSED AND UNFUNDED  WASTEWATER PROJECTSWASTEWATER PROJECTS Project DescriptionPriority Estimated Cost Operating FundCIP Fund BalanceBond SaleGrants/ ContribImpact FeesEscrow FundsCar Rental TaxOther EDCTo Be DeterminedWASTEWATER PROJECTSLR: Bayless/Pauline/Jones-CDBG 36thA $ 350,000 $ 50,000 $ 300,000 LR: E Huitt/Ascot/DunawayA $ 510,000 XX Sub-Total Wastewater Priority A-Proposed FY11 $ 860,000 LR: Blanco/Aransas/Crane (12)B $ 327,000 XX LR: Collin Drive (12)B $ 405,000 XX Line Relocation, N Tarrant Express Phase I (12)B $ 220,000 XX LR: Ross Avenue (13)B $ 215,000 XX LR: Slaughter Lane/E Huitt Lane (13)B $ 475,000 XX LR: W Huitt (13)B $ 180,000 XX LR: Oakwood Terrace Phase I (14)B $ 345,000 XX LR: Oakwood Terrace Phase II (14)B $ 635,000 XX LR: Denton Drive (15)B $ 539,000 XX LR: Milam Drive (15)B $ 253,000 XX Line Relocation, N Tarrant Express Phase II (15)B $ 600,000 XX Sub-Total Wastewater Priority B-Unfunded $ 4,194,000 LR: Aransas DriveC TBD XX LR: Boyd BranchC TBD XX LR: Cedar Hills Estates/Hollywood Blvd.C TBD XX LR: Cedar Hills Estates/Sunset DriveC TBD XX LR: Collin Drive/Harris Drive/Irion DriveC TBD XX LR: Donley/Shelmar DriveC TBD XX LR: Eastcliff/Windlea/SignetC TBD XX LR: Ector Dr/Donley Dr/Crane DrC TBD XX LR: Ector Drive/Fayette DriveC TBD XX LR: Evans/Canyon Ridge/N KynetteC TBD XX LR: Glenn Drive/Crane DriveC TBD XX LR: Huntington/Koen/AtkersonC TBD XX LR: Janann/Brownstone/Shelmar DriveC TBD XX LR: Kynette/Wilshire/SierraC TBD XX LR: Lakewood/Dogwood/BocowoodC TBD XX LR: Mary/Marlene/Commerce/ Wilshire/GreenbriarCTBD XX LR: N Midway ParkC TBD XX LR: Northcliff/Toplea/Winlea/Signet/ Kynette/WestcliffCTBD XX LR: NW Midway/Rusk/Parker/RockwallC TBD XX LR: S Main StreetC TBD XX LR: Sagebrush-Toplea/WilshireC TBD XX LR: W Donley/Private Drive/MimosaC TBD XX LR: W Midway/Victoria/Delta/ Lamar/RockwallCTBD XX Sub-Total Wastewater Priority C-Unfunded $ - WASTEWATER PROJECTS - TOTAL$ 5,054,000 LR = Line ReplacementCAPITAL IMPROVEMENT PROGRAMSFY11 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPEPROPOSED METHOD OF FINANCING143 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 15,2005 RON YOUNG LINE REPLACEMENT-BAYLESS/PAULINE/JONES (CDBG) WASTEWATER MAINS A The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. The project consists of the replacement of the following wastewater mains along: 1. Bayless Drive, 2. Pauline Street, 3. Jones Street, and 4. East of S. Mills to the outfall. (36th year CDBG project) Anticipate Award Design: July 2010 (Tarrant County) Anticipate Plans Complete: December 2010 Anticipate Begin Construction: March 2011 Anticipate Construction Complete: August 2011 Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 144 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-BAYLESS/PAULINE/JONES (CDBG) W/WW Fund (Engineering)$50,000 CDBG Funding Est. (Construction)$300,000 $0 $0 $0 $0 $0 $0 $0 $350,000 $50,000 0% 0% 0% 0% $300,000 0% This project lies within the current Community Development Block Grant area and will be submitted as the 36th year CDBG Project. Estimated Funding Sources: CDBG Funding $300,000 Transfer from W/WW Fund $50,000 145 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 30,2003 RON YOUNG LINE REPLACEMENT- E HUITT / ASCOT / DUNAWAY WASTEWATER MAINS A The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. The project consists of the replacement of the following wastewater mains: 1. Ascot Drive to E Huitt Lane along Fuller Branch, and 2. Ascot Drive, Dunaway Court, and Dunaway Drive between Dunaway Court and Ascot Drive. Anticipate Award Design: January 2011 Anticipate Plans Complete: August 2011 Anticipate Begin Construction: November 2011 Anticipate Construction Complete: 2nd Quarter 2012 Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 146 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT- E HUITT / ASCOT / DUNAWAY Engineering $60,000 Construction $450,000 $0 $0 $0 $0 $0 $0 $0 $510,000 XX 0% 0% 0% 0% 0% Proposed funding is W/WW Operations. 147 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 12,2004 RON YOUNG LINE REPLACEMENT-BLANCO DRIVE/ARANSAS DRIVE/CRANE DRIVE WASTEWATER MAINS B The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. This project consists of the replacement of the following wastewater mains: 1. Between Blanco Drive and Aransas Drive from south of Harwood Road and 2. Between Blanco Drive and Crane Drive from Harwood Road to Aransas Drive. FY2012 Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 148 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-BLANCO DRIVE/ARANSAS DRIVE/CRANE DRIVE Engineering $35,000 Construction $292,000 $0 $0 $0 $0 $0 $0 $0 $327,000 XX 0% 0% 0% 0% 0% 149 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 12,2004 RON YOUNG LINE REPLACEMENT-COLLIN DRIVE WASTEWATER MAINS B The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. This project consists of the replacement of the following wastewater mains: 1. Along Collin Drive from Falls Drive to Travis Drive, 2. Between Falls Drive and Fannin Drive east of Collin Drive, 3. Between Fannin Drive and Travis Drive east of Collin Drive, 4. Between Travis Drive and Dallas Drive east of Collin Drive, and 5. Between Dallas Drive and Tarrant Drive east of Collin Drive. FY2012 Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. The project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 150 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-COLLIN DRIVE Engineering $45,000 Construction $360,000 $0 $0 $0 $0 $0 $0 $0 $405,000 XX 0% 0% 0% 0% 0% 151 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 10, 2010 RON YOUNG NORTH TARRANT EXPRESS (SH183) PHASE I WASTEWATER RELOCATION WASTEWATER RELOCATION B The Texas Department of Transportation ("TxDoT") has entered into a developer agreement with North Tarrant Express Mobility Partners ("NTEMP") for the expansion of SH183. A portion of the Phase I construction will affect the City of Euless utilities along SH183 between Westpark Way and FM157. The City of Euless has approximately 2,200 linear feet of wastewater main and several manholes located within the SH183 right-of-way. These facilities must be relocated to accommodate the SH183 expansion. It is anticipated that the city will enter into a relocation agreement with NTEMP to authorize them to design and relocate wastewater lines. The city will be responsible for 50% of the cost of the line relocation. City funding available: October 2011 FY2012 City of Euless wastewater facilities are located within TxDoT right-of-way. As such, the city must provide for utility relocation to accommodate the roadway expansion. 152 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: NORTH TARRANT EXPRESS (SH183) PHASE I WASTEWATER RELOCATION City Funding $220,000 $0 $0 $0 $0 $0 $220,000 XX 0% 0% 0% 0% 0% 153 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 30,2003 RON YOUNG LINE REPLACEMENT-ROSS AVENUE WASTEWATER MAINS B The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. The project consists of the replacement of the wastewater mains located on Ross Avenue and outfall to West Alexander Lane. FY2013 Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 154 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-ROSS AVENUE Engineering $25,000 Construction $190,000 $0 $0 $0 $0 $0 $0 $0 $215,000 XX 0% 0% 0% 0% 0% 155 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 12,2004 RON YOUNG LINE REPLACEMENT-SLAUGHTER LANE/E HUITT LANE WASTEWATER MAINS B The project is part of the City of Euless Wastewater System Master Plan. The project consists of the replacement of the following wastewater mains: 1. Between John Vernon Lane and Slaughter Lane east of Dunaway Drive, 2. East of Dunaway Drive from Slaughter Lane to E Huitt Lane, and 3. Along E Huitt Lane from S Main Street to Dunaway Drive. FY2013 Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 156 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-SLAUGHTER LANE/E HUITT LANE Engineering $55,000 Construction $420,000 $0 $0 $0 $0 $0 $0 $0 $475,000 XX 0% 0% 0% 0% 0% 157 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 13,2010 RON YOUNG LINE REPLACEMENT- W HUITT WASTEWATER MAINS B The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. The project consists of the replacement of the following wastewater mains between Linda Lane and W Huitt Lane, FY2013 Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 158 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT- W HUITT Engineering $20,000 Construction $160,000 $0 $0 $0 $0 $0 $0 $0 $180,000 XX 0% 0% 0% 0% 0% 159 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 13,2006 RON YOUNG LINE REPLACEMENT-OAKWOOD TERRACE ADDITION PHASE I WASTEWATER MAINS B The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. This project consists of the replacement of the following wastewater mains: 1. Between Hollywood Boulevard/Reaves Court from Vine Street to the end of Reaves Court and 2. From Hollywood Boulevard to Reaves Court along 306 Hollywood Boulevard. FY2014 Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 160 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-OAKWOOD TERRACE ADDITION PHASE I Engineering $40,000 Cosntruction $305,000 $0 $0 $0 $0 $0 $0 $0 $345,000 XX 0% 0% 0% 0% 0% 161 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 13,2006 RON YOUNG LINE REPLACEMENT-OAKWOOD TERRACE ADDITION PHASE II WASTEWATER MAINS B The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. The project consists of the replacement of the following wastewater mains: 1. Along 608 and 610 Martha Street, 2. Between Martha Street/Cannon Drive from Reaves Court to W Huitt Lane, 3. Between Jefflyn Court/W Huitt Lane from Martha Street to S Main Street, and 4. Between Henslee Drive/Cannon Drive from Reaves Court to Jefflyn Court. FY2014 Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 162 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-OAKWOOD TERRACE ADDITION PHASE II Engineering $75,000 Construction $560,000 $0 $0 $0 $0 $0 $0 $0 $635,000 XX 0% 0% 0% 0% 0% 163 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 05,2007 RON YOUNG LINE REPLACEMENT-DENTON DRIVE WASTEWATER MAINS B The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. This project consists of the replacement of wastewater mains located on Denton Drive between Collin Drive and Harwood Road to include Bell Drive. FY2015 Many wastewater mains throughout the city are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 164 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-DENTON DRIVE Construction $477,000 Engineering $62,000 $0 $0 $0 $0 $0 $0 $0 $539,000 XX 0% 0% 0% 0% 0% 165 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 05,2007 RON YOUNG LINE REPLACEMENT-MILAM DRIVE WASTEWATER MAINS B The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. The project consists of the replacement of the wastewater mains located along Milam Drive from Blanco Drive to south of Bell Drive. FY2015 Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 166 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-MILAM DRIVE Construction $224,000 Engineering $29,000 $0 $0 $0 $0 $0 $0 $0 $253,000 XX 0% 0% 0% 0% 0% 167 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 10, 2010 RON YOUNG NORTH TARRANT EXPRESS (SH 183) PHASE II WASTEWATER RELOCATION WASTEWATER RELOCATION B The Texas Department of Transportation ("TxDoT") has entered into a developer agreement with North Tarrant Express Mobility Partners ("NTEMP") for the expansion of SH183. The Phase II construction will affect the City of Euless utilities along and crossing SH183 between FM157 and the east city limits. The City of Euless has wastewater mains and associated items located within the SH183 right-of-way. These facilities must be relocated to accommodate the SH183 expansion. It is anticipated that the City of Euless will enter into a relocation agreement with NTEMP to authorize them to design and relocate wastewater lines. The city will be responsible for the cost of the relocation of the utilities. Est. FY2015 City of Euless wastewater facilities are located within TxDoT right-of-way. As such, the city must provide for utility relocation to accommodate the roadway expansion. 168 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: NORTH TARRANT EXPRESS (SH 183) PHASE II WASTEWATER RELOCATION City Funding $600,000 $600,000 0% 0% 0% 0% XX 0% This project may qualify for a State Infrastructure Bank ("SIB") loan. Staff is currently researching requirements and repayment terms of SIB loans. SIB loans allow borrowers to access capital funds at or lower-than-market interest rates. If the SIB loan option is not feasible, a bond sale will be considered as an alternate source of funding. 169 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 05,2007 RON YOUNG LINE REPLACEMENT-ARANSAS DRIVE WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. The project consists of the replacement of the wastewater mains east of Aransas Drive between Harwood Road and Douglas Street. Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 170 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-ARANSAS DRIVE Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 171 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 10,2007 RON YOUNG LINE REPLACEMENT-BOYD BRANCH WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. This project consists of replacing the existing 12" clay tile wastewater line west of S Mills Drive extending north of S Pipeline Road to Carr Park. Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 172 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-BOYD BRANCH Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 173 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 15,2005 RON YOUNG LINE REPLACEMENT-CEDAR HILLS ESTATES/HOLLYWOOD BOULEVARD WASTEWATER MAINS C This project is part of the systematic replacement of wastewater mains using a worst first approach. This project consist of the design and construction of wastewater mains in the Cedar Hill Addition along Hollywood Boulevard from Vine Street to east of Cannon Drive. Wastewater mains in the Cedar Hill Estates Addition area have deteriorated as they have aged and they need to be replaced. 174 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-CEDAR HILLS ESTATES/HOLLYWOOD BOULEVARD Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 175 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 15,2005 RON YOUNG LINE REPLACEMENT-CEDAR HILLS ESTATES/SUNSET DRIVE WASTEWATER MAINS C This project is part of the systematic replacement of wastewater mains using a worst first approach. This project consists of the replacement of the following wastewater mains in the Cedar Hills Estates Addition: 1. Sunset Drive from Vine Street to S Main Street, 2. Henslee Drive from Sunset Drive to Hollywood Boulevard, and 3. Hollywood Boulevard from Henslee Drive to S Main Street. Wastewater mains in the Cedar Hills Estates Addition area have deteriorated as they have aged and need to be replaced. 176 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-CEDAR HILLS ESTATES/SUNSET DRIVE Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 177 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 05,2007 RON YOUNG LINE REPLACEMENT-COLLIN DRIVE/HARRIS DRIVE/IRION DRIVE WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project consists of the following wastewater main replacements: 1. West of Collin Drive between Denton Drive and Harwood Road, 2. West of Harris Drive from Dallas Drive to Harwood Road, 3. Dallas Drive from west of Collin Drive to west of Harris Drive, 4. South of Dallas Drive from west of Collin Drive to Dallas Drive, and 5. West of Irion Drive from Dallas Drive to Harwood Road Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 178 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-COLLIN DRIVE/HARRIS DRIVE/IRION DRIVE Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 179 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS February 16,2009 RON YOUNG LINE REPLACEMENT-DONLEY DRIVE/SHELMAR DRIVE WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains. This project consists of the replacement of the wastewater lines on: 1. Donley Drive from Shelmar Drive to W Ash Lane, 2. Donley Drive from Harwood Road to Shelmar Drive, and 3. Shelmar Drive from Green Hill Street to the end of Shelmar Drive. Many wastewater mains throughout the city are 40+ years old. Most of these lines are vitrified clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 180 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-DONLEY DRIVE/SHELMAR DRIVE Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 181 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS February 16,2009 RON YOUNG LINE REPLACEMENT-EASTCLIFF/WINDLEA/SIGNET WASTEWATER MAIN C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains. This project includes the replacement of the following wastewater mains: 1. Eastcliff Drive from Tyler Avenue to Signet Drive, 2. Windlea Drive from Eastcliff Drive to Wilshire Drive, and 3. Between Windlea Drive/Signet Drive from Eastcliff Drive to Wilshire Drive. Many wastewater mains throughout the City are 40+ years old. Most of these lines are vitrified clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 182 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-EASTCLIFF/WINDLEA/SIGNET Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 183 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS February 16,2009 RON YOUNG LINE REPLACEMENT-ECTOR DRIVE/DONLEY DRIVE/CRANE DRIVE WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains. The project consists of the replacement of the following wastewater mains: 1. Between Ector Drive and Donley Drive from Aransas Drive to Harwood Road and 2. Between Donley Drive and Crane Drive from Aransas Drive to Harwood Road. Many wastewater mains throughout the city are 40+ years old. Most of these lines are vitrified clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 184 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-ECTOR DRIVE/DONLEY DRIVE/CRANE DRIVE Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 185 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 15,2005 RON YOUNG LINE REPLACEMENT-ECTOR DRIVE/FAYETTE DRIVE WASTEWATER MAINS C This project is part of the systematic replacement of wastewater mains using a worst first approach. The project consists of the replacement of the wastewater mains between Fayette Drive and Ector Drive from Harwood Road to the end of the line. Many wastewater mains throughout the City are 40+years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 186 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-ECTOR DRIVE/FAYETTE DRIVE Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 187 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS February 16,2009 RON YOUNG LINE REPLACEMENT-EVANS DRIVE/CANYON RIDGE DRIVE/N KYNETTE DRIVE WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains. The project consists of the replacement of the following wastewater mains: 1. Between Evans Drive/Canyon Ridge Drive from Cyclone Branch to north of Kynette Drive and 2. North of Kynette Drive from Canyon Ridge Drive to Cyclone Branch. Many wastewater mains throughout the City are 40+ years old. Most of these lines are vitrified clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 188 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-EVANS DRIVE/CANYON RIDGE DRIVE/N KYNETTE DRIVE Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 189 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 05,2007 RON YOUNG LINE REPLACEMENT-GLENN DRIVE/CRANE DRIVE WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. The project consists of the replacement of the wastewater mains located west of Glenn Drive from Aransas Drive to Glenn Drive and West of Crane Drive from Harwood Road to upstream of Glenn Drive. Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 190 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-GLENN DRIVE/CRANE DRIVE Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 191 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS February 16,2009 RON YOUNG LINE REP-HUNTINGTON/KOEN/ATKERSON/E HUITT/SLAUGHTER/MARTIN WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains. This project consists of the replacement of the following wastewater mains: 1. East of Huntington Drive from S Atkerson Lane to E Alexander Lane, 2. Between Koen Lane/S Atkerson Lane from Huntington Drive to FAA Road, 3. Between S Atkerson Lane/N Atkerson Lane from Huntington Drive to FAA Road, 4. Between N Atkerson Lane/E Huitt Lane from Huntington Drive to FAA Road, 5. Between E Huitt Lane/Slaughter Lane from Huntington Drive to FAA Road, 6. Between Slaughter Lane/Martin Lane from Huntington to FAA Road, and 7. Between Martin Lane/E Alexander Lane from Huntington Drive to FAA Road. Many wastewater mains throughout the City are 40+ years old. Most of these lines are vitrified clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 192 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REP-HUNTINGTON/KOEN/ATKERSON/E HUITT/SLAUGHTER/MARTIN Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 193 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS February 16,2009 RON YOUNG LINE REPLACEMENT-JANANN STREET/BROWNSTONE DRIVE/SHELMAR DRIVE WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains. The project consists of the replacement of the following wastewater mains: 1. Janann Street from Aransas Drive to Donley Drive, 2. Brownstone Drive from Aransas Drive to Donley Drive, 3. Shelmar Drive from Greenhill Street to Aransas Drive, and 4. Aransas Drive from 500' south of Shelmar Drive to Janann Street. Many wastewater mains throughout the City are 40+ years old. Most of these lines are vitrified clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 194 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-JANANN STREET/BROWNSTONE DRIVE/SHELMAR DRIVE Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 195 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS February 16,2009 RON YOUNG LINE REPLACEMENT-KYNETTE/WILSHIRE/SIERRA/EASTCLIFF, E OF SIERRA WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains. The project consists of the replacement of the following wastewater mains: 1. Kynette Drive from Eastcliff Drive to Wilshire Drive, 2. Wilshire Drive from Kynette Drive extending 800' north, 3. Between Sierra Drive/Eastcliff Drive from Kynette Drive to Signet Drive, and 4. East of Sierra Drive from Signet Drive to Wilshire Park. Many wastewater mains throughout the City are 40+ years old. Most of these lines are vitrified clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 196 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-KYNETTE/WILSHIRE/SIERRA/EASTCLIFF, E OF SIERRA Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 197 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS February 16,2009 RON YOUNG LINE REPLACEMENT-LAKEWOOD BLVD/DOGWOOD CIRCLE/BOCOWOOD CIRCLE WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains. The project consists of the replacement of the following wastewater mains: 1. Lakewood Boulevard from Dogwood Circle north to Private Drive and 2. Dogwood Circle, Cypress Circle, Bocowood Circle, and Aspenway Circle. Many wastewater mains throughout the City are 40+ years old. Most of these lines are vitrified clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 198 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-LAKEWOOD BLVD/DOGWOOD CIRCLE/BOCOWOOD CIRCLE Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 199 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS February 16,2009 RON YOUNG LINE REPLACEMENT-MARY/MARLENE/COMMERCE/WILSHIRE/GREENBRIAR WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains. The project consists of the replacement of the following wastewater mains: 1. Between Mary Drive/Marlene Drive from Cyclone Branch to Marlene Drive, 2. Between Commerce Street/Wilshire Drive from Marlene Drive to Sagebrush Trail, 3. South of Greenbriar Drive from Cyclone Branch to Debra Drive, 4. Between Greenbriar Drive/Mary Street from Eastcliff Drive to Debra Drive, and 5. East of Debra Drive and south of Mary Drive. Many wastewater mains throughout the City are 40+ years old. Most of these lines are vitrified clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 200 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-MARY/MARLENE/COMMERCE/WILSHIRE/GREENBRIAR Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 201 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 13,2006 RON YOUNG LINE REPLACEMENT-N MIDWAY PARK WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. The project consists of the replacement of the following wastewater mains: 1. East of Denton Drive between Bell Drive and Dallas Drive, 2. Between Denton Drive/Irion Drive from Dallas Drive to Harwood Road, 3. Along Denton Drive from Harwood Road to Collin Drive, and 4. Along Milam Drive from Blanco Drive to Midway Park Drive. Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, open joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 202 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-N MIDWAY PARK Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 203 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS February 16,2009 RON YOUNG LINE REP-NORTHCLIFF/TOPLEA/WINDLEA/SIGNET/KYNETTE/WESTCLIFF WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains. The project consists of the replacement of the following wastewater mains: 1. Between Northcliff Drive/Toplea Drive from Canyon Ridge to Cyclone Branch, 2. Between Toplea Drive/Windlea Drive from Canyon Ridge to Cyclone Branch, 3. Between Windlea Drive/Signet Drive from Canyon Ridge to Cyclone Branch, 4. Signet Drive/Kynette Drive from the church to Cyclone Branch, and 5. Westcliff Drive from Toplea Drive to north of Windlea Drive. Many wastewater mains throughout the City are 40+ years old. Most of these lines are vitrified clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 204 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REP-NORTHCLIFF/TOPLEA/WINDLEA/SIGNET/KYNETTE/WESTCLIFF Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 205 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS February 16,2009 RON YOUNG LINE REPLACEMENT-NW MIDWAY/RUSK/PARKER/ROCKWALL WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains. The project consists of the replacement of the following wastewater mains: 1. North of West Midway Drive from FM 157 to Parker Drive, 2. West Midway Drive from Parker Drive to Rusk Drive, 3. Rusk Drive from West Midway Drive to Parker Drive, 4. Parker Drive from West Midway Drive to Rockwall Drive, and 5. Rockwall Drive from west of Parker Drive to 400' west of Lamar Drive. Many wastewater mains throughout the City are 40+ years old. Most of these lines are vitrified clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 206 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-NW MIDWAY/RUSK/PARKER/ROCKWALL Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 207 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 13,2006 RON YOUNG LINE REPLACEMENT-S MAIN STREET WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. The project consists of the replacement of the wastewater main along S Main Street from Jean Lane to W Alexander Lane. Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. This project is part of the systematic replacement of wastewater mains using a worst first approach to reduce maintenance costs and customer problems. 208 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-S MAIN STREET Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 209 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS February 16,2009 RON YOUNG LINE REP-SAGEBRUSH/TOPLEA/WILSHIRE/YORKSHIRE/SAGEBRUSH/TYLER WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains. The project consists of the replacement of the following wastewater mains: 1. Between Sagebrush Trail/Toplea Drive from Cyclone Branch to east of Wilshire Drive, 2. Between Wilshire Drive/Yorkshire Drive from Signet Drive to south of Toplea Drive, 3. Between Sagebrush Trail/Tyler Avenue from Cyclone Branch to Commerce Street, 4. Eastcliff Drive from /Tyler Avenue to the apartments, and 5. Between Marlene Drive/Tyler Avenue from Eastcliff Drive to Commerce Street. Many wastewater mains throughout the City are 40+ years old. Most of these lines are vitrified clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 210 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REP-SAGEBRUSH/TOPLEA/WILSHIRE/YORKSHIRE/SAGEBRUSH/TYLER Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 211 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS February 16,2009 RON YOUNG LINE REPLACEMENT-W DONLEY/PRIVATE DRIVE/MIMOSA/MAGNOLIA/REDBUD WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of wastewater mains using a worst first approach. The project consists of the replacement of the following wastewater mains: 1. West of Donley Drive from West Ash Lane to Private Drive, 2. Private Drive from west of Redbud Drive to Lakewood Boulevard, 3. Mimosa Lane from Bocowood Drive to Private Drive, 4. Magnolia Lane from Bocowood Drive to Private Drive, and 5. Redbud Drive from Bocowood Drive to Private Drive. Many wastewater mains throughout the City are 40+ years old. Most of these lines are clay tile and are susceptible to ground movement, pulled joints, root infiltration and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 212 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-W DONLEY/PRIVATE DRIVE/MIMOSA/MAGNOLIA/REDBUD Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 213 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS February 16,2009 RON YOUNG LINE REP-W MIDWAY/VICTORIA/DELTA/LAMAR/ROCKWALL WASTEWATER MAINS C The wastewater mains included in this project are part of the City of Euless Wastewater System Master Plan. The project is part of the systematic replacement of deteriorating vitrified clay tile wastewater mains. The project consists of the replacement of the following wastewater mains: 1. West Midway Drive from FM 157 to Victoria Drive, 2. Victoria Drive from West Midway Drive north 700', 3. Delta Drive from West Midway Drive north 1000', 4. Lamar Drive from West Midway Drive north to Fayette Drive, and 5. Rockwall Drive from Lamar Drive west and north 800'. Many wastewater mains throughout the City are 40+ years old. Most of these lines are vitrified clay tile and are susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 214 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REP-W MIDWAY/VICTORIA/DELTA/LAMAR/ROCKWALL Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 215 216 PROPOSED AND UNFUNDED  WATER PROJECTSWATER PROJECTS Project DescriptionPriority Estimated Cost Operating FundCIP Fund BalanceBond SaleGrants/ ContribImpact FeesEscrow FundsCar Rental TaxOther EDCTo Be DeterminedWATER PROJECTSNone for FY2011A $ - Sub-Total Water Priority A-Proposed FY11 $ - Water & Wastewater Impact Fee Update (12)B $ 30,000 XX Water System Security Camera Installation (13)B $ 75,000 XX LR: S Pipeline Road West (15) B $ 300,000 XX Line Relocation, N Tarrant Express Phase II (15)B $ 1,200,000 XX Sub-Total Water Priority B-Unfunded $ 1,605,000 LR: Blessing Creek and Little CreekC TBD XX LR: Collin-Dallas Dr to Harwood RdC TBD XX LR: Collin-Denton Dr to Dallas DrC TBD XX LR: Denton DriveC TBD XX LR: Dickey Drive NorthC TBD XX LR: Dickey Drive SouthC TBD XX LR: Dunaway DriveC TBD XX LR: E Huitt LaneC TBD XX LR: Eastcliff Drive C TBD XX LR: Ector DriveC TBD XX LR: Fuller DriveC TBD XX LR: Hollow Oak DriveC TBD XX LR: Kynette Drive C TBD XX LR: Live Oak Court/Live Oak Drive/Marlene DriveC TBD XX LR: Midcreek/Rock Creek/Stony CreekC TBD XX LR: Midway Drive East C TBD XX LR: Midway Drive WestC TBD XX LR: Needles StreetC TBD XX LR: Paula Lane C TBD XX LR: S Main Street (North)C TBD XX LR: S Main Street (South)C TBD XX LR: S Pipeline Road East C TBD XX LR: Shady Creek Drive/Cliffwood DriveC TBD XX LR: Springwood CourtC TBD XX LR: Sunset DriveC TBD XX LR: Westwood DriveC TBD XX LR: Wildwood StreetC TBD XX LR: Woodvine (East)C TBD XX LR: Woodvine (West)C TBD XX SH360 Water Crossing C TBD XX Standpipe Storage Tank & Bldg DemolitionC TBD XX Water System Security Land AcquisitionC TBD XX Sub-Total Water Priority C-Unfunded $ - WATER PROJECTS - TOTAL$ 1,605,000 LR = Line ReplacementCAPITAL IMPROVEMENT PROGRAMSFY11 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPEPROPOSED METHOD OF FINANCING217 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 31,2009 RON YOUNG WATER AND WASTEWATER IMPACT FEE UPDATE WATER B Water and wastewater impact fee charges were instituted by the City of Euless in 1990 in accordance with applicable state law to generate revenue for funding of capital improvements attributable to new development. Impact fees are related to the items identified by the Capital Improvements Plan and the Water and Wastewater System Master Plan. This project will consist of reviewing the City's Land Use Assumptions, the costs of future infrastructure needs, system capacity available for future growth, the cost of Trinity River Authority service, and update the Capital Improvements Plan. Calculations based on state dictated requirements will be made to determine the maximum allowable impact fees. The city council will determine what percentage of the maximum allowable fee to impose. FY2012 Legislation passed in 2001 provided an automatic five year extension to the 2002 Update. The impact fees were updated in 2007 as required. The next impact fee update will be in 2012 barring any new legislative action. 218 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: WATER AND WASTEWATER IMPACT FEE UPDATE Engineering $30,000 $0 $0 $0 $0 $0 $0 $0 $30,000 0% XX 0% 0% 0% 0% The proposed funding sources are impact fee fund balances. 219 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 12,2004 RON YOUNG WATER SYSTEM SECURITY CAMERA INSTALLATION WATER B This project is a result of the findings included in the 2004 Water System Vulnerability Assessment of the City of Euless Water System Master Plan. The project provides for the installation of security cameras at the water production and storage sites (ground storage tanks and towers) located at West Fuller Drive, Heritage Park, 1400 N Main Street, 2591 N Main Street, and 2700 N Main Street. FY2013 Increase water system security by addressing vital elements as recommended in the 2004 Water System Vulnerability Assessment as identified by Lockwood, Andrews, and Newman, Inc. and submitted to the Environmental Protection Agency (EPA). 220 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: WATER SYSTEM SECURITY CAMERA INSTALLATION Equipment Installation $75,000 $0 $0 $0 $0 $0 $0 $0 $75,000 XX 0% 0% 0% 0% 0% 221 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 28,2003 RON YOUNG LINE REPLACEMENT-S PIPELINE ROAD WEST WATER MAINS B This water main is included in the City's Water Master Plan. The project consists of the replacement of the existing 6" cast iron water main with an 8" PVC water main along S Pipeline Road west from Simmons Drive to Vine Street. FY2015 Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance costs. 222 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-S PIPELINE ROAD WEST Engineering $30,000 Construction $270,000 $0 $0 $0 $0 $0 $0 $0 $300,000 XX 0% 0% 0% 0% 0% 223 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 10, 2010 RON YOUNG NORTH TARRANT EXPRESS (SH 183) PHASE II WATER RELOCATION WATER RELOCATION B The Texas Department of Transportation ("TxDot") has entered into a developer agreement with North Tarrant Express Mobility Partners ("NTEMP") for the expansion of SH183. The Phase II construction will affect the City of Euless utilities along and crossing SH183 between FM157 and the east city limits. The City of Euless has water mains and associated items located within the SH 183 right-of-way. These facilities must be relocated to accommodate the SH183 expansion. It is anticipated that the City of Euless will enter into a relocation agreement with NTEMP to authorize them to design and relocate water lines and associated infrastructure. The City of Euless will be responsible for cost of the relocation of the utilities. Est. FY2015 City of Euless water facilities are located within TxDot right-of-way. As such, the city must provide for utility relocation to accommodate the roadway expansion. 224 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: NORTH TARRANT EXPRESS (SH 183) PHASE II WATER RELOCATION City Funding $1,200,000 $1,200,000 0% 0% 0% 0% 1,200,000 0% This project may qualify for a State Infrastructure Bank ("SIB") loan. Staff is currently researching requirements and repayment terms of SIB loans. SIB loans allow borrowers to access capital funds at or lower-than-market interest rates. If the SIB loan option is not feasible, a bond sale will be considered as an alternate source of funding. 225 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 05,2007 RON YOUNG LINE REPLACEMENT-BLESSING CREEK AND LITTLE CREEK WATER MAINS C The water main is included in the City's Water Master Plan. This project will replace the 6" AC main with an 8" PVC main for Blessing Creek and Little Creek. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance costs. 226 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-BLESSING CREEK AND LITTLE CREEK Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 227 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 28,2003 RON YOUNG LINE REPLACEMENT-COLLIN DRIVE, DALLAS DRIVE TO HARWOOD ROAD WATER MAINS C This water main is included in the City's Water Master Plan. The project will replace a 6" cast iron main with an 8" PVC main along Collin Drive from Dallas Drive to Harwood Road. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance costs. 228 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-COLLIN DRIVE, DALLAS DRIVE TO HARWOOD ROAD Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 229 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 28,2003 RON YOUNG LINE REPLACEMENT-COLLIN DRIVE, DENTON DRIVE TO DALLAS DRIVE WATER MAINS C This water main is included in the City's Water Master Plan. The project will replace a 6" cast iron main to an 8" PVC main along Collin Drive from Denton Drive to Dallas Drive. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance costs. 230 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-COLLIN DRIVE, DENTON DRIVE TO DALLAS DRIVE Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 231 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 28,2003 RON YOUNG LINE REPLACEMENT-DENTON DRIVE, TARRANT DRIVE TO HARWOOD ROAD WATER MAINS C This water main is included in the City's Water Master Plan. The project consists of the replacement of the 6" cast iron water main with an 8" PVC main along Denton Drive from Tarrant Drive to Harwood Road. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance cost. 232 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-DENTON DRIVE, TARRANT DRIVE TO HARWOOD ROAD Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 233 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 28,2003 RON YOUNG LINE REPLACEMENT-DICKEY DRIVE NORTH, SH10 TO E HUITT LANE WATER MAINS C This water main is included in the City's Water Master Plan. This project consists of replacing the 6" cast iron water main with an 8" PVC main along Dickey Drive north from SH 10 to E Huitt Lane. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance cost. 234 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-DICKEY DRIVE NORTH, SH10 TO E HUITT LANE Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 235 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 28,2003 RON YOUNG LINE REPLACEMENT-DICKEY DRIVE SOUTH, E HUITT LANE TO HILTON DRIVE WATER MAINS C This water main is included in the City's Water Master Plan. This project consists of the replacement of a 6" cast iron water main with an 8" PVC main along Dickey Drive south from E Huitt Lane to Hilton Drive. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance costs. 236 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-DICKEY DRIVE SOUTH, E HUITT LANE TO HILTON DRIVE Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 237 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 15,2005 RON YOUNG LINE REPLACEMENT-DUNAWAY DRIVE, E ALEXANDER LANE TO E ASCOT DRIVE WATER MAINS C This water main is included in the City's Water Master Plan. The project consists of the replacement of the existing 6" AC water main with an 8" PVC water main on Dunaway Drive from E Alexander Lane to E Ascot Drive. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance cost. 238 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-DUNAWAY DRIVE, E ALEXANDER LANE TO E ASCOT DRIVE Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 239 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 15,2005 RON YOUNG LINE REPLACEMENT-E HUITT LANE, S MAIN STREET TO DUNAWAY DRIVE WATER MAINS C This water main is included in the City's Water Master Plan. The project consists of the replacement of the existing 6" PVC water main with an 8" PVC water main along E Huitt Lane from S Main Street to Dunaway Drive. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance cost. 240 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-E HUITT LANE, S MAIN STREET TO DUNAWAY DRIVE Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 241 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 15,2005 RON YOUNG LINE REPLACEMENT-EASTCLIFF DRIVE, EASTCLIFF DRIVE TO DEL PRADO APTS. WATER MAINS C This water main is included in the City's Water Master Plan. The project consists of the replacement of the 6" AC main to an 8" PVC main along Eastcliff Drive from Toplea Drive to Del Prado Apartments. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance costs and increase water flow. 242 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-EASTCLIFF DRIVE, EASTCLIFF DRIVE TO DEL PRADO APTS. Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 243 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 28,2003 RON YOUNG LINE REPLACEMENT-ECTOR DRIVE, TROJAN TRAIL TO MIDWAY DRIVE WATER MAINS C This water main is included in the City's Water Master Plan. The project consists of the replacement of the 6" cast iron water main with an 8" PVC main on Ector Drive from Trojan Trail to Midway Drive. Old and deteriorated water mains increase the City's maintenance costs. Substandard size mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance costs. 244 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-ECTOR DRIVE, TROJAN TRAIL TO MIDWAY DRIVE Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 245 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 28,2003 RON YOUNG LINE REPLACEMENT-FULLER DRIVE, SALEM DRIVE TO CARTER DRIVE WATER MAINS C This water main is included in the City's Water Master Plan. The project consists of replacing a 6" cast iron water main with an 8" PVC water main along Fuller Drive from Salem Drive to Carter Drive. Old and deteriorated water mains increase the City's maintenance costs. Substandard size mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance cost. 246 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-FULLER DRIVE, SALEM DRIVE TO CARTER DRIVE Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 247 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 28,2003 RON YOUNG LINE REPLACEMENT-HOLLOW OAK DRIVE WATER MAINS C This water main is included in the City's Water Master Plan. The project consists of the replacement of the 6" cast iron main with an 8" PVC main along Hollow Oak Drive from Woodridge Circle to Pebble Creek Drive and Woodridge Circle south of Hollow Oak Drive. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance costs. 248 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-HOLLOW OAK DRIVE Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 249 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 15,2005 RON YOUNG LINE REPLACEMENT-KYNETTE DRIVE, CYCLONE CREEK TO WILSHIRE DRIVE WATER MAINS C This water main is included in the City's Water Master Plan. The project consists of the replacement of a 6" cast iron water main with an 8" PVC main along Kynette Drive from Cyclone Creek to Wilshire Drive. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance costs. 250 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-KYNETTE DRIVE, CYCLONE CREEK TO WILSHIRE DRIVE Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 251 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 28,2003 RON YOUNG LINE REPLACEMENT-LIVE OAK CT/LIVE OAK DRIVE/MARLENE DRIVE WATER MAINS C The water mains included in this project are included in the City's Water Master Plan. The project consists of the replacement of the existing 4" cast iron water main with an 8" PVC main along Live Oak Drive from Cedar Court to the south end of Live Oak Drive. Additionally, the replacement of the existing 8" cast iron water main with an 8" PVC water main from Canyon Ridge to West Cliff Drive is also included in the scope of the project. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water main provides inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance costs. 252 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-LIVE OAK CT/LIVE OAK DRIVE/MARLENE DRIVE Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 253 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 05,2007 RON YOUNG LINE REPLACEMENT-MIDCREEK/ROCK CREEK/STONY CREEK DRIVES WATER C The water main is included in the City's Water Master Plan. This project consists of the replacement of a 6" AC main with an 8" PVC main on Midcreek Drive, Rock Creek Drive, and Stony Creek Drive. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. 254 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-MIDCREEK/ROCK CREEK/STONY CREEK DRIVES Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 255 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 28,2003 RON YOUNG LINE REPLACEMENT-MIDWAY DRIVE EAST, N MAIN ST TO FREESTONE DR WATER MAINS C This water main is included in the City's Water Master Plan. This project replaces the 6" cast iron water main with an 8" PVC main on Midway Drive east from N Main Street to Freestone Drive. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance costs. 256 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-MIDWAY DRIVE EAST, N MAIN ST TO FREESTONE DR Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 257 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 28,2003 RON YOUNG LINE REPLACEMENT-MIDWAY DRIVE WEST, FREESTONE DRIVE TO ECTOR DRIVE WATER MAINS C This water main is included in the City's Water Master Plan. This project replaces the 6" cast iron water main with an 8" PVC main along Midway Drive west from Freestone Drive to Ector Drive. Old and deteriorated water mains increase the City's maintenance costs. Substandard size mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance costs. 258 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-MIDWAY DRIVE WEST, FREESTONE DRIVE TO ECTOR DRIVE Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 259 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 15,2005 RON YOUNG LINE REPLACEMENT-NEEDLES STREET, PAULA LANE TO RAIDER DRIVE WATER MAINS C This water main is included in the City's Water Master Plan. The project consists of the replacement of the existing 6" cast iron water main with an 8" PVC water main along Needles Street from Paula Lane to Raider Drive. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance cost. 260 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-NEEDLES STREET, PAULA LANE TO RAIDER DRIVE Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 261 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 28,2003 RON YOUNG LINE REPLACEMENT-PAULA LANE, NEEDLES STREET TO S PIPELINE ROAD WATER MAINS C This water main is included in the City's Water Master Plan. The project consists of the replacement of the 6" cast iron water main with an 8" PVC main along Paula Lane from Needles Street to S Pipeline Road. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance costs. 262 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-PAULA LANE, NEEDLES STREET TO S PIPELINE ROAD Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 263 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 12,2004 RON YOUNG LINE REPLACEMENT-S MAIN STREET (NORTH), E HUITT LANE TO SH10 WATER MAIN C The water mains included in this project are part of the City of Euless Water System Master Plan. The project will replace and upgrade the water main along S Main Street from E Huitt Lane to SH10 from a 6" cast iron main to an 8" PVC main. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance cost. 264 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-S MAIN STREET (NORTH), E HUITT LANE TO SH10 Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 265 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 12,2004 RON YOUNG LINE REPLACEMENT-S MAIN STREET (SOUTH), LANDOVER DR TO E HUITT LN WATER MAIN C The water mains included in this project are part of the City of Euless Water System Master Plan. This project will replace and upgrade the water main along S Main Street from Landover Drive to E Huitt Lane from a 6" cast iron main to an 8" PVC. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance cost. 266 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-S MAIN STREET (SOUTH), LANDOVER DR TO E HUITT LN Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 267 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 28,2003 RON YOUNG LINE REPLACEMENT-S PIPELINE ROAD EAST WATER MAINS C This water main is included in the City's Water Master Plan. The project will replace the existing 6" cast iron water main with an 8" PVC water main along S Pipeline Road east from Vine Street to S Main Street. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance costs. 268 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-S PIPELINE ROAD EAST Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 269 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 12,2004 RON YOUNG LINE REPLACEMENT-SHADY CREEK DRIVE/CLIFFWOOD ROAD WATER MAINS C The water mains included in this project are part of the City of Euless Water System Master Plan. This project will replace and upgrade the water mains along Shady Creek Drive and Cliffwood Road from the existing 6" cast iron mains to 8" PVC. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance cost. 270 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-SHADY CREEK DRIVE/CLIFFWOOD ROAD Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 271 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 12,2004 RON YOUNG LINE REPLACEMENT-SPRINGWOOD COURT WATER MAINS C The water mains included in this project are part of the City of Euless Water System Master Plan. The project consists of the replacement of 4" water main with an 8" main on Springwood Court. Old and deteriorated water mains increase the City's maintenance cost. Substandard size water mains provide a reduced flow of water. Systematic annual replacement of deteriorated and substandard size water mains will reduce maintenance costs. 272 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-SPRINGWOOD COURT Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 273 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 12,2004 RON YOUNG LINE REPLACEMENT-SUNSET DRIVE, S PIPELINE ROAD TO S MAIN STREET WATER MAINS C The water mains included in this project are part of the City of Euless Water System Master Plan. The project will replace and upgrade the water main along Sunset Drive from S Pipeline Road to S Main Street from a 6" cast iron main to an 8" PVC. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance cost. 274 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-SUNSET DRIVE, S PIPELINE ROAD TO S MAIN STREET Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 275 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS May 28,2003 RON YOUNG LINE REPLACEMENT-WESTWOOD DRIVE, FULLER DRIVE TO CARTER DRIVE WATER MAINS C This water main is included in the City's Water Master Plan. The project will replace a 6" cast iron main with an 8" PVC main along Westwood Drive from Fuller Drive to Carter Drive. TBD Old and deteriorated water mains increase the City's maintenance costs. Substandard size water main provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance costs. 276 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-WESTWOOD DRIVE, FULLER DRIVE TO CARTER DRIVE Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 277 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 12,2004 RON YOUNG LINE REPLACEMENT-WILDWOOD STREET WATER MAINS C The water mains included in this project are part of the City of Euless Water System Master Plan. This project will replace and upgrade the water main along Wildwood Street from a 6" cast iron main to an 8" PVC main. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance cost. 278 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REPLACEMENT-WILDWOOD STREET Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 279 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 12,2004 RON YOUNG LINE REP - WOODVINE DRIVE (EAST), CLIFFWOOD ROAD TO EL CAMINO REAL WATER MAINS C The water mains included in this project are part of the City of Euless Water System Master Plan. The project will replace and upgrade the water main along Woodvine Drive from Cliffwood Road to El Camino Real from a 6" cast iron main to an 8" PVC main. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance cost. 280 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REP - WOODVINE DRIVE (EAST), CLIFFWOOD ROAD TO EL CAMINO REAL Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 281 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 12,2004 RON YOUNG LINE REP - WOODVINE DRIVE (WEST), PEBBLE CREEK DR TO CLIFFWOOD RD WATER MAINS C The water mains included in this project are part of the City of Euless Water System Master Plan. This project will replace and upgrade the water main along Woodvine Drive from Pebble Creek to Cliffwood Road from a 6" cast iron main to an 8" PVC main. Old and deteriorated water mains increase the City's maintenance costs. Substandard size water mains provide inadequate flow of water. Systematic annual replacement of old deteriorated or substandard size water mains will reduce maintenance cost. 282 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: LINE REP - WOODVINE DRIVE (WEST), PEBBLE CREEK DR TO CLIFFWOOD RD Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 283 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 21,2000 RON YOUNG SH360 WATER CROSSING WATER MAINS C This project is related to the DFW International Airport Master Plan for property in Euless. This project consists of the extension of three water mains across SH360 right-of-way to provide service to a portion of the DFW Airport property. Development on the airport property could potentially increase the City's tax revenues. This development is dependent upon the availability of water service to this area. 284 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: SH360 WATER CROSSING Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 285 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS March 08, 2010 RON YOUNG STANDPIPE STORAGE TANK & BUILDING DEMOLITION WATER/FACILITIES DEMOLITION C The project does not affect the City's master plan nor is it dependent on other projects. All labor, equipment, and supervision to demolish the 2,000,000 gallon steel storage standpipe water tank (60'X104' high) and buildings and remove the debris from the property. This project does not include restoration, foundation demolition, or site grading. Approximately 40 days would be required for demo and removal of debris. Removal of the two million gallon water storage tank at the vacated Public Works Facility located at 1100 Central Drive in Bedford will improve the appearance of the property thereby rendering it more marketable. 286 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: STANDPIPE STORAGE TANK & BUILDING DEMOLITION To be Determined 0% 0% 0% 0% 0% XX 287 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 12,2004 RON YOUNG WATER SYSTEM SECURITY LAND ACQUISITION WATER C This project is a result of the findings of the 2004 Water System Vulnerability Assessment of the City of Euless Water Systems Master Plan. The project consists of the acquisition of a small residential property which shields the Fuller ground storage tank from public view. Removal of the residence in order to provide greater security, access, and visibility is also included in the scope of the project. Increase water system security by addressing vital elements as recommended in the 2004 Water System Vulnerability Assessment as identified by Lockwood, Andrews and Newman, Inc. and submitted to the Environmental Protection Agency (EPA). 288 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: WATER SYSTEM SECURITY LAND ACQUISITION Land Acquisition - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 289 290 PROPOSED AND UNFUNDED  OTHER PROJECTSOTHER PROJECTS Project DescriptionPriority Estimated Cost Operating FundCIP Fund BalanceBond SaleGrants/ ContribImpact FeesEscrow FundsCar Rental TaxOther EDCTo Be DeterminedOTHER PROJECTSNone for FY2011A $ - Sub-Total Other Priority A-Proposed FY11 $ - Glade Parks Trail Connection (12)B $ 1,211,175 $ 851,550 $ 359,625 Texas Star Sports Complex Phase IV (12)B $ 950,000 XX Trail Lighting-Phase I (12)B $ 50,000 XX Park Amenities Upgrade (13)B $ 150,000 XX Blessing Branch Park Improvements (14)B $ 275,040 XX Euless FLC Phase-II Design Outdoor Aquatics (15)B $ 469,000 XX Euless FLC Phase-III Design Indoor Aquatics (15)B $ 317,500 XX Development/Engineering Building (15)B $ 1,822,500 XX Euless FLC Phase-II Outdoor Aquatics Construction (16)B $ 5,200,000 XX $500,000 Euless FLC Phase-III Indoor Aquatics Construction (16)B $ 3,493,000 $750,000 XXTexas Star Sports Complex Phase V (16)B $ 4,152,000 XX Sub-Total Other Priority B-Unfunded $ 18,090,215 Animal ShelterC TBD XX Community Center for South EulessC TBD XX Emergency Call BoxesC TBD XX Fire Training Facility and TowerC TBD XX Kiddie Carr Park ImprovementsC TBD XX South Euless Water FeatureC TBD XX Trail Connection - S EulessC TBD XX Trail Enhancements-Phase IC TBD XX Trail Enhancements-Phase IIC TBD XX Trail Enhancements-Villages Bear CreekC TBD XX Trail Lighting-Phase IIC TBD XX Trailwood Park ImprovementsC TBD XX Wilshire Park Water FeatureC TBD XX Sub-Total Other Priority C-Unfunded $ - OTHER PROJECTS - TOTAL$ 18,090,215 CAPITAL IMPROVEMENT PROGRAMSFY11 PROPOSED & UNFUNDED PROJECTS - SORTED BY TYPEPROPOSED METHOD OF FINANCING291 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES May 05,2008 RAY MCDONALD GLADE PARKS TRAIL CONNECTION LAND IMPROVEMENTS B As identified in the Glade Parks development, this project proposes to connect the existing Trails of Euless to the City of Colleyville trails through the Glade Park Development. Construction of this trail will link the Trails of Euless to the City of Colleyville trail system through the Glade Park Development. The trail will tie-in to the existing trail to the east, go under SH121, and tie-in to the City of Colleyville trail system to the west. The "Creekwood Connector Trail" portion will connect to the existing trail at Creekwood Estates, run underneath the northbound service road, SH121, and the southbound service road to the southeast corner of the Glade Parks Development. Future connectivity through Glade Parks is planned within the overall development of that site. Very high interest in trails and trail connectivity were identified in the scientific survey conducted for the adopted Parks Master Plan. 88% of those who participated in the survey singled out trail connections between existing and future park developments as the number one priority. Additionally, 76% identified the need for trail connectivity to other cities as the top priority. The City of Euless has experienced significant progress in the last few years in the area of trail development with an extensive network of paved and unpaved trails. The trails system is a valuable asset to the community as it assists not only in providing a safe means for non-vehicular travel, but also in providing an opportunity for a variety of unstructured, low-impact recreational pursuits. The continued development and maintenance of the trail system received a great deal of support from the citizens as indicated in the responses to the scientific survey and has also been supported by past updates to the Parks Master Plan. 292 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: GLADE PARKS TRAIL CONNECTION Creekwood Connection Engineering, surveying, geotech, etc.$72,000 $0 Construction $270,500 $0 Contingency 5% $17,125 Glade Parks Connection $0 Engineering, surveying, geotech, etc. $133,500 Construction $677,500 Contingency 5%$40,550 $0 $0 $0 $0 $1,211,175 0% 0% 0% 0% 0% $851,550 $359,625 Donation contribution from developer agreement which accounts for the Glade Parks portion of the project. 293 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES May 01,2010 RAY MCDONALD TEXAS STAR SPORTS COMPLEX PHASE IV LAND IMPROVEMENTS B Texas Star Sports Complex Phase IV incorporates the addition of a concession and rest room facility and parking for 200 vehicles. This addition will ensure that the Texas Star Sports Complex is positioned as a premier facility that serves the athletic and recreational programming needs of the city. The project scope includes the design and construction of a parking lot and a concession/rest room facility at the Texas Star Sports Complex. FY2012 Since the completion of Phase III at the Texas Star Sports Complex, the facility has been severely under served in parking, rest room facilities, and concessions. With the completion of Phase IV, the Texas Star Sports Complex will be positioned to serve the ever-increasing athletic needs of the community and spur economic opportunities for the city. 294 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: TEXAS STAR SPORTS COMPLEX PHASE IV Parking Lot $400,000 Concessions/Rest Room Facility $300,000 $0 Design/Planning $100,000 $0 Landscape $20,000 10% Indirect Cost $82,000 $7,500 5% Contingency $48,000 $3,500 $11,000 $0 $0 $11,000 $950,000 0% XX 0% 0% 0% 0% 295 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES April 30,2008 RAY MCDONALD TRAIL LIGHTING-PHASE I FIXTURES IMPROVEMENTS B Identified in the Needs Assessment section of the adopted Parks Master Plan is the addition of trail lighting in various parks where trails are located. This request is for the first phase of a project dedicated to satisfying that need. This project includes the installation of trail lighting along the Trails of Euless similar to what was installed along the trail through Midway Park. Additional parks that have been identified as needing trail lighting are: Trailwood Park, The Preserve at McCormick Park, The Villages of Bear Creek Park and Heritage Park. Not all of the parks identified would be included in this phase, but rather in future phases of an overall Trail Lighting project. FY2012 Trails in the area have become popular and lighting trails could extend hours of usage as well as provide for increased visibility/security for remote trail areas. 296 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: TRAIL LIGHTING-PHASE I Fixtures $50,000 $0 $0 $0 $0 $0 $0 $0 $50,000 XX 0% 0% 0% 0% 0% 297 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES May 01,2008 RAY MCDONALD PARK AMENITIES UPGRADE FIXTURES IMPROVEMENTS B Identified in the Needs Assessment section of the adopted Parks Master Plan, are projects related to park infrastructure, fixtures, and amenities that are recommended for either renovation, upgrade, or repair. This project addresses park infrastructure needs and/or renovation of current park amenities such as: park structure painting (gazebos, pavilions, etc.), minor trail repairs, playground renovations, installation of shaded "stopping stations" along the Trails of Euless, and other projects identified in the Parks Master Plan. Anticipate Begin: FY2013 Pursuant to the recommendations in the Parks Master Plan, parks and related infrastructure should be maintained at levels that meets the citizens' expectations. The needs have been identified in the Parks Master Plan based on staff and citizen input. This project addresses some of those request. 298 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: PARK AMENITIES UPGRADE Fixtures $100,000 Park Amenities $50,000 $0 $0 $0 $0 $0 $0 $0 $150,000 0% XX 0% 0% 0% 0% The proposed method of financing is the EDC Fund Balance. 299 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES April 30,2008 RAY MCDONALD BLESSING BRANCH PARK IMPROVEMENTS PARK LAND IMPROVEMENTS B This project is a continuation of the overall trails expansion and general park improvements as identified in the Parks Master Plan. Blessing Branch Park is a 7.3 acre linear park located on the east side of Main Street across from Midway Park. Currently, the park has only one swing set. This project includes construction of a trail connection from Main Street to the west and Fuller-Wiser to the east. Additionally, the project includes a new playground, picnic pad (s) with grill(s), and some type of shade shelter/pavilion/gazebo. This area currently gets a high volume of foot traffic. Constructing a trail in this linear greenbelt would not only provide safe, paved access for the residents east of Main Street to Midway Park, Midway Park Elementary, and to Trinity High School, but also help create a renewed sense of quality of life for the residents in that area by enhancing the recreational amenities available. FY2014 The number one request from our citizens as it relates to trails, based on the responses to the survey as identified in the Parks Master Plan, was to construct trail connections between existing and/or future park developments. This project not only satisfies that request, but also provides trail connections to neighborhoods, schools, between major thoroughfares, and potentially to future commercial developments to the southeast. 300 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: BLESSING BRANCH PARK IMPROVEMENTS Approximately 28,000 square feet of 4"x8' concrete trail @ $6 square foot $168,000 $0 Playground/Border $30,000 $0 Picnic pads w/grills $10,000 Shade shelter/pavilion/gazebo $30,000 Trail Lighting $20,000 $0 Playground chips $5,400 Contingency 10%$11,640 $0 $0 $0 $0 $275,040 0% XX 0% 0% 0% 0% The proposed method of finance is EDC Fund Balance. 301 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES February 11,2009 RAY MCDONALD EULESS FLC PHASE II- OUTDOOR AQUATICS DESIGN DESIGN IMPROVEMENTS B The City of Euless has for many years recognized the importance of planning for parks, recreation, and open space based on the needs as expressed by the citizens. In the plan development process for the recent update to the Parks Master Plan and as part of the City’s five year master plan, a scientific survey of park, recreation, and open space needs was conducted from a sample of randomly selected citizens in Euless. From this valuable information, a list of priorities was identified. A new Outdoor Aquatic Center was identified as a top priority. The project consists of the design of an outdoor family aquatic center which will include various play components such as a leisure pool, slides, aqua play features, shade structures, a bath house, and all the necessary filtration systems to support the aquatic features. The project also involves redevelopments/ improvements to the entire site such as relocating the tennis courts and the construction of various trails, a group pavilion, an amphitheater, multi-use sport courts, additional picnic stations with grills, a nature area, a botanical garden, and public art display(s). FY2015 The City population is sufficient to support an outdoor family aquatic center. The City's existing aquatic facilities have aged and maintaining the pools and support facilities has been an ongoing issue and concern. The expenses necessary to maintain and operate the pools each season continue to increase, far exceeding the revenue generated by the pools. Continuing in repair mode is no longer possible at the Wilshire and South Euless Pools and a long-term plan is necessary. Given the fact that two of the neighborhood pools are over thirty years old and the cost to renovate, repair, or replace them is estimated at over one million dollars each, it is recommended that the city concentrate its efforts and resources toward the family aquatic facility to serve the citizens of Euless. Project approval requires revision of the master planning of Midway Park. The FLC project eliminates the current ball fields and requires the relocation of the the existing tennis courts, which will be replaced with the necessary support facilities to serve the project such as parking, lighting, landscaping, and recreational amenities such as pavilions, picnic stations, open space, sand volleyball court(s), and trails. 302 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: EULESS FLC PHASE II- OUTDOOR AQUATICS DESIGN Engineering $469,000 $0 $0 $0 $0 $0 $0 $0 $469,000 0% 0% 0% 0% 0% XX 303 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES February 11,2009 RAY MCDONALD EULESS FLC PHASE III- INDOOR AQUATICS DESIGN DESIGN INDOOR AQUATIC CENTER B The City of Euless has identified, as part of the city’s five year master plan, the need for an indoor aquatic center. The design of an indoor aquatic center will allow the City to serve the growing population by expanding services and programs for citizens. The project consist of the design of an indoor aquatic center (approximately 8,600 square feet) that includes a lap / leisure pool, current channel, slide, and therapy pool. This multi-purpose facility would be attached to the senior center and would serve the senior population, as well as the general public and would be used for various aquatic programs including aerobics / wellness classes, swim lessons, rehabilitation opportunities, and would also be used as a rental facility for birthday and private parties. FY2015 The City of Euless has for many years recognized the importance of planning for parks, recreation, and open space based on the needs as expressed by the citizens. In the plan development process for the recent update to the Parks Master Plan and as part of the City’s five year master plan, a scientific survey of park, recreation and open space needs was conducted from a full sample of randomly selected citizens in Euless. From this valuable information, a list of priorities was identified. An indoor aquatic center was identified as a high priority for aquatic facilities that the city currently lacks. An indoor aquatic center would allow staff the opportunity to serve the growing population by expanding services and programs for all citizens. 304 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: EULESS FLC PHASE III- INDOOR AQUATICS DESIGN Engineering $317,500 $0 $0 $0 $0 $0 $0 $0 $317,500 0% 0% 0% 0% 0% XX 305 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: FLEET & FACILITIES OPERATIONS May 07,2007 KYLE MCADAMS DEVELOPMENT/ENGINEERING BUILDING BUILDING REMODEL/EXPANSION B This project is part of the City's five year master plan and is the third of six proposed projects. The development and engineering building received a major remodel in 1996 with renovation of the building's interior. But due to limited funding at that time, certain elements could not be justified as part of the remodel. This upgrade will allow for construction of a new entrance facade to match the other campus structures. Security issues pertaining to controlled access will be addressed as well as renovation of the Fuller Room into a functional conference area. Public restroom facilities will be relocated to meet ADA/Texas Accessibility Standards, the interior will be upgraded, and new carpet will be installed throughout the facility. Bid Specifications: August 1, 2015 Bid Project: December 1, 2015 Receive Bids: January 1, 2016 Council Approval: February 1, 2016 Start Construction: February 1, 2016 306 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: DEVELOPMENT/ENGINEERING BUILDING Construction $1,400,000 Architect 8%$112,000 Survey & Testing Fees $4,000 Interior & Exterior Signage $5,500 $2,000 Furniture $250,000 $3,500 Fixtures $38,000 Instruments & Apparatus $2,000 Insurance $750 Data & Telephone $7,500 Alarm & Security Services $3,500 $6,250 Janitorial Service/Pest Control $2,230 PM & Minor Repairs $10,100 Unscheduled Maintenance $11,250 Renewal & Replacement $25,000 $48,580 $54,830 $1,822,500 25% 0% 0% 0% 0% XX 307 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES February 11,2009 RAY MCDONALD EULESS FLC PHASE II-OUTDOOR AQUATICS CONSTRUCTION CONSTRUCTION OUTDOOR AQUATIC CENTER B The City of Euless has for many years recognized the importance of planning for parks, recreation, and open space based on the needs as expressed by the citizens. In the plan development process for the recent update to the Parks Master Plan and as part of the City’s five year master plan, a scientific survey of park, recreation, and open space needs was conducted from a sample of randomly selected citizens in Euless. From this valuable information, a list of priorities was identified. A new Outdoor Aquatic Center was identified as a top priority. The project consists of the construction of an outdoor family aquatic center which will include various play components such as a leisure pool, slides, aqua play features, shade structures, a bath house, and all the necessary filtration systems to support the aquatic features. The project also involves redevelopments/ improvements to the entire site such as relocating the tennis courts and the construction of various trails, a group pavilion, an amphitheater, multi-use sport courts, additional picnic stations with grills, a nature area, a botanical garden, and public art display(s). FY2016 The City population is sufficient to support an outdoor family aquatic center. The City's existing aquatic facilities have aged and maintaining the pools and support facilities has been an ongoing issue and concern. The expenses necessary to maintain and operate the pools each season continue to increase, far exceeding the revenue generated by the pools. Continuing in repair mode is no longer possible at the Wilshire and South Euless Pools and a long-term plan is necessary. Given the fact that two of the neighborhood pools are over thirty years old and the cost to renovate, repair, or replace them is estimated at over one million dollars each, it is recommended that the city concentrate its efforts and resources toward the family aquatic facility to serve the citizens of Euless. Project approval requires revision of the master planning of Midway Park. The FLC project eliminates the current ball fields and requires the relocation of the the existing tennis courts, which will be replaced with the necessary support facilities to serve the project such as parking, lighting, landscaping, and recreational amenities such as pavilions, picnic stations, open space, sand volleyball court(s), and trails. 308 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: EULESS FLC PHASE II-OUTDOOR AQUATICS CONSTRUCTION Construction $4,684,538 Contingency 5%$257,813 $0 Inflation 5%$257,649 $0 $0 $0 $0 $0 $0 $5,200,000 0% 0% 0% $4,700,000 0% $500,000 0% 309 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES February 11,2009 RAY MCDONALD EULESS FLC PHASE III-INDOOR AQUATICS CONSTRUCTION CONSTRUCTION INDOOR AQUATIC CENTER B The City of Euless has identified, as part of the city’s five year master plan, the need for an indoor aquatic center. Construction of an indoor aquatic center will allow the City to serve the growing population by expanding services and programs for citizens. The project consists of the construction of an indoor aquatic center (approximately 8,600 square feet) that includes a lap / leisure pool, current channel, slide, and therapy pool. This multi-purpose facility would be attached to the senior center and would serve the senior population, as well as the general public and would be used for various aquatic programs including aerobics / wellness classes, swim lessons, rehabilitation opportunities, and would also be used as a rental facility for birthday and private parties. FY2016 The City of Euless has for many years recognized the importance of planning for parks, recreation, and open space based on the needs as expressed by the citizens. In the plan development process for the recent update to the Parks Master Plan and as part of the City’s five year master plan, a scientific survey of park, recreation and open space needs was conducted from a full sample of randomly selected citizens in Euless. From this valuable information, a list of priorities was identified. An indoor aquatic center was identified as a high priority for aquatic facilities that the city currently lacks. An indoor aquatic center would allow staff the opportunity to serve the growing population by expanding services and programs for all citizens. 310 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: EULESS FLC PHASE III-INDOOR AQUATICS CONSTRUCTION Grading/Utilities/Electrical $100,000 Indoor Pool Building $3,000,000 $0 Furnishings and Equipment $75,000 $0 Contingency 10% $318,000 $0 $0 $0 $0 $0 $3,493,000 0% 0% 0% 0% $750,000 0% $2,743,000 311 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES May 01,2010 RAY MCDONALD TEXAS STAR SPORTS COMPLEX PHASE V LAND IMPROVEMENTS B Texas Star Sports Complex Phase V incorporates the addition of four (4) additional multi-use playing fields (four - plex). This addition could also incorporate a multi-use all-season playing surface that will allow for additional recreational sports programming, baseball league and tournament play, and softball (adult and girls fast-pitch). With the closure of athletic fields at Midway Park, and the proposed relocation of Softball World, the addition of this complex will ensure that the Texas Star Sports Complex is positioned as a premier facility that serves the athletic and recreational programming needs of the city. The project includes the design and construction of four (4) multi-use playing fields (four-plex). The four-plex will feature bleacher/terraced sitting similar to that of the existing structures at the facility, as well as a location for softball (adult and girl's fast pitch), youth baseball (recreational and select), and other recreational sports. FY2016 The aging facility of Softball World would require a significant capital investment; this investment would not be required with the consolidation and movement of this operation to the Parks At Texas Star, collectively known as Texas Star Sports Complex. With the completion of Phase V, the new multi-use Texas Star Sports Complex will serve the athletic needs of the community and spur economic opportunities for the city. 312 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: TEXAS STAR SPORTS COMPLEX PHASE V Grounds/Utilities $290,000 Fencing (Est)$125,000 $0 Turf/Irrigation $360,000 $0 Terrace Seating/Bleacher/Dug Outs $2,162,000 Lighting (Piers / Relocation / Concrete)$250,000 Alt 1 (All Season Play Surface)$425,000 5% Contingency $180,000 10% Indirect Cost $360,000 $0 $0 $0 $4,152,000 0% 0% 0% 0% 0% XX Note: Operating currently under the TSSC umbrella, Softball World's proposed relocation to Parks At Texas Star, under this phase, will cover all operating cost of the new operations. Accordingly, no additional baseline expenses are anticipated. 313 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: FLEET & FACILITY OPERATIONS May 07,2007 KYLE MCADAMS ANIMAL SHELTER-EXPANSION/RENOVATION CONSTRUCTION REMODEL/EXPANSION C This project is part of the City's five year master plan and is the fourth of six proposed projects. The project consists of the expansion of the current animal shelter facility to better accommodate visitors, adoptions, and animal services. The project scope includes the addition of ten (10) enclosed dog runs, six (6) quarantine runs, an adoption room, additional room for cat containment, and an area for animal washing . Office space expansion will be included in the renovation as well as updates to the public / employee restrooms. The current animal control facility has insufficient space to meet current and future demands. 314 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: ANIMAL SHELTER-EXPANSION/RENOVATION Engineering - To Be Determined Construction - To Be Determined Insurance PM & Minor Repairs Unscheduled Maintenance Renewal & Replacement Pest Control 25% 0% 0% 0% 0% XX 315 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES May 12,2008 RAY MCDONALD COMMUNITY CENTER FOR SOUTH EULESS LAND/FACILITY IMPROVEMENTS C Identified in the adopted Parks Master Plan is the need for an additional recreation center to serve the citizens in South Euless. Constructing a community recreation center in south Euless would satisfy a demand that was clearly identified in the scientific survey of the adopted Parks Master Plan. Presently, the citizens living in south Euless must travel across major thoroughfares in order to participate in any recreational activities and/or programs that necessitate an indoor setting or that are programmed currently at the Midway Recreation Center. Current membership at the Midway Recreation Center would substantiate the claim that the residents in south Euless will not travel north to participate in recreational activities. A computer-generated report proved in 2007 that of the 2,576 members, 1,892 of them lived in the 76039 zip code as compared to 684 in the 76040 zip code. 316 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: COMMUNITY CENTER FOR SOUTH EULESS Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 317 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES May 12,2008 RAY MCDONALD EMERGENCY CALL BOXES AMENITY IMPROVEMENTS C Identified in the Needs Assessment and Identification section of the adopted Parks Master Plan is the installation of emergency call boxes in various parks within the park system. As the population grows and participation in park related leisure activities increases, it's important to consider opportunities to make parks safe for citizens. By installing emergency call boxes in various parks and along the trail system, citizens would be able to reach first responders immediately should an emergency situation arise where a person would need critical public safety assistance. This project would provide the citizens the ability to call directly to public safety dispatch should an emergency situation occur in one of the many park facilities located in Euless. 318 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: EMERGENCY CALL BOXES Equipment & Installation - TBD $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 319 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: FLEET & FACILITY OPERATIONS May 07,2007 KYLE MCADAMS FIRE TRAINING CENTER & TOWER CONSTRUCTION NEW CONSTRUCTION C This project is part of the city's five year master plan and is the final of six proposed projects. The site will be located in the area surrounded by the Texas Star Sports Complex softball fields and the Parks Maintenance Facility. The complex will be located on a 236' x 222' concrete slab and will consist of a five story 22' x 33' tower, a two story 22' x 34' training maze room, and a 14' burn room adjacent to the maze room. The facility must allow room for full maneuvering of fire trucks on all sides of the structure. Since the structure will be within the Texas Star Sports Complex the area surrounding the training center can be utilized for additional parking when not in use for training purposes. 320 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: FIRE TRAINING CENTER & TOWER Engineering - To Be Determined Construction - To Be Determined Insurance PM & Minor Repairs Unscheduled Maintenance Renewal & Replacement Pest Control 25% 0% 0% 0% 0% XX 321 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES May 13,2008 RAY MCDONALD KIDDIE CARR PARK IMPROVEMENTS LAND IMPROVEMENTS C The adopted Parks Master Plan recommends funding for system-wide park facilities and amenities upgrades. This project includes the construction or installation of a pavilion, a concrete trail connection to Carr Park, bank stabilization along Boyd Branch Creek which runs through the park, a playground, park lighting, picnic stations, an irrigation system, new perimeter fencing, a drinking fountain, benches, and a dedicated parking lot at Kiddie Carr Park. TBD As identified in the adopted Parks Master Plan, the municipal park is the foundation of any solid parks and recreational system. The City of Euless parks and recreation system provides residents and visitors with significant personal, social, environmental, and economic benefits. The revitalization efforts that the Euless City Council has focused on over the years has increased the sense of community pride. Kiddie Carr Park is a four acre park located adjacent to Carr Park off Pauline. The current amenities at this park include the Parks Department's in-ground tree farm, a greenhouse, and an outdoor basketball court. The park is located in a section of town that needs something to stimulate community pride. The proposed project will continue the City Council's revitalization efforts by creating an area that will serve both the passive and active leisure needs of the residents in this area. 322 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: KIDDIE CARR PARK IMPROVEMENTS Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 323 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES May 05,2008 RAY MCDONALD SOUTH EULESS WATER FEATURE FACILITY IMPROVEMENTS C The adopted Parks Master Plan calls for the renovation of the South Euless Pool. This aquatic facility has not received any major renovations since it opened in 1972. This request will probably be revised and/or withdrawn upon completion of the family aquatic facility. Recommendations made in both the adopted Parks Master Plan and the Swimming Pool Audit addressed major renovations that were needed at South Euless Pool. The estimated cost for these renovations was approximately $1.3 million. Because of limited space as well as parking, this project will need to be carefully thought through and a decision will need to be made to either spend the money to renovate this existing facility or use the funds toward the construction of a family aquatic facility. This has been documented in both the Swimming Pool Audit and the adopted Parks Master Plan. 324 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: SOUTH EULESS WATER FEATURE Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 325 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES May 12,2008 RAY MCDONALD TRAIL CONNECTION-SOUTH EULESS LAND IMPROVEMENTS C Identified in the adopted Parks Master Plan is the need for additional trail connections from neighborhoods to parks. There is as very high interest in trails and trail connectivity as identified in the scientific survey in the adopted Parks Master Plan. Eighty-eight percent of those participating in the survey identified the need for trail connections between neighborhoods and parks. Additionally, sixty-eight percent identified the need for trail connectivity to schools as a top priority. This project would allow for safe access to South Euless Park from adjacent neighborhoods as well as South Euless Elementary from the adjacent neighborhood to the south. The City of Euless has experienced significant progress in the last few years in the area of trail development with an extensive network of paved and unpaved trails. The trail system is a valuable asset to the community as it assists not only in providing a safe means for non-vehicular travel, but also in providing an opportunity for a variety of unstructured, low-impact recreational pursuits. The continued development and maintenance of the trails system received a great deal of support from the citizens as indicated in the responses to the scientific survey and has also been supported by past updates to the Parks Master Plan. 326 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: TRAIL CONNECTION-SOUTH EULESS Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 327 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES May 12,2008 RAY MCDONALD TRAIL ENHANCEMENTS- PHASE I TRAILS IMPROVEMENTS C Identified in the Needs Assessment and Identification section of the adopted Parks Master Plan are a number of trail related improvements. This project consists of the first phase of implementation of park improvements identified in the adopted Parks Master Plan which includes additional water fountains, additional benches, construction of shaded seating areas along the trail, additional and/or installation of new exercise equipment along the trails, picnic stations, and construction of additional pedestrian bridges in high water areas. Also identified is the need to address various areas along the trail that need to be converted from unpaved to paved trails. The City of Euless has experienced significant progress in the last few years in the area of trail development with an extensive network of paved and unpaved trails. The trails system is a valuable asset to the community as it assists not only in providing a safe means for non-vehicular travel, but also in providing an opportunity for a variety of unstructured, low-impact recreational pursuits. The continued development and maintenance of our trails system received a great deal of support from the citizens as indicated in the responses to the Scientific Survey and has also been supported by past updates to the Parks Master Plan. 328 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: TRAIL ENHANCEMENTS- PHASE I Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 329 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES May 13,2008 RAY MCDONALD TRAIL ENHANCEMENTS- PHASE II TRAILS IMPROVEMENTS C This enhancement was identified in the Needs Assessment and Identification section of the adopted Parks Master Plan are a number of trail related improvements. This project is phase II of the trail enhancements that continues implementation of park Improvements identified in the adopted Parks Master Plan which includes additional water fountains, additional benches, construction of shaded seating areas along the trail, additional and/or installation of new exercise equipment along the trails, picnic stations, and construction of additional pedestrian bridges in high water areas. Also identified is the need to address various areas along the trail that need to be converted from unpaved to paved trails. The City of Euless has experienced significant progress in the last few years in the area of trail development with an extensive network of paved and unpaved trails. The trails system is a valuable asset to the community as it assists not only in providing a safe means for non-vehicular travel, but also in providing an opportunity for a variety of unstructured, low-impact recreational pursuits. The continued development and maintenance of our trails system received a great deal of support from the citizens as indicated in the responses to the scientific survey and has also been supported by past updates to the Parks Master Plan. 330 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: TRAIL ENHANCEMENTS- PHASE II Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 331 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES March 23,2004 RAY MCDONALD TRAIL ENHANCEMENTS-VILLAGES OF BEAR CREEK OTHER IMPROVEMENTS C This project includes the infrastructure improvements as recommended as high priority in the adopted Parks Master Plan. This project includes the redevelopment/redesign and improvement of the trail at the Villages of Bear Creek Park to offer multiple uses for the citizens of Euless. Trail development and enhancement opportunities will be consistent with available land, funding and time variables. This Master Plan recommendation will be part of a city-wide comprehensive trail enhancement project. Due to the continual erosion of the existing trail, a redevelopment/redesign of the trail system at Villages of Bear Creek will be a high priority. 332 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: TRAIL ENHANCEMENTS-VILLAGES OF BEAR CREEK Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 333 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES May 13,2008 RAY MCDONALD TRAIL LIGHTING-PHASE II FIXTURES IMPROVEMENTS C Identified in the Needs Assessment section of the adopted Parks Master Plan is the addition of trail lighting in various parks where trails are located. This request is for the second phase of a project dedicated to satisfying that need. This project continues the installation of trail lighting along the Trails of Euless similar to what was installed along the trail through Midway Park. Parks that have been identified as needing trail lighting are: Trailwood Park. The Preserve at McCormick Park, The Villages of Bear Creek Park, and Heritage Park. Not all of the parks identified are included in this phase, but rather in future phases of an overall Trail Lighting project. Trails in the area have become popular and lighting trails could extend hours of usage as well as provide for increased visibility/security for remote trail areas. 334 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: TRAIL LIGHTING-PHASE II Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 335 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES May 13,2008 RAY MCDONALD TRAILWOOD PARK IMPROVEMENTS LAND IMPROVEMENTS C This project is a continuation of the overall park improvement plan as identified in the Parks Master Plan. Trailwood Park is an eleven acre site that currently has a playground and a half-mile hike/bike trail. This project includes the installation of a new pavilion, a parking lot, a non-paved nature trail on the east end of the park, upgrade the playground to meet ADA standards, park lighting, new park signs, benches along the trail, and trail lighting. As identified in the adopted Parks Master Plan, the municipal park is the foundation of any solid parks and recreational system. The City of Euless parks and recreation system provides the residents and visitors with significant personal, social, environmental and economic benefits. The revitalization efforts that the Euless City Council has focused on over the years has increased the sense of community pride. This proposed project will continue those efforts by creating an area that will serve both the passive and active leisure needs of the residents in the vicinity. 336 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: TRAILWOOD PARK IMPROVEMENTS Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 337 City of Euless Capital Project Request Department: Date Prepared: Submitted By: Date Completed: Project Title: Project Type: Sub-Type: Project Code: Priority: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES May 05,2008 RAY MCDONALD WILSHIRE PARK WATER FEATURE FACILITY IMPROVEMENTS C The adopted Parks Master Plan calls for the renovation of Wilshire Pool. This aquatic facility has not received any major renovations since it opened in 1972. This request will most likely be revised or withdrawn upon completion of the aquatic portion of the family life center. Recommendations made in both the adopted Parks Master Plan and the Swimming Pool Audit addressed major renovations that were needed at Wilshire Pool. The estimated cost for these renovations was approximately $1.3 million. Because of limited space as well as parking, this project will need to be carefully thought through and a decision will need to be made to either spend the money to renovate this existing facility or use the funds toward the construction of a family aquatic facility. Documented in both the Swimming Pool Audit and the adopted Parks Master Plan. 338 PROJECT TITLE: NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel: Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Maintenance Costs Subtotal: Total Estimated Annual Cost Total Estimated Capital Cost PROPOSED METHOD OF FINANCE: CURRENT STATUS: Operating Fund Conceptual Design % Fund Balance Preliminary Design % Special Project Fund Final Plans % Certificate of Obligation Specifications % County, State, Federal Funding Construction % General Obligation Bonds Revenue Bonds Donations Supplemental Sales Tax Car Rental Tax Fund To Be Determined ADDITIONAL COMMENTS: WILSHIRE PARK WATER FEATURE Engineering - To Be Determined Construction - To Be Determined $0 $0 $0 $0 $0 $0 $0 0% 0% 0% 0% 0% XX 339 340 COMPLETED  DRAINAGE PROJECTSDRAINAGE PROJECTS CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Date Completed Total Budget Total Project Costs (Over) Under Budget DRAINAGE PROJECTS DR9901 Sulphur Branch Phase II 08/01/99 123,404$ 120,128$ 3,276$ DR9902 Windlea & WestCliff 08/01/99 4,396$ 1,159$ 3,237$ DR9904 Hurricane Creek 04/31/02 257,500$ 69,906$ 187,594$ DR0302 Flooding Mitigation Cancelled 250,000$ -$ 250,000$ DR0303 Aransas @ Glenn 12/31/04 250,000$ 250,000$ -$ DR0304 Live Oak Drainage 04/15/05 218,000$ 175,958$ 42,042$ DR0305 Sierra Drive Drainage 04/15/05 40,738$ 40,738$ 0$ DR0306 Flood Mitigation Plan(FEMA)04/15/05 32,000$ 7,750$ 24,250$ DR0307 Simmons Drainage 04/15/05 22,995$ 22,995$ -$ DR0301 Fuller Branch Channel Stabilization 05/31/07 279,136$ 232,176$ 46,960$ DR0401 Channel Stabilization Tributary WFA 05/31/07 437,462$ 438,070$ (608)$ DR0402 Drainage Project Study 05/31/07 60,000$ 51,000$ 9,000$ DR0601 Little Bear Creek Study Update 04/25/08 50,000$ 49,000$ 1,000$ DR0602 McCormick Park 04/25/08 250,000$ 247,925$ 2,075$ 2,275,631$ 1,706,805$ 568,826$ DR0701 Eastcliff Drive/Greenbriar Drive Drainage Imp. 04/17/10 340,000$ 246,584$ 93,416$ DR0801 Rockwall Drive/Lamar Drive Drainage Imp.04/17/10 430,000$ 272,554$ 157,446$ 770,000$ 519,138$ 250,862$ Total Drainage Projects 3,045,631$ 2,225,943$ 819,688$ Project Number Project Description Drainage Projects - Prior Years Drainage Projects - Current Year 341 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 15,2005 RON YOUNG Apr 17, 2010 EASTCLIFF DRIVE/GREENBRIAR DRIVE IMPROVEMENTS DRAINAGE IMPROVEMENTS DR0701 November 26, 2008: Authorized the city manager to execute a design contract with Freese and Nichols, Inc. in the amount of $32,500. March 10, 2009: Authorized the city manager to execute a contract with 2L Construction, LLC, in the amount of $240,105 for drainage improvements. In 2005, the city commissioned and received a drainage plan from Freese and Nichols, Inc. Additional inlets and pipe systems will be constructed to contain the flows within the city drainage systems. The system will extend from the low point on Eastcliff Drive up Greenbriar Drive several hundred feet. Award Engineering Contract: November 2006 Award Construction Contract: March 2009 Begin Construction: May 2009 Complete Construction: August 2009 In moderate storms the drainage capacity in the streets is exceeded causing flooding of several homes. The construction of this project will help prevent the flooding of those homes. 342 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering $40,000 Construction $300,000 $340,000 Transfers from: Drainage Operating Fund $320,000 Drainage CIP Fund Balance $20,000 Transfer to: Drainage CIP Fund Balance ($93,416) $246,584 Engineering $40,000 $30,507 $9,493 76% Storm Sewers $300,000 $216,077 $83,923 72% $340,000 $246,584 $93,416 73% EASTCLIFF DRIVE/GREENBRIAR DRIVE IMPROVEMENTS DR0701 343 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 15,2005 RON YOUNG Apr 17, 2010 ROCKWALL DRIVE/LAMAR DRIVE IMPROVEMENTS DRAINAGE IMPROVEMENTS DR0801 April 30, 2009: Design contract awarded to Halff Associates for $38,000. May 26, 2009: Authorized the city manager to execute a contract with N.A.E. Enterprises, Inc. for drainage improvements in an amount of $269,359.75. In 2005, the city commissioned and received a drainage plan from Freese and Nichols, Inc. A flume is to be reconstructed and additional inlets and pipe systems are to be built from Midway Drive up Lamar Drive to the intersection of Rockwall Drive. Award Design Contract: April 2008 Plans Complete: March 2009 Right Of Way Complete: March 2009 Award Construction Contract: May 2009 Construction Complete: October 2009 In moderate storms, the drainage capacity in a flume and the streets is exceeded, causing flooding of several homes. The construction of the project will help prevent the flooding of those homes. 344 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering $50,000 Construction $380,000 $430,000 Transfers from: Drainage Operating Fund $300,000 Drainage CIP Fund Balance $130,000 Transfer to: Drainage CIP Fund Balance ($157,446) $272,554 Engineering $50,000 $32,288 $17,712 65% Storm Sewers $380,000 $240,266 $139,734 63% $430,000 $272,554 $157,446 63% ROCKWALL DRIVE/LAMAR DRIVE IMPROVEMENTS DR0801 345 346 COMPLETED  STREET PROJECTSSTREET PROJECTS CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Date Completed Total Budget Total Project Costs (Over) Under Budget STREET PROJECTS PS9902 Mid Cities Blvd.05/02/02 1,075,074$ 963,635$ 111,439$ PS9903 HWY 183 Service Road Cancelled -$ -$ -$ PS9907 Westpark Way -SH10 to SH183 09/30/00 605,542$ 479,915$ 125,627$ PS9906 Traffic Safety/Signalization 05/31/08 128,027$ 127,939$ 88$ PS9908 Signalization 05/31/06 168,055$ 168,055$ -$ PS9910 Sidewalks 06/30/03 200,000$ 200,000$ -$ PS9911 Overlay Projects 03/30/00 294,687$ 294,687$ -$ PS9912 Harwood-Main Intersection 04/30/00 1,126,935$ 1,077,303$ 49,632$ PS0001 FM 157 S Pipeline to SH10 (Utility Relocation) 04/30/04 378,207$ 371,318$ 6,889$ PS0003 Glade from Heritage to SH121 04/30/04 1,866,612$ 1,866,612$ -$ PS0004 Glade Rd (East) - SH121 to Champagne 04/30/04 1,210,014$ 1,162,009$ 48,005$ PS0201 Gateway Blvd - Southern Portion 04/30/04 510,000$ 473,817$ 36,183$ PS0301 Mid Cities Roadway Illumination 04/15/05 160,000$ 148,115$ 11,885$ PS0302 Driftwood Pipeline Traffic Signal 04/15/05 100,000$ 68,665$ 31,335$ PS0303 Aransas/Harwood Traffic Signal 04/15/05 120,000$ 89,118$ 30,882$ PS0401 West Pipeline - Raider to City Limits 05/31/06 223,000$ 104,859$ 118,141$ PS0402 South Pipeline Road Bridge 04/30/05 28,208$ 28,208$ -$ PS0403 Raider Dr -SH10 to South Pipeline 05/31/06 330,000$ 293,435$ 36,565$ PS0404 South Pipeline Road Overlay 05/31/08 114,750$ 85,062$ 29,688$ PS0501 Ross Avenue/S.Main 300' W 05/31/06 95,688$ 95,638$ 50$ PS0502 Industrial Signal Timing 05/31/06 50,000$ 50,000$ -$ PS0503 Overlay-Harwood 157/Main 05/31/06 137,000$ 119,816$ 17,184$ PS0604 Overlay-S.Main, SH10/S.Pipeline 05/31/06 137,000$ 140,211$ (3,211)$ PS0601 Overlay-East Midway 05/31/07 83,000$ 73,550$ 9,450$ PS0602 Overlay-Midway, N Main,/FM157 05/31/07 105,000$ 67,632$ 37,368$ PS0603 Overlay-Fuller Wiser, Midway/Harwood 05/31/07 40,000$ 28,695$ 11,305$ PS0701 Overlay-Dickey Drive 05/31/08 122,200$ 48,435$ 73,765$ PS0702 Overlay-East Huitt 05/31/08 89,000$ 64,895$ 24,105$ PS0703 Overlay-Huntington Drive 05/31/08 69,500$ 42,884$ 26,616$ PS0706 Gateway Blvd Screening Wall 05/31/08 135,800$ 138,862$ (3,062)$ PS0002 West Pipeline Road-Raider/Hwy10 12/01/08 6,082,621$ 6,081,392$ 1,229$ PS0704 Disability Access Study 05/31/09 30,000$ 13,950$ 16,050$ PS0705 Signal Gateway Blvd @ Glade 10/28/08 98,000$ 98,000$ -$ PS0801 Overlay-North Main/Cullum Drive 12/31/08 290,000$ 211,130$ 78,870$ PS9905 Traffic Studies 05/30/09 27,286$ 27,197$ 89$ 16,231,206$ 15,305,038$ 926,168$ PS9909 FM157 North - SH183 to SH121 04/16/10 267,519$ 129,215$ 138,304$ PS0304 Glade Road 04/16/10 3,077,977$ 2,905,205$ 172,772$ PS0901 Ash/Denton/Fair Oaks Overlay 04/16/10 320,000$ 231,984$ 88,016$ PS0903 Mid Cities @ Gateway & Baze Traffic Signals 04/16/10 320,000$ 250,702$ 69,298$ 3,985,496$ 3,517,106$ 468,390$ Total Street Projects 10,068,117$ 9,598,498$ 469,619$ Project Number Project Description Street Projects - Prior Years Street Projects - Current Year 347 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 17,1999 RON YOUNG Apr 16, 2010 FM157 NORTH, SH183 TO SH121 STREET CONSTRUCTION PS9909 February 2003: Signed an agreement with Oncor for street light installation. March 2003: Began negotiations with the Texas Department of Transportation for landscape projects in the medians. The Texas Department of Transportation (TXDOT) widened FM157 between SH183 and SH121 to a seven lane (5+2) undivided roadway section. This project includes the addition of landscaping in the FM157 medians and improvements to the existing pavement under the SH183 bridge. Landscaping Completed: FY2007-2008 Intersection Improvements: FY2008-2009 Construction Complete: July 2009 Improved visibility and enhanced aesthetics. 348 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Streets/Highways $129,215 $129,215 Transfers from: Street CIP Fund Balance $239,820 Escrow Funds $54,215 Transfers to: FM157 UT Relocation PS0001 ($26,516) Street CIP Fund Balance ($138,304) $129,215 Streets/Highways $267,519 $129,215 $138,304 48% (Expenses prior to FY99 not reflected) $267,519 $129,215 $138,304 48% FM157 NORTH, SH183 TO SH121 PS9909 349 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 31,1999 RON YOUNG Apr 16, 2010 GLADE ROAD STREET CONSTRUCTION PS0304 December 9, 2003: Approval of Resolution 03-1162 declaring intent to reimburse expenditures with proceeds of future debt. June 22, 2004: Approval of Resolution 04-1181 authorizing the interlocal agreement with the City of Grapevine. March 28, 2006: Approved recommending the City of Grapevine to award construction contract to JLB Contracting, LP in the amount of $5,228,709.56 with the City of Euless portion of the cost for paving, drainage and relocation of water mains to be $2,753,458.53. Glade Road is identified as a minor arterial in the 1999 Master Thoroughfare Plan. This is a continuation of the roadway improvements on Glade Road from SH121 to Champagne Drive completed in 2001. The City of Grapevine awarded a design contract in April 2003. The utility relocation began in January 2006. The street construction improvements began in May 2006. The roadway project consists of replacing the existing two-lane asphalt pavement with a four lane concrete roadway, including a median and protected turn lanes. Signalization will be provided at Baze Road and at North Main Street. The southern half of the project lies within the City of Euless. Adjustment or relocation of the City of Euless water main along the south side of Glade Road from approximately Roxboro Road to SH360 is required in advance of the road construction. Construction Complete: June 2008 The City of Grapevine had scheduled design for Glade Road in 2002-2003 and assumed the entire cost for plan preparation. Since the southern half of the proposed roadway construction lies within the City of Euless, that portion of construction costs lies with the City of Euless. 350 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Right-of-Way $90,000 Contract Labor $20,000 Construction $2,302,871 Utility Relocation $326,000 Issuance Cost $25,000 Contingency 10% $314,105 $3,077,976 Developer's Escrow $146,976 Transfer from PS0004 $65,651 Street Fund Balance $140,349 Certificates of Obligation $2,725,000 Transfer to: Street CIP Fund Balance ($172,772) $2,905,205 Right-of-Way $90,000 $39,815 $50,185 44% Contract Labor $20,000 $17,604 $2,396 88% Streets/Highways $2,302,872 $2,312,504 ($9,632)100% Utility Relocation $326,000 $326,000 $0 100% Contingency $314,105 $184,282 $129,823 59% Issuance Cost $25,000 $25,000 $0 100% $3,077,977 $2,905,205 $172,772 94% GLADE ROAD PS0304 351 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 11,2008 RON YOUNG Apr 16, 2010 ASH LANE/DENTON DRIVE/FAIR OAKS BLVD. OVERLAY STREET OVERLAY PS0901 January 13, 2009: Authorized the city manager to execute an inter local agreement between the City of Euless and Tarrant County for asphalt overlay improvements. Ash Lane, Denton Drive, and Fair Oaks Boulevard are collector streets that the City of Euless plans to overlay in a cooperative project with Tarrant County. The project consists of edge milling, asphalt overlay, and striping on Ash Lane from Aransas to FM157, on Fair Oaks Boulevard from North Main Street to Ash Lane, and on Denton Drive from North Main Street to Fuller-Wiser Road. Begin Construction: April 2009 Construction Complete: June 2009 The existing asphalt pavement is deteriorating and is becoming a maintenance problem. The asphalt overlay will provide an improved riding surface, will extend the life of the roadway, and will enhance the appearance of the street. 352 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Construction $320,000 $320,000 Street CIP Fund Balance $320,000 Transfer to: Street CIP Fund Balance ($88,016) $231,984 Overlay $320,000 $231,984 $88,016 72% $320,000 $231,984 $88,016 72% ASH LANE/DENTON DRIVE/FAIR OAKS BLVD. OVERLAY PS0901 353 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 12,2007 RON YOUNG Apr 16, 2010 TRAFFIC SIGNALS-MID CITIES AT GATEWAY AND AT BAZE STREET LIGHTING PS0903 September 9, 2009: Authorized City Manager to execute a contract with Roadway Solutions, Inc. in the amount of $199,117.00 for the construction of the Gateway Boulevard and Baze Road signals on Mid Cities Boulevard. Traffic signals are located at the intersections of arterial and collector thoroughfares identified in the City of Euless Master Thoroughfare Plan adopted in 1999. The project consists of the installation of traffic signal poles, mast arms, signal heads, pedestrian indicators, underground conduit, vehicle detection and signal controllers for the intersection of Mid Cities Boulevard and Gateway Boulevard and for the intersection of Mid Cities Boulevard and Baze Road. Award Design: March 2009 Plans Complete: July 2009 Award Construction: September 2009 Construction Complete: March 2010 Traffic volumes at these intersections have been monitored and signal warrant studies performed to justify the signal installation. 354 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Engineering $40,000 Traffic Signals $280,000 $320,000 Car Rental Operating Fund $140,000 Street CIP Fund Balance $18,155 Escrow Funds $161,845 (ES0249-ES0254, ES0290) Transfer to: Street CIP Fund Balance ($69,298) $250,702 Engineering $40,000 $33,575 $6,425 84% Traffic Signals $280,000 $217,127 $62,873 78% $320,000 $250,702 $69,298 78% TRAFFIC SIGNALS-MID CITIES AT GATEWAY AND AT BAZE PS0903 355 356 COMPLETED  WASTEWATER PROJECTSWASTEWATER PROJECTS CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Date Completed Total Budget Total Project Costs (Over) Under Budget WASTEWATER PROJECTS WW9901 CDBG B/98-UC-48-0001/B95-22-50 08/19/00 150,000$ 72,927$ 77,073$ WW9902 Impact Fee Study 09/30/99 13,000$ 12,238$ 762$ WW9903 Misc Sewer Rehab FY99 09/30/99 50,000$ 12,987$ 37,013$ WW9904 Hydraulic Analysis 06/30/00 27,000$ 27,000$ -$ WW0001 CDBG B/99-UC-48-0001 09/30/01 150,000$ 121,682$ 28,318$ WW0003 TRA Debt Payment 05/31/01 822,037$ 822,037$ -$ WW0101 CDBG B00-UC480001-2250 02/20/02 251,485$ 247,790$ 3,695$ WW0102 Manhole Rehab. Program 03/31/03 250,000$ 184,520$ 65,480$ WW0201 CDBG - B01-UC-48-0001-22-50 03/31/03 237,086$ 172,948$ 64,138$ WW0103 Line replacement-S. Pipeline,Heather-Vine 04/15/05 489,759$ 464,504$ 25,255$ WW0202 Line Replacement -Dunaway 02/28/05 140,000$ 139,955$ 45$ WW0203 Line Replacement - E. Alexander 02/28/05 20,000$ 20,000$ -$ WW0204 Line Replacement - Paula Lane 02/28/05 79,000$ 79,000$ -$ WW0205 Line Replacement - Midway Park 04/30/05 366,000$ 318,149$ 47,851$ WW0301 CDBG B02-UC-48-0001-22-50 07/26/05 271,455$ 271,454$ 1$ WW0303 Line Replacement, Canyon Ridge 08/31/06 196,200$ 173,516$ 22,684$ WW0304 Line Replacement, Sagebrush 08/31/06 160,900$ 136,470$ 24,430$ WW0305 Line Replacement, Short 08/31/06 251,400$ 219,932$ 31,468$ WW0306 Line Replacement, E. Fuller 08/31/06 231,372$ 180,089$ 51,283$ WW0401 CDBG B03-UC-48-0001-22-50 04/30/05 217,000$ 161,170$ 55,830$ WW0402 Line Replacement, Carr Park/SH10 05/31/08 588,000$ 528,302$ 59,698$ WW0403 Line Replacement, Ector Drive 05/31/08 373,000$ 328,309$ 44,691$ WW0501 Line Replacement, Pebble Creek 08/31/06 172,600$ 145,655$ 26,945$ WW0302 Inflow & Infiltration Cancelled 200,000$ -$ 200,000$ WW0601 Line Replacement, Cedar Hills Estate 05/31/08 319,000$ 200,201$ 118,799$ WW0602 Line Replacement, Ector Drive 05/31/08 425,000$ 285,758$ 139,242$ WW0603 Little Bear Creek Collection Line 05/31/08 575,000$ 464,293$ 110,707$ WW0604 Line Replacement, CDBG-Oakwood Terrace 05/31/07 293,723$ 232,274$ 61,449$ WW0701 Line Replacement, McCormick & Copher 02/05/09 243,000$ 194,254$ 48,746$ WW0702 Line Replacement, Arnett Addition 02/05/09 313,322$ 229,006$ 84,316$ WW0703 Line Replacement, Jean Lane 02/05/09 111,000$ 70,603$ 40,397$ WW0704 Line Replacement, W. Fuller 02/05/09 132,000$ 82,708$ 49,292$ 8,119,339$ 6,599,731$ 1,519,608$ WW0902 Line Replacement, West Mills Drive-34th CDBG 04/16/10 46,855$ 46,855$ -$ 46,855$ 46,855$ -$ Total Wastewater Projects 8,166,194$ 6,646,586$ 1,519,608$ Project Number Project Description Wastewater Projects- Current Year Wastewater Projects - Prior Years 357 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS April 15,2005 RON YOUNG Apr 16, 2010 LINE REPLACEMENT, WEST MILLS DRIVE WASTEWATER MAINS WW0902 February 26, 2008: Approved the recommended project selection for the 34th year Community Development Block Grant project for wastewater main line replacement. February 10, 2009: Recommended Tarrant County award construction contract to Hall Albert Construction Company in the amount of $46,855.05 representing the total amount of the project. The West Mills Drive wastewater main is part of the City of Euless Wastewater System Master Plan. Systematic replacement of wastewater lines in drainage basin areas using a worst first approach. Replace wastewater mains along West Mills Drive between South Mills Drive and Simmons. Begin Construction: April 2009 Anticipate Construction Complete: June 2009 Many wastewater lines throughout the city are 40 plus years old. Most of the lines are clay tile and are susceptible to ground movement, root infiltration, and deterioration from hydrogen sulfide gas and other chemicals. Many are substandard in size and have inflow/infiltration problems. Systematic replacement will reduce maintenance costs and customer problems. 358 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Wastewater Main $46,855 $0 $0 $0 $0 $46,855 34th CDBG FY2009 $46,855 $0 $0 $0 $46,855 Wastewater Mains $46,855 $0 46,855 0% $46,855 $0 $46,855 0% LINE REPLACEMENT, WEST MILLS DRIVE WW0902 359 360 COMPLETED  WATER PROJECTSWATER PROJECTS CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Date Completed Total Budget Total Project Costs (Over) Under Budget WATER PROJECTS WT9901 Meter Change Out Program 10/30/99 101,917$ 98,365$ 3,552$ WT9903 Master Plan 08/30/99 42,000$ 5,445$ 36,555$ WT9904 Well Repairs 09/30/99 66,921$ 66,921$ -$ WT9905 Misc Water Rehab 06/30/00 50,000$ 43,749$ 6,251$ WT9906 Hwy 10 Water Line 01/30/00 150,000$ 138,883$ 11,117$ WT9907 Impact Fee Study 09/30/99 13,000$ 12,238$ 762$ WT9908 Mid Cities Blvd. 12" Line 04/30/04 342,080$ 313,354$ 28,726$ WT9909 2MG Water Tank 03/31/03 2,430,881$ 2,289,571$ 141,310$ WT9910 Water Line for Elevated Tank 05/31/02 1,608,386$ 1,201,698$ 406,688$ WT9911 Water Distribution - Master Plan 09/30/99 25,600$ 24,000$ 1,600$ WT0002 Emergency Repair - Hwy 10 11/30/99 15,450$ 14,214$ 1,236$ WT0003 Waterline Replacement - Aransas 06/30/01 12,057$ 7,089$ 4,968$ WT0004 Water Line Milam - Ector/Midway 06/30/00 18,248$ 13,743$ 4,505$ WT0005 Waterline Replacement - Milam- Denton/Mid 04/30/02 26,988$ 26,988$ -$ WT0006 Central Drive Water Mains 03/31/00 92,814$ 90,742$ 2,072$ WT0102 SCADA Upgrade 04/09/01 93,400$ 93,400$ -$ WT0103 Fire Hydrant Replacement Program 03/31/03 50,000$ 49,626$ 374$ WT0401 Line Replacement, West Pipeline Main 05/31/06 1,215,663$ 1,215,663$ -$ WT0403 Waterline Replacement - Fairlawn Court Cancelled 35,000$ -$ 35,000$ WT0404 Waterline Replacement - Atkerson Lane Cancelled 104,000$ -$ 104,000$ WT0405 Line Replacement, West Ash Lane 08/31/06 30,000$ 11,626$ 18,374$ WT0406 Line Replacement, Westport/Newport/Asbury 08/31/06 67,000$ 9,866$ 57,134$ WT0501 System Security Upgrade 05/31/08 40,000$ 28,319$ 11,681$ WT0502 FY'2005 CDBG 08/31/06 69,300$ 29,549$ 39,751$ WT0503 Line Replacement, S. Atkerson Lane 08/31/06 79,000$ 51,294$ 27,706$ WT0504 Line Replacement, Blanco Drive 08/31/06 112,620$ 112,620$ -$ WT0505 Line Replacement, Henslee 08/31/06 183,000$ 123,859$ 59,141$ WT0506 Line Replacement, Vernon/Slaughter 08/31/06 161,000$ 113,052$ 47,948$ WT0601 Wtr Sys Security Perimeter Fence Upgrade 05/31/08 75,000$ 49,567$ 25,433$ WT0602 Line Replacement, Cannon Drive 05/31/08 250,000$ 223,055$ 26,945$ WT0701 Line Replacement, Canyon Ridge 05/31/08 116,000$ 78,136$ 37,864$ WT0702 CDBG FY07 - 32nd Oakwood Terrace 05/31/08 334,481$ 296,223$ 38,258$ WT9902 Tank Painting 05/31/07 1,317,763$ 957,542$ 360,221$ WT0402 Water & Wastewater Impact Fee Update 05/31/09 30,000$ 17,729$ 12,271$ WT0801 Line Replacement, Signet/Mesa 05/31/09 255,000$ 218,663$ 36,337$ WT0802 CDBG-33rd Oakwood Terrace-Simmons 12/31/08 451,639$ 384,173$ 67,466$ 10,066,208$ 8,410,962$ 1,655,246$ WT0201 Well Rehabilitation/Disinfection 04/17/10 600,000$ 522,308$ 77,692$ 600,000$ 522,308$ 77,692$ Total Water Projects 10,666,208$ 8,933,270$ 1,732,938$ Project Number Project Description Water Projects - Prior Years Water Projects- Current Year 361 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: PUBLIC WORKS July 26,1999 RON YOUNG Apr 17, 2010 WELL REHABILITATION/DISINFECTION WATER WATER PRODUCTION WT0201 October 9, 2001: Awarded bid 054-01 to Millican Well Services, LLC for $55,130 for plugging three water wells at 1100 Central Drive with a contingency of $13,750. October 23, 2001: Authorized the city manager to proceed with emergency plugging of Harwood Trinity water well by Layne-Texas in the amount of $29,450 and to proceed with emergency rehabilitation of the Far North Trinity water well by Layne-Texas at an estimated expenditure of $92,254. October 8, 2002: Awarded contract to Tank Builders for the Fuller ground storage reservoir in the amount of $222,600 plus a contingency in the amount of $11,180. This project consists of inspecting deep wells to determine the condition of well pipe, casing, screens, gravel packing and rehabilitating items that are found to be in need. It also includes adding ammonia injection facilities at each of the three well sites. Fuller Tank Complete Ammonia/Chlorine Feed Building: Design Complete Begin Construction: Fall 2007 Construction Complete: June 2009 Wells are old and heavily used. All three deep wells need to be rehabilitated according to needs determined by inspection. The Environmental Protection Agency, Texas Natural Resources Conservation Commission, and Safe Drinking Water Act mandate disinfection by-product limits. If test results indicate non-compliance, the need to modify the disinfection process or cease well operation will be necessary. 362 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Modification $60,000 $60,000 Transfer from: W/WW Operating Fund $600,000 Transfer to: W/WW CIP Fund Balance ($77,692) $522,308 Well Rehabilitation $600,000 $522,308 $77,692 87% $600,000 $522,308 $77,692 87% WELL REHABILITATION/DISINFECTION WT0201 363 364 COMPLETED  OTHER PROJECTSOTHER PROJECTS CAPITAL IMPROVEMENTS PROGRAM COMPLETED PROJECTS SUMMARY Date Completed Total Budget Total Project Costs (Over) Under Budget OTHER PROJECTS AC9901 Athletic Complex Phase II 06/30/02 123,654$ 75,047$ 48,607$ AC0202 Athletic Complex Phase Ill 05/31/06 1,252,221$ 1,251,915$ 306$ ED0102 Bell Ranch Terrace Cancelled 200,000$ -$ 200,000$ FM0101 Building D 09/30/02 930,610$ 930,608$ 2$ FM0209 Midway Recreation Upgrade 06/30/02 557,125$ 557,125$ -$ FM0308 Building A Remodel 05/31/07 1,663,238$ 1,651,325$ 11,913$ FM0309 Fire Station #3 05/31/07 2,286,798$ 2,286,229$ 569$ FM0601 Public Works Facility 05/31/08 2,210,956$ 2,213,507$ (2,551)$ PR9901 Hike/Bike Trail 04/30/05 237,714$ 237,714$ -$ PR9902 Senior Citizen Remodel 04/30/05 16,130$ 16,130$ -$ PR9922 Tejas Remodel 11/30/01 430,000$ 455,885$ (25,885)$ PR9927 Park Improvements - Texas Star 09/30/01 1,036,500$ 1,025,298$ 11,202$ PR0015 Purchase of Dallas Stars Center 05/31/00 10,327,978$ 10,327,978$ -$ PR0016 Wilshire Park Improvements 06/30/02 150,000$ 149,926$ 74$ PR0110 Slope Protection/Screening Wall 03/31/03 1,275,203$ 1,273,923$ 1,280$ PR0302 Bob Eden Parking 04/30/05 75,000$ 74,854$ 146$ PR0303 Youth Ballpark 04/30/05 600,000$ 600,000$ -$ PR0407 Parking Improvements, Midway Cancelled 11,000$ -$ 11,000$ PR0408 Parking Improvements, S. Euless Park 05/31/06 55,000$ 20,991$ 34,009$ PR0409 Parking Improvements, Simmons 07/29/04 6,960$ 6,960$ -$ PR0410 Parking Improvements, Villages Bear Creek 07/29/04 33,666$ 33,666$ -$ PR0411 Preserve at McCormick Park 05/31/06 1,168,427$ 1,168,427$ -$ PR0412 Splash Pool 05/31/06 125,000$ 124,477$ 523$ SS9901 Fire Station II 03/30/00 49,688$ 49,688$ -$ SS9902 Library Books 08/15/00 3,302$ 3,302$ -$ SS9919 Fire Station #3 - Structural Repairs 03/30/00 30,000$ 17,344$ 12,656$ SS0010 Former Fire Station #2 06/30/02 599,600$ 595,257$ 4,343$ SS0113 Park Building 06/30/02 1,492,400$ 1,492,100$ 300$ FM0504 Building "B" Remodel 05/31/09 1,322,490$ 1,315,697$ 6,793$ FM0801 TX Star Golf Course & Conference Ctr Expand 05/31/09 3,630,079$ 3,630,079$ -$ FM0802 Senior Citizen Center Design cancelled 250,000$ -$ 250,000$ FM0803 Midway Recreation Improvements 03/31/09 293,500$ 75,976$ 217,524$ FM0804 Library-Shell Expansion 12/31/08 307,034$ 305,664$ 1,370$ PR0602 Mid Cities Landscaping 05/31/09 40,000$ 33,199$ 6,801$ PR0719 Midway Park Trail 05/31/09 210,000$ 190,473$ 19,527$ 33,260,839$ 32,439,655$ 821,184$ PR0601 Park Amenities Upgrade 04/17/10 150,000$ 145,316$ 4,684$ AC0901 TSSC Study/Fending 04/17/10 100,000$ 85,204$ 14,796$ PR0901 Trail Enhancements - Bob Eden Park 04/17/10 135,000$ 101,673$ 33,327$ ED0801 Redi-Mix Regional Headquarters 12/20/09 5,200,000$ 4,928,322$ 271,678$ 5,585,000$ 5,260,515$ 324,485$ Total Other Projects 38,845,839$ 37,700,170$ 1,145,669$ Other Projects - Prior Years Other Projects- Current Year 259,566$ 248,891$ 10,675$ Project Number Project Description 09/30/06 PR9903- PR9918 Various EDC Park Projects 365 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES March 23,2004 RAY MCDONALD Apr 17, 2010 PARK AMENITIES UPGRADE FIXTURES IMPROVEMENTS PR0601 December 13, 2005: Approved purchase of playground equipment for Villages of Bear Creek Park from Miracle Recreation Equipment Company for an estimated expenditure of $67,000. The adopted Master Plan recommends funding for system-wide park facilities and amenities upgrades. This project addresses the upgrade of all city parks to modernize amenities from water fountains to play components to picnic stations and pavilions. This project provides funding for the replacement of aged playground units that are approaching 10-15 years old; these units will include, but not limited to, components in AJ Carr Park, Midway Park, Villages of Bear Creek, Trailwood Park, and McCormick Park. Additionally, this project provides contingency funding for minor improvements at all parks with respect to playground surfaces, structures, and minor landscaping features. Pursuant to the recommendations in the Parks Master Plan, parks should be brought in accessibility and Americans with Disabilities Act compliance. The existing equipment in many park areas is becoming aged and will require refurbishment or replacement in the near term. 366 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Park Furnishings $110,070 Landscaping $28,476 Contingency $11,454 $150,000 Transfer from: EDC Operating Fund $150,000 Transfer to: EDC CIP Fund Balance ($4,684) $145,316 Park Furnishings $110,070 $110,070 $0 100% Landscaping $28,476 $28,476 $0 100% Contingency $11,454 $6,770 $4,684 59% $150,000 $145,316 $4,684 97% PARK AMENITIES UPGRADE PR0601 367 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES July 13,2008 RAY MCDONALD Apr 17, 2010 TEXAS STAR SPORTS COMPLEX - STUDY/FENCING LAND IMPOVEMENTS AC0901 Identified in the adopted Parks Master Plan is the need for additional playing fields to accommodate the growing number of participants in the baseball league as well as the need to make necessary improvements to the aging fields, fencing, and structures at Softball World. It is important the staff remains committed to the vision the council has promoted over ten years to serve the athletic needs of the city and spur economic opportunities. This proposal would allow for research to develop the necessary renovations to become a more multi-use facility to accommodate the baseball league and tournament play, adult softball, girl's fast pitch league and tournament play. Consultant and/or design firm services to explore the many options available and costs associated with converting Softball World from its current state into a more programmable complex to accommodate multiple sports/uses as well as to work with staff in determining cost and design of practice fields at the Parks at Texas Star and to replace the fencing at Softball World. With the proposed Midway Park Family Life Center project, staff recognizes the impact that our athletic programs would have by losing the existing fields at Midway Park. The fields at Midway Park are currently used as practice fields for teams participating the the Parks at Texas Star baseball league on an assigned and rental basis. The Midway Park fields are also used as game fields primarily for tournaments, but also in league play for make-up games in the event of rain outs. Losing the fields entirely would limit the staff's ability to register the number of teams previously for tournaments and could extend the season by several weeks for make-up games. 368 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Feasibility Study $15,000 Improvements/Fencing $8,500 $23,500 TSSC CIP Fund Balance $100,000 Transfer to: TSSC CIP Fund Balance ($14,796) $85,204 Architectural Services $15,000 $15,000 $0 100% Improvements $85,000 $70,204 $14,796 83% $100,000 $85,204 $14,796 85% TEXAS STAR SPORTS COMPLEX - STUDY/FENCING AC0901 369 City of Euless Capital Project Request Department:Date Prepared: Submitted By:Date Completed: Project Title: Project Type:Sub-Type: Project Code:Priority: A COUNCIL AUTHORIZATION: RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT DESCRIPTION: PROJECT SCHEDULE: JUSTIFICATION: COMMUNITY SERVICES April 29,2008 RAY MCDONALD Apr 17, 2010 TRAIL ENHANCEMENTS-BOB EDEN PARK TRAILS IMPROVEMENTS PR0901 June 9, 2009: Award contract to Ratliff Hardscape, Ltd. for the construction of concrete trail in the amount of $92,664.48. This project will connect the trail of Bob Eden Park with the trail that was recently constructed in the Creekwood Addition north of Mid Cities Boulevard. This particular connection was originally identified in the update to the Trails Master Plan in 2001 and is part of an overall trail expansion project that was identified as a high priority in the adopted Parks Master Plan. This project includes approximately 1525 linear feet of 4" x 10' concrete trail that will connect the existing trail in Bob Eden Park to the recently constructed trail in the Creekwood Addition. Also included is a retaining wall under the Mid Cities bridge, hand rails, and rip rap for bank stabilization. This connection will provide safer access to five parks: Trailwood Park, Bob Eden Park, McCormick Park, The Preserve at McCormick Park, and the Villages at Bear Creek Park. The ultimate goal is to connect the City of Euless trail system to the trail system in the City of Colleyville at Heritage Road. Award Construction Contract: June 2009 Construction Complete: September 2009 This trail connection opportunity will be consistent with the identified need for further trail expansions as identified in the adopted Parks Master Plan. The master plan recommendation will be part of a city-wide comprehensive trail enhancement project. 370 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: Direct Operating Cost Personnel:Full Time Part Time Total Salary Purchase of Services Materials & Supplies Utilities Subtotal: Total Estimated Capital Cost Maintenance Costs Funding Source: Subtotal: Total Estimated Annual Cost Total Funding CURRENT STATUS OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +)% EXPENDED TOTAL PROJECT PROJECT TITLE:PROJECT CODE: Concrete Trail $110,000 Retaining Wall $5,000 Rip Rap and Hand Rails $5,000 Contingency $15,000 $135,000 EDC CIP Fund Balance $135,000 Transfer to: EDC CIP Fund Balance ($33,327) $101,673 Hike and Bike Trail $120,000 $101,673 $18,327 85% Contingency $15,000 $0 $15,000 0% $135,000 $101,673 $33,327 75% TRAIL ENHANCEMENTS-BOB EDEN PARK PR0901 371 Department:Date Prepared:May 31, 2007 Submitted By:Date Completed:December 2009 Project Title:REDI-MIX REGIONAL HEADQUARTERS Project Type:DEVELOPMENT Sub-Type: Project No.:ED0801 Priority: A COUNCIL/EDC AUTHORIZATION: December 2009: Project completed on schedule. RediMix begins operations from new location in January. PROJECT DESCRIPTION AND RELATIONSHIP TO OTHER PROJECTS AND/OR MASTER PLAN: PROJECT SCHEDULE: JUSTIFICATION: LLC in the amount of $3,333,244.00 for construction of the facility. November 11, 2008: Awarded bid for concrete only to Redi-Mix Concrete in the amount of $303,974.75 provide for job retention within the City and will provide substantial economic benefit to the City of Euless. square feet. This facility will be used as a regional corporate headquarters and training facility and will INCENTIVES February 25, 2008:EDC authorized acquisition of approximately 2 acres in the Main Centre Addition. February 25, 2008:EDC authorized acquisition of approximately 4 acres in the James P. Hallford Survey. February 25, 2008:Authorized architectural contract for design of corporate headquarters and job training facility. April 14, 2009: Authorized the City Manager to enter into a contract with Vratsinas Construction Company, June 24, 2008:Approved resolution #08-1284 approving a lease and incentive agreement by and between City of Euless, EDC, U.S. Concrete, Inc & Redi Mix, LLC and authorize the mayor to modify and execute such October 22, 2007:EDC held public hearing to consider Resolution 15-07 regarding declaration of project. October 23, 2007:Ratified EDC action to amend and modify existing project with Beall Concrete. LLC, and U.S. Concrete, Inc and authorize the mayor to execute such agreement. August 26, 2008:Approved Chapter 380 Construction Agreement between EDC, City of Euless, Redi-Mix, agreement. Construction Begins: May 2009 economic growth. Land Acquisition - April 2008 Design - October 2008 This project includes the purchase of land and the construction of building that is approximately 25,936 Providing incentive to current business to attract and retain primary jobs within the city and promote Award Construction Contract: April 2009 Construction Complete: December 2009 Updated: 03/23/10 City of Euless Capital Project Request ECONOMIC DEVELOPMENT KYLE MCADAMS June 24, 2008: Ratified EDC action regarding lease and incentive agreement. February 26, 2008:Ratified EDC action to purchase property and to authorize architectural contract. June 23, 2008:EDC authorized lease and incentive agreement between EDC, City of Euless, Redi Mix and U.S. Concrete, Inc. 372 PROJECT TITLE:PROJECT #:ED0801 NET EFFECTS ON OPERATING AND TOTAL ESTIMATED CAPITAL COST: MAINTENANCE COST (+ OR -) ANNUAL: $3,333,244 Direct Operating Cost $400,000 Personnel:Full Time $405,000 Part Time Engineering/Survey $57,500 $0 Utility relocation $50,000 Land Acquisition $650,000 Contingency $150,000 Landscape/Irrigation $140,000 $14,256 $5,200,000 Subtotal:$0 Maintenance Costs $3,450,000 EDC Operating Fund $1,750,000 ($271,678) $0 Total Estimated Annual Cost $0 Total Funding $4,928,322 OVER/UNDER PHASE/FUNDING SOURCE BUDGET EXPENDED BUDGET (- +) % EXPENDED $3,333,244 $3,388,800 ($55,556) 102% $383,774 $372,973 $10,801 97% $650,000 $633,453 $16,547 97% $150,000 $128 $149,872 0% $140,000 $89,667 $50,333 64% Engineering/Survey $78,726 $79,176 ($450) 101% $14,256 $230 $14,026 2% $50,000 $47,506 $2,494 95% $400,000 $316,388 $83,612 79% $5,200,000 $4,928,322 $271,678 95% Construction Land Acquisition Transfer from: Transfer to EDC Operating Fund Landscape/Irrigation Contingency Data and Telephone Architect CURRENT STATUS Subtotal: Equipment Concrete Utility relocation TOTAL PROJECT FUNDING SOURCE: Car Rental Fund REDI-MIX REGIONAL HEADQUARTERS Concrete Total Salary Construction Architect Total Estimated Capital Cost Purchase of Services Materials & Supplies Utilities 373 374